Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19-20704
CITY OF ZEPHYRHILLS • 5335 - 8TH STREET (813) 780-0020 20704 EMERGENCY GENERATOR PERMIT .PERMIT<INFORMATION .",10CATION INFORMATION. . r Permit Number: 20704 Address: 38220 HENRY DR Permit Type: FIRE EMERG GENERATOR<30 ZEPHYRHILLS, FL. Class of Work: ELECTRICAL MISC Township: Range: Book: Proposed Use: COMMERCIAL Lot(s): Block: Section: Square Feet: Subdivision: CITY OF ZEPHYRHILLS Est. Value: Parcel Number: 02-26-21-0080-OOA00-0122 Improv. Cost: 200,000.00 OWNER INFORMATION ', ' Date Issued: 1/24/2019 Name: HCRA PROPERTIES I LLC Total Fees: 167.50 Address: 333 N SUMMIT ST Amount Paid: 167.50 TOLEDO, OH. 43604 Date Paid: 1/24/2019 Phone: (813)788-7114 Work Desc: INSTALLATION GENERATOR W/SLAB & ELECTRICAL CONTRACTORS APPLICATION FEES . CALADE I CONSTRUCTION GO FIRE PERM T FEE 100.00 ELECTRICAL FEE 77.50 VOLT AIR CONSTRUCTORS l` Ins ections Required FIRE INSTALLATION-Final ELECTRICAL FINAL FINAL Chapter 633, Florida Statutes,authorizes the City to charge and collect user fees to pay for the costs of fire prevention and protection related activities such as inspections, plan review,administrative fees,and other costs related to the aforementioned. Complete Plans, Specifications and Fee Must Accompany Application. Commencement of work without written approval of the Fire Department's Fire Marshal or required permits or opening up for commercial activity without an approved final inspection shall be charged double permit fee per day of operation or a minimum of$100.00, whichever is greater. All work shall be performed in accordance with City Codes and Ordinances. "WARNING TO OWNER: YOUR FAILURE TO RECORD.A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." ONTRAC OR SIGNATURE PERMIT OFFICER PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED ZEPHYRHILLS FIRE RESCUE - 813-780-0041 t. 813-780-0020 City of Zephyrhills Fire Fax-813-780-0021 Permit Application Date Received Phone Contact for Permit E813 1 F635 5589 Owner's Name HbP Properties, LP(per attached legal document) Owner's Phone Number [: 24E] DEI 8538 Owner's Address 7361 Calhou Place Suite 300, Rockville, MID 20866 Fee Simple Titleholder Name Titleholder Phone Number Fee Simple Titleholder Address Job Address 38220 Henry Drive,Zephyrhills, FL Lot# NIA Sub Division N/A Parcel# 080-00A00-0122 C7 Bio-Hazard Waste Storage-ANNUAL Fumigation Tent Comm Exhaust Kitchen Hood/Duct Hazardous Material(Tier 11 or RQ Facility)ANNUAL Controlled Burn Q Hood Installation rgency Generator 5-ap LP/Natural Gas-Installation :r:g:encvta�nertr LP/Natural Gas-ANNUAL Sale Fire Protection Maintenance-ANNUAL Places of Assembly-ANNUAL rQTrTY_1 ❑ r8*57mi FA_nT1 1 Other Sprinkler F-1 0 0 rl r I F7 Recreational Bum Fire Alarm 0 0 L3 Sparklers Hood Cleaning 0 0 0 Sprinkler System Installations Hood Suppression 13 0 El Standpipes(Sprinkler Sys) F� Fire Alarm Installation F-1 Torch Rooff ngrrar Kettle Fire Pumps Waste Tire Storage ANNUAL Flammable Application-ANNUAL P7 Oc, �Zo, ozl Valuation of Project 5;,4�e �ans Other: Contractor TBD/ Company 7-0.0it-5 Signature Registered L Y/N Fee Current Y/N Address License# ELECTRICIAN .TBD Company Signature Registered Y/N Fee Current Address L= License# PLUMBER I TBD Company Signature Registered L Y/N Fee Current L NJ Address License# MECHANICALI TBD Company Signature Registered N_J Fee Current L=/N Address F License# —1 OTHER Company Klmley-Horn C/O Kyle Watson Signature Owner's Agent Registered .�/N Fee Current Y J N Address [ 6-55 N Frankl!6 SfSuit 150,Tam a, FL 33602 License# 82423 Directions: Fill out application completely. Owner&Contractor sign back of application,notarized(Or,copy of signed contract with owner) If over$2500,a Notice of Commencement is required(Mechanical work over$5000) Supply two(2)sets of drawings with applicable documentation Allow 10-14 days for review after submittal date. Parcel#-obtained from Property Tax Notice(hftp://appraiser.pascogov.com) NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is$2,500.00 or more, I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner" prior to commencement. - CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions must take to be in compliance. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90) consecutive days, the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S..1117.03) OWNER OR AGEN j/G/�s�v 9 P tk' W-4 �G`� CONTRACTOR I r✓J S bsc'bed and sworn fo(or affirmed)Peford me this Subscribed and sworn to(or affirmed)before me this 3 / 26 by f<t, 1 e— &0 0,,tS OA by Who is/are personally own to me or has/have produced Who is/are personally known to me or has/have produced as identification. as identification. :"�2 de Notary Public Notary Public Commission No. FF 0/, r?92, Commission No. Vil Il i' n D. -Re adc�,K Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped VIVIAN D.REDDICK _- Commission#FF 921892 Expires September 27,2019 �i�,�`, BOnddTlWTroyFalnMuur�B003eS7019 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date Received �—� phone Contact for Permitting 813 635 — 5589 1 1 It 1 II 1 1 1 1 1 1 1 1 Owner's Name [HGP Properties,LP(per attached legal document) Owner Phone Number 240-355-8538 Owner's Address 1 7361 Calhoun Place Suite 300,Rockville,MD 20866 Owner Phone Number Fee Simple Titleholder Name I N/A Owner Phone Number Fee Simple Titleholder Address l06 ADDRESS 38220 Henry Drive,Zephyrhills,FL LOr# N/A SUBDIVISION Tyson PARCELID# 02-26-21-0080-OOA00-0122 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED e NEW CONSTR® ADD/ALT = SIGN = = DEMOLISH INSTALL REPAIR PROPOSED USE 0 SFR 0 COMM ® OTHER Home for the Aged TYPE OF CONSTRUCTION 0 BLOCK Q FRAME = STEEL [Concrete slab and block wal Provide new hurricane impact assembly,diesel generator w connected above ground diesel tank, DESCRIPTION OF WORK concrete slab and corresponding electrical equipment.Removal of existing generator and pad. BUILDING SIZE SQ FOOTAGE 225 HEIGHT =BUILDING $ 200,000 VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE = PROGRESS ENERGY = W.R.E.C. =PLUMBING $ =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION =GAS = ROOFING 0 SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA DYES NO r ER TBD COMPANYTURE REGISTERED Y/ N FEE CURREN Y/N d License# �� s� �. LECTRICIAN Tl3k)1) COMPANY SIGNATURE l REGISTERED Y/ N FEE CURREN Y/N Address License# PLUMBER COMPANY SIGNATURE N/A REGISTERED I Y/ N FEE CURREN Y/N Address F License# MECHANICAL N/A COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREN Y/N Address License# OTHER COMPANY Kimley-Horn C/O Kyle Watson SIGNATURE 6nelf Agent REGISTERED 111,YJ N FEE CURREN I Y/N Address 655 N Franklin St Suite 150,Tampa,FL 33602 License# 1 82423 1111111111111111111111111111111111111111111111111111111111111111111 RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisionstlarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a.Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stomtwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new.projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW From:Shelethia Johnson .Fax:(813)867-4899 To:8137800021Crefax.eon Fax: 1813)780-0021 Page 12 of-2 M10612418 3:36 PM V. ST3440-M20 City ofZephyrhillS Permit Applioation Faz�f&r60.Wz1 . Sol"Dow"lem DMRV — Phone CondUTOrPemlldlny 8 3 C35 55t49, Owner's Name HCP Properties,LP(paWaMdt d teg.t doament) Oomor phone Number 2d43,5'sS548 ' Damara Addrele 7381 CeihienY PIWO Suite 300.Rockville,MD 20866'') owner Phone Number . ....FPa 5lmpie TIUahoiderHame I NIA I OxnerPhone Numbor L, . .. •.Fee Simple TFeeholderAddrees ' nos ADDRESS s8?p HenrV Drive,Zephyr hills,ft �OTr NSR SUBDIVISION Ty.- _ 1 PRROEL IM 02.26.214W"OAODd}122 . IdaTifteaFRaNPR9PPIiTY rA%--NIOIIiCEJ • WORK PROPOSED NEW CCNSM CO ADO/ALT Q SIGN O I.J DEMOLISH ... INSTALL U I REPAIR PROPOSEDUSE Q SFR, Q COMM ® -OTHER lHormtortheA4041 ' TYPE OF CONSTRUCTION [-1 BLOCK [] MAME © •STER anaete atabrmd btoeX� - provide new hupnwa asSoMbfy,WeSdOandTmarW nanuectetl above 4F� es D,EBCPoP11OxOFsvORK to»ta.a 'oval dl» BLRLDWGSRE BOFOOTAM 225 Hr3aHr " i C]BI%LDING "5 y,0.000 VALUR23ONOFT07A1 CANSTRUORON •, .. 'QELECTRFCAI. AMRSEWC� !� T'ROGEtESSENERGY "� •wR'sC . .•. QMECHAWCAL VALUA'nONOFMEC"ANICALtHSTALI.ATION . =OAS Q�--�R—OOOFFWG�Q-�7 SPECIALTY Q OTHER ED'•.MUSH FLOOR ELEVATIONS ! J FLODO:ANEAPEA QYES NO SUILDER(GNATOAE 2aD ae6MPWOURa�A YIN FEsa;aarn YfN .... Address t ELECTRICIAN TED COMPANY WWI,Constructors,LLC SII3MME C../1 naGeTE9m FieeuAftGr YIN . Ad. 220 W nth Ave.,Sail.210,Tamp..FL 33602 {�—•�—�Ux—nse�)i EC13000SSO PLUMBER WA --� COMPANY •SI,ONAlURE pez7stlxcvI YIN MECVrt Y1N ' AddressMECKANIO Lko�e b COMP— . AL WA SIGNMUAE lkocubrem:D I YIN FuEcupow, I�YIN , AddreSa 41Ger1le e 1 ". ' OTHER S ! COMPANY KimtayHorrt CdO Kyfa Matson_A_� 9MMATURE �r � Agent AacsrcrcYa '—[�Y rEac r Y7N A/fdttea w 655 N£xanrLSt Suits 150.Temp.,FL 33602 UAns&Y ' '.111IIIIYt111111111111111111f/lllll/1t11111711I1111 t1111111111 etf 111 ' .'RESWENUAI AG.sh(3}PbllP WaetsdiSdMmq F>anz:tl}eat orErterlN FenmS;R•GyY Pemdttdrmrwconsvtraion, Mhntnmmmn(rayswndng Jaya eeerautmYtal date,R%luinvd onske,Calsrmcdpl Plans,SwrmrreterPlaW W Sal Fare Fnsled. • S&n1aeY FacBY)a5.1(kuetpSte.Sde Node PenrelforBJ�divis onansge PmJWb 4gMMERCIAL At=h(2i aamptcee Leis ai auTding Ptens pLa a txe SaneH Page:(1)sH atEneryy Fmme.R-0-W Pe for newdans ff4ft hLnMsun wen(1%wodrhp deyseR:r»vbMdal dice.K.eqused nnsho,Coratwitan Sam,SwrmyN lerPu—ad SIR Ferma MOW, . • Smeary FealCe,8,I dvmPstra.Site Wank Pamlhtor ee newprojeela-All oonemert'at mquiremarirrmist ire»trndopnaisce • 'SIGN PEWT Adam M see;of E4meaed Pima. OPERTY SURVEY required is at NEW ocesnutft,. . ' •D,irechonai . • � FOooteppLWUmsomptetely. Omer R CoM edm skin 6aci dfnppurat(en,notanted R over E2da0,a NaUcs of Comrmntemant isnquirtd.(AFCuppradasever$?M Alen(for the cmdmdo*cc Pewvrot AtfwTW(for V*evma)wade be uwMaal with nolarizo ticraom QAT.W.gAw Wnq same . OVER THE COUNTER PERMITTING (copy of cohb.0 tegoyedi . Remdfi If 6t InGles 36wHe Ser"Uparedm No Fepoea(PIWiSuFueyrFdol.ge) •" . • Ouvowa5 Mrwc4vnk?rtAR.(>+»cttFedlYaF'a..t cZOw . ................................................................................................................... .................................................................................................................................................... ............................................. .......................................................................................................................................................... S 1:i.0 lilUfl VW City of Zephyrhills BUILDING PLAN REVIEW:COMMENTS 'GY�e�� Contractor/Homeowner: A l.�x� Date Received: Site: Permit Type: h-1rle Approved w/no comments: Approved w/the below comments: ❑ Denied w/the below comments: ❑ This comment sheet shall be kept with the permit and/or plans. Kalvin er—Plans Examiner Date Contractor and/or Homeowner (Required when comments are present) r-8 813 780-M20 City of Zephyrhilis Permit Application Fan-813-780-0021 Building Department Date Received -��.] "Z',,rc ;.ppona•Cantsct or Permttttng 813 j 635 55 g. � - �f 1 i T[•'ll`T'i�i'7"1'f`i'T'�-� ��'~_ owners Name ,HCP ProptrrUes,LP(per attached legal document) Owner Phone Number 24055�538 _... Owner's Address,7361_Calhoun Place Sue 30D,Rockville,MD 20868 t?wnar Phone Number s Fee Simple Titleholder Name N/A Owner Phone Number FooSImpleTideholderAddress. p• JOB ADDREss 38220 Henry DrI e,Zephyrhil)s,FL LOTS rt WA 7.. i _. Tyson 02-26 21-0080-0;A00-0122 1 SUBDIVISION PARCEL IDtA - {Dai'1dNEOF'ROIit PROPERTTTAXNOnOFi WORK PROPOSED e NEWcoNSrR® ADD/ALT 0 SIGN �] DEMOLISH INSTALL REPAIR PROPOSED USE SFR = COMM OTHER cfttt§ rthe ed' ' TYPE OF CONSTRUCTION 0 BLOCK Q FRAME = STEEL a c�(rgte slab and:Wcck wal row anew u cahe mpaa assem y, ese generatorwr connected a ZVO-gro n es_ n DESCRIPTION OF WORK Irt I e oXS BUILDING SIZE . SR FOOTAGE 225 HEIGHT �BUlLDiNG !S 200,601) VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL III AMP SERVICE = PROGRESS ENERGY Q W.R.E.C. =PLUMBING =MECHANICAL II VALUATION OF MECHANICAL INSTALLATION =GAS = ROOFING = SPECIALTY= OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO r :•;;4Y Y"�i#}`•;i"' BUILDER COMPANY `A SIGNATURE REGISTERED N. FEECURREF Y { 1 Rio, ucanaa$•, `'f � J• LECTRICWN TBQO fJ COMPANY i : IGNATURE �+ '""a, ` : - _ nEo:sTERED I'Yt'N :y FEE cuRRFs ..Y. a Y;. Addrose _ Uoansetr. PLUMBER N/A COMPANY SIGNATURE REGISTERED Y/N FEE CURRQ Y/. Address MECHANICAL , N/A ^^IIt COMPANY SIGNATURE t: REGISTERED :Y/::N' 'FEEcuRRMN Y! Address :. _ ucensa SIGNATURE LVTSE .: OTHER """ COMPANY Klmley--Hon CIO Kyle Watson _ -$-nt. REGISTERED Y7 N FEECURRa ".±'Y/N' ,.,. -•-... ''''�` Address 655 N Franklin St Suite 150;Tempe,FL 33602 Ucense 0 I1/ 111111/1(/-III1's11iIII1i1IIIIIIIIIIIIIIITIIIIIIIal1II(1i'1111II11It RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-"Permit for new construction, Wnfmum ten(10)woddng days after submlttal date.Required onsite,Construction Plans,StonnwaterPlans vA Slit Fence Installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivlslonsRarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Cite Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(110)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans wl Slit Fens installed, Sanitary Factitles&1 dumpster.Site Work Permit far all now projects,Ali commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. —PROPERTY SURVEY requiredfora!!NEW construction Dlrecdons: ' FRI out application completely. Owner&Contractorstgn back of application,notarized If over$2500,a Notice of Commancement Is required. (A/C upgrades over$7600) Agant(for the contractor)or Power of Atlomey(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Rem ofs If shingles Sewers Service Upgrades AIC Forces(PlottSurveyiFootage) Driveways-Nol over Counter If on public roadways,.needs ROW ZEPHYRHILLS FIRE DEPARTMENT 38410 6th Ave Zephyrhills,FL 33542 FIRE SERVICE USER FEES increase 1/1/2018 Occupancy No.- r Plan No.: Contractor: Business Name:_1—I�y�st�4�+�+c, 14 e; rra Billing Address: Business Address: DP— Business Phone No.: Billing Phone No.: Business Fax No.: Billing Fax No.: Contact: Contact: PLAN REVIEW FEES INSPECTION FEES PERMIT FEE Annual- Education,healthoare,De tentionBCorrectional Public Assembly,Business, schools, Storage,Mercantile and Churches Site Plan N/C Industrial. no charge Sprinkler $50 \ Multi-Family/Commerclal .03 sf up to 800 sq ft $ 24.00 Standpipes $50 i(Minimum Charge$24.00 801-1,500 sq ft $ 34.52 Fire Pump $50 Plan Revisions DBL 1,501-2,500 sq It $ 60.02 Hoods $50 2,501-3,500 sq ft $ 90.02 Fire Alarm $50 SPRINKLER SYSTEMS 3,501-5,000 sq ft $ 127.52 LP Gas $50 0-25 Heads $50 5,501-7,500 sq ft' $ 187.52 Natural Gas $50 26 plus Heads $100 7,501-10,000 sq ft $ 262.52 t-uei ianKS-pertank $50 STANDPIPE SYSTEM 10,001-15,000 sq ft $ 375.02 Sparklers $100 Per Riser $50 15,001-20.000 sq It $ 525.02 Fire Works $500 FIRE PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation: $25 Per Pump $100 30,00140,000 sq It $ 1,050.02 Controlled Bum(15da. $100 'FIRE ALARM SYSTEM 40,001-60,000 sq ft $ 1,500.02 Hood/Duct $50 0-25 Devices $50 60,001-80,000 sq ft $2,100.02 Place of Assembly $50 Annual 80,001-($2,100.02)per 26 plus Devices $100 ea add 1.000sq It $ 0.06 Fire Protection $25 SUPPRESSION SYSTEMS (Business closed until Flammable Application $50 Annual Wet $50 violations corrected) =Generator< $50 Annual Dry $50 SPRINKLER SYSTEMS $1000O2 $50 Hydro Undergrounds $45 $100 Other $50 Hydrostatic Test $65 persystem Bio-Hazard Waste $100 Annual KITCHEN EXHAUST Acceptance Test $45 persystem Fumigation Tenting $50 Hood/Ducts $50 Hydrant Flow $75 Torch PoUApplied $50 OTHER Haz.Materials $50-Annual 8 LP installation per tank $50 FIRE ALARM SYSTEM Fuel Tank installation $50 System Acceptance $50 (Per Tank) $50 a Recall Acceptance $50 Natural Gas Installation $50, OTHER (Per System) Fire Wall/Smoke Wall $15 per wall Spray Booth $50 LP Gas $25 pertank Natural Gas $25 par system Tent 10'x10'or greater $15 pertent Fire Pump $45 Fire Suppression $30 System Acceptance Exhaust Hood/Duct $30 Re-Inspection DBL El(other than annual) ` Inspection scheduled DBL and cancelled less than r 24 hours Construction Insp. Emergency Vehicle $50e Acce $50 PLANS TOTAL INSPECTION TOTAL PERMIT TOTAL GRAND TOTAL Comments: Date: 3 /9 / Inspector: /• 7�--"�—�— mh FALSE ALARM FEE a 1st Alarm N/C 2nd Alarm N/C 3rd Alarm N/C 4th Alann $100 5th Alarm $150 6th Alann $200 NON COMPLANCE $150 Cont.-Annual Inspection Fees 3-11 Units price per unit $ 5.36 12-25 Units price per unit $ 4.82 26-50 Units price per unit $ 4.26 51-100 Units price per unit $ 3.75 100 or more Units price per unit $ 2.68 Fire Safety re-inspection types First Re-Inspection N/C Second re-inspect $75 1 Third re-inspectior $ 125.00 Inspection scheduled but cancelled 24 hrs $ 50.00 TOTAL nm o d I• ���� �/�y��U�Jv�u. IItIIH . City of Zephyrhills JcF BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: /uy CA Date Received: I's--[ Site: V� 22 Permit Type: Q •2 0 1 �• Approved w/no comments:ILI Approved w/the below comments: ❑ Denied w/the below comments: ❑ This comment sheet shall be kept with the permit and/or plans. Gene Brown—Fire Safety Officer Date Contractor and/or Homeowner (Required when comments are present) AGENT AUTHORIZATION FORM Date: 5 I, Mar(- K i(-ha r cLS ,CIA,4 hl'ri w(W A w of HCP Properties,LP.,on behalf of the limited partnership,hereby authorize Kinsey-Horn&Associates,Inc.C/O Kyle Watson, to act as our agent for the submitting and/or obtaining permits for proposed generators for the following sites: See Exhibit A Owner Signature: Owner's Telephone Number: The foregoing instrument was acknowledged before me this �� day of tt hn>lty ,2018 by Kafr 21C.�Y)(-A�. 1 He is personally known to me or who has produced �� ,as identification. t� •9 My Commission Expires: Signatu re of Notary Public, State of (l i Print Name: ul i a I Q tc,- �e(f Suzanna Leigh Bell NOTARY PUBLIC ANNE ARUNDEL COUNTY MY COMMISSION EXPIRES DJULY 15,2019 � 1 EXHIBIT A Unit 9 Facility Name Address 332 Arden Courts of Palm Harbor 2895 Tampa Rd,Palm Harbor,FL 34684 333 Arden Courts of Delray Beads 16150 Jag Rd,Delay Beads,FL 33446 336 Arden Courts of Sarasota 5509 Swift Rd,Sarasota,FL 34231 345 Arden Courts of West Palm 2330 Village Blvd,West Palm Beath,FL 33409 Beach 371 Arden Courts of Seminole 9300 Antilles Drive,Seminole,FL 33776 373 Arden Courts of Largo 300 Highland Ave,Largo,FL 33770 386 MCHS-Palm Harbor 2851 Tampa Rd,Palm Harbor,FL 34684 438 MCHS-Delray 16200 Jog Rd,Delray Beach FL 33446 442 MCHS-Venice 1450 E Venice,Vence,FL 34292 443 MCHS-Carro11—cl 3030 W Bears Ave,Tampa,FL 33618 449 Arden Courts of Lely Palma 6125 Rattlesnake Hammock Rd,Naples,FL 34113 454 HHCC-South Joda-villa 3648 University Blvd.S.,Jacksonville,FL 32216 493 MCHS-West Pat.Beach 2300 Village Blvd,West Palm Beach FL 33409 511 Lely Palms Sprh9house 1000 Lely Palm Dr,Naples,FL 34113 533 MCHS-Duped 870 Patddo Ave,Dunedin,FL 34698 534 MCHS-5orosota 5511 Swift Rd,Sarwole,FL 34231 535 MCHS-Boca Raton 375 14W Sld Street,Bow Raton,FL 33431 536 MCHS-Boynton Beach 3001 S Congress Ave,Boynton Beads,FL 33426 537 MCHS-Plantalian 6931 W Sunrise BWd,Planlo0an,FL 33313 546 MCHS.Lely Pats 6135 Rattlesnake Hommodk Rd,Naples,FL 34113 611 MCHS-Winter Park 2075 Loch Lomond Dr,Winter Pork,FL 32792 3161 HHCC.Kendall 9400 S.W.1371h Ave.-,Miami,FL 33186 3181 HHCC-Zephyrh8h 38220 Henry Ddve,ZephyhBls,FL 33542 3191 HHCC-Tamara 5901 N.W.79th Avenue,Torm rac,FL 33321 4092 HHCC-Boynton Beach 3600 Old Boynton Road,Boynton Beach,FL 33436 4095 HHCC.JodaanvBle(Normandy) 8495 Normandy Blvd,Jadaonville,FL 32221 4096 HHCC-Orange Park 570 Well,Road,Orange Park,FL 32073 4097 HHCC-Miami Lakes 5725 NW 18611%Street,Hialeah,FL 33015 4227 HHCC-Nanh Sc rasoto 3250 121h Street,Soromtes,FL 34237 4266 HHCC-Boca Raton 7225 Bow Dal Mar Dine,Bow Raton,FL 33433 4268 HHCCSarosota 5401 Sawyer Read,Sarasota,FL 34233 4296 HHCC.L uderhi0 2599 N.W.55ih Avenue,Lauderhill,FL 33313 5434 Arden Courts al Ft.Myers 15950 McGregor Blvd,Ft.Myers,FL 33908 5467 MCHS-Ft.My— 13081 Eagle Ridge Drive,Fs.Myers,FL 33912 5639 Arden Counts of Tempo 14950 Casey Rd,Tempo,FL 33624 5665 Arden Courts of Winter Springs 1057 Willa Springs Drive,Winter Springs,FL 27 Owners Signature: Date: PENDING EMERGENCY RULE 59A-4.1265 HEARTLAND HEALTH CARE CENTER OF ZEPHYRHILLS - 3181 Y 38220 HENRY DRIVE ZEPHYRHILLS, FL 33542 DONNELLY ENGINEERING 8803 Futures Dr., Suite 5B Orlando, FL 32819 Tel 407.351.3085 DonnellyPE@aol.com Job No. 217032 SPECIFICATIONS_ PENDING EMERGENCY RULE 59A-4.1265 HEARTLAND HEALTH CARE CENTER OF ZEPHYRHILLS -3181 38220 HENRY DRIVE ZEPHYRHILLS, FL 33542 INDEX ELECTRICAL SPECIFICATIONS 16010 Basic Electrical Requirements 16020 Tests & Performance Verification 16030 Electrical Identification 16110 Raceways and Conduits 16120 Conductors and Cables 16130 Outlet, Junction and Pull Boxes 16441 Disconnect Switches 16450 Grounding 16470 Panelboards 16490 Automatic Transfer Switch 16650 Engine Generators 16670 Lightning Protection System \\����111►t l D rrUii�/i 0 • . NO. 44575 STATE OF 'P • ��/ '•.�ORIOP '• rrrinlm Heartland Health Care Center of Zephyrhills-3181 Index DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL SECTION 16010 BASIC ELECTRICAL REQUIREMENTS PART GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified in this section. 1.2 GENERAL A. Provisions: Provide all labor, materials, equipment, and incidentals required to make ready for use a complete electrical system as specified herein and shown on the drawings. B. Provide and Install: The word "provide" where used on the Drawings or in this Division shall mean "furnish, install, mount, connect, test, complete, and make ready for operation". The word "install' where used on the Drawings or in this Division shall mean "mount, connect, test, complete, and make ready for operation". The Contractor shall perform all work required by, and in accordance with, the Contract Documents. C. Installation: Provide and place in satisfactory condition, ready for proper operation, all conduits, wires, cables, and other material needed for the complete electrical systems required by the Contract Documents. Additional conduits and wiring shall be provided wherever necessary to complete the installation of the specific equipment provided. Include all auxiliaries and accessories for complete and properly operating systems. Provide all electrical systems and any necessary accessories per NEC and local codes and ordinances. It is the intent of these Specifications that the electrical systems shall be suitable in every way for the service required. All material and work which may be reasonably implied as being incidental to the work of this Contract shall be provided at no additional cost to the Contract. D. Made in the USA: All products shall be made and fabricated in the USA. 1.3 SCOPE OF WORK A. General: The work provided under this Division shall include all labor, materials, permits, inspections and reinspection fees, tools, equipment, transportation, insurance, temporary protection, supervision and incidental items essential for proper installation and operation, even though not specifically mentioned or indicated but which are usually provided or are essential for proper installation and operation of all electrical systems as indicated in the contract documents. B. Minimum Requirements: The contract documents describe the minimum requirements that must be met for an acceptable installation. C. Notices: Give all notices, file all Plans, pay all fees, obtain all permits and approvals from authorities having jurisdiction. Include all fees in the Bid Price. 1.4 INTERPRETATION OF DRAWINGS A. General: The Drawings are diagrammatic and are not intended to show exact locations of conduit runs, outlet boxes, junction boxes, pull boxes, etc. The locations of equipment, appliances, fixtures, conduits, outlets, boxes and similar devices shown on the Drawings are approximate only. Exact Heartland Health Care Center of Zephyrhills-3181 16010-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL locations shall be as accepted by the Engineer during construction. Obtain in the field all information relevant to the placing of electrical work and in case of interference with other work, proceed as directed by the Engineer and provide all labor and materials necessary to complete the work in an acceptable manner. B. Discrepancies: Notify Engineer of any discrepancies found during construction of the project and do not proceed with that portion of the project, until a written definitive statement is received providing clear direction. If a conflict exists between the contract documents and any applicable code or standard, the most stringent requirement shall be included for this project. The Engineer shall make the decision regarding questionable areas of conflict. C. Wiring: Each three-phase circuit shall be run in a separate conduit unless otherwise shown on the Drawings. Unless otherwise accepted by the Engineer, conduit shall not be installed exposed unless specifically directed to be exposed. Where circuits are shown as "home-runs" all necessary fittings and boxes shall be provided for a complete raceway installation. Do not install more than three circuits in a single raceway. Circuit numbers indicated for new circuits shall not be changed. Use the circuit numbers indicated. D. Surface Supports: Surface mounted panel boxes, junction boxes, conduit, etc., shall be supported by spacers to provide a clearance between wall and equipment. E. Layout: Circuit layouts are not intended to show the number of fittings, or other installation details. Provide all labor and materials necessary to install and place in satisfactory operation all power, control, lighting, and other electrical systems shown. All connections to equipment shall be made as required, and in accordance with the accepted shop and manufacturer's setting drawings. F. Coordination: Coordinate final equipment locations with existing conditions. Layout before installation so that all equipment has adequate space. Provide coordination as required for installation in a neat and workmanlike manner. 