HomeMy WebLinkAbout18-20045 CITY OF ZEPHYRHILLS
5335-8TH STREET
(813)780-0020 20045
BUILDING PERMIT
=PERMIT INFORMATION - LOCATION-INFORMATION
Permit Number: 20045 Address: 39736 MEADOWOOD LP
Permit Type: ADDITION/ALTERATION ZEPHYRHILLS, FL.
Class of Work: 434-ADD/ALT RESIDENTIAL Township: Range: Book:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Square Feet: Subdivision: MEADOWOOD ESTATES
Est. Value: Parcel Number: 13-26-21-0140-00000-0130
Improv. Cost: 17,250.00 OWNER INFORMATION -
Date Issued: 7/30/2018 Name: SOUTHEAST PROPERTY ACQUISITIONS
Total Fees: 195.00 Address: PO BOX 9567
Amount Paid: 195.00 TAMPA FL 33674-9567
Date Paid: 7/30/2018 Phone: 813-675-0916
Work Desc: FOUNDATION REPAIR STABIZATION
CONTRACTORS APPLICATION FEES
COMPLETE SINK HOLE REPAIR LLC BUILDING FEE 195.00
Ins ections Required
FO TER 2ND ROUGH PLUMB MSC INSULATION CEILING
FOOTER BOND DUCTS INSULATED SEWER MISC.
ROUGH ELECTRIC LINTEL MISC MISC.
1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC.
DUCTS INSTALLED WATER MISC DRIVEWAY
PRE-SLAB SHEATHING MISC. MISC.
CONSTRUCTION POLE FRAME MISC. MISC.
REINSPECTION FEES:(c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each such subsequent reinspection.
NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans,Specifications Must Accompany Application.All work shall be performed in accordance with
City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
ONTRACTOR SIGNATURE PERMIT OFFI R
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
e13-780-0020 City of Zephyrhills Permit Application air 21
Building Department
Date Received (� } Phone Corrtact for Permitting 1"— o
Owners NameijJhM5-j
L A/ p Owner Phone um er t p
Owners Address 5G� A t en-ter, ..1?Owner Phone Number [J ��r✓�
Fee Simple Titleholder Name I Owner Phone Number
Fee Simple Titleholder Address /
JOB ADDRESS �4� LOT##^� �My
SUBDIVISION e � PARCEL ID# — � — op" " ! v
(OBTAINED FROM PROPERTY TAX NOTICE)
WORK PROPOSED B NEW CONSTR e ADDIALT = SIGN = = DEMOLISH
INSTALL REPAIR
PROPOSED USE = SFR = COMM = OTHER
TYPE OF CONSTRUCTION d BLOCK 0 FRAME = STEEL =
DESCRIPTION OF WORK 'F 16D n f e Q P St 11 ,
BUILDING IZE / f> SQ FOOTAGE HEIGHT
BUILDING l^�7 . ��r V UATION OF TOTAL CONSTRUCTION
=ELECTRICAL $ G (J P SERVICE Q PROGRESS ENERGY Q W.R.E.C.
=PLUMBING $
=MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION
=GAS = ROOFING Q SPECIALTY OTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES INO
LDER COMPANY
S NATURE- walED I Iff/JN I I
/FEEEEE CURREn Y/N
Address Lic'hSe#
ELECTRICIAN COMPANY
SIGNATURE REGISTERED Y/N FEE CURREn LYIN
Address License#
PLUMBER COMPANY
SIGNATURE REGISTERED I Y/ N FEE CURREn 1 77 N
Address I License#
MECHANICAL COMPANY
SIGNATURE REGISTERED Y/N FEE CURREn LY/N
Address I License#
OTHER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREn Y/N
Address License#
IIIIIIIIIIIIi111111111111111111111111111111tillllllllllt11111111111
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit far new construction,
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed!
Sanitary Facilities&1 dumpster,Site Work Permit for subdivisions/large projects
COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Fortes.R-O-W Permit for new construction.
Minimum ten(10)worldng days after submittal date. Required onsite,Construction Plans,Stornwater Plans w/Silt Fence installed,
Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance
SIGN PERMIT Attach(2)sets of Engineered Plans.
""PROPERTY SURVEY required for all NEW construction.
Dlreottons:•
Fill out application completely.
