Loading...
HomeMy WebLinkAbout19-20748 CITY OF ZEPHYRHILLS s. 5335-8TH STREET (813)780-0020 20748 BUILDING PERMIT SINGLE FAMILY RESIDENTIAL PERMIT INFORMATION LOCATION INFORMATION Permit#:20748 Issued: 1/30/2019 Address: 2996 MOULDEN HOLLOW DR Permit Type: NEW SINGLE FAMILY DWELLING ZEPHYRHILLS, FL. Class of Work: 101-NEW CONST/SFR Township: Range: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Sq. Feet: Est. Value: Book: Page: Cost: 343,131.90 Total Fees: 19,048.97 Subdivision: HIDDEN RIVER Amount Paid: 19,048.97 Date Paid: 1/30/2019 Parcel Number: 25-26-21-0100-00000-0670 CONTRACTOR INFORMATION OWNER INFORMATION Name: LENNAR HOMES LLC Name: LENNAR HOMES LLC Addr: 4600 W. CYPRESS ST STE 200 Address: 4600 W CYPRESS ST STE 200 TAMPA, FL. 33607 TAMPA FL 33607 Phone: (813)574-5743 Lic: Phone: 813-574-5700 Work Desc: CONSTRUCT SINGLE FAMILY 3,046 SQ FT APPLICATION FEES BUILDING FEE 1,870.20 ELECTRICAL FEE 396.00 PLUMBING FEE 264.00 MECHANICAL FEE 184.80 SEWER CONNECTION RESIDEW 2,090.00 WATER CONNECTION RESIDENT 1,010.00 WATER METER RES 3/4" 473.78 POLICE-IMPACT FEE 254.00 FIRE IMPACT FEE 273.00 PUBLIC SAFETY 5% 26.35 PARK FEES SF 769.56 SCHOOL IMPACT FEE-sfr/100% 7,728.00 SCHOOL IMPACT FEE-sfr/1% 77.28 TRAFFIC IMPACT FEE 99% 3,595.68 TRAFFIC IMPACT FEE 1% 36.32' r /l InspectionInspectionA Re d FOOTER 2ND ROUGH PLUMB INSULATION CEILING FOOTER BOND DUCTS INSULATED S ER MISC. ROUGH ELECTRIC LINTEL MISC MISC. 1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC. DUCTS INSTALLED WATER MISC DRIVEWAY PRE-SLAB SHEATHING MISC. MISC. l CONSTRUCTION POLE FRAME MISC. MISC. REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection.REINSPECTION FEES: NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental; entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications and Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. ONTRA ORS SIGNATURE PERMIT OFFI PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER City DyZenhvrhilis peO0it4nn|ic3to Fox-03-780-0021 Building Department Date Received Phone Contact for Permitting 13 363 2891 Owner's Name Lennar Homes,LLC Owner Phone Number 4600 FL 33607 Owner's Addrress ess Owner Phone Number Fee Simple Titleholder Name I Owner Phone Number Fee Simple TitloholderAddress JOB ADDRESS LmT# ouaDKOm|ON Hidden River Phase One B PAnCsL|o# 25-26-21-0100-00000-0670 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED mowcomnn ADD�J][ �--� SIGN �—1 [--� DEMOLISH � INSTALL [_] REPAIR PROPOSED USE GFR F-7 COMM �--1 OTHER ` TYPE oFCONSTRUCTION BLOCK �—| FRAME �---� 8TEE� � DESCRIPTION OpWORK Single Family Residence/Pool/Screen Enclosure/Fence BUILDING SIZE U/R SF SQpoOTAGE HEIGHT 2 Story � OBUILDING D VALUATION'OF .O..`^.O,...`~C..~.. ELEcTn|[%u pR�QREGOBvEFV3Y [--1 xV.�EC. ^�—~ AMP SERVICE ���� ---' �w' UpLUK0B|NG u/ MECHANICAL VALUATION OF MECHANICAL INSTALLATION � F---lG�S ��L»'A ROOFING F—1 SPECIALTY OTHER CTHER �� FINISHED FLOOR ELEvAT�NG FLOOD O ' V U | � CI YES �—1 Address 14600 Liconoo# ELECTRICIANCOMPANY Edmonson Electric, Inc. SIGNATURE Adumoa 11034 Skipper Road, FL 33613License# PLUMBER ! a|omATVms REGISTERED x«mmns Licanno# I CFC042998 � MECHANICAL COMPANY Bayonet Plumbing, Heating & A SIGNATURE FEE CURREN --__—_^ Adumoy Lioenao# OTHER COMPANY C Sterling Quality Roofing, Inc a|omATums' REGISTERED Address 14211 Shoal Line Blvd, Spri4 Hill, FL 34607 ) Ucenoo# ICCCO57991 |' xnVUonmnnxxoonxomxxxmxxmoxu � uxmxxomxnmxnmuxuwxnmnnxVnnmnnuUnn � no � uo RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(1O)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans wl Silt Fence installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(1u)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1dumpstecSite Work Permit for all new projects.All commercial requirements must meet compliance i SIGN PERMIT Attach(q sets of Engineered Plans. ~**°PROPEgTY SURVEY required for all NEW construction. / Directions: Fill out application completely. Owner&Contractor sign back n[application,notarized |f over$25ou,o Notice of Commencement inrequired. (VC upgrades over$7sVD) . ^° Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same ' OVER THE COUNTER PERMITTING (copy uf contract required) Remofs if shingles Sewers Service Upgrades A/C Fnnoao(P|oVOuney/Fuotuga) Driveways-Not over Counter ifon public modwayo..noedaROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for'compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner" prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction.. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not.limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone W" unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued.under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes: Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S. 117.03) OWNER OR AGENT CONTRACTOR Subscribed and sworn to(or affirmed)be me this Subscribed and sworn to(or med)before me this U0_pan-1 y by Ashlee Callahan 08-Jan-19 by Ashl allahan Who is/are personally known to me-. Nave pFedW Who is/are personally kmTwn to me or tification. as identification. Notary Public Notary Public Commission No. FF98537 Commission No. FF98537 Elissa M.Holleran Elissa M.Holleran Name of Notary tvped,printed or stamped Name of Notary typed,printed or stamped �tlli - ORION, - �tlll�kl�9i�]IAI;G�IV yRr'tbnl>�.��G6aEp� 4i0mnt�ibnu�Pf�a��P1' � iG�I14i1od�N��t���4 161��,ii7�Y1P?i�y��� 'i ' . , ! 859�11'1JJ'frr�FtlaM1p9�JdR1:34119+'t�ll i ' . _--f3�idrllthaih�Faln4st��gdli&t,713�t11 _ . 