HomeMy WebLinkAbout19-20748 CITY OF ZEPHYRHILLS
s. 5335-8TH STREET
(813)780-0020 20748
BUILDING PERMIT SINGLE FAMILY RESIDENTIAL
PERMIT INFORMATION LOCATION INFORMATION
Permit#:20748 Issued: 1/30/2019 Address: 2996 MOULDEN HOLLOW DR
Permit Type: NEW SINGLE FAMILY DWELLING ZEPHYRHILLS, FL.
Class of Work: 101-NEW CONST/SFR Township: Range:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Sq. Feet: Est. Value: Book: Page:
Cost: 343,131.90 Total Fees: 19,048.97 Subdivision: HIDDEN RIVER
Amount Paid: 19,048.97 Date Paid: 1/30/2019 Parcel Number: 25-26-21-0100-00000-0670
CONTRACTOR INFORMATION OWNER INFORMATION
Name: LENNAR HOMES LLC Name: LENNAR HOMES LLC
Addr: 4600 W. CYPRESS ST STE 200 Address: 4600 W CYPRESS ST STE 200
TAMPA, FL. 33607 TAMPA FL 33607
Phone: (813)574-5743 Lic: Phone: 813-574-5700
Work Desc: CONSTRUCT SINGLE FAMILY 3,046 SQ FT
APPLICATION FEES
BUILDING FEE 1,870.20 ELECTRICAL FEE 396.00 PLUMBING FEE 264.00
MECHANICAL FEE 184.80 SEWER CONNECTION RESIDEW 2,090.00 WATER CONNECTION RESIDENT 1,010.00
WATER METER RES 3/4" 473.78 POLICE-IMPACT FEE 254.00 FIRE IMPACT FEE 273.00
PUBLIC SAFETY 5% 26.35 PARK FEES SF 769.56 SCHOOL IMPACT FEE-sfr/100% 7,728.00
SCHOOL IMPACT FEE-sfr/1% 77.28 TRAFFIC IMPACT FEE 99% 3,595.68 TRAFFIC IMPACT FEE 1% 36.32'
r /l
InspectionInspectionA Re d
FOOTER 2ND ROUGH PLUMB INSULATION CEILING
FOOTER BOND DUCTS INSULATED S ER MISC.
ROUGH ELECTRIC LINTEL MISC MISC.
1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC.
DUCTS INSTALLED WATER MISC DRIVEWAY
PRE-SLAB SHEATHING MISC. MISC.
l CONSTRUCTION POLE FRAME MISC. MISC.
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each such subsequent reinspection.REINSPECTION FEES:
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental;
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans,Specifications and Must Accompany Application.All work shall be performed in accordance
with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
ONTRA ORS SIGNATURE PERMIT OFFI
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
City DyZenhvrhilis peO0it4nn|ic3to Fox-03-780-0021
Building Department
Date Received
Phone Contact for Permitting 13 363 2891
Owner's Name Lennar Homes,LLC Owner Phone Number
4600 FL 33607
Owner's Addrress ess Owner Phone Number
Fee Simple Titleholder Name I Owner Phone Number
Fee Simple TitloholderAddress
JOB ADDRESS LmT#
ouaDKOm|ON Hidden River Phase One B PAnCsL|o# 25-26-21-0100-00000-0670
(OBTAINED FROM PROPERTY TAX NOTICE)
WORK PROPOSED mowcomnn ADD�J][ �--� SIGN �—1 [--� DEMOLISH �
INSTALL [_] REPAIR
PROPOSED USE GFR F-7 COMM �--1 OTHER `
TYPE oFCONSTRUCTION BLOCK �—| FRAME �---� 8TEE�
�
DESCRIPTION OpWORK Single Family Residence/Pool/Screen Enclosure/Fence
BUILDING SIZE U/R SF SQpoOTAGE HEIGHT 2 Story �
OBUILDING D VALUATION'OF .O..`^.O,...`~C..~..
ELEcTn|[%u pR�QREGOBvEFV3Y [--1 xV.�EC.
^�—~ AMP SERVICE ���� ---'
�w' UpLUK0B|NG
u/ MECHANICAL VALUATION OF MECHANICAL INSTALLATION
�
F---lG�S ��L»'A ROOFING F—1 SPECIALTY OTHER
CTHER
��
FINISHED FLOOR ELEvAT�NG FLOOD O
' V U | �
CI YES
�—1
Address 14600 Liconoo#
ELECTRICIANCOMPANY Edmonson Electric, Inc.
SIGNATURE
Adumoa 11034 Skipper Road, FL 33613License#
PLUMBER !
a|omATVms REGISTERED
x«mmns Licanno# I CFC042998 �
MECHANICAL COMPANY Bayonet Plumbing, Heating & A
SIGNATURE
FEE CURREN --__—_^
Adumoy Lioenao#
OTHER COMPANY C Sterling Quality Roofing, Inc
a|omATums' REGISTERED
Address 14211 Shoal Line Blvd, Spri4 Hill, FL 34607 ) Ucenoo# ICCCO57991 |'
xnVUonmnnxxoonxomxxxmxxmoxu � uxmxxomxnmxnmuxuwxnmnnxVnnmnnuUnn � no � uo
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction,
Minimum ten(1O)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans wl Silt Fence installed,
Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects
COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction.
Minimum ten(1u)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary Facilities&1dumpstecSite Work Permit for all new projects.All commercial requirements must meet compliance i
SIGN PERMIT Attach(q sets of Engineered Plans.
~**°PROPEgTY SURVEY required for all NEW construction.
/
Directions:
Fill out application completely.
Owner&Contractor sign back n[application,notarized
|f over$25ou,o Notice of Commencement inrequired. (VC upgrades over$7sVD) .
^° Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same '
OVER THE COUNTER PERMITTING (copy uf contract required)
Remofs if shingles Sewers Service Upgrades A/C Fnnoao(P|oVOuney/Fuotuga)
Driveways-Not over Counter ifon public modwayo..noedaROW
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for'compliance with any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
deliver it to the"owner" prior to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction.. I also
certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not.limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands, Water/Wastewater Treatment.
- Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
Watercourses.
- Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement.
- Federal Aviation Authority-Runways.
I understand that the following restrictions apply to the use of fill:
- Use of fill is not allowed in Flood Zone W" unless expressly permitted.
- If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
- If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued.under the attached permit application, for lots less than one (1)
acre which are elevated by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
requiring a correction of errors in plans, construction or violations of any codes: Every permit issued shall become invalid
unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension
may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
FLORIDA JURAT(F.S. 117.03)
OWNER OR AGENT CONTRACTOR
Subscribed and sworn to(or affirmed)be me this Subscribed and sworn to(or med)before me this
U0_pan-1 y by Ashlee Callahan 08-Jan-19 by Ashl allahan
Who is/are personally known to me-. Nave pFedW Who is/are personally kmTwn to me or
tification. as identification.
Notary Public Notary Public
Commission No. FF98537 Commission No. FF98537
Elissa M.Holleran Elissa M.Holleran
Name of Notary tvped,printed or stamped Name of Notary typed,printed or stamped
�tlli -
ORION, - �tlll�kl�9i�]IAI;G�IV
yRr'tbnl>�.��G6aEp�
4i0mnt�ibnu�Pf�a��P1' � iG�I14i1od�N��t���4
161��,ii7�Y1P?i�y��� 'i ' . , ! 859�11'1JJ'frr�FtlaM1p9�JdR1:34119+'t�ll
i ' . _--f3�idrllthaih�Faln4st��gdli&t,713�t11 _ .
