Loading...
HomeMy WebLinkAbout18-19482 CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780=0020 19482 BUILDING PERMIT PERMIT INFORMATION LOCATION INFORMATION Permit Number: 19482 Address: 4330 20TH ST Permit Type: COMMERCIAL ZEPHYRHILLS, FL. Class of Work: ADD/ALT COMMERCIAL Township: Range: Book: Proposed Use: COMMERCIAL LoAs:): Block: Section: Square Feet: Subdivision: CITY OF ZEPHYRHILLS Est. Value: Parcel Number: 13-26-21-0070-03900-0020 Improv. Cost: 800,000.00 OWNER INFORMATION Date Issued: 3/28/2018 Name: NESTLE WATERS NA INC Total Fees: 5,648.24 Address: 4330 20TH ST Amount Paid: 5,648.24 ZEPHYRHILLS, FL. 33542 Date Paid: 3/28/2018 Phone: (813)783-1959 Work Desc: BUILDING REDUCE SQ FT 3,025 ADD 3 LOADING DOCK CONTRACTORS APPLICATION FEES THE HASKELL COMPANY BUILDING FEE 3,922.50 COASTAL MECHANICAL SERVICES LLC ELECTRICAL FEE 790.00 EF LEA ELECT CONTRACTORS INC PLUMBING FEE 465.00 RANDALL MECHANICAL INC MECHANICAL FEE 290.00 FIRE PLAN REVIEW FEES 90.72 FIRE INSPECTION FEES 90.02 Ins ections Required FOOTER 2ND ROUGH PLUMB MIS INSULATION CEILING FOOTER BOND DUCTS INSULATED SEWER MISC. ROUGH ELECTRIC LINTEL MISC MISC. 1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC. DUCTS INSTALLED WATER MISC DRIVEWAY- PRE-SLAB SHEATHING MISC. MISC. CONSTRUCTION POLE FRAME MISC. MISC. REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning.to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. �. - I &-, CON OR GNATURE PERMIT OFFIgkR PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER ' ' t ` Rt�Leo mzn City of Zephyrhills Permit Application Fasts Aso oo2t SW1d€r4 Did ' DateRacei ad 2/21/18 O>iw'r»ttia'ss Nrsim-aF i, : . PhoneContectW'P6fmt n 904� 710 7 40 --ra-` r � Vt`? 5 `A be.,Ph..Number - W -zwod OwnersAddrea Zephyrhills, FL 33542' Owner Rmw Number 1: ,yy6, 84f -'N5 . Fee sh"leT€UahomerNome -�- - --_ _ - Owner Phone Numbsr Fee Simple 71detwider Address JOS ADDRESS 4330 20th St, Zephyrhills, FL 33542 LOT/ r�. SUBDIVISION PARCEL tD.13 26 21 0070 0740H000 -- (amurrm rAOH I'SWERI UX NarMM WORK PROPOSED NEW CONSrR ADDIALT ® SIGN Q CD DEMOLISH El INSTALL8 REPAIR PROPOSEDLISE SFR COW �r OT14ER _- TYPE OFCONS7RUCTION 0' BLOCK 0 FRAME i STEEL DESCRIPTION OF WORK Reduce-existing building by 3,025 SF and add 3 loading dock positfe iis:- BUILDINGSIZE NIA SWOOTAGE 3,025 HEIGHT N/A G]RUILDING 5 515,000 VALUATION OF TOTAL CONSTRUCTION �EUECTR!CALt 5 150,OOq AMPSERVICE Q PROGRESS ENERGY Q W.RE,C. ®PLUMBING $ 85,gg0 X MFCHAMCAL 5 50,000 VALUATION OF MECHANICAL INSTALLATION pGAS 0 ROOFING [D SPECIALTY Q OTHER FINISHED FLOOR ELEVATIONS 84 67 FLOOD ZONE AREA AYES N0; BUILDER L�C COMPANY I llask-4 SIGNATURE - FMO93FERW YIN IrrfctsocEA Y N Ad,,,,. 111 Riverside Avenue,.,Jacksonvill:e', FL 32202 LroenseS�CGC056894 ELECTRICIAN COMPANY E.F.Lea Electrical Contractor,Inc.- SIGNATURE r �' -- rmsTErteo I Y1 N FM CUM" - .'YIN. .. , t' a�lcse. ille,FL 32206 Lim; EC13004911 Address 339 '°: PLUMBER - ANY fLA1ypAt%.. GtLAn1!t-at'L=Vr.T�' SIGNATURE -- .� ';h£ci?TeffEp' - :Y!_N FEEcujrtt�rtL+•r..-' Y•tN Addreas ,y! tJ wp"..' "�1 License MECHANICAL COMPANY Coastal Mechanical Services,LLC ! (A5' Q SIGNATURE Yf•N FEEcuRArA i :YIN Addme 395 East Drive.-Melbourne,FL 332]904 Llcetsses CMC035444 OTHER - I COMPANY SIGNATURE ffaarF"O 11 Y1 W 1, FEEr"(pWh 1-YYYN Address: - LlbaR�tt i f)1 1 1 t f 1;1.I r't I,O.b',r•'a,1;1,t 14 I'L1 1: 1,1 1 t l:f 1'1 gill i 1 RESIDENTIAL llttecli�2)Pial'P1vic;'(s)'alaolSuflr6npl�darrs;(l)aelorClef{ly'FainxROW,Fong€tlorrsow.6ogatcyeE€on, M€n'vinim tail(t0}titidrtdpg+�Y?oltarri�,mttwt date.,RagriresC-at�ln;Ccnatniq€an Plans.Stosmvta2rtrPimss udS�i Fe€t4o hlSiutSnl; Sao(iarytRsnDt3eaR'-idumOsWf SitolhbrkPrmi4'foriubdivtsionalfarrtaDro)acts'._ COMMERCIAL AUoeh,(2)'ootiipiola,sotaolBukRngWsnapluaaUfa,$story.t?opc:(1)sciorEnerljylotrna.R.O•WPermlt for new ConsUvdioa; MinlmunY,ICJ1(10)vmr►I!1!i Hayp after.eaebrNUel.tlate:.'�RopuinW.onsiln;,Consiaucrion PLinc..StomrNarut;Ptnns.vi!SI€€Fcnca InstaIkd; SonRaryFodi€tine"$:1'ifumpstar'S€!o,'LYaskPttrmRrcriiilnowi' - ", SIGN PERMIT Attach(2),n6%,orEnpineeradiNum._ txO a.A!€'colninsr�ratsctptYxnantamvslrricglcatnpUanco "PROPERTY SURVEY raqulraA for•pjl NEW wnclruatlon.. FIt,put epp�agi€ap wmplolety:. Oour 8 Conlraclnr din basA,of appkaWn,notarind 11 over$200,a Notice of Commencement lorequimd. (AtC upgrades overlGT600) Agent(for Noe conbactor)or Pow of Atromey((at the owne0 xvUtd be someone wah nowbod tatter OCm mmor oultwiang smro d1/Et2THE 000NTER FERMITnNG (oopy 0i00nM fpqu1md} Reroota€fbbingtos. Swrrpm ServkoUpgrtrdos AtC Fanaoa(NlousurYoyrFoolcup OriveweywNot over Counter 11 an pubild rosdways..nee&ROW ata rsa oo?a'. City of Zephyrhiilis Permit Application FOX-613.7804=1 Building Department: Date Received- 2 2/21/1$ Phone Contact far Pokmitltr 90 A" 710 4051 Ownoda Name. N#r E' i9'v/s. Owner Phone Number. �rxJ'�.�r Z / 433.0"20t: ' St, Zephyrhills, FL.3354= ?,f6 -480'.sy.5r . Ownefs Add.an OtmtrrPhone Number . Fee Simple Titleholder Namo'" OwneaPhoea Number '.��• Fea'Simple TidoholdorAddress J-08ADDRESS 4330'20th" St,- Zephyr. ls," FL-335'42 LOT# ff .SUBOMION . PARCEL ID#13 26 21.0070 07400 0000. . - - (OBTAINED FROrt.PROPERTYTAX NOTICE) WORK PROPOSED NEW CONSIR ADDIALT � SIGN M. DEMOLISH e INSTALL ;8 REPAIR PROPOSED USE Q SFR' Q COMM' Q OTHER .TYPE OF CONSTRUCTION" .0'. BLOCK 0- FRAME Q: STEEL Q DESCRrPTtONOFWORK Reduce existing. }5tiildinq by 3,025 SF',and add ,3 loadijig-dock. positi hs. NlA 3,025 BUILDING SIZE; �:SO FOOTAGE '- . - HEIGHT /A 3, nrTIBUILDING S . 515,0 00 VALUATION OF TOTAL CONSTRUCTION : ELECTRICAL' . S'. AMP SERVICE Q PROGRESS'ENERGY �', W.R.E-C_ 150,000. .`Z c �PLUMBtNG QMECFIANICAL' S VALUATION OF.MECHANICAL INSTALLATION 50 000 ) "'E, " QPAS xQ ROOFING. '[] . SPECIALTY [x_ ]. OTHER. ' FINISHED FLOOR ELEVATIONS', $4.67. �FLOOD ZONE AREA- Y.ES NO' � � . BUILDER c.. COMPANY Haskell SIGNATURE: REGISTERED Y N FEECURREA Address• 111,Riverside 'Avenna 'Jac}cs'onvi32e,..FL 32202" . -tikense#t 'GGC056894. E)ECTR]CFAN TEDCOMPANY - SIGNATURE �( RMiTERED -I.N FIECURREa YIN— . Address `� Ltcensatt' ' PLUMBER TBD, "REDIS SIGNATURE GTTERRED I Y/N FEE GURRE7 T77M Address: License tt ' MECHANICAL TBA. COMPANY SIGNATURE REGISTERED I YIN 'FEE CURREn" YIN' Address License : . TBD COMPANY .� . . 'SIGNATURE OTHER � �" �' REGISTERED YI 1.N "FEECURREN" Acidness.. :Licensee 1.11:1'1 1.11.1 1 / / 111'1'111 LI 1 bt 11 11 t'1 1.1 1,1 11 1 11 t t 1 1'1 11'1 1.t 1.1 l,t 1'111 11'.1.1.1 1 11`L1 RESIDENTIAL A1tadQ2)Plot Plans;(2)setsofBuilding.Plans;'(t).set'of Energy Fams;R O•W Permit for new construction. Minimum ten(10)*wv*ing days after submittal dale.Required onsite,Constox ion Plarts;Stwmwater Plans vtt Siff Fence fnstalted.- Sanitary Facilities&1 dumpster Site Work Permit forsuddivislonsnarge projects COMMERCIAL, Aftach(2)complete,sets of Bu.Wi g'Plans plus a Life Safety Page;(1)set of Energy fortes.R•O.W Permit for new constriction, Mint urn ten(i O)worIwV days after submillai date;Required.oirsite,Constrixetion"Pians.Stotmwater Plans wi Silt Fence(nswiled. Son)tary:Facilities&A dumpster.Site Worts Permif for all nevi projects.AR.commercial requirements must meet cwrw&arrce. SIGN PERMIT Attach(2)sets'of Engineered Plans. —PROPERTY•SURVEY required for all NEW oanstnrdbn. Directions: Fil.out eppl'ical)on completely.: . Owner&Contrauor sign back of application;notarized - tf over$25aa,a.mouce efCommencoment isrequired. "(AIC upgrades over$7600) :Agent(for the contractor)or Power of Attorney(for the owner)Nauld be someone mdh notarized letter from ovmeraultariting.same ' OVER THE.COUNTER PERMITTING (copy of contract reclutred)- Remofs if shinglas Sewers Servi e.Upgrades AIC' Fences(PioUSutva*-taga), DrivewaYi+-Not over Counter if on public roadways..deeds ROW ' NOTICE OF DEED RESTRICTIONS:. The undersigned understands that this permit may be subject to"deed"restrlctlone" which.may be more restrictive than Counry.regulatlofts. The undersigned assumes responsibility.for compliance with any :applicable deed restrictions. . . UNUCENSED:CONTRACTORS.AND CONTRACTOR RESPONSIBILITIES: If the owner'.has hired a.contractor or, contractors,to undertake work,they maybe required to be licensed in accordance-with state and local regulations. If the contractor.is not licensed'as required by law,both the owner and contractor'maybe cited fora misdemeanor violation understate law: if the owner or intended contractor are uncertain as-to what licensing requirements may apply for the. intended work:;they are advised to contact the Pasco County Building Inspection Division-Licensing Section at 727-847- 8009_ Furthermore;if the owner has hired a contractor or contractors, he is advised to have the comractor(s) sign portions of the"contractor.Block"of this application for which they will be responsible. If you,as.the owner sign as the. contractor.-that may be an indication that.heis hot propmlylicensed and is not entitled to:permitting privileges in Pasco County. . TRANSPORTATION IMPACTIUTIU7iES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery.Fees may apply to the construction of new buildings,change.of use in existing buildings,or expansion of existing buildings,as specified-in Pasco County Ordinance.number 89;07 and'. . 90-07,:as amended. :The undersigned also understands;that-such fees,as may be due,wilt•be identified at the time of permitting. It is further understood that Transportation Impad:Fees and Resource Recovery Fees must be paid prior to. receiving a."certificate of occupancy'or final power.release: If.the project'does not involbe•a certificate of occupancy or final power release,the fees must be paid prior to permit issuance. Furthermore,if.Pasco County Water/Sewer impact. fees are due,they must be paid prior to permit issuance in aocordancewlth appl'rcabte Pasco County ordinances: CONSTRUCTION.LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,5W.00.or more;1. cedify.that 1.Re appfieMt have been provided.With a copy of,*the 'Florida Construction Lien Law=-iomeownees Protection Guide"prepared by the Florida Departrrientot Agriculture and.Consumer Affairs. If the,applicant.is someone other than the"owner",I certify that:I have:obtalned a copy.of the above described document and promise in good faith to deliver it to the"owner"prior to.commencement. CONTRACTOR'SIOWNER'S AFFIDAVIT: 1'certify that all the Information in this application is accurate-and that all work Will be done in compliance.with all epplidable laws.regulaUng'construction,'zoning and land development. Application is. hereby-made.to-obtain;a permit to do work and.installation.as indicated. -.I certify that.no work-or installation has commenced prior to issuance.of a permit and that 411:work.will.be performed:to'meet standards of ail laws regulating; construction,County and Cbty codes,:zoning regulations,:and.land:development regulations'In the,jurisdiction. t also. certify that 1 understand that the regulations of.other government agenctes may apply to the intended work,and that It Is my responsibility to identify what actions I must take to:be in compliance. Such agencies include but are not limited to: - Department:of Environmental Piotection-Cypress Bayheads, Wetland Areas and Emiironmentelly*Sensitive Lands,WaterANbstewater Treatment. -. Southwest Florida Water Management District-Wells, Cypress- Bayheads, Wetland Areas;. 'Altering. Watercourses. Am►y Corps of.Engineers-Seawalls;Docks,Navigable Waterways. Department•of.Health &.Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,. Septic.Tanks. . - US EnvironmentatProtection Agency Asbestos abatement. - Federal Aviation Authority-Runways.. 