Loading...
HomeMy WebLinkAbout19-22010 ' CITY OF ZEPHYRHILLS 5335-8th Street (813)780-0020 22010 ELECTRICAL PERMIT PERMIT INFORMATION LOCATION INFORMA-1104 Permit#:22010 Issued: A ess: 6411 LAURELWOOD D Permit Type: ELECTRICAL MISC ZEPHYRHILLS, FL. Class of Work: ELECTRICAL MISC wnship: Ran Proposed Use: NOT APPLICABLE L s): Section: Sq. Feet: Est. Value: Boo Page: Cost: 22,302.00 Total Fees: 232.50 Subdivision: SILVER OAKS Amount P e Paid: Parcel Number: 03-26-21-0190-00000-0010 C NT WTOkINFORMNTION OWNER INFORMATION N 9 Irce: MOMENTUM SOLAR Name: BECERRA, MARIO SR & EDNA dr: 8248 PARKLINE BLVD STE 10 Address: 6411 LAURELWOOD DR ORLANDO FL 32809 ZEPHYRHILLS, FL 33542-4870 one: Lic: Phone: 504-610-5659 Work Desc: INSTALLATIO OTO VOLTAIC SOLAR PANELS ROOFTOP APPLICATION FEES ELECTRICAL 232.50 INSPECTIONS REQUIRED ROUGH ELECTRIC CONSTRUCTION POLE PRE-METER FINAL REINSPECTION FEES:(c)With respect to Reinspection fees will comply with IFTorida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. CONTRACTOR PER OFFI PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER mpmentum solar Zephyrhills Building Department December 5,2019 5335 8th Street Zephyrhills,FL 33542 To Whom It May Concern: The purpose of this letter is to formally request that permit be withdrawn and canceled.The homeowner has chosen not to purchase a solar panel array from Momentum Solar.The site address is: 6411 Laurelwood Drive Zephyrhills,FL 33542 Please provide confirmation that the permit has been canceled to FLPermits@MomentumSolar.com. Respectfully, Cameron Christensen 321-247-6073 FLPermits@MomentumSolar.com 6210 Hoffner Ave Ste 1 Orlando,FL 32822 Contractor Signature State of Florida) County of Pasco) Sworn to(or affirmed)and subscribed before me this 5 day of December _,2019 by Cameron Christensen Personally Known X OR Produced Identific t'on Seal Public No ��,v Pue4 KRISTINASALGA0 r° MY COMMISSION#GG 014460 * * EXPIRES July 21.2020 N�'�rfoFe�°�`ot �edTlwBuesetNoteryse��as I � 813-780-0020 City of Zephyrhills Permit Application Fax-813-7e0-0021 Building Department Date Received 0 q q Phone Contact for Permitting 321 247 — 6073 -rrr"-rrrrr 1 Owners Name Mario Becerra f t Owner Phone Number 504-610-5659 Owners Address �euT W bl: -Z h !'tr ff Owner Phone Number Fee Simple Titleholder Name F Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS 6411 Laurelwood Dr.Zephyrhills,FL 33542 LOT# SUBDIVISION Laurelwood at Silver Oaks PARCEL ID#F0326210190000000010 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT = SIGN = = DEMOLISH e INSTALL a REPAIR PROPOSED USE Q SFR 0 COMM = OTHER oar TYPE OF CONSTRUCTION = BLOCK Q FRAME = STEEL = DESCRIPTION OF WORK Installation of photo voltaic solar panels on rooftop BUILDING SIZE SQ FOOTAGE HEIGHT �2 ©BUILDING $ y VALUATION OF TOTAL CONSTRUCTION �� E�DELECTRICAL $ AMP SERVICE Q PRIOGRESS ENERGY Q W.R.E.C. =PLUMBING Is v�(®4 (s� s fer-: =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION j /p/� GAS ROOFING 0 SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD Z NE AREA =YES NO BUILDER COMPANY Momentum Solar SIGNATURE REGISTERED Y/ N FEE CURREI. Address 8248 Parkline Blvd Ste.100 Orlando FL 32809 License# CVC57036 ELECTRICIAN :1COMPANY Momentum Solar SIGNATURE REGISTERED I Y/ N FEE CURREN Y/N Address 8248 Parkline Blvd Ste.100 Orlando,FL 32809 License# I EC13008217 PLUMBER COMPANY SIGNATURE REGISTERED Y I N FEE CURREK Y/N Address License# MECHANICAL COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Y/N Address License# OTHER COMPANY SIGNATURE REGISTERED Y/ N FEE CURREA Address License# RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisionstlarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. Directions. Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement Is required. (A/C upgrades over$7500) •` Agent(far the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW ` NOTICE or DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" / which may be more eatriotivmthan County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: |f the owner has hired o contractor ur contractors mundertake work,th be required tobe licensed m accordance With state and local regulations. |fthe contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner mintended contractor are uncertain as tn what licensing ui ntsnay apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furtennmm, if the owner has hired o contractor or onnoomnm. he is auwuod to have the contractor(s) sign portions nv the"contractor Block"n,this applicationfor which they will be responsible. |f you,aothe owner sign as the contractor,that may»ean indication that haiu not properly licensed and m not entitled tu permitting privileges|nPasco TRANSPORTATION ES understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance With applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I certify that 1, the applicant, have been provided With a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'SIOWNERIS AFFIDAVIT: I certify that all the information in this application is accurate and that all work Will be done in compliance With all applicable laws regulating construction,zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work Will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations In the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Weiland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. ' Southwest Florida vVumr ManeVamomu [xmhct-Nols. Cypress oayheaoo. Weiland Amoo. AftennU Watercourses. - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways, I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone'V"unless expressly permitted. - If the fill material is to be used in Flood Zone "N', it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone"N' in connection with a permitted building using stem wall construction,I certify that fill Will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill Will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application,for lots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced Within six months of permit Issuance,or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TOOWNER" YOUR FAILURE T# RECORD A NOTICE Op COMMENCEMENT MAY RESULT|mYOUR PAYING TWICE FOR IMPROVEMENTS ro YOUR PROPERTY. /p YOU INTEND no OBTAIN FINANCING,CONSULT momentum SOLAR SOLAR ELECTRIC INSTALLATION CONTRACT Mario R Becerra Customer Name Company Name 6411 LaurelWood Drive Zephyrhills FL 133542 Service Address City State Zip Billing Address(if different from Service Address) City State Zip 5046105659 marioedna4547@gmail.com Daytime Phone Evening Phone Email Address Duke Energy 4018014450 13,798.00 kWh Electric Utility Company Utility Account Number Annual Usage 7.56 Q-CELLS 315W .ENPHASE IQ7 24 ROOF 10,648.00 k stem Siz ' Solar Module Inverter Makerrype Module Count Solar Mount Type Estimated Annual Makerrype Production *IF SYSTEM SIZE IS BIGGER THAN 1.76KW D_ I10.0 KW AC,PLEASE SEE ATTACHMENT 1 REGARDING LIABILITY INSURANCE REQUIRMENT Payment Schedule and Third-party Financing: Your payments will become due as indicated below. The "Total Amount Payable to Momentum Solar" shown below reflects only the amount we charge for the PV System (as defined below) and installation, not including any applicable sales tax. If you choose to obtain financing from a third-party finance company, your payment schedule and total amount owed will be set out in your agreement with the third-party finance company and may include finance charges. You should read that agreement carefully to understand your repayment obligations. We are not your lender. The terms of any financing you obtain from a third party, including the amount and timing of your payments and any finance charges imposed, are solely determined by your third-party finance company. We are not affiliated with any third-party finance company. TOTAL AMOUNT PAYABLE TO MOMENTUM SOLAR: $ $ 22,302.00 (PLUS ANY APPLICABLE SALES TAX) ❑ CASH PURCHASE OR SELF-FINANCED SCHEDULED PAYMENT AMOUNT TIME DUE Deposit(10%) $ - Upon Signing of Contract 1st Installment(30%) $ - Upon Completion of Design and Permitting 2nd Installment(50%) $ - Upon Installation of Panels, Inverters and AC Electrical Final Payment(10%) $ - Upon Completion of Installation and Required Utility and Local Authority Inspection Ef FINANCED BY THIRD-PARTY FINANCE COMPANY SCHEDULED PAYMENT AMOUNT TIME DUE Refer to your agreement with the third-party financing company for a description of your payment obligations, including your payment schedule and total of payments including any finance charges). You acknowledge that, regardless of whether you obtain financing from a third party, we require payment in full upon completion of the installation (and required inspections) and that we are not extending credit to you in connection with this transaction. Document.24 FL Page 1 of 10 momentum. SOLAR ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES),THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB-SUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR.PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS MADE,YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY. Pro Custom Solar LLC d/b/a Momentum Solar is a certified solar contractor(Cert.#CVC57036)with the Department of Business Professional Regulation. General Terms and Conditions Definitions: In this agreement, the terms "customer', "owner', and "you" refer to the customer identified above, and the terms "contractor', "us" and "we" refer to Pro Custom Solar LLC d/b/a Momentum Solar and its employees, agents and subcontractors, as applicable. The term "agreement" or"contract" refers to this agreement between you and us and any change orders signed by you and us. "PV System" means the solar panels and related parts and the system of solar energy generation described above. Scope of Work: We agree to sell and install the PV System on your real property. We will not provide, or arrange for, architectural/engineering services or structural changes to dwellings or buildings unless we expressly agree to do so in a separate writing signed by us. We have the right to determine the method, details, and means of performing the work. We will obtain the necessary building and electrical permits and ensure code compliance. You agree to cooperate with us to obtain these permits and meet code compliance. You are solely responsible for obtaining, at your own cost and expense, any and all zoning variances required by any municipality or local governing body. We will not obtain a zoning variance for you unless we expressly agree to do so in a separate writing signed by us. Change Orders: Any change to the work or the installation schedule that you or we request will be set out in a written change order signed by both you and us. You agree that a change order may result in a change to the terms of the agreement between you and us, including but not limited to, the contract price and the anticipated installation schedule. If you request, in writing, a change to the scope or performance of the services provided under this agreement, then we will provide you with a written change order for your approval within a reasonable time after such written request. You agree that we may issue a change order if a Force Majeure Event (as defined below) occurs that changes or impairs our ability to perform under the current terms and conditions of this agreement. All change orders, including a change order resulting from a Force Majeure Event, must be approved in writing by you within a reasonable time after receipt, and you agree not to unreasonably withhold your approval of any change order. Time Period: We anticipate beginning work under this agreement within fourteen (14) days after we receive all required paperwork from the applicable state, utility, and municipality. We anticipate that we will complete the work within thirty (30) days after we begin. This is