151 11 'R V T PASCO COUNTY PASGI., , � BUILDING CORISTRUCTION SERVICES 8731 Citizens Drive Date:4/30/2019 COUNTY FLORIDV Suite 230 Ortrl Srnus.Virrr mr PtAcits. New Port,Richey, FL 34654 727-847-8126 Receipt#: 1852376 FEE DESCRIPTION ACCOUNT CODE UNITS INVOICE# FEE AMOUNT PAID RECEIPT# DATE Impact Fee Residential Solid .24503100-329010 1.00 14533.69 $45.00 $45.00 1852376 4/30/19 Waste Single Family TOTALS: $45.00 $45.00 Receipt# Paid By Check# CC Auth# Cashier ID Workstation Receipt Date Amt Paid' 1852376 Check 01212930 MLARNOLD 13CCCP59W 04/3012019. $45.00 Total Payments: $45.00 i Pavor Address Phone Lennar Homes, LLC Comments: 2996 Moulden Hollow DR !/ V While you will be paying your bill with Pasco County Building Construction Services,the full amount of.the credit card or a-check fees;NOT shown above,Is collected by First Billing payment services. i MyReports/reports//PASCOPROD/PASC0/ReceiptAA_V7.rpt 4/30/2019 Page 1 of 1 Lennar Homes-2996 moulden hollow dr 3,046 sq ft Column Its SQ. FEET PRICE MAIN OR LIVING: 3,046 $ 112.65 OTHER AREA UNDER ROOF: - $ : 88.00 j OTHER: $ - VALUATION $ 343,131.90 FEE SHEET $ 1,760.00 T ADDRESS $ 30.00 DRIVEWAY $ 45.00 BUILDING: $ 1,870.20 ELECTRICAL: $ 396.00 PLUMBING: $ 264.00 MECHANICAL: $ 184.80 SUB-TOTAL $ 2,715.00 TOTAL $ 2,715.00 SEWER: $ 2,090.00 WATER: $ 1,010.00 IRRIGATION: $ - TOTAL: $ 3,100.00 WATER METER: $ 473.78 IRRIGATION METER $ - FIRE DEPARTMENT FEES PLANS TOTAL: na INSPECTION TOTAL: PERMIT TOTAL TOTAL: $ - PUBLIC SAFETY IMPACT FEES POLICE $ 254.00 FIRE $ 273.00 5% $ 26.35 TOTAL: $ 553.35 SUB-TOTAL $ 6,842.13 PARK IMPACT FEES $ 769.56 SIF'S: $ 7,728.00 100.0% $ 7,728.00 1.0% $ 77.28 TOTAL: $ 7,805.28 T I F'S: $ 3,632.00 99% $ 3,595.68 1% $ 36.32 TOTAL: $ 19,048.97 i i Jacqueline Boges From: Jordon Davis (City of Zephyrhills Support) <support@zephyrhillsfl.zendesk.com> Sent: Wednesday, February 6, 2019 4:00 PM To: Jacqueline Boges Subject: [FATHOM] Re:2996 Moulden hollow dr by#20748 ##- Please type your reply above this line -## Your request (#262052) has been solved. TO REOPEN THIS REQUEST, reply to this email or click the link below: https://zephyrhillsfl.zendesk.com/hc/requests/262052 ....................................................................................................................................................................................................................................................................................................................................................................................... Jordon Davis (City of Zephyrhills Support ) Feb 6, 1:59 PM MST WO#765422 created to install new meter to the property. Best Regards, Jordon I FATHOM Support ................................................................................................................................................................................................................................................................................................................................................................... j Jordon Davis (City of Zephyrhills Support ) L---- -- Feb 5, 4:16 PM MST Account has been added and services are being mapped. Account number 0000889145- 003124214 Best Regards, Jordon I FATHOM Support ...................................................................................................................................................................................................................................................................................................................................................................................... ~- 9 Jacqueline Boges --' Feb 5, 2:21 PM MST I servi A z'R9 '6AMjaul:de to ,w D.r�bp#2,Or7�48,� This email is a service from City of Zephyrhills Support . 1 PASCO COUNTY, FLORIDA Permit No. 7 �/f��, Date Permitted / /9 Builder Name/Owner Name tel�.yl ar ��"" Control# County Par•.cel No. ��� r()r'dd�k�'06'70 SubDiv: G LO & Address/Location Z� / /Pt e-x Men. A A&, � Classificatlonrrype of Use (S l'1v le l C�f 131 y 1_" TRANSPORTATION IMPACT FEE Rate: Sq.Ft Unit: 3104 Exempt ❑Yes ❑ No How Determined Impact Fee Amount Ob Zone No. TAZ: SCHOOL IMPACT FEE Account (056) Single-Family Detached House Amount $ 6b6. ZS (057) Mobile Home (058) Other Residential 23) Collection Fee Exempt a Yes Q No How Determined PARKS AND RECREATION FEE Land Account Land Credit Land Total Recreation Account Recreation Credit Recreation Total a Zone TOTAL AMOUNT $ Exempt ❑Yes ❑ No How Determined LIBRARY FEE Land Account Land Credit Land Total Facility.Account Facility Credit Facility Total Exempt ❑ Yes ❑ No How Determined Total Amount _ RESOURCE FEE , ERU TOTAL AMOUNT Prepared By Checked By NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED OR FINAL INSPECTION PERFORMED UNTIL THE TOTAL AMOUNTS LISTED HAVE BEEN PAID AND RECEIPTED FOR BY A CENTRAL PERMITTING OFFICE.OF PASCO COUNTY Acknowledgement below does not Imply acceptance of concurrence,but simply receipt of.a.copy of this form,placing . the building permit owner on notice of this assessment and the conditions of payment for same. DATE RECEIVED BY RECEIPT NO. DATE BY Single Family Dwelling Plan Review Comments 1. F.F.E. shall be a m'inirnum of8" above the road elevation and an engineered site plan. I Lots shall be graded to comply with R401.3 of the F.B.C. 3. ompaction-test required if_2 C 4" or more of fill dirt.is brought in at any one place. 4. Tie in' survey required before pouring.concrete. 