Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
7050 GALL BLVD (42)
. ' I - _4#�'^_' _ "_ .=r.m.�.°L-'- --_'_ - � ,..r+� I , ,� .r i ' , 4� � . I � REVISION NO. 2 ' , ; JUNE 30, 2000 { � � � � �ADMINISTRATION RENOVATION EAST PASCO MEDICAL CENTER � - � - I ZEPHYRHILLS,FLORIDA �,`)- _ '„ � , �.�`" �' � �ESa JOB NO. 99048.00 - �( U� _ � , I � �EARI,SWENSSON ASSOCIATES �2100 WEST END AVENUE,SUITE 1200 �NASHVILLE, TENNESSEE 37203 � � � � , � This Revision forms a part of the Contract Documents and modifies the original Bidding Docume ts, dated iMarch 03, 2000, as outlined here in addition to being shown on the drawi�ngs as Delta 2,dat d June '30, 2000: , � �CHANGES TO THE DRAWINGS � , ; ' SheetiA-2—Life Safety—First Floor: � I ' � 1. Incorporate the changes to the Life Safety.Plan as indicated in sheet A-2, dated June 30,2 00, � � Delta No. 2. � ; � �Sheet A-2A—Phasing Diagrams: ; � � � � f 1. i Incorporate the changes to all three phasing diagrams and include phasing diab am 3B int the � I scope of work as indicated in the attached drawing A-2A, dated June 30, 2000,Delta No. . I ' Sheet A-5—Demolition—First Floor Plan: � 1. Incorporate the changes to exterior windows of the existing waiting area as indicated in th attached drawing A-5, dated June 30, 2000,Delta No. 2. ; I �Sheet�A-6—Noted and Dimensioned—First Floor Plan: i , �1. � Incorporate the changes to Files 1-110, HC Toilet 1-126A, VP 1-124, DON 1-127, CEO ; ' � 1-126, CFO 1-125, AV. Storage 1-121, Comm 1-121A, Women �-130, and add iConference Room 1-112 from the scope of work as indicated in t�he attached drawi g A- I 6, dated June 30, 2000, Delta No. 2. � �Sheet A-10—Reflected Ceiling—First Floor Plan: � 1. Incorporate the changes to the Reflected Ceiling Plan as indicated in sheet A-10, d ted � June 30,2000, Delta No. 2. , I I � � , i I I I i i I I i Ii I i ;REVISION NO.2 PAGE 1 JOB NO. 9 048.00 \ � I \ i I 1 �! i ' --+-s- - � . . r=9-�s- . I+ i .� , I Y I i I ' � i jSheet A-11 —Casework Elevations and Details: � I ' 1. Incorparate the changes to the casework elevations 7, 8, and 15 as indicated in she t A-11, dated June 30,2000,Delta No. 2. 4 � iSheet A-12—Elevations and Sections: � 1. � Incorporate the changes to Detail No.5 "Enlarged H.C. Toilets" as indi�ated in sheet A-12 dated June 30,2000,Delta No.2. ; ; I ;Sheet A-13 —Elevations and Sections: � i i � I 1. Incorporate the elevation 03 and Details 07 and 08 to the scope o work as indicate in sheet A-13, dated June 30, 2000,Delta No.2. Sheet'A-14—Door Schedule and Details: � I , ��1. Incorporate the changes to Details A and B indicated in sheet A-14, dated June 30, 000, Delta No.2. , 2. Incorporate the changes to the Door Schedule as mdicated in the attached drawing -14, i dated June 