REVISION NO 1 _
� ; i r ��,�
NOVEMBER l, 1999 �\� �
�
E.R. RENOiATION AND ADDITION
EAST PASCO MEDICAL CENTER
?EPHYRHIL';LS, FLORIDA
� i
ESa PROJECT NO. 99033.00
This Revision forms a part of the Contract Documents and modifies the original Bidding
]�ocuments, dated August 25, 1999, as outlined here in addition to being shown on the drawings
as Delta 2, dated November 1, 1999:
I
CHANGES TO THE DRAWINGS
; �
' Sheet A-7, Fiist Floor Plan—Noted and Dimensioned:
. 1. Add three more admissions stations to the original scope of work and add an operators
station as indicated in the enclosed Sheet A-7, dated November 1, 1999, Delta No. 2.
2. Add two exam rooms and relocate the wheelchair storage space as indicated in the
enclosed Sheet A-7, dated November 1, 1999, Delta No. 2.
Sheet A-8, Slecond Floor Plan—Noted and Dimensioned:
�
1. Incorporate the cath lab film file storage and pathologist's office as indicated in the
enclosed Sheet A-8, dated November 1, 1999, Delta No. 2.
.
Sheet A-9, Roof Plan:
1. Incorporate the location change to the exhaust fan as indicated in Sheet A-9, dated
� November 1, 1999, Delta No. 2.
�
Sheet A-15, Large Scale Plans:
1. Incorporate the casework elevations into the drawings as indicated in the enclosed Sheet
� A-15,�dated November 1, 1999, Del�ta No. 2.
�
Sheet A-21, First Floor Plan—Reflected Ceiling:
1. Incorporate the ceiling changes as required for the new admissions stations, operator
station and the new exam rooms. These changes are indicated in the enclosed Sheet A-
21, dated November 1, 1999, Delta No. 2.
; i
--� i
�- REVISION i O. 1 PAGE 1 JOB NO. 99033.00
s i
' I
_` I
I i �
� i
f- � I
� i i '
Sheet A-22, Second Floor—Reflected Ceiling Plan:
i
� 1. Incorporate the changes as indicated in the enclosed Sheet A-22, dated November 1,
1999, Delta No. 2.
, I
Sheet A-23, C;asework Elevations and Details:
�
1. Delete�the original drawing and substitute with the enclosed Sheet A-23, dated November
l, 1999, Delta No. 2.
, �
S'heet A-24, Door Schedule and Details:
l�. Incorp,orate the changes to door numbers 115 and 205 as indicated in the enclosed Sheet
A-24, dated November 1, 1999, Delta No. 2.
; �
Sheet F-1, Fumiture, Finishes, and Signage—First Floor Plan:
1. Incorporate the changes to the revised areas as indicated in the enclosed drawing F-1,
dated�November 1, 1999, Delta No. 2.
�
Sheet F-2, Furniture, Finishes, and Signage—Second Floor Plan:
' �
1. Incorporate the changes to the revised areas as indicated in the enclosed drawing F-2,
dated November l, 1999, Delta No. 2.
Sheet F-3, Fin�ishes —First Floor Plan:
i
, I
1. Incorporate the enclosed Sheet F-3, dated November 1, 1999, Delta No. 2, in its entirety '
into tlie project scope of work.
I
�
;
12efer to the alttached M, P, &E Revision.
� � I
, : �
, �
r I �
,.�
REVISION i O. 1 PAGE 2 JOB NO. 99033.00
i
� �
, �
i �
. � �
�
�
: Phoenix Design Group Project Revision No. �
104 Woodmont Blvel Suite 218
� Nashville, �v s72os NOVEMBER 1, 1999
615-386-9287 voice! 615-385-0922 fax
Project: East P'asco Medical Center ER Renovation To: Jim Breslin
Location: Zephyrhills, FZ From: Jon Long
Subjert: Revision No. 1 Project No: 98027.06
i , �
Revision No.;l �� �
,
]�R Renovation and Addition - t�l�fl9p
�ast Pasco Medical Center
�ephyhills, FL
�SA Project�No. 98033.00
PDG ProjectilNo. 98027.06
This Addendum forms an integral part of the Contract Documents and modifies the original Documents
dated August�25, 1999 as outlined here in addition to being shown on the drawings as Delta 2, dated
November 1,11999.
, ,-' - - �_
�HANGES TO TH� DRAWINGS - �
I --� -` � G� --- �
�-
VIECHANICAL �? .; ' 'J'r!�_--,
� �,.�,I'�.� ,-_, --
,. - � - - �
� ,,_ I
,..
Sheet M0.01,� Schedules: ,
1. Change schedules as shown on Sheet M0.01, Delta 2, dated November 1, 1999.
Sheet M1.01; First Floor Plan—HVAC: �
' I
l. Revise thle HVAC in the admitting, lobby and e;cam areas as shown on Sheet M1.01, Delta 2, dated
November 1, 1999.
�
i �
Sheet M1.02; First Floor Plan—HVAC:
i
1. Revise th'e piping in the admitting, lobby and exam areas as shown on Sheet Ml.01, Delta 2, dated
November 1, 1999.
�
Sheet Ml.0�, Second Floor Plan—HVAC:
;1. Revise the HVAC in the Pathology Office and Film Storage room as shown on Sheet M1.03, Delta
2, dated'November 1, 1999.
' I
Revision No. 1 Page-1 Phoenix Design Group, Inc.
r
I � 104 Wwdmon[Blvd •Suite 218•Nashville,TN 37205•(61�)336-9237
I
i .
. �
I � �
r �
; j PLUMBING �
�
Sheet P0.00, Plumbing Legend and Schedules:
1: Changed P-11 Water Closet specification to a wall hung water closet as shown on Sheet P0.00, Delta
2, dated November l, 1999.
; �
S�heet P1.01, First Floor Plan -Underground Plumbing:
I
1. Add P-3 L'avatory and associated piping at Exam 1-124 as shown on Sheet P1.01, Delta 2, dated
November l, 1999.
2;. Moved sink and associated piping at Nurse's Station 1-107 as shown on Sheet P1.01, Delta 2, dated
November 1, 1999. '
3�. H.C. Toilet 1-126 moved adjust piping as shown on Sheet P1.01, Delta 2, dated November 1,1999.
�
Sheet P2.01, Eirst Floor Plan—Pluinbing:
� i
i
1. Add P-3 Liavatory and associated piping at Exam 1-124 as shown on Sheet P2.01, Delta 2, dated
' November 1, 1999.
2�. Moved s'�ink and associated piping at Nurse's Station 1-107 as shown on Sheet P2.01, Delta 2, dated
� November l, 1999.
3. H.C. Toilet 1-126 moved adjust piping as shown on Sheet P2.01, Delta 2, dated November 1,1999. i
4,. Modified waste piping serving P-7 floor drain above Soffit Area as shown on Sheet P2.01, Delta 2, '
' dated No';ember 1, 1999.
i
Sheet P2.02, Second Floor Plan—Plumbing:
�
1. Modified rain water leader piping, vent piping, and floor drain location in Mechanical 2-101 as
shown on�Sheet P2.02, Delta 2, dated November 1, 1999.
� I
Sheet P3.01, First Floor Plan- Medical Gases:
l. Added medical gas outlets at Triage 1-103, Exam 1-124, and Exam 1-125 as shown on Sheet P3.01,
Delta 2, d�ated November 1, 1999.
�
Sheet FP-1, Fire Protection- First Floor—Renovation:
1. Modifiedjhead locations and associated piping for revised areas as shown on Sheet FP-1, Delta 2,
dated November 1, 1999.
