Loading...
HomeMy WebLinkAbout15-16322 CITY OF ZEPHYRHILLS �-4��1f _ �- 5335-8TH STREET _�,.� � �..- " (813)780-0020 1��11 BUILDING PERMIT � PERMIT INFORMATION LOCATION IPIFORMATION Permit Number: 16322 Address: 38410 6TH AVE Permit Type: COMMERCIAL ZEPHYRHILLS, FL. Class of Work: ADD/ALT COMMERCIAL Township: Range: Book: Proposed Use: COMMERCIAL Lot(s): Block: Section: Square Feet: Subdivision: CITY OF ZEPHYRHILLS Est. Value: Parcel Number: 11-26-21-0010-15300-0200 Improv. Cost: 36,815.00 OWNER INFORMATION Date Issued: 6/01/2 15 � Name: ZEPHYRHILLS FIRE DEPT. Total Fees: 3 ;.Oq����,c Address: 38410 6TH AVE Amount Paid: 34 . ZEPHYRHILLS, FL. 33542 Date Paid: 5/29/2015 Phone: Work Desc: REMODEL ESTROOM & BUNK ROOM FIRE STATION 1 (FEE WAIVED) CONTRACTOR S - APPLICATION FEES AZIZ,C NSTRUCTION CO. N BUILDING FEE 220.00 ELECTRICAL FEE 40.00 KW MORROW&SONS ELECTRIC INC PLUMBING FEE 40.00 MECHANICAL FEE 40.00 � BUCCANEER PLUMBING DYNAMIC HEATING&COOLING INC � � � � N�� � � �� � �� - � � Ins ections Re uired FOOTER 2ND ROUGH PLUMB MISC INSULATION CEILING FOOTER BOND DUCTS INSULATED SEWER MISC. ROUGH ELECTRIC LINTEL MISC MISC. 1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC. DUCTS INSTALLED WATER MISC DRIVEWAY PRE-SLAB SHEATHING MISC. MISC. CONSTRUCTION POLE FRAME MISC. MISC. REIIVSPECTION FEES: Reinspection fees will comply with Florida Statute 553.80 (2)(c)when extra inspection trips are necessary due to any one of the following reasons: a) wrong address b) condemned work resulting from faulty construction c) repairs or corrections not made when inspections called d)work not ready for inspection when called e) permit not posted on job site t) plans not at job site g) work not accessible. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this properly that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinanees. NO OCCUPANCY BEFO C.O. NTRACTOR SIG E PERMIT OFFI R PERMIT EX ES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NO7'I�E REQUIRED ' PROTECT CARD FROM WEATHER . , I IIIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII IIII This:in�,�ument prepared by: � 2015085636 r� r' 'Rcpt:1686254 Rec: 18.50 ` Aziz Construction Co., Inc. D5: 0.00 IT: 0.00 PO Box1439 06/01/2015 T. S. , Dpt,y Clerk Lutz, FL 33548-1439 Permit No. Tax Folio No. 11-26-21-0010-15300-0200 �PAULq S 0'NEIL,Ph D PRSCO CLERK 8 COMPTROLLER 06/01/2015 08:35am 1 of 2 OR BK �'1�� PG 3794 NOTICE OF COMMENCEMENT STATE OF FLORIDA COUNTY OF PASCO THE UNDERSIGNED hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. 1. Description of property. City of Zephyrhills Fire Rescue 38410 6th Avenue Zephyrhills, FL 33542 2. General description of improvement: Renovations to existing staff bathrooms and bunk rooms 3. Owner information: a) Name and address: City of Zephyrhills 5335 8th Street Zephyrhills, FL 33542 b) Interest in property:Owner c) Name and address of fee simple title holder(if other than Owner): �. Contractor information: Aziz Construction Co., Inc. PO Box 1439 Lutz, FL 33548-1439 Contractor's Phone Number: (813) 988-4500 5. Surety: N/A 6. Lender(name and address): N/A 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by section 713.13(1)(a)7,Florida Statutes (name and address) Phone Number (of designated person): 8. In addition to himself, Owner designates of (address)to receive a copy of the Lienor's Notice as provided in section 713.13(1)(b), Florida Statutes. Phone number (of person or entity designated by Ownerj: 9. Expiration date of notice of commencement (the expiration date is one year from the date of recording '� . , oR BK 9196 2� 3795 �_ y,r�ess a different date is specifiec�: : WARNING TO OWNER:ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENTARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I,SECTION 713.13, FLORIDASTATUTES.AND CAN RESULT IN YOUR PAYINGTWICE FOR IMPROVEMENTS TOYOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING. CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. ! City of Zephyrhills (Owner) By: ��J � � °�°-- Print Name: "��`e'"'� '^ S(p1 n � a Print Title: C c�� �a ��` � � Address: 5335 8th Street, Zephyrhills, FL 33542 STATE OF FLORIDA COUNTY OF PASCO . The foregoing instrumentwas acknowledged before me this ���day of May, 2015, by K �S 14� � (name of person), as � A-��� (type of authority) for City of Zephyrhills. (Signatu e) . I ,,�c,.,, o�-/,cJ,p(� � !