1 understand gist the following restrictions apply to the use of All: - Use of fill Is not allowed in Flood Zone"1P°unless expressly permitted:. If the.fill-material.Is to be used In Flood Zone °A", it is understood that a drainage,plan addressing a. "compensatirig:volume"Will be submitted at time of permitting which;is prepared by.a.professional:engineer: licensed by the•State of Florida. If.the fill material is to.be.used in-Flood'Zone "A"'in-connection with a permitted building using stem.watl construction,I certify that fill will be used only to-fill the area within Ube'stem wall: - If fill material Is to be used In any. area; I:certify that use of:such fill will.not adversely.affect adjacent -properties. -If.use of fill Is found to-adversely affect adjacent properties,:the.owner may:be cited for violating. the conditions of the building permit issued under*the'attached permit application,for lots less than one(1) acre which are elevated by fill.an engineered drainage plan is required. If 1 am the AGENT FOR,THE OWNER,:I promise 1n good-faith to.inform the owner of.the permitting•conditions set forth in: _this affidavit prior to commencing construction.'.I understand that a separate permit may be required for:electrical work, plumbing,.signs;wells, pools,.air conditioning,•gas;or other installations not specifically inducted in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,'after,or set aside,any provisions of the technical codes;nor shall Issuance of a rY p permit prevent,the Building Offaal from thereafter requiring.a.correelion Of errors plans;•construction or violations of an tod es. :Every permit.issued:shalt become invalid unless the work-auttiorized by such permit is:commenced'within six months of peril issuance,or if work authorized by the pernit•is suspendCd or abandoned fora period.of'six(6)months after the time the work'is commenced. An extension may.be requested,:in writing;from the Building Official fora period not to exceed ninety.(90)days and will demonstrate justifiable cause for the extension: if work ceases for ninety(96).consetx6tive days,the,job is considered abandoned.. WARNING TO OWNER: YOUR FAILURE TO RECORD•A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.-,IF YOU INTEND TO OBTAIN.FINANCING,CONSULT %WITIi YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT FLORIDA JURAT(F_&117.03): n OWNER OR AGENT yN• CONTRACTOR.TR�' AS�1/ �D {{{IIHIIIIP/� 'S swo or bef th ortDed,aria%swZMraftmod,6e—'mc Yife Apr ,\ /// Israre r�sonal known to or hasmave produced who israra 14�1 lG t1�:f 1 q C N rry�ee Pr son to me nasmave produced �` ••• •p�,. V sidentirtcation: "' J3sldert<Ificatiori��, t\SSION �; .� Q O 0$ER 29, ': NotaryPubtc = !NotawPukNv® •*C: ComrrpssionNo. Co <ron GG. OO/Z #�G016872 Q .:ky 11.a Name of Notary. Na ,e;or.Notery typed,printed or stamped: //� .A ...•• pQ����� �Y ►9�edSotidi Carolina ��////�eiilitnrii�����\ Nfy ColluftM DPW 812=27 - N— P,mANO. Parcel lD No 13-26-21-0010.07406-0000 B= be NOTICE OF COMMENCEMENT in litataw Florida Counrym vaeeo m= W�s THE U4i.3EWAGNED homy gives notice that imProvement wit be made to certain red properly,and in eccordanw vAlh Chapter 713,Florida St-des, the foil ing InforroaW Is provided in this Notice of Carwnenezrntnc 1. DescripdOn 01 Prepidy:Farrel IdMiffie eon No. Street Address: 4330 20th St. Z.phyrhlllc, FL 335a2 2. General Desap5w oflmprove*,A Reduce exlec ing building by 3,025 of and add 3 loading dock peairion. 3. Omar Infonnaoon m Lessee Infortna4en If the Lessee eentraded for the improvement ifestle,Waters N�o{ratmha America e- 1322 Creataido Drivo Suite 100 Coppell TX --- Addma. City State o a hmemin in Property; A in Dn Name of Fem Senple Titleholder. w CD`•~ (If diffenm from Ovmar IW d above) _ mod Add.. l CA), Stem m m 4. Contrat7w: Sr'ki3"1 �A I- Ct 5A ce 111 RSVer. Avenue Jacksonville, 7L Addmee Stara Contmctoe.Telephone No.: s n 6. Staet, H/A Cg-• Name m.+ 13 Address- City Amount of Bond:S Tekptwne No.: n 6, Lender: N/A '- Name F Addesa_-_- City State Le dar's Telephone No.; 7, Persons VANn the State of FfoWa designated by tta owner UPW whom nobus Of Mu doctonants may be served as p—ided by -- SecaanT13,13IpIa)(7),Florida Stahaea: Michael cuilmott Name om m 4330 loth St. Zephyrhi2l., pt W w Addess Gry State B P Tekphone Nurnher of Designated Pinson: 396-623-54s5 m (0 a. In ad6fion to hioseN,the oxtter d03igmtos J. Orlando Rivera of -4 -3 Neakell to—im a copy of the Lienor's Notico as pm%4dad In SvAou 713.13(1xb),Ftodda Slandas. �~ A Tdephma NtrMerol Pemmor Entity Deslgneladby0wAve. 904-351-5791 �N 3 n 9. E3pbatlon date of Notice of Corrmencomerl I91e a#..radon dale may not be before the Completion of const—lion end fnd payment to the Y GYtlratim,but w*be one year fmm W dale of recordrg trews a d.9uent dal.Is apadcf": In WARNING TO OWNER: ANY PAY1,7ENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMa4ENCEMENT F"o ARE CONSIDERED IMPROPER PAYA&NTS UNDER CHAPTER 713,PART t SECTION 713.13,FLORIDA STATUTES,AND CAN RESULT IN YOUR PAYING TYKE FOR IMPROVEMENTS TO YOUR PROPeRTY, A NOTICE OF COMWENCEMENT MUST BE C9„ RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION.IF YOU INTEND TO OBTAIN FINAr� 'SULT CID WITH YOURLENDER OR AN ATTORNEY BEFORE COLVAENCING WORK OR RECORDING YOUR NOTICE OF .„ENCEMEN, o Under penmly of peYjury,I dedare Stal I have read 9a forcpM3g notice of commmcm,eN and adftfadctbl ,gtereyt era W e o n hest ofmyknoefedgendDdSTATE OF FLORIDACOUNTY OF PASCOItorLacaeo. saa'• I.s••••.. C OT(rc.:NDiectwlPsrtne •p ICY' 1ssiav O°f•'� �n�fELT- 6�7ku 9 oe eM a �g`n Signmorys Tide/tie The lore fnsWmtmwae a&Aa#(ededbefomrrw Lhls J ds W �t'�'� •'c,1�7s'�1..2 '*�9�9 g, r f,r. as f.✓�-c, /r i.•..._.., Itype of a.Ihodly, r✓�,,!._1�.r r/.,1 r (name d Paf1Y on behsif of venom hrsir63I rlot P—aly Known(]Yo Proouced Ide09fta9on I] Notary Sigmltea <�,•_e f_%,-rn �i,h,,•,-,-z i/p,C,uiiTtlEtttt���\ Type of ldeaUication Produced Nanw(Pri. -c.: ill. 0 03/27/2018 2:24 PM 14077921317 -a18137800021 ®5 The following person(s)are authorized to sign/pick up permits. Michelle Minl• Vwe-- March 27,2018 1eff ^� COUNTY OF Orange.. On 20 before me;. 4 Notary Public in and for said::couri ersonall appeared ';, t (signer/witness)who has/have satisfactorily identified him/her/themselves as the signer(s)or Wtness(es)to the above-referenced document. Nota': ublic Signature � YWNDAMAR=RIOS .�' �' MYCO�iMY�SSIi�1ifl01962S4 Print F�fPiREB:Amah 14.20?2 • .. .. .'�, � `.'Qe11d14'glntNol�j.P,A9faUn My commission expires: (Seal) ftnM IMedankal Inmrpmud 3307SWAh CAVMV R004 Ap*V,Florldo 32W3 011ke 40.74M7776/Fort 47.46a7770 26-Mar-2018 02:02 PM COASTAL MECHANICAL 321-5744438 6/6 A 5.07 M L MECHANICAL Plumbing I HVAC IMechanical Contractors wwuvcoastalrneohanioal.00m 3/26118 City of Zephyrhills Building Department 5335 81h Street: Zephyrhills, FL 33542 (fie:Authorization Letter for Mechanical and Plumbing License Holders 1, Jeffre F.Geiger, hereby authorizes James Q 1„1�,a►, and/or Donald Smeller of Coastal Mechanical Services to sign, apply for and purchase permits on behalf of my plumbing License No. CFC142 6 for Coastal Mechanical Services, LLC. Jeffrey F. beige � 1, Howard W. Hauser,, hereby authorizes James D111gy and/or Donald Smeller of Coastal Mechanical Services to Sign, apply for and purchase permits on behalf of my Mechanical License No.gMC0314M for Coastal Mechanical Serv"rcea, LLC. )At� Howard W. Hauser Notary Affidavit- State of Florida County of Brevard Sworn to and subscribed before me this day of,ffi=—V) 2018, By Jeffrey F.Geiger,and Howard W.Hauser who are gamonally known to me.or produced for identification. �L�, , UNOA 0.BERTRAN Sign ture c- Notary Public Nbtvy Public•State of Florlda = camml891on a FF 677820 My comm.Uph$May 18,2020 „ Bonded i t ih Nanal Notary Aas^ 394 East Drive,Melboume,FL 32904 l Ph:321-725-3061 l Fax:321.98"718 CM0035444 I CFC1428460 MAR-27-2018 09:10AM From:EF LEA ELECTRICAL 9043556158 To:8137800021 page:6/6 XGL MECTOCAL CONTRACTOR INC. (904)355-INS (904)35"158 fax ESTARLISUED 1921 339 FAST 56M ST JACKSONVILLP,FLOPUDA 32208 #EC504 City of ZePbyrhills March 27,2018 CONTRACTOR LICENSE AUTHORIZATION FORM Name of Firm Licensed: E.F.Lea Electrical Contractor,Inc. Quaffier.-Ernest L. Lea-Jr - Title; Resident Qualffier's Electrical Contractor License Number:FL EC(?440504 AGENT(S)NAME (please print or type) I.-Jarrett McFatter 2.At Starratt 3.Gary Bennett 4. Jesse Hall 5. Eric Lea The above named individuals are authorized to sign for perm&and transact business for the company idenWied above. I understand that it is my sole responsibility as the qualifying contractor to keep this information current and resubmit a new accurate authorization forth each tune a change needs to he made to the above list of lndividaals. -- SIGNATM Of QUALIFtRO- jj,ATE "**, I �(r,L STATE OF,. 5 %'6\..Q D.A,- COUNTY OF: U, The foregoing instrument was acknowledged before me by 'PCoCt S \-SIX who is personally known to ma or has produced as identification and who did not take an oath, wnNESS my hand and off 'at at this 4h 0 a -q-V-1 day of A.D.,20-L% 7a-�' MOMM OF,*PAULALCARM Notarytublir.,State of Fl at Large eommWmv 80 122105 -1 W* 9j COMcheck Software Version 4^6.2 Envelope Compliance�Certificate Project Information Energy'Code: 90.1 (2010)Standard Project Title: NWNA Zephyrhills Location: Zephyrhills;Florida Climate Zone: 2a Project Type: Alteration Permit Date: 2/21/2018 Construction Site: Owner/Agent: Designer/Contractor: 4330 20th Si Gary Walo Zephyrhills, FL 33542 Haskell 111 riverside Ave Jacksonville, FL 32202 Bullding Area Floor Area 1-Manufacturing Facility:Semiheated .36712 Envelope Assemblies R-Value Proposed Max.Allowed. Post-Alteration Assembly. Cavity. Cont. U-Factor SHGC U-Factor SHGC WEST West Wall:Other Mass.Wall,Heat capacity 1 M,[Bldg.Use 1 - --- --- --- --- --- - Manufacturing.Facility],Exemption:No cavity will be created._(a) Dock Door:Other Door,Non-Swinging,[Bldg.Use 1 - --- --- 1.450 --- 1.450 Manufacturing Facility] Dock Door:Other Door,Non-Swinging,[Bldg:Use 1-= --- ---. 1.450 -- 1.450.. -==. Manufacturing Facility] Dock Door:Other Door,Non-Swinging,[Bldg.Use 1 - --- --- 1.450 --- 1.450 -- Manufacturing Facility] (a)'Other components require supporting documentation for proposed U-factors. Project Notes Per discucssions with Jackie at the Zephryhills Building Department,.only new walls; lighting, and HVAC equipment are ref report. DSZ Project Title: NWNA Zephyrhills Report date: 02/20/18 . Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph'.cck Page 1 of 13 Envelope PASSES ' Envelope Compliance Statement Compliance Statement. The proposed envelope alteration project represent m this document is consistent with the building plans,specifications,and other calculations submitted with thi er it appl' ation.The proposed envelope systems have been . designed to meet the 90.1(2010)Standard requirements' OM a ion 4 .6.2 and to comply with any applicable j Ato *C(J1 --6-Y, mandatory requirements listed in the Inspection Checkl' Name-Title S' atur Date Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 2 of 13 i COMcheck Software Version 4.0.6.2 Interior Lighting Compliance Certificate Project Information Energy Code: 90.1 (2010) Standard Project Title: NWNA Zephyrhills Project Type: Alteration Permit Date: 2/21/2018 Construction Site: Owner/Agent: Designer/Contractor: 4330 20th St Gary.Walo Zephyrhills, FL 33542 Haskell_ 111 riverside Ave Jacksonville, FL 32202 Allowed Interior Lighting Power A B C D Area Category, Floor Area . Allowed Allowed Watts (ft2) Watts/ft2. (B X C) 1-Manufactu ring:High Bay(25-50 ft.Floor to Ceiling'Height) 36712 1.23 45156 Total Allowed Watts= 45156 Proposed Interior Lighting Power A B '- C D E Fixture.ID :Description./Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture. Fixtures Watt. Ma nufacturing:High bay(25—50-foot floor=ceiling height) (36712 sq.ft.) A-LED:A:Digital Lumens:Other:. 