Loading...
HomeMy WebLinkAboutZEPHYRHILLS BOTTLED WATER (2)WRA [1TU nF, PA R T�IF'lVT RUTLDIIVG RELOCATI0N PLAN HIGHLAND PARK 0080-00000- 0 0000- oo 00400- o _ 0000 SITU__ 0 WNER: �.sa ,�4 0040 OO PERRIER GROUP OF AMERICA CONTACT: CHUCK DEEM 0010 4250 CAMBRIDGE ROAD 31.19 FORT WORTH, TEXAS 76155 CITY OF ZEPHYRHILLS (817) 354-2972 oozy (817) 354-2999 FAX C.A.R.E.S. 0030 2.03 0011 BUCKEYE EXCAVATING IN PROPERTY LOCATION DETAIL =NTS SITE PLAN REVI FEE RECE _ - — = -_ - - -_ OGER - _ - -- TOWON _ Airport Manager = _ _ Building Dept.= ----E- =- Planning Dept. _- _ ING9 INCO -_ _ - DRA WING INDEX 1.1. COVER SHEET _ _ = 2. GENERAL NOTES APPROVED SUBJECTTO ATIACNED CONDITIONS • 3. SPRCIFICA CA TIONS ,h _ - 4. SITE PLAN 5. PAVING AND DRAINAGE PLAN ___ ZEPHYRH ILLS, FLORIDA 33540 SITE PLAN APPROVAL EXPRIES 6. GENERAL SECTIONS AND DETAILS (813),788 0400 - - - NOTE: E]\ G j '�j �j R ALL CONSTRUCTION DOCUMENTS MUST BEAR THE ENGINEER'S STAMP 1� ljT LL SURVEYOR. REQUIRED PERMITS SUBMITTED PERMIT - PERMIT EXPIRATION "APPROVED FOR CONSTRUCTION (THIS STAMP IS RED) IN ORDER GRANTED NUMBER_ C. FRED DEUEL & ASSOCIATES, INC. TO BE USED ON THE SITE. NO WORK MAY. COMMENCE UNTIL THE TOWSON-ROGERS ENGINEERING INC. S IFF.W.M.D. 5514 7STREET 5151 GALL BLVD. CONTRACTOR HAS SECURED SAID DOCUMENTS. ANY PLANS NOT BEARING NOTIC GENERAL PERMIT 2-9-00 2-16-00 4720479.001 1-25-05 th ZEPHYRHILLS, - FLORIDA 33541 SAID STAMP ARE NOT APPROVED FOR CONSTRUCTION_ ENVIRONMENTAL RESOURCE PERMIT 2-9-00 3-1-00 , 4620479.000 3-1-05 ZEPHYRHILLS, FLORIDA 33540 c r OFZEPHYRxILLs - (813) 788—O400 (813) 782-6717 IT SPKC. APPROVAL 2-1-00 2-9-0O N/A 2-9-01 (81 3) 782-5426 (FAX) 1 (8 3) 782-4978 ( FAX ) ZEPHYRHILLS SPRING WA TER ION PLANT EXPANSION #_ = I V'AT ?pLT fL''DA DrPIIL�ATT DTTTT fTXTn DL'T r1/'ATTflAT ?7T A AT GENERAL CONDITIONS (PRE -CONSTRUCTION) PRE -CONSTRUCTION CONFERENCE THE CONTRACTOR IS RESPONSIBLE TO ATTEND A PRE -CONSTRUCTION CONFERENCE WITH THE ENGINEER PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONTRACTOR: The contractor shall obtain oil FDOT Index sheets referenced on the plans prior to the Pre —Construction meeting. CONSTRUCTION PLANS All Construction Documents MUST bear the Engineer's stamp "APPROVED FOR CONSTRUCTION" in order to be used on the site. NO WORK MAY COMMENCE until the Contractor has secured said documents. Any plans not bearing said stamp are NOT approved for construction! NOTICE OF COMMENCEMENT THE CONTRACTOR SHALL NOTIFY THE OWNER, ENGINEER, COUNTY, WATER MANAGEMENT DISTRICT AND ANY PUBLIC AGENCIES INVOLVED ONE (1) WEEK PRIOR TO COMMENCING WORK. Failure to give this notice may result in the work being stopped until such notice is given. PERMITS AND LICENSES The -Contractor shall be responsible for securing all permits and licenses from all agencies as to highway entry, curb cuts, sewer - taps, etc., and shall pay all fees for same as applied to the execution of his work. GENERAL CONDITIONS (CONSTRUCTION) REVIEW AND INSPECTION Review by the Engineer of the work is for the purpose of assuring the Owner that the Construction Documents are property executed. - It is not incumbent upon the Engineer to notify the Contractor to begin, to stop, to resume work, to give early notice of rejection of faulty materials, workmanship or to superintend to the extent of relieving the Contractor of responsibility. - - - It is mutually agreed that the Engineer shall decide all questions, difficulties, and disputes relative to the interpretation of the Contract Documents or Construction. Work within the Pasco County- right of way shall be subject to CITY OF ZEPHYRHILLS Inspections. -- The Inspector shall have safe access to the work wherever it is in progress and the Contractor shall provide for such access and inspection. All work and materials furnished shall be subject to inspection by the Engineer, and the County and any part condemned by them shall be removed and replaced at the Contractor's expense. if the Contractor refuses to replace or delays for an unwarranted length of time in replacing such condemned work; the Owner may stop the Con— tractor, supplymen and materials to replace such condemned work. Alt expenses thereto shalt be deducted from the amount due to the Contractor from the Owner. if any work should be covered up without the approval of the Engineer, the Contractor shalt be responsible for exposing the work at the Contractor's expense. WORK STOPPAGE -- - The work shalt not be stopped by the Contractor without the consent of the Engineer and/or Owner unless the Engineer or Owner orders the worked stopped. A temporary suspension may be granted because of weather or other natural causes after the Contractor has notified the Engineer of said suspension in writing, - setting forth the causes and the date of re —commencement. CONTINGENCY WORK Whenever the Engineer deems it necessary to make construction changes or construction additions in order to make the finished product more closely comply with the intended scope of the plans, whether shown on the plans or not, the Contractor shall enter into a contingency agreement with the Owner to cover the cost of said changes. The price for said contingency shall conform as nearly as possible to the unit prices for similar work in the original contract. Changes may need to be approved by CITY OF ZEPHYRHILLS. - FINAL AUTHORITY - THE FINAL AUTHORITY FOR APPROVAL OF THIS PROJECT AND PLANS WILL BE CITY OF ZEPHYRHILLS. GENERAL CONDITIONS - CONSTRUCTION OF PROJECT - SUPERINTENDENCE The Contractor shall keep on his work during its progress a competent Superintendent. The Superintendent shall represent the Contractor in his absence and in all- directions given to him by the Engineer shall be as binding as if given to him by the Contractor. DRAWN - DATE C.E. T. 1-11-00 REVISION'S CHECKED DATE CAD DRAWING NAME CAD SCALE 99150BGE 1"=100' PROTECTION OF MONUMENTS The Contractor shall protect all survey permanent reference markers, bench marks, triangulation points, section corners, etc. If the work requires the relocation or movement of such a monument, the Contractor shall notify the Engineer -of such requirement and the Engineer shall reference and reset such - monuments at the Owner's expense. If the Contractor destroys any such points, the cost of replacement will be born by the Contractor. - This includes iron rods or others set as lot corners. CHANGES IN THE WORK The Engineers shall have the authority to make minor changes in the work not involving extra cost, but otherwise, NO CHANGE SHALL BE MADE EXCEPT WITH PRIOR WRITTEN ORDER FROM THE ENGINEER AND THE OWNER IN AN APPROVED CHANGE ORDER. Changes in work occuring in County right of way or changes on site which affect the project's