Loading...
HomeMy WebLinkAbout18-20185 I CITY OF ZEPHYRHILL.' 5335-8TH STREET (813)780-0 Q20 -- 20185 BUILDING PERMIT - PERMIT JNFORMATION�- LOCATION INFORMATION Permit Number: 20185 Address: MIS SEE DESCRIPTION 6TH AVE SOUT Permit Type: MISC ZEPHYRHILLS, FL. Class of Work: RIGHT-OF-WAY Township: Range: Book: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Square Feet: Subdivision: CITY OF ZEPHYRHILLS Est. Value: Parcel Number: 07-26-22-0000-00400-0000 Improv. Cost: OWNER INFORMATION Date Issued: 8/28/2018 Name: CITY OF ZEPHYRHILLS Total Fees: Address: 5335 8TH ST Amount Paid: ZEPHYRHILLS FL 33542 Date Paid: Phone: Work Desc: MIS SEE DESCRIPTION 6TH AVE/SOUTH AVE- UTILITY WAIVED FEE CONTRACTORS APPLICATION FEES I Ins ections Required FOOTER 2ND ROUGH PLUMB MIS(; INSULATION CEILING FOOTER BOND DUCTS INSULATED SEWER MISC. ROUGH ELECTRIC LINTEL MISC MISC. 1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC. DUCTS INSTALLED WATER MISC DRIVEWAY PRE-SLAB SHEATHING MISC. MISC. CONSTRUCTION POLE FRAME MISC. MISC. REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PERMIT OFFI R PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER -CITY OFT EN1Y'= ILLS Iltilitie:S Department . .... . City 5335 Eighth Street Zephyrhills,;Florida 33542-4312 " (813) 780'0008.!k Fax.(813) 780'0613. - January"16, 2018 GENE WHri'FIELD Mayor CITY COLNI CIL Shane LeBlanc:and/or Bill Burgess, W.ALAN KNIGHT.. Councii.Presideiit ..The City.ofZephyrhills has.contracted.with Jones Edmunds and Associates,Inc... for"professional design:services for 17.000 feet of wastewater:force main-and two ... wastewater lift stations. Proposed Construction is it!Pasco County Right-of-Way, •LANCE A.SMITH_. : . :• . . p. .... . . Y. ice President City o .Zephyrhills_Right�of=Way, and,parcels•owned by,the.City.Expect. ..... "construction to:begin:in the first quarter o f 2018. Respectfully, we request a-warier KLNNETH M."BURGESS, .. : .... JR. of permit fees for the following.pro posed improvements: CHARLES.E.:PROCTOR Improverrients.in Pasco County Right-of-Way: 7,5.00.feet of wastewater.: force main and driveway:access to Lift Station No. 69 at"County Road 54. :. KENNETH V.:COMPTOT llnprovements.on parcels owned by the City of Ze h" hills: 7,000;feet of.- P."Yt wastewater force inain :Lift Station No. 68, and Lift Station"N6:69. STEVEN-F.SPINA C. Manager". .- . Improvements in City of Zcphyrhills Right-of=Way: 1500 feet of .... wastewater force main and driveway:access'to Lift Station-No. 68 at South LORI I;:HILLMAi`' Avenue. :" . ..... ... City Clerk;:CMC If you have;any questions:or"comments, please feel free to contact me at(813) MATTIIEw E.MAOGARI� '7$0_0008"or email jbostic(ci�6i.zeLliyrhills.fl.us. City Attorney Sincer 1 ...ohn:Bostic III,:Utilities Director City of Ze h Bills P Yr .' PERMIT APPLICATION t.. DRIVEWAY PERMIT APPLICATION CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY All information must be filled-in completely City of Zephyrhills 5335 8"'Street,Zephyrhills, FL 33542 Telephone 813.780.0000 Fax 813.780.0005 Dafbe of.aippli ' cation:' Y ProceSsed:Bye : Permit# - - - _ t9rar aim foi,staff Ilse only}, _ t,.: C a:PiiblicW(3Gopy:to Hold"ing.Depart?fient:,t'.',..`,'' opY_.... . or9cs D PROJECT JOB SITE: PROPERTY OWNER Address: 39421 South Avenue Ze h rhills, FL Name: US GOVERNMENT Unit#: Address: General Services Adm . .Unit: Parcel Identification Number:07-26-22-0000-00300-0010 City_, State Zip Washington, DC 20405-0001 ! Phone: N/A Fax: N/A CONTRACTOR: To Be Determined Through Public Bid Process Company: —_.....__..._ Name: Contractor's License #:. E-Mail: Phone: Cell: Fax: ARCHITECT/ENGINEER: Name: Udeni T.,Rosario Firm Name: Jones Edmunds&Associates, Inc. Address: 730 NE Waldo Road City: Gainesville State: FL Zip: 32641 State License #: 68327 Phone: 352-377-5821 Cell: Fax: 352-377-3166 Description of Proiect Refer to attached Drawings. TYPE OF DRIVEWAY 55 feet LENGTH OF DRIVEWAY CULVERTS NEEDED RESIDENTIAL DRIVEWAY 12 feet WIDTH OF DRIVEWAY (X)REINFORCED CONCRETE COMMERCIAL DRIVEWAY R.O.W. EXCAVATION ( )CORRUGATED MATERIAL X PUBLIC ACCESS DRIVEWAY 36 inchesDEPTH 55 feet LINEAR FEET ( }BOX CULVERT (Approximate depth including culvert) ( }OTHER(EXPLAIN) CONSTRUCTION