HomeMy WebLinkAbout7050 GALL BLVD (76) . I
.- , �
�
�_. , -
' y' I _
� I I
REVISION NO 1 _
� ; i r ��,�
NOVEMBER l, 1999 �\� �
�
E.R. RENOiATION AND ADDITION
EAST PASCO MEDICAL CENTER
?EPHYRHIL';LS, FLORIDA
� i
ESa PROJECT NO. 99033.00
This Revision forms a part of the Contract Documents and modifies the original Bidding
]�ocuments, dated August 25, 1999, as outlined here in addition to being shown on the drawings
as Delta 2, dated November 1, 1999:
I
CHANGES TO THE DRAWINGS
; �
' Sheet A-7, Fiist Floor Plan—Noted and Dimensioned:
. 1. Add three more admissions stations to the original scope of work and add an operators
station as indicated in the enclosed Sheet A-7, dated November 1, 1999, Delta No. 2.
2. Add two exam rooms and relocate the wheelchair storage space as indicated in the
enclosed Sheet A-7, dated November 1, 1999, Delta No. 2.
Sheet A-8, Slecond Floor Plan—Noted and Dimensioned:
�
1. Incorporate the cath lab film file storage and pathologist's office as indicated in the
enclosed Sheet A-8, dated November 1, 1999, Delta No. 2.
.
Sheet A-9, Roof Plan:
1. Incorporate the location change to the exhaust fan as indicated in Sheet A-9, dated
� November 1, 1999, Delta No. 2.
�
Sheet A-15, Large Scale Plans:
1. Incorporate the casework elevations into the drawings as indicated in the enclosed Sheet
� A-15,�dated November 1, 1999, Del�ta No. 2.
�
Sheet A-21, First Floor Plan—Reflected Ceiling:
1. Incorporate the ceiling changes as required for the new admissions stations, operator
station and the new exam rooms. These changes are indicated in the enclosed Sheet A-
21, dated November 1, 1999, Delta No. 2.
; i
--� i
�- REVISION i O. 1 PAGE 1 JOB NO. 99033.00
s i
' I
_` I
I i �
� i
f- � I
� i i '
Sheet A-22, Second Floor—Reflected Ceiling Plan:
i
� 1. Incorporate the changes as indicated in the enclosed Sheet A-22, dated November 1,
1999, Delta No. 2.
, I
Sheet A-23, C;asework Elevations and Details:
�
1. Delete�the original drawing and substitute with the enclosed Sheet A-23, dated November
l, 1999, Delta No. 2.
, �
S'heet A-24, Door Schedule and Details:
l�. Incorp,orate the changes to door numbers 115 and 205 as indicated in the enclosed Sheet
A-24, dated November 1, 1999, Delta No. 2.
; �
Sheet F-1, Fumiture, Finishes, and Signage—First Floor Plan:
1. Incorporate the changes to the revised areas as indicated in the enclosed drawing F-1,
dated�November 1, 1999, Delta No. 2.
�
Sheet F-2, Furniture, Finishes, and Signage—Second Floor Plan:
' �
1. Incorporate the changes to the revised areas as indicated in the enclosed drawing F-2,
dated November l, 1999, Delta No. 2.
Sheet F-3, Fin�ishes —First Floor Plan:
i
, I
1. Incorporate the enclosed Sheet F-3, dated November 1, 1999, Delta No. 2, in its entirety '
into tlie project scope of work.
I
�
;
12efer to the alttached M, P, &E Revision.
� � I
, : �
, �
r I �
,.�
REVISION i O. 1 PAGE 2 JOB NO. 99033.00
i
� �
, �
i �
. � �
�
�
: Phoenix Design Group Project Revision No. �
104 Woodmont Blvel Suite 218
� Nashville, �v s72os NOVEMBER 1, 1999
615-386-9287 voice! 615-385-0922 fax
Project: East P'asco Medical Center ER Renovation To: Jim Breslin
Location: Zephyrhills, FZ From: Jon Long
Subjert: Revision No. 1 Project No: 98027.06
i , �
Revision No.;l �� �
,
]�R Renovation and Addition - t�l�fl9p
�ast Pasco Medical Center
�ephyhills, FL
�SA Project�No. 98033.00
PDG ProjectilNo. 98027.06
This Addendum forms an integral part of the Contract Documents and modifies the original Documents
dated August�25, 1999 as outlined here in addition to being shown on the drawings as Delta 2, dated
November 1,11999.
