HomeMy WebLinkAbout7921 GALL BLVD � C � ;�;�,Y r II ��.,��"''�s��r, ` ° .Ltl`�� 1 �� �" �='` • . S ON #3 - ��-Pro'e�ct: Ze h rhills FL New Store � � ' A J P Y � � � -~May 2 ,2004 I � � . z. ( � I . LO�I'�'S - Zephyrhills Green rSlope Drive&Kossik Road � Zepfiyrhills,FL � This narratii e describes the revisions to the construction documents as d'uected by Lowes Home Centers, � Inc. All ite�s described below have been identified on the plans with a revision cloud and a delta 3 symbol. , � ARCHITECTURAL Sheet , -1.0,Floor Plan Item#� 1/AI-I.0 Revised shade structure and dimensions per proto updates. Item#i 1/ Lf.0 Deleted Haz-Mat area per proto updates. � Item#3 1/�-1.0 Relocated ladder per proto updates. Item#i 1/A�-I.0 Revised gate 8 per proto updates. � Sheet r�-1.1,Roof Plan and Details , Item#i 1/Ai i.1 Added keynote and expansion joint per proto updates Item#i 1/A-i.1 Relocated ladder per proto updates. Item#� 3/AI i.1 Revised detail per proto updates. Item#�� 5/Ai 1.1 Revised detail per proto updates. � Sheet r�-2.0,Exterior Elevations Item#i 1,2,I4i A-2.0 Deleted Haz-Mat area per proto updates. � Item#i 2/AI i.0 Revised shade structure per proto updates. Item#� 3,4/ I-2.0 Revised finishes per proto updates. Item# 4/AL2.0 Relocated ladder per proto updates. � � � Item#i Fnsh Revised finishes per proto,updates. - Sheet A,-2.1.EnlarB Id Exterior Elevations Item#� Fns�i Revised finishes per proto updates. , Sheet A-3.0,Wall Sel t�ons&Detials , I Item�#I 2/A 3.0 Revised note per proto updates. � Item#� 4/Ai 3.0 Revised expansion joint detail per proto updates. � -Item#3 17/AF3.0 Revised compactor pad per proto updates. ; ' S�ie'et�-4.0,EnlarSed Plans&Room Finish Schedule It�m#Il 3/AI 4.0 ' " Deleted Haz-mat area per proto updates. � ; � � � 'Iiem#2 4/Ai 4.0 Relocated ladder per proto updates. . Item#3 RFS Revised ceiling finish on Installed Sales per proto updates. � I OS.Z 7. i . � 1437 SOUTH BOULDER SUITE 800, TULSA, OK 74119-3609 • (918) 587-8600 • FA 587-8601 , , ! • � � , , ; Ze 6� rhiils �!.� � P �r , �3evisaon #3 �lay 27� 2p�4 � � � � = SheetlA-4.1,Restroom Plans&Elevations I i ' � Item#{1 1/A�4.1 Revised partition layout per proto updates. li "Sheet�A-6.0,Door&,Window Schedule&Details Item F 1 DrlSch Added Galv.To door and frame material per proto updates. Item 2 DrlSch Revised lockset notes per proto updates. Item i 3 DrSch Revised line for poor 17D per proto updates. I ; Item i 4 DrlTyp Added chart per proto updates. Item#5 WnTyp Revised note per proto updates. Sheet.A-7.0,Fence&Roof Ladder Details Item#1 GSch Deleted gate 9 per proto updates. � ; � i � i STRUCTURAL � Sheet 5-0.01.General Structural Notes I Item Ti. Added Secti�on2 Item 2.Replaced Paragraph 7.6 in the general notes � I ' � Sheet 5-1.0.Foundation Plan ' Item lli. Replaced no'te 11 Item 2i Added Saw J II int Note at Garden Center � Item 3. Changed thel footing call out at the drrve thru Item QI. Changed gr ldes at truck dock Item SI. Changed fo Ilting details at entry Item 6I Removed steel columns at SL Item 7 Added spreal li footing at 5.09L � Sheet 5-2.0,Roof Framin�Plan � Item l l Changed secti�on cut to 11/S-4.0 at SL and 5.09L Item 2. Removed joilst at C.32 and changed detail at wall to 19/S-4.0 � � ii Sheet a-3.0,Foundation Details Item 1� Changed detail 13 , Item 2. Changed det I il I S i I Sheet 5-3.1.Foundation Details I Item 1. Changed section 2 to section 15 ' It�'m 2_ Modified secltion3. 'S;eet�-4.0,Roof Framin�Details ii Item 1. Modified Section 4 � ; , � � 1437 SOUTH BO'iiLDER SUITE 800, TULSA, OK 74119-3609 • (918) 587-8600 • FAX 587-8601 � . � �epl�pyrt�ifls, FL Revisia►n#3 l�ay 27, 20�4 � Item i. Modified Seetion 5 r �¢Item i. Modified S i Ition 10 -�I t em-1. Mo di f ie d Se I tion 2 0 Sheet S-4.1,Roof Framin Details , Item i. Modified Section 7 Item i. Modified S I Ition 9 Item 3. Modified S Iction 10 � � � Sheet 5-4.2 Ro . , of Framm�Details Item I. Modified Sec�tion 7 h � S eet 55.0,Steel Fabrication&Surinkler Coordination Plan Item 1 Upl ated base i FIRE ALARM ' No changes � FIRE PROTECTION Sheet FP-0,Fire Protection Floor Plan i Item#i Upi i ted base Sheet FP-1.Fire Protection Site Plan Item#i Upd i ted base Shee t FP-2 Fire S i�mkler Pi in Plan A A P Item#Il Updated base . Sheet FP-3,Fire Spdi I kler Pipin�Plan-Svstem#1 &#2 Item#i Upldated base Sheet�P-4,Fire Sp I'I kler Pinin�Plan-Svstems#3&#4 Item#� Up i ited base S h e e t�P-5 Fire S rm k ler Pi in P lan-S s tems#5&#6 Item#i Up�i ted base , Sheet If P-7.Sections&Detials Item#i Rev�sed"gate valve"to"globe valve"in details 4&5 Sheet F'P-9,Fire Exti�ieuisher Plan Item#1 Updated base _ ,�. PLUMBING Sheet ,-1,PlumbinQ iSchedules Svmbols and Notes �tr►�#i Sch i dule: Revised model of Water Fountain(WF)fixture per 04.30.04 criteria update. Item#i 5/P-1 Added note to detail per 04.30.04 criteria update. Item#� Genle al Notes Revised lumbin eneral note#4 er 04.30.04 criteria u date. 1437 SOUTH BO�ULDER SUITE 800, TULSA, OK 74119-3609 . (918) 587-8600 . FAX 587-8601 � ; : ��pfltiyrhiils, FL ite�rision #3 �ay 27, 2t104 � SheetlP-2,Of�ce Plumbin�Floor Plan&Riser Diaerams �r Item�1 2��2 