�4 A�✓ ' ,,� rs��; LINDA D.BOAN �, €*: :.� Commission#EE 171703 ° ����: Expires June 15,2096 (Printed Name) '�P,F,�4� �+ded7MuTroyFainlnsuraroe800-3g5.7019 NOTARY PUBLIC, STATE OF FLORIDA _ I s � lCP (Commi ion Expiration Date) Personally Known_OR Produced Identification Type of Identification Produced � Verification pursuant to Section 92.525, FloridaStatutes Under penalties of perjury, I declare that I have read the foregoing and that the facts stated in it are true to the best of my knowledge and belief. S�,� � � t,��.. (Signafiure of person sig ing above) �i -- — i 813-780-0020 City of Zephyrhills Permit Application . FaX-s�aaao-oo2� • Building Department Date Received ' ���` phone Contact for Permittin � � — �v � Owner's Name � Q Z� �F�'/ �=, Owner Phone Number � 7� — Owner's Address �p T�a lp�" �f C , Owner Phone Number Fee Simple Titleholder Name G �r . �F z G �f/ Owner Phone Number � Fee Simple TitleholderAddress ✓ ��� s�' %' 2�//� " �c.��L� /C(� 33��Z �� JOB ADDRESS 3�� �� �U�. Z �' �N��,'LLS F(� �J' ?j.S LOT# Z 0 SUBDIVISION PARCEL ID# �� ^ d D[ 0 — ? �j �Q—Q (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED e NEW CONSTR e ADD/ALT � SIGN � � DEMOLISH INSTALL REPAIR � PROPOSED USE Q SFR Q COMM � OTHER TYPE OF CONSTRUCTION Q BLOCK Q FRAME STEEL � DESCRIPTION OF WORK ��n�� ��` ��T���� �jUN/G '�LE'J6YYl � BUILDING SIZE �w. SQ FOOTAGE� HEIGHT QBUILDING $ 2� t'Q� VALUATION OF TOTAL CONSTRUCTION J -1 l DELECTRICAL $ 1��. � AMP SERVICE 0 PROGRESS ENERGY 0 W.R.E.��2�-z� �� 7 �PLUMBING $ �Z� ' (,�j � , �� � �1�' � OMECHANICAL $ ` �� �p VALUATION OF MECHANICAL INSTALLATION ��'�'�S �� �a�� . ��` �'l QGAS Q ROOFING Q SPECIALTY 0 OTHER � ��,c� FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA DYES NO ((� J� � �� BUILDER COMPANY l�'SZ 1 Z �IV S/'�.U�iTI �• �/ L SIGNATURE REGISTERED Y N FEE CURRE� Y N Address P� ' p4X ��T�J 1 �l�� �L �J ��gj License# Ci Ci � ELECTRICIAN (j4��; ��/ r' COMPANY �• W• N�GJ��OGtI d",SON " (�� . � SIGNATURE ,/'y-��"^��"��� REGISTERED Y/ N FEE CURRE� Y/N S O S ZZ�( Address �5� � �'rG�� (�{i x�• � •�• L• F(. 3��0�� License# "C � 8 � PLUMBER COMPANY �� a�« LU , �- ,�- � SI�NATURE REGISTERED Y/ N FEE CURRE� Y/N Address Z�{' . Il�� �� 1�}V� , Pi '� f'L�,J3��-icense# G F Ci Z/ � � , ,;- - ��� I MECHANICAL COMPANY � N I�IM�"�G ��R'T7/lr � CQOL/ � ��� SIGNATURE ' Re�isTeReo ,Y/ N FEE CURRE� Y/N ` ,�J / v.•�aoy Address ZZ� 1,. U�Z ' L�1�r F' 12/� � Z UTL, rt- �icense# � �►� "I ZZ �JO� � ��� OTHER COMPANY SIGNATURE REGISTERED Y/ N FEE CURRE� Y/N IAddress , License# I 1111111111111111111111111111111111111111111111111111111111111111111 RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms; R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, I Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(3)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms,R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. **"PROPERTY SURVEY required for all NEW construction. Directions:• - , � Fill out application completely. Owner&Contractor sign back of application,notarized . If over$2500,a Notice of Commencement is required. (AIC upgrades over$7500) ** Agent(for the contractor)or Power of Attorney(for�the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMIITING (Front of Application Only) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) � Driveways-Not over Counter if on public roadways..needs ROW ti ' NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES. If the owner has hired a contractor or contractors to'undertake wo�K, they may be required to be licensed in accordance witH state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009 Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block".of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES,IMPACT AND RESOURCE RECOVERY FEES:. The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County WateNSewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended) If valuation of work is$2,500.00 or more, I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer AfFairs. If the applicant is someone ' other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner" prior to commencement. ' CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations_in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to. - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. - Southw�st Florida• Water Management District-Wells, Cypress Bayheads; 1Netland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. , ,, I understand.