our best estimate and is subject to change according to various factors outside of our control. We are not responsible for delays resulting from any Force Majeure Event (as defined below). Document.24 FL Page 2 of 10 0 momentum. SOLAR Force Maieure: We will not be liable to the you for any failure or delay in performance under this agreement caused by events beyond our control including, without limitation: negligence or delay by any governmental entity or utility company; your noncompliance with this agreement; your failure to furnish necessary information or furnishing of incorrect information; legal encumbrances on your property; your property's non-conformance with building codes or zoning requirements; your credit rating or financing arrangements; acts of God, nature, government or any third parties; war or acts of terrorism; labor strife or disputes; shortages of labor, fuel, raw materials or equipment; technical failures; accidents; sabotage; failure or delays in transportation or communication; failures or substitutions of equipment; or hidden or unforeseen physical or hazardous conditions, including but not limited to, environmental hazards such as mold, asbestos, and lead paint (each, a "Force Majeure Event"). Your Responsibilities: You agree to pay us for merchandise delivery and/or installation of the PV System according to the terms and conditions of this agreement. If your service address is subject to any easements, covenants or other legal encumbrances that could affect the Installation, you agree to notify us in writing, including by electronic mail or by certified mail,within five (5) business days of your becoming aware of the encumbrance or prior to our beginning work, whichever is earlier. You agree to ensure that work areas are free of preexisting hazards, including, but not limited to unsafe physical conditions or environmental hazards and building/zoning code violations. You agree to allow us access to work areas during work hours. If you have a security system, you agree to ensure that it does not interfere with installation. You agree not to allow unattended minors at the service address while we are performing the installation. You agree to control pets and keep them away from work areas. You agree that, if anyone under your control interferes with or delays installation,you may be subject to transportation and/or storage charges or other resulting charges. Payments: All payments must be made in cash, by credit card, or by check(s) made payable to "Momentum Solar" as specified in this agreement. Any payments you owe under your agreement with the third-party finance company must be made in accordance with the terms of your agreement with them. Failure to Pay: You will be in breach of this agreement if you fail to make any scheduled payment on time, in full, and otherwise in accordance with this agreement. If we have not received the full amount of any scheduled payment within ten days after the scheduled due date, you will incur a late fee equal to one percent (1%) of the unpaid amount due. If the installation is not completed when the breach occurs, we reserve the right to suspend all work until all past-due amounts have been paid in full. If the PV System is in operation when the breach occurs, we reserve the right to remotely shut off the PV System until all past-due amounts have been paid in full. Subject to applicable law, we may also pursue amounts you owe us through legal action, which may include perfecting or enforcing a lien against your property or the PV System.. If we take legal action to enforce this agreement, you agree, to the maximum extent permitted by applicable law, to pay reasonable attorney's fees and costs we incur before and after judgment and any other costs permitted under applicable law. If you fail to pay your third-party finance company pursuant to the terms of your agreement with them, you may be subject to any of the terms and remedies set forth in that agreement. Please consult that agreement to determine your liability and rights regarding the third- party finance company. Inspection of System: You agree to allow us, our designees, and any state or local governmental authority or utility company to inspect the PV System at the service address. Cancellation by Customer: If you cancel this agreement at any time after the cancellation period described in this agreement or otherwise prevent us from completing the installation, you agree to reimburse us in full for the cost of materials, labor, and services provided up to the date and time of cancellation. Document.24 FL Page 3 of 10 momentum. SOLAR Termination by Momentum: Prior to beginning design and permitting work, we will perform a physical assessment of the installation site, including suitability of the existing electrical panel and wiring, roof condition and shading of the intended location of the PV System to verify the suitability of the site for the PV System. If we determine that existing site conditions will not allow for installation of a PV System as described at the top of page 1, we may terminate this agreement if you and we are unable to agree to modifications needed to provide for additional work needed to make the site suitable for the PV System. If we do so terminate this agreement, we will refund your initial deposit in full. We may also terminate this agreement after completion of our site assessment without further obligation if either (a) you breach this agreement, or (b) we discover or become aware of: (i) previously undisclosed legal encumbrances or easements affecting the service address, (ii) building/zoning code violations at the service address, or(iii) hidden or unforeseen hazardous conditions such as the presence of mold, asbestos, lead paint, or any other conditions not disclosed to us. Component Manufacturer's Warranty: The manufacturers of certain of the PV System's major components warrant their components against certain defects. We have provided you with copies of all manufacturer's warranties which govern your rights to seek a remedy from the respective manufacturer with respect to covered defects. Limited Warranty: You agree to contact us in writing, including by electronic mail or by certified mail,with any problems or issues with the installation as soon as possible, but in any event within thirty (30) days from the date you become aware of such problem. We will take reasonable measures to remedy or otherwise resolve the problem within thirty (30) days after we receive your notice. You agree and acknowledge that our limited warranty covers the installation only for a period of ten years. The limited warranty does not apply if: (1) you fail to notify us of the problem within thirty (30) days, or (2) it is reasonably determined, upon inspection, that any of the following conditions caused the need for service: (a) damage resulting from accidents, acts of God, alterations or misuse; (b) your failure to properly follow the operating instructions; (c) damage: caused by animals; (d) alterations to your premises; or (e) alterations to the PV System made at your request, or made necessary by a change to your premises, damage to your premises; or any other cause beyond our control. The PV System includes a monitoring platform that allows us to remotely access performance information for the purpose of assessing the source of performance issues that need to be remediated. Additionally, we warrant that any penetrations of your roof used in the installation will not leak for a period of five (5) years. The limited roof penetrations warranty does not apply if: (1) you fail to notify us of the problem within thirty (30) days, or (2) it is reasonably determined, upon inspection, that any of the following conditions caused the need for service: (a) damage resulting from accidents, acts of God, alterations or misuse, (b) damage caused by animals; (c) alterations or damage to your premises; or(d) any other cause beyond our control. NO OTHER WARRANTIES: THE "LIMITED WARRANTY" RELATING TO OUR INSTALLATION OF THE PV SYSTEM OR "COMPONENT MANUFACTURER'S WARRANTY" RELATING TO THE VARIOUS COMPONENTS OF THE PV SYSTEM PROVIDED BY THE APPLICABLE MANUFACTURER, ARE THE WARRANTIES PROVIDED UNDER THIS AGREEMENT. WE MAKE NO GUARANTEE OR WARRANTY OF ANY KIND THAT EXTENDS BEYOND THE FACE OF THIS AGREEMENT, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THE SERVICE PERFORMED OR THE SYSTEMS PROVIDED UNDER THIS AGREEMENT. LIMITATION OF DAMAGES: TO THE MAXIMUM EXTENT PERMITTED BY LAW, YOU AGREE TO RELEASE US FROM ALL LIABILITY TO YOU OR ANY OTHER PERSON FOR ANY INCIDENTAL, CONSEQUENTIAL OR PUNITIVE DAMAGES EXCEPT TO THE EXTENT SUCH DAMAGES ARE CAUSED BY OUR GROSS NEGLIGENCE OR WILLFUL MISCONDUCT. By initialing here, you agree to the terms of this paragraph: M 0 Q Document.24 FL Page 4 of 10 momentum. SOLAR Binding Nature: This agreement shall bind and inure to the benefit of the respective heirs, personal representatives, successors, and permitted assigns of each party. Entirety of Contract; Modification; Waiver: This agreement constitutes the complete agreement between you and us concerning the subject matter of this agreement and supersedes and cancels any and all prior communications, representations, and agreements between you and us, whether written or oral, with respect to the subject matter of this agreement. This agreement may not be amended or modified unless in writing and executed by you and us. The rights and remedies of both parties under this agreement are cumulative and not alternative. No waiver of any breach or failure to enforce or insist upon performance any of the provisions of this agreement by either party at any time will in any way affect, limit or waive such party's right to enforce and compel strict compliance with every provision of this agreement. Severability: The invalidity or unenforceability of any provision of this agreement shall not affect the validity or enforceability of any other provisions of this agreement, which shall remain in full force and effect. Assignment: Neither party may assign, transfer or delegate any or all of its rights or obligations under this agreement, without the prior written consent of the other party, which consent shall not be unreasonably withheld or delayed; provided, however, that (a) the contractor may assign this agreement to any of its affiliates or to a successor of all or substantially all of the contractor's assets through merger, reorganization, consolidation or acquisition and (b) such consent is not required for an assignment (absolute, collateral or otherwise), pledge of, or grant of a security interest in, a right to payment under this agreement by either party. Dispute Resolution: In the event of a dispute, both you and we have the right to have the dispute resolved in a court of law. In this dispute resolution provision, you and we are agreeing to limit that right. If you have any dispute with us or if we have any dispute with you, then both you and we must seek resolution of the dispute in either arbitration or small claims court. If your dispute cannot be resolved in small claims court for any reason, then you must seek resolution of your dispute in arbitration. The arbitration hearing will be held before a nationally recognized provider of arbitration services at a location of your choice within your home state. The rules of the arbitration provider will apply. This dispute resolution agreement does not alter any substantive rights that you may have under state or federal law. By signing below, you agree to comply with this dispute resolution provision, which describes both your and our only procedure for resolving any dispute. Only the arbitrator, not any federal, state, or local court or agency, has the authority to interpret this provision or determine its applicability or enforceability. If any provision of this