Revised rough-in note. '�Item�2 3/P-2 Revised rough-in note. SheetlP-3,Plumbin�Floor Plan i Item�kl 1�!3 Revised garden center irrigation piping layout per 04.30.04 criteria update. Item �2 1 -3 Revise truck well storm pi in la out. r � � P g Y Item 3 4/P-3 � Revised pipe size to coordinate with plan per 04.30.04 criteria update. Item 4 5/P-3 Added condensate piping note. Item 5 6/P-3 Revised pipe size to coordinate with plan per 0430.04 criteria update. , Sheet�-4,Waterin�Svstem l I Item#1 1 I�4 Updated detail number for clarification. MECHANICAL Sheet M-1,Mechaniclal Equiument Plan Item 1 1 I �1 Updated detail number for clarification. Sheet M-2 � ,Office Mechanical Plan&Detail Drawin s Item#41 4/M i 2 Revised detail number and note for clarification. � Sheet PVi-3,Mechamcal Schedules and Notes Item#Ii� Scliedule Revised Rooftop Unit Schedule regarding factory supplied smoke detectors. 4 Item#2 Sc�edule Added to Rooftop Unit Schedule RTU-1 box note"RTU-1 shall be 208 volt 3 phase. Item#3 � � General Notes Revised general note#5 regarding factory supplied smoke detectors. Item#S Schedule Revised NationaI Account Pricing Information Box Note per 04.30.04 criteria update.. ELECTRICAL Sheet E-1,LiPhtina Fixture Schedule and Mountin� - Item#i Schi i ule Revised P-1 pole height per.04/30/04 criteria update. Sheet E-3,Lighting Fixture Wiring Plan � Item#A 1/E I3 Revised mounting height of Garden Center pushbutton per 04/30/04 criteria update. Sheet �-4,Buildine Eower Floor Plan Item#l,� 1/E I i Added circuits for pallet jack chargers 04/30/04 criteria update. Item#� 1/E i i Added notes for fire pump controller to BMS system per 04/30/04 criteria update. 'Sh et B-6,Cable Tra�and Miscellaneous Conduit Plan Item#l� 1/E I6 Added mounting heights for conduits in Telephone/Data Room per 04/30/04 criteria update. It m#� 1/E�6' Added note for conduit to D1 per 04/30/04 criteria update. I Item#3� 1/E-6'I Revised note for D 16 per 04/30/04 criteria update. 1437 SOUTH BO! LDER SUITE 800, TULSA, OK 74119-3609 . (918) 587-8600 • FAX 587-8601 i _ Z��S Cyrhitds, �L Revisi�r� #3 nRay 27, �fliP4 � Item� 1 i i6 Revised CCTV notes per 04/30/04 criteria update. �"Sheet! -7.Office Area Power Plan :�Item#�1 1/Ei7 Added conduit for fire pump controller and deleted data power outlets per 04/30/04 criteria updat I. I Item 2 -8/E-7 Added mounting heights for conduits in Telephone/Data Room and relocated quad outlets per 04/30/ .4 criteria updi i e. Item#3 9/E=7 Added mounting heights for conduits in LP Office and added quad outlet er 04/30/04 criteria I P updatel ' Sheet E-8,Groundine Details and"SMEF"Notes � Item#Il 1lE-�8 Revised grounding conductor for transformer BW'per 04/30/04 criteria update. Sheet lE-9.Electrical Installation Details Item#�1 1�i Revised location of"EAS"cabinets at lumber door per 04/30/04 criteria update. Sheet E-10,Gen-Set Control Wirin�Schematic I Item 41 1�-10 Added wire and conduit size to fue pump ATS per 04/30/04 criteria update. � ' Sheet E-12,Power Ril er Diaeram � Item#� Revised fire pump control wiring and notes per 04/30/04 criteria update. Sheet E-13 Panelbo rd Schedules Item#2 RP�I Added circuits for pallet jack chargers per 04/30/04 criteria update. Item#8 CP.2 Added circuit for Altronics in LP Office per 04/30/04 criteria update. SPECS SECT ION 08462 ' SLIDING AUTOMATIC ENTRANCE DOORS SECT ON 09300 , CERAMIC TILE END OF NARRATIVE � � � _ �, : .`. 1437 SOUTH BO ILDER SUITE 800, TULSA, OK 74119-3609 . (918) 587-8600 . -FAX 587-8601 . , , = L�DWE'S OF ZEPHYRHILLS,FL 06/02/2003 „ S�CTION 08461 -SLIDING AUTOMATIC ENTRANCE DOORS � , i P ART 1 -GENERAL :� � I � 1.01 RELATED DOCUMENTS A. Drawin'gs and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,apply to this Section. i � i l '02 SUMMARY A. 1'his Section includes automatic entrance door systems with automatic, biparting sliding operation (as indicated on drawings). B. See.Division 8 Section "Door Hardware"for lock cylinders. C. See Division 8 Section "Glazing"for glazing requirements for automatic entrance doors i 1:03 PERFORMANCE REQUIREMENTS � A. General� Provide automatic entrance door systems that have the following capabilities based on testing manufac,turer's standard units in assemblies similar to those indicated for this Project: 1. Operating Temperature Range: Door operators capable of operating between minus 10 deg F and plus 120'deg F(minus 23 deg C and plus 49 deg C). 2. Maximum Opening Force: a. Exterior poors: 15 ]bf(67 N). ' b. ,Interior poors: 5 lbf(22.2 N). I � � 1.