1 57 211 12027 Total Proposed Watts= 12027 . 'Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented.in this document.is consistent with the . building plans,specifications,and other calculations submitted'with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2010)Standard requirements in COMcheck Version 4.0.6.2.and to comply with any applicable mandatory requirements listed in the Inspection Checklist. 2D1!$ Name-Title Signature Dare Project Title: NWNA Zephyrhills Report date: 02/20/18 Data'filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 3 of 13 CO•Mcheck Software Version 4.0.6.2 Exterior Lighting Compliance Certificate Project Information Energy Code: 90.1 (2010)Standard Project Title: NWNA Zephyrhills Project Type: Alteration Permit-Date: 2/21/2018 Exterior Lighting Zone 2(Light industrial area with limited nighttime use) -Construction Site: Owner/Agent: Designer/Contractor: 4330 20th St Gary Walo Zephyrhills, FL 33542 Haskell 111 riverside Ave " Jacksonville, FL 32202 Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X"C) Drive-up windows/doors 3 windows 400-, " No 1200 Total Tradable Watts(a)= 0 Total Allowed Watts= 1200 Total Allowed Supplemental Watts(b)_ 600 (a)Wattage tradeoffs are onlyallowed between tradable areas/surfaces. (b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed.Exterior Lighting Power " A B. C D.. E . . Fixture ID. Description/Lamp"L Wattage Per Lamp/Ballast Lamps/- #of : ,Fixture (C X D)" Fixture Fixtures .Watt. Drive=up windows/doors(3 windows or doors):Non-tradable Wattage C-LED:Other: 1 ' 2 103 '206 SB-.LED:Other:. : 1 1. 448 448 Total Tradable Proposed Watts:_ 0 Exterior Lighting PASSES: Design 0.0% better than code .Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting alteration'project represented in this document is consistent"with the building plans,specifications,and other calculations.submitted with this permit application.The proposed exterior lighting systems have been designed to meet:the 90.1 (2010)Standard requirements in COMcheck Version 4.0.6.2 and to comply with any applicable mandatory 1requirements listed in the Inspection Checklist. sp �/+�1 �IA�tA` ' �`�Q1I^G�� �►�6`r�.C� l lA!, '• v vC.J 9 IIN Name-Title J Signature D13te. Project Title: NWNA.Zephyrhills Report date: 02/20/18 Data filename: C:\Users\wdeowian\Desktop\NWNA-Zeph.cck Page 4 of. 13 i CGMcheck Software Version 4.0.6.2 Mechanical Compliance Certificate Project Information Energy Code: 90.1 (2010)Standard_ Project Title: NWNA Zephyrhills Location: Zephyrhills, Florida Climate Zone: 2a Project Type: Alteration Permit Date: 2/21/2018 Construction Site: Owner/Agent: Designer/Contractor: 4330'20th St Gary Walo Zephyrhills;FL 33542 Haskell 111 riverside Ave Jacksonville, FL 32202 Mechanical Systems List Quantity System Type&Description Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this.document is consistent with the building- plans,-specifications,and other calculations submitted with this permit application.The proposed mechanical systems have,been designed to meet the 90.1 (2010)Standard requirements in COMcheck Version 4.0.6.2 and to,comply with any applicable mandatory requirements listed in the Inspection Checklist. �c���e �y�►ra- eL�ra��to�� Fh,,,b o�v►,u�' ��/ �70- 1$i Name Title Signature Date Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 5 of 13 COMc'heck Software Version 4.0.6.2 Inspection Checklist Energy'Code: 90.1 (2010) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed:Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review: Complies?. Comments/Assumptions & 4.2.2,5.4. I Plans and/or specifications provide all ; Complies Requirement will be met. 3.1.1,5.7 information with which compliance ❑Does Not [PR1]1 .;can be determined for the building ❑Not Observable envelope and document where ;❑Not Applicable exceptions to the standard are ;claimed.. 4.2.2,8.4. ;Plans,specifications,and/or ;❑Complies ;Requirement will be met. 1.1,8.4.1. :calculations provide all.information ElDoes Not 2,8.7 twith which compliance can be ❑Not Observable; [PR6]2 determined for the electrical systems I❑NotApp observable: land equipment andAocument-where, Applicable exceptions are,claimed. Feeder. ;'connectors sized in accordance with I approve-d.plans and branch circuits ; sized-for maximum drop of.3%. j 4.2.2,9.4. ;Plans,specifications,and/or ;❑Complies ;Requirement will be met: 4,9:T. (calculations provide all information ElDoes Not [PR4]1 ' with which compliance can be ❑Not Observable determined for the interior lighting land electrical systems and equipment ❑Not Applicable and document where exceptions.to . ;the standard are claimed. Information I provided should include interior. : j lighting power calculations,wattage.of I bulbs and ballasts,transformers and ; control devices. I I '❑Com lies ;Requirem ent will be met.9.7 ;Plans,specifications,and/or p' [PR8]1 !calculations provide all information I❑boes Not j with which compliance can be ❑Not Observable.; determined for the exterior lighting . land electrical systems and equipment I❑_NotApplicable j and document where exceptions to Ithe' standard are claimed. Information I provided should include exterior I lighting power calculations,wattage of; bulbs and ballasts,transformers and control.devices. I. . Additional Comments/Assumptions: 111 High Impact(Tier.1) 1 2 J.Medlu.rb Impact(Tier 2) 3 Low.Impact(Tier 3) Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename:. CAUserAwdrowlan\Desktop\NWNA-Zeph:cck Page 6 of 13 Section Footing/.Foundation. Pians Verified-.- Field Verified e " . _ " Complies., Comments/Assumptions & Req:ID Inspection Value. : Value 5.5.3:3 ;Below-grade wail insulation R- ; R- R- ;❑Complies ISee the ErivelopeAssemblies [FO1]2 value. ❑Does Not ;table for values. ❑blot Observable I ; . � Not Applicable. 5.5.3.5 !Slab edge insulation-R-value. R- R- ❑Complies ;See the Envelope Assemblies [F03]2 i ❑ Unheated ;❑ Unheated ;❑Does Not table for values. ❑ Heated ❑ Heated ;❑p(ot Observable f V of Applicable 5.5.3.5 Slab edge insulation ft ft ;❑Complies ;see the Envelope Assemblies [FO5]2 jdepth/length. j❑Does Not ;table for values. ❑Ijot Observable of Applicable 5'.B.1.7.3 ;Insulation in contact with the )❑Complies ;Requirement will be met. [F07]1 ground has <=0.3%water j❑Does,Not ;absorption rate per AS TM C272. j❑9{ot Observable . l Not Applicable-: Additional.Comments/Assumptions: 1 ,High Impact(Tier 1) 2 Medium Impact(Tier 2). . 3 1 LoW lmpact(Tier 3) Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 7 of 13 section . Pla.ns Verified: Field Verified # ' Framing-1 Rough=ln,lnspection Complies?;. Comments/Assumptions &Req.-ID . . Value' . •, "-Value . . _ 5.4.3.2 Factory.=built fenestration and ❑Complies Requirement will be met. [FRI]3 doors are labeled as meeting air ❑Does Not leakage requirements. i 1❑N t Observable t ;I�IVot Applicable- 5.5.4.3a ;Vertical fenestration U-Factor. U- 1 U- ;❑Complies ;See the Envelope Assemblies [FR8]1 ❑Does Not ;table for values. ❑No Observable ; ;IdNot Applicable 3b" ;.Skylight fenestration U-Factor.[FR9]1 U- U- ;❑Complies ;See the Envelope Assemblies [FR9] ; ; ElDoes Not ;table for values. ❑NO Observable j. of Applicable_ 5.5.4.4.1'. ;Vertical fenestration SHGC value. SHGC: SHGC: ;❑Complies ;See the Envelope.Assemblies ;table"for values. [FR10]1 ;❑Does Not ❑N�t Observable of Applicable ; 5.5.4.4.2 ;Skylight SHGC value'. ; SHGC: SHGC: ;❑Complies ISee the Envelope Assemblies [FRl1]1 I ❑Does Not ;table for values. ;❑�N�t Observable ; I ; . :i of Applicable 5.8.2.1 ;Fenestration products rated in 3❑Complies ;Requirement Will be met. [FR12]2 :accordance with NFRC. 1060es Not j❑Not Observable IH�1ot Applicable. 5.8.2.2 Fenestration products are ❑Complies Requirement will be met. [FR13]1 icertified as to performance labels' ❑Does Not or certificates provided. j 1❑Ngt Observable 11a1(jo .pplicable 5.8.2.3,5. !-U-factor of opaque doors ; U : J ; U= 1 omplies ;See the Envelope Assemblies 5.3.6 associated with the'building ❑ Swinging I❑ Swinging ;❑ oe Ds Not Itable for values. [FR14]2 ;thermal envelope meets ❑'Nonswinging ❑ Nonswinging ;❑Not Observable requirements. ; , i ❑Not Applicable 5.4.3.1 ;Continuous air barrier is, ;❑Complies ;Exception: Requirement [FR15]1 . wrapped,sealed, caulked, I❑Does Not :does not apply. gasketed,and/or taped.in an ;approved manner, except in 10Not Observable semiheated spaces and in i�ot Applicable climate.zones-1-6.. I Additional Comments/Assumptions: 1 High impact(Tier-1) 2 Medium Impact(Tier 2) 3 Low Impact-(Tier 3) Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename:. C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 8 of 13 .Section :. # hough-In.l=lect�ical Inspection : Compiles?. Comments/Assumptions : & Req.ID 8.4.2 At least 50%of all 325 volt.l5-and ;❑Complies Exception: Requirement does not apply. [EL10]2 120-Amp receptacles are controlled by !❑Does Not ; Ian automatic control device. ;❑Not Observable; ;❑Not Applicable 9.4.1.1 ;;IAutomatic controls to shut off all ;❑Complies ;Requirement,will be met. [ELl1� f-building lighting. ElDoes Not ❑Not Observable El Not Applicable 9.4.1.2 'Independent lighting controls installed ;❑Complies 1 Requirement will be met. [EL2]z per approved lighting plans and all ❑Does Not manual controls readily accessible and;❑Not Observable; i.visible to occupants. 'El Not Applicable 9.4.1.3 ;Parking garage lighting is'equipped ❑Complies ;Exception: Requirement does not apply. [EL11]2 with required lighting controls and j❑Does Not daylight transition zone lighting. ; ❑Not Observable, . ;❑Not Applicable ; 9-4.1.4 Primary sidelighted'areas >=250 ft2 1❑Complies ;Exception: Requirement does'not apply'. [EL12]1 !are equipped with required lighting ElDoes Not controls: ;❑Not Observable; ]Not Applicable 9.4.1.5 ;Enclosed spaces with daylight area ;❑Complies ;Exception: Require_merit does not apply. [EL13]1 under skylights and rooftop monitors :❑Does Not >900 ft2 are equipped with required ;.lighting controls: i❑Not Observable ;❑Not Applicable 9.4.1.7 !Automatic lighting controls for exterior;❑Complies ;Requirement will be met'.,' [EL3]z !lighting installed. j❑Does Not ❑Not Observable j ;❑Not Applicable 9.4.1.6 ;Separate lighting control devices for ilElcompms ;Requirement will be met. [EL4]1 :specific uses installed per approved ❑Does Not lighting plans. bNot Observable ❑Not Applicable 9:4.2 ;Exit signs do not exceed 5 watts per ;❑Complies t Requirement will be met. [EL6]1 :face. ;Does Not ❑Not Observable; ❑Not.Applicable. 9.4.3 Exterior grounds lighting over 100 W ;❑Complies ;Requirement will be met. [EL7]1 provides>60 Im/W unless on motion I❑Does Not sensor or fixture is exempt from scope; ; :of code or from external LPD. ❑Not Observable, ❑Not Applicable 9.6.2 -;Additional Interior lighting power !