Owner&Contractor sign back of application,notarized
If over$2500,a Notice of Commencement Is required. (A/C upgrades over$7500)
Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage)
Driveways-Not over Counter if on public roadways..needs ROW
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions-
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the
contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
portions of the"contractor Block"of this application for which they will be responsible. If you,as the owner sign as the
contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and
90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or
final power release,the fees must be paid prior to permit issuance. Furthermore,if Pasco County Water/Sewer Impact
fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I
certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
Protection Guide prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
other than the"owner".I certify that I have obtained a copy of the above described document and promise in good faith to
deliver it to the"owner"prior to commencement
CONTRACTOR'S/OWNER'S AFFIDAVIT: 1 certify that all the information in this application is accurate and that all work
will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is
my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands,Water/Wastewater Treatment.
- Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
Watercourses.
- Army Corps of Engineers-Seawalls,Docks,Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement
- Federal Aviation Authority-Runways.
understand that the following restrictions apply to the use of fill:
- Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
- If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone"A" in connection with a permitted building using stem wall
construction,I certify that fill will be used only to fill the area within the stem wall.
- If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating
the conditions of the building permit issued under the attached permit application,for lots less than one(1)
acre which are elevated by fill,an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
plumbing, signs,wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or
set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter
requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid
unless the work authorized by such permit is commenced within sot months of permit issuance,or if work authorized by
the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate
justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
FLORIDA JURAT(F.S.117.03) O
OWNER OR AGENT ONTRACTOR
Subscribed and sworn to(or affirmed)before me this Subscribed d om r r b re me thi
by by Who is/are personalty known to me or has/have produced Who I personally own tom or asRrave prod
ced
as identification. C• llla 5 L as identification.
Notary Public ` Notary Public
Commission No. Co o.
Name of Notary typed,printed or stamped Narrie—o-11'Notaill
tiisvPyef% JACOUELINEBOGES
` Commission#FF 150422
a• o€ Expires December 12,2018
Bonded Thru Troy Fain Insurance 8M385.7019
Complete
Sinkhole
Repair, LLC
Customer Service Reputation, It's in our name
7/20/18
RE: Contractor Agent Authorization
City of Zephyrhills Building Department,
I Patrick Webster(contractor)hereby grant authorization to Jeff Powell
(authorized agent)to act on my behalf with the City of Zephyrhills Building Department
while conducting activities related to obtaining permits. These activities specifically
include signing all documents requiring signature of contractor
Signature of Contractor ftnalure of AgeiA
CBC 1260963
State Certification or Registration Number
Notary for Contractors Signature Notary for Agent Signature
State off-/oe,'A County of 14-erwat&� State ofrl0eid- County of P+errJP,J62V
The foregoing acknowledged before me The foregoing acknowledged before me
ThisZ q'"-darof Z'u t-tg ,2018 by This 2gcl yday of SS U l-cj ,2018 by
_7 0-e lc W e/3 54e,7 who is erso 1 Se-EC who is personally
To me or produced to me or produced 75'L L
Identification. Identification.
Notary Public Signature Notary Public Signature
Print, Type or Stamp Name of Notary Print, Type or Stamp Name of Notary
Complete Sinkhole Repair, LLC 7333 Holiday Dr., Spring Hill,FL346O6
License#CBC126O963 PH#352-346-7023 Email:pflpc@aol.com
"" '• MARCtq M.MCCULLOUGH
MARCIAM.M0O0LLOUGH =i$• Y� ""'
MY COMMISSION#GG 137404 �._ COMMISSION#GG 137404
EXPIRES:September 21,2021 3 EXPIRES:September 21
,,f oP r ,2021
•"�',oF c� Bonded Tfw Notary Put�Ac UrMetv+riters Not�Y Public Underwriters
a
City of Zephyrhills
BUILDING PLAN REVIEW COMMENTS
Contractor/Homeowner: G°cam -4 �'w - �^
Date Received: �-�2�-��6
Site: 3 q 701c
r—
Permit Type: c�-
Approved w/no comments:❑ Approved w/the below comments: Denied w/the below comments: ❑
This comment sheet shall be kept with the permit and/or plans.
