HomeMy WebLinkAbout7050 GALL BLVD (47) �
:sa. ,
." - -. _• �
i
i �
i
� �
; I �
i �
,
i �
I ,
' I � �
� � ■
i ,
i , �
March 10, i1994 � ;
�
� ,
The Edge Group, P.A. � �
444 Bunker Road, Suite 201 � �
West Pa1m Beach, FL 33405-3694 � ,
Attn: Jeff Kathan I
Ri: East� Pasco Medical Center � '
I
Outp�atient Surgery Unit � ,
Log !No. H-425-R ! �
PEI ;Project No. H93-16 ,
Dear Jeff: —' - ; ,
�
The following are the AHCA comments dated Fehruary 17, 1994 with I
iur responses. j i
�
1dE CH�,DTI CAL ; �
� �
COMMENT• '
aC-1 Provide equal relative air pressure in the "PCU" corridor �
i ventilation system.
i �
RESPONSE• �
I
We havel•complied. See replacement sheet M-10„ S�ar 1, dated � �
December; 16, 1993. Return system modified to provide equal
pressureiin "PCU" and "ICU"_ Corridors. i
I �" � ,
�COMMENT•I �
. i i
I
�Sheet Ei21: ' ,1 . I I
E-9 I Delete the "Do not us-e elevator" warningl ligl�ts from this '
� floor. The warning;�light is to be located only at the ;
Idesignated and alternate levels per Chapter 4A-47, F.A.C. �
-. -, _._,.._ ; _ .. ,
. � �
' � ,
1833 Edgewater Drive; ■ Orlando, Florida 32804 ■ 407/246-1 I8 � FAX 407/246-1664
, �
, ,
, "�,>��. L i . I
I
_ - - � I
, -
, � , �
i I �
: ` i i � i
I '
�
0 ; the edge group, p.a.
�
I �44 BUNKER ROAO WEST PAIJA BEACH !
I FLORIDA 33405-369t 447/58b-9307 I - 1
I
'
� ' �
i � 1
i I
i
�
�
�
EA.ST PASCO MEDICAL CENTER �I ;
South Addition, Phase III
AHCA Log #H-425R �
ADDENDUM NO.i 1, March 17, 1994 �
The intent and purpose of this addendum is to augment or modify the Contract
Do�cuments (Project Manual and/or drawings) . This addendumi shall supersede
conflicting �requirements of the Contract Documents. �
Item 1 - Revised Drawings
A) A6-2 - Revised Detail ##2 with smoke stop (rev. date 3/17/94)
I �
B) A6-4 - Added Details #16 and #17 with variations on smoke stop (rev.
date 3/17/94)
C) �M-10 - Revised relative air pressures (rev. date 12/6/93)
D) �E-21 - Delete "do not use elevator" warning lights
(rev.. date 12/6/93) �
- Add note regarding exitinq at stair "J" (rev.date 12/6/93)
�
I
I ,
' �
� � ,
, �
�
�
�� I
, � i ,
i _ - ,
� - -. ,
� i _ _
C:\EPMCAdd1.317 i , �
� � :
Z���_ - �
I, � � -_ �1? - � .
. � , , - �
�
� � � � �
� ,
� i �
� i � �
� ; . I
I ! March 17, 1994 � �
�
I � �
I I I
i Mr. James R. Gregory, Bureau Chief � i
� Office of Plans & Construction � ;
��e ' Rgency for Health Care Administration I !
� 2727 Mahan Drive �
Tallahassee, FL 32308 I ;
edge group , �
' Re: East Pasco Medical Center
� South Addition, Phase III �
P•a• ' AHCA Log #H-425-R �
, � � .