•thaf'the following restrictions apply to,•tfie use of fill: - - Use of fill is not allowed in Flood Zone"V" unless expressly permitted. - If the fill material is to be used in Flood �Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting whicfi is prepared by a professional engineer licensed by the State of Florida. , - � ' If the fill"material is .to be used in Flood Zone "A" in connection.with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. - �If fill material is to be used in any area, I certify. that use of such fill will not adversely� affect adjacent properties. Ifi use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre wfiich are elevated by fll, an engineered drainage plan is required If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to:.commericing construction. �I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A per.mit issued shall be.construed to be a license to'proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor'shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations,of any codes. Every permit issued shall become invalid � ;unless the work authorized by�such permit is�commenced•within six�months�of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90) consecutive days, the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT � WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. I FLORIDA JURAT(F.S. 117.03) OWNER OR AGENT . _ CONTRACTOR -'Subscri6ed and-sworn to or affirmed)be--Pore me this- --""�--Su6scriGed"and sworri to(or affi�me`d)before me this- -�-�- --'` - � ` �-� � - by by Who is/are personally known to me or has/have produced Who is/are personally known to me or has/have produced as identification. as identification. Notary Public Notary Public Commission No. Commission No. � �.. Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped �� , CONTRACT STATION 2 �� . ' � i (�/tC✓� s This Agreement for Construction Services (the "Agreement") is made and entered into ; this �� day of�ii; 2015, by and between City of Zephyrhills, a municipal corporation � ("Owner") and Aziz Construction Co., Inc. ("Contractor"), with an address of P.O. Box 1439, � Lufiz, Florida 33538, and Federal I.D. iVo. �S as 13�`� ! , which is authorized to do i business in Florida. � 1 WITfVESSETH: • '' � � WHEREAS, Owner solicited bids from contractors for the construction of the project de- t� scribed as renovation of Fire Sfiate 2 inferior, and hereto included by reference (the "Project"); � and � l ' F I� WHEREAS, in addition to Contractor being selected because if is the lowest responsible and responsive bidder, Contractor also was se{ected because of ifs expertise and experience; ; and � F. ! WHEREAS, Owner and Confiractor desire to enter into this Agreement for the construc- � tion of the Project; and � E i f NOW THEREFORE, for and in consideration of the covenants herein contained and { other good and valuable consideration, the receipt and sufficiency of which is hereby acknowl- ; edged, the Owner and the Contractor agree as follows: i f ARTICLE 1. THE CONTRACT DOCUMENTS i i 1.1 The"Contract for Construction,"which constitutes the entire agreement between ; Own�r and Contractor, consists of this Agreement and all exhibits hereto; the General Terms ; and Conditions; special conditions, if any; the bid, the bid proposal submitted by�Contractor and ! post-bid�modifications, if any, set forth on Exhibit A; the Construction Documents; any amend- � ments or addenda executed by the Owner and the Contractor hereafte�; Owner-approved ; change orders or field orders; and the additional documents listed on Exhibit A, if any. � j 1.2 Documents not included or express contemplated in this Article 1 do not, and shall ; not, form any part of the Contraet for Cons#ruction. Without limiting the generality of the fore- � going, shop drawings and other submittals from the Contractor or its subcontractors and suppli- i ers do not constitute a part of the Contract for Construction. � i 1.3 At all times the Contractor is pertorming services, it shall comply with the require- ; ments of the Contract for Construction. i ARTICLE 2. THE WORK i 2.1 The Contractor represents and warrants that it has (i) fhoroughly reviewed the Con- � struction Documents, if applicable, for the Project and all other