1.5 EQUIPMENT SIZE AND HANDLING A. Coordination: Investigate each space in the structure through which equipment must pass to reach its final location. If necessary, the equipment shall be required to be shipped in sections of specific sizes to permit the passing through the necessary areas within the structure. B. Handling: All equipment shall be kept upright at all times. When equipment has to be tilted for ease of passage through restricted areas during transportation, the manufacturer shall be required to brace the equipment suitably, to insure that the tilting does not impair the functional integrity of the equipment. 1.6 RECORD DRAWINGS A. Production: The Contractor shall provide two (2) sets of black or blue line on white drawings to maintain and submit record "as-built drawings". One set shall be maintained at the site and at all times be accurate, clear, and complete, showing the actual location of all equipment as installed. The Record Drawings shall show actual locations of all underground lines and accurate wiring diagrams of all power, light and other systems marked in colored pencil "As Installed". The underground lines shall be shown "dashed". The "Progress As-Built" drawings shall show all Electrical work installed complete to the present stage of progress, actual routing of all branch wiring, actual routing of homeruns including all junction or pull boxes, drops and risers and the location of all junction boxes and access panels. These drawings shall be available to the Engineer's field representatives at all times. Heartland Health Care Center of Zephyrhills-3181 16010-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL B. Completion: At the completion of the Work, transfer onto the Second set all changes marked in colored pencil and submit to the Engineer. The "As-Built" drawings shall be made available to the Engineer to make the final punch list of the work completed under this Contract. C. Final: Upon Contractor's completion of the Engineer's final punch list, transfer all "As-Built" conditions and all requirements by the Engineer to a reproducible set of drawings and provide CAD discs of all changes and additions only. Submit drawings and CAD disks for review and acceptance to the Engineer. The Contractor shall provide updated discs which shall include final As-Built conditions. The Engineer shall provide PDF files which can be utilize for backgrounds and all contract drawings. The Engineer's cad files will not be available for use. D. Special Note: Provide a unit price for the final as-built drawings as part of the Bid price. 1.7 ABBREVIATIONS A. Abbreviations: The following abbreviations or initials may be used: A/C Air Conditioning AC Alternating Current ABV CLG Above Ceiling ADA American Disabilities Act AF Ampere Frame AFF Above Finished Floor AFG Above Finished Grade AHU Air Handler Unit AIC Amps Interrupting Capacity AL Aluminum AMP Ampere ! ANSI American National Standards Institute ASA American Standards Association AT Ampere Trip AWG American Wire Gauge BC Bare Copper BIL Basic Impulse Level BRK Breaker C Conduit CB Circuit Breaker CBM Certified Ballast Manufacturers CAN Cable Television CCTV Closed Circuit Television CKT Circuit CLG Ceiling COAX Coaxial Cable COND Conductor CONN Connection CPU Central Processing Unit CT Current Transformer CU Copper CW Cold Water DC Direct Current DEG Degree DISC Disconnect DN Down DPST Double Pole Single Throw EMT Electrical Metallic Tubing Heartland Health Care Center of Zephyrhills-3181 16010-3 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 1 DONNELLY ENGINEERING ELECTRICAL EWC Electric Water Cooler FCU Fan Coil Unit FLA Full Load Amperes FM Factory Mutual GFI Ground Fault Interrupter GND Ground HOA Hand-Off-Automatic HORIZ Horizontal HP Horsepower IEEE Institute of Electrical and Electronic Engineers IES Illuminating Engineering Society IMC Intermediate Metallic Conduit IN Inches IPCEA Insulated Power Cable Engineers Association JB Junction Box KV Kilovolt KVA Kilo-Volt-Amps KW Kilowatts LBS Pounds LED Light Emitting Diode LT Light LTG Lighting MAX Maximum MCB Main Circuit Breaker MIN Minimum MLO Main Lugs Only MTD Mounted MTG Mounting N Neutral NEC National Electrical Code NECA National Electrical Contractors Association NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association NF Non Fused NO Number 0 Phase OL Overload OSHA Occupational Safety and Health Administration P Pole PB Pullbox PIV Post Indicator Valve PNL Panel PR Pair PWR Power PF Power Factor PRI Primary PROJ Projector PT Potential Transformer PVC Polyvinylchloride REF Refrigerator RMS Root-Mean-Square RPM Revolutions Per Minute RECPT Receptacle SCA Short Circuit Amps SEC Secondary Heartland Health Care Center of Zephyrhills-3181 16010-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL S/N Solid Neutral SPKR Speaker SPST Single Pole Single Throw SW Switch SWBD Switchboard TEL Telephone TYP Typical UH Unit Heater UL Underwriters Laboratories V Volt W Wire WP Weatherproof XFMR Transformer 1.8 CODES, FEES, AND STANDARDS A. Application: The codes, standards and practices listed herein generally apply to the entire project and all specification sections. Other codes, standards or practices that are more specific will be referenced within a particular specification. B. Requirements: All articles, products, materials, fixtures, forms or types of construction covered in the specifications will be required to meet or exceed all applicable standards of manufacturer, testing, performance, capabilities, procedures and installation according to the requirements of ANSI, NEMA, IEEE, and NEC referenced documents where indicated and the manufacturer's recommended practices. Requirements indicated on the contract documents which exceed but are not contrary to governing codes shall be followed. C. Compliance and Certification: The installation shall comply with the governing state and local codes or ordinances. The completed electrical installation shall be inspected and certified by all applicable agencies that it is in compliance with all codes. D. Applicability: The codes and standards and practices listed herein, and their respective dates are furnished as the minimum latest requirements. 1. State of Florida 2. Pasco County 3. City of Zephyrhills E. Utility Company: Comply with latest utility company regulations. F. State Statutes: Florida Statutes, 69A-3.012, 6'h Edition 2017 The State Fire Prevention ` G. Building Code: Florida Building Code 2017 H. Standards: American National Standards Institute (ANSI), Architectural Standards FGI Guidelines 2014, IEEE, ANSI and NEMA. I. Manuals: Accessibility Requirements Manual Florida Department of Community Affairs. J. Labels: All materials shall be new and free of defects, and shall be UL listed, bear the UL label or be labeled or listed with an approved, nationally recognized Electrical Testing Agency. Where no labeling or listing service is available for certain types of equipment, test data shall be submitted to validate that equipment meets or exceeds available standards. K. NFPA: National Fire Protection Association (NFPA) Standards per Florida Building Code latest dates. Heartland Health Care Center of Zephyrhills-3181 16010-5 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 1 DONNELLY ENGINEERING ELECTRICAL NFPA-110 2013 Standard for Emergency and Standby Systems NFPA-70 2014 National Electrical Code. NFPA-99 2015 Standard for Health Care Facilities. NFPA-101 2015 Life Safety Code. NFPA-220 2015 Standards on Types of Building Construction NFPA-241 2013 Standard for Safeguarding Construction, Alteration & Demolition Operations NFPA 780 2014 Standard for the installation of Lightning Protection System 2014 Architectural Standards FGI Guidelines 1.9 INVESTIGATION OF SITE A. General: Before commencing the work, verify existing conditions at the premises including, but not limited to, existing structural frame, location and all dimensions; existing openings and characteristics; existing wall and partition locations, characteristics and relationship to each other; existing mechanical and electrical work, equipment type, and shall examine all adjoining work on which his work is in anyway dependent for its perfect efficiency according to the intent of the Contract Documents. B. Responsibility: No waiver of responsibility for defective and inadequate work or additional cost as a result of existing conditions which should have been verified shall be considered unless notice of same has been filed by the Contractor and agreed to in writing by the Engineer/Owner's before the bid date. C. Site Renovation: The Contractor shall verify and coordinate existing site conduits and pipes at any excavation on site. Bids to include hand-digging and all required rerouting in areas of existing conduits and pipes. 1.10 RENOVATION A. Renovation: Investigate site thoroughly and reroute all conduit and wiring in the area of new construction in order to maintain continuity of existing circuitry. Existing conduits shown on plans are shown with approximate locations only. B. Power Outage: Special attention is called to the fact that work involved is in connection with existing buildings which must remain in operation while work is being performed. Work must be done in accordance with the priority schedule. Schedule work for a minimum outage to Owner. Request written permission and receive written acceptance from the Owner no later than 24 hours in advance of all power and communication shut-downs. Perform work required at other than standard working hours where outages cannot be accepted by Owner during regular working hours. Protect existing buildings and equipment during construction. C. Special Considerations: Special attention is called to the fact that there will be piping, fixtures or other items in the existing building which must be removed or relocated in order to perform the alteration work. Bid shall include all removal and relocation required for completion of the alterations and the new construction. 1.11 SUPERVISION OF THE WORK A. Supervision: Provide one field superintendent who has had a minimum of four (4) years previous successful experience on projects of comparable sizes and complexity. The Superintendent shall be present at all times when work is being performed. The Superintendent shall have passed a proctored H.H. Block Journeyman Exam with 75% grade or better and shall be a licensed Journeyman. A resume of the Superintendent's experience shall be submitted to the Engineer before starting work. At least one member of the Electrical Contracting Firm shall hold a State Master Certificate of Competency. Heartland Health Care Center of Zephyrhills-3181 16010-6 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 1.12 COORDINATION A. General: Compare drawings and specifications with those of other trades and report any discrepancies between them to the Engineer. Obtain from the Engineer written instructions to make the necessary changes in any of the affected work. All work shall be installed in cooperation with other trades installing interrelated work. Before installation, all trades shall make proper provisions to avoid interferences in a manner approved by the Engineer. B. Adjustments: Locations of conduit and equipment shall be adjusted to accommodate the work with interferences anticipated and encountered. Determine the exact routing and location of all systems prior to fabrication or installation. C. Priorities: Lines which pitch shall have the right of way over those which do not pitch. For example, plumbing drains shall normally have the right of way. Lines whose elevations cannot be changed shall have the right of way over lines whose elevations can be changed. D. Modifications: Offsets and changes of direction in all conduit systems shall be made as required to maintain proper headroom and pitch of sloping lines whether or not indicated on the drawings. Provide elbows, boxes, etc., as required to allow offsets and changes to suit job conditions. E. Replacement: All work shall be installed in a way to permit removal (without damage to other parts) of all other system components provided under this Contract requiring periodic replacement or maintenance. All conduits shall be arranged in a manner to clear the openings of swinging overhead access doors as well as ceiling tiles. F. Layout: The Contract Drawings are diagrammatic only intending to show general runs and locations of conduit and equipment, and not necessarily showing all required offsets, details and accessories and equipment to be connected. All work shall be accurately laid out with other Trades to avoid conflicts and to obtain a neat and workmanlike installation which will afford maximum accessibility for operation, maintenance and headroom. G. Contract Conflicts: Where discrepancies exist in the Scope of Work as to what Trade provides items such as starters, disconnects, flow switches, etc. such conflicts shall be coordinated between the divisions involved. It is the intent of the Contract Documents that all work shall be provided complete as one bid price. H. Drawing Conflicts: Where drawing details, plans or specification requirements are in conflict and where sizes of the same item run are shown to be different within the contract documents, the most stringent requirement shall be included in the Contract. Systems and equipment called for in the specification or as shown on the drawings shall be provided under the Contract of each trade as if it was required by both the drawings and specifications. Prior to ordering or installation of any portion of work. which appears to be in conflict, such work shall be brought to Architect's attention for direction as to, what is to be provided. I. Working Clearances: Working clearances about electrical equipment shall be as referenced in NEC 110, and shall include new equipment installed in existing ceiling spaces. J. Motor Circuits: Contractor shall coordinate circuit breaker, wire and conduit sizes with actual motors supplied. All changes required shall be made at no additional cost to the Owner. 1.13 DEMOLITION A. General: During the execution of the work, all required relocation, rerouting, etc., of existing equipment and systems in the existing building areas where the work is required, shall be performed by the Heartland Health Care Center of Zephyrhills-3181 16010-7 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL ' Contractor, as indicated on the drawings, or as required by job conditions and as determined by the Engineer in the field, to facilitate the installation of the new systems. The Owner shall require continuous operation of the existing systems, while demolition, relocation work or new tie-ins are performed. B. Coordination: Prior to any deactivation and relocation or demolition work, arrange a conference with the Engineer and the Owner's representative in the field to inspect each of the items to be deactivated, removed or relocated. Care shall be taken to protect all equipment designated to be relocated and reused or to remain in operation and be integrated with the new systems. C. Provisions: All deactivation, relocation, and temporary tie-ins shall be provided by the Contractor. All demolition, removal and the legal disposal of demolished materials of system designated to be demolished shall be provided by the Contractor. D. Owners Salvage: The Owner reserves the right to inspect the material scheduled for removal and salvage any items they chose to be usable as spare parts or for other use. E. Phasing: The Contractor shall perform all work in phases as directed by the Engineer to suit the project progress schedule, as well as the completion date of the project. PART2- PRODUCTS 2.1 Product Directives A. Specified Method: Where several brand names, make or manufacturer are listed as acceptable, the acceptance shall be based on the design selection. Where a manufacturer's model number is listed, this model shall set the standard of quality and performance required. Where no brand name is specified, the source and quality shall be subject to the Engineer's review and acceptance. Where three manufacturers are listed, one of the listed manufacturers shall be submitted for acceptance. No substitutions are allowed unless the substitution process is accepted by the Engineer B. Certification: When a product is specified to be in accordance with a trade association or government standard requested by the Engineer, the Contractor shall provide a certificate that the product complies with the referenced standard. Upon request of the Engineer, the Contractor shall submit supporting test data to substantiate compliance. C. Basis of Bid: Each bidder represents that his bid is based upon the manufacturer's materials, and equipment described in the Contract Documents. D. Space Requirements: Substituted equipment or optional equipment where permitted and accepted, must conform to established space requirements within the project. Accepted substituted equipment which does not meet space requirements, shall be replaced at no additional expense to the Contract. All modifications of related systems as a result of substitutions shall be made at no additional expense to the Contract. Submit all modifications to the Engineer for acceptance. E. Samples: Samples shall be submitted for all electrical components, light fixtures, wiring devices, and other items deemed necessary by the Engineer to determine that the item meets all specifications and requirements before acceptance is allowed. Samples shall be submitted within 30 days after the award of the contract. 2.2 SHOP DRAWINGS A. General: Shop drawings shall be submitted for every item of equipment and material provided under this Division unless noted herein. An electronic email submission must be submitted to the Engineer Heartland Health Care Center of Zephyrhills-3181 16010-8 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL and acceptance received prior to ordering equipment. Obtain acknowledgment of receipt of the email submittal. The Engineer's receipt date will be the basis of the date of the submittal. All shop drawings shall be submitted on the same day. Include, with the submission, an index of shop drawings sent. Multiple emails can be done as long as they are immediately consecutive. List how many emails have been sent e.g 1 of 6 etc. All accepted submittals shall be printed in a binder and made available at the construction site for review. B. Responsibility: It is the Contractors responsibility to provide all material in accordance with the contract documents and specifications. Material not provided in accordance with the contract documents and specifications will be removed and replaced at the Contractors expense. The Contractor shall submit one of the manufacturers specified. No substitutions are allowed except where a 10 day prior is specified. C. Official Record: The shop drawing submittal shall become the official record of the materials to be installed. If materials are installed which do not correspond to the record submittal they shall be removed from the project without any additional cost to the Owner. Project completion delays for construction will not be allowed as a result of the material removal or handling. D. Information: The shop drawing record submittal shall include the following information to the extent applicable to the particular item; 1. Manufacturer's name and product designation or catalog number. 2. Standards or specifications of ANSI, ASTM, ICEA, IEEE, ISA, NEMA, NFPA, OSHA, UL, or other organizations, including the type, size, or other designation. 3. Dimensioned plan, sections, and elevations showing means for mounting, conduit connections, and grounding, and showing layout of components. 4. Materials and finish specifications, including paints. 5. List of components including manufacturer's names and catalog numbers. 6. Internal wiring diagram indicating all connections to components and the terminals for external connections. 7. Manufacturer's instructions and recommendations for installation, operation, and maintenance. 8. Manufacturer's recommended list of spare parts. E. Preparation: Prior to submittal, all shop drawings shall be checked for accuracy and contract requirements. Shop drawings shall bear the date checked and shall be accompanied by a statement that the shop drawings have been examined for conformity to Specifications and Drawings. This statement shall also list all discrepancies with the Specifications and Drawings. Shop drawings not so checked and noted shall be returned to Contractor unreviewed. F. Basis of Review: The Engineer's review shall be for compliance with the Contract documents G. Responsibility: The responsibility that all dimensions are confirmed and correlated with proper coordination of all other trades shall be included as part of the Contract Documents. The responsibility and the necessity of providing materials and workmanship required by the Specifications and Drawings which may not be indicated on the shop drawings shall be included as part of the Contract Documents. The Contractor is responsible for any delays in job progress occurring directly or indirectly from late submissions or resubmissions of shop drawings, product data, or samples. H. Ordering Equipment: No material shall be ordered or shop work started until the Engineer has officially. received the shop drawing record submittal and has formally released the Contractor for processing. I. Brochure Requirements: Provide Technical Information Brochures at the start of construction or no later than 30 days after Award of the Contract. Each brochure shall consist of an adequately sized, Heartland Health Care Center of Zephyrhills-3181 16010-9 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL ' hard-cover, 3-ring binder for 8-1/2" X 11" sheets. Provide correct designation on outside cover and on end of brochure. When one binder is not enough to adequately catalog all data, additional binders shall be provided. The intent of the brochure is a printed hard copy of which will be present at the job site and accessible to the Engineer and owner's representative. All brochures shall become part of the record documents. J. Brochure Contents: First sheet in the brochure shall be a photocopy of the Electrical Index pages in these specifications. Second sheet shall be a list of Project Addresses for this project. Third sheet shall list Project Information. Provide reinforced separation sheets tabbed with the appropriate specification reference number and typed index for each section in the Electrical Schedule. Technical Information consisting of marked catalog sheets or shop drawings shall be inserted in the brochure in proper order on all items specified and shown on drawings. At the end of the brochure, provide and insert a copy of the specifications for this Division and all addenda applicable to this Division. K. Contractor's Review: Review the brochures before submitting to the Engineer. No request for payment shall be considered until the brochure has been reviewed, stamped and submitted for review. L. Cost: Submit cost breakdown on work in the Technical Information Brochures. The cost of material and labor for each item shall be indicated. The cost of fittings and incidentals are not required. M. Title Drawings: Title drawings to include identification of project and names of Engineer, Contractors, and supplier, data, number sequentially and indicate in general; 1. Fabrication and Erection dimensions. 2. Arrangements and sectional views. 3. Necessary details, including complete information for making connections with other work. 4. Kinds of materials and finishes. 