_'
Kalvin Switzer—Plans Examiner Date VntAclor and/or Homeowner
(Required when comments are present)
llEE!!EllElIEElEIIIEEIlIIEIIIElEIIEIIEIEIIIIIIlIEEIIIIEIIEEI
2018124272
NOTICE OF CQMMENCEMENT ---
Rcpt:197$385 Rec: 10.00
DS: 0.00 IT: 0.00
Permit No. 07/24/2018 J. R. , Dpt I Clerk
Tax Folio No.3^21 —;)Ll--[L1 . —QC=7—101200
THE UNDERSIGNED hereby gives notice that improvements will be made to certain real property,and in accordance with Section
713.13 of the Florida Statutes,the following information is provided in this NOTICE OF COMMENCEMENT,I.Description of property(legal deser 8aM BAowovd 6ict116 F8 15 U p L U Of, all [ #:"191
Ll
a)Street(Jab)Address:
2.General description of improvements:
3.Owner Information
a)Name and address 't V �-f-L 0(15-1
b)Name and address of fee simple titleholder(it other Man owner) N A .
c)Interest in property N/
4.Contractor Information d 2J C t ' l I" //// /
a)Name and address: m fe t, h �1 dle C '12 D Q/ � 76U6
--
S.Surety Information
a)Name and address: N/A
b)Amount of Bond: N A
c)Telephone No.: N/A Fax No.(Opt.) N/A
61ender
a)Name and address: N/A
Phone No. NIA
7.Identity of person within the State of Florida designated by owner upon whom notices or other documents may be served:
a)Name and address: N/A
b)Telephone No.: N/A Fax No.(Opt.) N/A
S.In addition to himself:owner designates the following person to receive a copy of the Lienor's Notice as provided in Section.
713.13(1)(b),Florida Statutes:
a)Name and address: N/A
b)Telephone No.: N/A Fax No.(Opt.) N/A
9.Expiration date of Notice of Commencement(the expiration date is one year from the date of recording unless a different date
is specified): One year from the date of recording
WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF
COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713,PART I,SECTION 713.13,
FLORIDA STATUTES,AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.
A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING,CONSULT YOUR LENDER OR AN ATTORNEY BEFORE
COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT.
SATE OF FLORIDA -
COL'NTY OF 10.
Signature ofR++o or Owner's Authorized OtTicer/Dirmor/Partner/Manager
f-►�tlAl `L F—L tN Tk&
Print Narne
The foregoing instrument was acknowlaae��dged before me this day of +s 20 ,by AP —
�-�1 � �as k`'1�'14.+" .Q� (type of authority,e.g.officer,trustee,
attorney in fact)for � ,� t nx- (name of party on behalf of whom instrument was executed).
Personally Known OR Produced Identification_ Notary Signature I��,t_,�jI �� -
Type of Identification Produced Name(print) Ki Ut 31 e—
4
IIII'r• ` rt'
Verification pursuant to Section 92.525,Florida Statutes.Under penalties of perjury,I declare that.I have read the foregoing and that
the facts stated in it are true to the best of my knowledge and Belief.. . i
a"1, ,
�"`+ Signature o£Natural Person Signing(in line#10:)Above
� KRYSTLE GORDON
:�'`� ���-State of Florida-Notary Public
s •S Commission#GG 202090 PRULR S.Q'I4ESL,Ph.0.PA5CO CLERK & COMPTROLLEk
My Commission Ex lies 07/24/20 1 188 1y1'57AAam i' of .1":
'�ami�iN+ April 01,2022p OR BK ,r7 !6'1 PG � � '
STATE OF FLORIDA, COUNTY OF PASCO
THIS IS TO CERTIFY THAT THE FOREGOING IS A
TRUE AND CORRECT COPY OF THE DOCUMENT
ON FILE OR OF PUBLIC RECORD IN THIS OFFICE
LSEALTHIS
OFFIqlA
WI-*'NE , MY HAND D
DAY 0 2 OtE
1 P L S. C'NEIL, �[RK
A L S. 0 HAND
PTROLLER
By X DEPUTY CLERK
1 " 1
1 • Structural Consulting
21859 State Road 54, Lutz, Florida 33549
it I `• ,,�
Remediation Activities Summary Report
���.` -�e�% � �� �• yam.>.•.i:? a �'y'�1�Y"x '. :� +�+L'++.s
39736 Meadowood Loop
. r
Augustt 18
Project1 ili' ' 1
my, :Own"W-A
Vol;'
MR.
r'
r Sinkhole Geotech, Inc.
