Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
18-20257
CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780-0020 20257 BUILDING PERMIT PERMIT INFORMATION LOCATION INFORMATION Permit Number: 20257 Address: 5514 12TH ST r Permit Type: RE-ROOF ZEPHYRHILLS, FL. Class of Work: ROOF REPLACEMENT Township: Range: Book: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Square Feet: Subdivision: CITY OF ZEPHYRHILLS Est. Value: Parcel Number: 11-26-21-0010-13900-0190 Improv. Cost: 5,525.00 OWNER INFORMATION Date Issued: 9/21/2018 Name: BOYD MARIA ARMOUR & MICHAEL ERIC Total Fees: 105.00 Address: 27211 LIRIOPE CT Amount Paid: 105.00 WESLEY CHAPEL FL 33544-1822 Date Paid: 9/21/2018 Phone: (813)598-7105 Work Desc: REROOF FLAT MODIFIED j CONTRACTORS APPLICATION FEES BODAN ROOFING INC REROOF RESIDENTIAL 105.00 i / I CC DRY IN ROOF INSP Ins ections Re uired TAPE JOINTS ROOF INSP FINAL REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property: If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PERMIT OFFI R PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 01 1-f t3U_UUZU City of Zephyrhill'S Permit Application Fax-813-780-0021 Building Department Date Received .................rr Phone Contact for Permitting =6943 0 ryrm ..... I Owner's Name � Ct � M Owner Phone Number �f >�-OT Owner's Address q 12 Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS LOT SUBDIVISION F PARCELID# (D 3<nVCV,)0Aa0 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR F-1 ADDIALT SIGN, DEMOLISH e INSTALL L_j REPAIR PROPOSED USE SFR COMM OTHER % I TYPE OF CONSTRUCTION BLOCK 0 FRAME' STEEL 7CV�� Cg3C ZZ DESCRIPTION OF WORK -BUILDIING;SIIZE SCI FOOTAGE= HEIGHT BUILDING VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL AMP SERVICE 1$ PROGRESS ENERGY =IWW.R. C. =PLUMBING 1$ MI6 =MECHANICAL 1$ VALUATION OF MECHANICAL INSTALLATION [ GAS 0 ROOFING- Q SPECIALTY OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA AYES NO HHHHH : ....... BUILDER COMPANY SIGNATURE REGISTERED Y/'N FEE CURREN YM Address I P License# /-haa C ELECTRICIAN COMPANY& SIGNATURE REGISTERED L Y/ N. FEE CURREN- [Address License# 7-- PLUMBER COMPANY SIGNATURE REGISTERED- Y/ N FEE CURREN Address License_# F_ MECHANICAL COMPANY SIGNATURE REGISTERED Y] W FEE CURREN Y/N Address License# .OTHER;,. -COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN. L_YLN J Address License# ..`RESIDENTIAL Attach,(9)Plot,Pipris;:(2)i.etlsof Building Plans;,(I).set of Energy,Forms;R--0-W Permit for new construction, Minimum 166:(10)working days after sdbmittaldate. Required dftite�,Construction Plans,StormwaterPlans..W.Slit Fence installed, Sanitary Facilities&I dumpster,Site Work Permit for subdivisio'nsAarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working' ,riays after submittal date..Required onsite,Construction Plans,.6tormwater Plans w/,SIIt Fence installed, 'Sanitary-Facillities&I dumpster.Site Work Permit for all new projects.All commercial requirements must meet Compile.nce 'SIGN PERMIT 'Attach(2)sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. Fill out application completely. Owner&Contractorsign.b ack of application,notarized s. If over$2500,a Notice of Commencement Irequired. (AIC upgrades over$7500) Agent(for the contractor).or Power of Attorney-(for the owner)would be someone with notarized letter from owner authorizing same OVitfUTHE.COUNTER PERMITTING (copy of contract required) Retdofs 4f shingles Sewers Service Upgrades A/C Fences(PlottSurVey/Footage) .Driveways-Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS:, The.undersigned understands that this permit may be subject to"daed.' restrictions" which maybe more restrictive than County.regulations. The undersigned.assumes responsibility for compliance,with.any,.