151 11 'R V T
PASCO COUNTY
PASGI.,
, � BUILDING CORISTRUCTION SERVICES
8731 Citizens Drive Date:4/30/2019
COUNTY FLORIDV Suite 230
Ortrl Srnus.Virrr mr PtAcits. New Port,Richey, FL 34654
727-847-8126
Receipt#: 1852376
FEE DESCRIPTION ACCOUNT CODE UNITS INVOICE# FEE AMOUNT PAID RECEIPT# DATE
Impact Fee Residential Solid .24503100-329010 1.00 14533.69 $45.00 $45.00 1852376 4/30/19
Waste Single Family
TOTALS: $45.00 $45.00
Receipt# Paid By Check# CC Auth# Cashier ID Workstation Receipt Date Amt Paid'
1852376 Check 01212930 MLARNOLD 13CCCP59W 04/3012019. $45.00
Total Payments: $45.00
i
Pavor Address Phone
Lennar Homes, LLC
Comments:
2996 Moulden Hollow DR !/ V
While you will be paying your bill with Pasco County Building Construction Services,the full amount of.the credit card or a-check fees;NOT shown above,Is
collected by First Billing payment services.
i
MyReports/reports//PASCOPROD/PASC0/ReceiptAA_V7.rpt 4/30/2019 Page 1 of 1
Lennar Homes-2996 moulden hollow dr 3,046 sq ft
Column Its
SQ. FEET PRICE
MAIN OR LIVING: 3,046 $ 112.65
OTHER AREA UNDER ROOF: - $ : 88.00 j
OTHER: $ -
VALUATION $ 343,131.90
FEE SHEET $ 1,760.00
T
ADDRESS $ 30.00
DRIVEWAY $ 45.00
BUILDING: $ 1,870.20
ELECTRICAL: $ 396.00
PLUMBING: $ 264.00
MECHANICAL: $ 184.80
SUB-TOTAL $ 2,715.00
TOTAL $ 2,715.00
SEWER: $ 2,090.00
WATER: $ 1,010.00
IRRIGATION: $ -
TOTAL: $ 3,100.00
WATER METER: $ 473.78
IRRIGATION METER $ -
FIRE DEPARTMENT FEES
PLANS TOTAL: na
INSPECTION TOTAL:
PERMIT TOTAL
TOTAL: $ -
PUBLIC SAFETY IMPACT FEES
POLICE $ 254.00
FIRE $ 273.00
5% $ 26.35
TOTAL: $ 553.35
SUB-TOTAL $ 6,842.13
PARK IMPACT FEES $ 769.56
SIF'S: $ 7,728.00
100.0% $ 7,728.00
1.0% $ 77.28
TOTAL: $ 7,805.28
T I F'S: $ 3,632.00
99% $ 3,595.68
1% $ 36.32
TOTAL: $ 19,048.97
i
i
Jacqueline Boges
From: Jordon Davis (City of Zephyrhills Support) <support@zephyrhillsfl.zendesk.com>
Sent: Wednesday, February 6, 2019 4:00 PM
To: Jacqueline Boges
Subject: [FATHOM] Re:2996 Moulden hollow dr by#20748
##- Please type your reply above this line -##
Your request (#262052) has been solved. TO REOPEN THIS REQUEST, reply to this email or click the link below:
https://zephyrhillsfl.zendesk.com/hc/requests/262052
.......................................................................................................................................................................................................................................................................................................................................................................................
Jordon Davis (City of Zephyrhills Support )
Feb 6, 1:59 PM MST
WO#765422 created to install new meter to the property.
Best Regards,
Jordon I FATHOM Support
...................................................................................................................................................................................................................................................................................................................................................................
j Jordon Davis (City of Zephyrhills Support )
L---- -- Feb 5, 4:16 PM MST
Account has been added and services are being mapped. Account number 0000889145-
003124214
Best Regards,
Jordon I FATHOM Support
......................................................................................................................................................................................................................................................................................................................................................................................
~- 9
Jacqueline Boges
--' Feb 5, 2:21 PM MST
I
servi A z'R9 '6AMjaul:de to ,w D.r�bp#2,Or7�48,�
This email is a service from City of Zephyrhills Support .
1
PASCO COUNTY, FLORIDA
Permit No. 7
�/f��, Date Permitted / /9
Builder Name/Owner Name tel�.yl ar ��"" Control#
County Par•.cel No. ��� r()r'dd�k�'06'70 SubDiv: G LO &
Address/Location Z� / /Pt e-x Men. A A&, �
Classificatlonrrype of Use (S l'1v le l C�f 131 y 1_"
TRANSPORTATION IMPACT FEE Rate: Sq.Ft Unit: 3104
Exempt ❑Yes ❑ No How Determined
Impact Fee Amount Ob Zone No. TAZ:
SCHOOL IMPACT FEE
Account (056) Single-Family Detached House Amount $ 6b6. ZS
(057) Mobile Home
(058) Other Residential
23) Collection Fee
Exempt a Yes Q No How Determined
PARKS AND RECREATION FEE
Land Account Land Credit Land Total
Recreation Account Recreation Credit Recreation Total
a
Zone TOTAL AMOUNT $
Exempt ❑Yes ❑ No How Determined
LIBRARY FEE
Land Account Land Credit Land Total
Facility.Account Facility Credit Facility Total
Exempt ❑ Yes ❑ No How Determined Total Amount _
RESOURCE FEE , ERU
TOTAL AMOUNT
Prepared By Checked By
NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED OR FINAL INSPECTION
PERFORMED UNTIL THE TOTAL AMOUNTS LISTED HAVE
BEEN PAID AND
RECEIPTED FOR BY A CENTRAL PERMITTING OFFICE.OF PASCO COUNTY
Acknowledgement below does not Imply acceptance of concurrence,but simply receipt of.a.copy of this form,placing .
the building permit owner on notice of this assessment and the conditions of payment for same.
DATE RECEIVED BY
RECEIPT NO. DATE BY
Single Family Dwelling
Plan Review Comments
1. F.F.E. shall be a m'inirnum of8" above the road elevation and an engineered site plan.
I Lots shall be graded to comply with R401.3 of the F.B.C.
3. ompaction-test required if_2 C 4" or more of fill dirt.is brought in at any one place.
4. Tie in' survey required before pouring.concrete.
5. Driveways require a R.O.W. use permit. All 4 sides of driveway thru'the sidewalk shall have
expansion material.
6. All setbacks shall be met.
7. All property markers shall be uncovered and marked at time of first inspection.
8. All A.D.A.requirements shall be met.
9. No electric, plumbing,inechanical; or framing shall be-covered without an inspection and
approval first.,
10. All Garages 'shall comply with section R302.6 of the F.B.C. (Fire Separation).
11. Appliances shall not be installed in a location where subject'to mechanical damage unless
protected by approved barriers. W OW A.of the FAC
12. Wate'r.heaters shall comply with section P607.3 of the F.B.C.
13. Foundation supports for A/C units shall be raised at least 3" above finished_ grade, M13.08.1
14. Return air in all bedrooms. F.B.C. M1620.4
15. Smoke detectors are to be installed in accordance with R313.1 of the F.B.C.
16. All glazing :requirements are to be in accordance with R308.4 of the F.B.C.
17. All means.of egress are to.be in accordance with R311 of the F.B.C.
18. "Green gypsum board"shall riot be used as a backer in showers or tubs. R702.4.2.F.B.C.
