, R PF�,TF�uti1�IQN5 �ax �c�1ic� �t�tion & Caax�L Rc��c� ac�c�i�r_�_�n vas
c�
' The 7�pJxyrhills :�riuzpP.1. B�;ilc�ixlr,
i�i�?�;:i.�1G� sha11 � 10�' �, 2�� _ ,���K� i'�i CO��iS�.L�'. z'���i
four f�� rainfoa^��rag 1�� - cor���.nuo�sn
�EiYv'�ATION t Uhall 's� 8"' � ld p �C �?�9° OcP1a �1oc1� and a.�1. I
cell� fil7_e� �.�th concre�� m �� Lass �o tie I
p7.aced �ertice.l on �� c��.�ez°�. �,
F�:,t�C�: v'ha11 � 1�" - j,()fJ0 PSl co�Aca°���, �a�f�a �'� �; b�
i�esh #1.0 gage s�eel wir� �o�° a��iriforc�ffian�,;, ;�i a.+°�
�-ill �,e poured over co�acte� fil3 usin� 6 2�.��
go:�ethelene for vapor be�°x•iexv �efare �i�c�r�aa:�}, __
of concrete s!ast� a11 co��c�:� f3�.I *�.11 7�� ���•��t�tl
fur tex�.ita contrs��l..
E..'"TLRIOR WALLS: shall be 8�' � 8°' � 16� OcaZs� ��_�::�i��
�:��th Do:-�-Vlall pla���.� every other h�zei:an�
�oint startin�; in s�c�na �oir�t �bove floor. Jo�t�t�
Wi21 be raked �ot� �rt�ca.l and horizo�al �,o �a.�:���
I ��is�in.�,Y bu�_L�.1.��, �L1_ :;or�ev a� uhr��x2 �an sh��•Z :io
(General Notes) 1 8• 2' shall be poured. U lirttel
blocks as p�r plaxi sha.l.J. 1►e filled vri#.h concrete
�th 2 "5 reinforcing tars contirnious and joiet
anchors set.
� STRt;CI'LT�AL S'I'EEL s Stee1 J oist shal], be 18 S 8 (open web
type) to conform �aith existing �ilding. �° rous�d
rod hridging top and bottom as per plar.. Joist
shall l�e Weld.ed to existing steel and s���l anchors
shere supported L-y a�ason�r� �raa.11s.
- ��," _ _�,��.��-�;; ,
�
• 'aa �-',
•� .
a
' ROOFs Shall be 3�' thick tongued and grooroed roof deck
Yanela, with bui.lt-up white gravel roof. All aheet
� metal work to conform irith eaisting building.
DC?OFtS EXTERIOR= Froat door (South Wall) shall be donble
acting alumunums ptuiel to lr;e 1/!�" aafety
glass. Side door (West i+iall) eha11 be I
the same, except single acting.
� INTERIOR WALLSa All partitions shall be 2" Z !�" fraxiing
on 16" center uith preasure treated plates.
I A11 interior masonaxy Walls ahall be furred
, with 1" a 2" preasure treated strips on
, 16" center. All interior Walla shall. be
1 u" od �nelin of
/ P�o P 6
� •
� INTEftIOR DOORSs Sha11 lae hollo�r core� flush veneer to
match interior paneling.
�EII,INGs Sha11 be Acoustical Tile, snpported lry
' suspension system.
FINI�i FIliORs Sha11 be Commercial Carpeti�g ov�e� padding of
68 oa�. Super Chief Flat Slab Commercial
, cushion �or equivalent .
PAINTING: A11 painting� st�ining, etc� shall be applied
xhere required over proper�y prepared surfaces.
� �,ECTRICAL '6�RKs A11 electrical work, installing of wiring,
boxes, sWitches� receptaclea� etc, aha]1 be performed
as per glan. All materials wi.11 conform to Underwriters
Laboratory Standards.
2 of � ' Sheets
,
�y \z ,
'�
:'
WorY shall canform to a11 app],ica�le codes� laWs,
ordinances and regulationa of all agenciea �aving
�urisdiction, as �rell as reqnirements oY Florida
�a�rer Corporation.
PLUMBIldGs Shall be located and installed aa per plan in
accordance �rith local plumbing code. Material
and equipment shall tie standard products of a
reputable manut'acturer. Shower stall shall be
� ceramic tiled 6� high.
