HomeMy WebLinkAbout18-20241 CITY OF ZEPHYRHILLS
` 5335-8TH STREET
(813)780-0020 20241
BUILDING PERMIT
PERMIT INFORMATION LOCATION,INFORMATION
Permit Number: 20241 Address: 6500 WAGON TRAIL ST
Permit Type: IRRIGATION ZEPHYRHILLS, FL.
Class of Work: IRRIGATION Township: Range: Book:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Square Feet: Subdivision: SILVERADO
Est. Value: Parcel Number: 05-26-21-0080-00600-0180
Improv. Cost: 500.00 OWNER INFORMATION
Date Issued: 9/18/2018 Name: DR HORTON INC
Total Fees: 45.00 Address: 12602 TELECOM DR
Amount Paid: 45.00 TAMPA FL 33637-0935
Date Paid: 9/18/2018 Phone: 813-549-1968
Work Desc: IRRIGATION CONNECT ONLY********************
CONTRACTORS APPLICATION FEES
PIPE PROS INC IRRIGATION CONNECTION 45.00'
�I
Ins ections Required
PLUMBING FINAL
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each such subsequent reinspection.
NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans,Specifications Must Accompany Application. All work shall be performed in accordance with
City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
CONTRACTOR SIGNATURE PERMIT OFFI R
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
813-780.0020 City of Zephyrhills Permit Application Fax-813.780.0021
Building Department t�Date Received Phone Contact for Permitting `l 4, 8' D !�
r T r r r""rr r rl
Ownar's Name ( Owner Phone Number
Owner's Address Owner Phone Number
Fee Simple Titleholder Name I Owner Phone Number
Fee Simple Titleholder Address
JOB ADDRESS ` LOT# .�
SUBDIVISION 1V f C3 PARCEL ID#
(OBTAINED FROM PROPERTY TAx NOTICE)
WORK PROPOSED e NEW CONSTR e ADD/ALT = SIGN = [� DEMOLISH
INSTALL REPAIR
PROPOSED USE [] SFR Q COMM = OTHER
TYPE OF CONSTRUCTION [] BLOCK FRAME STEEL []
DESCRIPTION OF WORK �^ it
BUILDING SIZE SO FOOTAGE HEIGHT
=BUILDING $ VALUATION OF TOTAL CONSTRUCTION
=ELECTRICAL S AMP SERVICE = PROGRESS ENERGY = W.R.E.C.
>1PLUMBING
=2:1MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION 4 41
=GAS = ROOFING = SPECIALTY = OTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO
BUILDER COMPANY
SIGNATURE REGISTERED I Y/ N FEE CURREN
Address License#
ELECTRICIAN COMPANY
SIGNATURE REGISTERED. I Y/ N FEE cURREn
i,
Address n License#�
PLUMBER �` COMPANY , '7 �_ cc�5 -�
SIGNATURE LY a REGISTERED Y N FEa CURREt Y/N
Address �r•� lP-t 1 10 License# F� iL��M� �
MECHANICAL COMPANY
-SIGNATURE REGISTERED I Y/ N FEE CURREn Y/N
Address (� License#
OTHER I COMPANY -�
SIGNATURE REGISTERED I Y/ N FEE cuRREn
Address r I License#
11111111111111111111111111111111111IIIIIIIIIIIiIlllllllllllllllllrl
RESIDENTIAL Attach(2)Plot Plans;(2)Sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction,
Minimum ten(10)working days after submittal date. Required onsite,ConsWction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary Facilities&1 dumpster,Site Work Permit for subdivisionanarge projects
COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction.
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Sift Fence Installed,
Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must most compliance
SIGN PERMIT Attach(2)sets of Engineered Plans.
*"PROPERTY SURVEY required for all NEW construction.
Directions.
Fill out application completely.
Owner&Contractor sign back of application,notarized
If over$2500,a Notice of Commencement is required. (AiC upgrades over$7600)
^' Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMiTrING (copy of contract required)
Reroors if shingles Sewers Service Upgrades A/C Fences(Piol/Survey/Footage)
DNvoways-Not over Counter if on public roadways..needs ROW
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions.
UNLiCENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: -If the owner has hired a contractor or
contractors to undertake work,they maybe required to be licensed irr accordance with state•and local regulations. If-the-
contractor is not licensed as required by law,both the owner and contractor may be cited for a misdemeanor violation
under state law. if the owner or Intended contractor are uncertain as to what licensing requirements may apply for the
intended work,they are advised to contact the Pasco County Building inspection Division—Licensing Section at 727.847-
8009, Furthermore, if the owner has hired a contractor or contractors, he Is advised to have the contractor(s) sign I.
portions of the"contractor Blocte of this application for which they will be responsible. If you,as the owner sign as the
contractor,that may be an indication that he Is not property licensed and is not entitled to permitting privileges In Pasco
County.