19. Combination-type AFCI breakers are required at all.locations requiring an AFCI type breaker:
20. Carbon monoxide alarms will be required in new construction that uses fossil-burning heating
or appliances of an attached garage: They shall be-installed in accordance with the F.B.C:
21. All plumbing,mechanical, and-electrical shall be- separate from unit,t6.unit. This includes all
underground'plumbing and electric.
22. All 2016 N.E.C. Codes will be enforced.
23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N:E:C
24. In accordance with the Land Development Code, lots shall be.sodded before final.at least 10.
feet around the structure:
25. Blower'door test shall be provided before,CO.
26 A copy of the enerQy eacls shall be with permit at all times
27. Copv of final insulation report shall be.:provided with:permit before final .
.28: No fence,:pool or screen_enclosure is:issued with this permit
RRE.-Finished Floor Elevation
F.B.C-Florida Building Code Ob Edition
R.O.W.-Right of Way
A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016)
Lennar Homes 2996 Moulden Hollow Dr.3,046 Sqft
Column
SQ. FEET PRICE
MAIN OR LIVING: 3,046 $ 112.65
OTHER AREA UNDER ROOF: - $ 88.00
OTHER: - $ -
VALUATION $ 343,131.90
FEE SHEET $ 1,760.00
ADDRESS $ 40.00
DRIVEWAY $ 40.00
BUILDING: $ 1,875.20
ELECTRICAL: $ 396.00
PLUMBING: $ 264.00
MECHANICAL: $ 184.80
SUB-TOTAL $ 2,720.00
Public Fee 1%
TOTAL $ 2,720.00
SEWER: $ 2,090.00
WATER: $ 1,010.00
IRRIGATION: $ -
TOTAL: $ 3,100.00
WATER METER: $ 473.78
IRRIGATION METER $ -
FIRE DEPARTMENT FEES
PLANS TOTAL:
INSPECTION TOTAL:
PERMIT TOTAL
TOTAL: $ -
PUBLIC SAFETY IMPACT FEES
POLICE $ 254.00
FIRE $ 273.00
5% $ 26.35
TOTAL: $ 553.35
i
SUB-TOTAL $ 6,847.13
PARK IMPACT FEES $ 769.56
SIF'S: $ 7,628.00
100.0% $ 7,628.00
1.0% $ 76.28
TOTAL: $ 7,704.28
I
T I F'S: $ 3,632.00
99% $ 3,595.68
1% $ 36.32
TOTAL: $ 18,952.97
•~ � ,• "3`... .~ �.::j� `ram •r,..
.. .. •,..r. .. '�, _-i� '`�'� •.,ark=-.<
ice':_ ,t».. �` .S:. •�'' ", ,. ,r.,: w�.:.ti v" •� •a,: •.. ..... ;
•�.."4. ''�+'._t ^• :':r^,y .}++..'' ~:r .� i•.tL'.' "I'' �Y � 'sue�. r.�`
r w� . .s,•`:�;.�;�:r�....r -� ;r.y � 5 �-,t ,:'.,r.r' .+a.�'• �.•• ���.^�yl. wnn'
CY,
oW
`' \`1f
�:
tr
ow
r fit �4'tlll�� ma.
-
�. .� f .. #fly tt• •`
40 '
1 t
SKETCH ONLY SEC, 25—, TWP. 26 S, RNG.. 21 E.
PLOT PLAN NOT A BOUNDARY SURVEY BEARING BASIS:
LOT 67 HIDDEN RIVER PHASE ONE B NORTH BOUNDARY OF SUBJECT PLAT BEINGS 89*40'43" E
PASCO COUNTY, FLORIDA. THIS SURVEY IS SUBJECT TO ANY FACTS THAT
N MAY BE DISCLOSED BY A FULL AND ACCURATE
PRELIMINARY DRAWING: ON LOT AREA CALCULATIONS TITLE SEARCH. ALSO SUBJECT TO SETBACKS,
THIS PLAN 15 FOR PERMITTING PURPOSES LOT =--!16-00.00 SQ. FT. EASEMENTS AND RESTRICTIONS OF RECORD.
ONLY, NOT FOR CONSTRUCTION. VERIFY LIVING AREA =--10-93—SQ. FT. -0
ENTRY = 35 -SQ. FT. UNDERGROUND FOOTER, STEM WALL, AND
ALL DIMENSIONS BEFORE ANY CONSTRUCTION. GARAGE =--42-7SO. FT, II UNDERGROUND UTILITIES ARE NOT LOCATED, OR
COVERED LANAI = N/A 5Q. FT. SHOWN.
LEGEND: PA110 = 23 sQ. FT.
PROPOSED DRAINAGE FLOW DO NOT SCALE THIS PRINT. DIMENSIONS AND
CONC. DRIVE ----!L0-8SQ. FT. L4 NOTES TAKE PREFERENCE.
00.00) PROPOSED GRADE A/C & CONC PAD =--LB—SQ, FT.
E-00.00 = EXISTING GRADE PRIVATE SIDEWALK =--11—SQ. FT. DESCRIPTION NOT CONTAINING PLAT BOOK AND
IMPERVIOUS PAGE INDICATES THAT PLAT IS IN
NOTES* =--2-035SQ. FT. PRELIMINARY STAGE AND IS SUBJECT TO
LOT GRADING TYPE = A SOD =--A§-Q-5—SQ. FT. CHANGE AND/OR REVISION.
PROPOSED PAD ELEVATION
FRONT SETBACK = 20' OFF LOT AREA CALCULATIONS CERTAIN DATA SHOWN HEREON BASED ON
SIDE SETBACK = 10' RIGHT OF WAY =--22-0-00 SO. FT, ENGINEERING PLANS PROVIDED BY CLIENT.
REAR SETBACK = 10' DRIVE APRON = 144 5Q. FT.
PUBLIC SIDEWALK =---Z4-CL—SQ. FT, STRUCTURE TIES SHOWN HEREON DENOTES
SOD 336 —SQ. FT. MEASUREMENT FROM FORM BOARDS/FOUNDATION
TO PROPERTY LINE,
TOTALS 10' DRAINAGE/UTILITY EASEMENT
AREA =--Z3-2O-Q-0-SQ. FT. 5' DRAINAGE/UTILITY EASEMENT
DRIVEWAY = 552 SQ. FT.
SIDEWALK = 271 SQ. FT.
SOD =-4901 SQ. FT,
LOT 68
,,,--PRM(P) IV
TRACT "B"
WETLAND CONSERVATION AREA/
DRAINAGE EASEMENT
HIDDEN RIVER PHASE ONE A
(PLAT BOOK 74, PAGES 101-121)
o WETLAND CONSERVATION
AREA
0
0
00
<,100 ON-
61
0,
i5n
To.
PLAT- )'
BOUNDARY
-q
r0 by
0
10R2) LOT 66
BO DARY
o
;4
CO
PROPOSED:
LOWEST FLOOR ELEVATIONS:.