MATERIAL CURB CUT REQUIRED --X—ASPHALT YES X NO CONCRETE HEADWALL REOUIRED? YES _X_No d NOTICE TO APPLICANT: If actual work exceeds scope of this description,additional permits or drawings will be required. UTILITY LOCATIONS REQUIRED: CALL BEFORE YOU DIG: 1.800.432.4770 i Page I, of 3 ,i PERMIT APPLICATION UTILITIES LOCATE CONFIRMATION NUMBER. Sunshine 811 Design Ticket 240702605 PROVIDE SKETCH IN THIS AREA, IF ADDITIONAL SPACE IS REQUIRED,ATTACH TO THIS APPLICATION. Refer to attached Drawings. AFFIDAVIT: Application is hereby made to obtain a permit to do work and installations as indicated. I certify that all foregoing information is accurate and that all work will comply with all applicable codes. I understand these codes shall take precedence over all approved construction documents,and issuance of this permit is verification that I will notify the property owner of Florida Lien Law req.,F.S.713. i The issuance of this permit does not ensure compliance with deed restrictions and I understand that additional deed 1 restrictions may apply to this property. All work shall comply with the current Florida Building Code, Public Works Design Manual and FDOT Design Standards(if applicable). (Public works Design Manual online link: www.cl.zephyrhills.fl.us/public�_worksasp) APPLICATION IS VOID UNLESS SIGNED WITH PROPER IDENTIFICATION AND WITNESSED BY A PERMIT TECHNICIAN OR NOTARY PUBLIC. NOTE: The City of Zephyrhills is not responsible for maintenance or repairs of driveways. Driveways shall not alter/ interfere with existing stormwater treatment and/or conveyance. PROPERTY W y signing this application: I certify that I have read and understand the owner/builder disclosure statement. (please initial) John Bostic III.City ofZephyrhiils Utilities Director Applicant Print Name App' nt Signature Date Permit Technician Signature (or)Notary Signature Date Applicant is( ) personally known to me or produced as Identification. (type of identification) Page 2 of 3 PERMIT APPLICATION OFFICE USE ONLY PUBLIC;WQRKS USE ONLY, Concrete (min. 6'D Y N Asphalt Base (min. 6') Y N Asphalt(min. 1 1I7') Y N Length (min. 191 Y N Width (10'min—20'max) rY ' N Existing sidewalk. Y N New sidewalk. Y N ADA compliant. Y N U E} Expansion material required. Y N iv Contiguous parking pad. Y N t; Triangular flare(3W x 71) Y Visibility triangle o.k.? Y N Side set back(3'min. it.O.W.) Y N Plan Review Fee AdditionAl ttescri`#ian of work as defined PubLjc Works Director and cr desi ee: Permit application approved by: .2 3 I-4A)I Page 3 of 3 j i 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date'Received Phone Contact for Permitting. — Owner's Name Owner Phone Number Owner's Address Owner Phone Number Fee Simple;Titleholder Name Owner Phone Number Fee Simple,Titleholder Address JOB ADDRESS LOT# SUBDIVISION PARCEL ID# y (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED R NEW CONSTR e ADD/ALT = SIGN 0 = DEMOLISH 4 INSTALL REPAIR PROPOSED USE = SFR = COMM = OTHER TYPE OF.CONSTRUCTION D,t BLOCK = FRAME STEEL = I: w DESCRIPTION-OF WORK d ' I; BUILDING SIZE SQ FOOTAGE HEIGHT =B,UILDING $ VALUATION OF TOTAL CONSTRUCTION f =ELECTRICAL $. AMP SERVICE = PROGRESS ENERGY = W.R.E.C. 1 =PLUMBING $ =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION i =G AS = ROOFING = SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO i , OMPANY l� I c,BUILDER Nc SIGNATURE Y/'N FEE CURREN Y/N Address License# f - C 'ELECTRICIAN COMPANY SIGNATURE REGISTERED '/,N FEE CURREN i' Addri�'ss License# PLUMBER, I I COMPANY SIGNATURE REGISTERED Y/-'N•,' ; FEE"CURREN Y/N ' Address License it MECHANICAL COMPANY- SIGNATURE,,, REGISTERED Y./,N' FEE CURREN i. Address License# OTHER COMPANY SIGNATURE REGISTERED Y./ N FEE CURRE� Y/N Address License# . RESIDENTIAL Atfaoh_(2)Flot Plans;'(2)sets.of Building Plans,,(1.)set,of Energy,Forms;R=O,-W-Peftit.for,new..constmction, . Minimum ten(10)'working days after submittal`date. Required onsite,Construction Plans;Stormwatet Plans,w/Silt Fence installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life..Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(,10)working days after.submittal date. Required onsite,Construction Plans,Stormwater Plans w/•Silt Fence installed, Sanitary.Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of.Engineered Plans.' ""PROPERTY.SURVEY required for all NEW construction: Di�ectioris: :Fill.out application completely. Owner&Contractor sign,back of application,notarized If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500) " Agent:(for"the contractor),or Power of Attomey(for the owner)would be someone with notarized letter from owner authorizing same 'OVER THE:COUNTER PERMITTING .. (copy-of contract required) Reroofs'if shingles Sewers Service,Upgrades A/C ' Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW ('y NOTICE OF DEED RESTRICTIONS: Th:;.undersigned understands that this permit may be subject to"deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any ..• . applicable deed,restrictions. UNLICENSED CONTRACTORS_AND CONTRACTOR RESPONSIBILITIES: If the owner has`hired a contractor or contractors to undertake work, they may be'required'to be licensed in accordance with"state-and-local regulations: If-the contractor is not licensed as required-by law,_ both the owner and contractor may"be cited fora misdemeanor violation under state law. If the owner or intended contractor-are uncertain as-to.-what licensing.requirements::may.apply for'the intended work, they are advised to contact the Pasco County Building Inspection Division=Licensing.Section at 727-847- 8009. Furthermore, if the owner has hired-b contractor or, contractors,. he. is.advised to. have the cohtractor(s)•`sign portions of the "contractor Block" of-this-application for-which they,will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco .. County. TRANSPORTATION IMPACT/UTILITIES,IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees andRecourse.Recovery'Fe-es may apply to-th'e.cortstruction of new buildings, change-of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89707,and 90-07, as amended. The undersigns-&also understands, that such fees, as may be-due; Will-be identified at the time_"of permitting. It is further understood that Transportation Impact Fees and Resource,Recovery Fees must be paid pr'ior.to receiving a "certificate of'-occupancy" or final power release! If the:project does not involve a�certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be-paid prior to permit issuance in accordance with applicable Pasco County ordinances. ° CONSTRUCTION LIEN.LAW(Chapter.713, Florida Statutes, as amended):,, If valuation of work.is$2,500;00 or more, I- ' certify-that I, 'the applicant; have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone i other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT:' I"certifythat,all•the information in this"application-is accurate and that al[work will be done in compliance with all applicable laws..,regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work"and"installation as indicated. 1 certify that no work or installation has commenced prior to issuance of..,a,permit and-that all work will_be-performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also ? certify that I understand that the regulations of other government agencies may-apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies; include but are not limited to-! - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and-Environmentally Sensitive Lands,WaterM/astewater Treatment: - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls, Docks,`Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agericy=Asbestos abatement. j Federal Aviation Authority-Runways. - ---- I understand that thefollowing restrictions applytq-the use of fill: Use of fill is not.allowed in'Flood Zone"V" unless expressly permitted. i If the fill material is to:.be:,used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will-be.submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material-,-:is.