�04 SUBMITTALS A. Product Data: For each type of sliding automatic entrance door indicated. Check plans for total number of automatics,masonry opening sizes and door configurations. B. Shop Drawings: Include plans, elevations, sections, details, hardware mounting heights,wiring diagrams, and attachments to other Work. Also, shop drawings indicate that all assemblies meet local area wind load requirements(minimum 70 mph wind velocity),if requested. C. Hardware Schedule: Organize schedule into sets based on hardware specified. Include name of item and manufa�c�turer, and complete designation of every item required for each automatic entrance door. Use same reference designations indicated on Drawings and Door Schedule. , D. Maintenance data. I i 1.05 QUALIT'Y ASSURANCE A. Installei Qualifications: A qualified installer, approved by manufacturer to install and maintain manufa�cturer's products. B. Manufacturer's Certificate: Issued by the American Association of Automatic Door Manufacturers. C. Welding�Standards: Comply with AWSD1.2, "Structural Welding Code--Aluminum." D. ANSI (American National Standard Institute)BHMA (Builders Hardware Manufacturers Association) � Standard: ANSIBHMA A156.10, "Power Operated Pedestrian Doors." E. UL Standard: Provide power door operators that comply with UL 325. F. Emergericy Exit Door Requirements: Comply with requirements of authorities having jurisdiction for automatic entrance doors serving as a required means of egress. G. Preinstalllation Conference(if requested by Owner): Conduct conference at Project site. 1.06 COORDINATION �A. Coordinate size and location of recesses in concrete floors for automatic entrance door components. ' Concre�e, reinforcement, and formwork requirements are specified in Division 3 Section "Cast-in-Place Concrete."(if indicated on drawings). 1.07 WARRANTY - :.. �A. Special IWarranty: Manufacturer's standard form in which manufacturers agrees to repair or replace components of automatic entrance door system that fail in materials or workmanship,excessive air leakage, faulty operation of operators and hardware, or deterioration of inetals, metal finishes, and other materials : � beyondlnormal weathering within one year from date of Final Acceptance. SLIDING AUTOMATIC ENTRANCE DOORS 08461 -l Rievision#3, 0'S%26/04 � � i _ LOWE'S OF ZEPHYRHILLS,FL_ 06/02/2003 � , :, PART 2-PROD�UCTS I , 0 2�.01 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements,provide products by one of the following: 1• � I 2. Hoi-ton Automatics;Div.of Overhead Door Corporation. 3. Stanley Access Technologies;Div. of The Stanley Works. � � 2�.02 MATERIALS A. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated. 1. Extiuded: ASTM B 221 (ASTM B 221M). ', 2. Slieet and Plate: AST'M B 209(ASTM B 209M). 3. Welding Rods and Bare Electrodes: AWS A5.10. B. Glazingc As specified in Division 8 Section "Glazing." C. Sealants and Joint Fillers: Refer to Division 7 Section "Joint Sealants" for joints at perimeter of entrance system.� D. Nonmetallic, Shrinkag�Resistant Grout: ASTM C 1107,premixed,nonmetallic,nonconosive,nonstaining grout; of consistency suitable for application. E. Bitum'mous Paint: Cold-applied, asphalt-mastic paint complying with SSPC-Paint 12 requirements, except � contairiing no asbestos;fortnulated for 30-mil(0.76-mm)thickness per coat. 2.03 AUTO�V�IATIC ENTRANCE DOOR SYSTEM A. General: Manufacturer's standard automatic entrance door system, complete with doors, sidelite and � transom framing,operators, controls,activation devices,safety devices, and accessories as indicated. I. Configuration: Varies,see drawings for type. ' a. � ,Traffic Pattern: Two-way. b.i ;Emergency Breakaway Capability: Door and sidelite. c.I 'IVlounting: Between jambs. B. Activation Devices: 1. Motion detector. 2. Infrared presence detector. � 2.04 COMPONENTS FOR SLIDING DOORS �A. Sliding Door: 1. Stanley System included full breakaway SO-SX-SX-SO Dura-Glide 3000 with 4-inch muntins and 10- ineli bottom rails and medium stile doors. Stan-ray Motion Detectors, Dual Stan-Guard Safety Presence sensor, rivo (2) horizontal holding beams and extra long bottom sweeps. Provide alarm contact for door position and breakout monitoring in head member. 2. Horton Automatics system shall include Series 2001 belt drive operator with C2150 microprocessor control. Breakout configuration to be SO-SX-SX-SO. Medium stile door panels to have 4 inch muntm and 10 inch bottom rail. Package also includes:Motion detectors,dual horizontal photoelectric safety beams, threshold area presence sensor and extra long bottom sweeps. Provide Series 2001 alarm contracts in head member. B. Framing Members: Fabricate from extruded aluminum or formedaluminum sheet or plate. 1. Main Extrusions: Minimum wall thickness of0.125 inch(3.2 mm). � 2. Extruded Glazing Stops and Applied Trim: Minimum wall thickness of0.062 inch(1.6 mm). 3. Muntin Bars: 4-inch horizontal tubular rail members for sidelites;match stiles and rails. G Headers� Fabricated from minimum 0.125-inch- (3.2-mm-)thick,extruded aluminum or formed-aluminum sheet or plate. Conceal operator and roller track in header, providing access by means of hinged or , removable access panel to permit service and adjushnent. Secure panel to prevent unauthorized access. 