LIVING AREA: 71.35'
GARAGE AREA: 70.81'
DESCRIPTION: ELEVATIONS REFERENCED TO
LOT 67, MAP OR PLAT ENTITLED "HIDDEN RIVER PHASE ONE B", NATIONAL GEODETIC VERTICAL
oAS RECORDED IN PLAT BOOK 076, PAGES 077 THROUGH 082, DATUM OF 1929. MEAN SEA
OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIDA. LEVEL= 00.00 Fr.
APPARENTZONE: X - COMMUNITY PANEL NO. 12101C 0458 F EFFECTIVE DATE: 9/26/2014
Project Number: Square Feet: 660D.00 t LENNAR HOMES
of -T
LEGEND:
W
(C)= CALCULATED DATA, (D)= DEED DATA, (M)= MEASURED DATA, (P)= PLAT DATA, g-- CENTERLINE, A/C= AIR CONDITIONER, B/C= BACK OF CURB, C/S=
in 'CONCRETE SLAB, CH= CHORD, CHB= CHORD BEARING, CLF- CHAIN LINK FENCE, CONC= CONCRETE, COV.= COVERED, E/P= EDGE OF PAVEMENT, ESM'T= EASEMENT,NIC
I/C= FENCE CORNER, FCM= FOUND CONCRETE MONUMENT, FIP= FOUND IRON PIPE, FIR= FOUND IRON,ROD, FN&D= FOUND NAIL & DISK, FPP= FOUND PINCHED
,.�.T
PIPE, LFE= LOWEST FLOOR ELEVATION, MAS.= MASONRY, OR= OFFICIAL RECORD BOOK, PB= PLAT BOOK, PCP= PERMANENT CONTROL POINT, PRM= PERMANENT
I
a) REFERENCE MONUMENT, R/W= RIGHT OF WAY, R= RADIUS, SIR=SET 1/2" IRON ROD & CAP No. 4493, SN&D= SET NAIL & DISK, TBM= TEMPORARY BENCHMARK,
U/P= UTILITY POLE, W/F= WOOD FENCE
m Drawn By:
JOHN R.BEACH&ASSOCIATES,INC.
SMS
e
SURVEYORS AND MAPPERS Che cked By:
t 911 WEST ST. PETERSBURG DRIVE
ONE OLDSMAR, FLORIDA 34677 JRB
WAY (813) 854-1276 FAX (813) 855-8370 Scale:
1"=30'
NOT VALID WITHOUT THE SIGNATURE AND Date; PLOT PLAN 11/9/18 ACS
THE ORIGINAL RAISED SEAL OF A FLORIDA IGN'-URE DATE t
BEACH
LICENSED SURVEYOR AND MAPPER JOHN BEACH
32 Revisions: FLORIDA G. LAND SURVEYOR No. 2984 LB#4493
JEFF M. IjpTLEY
JEFF M.
-FROPE-SMONAL SURVEYOR & MAPPER No.7123
FORM R405-2017
i
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 2575A1 sf ADS Carrier VW Builder Name: Lennar Homes 0067
Street: 2996 Moulden Hollow Drive Permit office: � 7�phyrhills
City,State,Zip: ,FL, Permit Number: Y
Owner: Lennar Homes Jurisdiction: 611600
Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2)
1. New construction or existing New(From Plans) 9. Wall Types(2613.1 sqft.) Insulation Area
2. Single family or multiple family Single-family a.Frame-Wood,Exterior R=11.0 1264.00 ft2
b.Concrete Block-Int Insul,Exterior R=4.1 996.67 ft2
3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=11.0 352.44 ft2
4. Number of Bedrooms 4 d.N/A R= ft2
5. Is this a worst case? Yes 10.Ceiling Types (1491.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 1491.00 ft2
6. Conditioned floor area above grade(ft2) 2584 b.N/A R= ft2
Conditioned floor area below grade(ft2) 0 c.N/A R= ft2
11.Ducts R ft2
7. Windows(175.6 sqft.) Description Area a.Sup:Attic,Ret:2nd Floor,AH:2nd Floor 6 218.6
a. U-Factor: Dbl,U=0.33 71.25 ft2 b.Sup: Attic,Ret:2nd Floor,AH:2nd Floor 6 298.2
SHGC: SHGC=0.23
b. U-Factor: Dbl,U=0.33 71.00 ft2 12.Cooling systems kBtu/hr Efficiency
SHGC: SHGC=0.21 a.Central Unit 18.0 SEER:15.00
b.Central Unit 24.0 SEER:15.50
c. U-Factor: Dbl, U=0.58 33.33 ft2
SHGC: SHGC=0.32 13.Heating systems kBtu/hr Efficiency
d. U-Factor: N/A ft2 a.Electric Heat Pump 17.7 HSPF:8.50
SHGC: b.Electric Heat Pump 24.0 HSPF:9.00
Area Weighted Average Overhang Depth: 1.190 ft.
Area Weighted Average SHGC: 0.239 14.Hot water systems
8. Floor Types (1533.0 sqft.) Insulation Area a.Electric Cap:40 gallons
a.Slab-On-Grade Edge Insulation R=0.0 1093.00 ft2 b. Conservation features EF:0.950
b.Floor over Garage R=11.0 427.00 ft2 None
c.other(see details) R= 13.00 ft2 15.Credits Pstat
Glass/Floor Area: 0.068
Total Proposed Modified Loads: 73.47 PASS
Total Baseline Loads: 75.79 1�1a7�7
I hereby certify that the plans and specifications covered by Review of the plans and `jiE I. ,
this calculation are in compliance with the Florida Energy specifications covered b this 'Q
Code. P 9Y calculation indicates compliance
with the Florida Energy Code.
PREPARED BY: Dave Autich Before construction is completed
DATE: this building will be inspected for `u .
compliance with Section 553.908
I herebycertify that this building,as designed, is in;complia ce Florida Statutes.fY 9� 9 !� • r�,
with the Florida Energy Code.
OWNER/AGENT: JAN 11 BUILDING OFFICIALS. ..
DATE: DATE:
- Compliance requires certification by the r handler unit manufacturer that the air handler enclosure qualifies as
certified factory-sealed in accordance th R403.3.2.1.
-Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2).
- Compliance with a proposed duct leakage Qn requires a Duct Leakage Test Report confirming duct leakage to outdoors,
tested in accordance with ANSI/RESNET/ICC 380, is not greater than 0.040 Qn for whole house.