5. Descriptive names of equipment. 6. Modifications and options to standard equipment required by the contract. 7. Leave blank area, size approximately 4 by 2-1/2 inches, near title block (for Engineer's stamp imprint). 8. In order to facilitate review of shop drawings, they shall be noted, indicating by cross reference the contract drawings, notes, and specification paragraph numbers where items occur in the contract documents. 9. See specific sections of specifications for further requirements. N. Technical Data: Submit technical data verifying that the item submitted complies with the requirements of the specifications. Technical data shall include manufacturer's name and model number, dimensions, weights, electrical characteristics, and clearances required. Indicate all optional equipment and changes from the standard item as called for in the specifications. Provide drawings, or diagrams, dimensioned and in correct scale, covering equipment, showing arrangement of components and overall coordination. O. Samples: .Provide two samples of materials and finishes. Each sample shall be tagged, labeled, or marked, "Sample of .......... for (PROJECT). Accompany samples with copy, in duplicate of manufacturer's instructions regarding installation, and maintenance. P. Same Manufacturer: In general, relays, contactors, starters, motor control centers, switchboards, panelboards, dry type transformers, disconnect switches, circuit breakers, manual motor starter switches, etc., shall be supplied and manufactured by the same manufacturer. Heartland Health Care Center of Zephyrhills-3181 16010-10 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 2.3 EQUIPMENT, MATERIALS, AND SUPPORTS A. General: Each item of equipment or material shall be manufactured by a company regularly engaged, in the manufacturer of the type and size of equipment, shall be suitable for the environment in which it is to be installed, shall be approved for its purpose, environment, and application, and shall bear the UL label. B. Installation Requirements: Each item of equipment or material shall be installed in accordance with instructions and recommendations of the manufacturer, however, the methods shall not be less stringent than specified herein. C. Required Accessories: Provide all devices and materials, such as expansion bolts, foundation bolts, screws, channels, angles, and other attaching means, required to fasten enclosures, conduits, and other electrical equipment and materials to be mounted on structures which are existing or new. D. Protection: Electrical equipment shall at all times during construction be adequately protected against mechanical injury or damage by the elements. Equipment shall be stored in securely locked dry permanent-shelters. If apparatus has been damaged, such damage shall be repaired at no additional cost or time extension to the Contract. If apparatus has been subject to possible injury, it shall be thoroughly cleaned, dried out and put through tests as directed by the Manufacturer and Engineer, or shall be replaced, if directed by the Engineer, at no additional cost to the Contract. 2.4 IDENTIFICATION OF EQUIPMENT A. General: All electrical items shall be identified as specified in the Contract Documents. Such identification shall be in addition to the manufacturer's nameplates and shall serve to identify the item's function and the equipment or system which it serves or controls. Refer to Identification Section of the specifications for additional information. 2.5 SURFACE MOUNTED EQUIPMENT A. General: Surface mounted fixtures, outlets, cabinets, panels, etc. shall have a factory applied finish or shall be painted as accepted by Engineer. All conduits and fittings, where allowed to be installed surface mounted, shall be painted to match the finish on which it was installed. Paint shall be in accordance with other applicable sections of these specifications. Refer to additional specifications note herein, regarding conduit, boxes, etc. 2.6 CUTTING AND PATCHING A. Core Drilling: The Contractor shall be responsible for all core drilling as required for work under this section, but in no case shall the Contractor cut into or weld onto any structural element of the project without the written approval of the Engineer. B. Cutting and Patching: All cutting, rough patching and finish patching shall be provided as specified in the contract documents. All cutting and patching shall be performed in a neat and workmanlike manner. C. Openings and Sleeves: Locate all openings required for work performed under this section. Provide sleeves, guards or other accepted methods to allow passage of items installed under this section. D. Roof Penetration: Provide roofer with all pitch pans, fittings, etc., required for electrical items which penetrate the roof. Roof penetrations are to be waterproofed in such a manner that roofing guarantees are fully in force. Heartland Health Care Center of Zephyrhills-3181 16010-11 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 2.7 SLEEVES AND FORMS FOR OPENINGS A. Sleeves: Provide all sleeves for conduits penetrating floors, walls, partitions, etc. Locate all necessary slots for electrical work and form before concrete is poured. Water-tight sleeves shall be line seal type WS. Fire rated partition sleeves shall be mild steel. Sleeves shall be Schedule 40 PVC or galvanized rigid steel unless specifically noted otherwise. Size shall be one standard diameter larger than pipe being installed or of a larger diameter to below 1/4" minimum clearance. B. Forms: Provide boxed out forms for conduit penetrations only where allowed by the Engineer. Fill opening after conduit installation, with equivalent material. 2.8 OPERATING AND MAINTENANCE INSTRUCTIONS A. General: Thoroughly instruct the Representative of the Owner, to the complete satisfaction of the Engineer, in the proper operation of all systems and equipment provided. The Contractor shall make all arrangements, via the Engineer, as to whom the instructions are to be given in the operation of the systems and the period of time in which they are to be given. The Engineer shall be completely satisfied that the Representative of the Owner has been thoroughly and completely instructed in the proper operation of all systems and equipment before final payment is made. If the Engineer determines that complete and thorough instructions have not been given by the Contractor to the Owner's Representative, then the Contractor shall be directed by the Engineer to provide whatever instructions are necessary until the intent of this paragraph of the Specification has been complied with. B. Submittals: Submit to the Engineer for approval five (5) typed sets, bound neatly in loose-leaf binders, of all instructions for the installation, operation, care and maintenance of all equipment and systems, including instructions for the ordering and stocking of spare parts for all equipment installed under this contract. The lists shall include part number and suggested suppliers. Each set shall also include an itemized list of component parts that should be kept on hand and where such parts can be purchased. C. Information Requirements: Information shall indicate possible problems with equipment and suggested corrective action. The manuals shall be indexed for each type of equipment. Each section shall be clearly divided from the other sections. A sub index for each section shall also be provided. D. Instructions: The instructions shall contain information deemed necessary by the Engineer and include but not limited to the following; 1. Introduction: a. Explanation of Manual and its use. b. Summary description of the Electrical Systems. C. Purpose of systems 2. System: a. Detailed description of all systems. b. Illustrations, schematics, block diagrams, catalog cuts and other exhibits. 3. Operations: a. Complete detailed, step by step, sequential description of all phases of operation for all portions of the systems, including start up, shutdown and balancing. Include all posted instruction charts. Heartland Health Care Center of Zephyrhills-3181 16010-12 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 4. Maintenance: a. Parts list and part numbers. b. Maintenance and replacement charts and the Manufacturer's recommendations for preventive maintenance. C. Trouble shooting charts for systems and components. d. Instructions for testing each type of part. e. Recommended list of on-hand spare parts. f. Complete calibration instructions for all parts and entire systems. g. General and miscellaneous maintenance notes. 5. Manufacturer's Literature: a. Complete listing for all parts. b. Names, addresses and telephone numbers. C. Care and operation. d. All pertinent brochures, illustrations, drawings, cuts, bulletins, technical data, certified performance charts and other literature with the model actually furnished to be clearly and conspicuously identified. e. Internal wiring diagrams and Engineering data sheets for all items and/or equipment furnished under each Contract. f. Guarantee and warranty data. 2.9 EXISTING CONDITIONS A. Support: All existing conduit and cables within the area of construction shall be provided with proper supports as specified for new work in other sections of this specification. B. Installation: All existing electrical which is designated for reworking or requires relocation, repair or adjustment shall conform to all applicable codes and shall be treated as new work complying to all sections of this specification. C. Violations: Where existing conditions are discovered which are not in compliance with the codes and standards, the Contractor shall submit proper documentation to the Engineer for clarification and corrective work direction. Existing conditions shall not remain which will create a disapproval of the renovated area. D. Patching: All existing conduit and cable penetrations shall be properly fire treated per code and specification requirements. The Contractor shall thoroughly inspect all existing locations and include the cost of patching and repair in his proposed construction cost. PART 3 - EXECUTION 3.1 WORKMANSHIP A. General: The installation of materials and equipment shall be performed in a neat, workmanlike and timely manner by an adequate number of craftsmen knowledgeable of the requirements of the Contract Documents. They shall be skilled in the methods and craftsmanship needed to produce a quality level of workmanship. Personnel who install materials and equipment shall be qualified by training and experience to perform their assigned tasks. I B. Acceptable Workmanship: Acceptable workmanship is characterized by first-quality appearance and function, conforming to applicable standards of building system construction, and exhibiting a high degree of quality and proficiency which is judged by the Engineer as equivalent or better than that ordinarily produced by qualified industry tradesmen. Heartland Health Care Center of Zephyrhills-3181 16010-13 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL C. Performance: Personnel shall not be used in the performance of the installation of material and equipment who, in the opinion of the Engineer or owners representative or contractor are deemed to be careless or unqualified to perform the assigned tasks. Material and equipment installations not in compliance with the Contract Documents, or installed with substandard workmanship and not acceptable to the Engineer, shall be removed and reinstalled by qualified craftsmen, at no change in the contract price. 3.2 PROTECTION AND CLEAN UP A. Protection and Restoration: Suitably protect all equipment provided under this Division during construction. Restore all damaged surfaces and items to "like new" condition before a request for substantial completion inspection. B. Handling: All materials shall be properly protected and all conduit openings shall be temporarily closed by the Contractor to prevent obstruction and damage. Post notice prohibiting the use of all systems provided under this Contract, prior to completion of work and acceptance of all systems by the Owner's representative. The Contractor shall take precautions to protect his materials from damage and theft. C. Safeguards: The Contractor shall furnish, place and maintain proper safety guards for the prevention of accidents that might be caused by the workmanship, materials, equipment or systems provided under this contract. D. Cleanup: Keep the job site free from all debris and rubbish. Remove all debris and rubbish from the site and leave premises in clean condition on a daily basis. 3.3 SYSTEMS GUARANTEE A. General: Provide a one-year guarantee. This guarantee shall be by the Contractor to the Owner for any defective workmanship or material which has been provided under this Contract at no cost to the Owner for a period of one year from the date of substantial completion of the System. The guarantee shall include all lamps, for ninety days after date of Substantial Completion of the System. Explain the provisions of guarantee to the Owner at the"Demonstration of Completed System". 3.4 FINAL OBSERVATION A. General: All work shall be completed, and all forms and other information shall be submitted for acceptance one week prior to the request for final observation of the installation. 3.5 SPECIAL CONSIDERATIONS A. Attire: All workmen shall wear proper work clothing attire at all times. Shirts shall not be removed. Cleanliness of clothing shall not cause discomfort or problems with building residents and employees. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16010-14 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 i DONNELLY ENGINEERING ELECTRICAL SECTION 16020 TESTS AND PERFORMANCE VERIFICATION PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified in this section. 1.2 DESCRIPTION A. General: Provide all tests complete as required by codes, manufacturer's instructions, contract documents, inspection authorities and installation procedures. B. Submission: Submit completed testing results of all systems, cable, equipment, devices, etc., for acceptance prior to being energized or utilized. C. Verification: Perform verification work as required to show that the System is operating correctly in accordance with contract documents and manufacturers literature. All verification shall be done after 3-day full operational period. 1.3 QUALITY ASSURANCE A. Compliance: Testing shall comply to the following standards; 1. NEMA 2. ASTM 3. NETA 4. ANSI C2 5. ICEA 6. NFPA 1.4 QUALIFICATIONS OF TESTING FIRM A. Qualification: The testing firm shall be an independent testing organization which can function as an unbiased testing authority, professionally independent of the manufacturers, supplier, and installers of equipment or systems evaluated by the testing firm. B. Experience: The testing firm shall be regularly engaged in the testing of electrical equipment devices, installations, and systems. C. Accreditation: The testing firm shall meet OSHA criteria for accreditation of testing laboratories, Title 29, Part 1907, or be a Full Member company of the International Electrical Testing Association. D. Certification: The lead, on-site, technical person shall be currently certified by the International Electrical Testing Association (NETA) or National Institute for Certification in Engineering Technologies (NICET)i in electrical power distribution system testing. E. Personnel: The testing firm shall utilize engineers and technicians who are regularly employed by the firm for testing services. F. Proof of Qualifications: The testing firm shall submit proof of the above qualifications when requested. Heartland Health Care Center of Zephyrhills-3181 16020-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL PART 2-TESTS 2.1 EQUIPMENT A. Instruments: Supply all instruments required to read and record data. Calibration date shall be submitted on test reports. All instruments shall be certified per NETA standards and NFPA requirements. B. Adjustments: Adjust system to operate at the required performance levels and within all tolerances as required by META Standards. 2.2 APPLICATIONS A. Panelboard and Equipment Feeders: After feeders are in place, but before being connected to ` devices and equipment, test for shorts, opens and for intentional/unintentional grounds. B. Cables 600 Volts or Less: Cables 600 volts or less in size #4 AWG and larger shall be meggered using an industry approved "megger"with 1000 internal generating voltage. Readings shall be recorded and submitted to the Engineer. C. Location and Tabulation: Take readings of voltage and amperage at building main disconnect switch and at main for each panel, and at the end of the longest branch circuit at each panel. The above readings shall be taken (1) "no-load" conditions and (2) at"full-load" conditions with all equipment using electricity. Readings shall be recorded and submitted to the Engineer. 2.3 GROUNDS A. Electrode Ground: The resistance of electrodes (main service, generators, transformer, etc.) shall not exceed 5 ohms and shall be measured by The Contractor before equipment is placed in operation. Testing shall be performed on all grounding electrode installations. Testing shall be 3 point method in accordance with IEEE No. 81 Section 9.04 Standard or a clamp-on meter. Submit all ground test readings to the Engineer in tabulated format prior to energizing electrical equipment. PART 3 -EXECUTION 3.1 SUBMITTALS A. Cable Test Report: Submit Cable Test Report and Ground test to the Engineer upon completion of the test. B. Documents: Complete all information on forms at the end of this specification, project information, and certificate of completed demonstration memo. Submit data for examination and acceptance prior to final inspection request. C. Tabulated Data: Submit data on 8-1/2 x 11 inch sheets with names of the personnel who performed the test. D. Final: Submit documents before a request for final inspection. 3.2 QUANTITIES A. Quantity: Submit 2 copies as part of the record documents. Heartland Health Care Center of Zephyrhills-3181 16020-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL EQUIPOTENTIAL GROUND TEST REPORT FACILITY NAME: DATE: FACILITY ADDRESS: PROJECT NAME: JOB NUMBER: TESTED BY: TESTING COMPANY: ENGINEER COMPANY OF RECORD NAME: DONNELLY ENGINEERING ELECTRICAL CONTRACTOR: GENERAL CONTRACTOR: OWNER'S REPRESENTATIVE: TYPE OF METER USED AND EXTERNAL NETWORK(IF USED): CALIBRATION DATE: VOLTAGE MEASUREMENT IMPEDANCE GROUND ROOM DESCRIPTION MEASUREMENT PIN GROUND (C)CRITICAL POLARITY REFERENCE NO. Max MAX TENSION (G)GENERAL NO OF OTHER READING IN EC OF READINGS POINT RECEPTS. OTHER MILIVOLTS RECEPTS IN OHMS (OUNCES) I Heartland Health Care Center of Zephyrhills-3181 16020-3 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL FEEDER AND WIRING TESTS FACILITY NAME DATE FACILITY ADDRESS: PROJECT NAME TESTED BY: TESTING COMPANY: TYPE OF METER: CALIBRATION DATE: ENGINEER COMPANY OF RECORD NAME: DONNELLY ENGINEERING ELECTRICAL CONTRACTOR: GENERAL CONTRACTOR: OWNER'S REPRESENTATIVE: DESIGNATION LOCATION TABULATED DATA TARGET OR MAX/MIN eg. Panel PA eg. Main Electrical eg. 4#250MCM— 0.1 MV Max Room A=0.05MV B=0.06MV C=0.8MV eg. Panel PA eg. Main Electrical eg. Shorted to phases Room Heartland Health Care Center of Zephyrhills-3181 16020-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL GROUND TESTS FACILITY NAME DATE FACILITY ADDRESS: PROJECT NAME TESTED BY: TESTING COMPANY: TYPE OF METER: CALIBRATION DATE: ENGINEER COMPANY OF RECORD NAME: DONNELLY ENGINEERING ELECTRICAL CONTRACTOR: GENERAL CONTRACTOR: OWNER'S REPRESENTATIVE: DESIGNATION LOCATION TABULATED DATA TARGET OR MAX/MIN eg. Main Ground Rod eg. Exterior of Main eg. 4.3 OHMS 5 OHMS Max Access Box 1 Electrical Room +I END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16020-5 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 j i DONNELLY ENGINEERING ELECTRICAL SECTION 16030 ELECTRICAL IDENTIFICATION PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.2 DESCRIPTION A. Extent: Electrical identification work as required by the Contract Documents or other specifications. B. Types: Electrical identification work specified in the Contract Documents include the following; 1. Electrical power, control and communication conductors. 2. Operational instructions and warnings. 3. Danger signs. 4. Conduits, boxes, etc. 5. Distribution Equipment. 6. Cabinets. 7. Equipment/system identification signs and tags. 1.3 QUALITY ASSURANCE A. Manufacturers: Firms regularly engaged in manufacturer of electrical identification products of types required, whose products have been in satisfactory use in similar service for not less than 3 years. B. NEC Compliance: Comply with NEC as applicable to installation of identifying labels and markers for wiring and equipment. C. UL Compliance: Comply with applicable requirements of UL Standard 969, "Marking and Labeling Systems", pertaining to electrical identification systems. D. ANSI Compliance: Comply with applicable requirements of ANSI Standard A13.1, "Scheme for the Identification of Piping Systems", and ANSI Standard Z53.1 "Color Designation." E. NEMA Compliance: Comply with applicable requirements of NEMA Standard No's. WC-1 and WC-2 pertaining to identification of power and control conductors. F. ADA Compliance: All signage shall meet ADA standards. Identification for maintenance purposes shall be as specified herein. 1.04 SUBMITTALS A. General: Submit shop drawings of all identification materials to be used for this project. Submit one sample of each item to the Engineer for review and acceptance. Heartland Health Care Center of Zephyrhills-3181 16030-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL PART 2-PRODUCTS 2.1 ACCEPTABLE SUPPLIERS OR MANUFACTURERS A. General: Subject to compliance with requirements, manufacturers offering electrical identification products which may be incorporated in the work include, but not limited to, the following; 1. Alarm Supply Co, Inc. 2. Direct Safety Co. 3. Ideal Industries, Inc. 4. LEM Products, Inc. 5. Markal Company 6. National Band and Tag Co. 7. Panduit Corp. 8. Seton Name Plate Co. 9. Thomas and Betts Co. 10. Carlton Industries, Inc. 2.2 LANGUAGE A. General: Provide all products in this section in English. 2.3 ELECTRICAL IDENTIFICATION MATERIALS A. General: Except as otherwise indicated, provide manufacturer's standard products of categories and types required for each application. Where more than one single type is specified for an application, selection shall be at the installer's option, however, provide a single selection for each application. B. Conduit System Markers: Provide manufacturer's standard pre-printed, flexible, permanent, conduit markers, extending 360 degrees around conduits. Markers shall be designed for attachment to conduit by adhesive, adhesive lap joint, matching adhesive plastic tape at each end of marker, or pretensioned snap-on. Color shall match system printing requirements. C. Voltage Marking: Except as otherwise indicated, provide lettering which indicates voltage of the conductor(s) in conduit. Provide 4 inch minimum length with 7/8 inch minimum lettering for 2 inch and smaller conduit. Provide 8 inch minimum length with 1-1/4 inch minimum lettering for larger than 2 inch conduit. Provide one marker for each 20' section of conduit. Color shall match system printing requirements. D. Painted Band: Provide painted bands in color to match plastic markers or tape on all conduit. = Provide colors as specified herein. E. Cable/Conductor Identification Bands: Provide manufacturer's standard vinyl cloth self-adhesive cable/conductor markers of the wrap-around type; either pre-numbered plastic coated type, or write- on type with clear plastic self-adhesive cover flap; numbered to show circuit identification. F. Plasticized Tags: Manufacturer's standard preprinted or partially preprinted accident prevention and operation tags, of plasticized card stock with matt finish suitable for writing, approximately 3-1/4 x 5-5/8 inch, with brass grommets and wire fasteners, and with appropriate pre-printed wording including large size primary wording, e.g., DANGER, CAUTION, DO NOT OPERATE. Heartland Health Care Center of Zephyrhills-3181 16030-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL G. Baked Enamel Danger Signs: Provide manufacturer's standard "DANGER" signs of baked enamel finish on 20 gauge steel; of standard red, black and white graphics; 14 x 10 inch size except where 10 x 7 inch is the largest size which can be applied where needed, and except where larger size is needed for adequate vision; with recognized standard explanation wording, and subsequent directive e.g. HIGH VOLTAGE, KEEP OUT; BURIED CABLE, DO NOT DIG; LIVE PARTS, DO NOT TOUCH SWITCH. H. Engraved Plastic Laminate Nameplates: Provide engraving phenolic plastic laminate, in sizes and thicknesses indicated, engraved with 1/16 inch thick lines with square standard pica lettering and wording as specified herein, black face and white core plies (letter color) for normal systems, kelly green and white for equipment, bright orange and white for critical, bright yellow and white for life safety, and red and white for fire alarm and where noted in the specifications. Punch for mechanical fastening, except where adhesive mounting is necessary because of substrate. Material thickness shall be 1/16 inch. Provide beveled edge in order to eliminate sharp corners. Provide self-tapping stainless steel round head screws. Provide contact type permanent adhesive where screws cannot or shall not penetrate the substrate. Adhesive nameplate shall be permanently installed. Titles shall be 1/2 inch high and all other lettering shall be 1/4 inch high. I. Underground Type Plastic Line Marker: Manufacturer's standard permanent, bright colored, continuous printed, metal backed plastic tape, intended for direct burial service; not less than 6 inches wide x 4 mils thick. Provide tape with printing which most accurately indicates the type of service or type of buried cable. J. Junction Box Identification: Provide neat indelible felt tip, stenciled marking on junction box and pullbox covers. Letter sizes shall be 1 inch high minimum. Provide non-stenciled markings inside the junction box and on the exterior edge to match the cover markings. 