30,2000,Delta No. 2. , � I !Sheet F-1 —Finish Plan: ; � 1. Incorporate the changes as indicated in the enclosed drawing F-1, dated June 30,20 0, , Delta No. 2. � � iSheet F-2—Finish Plan: i1. Incorporate the changes as indicated in the enclosed drawing F-2, dated June 30, 20 0, ' ' Delta No.2. Sheet�F-3 —Signage Plan: � � 1. ' Incorporate the changes as indicated in the enclosed drawing F-3, dated June 30,20 0, � Delta No. 2. � iblm � I � � ( _ ' � I I END OF REVISION , � I � . i , , i � I , I ` � ;REVISION NO. 2 PAGE 2 JOB NO. 9 048.00 � � i I . I I :•. � i ....., .._.,:.�;:..,. ,,., _ _ -- _ _ _ _ - ,_: -_- -- - - — ,. ....,:_.... _ ♦r :.::. ... .. :..... . ,: ; .. , ,.u,., - - - - -- - _ - - - - _ i,..,-.,; ,. ., .,. ,.. _ - --- - - - - - _ - - - - -- � ' . ...�. ._ �c+�i�r::_,.., --.�,.,_, ._.�,.,. . . __.;.'. .. .. ' - - - '.::- .-'�' � � .. :,:`v,�,:�. . __"_, _ ,;. ..._. �i . . _.....-_ .,� .,k: . .+'. . :;. , .:_ ._ ._ . -. � .. . . ..., .':�_ ' ' _ :i:.� ��'�'� _ _ . . :. _. . . . ... . -_..:�;"___ ::::' ' ' " _ :.:.:..:.. . � :; .:. ,��:::..:' ..z;: --�......�... ._. _::;'��:._.. ..:,..�:.;�. ..'. ._ . .,-..:.. ., ,,��.��.�����,. �_.. .. .� .� ..._ . ..__._ � .� .,: - ' ' ' _ _ _ � - _'_ - - .... .�_._ �:���:��`":� ._.. ._.. .,. .�..,_..:� . . . . . .� _ " ' __ ' ' "_ ' '-_' _ __ -'' ' _ ' ' ' ___' ' �. � ; :_,_:�:._.-,�; - �. ' :r:_::.. "" "'" - ' _ ' - _ " '_ '"" " _ _ ' .' ' _ _ �:. .:.. . :,_ >,:. .. .. ^._, _ �_ .. -,. ....� ��: . ._. . ._ . . .. ._.. :�`' ;:.. . . -'�...:'``..` �:ir. _.,, .� .,. ...._. . ._. .., ,-.,_ ._ _,:.. . .. ._._.,- - - - - - - _.—�_,,. .,.,.,,. . _.,. __:_....,, ,,.� .�..:-� : . _ - _ - ' _ „_": - - __ _ _ _ , � _;- � ,:;:;_. :.:_-- ' ' - — - - - --- -- - _ 7 `...__,_ ._ _ _ - - _ - - �- - ,:,i,`�' " ' - -- - ' �i�'.: -_ -��. � � � - - ._ ,_ '�.� . ' ,•.._-` �'. �,.. _�� ' " ' ::._�'. }���':,_S _ - . . .- . ,'��,.� __ ,.-1.."'• ' �:; - ' ,-i . ' ':', � � : ` .� ,,. ' . : .t ::.� :�'_'- —_ _ __ -_-i,_�E=.;_._�:T„r�-°:�:�'.'_:�..�,. _ -_ <i�', �.. .�" 1 n..,Grou = . ._.,,_::: �':',;.'�_: � __ __ _ _- -- -- N 0:�:. Phaenix,..Des g p ..,: . _-�, _ _ o�e - _ _- _ , , ,,, ., ,. - - - - - -- - - _ _ - ,.:, , : : - : ; _- - . ..:. .. , . _,,.,, _: - - - -- - - _- . ._ , , � _.,:.a:, ;: _. _ ,.�. ..., . ,.;, , _ _ _ - - _ - --- - - - - - - - - - - . ._ __ - - - - ,, . , _ ,- - -: : _ __ _ ,,._. _ ____ : -- __ ----- _ -- - _ -_ : _ _,.-, ,.a:,, , .:. .- . - -_ ------- -_ _ -- - _ - -- _,, ,: ,,.. .___ :,:;_. _ - — -- - --- - - 18 ,:,. Suite.2 _._. �,.- �' - - - - - - -- - -- --- �- - — =-- - �. : dmont.Blvd. '� _ - - - - - -- - - 1.04 00 _.. ,..,, __� ._�::..,. . . _.: - - - - - - - W - - - ::_- - --- -- --- - - - - -- - - - - -- - .._ .. ... ,.