Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19-22112
CITY OF ZEPHYRHILLS 5335-$th Street (813)780-0020 22112 ELECTRICAL PERMIT PERMIT INFORMATION LOCATION INFORMATION Permit#:22112 Issued: 1/17/2020 Address: 36212 SHADY BLUFF LP LT1 Permit Type: ELECTRICAL MISC ZEPHYRHILLS, FL. Class of Work: ELECTRIC SERVICE/NEW Township: Range: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Sq. Feet: Est. Value: Book: Page: Cost: 23,587.20 Total Fees: 307.50 Subdivision: SILVERADO Amount Paid: 307.50 Date Paid: 1/17/2020 Parcel Number: 04-26-21-0060-00300-0010 CONTRACTOR INFORMATION OWNER INFORMATION Name: MOMENTUM SOLAR Name: ANDERSON JAMES E & LINDA Addr: 8248 PARKLINE BLVD STE 100 Address: 36212 SHADY BLUFF LOOP ORLANDO FL 32809 ZEPHYRHILLS FL 33541-2725 Phone: (321)247-6073 Lic: Phone: 813-380-6783 Work Desc: INSTALLATION ROOF MOUNT PHOTO VOLTAIC SOLAR APPLIGATION FEES ELECTRICAL FEE 240.00 BUILDING Et 67.50 INSPECTIONS R QUIRED ° ROUGH ELECTRIC CONSTRUCTION POLE PRE-METER FINAL REINSPECTION FEES:(c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. CONTRACTOR PER OFFI PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-813-780.0021 Bulldmg'Department Date Received �_ 9 O�7 �7 _�, Phone Contact for Permittin Tr-1T1-1TI- Ownees Name Linda Anderson Owner Phone Number Owner's Address 1 36212 Shady Bluff Loop Zephyrhills,FL 33541 Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS 36212 Shady Bluff Loop Zephyrhills,FL 33541 LOT# SUBDIVISION Silverado Ph 1A PARCEL ID# 0426210060003000010 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT = SIGN = = DEMOLISH e INSTALL a REPAIR PROPOSED USE Q SFR 0 COMM = OTHER Dar TYPE OF CONSTRUCTION = BLOCK 0 FRAME = STEEL = DESCRIPTION OF WORK Installation of photo voltaic solar panels on rooftop BUILDING SIZE I SQ FOOTAGE HEIGHT UILDING $�3 S �7 VALUATION OF TOTAL CONSTRUCTION $23,587.20 ELECTRICAL $ AMP SERVICE 8.19KW = P GRESS RGY = W.R.E.C. ZZ v =PLUMBING $ 0� G� =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION U `n/► (n J� S Z T =GAS = ROOFING 0 SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ,�NE AREA =YES NO C y1 T BUILDER COMPANY Momentum Solar SIGNATURE 11) REGISTERE Y/ N FEE CURREN I Y/N Address 8248 Parkline blvd Ste 100 Orlando,FL 32809 License# I CVC57036 kERED ELECTRICIAN Y Momentum Solar SIGNATURE Y/ N FEE CURREN Address 8248 Parkline blvd Ste 100 Orlando,FL 32809 License J EC13008217 PLUMBER COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREN Y/N Address License# MECHANICAL COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Y/N Address I License# OTHER COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN L11N Address License# RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormmwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement Is required. (AIC upgrades over$7500) •• Agent(for the contractor)or Power of Attomey(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the"contractor Block"of this application for which they will be responsible. If you, as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'SIOWNERIS AFFIDAVIT: I certify that all the information in this application is accurate and that all work Will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone"V"unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction,I certify that fill will be used only to fill the area Within the stem wall. - If fill material is to be used in any area, I certify that use of such fill Will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application,for lots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced Within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S 17.03)„ OWNER OR AGENT / .d1_01)QD CONTRACTOR 1181 bed and sw m to( rr affirmed before me this $ bs 'bed nd swo to(or affirmed)before_�n this , by �If IC>Gf'L L'i 1 ll 16 ZO1 by o re personally known to me or hasfhave produced lqnre p Esonally known to me or has/have produced as identification n as identification. Notary Public Notary Public Commission No. 1 Commission No. STr�.ra SALGAuO pasty pu,,e Namel0fgqJ�ty�AMted or stamped Name of Notary typed,printed or stamped �i, M pMMISSION�'GG 014480 MY COMMISSION#GG 014460 * E.XPIRES:July 21,2020 m Q EXPIRES:July 21,2020 ^,, oe �9rF o��� Bonded Thru Budget Notary Services `c�F �� Bonded 7hru Budget Notary SefylGes OFFe INSTR#2019196533 OR BK 1 0007 PG3558 Page 1 of 1 S/H 1 11/19,/2019 08:54 AM Rept:2109456 Rec:10.00 DS:O.GO IT:0.00 Nikki Alvarez-Sowles,Esq.,Pasco County Clerk&Comptroller - cl Permit Number. STATE OF FLORIDA,COUNTY OF PASCO Folio/Parcel ID IP 0426210060003000010 Prepared by: - Lauren El-Taher/Momentum Soler HIS IS TO CERTIFY THAT THE FOREGOING lc` 8248 Parkline Blvd.Suite 100 0 RUE AND CORRECT COPY OF THE DOCUME Orlando FL 32809 N FILE OR OF PUBLIC RECORD IN THIS OFF Return to: Momentum Soler Co 1 NES ,.MY HAND AqD OFFICIAL SEALTHIS� 8248 Parkline Blvd.Suite 100 DAY OF fqo(�erA�1 2D A, Odando,FL 32809 L K&COMPTROLL • NOTICE OF COMMENCEM By, DEP TY CL State of Florida,County of The undersigned hereby gives notice that improvement will be made to certain real property,and in accordance with Chapter 713,Florida Statutes,the following information is provided in this Notice of Commencement. 1. Description of property(legal description of the property,and street address if available) Silverado-Phase 1A PB 61 PG 071 Block 3 Lot I OR 9319 PG 2260/ 2. General description of improvement 36M Shady tJIUTT LOOP,Zephyrrhills,FL,3354T-- Installation of photo voltaic solar panels on rooftop 3. Owner Information or Lessee information if the Lessee contracted for the Improvement Name Linda Anderson&James Anderson Address 36212 Shady Bluff Loop,Zephyrhills,FL,33541 Interest in Property Owner Name and address of fee simple titleholder(if different from Owner listed above) Name N/A Address 4. Contractor Name Momentum Solar/Cameron Christensen _ Telephone Number 321-247-6073 Address 8248 Parkline Blvd.Suite 100,Orlando,FL- 32809 5. Surety(if applicable,a copy of the payment bond is attached) Name N/A relephone Number Address Amount of Bond 6. Lender Name N/A Telephone Number Address 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by§713.13(1)(a)7,Florida Statutes. Name N/A Telephone Number Address 8. In addition to himself or herself,Owner designates the following to receive a copy of the 1-119nor's Notice as provided In§713.13(1)(b),Florida Statutes. Name N/A Telephone Number Address 9. Expiration date of notice of commencement(the expiration date Will be 1 year from the date of recording unless a different date is specified) WARNING TO OWNER:ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713,PART 1,SECTION 713.13,FLORIDA STATUTES,AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION.IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH,YPUR LENDER;7 ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Owner Signature of Owner or Lessee,or Owners or Lessee's Authorized Officer/Director/PartnerManager Signatory's Title/Office The foregoing instrument was acknowledged before me this 18 day of 11/19 by Linda Anderson mongFe-a—r name of person as Owner for Type of authority,e.g.,officer,trustee,attorney In fact Name of party on behalf of whom Instrument was executed Z Signature of Notary Public-State of Florida Print,type,or stamp commissioned name of Notary Public Personally Known PR Produced ID X Type of ID Produced_ D.L.