2.4 LETTERING AND GRAPHICS A. General: Coordinate names, abbreviations, and other designations used in electrical identification work, with corresponding designations specified or scheduled. Provide numbers, lettering and wording as indicated or, if not otherwise indicated, as recommended by the manufacturer and as required for proper identification and operation/maintenance of the electrical system equipment. Comply with ANSI A13.1 pertaining to minimum sizes for letters and numbers. B. Size: System identification labeling consists of providing minimum 1/2 inch high stenciled black letters for raceway systems. PART 3 -EXECUTION 3.1 APPLICATION AND INSTALLATION A. Installation: Install electrical identification products as indicated, in accordance with manufacturer's written instructions, as required by the NEC and as specified herein. B. Coordination: Where identification is to be applied to surfaces which require a field finish application, install identification after completion of such application. C. Regulations: Comply with governing regulations and requests of governing authorities for the identification of electrical work. D. Hazards: Identify all rooms, spaces, and equipment, which house potential electrical hazards, and label with appropriate signage or indicators. Heartland Health Care Center of Zephyrhills-3181 16030-3 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 3.2 RACEWAY SYSTEM IDENTIFICATION A. Color Coding: All electrical conduit shall be identified by color-coding. Apply color-coded identification on electrical conduit in a neat and workmanlike manner. Utilize a stencil for application of paint. B. Identification: Identify all raceways provided or utilized as part of this project as follows; 1. Apply bands 10 feet on center along the raceway system and at each side of walls or floors, and at branches from mains. 2. Identify the following services; Service Label a. Low Voltage 120/208 Volts b. Life Safety Life Safety C. Critical Critical d. Equipment Equipment e. Emergency Emergency 3. Spot Painting on Rough-in; a. Conduit, raceways, boxes, backboxes, panelboards, etc. shall be spot painted. Conduit shall be identified within 6 inches of the box or enclosure. The entire box and coverplate shall be painted. b. Use following colors for color bands and for color coding; System Color 1) Emergency Orange 2) Critical Bright Orange 3) Equipment Kelly Green 4) Nurse Call Light Blue 5) EDP Normal Purple 3.3 CABLE/CONDUCTOR IDENTIFICATION A. General: Apply cable/conductor identification, including voltage, phase and feeder number, on each cable/conductor in each box/enclosure/cabinet where conductors of more than one circuit or communication (such as color coded conductors) is provided. Match identification with marking system used in panelboards, shop drawings, contract documents, and similar previously established identification for the project's electrical work. B. Color Coding: Color code all power and lighting cable. Use wire colored by integral pigmentation, making the wire 100 percent colored. Where not practicable or available (in larger conductor sizes), color code the wire by using colored plastic tape, painting the ends accessible at junction or pull boxes, or other method acceptable to the Engineer. Use the following chart as applicable; 120/208 CONDUCTOR VOLTS Phase A Black Phase B Red Phase C Blue Heartland Health Care Center of Zephyrhills-3181 16030-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL Neutral White Ground Green 3.4 OPERATIONAL IDENTIFICATION AND WARNINGS A. General: Provide identification and warning wherever reasonably required to ensure safe and efficient operation and maintenance of the electrical systems. Provide identification and warning identification if necessary for signage to help prevent misuse of electrical facilities by unauthorized personnel. B. Plasticized signs: Install self-adhesive plastic signs or similar equivalent identification, instruction or warnings on switches, outlets and other controls, devices and covers of electrical enclosures. Where detailed instructions or explanations are needed, provide plasticized tags with clearly written messages adequate for the intended purposes. C. Locations: In addition to installation of danger signs required by governing regulations and authorities, install appropriate danger signs at locations indicated and at locations subsequently identified as constituting dangers for persons in or about the project. D. Critical Switches/Controls: Install danger signs on switches and similar controls, regardless of whether concealed or locked up, where untimely or inadvertent operation (by anyone) could result in significant danger to persons, or damage to or loss of property. E. Electrical Equipment Rooms: Provide warning signage at the entrance to each such room; identify the hazard, and direct non-qualified personnel to stay away. F. Equipment Identification: 1. Nameplates: Install an engraved phenolic plastic laminate nameplate on each unit of electrical equipment in the building, including central or master unit of each electrical system unless unit is specified with its own self-explanatory identification or signal system. Except as otherwise indicated, provide single line of text. Provide text matching terminology and numbering of the contract documents and shop drawings. a. Normal system shall be 1/2 inch high white lettering in a black field. b. Life safety system - 1/2" high with black letters in a yellow field. C. Critical system— 1/2" high with white letters in orange field. d. Equipment system - 1/2" high with white letters in a green field. 2. Locations: Provide nameplates for each unit of the following categories of electrical work; a. Switchboard, panelboards, electrical cabinets, and enclosures. 1) Provide a nameplate inside, outside and above the door (if equipped with one) listing its designation, voltage, source and circuit number. b. Access panel/doors to electrical facilities. C. Major electrical switchgear and switchboards. d. Power Transfer Equipment. e. Motor starters. f. Disconnect switches. g. Light switch cover plate. Heartland Health Care Center of Zephyrhills-3181 16030-5 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 1) Provide 3/16 inch engraved and "filled in" lettering indicating panelboard and circuit number"where fed from". Fill red coverplates with white filler. Fill white coverplates with black filler. h. Receptacle coverplate 1) Provide 3/16 inch engraved and "filled in" lettering indicating panelboard and circuit number"where fed from". Fill red coverplates with white filler. i. Communication Control Panels, Terminal Cabinets and Equipment Cabinets. j. Telephone Switching Equipment k. Remote Annunciators I. Terminal Boards M. Other similar equipment as designated by the Engineer. 3. Viewing: Install nameplates at locations indicated and where not otherwise indicated at a location for the best convenience of viewing without interference with operation and maintenance of equipment. a. Secure to substrate with rigid fasteners. Utilize adhesive where fasteners cannot penetrate substrate. b. - Designate branch of essential power system (i.e. Life Safety, Critical, or Equipment branch) on nameplate after the word emergency, and Equipment designation. 4. Names: The names or wording used for a particular machine shall be the same as the one used on all motor starters, disconnects and remote button stations nameplates for that machine. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16030-6 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 i i DONNELLY ENGINEERING ELECTRICAL SECTION 16110 RACEWAYS AND CONDUIT PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section. 1.2 DESCRIPTION A. General: Provide all supports, hangers and inserts required to mount conduit, pullboxes and other equipment provided under this Division. B. Support: All items shall be supported from the structural portion of the project where applicable. Supports and hangers shall be of a type listed by Underwriters' Laboratories. Wire shall not be used as a support. Boxes and conduit shall not be supported or fastened to ceiling suspension wires or to ceiling channels. Do not install any devices supported by ceiling tiles. C. Installation: The Contractor shall lay out and provide their work in advance of the any construction of floors or walls, and shall provide all sleeves that may be required for openings through floors, walls, etc. Where plans call for conduit to be run exposed, provide all inserts and clamps for the supporting of conduit. D. Systems: Provide conduit system of empty raceways including terminal cabinets, backboards and outlets as described and specified herein. 1.3 QUALITY ASSURANCE A. Qualifications: Manufacturers shall be regularly engaged in the manufacture of conduit systems and fittings of types and sizes required, and whose products have been in satisfactory use in similar service for not less than 5 years in the USA. B. Compliance: Materials shall comply with the latest edition of the following standards as they apply to the different raceway types specified herein; 1. ANSI: a. ANSI C80.1: Rigid Steel Conduit(RSC) b. ANSI C80.3: Electrical Metallic Tubing (EMT) 2. UL: a. UL 1: Flexible Metal Conduit b. UL 6: Rigid Steel Conduit(RSC) C. UL 360: Liquid-Tight Flexible Metal Conduit d. UL 514: Fittings for Metal Conduit e. UL 797: Electrical Metallic Tubing (EMT) f. UL 1242: Intermediate Metal Conduit(IMC) 3. NEMA: a. NEMA TC3: Fittings for Rigid Nonmetallic Conduit(RNMC) b. NEMA RN1: Plastic Coated Metal Conduit 4. Federal Specifications: a. WW-C-581: Rigid Steel Conduit(RSC) b. WW-C-563: Electrical Metallic Conduit(EMT) C. WW-C-566: Flexible Steel Conduit d. WW-C-581 E: Intermediate Metallic Conduit(IMC) e. WC-582A Conduit, Raceway, Metal and Fittings Heartland Health Care Center of Zephyrhills-3181 16110-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DON NELLY ENGINEERING ELECTRICAL 1.4 CONDUIT A. General: Provide a complete and continuous system of raceways to maintain a protected path for wires and cables to distribute electric power, and low voltage systems throughout the project, utilizing UL listed or NRTL (nationally recognized testing laboratory) and labeled materials. B. Accessories: Provide conduit accessories of types, sizes, and materials, as specified herein complying with manufacturers published product information, which match and mate conduit and tubing. C. Interior Minimum Size: Minimum conduit size for light and power systems shall be 3/4 inch conduit for all power and lighting circuitry homeruns from panelboard to outlet box at first power consuming devices. The remainder of circuitry may be in 1/2 inch conduit, if it contains no more than 4 conductors per conduit (excluding the equipment grounding conductor), and phase conductors no larger than #12 AWG. Switchlegs may be 1/2 inch conduit unless otherwise noted on drawings. D. Site Underground Conduit: Unless otherwise noted, minimum underground raceways shall be 1 inch conduit. Homeruns from the branch circuit overcurrent device, through any control devices to the first exterior junction box or device shall be 1 inch minimum. E. System Conduit: Provide end bushings on all conduits. F. Pull Strings: Provide pull strings in all empty raceways. Pull strings shall be nylon and shall be impervious to moisture. Pull strings installed in one inch and smaller conduits shall have a tensile strength of not less than 30 lbs. Pull strings installed in conduits larger than 1 inch shall a tensile strength not less than 200 lbs. G. Conduit Bends: The use of NEC.Table 346.10 Exception is not allowed. 1.5 LOCATIONS A. Materials Above Grade: The following conduit types are to be installed above grade where specifically noted herein; 1. Electrical metallic tubing (thin wall) 2. Intermediate metallic conduit Hospital Grade 3. Flexible metal conduit Hospital Grade only. Where specifically noted on drawings. . 4. Liquid-tight flexible metal conduit. Where specifically noted on drawings. 5. Galvanized rigid steel conduit B. Materials Below Grade: The following conduit types are to be installed below grade where specifically noted herein; 1. Rigid galvanized conduit(heavy wall) 2. Intermediate metal conduit(IMC) 3. Sched 40 PVC. Note: not allowed in or below patient care areas. PART2 -PRODUCTS 2.1 ELECTRICAL METALLIC TUBING i A. Fittings: Provide steel set screw fittings. Steel fittings-shall be fitted with nonremovable insulated throats, and male threaded ends provided with a locknut. B. Locknuts: Provide locknuts for securing conduit to enclosures with sharp edges for digging into metal, a'nd ridged outside circumference for proper fastening. i Heartland Health Care Center of Zephyrhills-3181 16110-2 DE No 217032 j 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL C. Prohibited material: Die cast or pressure cast zinc-alloy fittings and fittings made of "pot metal' are prohibited. Indent type connectors or couplings are prohibited. 2.2 BUSHINGS A. Bushings: Bushings shall be provided on all terminations, all essential system conduits, mounted on the ends of all EMT connectors 1-1/4 inches and larger and within all equipment. B. Construction: Bushings shall have a flared bottom and ribbed sides, with smooth insides to prevent damage to cable insulation. C. Insulating Ring: Mold a phenolic insulating ring into sizes 1-1/4 inches and larger. D. Grounding: Provide a screw type grounding terminal on all sizes. E. Grounding Bushings: Grounding bushings shall be provided on all essential electrical system feeder conduits. 2.3 RIGID METAL CONDUIT A. Conduit: Conduit ends shall have precision cut hi-torque threads. One end of the conduit shall have a coupling and the other shall be covered with a color-coded plastic thread protector. Conduit shall be manufactured in 10 foot lengths. B. Fittings: Fittings shall be cut groove steel. Cast fittings are not acceptable. 2.4 FLEXIBLE STEEL CONDUIT A. Conduit and Standards: A continuous length, spirally wound steel strip, zinc-coated, each convolution interlocked with following convolution into a helix form. Product shall meet Federal Specification WW-C-566 and UL 1242. All conduit shall be"hospital grade". Installation where specifically noted on the drawings only. B. Fittings: Provide conduit fittings for use with flexible steel conduit of the threadless hinged clamp type, and a male threaded end, insulated throat, provided with a locknut. 1. Straight terminal connectors shall be one piece body, female end with clamp and deep slotted machine screw for securing conduit. 2. 45 and 90 degree terminal angle connectors shall be 2 piece body, with removable upper section, female end with clamp and deep slotted machine screw for securing conduit. 2.6 LIQUID-TIGHT FLEXIBLE STEEL CONDUIT A. Conduit: Plastic jacketed (PVC) liquid-tight flexible steel conduit with copper bonding conductor, and steel material galvanized inside and outside. Installation where specifically noted on the drawings only. B. Fittings: Provide cadmium plated, malleable iron fittings with compression type steel ferrule and neoprene gasket sealing rings with insulated throat. 2.6 INTERMEDIATE METAL CONDUIT A. Type: Intermediate metal conduit (IMC) shall be high frequency electro-welded into tube form to produce a high ductile conduit that can be easily bent with standard tools approved for IMC. Heartland Health Care Center of Zephyrhills-3181 16110-3 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DON NELLY ENGINEERING ELECTRICAL B. General: Conduit ends shall have precision cut hi-torque threads. One end of the conduit shall have a coupling and the other shall be covered with a color-coded plastic thread protector. Conduit shall be manufactured in 10 foot lengths. C. Finish: The electro-galvanized zinc finish shall be corrosion resistant and shall not crack or flake. A chromate conversion coating shall be applied over the entire tube as an additional corrosive preventative. The interior shall be protected and lubricated with a special silicone hard finish enamel. 2.7 MALLEABLE IRON EXPANSION FITTINGS B. Type: Conduit expansion fittings shall be malleable iron (hot dipped galvanized inside and outside). C. Fittings: These fittings shall have a 4 inch expansion chamber to allow approximately 2 inch movement parallel to conduit run in either direction from normal. D. Internal Bonding: Fittings shall have factory-installed packing and internal tinned copper braid packing to serve as a bonding jumper. E. External Bonding: Unless the fitting used is listed by Underwriters Laboratories for use "without external bonding jumpers", an external copper bonding jumper shall be installed with each metal expansion fitting. One end of the fitting shall be clamped on each conduit entering fitting. 2.8 SUPPORTING DEVICES A. Hangers: Hangers shall be made of durable materials suitable for the application involved. Where excessive corrosive conditions are encountered, hanger assemblies shall be protected after fabrication by galvanizing, or approved suitable preservative methods. B. Materials: Insert anchors shall be installed on concrete or brick construction, with hex head machine screws. Recessed head screws shall be used in wood construction. An electric or hand drill shall be used for drilling holes for all inserts in concrete or similar construction. Installed inserts, brick, shall be near center of brick, not near edge or in joint. Drilled and tapped, and round head machine screws shall be used where steel members occur. All screws, bolts, washers, etc., used for supporting conduit or outlets shall be fabricated from rust-resisting metal, or accepted substitution. Gunpowder set anchors are not permitted. C. Exterior: Supporting devices for exterior use shall be 316 stainless steel unless otherwise noted on drawings. D. PVC Coated Conduit: Supporting devices for PVC coated conduit shall be as manufactured by the PVC coated conduit manufacturer and shall match in color and appearance. 2.9 WIREWAYS A. General: Wireway shall be sized as shown on drawings, NEMA 1, lay-in type. Wireway sides and bottom shall contain no knock-outs. The Contractor shall punch holes required. The cover shall be hinge type with quarter turn fasteners to hold cover shut. Covers and bodies shall be 16 gauge steel. Wireway shall be as manufactured by Hoffman Engineering Company, Square"Y or Steel City. 2.10 PVC CONDUIT A. General: PVC conduit shall not be utilized anywhere except for site underground conduits as noted 'or detailed, provide for sleeves where specified or detailed. B. Location: No PVC shall be allowed anywhere except underground or in slab, with the exception that PVC conduit may be used in non-fire rated poured block walls and poured in place columns. Heartland Health Care Center of Zephyrhills-3181 16110-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 j DONNELLY ENGINEERING ELECTRICAL C. Floor Penetrations In Block: PVC may also be used for penetrations of floor into concrete block or hollow walls up to first outlet box provided outlet box is at a maximum height of 48 inches above finished floor. D. Joints: PVC joints shall be solvent welded. Threads shall not be permitted on PVC conduit and fittings, except for rigid steel to PVC couplings. Installation of PVC conduit shall be in accordance with manufacturer's recommendations. E. Ground Conductor Installation: All individual bare copper ground conductors (i.e. service, transformer, or lightning protection grounds) shall be installed in PVC conduit. F. Support: PVC conduit shall not be used to support fixture or equipment. G. Bends: Field bends shall be made with an approved hotbox. Heating with flame and hand held dryers are prohibited PART 3 -EXECUTION 3.1 IDENTIFICATION OF BOXES A. Tags: During installation of pull strings all pull strings shall be marked with vinyl tags indicating where the opposite end may be found. B. Boxes: Provide fixed label on boxes indicating circuit, panel and use of box eg. "power 120V, lighting 120V". Refer to identification specification section 3.2 BLANK PLATES A. Plates: Unless otherwise noted all outlet boxes shall receive blank plates matching the finish of plates on electrical devices in the same room. 3.3 RACEWAY INSTALLATION A. Support: All raceways shall be run in a neat and workmanlike manner and shall be properly supported and in accordance with the latest edition of the NEC. Supporting conduit and boxes with wire is not acceptable. Exposed raceways where allowed, shall be supported with clamp fasteners with toggle bolt on hollow walls, and with lead expansion shields on masonry. All conduits shall be securely fastened in place with at least one support per eight foot section. Support within one foot of changes in direction. All required hangers, supports and fastenings shall be provided at each elbow and at no more than one foot from the end of each straight run terminating at a box or cabinet. The use of perforated iron for supporting conduits shall not be permitted. The required strength of the supporting equipment and size and type of anchors shall be based on the combined weight of conduit, hanger and cables. Horizontal and vertical conduit runs may be supported by one-hole malleable straps, clamp-backs, or other accepted devices with suitable bolts, expansion shields (where needed) or beam-clamps for mounting to building structure or special brackets. B. Hanger Installation: Where 2 or more conduits 1 inch or larger run parallel trapeze hangers may be used consisting of concrete inserts, threaded solid rods, washers, nuts and galvanized "L" angle iron, or Unistrut cross members. These conduits shall be individually fastened to the cross member of every other trapeze hanger with galvanized cast one hole straps, clamp backs, bolted with proper size cadmium machine bolts, washers and nuts. If adjustable trapeze hangers are used to support groups of parallel conduits, U-bolt type clamps shall be used at the end of a conduit run and at each elbow. J-bolts, or approved clamps, shall be installed on each third intermediate trapeze hanger to fasten each conduit. C. Sealant: Provide a closed cell silicone foam sealant rated to provide a rating equal to the wall, ceiling, or floor assembly rating. Provide seals for the exterior of conduit penetrations consisting of a cast-in-place sleeve with a compressible rubber gasket between the conduit and the sleeve. Provide seals for the interior Heartland Health Care Center of Zephyrhills-3181 16110-5 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DON NELLY ENGINEERING ELECTRICAL of the conduit penetrations consisting of gland type sealing bushing or closed cell silicone foam. Provide duct seal inside an appropriate seal-off fitting to seal the interior of the conduit system from water seepage or hazardous gases. D. Routing: Conduits shall be run parallel to building walls wherever possible, exposed or concealed as specified, and shall be grouped in workmanlike fashion. Crisscrossing of conduits shall be minimized. E. Location: All raceways shall be run concealed from view. Surface mounted devices and equipment shall be specifically noted on the contract drawings or shall be located where panelboards are surface mounted. It is the intent that all raceways shall be run concealed unless specifically noted. F. Protection: All raceway runs, whether terminated in boxes or not, shall be capped during the course of construction until wires are pulled in and covers are in place. No conductors shall be pulled into raceways until the raceway system is complete. G. Coordination: All raceways shall be kept clear of mechanical equipment and plumbing fixtures to facilitate future repair or replacement of said fixtures without disturbing wiring. Except where it is necessary for control purposes, all raceways shall be kept away from items producing heat. H. Masonry Installation: All raceway runs in masonry shall be installed at the same time as the masonry so that no face cutting is required, except to accommodate boxes. I. Arrangement: All raceways shall be run connecting outlet to circuits generally as shown on the drawings. Provide circuit connection arrangement shown. Actual final arrangement shall be in accordance with the record drawings section as specified herein. J. Grounding: All branch circuit and feeder raceways shall have a insulated copper system ground conductor within the conduit throughout the entire length of the circuit. All conduit shall be electrically continuous to establish redundant grounding. 