❑Complies ;Requirement will be met. [EL8]1 1 allowed for special functions per the ❑Does Not ;approved lighting plans and is ❑Not Observable; !automatically controlled and separated from_general lighting.. . ; ]Not Applicable Additional Comments/Assumptions: 1 li_igh Impact(Tier_1) 12 I.Medium Impact(Tier 2) 3" Low Impact(Tier 3) Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 9 of 13 Section . Plans Verified Field Verified #., Insulation Inspection'.; ..Complies? " .CommenWAssuMptions & Req.l Value: : Value D 5.4.3:1 ;Air sources of air-'leakage in the complies ;Requirement will be met. [IN111 building thermal envelope are �❑Does Not !sealed,caulked,gasketed, I - - weather stripped or wrapped with []Not Observable (moisture vapor-permeable 1❑Not Applicable ;wrapping material to minimize air ; leakage. y 5.5:3.1 Roof R-value. For some ceiling R- R- iRrComplies ;See the Envelope Assemblies [IN2]1 systems,verification may need to:❑ Above deck ;❑ Above deck ❑Does Not table for values. occur during Framing Inspection. ❑ Metal j❑ Metal ❑Not Observable ❑ Attic ❑ Attic L❑Not Applicable I 5.5.3.2 jAboye-grade wallinsulation.R- R- R ;❑Corriplies See the ErivelopeAssemblies 1 value. ;❑ ;table for values. [IN6] � ,❑ Mass ,El Does Not , ❑ Metal ❑ Metal ;❑Not Observable ❑ Steel ❑ Steel TXot Applicable ❑ Wood ;❑ Wood 5.8.1.2' ;Above-gi•ade.wall insulation Complies ;Requirement will.be met. [IN7]1 installed per manufacturer's j❑Does Not instructions. I❑Not Observable r 0NofApplicable . ;. ' R- Complies ;See'theEnvelope.Assemblies 5.5.3.4 ,Floor-insulation R-value. R- , [IN8]2 I ❑ Mass ❑ Mass ;❑Does Not table for values. i ❑ Steel ❑ Steel ;❑Not Observable I ❑ Wood ❑ Wood ❑Not Applicable I I 5.8.1.1 ;Building envelope insulation is ❑Complies ;Requirement will be met. [IN10]z labeled with R-value or insulation ❑Does Not certificate providing R-value and I ;other relevant data. i❑ Observable ,VNot Applicable 5.8.1.4 ;Eaves are baffled to deflect air to 1❑Complies ;Requirement will be met. [IN11]Z labove the insulation: `❑Does Not I �❑"Observable ,FeNotApplicable 5.8.1.5 Insulation is installed in . ,❑Complies Requirement will be met. [IN12]2 ;substantial contact with the I❑Does Not inside surface separating ❑ t Observable conditioned space from unconditional space. i._ Not Applicable ; 5.8.1.6 !Recessed equipment installed in 10Complies ;Requirement will be met: [IN13]2 i building envelope assemblies +❑Does Not does not compress the adjacent . j❑Not Observable insulation. Nit Applicab e o I 5.8.1.7 1Exterior insulation is:protected ❑Compli'es ;Requirement.will.be met. [IN14]2 ifrom damage with a protective ❑Does Not I material.Verification for'exposed J (foundation insulation may need ❑ t Observable to occur during Foundation Not Applicable ;.Inspection.. i 5.8.1.7.1 ;Attics and mechanical rooms ❑Complies ;'Requirement will be met. " [IN15]2 have insulation protected where .1❑Does Not adjacent to attic or equipment ;access. ,❑f at Observable �. jV'Not Applicable 1 H_igh impact(Tier 1) 2 I.Mediurp Impact(Tier 2),', 3 LOW Impact(Tier 3) Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 10 of 13 Section Plans Verified Field Verified # Insulation Inspection -complies?'' Comments/Assumptions & Req.ID Value Value 5.8.1.7.2 'Foundation vents do not interfere i '❑Complies ;Requirement will be met. [IN16]2 with insulation. ❑Does Not ❑Not Observable 1 1 of Applicable ; Additional Comments/Assumptions: 1 High Impact(Tier 1). 2 1 Mediurb Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: NWNA Zephyrhills Report date: 07/20/18 Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck- Page 11 of 13 section- #_ Finallnspjectlon':. Complies? Comments/Assumptions, .- & Req.ID 5.4.3:3 Weatherseals installed on all loading I❑Complies ;Exception: Requirement does not apply. [Fill' Iclock cargo doors in Climate Zones 4- ElDoes Not 8. '❑N tObservable; O of Applicable 8.7.1 f Furnished as-built drawings for ;❑Complies ;Requirement Will'be met. [FI16]3 electric power.systems within 30 days �❑Does Not aof system acceptance. ;❑Not Observable; l . ;❑Not Applicable 8.7.2 Furnished O&M instructions for Complies Requirement will be met. [FI17]3 systems and equipment to the Does Not building owner or designated ❑Not Observable representative. i. El Not Applicable. ; 92.2.3 ;Interior installed lamp and fixture ❑Complies ;See the Interior Lighting fixture schedule for values. [FI18]' lighting power is.consistent with what 1❑Does Not j ;is shown.on the approved lighting ❑Not Observable; . ;plans,demo nstrati rig,proposed watts are less than or equal to allowed ;ONot Applicable Watts. 9.4.3 ;Exterior lighting power is consistent ❑Complies ;See the Exterior'Lighting fxture schedule.for values. [FI19]' with what is shown on.the approved ❑Does Not :lighting plans, demonstrating proposed watts are less than or equal ;❑Not Observable to allowed watts. ;❑NotApplicable Additional Comments/Assumptions: 1 High Impact(Tier 1). 2 1 Medium Impact(Tier 21 3 Low.Impact(Tier 3) Project Title: NWNA Zephyrhills Report date: 02/20/18 Data filename: C:\Users\wdrowlan\Desktop\NWNA-Zeph.cck Page 12 of 13 Report date: 02/20118 Project Title: NWNA Zephyrhills Page 13 of 13 Data filename: G:\Users\wdrowlan\Desktop\NWNA-Zeph.cck ZEPHYRHILLS FIRE DEPARTMENT 38410 6th Ave Zephyrhills,FL 33542 FIRE SERVICE USER FEES increase 1/1/2018 Occupancy No.: ^ Plan No.: Contractor: �Vy"U_ Business Name: A�as 5 Y `'LV;t� •ATJ Billing Address: Business Address: t!W 1 7C, '22-� Business Phone No.: Billing Phone No.: Business Fax No.: Billing Fax No.: Contact: Contact: PLAN REVIEW FEES INSPECTION FEES PERMIT FEE Annual- Education,heatthcare,De tention&Correctional Public Assembly,Business, schools, Storage,Mercantile and.Churches Site Plan N/C Industrial. no charge Sprinkler $50 .� Multi-Family/Commerclal .03 sf up to 800 sq It $ 24.00 Standpipes $50 P( (Minimum Charge$24.00 801-1,500 sq It $ 34.52 Fire Pump $50 ❑;Plan Revisions DBL 1.501-2,500 sq it $ 60.02 Hoods $50 2,501-3,500 sq It $ 90.02 Fire Alarm $50 SPRINKLER SYSTEMS 3,501-5,000 sq it $ 127.52 LP Gas $50 0-25 Heads $50 5,501-7,500 sq ft' $ 187.52 Natural Gas $50 26 plus Heads $100 7,501-10,000 sq It $ 262.52 Fuel Tanks-per tank $50 STANDPIPE SYSTEM 10,001-15,000 sq It $ 375.02 Sparklers $100 ❑Per Riser $50 15,001-20,000 sq it $ 525.02 Fire Works $500 FIRE PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation; $25 ❑,Per Pump $100 30,001-40,000 sq ft $ 1,050.02 Controlled Bum(15da; $100 ;FIRE ALARM SYSTEM 40,001-60,000 sq ft $ 1,500.02 Hood/Duct $50 0-25 Devices $50 60,001-80,000 sq It $2,100.02 Place of Assembly $50 Annual 80,0014$2,100.02)p er 26 plus Devices $100 ea add 1,000sq ft $ 0.06 Fire Protection $25 SUPPRESSION SYSTEMS (Business closed until Flammable Application $50 Annual Wet $50 violations corrected) Waste Tire Storage $50 Annual Dry $50 SPRINKLER SYSTEMS Generator<KW $100 CO2 $50 nHydro Undergrounds $45 Generator>30 KW $100 Other $50 H Hydrostatic Test $65 per system Bio-Hazard Waste $100 Annual KITCHEN EXHAUST Acceptance Test $45 per system Fumigation Tenting $50 Hood/Ducts $50 Hydrant Flow $75 Torch PotlApplied $50 OTHER Haz.Materials $50-Annual 8 LP Installation per tank $50 FIRE ALARM SYSTEM Fuel Tank Installation $50 System Acceptance $50 (Per Tank) $50 8 Recall Acceptance $50 Natural Gas Installation $50 OTHER (Per System) Fire walusmokeWall $15 per Wall Spray Booth $50 LP Gas $25 pertank Natural Gas $25 per system Tent 10'x10'orgreater $15 percent Fire Pump $45 Fire Suppression $30 System Acceptance ExhaustHood/Duct $30 Re-inspection DBL (other than annual) Inspection scheduled DBL and cancelled less than 24 hours Construction Insp. N/C r�D,72' Emergency Vehicle Acce $50 � PLANS TOTAL O INSPECTION TOTAL PERMITTOTAL GRAND TOTAL Comments: ix i Date: a Inspector: o ' nm FALSE ALARM FEE 1st Alarm N/C 2nd Alarm NIC 3rd Alarm N/C 4th Alarm $100 5th Alarm $150 6th Alarm $200 NON COMPUANCE $150 Cont.Annual Inspection Fees 3-11,Units price per unit $ 5.36 12-25 Units pace per unit $ 4.82 26.50 Units price per unit $ 4.29 51-100 Units price per unit $ 3.75 100 or more Units price per unit $ 2.68 Fire Safety re•inspection types First Re•inspectioi WC Second re-Inspecl $75 Third re-Inspeoflor $ 125.00 Inspection scheduled but cancelled 24 hrs $ 50.00 TOTAL Alh CITY OF ZEPHYRHILLS, FLORIDA 5335 8th Street CERTIFICATE OF OCCUPAN NAME: The Haskell Company ADDRESS: 4330 20th St PARCEL I.D.# 1-1-26-21-0070-0-1900-0020 SUBDIVISIOI TYPE OF BUILDING: Commercial— 3 Loading Docks/Restrooms REMARKS: BILL BURGESS BUILDING OFFICIAL/ 'b WHITE: Contractor or Owner YELLOW: Bldg. Dept. Jacqueline Boges From: Jacqueline Boges Sent: Thursday, November 29, 2018 3:00 PM To: 'Jones, Lee' Subject: RE: Final close out for the Nestle permit? Attachments: haskell.pdf Hello Lee see certificate of occupancy for final. Thank you for your patience -----Original Message----- From:Jacqueline Boges Sent:Wednesday, November 28,2018 8:09 AM To: 'Jones, Lee'<Lee.Jones@haskell.com>;Todd Vandeberg<tvandeberg@ci.zephyrhills.fl.us> Cc:Audrey McGuire<AMcGuire@ci.zephyrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephyrhills.fl.us> Subject: RE: Final close out for the Nestle permit? No Lee I do not ... I can forward email to planning to see if they are satisfied. Guys Nestle plant is wanting final on their project?are you all good with everything. I believe you were waiting on as built and received?Construct of restroom and docks -----Original Message----- From:Jones, Lee [mailto:Lee.Jones@haskell.com] Sent:Tuesday, November 27,2018 1:43 PM To:Jacqueline Boges<jboges@ci.zephyrhills.fl.us> Subject: Final close out for the Nestle permit? Hi Jackie, Do you know when the permit will be closed out? Nestle is chomping at the bit. Thank you. Lee Jones Haskell.com 407-756-9256 Sent from my iPhone Q- 1.4 Nestle Bottle Water Company ,^ Liftstation (Sewer) Meter f?� 7/3/2018 Shipping Charges $ 285.40 1 $ 285.40 Materials Cost Quantity Total+Admin 2" McCrometer Mag Meter $ 3,040.00 1 $ 3,344.00 McCrometer Rubber Boot Cover $ 48.00 1 $ 52.80 Neptune Antenna $ 115.00 1 $ 126.50 UPS Battery Back-up $ 64.99 1 $ 71.49 Traffic Rated Meter Box $ 313.44 1 $ 344.78 Material Total $ 4,224.97 Jacqueline Boges' , From: CJ Funnell Sent: Friday, June 29, 2018 11:14 AM To: Jacqueline Boges Cc: John Bostic; Mike Perry Subject: Re: NWNA Zephyr(#19482)-Sanitary Sewer Meter Hello Jackie, Attached is the itemized list of materials for the sewer meter for the bottle water company. This is the total meter cost that Nestle would be responsible to pay. Mr. Rivera from the Nestle Company would like all the documentation and fees that he would need to complete and pay to get this going. I am unsure of the water&& sewer impact fee. Could you please let Mr. Rivera know that Nestle will need to contact Fathom after the installation is complete to set up an account for billing. Please let me know if you have any questions. Thank you, C.J. Funnell Water Superintendent City of Zephyrhills 1 weldinginspection Ke on rcepvnff: yvuc-vuuulu Q �� p p Steel Reports 1-5 Report Date:11/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa /\) Client: Project: 4524 Oak Fair Boulevard Suite 200 ( Haskell 10106-1018007.000 Tampa,FL.33610, PO Box 45215(111 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623.3100 / � Jacksonville,FL 32232 Expansion Fax:-813.623.35.45 (�VJ 1 4330 20th St. l ` Zephyrhills,Florida 33542 Phase: Structural Steel Inspections Location: Building Exterior=Roof Contractor: R& D Erectors The following is a reference list of welding parameters related as required by Secion 3,5,9.6'of AWS D1.1. Yes/No Are contract documents.outlining specific job requirements in place?(6.1.2.1) Yes Are drawings provided showing size, length, type, and location of welds?(6.1.6) Yes Are weld and base material certifications available?(6:2) Not Applicable Are.qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all,Welder Certification Records current and in place?