dispute resolution provision is found to be unenforceable for any reason, such provision will be severed and the remainder of this dispute resolution provision will continue in full force and effect. You understand and accept that arbitration awards are subject to challenge only in limited circumstances. Class Action Waiver: ARBITRATION MUST BE ON AN INDIVIDUAL BASIS. AS A RESULT, NEITHER YOU NOR MOMENTUM MAY JOIN OR CONSOLIDATE CLAIMS IN ARBITRATION BY OR AGAINST OTHER "CUSTOMERS", OR LITIGATE IN COURT OR ARBITRATE ANY CLAIMS AS A REPRESENTATIVE OR MEMBER OF A CLASS OR IN A PRIVATE ATTORNEY L CAPACITY. By initialing here, you agree to the terms of this paragraph: Customer Initials: Transfer of Title: The title of the equipment will pass to you upon the delivery of the equipment to your property, or any storage facility you designate. Until the equipment has been delivered and signed for by you or your agent, we retain the title for the equipment. Governing Law: This agreement shall be governed by and construed in all respects in accordance with the laws of the State of Florida as they apply to a contract entered into and performed in that state. Document.24 FL Page 5 of 10 momentum SOLAR Taxes: You acknowledge and understand that you are responsible for any and all taxes that arise under this agreement, including, but not limited to, sales and use taxes. You agree to execute any certificate or other applicable documents relating to sales or use tax exemptions to ensure that you or we, as applicable, may claim exemption from paying or collecting any sales or use tax that arises under this agreement. You agree to pay all applicable sales or use taxes if such taxes are determined to be due at any time before or after the termination or expiration of this agreement. Momentum Solar and its affiliates do not provide tax, legal or accounting advice. Any discussions between you and your sales representative regarding federal, state or local tax incentives or rebates ("Tax Incentives") has been for informational purposes only, and is not intended to provide, and should not be relied on for, tax, legal or accounting advice. Momentum Solar makes no representations, warranties, or assurances as to the accuracy, currency or completeness of the content of your discussion regarding Tax Incentives. You should consult your own tax, legal and accounting advisors regarding the applicability to you of any Tax Incentives. FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND. PAYMENT, UP TO A LIMITED AMOUNT, MAY BE AVAILABLE FROM THE FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND IF YOU LOSE MONEY ON A PROJECT PERFORMED UNDER CONTRACT, WHERE THE LOSS RESULTS FROM SPECIFIED VIOLATIONS OF FLORIDA LAW BY A LICENSED CONTRACTOR. FOR INFORMATION ABOUT THE RECOVERY FUND AND FILING A CLAIM, CONTACT THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD AT THE FOLLOWING TELEPHONE NUMBER AND ADDRESS: DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, 2601 BLAIR STONE RD., TALLAHASSEE, FL 32399, (850) 487-1395. Acceptance and Authorization: By signing below, you authorize us to perform the installation. Except as set forth in this agreement, you agree there are no oral or written representations or inducements, expressed or implied, anyway conditioning this agreement, and we expressly disclaim their existence. By signing this agreement, you acknowledge that you have read and understand this agreement or have had a competent legal representative explain its terms, and hereby accept this agreement in its entirety. You further acknowledge receiving a complete copy of this agreement. You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right. Customer• Customer Signature Mario R Becerra 09/23/1.9 Print Customer Name Date Prp Custom Solar LLC d/b/a Momentum Solar: Authorized Officer Signature Andrew King 09/24/2019 Print Authorized Officer Name Date Document.24 FL Page 6 of 10 momentum. SOLAR Notice of Cancellation Date of Transaction: You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be cancelled. If you cancel, you must make available to the seller at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller regarding the return shipment of the goods at the seller's expense and risk. If you do make the goods available to the seller and the seller does not pick them up within 20 days of the date of your Notice of Cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this Cancellation Notice or any other written notice, or send an email, to Momentum Solar, 3096B Hamilton Blvd, S. Plainfield, NJ, 07080 1-888-666-3688 Cancel Rep uest MomentumSolar.com, NOT LATER THAN MIDNIGHT OF aM-OEee business day s after transaction date . I HEREBY CANCEL THIS TRANSACTION. Date: Buyer's Signature: Document.24 FL Page 8 of 10 momentum. SOLAR Notice of Cancellation Date of Transaction: You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be cancelled. If you cancel, you must make available to the seller at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller regarding the return shipment of the goods at the seller's expense and risk. If you do make the goods available to the seller and the seller does not pick them up within 20 days of the date of your Notice of Cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this Cancellation Notice or any other written notice, or send an email, to Momentum Solar, 3096B Hamilton BLV, S. Plainfield, NJ, 07080 1-888-666-3688 CancelRe nest MomentumSolar.com, NOT LATER THAN MIDNIGHT OF ME ,hree Or siness day s after transaction dat I HEREBY CANCEL THIS TRANSACTION. Date: Buyer's Signature: Document.24 FL Page 9 of 10 r 0 momentum SOLAR Attachment 1 Mandatory Liability Insurance Obligation The Florida Public Service Commission,pursuant to Section 120.54, Florida Statutes,has adopted Rule 25-6.065, Florida Administrative Code,relating to interconnection and net metering of customer-owned renewable generation. Section (5)(e)requires that the owner of a Tier 2 renewable generation system have general liability insurance for personal and property damage of$1 million. A Tier 2 renewable generation system is one that is 11.6 kW (dc) or 10.0 kW(ac) or larger. Your local utility has interpreted this to mean that, in order to interconnect your solar generation system to the local utility grid (and for it to function and provide you with the electricity it generates),you will have to provide proof that you have$1 million of general liability insurance as part of the application for interconnection with their system. By initialing here, you acknowledge that you understand the terms of this para ra h and the implications if you fail to provide and maintain proof of this insurance: Customer Initials: Alternatively, an owner of a Tier 2 renewable generation system may self-insure this $1 million if it can demonstrate to the utility that the owner has sufficient financial means to cover a potential$1 million obligation. As part of the interconnection process,your local utility will let you know what information it needs from you to make this determination and the timeline for such determination. Failure to provide proof of such insurance or to obtain approval from the interconnecting utility to allow you to self-insure will result in a denial of your request to interconnect your system or, if interconnected,the termination of such interconnection. Without this interconnection,your system will not operate,you will not be able to offset any electricity used in your home and you will not be able to obtain any benefits of net metering any extra energy your system produces. By initialing here, you acknowledge that you understand the terms of this paragraph and the implications if you fail to provide either the proof of insurance or the local utility's approval to self-insure instead of providing this insurance: Customer Initials: Document.24 FL Page 10 of 10 Parcel ID 03-26-21-0190-00000-0010 (Card: 1 of 1) Classification 00100-Single Family Mailing Address Property Value BECERRA MARIO R SR & EDNA Ag Land $0 6411 LAURELWOOD DR Land $17,794 ZEPHYRHILLS, FL 33542-4870 Building $108,170 Extra Features $912 Physical Address 6411 LAURELWOOD DRIVE, Just Value $126,876 ZEPHYRHILLS, FL 33542 Assessed (Non-School Amendment i) $110,942 Legal Description (First 200 Homestead -$25,000 characters) Additional Homestead -$25,000 See Plat for this Subdivision Non-School Taxable Value $60,942 LAURELWOOD AT SILVER OAKS PB School District Taxable Value $85,942 32 PGS 110-111 THAT PART OF LOT Warning: A significant taxable value increase may occur 1 DESC AS COM AT SW COR OF LOT when sold. 1 FOR POB TH N10DEG26' 42"W Click here for details and info. regarding the posting of 39.85 FT TH S89DEG52' 27E exemptions. 131.31 FT TO ELY BDY OF SAID LOT 1 TH 27.53 FT ALG AR[...] Jurisdiction CITY OF ZEPHYRHILLS Land Detail (Card: 1 of 1) Line Use ;Code �_De_s_cr_iption ZoningUnits ..Type -'Price Condition Value 1 0100R LP2-1 _ SFR OPUD ' 4,745.00 SF $3.75 1.00 $17,794 Additional Land Information Acres Tax Area FEMA Code Res Code Com Code Condo Code 0.11 30ZH -- SIVL SIVL SIVL View Sketch Building Information - Use 0700-Single Family Villas (Card: 1 of 1) Year Built 1996 Stories 1.0 . Exterior Wall 1 Concrete Block Stucco Exterior Wall 2 None Roof Structure Gable or Hip Roof Cover Asphalt or Composition Shingle Interior Wall 1 Drywall Interior Wall 2 None Flooring 1 Cork or Vinyl Tile Flooring 2 Carpet Fuel Electric Heat Forced Air - Ducted /C Central Baths 2.0 Line Code 'Description Sq. Feet 'Value 1 BAS01 LIVING AREA 1,255 $95,736 2 FGR01 FINISHED GARAGE 260 $7,933 .._3- ..--._. .. FSP01� FINISHED SCR...... -- -_._..... ............._.__. -.� ..__ ...- -- _ ---------- ------- -- - -•-- -_ ... _- _.. EENED PORCH 169 $4,501 Extra Features (Card: 1 of 1) -- - --------------- Line_ Code Description Year ?Units Value 1 RDWSWC DRVWAY/SIDEWALK CONC 1996 498 $912 Sales History Previous Owner: WARREN KELLY Month/Year ;Book/Page Type ':DOR Code Condition Amount 12/2016 9469 / 2730 Warranty Deed 01 - Improved -$124,000 02/2006 6860 / 1723 Warranty Deed - Improved $163,900 07/2000 4406 / 0779 Quit Claim Deed - Improved $0 City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: mbvtfekry, d 1&e__ Dat Received: (D -- I qA j Site: q- l l Lid Permit Type: C�� N 4 "A I"h,'C- Approved w/no comments. Approved w/the below comments: ❑ Denied w/the below comments: ❑ This comment s eet s e kept with the.permit and/or plans. Kalvin itzer—Plans Examiner Date Contractor and/or Homeowner (Required when comments are present) momentum solar I, (,G w,�r����„���nser, , license holder for Momentum Solar, authorize the following individuals to.apply,pick up, and sign for permits under my license number cl—V C 5 70 3 G . Please allow ONLY the person(s) listed below to sign. This letter supersedes all others. ��0(br YA c�2Z. Cameron Christensen Contractors Signature Contractor's Printed Name State of Florida County of M w The foregoing instrument was acknowledged before me this ( day of QG`T ,20 By Arneron av.Sfcm erA who is personally known to_me or has produced as identification. Notary Public State of Floride �`' Lauren E EI--Taher • �g y C.es 0 g0412023 �8001 NOTARY PUBLIC ` 1 momentum solar I, ACC+- ke-o license holder for Momentum Solar, authorize the following individuals to apply,pick up, and sign for permits under my license number EGc 30o Sa t 7 Please allow ONLY the person(s) listed below to sign. This letter supersedes all others. �iGllQ,l2 Morn_$-from a 1d Matthew Franz Contractors Signature Contractor's Printed Name State of Florida County of 4, o The foregoing instrument was acknowledged before me this day of C �" , 20 By who is pe r has produced as identification. 