- Notary Pubrie State of Florida 4 fAGN Lauren E EI-Taher 'W My commission GG 298001 Expires 0210412023 I ' Parcel ID 04-26-21-0060-00300-0010 (Card: i. of 1) Classification 00100-Single Family Mailing Address Property Value ANDERSON JAMES E &LINDA Ag Land $0 36212 SHADY BLUFF LOOP Land $26,976 ZEPHYRHILLS, FL 33541-2725 Building $157,046 Extra Features $1,324 Physical Address 36212 SHADY BLUFF LOOP, Just Value $185,346 ZEPHYRHILLS, FL 33541 Assessed (Non-School Amendment 1) $181,280 Legal Description (First 200 Homestead -$25,000 characters) Additional Homestead -$25,000 See Plat for this Subdivision Non-School Taxable Value $131,280 SILVERADO - PHASE 1A PB 61 PG School District Taxable Value $156,280 071 BLOCK 3 LOT 1 OR 9319 PG Warning: A significant taxable value increase may occur 2260 when sold. Jurisdiction Click here for details and info. regarding the posting of CITY OF ZEPHYRHILLS exemptions. Land Detail (Card: 1 of 1) --- - - _ _ --- - "-- -- ---------- - -- - - - ----- -- - -- ------- --"Line Use :Code ;Description Zoning',Units ;Type 'Price 'Condition Value 1 010OR CP1-1 SFR MPUD z 6,000.00 SF $4.40 1.00 $26,400 2 010OR CP1-2 SFR MPUD = 1,441.00 SF $0.40 1.00' $576 Additional Land Information Acres Tax Area FEMA Code Res Code Corn Code Condo Code 0.17 30ZH -- SLVR SLVR SLVR View Sketch Building Information - Use 0100-Single Family Residential (Card: 1 of 1) Year Built 2016 . Stories 1.0 Exterior Wall 1 Concrete Block Stucco Exterior Wall 2 None Roof Structure Gable or Hip Roof Cover Asphalt or Composition Shingle Interior Wall 1 Drywall Interior Wall 2 None Flooring 1 Ceramic Clay Tile Flooring 2 Carpet Fuel Electric Heat Forced Air - Ducted /C Central Baths 2.0 Line Code 'Description Sq. Feet_ 'Value 1 BAS01 LIVING AREA 1,730 $138,688 2 FGR01 FINISHED GARAGE 418 $13,388 3 FOP01 FINISHED OPEN PORCH 246 $4,970 Extra Features (Card: 1--of-1) ------- --------- ---- ----- -- -- - ----- Line :Code 'Description Year Units Value 1 RDWSWC1 DRVWAY/SIDEWALK CONC 2016 542 $1,324 Sales History Previous Owner: HIGHLAND HOLDINGS INC Month/Year Book/Page :Type DOR Code Condition Amount 01/2016 9319 / 2260 Warranty Deed 01 Vacant $200,300 03/2015 9163 / 1299 Warranty Deed 05 Vacant $0 09/2011 8606 / 3376 Warranty Deed 05 Vacant $0 05/2010 8373 / 1912 Certificate of Title 12 Vacant $0 07/2005 6725 / 1059 Quit Claim Deed - _ - - Vacant-- - $0 II City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeo caner: M 0 Mej4 a Date Received: N, 9~� Site: ZL Z- \�>k A AlAg- Permit Type: /l,l�� �/ 1 WI -140 Approved w/no comments: Approved w/the below comments: ❑ Denied w/the below comments: ❑ This comment sheet s alnbe kept with the permit and/or plans. NOV Kal ' w' zer—Plans Examiner Date Contractor and/or Homeowner (Required when comments are present) Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net November 15,2019 Re:Proposed Photovoltaic Solar Panel Installation Linda Anderson 36212 Shady Bluff Loop Zephyrhills,FL 33541 Dear Plan Reviewer: Certification:I have reviewed the engineering testing reports for the racking and attachments to be used on this project and I certify that the products are capable of supporting the code required loads and are suitable for this installation when installed in strict compliance with the manufacturers printed instructions. Regarding the solar panel array installation on the above referenced project please note that an inspection was performed by a representative of the Architect/Engineer of Record,and analysis of the existing structure was conducted.There is adequate structural capacity for the installation of the array with the following recommendations: 1.The array will be installed on the existing roof.The roof framing is constructed of 2"x4"wood trusses @24"o.c. spanning 19'11"with a top chord length of 8'4"with intermediate supports at 1/3rd points,making the effective longest span equals 217'with with 1/2"plywood sheathing.The new array(See Site map by contractor)will add 2.63 Lb./Sf overall to the roof.No additional structural support is required for the roof structure. 2.The system shall be secured to the roof using the"Ecofasten Solar""Rock-IT"®attachment system.The installation shall be in strict compliance with manufacturers printed instructions.The attachment system shall be UL 1703 approved tested.The attachments shall be min.5/16"x 4"long stainless-steel lags with a min.embedment of 3" into the rafters.Attachments shall be @ 48"o.c.max.in roof wind zone 1,@ 24"o.c.max.in roof wind zone 2,&3, lags to alternate rafters.Provide 6 mil.vapor barrier between dissimilar metals.Provide water tight gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the system manufacturer's installation manual.The panel angle shall match the roof slope. 3.Solar Modules shall be UL-1703 rated.Refer to manufacturers specifications sheets. 4.Positive drainage of the system shall be so as not to void the existing roof warranty. 5.All aspects of the installation shall comply with the Florida Administrative Code,2017 Florida Building Code- Residential Sixth Edition,ASCE-7-10,2017 Florida Building Code—Energy Conservation,Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.All components used meet the criteria of the Florida Solar Energy Center. 6.Please refer to the attached structural calculations. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. OF o PNIEL Daniel W.Dunzik,RA.LEED-AP FL.Lic.No.AR98795 gR9879g �&,;ARCS®'� Daniel W. DUnzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net November 15,2019 Gravity Load Calculation Criteria Structural Design Loads per ASCE 7-10 Dead Loads= 10 psf+2.6 psf(new solar panels)= 12.6 psf Roof Live Load=20 psf Ground Snow Load=0 psf Wind Load Calculation Criteria Wind Loads per ASCE 7-10,Ch.30 method 1 Using an area of 10 SF,wind loads from Figure 30.5-1: Zone 1 =-32.3 psf Roof Slope=20 degrees Roof Mean Height= 15 ft Zone 2=-56.2 psf Basic Wind Speed= 140 mph Zone 3=-83.1 psf Exposure=B Per section 2.4.1,ASD combo=D+0.6W: Zone 1 =2.6 psf+0.6(-32.3 psf)_-16.8 psf Zone 2=2.6 psf+0.6(-56.2 psf)_-31.1 psf Zone 3=2.6 psf+0.6(-83.1 psf)_-47.3 psf Check Attachment to Wood Truss Use 5116 dia.Lag screw w/3"embedment into 2 in.wide roof rafter Lag Screw Spacing: Lag Screw Tributary Area: Zone 1 = 48"o.c.max Zone 1 =(48"o.c.max)^2/144= 16 SF Zone 2= 24"o.c.max Zone 2=(24"o.c.max)^2/144=4 SF Zone 3= 24"o.c.max Zone 3=(24"o.c.max)^2/144=4 SF Lag Screw Forces: W=266lb/in(Table 12.2A,2015 NDS) Zone 1 = 16.8 psf x 16 SF=269 lb < W', OK Cd= 1.6(Table 2.3.2,2015 NDS) Zone 2=31.1 psf x 4 SF= 124 lb < W', OK Ct= 1 (Table 2.3.3,2015 NDS) Zone 3=47.3 psf x 4 SF= 189 lb < W', OK W'=W x embed x Cd x Ct W'=266 lb/in x 3 in.x1.6 x 1 = 1276.8 lb powered by i 0 DUO -G 3 QM PUO BLk 20 i . I SOLAR .i The new Q.PEAK DUO BLK-G5 solar module from.Q CELLS impresses with its outstanding visual-appearance and particularly-.high performance on.a 'small surface thanks to the-.innovative.Q.ANTUM-DUO technology. 1ANTUM's world-record-holding cell.:concept-has now been:combined with state-of-the-art.circuitry half cells and a-s.ix-busbar design,.thus. achieving outstanding performance under real conditions — both with low-intensity solar radiation as well.as on hot, clear summer days. MANTUM TECHNOLOGY:LOW LEVELIZED COST OF ELECTRICITY G Higher yield per surface area, lower BOS costs, higher-power classes,and an efficiency rate of up to 19.3%O. r INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields,whatever the weather with excellent low-light and temperature behavior. J ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID technology, -OCELLS, Anti PID Technology', p y TM. I gy, Hot-S of Protect.and Traceable Quality Tra.Q STOP BR/WD-PV EXTREME WEATHER RATING EUROK High-tech aluminum alloy frame,certified for high snow �2017 (5400Pa)and wind loads(4000Pa)regarding IEC. O A RELIABLE,INVESTMENT Inclusive 12- ear product warranty and 25 ear �rawud a'' y P tY y quality Tested linear performance guarantee2. '.n.d.9 Ieakallo wmun:w.m.� STATE OF THE'ART MODULE TECHNOLOGY ID.40032587 Q.ANTUM DUO combines cutting edge cell separation And innovative wiring with Q.ANTUM Technology. APT test conditions according to IEWS 62804-1:2015, method B(-1500V,168h) 2 See data sheet on rear for further THE IDEAL.SOLUTION FOR: information. ®Rooftop arrays on residential buildings. Engineered in Germany O-CELLS I. n - MECHANICAL SPECIFICATION Format 66.3 in x 39.4in x 1.26 in(including frame) (1685mm x 1000mm x 32mm) Weight 41.2lbs(18.7kg) + Front Cover_- 0.13in(3.2mm)thermally pre-stressed glass with anti-reflection technology Back Cover. Composite film no° Frame Black anodized aluminum a, Cell' 6 x 20 monocrystalline Q.ANTUM solar half-cells Junction box. 2.76-3.35in is 1.97-2.76in x 0.51-0.83in (70-85mm x 50-70mm x 13-21mm),decentralized;IP67 + .•MmE�LLaA1RYLY Cable 4mmzSolarcable;(+)a43.3in(1100mm),(-)a413in(1100mm) ���•��� ,°uL°,,,p,,m I-� Connector Multi-Contact MC4,IP65 and IP68 tea.°�I Qlovrw�u ELECTRICAL CHARACTERISTICS POWER CLASS 300. 305 316 315 320 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-O W) - Power at MPP° P,,,, IW] 300 305 310 315 320 Short Circuit Current* I. [A] 9.72 9.78 9.83 9.89 9.94 _ .Open Circuit voltage* VAc [V] 39.48 39.75 40.02 40.29 40.56 E Current at MPP` I,,,, [A] 9.25 9.31 9.36 9.41 9.47 Voltage at MPP• Van IV] 32.43 32.79 33.12 33.46 33.80 Efficiencyz rl. [%] z 17.8 z 18.1 z 18:4 Z 18.7 Z 19.0 MINIMUM PERFORMANCE AT'NORMAL'OPERATING CONDITIONS;NOCa Power at MPPz Pur, IW] 222.3 226.0 229.7 233.5 237.2 E .Short Circuit Current* lac [A] 7.84 7.88 7.93 7.97 8.02 e Open Circuit Voltage' VAc IV] 36.93 37.18 37.43 37.69 37.94 m Currant at MPP.• I„" [A] 7.28 7.32 7.36 7.41 7.45 Voltage at MPP• V_ M 30.55 30.88 31.20 31.52 31.84 11000W/m2,25°C,spectrum AM 1.5G 'Measurement tolerances STC x3%;NOC x5% 3800W/m2,NOCT,spectrum AM 1.5G 'typical values,actual values may differ Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE G��w -uo --r-----r------ ----i---- _ -.csr At least 98%of nominal power during first year. a? i, Thereafter max.0.54%degradation per year. 23 W r ---'------------------- At least 93.1%of nominal power up to 10 years. F At least 85%of nominal power up to 25 years. ' t;l: All data within measurement tolerances. _� ® --r------r------------------- Full warranties in accordance with the warranty terms of the Q CELLS sales organization of your -- - respective country. zm .m mo b IRRADIANCE IWAA21 z n 4 mw�m�w u•�orvw yEaas Typical module performance under low irradiance conditions in comparison to STC conditions(25°C,1000W/m2). .TEMPERATURE COEFFICIENTS ry Temperature Coefficient of Icc a I%/K1 +0.04 Temperature Coefficient of Va. R [%/IQ -0.28 d Temperature Coefficient of P. V' , I%/IU -0.37 Normal Operating Cell Temperature NOCT [71 113 f 5.4(45 d:3'C) �7 Y PROPERTIES FOR SYSTEM DESIGN m O Maximum System Voltage Vs.. M 1000(IEC)/1000(UU 'Safety Class II Maximum Seiles Fuse Rating. [ABC] 20 "Fire Rating. C(IEC)/TYPE 1(UL) d Design load,push(UL)° Ilbs/1119 75(360OPa) Permitted module temperature -40°F up to+185°F on continuous duty. (-40°C up to+85°C) Design load,pull(UL)2 [li sRtz] 55.6(2666Pa) P see installation manual 0. QUALIF ICATIONSI CERTIFICATES PACKAGING INFORMATION UL 1703;VDE Quality Tested;CE-compliant; Number of Modules per Pallet 32 IEC 61215(Ed.2);IEC 61730(Ed.])application class A Number of Pallets per"53'Trailer 30 S ® Number of Pallets'per40'Nigh Cuba Container, 26 wE C -E `�' Pallet Dimensions(L x W x H) 69.3 in x 45.3 in x 46.9 in G ,r us uyra, (1760mm x 1150mm x 1190mm) Pallet.Weight 1415lbs(642kg) - NOTE:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use - of this product. Hanwha Q CELLS America Inc. 300 Spectrum Center Drive,Suite 1250,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiry®us.q-cells.com I WEB www.q-cells.us Data Sheet ` Enphase Microinverters Region:AMERICAS The high-powered smart grid-ready .Enphase-� Enphase IQ.7 Micro' and Enphase IQ 7-:Micro'M IQ 7 and 1Q 7+ dramatically simplify the installation process while achieving the highest system efficiency. Microinverters Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy', Enphase IQ BatteryTM,and the Enphase EnlightenTM monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install Lightweight and simple ' Faster installation with improved,lighter two-wire cabling ! Built-in rapid shutdown compliant(NEC 2014&2017) Productive and Reliable • Optimized for high powered 60-cell and 72-cell*modules • More than a million hours of testing • Class II double-insulated enclosure • UL listed 0 Smart Grid Ready psi • Complies with advanced grid support,voltage and XWqq frequency ride-through requirements +� Remotely updates to respond to changing grid requirements Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) The IQ 7+Micro is required to support 72-cell modules. To learn more about Enphase offerings,visit enphase.com '"4'�. EN PHAS E. Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA(DC) IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Isc), 15 A 15 A. Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage/range2 240 V/ 208 V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency. 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles- 5.8 Arms 5.8 Arms Maximum units per 20 A(L-L)branch circuit3 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6°i 97.6% 97.5°i 97.3 i CEC weighted efficiency 97.0% 97.0°i 97.0% 97.0°i MECHANICAL DATA Ambient temperature range 400C to+65°C Relative humidity range 4%to 100°i(condensing) Connector type(IQ7-60-2-US&"IQ7PLUS-72-2-1jS) MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Connector type(IQ7-60-B-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Cooling Natural convection_No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor . FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at htt sp //enphase.com/en-us/support/module-com atn ibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com E N P HAS E. @ 2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 1 L Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman,NJ.08558 908-872-3664 January 29,2018 Building-Department Attn:Plan Reviewer Re:Proposed Photovoltaic Solar Panel Installation Dear Sir: I have reviewed the following documents related to the"EcoFasten Solar"ROCK-IT SYSTEM 4.0 and certify that the attachment system when installed in strict compliance with the manufacturers Installation Manual appropriate for this application and is in compliance with the latest building codes including Florida Administrative Code,2017 Florida Building Code-Residential Sixth Edition, ASCE-7-10,2017 Florida Building Code—Energy Conservation, Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.I make this certification for the following listed documents: 1. ROCK-IT SYSTEM 4.0 Installation Manual 2. PZSE,Inc Structural Engineers Certification. 3. EcoFasten Solar Certificate No.US 82150026 4. ROCK-IT SYSTEM 4.0 Cut Sheet for Coupling,Hybrid Coupling, and Mount. If you have any questions relating to this matter,please contact me at your earliest convenience. Thank you. D fir — : o Daniel W.Dunzik,RA.LEED-AP •�� Fl.Lie.No.AR98795 AR98795�c�'•, ;V Cut Sheet - Rock-H-4.0-Coupling 1. Installation to be completed in accordance with.manufacturer's written specifications-and installation instructions. 2. See spec.sheet or contact manufacturer1or detailed material;finishes,and configuration options. 3. Contact manufacturer for detailed-layout. 4. Do not scale drawings. 5. Subject to change without notice. 3.17in 0 A& W L8' O:54mm 7,00in L-1 77.80mm't 2.02in o 2.14in 2.34in [ r .5 M 54.37mm 9.36mi5l_38mml L 1-k 32mm 35MM 40mm Fasten Solae 4741 W Polk Stree Ste.-4 aQ Eco v Phoenix,AZ 85043 Toll Free Phone 1.888.766.4273 Toll Free Phone-1*'877.859'3947 Material:See Spec Sheet Toll Free Fax 1*.888.766.9994 Toll Free Fax 1.. - 888.766.9994 Scale: 1:4 6128'/2017 AS EFS': X � t Cut Sheet - Rock-It-4.0-Hybrid Coupling 1. Installation to be completed in accordance with manufacturer's written specifications-and installation instructions. .2. See spec.sheet or.contact manufacturer for-detailed material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. I 3.16in ® ® ® [80.29mm] 7.00in [177.80rnm] m 5.00in 127mm I I ' 2.02in 2.14in 2.34in I� [51.38mm] [54.37mm] [59.36mm] 32mm. 35mm 40mm ---ALPINE _ E�:bB,teffi Sol 4741 W Polk Street Ste.4 �f111VYY V UARI�B v Phoenix,AZ�85043 Toll Free Phone 1.888.766.4273 Toll Free Phone I*877:859.3947 Material:See Spec Sheet Toll Free Fax 1.888.766.9994 Toll Free Fax 1..888-.766.9994 Scale: 1:1 6/28/2017 Ei'$: .X 1` .-ROCK-IT SYSTE w 4,O RAIL-FREE RACKING UTILIZes ECOFasTen sOLars PaTenTeo-TeCHnOLOGY ®Qe Ecorasten Solar° C aste oF4 n SolarD committed to the connection Document Date:.9.8.2017 t C Contents Pg. 1 ................................................................................................................................................... Assets of.Design Features- System Components Pg. 2 ............................................................................................................................. Rock-it 4.0 Mount Assembly Rock-It 4.0 Coupling.Assembly Pg. 3 ............................................................................................................ Rock=lt.4.0 Hybrid Mount Assembly Rock-It.Clip SS Assembly Rock-It Clip 2.0 Assembly Pg. 4 ............................................................................................................................................... ......... Array Layout GreenFastenn-Flashing Install Pg. 5 ................................................................................................................................... Rock-it System 4.-0 Install Pg. 6................................................................................................................................................. Ground Lug.lnstall Pg..7 .......................................................................................................................................... Rock-It-Clip SS Install Rock-It Clip 2.0-Install ..................._.._............................................................................ Standoff Spacing Tables Snow Load 0-20-psf Snow Load 21-30 psf Snow.Load 31-40 psf Snow Load 41-50 psf "Snow-Load 51-60 psf Pg. 13 ..................................................................................................................................._ Grounding Information Bonding Assembly and Bonding Path Pg. 14..................................--••........................................................................... Thermal Expansion and Bonding Bracket Spacing Staggered layout Cantilever Pg. 15.. . ..................................................._................................... System.Specifications ............................................ Evaluated, Compatible.Modules z ROCK-IT SJ- STeM. 4.0 Designed with the installer in mind. EcoFasten Solar specializes in solar-roof attachments that are fast and-easy.to install;straightforward,secure and cost-effective.EcoFasten offers a wide variety of standard products as well as custom solutions,for a one-stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved-above and beyond industry standards in-house:and by third party agencies. EcoFasten's patented conical sealing system has been in service in the snow guard and solar industries for two decades. FeaTu res • New and improved design • North-South adjustability • Fastest,easiest to level system on the market • Only one tool required(1/2"deep well:socket). • Integrated electrical-bonding • Vertical adjustment of 3"-4" • SIMPLE-only 4 components SgSTem COmPonenTS* - recQulreD t ROCK-IT SLIDe ROCK-IT 4.0 ROCK-IT 4.0 COUPUnG ROCK-IT 4.0 4" For comp SHinGLe MOunT & LOaD BearinG FOOT array sKirT 8":For TILe SYSTem comPOnenTS* - OPTIOnaL \ ,a� ROCK-IT CLIP SS ®O�EcoFasten,Solar _ (ReFer TO PG.6) V EcoFasten Solar products are protected bythe following U.S.Patents: C 8,151,522 8,153,700 8,181,398 8,166,713 8,146;299 ROCK-IT 4.0 8,209,914 8,245,454 8,272,174 8,225;557 9,010,038 ROCK-IT 4.0 Array SKIrr 9,134,040 9,175,478 9,212,833 HuBrID MOur1T EnD caps (ReFer TO.PG..5) Pre(Eno on EasT ROC K-IT-CLIP 2.0 ens ofsKirrseccnons) (ReFer TO PG.6) *Components for use with 32mm modules are available as special order:Components for use with 32mm modules are labeled as such on system packaging.Please refer-to evaluated,.compatible modules,grid on page 15 to Identify system compatible 32mm modules. www:ecofastensolar.com info@ecofastensolar.com 877-859-3947 1 i i ROCK-IT 4.0 mounT ASSemBLY NOTe: ITems 1-7 SHIP assemBLeD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS 2 Rock-It 4.0 Mid-Clamp 6000 Series AL 3 Rock-It 4.0 Shelf 6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock-it 4.0 Tie Plate 6000 Series AL 6 Rock-It Pedestal 6000 Series AL (Z �;f �_� 7 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series SS 9 3/8"-16 x 3"Hex Tap Bolt 300 Series SS 1/116 ROCK-IT SLIDes are accePTaBLe BracKeTs For i Use WITH ROCK-IT 4.0 (SOLD separaTeLY) �! ROCK-IT 4.0 COUPLING aSSeMBLY NOTe: ITems 1-3 SHIP assemBLeD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS —- 2 Rock-It4.0 Coupling Mid-Clamp 6000 Series AL �® 3 Rock-It 4.0 Coupling Shelf 6000 Series AL 4 Rock-It Load Bearing Foot Clip 5 Rock-It Load Bearing Foot Base I - www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 2 1 ROCK-IT 4.0 HYBRID MOl. nT ASSeMBLY NOTe: ITems 1-10 SHIP assemBLeD I J j1 Rock-It 4.0 Shelf 6000 Series AL 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL U ", 1° 3 Rock-It 4.0 Coupling Tie Plate6000 Series AL 4 Flange Level Nut 300 Series SS I 5 Rock-it Pedestal 6000 Series AL ` y1 6 Rock-It Slide 6000 Series AL 7 3/8"-16 x 3"Hex Tap Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series S 9 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 10 5/16"-18 x 1.5"Hex Serrated Flange Bolt 300 Series SS � 0 e I 9 i ..JJ rJ L ROCK-IT CLIP SS ASSeMBLY ROCK-IT CLIP 2.0 ASSeMBLY NOTe: ITems 1-3 SHIP asseMBL.eD NOTe: ITems 1-3 SHIP assemBLeD i 1 Stainless Steel Carriage Bolt-.313-18X.75 1 Rock-It Clip 2.0 2 Rock-It Clip SS 2 Stainless Steel Flange nut.313-18 3 Stainless Steel Flange nut.313-18 3 Bolt.3125-18x1x1-S 0 03 ���� / a www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3 Array LAYOUT • Find the required structural attachment points. Mark these.using a.vertical(N-S)chalk line on the center of the rafters. • Spacing may vary depending u on roJect specific, structural'requirements;1e.high snowand wind load areas may require lesser bracket spacing,in the E-W axis vs.the maximum-spacing.Max spacing is48"for.portrait orientation and72"for landscape orientation:.Consult project layout diagram for project specific bracket spacing on the roof. • Install.Rock It Mounts.to predetermined mount spacing. • The Rock-It Array Skirt sections-are the width.of a typical 60.cell module.—use the.Rock-It Array Skirt as a guide to lay out module placement. Note:The distance between*the rows.of mounts is calculated by the module dimension-WS plus 1 3/8 (35mm).Lag screw should-be installed as close to center.of exposed shingle as-possible.-The minimum. distance between the lag screw and the edge ofthe shingle is 1/2" GreenFasTen` FLasHinG inSTaLL ON 1 Locate the rafters and snap horizontal and vertical lines to mark the installation ! , • position for each GreenFasten flashing. 2 Drill a pilot hole(1/4"diameter)for the lag bolt.Backfill.with sealant.EcoFasten Solar recommends an-EPDM mastic. 3 Insert.the flashing so the top part is under the next row of shingles and pushed far enough.up.slope to prevent water infiltration through vertical joint in shingles.The leading ed e.of flashing-must butt against up per row of nails to prevent fuming when torqued. 4 Lineup pilot hole with GreenFasten flashing hole:- Insert the lag bolt.through the EPDM bonded washer,the Rock-It slide,the gasketed -hole in the.flashing and into the rafter. Torque:The range is.between.1007140 torque Inch-pounds depending on the type of wood and time of year.The visual.Indicator for-proper torque is when the EPDM on the underside of.the-bonded washer begins to push out the sides as thewasher compresses.If using an Impact wrench to install the fasteners.be careful not to over torque the fastener.You may need to stop and use a ratchet to finish the install.. The Engineer of Record shell check capacity of rafter to support lag screw loading. wwwecofastensolarcom info@ecofastensolarcom 877-859-3947 4 4 6 ROCK-IT SY STeM 4.0 in-STALL s, F — r .Y w�Y Fig.A Install EcoFasten Solar Flashing with Rock-It Mounts •Follow EcOFastensolarkutatilnstrvcttonsforflashing and brackethntall(6rcenFasten shown above).' •Optimum vertloldistance betweenlag bolts is131V plus module dimension. .:Set mounts on eave most row so that the Rode-It Pedestal is on the South end of Rock4t Slide. .Set •Set mounts on all upper rows so thatthe Rock wit Pedestal is on the North end of Rodcdt Slide. Z- Install Rock-It Array Skirt onto_Eave Mounts •Slide Rock-it Array Skirt Into front channel on Rock-It Shelf, -.Array Skirt End,Caps are pre-installed on the fast end of each skirt section,and are-used to couple.the skirt sections where needed(see Flg A) Tighten Mld-Clamp bolt,clamping Rock-It Array Skirt to mount.Torque to 200ln4bs.(1301n4bs.when Installing with 32mm modules). 3.4 Install Rock-It Couplings(when joining 4 panels with a Coupllrig,the use of a load bearingfoot is required) •Prior to mounting on the roof,snap Load Bearing Foot Into the bottom of.Rock-It Coupling if required.. (Each Load Bearing Foot Is set to same height as the Rock-it Mounts-adjust accordingly) •.On.eave row only,slide Rock-It Array Skirt onto Rockat Coupling Shelf.Torque to specified value. • NOTE:If a coupling lands on a rafter,the Hyb'rid'Mount1 should be used in place oftheRock-It Coupling(refer to Image.3a). -Hybrid Mount can be made in the fleld.by assembling a coupling to a mount pedestal;or by purchasing separately. C, Align and Straighten*First Row of.the Rock-it System with Rock-It Array Skirt •Use North-South adjustment ofthe Rock-R Pedestal to straighten Rock4t Array Skirt and align module with ArraySkirL •Torque screw on side of Rock-It Pedestal to150In-Ibsto secure itto the Rock-ItSilde. -Adjust Flange Level Nut totevel the system(optional—can be leveled doringorafterinstallation). 