(6.5.7) Yes Does welding equipment comply with requirements? (6.3.2) Yes Joint preparation and.fit-up was observed at suitable intervals. (6.5.4) Not Applicable Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes (5.30.1) Isveilding being performed under proper atmospheric conditions? (5.12.2) Yes Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable List of names of welders on project this date: reviewed on site Date: 07/.11/2018 Prepared by: Lafon, Barry No observations;tests, inspections or approvals by NOVA shall relieve the Contractor.from his obligation to,perform the Work in strict conformity with the-Contract Documents. NOVA's inspections and tests reported herein are in no way a guarantee of deficient-free' construction.The:information provided herein is intended-for the sole and exclusive use of our Client unless other written agreement is entered.into by NOVA,and other parties.All other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only,and any use of said information shall be at their sole risk. Phase: Structural Steel Inspections Location: Building Exterior:Roof Contractor: R&D Erectors The following.is a reference list of welding parameters related as required by Secion 3,5,&6.of AWS W.I. Yes'/No Are contract documents outlining spec'ificjob requirements in place?(6.1.2.1) Yes Are drawings provided showing size, length, type, and location of welds?(6.1.6) Yes Are,weld and base material certifications available? (6.2) Not Applicable Are qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all Welder Certification Records current and'in place?(6.5.7) Yes Does welding equipment comply with requirements? (6.3.2) Yes STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 1 of 6 Weldin� Inspection Report Keporir;.:vvirc-uuuuiu N Q V� g p p steel Reportsl-5 Report Date: 11./16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106=1018007.000 Tampa,FL 33610 PO Box 45275(111 Riverside Avenue) Nestle.Waters North America Zephyrhiiis Phone:813.623.3100 Jacksonville,FL 32232 Expansion Fax:813.623.3546 4330 20th St. Zephyrhilis,Florida:M4_2 The following Is a reference list of welding parameters related as required by Secion 3,5,&6 of AWS D1.1. Yes/No Joint preparation,and fit-up was observed at suitable intervals. (6.5.4) Not Applicable Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes (5.30.1). Is welding being performed under.proper atmospheric conditions?(5.12.2) Yes Is contractor in compliance,With pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable List of names of welders on project this date: reviewed on site Remarks: Arrived on site to observe.the placement of the roof deck and.attachments at line 5-6/AA-A and 475/A-A.5.The area was approved'. Nova reviewed erectors welder certifications and verified on site welders. Date: 07/13/2018 Prepared by: Lafon, Barry No observations,tests; inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work in strict conformity with the Contract Documents: NOVA's inspections and/or tests reported herein are in no,way a guarantee of deficient-free construction.The information provided herein is intended for the sole and.exclusive use of our Client unless other written agreement is entered into by NOVA and other parties:All other recipients,are provided this document and any corresponding tests and/or inspection results for information-purposes only,and any use of said information shall beat their sole risk. Phase:,Structural Steel Inspections Location: Building Exterior-Roof Contractor: R& D Erectors The following is.a reference list of welding.parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes/.No Are contract docunients.outlining specific job requirements.in place?(6.1.2.1.) Yes Are drawings provided showing size, length,type, and location of welds?(6.1.6) Yes Are weld and base material certifications available?(6.2) Not Applicable Are qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all.Welder Certification Records current and in place?(6.5.7) Yes Does welding equipment comply with requirements?(6,3.2) Yes Joint preparation and fit-up was,observed at suitable intervals. (6.5.4) Not Applicable Are surfaces on which welding is to be performed, free of foreign material (scale,rust; moisture, grease)?(5:15) Yes . (5.30.1) .. I Is welding being performed under proper atmospheric conditions? (5.12.2) Yes Is.contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable List of names of welders on project this date: on site STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 2 of 6 Inspection. Report Report#:WIR-000010 Welding 4 'O.�� psteel Reports 1=5 N Report Date: 11_/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa Client: Project:. 4524 Oak Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,FL 33610 PO Box 45215(111 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:.813.623.3545 4330 20th St. Zephyrhilis,Florida_33542 Date: 07/17/2098 Prepared by: Lafon,,Barry No observations;testsjnspections or approvals by.NOVA shall relieve the Contractor from-his obligation to perform,the Work in strict• conformity with the.Contract Documents. NOVA'S.inspections and/or tests reported herein-are in no way a guar.antee.'of deficient-free construction.The information provided herein is intended for the sole and exclusive use of our Client unless other.written agreement is entered.into.by NOVA and other.parties:,All other recipients are.provided this document and any corresponding tests and/or inspection-results for information,purposes only,.and any,use of said information shall be at their sole'risk. .. I i I STATEMENTS IN THIS FIELD REPORTARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 3 of 6 Report#!WIR-000010Weldin Inspection Report steel Reports 1-5N � VA , Report Date:11.11612018 PROFESSIONAL I PRACTICAL I PROVEN Tampa. Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106=1018007.000 Tampa,FL 33616 PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:.813.623.3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhills,Florida 33542 Images Comments Arrived on site to observe the placement of the roof deck and attachments at line 3-4/A-A.5,the.work was incomplete at time of observation,and work is in progress by erector:;Reviewed erectors welder-certifications and verified on.site welders. RESOLVED DISCREPANCIES 1) Add joist x=bridging at line 5-6/A.5.Approved UNRESOLVED DISCREPANCIES 1) Install joist bridging and attach to panel at line A-A.5/3-4 2) Install correct size bolts and tighten at line 4/A.5 3 Install.stiffener at-8x8 joist seat per RFI at line 3/A-A.5. . 4) Install tilt=up panel to panel connection per C1/S-531 and 63/S-531 5) Attach bridging to existing bar joist after the temporary wall is removed Observer noted that the existing girder bolted connections were very loose. Girders were not welded to the column top.The Contractor was informed onsite. Phase: Structural Steel Inspections Location: Building Exterior-'Roof Contractor: R&D Erectors The following is a reference list of Welding parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes No Are contract documents out specific job requirements in place?(6.1.2.1) Yes. . Are drawings,provided showing size,,length, type, and location of welds?(6.1..6) Yes Are weld and base material certifications available? (6.2) Not Applicable Are qualified Welding Procedure.Specifications in place?(6.3.1) Yes Are all Welder Certification Records current and in place?(65.7j Yes Does welding equipment comply with requirements? (6.3.2) - Yes Joint preparation and fit=up was observed at suitable intervals,.(6.5,4) Not Applicable, Are surfaces on which welding is to be performed, free of foreign material-(scale, rust, moisture, g(ease)?(5.15) Yes Is welding being_performed under_proper atmospheric conditions?(5.12.2) Yes Is.contractor in compliance with.pre-heat and/or post-heat requirement?(Table 3.2) Not'Applicable Date: 07/19/2018 Prepared by: Lafon;Barry I No observations,.tests, inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the-Work in strict conformity with the Contract Documents. NOVA'6 inspections and/or tests reported herein are in noway a guarantee.of deficient-free construction.The information provided herein is intended for the sole and exclusive use of our Client unless-other written agreement is entered into by NOVA and other,parties.All other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only,and any use'of said information shall be at their sole risk. STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page:4 of 6 WeldingInspection Report Report#'WIR-000010 p on steel Reports 1:-5 N o Y`,A Report Date: 11/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa . Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106=1018007.000 Tampa,FL 33610, PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhills,Florida 33542 Images. Comments Arrived on site to observe the placement of the roof deck and attachments at line 3-4/A-A.5. See discrepancies below. Reviewed erectors welder certifications and verified on site . welders. RESOLVED DISCREPANCIES 1) Install joist bridging and attach to panel at line A=A.5/3-4. See report dated 7.17:18 2) Install correct size bolts and tighten at line 4/A.5: See report dated 7.17...18 . 3) Install stiffener at 8z8 joist seat per RFI at line 3/A-A.5._See report dated 7.17.18 4) Install tilt-up.panel to panel connection per.C1/S-531 and B3/S-531..See,report dated 7.17,18 UNRESOLVED DISCREPANCIES 1) Attach bridging to.existing bar joist after the temporary wall is removed. 2) Reference to Engineer sketch for repair at line A/3, detail. show 87 3/4"'anchors; in.the field there are 6. SEOR(Structural Engineer of Record),needs to verify if this is.acceptable._Also,the same detail shows a 5x3 angle bolted to the beam web and welded to the embed. Please verify if this is'required. 3) Reference to'Engineering sketch for the joist bearing seats at line 3/A-A.5..SEOR needs to verify-the size of the HIT=Z.anchor that is required. Phase:'Structu ra I Steel Inspections Location: Building Exterior_Roof Contractor: R&D Erectors The following:is a reference list of welding parameters related as required by Secion 3,5,&6 of AWS D1.1. Yes/No Are contractdocuments outlining.specificjob requirements.in place?(6,1.2,1.) Yes Are drawings provided showing size, length, type,and location of welds?(6.1.6) Yes Aremeld and base material certifications available? (6.2) Not_Applicable Are qualified.Welding Procedure Specifications iri place?(6.3.1) . Yes . Are all Welder Certification Records current and in place?(6.5.7) Yes Does welding equipment comply.with requirements?(6.3.2) Yes" Joint preparation and fit=up was.observed at suitable intervals. (6.5.4) Not Applicable A[e surfaces on which welding is to be performed, free of foreign material (scale, rust_, moisture, grease)?(5.15) Yes (5.30:1). Is'welding being performed under proper atmospheric conditions? (5.12.2) Yes i Is contractor in compliarice with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable i List of names of welders on project this date: on site Remarks: STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 5 of 6 I i WeldingInspection Report Report#:WI Reports N OVA p p steel Reports 1-5 Report Date:-1.1/16/2018 PROFESS19PIAL I PRACTICAL I PROVEN Tampa . Client: Project: 4524 OaK Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,FL 33610. PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623.3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 206 St. Zephyrhills,Florida 33542 Reference to report dated 7.11.2018; . 