-to be used-in-,Flood Zone."A"..in. connection with a permitted building using stem wall construction, I certify.thatfrll will`be-used only'to fill the_area-within the stem wall. If fill material is to be used .in any area, I certify that use of such fill will not adversely affect adjacent properties. If use'of'fill is-found-to adversely affect adjacent properties, the owner may be.cited for violating the conditions of the building permit issued under4the attached permit application, for lots less than one (1) acre which are elevated,byffrll�an engineered drainage;plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate,permit may be required for electrical work, plumbing; signs, wells, pools, "air conditioning, gas, or other 'installations not specifically included in the application. A permit issued shall be construed to be a license to proceedwith=the work and not as authority to violate, cancel, alter;or set aside any provisions-of the technical codes, nor'-hall issuance of a permit prevent the Building Official from thereafter i requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorizedsby j the permit is suspended or abandoned for a period of six(6)months after the time the work is}commenced. An extension j may be requested, in writing, from the,Building Official.for a-period not:to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If-work ceases for ninety(90)consecutive days,the job is considered abandoned: ` 4 WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR'IMPROVEMENTS'TO.YOUR'PROPERTY.'IF'YOU INTEND'TO OBTAIN FINANCING, CONSULT WITH.YOUR LENDER OR AN ATTORNEY.BEF ORE RECORDING YOUR,NOTICE'00 COMMENCEMENT. FLORIDA JURAT(F.S.117.03) - OWNER OR AGENT CONTRACTOR Subscribed and sworn to(or affirmed)before me this Subscribed and o to rmed)beforpjne this by Who Is/are personally known to me or hasthave produced Who is/are ovally known tome orhas/have Oroduced as identification. as.identification. Notary Public Notary Public Commission No. Commission No. Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped f ' BUILDING DEPARTMENT ' CITY t7F ZEPI'IYRI'IILLS- R'TtVIEttt k 8 RIGHT-OF-WAY.USE PERMIT PERMIT# DATE:. G t� Noxonstruction under'round or above ground of any facility shall be accomplished on any.City Rights of Way without written approval from the 'City Building Department.Any application for approval-of construction operations on any:City owned Rights of Way shall furnish;n detailed drawing 'showing the complete scope ot'the proposed work in triplicate to the office of the Building.Offcial for:approval prior to the commencement of"any work.A copy of this permit is to be k6fit'readily available at the site of the workot all:times. PARCEL I.D.4 07 26-22 D000-00400-00001see Location below) CITY ROAD 6111:Avenue,South Avenue DATE 1/18/18 I.00ATIOh(Legal Description).: The pro'ect is located in the vicinity of Zevvrhills Municipal Airport.: Addifsonat parcels::18-26-22-0010-00700-0001),18-26-22-00=0A00-0000,18 26.22-0420 00000-0000,16-26 22-0020=00000-001A, 1 B-26-22-0010-05800-0000,.i 8-26-22-00.10-05500-0000;.13-26-21-0000.00100-0000,. Permission is hereby granted to John:Bostic III,.Wifties Director.... .....of Cityof:2ephyrhiils... for the construction and maintenance of- INrich and 12-inch diameter force main and Lift Station 68. subject to the following conditions: 1. The construction and saintenance of such:atility shall not interfere with the property and rights of it prior occupant. 2. All work-shall be done,in keeping with the standards of,,the City Streets Department and under the supervision of the Ciy Building Official"who will be notified at least one day prior to commencement of construction. 3. All materials and equipment shall be subject to inspection by the City Building Official. 4. During construction all safety regulations ofthe,Departnent of Transportation shall.be observed and:the.City shall,be relieved of:nll responsibility:from ilamage;of any nature:arising from this permit.Subject to the same terms and conditions,the permit holder may take such safety. measures,including placing and display of caution signs;as it may deem necessary in conduct of construction and.maintenance work hereunder. it is.the responsibility p o?o0 of.i a ermittee.to.... - S.. All private and all City.properly shall be.restored:ta its.original condition as far as practical in:the opinion of theCI icing Bui G.: All underground crossing installations shall be laid at such depth its may be specified by the-City Building'Official. 