- -= - -- -- ',`�` -- - - - - - --- _ - ,., _. _:, - --- - - - _ _ - - - -- - - - ,. ,.,:,,.. ,_. :_�,, -` - - -- - - - - - ----._.. .. - - - - ---- -- - - ; ,. _. ,.:. ._. _..:._. - - --_ -- - _- - - - - ----- ....- _- - -- --- -- - - - .��,� _ , .. . ..... , _.. , . ;.:.:,:. �. -- -- - - -- = -- - - - - - - .:::z.�..: _._.._..... : _ � .,::::..:: ._ _.... ,:.: _::. , ,. :. ...:.:: _,.:::.,_,�; _ . _._:. _.._,.:v:,::;.. �. ... _,,: ,,... . :.. ..._.._._._...:.::.::_.:: __{-:,. ,-�. ._� r, __ ..... -- __. - - - - - - -_-- ,� .;;._.:-�- - -- -_..; _ - -=-- - -- --- --_-- ----__- - --_ = - -_- -_- _ , ;. : _____::-;._:_.:. ... _ -- - - ;.;,. �, . _.,:.,.: .:,.:. . __.,�:.:.:::, .,:...- :;: ;__:-;: ,.:. , ..:. _ � ,,:_,-:;.,;`;r.-;;'.., , _.-:<..._�:.,.�:., ..�. ,. , ,_ - ---..__,..,..._. . .:.: _ _ . . -. -- - ;. : .._ _ _. _.._.._. :.__�.. --_._:_.::_::._.__; - - ---- - e 'IN...3?205.. . _. . .__.__.,._.. .. . _ ._.. _ .. . . __.. .._- -- ,;---- - -- 0;�_2 Nashvzll .. ..,..,{. . .._. ._ ..-- -.__.-. ... - = - -- - - - , ... .............._.. _.. . _.. _. _.. _.. _ ._-_:._-,�.,,_n_,,.. _ - - - - _�.__.... ,... -._ _... ,..- .:_-._._.._. _.._._- _ - - - --- - ___....-. ,. _ . ..... .. ....... _. ._ _.._. . _ ._.._- --.._.. :,._-_:_:: - - - -----_ _.. .. _. . ...... .....:_:::.._ ... _. ... _ .. _ _., - - -_ - - -- ,_. �`JU E _ , , . __._ . _.._ _. - - -- __ _ _._._. .. ._ ._.. _. _ - ---_ - - - .:,,, �. _.. 3 0 00_.:_;... ___ _ .�. _ ____ -- ._. ,., - - - - - -- -- - - -- - - : _:,:.... ._._-.. ,_.... -- -- -- - --- ----- __-- -__- ---- -- - _— __- _ = - ----- - _.. �:. : :.: .__. _ 6Y5=386=9287�voice °615-385=0922-fax.,:; -. -:_---,-_ ,: -� :`:-_ -;`-�;=-=_ '.;:� _ - =- - - ---' --- Project: ' East Pasco Medical Center Admin Renovation To: Jim Breslin Location: ' Zephyrhills, FZ Frorn: Jon Long Subject: Revision No. 2 Project No: 98027.06� � Revision No. 2 East Pasco Medical Center iAdministration Renovation � � ; �Zephyhills, FL ; - � � - i ., _ IESAProjectNo. 99048.00 �r r�` �` � � �PDG Project No. 98027.08 :X �r= ;;��7-��`.�J-` _` _ � '!-,� - _- ; - .,�"-,_.� __-.-_, �This Addendum forms an integral part of the Contract Documents and modifies the origin��I%Documents 1 dated�August 25, 1999 as outlined here in addition to being shown on the drawings as Del a 2, dated � ;June 30, 2000. � �,CHANGES TO THE DRAWINGS � � ISheet M-1 —General Notes & Schedules: ;1. Revise the Duct Mounted Heating Coil Schedule as shown on Sheet M-1, Delta 2, dat d June 30, 2000. � I � ;Sheet M-3 —First Floor Plan—HVAC & Piping—Phase One: I �1. Revise the ductwork as shown on Sheet M-3, Delta 2, dated June 30, 2000. - Z ? c,�c, I Sheet M-7—First Floor Plan—HVAC & Piping—Phase Three: 1 �l. Revise the ductwork as shown on Sheet M-7, Delta 2, dated June 