ELECTRICI
i
�
Sheet E1.01, i ighting First Floor Plan:
�
1. Revise lighting layout in admitting, lobby, and exam areas as shown on Sheet E1.01, Delta 2, dated
Novemb�er 1, 1999.
i '
� Revision No. ll Page-2 PhoeniY Design Group, Inc.
� � 104 Woodmont Blvd•Suite 218•Nashville,TN 3720�•(615)356-9257
i i
� I
i
1 �
�
r , , �
. � �
Sheet E 1.02, Electrical Second Floor Plan:
� I �
1.1 Revise lighting and power layout in Cath Storage and Pathology office as shown on Sheet E1.02,
� Delta 2, dated November 1, 1999_
I �
Sheet E2.01, Rower and Systems First Floor Plan:
I
1. Revise power and systems layout in admitting, lobby, and exam areas as shown on Sheet E2.01,
�
� Delta 2, dated November 1, 1999.
�
�
I
Sheet E6.02, i lectrical Schedules:
1 I Revise pariel schedules DIAGDP, ECDIAG, ECER, ECB, EQERL, EQDIAG, EQB, and SA as
� shown on i heet E6.02, Delta 2, dated November 1, 1999.
� i
i '
�
i
i I
�
I I
� �
; I
' I
� ' �
I
, �
I
i I
, I
I
I
I
I
i
' Rievision No. l ; Page-3 Phoenix Design Group, Inc.
� 104 Woodmont Blvd•Suite 21S•Nashvil]e,T[Y 37205•(615)356-9257
' I
s I
' I
� I
�
, i �,
� � C'r�&A �, Proj ect Memorandum. '
Gene Burton&Associates
1 X;8 Seaboard I,ane, Suite 100
` Franklin, Tenti,essee 37067
�
[61�5] 376-3100
[6�5] 376-311� (FA�
http://www.gbainc.co�n
, ;
To; Jim Breslin i Project:East Pasco Med.ical Center—Temp ER
, i
�'rom:Philip Gazrett Location:Zephyrhills,Florida
i -
Su�j�ct:�tavasioz�? Page lof 1
Dar.�: 10125/99 � Fesponse Requested: _Yes X No
�
,
Changes to Communication bravviz�gs CM3 are�follows:.
� Moved voice/dats oudet to headwall in room 1-112.
Moved voice/data outlot to headwall in room 1-11I.
Added Camera on oxterzor wa11 of Vesribule I-121B. -
� Added Security Monitor at the Nurses Stati,ozt 1-107.
Added Securiry Keypad,pusk�Button Door Release,Door Coutact,and Magnetic Lock to door#107.
Added two(2)voice/data cables in Wor1c Room 1-lOSA.
Added two(2)voice/data eables on back counter oFadmit 1-105.
� Changed ehrea(3)voice/data cables to two(2)voice/data cables on bac�C counter of Admit 1-105 ,
Added three(3)registration cubicles to Admit 105 equippod as follows:
� Added four(4)voice/data cables per new re�istration cubicle.
Added Computer per new regisuation cubicle.
, A;dded Multi Line dcsk p�ozae per netv registr�arion cubi,cle.
Added Panie/Duross button to each new registzation cubicle. ,
Moved door hardware o�door# 105 to where the door'was relocated.
� Moved door hardware on door#102 to whero tb�e door�vas relocated. '�
Moved door liardwaze on door#1 IS to where the door was rolocated.
Added Camera in th.o�xltry 1-100 just outside door�I01.
Addcd four(4)voice/data cables to Opezator 1-104A. �
Moved PBX operators tolepb.one console to Operator 1-104A
;Replaced Mu�i'-I,ine telephone with a��X operator's console at�tecept. 1-IO�.
Chafnges to Communication Drawings CM�are as follows:
i Added three(�3�)voico/data cables to the new Pathology Office 2-105. i
Added a Multi�,ine Desk phone to the new�'atholo�;y Office 2-105.
Addod a Coznputer to the new Pathology O�ce 2-105.
�I