HEATII�G AND AIR �NDIT ON
I INat IInit sha11 be a product of
a reputat�le mannfacturer� adequate�y large eaough
to efficient]y heat and cool addition and re-
i m�deled area. Duct work sha11 be installed
approximate],y as per plan� to Le of a size and
design to effectively heat and cool area.
3 of b Sheets
� ,., �
� .
�,� � ,
; �
'}.
Month]y estimates w311 be made on or before the firat d� of
each month b,� the Ai3.lding Committee of the City Council and
� the Contractor. The �ontractor Will be paid 90;6 of the esti-
� mate. Final 1� y�,;ll, }� p�a �en the pro�ect is accepted
� by the City Council. F:ach bid xil.l be accompanied h�r a check
� in the, amount of two hundred fifty dollars (�250.00) and per-
�
formance bond. In lieu of a perform.Ance bond� the Contractor
� ti�rill be paid 80;b of the esti.mates. Fina1 20� wi11 te paid xhen
� project is accepted tay the City Council. In the event the
. proposal is accepted t,y the City and the Contractor fails to
i enter into a contrac�� his check Will be kept as liqnidated ,
i
; damages. Contractor to apecif� the number of srorking ds�ys in
j
�hich he �rill complete Luilding. A working xeek constitutes
� •
; 5 d�ys. (Mond�y through Friday)
� - li
, �
�
' NOTEs CHAI3C:�S IN PLANS
;
; l. Doonr�}rs to be cut through �ra:Ll to rest rooms from
� ' Court Room.
�
; 2. Yartitions to be installed in Court Room to provide dividers
,
between Court Room and Rest Room.
' 3. �utside door to be provided by vault.
• 4. Door to �e pmvided for bet�reen Council Chambers and Plat Room.
l� of 6 Sheets
,�� �'
;;
AIR COPIDITIONING SPECIFICA2'IUNS
Design Conditions �
Summer Uutside 9j°D.B. and 79° W.B.
Inside � 78° D.B. and 50� R.H.
Winter Uutside 30� D.B.
Inside 70° W.B.
reople Courtmom - 40
Offices and Jail Area - 25
Ventilation 10 CFM per person
Lights as per plan.
� Air velocities - shall not exceed 1�u00 FPM in main
ducts and SUO F'PM in branch ducts
v of the supply air system and 500 FPM
, in the return air system.
' Air �onditioning Units
Shall be unitary package heat pwaps as manufa ctured �y
, General Electric� Carrier, Fedders or Westinghouse or
i equivalent. All units to be rooftop mounted on pitch
; pans. Structural members supporting the pitch pans
i must spa.n a sufficient number of 3oists or rafters
to insure adequate support ot' the unit without endangering
i the building structure. �there duct work passes through
�- - the rooftop suita�ile provisions must be made to insure ___ �__
; weatherproofing.
' Duct or strip heaters sha11 be appropriately lo�ated I
' and be U. L. approved and labeled anci installed in com-
� pliance with the: National Electrical Code.
� Air Conditioning Units Required
� �
The courtroom sha11 be conditioned by a rooftop
mounted unit and one rooftop mnunted unit t'or the oi'fice
and �ail area. �
5 of 6 Sheets
� � 4�`R��
Air Distribution System
Ducts m�r be 1" thick fiberglaas' clasa II.' minimum
density of 2.5 1bs. per cubic foot.
Ur� galvanized sheet metal insnlated irith 2" thick
flexil�l.e insulation with vapor tiarrier - .75 lbs.
per cubic foot density.
All �oints ahall be scaled against vapor penetration.
Qpposed r,lade daa�pers shall be installed behind all supply
grllles for balancing.
Air �onditioning �ystem
Sha11 include all materials and la�or including e"lectri-
cal wiring to have• a complete operating syst�em. Con-
tractor shall balance sgstem upan co�letion of inatall-
ation. Contractor to service system including parts
and labor free of charge for oae year after final com-
. pletion and acceptance b� the citzy. The compressor�
are to have an additional tt year Warranty.
Contractor shall guarantee syatem to maintai� iadoor
temperatures and hwnidity at outdoor design conditions.
6 of 6 Sheets