7. The sketch covering fhe details of this installation shall be made'n part of this,permit.This permit is granted with the understanding that the applicant has,notified all other utility users.in the area covered by the permit and takes•full responsibility for any damage incurred by priur installations as a.. result of his operations in order that they may safe guard their interests. S. It:is expressly stipulated that this permit is alicense for permissive use only and that the placing of facilities upon imblie property.pursuant to this permit shall not operate:to-create or to vest any property right in said.holder. 9.: Whenever the City decides to further exploit the City Rights of Way,any or all said poles,wires,pipes,cables,or other facilities and appurtenances authorized hereunder,shall be immediately removed from said Rights of Way,or reset or relocated thereon as required by the City Building Official:at the expense.of the holder of this permit.: 10.The,holder shall save and keep iho City harmless fram'any and all damages,claims;or in juries that may occur by reason of the construction; maintenance,and operation ofsaid facility. I I.:The holder shall complete the requested work within .. .... days:or.this permit:shelFbecome.null-and vaid..In,the event the work requested is not completed upon the expiration date of this it,the Cify shalt have the right to complete such work and to charge the holder of the permit for all costs_incurred in completing said work: 12.The holder shall post a-cash or surety bond with the City Manager in the sum of$ : dollars to guarantee performance of the obligations herein,and,to.guarantee,niaintenance;of,the right-of-way described herein for a.perigd of one(4 year following completion of the requested installation.In the event a surety bond is posted,the surety bond shall be made'papable to the City and shall obligate the surety to hold the City harmless in the event the holder of this permit should fail to meet any of its obligations hereunder.The bond shall also indemnify the City for all court'etssts and reasonable attorneys fees in the event legal action is required to collect on said bond. SIIBAIITTED.BY:. �tt � � - Perm' ee)John Bo ' "ties.Director Signature&Title Address' 5335 8th feet, Zephyrh1ft,FL 33542-4312 APPR6'tb BY: CITY:OFZEPIIYRIIILLS wilding OIIi al _- Utilities Supervisor::: Date: biic Works �� SFi:' DOT it)bp( 30-t C�t"rrA6 4 b �� " �te: at,: hlaaager Pfk rvttitrf �. : .- .. ... .. DiJ AvC Jacqueline Boges From: John Bostic Sent: Friday,August 24, 2018 12:22 PM To: Jacqueline Boges Subject: RE: plans holding since 1/2018 They are currently constructing the project John Bostic III, Utilities Director City of Zephyrhills 5335 8th Street Zephyrhills, FL 33542-4312 Office- 813-780-0008 Fax - 813-780-0613 Cell - 813-778-1018 NEW CELL# Email -jbosticnci.zephyrhills.fl.us f' F PLEASE NOTE. Florida has a very broad public records law. Electronic communications regarding most City of Zephyrhills business are public records and available upon request. Your e-mail communications may therefore be subject to public disclosure.If you received this message in error,please do not read,forward,copy,.etc. and delete immediately. From:Jacqueline Boges Sent: Friday,August 24, 201812:20 PM To:John Bostic<JBostic@ci.zephyrhills.fl.us> Subject: RE: plans holding since 1/2018 In Progress meaning doing currently or will not begin until next,year. If they are doing work there is no permit issued . If they won't do until next-year we normally will not hold plans so long because of space but will place somewhere until job is started. thanks d"k e B09eS 813-780--0020 ext 3513 1 "A rule I have had for years is:to treat the Lord Jesus Christ as a personal friend. His is not a creed, a mere doctrine, but it is He Himself we have." Dwight L. Moody Florida has a very broad public records law. Electronic communications regarding most City of Zephyrhills business are public records and available upon request. Your e-mail communications may therefore be subject to public disclosure. If you received this message in error, please do not read, forward, copy, etc. and delete immediately. From:John Bostic Sent: Friday,August 24, 2018 11:23 AM