documents related thereto made ; available, or on file with Owner; (ii) visited and thoroughly inspected the Project Site and any ; structure(s) or other man-made features to be modified and familiarized itself with local condi- � tions under which the Project will be construeted and operated; (iii) familiarized itself with sur- , i veys and other as-builfi drawings provided by Ovvner the Professional-that indicate the location of all existing buildings, utilifiies, conditions, sfreets, equipment, components and ofher aftributes having or likely fio have an impact on fihe Project; (iv) familiarized itself with pertinent Projecfi dates and special requirements, including the Projecfi schedule; (v) reviewed and analyzed all Project geotechnical, Hazardous Substances, structural, chemical, electrical, mechanical and construction materials tesfis, invesfigafiions and recommendations provided by Owner or the Professional; and (vi) gathered any ofiher information necessary for a thorough understanding of fihe Project. If ttie Pr.oject involves modifications to any existing sfiructure(s) or other man-made feature(s) on the Projeet site, fihe Contractor represents that it has also revie�nred all as-built and record dravuings, plans and specifications provided by Owner or the Professional and thoroughly inspected the existing sfructure(s) and man-made feature(s) to identify existing deficiencies and ascertain the specific locations of per�inent sfiructural componenfs. Claims by Contractor result- ing from Contractor's failure fo fiamiliarize itself�nrifih fihe Site or pertinent documents shall be deemed waived. 2.2 The Contractor shall furnish or cause fio be furnished, and paid from the Construction Contract Price, the Work. The general nature of the scope of the Work the Contractor is to com- plete is outlined in the bid documents. 2.3 The Contractor agrees to provide all services required #o professionally complete the Work in an expeditious and economical manner consistent wifih the Contract for Construction and the best interests of the Owner. 2.4 The Contracfior shall, in consultation with the Qwner, Professional(s), and the sub- contractors, endeavor to develop, implement and maintain a spirit of cooperation, collegiality, and open communicafion among the parties so that the goals �nd objectives of each are clearly understood, potential problems are resolved promptly, and, upon completion, the Project is deemed a success by all par�ies. - 2.5 ConstructionServices 2.5(a) The Contractor shall supenrise and direcfi the work at the Site. The Con- tractor shall, at a minimum, staff the Project Site with personnel who shall: (i) supervise and coordinate the Contractor's personnel and act as its primary liaisori with fihe Owner and Professional; (ii) coordinate trade contracfiors and suppliers, and supervise Site construction services; (iii),be familiar with all trade divisions and trade contractor's scopes of Work, all applicable build- ing codes, and the Contract for Construction; (iv) check, review and coordinate shop drawings and materials delivered to the Site, regularly review the Work to determine its compliance with the Contracf for Construction, periodically con- fer with the Professional and any other Owner consultants to assure acceptable levels of quality; (v) prepare and maintain Project records, including process documents and daily logs; (vi)�schedule and conduct weekly progress meetings with subcontractors to review such matters as job site safety,job procedures, construction progress, schedule, shop drawing status, and other information as necessary and provide prior notification of, and minutes from, such meet- ings to the Owner and the Professional; (vii) schedule and conducf�nreekly progress meefiings vvith the Owner and Professional to review such matters as construcfion progress, schedule, shop drav►ring sfiatus, and other information as necessary; (viii) make provision for Project security to protecfi fihe Project sifie and materials stored off-site againsf theft, vandaiism, fire and accidents as required by the General Terms and Conditions; , and 2.5(b) The Contractor shall promptly reject any Work(i) which does not conform fo the Construction Documents, if applicable; or (ii) �nrhich does not comply vuith any applicable law, statute, building code, rule or regulafiion of any public authority flr agency of which it is a,vvare. 