- applicable-deed:restrictions. UNLICENSED. CONTRACTORS AND-CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractorsto.vndertake work-, they may be required to be-Ilcensed'in accordance with state-.and.local=:regulations:",if the contractor is not licensed as-required by law, both the owner and contractor may be cited for:a misdemeanor violation understate law. If the owner-or intended'contractor are.uncertain as-to what licensing requirements-,may apply'for the, intended work,they are advised.to contact the Pasco County Building inspection Division—Licensing Section at 727-847- 8009: Furthermore, if the owner has `hired'a contractor or contractors,. he is advised to.have the contractor(s)'sign portions of the "contractor Block" of this-application for-which they-will be responsible. If you, as the owner sign as the- contractor, that may be an indication that he is not properly licensed and is not entitled to permitting,.privileges..:in Pasco County: TRANSPORTATION IMPACT/UTILiTIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands,.that Transportation Impact Fees and:Recourse Recovery Fees may apply to the construction of new buildings, change-of use In existing buildings, or expansion of existing buildings,,as specified in Pasco County Ordinance number 89=07.,,and. 90-07, as amended. The undersigned also understands, that such fees, as maybe due, will be identified at the time of permitting. It is-further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be-paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LiEN LAW(Chapter-713, Florida Statutes, as,amended):..if valuation of work is$2,500:00 or more, i certify,that 1, the applicant,-have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner", i certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner" prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT! 1,certify that all,the Information in this application is accurate and that all:work will be done in compliance with all applicable.laws,regulating construction, zoning and.land'development. Application is hereby made to obtain a permit to do work and installation as"indicated. i certify that no work or installation has commenced prior to issuance of a permit and that all work will.,be..performed to meet standards of all laws regulating construction, County and City codes, zoning 'regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies rhay apply.to"the intended work, and that it is my responsibility to identify what actions 1 must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection-Cypress Bayheads; Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater'-Treatment: - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers-Seawalls, Docks;Navigable Waterways. Department' of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency-Asbestos abatement. Federal Aviation Authority-Runways. I understand that the following restrictions apply.to the use of fill: Use of fill is not allowed in Flood Zone"V'.unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will.be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. if the fill material is to'be used in Flood Zone "A" in connection with a permitted building using stem wall construction, i certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner maybe cited for violating the conditions of the building permit issued under.the attached permit application, for lots less than one (1) acre which are elevated�by fill;.an engineered drainage,plan is required. If I am the AGENT~FOR THE OWNER, I promise-in good faith-to inform the owner of the permitting conditions set forth in this affidavit.prior,to commencing construction. I understand that a separate permit may be required for electrical Work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter.,,or. set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction-of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the.work authorized bysuch permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work isgcommenced. An extension may be requested, in writing, from the.Building Official for a period not to exceed ninety(90) days and will demonstrate justifiable cause for the extension. If-Work ceases for ninety(90)consecutive days,the job is considered abandoned: WARNiNG,TO OWNER: YOUR.FAILURETO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR-IMPROVEMENTS'td YOUR PROPERTY. 