Loading...
HomeMy WebLinkAbout18-20245 CITY OF ZEPHYRHILLS 5335-8TH STREET / (813)780-0020 2024 BUILDING PERMIT -PERMIT INFORMATION LOCATION INFORMATION - Permit Number: 20245 Address: 37766 ALISSA DR Permit Type: MECHANICAL ZEPHYRHILLS, FL. Class of Work: A/C CHANGEOUT Township: Range: Book: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Square Feet: Subdivision: ORANGE BLOSSOM RANCH Est. Value: Parcel Number: 15-26-21-0170-01300-00130 Improv. Cost: 4,000.00 OWNER INFORMATION Date Issued: 9/19/2018 Name: BOURASSA STEPHAN & RAE ANN Total Fees: 60.00 Address: PO BOX 136 Amount Paid: 60.00 ZEPHYRHILLS FL 33539-0136 Date Paid: 9/19/2018 Phone: 863-604-9487 Work Desc: A/C CHANGE OUT 2 TON CONTRACTORS APPLICATION FEES COOLTECH HEATING AND COOLING INC A/C CHANGEOUT 60.00 r� DUCTS INSTALLED Ins ections a uired DUCTSINSULATED FINAL REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONT C OR SIGNATURE PERMIT OFFI R PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 0.,I11_f?ju_uuZu City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date Received 9 — 49 — Phone Contact for Permitting E:7 a-7 0-3 =Owner's Name ktv� Owner Phone Number Owner's Addressl J9.55(4 CA Ss-uih 'Ave- 1 Owner Phone Number Fee Simple'.Titleholder Name Owner Phone Number Fee Simp][61itleholder Address JOB ADDRESS sso_ LOT# SUBDIVIS16N PARCEL ID#1 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT SIGN DEMOLISH e INSTALL L_j REPAIR PROPOSED USE Q SFR 0 COMM OTHER TYPE OF CONSTRUCTION - O,s BLOCK Q FRAME STEEL DESCRIPTION OF WORK -2, BUILDING SIZE SO FOOTAGE 14EIGHT - : i i v i i 2 v i I i N =BUILDING $ VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMPSERVICE Q PROGRESS ENERGY 0 W.R.E.C. =PLUMBING $ MECHANICAL $ C)1 VALUATION OF MECHANICAL INSTALLATION L4 C) =GAS Q ROOFING Q SPECIALTY OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA. =YES NO BUILDER i COMPANY SIGNATURE REGISTERED Y/*N FEE CURREN LYLNLj Address License# ELECTRICIAN COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN- LILN _j Addre ss License# F PLUMBER, COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Address License'#'F ll eeA CAL MECHANI COMPANY /A SIGNATURE REGISTERED YJ N FEE CURREN Y/N— Address 3 C_. �-tk. License# I CAA 1?1 OTHER. 'COMPANY SIGNATURE REGISTERED . Y/ N FEE CURREN Address License# F_ I I H 11,1 fi+ RESIDENTIAL Attach..(2)-PIqt Plans;(2)Sets of Building Plans,,.(1).set of Energy Forms;R-O-W-0ermit"forneW.construction, Minimum t 6..(l 0)'wdrking days after submittal date. Require.d drIsiti,Constructlon-Plans,Stormwaterftns.wt Sliffence Installed, Sanitary Facilities&I dumpster,Site Work Permit for subdivisio'nsfiarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page-,(1)set of Energy Forms.R-O-W Permit for now construction. 'Minimum tan(10)working days after submittal date...Requir6d,onsite,Construction Plans,-ftrmwater Plans w/Slit Fenc e installed, SanItary.Facilities&I dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ""PROPERTY SURVEY required for all NEW,construction. Fill out application completely. Owner&'Contreictor-signtick of application,notarized if over$2500,a Notice of Commencement Is required. (A/C upgrades over$7500) Agent(for'the contractor),or Power of Aftomey(for the owner)would be someone with notarized letter from owner authorizing same OVERTHE COUNTER PERMITTING (copy of contract required) Retdbfs If-shingles Sewers Service Upgrades A/C Fences(Plot/SuiVey/Footage) .Driveways-Not over Counter if on public roadv.-Ays..needs ROW, NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County.regulations. The undersigned assumes responsibility for compliance,with:any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a-contractor or con tractors'to,undertake work; they may,be-requir-ed to be licensed.in accordance with state and aocaC regulations. If the contractor is not licensed as-required.by law, both the owner and contractor may be cited fora misdemeanor violation understate law: If the owner-or intended-contractor are.uncertain as-to,.what licensing requirements may apply for-the intended work, they are advised,to contact the Pasco County Building inspection Division—Licensing Section at 727-847- 8009: Furthermore, if the owner has'blred"b contractor or contractors,. he is advised to have the aoritractor(s)'sign portions of the "contractor Block":of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting::privileges in Pasco County: TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: 'The undersigned understands . - that Transportation Impact Fees and:Recourse.Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings,,as specified in Pasco County Ordinance number 89=07,and 90-07, as amended. The.undersigned also understands, that such fees, as may,be due, will'be identified at the timd of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid.prior to receiving a "certificate of occupancy" or final power release. if the project does not involve a.certificate of occupancy"or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact. fees are due, they must-be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN:LAW(Chapter.713, Florida Statutes, as amended): :if valuation of work is$2,500 00 or more, i certify that 1, the applicant,-have been provided with a copy of-the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner", 1 certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"-owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I,certifythat-all-the<information-in this-application is accurate and that all work will be done in compliance with all applicable.laws regulating;construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. 'I certify that no work or installation has commenced prior to issuance,.of a permit and that all work will..be.performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may-apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such'agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,WaterMfastewater Treatment: Southwest Florida Water Management District Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers-Seawalls, Docks;Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. 'US Environmental Protection Agericy-Asbestos abatement. Federal Aviation Authority-Runways. I understand that the following restrictions apply.to the use of fill: Use of fill'is not allowed in Flood Zone"V'unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material­is,to•be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will-be used only to fill the area within the stem wall. If till material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties: If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued underahe attached permit application, for lots less than one (1) acre whichare elevated byfiII,an engineered drainage,plan is required. If i am the AGENT-FOR THE-OWNER, 1 promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior.to commencing construction. i understand that a separate permit may be required for electrical work, plumbing, signs, wells; pools; air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with.the work and not as authority to violate, cancel, alter,-or. set aside any provisions of the-technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the,work authorized by.such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is;commenced. An extension may be requested, in writing, from the:Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. 'If Work ceases for ninety(90)'consecutive days,,the job is considered abandoned: WAR14ING I TO-OWNER: YOUR.FAILURE,TO,RECORD A NOTICE OF COMMENCEMENT MAY RESULT 1N YOUR PAYING TWICE FOR IMPROVEMENTS TO YQUR.PROP'ERTY. IF YOU INTEND10 OBTAIN FINANCING;CONSULT WITH YOUR LENDER ORAN ATTORNEY BEFORE RECORDING`YOUR.NOTICE COMMENCEMENT. FLORIDA JURAT(F.S.117.03) — OWNER OR AGENT CONTRACTOR Subscribed and sworn to(or affirmed)before me this Subscribed and swo a ed)bppre me this by by Who is/are personally known to me or has/have produced Who I are ersonally kno to me or has/have produced as identification. eL%_��...as identification. _Q,( L S Notary Public Notary Public Commission No. Commis 'o No. _LL_� Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped w .,, JAC F. {p"" 1 VC1111TY11$$I{3fl 3�i • expttet December 1?. e `'- 00Pid®dYhRlfitlY�afinrur¢nri ' rt_.... Ili H aswr+.'.•.. F: DUCT CERTIFICATION FOR INSTALLATION OF NEW DUCT-WORK OR.MODIFICA -!ON OF THE EXISTING DUCT-SYSTEM FLORIDA ENERGEY CONSERVATION CODE.(FBC.ENERGY;SECTION 403)TO.BE LEFT ONSI.T.E AND PICKED .: UR-BYINSPECTOR:. owner: 6c1� �.�5 a.. Permit.#: �/ .. .. f Site Address: . .. ����. f l: f i � Contractor: - ( GIB:. -i A 1G 7 License#: Final:Inspection Date:- .. . certify that f have.installed.new or modified-the' existing ductwork associated,with the HVAC system : : referenced,by' -the permit listed above and found it complies with.the reauirements,FBC EnergyCode, Section:403:2..Where modified,the existing ducts have been-sealed using reinforced mastic:or code-: :- approved equivalent._ Ducts are located within conditioned space(Section 403'.2'.1)Systerh.was tested' gY .. as per'FB.CEner code;section 403.2:2.1.All.new duct work,is to comply-with FBC Energy.403.2 and: FBC Mechanical.chapter 6. Name of License,Holder(print or type): ignature of License:Holder