6�, Install 1'st Row of PV Modules —9- Slide upslopeRodo-R Mounts down to engage top offirstmodule. •install Rock it[oupiingson the upslope side of Ist row ofpanels. •Torque 2nd row of Mid-Clamps on Rock-It Mounts and Rock It Couplings to specified value. •Install balance ofPV modulesensudng that the RodM Pedestals are In the appropriate position,then torque Mld-Clamps to secure modules: 1-0 Level the Rock-it System when assembiyls complete;levetthe entire system by adjusting.Flange Level Nuts(Flange Level Nuts have no torque value): • Height between mofsurface and underside of modules should be 3'or less,when Installed with Type-2 modules INSTALLATION NOTE:Modules should be instal led so thatthe junction.box Is installed upslope,away.from the leading edge of the array. www.ecofastensolarcom info@ecofastensoiarcom 877-859-3947 -5 f t GrounoinG LUG nSTaLL Necessary Components: - One of the following ground lugs(or any UL-2703 compliant ground lug): Burndy CL50-1 TN Ground Lug(UL 2703-E351343 / UL 467-E999% ILSCO SGB-4 Ground Lug(UL 2703-E354420 /UL 467-E34440) 1LSC0 GBL-4DBT(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4DBTH(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4SS(UL 2703-E354420 /UL467-E34440) Note:Drill and.deburr hole in Ground Lug prior to installation - 14 AWG-4 AWG Copper Ground Wire* Torque Values: - 8-32 x 0.5"Serrated Flange Head Bolt(300 Series SS) 14-10 AWG=20 in-lbs. - 8-32 Serrated Flange-Nut(300 Series SS) S AWG=25 in-ibs. - 11/32"and 1/4"wrenches or ratchets/sockets 6-4 AWG=35 in-lbs. 1 Insert the flange bolt into the module ground.hole.Place Star Washer over bolt.Place ground lug over the bolt.and Star.Washer,and turn to desired orientation. 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel and tighten setscrew to complete assembly. *Wire should be sized in accordance with the National Electrical Code,NFPA 70,Section 690.45,and a minimum of 1/4"clearance required between bare copper wire and aluminum. , X Driil.hole per.grounding lug manufacturers specifications In the upslope part of Rock-It Coupling for attaching grounding lug. r R• Note:Deburr hole in Ground Lug and Rock-It Coupling prior to installation. www.ecofastensolar.com info@ecofastensolar.com 877-859=3947 6 f c ROC K-IT CLIP .S S i n S`i a.LL .Arceat�hirth,aun��ng Lnra,lorl� 1 Locate all parts -Locate the.Rock It.Clip'SS,micro-inverter/power optimizer,and-the section of the modulefframe in which. . you will be mounting the micro-inverter/power optimizer. See fig.A for.acceptable mounting locations. 2 Install the Rock-it Clip SS • Slide the Rock-it Clip:SS onto the lip of the-module frame. • Slide the micro-inverter/power optimizer.intothe opposite lip ofthe.Rock:It Clip SS. • Tighten the bolt-to-150 in-lb minumum to clamp.the Rock-it Clip.SS to the module-frame and the. micro-inverter/power optimizer to the Rock-It Clip SS. Ensure that the.lip on the clip is tight against the frame and that.the micro-inverter/power optimizer flange is' . tight against the clip flange to avoid rotation during tightening.. ROCK-IT CUP 2.O inSTaLL Inverter Flange WIL. . Modute'Frame Rock-lt Up 2.0 1 Locate ail'parts •Locate the Rock-It,Clip 2.0,micro-inverter/power optimizer,and the section of the module frame in which you will be mounting the micro-Inverter/power optimizer. 2 Install the Rock-It Clip 2.0.(See below detail). • Slide-the-Rock-it Clip-2.0 onto the lip of the micro-Inverter/power optimizer. • .Slide the micro-inverter/power optimizer into the opposite lip of the module frame. • Tighten the.bolt to 150 In-lb.to clamp the Rock-it Clip 2.0 to-the module frame and-the micro-Inverter/power optimizer to the Rock=lt Clip.2.0. • Ensure that.the lip on the clip is tight against.the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to.avold rotation during tightening. www.ecofastensolar.com info@ecofastensolarcom 877.859-3947 7 Snow Load 0-20 psf Modules in Landscape Wind Speed Exposure 2:12-c Roof Pitch--c 6:12 7:12-C Roof Pltch-C 12:12 ASCE 7-05 ASCE 7-10 Category Zone I Zone 2 Zone 3 Zone 1 Zone 2 Zone'3 B 159 93- 59 86 mph 110 mph, C 1.14 42 88 88 - D '96 56 35- 91 ' ' 74 74 B 146 85 54 90 mph 115 mph C 104 61 38 98 80 80 D 88 51 32 83 68 68 81 123 12 45 95 95 100 mph 125 mph C 88 51 32 83 68 68 D 74 43 27 70 57 57 B 98 67 36 93 76 -76 110 mph 140 mph C 70 41 26 .66 54 64 D 59 34 22 56 46 46 B 85 5.0 31 '81 68 66 120 mph 150,mph C 61 36 2Z -58 47 47 1 1 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.)Values in above table.represent the maximum allowable spacing in inches for pullout forces only on EooFasten Solar standoff, however-the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72' 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet In height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table Snow Load 020 psf Wind Speed Exposure 2:19<Roof Pitch<6:12 1 712<Roof Pitch-c 12:12 ASCE7-05 ASCE 7AO Category Zonal Zone 2 Zone 3 Zone I Zone 2 Zone 3 B 91 53 85 mph 110 mph C 65 38 24 50i D 55 32 20 :2- x 42. 42' B. 83 49 30 90 mph 115 mph C 59 35 22 56 46 46 D 50 29 Is. 47 38 38 B 70 41 2--6 -54 54 100 mph 125 mph C so 29 is 47 39 39 D 42 26 15 40 32 32 B 56 33 20 53 43 43 110 mph 140 mph. C 40 23 14 38 31 31 D 34 19 12 32 26 26 B 49 28 120 mph 150 mph C 35 20 12 33 27 27 1 D 29 17 10 28 22 22 Notes: ®Spacing Governed by Snow Load 1.)Values In above table represent the maximum allowable spacing in Inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar Is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length.of 70" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1..No site specific engineering Is Included in this table www.ecofastensoiar.com info@ecofastensolar.com 877-859-3947 8 Snow Load 21-30 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch.<12:12 ASCE 7-05 ASCE 7-10 Category— Zone 1 Zone 2 Zone 3 Zone.1 Zone 2 Zone 3 B 93 59 85 mph _ 110 mph C 67 42 D 96 56 35 B 85 54 90-mph 115 mph C 104 61 38 D 88 51 32 B 72 45 100 mph 125 mph C 88 51 32 D 74 43 27- 57 57 B 98 57 36 110 mph 140 mph C 70 41 26 66 54 54 D 59 34 22 56 46 46 B 85 50 31 66 66 120 mph 150 mph C 61 36 22 58 47 47 D 51 30 .19 49 40 40 Notes: ®Spacing Governed by Snow Load 1.)Values In above-table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6:)Based on Risk Category II(ASCE 7-10)structures less then 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering Is Included in this table Snow Load 21-30. psf Wind S eed Exposure 2:12<Roof Pitch c 6:12 7:12<Roof Pitch< 12:12 ASCE 7-05-ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 -- _ - B -__53- - - - --33—= 85 mph 110 mph C 65 38 24 D 55 -32 20 B 49 30 90 mph 115 mph C 59 35 22 D 50 29 18 38 38 41 — -- 26—-y 100 mph 125 mph C 50 29 18 391, D 42 26 15 B 56 33 20 110 mph 140 mph C 40 23 14 38 31 3.1 D 34 19 12 32 26 26 B 49 --- 28 - 18 37 _1_7 120 mph 150 mph C 35 20 12 33 27 27 D .29 17 10 28 22 22 Notes: —Spacing Govemed by Snow Load 1.)Values in above table represent the maximum allowable spacing in Inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a.maximum module length of 70" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolarcom 877-859-3947 9 1 L Snow Load 31-40 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch-<6:12 7:12<-Roof Pitch.<12:12 ASCE 7-05 ASCE 7-10 Cate o Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 59 85 mph- 110 mph C 67 42 D 56 35 B 54 90 mph 115 mph C 61 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 74 43 27 B 57 36 110 mph 140 mph C 70 41 26 D 59 34 22 46 - 46 B 50 31 120 mph 150 mph C 61 36. 22 . 47 47 D 51 30 19 49 40 40 Notes: ®Spacing Govemed"by Snow Load 1.)Values In above table represent the.maximum allowable.spacing In Inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2:)Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.6 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)'Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table Snow Load 31-40 psf Wind Speed Exposure 2:12<Roof Pitch<.6:12 7:12<Roof Pitch <12,12 ASCE 7-05 ASCE 7-10 Category Zone.1 Zone-2 Zone 3 Zone 1 Zone 2 Zone 3 85 mph 110 mph C 38' 24 D _ - "_ 32 20. - B 49 30 90 mph 115 mph C 35 22 D 29 18 -- B- - 4"1` 100 mph 125 mph C 29 18 D 42-- ,_- 26. 15� B 33 20 110 mph 140 mph C 40 23 14 D 34 19 12 26 26 -- - -- -- - $- - 49 ---28 w�8 120 mph 150 mph " C 35 20 12 27 xj .27w D 29 17 10 28 22 , ._' 22.. Notes: -Spacing Governed by Snow Load 1.)Values-in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=5479(per testing results) 4.)Includes additional-factor of safety of 1.5 for lag pullout capacity 5:)Values based on.a maximum module length of 70" 6.)Based.on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 10 4 Snow Load 41-50-psf Modules in Landscape Wind•S eed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Cate o Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 59 85 mph 110 mph C 42 D 56 35 B 54 90 mph 115.mph. C 61 38 D 51 32 B 45. 100 mph 125 mph C 51 32 D 43 27 B 57 36 110 mph 140 mph C 41 26 D 59 34 22 46 46 B 50 31 120 mph " 150 mph C 61 36 22 47 47 D 51 30 19. 49 40 40 Notes: I�Spacing Governed by Snow-Load 1.)'Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site-specific engineering is included in this table Snow Load 41-50 psf Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE T=05 ASCE 7-10 Category Zone 1 Zone 1 Zone 3 Zone-1 Zone 2 Zone 3 B - 33 85 mph 110 mph C r 38 24 D 32 20 B 30 90 mph 115.mph C 35 22 D 29 18 B 26 100 mph 125 mph C 29 18 D 26 15 . B 33 20 110.mph 140 mph C 23 14 D 19 12 B 28 18 120 mph 150 mph C 35 20 12 D 29 17 10 22 r22-`' ,;; Notes: -spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in Inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3:)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.).AII adjustment factors are set to 1.No site specific engineering Is included In this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 11 I L Snow Load.51-60 psf Modules In Landscape Wind Speed Exposure 2:12<Roof Pitch<6:12- 7:12<Roof Pitch a 12:12 ASCE 7-05- ASCE 7-10. Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 85 mph 110 mph C 42 D 35 B 54 90 mph 115 mph C 38 D 51 32 B 45 100 mph 125 mph C 51 32 D .43 27 B 36 110 mph 140 mph C 41 26 D 34 22 B 50 31 120 mph 150 mph C 36 22 D 51 30 19 Notes: ®Spacing Governed by Snow Load 1.)Values In above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maxlmum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4:)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table Snow Load 51-60 psf Wind-Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Cate o Zon6 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 85 mph 110 mph C 24 D 32 20 B - 30 90 mph 115 mph C 22 D 29 18 B 26 100 mph 125 mph C 29, 18 D 26 15 B 20 110 mph 140 mph C 23 14 D 19 12 - - B 28 18 - 120 mph 150 mph C 20 12 D 29 17 10_ Notes: ®Spacing Governed by Snow.Load 1.)Values in above table represent the maximum allowable spacing in Inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4:)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category II(ASCE 7-10)structures less than.30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering Is Included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 12 L GrounDinG. inFormaTion The rail-free Rack-it System maybe used-to mount and ground PV modules that comply with UL.1703,only when that specific module has been evaluated for mounting and grounding,in compliance with the included installation instructions. Note:Grounding lug must be visible to inspectors from'the entire perimeter of the PVarray. Multiple Use Grounding Pins Grounding pins within the Mid-Clamp are multiple use-bonding/grounding devices.Modules will need to be adjusted if the Mid-Clamps are loosened to ensure there.is°new metal to pierce into upon retightening. Grounding Method Rock4t 4.0 Mount bonds N-S rows of modules Rock-It 4.0 Coupling bonds E-W rows of modules Rock It Array Skirt bonds E-W along the entire array when installed -One Burndy CI50-1 TN ground lug is required per PV-array;limited to 300 modules placed-in either portrait orlanclkape orientation, I' Bon-DInG' ASsemBLy anD'.BonDinG PaTH i' Bond Path I' ® Grounding Lug Equbme,:Groundlra r -.Condvc, IEG:r Integrated Bonding I - „v�ro""i ware cunh .. s Rock-it Coupling ■ Rock•lt Mourt Rock-It Array Skirt j Bond Path i Bond Path 15 Grounding Lug � - •'Grounding Lug couldmint Grounel"a. . /— CandurrorIECQt Equipment Grounding AdcralM la caur � CanduttorfEGf} Arad"d .8 v�tymeenh round I ®'Rock-Imoupling o.Rrxk-It Coupling ■ Rock-It Mounr Rock-it Array Skirt ■Rock-it Mount —Rock-It Array 5kirt l www.ecofastensolar.com info@ecofastensolarcom 877-859-3947 13 THermaL EXPansion anD BonDInG A thermal expansion gap is required per each continuous 40'length of modules. -- Bond Patn ® Grounding lug Omit a coupling and leave a 2°gap in the Rock-It Array Skirt and also between �cnductor�GL1,- rg the modules at that point. gEroundral'Y`°�"'� Roek•lt Coupling ® Rock-It Mount —Rock-it Array Skirt BracKeT sPacinG Portrait Orientation Landscape Orientation i Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"0C. 32mm modules:Max east/west bracket spacing.is 48°0C. Spacing may vary depending upon project specific structural requirements;i.e.high snow and wind load areas may require lesser spacing E-W than the maximum. ! sTaGGereD LaYOUT canTlLever anD oFFseT Staggered Mounting Points Cantilever: Maximum cantilever is 1/3 bracketspacing. For ortrait R-Rack-ItMount ®Rock-It Coupling orientation installations,check layout prior to installin . p The array layout instructions in this installation manual offer a general overview of layout. Periodically,.dueto a variety of Offset:Offset from all roof edges depends on wind speed,snow factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location www.ecofastensolarcom info@ecofastensolar.com 877-859-3947 14 ROCK- IT SYSTeM 4.0 SYSTem SpeclFicaTlons Max No.of Panels 300 Modules per ground lug Materials -300 Series Stainless, 6000 Series Aluminum Max System Voltage 1000VDC Coating Black Andodization/Mill Finish Class A Fire Rating With UL1703Type-i Rated Lug Specifications Bumdy CL50-M Ground Lug Modules;see note below. (UL Listing#KDER E9999) Leveling.Range. 3-4" Ground Wire 14 AWG-4 AWG Copper Per above Lug spec. Ground Wire Rock-It Slide Comp.Range 3" Max Module Size .64.96"(1650mm)x Rock-It SlideTile 7" 39.05'(992mm)x 2"(50mm) Min/Max Roof Slope 1/2:12/12:12 Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing(35mm/40mm) 72" Rock-It Mount Load Rating 547lbs with Single 5/16'Lag 3:0 Max Anchor Spacing(32mm) 48" Safety.Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16"diameter Mount Box QTY 12 units Module Cantilever Maximum cantilever is.1/3 Rock-it Slide Box QTY 50 units bracket spacing Coupling Box QTY 12 units Warranty 20 Year Material and Workman- ship Codes:National Electric Code;ANSi/NFPA 70,NEC 250,NEC 690,IRC,IBC Standards:UL 2703:First Edition,UpL�1703 ECAmn SolAr *E SYSTEM s:��•' T'�STLr: MFC to coo t GGTy2Q016 v.:n8mnn Ywm C"MYMtSMYI tTW CYNFONMSTO Solar .a.rvn., xANLL1l f"0.1L.10 dtIxGS r�r..�.•O ASS"(M'[DWIINYIOCY""4T[S m. m•nA The EcoFasten Solar Rock-It System is a rooftop PV racking system consisting of 6000 Series Aluminum-and 300 Series Stainless Steel components.The Rock-it System includes the rack components but does not include the PV panels, inverters or electrical:components.The PV modules to be used with Rock-it shall be certified under UL 1703.The system shall be used on steep slope roofs mounted over a Class A fire rated roofing material and attached to the roof structure using:5/16"diameter,minimum 4"long 300 series Stainless Steel lag bolts with minimum thread embedment depth of 21/2"into the roof structure. Periodic re-inspection for loose components The system is subject to re-inspection as required bythe PV-module manufacturer or by the Authority Having Jurisdiction.Re-inspection;as required,should include evaluation of any loose components or loose fasteners.All loose components and fasteners should be secured.in accordance with these instructions.The system should also be evaluated for.any evidence of corrosion.Any corrosion should be removed.Any affected part should be.cleaned.or replaced in accordance with these instructions. DA ,,V]Ec®Fasten Solar® www.ecofastensolar com info@ecofastensolar.com 877-859-3947 15 FeaTUres • New and improved design North-South adjustability • Fastest,easiest to level system on the market • Only one tool required(1/20deep well socket) • Integrated electrical bonding Vertical adjustment of 3"-4" • SIMPLE-only 4 components EVaLUaTeD, COI" paTIBLe MODULes ModuleMerufacturer Model Type("x'usedto Module Dimenslons(mm) ModuleDlmenSonsQn) Downward Pressure UpwardPnessure Down-slopa Design Matlmumdamp Indicate variable test) Design Load(psf) Design Load(psq' Load(psf) Spacing(In) Trino Solar TSM-xxx4*95.08 1640 x 992 x 40 6495"49.05"■1.57" 33.3 333 20 72 CanedlanSdar CSSP-xx)M 1638x922x40 6448"48.66"d.57" 33.3 333 20. 72 Canadian Solar CS6P-XxxP 1630x992x40 64.5"X38.7'k1.57" 33.3 33.3 20 72 Jlnko Solar J m)=P.60 1650 x 992 x 40 6A96'W9.05"xL57" 30 30 20 72 JlnkoSolar JKMxWA-6D 1650x992x40 6496"rO9.05'dM57" 30 30 20 72 Jlnko Solar Jl0NxxxPP40 1650 x 992 x 40 64.96539.05"rd.57" 30 30 20 72 Jlnka Solar JKMxxxMM-60 1650 x992 x40 6496'509.05"x1.57" 30 30 20 72 Yingll Soler 1.2xxP-291; 1650 x990 x40 6496"x38.9r'xL57" 30 30 20 72 LG Elcetronlcs LG3001,dGB3' 1640 x 1000 x 35 6457"A39.3r'xl.aa" 30 30 20 .72 LG Elcetronlcs LG300N1K-G4 1640 x 1000 x 40 6457:'x39.3714.57" 30 30 20 72. Axltec Solar AC-xxxM/156.605 1640 x992 x40 64.5"x39.06'kL38" 30 30 20 49 RECOM ROM-2xx-6MB 1640 x992 x35 6456"49A5"x1.37" 30 30 20 72 s0fab -SLA2xxP 1650X990X38 64.96"Xd8.979d.49" 30, 30 20 72 Solaria PoweY>Q xxxR4D( 1621 x 1056 x 40 63.89"x41.SSN2.57" 30 _30 20 48 Hanwha-QCPJIs• QPR0042xx 1670x1000x32 65.75'W9.3r'x1.25" 30 30 20 46 Hanwha-Q Oelis• Q PRO G42xx 1670 x 1000 x 82 65.75"x99.37'4.25" 30 30 20 72 Sunprerne' GxB-3xxT 1970x997x40 65,75"x39.25"x1.57" 30 30 9 20 49 REC REC-xxx-6MB 1675 x997-x38 65.94"x39.25'h1.5"" 20 20 1 20 72 REC. REC-xxx-GMB 1675 x997 xSo 65.94"x39.251KLS" 30 30 1 20 43 SolarWorld SW xxc Mono Black 1675 x961 x33 65,95"xaVY'1:30" 20 20 1 20 72 SclarWorld SWxxx Mono Block 1675x961x33 65.95"x37.8"xL30" 30 30 1 .20 48 •Hanwha Q-Cells 32mm modules to be used with special order Rock-it System components.Call for details. ®C EcoFasten Solaro www.ecofastensolarcom info@ecofastensolar.com 877-859-3947 16 Cut. Sheet - Rock-It-4.0-Mount 1. Installation to be completed in.accordance with.manufacturer's written specifications and installation instructions. 2.. See spec sheet or contact manufacturer for detailed material,finishes,-and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to-change without notice. 3.171n [80.54mm] 2.50in JSDI C�1 2.02in 2.1.4in 2.34in [51.38mm] [54.37mmI 59.36mm' _.- 32mm — 35mm 40mm ALPIN _ 4741 W Polk Street Ste:4 SNOG DS*'� �; r Phoenix,AZ 85043 Toll Free Phone 1.888.766.4273 Toll Free Phone 1.877.859.3947 Material:.See Spec Sheet Toll Free Fax 1.888.766.9994 Toil Free Fax 1.888.766.9994 =- - _ ....... Scale: 1:2 6/28/2017 ASG: - EFS: X � L Data Sheet Enphase Networking EnphaseThe Enphase IQ.Combiner 3" with Enphase IQ Envoy'" consolidates interconnection IQ-Cornbiner 3 equipment into a single enclosure and (X=1Q-AM.1-240-3) streamlines PV and storage installations by providing,a consistent-, pre-wired solution for residential applications. It offers up to four 2=pole input circuits and Eaton-BR series busbar assembly. Smart a, Includes IQ Envoy for communication I •• and control Flexible networking supports Wi-Fi, Qi Ethernet,or cellular Optional AC.receptacle available for PLC bridge Li Provides production metering and optional c consumption monitoring �i Simple Reduced size from previous combiner Centered-mouMing brackets support single } stud mounting. Supports back and,side conduit entry • Up to four 2=pole branch circuits for 240.VAC plug-in breakers.(not included) 80 A total PV or storage branch circuits Reliable • Durable NRTL-certified NEMA.type 3R enclosure- Five-year warranty UL UL listed LISTED ENPHASE. To learn more-about Enphase offerings,visit enphase.com !1 x Enphase IQ Combiner 3 MODEL NUMBER IQ Combiner 3 X-IQ-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy"-printed circuit board for integrated revenue grade PV production metering-(ANSI-C12.20+/-0.59i).and optional*consumption monitoring(+/-2.5%). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect'" CELLMODEM-03(4G:/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands,. CELLMODEM-M1(4G based LTE-M/5-year data plan) where there,is adequate cellular service.in the installation area.). Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5%). Circuit Breakers - Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. BRK-10A-2-240 Circuit breaker,2 pole,10A,Eaton BR210 BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 EPLC-01 Power line carrier(communication bridge pair),quantity 2 XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating .125 A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output), 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not.included) Max.continuous current rating(input from PV) 64 A Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed arid wired to IQ Envoy . MECHANICAL DATA Dimensions(WxHxD)' 49:5 x 37.5-x 16.8 cm(19.5"x 14.75"x 6.63"):Height is 21:06"(53.5 cm with mounting brackets). Weight 7.5 kg(16.5 Ibs) Ambient temperature range - -400 C to+46°C(-400 to 115°F) Cooling Natural convection,plus heat shield Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors • 60 A breaker branch input: 4 to 1/0 AWG copper conductors • Main lug combined output: 10 to 2/0 AWG copper conductors • Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters(6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) Cellular Optional,CELLMODEM-01 (3G)or CELLMODEM-03(4G) or CELLMODEM-M1(4G.based LTE-M) (not included) COMPLIANCE Compliance,Combiner UL 1741 CAN/CSA C22:2 No.107.1 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 *Consumption monitoring is required for Enphase Storage Systems. To learn more about Enphase offerings,visit enphase.com ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. EN PHASE 2018-09-13 t Installation Manual Soltection RJ=1 Rooftop Solar Junction Box Flashing Unit For Composition/Asphalt Shingle Roofs v G� w, ww� w ® wwtJ Manufactured by: Soltection: a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston,TX 77029 1-866-227-0577 www.soltection.com Soltection RJ-1 Installation Manual Page 1 TABLE OF CONTENTS IMS7ALLA710M INSTRUCTIONS Contents IMPORTANTSAFETY INSTRUCTIONS........................................................................................................................4 SAFETYWARNINGS & CAUTIONS ..........................................................................................................................4 ELECTRICALPRECAUTIONS.................................................................................................................................... 5 MECHANICALPRECAUTIONS.................................................................................................................................. 5 PRODUCTINFORMATION .............................................................................................................................................. 6 OVERVIEW...................................................................................................................................................................... 6 PREP & PLACEMENT...................................................................................................................................................... 7 REQUIREDTOOLS....................................................................................................................................................... 7 PRODUCTPLACEMENT..............................................................................................................................................7 SPECIFICATIONS .......................................................................................................................................................... 11 MECHANICAL/ELECTRICAL................................................................................................................................... 11 TORQUERATINGS..................................................................................................................................................... 11 WARRANTIES: Seller warrants to Buyer that products and any services furnished hereunder will be free from defects in material,workmanship and title and will be of the kind and quality specified in Seller's written quotation.The foregoing shall apply only to failures to meet said warranties(excluding any defects in title)which appear within two years from the date of shipment hereunder. The conditions of any tests shall be mutually agreed upon and Seller shall be notified of, and may be represented at, all tests that may be made.The warranties and remedies set forth herein are conditioned upon (a)proper storage, installation, use and maintenance, and conformance with any applicable recommendations of Seller and (b) Buyer promptly notifying Seller of any defects and, if required, promptly making the product available for correction. If any product of service fails to meet the foregoing warranties (except title), Seller shall thereupon correct any such failure either at its option, (i)by repairing any defective or damaged part or parts of the products, or(ii)by making available, F.O.B. Seller's plant or other point of shipment, any necessary repaired or replacement parts.Where a failure cannot be corrected by Seller's reasonable efforts,the parties will negotiate an equitable adjustment in price. The preceding paragraph sets forth the exclusive remedies for claims (except as to title) based on defect in or failure of products or services;whether the claim is in contract, indemnity,warranty,tort(including Seller's negligence), strict liability or otherwise and however instituted. Upon the expiration of the warranty period, all such liability shall terminate and Buyer shall have a reasonable time,within thirty days after the warranty period,to give written notice of any defects which appeared during the warranty period. Except as set forth in Article 2, "Patents," the foregoing warranties are exclusive and in lieu of all other warranties, whether written, oral, implied or statutory. NO IMPLIED STATUTORY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE SHALL APPLY. Seller does not warrant any products or services of others which Buyer has designated. www.soltection.com Soltection RJ-1 Installation Manual Page 3 IMPORTANT SAFETY S . - READ ALL INSTRUCTIONS & SAFETY WARNINGS PRIOR TO INSTALLATION NOTE: SAVE THESE INSTRUCTIONS This manual contains important instructions that shall be followed during installation and. maintenance of the Soltection RJ-1 rooftop junction box with flashing. LETHAL VOLTAGES ARE PRESENT DURING THE INSTALLATION, OPERATION AND SERVICE OF THIS EQUIPMENT. PROPER PRECAUTIONS MUST BETAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . SAFETY WARNINGS & CAUTIONS ■ Only qualified personnel or licensed electricians should install this product and the instructions herein are provided for those individual(s)only. ■ To reduce the risk of electric shock, injury, or death, all electrical wiring and connections must be performed by qualified personnel. ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper precautions must be taken at all times to ensure the safety of the service personnel. ■ Follow state and federal Occupational Safety and Health- Administration (OSHA) guidelines and regulations when installing this product. ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations as well as for installation best practices. ■ Install this apparatus in accordance with ANSI/NFPA 70, National Electrical Code (NEC). Follow all national or local electrical codes. ■ Install, operate, and use this product in a manner consistent with the instructions provided. Failure to follow the procedures indicated may result in roof leaks, property damage, or consequential damage. www.soltection.com Soltection RJ-1 Installation Manual Page 4 w� CAUTI+�N ELECTRICAL PRECAUTIONS ■ Ensure all electrical conductors are at zero voltage potential before installing or servicing this unit. ■ Never break contact on a circuit without using.the appropriate disconnect device. ■ Follow established lockout and tagout procedures for all electrical conductors prior to servicing. ■ Beware of power lines in the vicinity of the roof, where.inadvertent-contact may result in electrocution, personal injury, or=death. ■ When disconnecting source or supply circuits, provide sufficient time as stated in the,power electronics manufacturer's instruction manual in.order to ensure.discharge of all conductors in.the circuit. ■ Always verify the integrity and proper installation of the electrical components prior to energizing electrical circuits. ■ Non-metallic enclosures do not provide grounding means between conduit connections. The use of- grounding hubs-and.-jumper wires are required: ■ Grounding must be sized per NEC requirements, and is the responsibility of the installer. MECHANICAL PRECAUTIONS ■ When drilling into an attic.space,.ensure that electrical wires, mechanical obstructions, or potential electrical hazards are removed from the vicinity and direction of the drill. Do not install if the roof is wet,.frosted, or covered by ice or snow. ■ If any part of this.product becomes damaged, • remove and destroy the entirety of the unit. Failure to do so may result in fire, property damage, personal injury, electrocution, or death. ■ Do not use the product to anchor fall protection equipment. www.soltection.com Soltection R]-1 Installation Manual Page 5 PRODUCT INFORMATION OVERVIEW ■ The Soltection RJ-1 Residential Rooftop Junction Box is a flashed roof penetration designed to protect electrical conductors entering the rooftop/attic. It is made of a high-strength UV-resistant and UV- stabilized polymeric material. ■ The RJ-1 enclosures comes fully equipped with a slotted DIN rail mounted inside the enclosure designed for mounting of DIN rail accessories, such as terminal blocks. ■ A four position ground bar is also provided as a means to form a bond between the solar array mounted on the roof and the building. CORNER SCREWS MOLDED COVER PLASTIC SCREW FOR GROUND BAR AFFIXING DIN RAIL GROUND BAR i 00 O O O MOLDED BASE DIN RAIL www.soltection.com Soltection RJ-1 Installation Manual Page 6 PREP & PLACEMENT REQUIRED TOOLS ✓ Shingle Ripper Bar V #2 Phillips Screwdriver ✓ Lumber Crayon V Uni-Bit ✓ Hole Saw or Spade Bit V Utility Knife le Roofing Sealant RAFTER PRODUCT PLACEMENT • Identify the location and placement of the flashing on the roof as shown. The product may be mounted beneath the array or adjacent to the array. Af -DO NOT LOCATE THE .-PRODUCT-DIRECTLY OVER A RAFTER TO ENSURE THE-RAFTER DOES NOT'INTERFERE- WITH,THE WIRING Remove template from packaging and use in Step 2 ENTRY INTO-THEATTIC STEP 1 www.soltection.com Soltection RJ-1-Installation Manual Page 7 1 11.t'4�'t•1�y��.iCdr�T�.�s'S 1 �`'•�Ti"YF 'f'�a�j `_•.,�'1•".f�iwj-'�..•:•.t ` •`t`� a+:i';�•A', i7�..::jti:.•�.; `�'`,�,y`��' ' '`Y� "fir�'"f`�':;:�.`^�,::•:4:afi.t�,+ ,�}-�_r�'�^.!u;y :. is rt�; Position the top edge of the template 1/2" Trace and continue using a lumber crayon to the above the 1st course of shingle as shown. bottom of the 2nd course. Cut along lines and remove shingles. STEP 2 STEP 3 •N�� jK��n._ v, i r :`ECCOME11DED CONOU11 Fb11P'l I F +r11 O f OOf Ri,ISEQAF.F:A 111 I' MOLDED BASE Remove any roofing nails beneath the 1st, 2"d, or DRILL PILOT HOLE 3rd course of tile that obstructs the position of Slide RJ-1 Junction box into place where you the roof flashing. cut shingle template.The image above shows STEP 4 where you will drill in the next step STEP 5 www.soltection.com Soltection RJ-1 Installation Manual Page 8 >. ��l w '� :c. raw�! •. r r„ �� Y r I+YLa � � - • � ra Y, t `Y I r -w �-x •A r t • y i y I� - i it I Remove RJ-1,flip it over,wipe it clean&apply Reinstall Unit. Use the two supplied Decking a bead of roofing sealant to the underside of the Screws to mount the flashing to the roof. flashing unit. Ensure that it's placed in the Torque to the specification indicated in the "Upside-down U"Shape to support engress specifications. Refer to Table T2(page 10)for water protection,AS SHOWN. the proper tightening torques. STEP 10 STEP 11 POPULATE RJ-1 • Populate the RJ-1 unit using the s { y appropriate wire connectors, terminal blocks, or other necessary components. • Ensure that the components installed are rated for and are suitable for the intended purpose. • The RJ-1 unit is provided with multiple standoffs which can accommodate accessories to be mounted. Step 11 . A Install the cover onto the top of the enclosure. Tighten 4 cover screws to the Torque value indicated in Table T3(see page 10) STEP 12 www.soltection.com Soltection RJ-1 Installation Manual Page 10 SPECIFICATIONS MECHANICAL/ ELECTRICAL ■ Product Certifications: UL508A ■ Enclosure Rating: Type 4X ■ Attic Conduit Pass Through Connector.Size Range: 1/2"—1" ■ Max: Side Wall Conduit Size: 1" ■ Maximum Current:'N/A Maximum Voltage:-N/A ■ Ambient Operating Temperature: -35C to 75C TORQUE RATINGS Table T1: Ground'Bar Connection,.Wire Range: #4 to#14, 4 Usable Connections I, y, i! 0 Wire Size Tightening Torque(lb- in 4-6.AWG 35 8 AWG. -30 10-14 AWG 25 Table T1 Table T2: Mounting Screw, Mounting to Deckin , 2 Provided Tightening Torque Ib-in . 15-20 Table T3: Torque Values, Cover/Lid Screws , 4 Provided, Captive Yi htenin Torque (lb-in) 11 www.soltection.com Soltection RJ-1 Installation Manual Page 11 soltectl'o n"" by vy n.c ki e r Soltection is a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston, TX 77029 1-866-227-0577