1. He�a�der Type: Concealed, fabricated to match depth of framing and to extend full width of door _ �, openmg. D. Carrierl Assembly and Overhead Roller Track: Manufacturer's standard carrier assembly that allows vertical adjustment; consisting of nylon- or delrin-covered ball-bearing-center steel wheels operating on a � ,, continuous roller track, or ball-bearing-center steel wheels operating on a nylon- or delrin-covered continu'ous roller track. Support doors from carrier assembly by cantilever and pivot assembly. I ; � II SLIDING AUTiOMATIC ENTRANCE DOORS 08461 -2 R�evision#3, OS%26/04 LOWE'S OF 2EPHYRHILLS,FL 06/02/2003 j � 1. Roliers: Minimum two ba13-bearing roller wheeis and two antirise rollers for each active leaf. � E. Sills: �Manufacturer's standard sill mernbers and bottom guide system, with stainless-steel ball-bearing- ~ center roller wheels,and threshold and configuratian indicated belaw: „ I. Configuration: No threshold across door opening and pin-guide track system at sidelites. F. Brackets and Reinforcements: Manufacturer's standard; compatible with adjacent rnaterials. Provide nonstaining,nanferraus shims for aligning system connponents. G. Fasteners and Accessories: Manufacturer's standard cazrosion resistant, nonstaining, nonbleeding; � campatible with adjaeent materials. , 1. Reinforcement: Reinforce members as required ta retain fastener threads. 2. Exposed Fasteners: Do not use exposed fasteners, except for hardware apglication. For hardware application,use cauntersunk Phil3ips flat-head machine screws finished to match framing members or , hardware being fastened,unless otherwise indicated. ' ' H. Signag i Camply with ANSUBHMAA15b.10. ' 2�05 DOOR QPERATORS A. GeneraI�: Of size recommended by manufacturer for door size, weight, and movement; for condition of exposure; and for long-term, maintenanc�free operation under normal traffic load for type of occupancy � indieate�. I� 1. Type: Power operated,com 1 m with ANSUBHMAA156.10. P Y� g ( 2. Cannections: For power and carrtrol wiring. � 3. Adjustment Features: Fully adjustable without removing entrance daors, including adjustable speed, adjustable time delay for ]ength of time doar remains apen, and automatic door re-open if stopped wliile clasing. 4. O�Off Feature: On/off/hold-open switch controls electric power ta operator. Al] automatic ctoors � shali be equipped wzth an on-off-hald open switch with a cIear aluminum escutcheon pIate and opeiation label rnounted at 6'-6"above finished floor in jamb or other convenient inside locafion. 5. Provide "Opening Reduction Feature", set at 4$ inch typical reduced apening to ail l6'-0" (nominat) bi�part sliding door packages. (Typically"norrvestibule"stores). 6. Pravide"Keyless Entry Pad", type switch for"Re-Entry"to front exit daors. Mo�tnt an exterior at 6'- 0"above finish floor in jamb ar other convenient location. Caordinate with other trades. 7. Provide alarm contact security switches on all automatic sliding and swing doors. Contacts shall be factory installed with digita]connection extended at head members far connection to Owner. �B. Electromechanical Operatars: Self-contained overhead units,with power opening and closing mechanism, with cliecking in both opening and closing cycles,with safety-release clutch for absEructed closing,and that slides r�i�anually when power is off 1. Clasing Mechanism: Power operated_ 2. Moi nting: Concealed. � 2:06 ACTIVATION A1�Fll SAFETIr DEVICES IA. Motion Detector: Self-contained, sensing device that activates door operator; that is adjustable to pravide � detectio� patterns and sensitivity equivalent to those required for controi mats;with time delay for closing set at no Iess than 2.5 seconds;and with metal or plastic housing m black fimsh. I 2 Q7 HARDWARE ' A. General� Refer to Division 8 Section "Door Hardware" for requirements for hardwara items other than those iridicated to be grovided by automatic entrance daar manufactarer. B. ]-ieavy-Duty Hardware: Provide units as indicated in size, number, and type recommended by manufacturer for entrances required. Finish exposed parts to m�ch door finish,unless otherwise indicated. C. Emergericy Breakaway Hardware: Provide release hardware that allows panel to swing out in tl�e direction af egress to a full 90 degrees from any position in the sliding mode with zn�imum force required to open ` panel of SQ lbf{222 N) aeGording to ANSIIBHMA A I56.10. Interrupt operation of breakaway panet operator while in breakaway mode. D. Deadlocks: Manufacturer"s standard mortise haok bolt with 5-ply laminated steel,hook-shaped throw bolt, � '" I comply�mg with ANST/BHMA A1S6.5,Grade I requirements. 1. Cylinders: On door exterior,as specified in Divisian 8 Section "Door Hardware." 2. Mortise Cylinders: Manufacturer's standard b-pin, martise cylinders camplying with � � � AN�UBHMA A 15.6.5, Grade 1 requirements. , SL�DING AUTiOMATIC ENTRANCE DOORS 08461 -3 Rev�sian#3, 05�26144 � � � � . i � Ti OWE'S OF ZEPH'YRHILLS,FL 46/OZ/2003 . M 3. Tw;o-Point Lacking: Provide bottam balt and mechanism that automatically throws active-leaf battom bol't into threshold when deadlock engages inactive leaf and that provides onestage unlocking. � E. Campression Weather Stripping: Manufacturer's standard reglaceable, compressbte gaskets of malded w neoprene or moided PVC. Inctude bumper-type gaskets at daor stops arid laps. F. Sliding Weather Stripping: Manufacturer's standard replaceable weather stripping of wool,polygropylene, ar nylon woven pile,with nylon�fabric ar