, ,-' - - �_
�HANGES TO TH� DRAWINGS - �
I --� -` � G� --- �
�-
VIECHANICAL �? .; ' 'J'r!�_--,
� �,.�,I'�.� ,-_, --
,. - � - - �
� ,,_ I
,..
Sheet M0.01,� Schedules: ,
1. Change schedules as shown on Sheet M0.01, Delta 2, dated November 1, 1999.
Sheet M1.01; First Floor Plan—HVAC: �
' I
l. Revise thle HVAC in the admitting, lobby and e;cam areas as shown on Sheet M1.01, Delta 2, dated
November 1, 1999.
�
i �
Sheet M1.02; First Floor Plan—HVAC:
i
1. Revise th'e piping in the admitting, lobby and exam areas as shown on Sheet Ml.01, Delta 2, dated
November 1, 1999.
�
Sheet Ml.0�, Second Floor Plan—HVAC:
;1. Revise the HVAC in the Pathology Office and Film Storage room as shown on Sheet M1.03, Delta
2, dated'November 1, 1999.
' I
Revision No. 1 Page-1 Phoenix Design Group, Inc.
r
I � 104 Wwdmon[Blvd •Suite 218•Nashville,TN 37205•(61�)336-9237
I
i .
. �
I � �
r �
; j PLUMBING �
�
Sheet P0.00, Plumbing Legend and Schedules:
1: Changed P-11 Water Closet specification to a wall hung water closet as shown on Sheet P0.00, Delta
2, dated November l, 1999.
; �
S�heet P1.01, First Floor Plan -Underground Plumbing:
I
1. Add P-3 L'avatory and associated piping at Exam 1-124 as shown on Sheet P1.01, Delta 2, dated
November l, 1999.
2;. Moved sink and associated piping at Nurse's Station 1-107 as shown on Sheet P1.01, Delta 2, dated
November 1, 1999. '
3�. H.C. Toilet 1-126 moved adjust piping as shown on Sheet P1.01, Delta 2, dated November 1,1999.
�
Sheet P2.01, Eirst Floor Plan—Pluinbing:
� i
i
1. Add P-3 Liavatory and associated piping at Exam 1-124 as shown on Sheet P2.01, Delta 2, dated
' November 1, 1999.
2�. Moved s'�ink and associated piping at Nurse's Station 1-107 as shown on Sheet P2.01, Delta 2, dated
� November l, 1999.
3. H.C. Toilet 1-126 moved adjust piping as shown on Sheet P2.01, Delta 2, dated November 1,1999. i
4,. Modified waste piping serving P-7 floor drain above Soffit Area as shown on Sheet P2.01, Delta 2, '
' dated No';ember 1, 1999.
i
Sheet P2.02, Second Floor Plan—Plumbing:
�
1. Modified rain water leader piping, vent piping, and floor drain location in Mechanical 2-101 as
shown on�Sheet P2.02, Delta 2, dated November 1, 1999.
� I
Sheet P3.01, First Floor Plan- Medical Gases:
l. Added medical gas outlets at Triage 1-103, Exam 1-124, and Exam 1-125 as shown on Sheet P3.01,
Delta 2, d�ated November 1, 1999.
�
Sheet FP-1, Fire Protection- First Floor—Renovation:
1. Modifiedjhead locations and associated piping for revised areas as shown on Sheet FP-1, Delta 2,
dated November 1, 1999.
ELECTRICI
i
�
Sheet E1.01, i ighting First Floor Plan:
�
1. Revise lighting layout in admitting, lobby, and exam areas as shown on Sheet E1.01, Delta 2, dated
Novemb�er 1, 1999.
i '
� Revision No. ll Page-2 PhoeniY Design Group, Inc.