30, 2000. � �Sheet E-4 -Lighting First Floor Plan: I I � 1. R�evise lighting layout in 1-110, 1-111, 1-1�21, 1-121A, 1-124, 1-125 1-126, 1-126A, d 1-127 to r Iflect new floor plan as shown on Sheet E-4, Delta 2, dated June 30� 2000. � , � � � � ; i i � � � 'Revision No.2 Page-1 Phoenix Design Gro�p,Inc. , 104 Woodmont Blvd•Suite 218•Nashvi11e,1N 37205•(6 5)386-9287 j j I I I i � i � � � - — I - - -- - ---- � (� , � 'r' � ' � : , ;Sheet E-� —Power and Systezns First Floor Plan: � '� 1. Revise power and systems layout in 1-110, 1-111, 1-121, 1-121A, 1�124, I-125, 1-12 , 1-126A, and � 1-127 to reflect new floor plan as shawn an Sheet E-4, Delta 2, dated June 30,20Q0. � � I ,Sheet E-6---Electrical Qne Line Diagram and Schedules: 1. Revise panel schedules 1 LN6 and 1 LC7 as shawz� Sheet E-4�, De1ta 2, dated June 30, 000. , i i Sheet P-2—First F1oor Plan-Demolitian—Plumbzng: � � i 1. Nlodify the extent of demolition of hot water line and hot return line'as shown within Iauded area ! located an sheet F-2, labeled Delta No. 2, dated June 30, 2000. � i � {Sheet P-3 —First Floor 1'lan—Plumbing: ( ;1. Modify location and routing of waste, water, and vent pipe serving Toilet 1-126A as hown within ; clauded area Iocated on P-3, labeled Deita No. 2, dated June 30, 200�0. , ! �2. Madify location and routing af waste,water, and vent pipe servzng VWomen's Toilet 1-130 as shown i within clauded area located an P-3, labeled Delta No. 2, dated June 3�0, 24QQ. I ;Sheet FP-1 —First F1aor Plan—Fire Protection: � � � !1. Modify locatian of sprinkler heads to fit with new partition layout as shown within clo ded area ; located an sheet FP-1, labeled Delta No. 2, dated June 30, 2000. ! � � . ' , , I ' i i I , � { : ( - � � � i � � '� i � � � � ; � , , � � � ; � i � � ; : � � , � Revisian No.2 Page-2 Phoenix Design Grou�,I�c. ; •I � �� I 104 Woodmont Blvd•Suite 218�,Nashville,TN 37205•(615)386-92$7 I i � � I I � � � —-- ----------- — -- � I � : � !� ,�k. �•i r� y ( II , i � � REVISION NO. 1 � j I i, f�PRIL;20,2000 • i i DMINISTRATION RENOVATION I i � F�AST PASCO MEDICAL CENTER � U2`U� { ` - �P H Y R H I L L S,F L O R ID A � �S . ESa JOB NO. 99048.00 � -� � ., � ! � EiARL SWENSSON ASSOCIATES � I 2�100 WEST END AVENUE, SUITE 1200 � I �ASHVILLE,TENNESSEE 37203 � �i � � I , � ' � This Revision forms a part of the Contract Documen�ts and modifies the original Bidding Documents, � dated March 03, 2000, as outlined here in addition to being shown on the drawings as Delta l, dated�April � 20,2000: j ; j CHANGES TO THE SPECIFICATIONS � I� i � 1. IiRefer t o Specification Section 08424—Electro-Mechanical Sliding Doors. Refer to Sectiori 2.2 '� Equipment and add the following paragraph:� '� � � I "F. Automatic Door Testing—Automatic door