- Geotechnical&Structural Consulting
21859 State Road 54, Lutz, Florida 33548
Jim Fisher August 7, 2018
President
_ Mustang Homes
2474 Sunrise Ct.
Spring Hill,FL 34608
RE: Remediation Activities Summary Report
Property at: Southeast Property Acquisitions Property
39736 Meadowood Loop
Zephyrhills,Florida 33542
Dear Mr.Fisher,
Sinkhole Geotech, Inc. (SGT) is pleased to submit the Remediation Activities Summary
Report for monitoring the underpinning pressure piers at the above referenced site.
- Per your request to provide underpinning pier plan to augment the foundation, SGT
monitored the underpinning plan. The underpinning transfers the house load to more
stable deeper soil and prevents further foundation movement.
The purpose of this report is to provide certification that SGT, as a third party, monitored
the remediation operation performed by Mustang Homes on behalf of the client or
homeowner at the above referenced structure. This report documents the pressure pier
and the underpinning installation details of the work completed.The approximate locations
of the perimeter underpin piers are depicted on the enclosed underpinning layout.
_I
PURPOSE OF • .
WHATIS.T,HE.UNDERMINNING?
Underpinning system is a process of augmenting the foundation underneath the building.
There are a variety of methods to accomplish this, each with its own benefits and
drawbacks. Generally, underpinning is a method of transferring the wall and roof loads on
the foundations to deeper soils or even to the limestone itself.
HOW DOES...UNDERKNNING WORK? .
Underpinning involves attaching steel piers using pin brackets to the foundation' of the
home, and driving those piers into deeper competent soils or to the limestone formation. If
- correctly planed out and mounted, underpinning supplies the lift the structure or
foundation needs to meet a more satisfactory level, also providing a future support as a
preventative from settling of the underpinned area.
Southeast Property Acquisitions Property
Project No.:SGT-F1808-9130
Page 1 of 3
Sinkhole Geotech, Inc.
Geotechnical &Structural Consulting
21859 State Road 54, Lutz, Florida 33548
HEN-S D : N• RIN 1NG: Y` TE E ?- _W HOUL ,U D,E.R N S _S. M,.BE::.U,S D
There is a variety or reasons when underpinning should be usea. when buildings are on
- unpredictable land with voids, there is often a possibility that the foundation will become
unstable. In this situation, underpinning may be necessary. Here are a few examples of
situations that would require underpinning:
• Structure is not even: re-leveling the structure
• cosmetic/structural cracxs: closing or wiae cracxs causea by excessive settlement
• Soils have changed or cavities were created: bypass weak soil layers
• Soils have not been completely identified before construction began: pre-
construction underpinning
• The foundation may no longer be strong or stable enough for support of the
structure: foundation augmentation
• The structure's purpose may have changed: meeting the weight increase on the
foundation
® Structure needs additional foundation capacity to footings or mats with too little
-bearing-capacity (building movement or ground consolidation is excessive)
• Distressed or undermined Structure needs support: a catastrophic event (e.g.
erosion,landslides,burst pipes,mine subsidence, etc.)
• Adding load capacity to an existing foundation system to accommodate a seismic
retrofit or addition of new structure,building stories, etc.
• Cost considerations: homeowner preference
® .
In the �,outneast rroperty [acquisitions Property, the underpin piers were nyarauiicaiiy
driven down into the underlying soils to refusal or a pressure that was appropriate to avoid
damaging the structure based the condition of the foundation at each location. The plan
utilized 25 piers. However, piers no. 2 and 7 were eliminated for physical obstruction (to
avoid cutting the very deep and thick slab in the front). The pier depth ranged from 13 to
4kU ieM LU ieeL UtUOW iUucivaLiUii.