compliance with the Pasco County Land Development Code shall be approved by CITY OF ZEPHYRHILLS. MAINTENANCE OF TRAFFIC Where the work is on or tying into a street or highway being utilized by traffic, the Contractor shall maintain traffic wherever possible by use of marked detours, stabilized roadbed, or other approved methods. The traffic maintenance plan shall conform to F.D.O.T. Roadway and Traffic Design Standards INDEX 600 (latest edition) and the Manua', of Uniform Traffic Control Devices and ITS Supplements (latest edition). REFERENCE TO OTHER SPECIFiCATIONS Where reference is made to specifications such as American Society for Testing Materials, (ASTM), Florida Department of Transportation, (F.D.O.T.), American Association of State Highway Officials (AASHO), the latest edition shall be used. LINES AND GRADES The Contractor shall furnish and set all 'tine and grade stakes, at his own expense, according to the dimensions shown on the plans. - MATERIALS Unless otherwise specified, all materials Shalt be new. Materials and workmanship shall be of good quality. The Contractor shall retain a reputable commercial laboratory who shall certify to the OWNER that all materials entering into the work are in accordance with these specifications. All testing reports are to be submitted to the Engineer for review. PROTECTION OF ADJOINING PROPERTIES The Contractor shall protect all properties outside the limits of construction and shall indemnify and hold harmless the Engineer against any claims or liabilities arising from damage to adjoining properties during construction. EXCAVATION - Alt Subsurface construction shall comply with the "OSHA TRENCH SAFETY ACT" . The Contractor- shall insure that the method of trench protection and construction is in compliance with the Occupational Safety and Health Administration (OSHA) regulations. GENERAL CONDITIONS DEFINITIONS GENERAL CONDITIONS EXAMINATION OF DOCUMENTS AND SITE EXAMINATION OF CONSTRUCTION DOCUMENTS: The Contractor is responsible for making himself and his Super— intendent thoroughly familiar with oil construction documents, and all quality of materials required prior to submission of a proposal. Also, the Contractor is to obtain and become familiar with all permits and permit conditions, and to ensure that said conditions are adhered to in the performances of the work. - EXAMINATION OF SITE The Contractor is responsible for making his own site evaluation as to character of soil, water tables, or other construction considerations. Such information is frequently available through the Engineer, BUT, whether available or not, the Contractor is solely responsible for his own site investigation. Oversights resulting in extra expense are the Contractor's responsibility. SUBSURFACE DATA AND EXISTING FEATURES The Contractor is responsible for the- protection of all existing utilities whether shown on the plans or not Damages to such features shall be the responsibility of the Contractor. ERRORS OR OMISSIONS - if the Contractor finds any discrepancy between the drawings and the the existing site conditions or any errors or omissions in drawings or in layout as given by points and instruction, it shall be his duty to immediately inform the Engineer. ANY WORK DONE AFTER SUCH DISCOVERY, UNTIL AUTHORIZED, SHALL BE DONE AT THE CONTRACTOR'S RISK. Quantities on plans or bid forms do not relieve Contractor from estimating responsibility. It shall be the respon— sibility of the Contractor to do a construction estimate prior to submitting a bid to the owner. Any differences between quantities shown on the plans, bid forms and Contractor's estimate will be promptly called to the attention of the Engineers prior to bidding the work. The Contractor shell be solely responsible for his own - estimates of quantities. - "OR EQUAL" CLAUSE Specific reference in the Construction Documents to any product material or type of construction by name, make or product number, shall be interpreted as a standard of quality and shall not bconstructed as limiting competition_ Substitutions must be approved by the Engineer IN WRITING! Any existing wells in the path of construction shalt be properly plugged and abandoned by a licensed Water Well Contractor in accordance with Chapter 40D-3 AND 17-20.10 (4, F.A.C.) unless otherwise shown. REPLACEMENT OF EXISTING FACILITIES The Contractor is responsible for repair of any utility lines damag— ed during construction of this project. The contractor is also responsible for repair or roadway wherever necessary as a result of this construction. GENERAL CONDITIONS TEST REPORTS - Test reports must be performed by a reputable testing laboratory and certified by a Florida registered engineer. Such test shall be done as required by, and in conformance with all criteria of r.D.O.T. These General Conditions apply to all parts of the work. The Contractor shall be supplied with a copy of these Conditions and no arrang— ment with the Subcontractors are to be such as to conflict with the General Conditions- They shall also apply to any extra work or changes_ CONNECTION TO EXISTING FACILITIES DEFINITIONS Before installation of any drainage, water or sewer facilities, the Contractor is to verify the location and elevation of the existing CONSTRUCTION DOCUMENTS: The Construction Documents consist facilities which must be connected to the proposed facilities any. of. the General Conditions, Detailed Specifications, Details and significant deviation from the information indicated in the plans Drawings. shatbe reported to the engineer prior to proceeding with said CONTRACTOR: Thavingr sn nc lit for `n struccti or Those prime e..ro. ibi y o. n,,, on w,.. k_ installation. WORK: The term work of the contractor includes all labor, - materials, equipment transportation or any other facilities necessary SHOP DRAWINGS: to complete the construction of this project. •,, T ,. a I n +- f TI.- 11.1 %. actor iS tG pri�vlue s„vp urvwings for a,l insto„a1IGn v, ENGINEERS: Refers to Towson —Rogers Engineering, Inc. as the underground facilities for the Engineer's review prior to installation. Engineer appointed by the Owner to have responsible charge of - the work as representatives of the Owners, and to their properly authorized agents. - USE nCONSTRUCTIONl ► S: UISE OF DOCUMENTS- INSPECTOR: Refers to the representative of Towson —Rogers ALL CONSTRUCTION DOCUMENTS MUST BEAR THE ENGINEER'S STAMP " " APPROVED FOR CONSTRUCTION ( THIS STAMP IS RED ) IN ORDER Engineering Inc_, and the representative of CITY CrOF ZEPHYRHILLS as the 9 9p TO USED c r toMAY COMMENCE r In ti THE BE USED ON THE SIT.E. NO WORK CrIt'.1MENICE �,1„L_ ,,.