systems shall�meet the debris im'pact � � requirements as required in the South Florida Building C'ode (SFBC, Reference I ' 1.3). Provisions of SBCCI Test Standard for Determining Impact Resistanc'e for ' � Windborne'Debris, SSTD 12-97 (Reference 1.4). i i � , , � i CHANGES TO THE DRAWINGS I� j , ' I � � Sheet A;1 —Life Safety Ground Floor Plan: � i ; 1. Incorporate the changes to the Life Safety Analysis square footages m V.�I Height and area, as ; , indicated in the attached drawing A-1, dated�Apri120,2000, Delta No. 1., �i i -� , I i Sheet A�2A—Phasing Diagrams: I �� �'� I , 1. Add tr.avel distance notes to First Floor Plan—Phase I as indicated in the attached drawing A-2A, , dated Apri120, 2000,Delta No. 1. � I 2. Add travel distance notes to First Floar Plan—Phase 2, as indicated in thei attached drawing I � A-2A, dated Apri120,2000,Delta No. 1. I i �I i � Sheet A�5 —Demolition—First Floor Plan: � , I 1. Incorporate the changes to the scope of work now indicated as "Add Alternate No. 1" as ind'icated in the attached drawing A-5, dated Apri120,2000,Delta No. 1. � 2. Incorporate the changes to exterior windows�of the existing waiting area low to be existing to � remain as indicated in the attached drawing A-5, dated Apri120, 2000, Delta No. 1. i � � i� I i I � �, ( I � � ; � I � ' I � ; , � ' ' R�VISION NO. 1 PAGE 1 � JOB NO. 99048.00 ' � � I , � I � ' i � � , : � ; � .? � � � � � ; ; , , Sheet A-6—Noted and Dimensioned—First Floor Plan: i �� i I1� �Incorporate the changes to the scope of work now indicated as "Add Alternate No. 1" as �indicated in the attached drawing A-5, d Ited Apri120, 2000, Delta No. 1. � �, . 2. 'Incorporate the name change of Room 1-120 from "Kitchen" to "Lounge" as indicat�l d in ' the attached drawing A-6, dated Apri120�, 2000, Delta No. 1. �� 3. -Incorporate the changes to Files 1-110, HC Toilet 1-126A, VP 1-124, DON 1-127, C�FO ;1-125, and the removal of Conference Room 1-112 from the scope of work as indicated in the attached drawing A-6, dated April �20, 2000, Delta No. 1. i I I � i � S�eet A-10—Reflected Ceiling—First Floor Plan: , , , � 1. Incorporate the changes to the scope of work now indicated as "Add Alternate No. 1'i' as indicated in the attached drawing A-10, dated Apri120, 2000, Delta No. 1. '� 2. Incorporate the changes to the Reflected Ceiling Plan as indicated in sheet A-10, dated � Apri120, 2000, Delta No. 1. +� � � � � � ; Sheet A-11 —Casework Elevations and Details: I � � � ! � � 1, Incorporate the change of room name in casework elevation 3 and 4 from "Kitchen" to � �`Lounge" as indicated in sheet A-11, dated Apri120, 2000, Delta NI. 1. i I i Sheet A-12—Elevations and Sections: I i I 1. Incorporate the changes to Detail No. 5 "Enlarged H.C.Toilets" as