1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 1 of 5
r
FORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 2575A1 sf ADS Carrier VW Builder Name: Lennar Homes 0067
Street: 2996 Moulden Hollow Drive Permit office: City of Zephyrhills
City,State,Zip: FL, Permit Number:
Owner: Lennar Homes Jurisdiction: 611600
Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2)
1. New construction or existing New(From Plans) 9. Wall Types(2613.1 sqft.) Insulation Area
2. Single family or multiple family Single-family a.Frame-Wood,Exterior R=11.0 1264.00 ftZ
b.Concrete Block-Int Insul,Exterior R=4.1 996.67 ftZ
3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=11.0 352.44 ftz
4. Number of Bedrooms 4 d.N/A R= ftz
5. Is this a worst case? Yes 10.Ceiling Types (1491.0 sqft.) Insulation Area
a.Under Attic(Vented) R=30.0 1491.00 ft
6. Conditioned floor area above grade(ftZ) 2584 b.N/A R= ftz
Conditioned floor area below grade(ftZ) 0 c. R= ftZ
11.Duct
s R ftZ
7. Windows(175.6 sqft.) Description Area a.Sup:Attic,Ret:2nd Floor,AH:2nd Floor 6 218.6
a. U-Factor: Dbl,U=0.33 71.25 ftZ b.Sup: Attic,Ret:2nd Floor,AH:2nd Floor 6 298.2
SHGC: SHGC=0.23
b. U-Factor: Dbl,U=0.33 71.00 ftZ 12.Cooling systems kBtu/hr Efficiency
SHGC: SHGC=0.21 a.Central Unit 18.0 SEER:15.00
b.Central Unit 24.0 SEER:15.50
c. U-Factor: Dbl,U=0.58 33.33 ftZ
SHGC: SHGC=0.32 13.Heating systems kBtu/hr Efficiency
d. U-Factor: N/A ftZ a.Electric Heat Pump 17.7 HSPF:8.50
SHGC: b.Electric Heat Pump 24.0 HSPF:9.00
Area Weighted Average Overhang Depth: 1.190 ft.
Area Weighted Average SHGC: 0.239 14.Hot water systems
8. Floor Types (1533.0 sqft.) Insulation Area a.Electric Cap:40 gallons
EF:0.950
a.Slab-On-Grade Edge Insulation R=0.0 1093.00 ftZ b. Conservation features
b.Floor over Garage R=11.0 427.00 ftZ None
c.other(see details) R= 13.00 ftZ 15.Credits Pstat
Glass/Floor Area: 0.068 Total Proposed Modified Loads: 73.47 PASS
Total Baseline Loads: 75.79
I hereby certify that the plans and specifications covered by Review of the plans and TIC
this calculation are in compliance with the Florida Energy specifications covered by this �1.,0�,.
Code. calculation indicates compliance
with the Florida Energy Code. F. iirri`. `% _ ',•�� '« 0.
PREPARED BY: Dave Aup ch Before construction is completed
DATE: this building will be inspected for
compliance with Section 553.908
herebycertify that this building,as designed, is in compliance Florida Statutes.
fY 9� 9 P '�
with the Florida Energy Code. G'OD: .,,
OWNER/AGENT: BUILDING OFFICIAL:
DATE: DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory-sealed in accordance with R403.3.2.1.
-Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2).
- Compliance with a proposed duct leakage Qn requires a Duct Leakage Test Report confirming duct leakage to outdoors,
tested in accordance with ANSI/RESNET/ICC 380,is not greater than 0.040 Qn for whole house.
1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 1 of 5
FORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 2575A1 sf ADS Carrier VW Builder Name: Lennar Homes 0067
Street: 2996 Moulden Hollow Drive Permit office: City of Zephyrhills
City,State,Zip: FL, Permit Number: _
Owner: Lennar Homes Jurisdiction: 611600
Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2)
1. New construction or existing New(From Plans) 9. Wall Types(2613.1 sqft.) Insulation Area
a.Frame-Wood,Exterior R=11.0 1264.00 ft2
2. Single family or multiple family Single-family
b.Concrete Block-Int Insul, Exterior R=4.1 996.67 ft2
3. Number of units,if multiple family 1 c.Frame-Wood,Adjacent R=11.0 352.44 ft2
4. Number of Bedrooms 4 d.N/A R= ft2
5. Is this a worst case? Yes 10.Ceiling Types (1491.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 1491.00 ft2
6. Conditioned floor area above grade(ft2) 2584 b.N/A R= ft2
Conditioned floor area below grade(ft2) 0 c.N/A R= ft2
11.Ducts R ft2
7. Windows(175.6 sqft.) Description Area a.Sup:Attic,Ret:2nd Floor,AH:2nd Floor 6 218.6
a. U-Factor: Dbl, U=0.33 71.25 ft2 b.Sup: Attic,Ret:2nd Floor,AH:2nd Floor 6 298.2
SHGC: SHGC=0.23
b. U-Factor: Dbl,U=0.33 71.00 ft2 12.Cooling systems kBtu/hr Efficiency
SHGC: SHGC=0.21 a.Central Unit 18.0 SEER:15.00
c. U-Factor: Dbl,U=0.58 33.33 ft2 b.Central Unit 24.0 SEER:15.50
SHGC: SHGC=0.32 13.Heating systems kBtu/hr Efficiency
d. U-Factor: N/A ft2 a.Electric Heat Pump 17.7 HSPF:8.50
SHGC: b.Electric Heat Pump 24.0 HSPF:9.00
Area Weighted Average Overhang Depth: 1.190 ft.
Area Weighted Average SHGC: 0.239 14.Hot water systems
8. Floor Types (1533.0 sqft.) Insulation Area a.Electric Cap:40 gallons
a.Slab-On-Grade Edge Insulation R=0.0 1093.00 ft2 b. Conservation features EF:0.950
b.Floor over Garage R=11.0 427.00 ft2 None
c.other(see details) R= 13.00 ft2 15.Credits Pstat
Glass/Floor Area: 0.068 Total Proposed Modified Loads: 73.47 PASS
Total Baseline Loads: 75.79
I hereby certify that the plans and specifications covered by Review of the plans and T _$xq'
this calculation are in compliance with the Florida Energy specifications covered by this
Code. calculation indicates compliance
with the Florida Energy Code.
PREPARED BY: - �aVE f{ �'IGGI Before construction is completed
DATE: this building will be inspected for '
compliance with Section 553.908
hereby certify that this building,as designed, is in compliance Florida Statutes.
with the Florida Energy Code. G'OD
OWNER/AGENT: BUILDING OFFICIAL:
DATE: DATE:
IV 019
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory-sealed in accordance with R403.3.2.1.
-Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2).
- Compliance with a proposed duct leakage On requires a Duct Leakage Test Report confirming duct leakage to outdoors,
tested in accordance with ANSI/RESNET/ICC 380, is not greater than 0.040 On for whole house.
1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 1 of 5
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: 2575A1 sf ADS Carrier VW Bedrooms: 4 Address Type: Street Address
Building Type: User Conditioned Area: 2584 Lot#
Owner Name: Lennar Homes Total Stories: 2 Block/Subdivision:
#of Units: 1 Worst Case: Yes PlatBook:
Builder Name: Lennar Homes Rotate Angle: 45 Street:
Permit Office: Cross Ventilation: County: Pasco
Jurisdiction: Whole House Fan: City,State,Zip:
Family Type: Single-family FL,
New/Existing: New(From Plans)
Comment: Vinyl windows
CLIMATE
Design Temp Int Design Temp Heating Design Daily Temp
v Design Location TMY Site 97.5% 2.5% Winter Summer Degree Days Moisture Range
FL,Tampa FL_TAMPA_INTERNATI 39 91 70 75 645.5 54 Medium
BLOCKS
Number Name Area Volume
1 Blockl 1093 9399.8
2 Block2 1491 11928
SPACES
Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated
1 1 st Floor 1093 9399.8 Yes 0 1 Yes Yes Yes
2 2nd Floor 1491 11928 No 5 4 1 Yes Yes Yes
FLOORS
# Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet
1 Slab-On-Grade Edge Insulatio 1st Floor 102 ft 0 1093 ft2 — 0.3 0 0.7
2 Raised Floor 2nd Floor _--- 13 ft2 11 0 0 1
3 Floor over Garage 2nd Floor ____ 427 ft2 11 0.2 0 0.8
ROOF
i
Roof Gable Roof Solar SA Emitt Emitt Deck Pitch
V # Type Materials Area Area Color Absor. Tested Tested Insul. (deg)
1 Hip Composition shingles 1615 ft2 0 ft2 Medium 0.85 No 0.9 No 0 22.6
/ ATTIC
V
i
# Type Ventilation Vent Ratio(1 in) Area RBS IRCC
1 Full attic Vented 300 1491 ft2 N N
1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 2 of 5
7 ' .