1. Branch circuit raceways shall have an insulated equipment grounding conductor installed within the conduit raceway system. 2. Grounding conductor shall be included in total conduit fill determining conduit sizes, even though not shown on drawings. 3. Grounding conductors run with feeders shall be green insulated only. 4. Grounding conductors run with normal and essential electrical system feeders serving patient care area shall be bonded to portions of conduit that are metal by listed grounding bushings. K. Empty Raceways: Raceways which do not have conductors provided under this Division of the specifications shall be left with an acceptable nylon pullcord in raceway. L. Manufacturer: Rigid Metallic Conduit, Electrical Metallic Tubing, Flexible Steel Conduit, Liquid-Tight Flexible Conduit, and PVC Conduit shall be manufactured within the United States, and each shall be as manufactured by one manufacturer. M. Roof Installation: Conduit installations on roofs shall be exposed to a bare minimum. Conduit shall not be installed on roofs. Metal conduit stubs to mechanical equipment or receptacles are allowed however they must connect directly to the equipment or device without resting or supported on the roof. N. Firewall Installation: Provide pullboxes, junction boxes, fire barrier at fire rated walls etc., as required by NEC Article 300 where required. O. Dissimilar Metals: Avoid the use of dissimilar metals to reduce the possibility of electrolysis. Where dissimilar metals are in contact, coat all surfaces with corrosion inhibiting compound before assembling. P. Sealoff Fittings: Provide conduit sealoffs wherever the raceway system enters a hazardous or wet area'or areas of drastic temperature change such as coolers, freezers, etc. as required. Heartland Health Care Center of Zephyrhills-3181 16110-6 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL Q. Identification: Provide appropriate identification as required by codes and as indicated on the drawings and in accordance with the methods specified herein. R. Conduit: Conduits shall be anchored down to prevent floating while pouring in concrete. 3.4 RIGID METALLIC CONDUIT A. Locknuts: Rigid steel box connections shall be made with double locknuts and bushings. Turn down on threads to solidly connect raceway to box or enclosure. B. Bushings: Grounded insulated bushings shall be used on all rigid steel conduits terminating in panels, wire gutters, or cabinets in accordance with NEC 517 applicable sections. Bushing shall be impact resistant plastic molded in an irregular shape at the top to provide smooth insulating surface at top and inner edge. Material in these bushings must not melt or support flame. 3.5 FLEXIBLE CONNECTIONS A. Vibrating Equipment Connection: All connections to motors or other vibrating equipment or at other locations where required shall be made with not less than 12 inches of flexible liquid-tight steel conduit, using special type of connectors with strain relief fittings at both terminations of conduit, Kellems Type 074- 09 Series or accepted substitution. B. Normal Type: Flex connectors shall have insulated throat and shall be T & B 3100 Series or accepted substitution. C. Angle Type: Use angle connectors wherever necessary to relieve angle strain on flex conduit. D. Transformer Connection: Connections to dry type transformers shall be made with flexible conduit. 3.6 EXPANSION FITTINGS A. Installation: Provide expansion fittings in each conduit run wherever it crosses an expansion joint. Install the fitting on one side of the joint with its sliding sleeve end flush with joint, and with a length of bonding jumper in expansion equal to at least three times the normal width of joints. B. Location: Provide expansion fittings in each conduit run which is mechanically attached to separate structures to relieve strain caused by shift on one structure in relation to the other. C. Length: Provide expansion fittings in straight conduit runs above ground which are more than one hundred feet long. 3.7 ELECTRICAL METALLIC TUBING A. Location: Install Electrical Metallic Tubing (thin wall) inside buildings, above the ground floor where not subject to mechanical injury. B. Handling: All cut ends shall be reamed to remove rough edges. 3.8 PVC CONDUIT A. Ground Conductor Installation: All Individual bare copper ground conductors (i.e. service, transformer, or lightning protection grounds) shall be installed in PVC conduit. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16110-7 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 . . 'DONNELLYENG|NEERNG ELECTRICAL SECTION16120 CONDUCTORS AND CABLES PART I -GENERAL 1'1 RELATED DOCUMENTS , A. General: Drawings and general provisions of the Contract, including General ond8upp|ennenbary Conditions and Division 1 Specification sections, apply to work specified of this section. , 1'2 CONDUCTORS AND CABLES A. Description: Provide complete and continuous system of conductors as specified herein. All conductors shall be in accordance with the latest edition of the NEC. All conductors shall be copper for power applications. System and communication cables are specified in other sections. 1'3 QUALITY ASSURANCE A. Qualifications: Manufacturers shall be regularly engaged in the manufacture of conductor systems and fittings of types and sizes requined, and vxhoaa products have been in satisfactory use in o|nni|ar oen/iva for not |een than 5 years in the USA. All conductors and cables shall be a product manufactured in the USA. . B. Compliance: Materials shall comply with the following standards and codes as they apply to the different wire types specified herein. 1. UL o. 44-Rubber insulated wire and cables. b. 83-Thermoplastic insulated wires. C. 48O-A-8O-Wire connectors and soldering lugs for use with copper. d. 4O8B-Splicing wire connectors e. 493 -Thermoplastic insulated underground feeder and branch circuit cables. 2. NFP&: a. 70NEC PART2-PRODUCTS ^ 2.1 GENERAL A. Power Conductors: Branch circuit and feeder conductors for electric power shall be copper Utilize THHN/THVVN insulation for branch circuits and THVVN/KHHVV insulation for feeders, unless specificallynoted otherwise. Conductors #10 AWG and smaller shall shall be stranded. No aluminum wiring shall be permitted. All wire shall be sized as shown on the drawings. If no branch circuit size is shown, wire shall be#12 AWG or as required by code, except that branch "homeruns" over 50 ft. in length shall be #10 AWG for 120/208V circuits. Conductorsl in the vicinity of heat-producing equipment shall be type XHHW insulation. All wiring shall be manufactured in the USA and of 98 percent resistivity. #14 AWG minimum size conductors shall be used for fire alarm system powered NAC circuits. Heartland Health Care Center of Zephyrhills-3181 10120-1 OENo217O32 3D22U Henry Drive,Zephyrhi||o. FL33542 Pending Emergency Rule 5QA'4.12O5 | DONNELLY ENGINEERING ELECTRICAL B. Taps and Splices: All copper taps and splices in #8 AWG or smaller wire shall be fastened together by means of"wirenut"connectors (Ideal or accepted substitution). "Plug-In quick connect" devices are strickly prohibited from installation on the project or in manufacturers equipment. All taps and splices in wire larger than #8 AWG shall be made with compression type connectors and taped to provide insulation equal to the conductor. All taps and splices in manholes or in ground pull box shall be made with compression type connectors and covered with Raychem heavy wall cable sleeves (type CTE or WCS) with type "S" sealant coating. Provide sleeve kits as per manufacturer's installation instructions. C. Color Coding, General: All power feeders and branch circuits #8 AWG and smaller shall be installed with color-coded wire with the same color used for the system throughout the building. Power feeders above #8 AWG shall either be fully color-coded or shall have black insulation and be similarly color-coded with tape in all junction boxes and panels. Tape shall cover the conductor insulation within the box or panel in such a manner so as to allow standard markings to be readily observed. D. Colors: Unless otherwise accepted, color-code shall be as indicated in the Identification section of the specifications. All switch legs, other voltage system wiring, control and interlock wiring shall be color-coded other than those listed in the Identification Section of these specifications. E. Submittals: Submit cut sheets on all major types of conductors and cables including splicing tape, and terminating/splicing lugs or connectors and cable sleeves. 2.2 CONTROLS A. General: Control cables shall be as specifically indicated on the contract drawing documents, however the manufacturer's installation instructions shall be utilized to determine the required type and size of cable to be utilized. The type will also be governed by the installation method and location. 2.3 MANUFACTURERS A. General: Branch circuit and feeder conductors shall be manufactured by one of the following: General Cable Co., Anaconda, Pirelli or Rome Cable Corporation. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16120-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 i I DON NELLY ENGINEERING ELECTRICAL SECTION 16130 OUTLET BOXES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.2 DESCRIPTION A. General: Outlet boxes shall be of such form and dimensions as to be adapted to the specific use and location, type of device or fixtures to be used, and number and size of conductors and arrangement, size and number of conduits connecting thereto. All boxes shall be one piece only. B. Ceiling Size: Ceiling outlet boxes shall be 4 inch octagonal or 4 inch square by 1-1/2 inches deep or larger as required for number and size of conductors, conductor arrangement, conductor sizes and the number of conduits terminating at the box. C. Wall Size: Switch, wall receptacle, telephone and other wall outlet boxes in drywall shall be one piece only 4 inch square by 1-1/2 inches deep. For exposed masonry, provide recessed one piece:4 inch square by 1-1/2 inches deep wall boxes with appropriate 4 inches square cut tile wall covers Steel City series #52-C-49/52-C-52 or accepted substitution. For furred-out block walls, provide 4 inch square box with required extension for block depth and required extension for drywall depth. 1.3 QUALITY ASSURANCE A. Qualifications: Manufacturers shall be regularly engaged in the manufacture of conduit systems and fittings of types and sizes required, and whose products have been in satisfactory use in similar service for not less than 5 years in the USA. All boxes shall be manufactured in the USA. B. Compliance: Materials shall comply with the following standards as they apply to the different raceway types specified herein. 1. UL-50 & UL-514 2. NEC 70 1.4 SPECIAL PURPOSE OUTLETS B. Location: Locate special purpose outlets as indicated on the drawings for the equipment served. Location and type of outlets shall be coordinated with appropriate trades involved. The securing of complete information for proper electrical roughing-in shall be included as work required under this section of specifications. r PART 2-PRODUCTS I 2.1 GENERAL PURPOSE BOXES A. General: Provide standard galvanized one-piece steel outlet boxes at all concealed outlets for electric lights, switches, convenience receptacles, telephone outlets, etc. No multi piece boxes are allowed. Acceptable manufacturers shall be T&B, Steel City, Raco. Surface outlet boxes and conduit bodies shall be the heavy cast aluminum or iron with external raised hubs - Appleton, Crouse Hinds or Steel City or accepted substitution. Trim rings shall also be of one piece construction. Heartland Health Care Center of Zephyrhills-3181 16130-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 I I I DONNELLY ENGINEERING ELECTRICAL B. Exposed Boxes: Exposed boxes shall be cast type. PART 3 - EXECUTION 3.1 INSTALLATION OF OUTLET BOXES A. Installation: All flush outlets shall be mounted so that covers and plates shall finish flush with finished surfaces without the use of shims, mats or other devices not submitted or accepted for the purpose. Add-a-Depth ring or switch box extension rings (Steel City #SBEX) are not acceptable. Plates shall not support wiring devices. Gang switches with common plate where two or more are indicated in the same location. Wall-mounted devices of different systems (switches, thermostats, etc.) shall be coordinated for symmetry when located near each other on the same wall. Outlets on each side of walls shall have separate boxes. Through-wall type boxes shall not be permitted. Back- to-back mounting shall not be permitted. Trim rings shall be extended to within 1/8 inch of finish wall surface. B. Stud Walls: Outlet boxes mounted in metal stud walls, shall be supported to studs with 2 screws inside of outlet box to a horizontal stud brace between vertical studs. Do not mount screws on the face of the studs. C. Blank Covers: All outlet boxes that do not receive devices in this contract are to have blank plates installed matching wiring device plates. 3.2 MOUNTING HEIGHT A. Mounting Height: Height of wall outlets to center or bottom of box above finished floor shall be as follows, unless specifically noted otherwise. Verify all heights with the Architectural plans and shop drawings for installation. The following dimensions are a guide only. Specific heights required by governing institutions and laws shall apply. Switches & Dimmers 4 foot 0 inches to centerline Receptacles 2 foot 0 inches to centerline 4 feet or inches or 9"AFC (receptacles above counter) per symbol Branch Panelboards 6'-6" inches to top of panel trim B. Counter Tops: Bottoms of outlets above counter tops or base cabinets shall be minimum 2 inches above counter top or backsplash, whichever is highest. Outlets may be raised so that bottom rests on top of concrete block course, but all outlets above counters in same area shall be at same height. It is the responsibility of this Contractor to secure cabinet drawings and coordinate outlet locations in relation to all cabinets as shown on Architectural plans, prior to rough-in, regardless of height shown on documents. C. Wall Outlets: Height of wall-mounted fixtures shall be as shown on the drawings or as required by Architectural plans and conditions. Fixture outlet boxes shall be equipped with fixture studs when supporting fixtures. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16130-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL SECTION 16441 DISCONNECT SWITCHES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.2 DESCRIPTION A. General: This section specifies the furnishing, installation, and connection of disconnect switches to form a complete, coordinated, grounded raceway system. B. Furnish and install electrical disconnect switches and accessories in accordance with the specifications, drawings and applicable codes. 1.3 QUALITY ASSURANCE A. General: Provide disconnect switches where shown on the drawings. Provide appropriate fuse or non fused type as noted on the contract drawings. Disconnect switches shall be heavy duty type for fused applications and NEMA 3R locations and general duty type for non fused interior applications. 1.4 APPLICABLE PUBLICATIONS A. General: Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only. 1. National Electrical Manufacturers Association (NEMA): KS 1-01...............Enclosed and Miscellaneous Distribution Equipment Switches (600 Volts Maximum) 2. National Fire Protection Association (NFPA): 70-05.................National Electrical Code (NEC) 3. Underwriters Laboratories, Inc. (UL): 98-98..................Enclosed and Dead-Front Switches 198C-89...............High-Interrupting-Capacity Fuses, Current Limiting 4. Types: 198E-94...............Class R Fuses 977-99..................Fused Power-Circuit Devices PART 2 -PRODUCTS 2.1 LOW VOLTAGE FUSIBLE SWITCHES RATED 600 AMPERES AND LESS i A. General: Disconnect switches shall be quick-make, quick-break type in accordance with UL 98, NEMA KS 1 and NEC. B. Duty Rating: Disconnect switches shall have a minimum duty rating, NEMA classification General Duty (GD)for interior NEMA 1 and Heavy Duty (HD) for NEMA 3R and fused switches. Heartland Health Care Center of Zephyrhills-3181 16441-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A4-1265 i DONNELLY ENGINEERING ELECTRICAL C. Rating: Disconnect switches shall be horsepower rated. D. Requirements: Disconnect switches shall have the following features: 1. Switch mechanism shall be the quick-make, quick-break type. 2. Copper blades, visible in the OFF position. 3. An arc chute for each pole. 4. External operating handle shall indicate ON and OFF position and shall have lock-open padlocking provisions. 5. Mechanical interlock shall permit opening of the door only when the switch is in the'OFF position, defeatable by a special tool to permit inspection. 6. Fuse holders for the sizes and types of fuses specified. 7. Solid neutral for each switch being installed in a circuit which includes a neutral conductor. 8. Ground Lugs: One for each ground conductor. 9. Enclosures: a. Shall be the NEMA types shown on the drawings for the switches. b. Where the types of switch enclosures are not shown, they shall be the NEMA types which are most suitable for the environmental conditions where the switches are being installed. Unless otherwise indicated on the plans, all outdoor switches shall be NEMA 3R. c. Shall be finished with manufacturer's standard gray baked enamel paint over pretreated steel (for the type of enclosure required). 2.2 LOW VOLTAGE UNFUSED SWITCHES RATED 600 AMPERES AND LESS A. General: Shall be the same as Low Voltage Fusible Switches Rated 600 Amperes and Less, but no fuses. 2.3 LOW VOLTAGE FUSIBLE SWITCHES RATED OVER 600 AMPERES TO 1200 AMPERES A. General: Shall be the same as Low Voltage Fusible Switches Rated 600 Amperes and Less, except for the minimum duty rating which shall be NEMA classification Heavy Duty (HD). These switches shall also be horsepower rated. 2.4 IDENTIFICATION SIGNS A. General: Install nameplate identification signs on each disconnect switch to identify the equipment controlled. B. Nameplates: shall be laminated black phenolic resin with a white core, with engraved lettering, a minimum of 1/4-inch high. Secure nameplates with screws. PART 3—EXECUTION 3.1 INSTALLATION A. General: Install disconnect switches in accordance with the NEC and as shown on the drawings. B. General: Fusible disconnect switches shall be furnished complete with fuses. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16441-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A4-1265 DONNELLY ENGINEERING ELECTRICAL SECTION 16450 GROUNDING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.2 DESCRIPTION A. Description of System: In general, all electrical equipment (metallic conduit, motor frames, panelboards, etc.) shall be bonded together with a green insulated or bare copper system grounding conductor in accordance with specific rules of Article 250 of the N.E.C. Bonding conductor through the raceway system shall be continuous from main switch ground bus to panel ground bar of each panelboard, and from panel grounding bar of each panelboard to branch circuit equipment and devices. B. Ground Conductor: A main ground, insulated copper conductor, NEC sized but in no case less than #2/0 AWG, shall be run in conduit from 'the Main Switchgear to a driven ground field outside the building. This ground conductor shall also be bonded to the main water service and the metal frame of the building nearest the Main panel or main breaker. Provide properly sized bonding shunt around water meter and dielectric unions in the water pipe. C. Preparation: All contact surfaces shall be thoroughly cleaned before connections are made to insure good metal to metal contact. D. Bonding: Mechanical double lugs or wire terminals shall be used to bond ground wires to junction boxes and panel cabinets and shall be manufactured by Anderson, Buchanan, Thomas and Betts Co., or Burndy. Exothermic connections shall be provided at ground rods and main bonding on steel. E. Exterior Grade Equipment: All exterior grade mounted equipment shall have their enclosures grounded directly to the building ground connection. Utilizing the power feeder or circuit green insulated ground. F. Conductors: All raceways shall have an insulated copper system ground conductor run throughout the entire length of the circuit installed within conduit in strict accordance with NEC. Grounding conductor shall be included in total conduit fill determining conduit sizes, even though not included or shown on drawings. Grounding conductors run with feeders shall be green insulated only. G. Bushings: Provide insulated grounding bushings on all conduits within all panelboards. 1.3 QUALITY ASSURANCE A. Compliance: The entire ground system shall comply with NEC 250. Specific sections are noted 'as non compliant. Heartland Health Care Center of Zephyrhills-3181 16450-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4 1265 DONNELLY ENGINEERING ELECTRICAL PART2 -PRODUCTS 2.1 GROUNDING CONDUCTORS A. General: Provide UL or NRTL approved types of copper with THWN, THHN, or XHHW with green insulation. NEC to code requirements shall be applicable to types utilized. 2.2 GROUND RODS A. General: Provide copperclad steel, 3/4 inch diameter by 10 feet long ground rods. Service ground rods and exterior ground rods shall be 30 feet deep minimum. Where additional ground rod locations supplement the ground rod location from each other, the supplemental locations shall be located not less than the ground rod depth. Two thirty feet rod locations must be thirty feet apart and exothermically connected by a full rated ground conductor size. PART 3 - INSTALLATION 3.1 GENERAL A. Installation: Grounding conductors shall be so installed as follows; 1. Installed to permit shortest and most direct path from equipment to ground 2. Shall be installed in metal conduit with both conductor and conduit bonded at each end 3. Have connections accessible for inspection and made with accepted solderless connectors to the equipment or structure to be grounded 4. Shall in NO case be a current carrying conductor 5. Shall have a green jacket 6. Shall have exothermic connections at ground rods B. Connections: The main grounding electrode conductor shall be exothermically welded to ground rods and clamped to the water pipe or valve with a listed clamp. A listed clamp connection shall also be provided for the fire protection piping and each piping system. A welded plate shall be provided at building steel. A LIFER rebar connection shall be installed in the concrete slab for the service entry ground as well as all of the listed grounds noted herein. . END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16450-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4 1265 DONNELLY'ENGINEERING ELECTRICAL SECTION 16470 PANELBOARDS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.2 DESCRIPTION A. Description: Provide panelboards with main breaker or main lugs where shown on the drawings, of a dead front, distributed phase sequence design. Panelboards shall be equipped with thermal-magnetic molded case circuit breakers with frame and trip ratings as indicated in the schedules. B. Doors: Provide all panelboards with "Door in Door" design NO EXEPTIONS. 1.3 QUALITY ASSURANCE A. STANDARDS: The latest edition of the Reference Standards shall apply as follows; 1. ANSI Y32.2 - Graphic Symbols for Electrical and Electronic Diagrams. 2. ANSI Z55.1 - (R1973) Gray finishes for Industrial Apparatus and Equipment. 3. ANSI 67 4. ANSI 50 5. NEMA P131 Panelboards 6. ANSI 67 Panelboards 7. ANSI 50 Enclosures for electrical equipment B. Listing: Panelboards shall be listed by Underwriters Laboratories and bear the UL or other nationally recognized testing laboratory labels. Where required, panelboards shall be listed for use as service entrance equipment. 