Loading...
HomeMy WebLinkAbout0015 Seamless Carpet Completed 9th Grade Building During the summer,while students were The building was finished and ready for off having fun,the school was filled with the school year. At the beginning of the activity.The main entrance and through- year.students had a rough start with an out the hallways and commons area inability to hear the class bell. The build- carpet was updated and even extended ing also features beautiful landscaping into the trophy case. including nine palms. 44 1 Definitely bigger.softer chairs to sit in' •Cammi Savage 2 More lunch portions along with a wide variety ' of choices. 3 Some students would also enjoy having every classroom with windows,to born the warm sunshine --f 'We need a playground uitn Dig swings and "crsey bars •Zach Lemay ,.) Every student should have a laptop and iPod touch given to them •Taylor Nutt 6 1We need more advanced classes like AP Physics and AP calculus B.C'•Cal Smrth 7 They should build a Starbucks to sell coffee and hot chocolate to keep kids awake This school needs a water park' •Damel Alvarado A Flawless Gym Flooring Overhead Projectors 9 New and more textbooks to use at school Athletes and P.E.students enjoyed Teachers and students alike used these the new gym floor.The innovative floor tools to further their learning experience. In Many students would love a room where depicted a bulldog in the center and A total of 58 were installed in several theycould lust go and chili,get a nap.or watch a movie "Home of the Bulldogs".The floor also classrooms throughout campus.Mr. includes two Z's,one on the home side Steve works diligently to have this one and one in front of the away audience. up and running for class. 11