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
CEILING
# Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type
1 Under Attic(Vented) 2nd Floor 30 Blown 1491 ft2 0.11 Wood
WALLS
Adjacent Space Cavity Width Height Sheathing Framing Solar Belo w
1 N=>NE Exterior Concrete Block-Int Insul 1 st Floor 4.0999 19 8 8 164.7 ft2 0 0.600000 0
2 E=>SE Exterior Concrete Block-Int Insul 1 st Floor 4.0999 38 8 8 329.3 ft2 0 0.600000 0
3 S=>SW Exterior Concrete Block-Int Insul 1st Floor 4.0999 34 8 8 294.7 ft2 0 0.600000 0
4 W=>NW Exterior Concrete Block-Int Insul 1st Floor 4.0999 18 8 8 156.0 ft2 0 0.600000 0
5 N=>NE Garage Frame-Wood 1 st Floor 11 20 8 8 173.3 ft2 0.23 0.01 0
6 W=>NW Garage Frame-Wood 1st Floor 11 20 8 8 8 179.1 ft2 0.23 0.01 0
7 N=>NE Exterior Frame-Wood 2nd Floor 11 40 8 320.0 ft2 0.23 0.600000 0
8 E=>SE Exterior Frame-Wood 2nd Floor 11 39 8 312.0 ft2 0.23 0.6 0
9 S=>SW Exterior Frame-Wood 2nd Floor 11 40 8 320.0 ft2 0.23 0.600000 0
10 W=>NW Exterior Frame-Wood 2nd Floor 11 39 8 0 312.0 ft2 0.23 0.600000 0
11 S=>SW Exterior Concrete Block-Int Insul 1st Floor 4.0999 6 8 8 52.0 ft2 0 0.600000 0
DOORS
# Ornt Door Type Space Storms U-Value Width Height Area
Ft In Ft In
1 N=>NE Insulated 1 st Floor None .2 3 6 8 20 ft2
2 N=>NE Wood 1 st Floor None .4 2 8 6 8 17.8 ft2
WINDOWS
Orientation shown is the entered orientation => changed to Worst Case.
Wall Overhang
v # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening
3 S=>SW 11 Metal Low-E Double Yes 0.58 0.32 N 33.3 ft2 2 ft 0 in 0 ft 6 in Drapes/blinds None
4 S=>SW 3 Vinyl Low-E Double Yes 0.33 0.23 N 9.3 ft2 1 ft 0 in 10 ft 0 in Drapes/blinds None
5 N=>NE 7 Vinyl Low-E Double Yes 0.33 0.21 N 16.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None
6 S=>SW 9 Vinyl Law-E Double Yes 0.33 0.23 N 23.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None
i
7 W=>NW 10 Vinyl Law-E Double Yes 0.33 0.23 N 16.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None '
8 N=>NE 7 Vinyl Low-E Double Yes 0.33 0.21 N 32.0 ft2 1 ft 0 in 0 ft 6 in Drapes/blinds None
9 S=>SW 3 Vinyl Low-E Double Yes 0.33 0.23 N 23.0 ft2 1 ft 0 in 10 ft 0 in Drapes/blinds None
10 N=>NE 1 Vinyl Low-E Double Yes 0.33 0.21 N 23.0 ft2 1 ft 0 in 1 ft 4 in Drapes/blinds None
GARAGE
# Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation
1 427 ft2 427 ft2 41 ft 8.6 ft 1
1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 3 of 5
C
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
INFILTRATION
# Scope Method SLA CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse Proposed ACH(50) .000367 2488.2 136.6 256.9 .3396 7
HEATING SYSTEM
# System Type Subtype Efficiency Capacity Block Ducts
1 Electric Heat Pump/ Split HSPF:8.5 17.7 kBtu/hr 1 sys#1
2 Electric Heat Pump/ Split HSPF:9 24 kBtu/hr 2 sys#2
COOLING SYSTEM
# System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts
1 Central Unit/ Split SEER: 15 18 kBtu/hr 540 cfm 0.85 1 sys#1
2 Central Unit/ Split SEER: 15.5 24 kBtu/hr 720 cfm 0.85 2 sys#2
HOT WATER SYSTEM
# System Type SubType Location EF Cap Use SetPnt Conservation
1 Electric None Garage 0.95 40 gal 70 gal 120 deg None
SOLAR HOT WATER SYSTEM
FSEC Collector Storage
Cert # Company Name System Model# Collector Model# Area Volume FEF
None None ftz
DUCTS
/ —Supply— —Return— Air CFM 25 CFM25 HVAC#
V # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool
1 Attic 6 218.6 ft 2nd Floor 54.65 ft Proposed Qn 2nd Floor —cfm 43.7 cfm 0.04 0.60 1 1
2 Attic 6 298.2 ft 2nd Floor 74.55 ft Proposed Qn 2nd Floor —cfm 59.6 cfm 0.04 0.60 2 2
TEMPERATURES
Programable Thermostat:Y Ceiling Fans:
CoolingJan ]Feb Mar A r ]May X Jun Jul rl Aug Se Oct ( ]Nov Dec
Heatin Jan X]Feb X�Mar Apr ]May 4 i Jun r�Jul [ ]AugjXj
SeP �Oct [X]Nov X Dec
Ventin Jan [ ]Feb X Mar [X A r [ ]Ma [ Jun Jul [ ]Au Se Oct [X]Nov [ Dec
I
I
1f15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 4 of 5
1
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
Thermostat Schedule: HERS 2006 Reference Hours
Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12
Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 SO
PM 80 80 78 78 78 78 78 78 78 78 78 78
Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78
PM 78 78 78 78 78 78 78 78 78 78 78 78
Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
MASS
Mass Type Area Thickness Furniture Fraction Space
Default(8 Ibs/sq.ft. 0 ftz 0 ft 0.3 1st Floor
Default S Ibs/s .ft. 0 ft2 0 ft 0.3 2nd Floor
Name: Signature:
Rating Compant: Date:
� I
1/15/2019 10:15 AM EnergyGauge®USA Section R405.4.1 Compliant Software Page 5 of 5
r '
2017 EPL DISPLAY CARD
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 97
The lower the Energy Performance Index, the more efficient the home.