2.5(c) The Contractor shall comply vvith Owner's policies applicable to this Agreement as referenced herein by reference. 2.5(d) The Contractor shall cause its subcontractors and suppliers to comply with the Project Construcfion Schedule and applicable sub-schedules. The Contractor shall obtain and review schedules from subcontractors and suppliers, coordinate sub-schedules with the Construction Schedule, and enforce compliance vvith all applicable schedules to ensure timely completion of the Work. If at any time a Project is delayed, the Contractor shall immediately no- tify the Owner of the probable cause(s) and possible alternatives, and make recommendations to minimize expense and/or delay to the.Owner. 2.5(e) Contractor and its subcontractors shall participate in, and cooperafie with, construction phase commissioning, validation, and other quality assurance and quality control processes. ARTICLE 3. THE OWRIER'S REPRESENTATIVE - The Owner's Representative for this Project is set forth on Exhibit A. The Owner's repre- sentative shall be the contacfi person in dealing with the Contractor on all design and technical matters, and will administer the Contract for Construction. Unless otherwise directed by Owner, the Owner and Contractor shall communicate with each other in the first instance through the Owner's Representative. The Owner's instructions to the Contractor will be issued through the designated Owner's Representative. ARTICLE 4. TIME OF COMMEIVCEMENT AND COMPLETION Contractor shall commence the Work within ten (10) calendar days after the date indi- cated on the Notice to Proceed, and shall be completed within 60 days from the commencement date. ARTICLE 5. COMPENSATION OF CONTRACTOR 5.1 The Owner shall pay and the Confractor shall accept, as full and complete payment for the Contractor's timely and complete performance of its obligations hereunder the fixed price, not fio exceed $39,695.09. Such amount is fihe Construction Contract Price and includes the aggregate amounfi of all allovvances and any unit price items to be furnished or installed. 5.2 Within fwenty (20) days after execufiion of the Contract for Construction, the Contrac- tor shall prepare and present to fhe Ov►rner, the Contractor's Compensation Schedule a Com- pensation Schedule shall.be based on the amounts set forfh above. Applications for payment shall be submitted in detail sufficient for an audit thereof in accordance with Owner's policies on the subject in effect at the time the Contractor commences construcfion of the Work. 5.3 Wifhin tuvent 20 da s after recei t b Ov►rner of Co , y ( ) y p y ntracfiors invoice, properly pre- pared pursuant to Owner's policies on the subjecfi in effecfi at the time the Contraetor com- mences construction of the Work, the Owner shall pay the Contractor the amount approved by Prafessional, less retainage, unless there is a dispufe about the amounfi of compensation due to fihe Confiractor. AF2TICLE 6. LIQUIDATED DAiVIAGES FOR DELAY 6.1 Inasmuch as failure to Substantially Compfete the Work uvithin the fiime fixed in Exhi- bifi A will resulfi in injury to the Owner, and as damages arising from such failure cannot be cal- culated with any degree of certainty,.it is agreed that if the Work is not Substantially Completed � within the time provided in Exhibit A, or within such further time, if any, as shall be allowed for time extensibns in accordance with the provisions of the Contract for Construction, the Contrac- tor shall pay to the Owner as liquidated damages for such delay, and not as a penalty, the amount set forth in Exhibit A for each calendar day elapsing between the date fixed for Substan- fiial Completion and the dafie such Substantial Completion is fully accomplished. The parties agree that said liquidated damages are reasonable given existing circumstances, including, ' vuithout limitation, the range of harm that is foreseeable and the anticipation that proof ofi dam- ages would be costly and impractical. 