` accepting agency authorized to review the progress of construction_ CONTRACTOR HAS SECURED SAID DOCUMENTS. ANY PLANS NOT BEARING SAiDi STAMP ARE NOT APPROVED FOR CONSTRUCTION. DRAWINGS: The Drawings showing the work to be performed are referred to herein as plans or drawings. FURTHER, for purposes of construction layout, only approved drawings, stamped as stated above, shall be utilized. Use of CAD disks or other electronic media for this purpose shall be at the sole risk of the r . , OWNER: r: ,,conF' ppatractor. Any discrepancies between apparent dimensions as measured That person or persons, group, corporation or other, , who has ordered this work done and to whom the Contractor looks on the drawings with a scale versus written dimension labels shall be for payment. brought to the engineer's attention prior to proceeding with layout. Laboratory: Any independent testing laboratory authorized to perform the required tests, EXCEPT any laboratory the Contractor USE OF ELECTRONIC MEDIA: has personal interest in. Drawings in electronic format transmitted by either electronic mail or magnetic media, if issued by Towson —Rogers Engineering. Inc. are issued without warranty, expressed or implied. Use of such electronic SUPERINTENDENT: That person authorized by the Contractor to information shall be at the sole risk of the user. supervise the work and to who must be well qualified and must have authority to order work as directed by the Engineer. - GENERAL CONDITIONS ZEPHYRHILL S SPRING WATER PLANT ` EXPANSION HEALTH DEPARTMENT BUILDING RELOCATION PLAN WATER/SANITARY/STORM CLEARANCE REQUIREMENTS - V,vtical Clearance at ( rc sings: Gravity sewers* or force mains crossing under water mains shall be laid to provide a minimum vertical distance of 18 inches between the invert of the upper pipe and the crown of the lower pipe. The crossing shall be arranged so that the sewer joints and water joints will be equidistant from the point of crossing with no less than 10 feet between any two joints. Where the minimum 18 inch separation cannot be maintained, the sewer shall be placed in a sleeve of encased concrete for 20 feet centered - on the point of uossing. Where there is no alternative to sewer pipes crossing over water mains, the pipes shall be centered at the crossing as indicated above, and the water main shall be placed in a sleeve or encased in concrete for 20 feet centered on the point of crossing. Adequate structural support shall be provided for the sewer to prevent damage to the water main. Horizontal Separation Between Parallel Lines: (a GRA%-1TY SEWERS* shall be installed at least 10 feet horizontally from any existing or proposed water main. The distance shall be measured edge to edge. In cases where it is not practical to maintain a 10 —ft. separation, the water main shall be installed in a separate trench or on an undisturbed earth shelf located on one side of the sewer and at an elevation so that the bottom of the water main is at least 18 inches above the top of the sewer, and the water and sewer pints Shalt be Staggered. (b FORCE MAINS shall be installed at least 10 —ft. horizontally from urry existing or proposed water invirt. k INCLUDES SANITARY SEWERS AND STORM SEWERS. Ii E TOWSON-ROGERS ENGINEERING, INC. 5514 7th STREET ZEPHYRHILLS, FLORIDA 33540 - 813-788-0400 99150 SHEET 2 OF 6 II i' , a ti' I l r 1I t ; I,.� r l!'"l aka Vii , , 1 l F L, — C) RING AND GRUBBIN SCOPE: The work covered by this section shall include removal of trees, brush and other obstacles from the street right—of—way and from the site proper if so directed by the owner. METHOD: Unless otherwise directed by the owner, all trees, brush, roots, weeds, grass and other obstacles to construction shall be removed from the street right—of—way prior to grading operations. All undesirable soils such as slimes, muck or other unsuitable material shall be completely removed from the proposed street areas and disposed of off —site or as directed by the owner and/or engineer. DISPOSAL: Trees, roots, seeds, and other burnable material may be piled on the site and burned, but only with the Owner's consent, and in the area designated by the Owner. All other materials must be hauled away from site and disposed of at the Contractor's expense. Care should be taken to secure necessary burning permits, etc. Such permits are the sole responsibility of the Contractor and any instructions by the Owner and/or Engineer does not relieve the Contractor of the responsibility for containing the burning in a safe manner. Damages resulting from said burning to the overall site or neighboring lands or property are the Contractor's responsibility. DEPTH OF REMOVAL: All trees, roots, and other obstacles shall be removed to a depth of at least one (1) foot below the subgrade with the exception of slimes, muck or other unsuitable materials which shall be completely removed from road right—of-way. GROUNDWATER: Contractor may be required to dewater to construct improvements. The Contractor shall use waterproof base or underdrains, as required by the Final Authority, to protect the integrity of the construction when high—water tables are within eighteen (18) inches of the roadway base course. When any additional costs are anticipated, the Engineer shall be notified prior to proceeding to verify method(s) to be utilized, change— order(s) submitted and approval by the Owner and Engineer. GRADING AND EXCAVATION SCOPE: The work covered by this section shall include all excavation and embankment. Specifically this includes the excavation and embankment required to rough grade the streets, finishing the backslopes from the street to the property line and lot grading. BUT may be extended to include canals, ditches or lakes when directed by the plans. MATERIALS: The material used for fill shall be approved by the Engineer. Material obtained from on —site shall be used whenever possible. No material shall be hauled from the site without the approval of the Owner and/or Engineer. CONSTRUCTION METHODS GRADING TOLERANCE: Areas, to be graded shall be brought to within one —tenth (0.10) of a foot of elevation shown on the plans or as directed by the Engineer. Material for grading shall be placed in layers not to exceed eight (8) inches. Each layer shall be spread evenly and compacted to an average of 98% of maximum density in accordance with AASHTO T99. The minimum density acceptable at any location will be 96%. STABILIZATION SCOPE: The work covered by this section consists of stabilizing beneath the entire paved roadway. The limits of stabilization shall be in accordance with the "Typical Roadway Section" shown on the plans. This work shall be done after all subsurface work has been completed. MATERIALS: The material used for stabilization