March 10, i1994 � ;
�
� ,
The Edge Group, P.A. � �
444 Bunker Road, Suite 201 � �
West Pa1m Beach, FL 33405-3694 � ,
Attn: Jeff Kathan I
Ri: East� Pasco Medical Center � '
I
Outp�atient Surgery Unit � ,
Log !No. H-425-R ! �
PEI ;Project No. H93-16 ,
Dear Jeff: —' - ; ,
�
The following are the AHCA comments dated Fehruary 17, 1994 with I
iur responses. j i
�
1dE CH�,DTI CAL ; �
� �
COMMENT• '
aC-1 Provide equal relative air pressure in the "PCU" corridor �
i ventilation system.
i �
RESPONSE• �
I
We havel•complied. See replacement sheet M-10„ S�ar 1, dated � �
December; 16, 1993. Return system modified to provide equal
pressureiin "PCU" and "ICU"_ Corridors. i
I �" � ,
�COMMENT•I �
. i i
I
�Sheet Ei21: ' ,1 . I I
E-9 I Delete the "Do not us-e elevator" warningl ligl�ts from this '
� floor. The warning;�light is to be located only at the ;
Idesignated and alternate levels per Chapter 4A-47, F.A.C. �
-. -, _._,.._ ; _ .. ,
. � �
' � ,
1833 Edgewater Drive; ■ Orlando, Florida 32804 ■ 407/246-1 I8 � FAX 407/246-1664
, �
, ,
, "�,>��. L i . I
I
_ - - � I
, -
, � , �
i I �
: ` i i � i
I '
�
0 ; the edge group, p.a.
�
I �44 BUNKER ROAO WEST PAIJA BEACH !
I FLORIDA 33405-369t 447/58b-9307 I - 1
I
'
� ' �
i � 1
i I
i
�
�
�
EA.ST PASCO MEDICAL CENTER �I ;
South Addition, Phase III
AHCA Log #H-425R �
ADDENDUM NO.i 1, March 17, 1994 �
The intent and purpose of this addendum is to augment or modify the Contract
Do�cuments (Project Manual and/or drawings) . This addendumi shall supersede
conflicting �requirements of the Contract Documents. �
Item 1 - Revised Drawings
A) A6-2 - Revised Detail ##2 with smoke stop (rev. date 3/17/94)
I �
B) A6-4 - Added Details #16 and #17 with variations on smoke stop (rev.
date 3/17/94)
C) �M-10 - Revised relative air pressures (rev. date 12/6/93)
D) �E-21 - Delete "do not use elevator" warning lights
(rev.. date 12/6/93) �
- Add note regarding exitinq at stair "J" (rev.date 12/6/93)
�
I
I ,
' �
� � ,
, �
�
�
�� I
, � i ,
i _ - ,
� - -. ,
� i _ _
C:\EPMCAdd1.317 i , �
� � :
Z���_ - �
I, � � -_ �1? - � .
. � , , - �
�
� � � � �
� ,
� i �
� i � �
� ; . I
I ! March 17, 1994 � �
�
I � �
I I I
i Mr. James R. Gregory, Bureau Chief � i
� Office of Plans & Construction � ;
��e ' Rgency for Health Care Administration I !
� 2727 Mahan Drive �
Tallahassee, FL 32308 I ;
edge group , �
' Re: East Pasco Medical Center
� South Addition, Phase III �
P•a• ' AHCA Log #H-425-R �
, � � .