3 Y NotaN public State of Florida �`°' her Laurher en E E�? GG NOTARY PUBLIC �xP�S olio�izo23 2g8001 ", 1 l: • Y Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net October 7,2019 Re:Proposed Photovoltaic Solar Panel Installation Mario Becerra 6411 Laurelwood Dr Zephyrhills,FL 33542 Dear Plan Reviewer: Certification:I have reviewed the engineering testing reports for the racking and attachments to be used on this project and I certify that the products are capable of supporting the code required loads and are suitable for this installation when installed in strict compliance with the manufacturers printed instructions. Regarding the solar panel array installation on the above referenced project please note that an inspection was performed by a representative of the Architect/Engineer of Record,and analysis of the existing structure was conducted.There is adequate structural capacity for the installation of the array with the following recommendations: 1.The array will be installed on the existing roof.The roof framing is constructed of 2"x4"wood trusses @24"o.c. spanning 1 VI"with a top chord length of 12'4"with intermediate supports at 1/2 points,making the effective longest span equals 67'with with 1/2"plywood sheathing.The new array(See Site map by contractor)will add 2.63 Lb./ SE overall to the roof.No additional structural support is required for the roof structure. 2.The system shall be secured to the roof using the"Ecofasten Solar""Rock-IT"®attachment system.The installation shall be in strict compliance with manufacturers printed instructions.The attachment system shall be UL 1703 approved tested.The attachments shall be min.5/16"x 4"long stainless-steel lags with a min.embedment of 3"into the rafters.Attachments shall be @ 48"o.c.max.in roof wind zone 1,@ 24"o.c.max.in roof wind zone 2, &3,lags to alternate rafters.Provide 6 mil.vapor barrier between dissimilar metals.Provide water tight gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the system manufacturer's installation manual.The panel angle shall match the roof slope. 3.Solar Modules shall be UL-1703 rated.Refer to manufacturers specifications sheets. 4.Positive drainage of the system shall be so as not to void the existing roof warranty. 5.Florida Administrative Code,2017 Florida Building Code-Residential Sixth Edition,ASCE-7-10,2017 Florida Building Code—Energy Conservation,Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.All components used meet the criteria of the Florida Solar Energy Center. 6.Please refer to the attached structural calculations. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. Daniel W.Dunzik,RA.LEED-AP AN", FL.Lic.No.AR987958?95 - tS� .. •N IQ/t�/�r� L j Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net October 7,2019 Gravity Load Calculation Criteria Structural Design Loads per ASCE 7-10 Dead Loads=10 psf+2.6 psf(new solar panels)=12.6 psf Roof Live Load=20 psf Ground Snow Load=0 psf Wind Load Calculation Criteria Wind Loads per ASCE 7-10,Ch.30 method 1 Using an area of 10 SF,wind loads from Figure 30.5-1: Zone 1 =-32.3 psf Roof Slope=26 degrees Roof Mean Height=15 ft Zone 2=-56.2 psf Basic Wind Speed= 140 mph Zone 3=-83.1 psf Exposure=B Per section 2.4.1,ASD combo=D+0.6W: Zone 1 =2.6 psf+0.6(-32.3 psf)=-16.8 psf Zone 2=2.6 psf+0.6(-56.2 psf)=-31.1 psf Zone 3=2.6 psf+0.6(-83.1 psf)=-47.3 psf Check Attachment to Wood Truss Use 5/16 dia.Lag screw w/3"embedment into 2 in.wide roof rafter Lag Screw Spacing: Lag Screw Tributary Area: Zone 1 = 48"o.c.max Zone 1 =(48"o.c.max)^2/144=16 SF Zone 2= 24"o.c.max Zone 2=(24"o.c.max)^2/144=4 SF Zone 3= 24"o.c.max Zone 3=(24"o.c.max)^2/144=4 SF Lag Screw Forces: W=2661b/in(Table 12.2A,2015 NDS) Zone 1 =16.8 psf x 16 SF=269 lb < W', OK Cd= 1.6(Table 2.3.2,2015 NDS) Zone 2=31.1 psf x 4 SF= 124 lb < W', OK Ct= 1 (Table 2.3.3,2015 NDS) Zone 3=47.3 psf x 4 SF= 189 lb < W', OK W'=W x embed x Cd x Ct W'=2661b/in x 3 in.x1.6 x 1 = 1276.8 lb r � LG345N1 C-V5 345U'1� The LG NeONO 2 is.LG's-best selling solar module,and is one of the most power ful and versatile modules on the market today.Featuring LG's Cello Technology, the LG NeONO 2 increases power output.New updates include an-extended performance warranty to 90D8%to give customers a greater sense of reliabil- ity and peace of mind: DBE c UL us .-C E. r` /ff l it Feature -- - Enhanced Performance Warranty 25 ',Enhanced Product warranty �j LG NeONO 2-has an enhanced performance 'LG has extended the warranty of the NeONO 2 ----- ' warranty. After 25 years;LG NeON®.2 is guar- V ------- to 25.years,.which is among the top of industry anteed to perform at minimum 90,08%of ini- standards.- tial performance. — Better Performance on a Sunny Day '; Roof Aesthetics gap LG NeONO 2'now performs better on sunny .®l LG NeONO:2 has been designed with aesthetics in days,thanks to its improved.temperature — mind using thinner wires that appear all black at a coefficient. distance.The LG NeON®2 can increase the aesthetic value of your home with a more modern design. About LG Electronics LG Electronics is a global big player,committed to expanding its operations with the solar market.The company first embarked on a solar energy source research program In 1985,supported by LG Group's vast experience in the semi-conductor,,LCD,chemistry and materials Industries.In 2010.LG Solar successfully released its first MonoX� series to the marleC which Is now available In 32 countries.The NeONT(previous.ManoX'a NeON),NeONe2,NeON^2 Bilracial won the"Intersolar AWARD`in 2013,2015 and 2016.which demonstrates LG Solar%lead innovation and commitment to the industry. 2@2 LG eON LG345N1 C-V5 Electrical Pra erties(SE C* .General Data LG345N1C-V5 Mode-- el Monocrysta!lineJN-type ---- — Celt Properties{Material f Type) I Maximum Power(Pmax) [W] 345 .--- aker LG T -- 34.9 Cell M _MPP Voltage(VmPP) _ j[V] '—" Cell Configuration 60 Celts(6 x 10) 9.89— 12EA MPP Current(Impp) j tA3 Number ofBusbars _ _ 47.2 _ Open C''rrcuit Voltage(Vo4t 5%j-�_[u) Module Qimensions{L x W x H) 1,686mm x 1,016mm x 40 ram --- -� 1 pS7 _ Short Circuit Current(tst 155%))--I[A] 17-1 kg --'— — k ty.]; 20.7 - Module Efficiency Glass(Material) — Tempered Glass with AR Coating _ PowerTolerance 0-+3 eacksheet(color} White w •STC{Standard Test Condition):Irradiance 100 /m-,CeII temperature 25'C,A 1 S Frame(Materiat) ^—_ Anodized Aluminium — Junction 8ox(Protection Degree) — IP 68 with 3 Bypass Diodes 1,00o ram x'EA Operating;Conditions _.-----.------- Cables(Length) Tt^C�_ -40-+90 j�'�� MC4lMC OperetingTemperature ^-----{= 1000{IEC) Connector(Type J Maker)i I Maximum System Voltage _ [VI _Maximum Series Fuse Rating _ [?] ( 5,400/113 Mechanical Test—__-„-,-_L�ad Front), [Pa/psf] 4,O184 certifications and Warranty. MechanigiTestioad(Rear) tPa! st3 IEC 6 i 215-1/-1-1/2:2016,IEC 61730- *Test Load-Design toad%Safety Factor(1.5} - i/2-.2016 Certifications ISO goof,tsQ 14001,Iso s000l Packaging Configuration _ 25 OHSAS 18001,PV CYCLE Number of Modules per Pallet �.[EA3 650 _Salt Mist Corrosion Test IEC 61701:2012 Severity 6 Number of Modules per 40ft HQ Container [EA] _ ram 1,750 x 1,120 x 1,221 AmmoniaCorrosionTest IEC62716:2013 packaging Box n.nsions(L- dxH) [ 3 I 464 Class C(UL 790) Packaging Box Gross Weight -J tk93 Fire Rating ' Solar_Module_ProductWarrantyJ 25Years Solar Module Output Warranty L near Warranty' •1)Fimtyear:98,2)After istyear:o.33%annual degradation 3)90.08%for 25years Dimensions-(mrn inch). rara.o,.a.o Temperature Characteristics z'7zii, NMOT' j [ °C 3 - 42 t 3 _ ( [%1°C] -0.36 _Voc T—.1—vrcj� -0.27 iK.io`.9 Isc j [li°C] 003 tI *NMOT(Nominal Module Operating Temperature):Irradiance 800 W!m',Ambient temperature 20 C, � Wind speed 1 m/s,Spectrum AM 1.5 n - .Electrical 0 omioc'fitiMOT) ' I� Mode! LG345N1C VS Maximum Power Pmax MPPVottage(Vmpp) tV3 32.7 I' :� aidf . MPpCurrent(ImPP) tA3 7.89 3B.7 Open circuit Voltage(Voc) [V3 B.50 short circuit Current(Isc) I[A3 i-V Curves 1 z.o l000w 10.0 a ow 8.0 -— a gs . 608W m 6.0 U 400W 4.0 r 206W - - 2.0 OA 30.0 —_—_-`40.0 y— q0 10.0 20.0 voltage[V) Product specifications are subject to change without notice. � o r LG Electronics Inc. DS-V5-60-C-G-F-EN-90503 Solar Business Division NWLG LG Twin Towers,128 Yeoui-daero,Yeongdeungpo-gu,Seoul p 2019 LG Electronics.All rights reserved. - 07336,Korea ❑��' 'Lifds Good wwrwig-sotarcom Date Sheet Enphase Microlnvertere Reglon.AMERICAS The high-powered`smart gdd-mdy Enphase Enphase IQ 7 Micro"and Enphase 10 7+Micro" 1 7 n 17+ dramatically simplify the installation process while achieving the highest system efficiency.. cr i nve r e rs Part of the Enphase IQ System,the IQ 7 and iQ 7+Microkwerters-integrate with the Enphase IQ Envt>y'",Enphase IQ Batten►',and the Enphase Enllghl ee monitoring and anaiysis Software. IQ Sales.i+ croinverters extend the reliability standards Set forth by previous generations and .undergo over a million hours of power-on testing, enabling Enphase to provide an lndustry�ieading warranty of up to 25 years. Easy to Install • Lightweight and simple • FaMerinsmUationwKblmprovodUghtertwo mcobdng --- y� • Bu"rapid shutdown compUant(NEC 2014&2017) Productive and Reliable —-- • Opftbmd for high powered 60-cell and 72-ceP modules • Mona than a million hours oftasthrp i •Class l!double-Insulated enclosureUL Usted • Smart Grid Ready Complies with advanced grid support,voltage and ftmency ride-through requirements m• Reote updates to respond to changing grid requiremerft Configurable for varying grid profiles • Meets CA Rule 21(UL 17414W •7tw 1tT 7+Mkro to ngWred to wpport 72oell nbdaka. U� To learn more about Enphase offerings,visit etphase.00m EN PHASE. Enphase iQ 7-and-IQ 7+ Microinverters INPUT DATA(DC) IQ7.60 2-USI IQy 6a-g-US 107PLUS72 2-USI107PLUS 72-8-US Commonly used module palringsx 235 W-;350 W+ 235 W-440 W+ Module compatibility 60.-48111 PV modules only 60-call and 72-eo0 PV modules Maximum input DC voltage 48 V 60 v Peak powertracking voltage 27V-37V 27 V-46 V Operating range 16 V-48 V 16 V 40 V MtnfMax start voltage 22 V/48 V 22 V/60 V Max DC abort clmuft current(moduledsc) 16 A 15 A Overvoltage class DC port If 11 DO port backfeed current 0 A OA PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC aide protection requires max 20A per branch circuit OUTPUT DATA(AC) 110 7 Microlnvefter iQ 7+-Micralavarter Peakoutputpower -� 50.VA 295VA Maximum continuous output power 240 VA 290 VA Nomfnal(L-L)voltage/range= 240-V/ 208V/ 240W 208V/ 211264 V 19Mg V 211264 V 183-229 V: Maximum continuous output current 1.0 A(240 V). 