5. Driveways require a R.O.W. use permit. All 4 sides of driveway thru'the sidewalk shall have expansion material. 6. All setbacks shall be met. 7. All property markers shall be uncovered and marked at time of first inspection. 8. All A.D.A.requirements shall be met. 9. No electric, plumbing,inechanical; or framing shall be-covered without an inspection and approval first., 10. All Garages 'shall comply with section R302.6 of the F.B.C. (Fire Separation). 11. Appliances shall not be installed in a location where subject'to mechanical damage unless protected by approved barriers. W OW A.of the FAC 12. Wate'r.heaters shall comply with section P607.3 of the F.B.C. 13. Foundation supports for A/C units shall be raised at least 3" above finished_ grade, M13.08.1 14. Return air in all bedrooms. F.B.C. M1620.4 15. Smoke detectors are to be installed in accordance with R313.1 of the F.B.C. 16. All glazing :requirements are to be in accordance with R308.4 of the F.B.C. 17. All means.of egress are to.be in accordance with R311 of the F.B.C. 18. "Green gypsum board"shall riot be used as a backer in showers or tubs. R702.4.2.F.B.C. 19. Combination-type AFCI breakers are required at all.locations requiring an AFCI type breaker: 20. Carbon monoxide alarms will be required in new construction that uses fossil-burning heating or appliances of an attached garage: They shall be-installed in accordance with the F.B.C: 21. All plumbing,mechanical, and-electrical shall be- separate from unit,t6.unit. This includes all underground'plumbing and electric. 22. All 2016 N.E.C. Codes will be enforced. 23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N:E:C 24. In accordance with the Land Development Code, lots shall be.sodded before final.at least 10. feet around the structure: 25. Blower'door test shall be provided before,CO. 26 A copy of the enerQy eacls shall be with permit at all times 27. Copv of final insulation report shall be.:provided with:permit before final . .28: No fence,:pool or screen_enclosure is:issued with this permit RRE.-Finished Floor Elevation F.B.C-Florida Building Code Ob Edition R.O.W.-Right of Way A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) Lennar Homes 2996 Moulden Hollow Dr.3,046 Sqft Column SQ. FEET PRICE MAIN OR LIVING: 3,046 $ 112.65 OTHER AREA UNDER ROOF: - $ 88.00 OTHER: - $ - VALUATION $ 343,131.90 FEE SHEET $ 1,760.00 ADDRESS $ 40.00 DRIVEWAY $ 40.00 BUILDING: $ 1,875.20 ELECTRICAL: $ 396.00 PLUMBING: $ 264.00 MECHANICAL: $ 184.80 SUB-TOTAL $ 2,720.00 Public Fee 1% TOTAL $ 2,720.00 SEWER: $ 2,090.00 WATER: $ 1,010.00 IRRIGATION: $ - TOTAL: $ 3,100.00 WATER METER: $ 473.78 IRRIGATION METER $ - FIRE DEPARTMENT FEES PLANS TOTAL: INSPECTION TOTAL: PERMIT TOTAL TOTAL: $ - PUBLIC SAFETY IMPACT FEES POLICE $ 254.00 FIRE $ 273.00 5% $ 26.35 TOTAL: $ 553.35 i SUB-TOTAL $ 6,847.13 PARK IMPACT FEES $ 769.56 SIF'S: $ 7,628.00 100.0% $ 7,628.00 1.0% $ 76.28 TOTAL: $ 7,704.28 I T I F'S: $ 3,632.00 99% $ 3,595.68 1% $ 36.32 TOTAL: $ 18,952.97 •~ � ,• "3`... .~ �.::j� `ram •r,.. .. .. •,..r. .. '�, _-i� '`�'� •.,ark=-.< ice':_ ,t».. �` .S:. •�'' ", ,. ,r.,: w�.:.ti v" •� •a,: •.. ..... ; •�.."4. ''�+'._t ^• :':r^,y .}++..'' ~:r .� i•.tL'.' "I'' �Y � 'sue�. r.�` r w� . .s,•`:�;.�;�:r�....r -� ;r.y � 5 �-,t ,:'.,r.r' .+a.�'• �.•• ���.^�yl. wnn' CY, oW `' \`1f �: tr ow r fit �4'tlll�� ma. - �. .� f .. #fly tt• •` 40 ' 1 t SKETCH ONLY SEC, 25—, TWP. 26 S, RNG.. 21 E. PLOT PLAN NOT A BOUNDARY SURVEY BEARING BASIS: LOT 67 HIDDEN RIVER PHASE ONE B NORTH BOUNDARY OF SUBJECT PLAT BEINGS 89*40'43" E PASCO COUNTY, FLORIDA. THIS SURVEY IS SUBJECT TO ANY FACTS THAT N MAY BE DISCLOSED BY A FULL AND ACCURATE PRELIMINARY DRAWING: ON LOT AREA CALCULATIONS TITLE SEARCH. ALSO SUBJECT TO SETBACKS, THIS PLAN 15 FOR PERMITTING PURPOSES LOT =--!16-00.00 SQ. FT. EASEMENTS AND RESTRICTIONS OF RECORD. ONLY, NOT FOR CONSTRUCTION. VERIFY LIVING AREA =--10-93—SQ. FT. -0 ENTRY = 35 -SQ. FT. UNDERGROUND FOOTER, STEM WALL, AND ALL DIMENSIONS BEFORE ANY CONSTRUCTION. GARAGE =--42-7SO. FT, II UNDERGROUND UTILITIES ARE NOT LOCATED, OR COVERED LANAI = N/A 5Q. FT. SHOWN. LEGEND: PA110 = 23 sQ. FT. PROPOSED DRAINAGE FLOW DO NOT SCALE THIS PRINT. DIMENSIONS AND CONC. DRIVE ----!L0-8SQ. FT. L4 NOTES TAKE PREFERENCE. 00.00) PROPOSED GRADE A/C & CONC PAD =--LB—SQ, FT. E-00.00 = EXISTING GRADE PRIVATE SIDEWALK =--11—SQ. FT. DESCRIPTION NOT CONTAINING PLAT BOOK AND IMPERVIOUS PAGE INDICATES THAT PLAT IS IN NOTES* =--2-035SQ. FT. PRELIMINARY STAGE AND IS SUBJECT TO LOT GRADING TYPE = A SOD =--A§-Q-5—SQ. FT. CHANGE AND/OR REVISION. PROPOSED PAD ELEVATION FRONT SETBACK = 20' OFF LOT AREA CALCULATIONS CERTAIN DATA SHOWN HEREON BASED ON SIDE SETBACK = 10' RIGHT OF WAY =--22-0-00 SO. FT, ENGINEERING PLANS PROVIDED BY CLIENT. REAR SETBACK = 10' DRIVE APRON = 144 5Q. FT. PUBLIC SIDEWALK =---Z4-CL—SQ. FT, STRUCTURE TIES SHOWN HEREON DENOTES SOD 336 —SQ. FT. MEASUREMENT FROM FORM BOARDS/FOUNDATION TO PROPERTY LINE, TOTALS 10' DRAINAGE/UTILITY EASEMENT AREA =--Z3-2O-Q-0-SQ. FT. 5' DRAINAGE/UTILITY EASEMENT DRIVEWAY = 552 SQ. FT. SIDEWALK = 271 SQ. FT. SOD =-4901 SQ. FT, LOT 68 ,,,--PRM(P) IV TRACT "B" WETLAND CONSERVATION AREA/ DRAINAGE EASEMENT HIDDEN RIVER PHASE ONE A (PLAT BOOK 74, PAGES 101-121) o WETLAND CONSERVATION AREA 0 0 00 <,100 ON- 61 0, i5n To. PLAT- )' BOUNDARY -q r0 by 0 10R2) LOT 66 BO DARY o ;4 CO PROPOSED: LOWEST FLOOR ELEVATIONS:. LIVING AREA: 71.35' GARAGE AREA: 70.81' DESCRIPTION: ELEVATIONS REFERENCED TO LOT 67, MAP OR PLAT ENTITLED "HIDDEN RIVER PHASE ONE B", NATIONAL GEODETIC VERTICAL oAS RECORDED IN PLAT BOOK 076, PAGES 077 THROUGH 082, DATUM OF 1929. MEAN SEA OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIDA. LEVEL= 00.00 Fr. APPARENTZONE: X - COMMUNITY PANEL NO. 12101C 0458 F EFFECTIVE DATE: 9/26/2014 Project Number: Square Feet: 660D.00 t LENNAR HOMES of -T LEGEND: W (C)= CALCULATED DATA, (D)= DEED DATA, (M)= MEASURED DATA, (P)= PLAT DATA, g-- CENTERLINE, A/C= AIR CONDITIONER, B/C= BACK OF CURB, C/S= in 'CONCRETE SLAB, CH= CHORD, CHB= CHORD BEARING, CLF- CHAIN LINK FENCE, CONC= CONCRETE, COV.