1. New home or,addition 1. New(From Plans) 12. Ducts, location&insulation level
a)Supply ducts R 6.0
2. Single-family or multiple-family 2. Single-family b) Return ducts R 6.0
c)AHU location Attic/2nd Floor
3. No.of units(if multiple-family) 3. 1
4. Number of bedrooms 4. 4 13.Cooling system: Capacity 42.0
a)Split system SEER varies
5. Is this a worst case?(yes/no) 5. Yes b)Single package SEER
c)Ground/water source SEER/COP
6.Conditioned floor area(sq.ft.) 6. 2584 d) Room unit/PTAC EER
e)Other
7.Windows,type and area
a) U-factor:(weighted average) 7a. 0.377
b)Solar Heat Gain Coefficient(SHGC) 7b. 0.239 14. Heating system: Capacity 41.7
c)Area 7c. 175.6 a)Split system heat pump HSPF varies
b)Single package heat pump HSPF
8. Skylights c) Electric resistance COP
a) U-factor:(weighted average) 8a. NA d)Gas furnace, natural gas AFUE
b) Solar Heat Gain Coefficient(SHGC) 8b. NA e)Gas furnace, LPG AFUE
f)Other
9. Floor type, insulation level:
a)Slab-on-grade(R-value) 9a. 0.0
b),Wood,raised(R-value) 9b, 11.0 15.Water heating system
c)Concrete, raised(R-value) 9c. a) Electric resistance EF 0.95
b) Gas fired, natural gas EF
10.Wall type and insulation: c) Gas fired, LPG EF
A. Exterior: d)Solar system with tank EF
1.Wood frame(Insulation R-value) 10A1. 11.0 e) Dedicated heat pump with tank EF
2. Masonry(Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec%
B.Adjacent: g)Other
1.Wood frame(Insulation R-value) 10131. 11.0 j
2. Masonry(Insulation R-value) 10132.
16. HVAC credits claimed(Performance Method)
11. Ceiling type and insulation level a)Ceiling fans
a) Under attic 11 a. 30.0 b) Cross ventilation No j
b)Single assembly 11 b. c)Whole house fan No
c) Knee walls/skylight walls 11 c. d) Multizone cooling credit
d) Radiant barrier installed 11 d. No e)Multizone heating credit
f) Programmable thermostat Yes
*Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy
saving features which will be installed(or exce ed) in this home before final inspection.Otherwise,a new EPL
display card will be completed based on in led code compliant features.
Builder Signature: Date: 01/15/19
Address of New Home: 6 Moulden Hollow Drive City/FL Zip: , FL Zephyrhills,FL 33540
1/15/2019 10:16:07 AM EnergyGauge®USA 6.0.02-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1
i
BIII�C�In Analysis Job: 2575A1 sf ADS Carrier VW
g Y Date: 1/1512019
lower floor By: Dave
BAYONET PLUMBING COOLING HEATING
Project I • •
For: Lennar Homes
-Design • • •
Location: Indoor: Heating Cooling
Tampa Intl AP, FL, US Indoor temperature(°F) 70 75
Elevation: 10 ft Design TD (°F) 38 16
Latitude: 28°N Relative humidity(%) 50 50
Outdoor: Heating Cooling Moisture difference(gr/lb) 33.5 53.9
Dry bulb(°F) 32 91 Infiltration:
Daily range(°F) - 14 ( L ) Method Simplified
Wet bulb(°F) - 77 Construction quality Semi-tight
Wind speed (mph) 15.0 7.5 Fireplaces 0
Component Btuh/ftz Btuh % of load
Walls 4.6 7589 42.0 °cts
Glazing 22.1 1941 10.7 Infiltration
Doors 22.7 838 4.6
Ceilings 1.7 55 0.3 Walls
Floors 4.0 4329 23.9 -41
Infiltration 1.9 1966 10.9
Ducts 1368 7.6 Floors
Piping 0 0
Humidification 0 0 other
Ventilation 0 0 Glazing Doors
Adjustments 0
Total _ 18086 100.0
Component Btuh/ftz Btuh % of load
Walls 2.4 3898 31.6 Internal Gains
Glazing 49.7 4366 35.4
Doors 18.6 684 5.6 Wall Ducts
Ceilings 2.0 65 0.5
Floors 0 0 0
Infiltration 0.4 456 3.7 Infiltration
Ducts 1657 13.4 Other
Ventilation 0 0 Doors
Internal gains 1200 9.7
Blower 0 0
Adjustments 0
Total 12326 100.0 Glazing
Latent Cooling Load= 1216 Btuh
Overall U-value= 0.134 Btuh/ftz-°F
Data entries checked.
-Fk-=ightsoft- 2013Jan-15 10:31:42
w- �•P Right-Suite®Universal 2018 18.0.16 RSU05714 Page 1
...5A1 sf ADS templateTIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW
r
Building Anal Job: 2575A1 sf ADS CarrierVW
g YSIS Date: 1/1512019
upper floor By: Dave
BAYONET PLUMBING COOLING HEATING
Project • •
For: Lennar Homes
i
Design Conditions
Location: Indoor: Heating Cooling
Tampa Intl AP, FL, US Indoor temperature(OF) 70 75
Elevation: 10 ft Design TD (OF) 38 16
Latitude: 28°N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference(gr/lb) 33.5 53.9
Dry bulb(OF) 32 91 Infiltration:
Daily range(OF) - 14 ( L ) Method Simplified
Wet bulb(OF) - 77 Construction quality Semi-tight
Wind speed (mph) 15.0 7.5 Fireplaces 0
•
Component Btuh/ft2 Btuh % of load
Walls 3.7 4134 34.4 ��ts
Glazing 17.8 1539 12.8
Doors 0 0 0 Wall
Ceilings 1.2 1808 15.0
Floors 1.1 489 4.1 nfiltration
Infiltration 1.9 2258 18.8
Ducts 1805 15.0
Piping 0 0 Floors
Humidification 0 0 Glazing
Ventilation 0 0 Ceilings
Adjustments 0
Total 12034 100.0
i
Component Btuh/ft2 Btuh % of load
Walls 2.8 3114 17.5 Walls
Glazing 42.9 3702 20.8
Doors 0 0 0 Internal Gains
Ceilings 1.7 2598 14.6
Floors 0.4 187 1.1
Infiltration 0.4 523 2.9
Ducts 2140 12.0
Ventilation 0 0 Glazing
Internal gains 5500 31.0
Blower 0 0 Ducts
Adjustments 0
Total 17765 100.0 Ceilings Othertration
i
Latent Cooling Load= 3437 Btuh
Overall U-value= 0.067 Btuh/ft2-°F
Data entries checked.