indicated in sheet A-12, dated i Apri120, 2000, Delta No. 1. � � � ; I , Sheet A'-13 —Elevations and Sections: � � , 1. Incorporate the removal of Details 03 and 08 from the scope of work as indicated in sheet i A-13, dated A,pri120, 2000,Delta No. 1. i � ' 2. Incorporatethe changes to Details, 02, 0 , and 07 for expansion of j`Panzer" mesh sy'stem � as indicated in sheet A-13, dated Apri120, 2000, Delta No. l. ' � ' I I � � Sheet A=14—Door Schedule and Details: I , � , 1. Incorporate the changes to Details A and B now indicated.as "Add Alternate No. 1" as � i�ndicated in sheet A-14, dated Apri120, 2000,Delta No. 1. i ; '� 2. Incorporate the changes to Dimensions in the Detail A as indicated in the attached ; � ' drawing A-14, dated Apri120, 2000, Delta No. 1. ' , 3. Incorporate the changes to the Door Schedule as indicated in the attached drawing A�14, dated Apri120, 2000, Delta No. 1. � ' � i I I � � Sheet F�;1 —Finish Plan: � � ' , ' � � i 1.I Incorporate the changes as indicated in the enclosed drawing F-1, dated Apri120, 2000, Delta No. 1. � � ' � li �' � , � , i ' RI�VISION NO. 1 PAGE 2 ', JOB NO. 99048.00 , � � � I � i � � � , � . � i , � , I , . � f ..S i , � ' � � , ; i � ��heet F-2—Finish Plan: � , I � � ; � ' l. �Incorporate the changes as indicated in the enclosed drawing F-2, dated Apri120, 2000, �Delta No. 1. j i I i I S� , ; , heet F-3 —Signage Plan: � � � � ; i ]�. �Incorporate the changes as indicated in the enclosed drawing F-3, dated Apri120, 2000, ' � iDelta No. 1. � ; � 1 �jlm " � � � � � i I � , � , , I I j f ' , ! I END OF iREVISION � i , i � � ; � � � 1' i � � � � � I ; � i , ; , ` ' � ' I� ; i � � � , � � ; � ; � i � � � I , ; � "� ' - ' 7 I � I , i � � i � I � ' ' � � , I I , � I I , I I I i , � I I � I , I I I i i � I � i � � � I I I ' i � i � I � I REVISION NO. 1 PAGE 3 JOB NO. 99048.00 i I i � I . � I � j i �:,.<,.:.,,,,,.. , ..,.. .,. - - ' -- , ,.�:. _ - '`��,' .�;y;.:';' �,;.; z ^:` � t. <�` .,,u ��. 'a;�, > „X .,3, .;,_ ;;�; ,,._ v.t_ �f'..: ., r,o�� �A:'' � .f' �. _ �z :'A� '�i• L '.�:j:i' ,�:. �'A'2�, - '�'x..1��'",M. �.q:,:; _ TK.t�4.: '!, ��'� i• F��:���.. j;.: a t ... 4 � . ..�.: "��.. :..f , �� . ' r i . a;.. . � _ . ,..�.i ..�j�.a� i . '.„�- � . . _ . . ^r i:.'._ .'y'� . , .:.... :.�try�;- .y . ...;,,;r�. ,..< , ;..�., �. : ,, i:�..;,,5 . , a.,. ' �,. . �. . ... : .,! : ., :. ..�.... .i� :M.'��.:.,..,.,..�.� '�.s'Ne�' " �,< <.. . , ,; � : *.... .. , � i 5',r.(e�E. .,L '.'t...._,,� q' t/ ' �' _ ✓.`{.f. . �.,,� i i_ ..<..t .. .x .t".^• �a'.t�•�"\ : ✓ ''�-�i . i.., .n .. ::u. ..� . .�. '.';�: �...� ..IG . ;..:..�....� . f3 ' .�f��,`",T:: . c. •..y ..� .n � .��.. �. . . .t '{'aF T.SF�- �. - ,:j:` r.t"j`.. � �:s." �Y:.P° i�s . :.. � .��.,:!.2.�;i� .,�_ .. i!. !v �,:.;-,�:�� .,.,....