To:Jacqueline Boges<iboges@ci.zephvrhills.fl.us> Subject: RE: plans holding since 1/2018 The project is currently in progress and isn't scheduled to be complete until 15t quarter of next year. John Bostic III, Utilities Director City of Zephyrhills 5335 8th Street Zephyrhills, FL 33542-4312 Office - 813-780-0008 Fax - 813-780-0613 Cell - 813-778-1018 NEW CELL# Email -jbosticgci.zephyrhills.fl.us A r mod. PLEASE NOTE: Florida bas a very broad public records law. Electronic communications regarding most City of Zephyrhills business are public records and available upon request. Your e-mail communications may therefore be subject to public disclosure.If you received this message in error,please do not read,forward,copy,etc. and delete immediately. From:Jacqueline Boges Sent: Friday,August 24, 2018 10:06 AM To:John Bostic<JBostic@ci.zephvrhills.fl.us> Subject: plans holding since 1/2018 Hello John, Bill asked me to get with you about some plans for a new lift station for the airport .See attached memo sent by you. Could you let me know where you are at with this project... normally I can only hold plans in office for 6 months. Thank you John 2 _p S claekle BegeS ;'f - 8>3-780-0020 ext 351(3 "A rule I have had for years is:to treat the Lord Jesus Christ as a personal friend. His is not a creed, a mere doctrine, but it is He Himself we have."Dwight L. Moody Florida has a very broad public records law. Electronic communications regarding most City of Zephyrhills business are public records and available upon request. Your e-mail communications may therefore be subject to public disclosure. If you received this message in error, please do not read, forward, copy, etc. and delete immediately. 3 Jacqueline Boges From: Jacqueline Boges Sent: Friday,August 24, 2018 10:06 AM To: John Bostic Subject: plans holding since 1/2018 Attachments: If.pdf Hello John, Bill asked me to get with you about some plans for a new lift station for the airport .See attached memo sent by you. Could you let me know where you are at with this project... normally I can only hold plans in office for 6 months. Thank you John Im v� daelele Boges 813-780-0020 ext JAM "A rule I have had for years is:to treat the Lord Jesus Christ as a personal friend. His is not a creed,a mere doctrine, but it is He Himself we have." Dwight L. Moody Florida has a very broad public records law. Electronic communications regarding most City of Zephyrhills business are public records and available upon request. Your e-mail communications may therefore be subject to public disclosure. If you received this message in error, please do not read, forward, copy, etc. and delete immediately. r. Utilities.Department . `Czty of Pine Water" 5335 Eighth Street O:Zephyrhills,:Florida 33542-4312 . 813 780-0008.-Fax-(813) 780-'0613 January 16, 2018 GENB WHITFIELD Mayor cri-Yc6uNcIL Shane LeBlanc.and/orBill Burgess, : :W.ALAN KNIGHT. . Council"President The City.of Zephyrhills has contracted.with Jones Edmunds and Associates,Inc.. for professional:design'services for 1:7;000 feet of wastewater force main:' nd two wastewater lift stations. Pro osed Construction Is irz:Paseo Count Ri :t of-Way, LANCE A.SMITH.. : . : p. . . . Vice President City,of.Zephyrhilis.Right�of Way, and.parcels owned by the.City.Expect.. construction to begin in the f rst quarter of 2018. Respectfully, we request a bier KI NNETH IVI:BURGESS, of permit fees for the following-proposed improvements: " 71t. CHARLES-E.:PROCTOR Improvements in Pasco County Right-of-Way:.7,5.00 feet of wastewater:.. orcc main and driveway:access to Lilt Station No. 69 at-Count y Road 54. KENNETH V.:COMPTON Improvements on parcels owned by the City of Zephyrhills: 7,000:feet of wastewater force main;Lift Station No, 68- and Lift Station No 69. STEVEN F,SPINA City Manager. Improvements in City of Zephyrhills Right-of Way:-2;500 feet of wastewater force main and driveway_access'to Lift Station No.68 at South LORI L.HILLMAI`I Avenue. City Clerk;:CMC If you have,any questions.or comments,please:feel free to contact:me:at(813) - MATTHEW.E.MAGGARIS MOM or emailjbostic Qki.zephyrhillsffi.uS. City Attorney Sine.er 1 Johri.Bostic III,Utilities,Director City of Zephyrhills