= COVERED, E/P= EDGE OF PAVEMENT, ESM'T= EASEMENT,NIC I/C= FENCE CORNER, FCM= FOUND CONCRETE MONUMENT, FIP= FOUND IRON PIPE, FIR= FOUND IRON,ROD, FN&D= FOUND NAIL & DISK, FPP= FOUND PINCHED ,.�.T PIPE, LFE= LOWEST FLOOR ELEVATION, MAS.= MASONRY, OR= OFFICIAL RECORD BOOK, PB= PLAT BOOK, PCP= PERMANENT CONTROL POINT, PRM= PERMANENT I a) REFERENCE MONUMENT, R/W= RIGHT OF WAY, R= RADIUS, SIR=SET 1/2" IRON ROD & CAP No. 4493, SN&D= SET NAIL & DISK, TBM= TEMPORARY BENCHMARK, U/P= UTILITY POLE, W/F= WOOD FENCE m Drawn By: JOHN R.BEACH&ASSOCIATES,INC. SMS e SURVEYORS AND MAPPERS Che cked By: t 911 WEST ST. PETERSBURG DRIVE ONE OLDSMAR, FLORIDA 34677 JRB WAY (813) 854-1276 FAX (813) 855-8370 Scale: 1"=30' NOT VALID WITHOUT THE SIGNATURE AND Date; PLOT PLAN 11/9/18 ACS THE ORIGINAL RAISED SEAL OF A FLORIDA IGN'-URE DATE t BEACH LICENSED SURVEYOR AND MAPPER JOHN BEACH 32 Revisions: FLORIDA G. LAND SURVEYOR No. 2984 LB#4493 JEFF M. IjpTLEY JEFF M. -FROPE-SMONAL SURVEYOR & MAPPER No.7123 FORM R405-2017 i FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: 2575A1 sf ADS Carrier VW Builder Name: Lennar Homes 0067 Street: 2996 Moulden Hollow Drive Permit office: � 7�phyrhills City,State,Zip: ,FL, Permit Number: Y Owner: Lennar Homes Jurisdiction: 611600 Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2) 1. New construction or existing New(From Plans) 9. Wall Types(2613.1 sqft.) Insulation Area 2. Single family or multiple family Single-family a.Frame-Wood,Exterior R=11.0 1264.00 ft2 b.Concrete Block-Int Insul,Exterior R=4.1 996.67 ft2 3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=11.0 352.44 ft2 4. Number of Bedrooms 4 d.N/A R= ft2 5. Is this a worst case? Yes 10.Ceiling Types (1491.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 1491.00 ft2 6. Conditioned floor area above grade(ft2) 2584 b.N/A R= ft2 Conditioned floor area below grade(ft2) 0 c.N/A R= ft2 11.Ducts R ft2 7. Windows(175.6 sqft.) Description Area a.Sup:Attic,Ret:2nd Floor,AH:2nd Floor 6 218.6 a. U-Factor: Dbl,U=0.33 71.25 ft2 b.Sup: Attic,Ret:2nd Floor,AH:2nd Floor 6 298.2 SHGC: SHGC=0.23 b. U-Factor: Dbl,U=0.33 71.00 ft2 12.Cooling systems kBtu/hr Efficiency SHGC: SHGC=0.21 a.Central Unit 18.0 SEER:15.00 b.Central Unit 24.0 SEER:15.50 c. U-Factor: Dbl, U=0.58 33.33 ft2 SHGC: SHGC=0.32 13.Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a.Electric Heat Pump 17.7 HSPF:8.50 SHGC: b.Electric Heat Pump 24.0 HSPF:9.00 Area Weighted Average Overhang Depth: 1.190 ft. Area Weighted Average SHGC: 0.239 14.Hot water systems 8. Floor Types (1533.0 sqft.) Insulation Area a.Electric Cap:40 gallons a.Slab-On-Grade Edge Insulation R=0.0 1093.00 ft2 b. Conservation features EF:0.950 b.Floor over Garage R=11.0 427.00 ft2 None c.other(see details) R= 13.00 ft2 15.Credits Pstat Glass/Floor Area: 0.068 Total Proposed Modified Loads: 73.47 PASS Total Baseline Loads: 75.79 1�1a7�7 I hereby certify that the plans and specifications covered by Review of the plans and `jiE I. , this calculation are in compliance with the Florida Energy specifications covered b this 'Q Code. P 9Y calculation indicates compliance with the Florida Energy Code. PREPARED BY: Dave Autich Before construction is completed DATE: this building will be inspected for `u . compliance with Section 553.908 I herebycertify that this building,as designed, is in;complia ce Florida Statutes.fY 9� 9 !� • r�, with the Florida Energy Code. OWNER/AGENT: JAN 11 BUILDING OFFICIALS. .. DATE: DATE: - Compliance requires certification by the r handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance th R403.3.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2). - Compliance with a proposed duct leakage Qn requires a Duct Leakage Test Report confirming duct leakage to outdoors, tested in accordance with ANSI/RESNET/ICC 380, is not greater than 0.040 Qn for whole house. 1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 1 of 5 r FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: 2575A1 sf ADS Carrier VW Builder Name: Lennar Homes 0067 Street: 2996 Moulden Hollow Drive Permit office: City of Zephyrhills City,State,Zip: FL, Permit Number: Owner: Lennar Homes Jurisdiction: 611600 Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2) 1. New construction or existing New(From Plans) 9. Wall Types(2613.1 sqft.) Insulation Area 2. Single family or multiple family Single-family a.Frame-Wood,Exterior R=11.0 1264.00 ftZ b.Concrete Block-Int Insul,Exterior R=4.1 996.67 ftZ 3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=11.0 352.44 ftz 4. Number of Bedrooms 4 d.N/A R= ftz 5. Is this a worst case? Yes 10.Ceiling Types (1491.