1.4 SUBMITTALS A. Shop drawings: 1. Product data shall be submitted for; a. Panel b. Cabinet c. Bus d. Construction e. Dimensions 2. Shop drawings shall be submitted for every panel, and shall clearly indicate all of the following information; a. Listed Labels b. Each circuit breaker amperage rating, circuit number and position/location in panel c. Electrical characteristics of panel d. Main bus rating e. Main device rating f. Mounting type g. Dimensions, (width, depth, height, weight) h. Bus material i. Interrupting capacity of minimum rated breaker Heartland Health Care Center of Zephyrhills, FL-3181 16470-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 I DONNELLY ENGINEERING ELECTRICAL j. Panelboard classification k. Submit coordination curves on log-log paper for all breakers, fuses, etc. I. If dimensions for equipment proposed in submitted shop drawings are different than what is shown on the drawings, the contractor shall submit sketches showing layout of proposed equipment. 1. Coordination Study: The Contractor shall expect an additional 10 working days for panelboard and switchboard review to allow the Engineer to design the coordination study. D. NFPA 70E compliance: The panelboards and switchboards shall have a NFPA 70E label applied to the front face. It shall include the PPE requirements and the hazard classification. Fault current levels are indicated in the plans. Note: A label indicating "NFPA 70E compliance" only is not acceptable. Coordinate with the engineer of record. 1.5 OVERCURRENT PROTECTIVE DEVICES A. Shop drawings and product data: Shop drawings shall clearly indicate; 1. Frame sizes and interrupting capacity of all circuit breakers. 2. Horsepower ratings of rated voltage of fused switches and circuit breakers. 3. Size and type of fuses being provided. 4. Device is listing by a nationally recognized testing Agency. 5. Device complies with these specifications, drawings, and applicable standards of NEMA, IEEE, and ANSI. PART 2— PRODUCTS 2.1 PANELBOARDS A. Equipment: The panelboard bus assembly shall be enclosed in a steel cabinet and shall be surface or flush mounted as shown in the schedules and drawings. The box shall be fabricated from galvanized steel with standard baked enamel finish. The panelboard front shall include a door-in-door design and shall have a flush, cylinder tumbler-type lock with catch and spring-loaded stainless steel door pull. Lift and shift cover will not be considered "door-in-door". All panelboard locks shall be keyed alike. All panel cabinets shall be a minimum of 20 inches wide. The panel fronts shall have adjustable indicating trim clamps which shall be completely concealed when the doors are closed. Doors shall be mounted with concealed steel hinges. Panel front shall not be removable with door in the locked position. B. Bus: Panelboard bus structures and main lugs or main circuit breakers shall have current ratings as shown on the panelboard schedule. The bus shall be insulated.The bus bar connections to the branch circuit breakers shall be of the "distributed phase" or phase sequence type. All current carrying parts of the bus structure shall be tin plated copper. A full size insulated neutral bus bar shall be provided. Provide system grounding tin plated copper bus bar bonded to the panelboard cabinet for connection of system grounding conductors. The bus bar shall be mechanically and electrically isolated from the neutral bar except where panelboard is used as service entrance equipment. C. Molded Case Circuit Breakers: All panelboard branch circuit breakers shall be bolt-on thermal-magnetic molded case type. Breakers shall be 1, 2 or 3 pole with an integral crossbar to assure simultaneous opening of all poles in multi-pole circuit breakers. Breakers shall have an over center, trip-free, toggle-type operating mechanism with quick-make, quick-break action and active handle indication. Handles shall have "ON", "OFF", and "TRIPPED" positions. Bolt-on circuit breakers shall be able to be installed in the panelboard without requiring additional mounting hardware. Multiple pole breakers shall not utilize individual single pole breakers with a common tie. Heartland Health Care Center of Zephyrhills, FL-3181 16470-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL D. Solid State Circuit Breakers: Provide solid state circuit breakers for all breakers 600 amperes and above. Breakers shall have adjustable settings for long time, short-time, instantaneous, long time delay and short time delay. E. 120/208 Rating: 120/208 volt circuit breakers shall have interrupting ratings a minimum of 10,000 rms symmetrical amperes at 240 volts AC maximum. F. Switching Type: Single pole, 15 and 20 ampere circuit breakers intended to switch fluorescent lighting loads on a regular basis shall carry the SWD marking. G. Directories: A typed panelboard directory shall be provided for each panelboard and shall indicate the actual circuit number used, room name and type of load. Room names shall be the actual name and room number used not necessarily as shown on the drawing. Panel directories shall include all room numbers and names. Where panel schedules are indicated on the drawings as "receptacles or "lighting", etc., it shall be the responsibility of the Contractor to include the specific area served. H. Bracing: The panelboard, as a complete unit, shall be braced for a minimum short circuit rating equal to or greater than the lowest breaker symmetrical interrupting capacity as shown on the schedule. All panelboards shall be fully rated. No series ratings are allowed. I. Grounding: All panelboard cabinets shall have a system grounding bar bonded to the panelboard cabinet for connection of system grounding conductors. This bar shall be mechanically and electrically isolated from the neutral bar. J. Stubs: Provide four 3/4 inch conduits from all flush mounted panels to adjacent accessible ceiling space and mark"for future use". Provide pull cord in all empty conduits and provide plastic end bushing. Provide conduit opening tape to seal. K. Design Selection: Square "D" NQOD for panelboards. Square "D" I-Line for 800 and 1200 amp distribution panels. Acceptable manufacturers are EATON and GENERAL ELECTRIC. The manufacturer shall submit a coordination study with the shop drawings. PART 3 -EXECUTION 3.1 INSPECTION A. General: Examine area to receive panelboard and assure that there is adequate clearances to meet NEC requirements and normal maintenance issues. B. Correction: Start work only after any unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. General: Provide panelboards in complete accordance with manufacturer's written instructions and all applicable codes. B. Support: Panelboards shall be rigidly supported and installed per manufacturers recommended supporting instructions, with beams provided if necessary, to suit actual site conditions. Panels shall not be directly mounted to masonry walls. Use kindorf or similar channel for surface mounted locations. C. Storage and Delivery: Panelboards shall be delivered to the site during that phase of panelboard installation in order to avoid storing panels on site where damage may occur. Replace any damaged parts prior to energizing panel. Cover panelboard to avoid damage to finish. D. Mounting: Do not mount equipment directly to masonry or concrete walls. Provide two uni-strut spacers between wall and panelboard. i Heartland Health Care Center of Zephyrhills, FL-3181 16470-3 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL E. Operations and Maintenance Data: Comply with the manufacturer's instructions for tightening bus connections, cleaning, operation and maintenance. 3.3 QUALITY CONTROL A. General: Field test prior to energization; 1. Megger check, and record all data, of phase to phase and phase to ground insulation levels. 2. Continuity. 3. Proper phase relationship. END OF SECTION Heartland Health Care Center of Zephyrhills, FL-3181 16470-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL SECTION 16490 AUTOMATIC TRANSFER SWITCH PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections,apply to work of this section. 1.2 DESCRIPTION A. General: Provide a automatic transfer switch of the size, number of poles,amperage,voltage and withstand ratings as shown on the contract drawings and as specified herein. B. Description: The switch shall automatically transfer the load to the generator during normal power outages after the standby generator timing period has elapsed. The switch shall be fully rated, electrically operated, mechanically held unit with both electrical and mechanical interlocks to prevent simultaneous energizing of both sides. The switch shall be housed in a NEMA 1 housing unless specified with a NEMA 3R listing. The switch shall be open and inspectable. 1.3 QUALITY ASSURANCE A. Manufacturer Requirements: Firms regularly engaged in manufacture of automatic transfer switches, of types and ratings required, whose products have been in satisfactory use in similar service for not less than 5 years. B. Manufacturers: Subject to compliance with the requirements of this specification,provide an automatic transfer switch manufactured by KOHLER, provide KTSDCTA 1600 Amp for equipment emergency. The transfer switch shall be as shown on the drawings. All contacts must be open and inspectable type. C. Standards: Comply With The Following Standards: 1. UL-1008 and UL 2200 a. As a precondition for acceptance, the transfer switch, complete with timers relays and accessories, shall be listed by Underwriters Laboratories, Inc. in their Electrical Construction Materials Catalog, and accepted for use on emergency systems. b. When conducting temperature rise tests to Paragraph 99 of UL-1008 the manufacturer shall include post-endurance temperature rise tests to verify the ability of the transfer switch to carry full rated current after completing the overload and endurance tests. j I C. Produce UL 1008 closing and withstand ratings for 3 cycles at 208 volts. Certified test reports from an independent testing laboratory to verify the identical samples have been-subject to three phase short circuit current at voltage indicated on drawings, for a minimum of 3 cycles duration, without contact damage or contact welding and without the use of current limiting fuse protection. Oscillograph traces are to be supplied to verify that the test parameters have been met. Withstand ratings shall not be series rated. i I Heartland Health Care Center of Zephyrhills-3181 16490-1 DE No 217032 j 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 1.4 SUBMITTALS A. Shop Drawings: Provide all equipment cabinet dimensions and wiring diagrams as required. B. Product Data: Provide all applicable options, accessories, and interrupting or withstanding current ratings. Provide all electrical characteristics and data as required to show compliance with these specifications. C. Testing: Provide test results from UL 1008 as listed above. 1.5 PRODUCT HANDLING A. Equipment Storage: The Contractor shall store items provided under contract specifications until the time of installation. Such storage shall meet the requirements of the system supplier and be accepted by the Engineer. The stored equipment shall not be delivered to the site until it is to be installed. B. Protection: Use all means necessary to protect the materials of this section before, during and after installation and to protect the installed work and materials from the activities of all other trades. C. Replacement: In the event of damage, immediately make all repairs and replacements necessary to the acceptance of the Engineer and at no cost to the Owner. PART2 -PRODUCT 2.1 GENERAL A. Type: Provide 3 pole automatic transfer switches as shown on plans, with full load current and voltage rating as shown, 60 Hz normal and emergency. B. Load Types: The transfer switch shall be capable of switching all classes of load, and shall be rated for continuous duty when installed in a nonventilated enclosure that is constructed in accordance with Underwriters Laboratories, Inc., Standard UL-1008. C. Accessories: All relays, timers, control wiring and accessories to be front accessible. 2.2 COMPONENTS A. Features: Provide the following transfer switch features; 1. The transfer switch shall be double throw, actuated by a single electrical operator momentarily energized; and mechanically connected to the transfer mechanism by a simple over center type linkage with a total transfer time not to exceed 1/6 of a second. 2. The mechanism shall be a high speed actuator, capable of transferring successfully in either direction with 70 percent of rated voltage applied to the switch terminals. 3. Circuit breaker switches are not acceptable. 4. Mechanical interlocking of transfer switches to prevent unintended interconnection of the normal and alternate sources of power. 5. A means of safe manual operation of the transfer switch. B. Main Contacts: The normal and emergency contacts shall be positively interlocked mechanically and electrically to prevent simultaneous closing. Main contacts shall be fully rated,arc quenching, mechanically locked in both the normal and emergency positions without the use of hooks, latches, magnet, or springs and shall be renewable silver-tungsten alloy protected by arcing contacts,with magnetic blowouts on each pole. Contacts shall be able to Heartland Health Care Center of Zephyrhills-3181 16490-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL withstand high fault current levels without contact damage or separation. Parallel main contacts are not acceptable. Contacts shall be open and inspectable type. C. Exercise Timer: Include an exerciser with the transfer switches for exercising the generator in loaded or unloaded condition, up to every 168 hours for a period adjustable from a minimum of 20 minute intervals to 24 hours. D. Engine Start Delay: Time delay to override momentary normal source power outages to delay engine start signal and transfer switch operation. Adjustable 0.5 to 3 seconds,factory set at 1.5 seconds. E. Load Test Switch: Load test switch to simulate normal power failure. (Maintained type). F. Contact Failure indicators: Contact to close on failure of normal source to interface with data acquisition panel. Contact to open on failure of normal source to initiate customer functions. G. Pilot lights: Green push to test pilot light on the cabinet door to indicate the main switch in normal position. Red push to test pilot light on the cabinet door to indicate the main switch in emergency position. All lights shall be LED type. No incandescent types are allowed. H. Auxiliary Contacts: Provide an auxiliary contact closed in normal position. Provide an auxiliary contact closed in emergency position. I. Load Shed Relay: Provide a relay energized by 24 volt DC signal from generator control switchgear to disconnect the load from the emergency source when an overload condition occurs. J. Additional Contacts: Two sets of relay contacts shall be provided to open and close upon loss of the normal power supply. K. Doors: Door swings shall be as required based on layout. Refer to drawings for door swing positions. 2.3 OPERATION A. Low Voltage: Provide engine starting contacts in transfer switches to start the generator if any ungrounded phase of the normal source drops below 70 percent of rated voltage,after a non-adjustable time delay period of 1 to 3 seconds, to allow for momentary dips. B. Transfer: The transfer switch shall transfer to emergency as soon as the generator source voltage and frequency have reached 90 percent of rated values. • C. Stabilization: After restoration of normal power on all phases to 90 to 95 percent of rated voltage, adjustable time delay period of 2 to 25 minutes shall delay transfer to normal power until it has had time to stabilize. If the emergency power source shall fail during the time delay period, the time delay shall be by-passed, and the switch shall return immediately to the normal source. D. Generator No-Load Operation: Whenever the switch has retransferred to normal, the engine-generator shall be allowed to operate at no load for a fixed period of time(5 minutes) to allow it to cool before shut-down. E. Test Switch: The transfer switch shall include a test switch to simulate normal power failure with actual load transfer. Heartland Health Care Center of Zephyrhills-3181 16490-3 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 2.4 ASSESSORIES A. Literature and Features: The specified manufacturer's literature shall become the basis of the design selection and submittal requirements and shall become part of this specification. Transfer switch standard features, controller standard features, programmable features, user interface, led displays, communications and all standard features as listed in the specified manufacturer's literature shall be provided. B. Ratings: Switches shall be fully rated. Do not use the ratings with specific manufacturer's breakers. C. Other Accessories: Provide additional features as follows: 1. Digital meters for voltage and current. 2. Current sensing kit. 3. Extended warranty 5 years. PART 3 -EXECUTION 3.1 EXISTING CONDITIONS A. Inspections: Prior to performing the work required by this section, carefully inspect the installed materials and equipment of all other trades and verify that the project has progressed to a point where this inspection may properly begin. B. Verification: Verify that all equipment provided under this section of the specification may be installed in accordance with all pertinent codes and regulations, the original design, and the referenced standards. C. Discrepancies: If any discrepancies are found, immediately notify the Engineer. Do not proceed with the installation in areas of discrepancy until all such discrepancies have been fully resolved. 3.2 CONNECTIONS A. Tightening Connectors: Tighten connectors and terminals, including screws and bolts, in accordance with equipment manufacturer's published torque tightening values for equipment connectors.Where manufacturer's torquing requirements are not indicated,tighten connectors and terminals to comply with tightening torques specified in UL Stds. 486A and 486B. END OF SECTION ' Heartland HealthCare Center of Zephyrhills, FL-3181 16490-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL SECTION 16650 ENGINE GENERATOR PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.2 DESCRIPTION A. General Bold: This section describes materials, installation and testing of engine generator sets,with main breaker and auxiliary support system, which shall be used for standby power in the event of a utility power failure. 1.3 SCOPE OF WORK A. General: Provide a emergency standby system to supply electrical power in the event of failure of the normal supply.The system shall consist of a liquid cooled engine,an AC alternator and system controls with all necessary accessories for a complete operating system,including but not limited to the items as specified herein. The generator shall be a 35OKW 120/208V, 3 Phase, 4 Wire DIESEL type. The generator shall be a LEVEL 1 class 96 generator tested in accordance with NFPA 110 and installed per the requirements of NFPA 99 and NFPA 110. B. Automatic Operation: The existing standby system where existing, shall utilize the existing transfer switches. Except a new equipment branch transfer switch shall be provided. The Generator shall transfer in less than 10 seconds upon loss of normal power and the voltage to at least 90% of rating. C. Special Generator Provisions: The owner shall purchase the generator, base tank, housing and transfer switch. The contractor shall supervise the shipping and handling to the site and take responsibility for off loading and installation complete. 1.4 CODES AND STANDARDS A. Standards UL2200-Stationary Power Generator Assemblies B. CODES REFER TO SECTION 16010 1.5 SUBMITTALS A. Shop Drawings: Submit shop drawings in accordance with Section 16010 of this specification.Show applicable ratings, sizes, materials, manufacturers and part numbers, and overall dimensions and weights, for the following; 1. Itemized bill of material 2. Manufacturer and model of engine 3. Manufacturer and model of generator 4. Control panel DEC 550 5. Battery and battery charger 6. Batteries and rack 7. Electric governor 8. Exhaust silencer(Inside Housing). 9. Main line circuit breaker square D LSI electronic trip. 10. Base tank and isolators 11. AnnunciatorPanel Heartland Health Care Center of Zephyrhills—3181 16650-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 12. Voltage regulator 13. Jacket water heaters 14. Fuel, lube oil and intake air filters 15. System schematic diagram showing wiring interconnections with sizes and quantities. 16. Modification fact sheet giving fuel, coolant, lubricating oil, and exhaust and ventilation requirements. 17. Torsional vibration analysis for engine and generator. 18. Certified factory test report at rated power factor. 4hour factory reactive load test. 19. A start-up inspection report signed by the engine manufacturer's authorized field service representative. 20. Provide an information copy of the standard engine inspection and maintenance service contract. The contract shall be for the complete system including all auxiliary support systems. 21. Emissions information 22. Remote Emergency Stop (metallic type) 23. The name and location of parts and service facility which shall service equipment. 24. Parts and service as required in this section for engine and generator. Submit preventive maintenance program. 25. Manufacturer's Warranty 26. Bore, stroke, piston, speed and number of cylinders. 27. Engine displacement. 28. Temperature rise by resistance of both rotor and stator, maximum KVA and KW rating, generator efficiency, type of excitation, generator regulator and regular accessories. 29. Submit current cost of oil sampling. 30. Shop drawings on exhaust muffler and exhaust piping showing all parts,dimensions,and required mounting accessories. 31. Dimensions, installation, and connection requirements. 32. CFM requirements 33. Manufacturer's recommended hours of operation between overhauls. 34. Submit generator thermal damage curve, generator current decrement curve and overcurrent protective device curve on a full size 11" x 17" log-log paper. Time in seconds on Y axis and current on X axis.The curve shall show the breaker with settings, al damage curves and the DEC 550 controller curve. 35. Diesel fuel base tank as show non the drawings. 36. The housing shall be Aluminum with a hurricane rating. 37. Provide a battery heater base. 1.6 MANUFACTURER'S SERVICES A. Manufacturer's Services: Provide authorized equipment manufacturer's services at the jobsite. Install equipment, check the modifications, supervise start-up, and supervise testing and adjustment of the equipment. Provide two man-days to instruct the Owner's personnel in the operation and maintenance manuals prior to this instruction. 1.7 WARRANTY A. Warranty: Equipment furnished under this section shall be warranted against defective parts or workmanship for a period of 5 years/3000 hrs from date of field testing and acceptance by the Owner's Representative. Multiple warranties for individual components shall not be acceptable. All parts shall be repaired or replaced free of charge for parts, labor and travel. PART 2 -MATERIALS 2.1 MANUFACTURERS A. Manufacturer:The units shall be made, manufactured and assembled in the U.S.A.and shall be the product of a firm regularly engaged in the manufacture of engine sets and shall meet the Heartland Health Care Center of Zephyrhills-3181 16650-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLYENG|NEERING ELECTRICAL requirements of these specifications. It'must be standard model i regu lar production th e manufacturer's place of business. Engin�. generator and control panels shall be serviced bvthe same supplier ao that there shall be one source and one responsibility. B. Service: It is essential that the engine-generator supplier maintain a local parts and 168 hour/week service facility located within a 60 mile rad'ius of jobsite. In addition, and in order not to penalize the Owner for unnecessary or prolonged periods of time for service or repairs to the emergency system, the generator set supplier must have no less than 60 percent of all engine replacement parts in his stock within the State at all times. Certified proof of this requirement shall be available from the dealer,and a personal inspection of the dealer's facilities shall be made by the consulting engineer or his appointed representative to substantiai'te claims made by the generator set supplier. The supplier shall provide all installation and test supervision necessary for final acceptance and testing. The generator set supplier shall provide all equipment.All power feeders and service entrance conductors and conduit shall be provided and completely installed per contract documents and coordinated with by generator representative __ required. All generator control— alarmandinterlock ~ including ' conduit shall be completely provided by the Contractor.The service company shall offer 24 hour on site service. C. Qualifications: The engine-generator manufacturer shall be an authorized full service dealer. D. &0ammfmmtunmma: Provide a KOHLER 35OREOZJB 360 KW 120/208V. Equals by Cummins Gememacaod CmtmpiUlaromhy. ` . . E. The enclosure shall beaNOA enclosure aa detailed and specified on the plans. 