1.15A(208 V) 1.21 A(240.V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz, Extended frequency range 47 48 Hz 47.68 Hz AG short circuit fault current over 3 cycles 5.8 Arms 6.8 Arms Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13 08 VAC) 13(240 VAC) 11(208 VAC) Overvoltage class AC part iII IIi AC part beckfeed current 0 A 0 A Powerfactor setting 1.0 1.0 Power factor(adjustable) 01 leading...0.7 logging- 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEO efficlerrcy 97.5% 97.6`!0 97.5% 97.3% CEO weighted efficiency 97.0% -97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range 40'C to+86'C Relative humidity range 4%to 180%(condensing) Connector type Q07-60-2US&iQ7PLUS-722-US) M04(crAmphenolH4UTX with additional Q-DCC=5adapter) Connector type OQ74"-US&1071'LUS-72 S=US) Friends PV2(MC4 intermateabre). Adaptors for modules with MC4 or UTX connectors: -PV2 to MC4:order ECA-S20-S22 -PV2 to UTX:order ECA-s20-$25 Dimensions(WxHxD) 212 mmx 175 mmx 302 mm(without bracket) iNeight 1.00 k9(2.38 Ibs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class it double;insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMAType6/outdoor FEATURES Commulticatfon Power l.ina Communication(PLC) Monitoring Enlighten Manager and MyEniighten monitoring options. Both options require installation of an Enphase IQ Envoy, Disconnecting means The AC and DC connectors have been evaluated and approved byUL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21(1)L 1741-SA) UL 62109-1;UL1741/IEEE1547,FCC Part 15 Class 8,ICE&0003 Class B. CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid shut Down Equlpment.and conforms with NEC-2014 and NEG42017 section 69012 and C22.1-201S Ruia 64-218 Rapid Shutdown of PV Systems,for AC' and DC conductors,when Installed according manufacturer's instructions. .Noenforced OCACmuo.See the compatibility calculator athitaclrlennhaa.c�n�fsaoa 2.Nominal voltage ranga can be extended beyond nominal If required by theutlllty, 3.Urnhs may vary.Refertofooei requirements to define the number of microlnvertera per branch in your area. To learn more abort Enphase offerings,visit enphase,com EN PHASiE- ®2Ma&Vhase Energy Ali ruts feservad.All bademaft or brantls used are rite property of Enphase Energy,inc, 2018.05.24 f }. Daniel W. Dunzik Architect LEED-AP 370 Burnt Hilt Rd.Skillman,NJ.08558 908-972-3664 January 29,2018 Building Department Attn:Plan Reviewer Re:Proposed Photovoltaic Solar Panel Installation _Dear Sir: I have reviewed the following documents related to the"EcoFasten Solar"ROCK-IT SYSTEM 4.0 and certify that the attachment system when installed in strict compliance with the manufacturers Installation Manual appropriate for this application and is in compliance with the latest building codes including Florida Administrative Code,2017 Florida Building Code-Residential Sixth Edition, ASCE-7-10,2017 Florida Building Code—Energy Conservation, Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.I make this certification for the following listed documents: 1. ROCK-IT SYSTEM 4.0 Installation Manual 2. PZSE,Inc Structural Engineers Certification, 3. EcoFasten Solar Certificate No.US 82150026 4. ROCK-IT SYSTEM 4.0 Cut Sheet for Coupling,Hybrid Coupling,and Mount. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. CIF,FLQ W. AR98795 ; Daniel W.Dunzik,.RA.LEED-AP Fl.Lic.No.AR98795 t ,a Cut Sheet - Rock-It-4.0-Coupling 1. Installation to be completed in accordance with,manufacturer's-written specifications and installation instructions. 2. See spec-sheet or contact manufacturer for detailed material;finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4: Do not scale drawings. 5. Subject to change without notice. 3.17in 0- {l} [80:54mm � 7.00in 1-7730mm' 2.02in o 2.1-4in 2.34in L51.38mm] 154.37mm_t ;r59:36mm] 32mm 35mm40mm �INE �i z` 4741 W Palk Stree Ste.4 � ` .�� ��r �� Ce� t�ri0 � Phoenix,AZ 85043 T oil.Free-Phone 1.888.766.4273 Toll'Free Phone 1:877.859.3947 Material:See Spec Sheet Toll Free Fax 1'.888.766.9994 Toil Free Fax 1.888.766.9994 - Scale: 1:4 6/28/2017 ASG: - EFS: X. f { Cut sheet - Rock-it-4.0-Hybrid Coupling 1. Installation to be completed in accordance with,manufacturer's written specifications-and installation instructions. 2. See spec sheet or-contact manufacturer for.detailed material,finishes,and configuration options.. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change-without notice. 3.16in [80.29mm] 7.00in' [177'.80rnm] .1 M i 5'00in --�.- [127mm j 2.02ir 2.14in a 2.34in > .[51.38_mm] [54.37mm] 59.36mmj 32mm 35mm 40mm 4141 W Polk Street Ste.4 *E- co R F ksten S61ar' Phoenix,AZ 85Q43 Toll-Free Phone-1.888.766.4273 Toll'Free Phone 1:877:859.3947 Material:See Spec Sheet Toll Free Fax 1-.888.766.9994 Toll Free Fax 1.888:766.9994 Scale: 1:1 6i2812017 ASG: - EFS: .x .c s. ROCK-IT S Y ST E W 4,O RAIL-FREE RACKING UTIUzeS ECOFasTen SOLars PaTenTeD-TeCHnOLOGY �Q4 ®��Eco aster- Solar Q C asten Solar@' Committed to tieonnectin Document.Date:9.8.2017 Contents Pg. 1.....;....... ...........................I.,....................................I......................................................... Assets of Design -Features System Components Pg. 2......... .............................................I........................................................................ Rock-It 4.0 Mount Assembly Rock-it 4.0 Coupling Assembly Pg..3................................................. .................. ....................I.................. Rock-it 4.0 Hybrid Mount Assembly Rock-4t.Clip SS Assembly Rockrlt:Clip 2.0.Assembly Pg. 4.................................. ....................................................................................................................... Array Layout GreenFasten Flashing Install, Pg. 5..................................................................................................................................... Rock-it System 4.0 Install Pg..6............................................................................................................................I................. Ground Lug Install Pg. 7 .................................................................................................... ..................................... Rock-it Clip SS Install Rock'-It-Clip 2.01ristall Pg. 8-12 ............................................................................................................................. Standoff.Spacing Tables Snow.Load 0-20.psf Snow Load21-30,psf Snow Load 31-40 psf Snow Load-41-50 psf Snow-Load 51-60,psf. Pg. 13 ................................................................................................................................... Grounding Information Bonding Assembly and Bonding Path :Pg. 14................................................................................. ............................... Thermal Expansion and Bonding Bracket.Spacing Staggered layout Cantilever Pg. 15.. . ........................................................................................................... ....................... System Specifications Evaluated, Compatible-Modules ROCK-IT SYSTeM 4.0 Designed with the installer in mind. EcoFasten Solar specializes in solar-roof attachments that are fast and easy to install,straightforward,*secure and cost-effective.EcoFasten offers a wide variety of standard products aswell as custom solutions,for a one-stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry standards In-houseiand,by third party agencies. EcoFasten's patented conical sealing system has been-in service in the snow guard and solar industries for two decades. FeaTures • New and improved design . North-South adjustability • Fastest,easiesttb level system on the market . Only one tool required(11/2"deep well.socket) Integrated electrical bonding . Vertical adjustment of 3W • SIMPLE=only 4 components sysTem componenTS* - reauireD ROCK-IT SLIDe ROCK-IT 4.0 ROCK-IT 4.0 COUPLinG ROCK-IT 4.0 47 For COMP SHinGLe mounT & LoaD BearinG FOOT Array -sKin, 8" For TiLe SYSTem com-ponenTS* - OPTIonaL A imp 9 — . - --_ < ROCK-IT CLIP SS -10 O.Athcorasten bolar (ReFer To PG.6) V EcoFasten Solar products are protected by the following US.Patents: .8,151,522 8,153,700 8,181;398 8,166,713 8,146,299 ROCK-IT 4.0 8,209,914 8,245,454 8,272,174 8,225,557 9,010,038 ROCK-IT 4,0 Array sKirr 9,134,040 9,175,478 9XZ833 HyBrID mounT EnD caps ,(ReF=er To PG. 5) (Eno.caps Come Pre-inSTaLLeD on EaST ROCK-IT CLIP 2.0 enD of smirr sec'nons) (ReFer To PG.6) *Components for use with 32mm modules-are available as special order.Components for use with 32mm modules are labeled as such,on- system packaging.Please-referto evaluated,compatible modules grid on page 15to Identify-system compatible 32mm modules. www:ecofastensolar.com lnfo@ecofastensolar.com- 877=859-3947 1 A ROCK-IT 4.0 mounT ASseMBLY NOTe: ITeMS 1-7 SHIP aSSeMBLeD 121� r 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS < 2 Rock-it 4.0 Mid-Clamp 6000 Series AL 3 Rock-it 4.0 Shelf 6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock-it 4.0 Tie Plate 6000 Series AL 6 Rock-It Pedestal 6000 Series AL (Z" 7 5/16"-1 8 x 3/8"Hex Serrated Flange Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series SS 9 3/8"m 16 x 3"Hex Tap Bolt 300 Series SS ROCK-IT SLIDes are accePTaBLe BracKeTS For use WITH ROCK-IT 4.0 (SOLDseparaTeLw) ROCK-IT 4.0 COUPLING asse!MBLY� NOTe: I'Tems 1-3 sHip assemBLeD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL 3 Rock-It 4.0 Coupling Shelf 6000 Series AL 4 Rock-it Load Bearing Foot Clip 5 Rock-It Load Bearing Foot Base I www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 2 ROCK-IT 4.0 HYBRID MOI.. nT ASSemBLY NOTe: ITems 1-lo SHIP assemBL_eD 1 Rock-It 4.0 Shelf 6000 Series AL 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL J 10 3 Rock-It 4.0 Coupling Tie Plate6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock-It Pedestal 6000 Series AL 6 Rock-It Slide 6000 Series AL ID 7 3/8"-16 x 3"Hex Tap Bolt 300 Series SS J 8 3/8"ID Star Washer 300 Series S 9 5/16 18 x 3/8 Hex Serrated Flange Bolt 300 Series SS J� 10 5/16"-18 x 1.5"Hex Serrated Flange Bolt 300 Series SS 4 111J� � 5 �6 `_ _07 ROCK-IT CLIP SS AsseMBLY ROCK-IT CLIP 2.0 ASSeI`l"1BLY NOTe: ITems 1-3 SHIP assemBLeD NOTe: ITems 1-3 SHIP assemBLeo �.l Stainless Steel.Carriage Bolt-.313-18X.75 1 Rock-It Clip 2.0 2 Rock-It Clip SS 2 Stainless Steel Flange nut.313-18 3 Stainless Steel Flange nut.313-18 3 Bolt.3125-18x1x1-S . MN ` 3 o www.ecofastensolarcom info@ecofastensolar.com 877-859-3947 3 Array LaY OUT i • Find the required.structural attachment points. Mark these.using a.vertical(N=S).chalk line on the center of the rafters. • Spacing may vary depending upon project specific structural requirements;.i:e:high snow and wind load areas may require lesser bracket spacing in the EV axis vs.the maximum spacing.Max spacing is 48"for portrait orientation and 72"for landscape orientation:Consult project layout diagram for project specific bracket:spacing on-the roof. • Install Rock It Mounts.to predetermined mount spacing. • The Rock-It.Array Skirt sections are the width of a typical 60.cell module—.use-the:Rock-lt Array Skirt as a.guide to lay out module placement. Note:The distance between the rows of mounts is-calculated by the module dimension N=S plus 1 3/8" (35mm).Lag screw should be installed as close to center.of exposed shingle as possible. The minimum distance between the lag screw and the edge of-the-shingle is 1/2" ereenFasTen FLasHinG insTaLL 1 Locate the rafters and snap horizontal and vertical lines to mark the Installation- positionfor each GreenFasten flashing. 2 Drill a pilot hole OXdiameter)forthe lag bolt.Backfill with sealant.EcoFasten Solar recommends an.EPDM mastic. 3 Insert the flashing sotheto p part is under the next row of shingles and pushed far ,.d enough.up slope to prevent water infiltration through vertical joint In shingles.The leading edge of flashing must butt against upper row of nails to prevent turning when torqued. 4 Line up pilot hole with GreenFasten flashing hole.. Insert the lag bolt.through the EPDM.bonded washer,the Rock-it slide,the gasketed. hole In the flashing and Into the rafter. Torque:The-range is between.100,140 torque inch-pounds depending on the type of wood and time of year.The visual.Indicator for-proper torque is when the EPDM on the underside of.the bonded washer begins to push out the sides as the washer compresses.If using an impact wrench to install the fasteners.be careful not to over torque the fastener.You may need to stop and use a ratchet to finish the install. 'The Engineer of Record shall check capacity of rafter to support lag screw loading. www.eccifastensolarcom info@ecofastensolarcom 877-859-3947 4 s [ ROCK-IT S9 STeM 4.0 jnSTaLL i Fig.A Install ECOFasten Soiar Hashing with Rock-it.Mounts •FoilowEwFanensolarinstallin*ucuomforflwtdngandbrackettrotall(Ureenfastanshownabow). •Optimum vertical distance between lag bolts Is13/8'pfus module dimenslom •Setmountsoneavemostrowsothat the Rock4t Pedestal IsontheSouthendofRock4t5ikie.' •Set mounts on all upper rows so that the Rodr:lt Pedestal is on the North end of Rock4t Slide. Z Instali Rock-it Array Skirt onto Eave Mounts • Slide Rock-It Array Skirt Into front channel on Rock-It shelf. -.Array Skirt End.Caps are pre-installed on the East end of each skirt'section,and are used to'couple.the skirt sections where needed(see Fig.A). •Tighten Mid-Clamp bolt,clamping Rock-lt Array Skirt to mount.Torque to 200 in-Ibs.(1301n-Ibs when Installing wlth 32mm modules). �� install Rock-It Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot is required) ' Prior to mounting on the roof,snap Load Bearing Foot Into the bottom of.Rodc-it Coupling If required.. (Each Load Bearing Foot Is set to same height as the Roth-It Mounts,adjust accordingly) -On.eaverow.only,slide Rock4t Array Skirt onto Rock-it Coupling Shelf.Torque tospecified value. • NOTE:If a coupling lands on a.rafter,the Hybrid Mounts should be used in place of the Rock-It Coupling(refer to irirage3a); *Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal,or by purchasing separately. 5 Align and Straighten rFirst Row of.the Rock-It System with Rock-It Array.Skirt -Use North-South adjustment of the Rock-tt Pedestal to straighten Rodr-It Array skirt and align module with Afray$idrt -Torque screw on side of Rock-it Pedestal to 150 in-Ibstosecure it to the Rock-t Slide. •Adjust Range Level Nut to level the system(optional—can be leveled during or afterinstallatton). 6: install 1 st Row of pV Modules. Slide upslope Rock-It Mounts down to engage top of first module. •Install RockltCoupiingson the upstopesideoflst raw ofpanels. •Torque 2nd raw ofMWaampsonRock-It Mounts and Rock-It Couplings to specified value. •instaiibalanceofPVrnodules,ensuringthattheRods-ItPedestalsareIntheappropriate,position,then torque Mid-Clamps to secure modules,. 10 Level the.Rock-It System •When assembly Is complete,level the entire system by adjusting Flange Level Nuts(Flange Level Nuts have no torque value). • Height between roof surface and underside of modules should be 3'or less,when Installed with Type 2 modules INSTALLATION NOTE:Modules should.be installed so that the Junction box Is installed upslope,away.from the leading edge of the array. wwwecofastensolarcom info@ecofastensolarcom 877=85.9-3947 5 ♦ t GrounD nG LUG inSTaLL y � + Necessary Components: - One of the following ground lugs(or any UL 2703 compliant ground lug): Burndy CL50-1TN Ground Lug(UL 2703-E351343./ UL 467-E9999) ILSCO SGBA Ground Lug(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4DBT(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4DBTH(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4SS(UL 2703-E354420 /UL 467-E34440) Note:Drill and.deburr hole in Ground'Lug prior to installation - 14 AWG-4 AWG Copper Ground Wire* Torque Values: - 8-32.x 0.5"Serrated Flange Head Bolt(300 Series SS) 14=1 oAWG=20 in-lbs. - 8-32 Serrated Flange'Nut(300 Series SS) 8 AWG=25 in-lbs. - 11/32"and-.1/4"wrenches or ratchets/sockets 6-4-AWG=35 in-lbs. 1 Insert the flange bolt into the module.ground.hole.Place Star.Washer over bolt.Place ground lug over the bolt and Star.Washer,and turn to desired orientation. 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4-Place wire in Ground Lug channel and tighten set screw to complete assembly. *Wire should be sized in accordance with the National Electrical Code,NFPA 70;Section 690.45,and a minimum of 1/4"clearance required between bare copper wire and aluminum. �r . " Drill hole per grounding lug manufacturers specifications in the upslope part of Rock-It Coupling for attaching grounding lug. t� - - Note:Deburr hole in Ground Lug and Rock-It Coupling prior to installation. www.ecofastensolarcom info@ecofastensolar.com 877-859-3947 6 4 ROCK-iT CLIP SS inSTa.L_L a. l 2'1.1h f om len^finn Box q.s 1 Locate all parts -Locate the Rock It.Clip SS,micro-inverter/power optimizer;and the section of the module frame in which you will be mounting the-micro=Inverter/power optimizer. See fig.A for.acceptable mounting'locations. 2.Install the Rack It Clip 55 • Slide the Rock-it Clip'.SS onto the lip of the module frame. • Slide the micro-Inverter/power optimizer into the opposite lip of the Rock-it Clip SS. • Tighten the bolt to 150-In-lb minumum to clamp the Rock-it Clip SS to the module frame and the. -micro4riverter/power optimizer to the Rock-It Clip SS. • .Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. ROCi-<-IT" CLIP 2.0 inST8 L Inverter.Flange 4 Module Frame Ronk-lt Clip 2.0 1 Locate ail parts -Locate the Rock-it Clip 2:0,micro-inverter/power optimizer,and the section of the module frame in which you will be mounting the micro-inverter/power optimizer. 2 Install the Rock-It Clip 20.(See below detail). • Slide'the Rock-It Clip 2.0 onto the-lip of the micro-inverter/power optimizer. • ,Slide the micro-inverter/power optimizer into the opposite lip of the module frame. • Tighten"the.bolt to 150 In-lb to clamp the Rock-it Clip 2.0 to the.module frame and the micro-inverter/power optimizer to the Rock-'It Clip 2.0. • Ensure that.the lip on the clip is tight.against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to.avoid rotation during tightening. www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 7 Snow Load-0-20 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch{6:12 .7:12,c Roof Pitch t 12:12 ASCE 7-05 ASCE 7- 00 Category Zone 1 Zone 2 Zone 3 Zone 1 ta8n t74 B 159 . 93 59. 85 mph 110 mph C. .114 67 42 D 96 56: 35 91 B 146 85 54 90 mph 115 mph C 104 61 3$ 98 80 D 88 51 32 83 68 68 B 123 72 45 95 95 100 mph 125 mph' C . 88 51. 32 83 68 68 D 7.4 43 '27 70 57 57 B 98 57 36 93- 76 76 110-mph 140 mph C 70 41 26 66 54 54 D 59 34 22 56 46 46 B 85 50 31 81 66 66 120 mph. 150 mph C 61 36"- 22 .58- 47 47 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow toad 1.)Values in above table.represent the maximum allowable spacing in inches for pullout forces only on EooFasten Solar standoff, howeverr the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of"1.5 for lag-pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)structures less than r30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering Is included in this table Snow Load 0 20 psf Wind"S eed- Exposure 2:12-c Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7=10 Category Zone 1 Zone 2 Zone 3 Zone.1 Zone 2 Zone 3 _ B 9 1 85 mph 110 mph C 65 38 24 61 50 i, D 55 32 20 . �... .�52 B 83 y 49 30 90 mph 115 mph C 59 35 22 56 46 46 D 50 29 18_ 47 38 38 B --�-10 — 41 r __26_ 54 -154 'x"y 100 mph 125 mph C 50 29 18 47 39 k39 D 42 26_ 15 40 32_ _ B 56 33 20 53 43 43 110 mph 140 mph C 40 23 14 38 31 31 D 34 19 12 32 26 26 — - - B - ` 49 28 18 46 37 37 120 mph • 150 mph C 35 20 12 33 27 27 D 29 17 10 28 22 22 Notes: Spacing Governed by Snow toad 1.)Values In above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by.EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6:).Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1..No site specific engineering"is Included in this table www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 8 Snow Load 21-30 psf Modules in Landscape "Wind Speed Exposure 2:12{Roof Pitch<6:12 7:12.<Roof Pitch-<12:12 ASCE 7-05 ASCE 7-10 Cate o Zane 1 Zone 2 Zone.3 Zone 1 Zone Zone 3 B 93 59 85 mph , 116 mph C "67 42 D 96 56 35 B 85 54" 90 mph. 115 mph C 104 61 38 D 88 51 32 B 72 45 100 mph 125'mph C 88 51 32 D 74 43 27 57 .57 B 98 S7 36 110 mph 140 mph C 70 41 26 66 54 54 D 59 34 22 56 46 46 B 85 50 '3 1' 66 66 120 mph 150 mph C 61 36 22. .58 47 47 D- 51 30 . 19 49 40 40. Notes: '��Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)includes additional factor of safety of.1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40° 6:)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is Included In this table Snow Load 21,30 psf. wind'S eed Exposure 2:12<Roof Pitch<-6:12 7:12<Roof Pitch c 12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone Zone 1 Zone 2 Zone 3 B .—53— ----- 33 3-- 85 mph 110 mph C 65 38 24 D 55. 32 20 B .49 30 90 mph 115 mph . . C 59 35 22 D 50 29 18 38 38 100 mph 125 mph C 50 29 D .42 26 15 B 56 33 20 110 mph 140 mph C 40 23 14 38 31 3.1 D 34 19 12 32 26 26 .37 120 mph 150 mph C 35 20 12 33 27 .27 D 29 17 10 28 22 22 Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)includes additional factor of safety of.1.5 for lag pullout capacity 5.)Values based on a maximum module length of_70" 6:)Based on Risk Category Il'(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1:No site specific engineering is Included in-this table www.ecofastensolar.com info@ecofastensoiarcom 877-859-3947 9 6 4 Snow Load 31-40 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 59 85 mph 110'mph C 67 42 D 56 35 B 54 90 mph 115 mph C 61 38 D. 51 32 B 45 100 mph 125 mph C 51' 32 D 74 43 27 B 57 36 110 mph 140 mph C 70 41 26 D 59 34 22 46 46 B 50 31 120 mph 150 mph C 61 36 22 47 47 D 51 30 19 49. 40 40 Notes: Spacing Governed by Snow Load 1.)Values in above table represent the.maximum allowable spacing in inches for pullout forces only on EcoFasten-Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site-specific engineering Is included in this table Snow Load 31-40 psf Wind Speed Exposure 2:12.<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zane.1 . . Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 -- — B «M--33, 85 mph 110 mph C 38" 24 D 32 20 B 49 30 90 mph 115 mph C 35 22 D 29 18 41.-- B_-- _ _ 100 mph 125 mph C 29 18 D _42 ;.. 26 15, B 33 20 110 mph 140 mph C 40 23 14 D 34 19 12 26 26 120 mph 150 mph C 35 20 12 D 29 17 10 28 22 `._ :22 - Notes: -Spacing Governed by Snow Load 1.)Values-In above table-represent the maximurn.allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet In height 7.)All adjustment factors are set to 1.No site specific engineering Is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 10 Snow Load 41-50 psf Modules In Landscape Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<'Roof Pitch<112,12 ASCE 7-05 ASCE 7­10 Category Zone I Zone 2 Zone 3 Zone I Zone 2 Zone 3 B 59 85 mph 110 mph C 42 D 56 35 B .54 90 mph 115 mph C 61 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 43 27 B 57 36 110 mph 140 mph C 41 26 D -59 34 22 46 46 B 50 .31 120 mph 150 mph C 61 36 22 47 47 0 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.).Values in above table represent the maximum allowable spacing In Inches for pullout forces only on EcoFasten Soler standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.),Includes additional factor of safety of 1.54or lag pullout capacity 5')Values based on a maximum module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering isIncluded in this table Snow Load 41-50 psf Wind Speed -Exposure 2:12<Roof Pitch<612 1 7:12<Roof Pitch<12-12 ASCE 7-05"ASCE 7-10 Cate o Zone Zone-2 Zone 3 Zone 1 Zone 2 Zone 3 B 86 mph 110 mph C 38 D 32 20 1 B 30 90 mph 115,mph C 35 22 D 29 18 B 26- 100 mph 125 mph C > 29 18 26 Is B 33 20 110.mph 140 mph C 23 14 D 19 12 26- 1-81-_ 120 mph 150 mph C 35 20 12 D 29 17 10 A- 22 1 Notes: .Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing In Inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum,allowed spacing approved by EcoFasten Solar Is 48" 3.)Maximum allowed standoff cappity=547#.(per testing results) 4;)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based.on a maximum module length of 70" 6.)Based on Risk Category 111,(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineedng.is Included In this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 11 Snow Load.51-60.psf Modules In Landscape Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<.Roof Pitch<.12:12 ASCE 7-05 ASCE 7-10. Cate ory Zone 1 Zone 2 Zone'3 Zone 1 Zone 2 Zone-3 B 85 mph 110 mph C 42 D 35 B 54 90.mph 115 mph C 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 43 27 . B 36 110 mph. 140 mph C 41 26 D 34 22 B 50 .31 120 mph : 150 mph . C 36 22 D 51 30 19 Notes: ®Spacing Govemed.by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2-)Maximum_allowed spacing approved by EcoFesten Solar is 72" 3.):Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag.pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table Snow Load 51-60 psf Wind Speed Exposure 2:12<Roof Pitch<-6:12 1 7:12<Roof Pitch<12:12. ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone.1 Zone 2 Zone.3 B 85 mph 110 mph C ! 24 D 32 __ 20 B 30 90 mph 115 mph C 22 D 29 18 B 26 100 mph 125 mph C 29 18 D _ 26 15 B 20 110 mph 140 mph C 23 14 D 19 12 - --- B 120 mph 150 mph C 20 12 D 29 17 10.- - Notes: -Spacing Governed by Snow Load 1.)Values in above'table represent the maximum allowable spacing in Inches for pullout forces only on EcoFasten Solar standoff 2:)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4:)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" .6.)Based on Risk Category 11(ASCE 7-10)structures less than.30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering Is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 12 GrounDnGnFormaTlon The rail-free Rock It System maybe used to mount and ground PV modules that comply with UL1703,onlywhen that specific module has been- evaluated for mounting and grounding,in compliance with the included installation instructions. Note:Grounding lug must be visible to-inspectors from the entire perimeter of the PV array. Multiple Use Grounding Pins Grounding pins within the Mid-Clamp are multiple use bonding/grounding devices.Modules will need to be adjusted if the Mid-Clamps are loosened to ensure there Is Nnewmetal to pierce into upon retightening. Grounding Method Rock4t 4.0 Mount bonds N-S rows of.modules Rock-it 4.0 Coupling bonds EV rows of modules Rock it Array Skirt bonds E-W along the entire array when installed One Burndy CL50-1TN ground lug is required per Warray,limited to 300 modules placed in either portraitzr landscape orientation. Bon-DinG ASseMBL-Y anD BonDinGpaTH Bond Path Grounding Lug Groundirs Integrated Bonding' to RoCk-ItCcupling 0 Rock-it Moirt —Rock-It Array Skirt Bond Path I Bond Path -19 Grounding Lug *".Grmmftg Lug Cnb onductor(ECCI Grourgling ground M Rock'Itcouplinm w Rcck-ItCoupUng w Rock-it Mount Rock-it Array Skirt a Rotk-lt mount Rock-It Array Skirt .www.ecofastensolar.corn lnfo@ecofastensolar.com 877-859-3947 13 THermaL Expansion. anD BonDInG A thermal expansion gap is required per each continuous 401 length,of modules. -- Bond Path Omit a coupling and leave a T gap in ID Grounding Lug the Rock-It Array Skirt and also between /---Gcnducto�(ECQ-�r~R the modules at that point. Vou d'r"�"� m Rock-It Coupling ® Rock-It Mount —Rock-It Array Skirt BracKeT sPacinG Portrait Orientation Landscape Orientation I j I Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. 32mm modules:Max east/west bracket spacing is 48"OC- Spacing may vary depending upon project specific structural requirements;i.e.high snow and wind load areas may.require lesser spacing E-W than the maximum. sTaGGereD .LaY ouT canTlLever anD oFFSeT Staggered Mounting.Points ,Rack-It Mount ®Rock-It Coupling Cantilever: Maximum cantilever Is 1/3 bracket spacing. For portrait orientation installations,check layout prior to installing. The array layout instructions in this Installation manual offer a general overview of layout. Periodically,due to a variety of Offset:Offset from all roof edges depends on wind speed,snow factors(roof obstacles,shading,etc,)other layouts are required. loads,local fire and building codes per location www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 ROCK- IT SYSTeM 4.0 SYSTem speclFicaTlons Max No.of Panels 300 Modules per ground lug Materials -300 Series Stainless, 600O Series Aluminum Max System Voltage 1OOOVDC Coating Black Andodization/Mill Finish Class A Fire Rating. With UL1 703 Type I Rated Lug Specifications Bumcly C150-ITN Ground Lug Modules,see note below. (UL Listing#KDER E9999) Leveling Range 34! Ground Wire 14AWG-4AWG Copper Per above Lug spec. Ground Wire Rock-It Slide Comp.Range 3' Max Module Size 64.96"(1650mm)x Rock-It Slide Tile 7" 39.05'(992mm)x 2"(SOmm) :MIh/Max Roof Slope 1/2--12112-12 Max Downibrce/Uplfft Rating 45 PSF Max Anchor Spacing(35=140mm) 72' Rock-it Mount Load Rating 547lbs with Single 5/16'Lag 10 Max Anchor Spacing(32mm) 48' Safety Factor Skirt Box(UY 6 units Slide Fastening Hole 5/16"diameter Mount Box(ITY 12 units Module Cantilever Maximum cantilever Is 1/3 Rock it Slide Box QrY 50 units bracket spacing Warranty 20 Year Material and Workman- Coupling Box QTY 12 units ship. Codes:National Electric Code;ANSI/NFPA 70,NEC 250,NEC 690,IRC,IBC Standards:UL 2703.First Edition,UL 1703 EmIIL"cD solar S.Tol.g.r A-z;njlwj;"V MMIDCODEW-M-2 6 cowo"To Ul2TW ONFORMSIOUL2703 ut ms�� `�Y AL) The Ecol'asten Solar Rock-it System is a rooftop PV racking system consisting of 6000 Series Aluminum and 300 Series Stainiess.Steel components.The Rock-it System includes the rack components but does not include the PV panels, inverters or electrical components.The PV modules to be used With Rock-it shall be certified under UL 1703.The system shall be used on steep slope roofs mounted overa Class A fire rated roofing material And attached-to the roof structure-using3/16"diameter,-minimum 4"long 300 series Stainless Steel lag bolts with minimum thread embedment depth of*2 I/Zinto the roof structure. Periodic re-inspection for loose components The system is subject to re-inspection as required by the PV module manufacturer or by the Authority Having Jurisdiction,Re-inspection,as required,-should include evaluation of any loose component or loose fasteners.All loose components and fasteners-should be secured In accordance with these Instructions.The system should also be evaluated for any evidence of corrosion.Any corrosion should-be removed.Any affected part should be cleaned or replaced In accordance with these instructions. OtEcolEaa.sten Solar -www.ecofastensolar.corn lnfo@ecofastensolar.com 877-859-3947 15 r � FeaTures • New and improved design North-South adjustabllity • Fastest,.easiest to level system on-the market • Only one tool required{1/2"deep well socket} • Integrated electrical bonding Vertical adjustment of 3"-4" • SIMPLE-only4 components EUaLUaTeD, compaTIBLe MODULes ModcleManufacturer Model Type("x"usedto Module Dimeisions(mm) Module 01mens'.ansQn) Oownward pressure Upward Pressure Down-slopeoeslgn .Maxtmum(jamp inditartevarlabletest) DesignLoad(psf) DeslgnLcad(pst) Load(pst) Spadng(in) Trina'Solar TSM-xxx4WS.08. 1640x992x40 64951149.05"•L57" 33.3 33.3 20 72 Canadian Solar C56P-xxxM 1638 x 922 x 40 64481'48.66"x1.57" 33.3 SIS 20 72 - Canadlansolar t,6P-wp 1638x992x49 -64.5"48.7"91,57' 33.3 $33 20 72 Jlnko Solar JKMxxxP.60 1658 x 992'x 40 64961149.05"x1.57" 30 30 20 72 Anko Solar JKMxxW-60 .165Dx992x40 6496"x39. V4.57" 3o 30 20 72- JinkoSolar JKMmWEA-60 1650x992x40 64.96"x39xs,,xL57" 30 3o 20 72 Anka Solar JxM»cxMM-60 1650 x992 x40 64961W9.05"rd.57" 90 30 .20 72 -yingilsolar VL2)%P 29b 1650 x990 x40 6496"X3837"XL57" 3o 3o 20 72' LG Elcetrmics 1000N1GB3 1640 x 1000 x 35 S45T'hG9.97'x1.38" 30 30 20 72 LG Elcetronlcs LG300N1K-G4 1640 x 1000 x 40 64.S7"x39.3T.xLS7" 30 30 20 72 Adtec Solar ACwW156.60S 1640x992x4o S45"ir39.061KLSB" 30 30 20 48' RECOM RCN-2xx-6MB 1640x992X35 S456")G9.05''KL37" 30 3o 20 72 Sllfab MA2xxP 1650 x 990 x 38 64.951h6837&49" 30 30 20 72 Solaria PowerW)=R-bat 1521 x 1056 x 40 63.09"x41.53"xL57" 3o 30 20 48 Hanwha-Q Q'lis' Q,PRO G42xx 1670 x 1000 x 32 55.75"x39.37'x1.25" '30 30 20 48 Hanwha-Q Cells' QPRO G42xx 1670 x1000 x 32 65.75"x39.37"xL25" 3o 30 20 72 Sunprene GXB73XXT 1670x997x40 65,75'509.25"x1.57" '30 30 20 48 REC REGxxx-6Ma 1675 x997.xaa 65.9ex39.2S1xL5" 20 20 20 72 REC REC-xxx-6Ma 1675X997x30 65.94"x39.25"xL5" 30 30 20 .48 Solarwodd SW xxx Mono Black 1675 x961 x33 65.95"x97B"x1:30" 20 20 20 72 SolarWorld SW xxx Mono Block 1675X961X93 65.95"x37.8x1.30" 30 30 20 48 •Hanwha CJ-Cells 32mm modules to be used with special order Rock-It System components.Call for details. �A� b coFasten Solav V . www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 16 1 1 Cut Sheet - Rock-It4.0-Mount 1.. Installation to be completed in accordance with.manufacturer's written specifications and installation instructions. 2.. See spec sheet or contact-manufacturer for detailed.material,finishes,.and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. 0 3.17in. [80.54mm] — 2.50in '_63.50mm I no i I 2.02in 2.14in 2.34in 54.37mm] - 59.36mm'' 32mm 11 __ 35mm 40mm *, Ec.Fe.S.I. 4741 xPol Street, Ste.4 Phoen85043 Toll Free Phone 1.888.766.4273' T611 Free Phone 1.877-.859.3947 Material:See Spec Sheet Toll Free Fax 1.888.766:9994 Toll Free Fax 1.888.766.9994 -- - - Scale; 1:2 6/28/2017 ASG: - EFS: x Data Sheet Enphase Networking Enphase The Enphase IQ.Combiner 3"' with Enphase IQ EnvoyT"' consolidates interconnection �� Cotl�biner 3 equipment into a single enclosure and (X-1Q-AM1-240-3) streamlines PV and storage installations.by providing a consistent, pre-wired solution for residential applications. It-offers up to four 2=pole input circuits and Eaton BR series busbar assembly. Smart II j Includes IQ Envoy for communication and control I Flexible networking supports Wi-Fi, Ethernet,or cellular Optional AC.receptacle available for PLC bridge • Provides production metering and optional consumption monitoring k+ Simple Reduced size from previous combiner Centered mounting brackets support single Nd k stud mounting Supports back and side conduit entry Up to four 2- ole branch circuits for 240 VAC plug-in breakers(not included) ___ .r __.� �. ._____J •-80 A total PV or storage branch circuits Reliable • Durable NRTL-certified NEMA.type 3R.enclosure • Five-year warranty UL listed LISTED To learn more.about Enphase offerings,visit enphase.com `/ E N P H A S E. Enphase IQ Combiner 3 MODEL NUMBER IQ Combiner 3 X-IQ-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy'"-printed circuit board for integrated revenue grade PV production.metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2-.5%). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect" CELLMODEM 03(4G/12-year data plan) Plug and play industrial grade cellular modern with data plan for systems up to 60 CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-M1(4G based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5°i). Circuit Breakers. Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers.. BRK-10A-2-240 Circuit breaker,2 pole,10A,Eaton BR210 BRK 15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 EPLC-01 Power line carrier(communication bridge pair),quantity 2 XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS Rating Continuous duty. System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating 125-A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max..continuous current rating(input from PV) 64 A Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions(WxHxD)' 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6.63").Height is 21.06"(53.5 cm with mounting brackets). Weight 7.5 kg(16.5 Ibs) Ambient temperature range -40Q C to+460 C(-400 to 1150 F) Cooling Natural convection,plus heat shield Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors • 60 A breaker branch input: 4 to 1/0 AWG copper conductors Main lug combined output: 10 to 2/0 AWG copper conductors • Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters(6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) Cellular Optional,CELLMODEM-01 (3G)or CELLMODEM-03(4G) or CELLMODEM-MI(4G based LTE-M) (not included) COMPLIANCE Compliance,Combiner - UL 1741 CAN/CSA C22.2 No.107.1' 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 *Consumption monitoring is required for Enphase Storage Systems. To learn more about Enphase offerings,visit enphase.com ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. `-I -E N P H A S E, 2018-09-13 \.# • y = .. •;` ° , "mot 4 _ �. A. t�,,,,�} ,,• r t"s . . _ ; »� tt� -fie,'. f.•�' ���_[+. -. - T ,'wry Y.,C � �.,. -r�'• My�t J � ZZ '-. - '• t ♦ �{'• � •a,]t � $^ r 'tit � . s s; -••yr'�k t r -+ ✓y Z�;�T !` mkt 'y"hrwyw�,� a�'S .+, *•s�,r �'r*x y, v'at '^"+c � r _ ., . _ + t rri�� -s�T ��5. .f^ _ �i,s;""}!'a-1�',,.+�ar�,t�, �*+.wM�i�� _�"+`�-'"�`r •'^ _ t t�M1 t`�'4.�h�4*::t �� t�r�'4�tY"'""•� ��y` ��yn�� �4��A�re"-*a. st^,�+��"��+` `¢ ,�`Y h 5 - _ . ' r " _ -._-k rs-:.-` tc.F. r.. •,:.-..'r.. .. ..cam,.._..... c. '--_ K .-M«'.s.. M...z S�Ss--_: -„ . � 4 TABLE OF CONTENTS INSTALLATPON INSTRUCTIONS Contents IMPORTANTSAFETY INSTRUCTIONS........................................................................................................................4 SAFETY WARNINGS &CAUTIONS..........................................................................................................................4 ELECTRICALPRECAUTIONS....................................................................................................................................5 MECHANICALPRECAUTIONS..................................................................................................................................5 PRODUCTINFORMATION.............................................................................................................................................. 6 OVERVIEW......................................................................................................................................................................6 PREP & PLACEMENT...................................................................................................................................................... 7 REQUIREDTOOLS.......................................................................................................................................................7 PRODUCTPLACEMENT..............................................................................................................................................7 SPECIFICATIONS .......................................................................................................................................................... 11 MECHANICAL/ELECTRICAL...................................................................................................................................11 TORQUERATINGS..................................................................................................................................................... 11 WARRANTIES: Seller warrants to Buyer that products and any services furnished hereunder will be free from defects in material,workmanship and title and will be of the kind and quality specified in Seller's written quotation.The foregoing shall apply only to failures to meet said warranties(excluding any defects in title)which appear within two years from the date of shipment hereunder. The conditions of any tests shall be mutually agreed upon and Seller shall be notified of, and may be represented at, all tests that may be made.The warranties and remedies set forth herein are conditioned upon(a)proper storage,installation, use and maintenance, and conformance with any applicable recommendations of Seller and (b) Buyer promptly notifying Seller of any defects and, if required, promptly making the product available for correction. If any product of service fails to meet the foregoing warranties(except title), Seller shall thereupon correct any such failure either at its option, (I)by repairing any defective or damaged part or parts of the products, or(ii)by making available, F.O.B. Seller's plant or other point of shipment,any necessary repaired or replacement parts.Where a failure cannot be corrected by Seller's reasonable efforts,the parties will negotiate an equitable adjustment in price. The preceding paragraph sets forth the exclusive remedies for claims (except as to title) based on defect in or failure of products or services;whether the claim is in contract, indemnity,warranty,tort(including Seller's negligence),strict liability or otherwise and however instituted. Upon the expiration of the warranty period, all such liability shall terminate and Buyer shall have a reasonable time,within thirty days after the warranty period,to give written notice of any defects which appeared during the warranty period. Except as set forth in Article 2, "Patents," the foregoing warranties are exclusive and in lieu of all other warranties, whether written, oral, implied or statutory. NO IMPLIED STATUTORY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE SHALL APPLY. Seller does not warrant any products or services of others which Buyer has designated. www.soltection.com Soltection RJ-1 Installation Manual Page 3 L IMPORTANT SAFETY INSTRUCTIONS . D ALL INSTRUCTIONS & SAFETY WARNINGS PRIOR TO INSTALLATION NOTE: SAVE THESE INSTRUCTIONS This manual contains important instructions that shall be followed during installation and maintenance of the Soltection RJ-1 rooftop junction box with flashing. LETHAL VOLTAGES ARE PRESENT DURING THE INSTALLATION, OPERATION AND SERVICE OF THIS EQUIPMENT. PROPER PRECAUTIONS MUST BETAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . SAFETY WARNINGS & CAUTIONS ■ Only qualified personnel or licensed electricians should install this product and the instructions herein are provided for those individual(s)only. ■ To reduce the risk of electric shock, injury, or death, all electrical wiring and connections must be performed by qualified personnel. ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper precautions must be taken at all times to ensure the safety of the service personnel. ■ Follow state and federal Occupational Safety and Health Administration (OSHA) guidelines and regulations when installing this product. ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations as well as for installation best practices. ■ Install this apparatus in accordance with ANSI/NFPA 70, National Electrical Code (NEC). Follow all national or local electrical codes. ■ Install, operate, and use this product in a manner consistent with the instructions provided. Failure to follow the procedures indicated may result in roof leaks, property damage, or consequential damage. www.soltection.com Soltection RJ-1 Installation Manual Page 4 !® GAUTIC•]N ELECTRICAL PRECAUTIONS ■ Ensure all electrical conductors are at zero voltage potential before installing or servicing this unit. • Never break contact on a circuit without using the appropriate disconnect device. ■ Follow established lockout and.tagout procedures for all electrical conductors prior to servicing. ■ Beware of power lines in the vicinity of the roof, where inadvertent contact may result in electrocution, personal injury, or death. ■ When.disconnecting source or supply circuits, provide sufficient time.as stated in the.power electronics manufacturer's instruction manual in order to ensure discharge of all conductors in the circuit. ■ Always verify the integrity and proper installation of-the electrical components prior to energizing electrical circuits. ■ Non-metallic enclosures do not provide.grounding means between conduit connections. The use of grounding hubs-.and.jumper wires are required. ■ Grounding must be sized-per NEC requirements, and is the responsibility of the installer. MECHANICAL PRECAUTIONS ■ When drilling into an attic space, ensure that electrical -wires,. mechanical obstructions, or potential electrical hazards are removed from the vicinity and direction of the drill. Do not install if the roof is wet, frosted, or, covered by ice or snow. ■ If any-part-of this product becomes damaged, • remove and destroy the entirety of the unit. Failure to do so may result.-in fire, property damage, personal injury, electrocution, .or death. ■ Do not use the product to anchor fall protection equipment. www.soltection.com Soltection RJ-1 Installation Manual Page 5 4 PRODUCT INFORMATION OVERVIEW ■ The Soltection RJ-1 Residential Rooftop Junction Box is a flashed roof penetration designed to protect electrical conductors entering the rooftop/attic. It is made of a high-strength UV-resistant and UV- stabilized polymeric material. ■ The RJ-1 enclosures comes fully equipped with a slotted DIN rail mounted inside the enclosure designed for mounting of DIN rail accessories, such as terminal blocks. ■ A four position ground bar is also provided as a means to form a bond between the solar array mounted on the roof and the building. CORNER SCREWS MOLDED COVER PLASTIC SCREW FOR GROUND BAR AFFIXING DIN RAIL GROUND BAR 0 0 00 0 MOLDED BASE DIN RAIL www.soltection.com Soltection RJ-1 installation Manual Page 6 PREP & PLACEMENT REQUIRED TOOLS ✓ Shingle Ripper Bar ✓ Phillips Screwdriver ✓ Lumber Crayon ✓ Uni-Bit ✓ Hole Saw or Spade Bit ✓ Utility Knife ✓ Roofing.Sealant RAFTER PRODUCT PLACEMENT -- • Identify.the location and placement.of the flashing on the roof as shown. The product = - may be mounted beneath the array or - adjacent to the array. Affe ) DO NOT LOCATE THE PRODUCT DIRECTLY OVER RAFTER TO ENSURE THE RAFTER DOES NOT INTERFERE WITH THE WIRING Remove template from packaging ENTRY INTO THE.ATTIC and use in Step 2 STEP I. www.soltection.com Soltection RJ-1 Installation Manual Page'7 WT t `t U• a'" Y• .��7-5w..-•ate*+.' n r"� Tom:C�;}w,.wt s>..`s• .r,_ -/• v _ • •i �firirk ,^: `�.�`�.':. 'tea'" s55, , a'S '�+hFr.� �:�sv ;�=�" ,•}, ie �� .� R<5�.h�"i�';:,"~.5 Tom; :. y y' 1N{v•1:'-i,. C,�y`'�,. -•l 4s'' tai�'I::rn.+: .�Y 'A`"�"f frj_J.. r¢� t..ix n�yG���ey N''�`+ r J.• .ypii '14^�%s_=x: TVkS Ri�rah')''.n i Position the top edge of the template 1/2" Trace and continue using a lumber crayon to the above the 1st course of shingle as shown. bottom of the 2nd course. Cut along lines and remove shingles. STEP 2 STEP 3 y RECCOMENDED I LOCAIIUI1 FOP CONDUIT ENTRY j r•110 ROOr RAISED AREA IN MOLDED BASE z I Remove any roofing nails beneath the 1st 2nd+ or DRILL PILOT HOLE 3rd course of tile that obstructs the position of Slide RJ-1 Junction box into place where you the roof flashing. cut shingle template.The image above shows STEP 4 where you will drill in the next step STEP 5 www.soltection.com Soltection RJ-1 Installation Manual Page 8 •ry r fI•�� .�7 j �^�y� S `', ,r�• y� +Qt �t�C jr., a i •1! , r ` r'- y'i'���3 k�;:+ A} 44 jd 7r errs 1 .. "prrw t , •' 'a. ,K" - r go • • •• • • • • of y tip V� � s r � t• iiyy��'-•r.1Y. ,`..y�,.. �'.r,t1 b�°i:r Y ✓r y ''F"�� . .. • • • •M 19111 • • •• •• • 1 • • •. • • A J ::y Remove RJ-1,flip it over,wipe it clean&apply Reinstall Unit. Use the two supplied Decking a bead of roofing sealant to the underside of the Screws to mount the flashing to the roof. flashing unit. Ensure that it's placed in the Torque to the specification indicated in the "Upside-down U"Shape to support engress specifications. Refer to Table T2(page 10)for water protection,AS SHOWN. the proper tightening torques. STEP 1 0 STEP 11 POPULATE RJ-1 •{, Rtj 5��i ' a.4 `;- • Populate the RJ-1 unit using the appropriate wire connectors,terminal z }-•xti `' blocks, or other necessary components. • Ensure that the components installed are rated for and are suitable for the intended purpose. ! w� • The RJ-1 unit is provided with multiple standoffs which can accommodate accessories to be mounted. T Step 11 . A Install the cover onto the top of the enclosure. Tighten 4 cover screws to the Torque value Indicated in Table T3(see page 10) STEP 12 www.soltection.com Soltection RJ-1 Installation Manual Page 10 ♦ 4 SPECIFICATIONS MECHANICAL/ ELECTRICAL ■ Product Certifications: UL508A ■ Enclosure Rating:TypeAX ■ Attic Conduit Pass Through Connector Size Range: 1/2"—1" ■ Max.Side Wall Conduit Size: 1" • Maximum Current: N/A ■ Maximum Voltage: N/A- ■ Ambient Operating Temperature: -35C to 75C TORQUE. RATINGS Table T1: Ground Bar Connection,.Wire Range:#4 to#.14, 4 Usable Connections 0 0 Wire Size Tightening Torque(lb- in 4-6.AWG. 35 8 AWG - -30 10-14 AWG 25 Table T1 Table T-2:-Mounting Screw, Mounting to Deckin ,.2 Provided [TighteningTorque(lb-in) 15-20 Table T3: Torque Values, Cover/Lid Screws , 4 Provided, Captive Tightening Torque (lb-in) 11 www.soltection.com Soltection R]-1-Installation-Manual Page-11 1 ■ TM soltection. by vynckier Soltection is a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston,TX 77029 1-866-227-0577