shall consist of suitable roadway materials, such as the local sandy, clay, limerock screenings, in accordance with requirements set forth by the F.D.O.T. Standard Specifications. CONSTRUCTION METHODS: The stabilization material shall be uniformly mixed with the virgin ground to the depth and bearing value indicated in the Typical Roadway Section. Mixing shall be accomplished by use of rotary tillers or other methods approved by the Engineer. Stabilization MAY NOT commence on any area that has not first been cleared and grubbed according to the previous section. The stabilized area shall be compacted throughout it's entire thickness, per "Typical Roadway Section". MAINTENANCE OF STABILIZED AREA: After the stabilization has been completed, the Contractor shall maintain roadway free from damage, ruts, etc., caused by hauling or erosion or other causes. The required Bearing Value MUST be maintained at all times in preparation for the base course. BASE Scope: The work covered by this section consists of the construction of a roadway base which is composed of limerock, shell, asphalt or soil cement as indicated on the "Typical Roadway Section" shown on the plans. The base shall be constructed on a prepared subgrade where applicable in accordance with these specifications and with the lines, grades and typical cross sections shown on the plans and details. MATERIALS: The materials used shall conform to the requirements set by the Florida Department of Transportation "Standard Specifications For Road and Bridge Construction" latest edition. EQUIPMENT: All equipment, necessary for the proper construction of this work shall be on the project in good mechanical condition. DRAWN DATE C.E. T. 1-11-00 CHECKED DAT►? CAD DRAWING NAME CAD SCALE 9915OBCS I"=100' REVISIONS TRANSPORTATING BASE MATERIAL: The base material shalt be transported to the point where it is to be used, over base previously placed. NO HAULING OVER THE SUBGRADE shall be allowed without the approval of the Engineer. SPREADING BASE MATERIAL: The base material shall be spread uniformly with approved equipment. All non —uniform material shall be removed and replaced. Roadway base with specified thickness in excess of 6" shall be constructed in two courses. COMPACTING BASE MATERIAL: After the spreading is completed, the entire surface shall be finished and shaped so as to produce the exact grade and cross section required by the plans after compaction. When applicable base material does not have the proper moisture content to insure the required density, wetting to drying will be required. If moisture is added, it shall be uniformly mixed for the FULL DEPTH of the base course. During the final compacting operations on limerock or shell base, all areas must be finished to grade before density tests are performed. Diligence shall be used to avoid mixing the subgrade material into the base material. If this occurs, the Contractor shall remove and replace with clean materials at his expense. If cracks or checks appear in the base course, before or after priming, which, in the opinion of the Engineer, would impair the structural efficiency of the base course, the Contractor shall remove such cracks or checks by reworking and the cost of such removal shall be the Contractor's responsibility. MAINTAINING: Where applicable, the Contractor shall maintain the base to a true and satisfactory surface until the wearing_ surface is laid. The base shall include a prime coat which will be placed only after the moisture content of the base is less than ninety (90) per cent of optimum. The base MUST be maintained at required densities as previously outlined. DETERMINATIONS: When the completed base course fails to meet the required minimum compacted thickness, the Contractor shall correct such areas by scarifying and adding material. The affected areas shall then be brought to the required state of compaction and required thickness. PRIME COAT: The base course, (except asphalt base), shall be primed with RC -70 or RC -250 liquid asphalt not less than one — tenth (0.10) gallon per square yard. The prime coat shall then be covered with sand or screenings and MAINTAINED until the wearing surface is constructed. WATER —PROOF BASE COURSE: Shell base may be substituted for limerock base on an equivalent thickness if used as described in F.D.O.T. Specifications. When soil cement is used, the Contractor shall employ a licensed testing laboratory to design an in —place mix or a plant mix may be used providing the material will develop a compressive strength of 300 psi in 28 days. Soil cement base shall be allowed to cure in accordance with F.D.O.T. specifications. ASPHALTIC CONCRETE WEARING SURFACE SCOPE: The work covered by this section consists of the construction of an asphaltic concrete wearing surface composed of aggregate mineral filler (if necessary to produce the desired stability) and asphalt cement laid upon a prepared base in accordance with these specifications and in conformity with the lines, grades, thickness and typical cross section shown on the plans and details. COMPOSITION OF MIXTURE: The mixture shall be combined in such proportions as to produce the minimum required Marshall stability for the type mix specified in the plans as shown in Table 331-2 of the F.D.O.T. Standard Specifications. The mixture shall be equivalent to the F.D.O.T. specifications for the type asphaltic concrete specified in the plans or directed by Engineer. CLEANING AND PREPARING SURFACE: The surface shall be prepared as set forth in the section covering the road base and shall be cleaned of all loose and foreign materials. PLACING THE MIXTURE: The ingredients of the mix shall be heated and combined in such a manner as to produce a mixture which shall be at a temperature when discharged from the pugmill or surge bin within the range of 230'F to 310'F with a tolerance off 2`'F. Finishing by hand shall not be permitted unless approved by the Engineer; However, in limited areas where the use of mechanical spreading and finishing equipment is iiripructicable, the mixture may be spread and compacted by hand. Compaction effort shall be sufficient to produce an acceptable density and surface texture. The wearing surface shall be checked at frequent intervals by the Engineer. Deviations from the required thickness or from standard crown and section shall be corrected at the Contractor's expense. COMPACTING MIXTURE: Seal rolling with tandem steel rollers weighing from five (5) to twelve (12) tons shall follow as close behind the spreaders as possible without picking up, displacing, or blistering the material. Rolling with self —propelled — pneumatic —tired rollers shall follow as close behind