aluminum-strip backing,camplying with AAMA7Q3. G. Key Pad: Pravide key pad for outside coded access as manufactured by Locknetics Security Engineering Type KF74+StainIess SEeel Finish ar Equal. jl �.08 FABRICATIQN A. Prefabiricatian: Complete automatic daor fabrication, assembly, finishing,hardware applicatian, and other work�efore shipment to Project site. I I. Perfarm fabrication operations, including cnEEing, fitting, farming,drilling,and grinding of inetatwork � i inimanner that prevents damage to exposed finish surfaces. For hardware, perforrn these operations I before a 1 m ftnishes. � PP Y� g 2. Prepare components ta receive concealed fasteners and anchor and connection devices. B. Weld companents to comply with referenced AWS standard, Weld before fmishing components to greatest extent�possible. Weld in concealed locations to greatest extent possible ta miniraize distortion or discoloration of finish. Remove weld spatter and welding axides from exposed surfaces by descaling or grindirig. C. Glazing'Channels: Provide minimum clearances for thickness and type of glass indicated according to GANA"s"Glazing Manual." D. Metal i$rotection: Where aluminum wilI contact dissimilar metals, protect against galvanic actian by ' paintin�g contact surfaces with prrrner or by applying sealant or tape recommended by znanufach�rer far this ' purposeG ' E. Hardware: Install 1�ardware, except surface-mounted hardware, at fabrication plant. Remove only as � required for finaI fmishing ogeratian and far delivery to and installation at I'raject site. (� F. Doors:j 'Fabricate daors in profiles indicated. Reinforce as reqaired ta support impased laads and for installing hardware. Factory assetnble door and frame units. , 1. Exterior poors: Provide cornpression weather stripping at fixed staps. At Iocations without fixed ' stops,provide sliding weather stripping retained in adjustable strip mortised into daor edge. ( G. �ramin�g: Fabricate tubu]ar a�d channei frame assemblies in configuration fndicated, with welded or mechariical joints according to manufacturer's standards. Provide subfrarnes and reinforcement of types indicated or,if not indicated,as needed for a conngIete system ta support required loads. ; 1. E�terior Framing: Fabricate companents to drain water passing joints and condensation and moisture occurrmg or migrating within the system to the exterior. Provide anchorage and alignment brackets for caneealed suppart af assembiy from the building structure. Allow for thermal expansion af exterior ❑mts. � � 2.09 FINISHES �A. Alumi�tun Clear Anodic Finish: Class U�28 clear caating comgiying with AAMA647.1. PART 3 -EXECU( TION I 3.0 1 INSTALLATION �'I �A_ 'Templates and Diagrams: Furr�ish templates, diagrams, and other data to fabricators and installers of , related work,as necessary for coardinating automatic entrance door installation. B. Recessed Sills: Level recess using nonshrink gxout. C. Da nat instatl damaged cornponents. Fit frame joints to produce hairline joints free of burrs and distartion. � Rigidly;ecure nonmovement joints. Seal joints watertight. { i - .. � � � ; . }+ j i I SE,IDING AUTOMATIC ENTRANCE DOORS 08461 -4 R�v�sion#3, 05�26144 � ' I�OWE'S OF ZI PHYRHILLS,FL 06/02/2003 ' � D. Metal Protection: Where aluminum will contact dissimilar metals, protect against galvanic action by ; painting contact surfaces with primer or by applying sealant or tape recommended by manufacturer for this purpose. Where aluminum will contact concrete or masonry,protect against corrosion by painting contact surfaces with bituminous paint. � E. Entran�ces: Install entrances plumb and true in alignment with established lines and grades without warp or rack of framing members and doors. Anchor securely in place. Lubricate operating hardware and other movmg parts. 1. Install surface-mounted hardware using concealed fasteners to greatest extent possible. 2. Install components to drain water passing joints and condensation and moisture occurring or migrating within the system to the exterior. F. Door Operators: Install door operator system,including control wiring. Refer to Division 16 Sections for connection to electrical power distribution system. G. Activation and Safety Devices: Install control devices and wiring,including connections to door operators, as follows: 1. Mo�tion Detectors: Install scanners on both interior and exterior sides of each sliding automatic entrance door. 2. Infrared Threshold Presence Detectors: Install scanners on both interior and exterior sides of each sli�ding automatic entrance door as indicated. H. Glaziri�� Comply with installation reyuirements in Division 8 Section "Glazing." I. Sealarits: Comply with requirements in Division 7 Section "Joint Sealants" for installing sealants, fillers, and gaskets. 1. Se�t continuous sill members and flashing in a full sealant bed to provide weatlErtight construction. 2. Se�a'1 frame perimeter with sealant to provide weathertight construction. J. Adjusting: Adjust door operators, controls, and hardware for smooth and safe operation and for weathertight closure. 