Loading...
HomeMy WebLinkAbout19-22071 CITY OF ZEPHYRHILLS 5335-8th Street 6" (813)780-0020 2071 ELECTRICAL PERMIT PERMIT INFORMATION LOCATION INFORMATIO9 Permit#:22071 Issued: 11/20/2019 Address: 39031 3RD AVE Permit Type: ELECTRICAL MISC ZEPHYRHILLS, FL. Class of Work: ELECTRICAL MISC Township: Range: Proposed Use: SINGLE FAMILY RESIDENTIAL Lot(s): Block: Section: Sq. Feet: Est. Value: Book: Page: Cost: 39,690.00 Total Fees: 427.50 Subdivision: CITY OF ZEPHYRHILLS Amount Paid: 427.50 Date Paid: 11/20/2019 Parcel Number: 12-26-21-0000-03500-0000 CONTRACTOR INFORMATION OWNER INFORMATION Name: MOMENTUM SOLAR Name: WARREN, WILLIAM & KATHLEEN Addr: 8248 PARKLINE BLVD STE 100 Address: 39031 3RD AVE ORLANDO FL 32809 ZEPHYRHILLS, FL. 33542 Phone: Lic: Phone: (813)477-8218 Work Desc: INSTALL ROOF TOP SOLAR PANELS APPLICATION FEES ELECTRICAL FEE 360.00 BUILDING FEE 67.50 ROUGH ELECTRIC INSPECTION'S REOUIRED CONSTRUCTION POLE PRE-METER ` FINAL REINSPECTION FEES:(c)With respect to Reinspection fees will/comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. CONTRACTOR PER OFFI PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit A ion Leo 0021 Building Departme 7 Date Received (l0 h Phone Contact for Perm ing 321 247 6073 1� Owner's Name William Warren Owner Phone Number 407 477-2219 Owner's Address 39031 3rd Avenue Zephyrhills,FL 33542 Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS 390313rd Avenue Zephyrhills,FL 33542 LOT# SUBDIVISION PARCEL ID# 1226210000035000000 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT = SIGN = = DEMOLISH X INSTALL REPAIR PROPOSED USE = SFR 0 COMM = OTHER_ I Solar TYPE OF CONSTRUCTION = BLOCK Q FRAME = STEEL = DESCRIPTION OF WORK Installation of PV solar panels On rooftop/install new 150 amp main breaker panel and line side tap BUILDING SIZE SO FOOTAGE HEIGHT n� BUILDING Is /� / r• `h�4 � � VALUATION OF TOTAL CONSTRUCTION 3't1 0��• d a]ELECTRICAL $ AMP SERVICE = PROGRESS ENERGY = W.R.E.C. l3.331�w 7 r =PLUMBING $ D',/_ okp�iV7/✓ =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION ( [ J A)V =GAS 0, ROOFING 0 SPECIALTY = OTHER11 FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO 5j �;�41 Momentum SolarBUILDER COMPANYSIGNATURE Cameron Christensen REGISTERED Y/ N FEE CURREN YIN Address 8248 Parkline Blvd.Ste.100 Orlando,FIL 32809 License# I GVC-5 ELECTRICIAN Matthew Franz COMPANY Momentum Solar SIGNATURE REGISTERED I Y/ N FEE CURREK Address 8248 Parkline Blvd.Ste.100 Orlando,FL 32809 License# 300 17 PLUMBER COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREK I YIN Address License# MECHANICAL COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREK Y/N Address I License# OTHER COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREK LZLN Address License# RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisionsAarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. .'"PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement Is required. (A/C upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with'state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the"contractor Block"of this application for which they Will be responsible. If you, as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands,that such fees, as may be due,Will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I Certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,WaterM/astewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction,I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application,for lots less than one (1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER,I promise in goad faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F. 03) OWNER OR AGENT C'� CONTRACTOR Sub ribe and swo to(or affirmed befor me his Subs ribe and wom to(or affirmed) efore m this o zs' by `d a ta-, o y CantCron I.rss�eanIen Who is/a a personally known to me or hasthave produced Wh is/arb pyrconal yawn to mP or hasthave produced asidentification. asidentification. /n Notary Public ` Notary Public G Commission No. l7 Vc �Q6d1 Commission No. 6-6-gn roo 1 Name of Notary typed,printed or stamped Name of Notary Notary Public State of Florida Wx .p �4a� Notary Public State of Florida a41` Lauren E EI-TaherLauren E EI-Taher i My Commission GG 298001< My Commission GG 298001 } Expires 02/o412023 Expires 02/04/2023 ar n City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: Date Received: Site: Permit Type: AW4 Approved.w/no comments:❑ Approved w/the below comments: ❑ enied w/the below comme s: ❑ This comment sheet shall be kept with the permit and/or plans. h 1,A1:) ///4,4 KalVilds6 zer—Plans Examinef Date Contractor and/or Homeowner (Required when comments are present) m-omentum solar I,_Robert Smith , license holder for Momentum Solar, authorize the following individuals to apply,pick up, and sign for permits under my license number CCC1328070 Please allow ONLY the person(s) listed below to sign. This letter supersedes all others. _Philip Reese_ _Dawn Welch_ _Michele Hornstrom_ _Jose Gomez_ _Robert Johnson_ _Kristina Salgado_ _Lori Hill_ v— Robert Smith Contract Signature Contractor's Printed Name State of Florida County of_Hillsborough_ The foregoing instrument was acknowledged before me this 28_day of—October____, 20 19 By Robert Smith_who is,personally known to me or has produced as identification. �• •' Notary Public State of Florida Lauren E EI-Taher NOTARY PUBLIC My Commission GG 288001 or n Expires 02/04/2023 1 mom e nt um solar I,_Matthew Franz___, license holder for Momentum Solar, authorize the following individuals to apply,pick up, and sign for permits under my license number EC13008217 Please allow ONLY the person(s) listed below to sign. This letter supersedes all others. _Philip Reese_ _Dawn Welch_ _Michele Hornstrom_ _Jose Gomez_ _Robert Johnson_ _Kristina Salgado_ _Lori Hill_ Matthew Franz Contractor i ature Contractor's Printed Name State of Florida County of_Hillsborough The foregoing instrument was acknowledged before me this 28_day of—October___, 20 19 By Matthew Franz_who is personal y muwn ra,,,,P or has produced as identification. �— ,faY v Notary Public State of Florida NOTARY PUBLIC ' Lauren E EI-Taher i ly4yEx Commission 23 298001 Fora Expires 0210412023 1 momentum solar I, Cameron Christensen, license holder for Momentum Solar, authorize the following individuals to apply,pick up, and sign for permits under my license number CVC57036 Please allow ONLY the person(s) listed below to sign. This letter supersedes all others. _Philip Reese_ _Dawn Welch_ _Michele Hornstrom_ _Jose Gomez_ _Robert Johnson_ _Kristina Salgado_ _Lori Hill_ L� Cameron Christensen Contractors Signature Contractor's Printed Name State of Florida County of_Hillsborough The foregoing instrument was acknowledged before me this 28_day of_October_, 20 19 By_Cameron Christensen_who is personally known to me or has produced as identification. Notary Public State of Florida Lauren E El-Taher NOTARY PUBLIC My Commission GG 298001 Expires 0210412023 of�� 1 INSTR#2019184451 OR BK 9997 PG 1308 Page 1 of 1 10/29/2019 09:37 AM Rcpt:2103566 Rec: 10.00 DS:0.00 IT:0.00 Nikki Alvarez-Sowles,Esq.,Pasco County Clerk&Comptroller Permit Number Folio/Parcel iD# 1226210000035000000 Prepared by Lauren EI-Taher/Momentum Solar 8248 Parkline Blvd Suite 100 Orlando, FL 32809 Return to Momentum Solar 8248 Par0ne Blvd Suite 100 Odando,FL 32809 NOTICE OF COMMENCEMENT State of Florida, County of The undersigned hereby gives notice that improvement will be made to certain real property,and in accordance with Chapter 713,Florida Statutes,the fallowing information is provided in this Notice of Commencement 1 Description of property(legal description of the property,and street address if available) Cam SW Cor of S 198ft of SW 1/4 of NW 1/4 of SW1/4 TH E/ 2 General description of improvement 390313rd Avenue Zephyrhdls,FL 33542 Installation of PV solar panels on rooftop/install new 150 amp main breaker panel And i,rnc 9/ e-M6P. 3 Owner information or Lessee information if the Lessee contracted for the improvement Name William&Kathleen Warren Address 39031 3rd Avenue Zephyrhdls,FL 33542 interest in Property.Owner Name and address of fee simple titleholder(if different from Owner listed above) Name N/A Address 4 Contractor Name Momentum Solar/Cameron Christensen Telephone Number 321-247-6073 Address 8248 Parkline Blvd Suite 100,Orlando, FL 32809 5 Surety(if applicable,a copy of the payment bond is attached) Name N/A Telephone Number Address Amount of Bond $ 6 Lender Name N/A Telephone Number Address 7 Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by§713.13(1)(a)7,Florida Statutes. Name N/A Telephone Number Address 8 In addition to himself or herself,Owner designates the following to receive a copy of the Lienor's Notice as provided in§713.13(1)(b),Florida Statutes Name N/A Telephone Number Address 9 Expiration date of notice of commencement(the expiration date will be 1 year from the date of recording unless a different date is specified) WARNING TO OWNER ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713,PART I,SECTION 71313,FLORIDA STATUTES,AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY A NOTICE OF COMMENCEMENT MUST BE RECORDED POSTED ON THE JOBS BEFORE THE FIRST INSPECTION IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR N OR A TTORN BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT Owner Signapp of Owner or Le ee, er's or Lessee's Authorized Officer/Director/Partner/Manager Signatory's Title/Office The foregoing instrument was acknowledged before me this 28 day of 10/19 by William Warren mont Vy—ear name of person as Owner for Type of authority,e g,officer,trustee,attorney in fact Name of party on behalf of whom instrument was executed Signature of Notary Public—State of Florida Print,type or stamp commissioned name of Notary Public Personally Known OR Produced ID. X � ti�nry Type of ID Produced D L 4F Notary Public State of Ronde +1' Lauren E El-Taher My Commission GG 298001 W R� Expires 02104/2023 ` JUDI STATE OFFLORIDA, COUNTY OFPASCO THIS\GT0 CERTIFY THAT THE FOREGOING\,�A TRUE AND CORRECT COPY OF THE DOCUMENT ON FILE DRDF PUBLIC RECORD |N THIS OFFICE DS�%HAN D AND.OFFICIAL SEAL TH\ momentum. J SOLAR SOLAR ELECTRIC INSTALLATION CONTRACT William Warren_ Customer Name Company Name 39031 3rd Avenue Zephyrhills I FL 133542 Service Address City State Zip Billing Address(if different from Service Address) City State Zip 813 477-82118 wfwarren5l@yahoo.com Daytime Phone Evening Phone Email Address Duke 1816334229 17093 kWh Electric Utility Company Utility Account Number Annual Usage 13.23 Q-CELLS 31 SW ENPHASE.IQ7 42 ROOF 17304 kWh stem Siz Solar Module Inverter Make/Type Module Count Solar Mount Type Estimated Annual Make/Type Production *IF SYSTEM SIZE IS BIGGER THAN .7,6 I 1. D_ /10.0 KW AC,PLEASE SEE ATTACHMENT 1 REGARDING LIABILITY INSURANCE REQUIRMENT Payment Schedule and Third-party Financing: Your payments will become due as indicated below. The "Total Amount Payable to Momentum Solar shown below reflects only the amount we charge for the PV System (as defined below) and installation, not including any applicable sales tax. If you choose to obtain financing from a third-party finance company, your payment schedule and total amount owed will be set out in your agreement with the third-party finance company and may include finance charges. You should read that agreement carefully to understand your repayment obligations. We are not your lender. The terms of any financing you obtain from a third party, including the amount and timing of your payments and any finance charges imposed, are solely determined by your third-party finance company. We are not affiliated with any third-party finance company. TOTAL AMOUNT PAYABLE TO MOMENTUM SOLAR: $ 39690 (PLUS ANY APPLICABLE SALES TAX) ❑ CASH PURCHASE OR SELF-FINANCED SCHEDULED PAYMENT AMOUNT TIME DUE Deposit(10%) $ - Upon Signing of Contract 1st Installment(30%) $ - Upon Completion of Design and Permitting 2nd Installment(50%) $ - Upon Installation of Panels, Inverters and AC Electrical Final Payment(10%) $ _ Upon Completion of Installation and Required Utility and Local Authority Inspection Ef- FINANCED BY THIRD-PARTY FINANCE COMPANY SCHEDULED PAYMENT AMOUNT TIME DUE Refer to your agreement with the third-party financing company for a description of your payment obligations, including your payment schedule and total of payments(including any finance charges). You acknowledge that,-regardless of whether you obtain financing from a third party, we require payment in full upon completion of the installation (and required inspections) and that we are not extending credit to you in connection with this transaction. Document.24 FL Page 1 of 10 momentum SOLAR ACCORDING TO. FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES),THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND.ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB-SUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS MADE,YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY. Pro Custom Solar LLC d/b/a Momentum Solar is a certified solar contractor(Cert.#CVC57036)with the Department of Business Professional Regulation. General Terms and Conditions Definitions: In this agreement, the terms "customer", "owner", and "you" refer to the customer identified above, and the terms "contractor", "us" and "we" refer to Pro Custom Solar LLC d/b/a Momentum Solar and its employees, agents and subcontractors, as applicable. The term "agreement" or"contract" refers to this agreement between you and us and any change orders signed by you and us. "PV System" means the solar panels and related parts and the system of solar energy generation described above. Scope of Work: We agree to sell and install the PV System on your real property. We will not provide, or arrange for, architectural/engineering services or structural changes to dwellings or buildings unless we expressly agree to do so in a separate writing signed by us. We have the right to determine the method, details, and means of performing the work. We will obtain the necessary building and electrical permits and ensure code compliance. You agree to cooperate with us to obtain these permits and meet code compliance. You are solely responsible for obtaining, at your own cost and expense, any and all zoning variances required by any"municipality or local governing body. We will not obtain a zoning variance for you unless we expressly agree to do so in a separate writing signed by us. Change Orders: Any change to the work or the installation schedule that you or we request will be set out in a written change order signed by both you and us. You agree that a change order may result in a change to the terms of the agreement between you and us, including but not limited to, the contract price and the anticipated installation schedule. If you request, in writing, a change to the scope or performance of the services provided under this agreement, then we will provide you with a written change order for your approval within a reasonable time after such written request. You agree that we may issue a change order if a Force Majeure Event(as defined below) occurs that changes or impairs our ability to perform under the current terms and conditions of this agreement. All change orders, including a change order resulting from a Force Majeure Event, must be approved in writing by you within a reasonable time after receipt, and you agree not to unreasonably withhold your approval of any change order. Time Period: We anticipate _beginning work under this agreement within fourteen (14) days after we receive all required paperwork from the applicable state, utility, and municipality. We anticipate that we will complete the work within thirty (30) days after we begin. This is our best estimate and is subject to change according to various factors outside of our control. We are not responsible for delays resulting from any Force Majeure Event (as defined below). Document.24 FL Page 2 of 10 momentum. SOLAR Force Majeure: We will not be liable to the you for any failure or delay in performance under this agreement caused by events beyond our control including, without limitation: negligence or delay by any governmental entity or utility, company; your-noncompliance with this agreement; your failure to furnish necessary information or furnishing of incorrect information; legal encumbrances on your property; your property's non-conformance with building codes or zoning requirements; your credit rating or financing arrangements; acts of God, nature, government or any third parties; war or acts of terrorism; labor strife- or disputes; shortages of labor, fuel, raw materials or equipment; technical failures; accidents; sabotage; failure or delays in transportation or communication; failures or substitutions of equipment; or hidden-or unforeseen physical or hazardous conditions,including but-not limited to, environmental hazards such as mold, asbestos, and lead paint (each, a "Force Majeure Event"). Your Responsibilities: You agree to.pay us for merchandise delivery and/or installation of the PV System according to the terms- and conditions of this agreement. If your service address is subject to any easements, covenants or-other legal encumbrances-that could affect the Installation, you agree to notify us in writing, including by electronic mail or by certified mail, within five (5)'business days of your becoming aware of the encumbrance or prior to our beginning work, whichever is earlier. You agree to ensure that work areas- are free of preexisting hazards, including, but not limited to unsafe physical conditions or environmental hazards and building/zoning code violations. You agree to allow us access to work areas during work hours. If you,have a security system, you .agree to ensure that it does not interfere with installation. You agree not to allow unattended minors at the service address while we are performing the installation. You agree-to control pets and keep them away from work areas. You agree that, if anyone under your control interferes with,or delays installation, you may be subject to transportation and/or storage charges or other resulting charges. Payments: All payments must be made in cash, by credit card, or by check(s) made payable to "Momentum Solar" as specified in this agreement. Any payments you owe under your agreement with the third-party finance company must be made in accordance with the terms of your agreement with them. Failure to Pay; You will be in breach of this agreement if you fail to make any scheduled payment on time, in full, and