<.. � �,., , ,; :c• ��r , • _ . �., :�:�.:..:� =�,....:.._. _ .. _ _ "�' �=i -� '� . �.�:^��„`; . : ,. . F.;.,.,. ,.i� :� ,.y��;.;.:.�... . . ,.�,k,�., ,. ,..._ . ' �_-� "i �; . , �. � , . .. `.�.,.... . .,, � ��f�, ,, .. r<; . i;......�. .: v ,.,.Y .<< ;ri ,• :<> ,. ...,.« .:. .. .. ... . , .... �. �. .. : . . -i a :.... ,: . ..: .vE: .<Y' .. . ;�' .i, `�ti.. . ',1 �. �,,�;. • ! M:3 � a �t' ;E' 't��y- .•:k: :ti�:.;+...::�,�.:: ':�:f - >,;�„� �ect� -�evisio:n� :o:: =1 - �P:li�.o�riix;rD'esi` n��Gr�ou: r;: .P�'O: .R N . :.�::.��...F:.:. :.,�.� � .�:.,...::g..,.�,, p�: ��..��_ _ :;.-: _ - ..: ...�.w ;;:, �,�: :< <t-:� . ...., . . , �. .. .,.:v _ _:. . ,. ..« , :: .., .. .,�. ..:.:�.:.:�a ::.,. , . �: ,...,.a ... ...A��..r .z� �:..;. . , . ,. .:. _ _ �>,:. a_.=, � �. _ ;� 104:��oodrn.ont:.$lvd:+�Suite.'2]:8; =:�:: `"'�:� � _ -'�"h' i h <: 'Fs,�.. ';,:��a. ,,.: °,�>�=', - , .. , �. ,;-� . _��,:�ee=:�:,�.� . ,.. .. _ ,:1,�,.J i.' .. ,t•., . ^�'•':�:'`�, � , '�a _ ,tr:E �•.. _ , �. .,_.: _ .,> ., , ;..: . .. . �.,..., .. �:t:� ,,.. . .,....„ . . . s' , : „ . „;:.;;:<.< . ,..,r: .� .... .. -� �.F-:'1C..�-.� ci��>: - '1 ;.,e.. .� ,. . �'>,w.;;-.« _ _ . , ''� �.,�,s�;�t..� ? �' ��O,O �':, �� t , Y:.x r.�. ��A�ril 0�� 0=:. Nashville� TN:`�=,3720.5: , - - ,. N`u', , ., ) . - 5,`a'' . :b=. . N� . - :>�a ;fFl:' _ � .,:,.�... ..Fi ..�.� -i .�, - . '. . .. . . ,, •," + ,.. . . ... . , . . .�, . . = � .:i t .�:� '�1� �: :i ..�; ^e,p... �. ; .y..: ..:^' , . ' ' .�. '.�.�.• ��. x� : � " , f: ::., ti .. . . ,.�.v .a . . . : :: . '�:� "Nl,� ' . ' . ;� �e y .�1��xa w� -.t�`.�'~ `.�.. :.F:i'_r" ..1.._ - -- 22..f� �.._ -- _ _ - 28Z.;voice ,:6 I5 385.09 .: - 6-15,386:_9 .. .,... .. . . ._ . . � . . - .�:` - =- - ; � . � Proje�ct: � East Pasco Medical Center Admin Renovation To: � � Jim Breslin i Locauon i Zephyrhills, FL . From: u�� John�Wade j Sub���ct: ! Revision No. 1 _ Pro�ict � 98027.06 j ; _ j � Revision No. 1 � , � � i ; _ I East P,asco Medical Center �I"�'l'� ' dministration Renovation �' , ' I, �. ' ephyhills, FL i � I ESA Project No. 99048.00 { , PDG Project No. 98027.08 j �, � This Addendum forms an integral part of the Contract Documents and modifies the original Documents c�ated August 25, 1999 as outlined here in addition to being shown on the drawings as Delta 1�dated _ Apri120, 2000. � - _ � I _ I - ' ,;�!