HomeMy WebLinkAbout7050 GALL BLVD (90) ' _ VT " - :
I REVISION NO. 10
{ December 11, 2001 l2
i DIAGNOSTICS ADDITION - PHASE 11 & III
EAST PASCO MEDICAL CENTER
ZEPHYRHILLS, FLORIDA
ESa PROJECT NO. 99087.00
EARL SWENSSON ASSOCIATES
2100 WEST END AVENUE, SUITE 1200
NASHVILLE, TN 37203
This Revision forms a part of the Contract Documents and modifies the original
Bidding Documents, dated April 13, 2001, as outlined here in addition to being
- - - ! shown on the drawings as Delta 10, December 11, 2001:
CHANGES TO THE DRAWINGS
V .
SHEET A-4B - PHASING PLAN
1 . Remove applied U.L. rating from the existing building in the attached Sheet F -
A-4B, dated December 11, 2001, Delta No. 10.
SHEET A-6 — DIMENSIONED AND NOTED FIRST FLOOR PLAN
1. Add MRI room 1-129, Comp. 1-124, and Control 1-130 as shown in the
attached Sheet A-6, dated December 11, 2001; Delta No. 10.
- - SHEET A-13 — REFLECTED CEILING PLAN — 1ST FLOOR
1. Add changes to the ceiling plans as shown in the attached Sheet A-13,
dated December 11, 2001, Delta No. 10.
SHEET A-16- DOOR SCHEDULE
- 1. Add doors as shown in the attached Sheet A-16, dated December 11, 2001, —
V Delta No. 10.
F-0 -FINISH SCHEDULE
1 Add finishes for MRI suite as shown in the attached Sheet F-0, dated
December 11, 2001, Delta No. 10.
— — t �_ ci . - Li- .fl�lu3.: .� 1 lt� — `_=�' —_■}_a. ii� .�: i :;�__� —
Page is too large to OCR.
ii REVISION NO. 10 _
DECEMBER 18,2001
{ DIAGNOSTICS ADDITION-PHASE II & III
EAST PASCO MEDICAL CENTER
ZEPHYRHILLS,FLORIDA
ESa PROJECT NO. 99087.00
PDG PROJECT NO.98027.21 =
1
PHOENIX DESIGN GROUP,INC. -_
� SUITE 218 i /(�104 WOODMONT BLVD. - - _ _ I
j NASHVILLE,TN 37205 =
This Revision forms a part of the Contract Document and modifies the original Bidding
Documents dated April 13,2001,as outlined here in addition to being shown on the drawings as F
Delta 10,dated December 18,2001.
DRAWINGS
CHANGES TO
- - I
ELECTRICAL
_ . = Sheet E-4—LIGHTING FIRST FLOOR
• 1. Add lighting for MRI suite as indicated on Sheet E-4,Delta 10, dated December 18,200E
ii
Sheet E-5—POWER& SYSTEMS FIRST FLOOR
1. Add power connections for MRI unit as indicated on Sheet E-5,Delta 10, dated December
18, 2001. _ f
--
Sheet E-12—ELECTRICAL ONE LINE DIAGRAM i f
1. Revise one line diagram to include MRI unit connections as indicated on Sheet E-12,Delta _
10, dated December 18,2001.
• • Sheet E-13 —ELECTRICAL PANEL SCHEDULES
- - - - I 1 .
1. Revise panel schedules DIAGDP and ECLDI as indicated on Sheet E-13,Delta 10, dated E
•
December 18,2001. E
r
REVISION NO. 10 PAGE 1 JOB NO. 99087.00 -
- H1 : r ; : iJ - : : - - - -
Sheet E-15-ELECTRICAL PANEL SCHEDULES
• 1. Add panel schedule for panel MR as indicated on Sheet E-15,Delta 10, dated December 18,
2001.
MECHANICAL
Sheet M-2—SCHEDULES—HVAC
1. Added V21-118 to schedule as indicated on sheet M-2,Delta 10,dated December 18,2001. _
Sheet M-5—FIRST FLOOR PLAN PHASE 2A—HVAC
1. Added HVAC for MRI Room 1-129, COMP. 1-124, and balanced Reading Room 1-121 as
indicated on sheet M-5,Delta 10, dated December 18, 2001. k
Sheet M-6—FIRST FLOOR PLAN PHASE 2A-HVAC PIPING
1. Added piping for new equipment as indicated on sheet M-6,Delta 10, dated December 18, E
• = I 2001. =
•
= I Sheet M-9-SECOND FLOOR PLAN -HVAC PIPING -
1. Added piping for new equipment from MR I as indicated on sheet M-9,Delta 10, dated
December 18,2001.•
Sheet M-20—ROOF PLAN —HVAC
1. Added CD-2 for new CAC-2, cryogen vent and showed new location of relocated condenser I
for MRI chiller as indicated on sheet M-20,Delta 10,dated December 18,2001.
Sheet M-24—DETAILS -HVAC
1. Added detail DE-11 as indicated on sheet M-24,Delta 10,dated December 18,2001.
t f _ _ PLUMBING — — _
Sheet P-2—FIRST FLOOR PLAN-PHASE 2A-UNDERGROUND PLUMBING
1. Add waste piping to serve new floor drain as shown on sheet P-2,Delta 10, dated December
18,2001.
E
REVISION NO. 10 PAGE 2 JOB NO 9908700
F = .
- .i.•f i'- - - _ - _
Sheet P-3—FIRST FLOOR PLAN-PHASE 2A-PLUMBING
1. Add waste and vent to piping to serve new floor drain as shown on sheet P-3,Delta 10,dated
December 18, 2001.
2. Add %z"cold water line and backflow preventer to serve MRI process chiller as shown on
sheet P-3,Delta 10, dated December 18,2001.
Sheet P-4—FIRST FLOOR PLAN-PHASE 2A-MEDICAL GAS/ STORM DRAIN
1. Add medical gas outlets and associated piping as shown on sheet P-4,Delta 10, dated
December 18,2001.
END OF REVISION
I
a
:,
.3-
REVISION NO. 10 PAGE 3 JOB NO. 99087.00
t'j
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.