� Review letter dated Feb. 17, 1994 � ;,
architects ; ,
� Dear Mr. 6regory: �� , I
designers ; � -
�
c o n s ulto nts I � We are herewith submitting responses to comments in the above _ ;
referenced review letter:
i planners � ;
� I Cl t 8 r;I O � S Comment: A-2 Shee� A-6-2, Detail 2/A6;-2: Provide a j
� manufacturer's proprietary system of fire ;
, stop and smoke tight seal iat edge of floor �
� slabs and curtain wall. � �
�
, � Provide a proprietary system that includes i
; the firestop material, retention method and '
; smoke seal material. �
,
, , ;
. i Response: We have renised our project manual to more
� clearly reflect the used USG �'ire/Smoke I
� ' � seal �system. Please see Addendvm �1 dated �
SUITE 201 3/17/94, attached. �
444 BUNKER ROAD � i
, WEST PALM BEACH NeW Comment: I
FLORIDA 33405-3694 A-7 Addendum 1, Item 5: Undercuts on doors in
� rated or smoke tight partitions cannot ;
407/585�sso� exceed 3/4 inch from the floor slab to the '
FAX. 407/585-9628 F
bottom of the door. � 1
�RINqPl11. i Response: Project Manual, page 0821-05, by reference
Donald R. Edge, AIA to NFPA 80 re ires maY{+*+++� n '
. � 3/4 clearance �
MANAQER (NFPA-80, 3-6.1) . By copy� of this letter, ' I�
Jeffrey L othan Me are .reminding the Contractor of this � I
SECRETARY ' requirement. � �
�nifred M. Kennedy j � I
I j �
; Responses to the air conditioning and electri�cal comments are �
being provided by Peninsula Engineering, and� are attached. �
I
'i Ver truly yo s, � i
� , ► r
I '
� j
�
; �ff ey L. Kathan, Office Manager �
i I
� cc: , East Pasco Medical Center �
,�nR0002os � Peninsula Engineerinq �
,�a►c000es , , �
Poole Construction ' c.�, �
, ; pmcahca.31T
I
� II �
�
i
I
i I �
The Edge Group, P.A. - 2 - �,March 10, 1994 ;
i
�
I j ,
RESPONSE• ' I ,
I �
We have complied. See replacement Sheet E-21, ,Star 1, dated
December 16, 1993.
�
i
�
COMMENT• � I I
�
E-10 Provide fire alarm pull station at the entrance to stair �
J. �
j ,
i �
RESPONSE: ;
� S�air J is not a means of Egress Stair. This� Stair is for
cc�mmunicating only. See replacement Sheet E-21, � Star 1, dated
December 16, 1993. I �
i �
i
This concludes the comments/responses. If you have any questions
or require any additional information, please contact this office.
i
Sincerely, ;
� !
�G� �
erry N. Thompson
Project Manager
TNT/mp � I I
� i ,
, � �
I
� i
I I I
I I
�
� �
� ;
I i � i
i _ ,
� i
- � �� �
' I �
� .MAR���4 :�9�4 �3 � �
I
, ' ,
� ,
�
� i �
' '
� ' � ;
March 10, �1994 , '
i '
The Edge Group, P.A.
444 Bunker Road, Suite 201 �
West Palm Beach, FL 33405-3694 �
A�tn: J�ff Kathan �
i
RE: EastlPasco Medical Center
Outpatient Surgery Unit '
Log No. H-425-R �
PEI Project No. H93-16
� �
Dear Jeff: , ,
The following are the AHCA comments dated February 17, 1994 with �
our responses.
I �
M�CHANICAL '
COMMENT• �
�
AC-1 ' Provide equal relative air pressure in the,� "PCU" corridor
ventilation system. j
, �
� i
RESPONSE• 'I I i
i � ,
We have complied. See replacement sheet M-10, Star 1, dated
December �16, 1993. Return system modified to provide equal �
p�ressure in "PCU" and "ICU" corridors. ;
�
COMMENT•
S�eet E-21:
�
i
E�9 Delete the "Do not use elevator" warning 1'ights from this
floor. The warning light is to be located only at the
i designated and alternate levels per Chapter 4A-47, F.A.C.
� ��
�
1833 Edgewater Drive ■ Orlando, Florida 32804 ■ 407/246-1688 i FAX 407/246-1664
�
�
i
: . �
I
I
The EdgelGroup, P.A. - 2 - March 10, 1994
i
�
�
RESPONSEI
I �
We have complied. See replacement Sheet E-21, Star l, dated
December 16, 1993.
COMMENT: ;
I
E-10 ; Provide fire alarm pull station at the entrance to stair
I J.
�I
RE S PONS E':
Stair J is not a means of Egress Stair. This Stair is for
communicating only. See replacement Sheet E-21, Star 1, dated
Decemberll6, 1993 .
�
�
This concludes the comments/responses. If you have any questions
or require any additional information, please contact this office.
I
Sincerely, -
�
�
� �
� erry N.i Thompson
Project Manager
I
TNT/mp I
�
I
�
i
�
�
� : -
�
� - .
I ` - `.
i _ - . ����
� - - - � � y�
. 6 aR� �: 4�a���. �f�l
� _� _- �
� .
i
�
� �
i �
� . �
I
,�
�� '
I March 17, 1994
_ I I
i
i �
� Mr. James R. Gregory, Bureau Chief
% '� Office of Plans � Construction
��e i Agency for Health Care Administration
� 2727 Mahan Drive
�
�
� Tallahassee, FL 32308
edge !group
� Re: East Pasco Medical Center
� � South Addition, Phase III
p.a. �
I AHCA Log #H-425-R
I , Review letter dated Feb. 17, 1994
architects �
�i Deas Mr. Gregory:
desig� ners �
c o n s uita nts �� We are herewith submitting responses to comments in the above
� referenced review letter:
planners i -�
i n t e f� I O � S �, Comment: A-2 Sheet A-6-2, Detail 2/A6-2: Provide a
� ; manufacturer's proprietary system of fire
� stop and smoke tight seal at edge of floor
� slabs and curtain wall.
�
�
; Provide a proprietary system that includes
I , the firestop material, retention method and
i � smoke seal material.
i
. � Response: We have revised our project manual to more
� clearly reflect the used II3G �ire/3moke
� seal system. Please see ��deadum �1 dated
� � 3/17/94, attached.
suirE 20�j
444 BUNKER ROAD '
WEST PALIvi BEACH i New Comment:
FLORIDA 33405-3694 i A-7 Addendum 1, Item 5: Undercuts on doors in
i —
407/585i sao� ' rated or smoke tight partitions cannot
F�x. 407/585-9628 � exceed 3/4 inch from the floor slab to the
i bottom of the door.
�
�1NppM. l Response: Project Manual, page 0821-05, by re£erence
Donaid R. Eige, A.I.A
, to NFPA 80, requires m�Y++n+++++ 3/4" clearance
MANAOER � �, (NFPA-80, 3-6.1) . By copy of this letter,
Jeifrcy L Kathan Ke are remiading the Contractor of thia
SECRE7ARY I requirement.
�nifred M. Kennedy
I Responses to the air conditioning and electrical comments are
being provided by Peninsula Engineering, and are attached.
Ver truly yo s,
�
r
�ff ey L. Kathan, Office Manager
cc: East Pasco Medical Center
,�nR0002osol, i Peninsula Engineerinq
��wc000e6�� i Poole Construction C:\epmeaAca.a�,
I �
� I �
i
,. . . ._ �
I
i �
0 � the edge group, p.a.
I 444 9UNKIER ROAD WFST PALlA 8£J�CH
i fLORIDA 33405-J694 447/6eb-8307
II
I I
I I
I� I
I li
il �I
��
EAS�T PASCO MEDICAL CENTER
Sou'th Addition, Phase III
AHCA Log #H-4�I25R
I �
ADDENDUM N0. 1, March 17, 1994�
Thelintent anld purpose of this addendum is to augment or modify the Contract
Documents (Pro�ect Manual and/or drawings) . This addendum shall supersede
conf�licting requirements of the Contract Documents.
Iteml 1 - Revi led Drawings
I �
� A) A6�,-2 - Revised Detail #2 with smoke stop (rev. date 3/17/94)
�I
B) A6=4 - Added Details #16 and #17 with variations on smoke stop (rev.
Idate 3/17/94)
C) M-ll - Revised„relative air pressures (rev. date 12/6/93)
D) E-2�1 - Delete do not use elevator warning lights
� (rev. date 12/6/93)
I - Add note regarding exiting at stair "J" (rev.date 12/6/93)
�
I �
�
�
_ - - _' 1
I '_��� _-- '
i ; -
� -
C:\E4MCAdd].i �7 � ' - -
I � ^'
� � _ � �
�' ,, �1,�" a .-_^ ,
� `� � _, .
,� � ; - � .
� �� � -