the seal ruiliny us the .nix will permit. The self—propelled—pneurnutic— tired roller shall cover every area of the surface with at least five (5) posses. The seal rolling and the pneumatic tired rolling shall be done prior to the internal pavement temperature dropping below 175'F and shall be continued until other roller marks or tire marks are eliminated. TESTING: Testing within the Right of Way Shall be in accordance with Pasco County Engineering Services Department, Testing Specifications for Construction of Road V, Storm Drainagge and Utilities with copies of test reports to Pasco County inspection Division and the Engineer of record. SPECIFIPATIONS In all places inaccessible to a roller, such as adjacent to curbs, headers, gutters, manholes, etc., the required compaction shall be secured with hand tamps. TRAVERSE „DINTS: The mixture silo![ be trimmed back to a sawed joint at the full thickness of the layer before laying fresh hot mixture against it. SURFACE REQUIREMENTS: The finish surface shall be such that it will not vary more than three —sixteenths (3/16) inch as determined by testing the surface with a 15' rolling straightedge. GRASSING AND SODDING CLEAN—UP: After the surface course has been completed, the area between the edge of pavement and the right—of—way line shall be thoroughly cleaned and raked of all rocks, debris or other undesirable materials, and made ready for grassing. This area shall be MAINTAINED in a cleaned condition at all times until the grassing operation commences. GRASSING: 1) Grassing and mulching of the right—of—ways shall be in accordance with F.D.O.T. specifications. After the area between the edge of pavement and street right—of—way has been cleaned as outlined above, the entire area shall be fertilized. The fertilizer shall be applied at a rate of 800 to 1,000 pounds per acre and to a depth of approximately three (3) inches and the soil dampened. Argentine Bahia grass seed shall be evenly spread at a rate of approximately -one —hundred (100) pounds per acre. Grass seed shall be approved, permanent seed. After the seed is in place, loose hay mulch shall be applied evenly over the entire area, approximately two (2) inches thick. The area shall then be watered, and MAINTAINED until such time as the Contractor is released, or has completed the project. Where necessary, rolling will be employed to secure the grass seed. The Contractor is also responsible for grassing and mulching all areas other than street right—of—ways that are shown on the construction drawings, including all areas disturbed as part of the paving and drainage construction. SODDING: 1) Preparation of Ground: The ureus which the sod is to be placed shall be scarified or loosened to a suitable depth. On areas where the soil is sufficiently loose, particularly on shoulders and fill slopes, the Engineer may at his discretion authorize the elimination of the ground preparation. 2) Fertilizing: The operations of fertilizing and of applying dolomitic limestone shall be the same requirements as for grassing. 3) Placing Sod: Whenever a suitable length of roadway has been graded and is ready for sodding the Contractor shall, when directed by the Engineer, proceed at once with the sodding of the available areas. Sod which has been cut for more than 72 hours shall not be used unless specifically authorized by the c. after ♦ f Any h i Engineer inspection thereof. sod willCti is not planted within 24 hours after cutting shall be stacked in an approved manner and maintained properly ITioistened. Sodding shall not be performed when weather and soil conditions are, in the Engineer's opinion, unsuitable for proper results_ The sod shall be placed on the prepared surface with edges in close contact and shall be firmly and smoothly embedded by light tamping with appropriate tools. Where sodding is used in drainage ditches or retention areas, the setting of each sod mat shall be staggered so that there art- no continuous seams along the line of flow. Along the edges of such staggered a offsets of individual S ins hn n t exceed s y7..red areas, the offs t strips shalt o ex e d six inches. In order to prevent erosion caused by vertical edges at the outer limits, the outer pieces of sod shall be tamped so as to be produce a featheredge effect. On areas where the sod may slide due to height and slope, the Engineer may direct that the sod be pegged with pegs driven through the sod blocks into firm earth at suitable intervals. - Any pieces of sod which, after placing, show an appearance of extreme dryness shall be removed from the work. 4) Watering: The areas on which the sod is to be placed shall contain sufficient moisture, as determined by the Engineer, for optimum results. The sod shall be kept in moist condition for the duration of the contract period and in no case less than two weeks. The moistened condition shall extend to at least the full depth of the rooting zone. Water shall not be applied. When there is danger of a freezing condition. - CNCRETE — GENERA! l) Classification, of Concrete, General. a) The separate classification of concrete prepared under •f a C. 1 111 ihCsC speci�ICatioris are dcS�gnaieu herei�ti v5 ...asses t1iruugh iJ, in accordance with the intended use and the proportions, strength and other requirements. II) Location of Use of Each Class: a) Class I Concrete shall be used for cement concrete pavement. (both plain and reinforced) and for headwalls, inlets, curbs, gutters, valley gutters, slope pavement, ditch pavement, manholes, pipe endwalls, and other miscellaneous concrete items which are not structurally reinforced - b) Class Ii Concrete shall be used for bridge concrete and box culverts, except where Class III or Class IV is specifically required for such uses, as specified below. Class I! sham also be used at other locations as may be specifically called for in the plans or in the special provisions. c) Class III Concrete is required for the following uses: 1 For prestressed members. 2 For concrete piles of all types. 