The jacking of each pier was monitored and terminated at a pressure that was appropriate
to avoid damaging the structure based the condition of the foundation at each location. All
piers were jacked to a pressure up to 3,500 psi, which provides more than 24,000 pounds
of foundation support per pier. When the piers reached the ultimate support depth, each
underpin bracket was secured to the pressure pier with 1/2' pin. The jacking depth and
pressures of each individual pier are presented in tabular form in the appendix; of this
report.
s
in conclusion, to tree best of our belier or xnowledge, mustang Homes nas completed this
- piers installation in accordance with applicable standard practice and the foundation has
been stabilized and habitable at this time. Therefore, it is also our opinion that there is no
i
Southeast Property Acquisitions Property
Prniart Nn •CGT-F1RM A1If1
- Page 2 of 3
.. ... �
.. . .. _: . .,,.. � i
Sinkhole Geotech, Inc.
Geotechnical&Structural Consulting
21859 State Road 54, Lutz, Florida 33548
visual evidence of new or continued settlement activity at this location at this time. This
documentation is limited to the underpinning piers installation only and not intended to
deal with problem behind the limits of this remediation. Our opinion is based on a
reasonable professional probability from similar conditions and similar locations. In
addition,it is not intended to remediate soil conditions that may or may not exist at the site
such as buried debris, organic matter, or improper foundation design or embedment. No
structural analysis has been performed to determine the structural integrity of covered
structural members. SGT does not imply any warranty to the effectiveness of work
performed nor should any be implied,but only accuracy of the information reported'herein.
We cannot be responsible for unforeseen soil shifts, movements, or building cracking that
may result as part of implementing this stabilization process.
LIMITATIONS
This report and information contained herein was,prepared for the specific and exclusive
use of Titan Foundation Repair Specialist. Any other use of this report or parts,of this
report shall be authorized in writing by Sinkhole Geotech,Inc.
The reproduction of any portion.of this report in plans or other engineering documents
supplied to parties other than the client or assigned parties must bear .the language
indicating that the information contained in the report is for general information only, and
that neither the Client nor SGT are liable to such parties.-
Respectfully Submitted,
SINKHOLE CMOTKCH, INC.
i
i
Ahmed Said.,Ph.D.
Principal Engineering Consultant
Florida P.E. #70901
August 7,2018
i
i
Southeast Property Acquisitions Property
Project No.:SGT-F1808-9130
Page 3 of 3
Appendix
A.As-built Plan
J
B. Underpinning Logs
C. Site Photos
� 1
ASSUMED LAADS man 7pammm
Dsr IINYN
Vertw LOG"ddlJt) D d L WKI FMCORMOWNMR: SOUTHEAST PROPERTY
ALL LLC CONSTRUCTIONBU UC710N DAIS COMPLY ALL STATE
RoarxQtaue ddU 3D <0 n/a LaA��FLOFU AACCEau®m�mR
Grade Haw plP 80 n/a No Amcor TSlNFNEAOORVODLOW SUMOMCOWIRL=MT"ERTANDAFWUECKLWAL
Va8 pit 531 nla No JEPTnalnte,FLTOSQ CODE.THESTAIDIUDPUIU®DCOOPTE
Ca
ppt(P U3 n/a Ufa OCCLWAnmuuu aEnuDMftl"A=.kFPAAwne
Ga Eltdt plf 99 n/a n/a LEOALT UEADOYAOOESTATES CURRJORRYATIAPTEDSTANINUDRIRIDINUMMIL'
PBI5PGIwU TtT . CONRUICTORM"Ft MALLDFDDSFRMTE
ORURIP0I174 PROJECT WEABREOWDWTDMAM1Ux ASMEALD
tTATNiANV mtK ti O1W oEto.eb IOd10+C • ORAL CWDIIA VERIFY ALLO/MOIR
to ,r,�W e�,��„�. � {AIO WB BWitCFAYLY RESOERfgL AND EXISTINGCONDITINNSPWORTOARDDIRING
yu!"I LT. 1Bn CONF"UPCTML
®33R116 GROUND SKALL DE PROTECTED D W @D
CONSTIBICRDl1 THECONTRACTOR6RALLCIEMIAFTER
CONSTRUCTION AND RP JUMAR WWAG®ASA
I RTOF/E160101ARCL aFTIEVIUM
• MMCOLRRICIORBNA4SMMALOPENWOUNOM -
CONSTRUCRONATTTlEIDOFPACNW MQWDAY.