6.2 The liquidated damages shall be payable in addition#o any excess expenses or costs payable by the Contractor to the Owner under the General Terms and Conditions, and shall not preclude the recovery of damages by the Owner under other provisions of the Contract for Construction, except claims related to Contractor's delays in Substantial Completion. Own- er's right to receive liquidated damages shall in no manner affect the Owner's right to terminate the Contract for Construction, as provided in the General Terms and Conditions or elsewhere in , the Contract for Construction. The Owner s exercise of the right to term inate shall not release the Contractor from the obligation to pay said liquidated damages. 6.3 When the Owner reasonably believes (i)that Substantial Completion will be inexcus- ably delayed; or(ii) that the Contractor will fail to.achieve Final Completion by the date of Final Completion, the Owner shall be entitled, but not required, to withhold from any amounts other- wise due the Contractor the daily amount specified for liquidated damages in this Article for each calendar day of the unexcused delay. If and when the Contractor overcomes the delay in timely achieving Substantial Completion or Final Completion, or any part thereof, for which the Owner has withheld payment, the Owner shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages. ARTICLE 7. INTENTIONALLY LEFT BLANK ARTICLE 8. A.DDITIOR�AL COf�STRUCTIOfV SEFiVICES 8. 1 The Confiracfor shall provide such addifiional services as are initiafied and authorized in vvrifing by fhe Ovuner prior to performance. The services described in this Article 8 are not in- cluded in Work.Additional services include, but are not limited #o: (i) services performed after fhe Dafie of Final Com.pletion, except when required as par� � of the original Work. - (ii) services for preparafiion for and aftendance at deposition,.discovery or court or other dispute resolution proceedings on behalf of the O�nrner, excepfi when such proceedings involve issues of fault, neglect or alleged liability of the Contractor, or its agents, employees, or consul- tants. (iii) Other services not included in the Work mutually agreed to by the Owner and the Contractor in writing. 8.2 Paymenfs fio the Contractor for additional services shall be in accordance with appli- - cable provisions of the Contract for Construction. ARTfCLE 9. lf�TENTIORIALLY LEFT BLAiVK ' ARTICLE 10. MISCELLANEOUS PROVISIO�NS , 10.1 Owner and Contractor, respectively, bind themsefves, their partners, successors, " assigns and legal representatives to the other p�rty to this Agreement and to the partners, suc- cessors and assigns of such other party with respect to all covenants of this Agreement. Con- tractor shall not assign this Agreement, whether by operation of law or otherwise, without the written consent of Owner. 10.2 The Contract for Construction shall be governed by, and consfirued under, the laws - of the State of Florida, v�rithout regard to its choice of law provisions and venue shall lie in the eourts in Pasco County, Florida. 10.3 The Contractor represenfs and warrants that it has not employed or retained any company or person (other than a bona fide employee working solely for the Contractor)to solicit or secure this Agreement, and that it has not paid or agreed to pay any person, company, cor- poration individual or firm (other than a bona fide employee working solely for the Contractor) �any fee, commission, percentage, gift, or any other consideration contingent upon or resulting from the award or making of this Agreement. 10.4 The Contract for Construction may be unilaterally canceled by the Owner for refusal by the Contractor to allow public access to all documents, papers, letters, or other material sub- ject to the provisions of Chapter 119, Florida Statutes, and made or received by the Contractor in conjunction herewith. 10.5 Owner's pertormance and obligation to pay hereunder is contingent upon an annual appropriation by the City Council. 10.6 Intentionally Left Blank. 10.7 All capitalized terms used herein bufi not defined herein shall have fihe meaning as- ' cribed therefio in the General Terms and Conditions. � 10.8 Owner is an equal opportunity institution and as such, encourages the use of small businesses including uvomen and minority-owned small businesses in the provision of construc- - tion related services. Small businesses should have a fair and equal opportunity to compete for dollars spent by the University of Florida fo proctare construction- related services. Competition ; ��, ensures that prices are competitive and a broad vendor base is available. Contractor shall use ' good faith efforts to ensure opportunities are avaifable to small businesses including women and , rninorifiy-owned small businesses on the Project. 