� Review letter dated Feb. 17, 1994 � ;,
architects ; ,
� Dear Mr. 6regory: �� , I
designers ; � -
�
c o n s ulto nts I � We are herewith submitting responses to comments in the above _ ;
referenced review letter:
i planners � ;
� I Cl t 8 r;I O � S Comment: A-2 Shee� A-6-2, Detail 2/A6;-2: Provide a j
� manufacturer's proprietary system of fire ;
, stop and smoke tight seal iat edge of floor �
� slabs and curtain wall. � �
�
, � Provide a proprietary system that includes i
; the firestop material, retention method and '
; smoke seal material. �
,
, , ;
. i Response: We have renised our project manual to more
� clearly reflect the used USG �'ire/Smoke I
� ' � seal �system. Please see Addendvm �1 dated �
SUITE 201 3/17/94, attached. �
444 BUNKER ROAD � i
, WEST PALM BEACH NeW Comment: I
FLORIDA 33405-3694 A-7 Addendum 1, Item 5: Undercuts on doors in
� rated or smoke tight partitions cannot ;
407/585�sso� exceed 3/4 inch from the floor slab to the '
FAX. 407/585-9628 F
bottom of the door. � 1
�RINqPl11. i Response: Project Manual, page 0821-05, by reference
Donald R. Edge, AIA to NFPA 80 re ires maY{+*+++� n '
. � 3/4 clearance �
MANAQER (NFPA-80, 3-6.1) . By copy� of this letter, ' I�
Jeffrey L othan Me are .reminding the Contractor of this � I
SECRETARY ' requirement. � �
�nifred M. Kennedy j � I
I j �
; Responses to the air conditioning and electri�cal comments are �
being provided by Peninsula Engineering, and� are attached. �
I
'i Ver truly yo s, � i
� , ► r
I '
� j
�
; �ff ey L. Kathan, Office Manager �
i I
� cc: , East Pasco Medical Center �
,�nR0002os � Peninsula Engineerinq �
,�a►c000es , , �
Poole Construction ' c.�, �
, ; pmcahca.31T
I
� II �
�
i
I
i I �
The Edge Group, P.A. - 2 - �,March 10, 1994 ;
i
�
I j ,
RESPONSE• ' I ,
I �
We have complied. See replacement Sheet E-21, ,Star 1, dated
December 16, 1993.
�
i
�
COMMENT• � I I
�
E-10 Provide fire alarm pull station at the entrance to stair �
J. �
j ,
i �
RESPONSE: ;
� S�air J is not a means of Egress Stair. This� Stair is for
cc�mmunicating only. See replacement Sheet E-21, � Star 1, dated
December 16, 1993. I �
i �
i
This concludes the comments/responses. If you have any questions
or require any additional information, please contact this office.
i
Sincerely, ;
� !
�G� �
erry N. Thompson
Project Manager
TNT/mp � I I
� i ,
, � �
I
� i
I I I
I I
�
� �
� ;
I i � i
i _ ,
� i
- � �� �
' I �
� .MAR���4 :�9�4 �3 � �
I
, ' ,
� ,
�
� i �
' '
� ' � ;
March 10, �1994 , '
i '
The Edge Group, P.A.
444 Bunker Road, Suite 201 �
West Palm Beach, FL 33405-3694 �
A�tn: J�ff Kathan �
i
RE: EastlPasco Medical Center
Outpatient Surgery Unit '
Log No. H-425-R �
PEI Project No. H93-16
� �
Dear Jeff: , ,
The following are the AHCA comments dated February 17, 1994 with �
our responses.
I �
M�CHANICAL '
COMMENT• �
�
AC-1 ' Provide equal relative air pressure in the,� "PCU" corridor
ventilation system. j
, �
� i
RESPONSE• 'I I i
i � ,
We have complied. See replacement sheet M-10, Star 1, dated
December �16, 1993. Return system modified to provide equal �
p�ressure in "PCU" and "ICU" corridors. ;
�
COMMENT•
S�eet E-21:
�
i
E�9 Delete the "Do not use elevator" warning 1'ights from this
floor. The warning light is to be located only at the
i designated and alternate levels per Chapter 4A-47, F.A.C.
� ��
�
1833 Edgewater Drive ■ Orlando, Florida 32804 ■ 407/246-1688 i FAX 407/246-1664
�
�
i
: . �
I
I
The EdgelGroup, P.A. - 2 - March 10, 1994
i
�
�
RESPONSEI
I �
We have complied. See replacement Sheet E-21, Star l, dated
December 16, 1993.
COMMENT: ;
I
E-10 ; Provide fire alarm pull station at the entrance to stair
I J.
�I
RE S PONS E':
Stair J is not a means of Egress Stair. This Stair is for
communicating only. See replacement Sheet E-21, Star 1, dated
Decemberll6, 1993 .