_ __ - CHANGES TO THE DRAWI•lYGS :; -� , - _�_� = � - !'r' � . , %/ Ar'^, � ✓ Sheet M-1 -General Notes & Schedules: �'�,,�(:���- ; ��I �`�2 �, _ _� i ,, —_ � 1. Revise the Duct Mounted Heating Coil Schedule as shown on Sheet M-1, Delta 1, dated Apri120, I � 2000. - � � Sheet M-2-Firsf�'loor Plan-Demolition-HVAC & Piping-Phase One: i ' -, � � 1. Re'vise the ductwork demolition as shown on Sheet M-2, Delta 1, dated Apri120, 2000. i i � i i � heet M-3 -First Floor Plan-HVAC & Piping-Phase One: ', � 1. Revise the ductwork and piping as shown o Sheet M-3, Delta 1, dated Apri120, 2000. � � i � heet 1V1-6-First Floor Plan-Demolition-HVAC & Piping-Phase Three: i ' I � 1. Revise the plan to indicate Add Alternate#1 as shown on Sheet M=6, Delta 1, dated Apri120; 2000. ' , � � � , 1 � � I � S�heet M-7-First Floor Plan-HVAC &Piping-Phase Three: ; � { � 1. Re I ise the plan to indicate Add Alternate# 1 as shown on Sheet M-7, Delta 1, dated Apri120, 2000. , I Revision No. l Page-1 Phoenix Design Group, Inc. � 104 Woodmont Blvd•Suite 218•�uhville,TN 37205•(615)386-9287 , I � � � � , + ` I � I 1 � ti , , Sheet'�E-4 - Lighting First Floor Plan: � � � I 1. Revise lighting layout in 1-110, 1-111, 1-1�4, 1-125, 1-126, 1-126A,�and 1-127 to reflect new floor , plan as shown on Sheet E-4, Delta 1, date�Apri120, 2000. � 2. Add designation of area to be included in Add Alternate #1 as shown on Sheet E-4, Delta 1, dated ' Apri120, 2000. �' � i Sheet E-5 —Power and Systems First Floor Plan: � , � �il. Revise power and systems layout in 1-110, 1-111, 1-124, 1-125, 1-12,6, 1-126A, and 1-127 to reflect� ' new floor plan as shown on Sheet E-4, Del la 1, dated Apri120, 2000. '� � 2. Add designation of area to be included in Add Alternate #1 as shown on Sheet E-4, Delta 1, dated �, Apn120, 2000. Sheet E-6—Electrical One Line Diagram and Schedules: � I. Revise panel schedules 1HN4 and 1LC7 as shown Sheet E-4, Delta l, dated Apri120, 2000. ' � � Sheet P-2—First Floor Plan-Demolition—Plumbing: � 1. M�dify the extent of demolition of hot water line and hot return line as shown within clouded area I ! located on sheet P-2, labelecl Delta No. l, dated Apri120, 2000. � 1'�. Add designation of area to be included in Add Alternate#1 as shown on sheet P-2, labeled Delta No.�� 1, dated Apri120, 2000. ; � i Sheet P-3 —First Floor Plan—Plumbing: 1. Modify locatic�n'and routing of waste, wate'r, and vent pipe serving Toilet 1-126A as shown within , clouded area located on P-3, labeled Delta � o. 1, dated Apri120, 2000. � I 2. Add designation of area to be included in Add Alternate#1 as shown on sheet P-3, labeled Delta No. , 1, dated Apri120, 2000. � i � � �� � . Si eet IP-1 —First Floor Plan—Fire Protection: , i � 1. Modify location of sprinkler heads to fit wit new partition layout as shown within clouded area located on sheet FP-1, labeled Delta No. 1, dated Apri120, 2000. �� i , 2i Add designation of area to be included in Add Alternate #1 as shown on sheet FP-1, lab'eled Delta No:l, dated Apri120, 2000. I � � I Revision No. 1 Page-2 �i Phoen�ix Design Group, Inc. 100.Woodmont Blvd•Suite 218•i azhville,T'N 37205•(615)386-9287 � , I �