� � 104 Woodmont Blvd•Suite 218•Nashville,TN 3720�•(615)356-9257
i i
� I
i
1 �
�
r , , �
. � �
Sheet E 1.02, Electrical Second Floor Plan:
� I �
1.1 Revise lighting and power layout in Cath Storage and Pathology office as shown on Sheet E1.02,
� Delta 2, dated November 1, 1999_
I �
Sheet E2.01, Rower and Systems First Floor Plan:
I
1. Revise power and systems layout in admitting, lobby, and exam areas as shown on Sheet E2.01,
�
� Delta 2, dated November 1, 1999.
�
�
I
Sheet E6.02, i lectrical Schedules:
1 I Revise pariel schedules DIAGDP, ECDIAG, ECER, ECB, EQERL, EQDIAG, EQB, and SA as
� shown on i heet E6.02, Delta 2, dated November 1, 1999.
� i
i '
�
i
i I
�
I I
� �
; I
' I
� ' �
I
, �
I
i I
, I
I
I
I
I
i
' Rievision No. l ; Page-3 Phoenix Design Group, Inc.
� 104 Woodmont Blvd•Suite 21S•Nashvil]e,T[Y 37205•(615)356-9257
' I
s I
' I
� I
�
, i �,
� � C'r�&A �, Proj ect Memorandum. '
Gene Burton&Associates
1 X;8 Seaboard I,ane, Suite 100
` Franklin, Tenti,essee 37067
�
[61�5] 376-3100
[6�5] 376-311� (FA�
http://www.gbainc.co�n
, ;
To; Jim Breslin i Project:East Pasco Med.ical Center—Temp ER
, i
�'rom:Philip Gazrett Location:Zephyrhills,Florida
i -
Su�j�ct:�tavasioz�? Page lof 1
Dar.�: 10125/99 � Fesponse Requested: _Yes X No
�
,
Changes to Communication bravviz�gs CM3 are�follows:.
� Moved voice/dats oudet to headwall in room 1-112.
Moved voice/data outlot to headwall in room 1-11I.
Added Camera on oxterzor wa11 of Vesribule I-121B. -
� Added Security Monitor at the Nurses Stati,ozt 1-107.
Added Securiry Keypad,pusk�Button Door Release,Door Coutact,and Magnetic Lock to door#107.
Added two(2)voice/data cables in Wor1c Room 1-lOSA.
Added two(2)voice/data eables on back counter oFadmit 1-105.
� Changed ehrea(3)voice/data cables to two(2)voice/data cables on bac�C counter of Admit 1-105 ,
Added three(3)registration cubicles to Admit 105 equippod as follows:
� Added four(4)voice/data cables per new re�istration cubicle.
Added Computer per new regisuation cubicle.
, A;dded Multi Line dcsk p�ozae per netv registr�arion cubi,cle.
Added Panie/Duross button to each new registzation cubicle. ,
Moved door hardware o�door# 105 to where the door'was relocated.
� Moved door hardware on door#102 to whero tb�e door�vas relocated. '�
Moved door liardwaze on door#1 IS to where the door was rolocated.
Added Camera in th.o�xltry 1-100 just outside door�I01.
Addcd four(4)voice/data cables to Opezator 1-104A. �
Moved PBX operators tolepb.one console to Operator 1-104A
;Replaced Mu�i'-I,ine telephone with a��X operator's console at�tecept. 1-IO�.
Chafnges to Communication Drawings CM�are as follows:
i Added three(�3�)voico/data cables to the new Pathology Office 2-105. i
Added a Multi�,ine Desk phone to the new�'atholo�;y Office 2-105.
Addod a Coznputer to the new Pathology O�ce 2-105.
�I
` G:1GBA Projects_AcrivolEast Pasco\Temp
ER\Coznmunications\Correspondence Com1102599_Projmemo Re�2.doe
F
II
� I
�
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.