CONIRIGTORUIOIRDIIAtE GENERAL LIABILITY
6MURARCE
CONDITIONS
TWC11 ASINSUFNCIENTBTYFL NTESIAB
AIDlOROTHERBIRUCTUDALCONORIONB W1YUE
OMCOVERED AF MRWG;tK COYRCRCES THAT WY NOT
BEVMZ EPWOINTOCORUENCFDEIfOFTYDRKOREVEN
DURNOTHEV DRK1FS00000NMWNSAIEFOUND.
eomRACTwt WTLL mlEDumr xAIT NAItRA1D
tF.DUA T ECOUATDIORTIESITEERr"JUI.
D,DURESMCONmnOM ;MKNCOUNPEPATR
uraroREBEn+camlTlaaARecxcowTFFtZDTNAr
P19 P18 P17 P16 P15 P14 P13 CMTZAR OBSTRUCTION FORUM CONTR""°'°TTE
CDUTRRCURIWILLBDDP rKEWORKANDNOMTIE
ORRAix ANDOR TIE TOTE ETMM OF UJCN CaamNL
CONTRAC=V LOMCKFORDarFSTKVATFNIFAKS
BEFOREANDAFMTEFOINJDIgTONMA RnUORAY.
ANY PLUURSNOLEAKIS FUDD WLLRUDM=TELY
REPOATEDTO TIE DV MM ANMM THE MTE E:iDWJEER.
PRESSURE PIER BRACKET DETALLW CDNRaLCTORWARRAxTBiHAstHevolaAw
P20 4
INTHEN TURF FSUCHIFTWANOFGffiRIALB.ALL
D Rretar'�D P12 IKTIEKILTUREOFSUO1tEDAS FATEDI RIMaALL
Sk"B"FrnfnIDuPUO Dote WOIIXACTORN OSTOL ATEALEDIIQOlt
By11ByeY.. .TflIe.IDRe . WATECONTR SEDER,MI TDlAL.TELE HIDNEAB9eAlMD
Fv DdG UdDTTJRRotIND SAId7D/Q NMGATM L"I BAROtOCAT.TFIEPN EMOF
RfB W TION IINFD AIUIIID TKE PEIYETBI O%IE
P21 . woiamFDSUmOLSTABaaATroxPROPOSALIS
Pil BABEDDNaURC[IDn'EOUESTMDTHE"tMOM
BUDGET.SRDMOLEGEDTECR NC,WOLACTASA TNAD
I PARTYUdrtORONIENMFCWMUWTDDOW�.
COLDIRU ANDRECORDALL FIFIDDATA.INECAIEDTTE
I� RESPOIBIMEFDRVIFORESEENSOB.SIFT$
P22 MOVEMENTS,ORBURDUO CRACKIYOTHATRAYRESULT
SME PN87.Y RESMUCE P1O ABPARTOFEOYUKNTTROTILWTI ERESKNTiiDCEEEI
rLRDGIaEGEDTEcx.ncexAuxotaeRETRousIE
6S1itlLL4f'd�E A OEBOCD AT
uv a<oe.�.... mc"^®+mvei+raroue�maowaOnP•>i•uuKO.a��.ru.o`Aw:no.iva.��roaon�®w�av`omn."uxan�a.nn.wR REPRUCONST
0 10M.IOU
UNDEFtAWWTKATTKECON"MCMR YW WP 1NTB
THATTIPIDANT)U SAIMF
DEECf$ADDRnUP7OFLO@AtLOMCO8J9
P23 INEDINO IS,THML PROPOSED PLAN OT OTP9 WITH
ARTDEEP
ITMO CONDITIONS
THAT
EO
DM
OR
Jf w,ubesae.aaam�Om�m�. RTinACEx K @1
lEPLA EASTAT7IE RTIBDEDTO�A
TFORAeoMFAenoxaRDDIvroPJDTR+Ax
P24
® f
P8 I MA IrRF.n.. DFr
P25
AP3 P4 P P6
ro
SnaHOLE GFA' M
QA+1.oti
MM ATA
® LEGEND:
1O1tlmOm®„��"" ��,�• �•� P21 a INDItOrCATES ESANDU NwEER� mfLLlt ft000i Ri7M81
1. FLOOR PLAN IAYWTIBAPPRO%MATE
...�..m,�„� 7. PIERS AND/OR OTTER INSTALLATION R s Jh1 Aw ONE
we�!�ia�ial LOCATIONS ARE APPROJWATE AND MAY wy
uvommo1aene.vm REOUOtEADNSTMENTNTIEFELD.AS /
AEQUIREDBY THE ENcc�R N•Y 1OF1
UNDERPINNING LAYOUT 3 PIERS LRDFA WVAXNVSMOOR WILL BE
CONVERTED FOGROU'OTRY At.WSAx.PPMW1