3 For seal concrete in foundation areas where the - concrete must be placed under water and the foundation cannot be dewatered before the concrete is placed. (4) For bridge concrete and other work where specifically required by the plans. - - d) Class IV Concrete shall be used for all concrete (except seal concrete) placed in a location which is in or over salt or brackish water, and elsewhere aS may he specifically called for in the plans. III) Required Strength of Concrete: Except as may be modified in the plans or special provisions the required minimum 28 —day compressive strength for the various classes of concrete shall be as follows: Class I (*a) 2,500 psi Class II 3,400 psi Class III (*c) 5,000 psi Class iV (*b) 3,400 psi (*a) When used for cement concrete pavement, both plain and reinforced, Class I Concrete shall have a minimum strength of 3,000 p_,i. (*b) When used for prestressed members, Class IV Concrete shall have a rnii iiri iuc i strength of 5,500 psi. (*c) No minimum strength is required when Class III Concrete is used as seal concrete. CONCRETE STRUCTURES The work specified in this Section consists of the construction of concrete structures and other concrete members with the exception of pavement and incidental concrete construction which are specified in other sections of the Specifications. This work shall be constructed in accordance with these specifications and in conformity with the lines, grades, dimensions and notes shown in the plans. General Requirements for Placing Concrete: Concrete shall be deposited as nearly as possible to its final position. Large quantities shall NOT be deposited at one point and then run or worked along the forms. Special care shall be taken to fill each part of the forms and to work the concrete around the reinforcing bars without displacing the forms. - The method and manner of placing concrete shall be of metal chutes or metal - lined chutes. Where steep slopes are required, the chutes shall be equipped with baffles or shall be in short lengths the slow the direction of rnuvernent. Where placing operations would involve dropping concrete freely more than five feet, it shall be deposited through pipes, troughs or chutes of sheet metal or other approved material. Troughs, chutes or pipes with a combined length of more than 30 feet shall be used only with the Engineer's authorization. All troughs, chutes and pipes shall be kept clean and free from coatings of hardened concrete by being thoroughly flushed with water after each use or more often if necessary- - Surface Finishes: in addition to the general surface work spPrifiPd for all exposed concrete surfaces. A specific surface finish may be required by the plans. QUALITY CONTROL TESTING: All construction shall be subject to quality control testing including quality ..n thickness arid connpacttun. Test reports prepared by a licensed testing laboratory and certified by a Professional Engineer shall be submitted to the Engineer, Final Authority, and Owner upon completion of each phase of the work. The Contractor shall not pave any area until subgrade and base course are certified to comply with the plans and specifications. AS—BUILTS: The location of all drainage systems, water distri— bution systems and sewer systems, shall be recorded on a set of CONSTRUCTION PLANS and shall be known as the AS —BUILT PLANS. Any construction deviation(s) as to line, grade, material and com— position shall be noted on the plans by the Contractor and submitted to the Engineer. The contractor may be required to modify any deviations to that shown on the plans unless prior approval is unless approved from the Engineer. FINAL AUTHORITY Tile lima( authority fJr quOiity of coinstructionn Shale be an ordinance adopted by the accepting agency. Any item not addressed by the Final Authority shall be performed under the latest edition of the Florida Department of Transportation manual commonly known as "Detailed Specifications for Street and Bridge Construction" latest edition. ZEPHYRHILL S SPRING WATER PLANT EXPANSION HEALTH DEPARTMENT BUILDING RELOCATION PLAN STORM SEWER SYSTEM SCOPE: The work covered by this section shall include clearing, trenching. furnishing and installing pipe, structures, backfilling and any work necessary to construct a complete drainage system in accordance with these plans and specifications, and leave the site in an orderly condition. EXCAVATION: The Contractor shall perform all excavation to a depth shown on the plans. Excavated materials not required for backfill she!! be placed where directed by the Owner. Unstable soil shall be removed and replaced with acceptable sand or crushed stone, thoroughly tamped. - TRENCH EXCAVATION: The width of trenches shall be approximately six (6) inches wider than the pipe on each side, or of width needed for free working space. The trench shall be dry until pipe joints are secure. BRACING AND SHORING: The contractor, at his own expense, shall do all bracing and shoring necessary to protect all excavations as required for safety. MATERIALS: AS INDICATED ON THE PLANS, pipe shall be either corrugated metal or concrete, of approved design and manufacturer- Concrete pipe shall meet _ the requirements set forth in ASTM C-76. The pipe shall meet the design requirements shown in Table 3 for Standard Concrete Pipe as listed in the Concrete Pipe Handbook. All pipe Shall meet the requirements of the Florida D.O.T. specifications. BEDDING: Pipe shall be bedded in accordance with the requirements of The Florida D.O.T. specifications. LAYING: All pipe shall be laid to line arid grade us indicated on the plans, beginning at the downstream end. Concrete pipe shall be laid with the bell end upstream. Corrugated metal pipe shall be assembled in accordance with the manufacturer's instructions. All pipe shall be unloaded and handled with reasonable care. Pipe shall not be rolled or dragged over gravel or rock(s) and shall be prevented from striking rock(s) or other hard objects during placement in trench or on bedding. Corrugated metal pipe shall be placed on the bed starting downstream end with the inside circumferential laps pointing downstream and with the longitudinal laps at the side or quarter points Bituminous coated pipe and paved invert pipe shall be installed in a similar manner as corrugated metal pipe with special care in handling to avoid damage to coatings. Paved invert pipe shall be installed with the invert pavement placed and centered on the bottom. - The pipe sections shall be joined by coupling bonds of like material. One—piece or two— piece bonds may be used. Coupling bands of annular and helical corrugated metal pipe shall provide circumferential and longitudinal strength to preserve the culvert alignment, prevent separation of the pipe sections, and prevent infiltration of backfill material. Guage of all metal pipe shall be as per D.O.T. specifications, unless otherwise shown on the plans. Contractor shall furnish certification from manufacturer that the gouge meets the requirements shown. BACKFILLING: Backfilling material in a trench up to the top of the pipe shall be compacted in layers not to exceed six (6) inches in thickness. Compaction may be by hand or pneumatic tampers. All backfill material shall be compacted to 100% maximum density as determined by AASHTO T-99. Care shall be exercised to compact the backfill under