wrightsoft- 2019-Jan-1510:31:42
w - w-� Right-Suite®Universal 2018 18.0.16 RSU05714 Page 2
..5A1 sf ADS template TIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW
Project Summary Job: 2575A1 sf ADS Carrier VW
ry Date: 1/1512019
lower floor By: Dave
BAYONET PLUMBING COOLING HEATING
Project Information
For: Lennar Homes
Notes: Vinyl windows
Design Information
Weather: Tampa Intl AP, FL, US
Winter Design Conditions Summer Design Conditions
Outside db 32 °F Outside db 91 °F
Inside db 70 °F Inside db 75 °F
Design TD 38 °F Design TD 16 °F
Daily range L
Relative humidity 50 %
Moisture difference 54 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 16718 Btuh Structure 10669 Btuh
Ducts 1368 Btuh Ducts 1657 Btuh
Central vent(0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh
(none) (none)
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 18086 Btuh Use manufacturer's data y
Rate/swing multiplier 1.00
Infiltration Equipment sensible load 12326 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Semi-tight
Fireplaces 0 Structure 925 Btuh
Ducts 291 Btuh j
Central vent (0 cfm) 0 Btuh
Heating Cooling (none)
Area(ftz) 1093 1093 Equipment latent load 1216 Btuh
Volume(ft') 9641 9641
Air changes/hour 0.29 0.16 Equipment Total Load (Sen+Lat) 13542 Btuh
Equiv.AVF (cfm) 47 25 Req. total capacity at 0.85 SHR 1.2 ton
Heating Equipment Summary Cooling Equipment Summary
Make Carrier Make Carrier
Trade Trade
Model 25HBC518AO0300 Cond 25HBC518AO0300
AHRI ref 9154643 Coil FB4CNP025L
AHRI ref 9154643
Efficiency 8.5 HSPF Efficiency 12.5 EER, 15 SEER
Heating input Sensible cooling 15300 Btuh
Heating output 17700 Btuh @ 47°F Latent cooling 2700 Btuh
Temperature rise 27 °F Total cooling 18000 Btuh
Actual air flow 600 cfm Actual air flow 600 cfm
Air flow factor 0.033 cfm/Btuh Air flow factor 0.049 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.91
Capacity balance point= 34°F
Backup:
Input=4 kW, Output= 15295 Btuh, 100 AFUE
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-Fk- wright.oft- 2019-Jan-15 10:31:43
Right-Suite®Universal 2018 18.0.16 RSU05714 Page 1
ACC ...5A1 sf ADS templateTIA VW 1.5-2ton Carrier.rup Cale=MJ8 Front Door faces:SW
r `
• Project Summary Job: 2575A1sf ADS CarderVW
1 Date: 1/1512019
upper floor By: Dave
BAYONET PLUMBING COOLING HEATING
i
Project I • •
For: Lennar Homes
Notes: Vinyl windows
i
Design Information !
Weather: Tampa Intl AP, FL, US
Winter Design Conditions Summer Design Conditions
Outside db 32 OF Outside db 91 OF
Inside db 70 OF Inside db 75 OF
Design TD 38 OF Design TD 16 OF
Daily range L
Relative humidity 50 %
Moisture difference 54 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 10229 Btuh Structure 15625 Btuh
Ducts 1805 Btuh Ducts 2140 Btuh
Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh
(none) (none)
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 12034 Btuh Use manufacturer's data y
Rate/swing multiplier 1.00
Infiltration Equipment sensible load 17765 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Semi-tight
Fireplaces 0 Structure 3063 Btuh
Ducts 374 Btuh
Central vent (0 cfm) 0 Btuh
Heatin Coolingg (none)
Area(ftz) 149� 1491 Equipment latent load 3437 Btuh
Volume(W) 12077 12077
Air changes/hour 0.27 0.14 Equipment Total Load (Sen+Lat) 21202 Btuh
Equiv.AVF (cfm) 54 29 Req. total capacity at 0.85 SHR 1.7 ton
Heating Equipment Summary Cooling-Equipment Summary
Make Carrier Make Carrier
Trade Trade
Model 25HBC524AO0300 Cond 25HBC524AO0300
AHRI ref 9154943 Coil FB4CNP025L
AHRI ref 9154943
Efficiency 9 HSPF Efficiency 12.5 EER, 15.5 SEER
Heating input Sensible cooling 20400 Btuh
Heating output 24000 Btuh @ 47°F Latent cooling 3600 Btuh
Temperature rise 27 OF Total cooling 24000 Btuh
Actual air flow 800 cfm Actual air flow 800 cfm
Air flow factor 0.066 cfm/Btuh Air flow factor 0.045 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.84
Capacity balance point= 16 OF
Backup:
Input= 3 kW, Output= 11787 Btuh, 100 AFUE
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
41- wrightsoft- 2019-Jan-15 10:31:43
^w.• w-��-� Right-Suite®Universal 2018 18.0.16 RSU05714 page 2
...5A1 sf ADS template TIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW
Manual S Compliance Report Job: 2575A1sfADSCarrierVW
Date: 1/1512019
lower floor By: Dave
BAYONET PLUMBING COOLING HEATING
Project •
For: Lennar Homes
i
Cooling Equipment
Design Conditions
Outdoor design DB: 91.4°F Sensible gain: 12326 Btuh Entering coil DB: 75.8°F
Outdoor design WB: 77.2°F Latent gain: 1216 Btuh Entering coil WB: 62.9°F
Indoor design DB: 75.0°F Total gain: 13542 Btuh
Indoor RH: 50% Estimated airflow: 600 cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: SpIitASHP
Manufacturer: Carrier Model: 25HBC518A00300+FB4CNP025L
Actual airflow: 600 cfm
Sensible capacity: 15300 Btuh 124% of load
Latent capacity: 2700 Btuh 222% of load
Total capacity: 18000 Btuh 133% of load SHR: 85%
Design Conditions Heating Equipment
Outdoor design DB: 32.1 OF Heat loss: 18086 Btuh Entering coil DB: 69.6°F
Indoor design DB: 70.0°F
i
Manufacturer's Performance Data at Actual Design Conditions
i
Equipment type: SpIitASHP
Manufacturer: Carrier Model: 25HBC518A00300+FB4CNP025L
Actual airflow: 600 cfm
Output capacity: 13793 Btuh 76% of load Capacity balance: 34 OF
Supplemental heat required: 4293 Btuh Economic balance: -99 OF
Backup equipment type: Elec strip
Manufacturer: Model:
Actual airflow: 600 cfm
Output capacity: 4.5 kW 85% of load Temp. rise: 50 OF
Meets all requirements of ACCA Manual S.
-�- wrightsoft® 2010—Jan-15 10:31:43
^'�- .dROH e��a,•m ym wm Right-Suite®Universal 2018 18.0.16 RSU05714 Page 1
...5A1 sf ADS templateTIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW
Manual S Compliance Report Job: 2575A1 sf ADS Carrier VW
Date: 1/15/2019
upper floor By: Dave
BAYONET PLUMBING COOLING HEATING
i
I
Project Information
I
i
For: Lennar Homes
Cooling Equipment
Design Conditions
Outdoor design DB: 91.4°F Sensible gain: 17765 Btuh Entering coil DB: 75.7°F
Outdoor design WB: 77.2°F Latent gain: 3437 Btuh Entering coil WB: 62.8°F
Indoor design DB: 75.0°F Total gain: 21202 Btuh
Indoor RH: 50% Estimated airflow: 800 cfm
i
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split ASHP
Manufacturer: Carrier Model: 25HBC524A00300+FB4CNP025L
Actual airflow: 800 cfm
Sensible capacity: 20400 Btuh 115% of load
Latent capacity: 3600 Btuh 105% of load
Total capacity: 24000 Btuh 113% of load SHR: 85%
Heating Equipment
Design Conditions
Outdoor design DB: 32.1°F Heat loss: 12034 Btuh Entering coil DB: 69.7°F
Indoor design DB: 70.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split ASHP
Manufacturer: Carrier Model: 25HBC524A00300+FB4CNP025L
Actual airflow: 800 cfm
Output capacity: 24000 Btuh 199% of load Capacity balance: 16 °F
Supplemental heat required: 0 Btuh Economic balance: -99 °F
I
Backup equipment type: Elec strip
Manufacturer: Model:
Actual airflow: 800 cfm
Output capacity: 3.5 kW 98% of load Temp. rise: 50 °F
Meets all requirements of ACCA Manual S.
wrightsoft® 2010—Jan-1510:31:43
Right-Suite®Universal 2018 18.0.16 RSU05714 Page 2
'� ...5A1 sf ADS template TIA VW 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:SW