10.9 All exhibits referenced herein are afifiached hereto and incorporated herein by refer- : ence. 10.10 This Contracfi for Construction represents the entire and integrated agreement be- �v►reen fihe Owner and the Contracfor, and supersedes all prior negotiations, representations or agreements, either written or oral, for the Project. This Contracfi for Constructi�n may be amended only by written instruments signed by both the Owner and Contractor. 10.11 Any modifications to the Contract for Construction shall be set forth in writing and . approved by the City Council. 10.12 Contractor shall provide Owner and its representatives access to the Work in preparation and progress wherever located. �0.13 The Contractor shall not by any means: (i) induce any person or entity employed in the construction of the Project to give up any part of the compensation to which thafi person or entity is entitled; (ii) ofFer nor accept any bribes or kick-backs in connection with the Project from or to any individual or enfifiy, including any of its trade contracfiors, subcontractors, consultants, suppliers or manufa�turers of Project goods and materials; or (iii} without the express written permission of the �wner in accordance vuith ��nrner's policies on the subject, in effect at the time Contractor commences construction, call for or by exclusion require or recommend the use of any subcontractor, consultant, product, ma- � � terial, equipment, system,�process or procedure in which the Contractor has a�direct.or indirect proprietary or other pecuniary interest. 10.14 Until the Contract for Construction fierminates, Contractor shall carry the insurance and payment and pertormance bonds described in the General Terms and Conditions. IN WITNESS WHEREOF, the parties have affixed their signatures, effective on the date first written above. �OR THE CONTRAG�OR: ATTEST: Aziz Construction Co., Inc. B (�IAME, TITLE A�ID CtJRPC3RAT� SEAL) 5i���.1 l�- 212- ��.��z�� NAlVIE, Ai�D TiTLE AS iV�SSED BY: DATE: /��� �� , Z G�5 F��THE Q�NE�9 �, ATTEST: G.ITY OF,�EPHYRHILLS , , �/, -�9d , � �`l/`L'�L g. ...- r (NA E, TiTL� AI�D CORPORATE SEAL) �� ��f� � � , �c�� �. NAME, A�1D�TiT�E ; . _�. . �...� I S— ', AS ITNE SED BY: DATE. � �' f � ������� � Project Description, Post-Bid Modifications, Addifiional Documents, Deadlines, Change Order Mark-ups and Liquidated Damages Project: Zephyrhills Fire Station 2 inferior remodel I Project Location: ZephyrhiUs Fire Station 2 Post-Bid Modifications to Contract for Construction (Section 1.1): , NONE Additional Documents forming part of Confiract for Construction (Section 1.1): See Attached. Brief Description of Work (Article 2): See A#�ached. , Final Completion Deadline (Article 4): 60 DAYS FROM START DATE. Liquidated Damages for Defay �Section 6.1): $250.00 per calendar day i Aziz Consfruction Co.,Inc. Printed 5/8/2015 PO Box 1439 Lutz,FL 33548,1439 . Project: Zephyrhills Fire Dept.-Station 2 pate: 518/2015 Address: 36410 6th Ave. City/$UZip: Zephyrhilis,FL 33542 Total Estimated Job Price 39,695.09 Total ofAllowance Items 5,592.00 Total Job Cost Less Allowance 34,103.09 Allowance Overhead Percentage 8.OD% Added to Actual Allowance Cost _ Allowance Profit Percentage 8.DD% Added to Actual Allowance Cost SCOPE OF WORK: Allowance Total No. Allow Room Description of Work QTY U/M Per Item Allowance ELECTRIC 13 [113]-Radio Room Cubicle power connected to wall recep. 1 EA 17 [119J-New Bathroom Install EMT/box for fire alarm wire 80"AFF 1 EA 18 [119]-New Bathroom New GFCI for remodeled bathrooms 2 EA 19 [119]-New Bathroom Relocate power for exhaust fan in remodel 2 EA 20 [119J-New Bathroom New Lighting for remodeled bathrooms 2 EA 23 [122]-New Bunk Rooms install EMTlbox for fire alarm wire 80"AFF 1 EA 26 [122]-New Bunk Rooms Install switch for existing ceiling lighting 2 EA 27 (122j-New Bunk Rooms Instali GP receptacle 2 EA 28 [122]-New Bunk Rooms Relocate lay-in to fit in new hall 1 EA 44 [127j-Generator Room Wire SCBA compressor to existing disconnect 1 EA 49 ELECTRIC SUB-CONTRACT LS PLUMBING 3 [112A]-Officers Bathroom Remove and repiace shower head to 84"AFF 1 EA 3 [112A]-Officers Bathroom Remove and replace toilet with comfort height 1 EA 7 [119]-New Bathroom Sewer