1)Observations noted that the existing girder bolted connections were very loose. Girders were not welded to the column top. Vibrations could cause the.nut fo come loose and fall resulting in injury or damage.The undersigned arrived:on site to perform a visual inspection on the items in the above report. The bolts have.been added where missing and.the girders with missing bolts have been field welded.Further'observations were noted at the existing x-bracing structure.The bolts.weremissing; and the existing bolts are.. loose and not torqued per ASTM Bolts and the manufacture.These observations were pointed out to the Nestle Waters representative on site. . Date: 08/17/2018 Prepared by: Lafoh, Barry No observations,tests;inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work.in strict conformity with the Contract Documents.'NOVA's inspections and/or tests reported herein are in no way a guarantee of deficient-free construction..The information provided herein is'intended for the:sole and exclusive use.of our.Client unless other written.. agreement is entered into by NOVA and other parties:All other recipient 'are provided this document and any corresponding tests and/or inspection results for information purposes only,-and any use of said information shall be at their sole risk. i I i STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 6 of 6 0 VA. ENGMEERIN113 AND Special Inspections ENVIRONMENTAL 4524 Oak Fail Blvd,Suite 200 Daily Report Tampa,Florida 33610 813.623,3100 mnmw sanova.corn 813.623.3545 Project: Nestle Waters North America NOVA lob Number: 10106-1018007,000 Client: Haskell Date of Report: 7.19.2018 Contractor: R&D Erectors NOVA Representative: Barry Lafon .Engineer: Sawn Wilkerson Architect: Plans: 3.23.2018 At the request of the client,the.undersigned visited the project site on the above date and conducted a number of special inspections and observations of the contractor's work in progress. The observations were performed in general accordance with the requirements of Section 553,79,Florida Statutes,Permits;applications;issuance,•inspections. The observations employ visual observation techniques of the work to verify general compliance with the requirements of the project plans and specifications: This report is a follow up to the report dated 7.19.2018.The discrepancy noted below has been corrected.This was observed on site visit on 10.18,2018. RESOLVED DISCREPANCIES 1) Attach bridging to existing bar joist after the temporary wall is removed.Approved A final steel inspection was performed on the new addition.The bar joist,bridging,field welds,roof deck and attachments. have been completed and meet the requirements of contract drawings and specifications. The work observed today appears to have been installed.in general accordance with details of site.project plans and specifications. The field welds appeared to be in general compliance with quality standard requirements of AWS D 1.1 visual acceptance criteria and the contract documents UNLESS NOTED ABOVE. i Signed: 6o/1-/ov,C/_ �-� ��/ '��> Barry Lafon BN4947/CWI/ICC Statements in this field report are subject to NOVA's principal review, Page 1 of 1 i WeldingInspection Report ReporiK-uuuulu p rn t: w Steel Reports 1:-5 N ®VA Report Date: 11/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa. Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,,FL 33610 PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623.3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhills,Florida 33542 Phase: Structural Steel Inspections Location: Building Exterior-Roof Contractor: R&D Erectors The following is a reference list of welding parameters related as required by Secion 3,5,&6'of AWS D1.1. Yes/-No Are contract documents outlining specific job requirements in place?(6.1.2.1) Yes Are drawings provided showing size, length,type, and location of welds?(6.1.6) Yes Are weld and base material certifications available?.(6:2) Not Applicable Are.qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all.Welder Certification Records.current and in place?(6.5.7) Yes Does welding equipment comply with.requirements?(6.3.2) Yes Joint preparation and fit-up.was observed at suitable.•intervals. (6.5.4) Not Applicable Are surfaces on which welding is to be performed, free of foreign material(scale, rust, moisture, grease)?(5.15) Yes (5.30.1) Is.welding being performed under proper atmospheric conditions?(5.12.2) Yes . Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3:2) Not Applicable List of names of welders on project this date: reviewed on site Date: 07/11/20113 Prepared by: Lafon, Barry No observations,tests, inspections or approvals by NOVA:shall relieve the Contractor from his obligation to perform the Work in strict conformity with the.Contract Documents. NOVA's.inspections and tests reported herein are in noway a guarantee of deficient-free construction.The information provided herein is intended for the sole and exclusive use of our Client-unless other.written agreement is entered into by NOVA and other parties.All other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only,'and any use of said information shall be at their sole risk. Phase: Structural Steel Inspections Location: Building Exterior=Roof Contractor: R&D Erectors The following.is a reference list of welding parameters related as.required by Secion 3,5,&6.of AWS D1.1. Yes/No Are conteact.documents outlining specific job requirements in place?(6.1.2.1) Yes Are drawings provided showing size, length; type, and location of welds?(6.1.6) Yes Are weld and base material certifications available? (6.2) Not Applicable - Are qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all Welder'Certification Records current and in place?(6.5.7) Yes Does welding equipment comply with requirements?(6.3.2) Yes STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 1 of 6 Inspection Report Repo-Steel WIR-000010 Welding p p , :steel Reports 1=5 N OVA Report Date: 11/16/2018 PROFESSIONAL I PRACTICAL I PROVEN ' Tampa Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106A 018007.000 Tampa,,FL W616. PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Ze.phyrhills Phone:813.623:3100 Jacksonville,,FL32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhills,Florida.33542- The following is.a reference list of welding parameters yelated as.required by Secion 3,5,&6 of AWS D1:1. Yes I No Joint preparation and fit=uP was observed at suitable intervals:,(6.5.4), Not'Applicable, . Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, g(ease)?(5.15) Yes (5.30:1). Is welding being performed under proper atmospheric conditions?(5.12.2) Yes Is.contractor in compliance with,pre-heat and/or post-heat requirement?(Table 3.2). Not Applicable. . List of names of welders on project this date: reviewed on site Remarks: Arrived on site to observe the placement of the roof deck and attachments at line 5-6/AA-A and 4-5/A-A.5.The area.was approved. Nova reviewed erectors welder certifications and verified on site welders. Date:07/13/2018 Prepared by: Lafon, Barry . No observations,tests, inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work in-strict conformity with'the Contract Documents, NOVA's inspections and/or tests reported.herein are in no,way a guarantee of deficient-free construction.The information provided herein.is intended for the sole and exclusive use of our Client unless other.written agreement is entered into by NOVA and other parties:All other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only,and any use of said information shall-be at their sole'risk.- Phase: Structural Steel Inspections Location: Building Exterior-Roof Contractor: R&D-Erectors . j. i The following is.a-reference list of welding.parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes 1:No Are contract.documents outlining specific'job re,qu'irements.in place?(6.1,2.1.) Yes i Are drawings provided,showing size, len th; type, and location of welds? 6.1.6 Yes 9 P .. . . 9.. . . 9 .. yp .. ( ) Are weld and.base material certifications available?(6.2) Not Applicable. Are qualified.Welding Procedure Specifications in place?(6.3.1) _ Yes Are all.Welder Certification Records current and in place?(6.5:7) Yes Does welding equipment comply.w'ith requirements?(6,3.2) Yes Joint preparationi and fit-up was.observed at suitable intervals. (6.5A4 Not Applicable Are surfaces on which welding is to be performed, free of foreign material (scale, rust; moisture, grease)?(5:15) Yes (5:30.1) Is welding being performed under proper atmospheric conditions?(5.12.2) Yes Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable .I List of names of welders on project this date: on site STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 2 of 6 Weldin Ins ection Re ort Report#:WIR-000010 N �vA g p p steel Reports 1-5 Report Date: 1.1/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa .Client: Project 4524 Oak Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,FL 33610, PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhilis,Florida 33542 Date: 07/17/2018 Prepared by: Lafon, Barry No observations,tests,.inspections or approvals by NOVA shall relieve the Contractor from,his obligation to perform_the Work in strict conformity with the.Contract Documents.NOVA's inspections and/or tests reported herein are in no way a guarantee_of deficient-free construction.The information provided herein is intended for the sole and exclusive use of our Client unless other written agreement is entered into by NOVA and other parties..All-other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only;.and any.use of said information shall be at their sole risk. i i i 1 Y ' I. i STATEMENTS IN THIS FIELD REPiRT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 3 of 6 f r WeldingInspection Report Report#:WIR-0000-0 N OVA p P steel Reports 1 Report Date: 11/16/208 PROFESSIONAL I PRACTICAL.I PROVEN Tampa . Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell . 10106A 018007.000 Tampa,.FL 33610 PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:813.623.3546 4330 20th St. Zephy falls,Florida 33542 Images. comments. Arrived on site,to observe the placement of the roof deck and . attachments at line 3=4/A-A.5,the.work was incomplete at time of observation,;and work is in progress by erector:Reviewed erectors welder certifications and verified on site welders. RESOLVED DISCREPANCIES 1) Add.joist x.-bridging at line 5-6/A.5..Approved I UNRESOLVED DISCREPANCIES 1) Install joist.bridging and attach to panel at line A-A.5/3-4 2) Install correct size bolts and tighten at line 4/A.5 3) Install.stiffener at,8x8 joist seat per RFl at.line 3/A-A:5; 4) .. Install tilt=up panel to.panel connectiion:per C1%S-531 and B3/S-531 :5) Attach bridging to existing bar joist after.the temporary wall is removed Observer noted that the existing-girder bolted.connections were very loose._Girders Were not welded to the column top.The . Contractor was informed onsite. Phase:-Structural Steel Inspections Location: Building Exterior-Roof Contractor: R&D Erectors' The following is:a'reference list of welding parameters related as reoulred.by Seclon 3,•5,8L 6 of AWS 61.1. Yes No Are-contract documents outlining specific job requirements in place?.(6.11.2.1) Yes. . Are drawings provided showing size, length, type,.and.location of welds?.(6.1.6) Yes Are weld and base material certifications available?(6.2) Not Applicable Are qualified Welding Procedure Specificationsin place?(6.3.1) Yes - Are all Welder.Certifcation.Records current and in place?.