Loading...
HomeMy WebLinkAbout19-20863 CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780-0020 863 PLUMBING PERMIT PERMIT INFORMATION LOCATION INFORMATION Permit#:20863 Issued: 2/22/2019 Address: 4932 GALL BLVD Permit Type: PLUMBING ZEPHYRHILLS, FL. Class of Work: PLUMBING RENOVATIONS Township: Range: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Sq. Feet: Est. Value: Book: Page: Cost: 2,000.00 Total Fees: 75.00 Subdivision: CITY OF ZEPHYRHILLS Amount Paid: 75.00 Date Paid: 2/22/2019 Parcel Number: 14-26-21-0010-00800-0120 CONTRACTOR INFORMATION OWNER INFORMATION Name: OWNER Name: HERNANDEZ VINCENT & EMINA Addr: Address: 26652 SHOREGRASS DR WESLEY CHAPEL FL 33544-7728 Phone: Lic: Phone: (813)610-7181 Work Desc: INSTALL INTERCEPTOR , TOILET, SINK& PIPES FOR CLEANER MACHINES APPLICATION FEES PLUMBING FEE 75.00 INSPECTIONS TIONS REQUIRED 1ST ROUGH PLUMB 2ND ROUGH PLUMB SEWER ` WATER FINAL Lk i 2' REINSPECTION FEES:(c)With respect to Reinspection f es will comply with Florida Statute 553.80-(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. The payment of inspection fees shall be made before any further permits will be issued to the person owning same "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. CONTRACTOR PER OFFI PERMIT EXPIRE I 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date Received Phone Contact for Permitting d IS Owner's Name �ecnaaje-T Owner Phone:Number Owner's Address hQ.- r Owner Phone Number oez le'l Owner Phone Number JOB ADDRESS Blvd LOT# SUBDIVISION PARCEL ID# (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR B ADD/ALT = SIGN = = DEMOLISH E� INSTALL REPAIR PROPOSED USE = SFR Q COMM = OTHER TYPE OF CONSTRUCTION Q ii BLOCK Q FRAME = STEEL = DESCRIPTION.OF WORK I 4 r �)t? v- I pl- / BUILDING SIZE SO FOOTAGE=. HEIGHT. =BUILDING $ VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE = DUKE ENERGY 0 W.R.E.C. =PLUMBING $ L n wo. =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION =GAS = ROOFING Q SPECIALTY OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE'AREA =YES NO BUILDER COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Address I License# ELECTRICIAN COMPANY SIGNATURE REGISTERED Y/ N_J FEE CURREN Address License# PLUMBER COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN .. Y/N Address License# MECHANICAL COMPANY SIGNATURE REGISTERED Y/ N' FEE CURREN Address License# OTHER COMPANY SIGNATURE REGISTERED N FEE CURREN Address 2-4450 s5kc')rP T W esk a License# RESIDENTIAL Attach`(2).Plot'P.lans;(2)sets of Building,Plans;.(1)sets of..Energy Forms;R-O-W Permit for new construction,. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans-plus.a Life Safety Page;(1)set of Energy_Forms.R-O-W Permit for new construction. Minimum ten(10)working days after-submittal'date. Reyuired-onsite,Construction Plans,.Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for.all new projects.All commercial.requirements must meet compliance SIGN PERMIT Attach(2)'sets of Engineered Plans: ""PROPERTY SURVEY required for all NEW construction. Directions: z Fill out application completely. Owner&Contractor sign back of application;notarized If over$2500,a Notice of Commencement is 4equlred: .•(A/C upgrades'dver$7500) Agent(for the contractor)or Power of Attomey(for•,the,owner)would be someone with notarized letter from.owner:authodiing same OVER THE COUNTER PERMITTING, co :q ) I ( py.of•contract re uired - 1 Reroofs if shingles Sewers �'Setvice;Upgra&s-A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW 4 er :' = ' i NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: 'If the owner has hired--a-contractor or contractors to undertake work, they may be-required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misIdemeanor violation under.state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has:hired a contractor or contractors, he is advised to have the contractors) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as'theli owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may.apply to-the construction of new.buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance inumber 89-07 and 90-07, as amended. The undersigned also understands, thatsuch fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees mt lust be paid prior to receiving a "certificate of occupancy" or.final power release. If the project does not involve a certificate of occupancy.or final.power release,.the fees must be paid prior to permit issuance: Furthenihore, if Pasco County Water/Sewer Impact fees-are due,.they..must.be..paid prior to permit issuance'in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN-LAW(Chapter 713, Florida Statutes,as amended): If valuation of work is $2,500.00 or more, I certify that I,-the'"applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than'the-"owner"; I certify that I have obtained a copy of the above described document and promise in good faith to !' deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S.AFFIDAVIT:: I certify that all the information in this application is accurate and that all work i will be done in compliance with all applicable laws regulating construction, zoning and.:larid development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work for installation has commenced prior.to issuance of a permit and that all work will be performed to meet standards of fall laws regulating construction, County and City coddes;=zoning regulations,,,and land development regulations in the'jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but-are not limited to:- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environimentally Sensitive Lands,WaterMastewater-Treatment. Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wast water Treatment, Septic Tanks. US Environmental Protection Agency-Asbestos abatement. Federal Aviation Authority-Runways. 1,understand that the following_restrictions apply to the use of fill: Use of fill is not allowed"in Flood Zone W"unless-expressly permitted. If the fill material is to be used in Flood Zone -"A", it is understood-that a drainage plan addressing a "compensating volume" will be submitted at time of permitting.which is prepared by a professional engineer licensed by the State of Florida. If the fill material is-to be used. in Flood Zone "A" in connection with a permitted building using stem wall construction; I certifythat'fill will be used only to fill the area within the stem wall. - If fill material is to.be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application; for lots) less than one (1) acre which are elevated-by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting.conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air.conditioning, gas, or other installations not specifically-included ih'.the.application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the'technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if,work authorized by the permit is suspended-or abandoned.for a period of six(6)months after the time the work.is commenced. An extension . may be requested, in writing, from the Building Official for a-period not to exceed ninety (90) days and will demonstrate justifiable cause for the-extension. If work ceases for ninety(90)consecutive days,the job is considered) abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FdWIMPROVEMENTS TO;YOUR PROPERTY. -IF YOU INTEND TO?OBTAIN FINANCING;CONSULT WITH YOUR LENDEWOR AN ATTORNEY-BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S.117.03) NEkt MAGEN;=—- ' CONTBRC TAR` it4 ,-_� - Subscnbed nd sworn or affi ed befor me this K "'Subscnbed and swom_to �r affi e�)_ ef re. 3his �Z _A_ayt Who is/ person Ily known tome or has/have produced Who is/are perso to me or has/have produced as identification. as identification. Notary Public 04� Notary Public Co si o. 9 QI/ 'lr:: All `' x I rlileoi�a G®Bi f Notary PGG27Bg ed ��sd?hro57 anlesdraep Name o �01 Deer 12,2 3 iM cembYFell InauraR �SlOf9 ALL WORK SHALL COMPLY WITH PREVAILING CODES FLORIDA BUILDING CODE, ~� E NATIONAL ELECTRIC CODE, AND THE CITY OF ZEPHYRHILLS ql, ORDINANCES r s EVq DATE CITY OF ZEP PANS EXA�n,IN�FR F 1 J 4 `V ; 3� I • L r0+ �-►_ - d ALWAYS QUEOFF THE TOP ALWAYS CDAI£OFF Gf TrE A-N HEADER FGR TH£TO?OF Al? UNES TO PRESSES P+T AUR.FORSECOWSTIARY �1, RCOK DL�T£5 \ / 1 AFTERCCOl.fR Y I AER COA r�Rf SSOR TD PRESS ✓ r ar -P)Tra Amr�ac�R�, CRA{Y J FUIRY 3 SECUNTARY \-VOSTURE SEPARATOR TO PRESS ALSSaYS CUE OFF TF I/2"PPE WITH AUTO D?A': BOTTOM Cf TK AIR "K TO PRESS HEADERFOR K PAN 1 PRESS �t0`PRESS SLOE VALVE PFE iNON —FS TER RECIRATOR ASS'Y r� cc R)TH aUTO ORAS' (SUPPLIED bTTH VAC>f}�} t U 9U U!>✓W NJ NiP LEG `TD`PRESS 1rHDRan LYMULLI Y IOU,MOPES i TYPICAL TYPICAL STEAM RETURN STEADA SUPPLY ASSEMBLY ASSf�+BLY CHECK VALVE CUT—CFI VALVE 1 PIPE UNION �—PIPE UNION `�--INVERTED BUCKET TRAP �Et�?OF THE STRAINER i LINE TRAP PIPE UNION ENO OF THE LINE TRAP l'NSULATE ALL �``�,,, `` • STEAM PIPING ALWAYS DROP `- ` `:.• DO`;t..TO TRAP � �'� '"�' �STEMMA SUPPL t STEAD RETURN INSTALL TRAP AS— Low AS POSSIBLE i 2;633 ALWAYS USE AN MEN E " v ENO OF THE LiR�TRAP J !a1 ,,fl (D �Ivt(j N Q T4 PROVIDE CONTMIAL !!' U L CIRCULATION U M E L M E Prod action(1 +Pperator) 75 shirts pe(huur Productio-h-Q.Operator) 90 shuts per hour Steam:Pressure.Supply 100- 125 psi 7-_9:bar Steam.Consumption 3412,.bhp .55.k�lhr. Air.Pressure_Supply S5= 125 psi 6 9 bar. Airbonsumplion 75dhr 9.1 Cfm 257 Unin Air.Consumption @.901hr. 160.cfrn. .309,LfMin Electrical Supply fC0ntf.0Is):. 1 i.5/1160 24011/50 Eledtical; (bler} .Supply o1.w 200 23013160" '380-415f315a - ,Electrical Consumption (,3.phase), I.2 9 amps' 230 6.7.amps @ 400 FloorSpace 1. 85 sn:f. 7.9 sq rn a 9': 6 8'-i 1". [29001 [27201 Two Operator Double Buck Unit TD2 - Double Buck, ABS - Sleever and Two 3TZ - Collar & Cuff Presses MINIMUM MAICLEARANNTENANCECE, '/-AJFR INLET I— Is TYP i ISVII PHOO HZ lt2 NPT li t HZ 2S2XV13 P�10 3 CONNECTION 14 g 3-1 17-112 L MIN 20 31.11t2 35 34 MAX ig 1 4 J-J SOOYSUCKOIMENSIQNS L 93 RIB 4-V4 STEAM OUT-/ 102 NPT irl NPT 45 VIEW A REQUIREMENTS m WEIGHT OF PRESS:2,400 LOS AIR SUPPLY,SS PSI ELECTRICAL PRESS,115110 ELECTRICAL SLOWEft 20=30 -L F CUBIC FEET:165 - -- I - I,- �64 PC—: :-:�Ji STEAM:28HP 23 23.!716 ELECTRICAL.-PRESS-1 AMP 115 VOLT ELECTRICAL'aLOWERS-123AjoP@mVOLT llSVPOWERJ ON 14-118 1-- CONNECTI `SEE ENLARGED VIEW A ucol:- 44017-DC 4334------.._...; ct13tr9t4f' iI EFttti(I(lEFFIII; 41a . ,'" 32.00 ' 2r,00 ;�ttCftttt[UEtIllF �.F`�. ` DIMENSIONS ' Lin -AIR INLET 318 NPT 1 ' AIRBAG•\ 2@.IXT i I SUPPLY .EMENTS__ i2E0U1R YlE40HT OF PRESS:850 LSS I �', AIR SUPPLY:65 PSI STEAM SUPPLY-.1*125 LOS ELECTRlC41.:115Y11 PWSOHZ 83�12 1 EXPORT CUSSCFEESiBS _ _:, `' _CON_SU_MPTION$ Isis '•S4` o AIR:f,0 CUSIC FEET1CYClE 1 STEAM:314 SHP { y� 25�{13 yts .- _ ELECTRICAL:12 AMP—_, _...----..----- tjt i r j P'' = ii,S6 'j). _1`, t�.-:_.._:'-"^1-.., 'M m.u�.•,. "aK.�..z.•� j l�B.OD�+1\'TEAM OUT 1.56- !, ••P0(II511ERR�C»NECt14N IN -ter t0.00 i+ iR NPT FOOTSATCH•' !"ivir',-:,`-. •", t 3:32 30QC}C'1aNC I 0 a a ' ELECTRICAL I ��I'•.` I�.•;^?'1.,1.�+.� �.J_3_.e{'`��1 44.00 I i i" j i CQNNECTION —�1 y ; .11.00 B'13PROHGI,_ IL, ' ELECTWCCAALL CORCC ---'- -- ;..^ r LL--- .;_.; T 50.13 STEAM IN NPT- t I AIR CONNECTION r,�;I�""-L--- iI "`-STEAM OUT 318 NPT-�, �r; rl�_.-•.__I �; 3M NPT 23.50j tf 26.75 I-_ 15.63 (---- ___ —._.__.�_ _l.L!.F1`_'.C-,•. ,.1311801`MOUNTING —_22.75----'{�I-'-1.68 I - �^-9.50 35.25- ------""'_- I i -19.00-----..r BUCK DIMENSIONS SUPPLY REQUIREMENTS i 1, WEIGHTOF PRESS'850 LES y AIR SUPPLY:85 PSI 3, STEAM SUPPLY:100.125PSI -- 700 9.00 ! 4. ELECTRM'120MOV,1P,H, ' I ...�___�_ 5W Hz,112 AMP -19.69 CONSUMPTION ,;,hs;. 1. AIR:1314 CU.FT.f CYCLE ,1✓• jRT.S;� 2. STEAM:314 BOILER HP I .,}.` r. 1 W ROUGHING R1125 ;s+y,I�h� ROUGHING ItC A '- isB 42 473•DC I A m.i,:w -: r 7 SHIRT UNIT SPECIFICATIONS Steam Steam Steam Steam Air Air Operating Air Volume Electrical Shipping Model Supply Inlet Outlet Usage Supply Inlet Air Press. Per Cycle Supply Amps Weight PSI NPT NPT BPH PSI NPT PSI CU.FT. LBS TS1 100-125 (1)1/2" (2)1/2" 1.5 85-125 .1/2" 80 3.6 115/1/60 1 2550 230/3/60 12.9 'iD 100-125 (1)1/2" (2)1/2" 2.0 85-125 1/2" 80 3.6 115/1/60 1 2720 230/3/60 12.9 HS 100-125 (1)1-1/4" (5)1/2" 2:5 85-125 1/2" 80 3.5 115/1/60 1 2850 230/3/60 17.7 115/1/60 1 HS1 100-125 (1)1-1/4" (5)1/2" 3.25 85-125 1/2" 80 4.5 230/3/60 17.7 3865 HSZ 100-125 (1)1-1/4" see note 3.5 85-125 1/2" 80 3.0 115/1/60 1 3600 below 230/3/60 17.7 ABS 100-125 (1)1/2" (1)1/2" 0.75 85-125 3/8" 75 1.9 115/1/60 1/2 1150 F3T 100-125 (1)3/8" (2)3/8" 0.5 85-125 3/8" 75 1.0 115/1/60 1/2 795 F3TB 100-125 (1)3/8" (2)3/8" 0.5 85-125 3/8" 75 1.0 115/1/60 1/2 795 3TZ, 100-125 (1)3/8" (2)3/8" 0.75 85-125 3/8" 75 1.75 115/1/60 1/2 1020 WCZ 100-125 (1)3/8" (2)3/8" 1.0 85-125 3/8" 75 1.75 115/1/60 1/2 1020 Q4T 100-125 (1)1/2" (2)1/2" 1.25 85-125 1/2" 60 2.0 115/1/60 1 1445 Note: (1)1"with internal traps supplied (5)1/2"without internal traps supplied ----------------- n� 25 0.25 ELECTRICAL-,, CONNECTION ONG)ELECTRIMICOR 50.13 STEAM OUT. 318 NPT STEAM IN 318 NPT 26W 318 NPT AIRCONNECTION-' I 23.50 FrTl 15:63 23 81 13116 DIA MOUNTING 22.75 In I i 8.00 HOLES(4) 37,50 SUCK DIMENSIONS SUPPLY REQUIREMENTS WEIGHT OF PRESS;1080 LOS AIR SUPPLY;85 PSI STEAM SUPPLY,.IDD-125 PSI MIN ELECTRICAL'120f2JOV.IPH, 50,60 Hz.112 AMP t 24;m CONSUMPTION f*Z'r'(ta'!-ijf RIGUGHIKG]R--� AIR:1414 CU,FT.FREE AIR.,CYCLE 1-Tia 1 STEAM:W4 BOILER HP A:; ne 29908-DC 7 " � '. r— '-- ---'--'-- ---'------'-------- ---'--- — - --' '-- -- ' --- ` ^ ' / ^ i � . . . i ` ! ELECTRICAL CONNECTION 1147-: � � LRONG ELECTURRAP STEAM~��� | ! 27 AIR / � �"" / 14 w | � ! � � ! � "­,03116 MOUNTING mo xmESw ! ' . SUCK DIMENSIONS SUPPLY REQUIREMENTS ' i � � � SWHzmAMP . ! m,,r � | -------' ^--_~^_-- . w9*l CONSUMPTION / i�� --------- ------------. ' ���` � ���J����c�� ROUGHING 114'� -- / | � KIT � � �� �A � � � � ~ � :A LAUNDRY PRESS SPECIFICATIONS Steam Steam Steam Steam Air Air Operating Air Shipping Model Supply Inlet Outlet Usage Supply Inlet Air Volume Electrical Amps Weight PSI NPT NPT BHP PSI NPT Pressure /Cycle SupplyLBS PSI CU.FT. 100-125 (1)3/8" (1)3/8" 0.75 85-125 3/8" 75 1.75 115/1/60 1/2 1215 DTZ 100-125 (1)3/8" (1)3/8" 0.75 85-125 3/8" 75 1.75 115/1/60 1/2 995 SLZ 100-125 (1)3/8" (1)3/8" 0.75 85-125 3/8" 75 1.75 115/1/60 1/2 1095 WAZ 100-125 (1)3/8" (1)3/8" 0.75 85-125 3/8" 75 1.75 115/1/60 1/2 1050 LPZ 100-125 (1)3/8" (1)3/8" 0.75 85-125 3/8" 75 1.75 115/1/60 1/2 1195 ESLZ 85-125 3/8" 75 1.75 115/1/60 1/2 1015 230/1/60 21.1 =. 100-125 (1)3/8" (1)3/8" 0.25 85-125 3/8" 75 1.0 115/1/60 1/2 580 FB 100-125 (1)3/8" (1)3/8" 0.5 85-125 3/8" 75 1.0 115/1/60 1/2 670 EFB 85-125 3/8" 75 1.0 115/1/60 1/2 670 230/1/60 16.5 4 City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: Date Received: 5-19 Site: Permit Type: /G�'1�J ��� ✓ � Approved w/no comments. Approved w/the below comments: ❑ Denied w/the below comments: ❑ This comment sheet s be kept with the permit and/or plans. FEB 2 `0 2019 Kalvin Swi er lans Examiner Date Contractor and/or Homeowner (Required when comments are present)