2'2 RATING A. General: The rating of the standby engine-generator shall be as listed below and based on operation when equipped with all operating accessories, including air clean ena.fans, |ubhcatingoil punnpe.fuel injection punnp. and jacket water pump. l[hespecified standby �KVV shall be rated for continuous electrical service during interruption of the normal utility source, The engine generator shall have the following ratings; 1. Standby rating: 412KV/V35OKW for standby 2. Engine Speed: 1.8OU RPM /max|nnurn\ 3. Voltage: 12O/2OHV. 3 phase, 4wire 4. Frequency: 80hodz 5. Power Factor: 0.8 8. Altitude: 97 feet above sea level. 7. Engine Room Temperature: 120degnaes F. rnaxirnurn. 25degrnom F. minimum. 2.3 ENGINE ' A. General: Provide an engine with the following features; 1. Full compression ignition Diese 2. Four-stroke cycle 3. Water cooled engine 4. Air cooled radiator � 5. Replaceable valve seat inserts � G. Capable of the rated output when operating oneoom available Diesel ' 7. Capable of extended no load operation without loss of lubricating oil. B. Accessories: Provide the engine generator with the following accessories; 1. Fuel, lube oil, and intake air filters 2. Intake air silencer, high frequency type Heartland Health Care Center of Zephyrhills-3181 10650-3 DENo217D32 3822D Henry Drive,Zephyrhi||o. FL33542 Pending Emergency Rule 50A-4.126S DONNELLY ENGINEERING ELECTRICAL 3. Lube oil cooler 4. Flexible fuel lines 5. Gear-driven water pump 6. Coolant and oil drain valves 7. Fuel priming pump 8. Crankcase fumes disposal system 9. Engine control wiring - multi-strand plastic insulated cable enclosed in nylon flexible slotted conduit terminated in bulkhead fittings. 10. Electronic solid state main breaker 11. Fan guard per UL2200 12. Wiring harnesses per UL2200 13. Base fuel tank and tie down bolt openings 14. A temperature gage installed on the exhaust for start-up inspection by the maintenance director and certification 2.4 STARTING A. Starting Motor: A DC electric starting system with positive engagement drive shall be provided. The motor voltage shall be as recommended by the engine manufacturer. B. Automatic Control: Fully automatic generator set start stop controls in the generator switchboard shall be provided. Controls shall provide shutdown for low oil pressure, high water temperature, overspeed, overcrank, and two auxiliary contacts for activating accessory items. Controls shall include a 30 second single cranking cycle limit with lockout. C. Batteries: A lead acid storage battery to be used in conjunction with the electric starting system and generator control switchgear shall be provided for each engine. The batteries shall have sufficient capacity to provide for on minute total cranking time without recharging and shall be 12 hour rated. The battery shall be rated by the battery manufacturer in accordance with requirements set forth by the engine manufacturer. Provide a battery rack of fiberglass construction with bottom insert to insulate the batteries and prevent corrosion and necessary cables, clamps and replaceable connectors. Batteries shall be mounted in the weatherproof enclosure as required. Wiring shall be sized as required by manufacturer for distance involved. Battery heater shall be provided where indicated on the submittals list and where the generator is installed above 40 degrees north latitude. D. Battery Charger: Current limiting battery charger shall be provided to automatically recharge batteries. Charger shall be float equalized and shall float at 2.17 volts per cell and equalize at 2.33 volts per cell. It shall include overload protection silicon diode full wave rectifiers, voltage surge suppressor, DC ammeter, DC voltmeter, and fused AC input. AC input voltage shall be 120 volts, single phase. Amperage output shall be no less than 20 amperes and size based on load of gear and recharge of battery in 24 hours. Charger shall be Olympian 10amp dual rate. Charger shall have auxiliary contacts to close on low voltage and N.O. AC input for connection to respective generator control cubicle in generator switchboard. Charger shall be capable of fully charging batteries during running conditions and shall be coordinated with generator provided. E. Governing System: Governing system shall be as follows; 1. Provide a Woodward 2301 or Barber Coleman equal, electronic adjustable isochronous governor with electronic speed sensing. 2. Governor shall provide adjustable speed setting from 58 to 62 hertz and maintain the frequency within plus or minus 0.25 percent from no load to full load. Upon load change of not more than 25 percent of rated load,the governor shall re-establish stable operation in not less than one and one-half seconds. Stable operation is defined as operation at a frequency within plus or minus 0.25 percent of rated frequency. 3. The maximum change of frequency during the one and one-half second load change surging period shall not exceed 0.5 Hz. Heartland Health Care Center of Zephyrhills-3181 16650-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 . . DJNNELLY ENGINEERING ELECTRICAL 4. After any sudden load change of not more than 25 percent qf rated load, the governor shall reestablish stable operating conditions in not less than 1-1/2seconds. Stable . dafinedaeoporetedo1,mfrequenoythoti000nabantvvithinp|usornninuoO.25peh:antofnated frequency. 5. The nnax|rnunn change of frequency during the one-half second surging period oheU not exceed O.5Hz. 8. Governor module shall be mounted inside generator control panel. 7. The engine shall be equipped with a compatible actuator and the necessary magnetic pick-up bo drive the governor. 8. All connections between the engine governor,engine and switchgear auxiliary switching points shall be made with shielded cable. . S. Governor cable shall not be run in the same conduit with AC control of primary voltages. F. Lubrication: Lubrication shall beoofollows: . 1. A gear-type lubricating oil pump shall supply oil under pressure to main bearings, crank pin bearings, pistons, timing gears, camshaft bearings and valve rocker mechanism. 2. Pistons shall ba spray cooled. 3. Effective full flow lubricating oil filters shall be provided and so located that lubricating oil is continuously filtered except during periods when oil is by-passed to protect vital parts such as when filters are clogged. 4. Replacement resin impregnated cellulose type filter elements shall be accessible and easily removable. Filter system ahoU be equipped with e spring-loaded bypass valve as an insurance against stoppage cf lubricating oil circulation \n event the filters become clogged. � 5. A suitable water-cooled, engine-mounted lubricating oil cooler shall be provided. The diesel , oil sump drain shall be brought to the outside of the set for ease of changing oil. � G. Air Cleaners: One or more engine-mounted dry type air cleaners of sufficient capacity to protect working parts of the engine from dust and grit shall beprovided. L Jacket Water Heater: Jacket water heater shall beasfollows; � 1. Provide a unit-mounted thermal circulation-type water heater incorporating a self-contained thannoebabo mwitoh, controlled by the exit coolant temperature from the heater to maintain; engine jacket coolant to9D degree F. 2. The heater shall ba single phase,OO Hz, 12Ovolts. 15OO Waft Heater shall be(}hnoma\ox.or Kim-Hotstort. 3. Provide hand valves in the heater hones to facilitate changing heating elements without', draining the entire cooling nyoharn. J. Duty Cycle: The engine shall ba capable of operation st light loads for extended periods of time and, shall provide for pre-combustion of fuel or a similar means for the prevention of carbonization. � K. Engine Instrument Panel: Provide an engine-mounted instrument panel with gauges for items in the following table. L. Safety Switches: Provide devices for indication and control of the items in the following table requiring pre-alarm and shutdown;Indicator Function . | (at Battery Voltage) CV S RAV (b) Low Water Temp. <70 degrees,F (21 degrees C) X X Heartland Health Care Center of Zephyrhills � | � / -3181 16650'5 DENo217D32 3O22O Henry Drive,ZephyrhUb. FL33542 Pending Emergency Rule 5QA-412G5 . . DONNELLY ENGINEERING CAL (h) Low.Fuel Main Tank(@ 64 hrs. fuel remaining) X X 0) Control or Test Switch Not in Auto. Position X X (1) Low Voltage in Battery X (m) Lamp Test X (n) Contacts for Local&Remote Com. Alarm X X* (o)Audible Alarm Silencing Switch X (p) Low Starting Air Pressure X (q) Low Starting Hydraulic Pressure X (r)Air Shutdown Damper when used X X X (s) Remote Emergency Stop X (t) Day tank Hi-low Alarm X X (u) Remote Radiator Breaker Position X X (v) Fuel Leaking X CV Control panel-mtd. visual indication RAV Remote Audible an visual S Shutdown of EPS X Required ^ ^ M. Exhaust : The exhaust system shall be as follows/NOTE:The exhaust system is part of ' the generator package) 1. Exhaust system shall consist of a critical silencer, Maxim M51 or Donaldson TCU Series, flexible exhaust fitting, exhaust piping, insulation, and mounting hardware. 2. Provide o critical type silencer constructed of mild steel, Exhaust noise shall not exceed 75 dBAat25feet. Provide brackets, companion flanges, gaskets, and fasteners. 3. Provide Type 318 stainless steel bellows-type flexible exhaust fitting ot least 18 inches long. 4. Provide exhaust.system consisting of adapters, e|bovvo. lined boUcxwa, piping, supports, drain tees, and support assemblies. The system shall beo custom-fitted fabrication. The discharge shall be vertical with nyinoap and elbow. Mount within enclosure. ' Heartland Health Care Center ufZe h iUo'31G1 16650'6 DENo217O32 3O22U Henry Drive,ZephyrhU|u. FL33542 Pending Emergency Rule 59A-4.12G5 DONNELLY ENGINEERING ELECTRICAL 5. Pitch horizontal runs of exhaust pipe away from the engine. Provide condensate traps with petcocks or valves at low spots in the exhaust system. 2.5 EXHAUST EMISSIONS A. General: To maintain environmental quality,the engine shall be equipped with a precombustion chamber compliant with EPA tier 3 emissions standards or have suitable emission control equipment to ensure that gaseous exhaust emissions do not exceed: NOx(Calculated as No2) 8.75 GRAMS/BHP-HR HC 0.25 GRAMS/BHP-HR CO 1.50 GRAMS/GHP-HR These maximum levels shall be at manufacturer's rated speed and load as measured by SAE J177 and SAE-J215 recommended practices. Verification of the ability to meet these emission specifications shall be available from the engine manufacturer. 2.6 GENERATOR A. General: Provide the following; 1. The generator shall be 3 phase,60 Hz, 1201208 volt,insulated, single-bearing,drip-proof, rotating field, synchronous type, with 1 phase brushless PMG exciter. 2. Provide Class H insulation limited to Class"B" (125 degrees C) rise. 3. Provide 100 percent epoxy varnish impregnation and a coat of epoxy asphalt insulating material to increase resistance to abrasive dust or sand, high humidity, and light acidic, oil, or salt-laden atmospheres, as well as prevent fungus growth. 4. Heaters for the generator must automatically deactivate when the engine starts in accordance with article 3-3.1 of NFPA 110. 5. Generator remote Annunciator must be battery powered from the generator batteries as required by NFPA 110 and NFPA 99 and the Florida Administrative Code. Utilize the existing raceway for both annunciators which shall be located at the 24 hour monitored Nurse station (where the existing Annunciator is located) B. SCR Equipment: Generator shall be designed for operation of SCR type equipment. C. Wave Form: The wave form deviation factor of the line-to-line voltage at no load and balanced rated load at 0.8 power factor not to exceed 4 percent. The rms of all harmonics shall be less than 2 percent and that of any one harmonic less than 1 percent at full rated load. TIF shall be under 50. D. Transient Dip: The transient dip shall not be greater than 20 percent of rated voltage when full load at rated power factor within 5 cycles is applied to the generator. E. Voltage Regulator: Provide a static type voltage regulator to maintain a constant and stable generator output voltage within plus or minus 0.5 percent of nominal for all steady-state loads from no load to full load with isochronous speed control and plus or minus 2 percent speed droop operation. A 5 percent variation in frequency and the effects of field heating will not affect the unit's regulation. Provide stability and voltage range adjustments. F. Fault Current: Provide permanent magnet generator boost to provide a minimum of 300 percent of fault current for 10 seconds. Heartland Health Care Center of Zephyrhills-3181 16650-7 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 2.7 STRUCTURAL STEEL BASE A. Base: Isolate the structural steel base from the engine with 6 quad spring-type isolators with neoprene jacketed pre-compressed molded fiberglass noise isolation pads,steel load plate, built- in leveling bolt, welded steel or cast housing, and high deflection steel springs. B. Isolators: Isolators shall be Peabody Noise Control, Inc.; Kinetics brand, Type SM; Norfund or Dynamics Corporation. 2.8 COOLING SYSTEM -ENGINE MOUNTED RADIATOR A. Radiator: Provide an "50 degree Crated"engine-mounted radiator with blower-type fan sized to maintain rated full load continuously at the specified maximum ambient temperature. Fan rpm shall not exceed 819 rpm. B. Coolant Switch: Provide a low coolant level switch with 1 N.O. and 1 N.C. contact. B. Airflow: Airflow restriction from the radiator shall not exceed 0.50 inch water. C. Fluid: Fill the engine cooling system with a solution of 30 percent by volume ethylene glycol with rust inhibitor. 2.9 GENERATOR CONTROL PANELS A. General: Provide NEMA 1, vibration isolated, dead front, 12 gauge steel control panels with lockable hinged cover. Mount and wire the control panel to the engine-generator set. The panel shall include the following equipment; 1. Voltmeter, 1 percent accuracy with 1 phase fuse protection digital type to read true rms. 2. Ammeter, 1 percent accuracy, digital type to read true rms. 3. One ammeter and one voltmeter phase selector switch. 4. Frequency meter, 1 percent digital type. 5. Running time meter. 6. Instrument transformers. a) Automatic starting controls, cycle crank. 7. Voltage level adjustment rheostat, minus 25 to plus 10 percent. 8. Dry contacts for remote alarms wired to terminal strips. a) Fault indicator lights with press to test feature for low oil pressure, high coolant temperature, low coolant level, overspeed, and overcrank. 9. Visual alarm indicators for impending shutdown from oil pressure and high coolant temperature. 10. Visual alarm indicators for low fuel level and low coolant temperature. 11. Three-position function switch marked "manual", "off/reset", and "auto". 12. Emergency engine stop pushbutton. 13. Panel illumination lights and switch. B. Components: Pilot lights and pushbuttons shall be standard duty type. C. Devices: Provide relays and timing devices with clear polycarbonate dust covers. Devices shall be plug-in type with hold down spring retainers. Output contacts shall be rated 10 amperes at 24 volt dc. D. Nameplates: Provide engraved or etched nameplates to show position of switches and function of pilot lights, pushbuttons, and meters. Heartland Health Care Center of Zephyrhills-3181 16650-8 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL E. Controls: Controls shall be as follows; 1. General a. The generator set shall be provided with a microprocessor based control system designed to provide the following features and functions: 1) The control system shall be mounted within the generator set and provide a suitable operator control panel. The control panel shall provide vibration isolation as necessary to the mounted controls to provide trouble free operation 2) Manual and automatic starting/stopping of the generator set shall be provided a) Automatic mode of operation shall have provisions for accepting a starting/stopping signal from a remote device b) Manual mode of operation shall be provided at the operator control panel located on the generator set 3) Monitoring and control functions for the generator set shall be provided a) Local monitoring and control shall be provided on the generator set operator control panel b) Control system shall have the capability for remote monitoring and control with the use of additional hardware, components, and cabling as noted in the text 4) Automatic annunciation or shutdown of generator set warning or alarm functions a) Local monitoring and control shall be provided on the generator set operator control panel b) Control system shall have the capability for remote monitoring and control with the' use of additional hardware, components, and cabling as noted in the text b. Control Functions 1) The control system shall include a engine cycle cranking system with adjustable settings for: a) Pre Start Delay Time b) Maximum Crank Time c) Pause Time between crank attempts d) Idle Time 2) The control system shall include an engine governing control to provide steady state frequency regulation.The governor shall include adjustments for gain,dampening, and ramping functions to control engine speed if not provided by the engine control module supplied by the engine manufacturer 3) The control system shall include adjustable time delay functions for: a) Time Delay Start b) Time Delay Stop C. Emergency Stop 1) An emergency stop switch shall be provided. Depressing the switch shall cause the generator set to shut down. The switch shall be flush mounted and located to prevent accidental operation.The switch shall be a Red mushroom type requiring a manual reset and shall be clearly marked as emergency 2. Controller Operator Display a. The generator set controller shall have the following operator display features as a minimum 1) Backlit graphical LCD display 64x128 pixel resolution minimum 2) Genset status LEDs shall provide the following indications: a) Alarm - Preferred color is Red Heartland Health Care Center of Zephyrhills-3181 16650-9 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL b) Not In Auto- Preferred color is Red c) Warning - Preferred color is Yellow d) Running - Preferred color is Green e) Ready/Auto-Preferred color is Green f) Supplying Load - Preferred color is Green 3) The controller panel shall be a sealed membrane type. Sealing shall meet IP64 and have operator keys for the following control functions: a) Start b) Stop c) Fault Reset d) Horn Reset e) Data Entry-Mode, Page Up, Page Down, and Enter 4) The genset controller shall display the following engine metering and protection functions: a) Running Hour Meter b) Over Speed Shutdown c) Low Oil Pressure Warning d) Low Oil Pressure Shutdown e) High Coolant Temperature Warning f) High Coolant Temperature Shutdown g) Low Coolant Temperature Warning h) Battery Under Voltage Warning i) Battery Over Voltage Warning j) Low Fuel Level Warning k) Low Fuel Level Shutdown 5) The genset controller shall display the following generator set metering and protection functions: a) Under Voltage Warning b) Under Voltage Shutdown c) Over Voltage Warning d) Over Voltage Shutdown e) Over Frequency Warning f) Over Frequency Shutdown g) Under Frequency Warning h) Under Frequency Shutdown i) Over Current Shutdown 6) The genset controller shall display the following generator set output metering functions: a) Output Voltage- Each Phase b) Output Current- Each Phase c) Output Frequency d) Output kW(kilowatt) e) Output kWh (kilowatt hours) f) Output kVAr(kilovolt-ampere Reactive) g) Output kVAh (kilovolt-ampere hours) 3. Common Alarm a. A common remote audible alarm function will be provided so that a horn output will occur. The horn shall be battery powered and resettable from the operator control panel and any remote annunciator as specified in the text. The horn will activate if any of the following conditions occur: 1) Over Crank Alarm 2) Low Coolant Temperature Warning 3) High Coolant Temperature Warning 4) High Coolant Temperature Alarm 5) Low Oil Pressure Warning Heartland Health Care Center of Zephyrhills-3181 16650-10 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 I, \ DONNELLY ENGINEERING ELECTRICAL 6) Low Oil Pressure Alarm 7) Over Speed Alarm 8) Not In Automatic Warning 9) Low Cranking Voltage Warning 10) Low Coolant Level Alarm - Preferred color is Red 4. Remote Annunciator: Provide a new remote annunciator. F. Main Line Circuit Breaker: Provide main line circuit breaker as follows; 1. Provide a main line circuit breaker. Refer to power-one-line for type. 2. Install on the generator in a NEMA 1 enclosure to function as a load circuit interrupting and ` protection device. 3. Circuit breaker shall be trip free of the handle. 4. The handle position, or a luminescent flag, shall indicate "off', "on", or"tripped" breaker positions. 5. The trip unit for each pole shall have elements providing inverse time delay during overload conditions and instantaneous magnetic tripping for short-circuit protection. 6. Insulated neutral terminals and a ground terminal shall be provided and marked. 7. The circuit breaker shall meet standards established by UL, NEMA, and NEC. 8. Do not use generator exciter field circuit breakers. 9. The circuit breaker shall be electronic trip. 2.10 FUEL PIPING AND STORAGE TANKS A. Tank: Sub-base mounted tank fuel storage tank shall be provided as a complete package with the generator. The Contractor shall be responsible for a complete fuel system installation. The fuel shall provide 127 hours of operation minimum at 100% loaded with a low level set at 96 hours at 100% loaded. B. Coordination: It shall be the responsibility, however,of the generator set supplier to coordinate all materials and work of other trades so that the total installation is complete and fully operational and meets all engine manufacturers' requirements. Any materials or installation required for proper interfacing of all trades shall be provided and installed by the generator set supplier. C. Construction: The tank shall be double wall with fuel leak monitoring and alarm. Compliant with UL142 after alarm. 2.11 TORSIONAL VIBRATION ANALYSIS A. General: Submit a torsional vibration analysis of the engine-generator combination, showing it free of harmful torsional vibration stresses within plus or minus 10 percent of its normal operating speed range, the natural frequency, critical speeds, relative amplitudes of angular displacement, and approximate nodal locations of the complete elastic system of the engine and driven equipment. 2.12 SPECIAL PROVISIONS A. General: Provide a battery pack emergency light with two 12 w heads within the enclosure connected to the normal/emergency power supply. Provide a red duplex receptacle with a yellow JB and yellow cover connected to the life safety power supply. Provide a ground conductor per NEC for the enclosure and fuel tank. Provide one air terminal at each corner and two lightning down conductors for lightning protection. Refer to drawing details and schedules. Heartland Health Care Center of Zephyrhills-3181 16650-11 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL B. Replacement Kit: Provide a replacement kit package which shall include all replacement parts as directed by the Engineer and as required by CMS and NFPA 110. PART 3 -EXECUTION 3.1 GENERAL A. Miscellaneous Requirements: Provide the following: 1 Equipment nameplate. 2 Operating manual (5 copies). 3 Parts list(5 copies). 4 Special tools (as required). 5 Lubricants (6 months supply). 6 As-built shop drawings (5 sets). 7 Services of a Manufacturer's Representative, minimum ten (10) days. 3.2 PREVENTIVE MAINTENANCE PROGRAM REQUIREMENT A. General: The manufacturer of the Power Generation System equipment shall develop a computerized preventative maintenance program. Specific recommendations for actual equipment application shall be made for a computerized program based on operating hours and/or elapsed time. The preventative maintenance recommendations shall be submitted with the shop drawings. B. On-site Replacement Parts: The Generator shall be shipped with replacement kits of all field replaceable components as require by code. Kits shall be given to the Owner's Representative and shall be stored on site as required. . 