3.02 FIELD QUALITY CONTROL A. Inspection: After completing installation, an inspector certified by the American Association of Automatic Door Manufacturers shall test and inspect each automaric entrance door for compliance with applicable ANSUBHMA standards. l. Inspection Report: Submit report in writing to Owner and Contractor within 24 hours after inspection. B. Repair�or remove and replace Work that does not comply with requirements. 3:03 DEMO STRATION A. Engage manufacturer's inspector certified by the American Association of Automatic Door Manufacturers to train Owner's maintenance personnel to adjust, operate, and maintain automatic entrance doors and operator . END OF SECTION 08461 � � ' - � : ., � . SLIDING AUTOMATIC ENTRANCE DOORS 08461 -5 Revision#3, OSl 6/04 i ij . , , , ! i , _ LOWE'S OF ZEPHYRHILLS,FL 06/02/2003 � � � 4 i j � :. i I This Page Left Intentionally Blank il i � I � ' I i � I i � ; ! II i � , I ' � I i I � � I I I I II i � I ' I I � � � li - w � ; � I � . M li i jl I SLIDING AUTOMATIC ENTRANCE DOORS 08461 -6 ievision#3, OSI 26/04 , � i . i i � ; _ i OWE'S OF ZEPHYRHILLS,FL 09/Ol/2003 Y SECTION 093IQI0—CERAMIC TILE � PART 1 -GENERAL � � i 1.01 RELA� � D DOCLJMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Divis�on 1 Specification Sections,apply to this Section. ii , 1�.02 SUMIv1'ARY A. This Section includes the following 1. Porcelain floor tile. 2. Porcelain Wall tile � 1.03 REFER�ENCES A. American national Standards Institute(ANSI): 1. A��108.5-Installation of Ceramic tile with Dr�Set Portland Cement or Latex-Portland Cement. ' 2. A�108.10-Installation of Grout in Tilework. �' 3. A108.13-Installation of Membranes for ThirrSet Ceramic Tile. 4. Afl!18.4-Latex-Portland Cement Mortar. 5. A,118.6-Ceramic Tile Grouts. 6. A�137.1 -Ceramic Tile " B. American Society for Testing and Materials(ASTM): 1. C'136-Sieve Analysis of Fine and Coarse Aggregates. 2. C 1�44-Aggregate for Masonry Mortar. 3. CI1�50-Portland Cement. 4. C�627—Robinson Floor Test for Tile Service Level. � 5. C j 1b28-Static Coefficient of Friction of Ceramic Tile and Other Like Surfaces by the Horizontal D�- namometer Pull-Meter Method. C. TCA Handbook for Ceramic tile Installation by Tile Council of America,latest edition. 1.04 SUBMIT"I'ALS A. The General Contractor and the Sub-Contractor must execute the provided Conformance Submittal for each produet�specified. 1.OS PROJECT CONDITIONS A. Mainta'�n a temperature of not less than 72 deg F or more than 95 deg F in spaces to receive floor tile for at least 48 hours before installation, during installation, and for at least 48 hours after installation, unless manufacturer's written recommendations specify longer time periods. l. A$�er post installation period,maintain a temperature of not less than 72 deg F or more than 95 deg F. B. Install floor tile after other finishing operations,including painting,have been completed. C. All concrete surfaces that are to receive ceramic tile shall be inspected by the installing contractor,if found unsatisfactory the work of laying the ceramic tile shall not commence until the defective surfaces have been made satisfactory. Beginning work constitutes an acceptance of the base concrete flooring. ].06 QUALIiTYASSURANCE A. The work covered by this Section of the specifications includes the furnishing of all labor, equipment, appliances, materials and the performing of all operations in connection with the laying, installing and finishing of all ceramic tile in strict accordance with the applicable drawings, schedules, and the approved samples and color selection. , B. SINGLE SOURCE RESPONSIBILITY: ii 1. Tile: Minimum 5 years experience in manufacture of tile products. II 2. Setting Materials: Minimum 10 years experience in manufacture of setting and grout materials - „ specifed. C. INSTALLER QUALIFICATIONS: 1. Specializing in tile work having minimum of 5 years successful documented experience with work . .. comparable to that required for this Project. � ; I CERAMIC,TILE 09300-1 evision#3, OS/26/04 � I � , OWE'S OF ZEPHYRHILLS,FL 09/d212003 � I D. CERTIFICATIONS: � 1. Sutimit"Master Grade Certificate"for each tile type in accordance with requirements of ANSI A 137.1. 2. Subm3t rnannfacturer's certi�eations that mortars,adhesives,and grouts are suitable far intended use. „ E. Conform to ANSI—Recommended Staridard Specifications for Ceramic Tile—A 237.1. F. Conform to TCA Ceramic Tile: T"l�e Installation Handbook. i ! l07 WARRANTY A. Special Project Warranty: Submit a written warranty,executed by the Cozttractor,InstaIler,and IVlanuf�- turer,agreeing to repair or replace tile that fails in materials or workmanshipwithin the specified warranty period� � l. Warranty Peripd:2 years after date of Finat Acceptance. � + � i PART 2-PRt�DUCTS I ' , Contact Roy Foster{214-3Q9-4$4I}or Gina Norman{214-349-4559)far Lawe's National Account pricing on aIl t�merican Olean products. 2 OI GLAZE�D PORCELAIN FLOOR TILE A. Produc�ts: Subject to compliance with requirements,provide the following: 2. Ati��erican Oiean Glazed Porcelain Floor Tile,6"x 6",A4T'VL0466 Vailano Dark Chaco�ate. 2. Am�erican Olean Glazed Porcelain Floor Tile, 12"x 12",AOTVL0112 Vallano Macadamia. 