the pipe and to insure that the backfill is in contact with the sides of the pipe. CLEAN—UP: Upon completion of the 'work, the Contractor Shall dress up the work area. MAINTENANCE: The storm sewer MUST be maintained during construction. The Contractor is soiey responsible for protection of pipelines against sand entering through openings, etc., by properly closing said openings. Whenever a pipe line becomes infiltrated by sand or other debris, the Contractor will be responsible for cleaning the lines prior to completion of the project. CEMENT CONCRETE PAVEMENT Description. The work specified in this Section consists of the construction of portland cement concrete pavement. The pavement shall be constructed in one course, on a prepared subgrade, in accordance with these specifications and in reasonably close conformity with the lines, grades, dimensions and notes shown in the plans. Construction may be done by either the fixed —form or the slip —form method. When reinforced cement concrete pavement is called for, the concrete shall be reinforced with steel bars or steel fabric, in accordance with details shown in the plans. The requirements for aggregates, proportioning and mixing, and other provisions for the production of the concrete shall comply with the applicable provisions of the Florida D.O.T. sspecifications. Subgrade Preparation. i) General: Construction of the subgrade shall be kept completed for a distance of at least 500 feet ahead of the paving operation. The finished subgrode shall be maintained in a smooth, compact condition any areas which are disturbed prior to placing of the concrete shall be restored at the Contractor's expense. No concrete shall be placed on a frozen subgrade. The subgrade shall be moist at the time of concrete is placed. Water shall be uniformly applied ahead of the paving operations, as directed by the Engineer. No vehicles will be allowed to travel on the prepared subgrade between the subgrade trimming machine and the paving operations unless specifically authorized. ll) Trimming: The subgrade shall be accurately trimmed to the required elevation. High areas shall be trimmed to proper elevation. Low areas may be filled with suitable material and compacted to the specified density, or filled with concrete integrally with f the W the t I the piGCin�g of pavement. When paving is to be done by the slip —form method the areas on which the tracks of the paver will operate shall be included in the width to be tr inirned. - Material planed from the subgrade shall be removed before any concrete is placed- The use of the planer may be waived for small or isolated areas or any areas where its use would be impracticable. CURING: After the finishing operations have been completed and as soon as the concrete has hardened sufficiently that marring of the surface will not occur, the entire surface and (when the slip —form method is used) the edges of the newly placed concrete shall be covered and cured in accordance with Florida D.O.T. specifications. - TOWSON L v- L S c:r T ENGINEERING, IIN J - 5514 7th STREET ZEPHYRHILLS, FLORIDA 33540 813-788-0400 99150 SHEET 3 OF 6 I N t --I.& tl4LL Li L.rrLL.ar--J--LJ_,IIA__l LdL_3y1,..J.. ._i.IrJ.aa YJi N: 7 F.N&D. 'X' CUT IN CON. WALK GRAPHIC SCALE 0 20 40 1 inch = 20 ft GENERAL NOTES SECTION 13, TOWNSHIP 26S, RANGE 21E PASCO COUNTY, FLORIDA 1. PROJECT AREA IS 0.83 ACRES 2. GROSS FLOOR AREA: 3.480 GSF 3. PROPOSED BUILDING: 1 STORY - PEAK ROOF HEIGHT <20' 4. ZONING CLASSIFICATION: COMMERCIAL 5. MAXIMUM ALLOWABLE LOT COVERAGE: 18,077 S.F. X OF LAND AREA - 50% 6. PROPOSED LOT COVERAGE: 3,480 S.F. - S OF LAND AREA - 10% 7. PERVIOUS AREA REQUIRED: 7,231 S.F. X OF LAND AREA - 20% 8. PERVIOUS AREA PROVIDED: 17,354 S.F. X OF LAND AREA - 48% 9. IMPERVIOUS AREA: 18,801 S.F. X OF LAND AREA = 52% 10. PROPOSED USE MODULAR BUILDING W/FOLLOWING USE: 0 PUBLIC HEALTH CLINIC 11. BUILDING SETBACK REQUIREMENTS: FRONT = (OLD BARRACKS ROAD) 30 FEET - PROVIDED 57.08' SIDE _ (AIRPORT ROAD) 25 FEET PROVIDED 143.5' REAR = 20 FEET - PROVIDED 35' 12. PARKING SPACE SUMMARY: REQUIRED AUTOMOBILE: 23 SPACES TOTAL (DETAILED AS FOLLOWS) MEDICAL - 1 SPACE FOR EVERY 150 S.F. - 3.480 S.F. OF OFFICE/150 - 23 SPACES 13. PROVIDED AUTOMOBILE: 24 SPACES TOTAL (DETAILED AS FOLLOWS) 23 REGULAR SPACES 1 H.C. SPACE 14. SEWER DISPOSAL BY CITY OF ZEPHYRHILLS. 15. WATER SUPPLY BY CITY OF ZEPHYRHILLS. 16. REFUSE WILL BE STORED OUTSIDE - SEE DUMPSTER LOCATION. 17. FIRE PROTECTION PROVIDED BY CITY OF ZEPHYRHILLS FIRE DEPT. 15. ELECTRICAL SERVICE PROVIDED BY FLORIDA POWER 19. THIS IS NOT A SURVEY. THIS ENGINEERING FIRM ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS, CORRECTNESS OR ACCURACY OF THE SURVEY INFORMATION SHOWN HEREON. SURVEY BY C. FRED DEUEL AND ASSOCIATES, INC., 1-8-00. 20. THIS SITE IN FEMA FLOOD ZONE 'X' PER FEMA PANEL 00005C. 21. ALL CLEAR -SITE AREAS SHALL BE KEPT FREE OF ANY SIGNAGE, PLANTINGS, TREES. ETC. IN EXCESS OF THREE -AND -A -HALF (3-1/2) FEET IN HEIGHT. 22. NO IRRIGATION SYSTEM OR LANDSCAPING SHALL BE INSTALLED IN ANY COUNTY OR STATE RIGHT-OF-WAY WITHOUT ISSUANCE OF APPROPRIATE RIGHT-OF-WAY USE PERMIT. 23. DRAINAGE SYSTEM PER SHEET 5. 24. PROJECT TO BE DEVELOPED IN ONE PHASE. 25. NO WETLANDS ON SITE. 26. ALL PROPOSED SIGNS MUST BE APPLIED FOR, APPROVED AND PERMITTED ON AN INDIVIDUAL BASIS APART FROM ANY ULTIMATELY APPROVED SITE PLAN. APPROVAL OF THIS SITE PLAN DOES NOT CONSTITUTE APPROVAL OF ANY SIGN. 27. PROPOSED PAVING AND SIDEWALKS AS NOTED. 28. FOLIO NO. 13-26-21-0080-00000-0010 13-26-21-0080-00000-0040 29. FUGITIVE DUST CONTROL BY SPRINKLING DURING CONSTRUCTION, IF NECESSARY. 30. HANDICAPPED PARKING SPACES WILL 13E PROPERLY SIGNED AND STRIPED IN ACCORDANCE WITH FLORIDA STATUTE 316, THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. OR OTHER APPLICABLE STANDARDS. 31. PAVEMENT MARKINGS IN DRIVEWAY SHALL BE PER FOOT INDEX #17345. 32. ALL LANDSCAPED AREAS WILL BE 1007 COVERED BY AN IRRIGATION SYSTEM. 33. LANDSCAPING WILL CONFORM TO SECTION 4320 AND 4344 OF - THE CITY OF ZEPHYRHILLS LAND DEVELOPMENT CODE AS NOTED ON PLAN. 34. ALL TREES TO BE SAVED DURING CONSTRUCTION SHALL BE MARKED WITH RIBBONS. 35. TREE PERMIT SHALL BE APPLIED FOR WITH THE CITY OF ZEPHYRHILLS BUILDING DEPARTMENT PRIOR TO TREE REMOVAL. 36. SITE SHALL BE CONSTRUCTED TO MEET ALL APPLICABLE REQUIREMENTS OF THE ZEPHYRHILLS LAND DEVELOPMENT CODE AND APPLICABLE STATE AND FEDERAL REGULATIONS. - - - - - - .•` -a� - L�ai�___L>t�i�.}�ai.��l►�19.�u� _- i LIL k _ - t INVESTIGATE BEFORE YOU EXCAVATE I FLORIDA ONE -CALL 1-800-432-4770 - _ TOLL FREE FL. STATUE 553 351(1979) REQUIRES MIN.