3.3 SYSTEM SERVICE CONTRACT A. General: The supplier of the power system must provide a copy of and make available to the Owner his standard service contract which, at the Owner's option, may be accepted or refused. This contract shall accompany any documents, drawings, catalog cuts, specification sheet,wiring or outline drawings, etc. submitted for acceptance to the designing engineer. 3.4 REMOTE ANNUNCIATION A. General: All necessary relays and wiring shall be provided by the generator system supplier for remote annunciation for the generator; 1. Normal power on/off. 2. Main breaker open/closed. 3. Generator running. 4. Pre-alarm trouble on generator. 5. Generator trouble shutdown. 6. Emergency system operating. 7. Diesel fuel low level. 8. Refer to table within this spec for additional items 3.5 FACTORY TESTING A. General: Perform factory tests prior to shipment. Include the following; 1. Demonstrate proper operation of all safety devices. 2. Conduct load tests utilizing resistive load banks as follows: Heartland Health Care Center of Zephyrhills-3181 16650-12 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL Load Hours half 1 three quarter 1 full 4 3. At the end of two hours at full load,the engine-generator shall be block loaded from no load to full load for a total of two times, and the voltage dip shall be recorded by a strip chart recorder. 4. Record current, voltage, frequency, water temperature, lube oil pressure, and lube oil temperature every 5 minutes. 5. Perform factory testing in the presence of the Owner's Representative. The Contractor shall pay all costs for the Owner's representative to witness the factory tests. Cost shall include the representative's hourly rate, lodging if necessary, meals and all forms of travel. Submit request for representative's attendance and completed test verification to the Engineer. 3.6 REQUIRED FIELD TESTING: NFPA 110 testing for each generator will require the following; 1 Provide testing per section NFPA 110 paragraph 7.13 2 Provide advanced notification to Donnelly Engineering so that we may witness or have the owner's rep witness the test. Obtain confirmation that a representative of Donnelly Engineering will be present. 3 On-site test as follows; (1) From a cold start, initiate a power failure by opening the main normal device (2) All required loads shall be on the generator (3) Record time delay to start (4) Record cranking time (5) Record time to reach operating speed (6) Record voltage and frequency overshoot (7) Record transfer time (8) Record Voltage, Frequency and amperage (9) Record oil pressure and water temperature (10) Record battery rate at 5 minute intervals for first 15 minutes and at 15 minutes for the duration of the test (11) Record exhaust temperature and pressure (12) Continue test for 2 hours and record all load and frequency changes (13)After two hours close the main power switch to normal power and record the time to retransfer to normal with a minimum time of 5 minutes (14) Record time delay for cool down and shutdown 4 Allow the generator to cool for 5 minutes after shutdown. Start the generator and provide a full load test using a load bank for the 100% of the rated load of the generator in one step at unity power factor. Record information as listed above in 3 (4) through (10) 5 Provide a crank cycle test(override starting) • 6 Test all safeties 7 Provide formal test results 8 Provide a letter of compliance per 110 5.6.10.5 9 Provide a certified analysis per 110 5.6.10.2 10 Provide evidence of the complete test as outlined in 100 5.6.10.2 for level 1 systems 3.7 FUEL A. General: Provide 1/2 filled tank prior to final testing. The contractor shall fill the tank 100% #2 Diesel fuel after field testing is complete, refill the tank. Heartland Health Care Center of Zephyrhills-3181 16650-13 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL 3.8 STARTUP A. Initial: On completion of the installation,the initial startup shall be performed by a factory-trained service representative of the engine supplier,who shall thoroughly inspect,operate,test and adjust the equipment. B. Provisions: The inspection shall include the soundness of all parts, completeness of all details, proper operation of all components with special emphasis on safety devices, correctness of settings, proper alignments, and correct phase rotation to match other sources. C. Field Tests: On site load test specifications shall comply with the load test requirements of article NFPA 110. 3.9 SCHEDULED OIL SAMPLING A. Sampling Analysis: In order to minimize engine failure, the supplier of the equipment shall provide a quarterly(every three months)oil sampling analysis(for each engine)for a period of two years from date of acceptance. B. Method: This scheduled oil sampling shall be of the atomic absorption spectrophotometry method accurate to within 1 ppm for the following elements: lead, iron,chromium,copper,aluminum,and silicon. C. Test Requirements: In addition, test the sample for the presence of water, fuel, dilution, and antifreeze. D. Equipment: Provide equipment needed to take oil samples in a kit at the time of acceptance. Include a sample gun kit, bottles, mailers, and written instructions. E. Notification: Provide immediate notification (within two hours of analysis) by telephone or fax to the Owner when analysis results show any critical reading. If readings are normal, provide a report by mail showing that the equipment is operating within established requirements. I F. Owner Availability: This scheduled oil sampling program to be available to the Owner at the supplier's normal rate, after the mandatory 2 years and shall be continued thereafter at the Owner's option. I j 3.10 HEATER AND ANTIFREEZE F. General: The engine shall be provided with antifreeze, (a solution of 30 percent ethylene glycol) and suitable unit mounted thermal circulation type water heaters incorporating a thermostatic switch to maintain engine jacket water to 90 degrees F in an ambient temperature of 30 degrees F. The heaters shall be sized as recommended by manufacturer, single phase, 60 Hz 120 volts. Heaters shall be Kim-Hotstart, Chromalux or accepted substitution. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16650-14 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL SECTION 16670 LIGHTNING PROTECTION SYSTEM PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.2 DESCRIPTION A. General: Provide a complete lightning protection system as indicated on the drawings and as specified herein. The lightning protection system shall be installed by a professional firm presently engaged in installations of Master Labeled or LPI certified lightning protection systems. The system as completed shall comply with the latest edition of UL96A, Installation Requirements for Lightning Protection Systems, and NFPA-780 "Lightning Protection Code." The system shall meet all requirements of these codes and the Lightning Protection Institute Standard of Practice LPI-175. All components required for a full LPI certification plate shall be provided whether or not such materials are specifically addressed by the contract drawings or described herein. B. Qualification: All installers shall be experienced and LPI certified or of equivalent qualification, as accepted in writing by the engineer of record. An LPI certified installer shall be on the project site at all times during installation of the systems and shall supervise all of the installation. C. Made in the USA: All products shall be made and fabricated in the USA only 1.3 SUBMITTALS A. General: Shop drawings identifying all system wiring and component placement, including all details, shall be submitted to the Engineer for review. Utilize the design drawings only. Provide proposed modifications and additions only. Do not redraw or create your own drawings. The Contractor shall not perform any portion of the Work until the respective submittal has been accepted. All work shall be in accordance with accepted submittals. B. Detail Submission: Details shall be submitted to the Engineer for review indicating the method of cabling connections and attachments starting at the top of the project structure to the ground rods and the counterpoise where applicable. All details shall be appropriate for the project. Utilize details indicated on the design drawings only. C. Identification: All product data sheets submitted, for proposed system components, shall clearly identify the item being submitted and shall indicate the UL or NRTL (nationally recognized testing laboratory) label. D. Suppression Device: All transient voltage surge suppressors for the project shall be submitted at the same time the lightning protection floor plans, details and product data sheets are submitted. Each suppressor shall clearly indicate the item to be protected. E. Deviations: The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the acceptance of shop drawings, product data, samples or similar submittals unless the Contractor has specifically informed the Engineer in writing of such deviation at the time of submittal and the Engineer has given written acceptance to the specific deviation. Heartland Health Care Center of Zephyrhills-3181 16670-1 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL F. Certification: Provide documentation of LPI certification or equivalent qualification of exact installer intended to do this particular job. PART2 - PRODUCTS 2.1 GENERAL REQUIREMENTS A. Labels: All materials used for the system installation shall comply in size, composition and weight to all requirements of NFPA and LPI for the class of system in which they are installed. All materials shall be labeled or listed by Underwriters Laboratories Inc or NRTL for use in master labeled or LPI certified lightning protection systems. B. Material: Generally, the lightning protection system at the roof level shall be constructed of aluminum cable and aluminum compatible components except for down conductors and ground loops, which shall be copper. C. Compatibility: All portions of the system, whether copper or aluminum, shall be galvanically compatible to the building material to which they are to be attached. Connections between copper and aluminum portions of the system shall be made with appropriate bimetallic coupling devices. In all areas, the conductor shall be supported to maintain clearance from all galvanically incompatible materials and/or installed from same. D. Components: All system components (i.e. air terminals, bases, connectors, cable, thru-roof fittings, ground rods, etc.) shall be, to the maximum extent possible, the product of a single manufacturer. All components shall be heavy duty construction utilizing hexagonal head bolts for fastening to mechanical equipment and adhesive bases for mounting to roof. 2.2 AIR TERMINALS A. General: Air Terminals shall be aluminum as required to match the building system to which they attach. Air terminals shall protrude a minimum of 10 inches above the object to be protected. Air iterminals shall be 24" minimum. B. Base: Each air terminal shall be equipped with the correct type of base for the location in which it is mounted. 2.3 CONDUCTORS A. General: Main roof conductors shall be aluminum and provide a two-way path from each air terminal horizontally or downward to connections with ground terminals. Conductors shall be free of excessive i splices and sharp bends. No bend of a conductor shall form an included angle of less than 90 degrees nor have a radius of bend of less than 8 inches. Conductors shall be secured to the structure at intervals not exceeding 3 feet. B. Down Conductors: Down conductors shall be copper and shall be exposed on the exterior wall construction or concealed in the block walls. No electrical devices shall be installed in the cell where the down conductor is installed. Down conductors installed in shed 80 pvc located in exterior furred walls shall be installed only where allowed by the Engineer. Install in walls located in between studs that have electrical devices or any other components that can have induced flash over strikes. Down conductors shall be spaced at intervals averaging not more than 100 feet around the perimeter of the structure. Connections to the steel frame at the base of the building shall be made with heavy duty bonding plates having 8 square inches of contact surface. C. Main conductor cable shall be 3/0 minimum. Heartland Health Care Center of Zephyrhills-3181 16670-2 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL D. Shop Drawing: Submit all conductor types in shop drawing form. Each conductor shall be identified as to location in the lightning protection system. 2.4 PENETRATIONS AND SPECIFIC INSTALLATIONS A. General: Roof penetrations shall not be allowed B. Metal Pan Deck: Conductors shall not be installed in contract with metal pan ceiling of floor supports. C. Above Ceilings: No exposed conductors are allowed above ceilings. i D. Steel Joists: No conductors shall be connected to steel joists or beam supports. E. Steel: Steel columns shall not be used as a down conductor path. 2.5 COMMON GROUNDING A. General: Common grounding of all ground mediums within the project building shall be made by interconnecting with main size conductors and heavy duty fittings. B. Bonding: Grounded metal bodies located with the required bonding distance (as determined by the bonding distance formulas in NFPA 780) shall be bonded to the system using bonding conductors, and fittings. Bond to rebar utilizing exothermic braze connections. 2.6 GROUND TERMINATIONS A. Ground Rod: A ground rod termination shall be provided for each down conductor and shall consist of a 3/4" inch x 10 feet copper-clad ground rods. All ground rods shall be located 2 feet below finished grade and 2 feet from the foundation wall and shall extend a minimum of 30 feet vertically into the earth. 5 OHMS maximum resistance is required measured at the rod. No exceptions. I B. Building Steel: Perimeter steel columns shall be bonded at intervals averaging not more than 60 feet apart. Do not use steel columns for substitution of down conductors. Down conductors shall be provided in addition to steel column bonding at the base of the structure. Steel columns shall be connected using bonding plates having 8 square inches of surface contact area. Conductors from the bonded connections to the ground termination shall be full size Class II copper lightning conductors. I 2.7 FASTENERS A. General: Conductor fasteners shall be manufactured of a material which is compatible with the type of conductor being supported. Fasteners shall be of sufficient strength to properly support each conductor ' or terminal base, etc. 2.8 ACCEPTABLE MANUFACTURERS A. Manufacturers: Equipment manufactured by Thompson Lightning Protection, Inc., Harger Lightning Protection or Heary Brothers shall be considered acceptable. PART 3 -EXECUTION 3.1 INSTALLATION OF CONDUCTORS A. General: Conductors shall be installed to interconnect all air terminals to the system of grounding electrodes, and in general provide a minimum of at least two paths to ground from any point on the Heartland Health Care Center of Zephyrhills-3181 16670-3 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 DONNELLY ENGINEERING ELECTRICAL system. Conductors shall provide a horizontal or downward path between the system air terminals and grounding electrode system. No bend in any conductor shall exceed 90 degrees or have a radius of less than 8 inches. B. Routing: Conductors shall be routed in such a manner that maximum concealment from public view is achieved. Down conductors shall be installed in one-inch PVC conduit from roof to grade. C. Connections: All connections between conductors below grade shall be exothermically welded. Improper application of weld shall be replaced at no additional cost to the contract. 3.2 INSTALLATION OF GROUND RODS I A. General: Ground rods shall be installed vertically at each down conductor position at a minimum of 2 1 feet from the building foundation wall. Inspection and documentation at each grounded location, weld, depth of counterpoise, etc., shall be made by the Engineer prior to backfill. The-Contractor shall notify the Engineer in writing at the conclusion of their installation. Allow a minimum of one week for the Engineer to make the inspection after notification from the Contractor. Ground access boxes shall be provided at all ground rods, below ground splices and connections. 3.3 BONDING OF SECONDARY METALLIC BODIES A. General: All metallic equipment located within 6 feet of a lightning protection conductor shall be bonded to the lightning protection system. B. Structure Grounding: Provision shall be made at the roof level on reinforced concrete structures for bonding, metallic elements of the roof system and metallic exterior wall systems to the ground grid at the base of the structure. Do not bond to the down conductor at the roof level or intermediate level. C. Bonding: All down conductors run in concrete columns shall be run in PVC only. Do not encase in concrete. Bond the ground grid to column bases. 3.4 GENERAL WORKMANSHIP IA. General: All elements of the Lightning Protection System shall be installed in a professional and it workmanlike manner consistent with the best industry practices. I B. Concealed Installation: All system components shall be concealed to preserve the aesthetic appearance of the project building on which the system-is installed. Unless specifically detailed as I exposed. i I 3.5 COORDINATION WITH OTHER TRADES A. Coordination: The Contractor shall coordinate his work with all trades, to insure the use of proper materials and procedures in and around the roof in order not to jeopardize the roofing warranty. B. Fasteners: Where fasteners are to be embedded in masonry or the structural system, those fasteners II shall be provided to insure installation at the proper time of installation. C. Certification: Upon completion of the installation the Contractor shall provide to the owner the Master Label issued by Underwriters Laboratories, Inc. for the installation, or the LPI certification issued by LPI. END OF SECTION Heartland Health Care Center of Zephyrhills-3181 16670-4 DE No 217032 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 r j From:Shelethla Johnson Fax:18138674899 To:8137800021®rcfax.com Fax:(813)780-0021 Page:1 of 3 1212412019 8:31 AM FAX Date: 1IJ14/2019 Pages including cover sheet: 3 To: 8137800021@rc#ax.com From: Shelethia Johnson VoltAir Consulting Engineers Phone Phone (813) 867-4899* 100 Fax Phone (813) 780-0021 Fax Phone 18138674899 Generator FOR Acceptance Letter (Permit #20704) Sp From:Shelethia Johnson Fax:18138674899 To:8137800021@rcfax.com Fax:(823)780.0021 Page:3 of 3 1211412029 8:32 AM .. ... ..y. •apt �+ • ms t>3,Futurest?rlve�Suite:5� .. � - �'.:Tei,t�r#:�?;353:.3•(385... .. • .e ;:'.. da4elfjfp��Ql:evrt�~ Atfp;' cv WaEtz;.:NCAR :;: f tfi:;lUiike' ie.®ran;Rioh,:SnoddX 'ttief.ofFlaFts.arldGof�s#ruction. MaiFrag®r:of F?latt:QperaSfons '.' ency.fnr:Meg lth;Gar$A..i�lnistr�#pn.: �IG.R:tVIANt9RGARE. ::.. . ..., ACi AE#ASS.EE`CEW-M-OFF(G .':':.. . ... 3822Q:Fteni E i",:2eph}!ih1lls,FL'33.6 42.... " 2?27:Mahart..Mve;:f?;:.KnoX.'$1dg�t3 Sialte t45 E Fr;. 3�$77 6813 813 200 3�S1 Eallai�assee;:>= :323t)8:'.::: E-mail. rr�s#�esran cr mai orcar�-torno E-mail:,Seo#t141at 13�A#�iGR 11+1yF6orida cesrri•... . Tel:$5049285:Fax:: 5D=�221e3: 1ZE1=; -Facility-Na -m- 1166d j3.eaitt}. ark;Center of Z6phyrhRs.'-.:•.. :: .. .. .. ' Project_.pwe:Gsnerafi? •:€1pSrad.e k ttie 9A,4 9265.CnmpGanre.. ' ;Facili Atlitress.;.:3$22Q:Hen:.,Chive;ZepFty�;hffis;:FL:_335 2'�.• ... . Client Giiell*ite E?ojec#.Sutt:.;hlurrtt�er:' 5-55 'd+1 �04.'; ..• ... . .. :Generator:l*Clk�acceptaCa�!@;ietti:r.: '. . • - ' .. . .. . . 40,9/.3DI;�Q19,`:anonsite.cpn'sii�t�tien.sureep:'ofthe'•.referer�ced�'pr�ijeet'(Generafis3r;Li.grad�;�i�iei•` 59A-!4.12+5S�;was.conducted::'fheintentf:the:irieection.,wastoeua(Ua#e: Qlo;carnple3iart.:�srith.:respefflcfransfer. •. .. . arid.�rrir{n to:a:1(1Q°lo acceptabte`irzstallatibrt<'Tlii :.ro eclas a:Fie+nr.hufrideneiiiLarit':35f3KWgenerator; diesel•base:tank;tiew concrefe:sEab''new ezterior:# iQR;rielv.eXtercit:A1 S=Etrf1'rieur fur a rotecfian.and;new P . . lightning protecgon(q i'tkte: erteFato[;toiisirig) kie:neuvgenerafor:stipp)iQs;pvW:ertp:tfie;llfe,saf. tY;;crifi, Znd`.::;; eq.uipme[tt,3�janeh@s;: 1higw:extmorM60and `(?S=E)Vl asiristalleii::6,6]m e-eyriei; cottRectioiis ale req�tuesJk:Tjtts:�s sehedt�led;foF-:14T 4% 9::TtrQ. en®rator :ram ect;ts: pert uedk`f �i#s:iriteaxled put Se ;....:.....9 ?. :}... .. . ... . 'upon cGrrtptetiort.;of#he.;esrFergency::5iial: ti neetions; .a result;#fie facility v+dill:'.L1e3p...;c irnp t4hce: :Emerg rroy,Ep ifgnrOentai:Control:for'l�diirsitig# o>E tes F:A:C',,•;pei):i#i g a !?rauai d:the'.:facliity's paas�::fay.the.oral.: errTergeneymartagementagency. Before:tfiis .ptojeet'tttay:try"ciisldeted ciased`#iyHG :.alE'deficienc%e Hated::(as:tSick up.Itents ':rCats>:be corrected:and 'resufvey mu$tbe:eQnducteii`Ir�r:the'A"' A—' coi[ectivtis,iav `tieeri`catriple#etl: The 050Ki�.lt,getteretor senrirlg:ttre':ab..pve reference factlttyhad:beert':sineinspeetec3°:hiihe l:ijg'iiieec.'pfRecord. ' :;Rokeh.t 'DonnelL :RE, .. 5inc. ei fit .. .. .. . . ........ s.:. ".#�G 4. nr�etly ` V. 2]74t321I3 itlandof2ephyibifls.Cwnr aworAccc loll From:Orlando Office Julius I Fax:18138674566 To:8i37800021®rcfax.com Fax:(813)780.0023. Page:2 of 4 02/0412019 10:37 AM ,r�urnx�.v avv stv-evr Vrt orb J6JJ b'v 1 665 rage 1 of 1 02/04/2019 08:50 AM Rcpt:2025394 Rae-10.00 DS:0.00 1T:0.00 Paura S. O'NeX Ph.D.,Pasco County Crerfi&Comptrolrer NOTICE O O MENCEINEMT Permit Numbei 20704 Tax Folio d 02-2s-21-=0-00A00.0122 The undersign ereb vas notice that improvement will be made to certain Real Prope ,and in accordance with Chapter 713,Florida Statutes,the following information is provided In this Notice of Commencement. 1. DESCRIPTION OF PROPERTY: (Legal desedpflon of the properly and street address,!f avaliab/e). 3e220 Henry Dive,Zephyih➢ls,FL 33542 Thai portion of TractA.Tyson Subdhlalon,as recorded In Piet 4,Pg 109 of Publk Rem of Paean County,FL 2. GENERAL DESCRIPTION OF IMPROVEMENT: Provide new hunlaane Impad assembly,diesel generator with connected above ground tank, This space reserved for recording concrete Pad and corresponding electrical equipment.Removal of e:detlng duel generator. 3. OWNER INFORMATION OR LESSEE INFORMATION IF THE LESSEE CONTRACTED FOR THE IMPROVEMENT: Name&Address: Heartland of Zepbyddlis FL,LLC,333 N.Summn streel,Toledo,Ohio 43604 Interest in Property: Lessee Fee Simple Title Holder(if different from owner listed above):WELL PM Propertles,LLC,4600 Don Street,Tolodo,OH43615 4. CONTRACTOR: Name: volt Cortlnrolora,LLC Phone Number: 613e674699 Contractors Address: 220 went 7th Avenue,rune 210,Tampa,FL 3=2 5. SURETY(If applicable,a copy of the payment bond is attached):Amount of bond: $ Name: Phone Number: Address: 8. LENDER'S NAME: Phone Number: Lender's address: 7. Person's within the State of Florida Designated by Owner upon whom notice or other documents may be served as provided by Section 713.13(1)(a)7.,Florida Statutes. Name: CTCorporation System Phone Number. an•724-9870 Address: 1200 S.Pine bland Road,Plantation,FL 3=4 8. In addition,Owner designates of to receive a copy of the Lienor's Notice as provided in Section,713.13(1)(b),Florida Statutes. Phone number of person or entity designated by Owner: 9. Expiration of notice commencement(the expiration date will be 1 year from date of recording unless a different date is specified. 20, WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART 1, SECTION 713.13, FLORIDA STATUTES,AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFOR OMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. 1 John Huber (Sign ofDwrffr or Lessee,or Owners or lessee's (Print Name and Provide Signato y'8 Tigelofflce) Authurbfd Ot6oer/Director/PartnenUanager) State of Ohio County of Lucas The foregoing instrument was acknowledged before me this 25th day of January 2019 by John Huber,Authorized Representative for Heartland atZephydri6s FI,LLC (type of authority,...e.g.officer,trustee,attorney in fact) (frame of party on behalf ofwhom instrument was executed) X Personally Known or Produced Identification P, "/. 0 SEA _(Signature of No Public Stilts of Ohio) ttilotafy Pilblio,Slapei 01'Ohio '. ., sty(balmfs9lQtt EYalltae �FormiPS02—Re;ri%d 01/13/15 From:Orlando Office JUHUS I FaX:18138674566 To:8137800021@rctax.com Fax:(813)780.0021 Page:3 of 4 0210412019 10:37 AM STATE OF FLORMAI COUNTY OF PASCO THIS IS TO CERTIFY THAT THE FOREGOING IS A TRUE AND CORRECT COPY OF THE DOCUMENT ON FILE OR OF PUBLIC RECORD IN THIS OFFICE WIT WSW HAND AND OFFICIAL SEAL IS AY OF& ' L'2ft iCOI& :1--M- R PAULA EIL,CL RK J�- TROLL CEPUTY CLERK