3. S;listitutions nat permitted. � i 2 02 WALL TILES A. Praducts:Subject ta campliance with requirements,pravided the following: 1. Am'erican Olean Glazed Porcelain Wall Tile,6"x6",AOTVL0466 Vallano Dark Chacolate. 2. Atn�ericari Olean Glazed PorceIain Wall Tile, 12"x12",AOTVLOl 12 Vallana Macadamia. B. Provide 3"x 12" bullnosed tile at locations where tile edge is exposed (i.e. vertical edge of exposed wall tile). � 2.03 MOR'�AR A. Latex�ortiand Cement Thin Bed Adhesive Mortar 1. Dr,y set mortar to be weather, frost,shock resistant meeting thefallowing physical requirements: a., Compressive strength SOOQ psi{3�.5 MPa}Min.(ANSI A 118.4) b. ' Bond strength 500 psi(3.5 Mpa)Min.(ANSI A118.4) c. Water absorption 4°10 Max.(ANSI A118.6} d. Smake&Ftame contribution factors 0(ASTM E84—Modified} B. Acceptable Products 1. Hydrament, Single-Flex F.S. (#973 Gray}thit�-set mortar with admixture#425 Multi-Purpose Acrylic La�tex. 2. Laticrete,premium flaar`n'wall thin set mortar gauged with morEar admix#3701. � 2.04 GROUI� A. Chemical-ResisEant Epoxy Grout far Floor TiJe: 1. Description: Stain-proof, chemical resistant ]00% salids epoxy with temperature resistance and coinply with ANSI A218.3. 2. Acceptable Products: a. �Hydrament,Color-Poxy grout,color Sand Beige. B. Sandec�Latex-Modified Graut for Wall Tile: 1. De�scription: Latex-modified,factory blended,mildew resistant,sanded,grout consisting of portland cement and additives;camply with ANSI A l 18.6. 2. Latex Additive: Type as recornmended by latex mortar rnanufacturer. _ „ 3. Acc�eptab2e Products: a. � �Hydroment Ceramic Tile Grout(sanded),colar Sand Beige. � � - `' � I � ERAMIC TILE 093p0-2 evision#3, OS 26104 � � — ! LOWE'S O�'ZEP�IYRHILLS,FL 49/01/2003 , � { . 2.45 INSTALLATION ACCESSORIES , A. Trowelable Leveling and Patching Compounds: Latex-modi�ed, portland cement-based ar blended :, hydraulic cement-based formulation provided or approved by flooring manufacturer for applications indicate'd. B. Tiie Edge: Provide edge strip Schiiiter-Reno-EUGB#140. Schtuter Systems 1-800-�72-4588. � PART 3-E�CUTIt3N ii 3:01 INSTALLATION A. Concrete Subfloors: Verzfy that concrete slabs comply with ASTMF 710 and the following: 1. Slab substrates are dry and free of curing compounds,sealers,hardeners,and other materials that may interfere with adhesive bond. Determine adhesion and dryrtess characteristics by performing bond and moisture tests recommended by flooring rnanufacturer. B. Tiie Installation,GeneraI: 1. Install tile materials in accordance with ANSI A137.1, ather referenced ANSI and TCA specifications, ari�d TCA "Handbook for Ceramic Tile Installation", except fflr more stringent requirements of manufacturer or these Specifications. 2. Gut� and fit tile tight to pratrusions and vertical :interruptions and treat with a cnmpatible sealant as specified in Section Q7924 Joint Seaiants. Form corners and bases neatly. Tnstail tile edge in accordance with manufacturer recommendations. 3. W�ork tile joints uniform in width, subject ta variance in tolerance allowed in tile siae. Make jaint watertight,without vaids,cracks,excess nnortar,or grout. 4. Prepare surface, fit, set, bond, grout and clean in accardance with applicable requirements of ANSI standards and Tile Council of America. a. Flaors-Dry-set: TCA F113 b: Walls-Dry-set on Masonry: TCA W2Q2. 3.Q2 MOR�AR A. Thin bed method: Apply mortar with natched trowel to work instalIation materials inta good contact with tile sub�strate. Select trowel notch size per tile selected. Spread only as much martar as can be covered in 20-30 ininutes or whiie mortar surface is stitl wet and tacky. When installing large tiles, spread {back- butter)iinortar onto back af each tile in additipn to troweling materials over tile substrate. Beat each piece inta mortar with a beating biock or rubber maltet to insure fu31 bedding and flatness. Allow installation to set untiljfirm. CIean excess mortar from tile surface. I � 3.fl3 GROU�TING A. Allow tiles to set a minimum of 4$hours before grouting. B. If bond'�ng materials are rapid setting,foliaw manufacturer's recommendatians. C. Install in accordance with grout manufacturer's recommendations and ANSI A 108.10. D. Pack Y4'�wide joints full and free before martar takes initial set. E. Clean excess grout from surface with wet chees�loth as work progresses. Do nat use hydrospanges. F. Install sealant to match grout in vertical wall joints at interior corners. i i � 3 04 CLEAN'1NG A. CIean excess tnortar fram surface with water as work progresses. Perform cieaning while mortar is fresh and bafore it hardens on surfaces. B. Sponge and wash tile diagonally across jaints. Polish with clean dry cloth �I END OF 5ECTION 09300 � - � . �. i i i � � C�ERAMIC TILE 09300-3 �evision#3,0�/26IQ4 _ i ; � I � ; , , LOWE'S OF ZEPHYRHILLS,FL 09/Ol/2003 . � ' i . � � This Page Left Intentionally Blank I � , ; � � i � ' I ! � i I � � ii - I I I i I � i ' � I ' � I i I � I � I - P I I I • y � I III CERAMIC TILE 09300-4 Iievision#3, OS/26/04 � � � �'� � i � � r L;OWE'S OF ZEPHYRHILLS,FL 09/Ol/2003 ; i . � I CONFORMANCE SUBMITTAL - � i Section 09300—Ceramic Tile � � Lowe's of (City, State) I � General Contractor: i i ; (Comparry Name) � (Address,Phone Number) ' Sub-Contractor: i I' ; � (Comparry Name) � , � (Address, Phone Number) I Tihe following product has been selected(check one box)for use in this project from the list of acceptable products s ecified: � � P Porcelain Wall Tile and Grout: i ; I❑ American Olean A01'VL0466 Vallano Dark Chocolate. i I 0 Ameri�can Olean AOTVL0112 Vallano Macadamia. I I� Hydroment,Color—Poxy,color Brown. � I ' . �, I � �I represent to Lowe's that the product selected will be installed in compliance with the applicable codes for the au- I tharrties havmg I�unsdiction and m accordance with the project specification. If noncompliance is discovered the I General Contractor shall make or cause to be made all necessary corrections to meet the applicable codes and speci- �� fications. Immediately or as directed by Lowe's the work shall be completed without additional cost to the Lowe's �i � and/or the conti-act. �eneral Contractor: (Signature of the Authorized Agent of the General Contractor) ; � (Print Name of the Authorized Agent of the General Contractor) i I represent to Lowe's that the product selected will be installed in compliance with the applicable codes for the au- thorities havingi�urisdiction and in accordance with the project specification. If noncompliance is discovered the General Contraetor shall make or cause to be made all necessary corrections to meet the applicable codes and speci- fcations. Immediately or as directed by Lowe's the work shall be completed without additional cost to the Lowe's and/or the contract. Sub-Contractor:� ' � (Signature of the Authorized Agent of the Sub-Contractor) _ , (Print Name of the Authorized Agent of the Sub-Contractor) i I � � ` � i i � i CERAMIC T LE 09300-5 Revision#3;OS/26/04 . i ; � � i � , LtiWE'S OF ZEPHYRHILLS,FL 04/01/2003 I i • � CON�QF:MANCE SLTBNBTTAL I : Section 0930p—Ceramic Tile � Lowe's of � i (Ciry, State) � � � Cxeneral Contractor: � � � (Company Name) � ' � � (Address, Phane Number) Sub-Contractor: ' i ! {eamparly Name) ( ( � ; {tlddress, PhoneNumber) The following product has been selected(check one box)for use in this project fronn the list�acceptable products specified: ' i I i ; �arcelain Floar Tile and Graut: i � I ' I� American 03ean AOTVL4466 Vatlano Dark Chocolate. ( , i American Olean A(7TVL0112 Vallano Macadamia. � ! [.� Hydra'riment,Color-Poxy,color Brown. � ii I li I�represent to I.!.owe's that the product selected will be installed in cornplianea with the applicable codes far the au- thorities having�jurisdiction and `ua accordance with the project specification. If nancompliance is discovered the General Contractor shall make or cause to be made all necessary corrections to meet the applicable codes and speci- � �catians. Imrriediately or as directed by Lowe's the work sha31 be campleted without additional cast to the Lowe's �tnd/or the contiract. i � General Contractor: j (Signature of the Authorized Agent of the General Contractor) � i i � {Print Name of 1he Authorized tlgent of fhe Gerteral Cantractor} t represent to LI we's that the product selected will be installed in coznpliance with the applicable codes for the au- 1:horities havin�g�jurisdiction and in accordance with the project speeification. If noncampliance is discovered the General Contractor shall make or cause to be made all necessary corrections to meet the applicable codes and speci- �cations. Imrr�ediateIy or as directed by Lawe's the wark shall be caznpleted withaut additional cast to the Lawe's �nd/or the cantract. . � , Sub-Contractor� 3 (Signature of the Authorized Agent of the Sub-Contractor) i ( � I , {Prinf Name of the.4uthr�rizecl Agent of the Sub-Contraetor} y w i i . .. I I CERAMIC TILE 09300-6 `Revisian#3, 05126144 � i � ��,�� � Irl���Iz r - REVISION #5 "�fl` ��� ��"�`'� Prmject: Zephy�'rhills,Florida New Store � � � Jul� 1, 2004 I � F Lowes � i Zephyrhills,Florida i I o�ect#: 0319020 TSA Pr � � ' � ' This nari�ative describes the revisions to the construction documents as directed by Lowes Home Centers, I Inc. All items described below have been identified on the plans with a revision cloud and a Delta 5 symbol. �i � ARCHITECTURAL No changes. I - �I STRUCTURAL Sheet 5-2.0,Roof i ,ramin�Plan Ite " 1. RT'LJ locat4bns and weights were added to the drawing. , FIRE ALARM I No changes. FIRE PROTECTION No changes. PLUMBING Sheet P-3,Plumbing Floor Plan , Item#1 �/P-3 Updated downspout locations per revised shade structure. MECHANICAL No changes. ' ELECTRICAL Sheet E-2,Lightins Fixture Location Plan Ite�#1 1�/E-2 Revised.Garden Center lighting for zone B shade structure. Sheet E-3.Lightin�Fixture Wirin�Plan Item#1 1VE-3 Revised Garden Center lighting for zone B shade structure. She�t E-13,Panelbl ard Schedules Ite '#1 LPB Revised circuit for zone B shade structure. SPECS No Changes. END OF NARRATIVE , I I 143I�7 SOUTH BOULDER SUITE 800, TULSA, OK 74119-3609 • (918) 587-8600 • FAX 587-8601 C ' � �