.y„ c:..z.ar.. Sa`". `ncacvAtyc'-4.:+v Y�..�,..v,.nY_.vna... •n�sr..#,rn..✓.".'2•r..s_rY..:__.�. ......G:1art._.,._:•..rsv�: ..w.i>...•cs.:. .rr.s+- :...R,_.#r _c_--v;.'Cx:...e.r_.r.LKwa arzr. ..r..rr•.., 1 -
r
-
•
5
C
.i•�r
:
5 F -
" 5
it f��^ •; .i `1� l:; - ��
(
, d I
1
T #� �� �is• r i
9•�'zct..a.-,Ye-•'+�Z.+eck�:tes.nt!.�uY9.wc..�+R'�4::•r�Lx,v:.,rfi.^-aa+aar•rzs:.3`.:ic c�-w^s:.YYu•C:<Y�.3r..•`-::w.e.9n`.-4in.y.-..�:�Je.nq•.v:n._1c. a.a_-e.a _.,+. -te_, -...a_r.r.. <.._lc.:�1-.-=-.
r —I rn Ct C1 U7 Ui Ut A A A w w w W N N N N N N to O W ^�,
rn Q C1 W O V A I- 00 Ut N w m W O V .p F+ w w N cp �
r W N N N N
i . V U7 " O
(V 00000
r —I C11 (n C1 0 0 A A A W W W W N N N N F-A F-A �O m W --
DO W O V A F 00 UI N t0 01 W O U1 P W 00 U7 N
^
c
_m O M N
O
0.
r -i C1 C1 Cn N In w A A .A W W W w N N N I- Q1 W
Z p Im w O `►I P I-A w w N w 0 w o V -Pb F-A 00 O N m T
r V = sn
r O O V ~ O Ri
'p
00000 W
� O N
i
i
r -► 01 C1 C1 V7 U7 Ut A A A W W W W N N N Fi I-•► F-a l0 0 w
Z p C1 W O V A I-+ mw N w m W O V dP N 00 In N m - _
rr
= r Z p;
fD
� A O Ln R1
v � H •A
00 N
r - O1 C1 C1 W w w A A A W w W W N N N 14 F-+ F-A
m D M W O V A N 00 ut N tp Vt W O V A FA V Ln N �p
rM
-
C
0 0 0 �
ti T
p . N ` 0 0 0 0 0 0 0 v m 'w
r -i C1 01 Q1 V7 l!1 w A A A W W W W N N N F-� F-W I-+ w C1 W n
Z p (n W O V A I+ 00 U7 fV lD C1 w O V A I-A 00 U7 N rt T �.
,Y
CD co pp V H
co
O O O 0 0 0 0 �• O
QT co \ O „' _
p oo y1
Southeast Property Acquisitions Property
PIER#7 PIER#8 PIER#9 PIER#10 PIER#12 PIER#12
DEPTH PRESS. DEPTH PRESS. DEPTH PRESS. DEPTH PRESS. DEPTH PRESS. DEPTH PRESS.
(feet) (psi) (feet) (psi) (feet) (psi) (feet) (psi) (feet) (psi) (feet) (psi)
3 3 600 3 600 3 600 3 500 3 400
6 6 1000 6 1000 6 1200 6 1000 6 600
9 9 1500 9 1000 9 1000 9 1200 9 1200
12 12 2000 12 1500 12 3400 12 1400 12 1400 '
15 15 3400 15 1800 15 15 3400 15 2400
18 18 18 2200 18 17 18 3400
21 21 21 21 21 21
24 24 23 24 24 24
27 27 27 27 27 27
30 30 30 30 30 30
33 33 33 33 33 33 ,
36 36 36 36 35 36
39 39 39 38 39 39
42 42 42 42 42 42
45 45 45 45 45 45
48 48 48 48 48 48
51 51 51 51 51 51
54 54 54 54 54 54
57 57 57 57 57 57
60 60 60 60 60 60
63 Eliminated 63 63 63 63 63
66 dueto 66 66 66 66 66
obstruction Lift 1/8" Lift 1/8" Lift 1/8" Lift 1/8" Lift 1/8"
TOTAL TOTAL 151 TOTAL 17F TOTAL 131
TOTAL 13' TOTAL 16"
LENGTH LENGTH LENGTH LENGTH LENGTH LENGTH
Sinkhole Geotech,Inc.