TRANSPORTATION IBIPACTtUTILITIES IMPACT ARID RESOURCE RECOVERY FEES: The undersigned understands
that'Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
-use-in-exleting•buildings,or.expansion.of existing buildings,as-spechied in Pasco County Ordinance number W07 and �
90.07,as amended. The undersigned also understands,that such flees,as may be due,will be Ident[W at the time of
permitting. K Is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid•prior to
receiving a"certificate of occupancy"or final power release. If the project does not Involve a certificate of occupancy or
final power release,the fees must be paid prior to permit Issuance. Furthermore,If Pasco County Water/Sewer Impact
fees are due,they must be paid prior to permit Issuance In accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): if valuation of work is$2,600.00 or more,I
certify that 1, the applicant, have been provided with a'copy of the "Florida Construction Uen Law--41orneewner's
Protection Guide prepared by the Florida Department of Agriculture and Consumer Affairs. If the-applicant Is someone
other than the"owner".I certify that I have obtained a copy of the above described document and promise in good faith to
deliver it to the"owner"prior to commencement
CONTRACTOWSIOWNEWS AFFIDAVIT Ice"that all-the information,in.this applicatfon.fs accurate.and.Ihat-,ati.work- �
will be done in compliance with all applicable laws regulating construction,zoning and land development. 'Application Is
hereby made to obtain a permit to do work and installation as Indicated. I certify that no work or Installation has
commenced prior to Issuance of a permit and that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is
my responsibility to Identify what actions I must take to be In compliance. Such agencies Include but aremot limited to:
- Department of Environmental Protection-Cypress Bayheads,Welland Areas and Environmentally Sensitive
Lands,Water/Wastewater Treatment.
Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
Watercourses.
- 'Army'Corps of Engineer&rSeawails;Docks,Navigable Waterways.
Department of Health & Rehabilitative SenAces/Environmentai Health UnitWells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement.
Federal Aviation Authority-Runways,
i understand that the following restrictions apply to the use of fill:
- Use of fill Is not allowed in Flood Zone"V"unless expressly permitted.
if the fill material is to be used in Flood Zone "A", it Is understood that a drainage plan addressing a
"compensating volume"will be submitted at time of permitting which Is prepared by a professional engineer
licensed by the State of Florida,
- if'the fill material Is to be used In Flood Zone"A"In connection with a permitted building using stem wall ri
construction.I certify that fill will be used`oniy to fill the area within the stem wall. !
If fill material is to be used In any area, I certify that use of such All will not adversely affect adjacent
propertles, if use of fill Is found to adversely affect adjacent properties,the owner may be cited for violating
the conditionsof the building permit Issued under the attached permit application,for lots less than one(1) �.
acre which are elevated by fill,an engineered drainage plan Is required.
If I am the AGENT FOR THE OWNER,I promise in good faith to Inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction, I understand that a separate permit may be required for electrical work,
plumbing,signs,welts, pools, air conditioning,gas, or other installations not specifically included in the application. A
permit Issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or
set aside any provisions of the technical codes,nor shall Issuance of a permit prevent the Building Official from thereafter
requirirtg a correction of errors In plans,construction or violations of any codes. Every permit Issued shall become Invalld
unless the work authorized by such permit is commenced within six months of permit Issuance,or if work authotfzed by
the permit Is suspended or abandoned for a period of six(8)months after the time the work is commenced. An extension
may be requested,In writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate
justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job Is considered abandoned,
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYiNG TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT
LENDER YOUR O E BEFORE C O O C CO T
FLORIDAJURAT(F.1 )
OWNERy�0 ACiF I _ CONIrRABTCI � --r'z—� 1'
( to affirmed) etor m3 tfus. Subscribed and umxqb(or affirmed)before m@ III*
a Isla pe y known t 9 Or tFaetAave produked Who Israts natty knoam M or haaiheve produced
as identification. as Identification.
Notary Public Notary Public
miesian Na Camm4�ssion No.
Name o A der atanae ; Namo"of Notary Wed,printed p nted or slam_ `
tvm.+�` #FF963675 NQA /)►+v:ICI ,�'sQhl
' MY CpMMiSStON ! a AMA
2020 rvr`
PIRES bruary 23, MY COMMISgIQN#FF9ti3675
I.'pouf a�a8: EX Fea,gtrv,:e.con" j�i„�Fa: FEybruarY 2 20
FtoridaM Y i 2�
7539t1•C; "'Fo«i°4• EXPIRES
I:
53
,dC7130B-0;53 Floridallo:a'YSormcacan'