- OF 2 DAYS . AND MAX., OF 5 DAYS NOTICE BEFORE YOU EXCAVATE. : _________ _________ _________ _________ _________ _________ _________ >/YV V i -` t �ry _ ` t 5 M ES 15 MSS i ,8 MES L.1 75.5a F-.LEL.76,20 F L1rC..76.Z5 7!3:16 I -- —+ '� 78.36 78.1 fi o ,�� B E�°i b:C.P. -SW. R 1 MANHOLE - - 7$ - -78 ,� V -C. SAlV. sEyy 53' F 15 P a t7 7 � J_ C.TV 24' OF 8" DR 18" U.P. orw ��ti PVC ® 1.259 ��R 8 O 78.26 '� ' CP i (50') TOB EL78.50 tONTROL Rt1CTUF 79.37 �1 • ., 7S.Li6 79.30 I ri } 1 10'x10' CONC. 78.87 i - i AREA ®� { . 80T EL77.00 FLUME— — ILUH— 4:1LV. Ci." i. I —(SEE DEIAIL)= SB - D - i END_CURB • L - - - - - - = UARD - - - _ 10•X10' �" .-_ SILT FENCE 79.37 BO BOTTOM EL77.00 79.08 4:1 78.87 - � _ - , 78.50 E TOB EL.78.50 LF E 1 4:1 78.50S�y t " POST % - '••�' i TOB EL78.50 ( o 't 4 SILT FENCE I x K 79 S 1 1 Jf 0_ .a ! i i f I � Si t J__- ELO t �i cv ® I` °° 'RELOCATED MQ[ULAR BUILDING o= s t-///y/)j •� q°}` pro U E 1 FtN. - Gk --BELOW- �tflG. i / L2 4- 8 - ___ 7 V V [[.. V1 f I ( W� JO T3RAif ) _ k 4 79.80 t 79.63 " 1 { I } r li/ SILT FENCE • ' V • BASIN LINE 79 y c (50) (51.17) (50) (50') (50.) 5 L./ - t 7 I I 1111 ! - - - GRAPHIC SCALE 0 20 4O 1 inch = 20 ft DRAINAGE NOTES 1. The contractor shall ensure that all roof runoff from all structures is directed such that its final destination is the retention pond. Ali roof drains, downspouts or other roof drainage devices shall be directed towards the nearest conveyance such that all runoff is directed to the retention pond. 2. All storm water runoff from this site shall be visually monitored during construction by the contractor to assure water quality and quantity ore generally maintained to the pre —development levels. The following shall be used to accomplish mitigation of adverse quantity and quality impacts to offsite properties during construction: A. Drainage swales and retention should be rough constructed first to avoid any increase in runoff due to the construction. B. Temporary erosion and sediment control struc— tures shall be installed to protect existing drainage systems and water quality during construction. C. Where work is performed in a water course or water body, silt curtains and silt screens shall be used to control siltation and tur— bidity. D_ Disturbed areas as a minimum requirement shall be seeded and mulched. All slopes 4:1 and steeper shall be sodded. E. If special conditions exist requiring unanti— cipated measures to control stormwater runoff, these measures shall be implemented as soon as possible. . F. The system is to be inspected on a weekly basis and after any rainfall event of one—half inch or greater. G. The operation and maintenance instructions during construction must be performed in accordance with regulatory agency permit requirements. 3. The grading of the last six (6) Inches of the reten— tion areas shall be the last construction activity. 4. Pipe lengths are approximate and may require minor adjustments in the field. 5. The contractor is to verify locations and elevations of all outfalls before construction, and if found to be inadequate, shall notify the engineer. 6. The contractor shall construct all drainage structures in accordance with F.D.O.T. standard specifications for road and bridge design. 7. All reinforced concrete pipe shall be Class III with rubber gasket joints. 8. Operation and maintenance instructions: A. The stormwater management system shall be per- iodically inspected during storms to determine that it is operating properly. Inspections should also be made when the system is dry. B. Any broken pipes or damaged inlets must be re— paired or replaced. Any debris clogging same shall be removed as necessary. C. The retention area shall be periodically cleaned of debris or siltation as necessary. 0. Swales and ditches shall be cleaned as required to maintain flows and resodded when necessary. E. The owner is responsible for maintenance of the vegetation in retention areas, swales, and ditches. r a_- w I 2't 16'± 4' 411 UN ENERGY BLOCKS _= ° i. a°a°aa lIE N d ,I h'ANKINLJ �_��=�..:. _._ ��� ,�_ •r--� '�( 1 t/4" TYPE fi -Dr 1 1 1 1 2,500 P.S.I. CONCRETE 1 CURB STOP DETAIL < - S3 AS W/6X6XW1.4XWI.4 WWF _: ' ' St'AB. SUBBASE _ L 4`-0< t � r. (7 SIDEWALK DETAILS 0'-6» 4r R b s � b I 0 • b b b b b r STANDARD CURB PAVING : I 12 Dl A. — 6" SCt-t 40 CON C. FILLED PIPE ( PAINT YELLOW CONCRETE I < BOLLARD DETAIL 20'+/- POST (OPTIONS: 2'x4< OR OPTIONAL POST POSITION (VERTICAL) PRINCIPLE POST POSITION 2.5<MIN.DIA.WOOD; STEEL (CANTED 20' TOWARD FLOW) 1.33 LBS./FT. MIN.) --- 6' MAX. FILTER FABRIC (IN CONFORMANCE WITH A��7FLOW FABRIC SEC985 FDOT SPEC.) t w SECTION i ELEVATION TYPE III SILT FENCE 20'+/- POST (OPTIONS: 2rx4' OR OPTIONAL POST POSITION 1.33MLBS MIN.STEEL to' MAx. (VERTICAL) --� PRINCIPLE POST POSITION —(CANTED 20' TOWARD FLOW) POULTRY MESH (� GA.MINr_Z3 POULTRY MESH OR TYPE A FENCE FABRICTYPE A FENCE FABRIC �INDEX NO.452 & SEC.966ER FABRIC FOOT SPEC.) FILTER FABRIC (IN o Aw CONFORMANCE WITHOW SEC 9B5 FDOT SPEC.)� --Ii-z-r--- o ELEVATION SECTION TYPE IV SILT FENCE DO NOT DEPLOY IN A MANNER THAT SILT FENCES WILL ACT AS A DAM ACROSS PERMANENT FLOWING WATERCOURSES. SILT FENCES ARE TO BE USED AT UPLAND LOCATIONS AND TURBIDITY BARRIERS USED AT PERMANENT BODIES OF WATER. NOTES: —For additional Information and details, see F.D.O.T. Index No.102. —Unless specified, hey barriers may be used in lieu of sIt fences. —Additional posts and ralls may be necessary to secure and support barriers. Additonal fence lengths may be required by the County Engineer or by regulatory agencies. SILT FENCE MATERIALS ITEM DUANT. DESCRIPTION 1 I BACKFLOW PREVENTER ASSEMBLY 2 4 UNIONS (GALV.) 3 2 NIPPLES - BRASS 4 2 ELBOWS - GALV. 900 5 2 RISER - GALV. B * CONCRETELL SLAB 7 2 (BRASS BAVALVES OR SS) NOTES: 1. MINIMUM CLEARANCE OF 24r TO BE MAJNrTANED AROUND DEVICE — , f — - FOR TESTING. �1 2. FIELD ADJUST AND CUT ITEM 4 TO PROPER LENGHT. 4 3. ENTIRE ASSEMBLY TO BE PAINTED AWWA BLUE. - 4. CONCRETE SLAB TO EXTEND 12" MIN. AROUND ENTIRE DEVICE. 5. DEVICE MUST BE LISTED WITH THE UNIVERSITY OF SOUTHERN MIN. CALIFORNIA FOUNDATION FOR CROSS CONNECTION CONTROL METER AND HYDRAULIC RESEARCH. DOUBLE CHECK OR REDUCED PRESSURE BACKFLOW PREVENTER SINGLE SERVICE:- 3/4. 1" 1 1/2r & 2r FINAL (GRE MIN. SERVICE IJ �.-0. FACE OF CURB OR EDGE OF PAVEMENT F.T.C.0 r STEEL SIGN 25 TOP PART: - r WHITE REFLECTORIZED 0 PARKING SPACE BORDER AND LEGEND, - BLUE REFLECTORIZED I ! BACKGROUND. _ PARKING BY +* f DISABLED PERMIT BOTTOM PART: MIN. 5' co ONLY 1r SERIES 'Co■ (F.D.OJ.) o I WHITE I = VAN ACCESSIBLE BLACK LETTERS, F " BLACK BORDER AND Or t WHITE REFLECTORIZED �y, '�11 - BACKGROUND h C $250 FINE I j i GALV_ »1J TYPE w Lw- FLANGED STEEL POST. 6GRADE- HANDICAP PARKING DETAIL r - 6 -TOWSON- ROGERS- - 99150 SHEET 5514 7th STREET ZEPHYRHLLIS, FLORIDA 33540 813-788-0400 6