(6;5.7) Yes Does welding equipment comply with requirements?.(6.3.2), Yes Joint preparation.acid fit-up was observed at suitable iritervals..(6.5.4). Not Applicable. " Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes (5.30:1) . Is welding beiino.performed, under proper atmospheric conditions? (5.12.2) Yes Is.contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable I Date: 07/19l2018 Prepared by: Lafon, Barry j l No observations,tests,inspections or approvals by,NOVA shall relieve the Contractor from.his obligation to perform the Work iri strict conformity with the.Contract Documents.NOVA:s inspections and/or tests reporteii herein are in no way a guarantee.of deficient-free construction:The information provided herein is intended for the sole and exclusive use of our Client unless other written agreement is entered into by NOVA and other parties:All other,recipients are provided this document and any corresponding tests and/or inspection:results for information purposes only,acid any use of said information shall be at their sole risk. STATEMENTS IN THIS FIELD REPORTARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 4 of 6 WeldingInspection Report Report#:WIR-17001J1U e ■ OVA p p steel Reports 1:-5 N v Report Date: 1.1/16/2018 PROFESSIONAL I PRACTICAL I PROVEN ' Tampa Client: Project: 4524 Oak Fair Boulevard Suite'200 Haskell 10106A 018007.000 Tampa,FL 33610 PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623.3100 Jacksonville,FL 32232 Expansion Fax:813.623.35,45 4330 20th St. Zephyrhills,Florida 33542 Images Comments . Arrived on site to observe the placement of the roof deck and attachments at line 3=4/A-A.5. See discrepancies below. Reviewed erectors welder certifications and.verified.on site . Welders. RESOLVED DISCREPANCIES 1) Install joist bridging and attach to panel at line A-A.5/3-4. See-report dated 7.17:18 2) Install correct size bolts and tighten at line 4/A.5. See report dated 7.17.18 3) Install stiffener at 8x8 joist seat per RFI at line 3/A-A:5.See report.dated 7.17.18_ 4) Install tilt-up panel to panel connection per.C1/S-531 and B3/S-531..See report.dated 7.17.18 UNRESOLVED DISCREPANCIES.. 1). Attach bridging to existing bar joist after the temporary wall is removed. 2). Reference to Engineer sketch for repair.at line A/3, detail. show_87 3/4"'anchors; in:the field there are 6. SEOR(Structural Engineer of Record) needs to verify if this is.acceptable.Also,the same detail shows.a 5x3 angle bolted to the beam web and welded to the embed:Please verify if this is required. 3) Reference to Engineering sketch for the joist bearing seats at line 3/A-A.5..SEOR needs to verify the size of the HIT-Z anchor that is required. Phase: Structural Steel Inspections Location: Building Exterior=Roof Contractor: R&D Erectors The following-is a reference list of welding parameters related as required_by Secion 3,5,8L 6 of AWS D.1.1. Yes/No . Are contract documerits.outliriing specific .job requirements in place?(6.1.2.1) Yes i Are,drawings provided.showing size, length,type, and location of welds?(6.1.6) Yes Are Weld and base material certifications available?(6.2) Not:Applicable Are qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all Welder Certification Records current and in place?(6.5.7) Yes. Does welding equipment comply with requirements?(6.3.2) Yes Joint preparation and fit-up was observed at suitable intervals. (6.5.4) Not Applicable Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes (5.30:1) Is.welding being performed under proper atmospheric conditions? (5.12.2) Yes is contractor in compliance.with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable List of names of welders on project this date:on site Remarks: STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 5 of 6 WeldingInspection Report Report WIR-000010. p p . Steel Reports 1:75 N OVA Report Date: 11/16/2018 PROFESSIONAL I PRACTICAL.I PROVEN Tampa Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,FL 33610. PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:.813.623.3100 Jacksonville,.FL 32232 Expansion Fax:813.623.3546 4330 20th St. Zephyrhills,Florida 33542 Reference to report dated 7.11.2018; . 1)Observations noted that the existing girder bolted_connections were very loose. Girders were not welded to the column top. Vibrations could cause the'nut to come loose and,fall resulting in injury or damage.The undersigned arrived bn site to perform a visual inspection on the items;in the above report. The bolts have been added where missing and the girders with missing bolts.have been field welded. Furthee-observations were noted at the existing x-bracing structure. The bolts were:missing, and the existing bolts are:. loose'and not torqued per ASTM Bolts and the manufacture.These observations were pointed out to the Nestle Waters representative on site. 1 Date: 013/17/2018 Prepared by: Lafon, Barry No observations,tests, inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work in_strict conformity with the Contract Documents.NOVA's inspections and/or.tests reported herein are in,no way a guarantee of deficient free construction.The information provided herein is intended for the:sole and exclusive use-"of our'Client'unless otherwritten agreement is entered into by NOVA and other parties.All other recipients-are provided this document and any corresponding tests and/or inspection results for information purposes only,and any use of said information shall.be at their sole risk. i i I I I I I I I STATEMENTS IN THIS FIELD REPORTARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 6 of 6 V VA- ENGINEERING AND Special Inspections ENVIRONMENTAL 4524 Oak Fail Blvd.Suite 200 Daily Report Tampa,Florida 33610 813.623.3100 www.Usanova.com 813.623,3545 Project:. Nestle Waters North America NOVA job Number: 10106-1018007,000 Client:. Haskell Date of Report: 7.19.2018 Contractor: R&D Erectors NOVA Representative: Barry Lafon Engineer: Sawn Wilkerson Architect: Plans: 3.23.2018 At the request of the client,the undersigned visited the project site on the above date and conducted a number of special inspections and observations of the contractor's work in progress. The observations were performed in general accordance with the requirements of Section 553.79,Florida Statutes,Permits,applications,issuance,inspections. The observations employ visual observation techniques of the work to verify general compliance with the requirements of the project plans and specifications. This report is a follow up to the report dated 7.19.2018.The discrepancy noted below has been corrected.This was observed on site visit on 10.18.2018. _ RESOLVED DISCREPANCIES 1) Attach bridging to existing bar joist after the temporary wall is.removed. Approved A final steel inspection was performed on the new addition.The bar joist,bridging, field welds,roof deck and attachments have been completed and meet the requirements of contract drawings and specifications. i The work observed today appears to have been installed,in general accordance with details of site.project plans and specifications.The field welds appeared to be in general compliance with quality standard requirements of AWS D 1.1 visual acceptance criteria and the contract documents UNLESS NOTED ABOVE. I r' I Signed: CA Barry Lafon BN4947/CWI/ICC Statements in this field report are subject to NOVA's principal review, Page 1 of 1 WeldingInspection Report Report#:WIR-000010 - NOVA p p steel Reports 1-5 Report Date: 11/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,FL 33610 PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623.3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhills,Florida 33542 Phase: Structural Steel Inspections Location: Building Exterior-Roof Contractor: R&D Erectors The following is a reference list of welding parameters related as required by Secion 3,5;&6.of AWS D1.1. Yes/No Are contract documents outlining specificjob requirements in place?(6.1.2.1) Yes Are drawings provided showing size, length,type,and location of welds?(6.1.6) Yes Are weld and base material certifications available?(6.2) Not Applicable Are qualified Welding Procedure Specifications in,place?(6.3.1) Yes Are ail Welder Certification-Records-current.and in place?(6.5.7) Yes Does welding equipment-comply with,requirements?(6.3.2) Yes Joint preparation and fit-up.was observed at.suitable.intervals. (6.5.4) Not Applicable Are surfaces on which welding is to be performed, free of foreign material (scale,rust, moisture, grease)?(5.15) Yes (5.30.1) Is.welding being performed under proper atmospheric conditions? (5.12.2) Yes Is contractor in compliance with pre=heat and/or,post-heat requirement?(Table 3:2) Not Applicable List of names of welders on project this date: reviewed on site Date: 07/11/2018 Prepared by: Lafon, Barry No observations;tests, inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform.the-Work in strict conformity-with the-Contract Documents. NOVA's inspections and/or tests reported herein are in no way a guarantee.of deficient-free construction.The information provided herein is intended for the sole and exclusive use of our-Client unless other.written agreement is entered.into.by NOVA and other parties.All other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only,and;any use of said information shall be at their sole risk. Phase: Structural Steel Inspections Location: Building Exterior=Roof Contractor: R& D Erectors The following is a reference list of welding parameters related as required by Secion 3,5,&6 of AWS D11. Yes/No Are contract documents outlining specific job requirements in place?(6.1.2.1) Yes Are drawings provided showing size, length, type,and location of welds? (6.1.6) Yes Are weld and base material certifications available? (6.2) Not Applicable Are qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all Welder Certification Records current and in place?(6.5.7) Yes Does welding equipment comply with requirements?(6.3.2) Yes STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 1 of 6 WeldingInspection Report Report#:WIR-000010 1: . N OVA P p steel Reports -5 Report Date: 11/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa. Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell . 10106-1018007.000 Tampa,FL 33610 PO Box 45275(11.1 Riverside Avenue) Nestle.Waters North America Zephyrhills Phone:813.623.3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhilis,Florida 33542 The following is a reference list of•welding parameters related as required by-Secion 3,5,&6 of AWS D1,.1. Yes I No Joint preparation and fit=up was observed at,suitable intervals.,(6.5.4), Not Applicable• . Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes (5:30:1) Is welding being performed under proper atmospheric conditions?(5.12.2) Yes, Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2)_ Not Applicable . List of names of welders on project this date: reviewed on site Remarks: Arrived on site.to observe.the placement of the roof deck and.attaichments at line 5-6/AA-A and 4-5/A-A.5. The area.was approved: Nova, reviewed erectors welder certifications and verified on site welders. Date:07/13/2018 Prepared by: Lafon, Barry No observations,tests-,inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work in strict conformity with the Contract Documents.NOVA's inspections and/or tests.reported.herein are in noway a guarantee-of deficient-free construction.The.information provided herein is intended for-the sole and exclusive use of our Client unless.other:written agreement is entered into by NOVA and other parties:All other recipients are provided this document and any corresponding tests and/or.inspection results for information purposes only,and.any use of said information shall beat their sole risk. Phase: Structural Steel Inspections Location: Building Exterior-Roof Contractor: R&D Erectors The following is a reference list of welding parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes[No Aee contract.docurrients:outlining specific job requ'rrements.in place?