1F YOU INTENDTO OBTAIN FINANCING CONSULT WITH YOUR LENDER OR AN ATT(?RNEY-BEFORE RECORDING'YOUR.NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S. 117.03) OWNER OR AGENT - CONTRACTOR-' Subscribed and swornto(or affirmed)before me this S _s�b irl,and sbwo o(orraaffirmed b f re me this L13 �2. Who islare personally known to me or hasihave produced Wh�lsla pffnally known to me or has/have produced as identification. T"Lc +t C (1 u µS•Q._. as Identification. Notary Public Notary Public Commission No. Commissl JACQUELINEfIO.GESName of Notary typed,printed or stamped Name of Notary typ c€,� d'erEs_,,•. ece12,2018jf °•`' BondedThruTroyFano 000-3P.5.7019 '� °Seri`ng the Tampa Bay Aea Since 1994" 4263 1936 Bruce B:-Dovyhs-Blvd.;#329 * Wesley Chl,.FL 33544 813-977-5919 Bo@Bo dRoofmg.com Lic#RC0066843 a WXWbadan Roofing.com BBBJ ' PROPOSAL AGREEMENT PROPOSAL SUBMITTED TOy-. ;P�ONE DATE t / STREET IV A�. EMAIL t r CITY,STATE AND ZIP CODE SUB-DIVIS ON I hereby propose to fumish mat T an rot o I ion o - 'EMOVE EXISTING � ROO1��" [7,INSTALL 26 G.A.6"DRIP EDGE ❑ INSTALL -- El IN T_A' 4 SHINGLE COLOR OF CUSTOMERS CHOICE El. REMOVE EXISTING ROOF ULL MAGNET AROUND?JOB TO.PICK'UP'-ANY LOOSE NAILS_, ,. � jSTALL-' r /!_ BASE SHEET E-NAIL DECKING TO CURRENT CODE P ALL -_S- r- "' CAP SHEET ElISTALL RIDGEIOFF RIDGE ATTIC VENTS ALL NEWPIPECOVERS 1 GULL ALL NECESSARY PERMITSALL NEW VALLEY FLASHING A AWAY OLD DEBRIS CrrY OF Z PHY �� ci$DDITIONAL NOTES: = PLANS E XAM'9NE CARPENTRY RATES AS FOLLOWS: ^-- 112 OR 3/4 INCH PLYWOOD @ -1/ PER SH FRAMING MEMBERS @ �fi 7r PER LF;' 1 X 6 DECKING @' �/,�-� PER LF w'iA4 FASCIA AND TRIM@ PER LF - \ ANY VARIATION IN WOOD SIZ56,0VILL_INCUR EXTRA COSTS ';..•., In' ® r` - 77 IF THERE IS MORE THAN 1 LAYER OF ROOFING THERE WILL BE AN ADDITIONAL CHARGE OF WE PROPOSE hereby to furnish material and labor-complete in accordance With above specifications,for the sum of P yment to be mad6 a fo '- 4 Peel&Stick `.t Underlayment•iAdd$ All e al is guarantee be as spe .cif All work to be completed in a substantial workmanlike manner according mat to Vecific6tkins submitted,per standard practices.Any atteratioris or deviation from above specifications Involving extra costs will be executed onlp;upon written orders,and will become atiejitta chre over and above the estimate.AU agreement contingent upon strikes, accidents or delays beyond our control.Owner to carry fire,tornado and`other necessary insurance Our workers are fully coved by Workman's Compensation Insurance:. ACCEPTANCE OF PROPOSAL.The above prices,specifications.and conditions are �' ;. " satisfactory and are hereby accepted.You are authorized to do the work specified. Authorized Payment will be as outlined above. r Signature ' NOTE TO OWNERS:During the removal of your old roof and the installation of your new roof it is possible•vibration will be generated by the.various construction Note:This proposal m�y,bb, activities.We recommend that any pictures and other breakable items be removed t withdrawn by us if not agcept4 within days from waAs,unprotectedshehes or areas where items might be able to.fall and break- acknowledge receipt if the above advisory and agree hold Bo Dan Roofing,Inc. harmless to the event I do-noi follow the above suggested precautions and damage occurs. Signatures ' CE�riE$?.'�'-Ft)R nE iCltJCSC I_fltttt.tdflft_G7�7 - ., - 5�.,t rtu.-�� tsc.,nnacn Florida Building Code Online Page 1 of 2 v' D BCIS Home I Log In ` User Registration Hot ropl6 Submit Surcharge ! Stats&Facts i Publications FBC Staff I BCIS Site Map Links •Search.� (Z' �r pr `.i s'ar.' Product Approval �r�� �" USER:Public User l Product Approval Menu>Product or Application Search>Application List>Application Detail FL# FL5680-R19 Application Type Revision Code Version 2017 Application Status Approved Comments Archived ❑ Product Manufacturer GAF Address/Phone/Email 1 Campus Drive Parisppany,NJ 07054 (800)766-3411 mstieh@gaf.com Authorized Signature Robert Nieminen lindar@nemoetc.com Technical Representative William Broussard Address/Phone/Email 1 Campus Drive Parsippany,NJ 07054 (800)766-3411 TechnicaIQuestionsGAF@gaf.com Quality Assurance Representative Address/Phone/Email Category Roofing Subcategory Modified Bitumen Roof System Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer ❑ Evaluation Report-Hardcopy Received Florida Engineer or Architect Name who developed Robert J.M.Nieminen the Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 04/22/2019 Validated By John W.Knezevich,PE © Validation Checklist-Hardcopy Received Certificate of Independence FL5680 R19 COI 2017 01 COI Nieminen.Ddf Referenced Standard and Year(of Standard) Standard Year ASTM D6162 2008 ASTM D6163 2008 ASTM D6164 2011 ASTM D6222 2011 FM 4470 2012 FM 4474 2011 TAS 114 2011 Equivalence of Product Standards Certified By http://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgt45H 1 a2A,P3Iy... 3/15/2018