rough-in for new layout/remove existing 1 EA 8 [119]-New Bathroom Water rough-in for new layout/remove existing 1 EA 9 [119�-New Bathroom Instali shower.pan and rough-in valve 2 EA 10 [119J-New Bathroom Install shower fim and head 2 -EA 11 [119]-New Bathroom Install new lavatory and faucet 1 EA 12 [119]-New Bathroom Instaii new comfort height elongated toilet 2 EA 13 [121]-K(tchen Install Ice maker line for Refrigerator 3 EA 17 PLUMBING SUB-CONTRACT HVAC 4 [119]-New Bathroom New exhaust fan 50 CFM tie in to existing pipe 2 EA 5 [122]-New Bunk Rooms Relocate existing supply/return to fit room 2 EA 9 HVAC SUB-CONTRACT LS N's Disclaimer:This Confidential Cost Estimate is intended solely for intemal budgetary purposes. 1 of 3 Aziz Construction Co.,Inc. Printed 5l8/2015 PO Box 1439� Lutz,FL 33548-'F439 Allowance Total No. Allow Room Description of Work QTY U/M Per Item Allowance 10 [122]-New Bunk Rooms 24"LED HD/Flat mount 1 EA 11 [122]-New Bunk Rooms 24"LED HD!Flat mount 1 EA � 13 Fixed 24"TV Mount 2 EA I APPLIANCES I FURNITURE/CABINETRY I 1 A [112]-Officers Room Bed Frame/base drawers 1 EA $489.00 $489.00 �i 2 A [112]-Oificers Room Mattress for bed frame 1 EA $215.00 $215,00 I 3 A [112]-Officers Room Beciside Table 1 EA $143.00 $143.00 I 4 A [112J-Officers Room Lockers(3 per room) 3 EA $339.00 $1,017.00 I 6 A [122]-New Bunk Rooms Bed Frame/base drawers 2 EA $489.00 $978.00 7 A [122�-New Bunk Rooms Mattress for bed ftame 2 EA $215.00 $430.00 8 A [122�-New Bunk Rooms Bedside Table 2 EA $143.0o g286.00 9 A [122]-New Bunk Rooms Lockers(3 per room) 6 EA $339.00 $2,034.00 10 A [122]-New Bunk Rooms Small desk �2 EA FIRE ALARM[Notifier](Not addin any additional 1 [106-A]-Officers Bunk Add sounder at 80"AFF 1 EA 3 [119j-New Bathroom Add Strobe for bath remodel 1 EA 4 [119�-New Bathroom Relocate Strobe for bath remodel 1 EA 5 [122]-New Bunk Rooms Add sounder at 80"AFF 2 EA 9 FIRE ALARM SUB-CONTRACT LS FIRE SPRINKLER GENERALCONSTRUCTION 27 [112A]-Offcers Bathroom Install shower curtain and rod 1 EA 32 [116J-Gear Room install VCT over bare concrefe slab 115 SF 33 [116]-Gear Room Install 4"vinyl base 40 LF 3a [119]-New Bathroom Sawcut floor fo�plumbing 1 EA 39 [119]-New Bathroom Patch concrete at slab cuts 1 LS 40 [179]-New Bathroom Framing for new walls 2 EA 41 [119]-New Bathroom Drywall new walls 2 EA 42 [119]-New Bathroom Instail concrete or Hardie Backer to showers 2 EA 43 [119]-New Bathroom Drywall ceilings 2 EA 44 [119]-New Bathroom Install doors(Use existing doors on site) 1 EA 45 [119]-New Bathroom Install doors(New door) 1 EA 46 [119�-New Bathroom Paint walls,ceiling and doors 2 EA 47 [119]-New Bathroom Apply Red Gard to shower walls 2 EA 48 [119j-New Bathroom Tile shower and shower floor 2 EA 49 [119]-New Bathroom Insiall ceramic floor tile 2 EA Disclaimer:This Confidential Cost Estimate is intended solely for intemal budgetary purposes. 2 of 3 I Aziz Construction Co.,Inc. Printed 5/8/2015 PO Box 1439 Lutz, FL 33548-'i439 Allowance Total No. Allow Room Description of Work QTY UIM Per Item Allowance 50 [119]-New 8athroom Vanity and Laminate top 7 EA 51 [119J-New Bathroom Install vanity and top 1 EA 52 [119]-New Bathroom Install door hardware/locksets 2 EA 53 [119]-New Bathroom Install shower curtain and rod 2 EA 56 [122]-New Bunk Rooms Place floor protec6on over tile 1 EA 57 [122]-New Bunk Rooms Cut existing concrete block wall for door opening 1 EA � 58 [122]-New Bunk Rooms Remove ceiling tile(Salvage for re-install) 1 EA 59 [122]-New Bunk Rooms Remove ceiling grid at new wall locations 1 EA 6D [122J-New Bunk Rooms Framing for new walis - 1 EA � 61 [122J-New Bunk Rooms Insulate new walls � 1 EA 62 [122]-New Bunk Rooms Drywall new walls 1 EA 63 [122]-New Bunk Rooms Install doors to bunk rooms 2 EA 65 [122]-New Bunk Rooms Paint wails and doors 1 EA 66 [122j-New Bunk Rooms instatl ceramic tile base 1 EA � 67 [122]-New Bunk Rooms Install mount for N and install N 2 EA I 68 [122]-New Bunk Rooms Reinstall ceiling grid and tile 1 EA 69 [122]-New Bunk Rooms Install door hardware!locksets 2 EA I 87 [127]-Generator Room Build raised level pad for ice machine(3x3) 1 EA 88 [127]-Generatof Room Build raised level pad for Cascade Comp.(4x8) 1 EA 89 [127]-Generator Room Install roll-up door opener with remote keypad 1 EA I Disciaimer:This Confidential Cost Estimate is intended solely for intemal budgetary purposes. 3 of 3 —