(6.1.2.1). Yes Are drawings provided,showing size, length;type, and location of.weld.0(6.1.6) Yes. Are weld and,base material certifications available?.(6.2) Not Applicable Are qualified,Welding Procedure Specifications in place?(6.3.1) Yes Are all Welder Certification Records.current and in place?(6.5.7) Yes Does welding equipment comply with requirements?•(6,3.2) Yes . Joint preparation and fit-up was observed at suitable intervals. (6.5.4) Not Applicable Are surfaces on which welding is to,be performed, free of foreign material (scale;rust;moisture,grease)?(5:15) Yes (5.30.1).. Is welding being performed under proper atmospheric conditions? (5.1.2.2) Yes I. Is contractor in compliance with pre-heat and/or post=heat requirement?(Table 3.2) Not Applicable . List of names of welders on project this date: on.site i STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 2.of 6 i Weldin Ins ection Re ort Report#:WIR-000010 g p p Steel Reports 1-5 N OVA Report Dater 11/16/2018 j PROFESSIONAL I PRAOTICAL jr PROVEN Tampa Client: Project: 4524 Oak Fair Boulevard - Suite'200 Haskell 10106-1018007.000 Tampa,_FL 33610 PO Box 45275(11-1 Riverside Avenue) Nestle'Waters North America Zephyrhills Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:813.623.3.545 4330 20th St. Zephyrhills,Florida33542 Date: 07/17/2098 Prepared by: Lafon,.Barry No observations,tests,:inspections or approvals by NOVA shall'relieve the Contractor from his obligation to perfoim.the Work in strict conformity with the Contract Documents.NOVA's'inspections and/or tests reported herein are in no way a guarantee,of deficient-free construction.The:information provided herein is intended for the sole and exclusive use of our Client unless other.written agreement is entered Into by NOVA and other parties:All other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only;and any use of said information shall be at-their sole risk. i I i i i STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 3'of 6 WeldingInspection Report Report#:WIR-000010 N D V� p p steel Reports 1-5 Report Date: 11,/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,FL.33610 PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills .Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20th St. Zephyrhills,Florida 33542 Images Comments Arrived on site,to observe the placement of the roof.deck and attachments at line 3=4/A-A:5,the work was incomplete at time of observation,and work is in progress by erector. Reviewed erectors welder certifications and verified on site welders. RESOLVED DISCREPANCIES 1) Add joist x-bridging at line 5-6/A.5.Approved UNRESOLVED DISCREPANCIES 1) Install joist bridging,and attach-to panel at line A-A.5/34 2) Install correct size bolts and tighten at.line 4/A.5 3) Install,stiffener at•8x8 Joist seat per_RFI-at line-3/A-A.5 4) Install tilt-:up panel to panel connection per-C1/S-531 and 63/S-531 5) Attach bridging to existing bar joist after the temporary wall is removed Observer noted that the existing girder bolted connections were very loose. Girders were not welded to the column top.The Contractor was informed onsite. Phase: Structural Steel Inspections Location: Building Exterior-Roof Contractor: R&D Erectors The following is a reference list of welding parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes/No Are contract documents outlining specific job requirements in place?,(6.1.2.1) Yes Are drawings provided showing size, length, type,and location of welds?(6.1.6) Yes Are weld and.base material certifications available? (6.2) Not Applicable Are qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all Welder Certification Records current and in place?(6.5.7) Yes Does welding equipment comply with requirements?(6.3.2) Yes Joint preparation and fit-up' was observed at suitable interval ..(6.5A Not Applicable. Are surfaces on which welding is to be performed,free of foreign material (scale, rust, moisture, grease)? (5.15) Yes (5.30.1) Is welding being performed under.proper atmospheric conditions?(5.12.2) Yes Is,contractor in compliance with pre-heat and/or post=heat requirement?(Table 3.2) Not Applicable Date: 07/19/2018 Prepared by: Lafon, Barry i . No observations,tests, inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work.in strict conformity with the Contract Documents. NOVA's inspections and/or tests reported herein are in no way,a guarantee of deficient-free construction:The'inforination provided herein is intended for the sole and exclusive use of our Client unless other written agreement is.entered into by NOVA and other parties.All other recipients are provided this document and any corresponding tests and/or inspection results for information purposes only,and any use of said information shall be at their sole risk. STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 4 of 6 Welding Inspection Report Report#! WIR-000010, Steel Reports 1-5 N OVA Report Date: 1,1/16/2018 PROFESSIONAL I PRACTICAL I PROVEN Tampa Client: Project: 4524 Oak Fair Boulevard Suite 200 Haskell 10106=1018007.000 Tampa,FL 33610 PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Zephyrhills Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:813.623.3545 4330 20ih St. Ze-phyrhills,Florida 33542 Images Comments Arrived on site to observe the placement of the roof deck and attachments at line 3-4/A-A.5. See discrepancies below. Reviewed erectors welder certifications and verified.on site welders. RESOLVED DISCREPANCIES 1) Install joist bridging and attach to panel at line A-A.5/3=4. See report dated 7.17.18 2) Install correct size bolts and tighten at line 4/A.5: See report dated 7.17.18 3) Install stiffener at 8x8 joist seat per RFI at line 3/A-A.5.See report dated 7.17.18 4) Install tilt-up.panel to panel connection per.C1/S-531 and B)/S-531. See report dated 7.17.18 UNRESOLVED DISCREPANCIES 1) Attach bridging to-existing bar joist after the temporary wall is removed. 2). Reference to Engineer sketch for repair at line A/3, detail show 8-3/4"' anchors, in.the field there are 6. SEOR(Structural Engineer of Record) needs to verify if this is.acceptable.Also,the same detail shows,a 5x3 angle.bolted to the beam web and, Welded to the embed. Please verify if this is required. 3) Reference to Engineering sketch for the joist bearing seats at line 3/A=A.5. SEOR needs.to verify the size of the HIT-Z anchor that is required. Phase: Structural Steel Inspections Location: Building Exterior-Roof Contractor: R&D Erectors The following.is a reference list of welding parameters related as required by Secion 3,5,&6 of AWS D1.1. Yes'/.No Are contract documents outlining specificjob requirements in place?(6.1.2.1) Yes Are,drawings provided.showing size, length, type, and location of welds? (6.1.6) Yes Are weld and base material certifications available? (6.2) Not Applicable Are qualified Welding Procedure Specifications in place?(6.3.1) Yes Are all Welder Certification Records current and in place?(6.5.7) Yes Does welding equipment comply with requirements.?(6.3.2) Yes Joint preparation and fit-up was observed at suitable intervals. (6.5.4) Not Applicable Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes (5.30:1) Is welding being performed under proper atmospheric conditions? (5.12.2) Yes Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable i List of names of welders on project this date: on site Remarks: STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL-REVIEW Page 5 of ii Report#: � oWeldin Inspection Report steel 1=5N OVA Report Date: 11_/16/2016 PROFESSIONAL I PRACTICAL I PROVEN Tampa Client: Project:. 4524 Oak Fair Boulevard Suite 200 Haskell 10106-1018007.000 Tampa,FL.33610 PO Box 45275(11.1 Riverside Avenue) Nestle'Waters North America Zephyrhiils Phone:813.623:3100 Jacksonville,FL 32232 Expansion Fax:813.623.3546 - 4330 20th St. Zephyrhills,Florida 33542 Reference to report dated 7.11:2018; . 1)Observations noted that the existing girder.bolted connections were very loose. Girders were not welded to the column.top. Vibrations could cause the:nut to come loose and m,fall resulting in injury or daage:The undersigned arrived.on site to perform a visual inspection on the items in the above report.The bolts have been added where-missing and the girders with missing bolts.have been field welded:Further observations were noted at the existing x-bracing structure.The bolts vuere:missmg; and the existing bolts are loose and not torqued 'per ASTM Bolts and the manufacture.These observations were.pointed out to the and Waters representative on site. Date: 08/17/2018 Prepared by: Lafon, Barry No observations,tests; inspections or approvals by NOVA shall relieve the.Contractor from his obligation to perform the Work in,strict conformity with the Contract Documents. NOV A's inspections and/or tests reported herein are in no way a guarantee of deficient-free construction..The information provided herein is intended for the:sole and exclusive use of our.Client unless other written agreement is entered into by NOVA and other parties.All other recipients are provided this:document and any corresponding tests and/or inspection results'for information purposes only,and any use of said information shall beat their sole risk. I ' i I STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page'6 of 6 fi N 'OVA ENGMEEF2ING AND Special Inspections ENVIRONMENTAL. 4524 Oak Fail Blvd.Suite 200 Daily Report Tampa,Florida 33`610 813.623.3100 wwiv.bi anova.com 813.623,3545 Project: Nestle Waters North America NOVA lob Number: 10106-1018007,000 Client: Haskell Date of Report: 7.19.2018 Contractor: R&D Erectors NOVA Representative: Barry Lafon Engineer: Sawn Wilkerson Architect: Plans: 3.23,2018 i y � At the request of the client the undersigned visited the project site on the above date and conducted a number of special inspections and observations of the contractor's work in progress. The observations were performed in general accordance with the requirements of Section 553.79,Florida Statutes,Permits;applications;issuance;inspections. The observations employ visual observation techniques of the work to verify general compliance with the requirements of the project plans and specifications. This report is a follow'up to the report dated 7,19.2018.The discrepancy noted below has been corrected.This was observed on site visit on 10.18.2019. , RESOLVED DISCREPANCIES 1) .Attach bridging to existing,bar joist after the temporary wall is removed.Approved A final steel inspection was performed on the new addition.The bar joist,bridging, field welds,roof deck and attachments. have been completed and meet the requirements of contract drawings and specifications. G I I I i I I The work observed today appears to have been installed.in general accordance with details of site,project plans and specifications;The field welds appeared to be in general compliance with quality standard requirements of AWS D1.1 visual acceptance criteria and the contract documents UNLESS NOTED ABOVE. I. Signed: OCXALAULI, ;-t Barry Lafon BN4947/CWI/ICC Statements in this field report are subject to NOVA's principal review. Page 1 of 1