Project No.: SGT-F1808-9130
Page b2 of b5
i
i
r -I Cl) Ol 0) y tf1 to A A P w W w W N N N 1-4 F-+ 1-► to 01 w y,
m Q (MW O V A 1-4 00 to N w m W 0 -1 A 1-► w to N (p
cl > r►
2 r = V -
m
r W N N N N F-4 N N 1-& 1-4 1-► 1-+ W Ln ^
V V O A O In to O 01 to to N O 0 V
m
FA
Vf
m -
Q M W o V A 1-, W lJ 1 N t0 m w o V A 1-+ w w N
z -I M m
'O
m
W 1-A N 1-+ 1-A 1-b t0 U1 ^ #
A t0 W 00 w 1-% b 0 0 V N
N 000000000 = :* -
�" y
00 y
0 w w A A A W W W w N N N I-A i-& 1-A w O w ^
m D O W 0 V A 1-4 W lJ1 N W O W O V A 1-L W W N -
r+
2 r = 'b
m
f W N 1-► I--� 1-A 1-A 1-A � ---
W wp w m w W O o o N
0 0 0 0 0 0
Ln
00 PA
r -I M 0n m to w 0 A A A W W W W N N N w m W �
m D 0) w O V A F-+ 00 In N w m w O V A 1-A w w N F
m
�0
I� W F.- F+ F+ t0 . N
NN
r -i 01 01 M In 0 to A A A W W W W N N N -
m Q 01 w O V A W to N w to w O V A F-* V w N
Gl D r* m
V C
2 2 V
m
r w N N N 1-► 1-� F+ ^ �
W
N00 0 0 00 CD
z y
0 r -4 M 0) M U1 to U1 A A A W W W W N N N 1-& W O1 W y, n
Cn I m Q 0W O V .P 1-� W Ln N W MW O V A 00 to N ro m ,p
'L7 n = _ V
m o
cm F-� O m O
c� 00 rt � y
cr O �9 W N 1-& N N FA F+ 00 Ln N .d
0 b LLL
00000C)00C) � A a
tfl � o000000 N
i!i O A
Southeast Property Acquisitions Property
Inside PIER US
DEPTH PRESS.
(feet) (psi)
3 500
6 1000
9 1500
12 2000
15 2000
18 2000
21 3400
24
27
30
33
36
39
42
45
48
51
54
57
60
63
66 -
Lift 1/8"
TOTAL 211
LENGTH
Sinkhole Geotech,Inc.
Project No.: SGT-F1808-9130
-Page b5 of b5
Southeast Property Acquisitions Property
Yl
i
Sinkhole Geotech,Inc.
Project No.: SGT-F1808-9130
Page G1 of c4
7
i
:
^
r
L
CIA
WOE
ova. <-
• _ rF..
- J,~ � •.t ter'•
- Y
Southeast Property Acquisitions Property
t _
fi(
wrz
4
1.
Sinkhole Geotech,Inc.
Project No.:SGT-F1808-9130
Page c2 of c4
'i
,.
Southeast Property Acquisitions Property
•ryf� ,ci i ���1,`r,
arv� J.
J4
- LY ,p.� y •.�v.. ��3V
V $r7
G'
1
J Sinkhole Geotech,Inc.
Project No.: SGT-F1808-9130
Page c3 of c4
Y i
l
low
Win
list -
�,.r.`- 'gym• rc�•,. y�x'.-� '�f�k�. � �-.,
l �
Southeast Property Acquisitions Property
i
>m P'
- � 4eyg f.. •
<s�
I
Sinkhole Geotech,Inc.
Project No.: SGT-F1808-9130
Page 0 of c4
e!
MU
IV, wou
_ - � Rid+ -'.'1��' •i4� _ -V.yv.' -
.. Y. .. NY
60
i 'tie-•''�'•-''' tt.:.1 -
1. ,� ._fir•-
I I