�
�
This concludes the comments/responses. If you have any questions
or require any additional information, please contact this office.
I
Sincerely, -
�
�
� �
� erry N.i Thompson
Project Manager
I
TNT/mp I
�
I
�
i
�
�
� : -
�
� - .
I ` - `.
i _ - . ����
� - - - � � y�
. 6 aR� �: 4�a���. �f�l
� _� _- �
� .
i
�
� �
i �
� . �
I
,�
�� '
I March 17, 1994
_ I I
i
i �
� Mr. James R. Gregory, Bureau Chief
% '� Office of Plans � Construction
��e i Agency for Health Care Administration
� 2727 Mahan Drive
�
�
� Tallahassee, FL 32308
edge !group
� Re: East Pasco Medical Center
� � South Addition, Phase III
p.a. �
I AHCA Log #H-425-R
I , Review letter dated Feb. 17, 1994
architects �
�i Deas Mr. Gregory:
desig� ners �
c o n s uita nts �� We are herewith submitting responses to comments in the above
� referenced review letter:
planners i -�
i n t e f� I O � S �, Comment: A-2 Sheet A-6-2, Detail 2/A6-2: Provide a
� ; manufacturer's proprietary system of fire
� stop and smoke tight seal at edge of floor
� slabs and curtain wall.
�
�
; Provide a proprietary system that includes
I , the firestop material, retention method and
i � smoke seal material.
i
. � Response: We have revised our project manual to more
� clearly reflect the used II3G �ire/3moke
� seal system. Please see ��deadum �1 dated
� � 3/17/94, attached.
suirE 20�j
444 BUNKER ROAD '
WEST PALIvi BEACH i New Comment:
FLORIDA 33405-3694 i A-7 Addendum 1, Item 5: Undercuts on doors in
i —
407/585i sao� ' rated or smoke tight partitions cannot
F�x. 407/585-9628 � exceed 3/4 inch from the floor slab to the
i bottom of the door.
�
�1NppM. l Response: Project Manual, page 0821-05, by re£erence
Donaid R. Eige, A.I.A
, to NFPA 80, requires m�Y++n+++++ 3/4" clearance
MANAOER � �, (NFPA-80, 3-6.1) . By copy of this letter,
Jeifrcy L Kathan Ke are remiading the Contractor of thia
SECRE7ARY I requirement.
�nifred M. Kennedy
I Responses to the air conditioning and electrical comments are
being provided by Peninsula Engineering, and are attached.
Ver truly yo s,
�
r
�ff ey L. Kathan, Office Manager
cc: East Pasco Medical Center
,�nR0002osol, i Peninsula Engineerinq
��wc000e6�� i Poole Construction C:\epmeaAca.a�,
I �
� I �
i
,. . . ._ �
I
i �
0 � the edge group, p.a.
I 444 9UNKIER ROAD WFST PALlA 8£J�CH
i fLORIDA 33405-J694 447/6eb-8307
II
I I
I I
I� I
I li
il �I
��
EAS�T PASCO MEDICAL CENTER
Sou'th Addition, Phase III
AHCA Log #H-4�I25R
I �
ADDENDUM N0. 1, March 17, 1994�
Thelintent anld purpose of this addendum is to augment or modify the Contract
Documents (Pro�ect Manual and/or drawings) . This addendum shall supersede
conf�licting requirements of the Contract Documents.
Iteml 1 - Revi led Drawings
I �
� A) A6�,-2 - Revised Detail #2 with smoke stop (rev. date 3/17/94)
�I
B) A6=4 - Added Details #16 and #17 with variations on smoke stop (rev.
Idate 3/17/94)
C) M-ll - Revised„relative air pressures (rev. date 12/6/93)
D) E-2�1 - Delete do not use elevator warning lights
� (rev. date 12/6/93)
I - Add note regarding exiting at stair "J" (rev.date 12/6/93)
�
I �
�
�
_ - - _' 1
I '_��� _-- '
i ; -
� -
C:\E4MCAdd].i �7 � ' - -
I � ^'
� � _ � �
�' ,, �1,�" a .-_^ ,
� `� � _, .
,� � ; - � .
� �� � -
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.