Loading...
HomeMy WebLinkAbout7050 GALL BLVD (87)Page is too large to OCR. I , Sheet A-7 Typical Details: ` 1. Add Details: 03 Intersection of rated walls 08 Door head detail 09 Doorjamb detail 15 Door sill detail As indicated in the attached drawing A-7,dated June 13, 2000,Delta No. 1. Sheet A-8 Reflected Ceiling Plan—Second Floor Plan/Casework Elevations: 1. Incorporate the Casework Elevations 1,2,3 and 7 as indicated in the enclosed drawing A-8, dated June 13,2000,Delta No. 1. 2. Incorporate the changes to the Reflected Ceiling Plan as indicated in the enclosed = drawing A-8,dated June 13,2000,Delta No. 1. 3. Add the Door Schedule to the sheet as indicated in the enclosed drawing A-8, dated June i. 13,2000, Delta No. 1. _ Sheet F-1 Finish Floor Plan: 1. Incorporate the changes to the Finish Drawing as indicated in the enclosed drawing F-1, dated June 13, 2000,Delta No. 1. _ Refer to the attached Mechanical,Plumbing and Electrical Revision. blm END OF REVISION E REVISION NO. I PAGE 2 JOB NO. 00054.00 Page is too large to OCR. PLUMBING Sheet P-1, Second Floor Plan-Plumbing: t 1. Revise demolition and new work plumbing layout as required to match new floor plans as P-1,labeled o. 1,dated shown on sheet as Delta June 13,20 N 00 2" Add waste,water and vent piping to serve new service basin as shown on sheet P-1,labeled i as Delta No 1,dated June 13,2000 3. Add Keynotes 10 and 11 as shown on sheet P-1,labeled as Delta No. 1,dated June 13,2000. I�. 4. Add new service basin(P-6)to Plumbing Fixture Specifications List and Fixture Connection Schedule as shown on sheet P-1, labeled as Delta No.1,dated June 13,2000. - E 5. Revise fixture specification for emergency eyewash(P-4) as shown on sheet P-1, labeled as _ Delta No. 1,dated June 13,2000. ` ELECTRICAL Sheet E-2,Lighting and Notes Second Floor Plan- } 1. Revise demolition and new work lighting layout to match new floor plans as shown on Sheet E-2,Delta 1,dated June 13,2000. Sheet E-3,Power and Systems Second Floor Plan: 1. Revise demolition and new work power and systems layout to match new floor plans as shown on Sheet E-3,Delta 1, dated June 13,2000. Sheet E-4, Electrical Panel Schedules and One Line Riser Diagram: {e:� 1 Add fixture schedule as shown on Sheet E-4,Delta 1,dated June 13,2000. REVISION NO. 1 PAGE 2 JOB NO. 00054.00 . t•- - - - - - - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - - -- - - - J: - - - - - `i .1 ; ,--,.-�_ i 1 -L -- - - = auli ail - Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR.