Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19-21689
CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780-0020 e2 BUILDING PERMIT ,:-k PERMIT INFORMATION LOCATION INFORMATION '_ Permit Number: 21689 Address: 38603 8TH AVE Permit Type: MECHANICAL ZEPHYRHILLS, FL. Class of Work: A/C CHANGEOUT Township: Range: Book: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Square Feet: Subdivision: CITY OF ZEPHYRHILLS Est. Value: Parcel Number: 11-26-21-0010-10400-0110 Improv. Cost: 7,450.00 OWNER INFORMATION Date Issued: 8/28/2019 Name: MOWREY, CATHERINE M. Total Fees: 80.00 Address: 38603 8TH AVE Amount Paid: 80.00 ZEPHYRHILLS, FL. 33542 Date Paid: 8/28/2019 Phone: (813)782-6404 Work Desc: A/C CHANGE OUT 3 TON CONTRACTORS .. APPLICATION FEES BAHR'S PROPANE GAS &A/C, INC. A/C CHANGEOUT 80.00 I Ihs ections Required DUCTS INSTALLED DUCTSINSULATED FINAL REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. ONTRACTOR SIGNATURE PERMIT OFFI R PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813 760 28 City Of LZeph3tffi111S Permit Application Fac-813--780,0021 Building Department l '�Dam Received Phone Contact for PermiRn+9 Y 19 ) I —v F �• Owner's Name CJ LQNi_{r yr%��y /L1L�11�1 Owner Phone Pdonb� �L r / Owm�sAddress�0-505 % Y I Ayc OwnerPhowBomber Fee Simple Tdlelwider Name l Own"Phone Ntprfber Fee SimpW TfltehotderAddress p JOB ADDRESS .1(003 9.+h AVM f �ry ,/��L T 0/ SUBDIVISION PARCEL 109 /� ��o)! d d 0 1164co 0 ' (OBMAmtEO FROM PROPOMTAX PICTICE) WORKPROPOSED e NEWODNSrtt(vJ ADDIALT p SIGN p p DEMOLISH INSTALL U REPAIR PROPOSED USE C] SFR p COMM p OTHER TYPE OF CONSTRUCTION p BLOCK p FRAME pR STEEL p DESCRIPIT.ON OF WORK r c . l& _ I Oorn r 3TQ w BUILDING SIZE SQ FOOTAGE= HEIGHT =BUILDING �� VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL ��$ AMP SERVICE p PROGRESS ENERGY = W.R.E.C. =FLUMBING (($ 1CHANICAL $ 1 j5()'- VALUATION OF MECHANICAL INSTALLATION- =GAS M ROOFING Q SPECIALTY= OTHER FINISHED FLOOR ELEVATIONS �� FLOODZONEAREA AYES NO BUILDER ( I COMPANY SIGNATURE t REG ID, Y J'N FEE CURFM Y!N Address (� License#r ELECTRICIAN i COMPANY SIGNA71L1RE ( REGISMW I YIN FEE cumte. I Y/N Address License#1 PLUMBER COMPANY SIGNATURE' REGMTERED Y/N FEE CURREn Y I N Address —�_. License iv Fn 7 --�,T�,, MECHANICAL COMPANY hr S rC/(-�f7� s cic -s f 1 SIGNATURE REGts7ERED I Y/N FWCURM• Y I N Address Ira i l .r, t Uwe# OTHER COMPANY SIGNATURE REGtS EKED I Y/N FEE CURREN Y/N Address Uoense.#F— ! III l! i i ! !'1 {! Ili //i i.F l.i l !i t-! ! / i l i i! 1-!,t t ! i! /1.1 1 i t-! 11 1 l l l l 1'! 1 !l i l 1'! 1 1 RESIDENTIAL Attscti.(2j Ph#PTwns;(2)sets cf Building Plans,(I)set of Energy Forms,.R-O-W Permit for;new owisUuUtion: Minimum ten(10)woftV days after submittal date.'ReWNW otsite.Cornsbuction Plans,Stomiwatar Plans v11 Sot Fence installed, San tW Facilities&1 dumpster:Site Work Pemit for subdivisiansparpe prated& COMMERCIAL. Adadt(2)complete sets of Building Piers plus a Ufa Se W I ase;(1)set of Energy Foram R-O-W Permit for nowcrorstruc6om. Minimum ten(10)vMdft days after submittal data. Requited onsits.Corstrutdim Plals;.S6omnratef Plans w/Silt Fence installed, Sanitary Facilities&1 dnarpster:Site Work Permit for all now projects.All commercial iequkemerds must meet compliance SIGN PERMIT Attach(2)sets of Flrgirteeled Plans. —PROPERTY SURVEY regnmed for all NEW corstrudion. . . . . . . . . . . . . . . . . .. . .. . . . ... . .. . . . . . . . . . . Directions: Fill out application completely. Owner&Contractor sign bads of application,notarized If over$25W,a Notice ofCommencement is required. (AIC upgrades over$7500) Agent(far the contractor)or Power of Attorney(for fhe owner)would be someone with notermad letter from amw aulhon2ing same OVER THE COUNTER PERMITTING (oopy of contract required) Remofs N shingles Sewrws Service Upgrades A/C ' Fences(Ptat/SurveylFootage) Driveways-Not over Counter if on public roadways-needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. ~ UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the contractor is not-licensed as required.by.law,.both the owner and contractor may be cited for a misdemeanor violation under state law. If'the owner or in contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised,to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner-has hired_a contractor or contractors, he is advised to have the contractor(s) sign portions of the"contractor Block"of this application for which they will be responsible. If you,as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings,or.expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended. The undersigned also-understands,that such fees;as may be due,will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit Issuance. Furthermore,if Pasco County Water/Sewer Impact. fees are due,they must be paid prior to pernit.issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I certify that I, the applicant, have been provided with a copy'of the "Florida Construction Lien Law—Homeowner's Protection Guide"prepared-by-the Florida-Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to-the"owner"prior to commencement CONTRACTOR'S/OWNER'S AFFIDAVIT:,.I certify that all the,infornation in this application is accurate and that all work will be-done in compliance with all applicable laws regulating construction,zoning-and-land development Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations In.the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended worts,and that it is my responsibility to identify what actions 1 must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls,Docks;Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic.Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone"V"unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to-be used in Flood Zone"A"in connection with a permitted building using stem wall construction,I-certify that fill Will be used only to fill the area Within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application,for lots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER;I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs,wells, pools, air conditioning,gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside.any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errois'in plans,construction or violations of any codes. Every permit issued.shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commented.. An extension may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO!OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,-CONSULT WITH YOUR LENDER-OR AN•ATTORNEY BEFORE RECORDING YOUR NOTICE-OF C MENCEMENT. FLORIDAJURAT(F.S.117.03) OWNERORAGENT _ CONTRACTOR' Subscribed and swom to(or affirmed)before me this Subscribed and to(or affirmed)before me this by Who islare personally known to me or has/have produced Who is/are personally known to me or has/have produced as identification. as identification. Notary Public Notary Public Commission No. - Commission No. Name of Notary typed,printed or stamped Name of Not ary typed,printed or stamped • - AND;AIG°�c5 "S:ervFranklin ><cr� ;rd`er ��p roposah 988 . "l -725Q:�. Invoice , WORK Q,RDER#/SERV ICEMAN 100424 AUG Sales, se vice I}ATE/TIhfE TAF:El�1 08/14/1`3 14�.a�9 4441 Allen.Rd.: t Zephyrhills-; FL 3354,1� TAKEN 'g.Y F',IM r. DATE/TIME PROMISED 08/15/19 08:0,0 , NOTES:; _,CUSTOMERd#/LOCATION - AC 955 " PHONE# d'- - •'ROUTE/SE01 AUG MOWE.RY"CATHERINE --M:a :. , .....:.- -- ,:.,._. ... MOWERY- CATHE-RINE M. 38603 8TH AVE 38803 8TH AVE, ZEPHY•RHILLS FL,-33542,- ',:. ZEPHYRHILLS ESTIMATE DE GF21F?TION OF tRI< C�TI'.n AST RIALS&.SERUIGES w„ m. U(51T PRICENMOUNT v �r/ii _ J Gf 4' ..J b ✓ L 1. -Z..7 /i [i /tom' I.' .1 50 IC1 fc- oe src V " Annual Maintenance f2ecammended by Atl€qufpment Manufaetur`ers. I I f _ Pressures. Lo HIS T-Stat:> I. r AM/ I % V , y R 7R- Lss. s}Perlbs' S' A: =z _v,... .•_,.... • %fO rvFILTER5 x. x• Changed Monthly. F{LTER$: x x Changed Morrthty, 0"REGULAR-, D-WARRA_NT_Y- :^d TOTALSUMMAF2`t _'._ De • < <. .I� ,.�. ::-- -• hmetgs;Whe.n..hereom, W henAway. ° T Stat )NTRACT; _ SERVICE _ I �+..rr ,xA�, �. :;CALL I UMiTEDjWARRAIVI Y:_All materials,parts and equipment are wammt0.by the'manttfaclureis: MET(-(R p (?AYtV1ENT_ or suppliers'v+ri[ien.warranfy Doty,Ali labor performed by fhe above named company is warranted for -.; � � 30,da s or as;tithenvise indicated in writing.The above Omed,Ompany makes ho otherwarrantias TOTAL I express or implied,:and its agents'ortechfiicans are not authorized.to make any such:ivarrapu.es on - ."-- R _. _ M:4TERlALS.- behattofatiovenamed,company., ;:` U�DEBIT O.CREDIT`0'QTHER: MAI I . . ..: � FROG. W! C I �I have auttmdry�to order the wotiC'oetlined above;which has been satlsfactoriy'completed.I agma�that Seller -' - _ " ,refalns title!o equipmentlmateitals;ruinlstieG,,uritir Tinaf"payment Is mado.If paymerlCis ngt'matle_as agr©ed;. (-,(;;AIM#•• se0et=can cemova'said equipirientltrtateriatsatSaliets'expet>se.Arty damage resulting from soli!iemovai.shait. not be the iespdrisibitiiy of Setier.:NET 3d,DAea.A'1•12%SERVICE CHARGE WILI.,SE ADDED.MONTHLY DATE COMPLETED, �v � ��d.- ALL UNPAID BALANCES OVER 3p DAYS.NO,REEUNDS.,." _ - ,� TAX.. 1; TECH:, t;IL ''CUSTOMER SIGNATURE:_ .. r.,:.;Y"..' ' 'DATE ... _ _ ✓�- ✓�� I" DUCT CERTIFICATION FOR INSTALLATION OF NEW DUCT WORK OR MODIFICATION OF THE EXISTING DUCT SYSTEM FLORIDA ENERGEY CONSERVATION CODE (FBC ENERGY,SECTION 403)TO BE LEFT ONSITE AND PICKED UP BY INSPECTOR Owner: nct, Q �- Permit#: 0? 1(P D—I Site Address: O OTI/) A V eJ Contractor: t5 PCQWLnb 60� 'I0, T-nC, License#: Final Inspection Date: „ I certify that I have installed new or modified the existing duct work associated with the HVAC system referenced by the permit listed above and found it complies with the requirements FBC Energy Code, Section 403.3.Where modified,the existing ducts have been sealed using reinforced mastic or code- approved equivalent. Ducts are located within conditioned space (Section 403.3)System was tested as per FBC Energy code,section 403.3.2.1.All new duct work is to comply with FBC Energy 403.2 and FBC Mechanical chapter 6. ia 2- L6hr Name of License Holder(print or type) Signature of License Holder r-u � add a t DUCT CERTIFICATION FOR INSTALLATION OF NEW DUCT WORK OR MODIFICATION OF THE EXISTING DUCT SYSTEM FLORIDA ENERGEY CONSERVATION CODE (FBC ENERGY,SECTION 403)TO BE LEFT ONSITE AND PICKED UP BY INSPECTOR Owner: Permit#: Site Address: 3"�d(003 Sth Avg Contractohrs Pro cane, GaS4 �}I c =nG License#: C�co3� Final Inspection Date: 1 ( Jl 9 I.certify that I have installed new or modified the existing duct work associated with the HVAC system referenced by the permit listed above and found it complies with the requirements FBC Energy Code, Section 403.3.Where modified,the existing ducts have been sealed using reinforced mastic or code- approved equivalent. Ducts are located within conditioned space (Section 403.3)System was tested as per FBC Energy code,section 403.3.2.1.All new duct work is to comply with FBC Energy 403.2 and FBC Mechanical chapter 6. Name of License Holder(print or type) Signature of License Holder t