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 1491.00 ft 6. Conditioned floor area above grade(ftZ) 2584 b.N/A R= ftz Conditioned floor area below grade(ftZ) 0 c. R= ftZ 11.Duct s R ftZ 7. Windows(175.6 sqft.) Description Area a.Sup:Attic,Ret:2nd Floor,AH:2nd Floor 6 218.6 a. U-Factor: Dbl,U=0.33 71.25 ftZ b.Sup: Attic,Ret:2nd Floor,AH:2nd Floor 6 298.2 SHGC: SHGC=0.23 b. U-Factor: Dbl,U=0.33 71.00 ftZ 12.Cooling systems kBtu/hr Efficiency SHGC: SHGC=0.21 a.Central Unit 18.0 SEER:15.00 b.Central Unit 24.0 SEER:15.50 c. U-Factor: Dbl,U=0.58 33.33 ftZ SHGC: SHGC=0.32 13.Heating systems kBtu/hr Efficiency d. U-Factor: N/A ftZ a.Electric Heat Pump 17.7 HSPF:8.50 SHGC: b.Electric Heat Pump 24.0 HSPF:9.00 Area Weighted Average Overhang Depth: 1.190 ft. Area Weighted Average SHGC: 0.239 14.Hot water systems 8. Floor Types (1533.0 sqft.) Insulation Area a.Electric Cap:40 gallons EF:0.950 a.Slab-On-Grade Edge Insulation R=0.0 1093.00 ftZ b. Conservation features b.Floor over Garage R=11.0 427.00 ftZ None c.other(see details) R= 13.00 ftZ 15.Credits Pstat Glass/Floor Area: 0.068 Total Proposed Modified Loads: 73.47 PASS Total Baseline Loads: 75.79 I hereby certify that the plans and specifications covered by Review of the plans and TIC this calculation are in compliance with the Florida Energy specifications covered by this �1.,0�,. Code. calculation indicates compliance with the Florida Energy Code. F. iirri`. `% _ ',•�� '« 0. PREPARED BY: Dave Aup ch Before construction is completed DATE: this building will be inspected for compliance with Section 553.908 herebycertify that this building,as designed, is in compliance Florida Statutes. fY 9� 9 P '� with the Florida Energy Code. G'OD: .,, OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.3.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2). - Compliance with a proposed duct leakage Qn requires a Duct Leakage Test Report confirming duct leakage to outdoors, tested in accordance with ANSI/RESNET/ICC 380,is not greater than 0.040 Qn for whole house. 1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 1 of 5 FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: 2575A1 sf ADS Carrier VW Builder Name: Lennar Homes 0067 Street: 2996 Moulden Hollow Drive Permit office: City of Zephyrhills City,State,Zip: FL, Permit Number: _ Owner: Lennar Homes Jurisdiction: 611600 Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2) 1. New construction or existing New(From Plans) 9. Wall Types(2613.1 sqft.) Insulation Area a.Frame-Wood,Exterior R=11.0 1264.00 ft2 2. Single family or multiple family Single-family b.Concrete Block-Int Insul, Exterior R=4.1 996.67 ft2 3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=11.0 352.44 ft2 4. Number of Bedrooms 4 d.N/A R= ft2 5. Is this a worst case? Yes 10.Ceiling Types (1491.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 1491.00 ft2 6. Conditioned floor area above grade(ft2) 2584 b.N/A R= ft2 Conditioned floor area below grade(ft2) 0 c.N/A R= ft2 11.Ducts R ft2 7. Windows(175.6 sqft.) Description Area a.Sup:Attic,Ret:2nd Floor,AH:2nd Floor 6 218.6 a. U-Factor: Dbl, U=0.33 71.25 ft2 b.Sup: Attic,Ret:2nd Floor,AH:2nd Floor 6 298.2 SHGC: SHGC=0.23 b. U-Factor: Dbl,U=0.33 71.00 ft2 12.Cooling systems kBtu/hr Efficiency SHGC: SHGC=0.21 a.Central Unit 18.0 SEER:15.00 c. U-Factor: Dbl,U=0.58 33.33 ft2 b.Central Unit 24.0 SEER:15.50 SHGC: SHGC=0.32 13.Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a.Electric Heat Pump 17.7 HSPF:8.50 SHGC: b.Electric Heat Pump 24.0 HSPF:9.00 Area Weighted Average Overhang Depth: 1.190 ft. Area Weighted Average SHGC: 0.239 14.Hot water systems 8. Floor Types (1533.0 sqft.) Insulation Area a.Electric Cap:40 gallons a.Slab-On-Grade Edge Insulation R=0.0 1093.00 ft2 b. Conservation features EF:0.950 b.Floor over Garage R=11.0 427.00 ft2 None c.other(see details) R= 13.00 ft2 15.Credits Pstat Glass/Floor Area: 0.068 Total Proposed Modified Loads: 73.47 PASS Total Baseline Loads: 75.79 I hereby certify that the plans and specifications covered by Review of the plans and T _$xq' this calculation are in compliance with the Florida Energy specifications covered by this Code. calculation indicates compliance with the Florida Energy Code. PREPARED BY: - �aVE f{ �'IGGI Before construction is completed DATE: this building will be inspected for ' compliance with Section 553.908 hereby certify that this building,as designed, is in compliance Florida Statutes. with the Florida Energy Code. G'OD OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: IV 019 - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.3.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2). - Compliance with a proposed duct leakage On requires a Duct Leakage Test Report confirming duct leakage to outdoors, tested in accordance with ANSI/RESNET/ICC 380, is not greater than 0.040 On for whole house. 1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 1 of 5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: 2575A1 sf ADS Carrier VW Bedrooms: 4 Address Type: Street Address Building Type: User Conditioned Area: 2584 Lot# Owner Name: Lennar Homes Total Stories: 2 Block/Subdivision: #of Units: 1 Worst Case: Yes PlatBook: Builder Name: Lennar Homes Rotate Angle: 45 Street: Permit Office: Cross Ventilation: County: Pasco Jurisdiction: Whole House Fan: City,State,Zip: Family Type: Single-family FL, New/Existing: New(From Plans) Comment: Vinyl windows CLIMATE Design Temp Int Design Temp Heating Design Daily Temp v Design Location TMY Site 97.5% 2.5% Winter Summer Degree Days Moisture Range FL,Tampa FL_TAMPA_INTERNATI 39 91 70 75 645.5 54 Medium BLOCKS Number Name Area Volume 1 Blockl 1093 9399.8 2 Block2 1491 11928 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 1 st Floor 1093 9399.8 Yes 0 1 Yes Yes Yes 2 2nd Floor 1491 11928 No 5 4 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulatio 1st Floor 102 ft 0 1093 ft2 — 0.3 0 0.7 2 Raised Floor 2nd Floor _--- 13 ft2 11 0 0 1 3 Floor over Garage 2nd Floor ____ 427 ft2 11 0.2 0 0.8 ROOF i Roof Gable Roof Solar SA Emitt Emitt Deck Pitch V # Type Materials Area Area Color Absor. Tested Tested Insul. (deg) 1 Hip Composition shingles 1615 ft2 0 ft2 Medium 0.85 No 0.9 No 0 22.6 / ATTIC V i # Type Ventilation Vent Ratio(1 in) Area RBS IRCC 1 Full attic Vented 300 1491 ft2 N N 1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 2 of 5 7 ' . FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic(Vented) 2nd Floor 30 Blown 1491 ft2 0.11 Wood WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Belo w 1 N=>NE Exterior Concrete Block-Int Insul 1 st Floor 4.0999 19 8 8 164.7 ft2 0 0.600000 0 2 E=>SE Exterior Concrete Block-Int Insul 1 st Floor 4.0999 38 8 8 329.3 ft2 0 0.600000 0 3 S=>SW Exterior Concrete Block-Int Insul 1st Floor 4.0999 34 8 8 294.7 ft2 0 0.600000 0 4 W=>NW Exterior Concrete Block-Int Insul 1st Floor 4.0999 18 8 8 156.0 ft2 0 0.600000 0 5 N=>NE Garage Frame-Wood 1 st Floor 11 20 8 8 173.3 ft2 0.23 0.01 0 6 W=>NW Garage Frame-Wood 1st Floor 11 20 8 8 8 179.1 ft2 0.23 0.01 0 7 N=>NE Exterior Frame-Wood 2nd Floor 11 40 8 320.0 ft2 0.23 0.600000 0 8 E=>SE Exterior Frame-Wood 2nd Floor 11 39 8 312.0 ft2 0.23 0.6 0 9 S=>SW Exterior Frame-Wood 2nd Floor 11 40 8 320.0 ft2 0.23 0.600000 0 10 W=>NW Exterior Frame-Wood 2nd Floor 11 39 8 0 312.0 ft2 0.23 0.600000 0 11 S=>SW Exterior Concrete Block-Int Insul 1st Floor 4.0999 6 8 8 52.0 ft2 0 0.600000 0 DOORS # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft In 1 N=>NE Insulated 1 st Floor None .2 3 6 8 20 ft2 2 N=>NE Wood 1 st Floor None .4 2 8 6 8 17.8 ft2 WINDOWS Orientation shown is the entered orientation => changed to Worst Case. Wall Overhang v # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 3 S=>SW 11 Metal Low-E Double Yes 0.58 0.32 N 33.3 ft2 2 ft 0 in 0 ft 6 in Drapes/blinds None 4 S=>SW 3 Vinyl Low-E Double Yes 0.33 0.23 N 9.3 ft2 1 ft 0 in 10 ft 0 in Drapes/blinds None 5 N=>NE 7 Vinyl Low-E Double Yes 0.33 0.21 N 16.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None 6 S=>SW 9 Vinyl Law-E Double Yes 0.33 0.23 N 23.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None i 7 W=>NW 10 Vinyl Law-E Double Yes 0.33 0.23 N 16.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None ' 8 N=>NE 7 Vinyl Low-E Double Yes 0.33 0.21 N 32.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None 9 S=>SW 3 Vinyl Low-E Double Yes 0.33 0.23 N 23.0 ft2 1 ft 0 in 10 ft 0 in Drapes/blinds None 10 N=>NE 1 Vinyl Low-E Double Yes 0.33 0.21 N 23.0 ft2 1 ft 0 in 1 ft 4 in Drapes/blinds None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation 1 427 ft2 427 ft2 41 ft 8.6 ft 1 1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 3 of 5 C FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000367 2488.2 136.6 256.9 .3396 7 HEATING SYSTEM # System Type Subtype Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split HSPF:8.5 17.7 kBtu/hr 1 sys#1 2 Electric Heat Pump/ Split HSPF:9 24 kBtu/hr 2 sys#2 COOLING SYSTEM # System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ Split SEER: 15 18 kBtu/hr 540 cfm 0.85 1 sys#1 2 Central Unit/ Split SEER: 15.5 24 kBtu/hr 720 cfm 0.85 2 sys#2 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.95 40 gal 70 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model# Collector Model# Area Volume FEF None None ftz DUCTS / —Supply— —Return— Air CFM 25 CFM25 HVAC# V # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 Attic 6 218.6 ft 2nd Floor 54.65 ft Proposed Qn 2nd Floor —cfm 43.7 cfm 0.04 0.60 1 1 2 Attic 6 298.2 ft 2nd Floor 74.55 ft Proposed Qn 2nd Floor —cfm 59.6 cfm 0.04 0.60 2 2 TEMPERATURES Programable Thermostat:Y Ceiling Fans: CoolingJan ]Feb Mar A r ]May X Jun Jul rl Aug Se Oct ( ]Nov Dec Heatin Jan X]Feb X�Mar Apr ]May 4 i Jun r�Jul [ ]AugjXj SeP �Oct [X]Nov X Dec Ventin Jan [ ]Feb X Mar [X A r [ ]Ma [ Jun Jul [ ]Au Se Oct [X]Nov [ Dec I I 1f15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 4 of 5 1 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 SO PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ftz 0 ft 0.3 1st Floor Default S Ibs/s .ft. 0 ft2 0 ft 0.3 2nd Floor Name: Signature: Rating Compant: Date: � I 1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 5 of 5 r ' 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 97 The lower the Energy Performance Index, the more efficient the home. 1. New home or,addition 1. New(From Plans) 12. Ducts, location&insulation level a)Supply ducts R 6.0 2. Single-family or multiple-family 2. Single-family b) Return ducts R 6.0 c)AHU location Attic/2nd Floor 3. No.of units(if multiple-family) 3. 1 4. Number of bedrooms 4. 4 13.Cooling system: Capacity 42.0 a)Split system SEER varies 5. Is this a worst case?(yes/no) 5. Yes b)Single package SEER c)Ground/water source SEER/COP 6.Conditioned floor area(sq.ft.) 6. 2584 d) Room unit/PTAC EER e)Other 7.Windows,type and area a) U-factor:(weighted average) 7a. 0.377 b)Solar Heat Gain Coefficient(SHGC) 7b. 0.239 14. Heating system: Capacity 41.7 c)Area 7c. 175.6 a)Split system heat pump HSPF varies b)Single package heat pump HSPF 8. Skylights c) Electric resistance COP a) U-factor:(weighted average) 8a. NA d)Gas furnace, natural gas AFUE b) Solar Heat Gain Coefficient(SHGC) 8b. NA e)Gas furnace, LPG AFUE f)Other 9. Floor type, insulation level: a)Slab-on-grade(R-value) 9a. 0.0 b),Wood,raised(R-value) 9b, 11.0 15.Water heating system c)Concrete, raised(R-value) 9c. a) Electric resistance EF 0.95 b) Gas fired, natural gas EF 10.Wall type and insulation: c) Gas fired, LPG EF A. Exterior: d)Solar system with tank EF 1.Wood frame(Insulation R-value) 10A1. 11.0 e) Dedicated heat pump with tank EF 2. Masonry(Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec% B.Adjacent: g)Other 1.Wood frame(Insulation R-value) 10131. 11.0 j 2. Masonry(Insulation R-value) 10132. 16. HVAC credits claimed(Performance Method) 11. Ceiling type and insulation level a)Ceiling fans a) Under attic 11 a. 30.0 b) Cross ventilation No j b)Single assembly 11 b. c)Whole house fan No c) Knee walls/skylight walls 11 c. d) Multizone cooling credit d) Radiant barrier installed 11 d. No e)Multizone heating credit f) Programmable thermostat Yes *Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy saving features which will be installed(or exce ed) in this home before final inspection.Otherwise,a new EPL display card will be completed based on in led code compliant features. Builder Signature: Date: 01/15/19 Address of New Home: 6 Moulden Hollow Drive City/FL Zip: , FL Zephyrhills,FL 33540 1/15/2019 10:16:07 AM EnergyGauge®USA 6.0.02-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1 i BIII�C�In Analysis Job: 2575A1 sf ADS Carrier VW g Y Date: 1/1512019 lower floor By: Dave BAYONET PLUMBING COOLING HEATING Project I • • For: Lennar Homes -Design • • • Location: Indoor: Heating Cooling Tampa Intl AP, FL, US Indoor temperature(°F) 70 75 Elevation: 10 ft Design TD (°F) 38 16 Latitude: 28°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 33.5 53.9 Dry bulb(°F) 32 91 Infiltration: Daily range(°F) - 14 ( L ) Method Simplified Wet bulb(°F) - 77 Construction quality Semi-tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Component Btuh/ftz Btuh % of load Walls 4.6 7589 42.0 °cts Glazing 22.1 1941 10.7 Infiltration Doors 22.7 838 4.6 Ceilings 1.7 55 0.3 Walls Floors 4.0 4329 23.9 -41 Infiltration 1.9 1966 10.9 Ducts 1368 7.6 Floors Piping 0 0 Humidification 0 0 other Ventilation 0 0 Glazing Doors Adjustments 0 Total _ 18086 100.0 Component Btuh/ftz Btuh % of load Walls 2.4 3898 31.6 Internal Gains Glazing 49.7 4366 35.4 Doors 18.6 684 5.6 Wall Ducts Ceilings 2.0 65 0.5 Floors 0 0 0 Infiltration 0.4 456 3.7 Infiltration Ducts 1657 13.4 Other Ventilation 0 0 Doors Internal gains 1200 9.7 Blower 0 0 Adjustments 0 Total 12326 100.0 Glazing Latent Cooling Load= 1216 Btuh Overall U-value= 0.134 Btuh/ftz-°F Data entries checked. -Fk-=ightsoft- 2013Jan-15 10:31:42 w- �•P Right-Suite®Universal 2018 18.0.16 RSU05714 Page 1 ...5A1 sf ADS templateTIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW r Building Anal Job: 2575A1 sf ADS CarrierVW g YSIS Date: 1/1512019 upper floor By: Dave BAYONET PLUMBING COOLING HEATING Project • • For: Lennar Homes i Design Conditions Location: Indoor: Heating Cooling Tampa Intl AP, FL, US Indoor temperature(OF) 70 75 Elevation: 10 ft Design TD (OF) 38 16 Latitude: 28°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 33.5 53.9 Dry bulb(OF) 32 91 Infiltration: Daily range(OF) - 14 ( L ) Method Simplified Wet bulb(OF) - 77 Construction quality Semi-tight Wind speed (mph) 15.0 7.5 Fireplaces 0 • Component Btuh/ft2 Btuh % of load Walls 3.7 4134 34.4 ��ts Glazing 17.8 1539 12.8 Doors 0 0 0 Wall Ceilings 1.2 1808 15.0 Floors 1.1 489 4.1 nfiltration Infiltration 1.9 2258 18.8 Ducts 1805 15.0 Piping 0 0 Floors Humidification 0 0 Glazing Ventilation 0 0 Ceilings Adjustments 0 Total 12034 100.0 i Component Btuh/ft2 Btuh % of load Walls 2.8 3114 17.5 Walls Glazing 42.9 3702 20.8 Doors 0 0 0 Internal Gains Ceilings 1.7 2598 14.6 Floors 0.4 187 1.1 Infiltration 0.4 523 2.9 Ducts 2140 12.0 Ventilation 0 0 Glazing Internal gains 5500 31.0 Blower 0 0 Ducts Adjustments 0 Total 17765 100.0 Ceilings Othertration i Latent Cooling Load= 3437 Btuh Overall U-value= 0.067 Btuh/ft2-°F Data entries checked. wrightsoft- 2019-Jan-1510:31:42 w - w-� Right-Suite®Universal 2018 18.0.16 RSU05714 Page 2 ..5A1 sf ADS template TIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW Project Summary Job: 2575A1 sf ADS Carrier VW ry Date: 1/1512019 lower floor By: Dave BAYONET PLUMBING COOLING HEATING Project Information For: Lennar Homes Notes: Vinyl windows Design Information Weather: Tampa Intl AP, FL, US Winter Design Conditions Summer Design Conditions Outside db 32 °F Outside db 91 °F Inside db 70 °F Inside db 75 °F Design TD 38 °F Design TD 16 °F Daily range L Relative humidity 50 % Moisture difference 54 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 16718 Btuh Structure 10669 Btuh Ducts 1368 Btuh Ducts 1657 Btuh Central vent(0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 18086 Btuh Use manufacturer's data y Rate/swing multiplier 1.00 Infiltration Equipment sensible load 12326 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi-tight Fireplaces 0 Structure 925 Btuh Ducts 291 Btuh j Central vent (0 cfm) 0 Btuh Heating Cooling (none) Area(ftz) 1093 1093 Equipment latent load 1216 Btuh Volume(ft') 9641 9641 Air changes/hour 0.29 0.16 Equipment Total Load (Sen+Lat) 13542 Btuh Equiv.AVF (cfm) 47 25 Req. total capacity at 0.85 SHR 1.2 ton Heating Equipment Summary Cooling Equipment Summary Make Carrier Make Carrier Trade Trade Model 25HBC518AO0300 Cond 25HBC518AO0300 AHRI ref 9154643 Coil FB4CNP025L AHRI ref 9154643 Efficiency 8.5 HSPF Efficiency 12.5 EER, 15 SEER Heating input Sensible cooling 15300 Btuh Heating output 17700 Btuh @ 47°F Latent cooling 2700 Btuh Temperature rise 27 °F Total cooling 18000 Btuh Actual air flow 600 cfm Actual air flow 600 cfm Air flow factor 0.033 cfm/Btuh Air flow factor 0.049 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.91 Capacity balance point= 34°F Backup: Input=4 kW, Output= 15295 Btuh, 100 AFUE Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -Fk- wright.oft- 2019-Jan-15 10:31:43 Right-Suite®Universal 2018 18.0.16 RSU05714 Page 1 ACC ...5A1 sf ADS templateTIA VW 1.5-2ton Carrier.rup Cale=MJ8 Front Door faces:SW r ` • Project Summary Job: 2575A1sf ADS CarderVW 1 Date: 1/1512019 upper floor By: Dave BAYONET PLUMBING COOLING HEATING i Project I • • For: Lennar Homes Notes: Vinyl windows i Design Information ! Weather: Tampa Intl AP, FL, US Winter Design Conditions Summer Design Conditions Outside db 32 OF Outside db 91 OF Inside db 70 OF Inside db 75 OF Design TD 38 OF Design TD 16 OF Daily range L Relative humidity 50 % Moisture difference 54 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 10229 Btuh Structure 15625 Btuh Ducts 1805 Btuh Ducts 2140 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 12034 Btuh Use manufacturer's data y Rate/swing multiplier 1.00 Infiltration Equipment sensible load 17765 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi-tight Fireplaces 0 Structure 3063 Btuh Ducts 374 Btuh Central vent (0 cfm) 0 Btuh Heatin Coolingg (none) Area(ftz) 149� 1491 Equipment latent load 3437 Btuh Volume(W) 12077 12077 Air changes/hour 0.27 0.14 Equipment Total Load (Sen+Lat) 21202 Btuh Equiv.AVF (cfm) 54 29 Req. total capacity at 0.85 SHR 1.7 ton Heating Equipment Summary Cooling-Equipment Summary Make Carrier Make Carrier Trade Trade Model 25HBC524AO0300 Cond 25HBC524AO0300 AHRI ref 9154943 Coil FB4CNP025L AHRI ref 9154943 Efficiency 9 HSPF Efficiency 12.5 EER, 15.5 SEER Heating input Sensible cooling 20400 Btuh Heating output 24000 Btuh @ 47°F Latent cooling 3600 Btuh Temperature rise 27 OF Total cooling 24000 Btuh Actual air flow 800 cfm Actual air flow 800 cfm Air flow factor 0.066 cfm/Btuh Air flow factor 0.045 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.84 Capacity balance point= 16 OF Backup: Input= 3 kW, Output= 11787 Btuh, 100 AFUE Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 41- wrightsoft- 2019-Jan-15 10:31:43 ^w.• w-��-� Right-Suite®Universal 2018 18.0.16 RSU05714 page 2 ...5A1 sf ADS template TIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW Manual S Compliance Report Job: 2575A1sfADSCarrierVW Date: 1/1512019 lower floor By: Dave BAYONET PLUMBING COOLING HEATING Project • For: Lennar Homes i Cooling Equipment Design Conditions Outdoor design DB: 91.4°F Sensible gain: 12326 Btuh Entering coil DB: 75.8°F Outdoor design WB: 77.2°F Latent gain: 1216 Btuh Entering coil WB: 62.9°F Indoor design DB: 75.0°F Total gain: 13542 Btuh Indoor RH: 50% Estimated airflow: 600 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: SpIitASHP Manufacturer: Carrier Model: 25HBC518A00300+FB4CNP025L Actual airflow: 600 cfm Sensible capacity: 15300 Btuh 124% of load Latent capacity: 2700 Btuh 222% of load Total capacity: 18000 Btuh 133% of load SHR: 85% Design Conditions Heating Equipment Outdoor design DB: 32.1 OF Heat loss: 18086 Btuh Entering coil DB: 69.6°F Indoor design DB: 70.0°F i Manufacturer's Performance Data at Actual Design Conditions i Equipment type: SpIitASHP Manufacturer: Carrier Model: 25HBC518A00300+FB4CNP025L Actual airflow: 600 cfm Output capacity: 13793 Btuh 76% of load Capacity balance: 34 OF Supplemental heat required: 4293 Btuh Economic balance: -99 OF Backup equipment type: Elec strip Manufacturer: Model: Actual airflow: 600 cfm Output capacity: 4.5 kW 85% of load Temp. rise: 50 OF Meets all requirements of ACCA Manual S. -�- wrightsoft® 2010—Jan-15 10:31:43 ^'�- .dROH e��a,•m ym wm Right-Suite®Universal 2018 18.0.16 RSU05714 Page 1 ...5A1 sf ADS templateTIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW Manual S Compliance Report Job: 2575A1 sf ADS Carrier VW Date: 1/15/2019 upper floor By: Dave BAYONET PLUMBING COOLING HEATING i I Project Information I i For: Lennar Homes Cooling Equipment Design Conditions Outdoor design DB: 91.4°F Sensible gain: 17765 Btuh Entering coil DB: 75.7°F Outdoor design WB: 77.2°F Latent gain: 3437 Btuh Entering coil WB: 62.8°F Indoor design DB: 75.0°F Total gain: 21202 Btuh Indoor RH: 50% Estimated airflow: 800 cfm i Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split ASHP Manufacturer: Carrier Model: 25HBC524A00300+FB4CNP025L Actual airflow: 800 cfm Sensible capacity: 20400 Btuh 115% of load Latent capacity: 3600 Btuh 105% of load Total capacity: 24000 Btuh 113% of load SHR: 85% Heating Equipment Design Conditions Outdoor design DB: 32.1°F Heat loss: 12034 Btuh Entering coil DB: 69.7°F Indoor design DB: 70.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split ASHP Manufacturer: Carrier Model: 25HBC524A00300+FB4CNP025L Actual airflow: 800 cfm Output capacity: 24000 Btuh 199% of load Capacity balance: 16 °F Supplemental heat required: 0 Btuh Economic balance: -99 °F I Backup equipment type: Elec strip Manufacturer: Model: Actual airflow: 800 cfm Output capacity: 3.5 kW 98% of load Temp. rise: 50 °F Meets all requirements of ACCA Manual S. wrightsoft® 2010—Jan-1510:31:43 Right-Suite®Universal 2018 18.0.16 RSU05714 Page 2 '� ...5A1 sf ADS template TIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW