Loading...
HomeMy WebLinkAbout19-20880 CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780-0020 20880 BUILDING PERMIT SINGLE FAMILY RESIDENTIAL PERMIT INFORMATION LOCATION INFORMATION Permit#:20880 Issued: 2/25/2019 Address: 7954 SALI CLOVER LANE Permit Type: GENERAL BUILDING PERMIT ZEPHYRHILLS, FL. Class of Work: SITE WORK Township: Range: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Sq. Feet: Est. Value: Book: Page: Cost: Total Fees: 3,015.00 Subdivision: CITY OF ZEPHYRHILLS Amount Paid: 3,015.00 Date Paid: 2/25/2019 Parcel Number: 35-25-21-0010-00500-0000 CONTRACTOR INFORMATION OWNER INFORMATION Name: QGS DEVELOPMENT Name: DUNE FL LAND I SUB LLC Addr: 1450 SOUTH PARK RD Address: 2502 N ROCKY POINT DR STE 1050 PLANT CITY 33566 ROCKY POINT FL 33607 Phone: Lic: Phone: Work Desc: SITE WORK FOR ZEPHR LAKES APPLICATION FEES SITE WORK 3,015.00 i ,2A Inspections Required FOOT ER 2ND ROUGH PLUMB MIS INSULATION CEILING FOOTER BOND DUCTS INSULATED SEWER MISC. ROUGH ELECTRIC LINTEL MISC MISC. 1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC. DUCTS INSTALLED WATER MISC DRIVEWAY PRE-SLAB SHEATHING MISC. MISC. CONSTRUCTION POLE FRAME MISC. MISC. REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute SS3.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection.REINSPECTION FEES: NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications and Must Accompany Application.All work shall be performed in accordance. with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. TRACTORS SIGNATURE PERMIT OFFI PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIOlf CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Data Received Phone Contact for Permitting 813 323-3336 _ Owner's Name Zephyr Lakes Community Development District Owner Phone Number Owners Address 250 International Pkwy Suite 280 Lake Mary,FL Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address 17 JOB ADDRESS Pretty Pond Road ' stiff / j/�✓ LOT# SUBDIVISION ephyr Lakes Subdivision Phase -5 PARCEL ID# (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED B NEW CONSTR e ADD/ALT = SIGN 0 0 DEMOLISH INSTALL REPAIR PROPOSED USE = SFR 0 COMM = OTHER TYPE OF CONSTRUCTION = BLOCK Q FRAME = STEEL = DESCRIPTION OF WORK Site development-clearing/grubbing/earthwork/sewer/storm/water/base/pavement BUILDING SIZE I SO FOOTAGE HEIGHT BUILDING $ VALUATION OE-T.OTALCONSTRUC 10 $6,3 44,435.00 =ELECTRICAL $ AMP SERVICE = PROGRESS ENERGY = W.R.E.C. =PLUMBING $ tg � =MECHANICAL $ VALUATI NbF MECHANICAL INSTALLATION =GAS = ROOFING 0 SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO -.-.�-...-.-.-...-... . . . L+�:-74 .�-.�...-. . BUILDER o� COMPANY FP e, L) G1AI M /✓/--/UL SIGNATURE E:' REGISTERED f I Y/ N FEE CURREA�3 Y/N Address �J �C� J ;L/.{ J' •fir .`t!,� ��S��G License L_u C 2 27 7 ELECTRICIAN COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREK Y/N Address License# PLUMBER COMPANY SIGNATURE REGISTERED Y/ N FEE CURRE<` _Y/N Address License# MECHANICAL COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREN Address License# OTHER COMPANY QGS Development,Inc. SIGNATURE REGISTERED Y/ N FEE CURREN IY/N Address 1450 S.Park Road Plant City,FL 33566 License# I CUC 1224741 Illllllllllllllllllllllllllllllllllllllllllllllllltllllllllllllllll RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Fortes;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisionsflarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Fortes.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stornwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. . . . Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance With state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the"contractor Block"of this application for which they will be responsible. If you, as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands,that such fees, as may be due,will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowners Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner',I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner'prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency-Asbestos abatement. Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction,I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTIC&OF COMMENCEMENT. FLORIDA JURAT(F.S.117.03) j OWNER OR AGENT CONTRACTOR `, Subscribed and swam to(or affirmed)before me this sub ' e d swo to,(olr ffirmed)before th's by hr by .,91 !f1 �G 1►\ Who is/are personally known to me or has/have produced o is/are personal Known to me or hasthave produced as identification. as identification. Notary Public AIR Notary Public Commission No. Com is on N Name of Notary typed,printed or stamped Name of Notary pAdr,p&t .c}r W#GG 276W °'•'DO=December 12,2022 •'ko�R�p•' Bonded TW Troy Fain InStRm a U 7019 I %Jr I r FxL--LJGV GLtJr"1"IGIV 1 VR/`11114/-1VL . I OF I OVERALL DRAINAGE AREA MAF 1 -4 OF 4 DRAINAGE AREA MAP I OF I CONSTRUCTION SURFACE WATER M BY �5. GS f:iw of 6v[ i_eph�;�htll� i... C Site Plan RcNia Appr,3N BJL Approved t� fat of By irec�,,r of SITE PLAN A� tip AuthorizedSigtiFan Site Plan 1teiisy Fee Paid ff? `� 101� �-P �7°a- �r"�` �' ) ZEPHYR LAKES SUBS JC Bldg Dept From: Bldg Dept <BDept@ci.zephyrhills.fl.us> Sent: Tuesday,January 15, 2019 11:54 AM To: jrodi@qgsdevelopment.com Subject: fee cost for site work Hello Joseph, The cost for site work will be$13,513.87 . Make Check payable to city of zephyrhills and you may bring into our office and I will create site permit for the job. Thank you for your time. ' Building Dept 813-780-0020 813-780-0021 Florida has a very broad public records law. Electronic communications regarding most City of Zephyrhills business are public records and available upon request. Your e-mail communications may therefore be subject to public disclosure. If you received this message in error, please do not read, forward, copy, etc. and delete immediately 1 RESOLUTION,NO:741,4 7 A RESOLUTION OF THE CITY COUNCEL'�OF -'THE CITY OF ZEPHYRHILLS, FLORIDA, AMENDING RESOLUTION 634-10 AND PROVIDING FOR A SCHEDULE OF FEES FOR'RESIDENTIAL AND MISCELLANEOUS UTILITY CONNECTION'f'EESl PURSUANT TO THE LAND DEVELOPMENT CODE,RELATING TO MATTERS OF ZONING, DEVELOPMENT REGULATIONS,AND PERMITTING. WHEREAS,the City Council of the City of Zephyrhills;Florida has,previously enacted a Schedule of Fees for expenses pursuant to the Zephyrhills Land Development Code,relating to matters of zoning, development regulations, and permitting; and` ' WHEREAS,the City Council finds it necessary to enact.a new Schedule of Fees for certain administrative functions of the city to more equitably assess the-costs of these services to the parties.;directly benefiting from them. WHEREAS, the Schedule of Fees are reasonably related to the actual costs of performing the related administrative functions. NOW,THEREFORE,BE IT RESOLVED by the City Council of the City of Zephyrhills,Florida, as follows: 1. Building Permits: Minimum Permit Fee: $45.00 a. $1,000 and less: No fee, unless inspection is required, in which case a$45.00 fee for each 4 inspection shall be charged. b. $1,001 to $50,000: $45.00 for the first$1,000,plus $5.00 for each additional $1,000 or fraction thereof,up to and including $50,000. c.`,$50,001 to $100,000: $330.00 for the first$50,000,plus $5.00 for each additional thousand or fraction thereof,up to and including $100,000. M d. $100,001 to $500,000: $530.00 for the first$100,000,plus $5.00 for each additional $1,000 or fraction thereof,up to and including $500,000. ;I e. $500,001 and up: $1,730 for the first$500,000,plus $5.00 for each additional $1,000 or fraction thereof )l Jacqueline Boges From: Bill Burgess Sent: Monday, February 11, 2019 11:52 AM To: Kevie DeFranc Cc: Todd Vandeberg; Rodney Corriveau;Jacqueline Boges Subject: RE:ZEPHYR LAKES - HAMILTON ENGINEERING - KOSSIK RD We can review the amenity center plan simultaneously but keep in mind we cannot issue a permit until site approval has been completed...Thanks, Bill From: Kevie DeFranc<KDeFranc@ci.zephyrhills.fl.us> Sent:Thursday, February 07, 2019 3:16 PM To: Bill Burgess<bburgess@ci.zephyrhills.fl.us> Cc:Todd Vandeberg<tandeberg@ci.zephyrhilis.fl.us>; Rodney Corriveau<RCorriveau@ci.zephyrhills.fl.us> Subject: FW:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Bill, Read the email below from the Hamilton Engineering representative for the Zephyr Lakes Amenity Center proposal and let us know your take on this inquiry. Best regards, Kevie Defranc ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Def ra nc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law,e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From: Brad Kuhl<BradK@ ham iltonengineerinl;.us> Sent:Thursday, February 7, 2019 1:52 PM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Hi Kevie, 1 I have a quick question for you. Can we submit building plans for the amenity for a simultaneous review? I understand you cannot issue a building permit without site plan approval, but I was hoping we could get the building plans reviewed at the same time. Thanks, H A M I LT 0 NI EN4314E0111N0 d SURVEYING. 111C. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa, FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@hamiltonenaineering.us I www.hamiltonenaineering.us From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Sent:Thursday, February 7,2019 11:31 AM To: Brad Kuhl<BradK@ ham iltonenginee ring.us> Cc:Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephvrhills.fl.us>; Ryan McCaffrey<RyanM@hamiltonengineering.us>;Sean Oconnor<Sean@metrodevelopmentgroup.com>; Brandy McKown <BrandvM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Good morning Brad, I have conducted a preliminary review of the Zephyr Lakes Amenity Center Construction Plans and there are several issues that need to be resolved, preferably, prior to the upcoming Site Plan Review Meeting on Wednesday, February 20, 2019.The issues are: 1) Missing landscaping and irrigation plans [so please submit hardcopy and electronic copies of these plans] 2) The parking stalls/spaces length proposed do not meet the minimum length requirement of 20 feet(LDC Table 7.03.02) [so please correct this issue] 3) Missing landscaping islands per a maximum of ten parking spaces (LDC Section 7.06.04.01(C)(7)) [so please correct this issue] 4) Missing crosswalk from the Center's front entry walkway crossing to the opposite side of Broad Pointe [so please add] In addition, can you give us an update on the plans for the Park areas. Best regards, Kevie Defranc ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Defranc GIS Technician 2 City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law,e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From: Kevie DeFranc Sent: Monday, February 4,2019 1:03 PM To: Brad Kuhl<BradK@hamiltonengineering.us> Cc:Todd Vandeberg<tandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephvrhills.fl.us>; Ryan McCaffrey<RvanM@hamiltonengineering.us>;Sean Oconnor<Sean@metrodevelopmentgroup.com>; Brandy McKown <BrandvM@ham iltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Good afternoon Brad, Please find the attached receipt for the Zephyr Lakes Amenity Center Site Plan Review Fee. Best regards, Kevie Defranc ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Defranc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law,e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this office. From:Todd Vandeberg<tandeberg@ci.zephvrhills.fl.us> Sent: Monday,January 14, 2019 11:15 AM To: Mike Lawson<Mike@metrodevelopmentgroup.com>; Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us>; Brad Kuhl <BradK@hamiltonengineering.us> Cc:Sean Oconnor<Sean@metrodevelopmentgroup.com>; Ryan McCaffrey<RyanM@hamiltonengineering.us>; Brandy McKown<BrandvM@hamiltonengineering.us>; Rodney Corriveau<RCorriveau@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD 3 Thank you Mike. As you know from our prior conversations concerning final approval of the Zephyr Lakes Construction plans that there are approval conditions/ Residential design guidelines that we wanted to be proactive and communicate with the builder prior to commencement of construction. We see the site contractors are working hard out there so that was the purpose/timing of the email. We have discussed with the Building Dept the creation of a submittal checklist that the Builder could sign off when submitting permits ensuring compliance with the conditions/ design guidelines. Thanks, Zephyrhills 20JO ToGCd H 'Vande Berg Director of Planning Planning Department City of Zephyrhills 5335 8th Street Zephyrhills, FL 33542 Phone: 813.780.0006 Fax: 813.780.0005 vandeberg@ci.zephvrhills.fl.us "It's not the Plan that's important.... it's the Planning" From: Mike Lawson<Mike@metrodevelopmentgroup.com> Sent: Monday,January 14, 2019 11:04 AM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us>; Brad Kuhl<BradK@hamiltonengineering.us> Cc:Sean Oconnor<Sean@metrodevelopmentgroup.com>; Ryan McCaffrey<RyanM@hamiltonengineering.us>; Brandy McKown<BrandyM@hamiltonengineering.us>;Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephyrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING-KOSSIK RD Kevie, In regard to homebuilder information for Zephyr Lakes or any of our residential communities within Zephyrhills,the developer is the appropriate party to respond to these types of inquiries. In the future, please feel free to contact me directly and I'll be happy#o update you. For Zephyr Lakes,we are in the final stages of contract discussions. I will let you know once the contract is deemed in effect. Thanks Mike Lawson I Managing Director,Operations METRO DEVELOPMENT GROUP 4 2502 N.Rocky Point Drive I Ste 1050 1 Tampa,FL 33607 office:813.288.8078 1 mobile:813.843.3875 mike MetroDevelopmentGroun.com MetroDeveloumentGroup.com I MetroPlaces.coin From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Sent: Monday,January 14, 201910:30 AM To: Brad Kuhl<BradK@hamiltonengineerinl;.us> Cc:Sean Oconnor<Sean@metrodevelopmentl;roup.com>; Ryan McCaffrey<RvanM@hamiltonengineering.us>; Mike Lawson<Mike@ metrodevelopmentgroup.com>; Brandy McKown<BrandvM@hamiltonengineering.us>;Todd Vandeberg<tandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES-HAMILTON ENGINEERING- KOSSIK RD Good morning Brad, The purpose of this email is to retrieve the Home Builders' contact information, if you guys have come to terms with a or several specific Builders for the Zephyr Lakes Residential Development project. Best regards, Kevie Defranc ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Defranc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From: Brad Kuhl<BradK@hamiltonengineerinl=.us> Sent:Wednesday, December 12,201811:14 AM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Cc:Sean Oconnor<Sean@metrodevelopmentgroup.com>; Ryan McCaffrey<RvanM@hamiltonenl?ineering.us>; Mike Lawson<Mike@ metrodevelopmentl;roup.com>; Brandy McKown<BrandyM@hamiltonengineering.us>;Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Thank you again Kevie. We are making arrangements to pick those up. 5 ENGINEERING & SURVEYING. INC. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa,FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@hamiltonengineerina.us I www.hamiltonenaineerina.us From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Sent:Wednesday, December 12,2018 10:50 AM To: Brad Kuhl<BradK@ ham iltonengineering.us> Cc:Sean Oconnor<Sean@metrodevelopmentgroup.com>; Ryan McCaffrey<RyanM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>; Brandy McKown<BrandvM@hamiltonengineering.us>;Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Good morning Brad, The plans have been stamped and approved and are ready for you to pick up. Best regards, Kevie Defranc ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Defranc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From: Brad Kuhl<BradK@hamiltonengineering.us> Sent:Tuesday, December 11, 2018 4:03 PM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD The courier should arrive right at 5. 6 From: Brad Kuhl Sent:Tuesday, December 11, 2018 3:18 PM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Cc: Ryan McCaffrey<RvanM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>;Sean Oconnor<Sean@metrodevelopmentgroup.com>;Todd Vandeberg<tandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephvrhills.fl.us>; Brandy McKown<BrandvM@hamiltonengineering.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING-KOSSIK RD Hi Kevie, The courier is en route with the check. I just wanted to make sure someone will be available when it arrives in the next hour or so. Thanks, -;�HAMILTON £NGINEERITiG G SURVEYING. INC. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa,FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@hamiltonenaineering.us I www.hamiltonengineering.us From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Sent:Thursday, December 6, 2018 3:43 PM To: Brad Kuhl<BradK@hamiltonengineering.us> Cc: Ryan McCaffrey<RvanM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>; Sean Oconnor<Sean@ metrodevelopmentgroup.com>;Todd Vandeberg<tandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephvrhills.fl.us>; Brandy McKown<BrandyM@hamiltonengineering.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Brad, I want to inform you that I received the four sets of signed and sealed plans,comment response letter, and tree removal application. Kevie ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Defranc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street 7 Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From: Brad Kuhl<BradK@hamiltonengineering.us> Sent:Thursday, December 6, 2018 2:47 PM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Cc: Ryan McCaffrey<RyanM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>;Sean Oconnor<Sean@ metrodevelopmentgroup.com>;Todd Vandeberg<tandeberg@ci.zephyrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephvrhills.fl.us>; Brandy McKown<BrandvM@ham iltonengineering.us> Subject: RE:ZEPHYR LAKES-HAMILTON ENGINEERING- KOSSIK RD Hi Kevie, The 4 sets of signed and sealed plans,comment response letter, and tree removal application are headed your way now. We will forward the$1,600 check to you when we receive it from the client. Thanks, A M 1 .1" 0 ENGINEERING & SURVEYING, INC. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa,FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@hamiltonenaineering.us I www.hamiltonenaineerina.us From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Sent:Thursday, December 6, 2018 9:00 AM To: Brad Kuhl<BradK@hamiltonengineering.us> Cc: Ryan McCaffrey<RvanM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>; Sean Oconnor<Sean@ metrodevelopmentgroup.com>;Todd Vandeberg<tandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephyrhills.fl.us>; Brandy McKown<BrandvM@hamiltonengineering.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING-KOSSIK RD Thank you Brad and I look forward to receiving them. Kevie ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY 8 Kevie Defranc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law,e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From: Brad Kuhl<Brad K@ ham iltonengineering.us> Sent:Thursday, December 6, 2018 8:53 AM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Cc: Ryan McCaffrey<RyanM@hamiltonenginee ring.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>;Sean Oconnor<Sean@metrodevelopmentgroup.com>;Todd Vandeberg<tandeberg@ci.zephyrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephvrhills.fl.us>; Brandy McKown<BrandvM@hamiltonengineering.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Thank you Kevie. We will send you the check as soon as I receive it from the client and I will get the tree removal application to you today when we deliver the revised plans. AMILTOX ENGI!:EEHING L SVNVEYING, ING, Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa, FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@homiltonengineerina.us I www.hamiltonenaineerina.us From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Sent:Thursday, December 6, 2018 8:36 AM To: Brad Kuhl<BradK@ ham iltonengineering.us> Cc: Ryan McCaffrey<RyanM@hamiltonengineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>; Sean Oconnor<Sean@ metrodevelopmentgroup.com>;Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <RCorriveau @ci.zephyrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Good morning Brad, 9 Please find the attached invoice. Best regards, Kevie Defranc ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Defranc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law,e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From: Brad Kuhl<BradK@hamiltoneneineering.us> Sent:Wednesday, December 5, 2018 9:50 AM To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Cc: Ryan McCaffrey<RvanM@hamiltoneneineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>;Sean Oconnor<Sean@metrodevelopmentgroup.com>;Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Hi Kevie, I have a quick response to your comment number 3 below regarding Wire Road. The attached comments from the County show that we addressed their concerns on Wire Road. Please note comment 11 has been rectified per Chuck Wilson's comment in red. We added sections to show the proposed sidewalk and are currently adding detail for the open cut to extend the storm pipe under Wire. The County has determined that plan and profile is not required for the entirety of Wire along our project boundary to show the addition of sidewalk and one crossing. We are addressing the other comments now and I expect to have them back to you by the end of the week. Thanks, , ''" ti AMILfTON ENGINEERING & SURVEYING, INC. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa,FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 10 bradk@hamiltonenaineerina.us I www.hamiltonenaineerina.us From: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> Sent:Tuesday, December 4, 2018 5:20 PM To: Brad Kuhl<BradK@hamiltonengineering.us> Cc: Ryan McCaffrey<RyanM@hamiltonengineering.us>; Mike Lawson <Mike@metrodevelopmentRroup.com>;Sean Oconnor<Sean@ metrodevelopmentgroup.com>;Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <RCorriveau@ci.zephvrhills.fl.us> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Brad, After reviewing the resubmittal, we noticed a significant amount of improvements to the plans and we greatly appreciate the effort. However, we have a few minor items to complete the review and approval of the plans. In regards to the "Street Tree Plan",you still failed to darken the trees (indicating you will install & plant them) abutting the Storm Drainage Structure on sheets 84-85 and if you refer to Section 7.06.04.01 of the Land Development Code,you will see that you are required to provide landscape buffering and screening around the entire project site (regardless of this future Dairy Road factor).Therefore, we need you to correct this error. In addition,you still failed to provide correct information in the "LDC Min. Replacement" row of the Overall Removal/Replacement Tree Calculations tables on sheets 84-87, but we do recognize you are proposing to provide replacement trees over the "correct" required amount (and will be after adding the ones abutting the Storm Drainage Structure).Therefore,we need you to correct this information. In regards to the Zephyr Lakes Residential Design Guidelines, we will need to meet with the Builders prior to them submitting for permits.Therefore, we need you: 1) To provide us with the appropriate Builders' contact information 2) To inform them that they will need to meet with both the Planning and Building Departments along with providing them the design guidelines In regards to the pending items involving the County: 1) Pedestrian Crossing Treatment on Kossik Road a. Detail regarding the alternating flashing lights between the W11-2 and W16-713 signs (as provided in image via email from 9/28/2018) is missing and thus, needs to be provided 2) Kossik Road connection to Wire Road a. Engineering & Design of the segment from Zephyr Lakes Road to Wire Road will need to be completed within an appropriate time prior to the construction completion date of December 31, 2022 b. Construction Plans for that segment will need to be provided for approval within an appropriate time prior to the construction completion date L Entry Water Features at intersection of Kossik Road &Wire Road (as discussed) will need to be included 3) Wire Road a. Section 7.02.02.02 of the Land Development Code warrants a plan and profile for the entirety of Wire Road along the property boundary,which will be brought up in conversation with the County Furthermore,we conducted a site visit and observed trees being removed without a tree removal application and fee being submitted.Therefore,you need to submit a tree removal application and fee ($100). 11 Overall,submit to us four(4) sets(this includes two sets to return to your team and two sets for the City) of the final revised construction plans addressing the corrections outlined in this email along with the associated fees ($500 for each time you submitted revised construction plans),the information requested, and the tree removal application and fee ($100) in order for us to stamp and approve the plans. Best regards, Kevie Defranc ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY Kevie Defranc GIS Technician City of Zephyrhills City Hall 5335 Eighth Street Zephyrhills, FL 33542 Phone: 813.780.0204 Fax: 813.780.0005 Under Florida law,e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this office. From:Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us> Sent:Tuesday, December 4, 2018 3:48 PM To: Brad Kuhl<BradK@ ham iltonengineering.us> Cc: Kevie DeFranc<KDeFranc@ci.zephyrhills.fl.us>; Ryan McCaffrey<RyanM@hamiltonengineering.us>; Mike Lawson <Mike@metrodevelopmentgroup.com>;Sean Oconnor<Sean@ metrodevelopmentgroup.com> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Brad, Hello. Kevie and I have reviewed the recent resubmitted plans. Looks like we are pretty close. There remain a few minor items to complete the review/approval. We will get those items to you shortly. Zephyrhills 3 v Todd-H 1Vande Berg Director of Planning Planning Department City of Zephyrhills 5335 8th Street 12 Zephyrhills, FL 33542 Phone: 813.780.0006 Fax: 813.780.0005 vandeberg@ci.zephyrhills.fl.us "It's not the Plan that's important.... it's the Planning" From: Brad Kuhl<BradK@hamiltonengineering.us> Sent:Tuesday, December 4, 2018 9:24 AM To:Todd Vandeberg<tandeberg@ci.zephvrhills.fl.us> Cc: Kevie DeFranc<KDeFranc@ci.zephyrhills.fl.us>; Ryan McCaffrey<RvanM@hamiltonengineering.us>; Mike Lawson <Mike@metrodevelopmentgroup.com>;Sean Oconnor<Sean@metrodevelopmentgroup.com> Subject:ZEPHYR LAKES-HAMILTON ENGINEERING-KOSSIK RD Hi Todd, I wanted to follow up on our call and a-mails from last week to see if you needed any additional information or had any questions for me on the last Zephyr Lakes submittal. Thanks, EKGINEERIKG & SURVEYING. INC. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa,FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@hamiltonenaineerina.us I www.hamiltonenaineerina.us From:Todd Vandeberg<tandeberg@ci.zephyrhills.fl.us> Sent:Thursday, November 29,2018 8:58 AM To: Brad Kuhl<BradK@hamiltonengineering.us> Cc: Kevie DeFranc<KDeFranc@ci.zephyrhills.fl.us>; Ryan McCaffrey<RvanM@hamiltonengineering.us>; Mike Lawson <Mike@metrodevelopmentgroup.com>;Sean Oconnor<Sean@ metrodevelopmentgroup.com> Subject: RE: ROW#37216-ZEPHYR LAKES- HAMILTON ENGINEERING-KOSSIK RD You're welcome and we'll be in touch shortly on the resubmitted plans. 13 d �11 �! � r r, r ^� Zephyrhills I r ,� � , d �j 'Odd H. Tande Berg Director of Planning Planning Department City of Zephyrhills 5335 8th Street Zephyrhills, FL 33542 Phone: 813.780.0006 Fax: 813.780.0005 vandeber;@ci.zephyrhills.fl.us "It's not the Plan that's important.... it's the Planning" From: Brad Kuhl<Brad K@hamiltonengineering.us> Sent:Thursday, November 29,2018 8:56 AM To:Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us> Cc: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us>; Ryan McCaffrey<RvanM@ham iltonengineering.us>; Mike Lawson <Mike@metrodevelopmentgroup.com>; Sean Oconnor<Sean@metrodevelopmentgroup.com> Subject: RE: ROW#37216-ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Thanks again Todd for continuing to work with us. Do not hesitate to call or e-mail me any questions you might still have. A M I LT O ICI ENGINEERING 6 SURVEYING. INC. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W. Lemon Street,Tampa,FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@hamiltonenaineerina.us I www.hamiltonenaineerina.us From:Todd Vandeberg<tvandebere@ci.zephvrhills.fl.us> Sent:Thursday, November 29, 2018 8:54 AM To: Brad Kuhl<BradK@ ham iltonenginee ring.us> Cc: Kevie DeFranc<KDeFranc@ci.zephyrhills.fl.us>; Ryan McCaffrey<RvanM@hamiltonengineering.us>; Mike Lawson <Mike@metrodevelopmentgroup.com> Subject: RE: ROW#37216-ZEPHYR LAKES- HAMILTON ENGINEERING-KOSSIK RD 14 Brad, Yesterday, I received a call from Metro seeking an email that would provide the Zephyr Lakes Builders a comfort level of where the City Planning Department is at with the finalization of the Zephyr Lakes.construction plans. Please let this email serve as conditional approval of the construction plans with the understanding that Staff has received and is reviewing the amended set of construction plans addressing prior Staff comments. Following our last meeting there seem to be a positive understanding on both sides to complete the review process. Staff is currently reviewing the resubmitted plans and will confirm everything is ready to go. Of course other jurisdictional permits/approvals if not provided will also be necessary and/or can be conditioned with the Plan approval. Thank you and let me know if you should have any questions. Thanks, Zephyrhills a0 `'Odd H. Tande Berg Director of Planning Planning Department City of Zephyrhills 5335 8th Street Zephyrhills, FL 33542 Phone: 813.780.0006 Fax: 813.780.0005 vandeberg@ci.zephvrhills.fl.us "It's not the Plan that's important.... it's the Planning" From: Brad Kuhl<BradK@hamiltonensineering.us> Sent:Wednesday, November 7,2018 3:56 PM To:Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us> Cc: Kevie DeFranc<KDeFranc@ci.zephyrhills.fl.us>; Rodney Corriveau<RCorriveau@ci.zephyrhills.fl.us>; Ryan McCaffrey <RvanM@hamiltoneneineering.us> Subject: FW: ROW#37216-ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Hi Todd, I'm just keeping you updated. We are still working to address the second set of ROW comments I received this morning from Pasco ROW. They are attached. Thanks, 15 l` A I T O N !!NGINEERING i SURVEYING, INC. Brad Kuhl,P.E. Senior Project Manager/Vice President 3409 W.Lemon Street,Tampa,FL 33609 c 813.440.7043 1 o 813.250.3535 Ext. 125 bradk@hamiltonenaineerina.us I www.hamiltonenaineerina.us From: Row Permits [mailto:rowpermits@pascocountvfl.net] Sent:Wednesday, November 7, 2018 8:29 AM To: Ryan McCaffrey<RyanM@hamiltonengineering.us>; Brandy McKown<BrandvM@hamiltonengineering.us>; Brad Kuhl<BradK@ ham ilto'nengineering.us> Cc:Vanessa Rogers<vrogers@pascocountyfl.net> Subject: FW: ROW#37216-ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD Good Morning, Please find attached the comments from our Public Works Department to be addressed and resubmit a complete set of revised plans.Their comments indicate that there is a roadway crossing requiring an open-cut.The additional fee for an Open Cut Roadway Crossing is$120.00. Please send a check to cover this additional fee, made payable to Pasco County B.O.C.C. Thank You, and Have a Great Day! Gary From: Charles W. Wilson Sent: Monday, November 05, 2018 10:10 AM To: Row Permits Subject: RE: ROW #37216 - ZEPHYR LAKES- HAMILTON ENGINEERING - KOSSIK RD resubmit Chuck Wilson D A §JQCertified Engineering Inspector II Ci)U`'1tt�,' - Stormwater Management Pasco County P 727-834-3611 ex 1013 C 727-247-0852 4454 Grand Blvd. New Port Richey, FL 34652 cwilson@pascocountvfl.net www.pascocountvfl.net "Serving our community to create a better future." 16 From: Row Permits Sent: Wednesday, October 17, 2018 10:00 AM To: Destinee Coleman; Michelle M. Davis; Mike Bunk; Charles W. Wilson; Richard Jennings; Wayne Radke; William R. Williams; William Watkins; William Poon; Mary Thomas; Ahsan K. Khalil; Corelynn Howell Cc: Vanessa Rogers Subject: ROW #37216 -ZEPHYR LAKES - HAMILTON ENGINEERING - KOSSIK RD Hi All, Please find REVISED PLANS 10-17-18 in Sybmit 2 for your review. Thank You,, Gary Gary 0.Miller Sr. Development Review Tech. —P- 1 S C f.' Building Construction Services �.OU1'n, �" oIZII)A - Pasco County 727-847-8126 ext. 7636 8731 Citizens Drive,Suite 230 New Port Richey, FL 34654 gmiller@pascocountyfl.net www.pascocountyfl.net "Serving our community to create a better future." Tell us how we are doing by clickinq here Development Services Branch Social Media: 4 ICY "Bringing Opportunities Home" The information transmitted, including attachments, is intended only for the person(s) or entity to which it is addressed and may contain material that is confidential,privileged and/or exempt from disclosure under applicable law. Any review,retransmission, dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you received this 17