otherwise in accordance with this agreement. If we have not received the full amount of any scheduled payment within ten days after the scheduled due date, you will incur a late fee equal to one percent (1%) of the unpaid amount due. If the installation is not completed when the breach occurs, we reserve the right to suspend all work until all past-due amounts have been paid in full. If the PV System is in operation when the breach occurs, we reserve the right to remotely shut off the PV System until.all past-due amounts have been paid in full. Subject to applicable law, we may also pursue amounts you owe us through legal action, which may include perfecting or enforcing a lien against your property or the PV System.. If we take legal action to enforce this agreement, you agree, to the maximum extent permitted by applicable law, to pay reasonable attorney's fees and costs we incur before and after judgment and any other costs permitted under applicable law. If you fail to-pay your third-party finance company pursuant to the terms of your agreement with them, you may be subject to any of the terms and remedies set forth in that agreement. Please consult that agreement to determine your liability and rights regarding the third- party finance company. Inspection of System: You agree to allow us, our designees, and any state or local governmental authority or utility company to inspect the PV System at the service address. Cancellation by Customer:- If you cancel this agreement at any time after the cancellation period described in this agreement or otherwise prevent us from completing the installation, you agree to reimburse us in full for the cost of materials, labor, and services provided up to the date and time of cancellation. . Document.24 FL Page 3 of 10 momentum. SOLAR Termination by Momentum: Prior to beginning design and permitting work, we will perform a physical assessment of the installation site, including suitability of the existing electrical panel and wiring, roof condition and shading of the-intended location of the PV System to verify the suitability of the site for the PV System. If we determine that existing site conditions will not allow for installation of a PV System as described at the top of page 1, we may terminate this agreement if you and we are unable to agree to modifications needed to provide for additional work needed to make the site suitable for the PV System. If we do so terminate this agreement, we will refund your initial deposit in full. We may also terminate this agreement after completion of our site assessment without further obligation if either (a) you breach this agreement, or (b) we discover or become aware of: (i) previously undisclosed legal encumbrances or easements affecting the service address, (ii) building/zoning code violations at the service address, or (iii) hidden or unforeseen hazardous conditions such as the presence of mold, asbestos, lead paint, or any other conditions not disclosed to us. Component Manufacturer's Warranty: The manufacturers of certain of the PV System's major components warrant their components against certain defects. We have provided you with copies of all manufacturer's warranties which govern your rights to seek a remedy from the respective manufacturer with respect to covered defects. Limited Warranty: You agree to contact us in writing, including by electronic mail or by certified mail,with any problems or issues with the installation as soon as possible, but in any event within thirty (30) days from the date you become aware of such problem. We will take reasonable measures to remedy or otherwise resolve the problem within thirty (30) days after we receive your notice. You agree and acknowledge that our limited warranty covers the installation only for a period of ten years. The limited warranty does not apply if: (1) you fail to notify us of the problem within thirty (30) days, or (2) it is reasonably determined, upon inspection, that any of the following conditions caused the need for service: (a) damage resulting from accidents, acts of God, alterations or misuse; (b) your failure to properly follow the operating instructions; (c) damage caused by animals; (d) alterations to your premises; or (e) alterations to the PV System made at your request, or made necessary by a change to your premises, damage to your premises; or any other cause beyond our control. The PV System includes a monitoring platform that allows us to remotely access performance information for the purpose of assessing the source of performance issues that need to be remediated. Additionally, we warrant that any penetrations of your roof used in the installation will not leak for a period of five (5) years. The limited roof penetrations warranty does not apply if: (1) you fail to notify us of the problem within thirty (30) days, or (2) it is reasonably determined, upon inspection, that any of the following conditions caused the need for service: (a) damage resulting from accidents, acts of God, alterations or misuse, (b) damage caused by animals; (c) alterations or damage to your premises; or(d) any other cause beyond our control. NO OTHER WARRANTIES: THE "LIMITED WARRANTY" RELATING TO OUR INSTALLATION OF THE PV SYSTEM OR- "COMPONENT MANUFACTURER'S WARRANTY" RELATING TO THE VARIOUS COMPONENTS OF THE PV SYSTEM PROVIDED BY THE APPLICABLE MANUFACTURER, ARE THE WARRANTIES PROVIDED UNDER THIS AGREEMENT. WE MAKE NO GUARANTEE OR WARRANTY OF ANY KIND THAT EXTENDS BEYOND THE FACE OF THIS AGREEMENT, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THE SERVICE PERFORMED OR THE SYSTEMS PROVIDED UNDER THIS AGREEMENT. LIMITATION OF DAMAGES: TO THE MAXIMUM EXTENT PERMITTED BY LAW, YOU AGREE TO RELEASE US FROM ALL LIABILITY TO YOU OR ANY OTHER PERSON FOR ANY INCIDENTAL, CONSEQUENTIAL OR PUNITIVE DAMAGES EXCEPT TO THE EXTENT SUCH DAMAGES ARE CAUSED BY OUR GROSS NEGLIGENCE OR WILLFUL MISCONDUCT. By initialing here, you agree to the terms of this paragraph: Document.24 FL Page 4 of 10 momentum SOLAR Binding Nature: This agreement shall bind and inure to the benefit of the respective heirs, personal representatives, successors, and permitted assigns of each party. Entirety of Contract; Modification; Waiver: This agreement constitutes the complete agreement between you and us concerning the subject matter of this agreement and supersedes and cancels any and all prior communications, representations, and agreements between you and us, whether written or oral, with respect to the subject matter of this agreement. This agreement may not be amended or modified unless in writing and executed by you and us. The rights and remedies of both parties under this agreement are cumulative and not alternative. No waiver of any breach or failure to enforce or insist upon performance any of the provisions of this agreement by either party at any time will in any way affect, limit or waive such party's right to enforce and compel strict compliance with every provision of this agreement. Severability: The invalidity or unenforceability of any provision of this agreement shall not affect the validity or enforceability of any other provisions of this agreement, which shall remain in full force and effect. Assignment: Neither party may assign, transfer or delegate any or all of its rights or obligations under this agreement, without the prior written consent of the other party, which consent shall not be unreasonably withheld or delayed; provided, however, that (a) the contractor may assign this agreement to any of its affiliates or to a successor of all or substantially all of the contractor's assets through merger, reorganization, consolidation or acquisition and (b) such consent is not required for an assignment (absolute, collateral or otherwise), pledge of, or grant of a security interest in, a right to payment under this agreement by either party. Dispute Resolution: In the event of a dispute, both you and we have the right to have the dispute resolved in a court of law. In this dispute resolution provision, you and we are agreeing to limit that right. If you have any dispute with us or if we have any dispute with you, then both you and we must seek resolution of the dispute in either arbitration or small claims court. If your dispute cannot be resolved in small claims court for any reason, then you must seek resolution of your dispute in arbitration. The arbitration hearing will be held before a nationally recognized provider of arbitration services at a location of your choice within your home state. The rules of the arbitration provider will apply. This dispute resolution agreement does not alter any substantive rights that you may have under state or federal law. By signing below, you agree to comply with this dispute resolution provision, which describes both your and our only procedure for resolving any dispute. Only the arbitrator, not any federal, state, or local court or agency, has the authority to interpret this provision or determine its applicability or enforceability. If any provision of this dispute resolution provision is found to be unenforceable for any reason, such provision will be severed and the remainder of this dispute resolution provision will continue in full force and effect. You understand and accept that arbitration awards are subject to challenge only in limited circumstances. Class Action Waiver: ARBITRATION MUST BE ON AN INDIVIDUAL BASIS. AS A RESULT, NEITHER YOU NOR MOMENTUM MAY JOIN OR CONSOLIDATE CLAIMS IN ARBITRATION BY OR AGAINST OTHER "CUSTOMERS", OR LITIGATE IN COURT OR ARBITRATE ANY CLAIMS AS A REPRESENTATIVE OR MEMBER OF A CLASS OR IN A PRIVATE ATTORNEY GENERAL CAPACITY. By initialing here, you agree to the terms of this paragraph: Customer Initials: Transfer of Title: The title of the equipment will pass to you upon the delivery of the equipment to your property, or any.storage facility you designate. Until the equipment has been delivered and signed for by you or your agent, we retain the title for the equipment. Governing Law: This agreement shall be governed by and construed in all respects in accordance with the laws of the State of Florida as they apply to a contract entered into and performed in that state. Document.24 FL Page 5 of 10 momentum. SOLAR Taxes: You acknowledge and understand that you are responsible for any and all taxes that arise under this agreement, including, but not limited to, sales and use taxes. You agree to execute any certificate or other applicable documents relating to sales or use tax exemptions to ensure that you or we, as applicable, may claim exemption from paying or collecting any sales or use tax that arises under this agreement. You agree to pay all applicable sales or use taxes if such taxes are determined to be due at any time before or after the termination or expiration of this agreement. Momentum Solar and its affiliates do not provide tax, legal or accounting advice. Any discussions between you and your sales representative regarding federal, state or local tax incentives or rebates ("Tax Incentives") has been for informational purposes only, and is not intended to provide, and should not.be relied on for, tax, legal or accounting advice. Momentum Solar makes no representations, warranties, or assurances as to the accuracy, currency or completeness of the content of your discussion regarding Tax Incentives. You should consult your own tax, legal and accounting advisors regarding the applicability to you of any Tax Incentives. FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND. PAYMENT, UP TO A LIMITED AMOUNT, MAY BE AVAILABLE FROM THE FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND IF YOU LOSE MONEY ON A PROJECT PERFORMED UNDER CONTRACT, WHERE THE LOSS RESULTS FROM SPECIFIED VIOLATIONS OF FLORIDA LAW BY A LICENSED CONTRACTOR. FOR INFORMATION ABOUT THE RECOVERY FUND AND FILING A CLAIM, CONTACT THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD AT THE FOLLOWING TELEPHONE NUMBER AND ADDRESS: DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, 2601 BLAIR STONE RD., TALLAHASSEE, FL 32399, (850) 487-1395. Acceptance and Authorization: By signing below, you authorize us to perform the installation. Except as set forth in this agreement, you agree there are no oral or written representations or inducements, expressed or implied, any way conditioning this agreement, and we expressly disclaim their existence. By signing this agreement, you acknowledge that you have read and understand this agreement or have had a competent legal representative explain its terms, and hereby accept this agreement in its entirety. You further acknowledge receiving a complete copy of this agreement. You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right. Customer: Customer Signature William f warren 09/10/19 Print Customer Name Date Prp Custom Solar LLC d/b/a Momentum Solar: Authorized Officer Signature Andrew King 09/10/2019 Print Authorized Officer Name Date Document.24 FL Page 6 of 10 momentum SOLAR Notice of Cancellation Date of Transaction: You may CANCEL this transaction, without any Penalty or Obligation, within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be cancelled. If you cancel, you must make available to the seller at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller regarding the return shipment of the goods at the seller's expense and risk. If you do make the goods available to the seller and the seller does not pick them up within 20 days of the date of your Notice of Cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this Cancellation Notice or any other written notice, or send an email, to Momentum Solar, 3096B Hamilton Blvd, S. Plainfield, NJ, 07080 1-888-666-3688 Cancel Rep uest MomentumSolar.com, NOT LATER THAN MIDNIGHT OF hree 1570 7s.i Tn-e-s-si da, s after transaction dat I HEREBY CANCEL THIS TRANSACTION. Date: Buyer's Signature: Document.24 FL Page 8 of 10 F 's • r s v J"r Y P �aetie6• City of Zephyrhills r `' BUILDING PLAN REVIEW COMMENTS i Contractor/Homeowner: P U�' S"04, d Date Received: Site: 3 1 W - -�� Permit Type: �l Approved w/no comment : w Approved w/the below comments: ❑ Denied w/the below comments: ❑ This comment sheet shall be kept with the permit and/or plans. JAN .0 6 2020 Kalvin Swi —Plans Examiner Date Contractor and/or Homeowner (Required when comments are present) m_omentum- sola r City of Zephyrhills Building Department 5335 8th street zephyrhills,fl 33542 To Whom it May Concern: RE: Permit#: 390313rd Avenue Address: 22071 We need to make a revision to an issued permit. Revision : Added another 60A disconnect(60A fuses) between the combiner panel and Main Service Panel. Combiner panel should reflect 2-20A breakers a 40A- breaker and a 10A(Envoy) breaker Should you have any questions or concerns please contact Lauren El-Taber @ 407-477-2219 or lel-taker@momentumsolar.com 1 Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net October 24,2019 Re:Proposed Photovoltaic Solar Panel Installation William Warren 39031 3rd Ave Zephyrhills,FL 33542 Dear Plan Reviewer: Certification:I have reviewed the engineering testing reports for the racking and attachments to be used on this project and I certify that the products are capable of supporting the code required loads and are suitable for this installation when installed in strict compliance with the manufacturers printed instructions. Regarding the solar panel array installation on the above referenced project please note that an inspection was performed by a representative of the Architect/Engineer of Record,and analysis of the existing structure was conducted.There is adequate structural capacity for the installation of the array with the following recommendations: 1.The array will be installed on the existing roof.The roof framing is constructed of 2"x4"wood trusses @24"o.c. spanning 12'11"with a top chord length of 14'5"with intermediate supports at 1/2 points,making the effective longest span equals 8'with with 1/2"plywood sheathing.The new array(See Site map by contractor)will add 2.63 Lb./Sf.overall to the roof.No additional structural support is required for the roof structure. 2.The system shall be secured to the roof using the"Ecofasten Solar""Rock-IT"®attachment system.The installation shall be in strict compliance with manufacturers printed instructions.The attachment system shall be UL 1703 approved tested.The attachments shall be min.5116"x 4"long stainless-steel lags with a min.embedment of 3"into the rafters.Attachments shall be @ 48"o.c.max.in roof wind zone 1,@ 24"o.c.max.in roof wind zone 2, &3,lags to alternate rafters.Provide 6 mil.vapor barrier between dissimilar metals.Provide water tight gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the system manufacturer's installation manual.The panel angle shall match the roof slope. 3.Solar Modules shall be UL-1703 rated.Refer to manufacturers specifications sheets. 4.Positive drainage of the system shall be so as not to void the existing roof warranty. 5.Florida Administrative Code,2017 Florida Building Code-Residential Sixth Edition,ASCE-7-10,2017 Florida Building Code—Energy Conservation,Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.All components used meet the criteria of the Florida Solar Energy Center. 6.Please refer to the attached structural calculations. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. oF 0 AV P NZi Daniel W.Dunzik,RA.LEED-AP FL.Lic.No.AR98795 AR98795 rr. �:� ,t. .11) l -y.�,� Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net October 24,2019 Gravity Load Calculation Criteria Structural Design Loads per ASCE 7-10 Dead Loads=10 psf+2.6 psf(new solar panels)=12.6 psf Roof Live Load=20 psf Ground Snow Load=0 psf Wind Load Calculation Criteria Wind Loads per ASCE 7-10,Ch.30 method 1 Using an area of 10 SF,wind loads from Figure 30.5-1: Zone 1 =-32.3 psf Roof Slope= 17 degrees Roof Mean Height= 15 ft Zone 2=-56.2 psf Basic Wind Speed= 140 mph Zone 3=-83.1 psf Exposure=B Per section 2.4.1,ASD combo=D+0.6W: Zone 1 =2.6 psf+0.6(-32.3 psf)_-16.8 psf Zone 2=2.6 psf+0.6(-56.2 psf)=-31.1 psf Zone 3=2.6 psf+0.6(-83.1 psf)_-47.3 psf Check Attachment to Wood Truss Use 5/16 dia.Lag screw w/3"embedment into 2 in.wide roof rafter Lag Screw Spacing: Lag Screw Tributary Area: Zone 1 = 48"o.c.max Zone 1 =(48"o.c.max)^2/144= 16 SF Zone 2= 24"o.c.max Zone 2=(24"o.c.max)^2/144=4 SF Zone 3= 24"o.c.max Zone 3=(24"o.c.max)^2/144=4 SF Lag Screw Forces: W=266lb/in(Table 12.2A,2015 NDS) Zone 1 =16.8 psf x 16 SF=269 lb < W', OK Cd=1.6(Table 2.3.2,2015 NDS) Zone 2=31.1 psf x 4 SF= 124 lb < W', OK Ct= 1 (Table 2.3.3,2015 NDS) Zone 3=47.3 psf x 4 SF= 189 lb < W', OK W'=W x embed x Cd x Ct W'=266 lb/in x 3 in.x1.6 x 1 =1276.8 lb Fill powered by 14111111WOW21101 DUD . U 1 1, 13\20 , Q.ANTUM1 A' MODULE The new Q.PEAK DUO BLK-G5 solar module from Q CELLS impresses with its outstanding visual-appearance and particularly .high performance on a small surface thanks to the innovative Q.ANTUM DUO technology. Q:ANTUM's world-record-holding cell-concept-has now been combined with state-of-the-art'.circuitry half cells. and a six-busbar design, thus achieving outstanding performance under real conditions — both with low-intensity solar radiation as well as on hot, clear summer days. MANTUM TECHNOLOGY:LOW LEVELIZED COST OF ELECTRICITY G Higher yield per surface area, lower BOS costs, higher power classes,and an efficiency rate of up to 19.3%. r INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields,whatever the weather with excellent low-light and temperature behavior. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID technology, CKELLS Anti PID Technology', Hot-Spot Protect and Traceable Quality Tra.QTm. _T0R6RANOPV- EXTREME.W 2017 EATHER RATING E07 AHigh-tech aluminum-alloy frame,certified for high snow '� (5400 Pa)and wind loads(4000 Pa)regarding IEC. O A RELIABLE INVESTMENT ■ Inclusive 12-year product warranty and 25-year o1uroell Tested linear performance guarantee2. 1 ; STATE OF-THE ART MODULE TECHNOLOGY I13.40032587 Q.ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology. r APT test conditions according to IEC/TS 62804-1:2015, method B(-1500V,168h) P See data sheet on rear for further - THE IDEAL.SOLUTION FOR: information. ®Rooftop arrays on residential bulldings . Engineered in Germany OCELLS 1 � SPECIFICATIONMECHANICAL Format 66.3in x 39.4in x 1.26 in(including frame) (1685mm x 1000mm x 32mm) Weight 41.2 lbs(18.7 kg) + 4- Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass with anti-reflection technology Back'Cover Composite film Frame Black anodized aluminum Cell 6 x 20 monocrystalline O.ANTUM solar half-cells ❑ a„ Junction box. 2.76-3.35in x 1.97-2.76in x 0.51-0.83in (70-85mm x 50-70mm x 13-21mm),decentralized,IP67 u - {°Y Cable 4mm2Solarcable;(+)z43.3in(1100mm),(-)a43.3in(1100mm) Connector Multi-Contact MC4,IP65 and IP68 asarua,..ml�Ic ELECTRICAL CHARACTERISTICS .POWER CLASS 300. 305 "" 316 . 315 320 . MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-0 W) Power at MPP2 Pa„ [W] 300 305 310 315 320 Short Circuit Current• I,c [A] 9.72 9.78 9.83 9.89 9.94 E ..Open Circuit Voltage* V. IV] 39.48 39.75 40.02 40.29 40.56 E f Current at MPP' IN" [A] 9.25 9.31 9.36 9.41 9.47 Voltage"at MPP` Van IV] 32.43 32.78 33.12 33.46 33.80 Efficiency2 rl [%] Z 17.8 218.1 218.4 z 18.7 219.0 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS;NOC' -Power at MPP2 Paz, [W] 222.3 226.0 229.7 233.5 237.2 E .Short Circuit Current` I,c [A] 7.84 7.88 7.93 7.97 8.02 E 'Open Circuit Voltage* V. IV] 36.93 37.18 37.43 37.69 37.94 Currenl'al MPP' I„" [A] 7.28 7.32 7.36 7.41 7.45 Voltage at MPP• Vu" IV] 30.55 30.88 31.20 31.52 31.84 110DOW/m2,250C,spectrum AM 1.5G 'Measurement tolerances STC 33%;NOC:5% 3800W/m2,NOCT,spectrum AM 1.5G •typical values,actual values may differ Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE �..Im acna -°0 --T'----r-----i---- ----'� At least 98%of nominal power during first year. , I 1n0i�""""s°•"°"�""'� Thereafter max.0.54%degradation per year. ' ------------------------------- At least 93.1%of nominal power up to 10 years. At least 85%of nominal power up to 25 years. I I I ' r - All data within measurement tolerances. c ® --r-----r---- Full warranties in accordance with the warranty 5 .� - terms of the 0 CELLS sales organization of your ' u respective country. IRRADIANCE[W/W21 z Q a Typical module performance under low irradiance conditions in sme,am,�.ew.e•.u.,n,lawm,w,� W ruRs comparison to STC conditions(25°C,1000W/m2). y.ne,�a.no,�M m zau m.,sm .mro TEMPERATURE COEFFICIENTS Temperature Coefficient of 12c a [%/IQ +0.04 Temperature Coefficient of V.- p [%/IQ -0.28 d Temperature Coefficient of Pa„ Y [%/IQ -0.37 Normal Operating Cell Temperature"" NOCT ['F] 113 t5.4(45+3°C) - PROPERTIES 1. SYSTEM DESIGNo Maximum System Voltage Vsn [V] 1000(IEC)/1000(UL) -Safety Class II x Maximum.Series Fuse Rating [A OC] 20 " Fire Rating. C(IEC)/TYPE 1(UL) a d Design load,push(1102 Dbs/1119 75(360O Pa) Permitted module temperature -40°F up to+185'F on continuous duty. (-40'C up to+85°C) Design load,pull(UL)2 [Ibs/H2] 55.6(2666Pa) 2 see installation manual 0 QUALIFICATIONS1 CERTIFICATES PACKAGING INFORMATION UL 1703;VIDE Quality Tested;CE-compliant; Number of Modules per Pallet 32 _ IEC 61215(Ed-2);IEC 61730(Ed.1)application class A - Number of Pallets per.53'Traller 30 C E wl Number o1 Pallets per 40'High Cube Container 26 DVE o`�US Pallet Dimensions(L x W x H) 69.3 in x 45.3 in x 46.9in - �,• (1760mm x 1150mm x 1190mm) Pallet Weight 1415lbs(642 kg) - NOTE:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use yI of this product. m Hamxha G CELLS America Inc. - 300 Spectrum Center Drive,Suite 1250,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL Inquiry®us.q-cells.com I WEB www.q-cells.us Data Sheet Enphase Microinverters Region:AMERICAS The high-powered smart grid-ready Enphase Enphase IQ 7 Micros" and Enphase IQ 7+.Micro"' =Q7and1Q7+ dramatically simplify the installation process while achieving the highest system efficiency. Microinverters `erS Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy'm, Enphase IQ Battery"", and the Enphase Enlighten' monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and' undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install Lightweight and simple i Faster installation with improved,lighter two-wire cabling Built-in rapid shutdown compliant(NEC 2014&2017) i i Productive and Reliable pow • Optimized for high powered 60-cell and 72-cell*modules • More than a million hours of testing • Class II double-insulated enclosure UL listed m Smart Grid Ready Complies with advanced grid support,voltage and frequency ride-through requirements s ` IZ - Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) The IQ 7+Micro is required to support 72-cell modules. To learn more about Enphase offerings,visit enphase.com ':I:EN PHASE. t Y Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA(DC) IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range. 16 V-48 V .16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Isc) 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A : PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage%rangez 240 V/ 208 V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz- Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting - 1.0 1.0 Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency, 97.6% 97.6% 97.5%. 97.3%. ' CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range -400C to+65°C Relative humidity range 4%to 100%(condensing) Connector type(IQ7-60-2-US&IQ7PLUS-72-2-US)_ MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Connector type(IQ7-60-B-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.Seethe compatibility calculator at httos7Henphase.com/en-us/support/module-com atn ibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Referto local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com � EN PHASE. ©2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 V Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman,NJ.08558 908-872-3664 January 29,2018 Building Department Attn:Plan Reviewer Re:Proposed Photovoltaic Solar Panel Installation Dear Sir: I have reviewed the following documents related to the"EcoFasten Solar"ROCK-IT SYSTEM 4.0 and certify that the attachment system when installed in strict compliance with the manufacturers Installation Manual appropriate for this application and is in compliance with the latest building codes including Florida Administrative Code,2017 Florida Building Code-Residential Sixth Edition, ASCE-7-10,2017 Florida Building Code—Energy Conservation, Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.I make this certification for the following listed documents: 1. ROCK-IT SYSTEM 4.0 Installation Manual 2. PZSE,Inc Structural Engineers Certification. 3. EcoFasten Solar Certificate No.US 82150026 4. ROCK-IT SYSTEM 4.0 Cut Sheet for Coupling,Hybrid Coupling,and Mount. If you have any questions relating to this matter,please contact me at your earliest convenience. Thank you. 0 ... . 0 NIEL •.� Daniel W.Dunzik,RA.LEED-AP �.. AR9g 95 Fl.Lic.No. AR98795 ®� b t ,.'V Cut Sheet - Rock-it-4.0-Coupiing 1. Installation to be completed in-accordance with manufacturees.written specifications and installation instructions. 2. See spec.sheet or contact manufacturer-for detailed material,finishes,and configuration options. 3. Contact manufacturer for detailed layout: 4. Do not scale drawings. 5. Subject to change without notice. 1 3.17in ® ® ® [80.54rnm 7600in Y j j 1.77.80mm] I I 2-.02in 2.14in 2.34in r� .�51:.38mm] [54:37mm_! L59.36mm] i 32mm 35mm 40mm ALPINE ,.� �+,�� E c oFa sto n Solar-L' 4741 W Polk Stree Ste.4 Phoenix,AZ 85043 Toll.Free Phone 1.888.766.4273, Toll-Free Phone 1:877.859:3947 Material:See Spec Sheet Toll Free Fax 1.888.766.9994 Toll Free Fax 1.888.766.9994 Scale: 1:4 6/28/2017 ASG: - EFS: x. ,Y Cut Sheet Rock-It4.0-Hybrid Coupling. 1. Installation to be completed in accordance with:manufacturer's written specifications-andinstallation instructions. 2. See spec.sheet or.contact manufacturer for detailed material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. I 3.:16in ® 0 ® [80.29mm] 7.00in- [177.80mm] m 5.00in [127mm] 2.02in 2.14in 2.34in I� [51.38mm] [54.37mm] [59.36mm] r 32mm. 35mm j 40mm - ----ALPINE. !,��,,��, Y &oFkstpn Solar" 4741 W-Polk Street Ste.4 �VIJ� s" Phoenix,AZ-85043 Toll.Free Phone 1.888.766.4273. Toll-Free Phone 1:877.859.3947 Material:See Spec Sheet Toll-Free Fax 1.888.766.9994 Toll Free Fax 1.888.766.9994 Scale: 1:1 6/28/2017 AS EFS:.x Y i fff + . e SYSTEw4.10 RAIL-FREE RACKING QD ♦ �,�>Eco �. i F'k* P"A,%oFasten Solar@ —O Committed to the connection Document Date:'9.8.2017 -Contents -Pg. 1......................................................I..............................I................................................................ Assets-of Design Features, -System Components Pg.,2...I............................................................................ ............................................... Rock;-lt4.0 Mount Assembly Rock-it 4.0 Coupling Assembly Pg. 3 .....................................I...................................................................... Rock-It 4.0 Hybrid Mount Assembly Rock-4t.Clip SS Assembly Rock-It Clip.2.0-Assembly- Pg..4........................................................................................................................................................... Array Layout GreenFasten Flashing.Install- Pg. 5.................................................................................................................................... Rock-it System 4.'0 Install Pg.6.................................................................................................................................................. Ground.Lug,Install Pg. 7 .......................................................................................................................................... Rock-it Clip SS Install Rock-It'Clip 2.0 Install Pg. 8 -12 ................................................................................................................. ........... Standoff Spacing.Tables Snow Load.0-20.psf Snow Load-21-30 psf Snow.Load 31 40 psf Snow Load 41-50 psf Snow Load 51-60 psf Pg. 13 .................................................................................................................................... Grounding Information- Bonding Assembly and Bonding Path Pg. 14................................................................................................................. Thermal-Expansion and-Bonding Bracket:Spacing Staggered Layout Cantilever Pg. 15.. • ................................................................................................................................... System Specifications -Evaluated, Compatible-Modules � l ROCK-IT SY STem 4.0 Designed with the installer in mind. EcoFasten.Solar specializes in solar-roof attachments that are fast and easy to install;straightforward;secure and- cost effective.EcoFasten offers a wide variety of-standard products as well as custom solutions,for a one-stop source for all of your rooftop anchoring needs. Productsare rigorously tested and approved above and beyond industry standards in-house and by third party agencies. EcoFasten's patented conical sealing system has been in service in the snow guard and solar industries for two-decades. . FeaTures • New and improved design North-South adjustability • Fastest,easiest to-level-system on the market Only one tool.required(1/2"deep well:socket): • Integrated electrical bonding Vertical adjustment of 3"4 • .SIMPLE-only 4 components. sysTem comPonenTs* - reauire.D got ROCK-IT SLIDe ROCK-IT 4.0 ROCK-IT 4.0 COUPLInG ROCK-IT 4.0 4" For comP.sH nGLe MOUnT & LOaD BearinG FOOT Array SKII'T 8•:For TILe SYSTem Com-PonenTS* - OPTIOnaL Aq ROCK-IT CLIP SS Q EcoFaRV. Solar® t+\ (R2Fer TO PG:6) Ec l sten Solar products are protected by the followMg US.Patents: 8,151,522 8,153,700 8,181,398 8,166,713 8,146,299 ROCK-17 4.0 8,209,914 8,245r154 8,272,174 8,225,557 9410,038 ROCK—IT 4.0 Arra6i sKirT 9,134,040 9,175,478 9,212,B33 HgBrID mounT EnD CAPS (ReFer TO.PG.5) nsaa� on ae TeoEsT ROCK-IT-CLIP-2.0 enDofsmirrsecnons) (ReFer TO PG. 6) *Components for use with 32mm modules-are available as special order:Components for use with 32mm modules are labeled as such.on system packaging.Please refer to evaluated,.compatible modules grid.on page 15 to Identifysystem compatible 32mm modules. www;ecofastensolar com info@ecofastensolar.com 877-859-3947 1 � C ROCK-IT 4.0 MOl. nT ASSeI"1"1BLY NOTe: ITems 1-7 SHIP assemBL.eD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS 2 Rock-It 4.0 Mid-Clamp 6000 Series AL 3 Rock-It 4.0 Shelf 6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock-it 4.0 Tie Plate 6000 Series AL 6 Rock-It Pedestal 6000 Series AL � 7 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS ' 8 3/8"ID Star Washer 300 Series SS 9 3/8"-16 x 3"Hex Tap Bolt 300 Series SS J . i ROCK-IT SLIDes are accePTaBLe BracKeTs For I"I f Use WITH ROCK-IT 4.0 (SOLD separaTeLg) ROCK-IT 4.0 COUPLING aSSe I"1'IBLY. NOTe: ITems 1-3 sHip assemBL.eD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS -- ►; 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL 3 Rock-It 4.0 Coupling Shelf 6000 Series AL 4 Rock-it Load Bearing Foot Clip " ! 5 Rock-It Load Bearing Foot Base e �8'`IIti d , �j•I \,fie www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 2 ROCK-IT 4.0 HYBRID MOl.. nT ASSemBLY NOTe: ITems 1-10. SHIP aSSemBLeD 1 Rock-It 4.0 Shelf 6000 Series AL 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL z 1° 3 Rock-It 4.0 Coupling Tie Plate6000 Series AL �\® 4 Flange Level Nut 300 Series SS 5 Rock-it Pedestal 6000 Series AL 6 Rock-It Slide 6000 Series AL 7 3/8"-16 x 3"Hex Tap Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series S 9 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 10 5/16"-18 x 1.5"Hex Serrated Flange Bolt 300 Series SS 0 07 ROCK-IT CLIP SS ASSeMBLY ROCK-IT CLIP 2.0 ASSeMBLy NOTe: ITems 1-3 SHIP assemBLeD NOTe: ITems 1-3 SHIP assemBLeD 1 Stainless Steel Carriage Bolt-.313-18X.75 1 Rock-It Clip 2.0 2 Rock-It Clip SS 2 Stainless Steel Flange nut.313-18 3 Stainless Steel Flange nut.313-18 3 Bolt.3125-18x1x1-S -�` 0 1 0 O www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3 Array ' Lc3 OUT Find the required.structural attachment points. Markthese.using a.vertica[(WS)chalk line on the , center of the rafters. • Spacing mayvary depending upon project specific structural requirements;Le.high snow and wind load areas may require lesser bracket spacing in the E-W axis vs.-the maximum spacing.Max spacing is 48"for.portrait orientation and 72".for landscape orientation:Consult project layout diagram for project specific bracket spacing on the,roof. • Install Rock-It-Mounts to predetermined mount spacing. • The Rock-It_Array Skirt sections are the width.of a typical 60 cell module-use the Rock-It Array Skirt as a guide to=lay out module placement. Note:The distance between the rows of mounts is calculated by the module dimension N-S plus 1 3/8" (35mm).Lag screw should be installed as close to center.of exposed shingle as-possible. The minimum. distance between the lag screw and the edge of the shingle is 1/2" -GreenFaSTen-i'm FLaSHinG inSTaLL E- 1 Locate the raffers and snap horizontal and.vertical lines to mark the installation position for each GreenFasten flashing. 2. Drill a pilot hole(1/4"diameter)for the lag bolt Backfill.with sealant.EcoFasten Solar recommends an,EPDM mastic 3 Insert the flashing so the top part is under the next row of shingles and pushed far enough.up slope to prevent water infiltration through vertical joint in-shingles.The " leading edge.of flashing must butt against upper row,of nails to prevent turning. when torqued. 4 Line up.pilot hole with GreenFasten flashing hole.. Insert the lag bolt through the EPDM.bonded washer,the Rock-it slide,the gasketed. hole in the flashing and into the rafter. Torque:The-range is between 1007140 torque inch-pounds depending on the type of wood and time of year.The visual.indicator.for proper torque is when the EPDM on the underside of the-bonded washer-begins to push out the sides as the washer compresses.If using an impact wrench to install the fasteners.be careful not to over torque the fastener.You may.need to stop and use a ratchet to finish the install.. *The Engineer of Record shall check capacity of rafter to support lag screw loading. www.ecofastensolaccom info@ecofastensolarcom 877-859-3947 4 ROCK-IT SJ-STeI'1"1 4,0 inSTaLL ON 7. PWA a ' 1 � J ' 1 Fig.A Install EcoFasten.Solar Flashing with Rock-It.Mounts •Follow EcoFastanSolminstalllnstructionsforflashing and bradrethntall(GreenFasten shown above). •Optimum vertical dlstancebetween lag bolts is13Wplus module dimension. •Set mounts on eave most row sothat the Rock-It Pedestal is on the South end of Rock-It Slide. •-Set mounts on all upper rows so that the Rock:lt Pedestal Is on the North end of Rode-R Slide 2 Install Rock-It Array Skirt onto Eave Mounts • Slide Rock-It Array Skirt Into front channel on Rock-It Shelf. • Array Skirt End Caps are pre-installed on the East end of each skirt section,and are used to couple the skirt sections where needed(see Fig.A). •Tighten Mid-Clamp bolt,clamping Rock-It Array Skirt to mount:Torque to 2001n4bs.(130 in-Ibs.when installing with 32mm modules). 3_4 Install Rock-It Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot Is required) • Prlor'to mounting on the roof,snap Load Bearing Foot into the bottom of Rock-It Coupling If required. (Each Load Bearing Foot is set to same height as the Rock-It Mounts-adjust accoidingly) •.On.eave rowonly,slide Rock-It Array Skirt onto Rock-It coupling Shelf.Torque to specified value. • NOTE:If a coupling lands on a rafter,the Hybrid Mount'should be used in place of the Rock-It coupling(refer to image 3a): 'Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal;or by purchasing separately. 5Align and Straighten"First Row of.the"Rock-It System with Rock-It Array Skirt •UseNorth-&uth adjustment oftheRock-it Pedestal to straighten Rock-It Array Skirt and align module with Array SkIrL •Torque screw on side of Rock-It Pedestal to 150ln4bs to secure it to the Rock-It slide. Adjust Flange Level Nut to level the system(optional—can be leveled during or after installation). 6-9 Install 1st Row of PV Modules. •Slide upslopeRock-t Mounts down to engage top offirstmodule. •Install Rock=lteoupltngson the upsiopesideoflst row ofpanels. •Toque 2nd row of MidClamps on Rock-It Mounts and Rock-It couplings to specified value. •Install balance ofPV modules,ensuring thatthe Rodc4t Pedestals aye In the appropriate position,then torque Mid-Camps to secure modules. " 10 Level the Rock-It System •When assembly Is complete,level the entire system by adjusting Flange Level Nuts(Flange Level Nuts have no torque value). • Height between roof surface and underside of modules should be 3'orless,when Installed with Type 2 modules. INSTALLATION NOTE:Modules should.be installed so that the-Junction box Is installed upslope,away.from the leading edge of the array. www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 5 'GrounDi.nG LUG InSTaLL is Necessary. Components: - One of the following ground lugs(or any UL 2703 compliant ground lug): Burndy CL50-1 TN Ground Lug(UL 2703-E351343 / UL 467-:E9999). ILSCO SGB-4 Ground Lug(UL 2703-E354420 /UL.467-E34440) ILSCO.GBL-4DBT,(UL 2703-E354420 /.UL 467-.E34440) ILSCO GBL-4DBTH(UL 2703-.E354420 /UL 467-E34440) ILSCO GBL=4SS(UL 2703-E354420 /UL 467-E34440) Note:Drill and deburr hole in Ground Lug prior to installation - 14 AWG-4 MG Copper Ground Wire* Torque Values: - 8-32.x 0.5"Serrated Flange Head Bolt(300 Series SS). 14=1 GAWG=20 in-Ibs. 8-32 Serrated Flange Nut(300 Series SS) 8 AWG=25 in-Ibs. 11/32'and.1/4"-wrenches or ratchets/sockets 6-4-AWG=35 in-Ibs. 1 Insert the flange bolt into the module.ground.hole.Place Star.Washer over bolt:Place ground lug over the bolt:and Star Washer,and turn to desired orientation. 2 .Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel and tighten set screw.to complete assembly. *Wire should be sized in accordance with.the National Electrical Code,NFPA 70,Section 690A5,and a minimum of 1/4"clearance required between-bare copper wire and aluminum. Drill hole per.grounding lug manufacturers specifications in the upslope part of Rock-it.Coupling, for attaching grounding lug. 17, Note:Deburr hole in Ground Lug and'Rock-It.Coupling prior to installation. www:ecofastensolarcom info@ecofastensolar.com 877-859-3947 6 L ROCK-IT CLIP SS 'I nSTa LL •Ac=entatfte6fmouEr��ocati�N 4afion Roy 1 Locate_all.parts •Locate'the Rock It.Clip SS,micro-inverter/power optimizer,and-the section of the module fram_ a in which you.will be-mounting the-micro=inverter/power optimizer. See fig.A foracceptable mounting locations. 2.install the Rock-it Clip SS • Slide the-Rock-lt Clip SS onto the lip of the module frame. • Slide the micro-inverter/power optimizer.into the opposite-lip of the.Rock:lt Clip SS. • Tighten the bolt to-1 50 in-lb minumum to clamp.the Rock-It Clip.SS to the module frame and the. micro-inverter/power optimizer to the Rock-It Clip SS: • .Ensure that the-lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid-rotation during tightening. ROCK-IT .CLIP 2.O inSTaLL Inverter Flange Module Frame Rock--Clip-2.0 1 Locate ail parts -Locate the Rock-it Clip 2:0,micro-inverter/power optimizer,and the section of the module-frame in which you will be mounting the micro-inverter/power optimizer. 2_-Install the Rock-it Clip 2.0.(See below detail). • Slide the Rock-It Clip'2A onto the lip of the micro-inverter/power optimizer. •_Slide the-rriicro=inverter/power.optimizer into the opposite lip of the-module frame. • Tighten the.bolt to 1.50 in-lb.to clamp the Rock-It Clip 2.0 to the module frame and the micro-inverter/power optimizer to the Rock-It Clip 2.0. • Ensure that-the lip on the clip is tight.against.the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. www.ecofastensolar.com info@eco%stensolarcom 877-859-3947 7 Snow Load 0-20 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch<.6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1- Zone 2 Zone 3. B 159 . 93 59 85 mph 110 mph C 114- 67 42 88 88 D 96 - 56_ 35 91 74, 74 B 146 85 54 90 mph 115 mph C 104 61 38 ::98 ;l80 1 80 D 88 51 32 83 68 68 B 123 72 45 95 .95 100 mph 125 mph C 88 51 32 83. 68 68' D _ 74 43 .27 .70 57 57 B 98 57 36 93 76 76 110 mph 140 mph C 70 41 26 66 54 54 D 59 34 22 56- 46 46 B 85 50 31 .81 66 66 120 mph 150 mph C .61 36 '22. 58- 47. 47 D 51 30 19 49 40 40 Notes: ®Spacing Governed by snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the-designer must round down to meet-appropriate rafter spacing 24 Maximum allowed spacing approved by EcoFasten Solar is 72' .3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag.pullout capacity 5.)Values based on maximum module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included In this table Snow Load 0-20 psf Wind Speed Exposure 2:12<Roof Pitch<6:.12 712<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Cate o Zonal- Zone 2 Zone 3 Zone.1 Zone 2 Zone 3 . B — 91__ .___53�� r 33 85 mph 110 mph C 65 38 24 61 1 �50 ;i 1'�50�, x D 55 32 20 _ _ -- 52r 4 B 83 49 30 90 mph 115 mph C 59 35 22 56 46 46 D 50 29 18 47 38 38 B 70 41 26 7 544'7 7_"6 F``g 100 mph 125 mph C 50 29 18 1 47 ; ( 39 39z § D 42 26_ e 15 _ ,__ - 40 32 ._ _ 32_ B 56 33 20 53 43 43 110 mph 140 mph C 40 23 14 38 31 31 D 34 19 -12 32 26 26 B 49 — -- 28 120 mph 150 mph . C 35 20 12 33 27 27 D 29 17 10 28 22 22 Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by-EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.).Based on Risk'Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1..No site specific engineering is Included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 8: Snow Load 21-30 psf Modules in Landscape -Wind S eed Exposure 2:12 c Roof Pitch<.6:12 7:12.<'Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone'2 Zone 3 . B 93 '59 85 mph . . 110 mph C 67- 42 D 96 56 35 B 85 -54. 90 mph. 115.mph. C 104 61 38 D 68_ 51 32 B 72 46 100 mph 125 mph . C 88 51 32 D 74 43 27 57 57 B 98 57 36 110 mph 140 mph C 70 41 26' 66 54, 54 D 59 34 22 56' 46 46 B 85 50 - 31 66 66 120 mph' ' 150 mph C 61 36 22 58 47 47 D 51 30 1 19 49 40 40. Notes: Spacing Governed by Snow Load 1.)Values in above-table represent the maximum allowable spacing In inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout rapacity 5.)Values based on a maximum module width of 40" 6:)Based on Risk-Category II(ASCE 7-10)structures less than 30 feet in height,' 7.)Nl.adjustment factors are set to 1.No site specific engineering Is Included In this table Snow Load 21:-30. psf. Wind'S eed Exposure 2:12<Roof•Pitch<6:12 7:12_<Roof Pitch ASCE 7-05 ASCE 7-10 -Categoly Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 33; 85 mph 110 mph C 12 D- 5 - B 49 30 90 mph. 115 mph C 59 35 22 D 50 29 18 38 38 100 mph 125 mph C 50 f 29 18-, 3.9 39 D 42 B 56. 33 20 110 mph 140 mph C 40 23 14 38 31 3.1 D 34 19 12 32 26' 26 — B-- -- 49 - _ 2$- 18 --y6 `" 37 � " 37 " 27 27 120 mph 150 mph C 35 20 12 33 D 29 17 10 28 2222« . Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing In Inches for puilout.forces only on EcoFasten Solar standoff 2.)Maximum'allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed.standoff capcity=547#.(per,testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.):Values based on a.maximum module length of70" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1;No site specific engineering Is'Included in.this table www.ecofastensolarcom info@ecofastensoiarcom 877-859-3947 9 Snow Load 31-40 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch<M2 7:12<Roof Pitch.<12:12 ASCE 7705 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 59 85 mph 110 mph C 67 42' . D 56 35' B 54 90•mph 115 mph C 61 38 D 51 32 B 45:. 100 mph '125 mph: C. 51 32 D 74 - 43 27 B 57 36 110 mph 140 mph C 70 41 26 D 59 34 22 46 46 B 50 - 39 120 mph 150 mph' C 61 36 22 47 47. D 51 30 . 19' 49; 40 40. Notes: Spacing Govemed by Snow Load 1.)Values in above table represent the maximum allowable-spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer-must round down.to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.),Values based on a ma)dmum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet In height 7.)All adjustment factors are set to 1.No site specific engineering is Included In this table Snow Load 31-40 psf Wind Speed Exposure 2:12.<Roof Pitch<-6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE.7-10 Category.. Zone 1 Zone 2 Zone 3. Zone 1 Zone 2- - Zone 3 — - --- --- _-: - 3�3 85 mph ; ` 110 mph; C 389, -B - 49 30 90.mph 115 mph C 35 22 D 29 18 - - ----B__ - 41 ,7-.�26- r 100 mph r` 125 mph ,T C 29 ''4 iak q ,. B 33� 20 110 mph 140 mph C 40 23 14 D 34 19 12 26 26 120 mph. —150 mph '' C _ • 35 20 12' ��28,r'� x27 27 D 29 17 10 I�T 22 s 2 'r; Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the rinaximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3-)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5:)Values.based on a maximum module length of 70" 6.).Based.on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7-)All adjustment factors are.set to 1.No site-specific engineering Is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 10 Snow Load.41-50.psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch<.6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zonal Zone 2 1 Zone 3 Zone 1 Zone 2' Zone 3. B 59 85 mph 110'mph C Q. D, '5.(3: 35 B 54 90 mph .. 115 mph C 61 38 D 51 32 B. 45 100 mph 125 mph. C 51 32 D 43• 27 B 57 36 110 mph 140 mph C 41 26, D 59 34 22 46 46 B 50 31 120 mph 150 mph.:, C 61 36 22 47 47 D 51 ' 30 19 -49 40 40 Notes: ®Spacing Governed by Snow Load 1,.)Values in above table represent the maximum allowable spacing in Inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing-results) 4.),Includes additional factor of safety-of 1.5 for lag pullout capacity 5:)Values based on a maximum module width of 40" 6.)Based on Risk Category it(ASCE 7-10)structures less than 30 feet in height 7.)Ail adjustment factorsare set to 1.No site specific engineering_is included in this table Snow Load 41-50.psf Wind Speed Exposure 2:12<Roof.Pitch<6:12 7:12<Roof Pitch ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone-1 Zone 2 Zone 3 85 mph 110 mph C38� .`:':* 24 - D � 32:' 4 20` B 30 90 mph 115.mph C 35 22 D 29 18 - - B - is 26.' 100 mph 125 mph C 29 18 D. 2Q 15 B 33 20 110.mph 140 mph. C 23 14 D 19. 12 120 mph 150 mph C 35 20 12 1 D 29 17 10 Notes: Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per-testing results) 4:)Includes additional factor of.safety of 1.5 for lag pullout capacity 5.)Values based.on a maximum module length.of-70" 6.)Based on Risk Category.11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering.is Included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 11 4 Snow Load 51-60 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch<.6:12 7:12<Roof Pitch- ASCE 7-05 ASCE 7-10. Cate o . Zone 1 Zone 2 'Zone-3 Zone 1 - Zone 2 Zone.3. B 85 niph. 110 mph C 42 D 35 B 54 90 mph 115 mph C 38 D 51 32 B- 45 �100 mph . 125.mph C 51 32 D 43 . 27. B 36 110 mph 140 mph C 41 26 D 34 22 B 50 31 120 mph : 150 mph C. 36 22 . D_ 51.. 30' 19 Notes: Spacing Governed.by Snow Load 1.)Values in above table represent the maximum allowable spacing in Inches for pullout forces only on EcoFastan Solar standoff, however the.designer must round down to meet appropriate-rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.):Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum.module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included In this table Snow Load 51-60 psf Wind-Speed Exposure 2:12<Roof Pitch a 6:12 7:12<Roof Pitch<12:12. ASCE.7-05 ASCE 7-10 Category Zone•1 Zone 2 Zone 3 Zone.1 .Zone 2 Zone.-3 . 85 mph 110 mph C 24 D (g32 20 B 30 90 mph 115 mph C 22 D 29 18 B -28 _1 100 mph 125 mph C 29.'• 18 D` ..�26 B 20 110 mph 140 mph C 23 14 D 19 12 120 mph , 150 mph C 20 12 _ D .29�, 17 _ 10___- = Notes: -Spacing.Govemed by Snow Load 1.)Values in above table represent the maximum allowable spacing In inches.for pullout forces only on EcoFasten Solar standoff -2.)Maximum allowed-spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4:)-Includes additional factor of safety of 1.5 for lag pullout capacity 5J Values based on a maximum module length of 70" 6.).Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7:)All adjustment factors are set to 1.No site specific engineering.is included In this table www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 12 GrounDinG inFormaTion The rail-free Rack-it System maybe used to mount and ground PV modules that comply with UL.1703,on'lywhen that specific module has been -evaluated for mounting and grounding,incompliance with the included installation instructions. Note;Grounding lug must be visible to inspectors from the entire perimeter of the PV array. Multiple Use Grounding Pins Grounding pins within the-Mid-Clamp are multiple use bonding/grounding devices.Modules will need to be adjusted if the Mid-'Clamps are loosened to ensure there.is"new"metal to pierce into upon retightening. Grounding Method- Rock-It 4.0 Mount bonds N-S rows of.modules Rock-It 4.0 Coupling bonds E-W rows of modules Rock-It Array Skirt bonds E-W along the entire array when installed .One Burndy CL50-1 TN ground lug is required per PV array,limited to 300 modules placed in either portrait or landscape orientation. BonDInG- ASsemBLY anD .BonDinG PATH " I Bond Path J-Grounding Lug r_Con�iccor(EG:i�d�E Integrated Bonding genIra'y to earth gm tnd I © Rock-It Coupling M Rotk•It Moaet �.Rockdt Array Sklrt 1 i I j Bond Path Bond Path Grounding Lug ®Grounding Lug Equlomerr.Groundkrg - /— CondutteriEGq. equipment Gr Ing acnnalH to cxdr � CanduttorlEGC1• around genCdyrto mrth " �'tl growl 1 ®Rock•ItCoupling ®Rock-it Coupling ■ Rock-It Mourn —Rock-It Array Skirt ■ROdtdt Mount +Rock-It Array Skirt" . www ecofastensolar.com info@ecofastensolarcom 877-859-3947 13 THermaL EXPansion anD BonDinG A thermal expansion gap is required per each continuous 40'length.of modules. -- Bond Path ® Grounding Lug Omit a coupling and leave a 2"gap in the Rock-it Array Skirt and also between ,---Equipment CV,- the modules at that point. s��lr"�`� ® ROrk-It Coupling ® Rock-It Mount _Rock-lt'Amay Skirt BracKeT sPacinG Portrait Orientation Landscape_Orientation I i I I I Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. 32mm modules:Max east/west bracket spacing-is 48"OC. I Spacing may vary depending upon project specific.structural requirements;I e.Ngh snow and wind load areas may require lesser spacing E-W than the maximum. sTaG.GereD LaYOUT canTiLever an.D oFFseT Staggered Mounting Points I .®Rock-It Mount ®Rock-it Coupling Cantilever. Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations,check layout.priorto installing. The array layout instructions in this installation manual offer a general overview of layout. Periodically,due to a variety of Offset:Offset from all roof edges depends on wind speed,snow i'factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location www.ecofastensolarcom info@ecofastensolarcom -877-859-3947 14 ROCK- IT SY STef'Yl 4.0 SYSTem sPeciFicaTions. Max No.of Panels. 300.Modules per ground lug Materials 306 Series Stainless, 6000 Serles Aluminum- Max System Voltage 100oVDC Coating BlackAndodization/Mill Finish Class A Fire Rating With UL7 703 Type 1 Rated Lug Specifications Bumdy CL50-ITN Ground-Lug Modules,see note below. (UL Listing#KDER E9999) Leveling.Range. 34" Ground Wire 14 AW&4 AWG Copper Per above lug spec. Ground Wire Rock-It Slide Comp Range 3" Max Module Size 64.96"(1-650mm)x Rock-lt SlideTile 7" 39.65(992mm)x 2150mm) =Min/Maio Roof Slope 1/2.12/12:12 Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing(35mm/40mm) 72" Rock-It Mount Load Rating 547lbs with Single 5/16"Lag 3.0 Max-Anchor Spacing(32mm) 48" Safety Factor Skirt Box.QTY 6 units Slide Fastening Hole 5/-1 Wdlameter Mount Box QTY 12 units Module Cantilever Maximum cantilever is 1/3 Rock-It Slide Box QTY 50 units bracket spacing 'Coupling Box OTY. 12 units. Warranty 20 Year Material and Workman ship. Codes:National.Electric Code;ANSI/NFPA 70,NEC 250,NEC 690,IRC,IBC Standards:UL 2703:First Edition,UL 1703 solar F.nilvrcn Solo 'ao STEM . v,^:•:'T""STf.:+ MFGIOCOQEGGN2.2 6 anmF:nu»mc CCNM"TOUL77W "CGNW,mRT0 uL3703 ' ,.,a. ".uwlroa�aomwa �"..Mnancuoouus The EcoFasten Solar Rock-It System,is a rooftop PV racking system consisting of 6000 Series Aluminum and 300 Series. Stainless.Steel components.The Rock-It System includes the rack components but does not include the PV panels, inverters or electrical-components.The PV modules to be used with Rock-It shall be certified under UL 1703.The system shall be used on steep slope roofs mounted-over a Class Afire rated roofing material and attached to the roof structure using:5/16".diameter;minimum 4"long 300 series Stainless.Steel lag-bolts with minimum thread embedment depth of 2 1/2"into the roof structure. Periodic re-inspection for loose components The system is subject tote-inspection as-required by the PV module manufacturer or by the Authority.Having Jurisdiction:Re-inspection,.as required,should include evaluation of any loose components or loose fasteners.All loose components and fasteners.should be secured.in accordance with-these instructions.The system should also-be evaluated for any evidence of corrosion.Any corrosion should be removed:Any affected part should be-cleaned or replaced in accordance with these instructions.. A Q,)rEcoFasten.. Solar www.ecof,istensolar.com info@ecofastensdiar..com 877-859-3947 .15 FeaTures • New and improved design North-South adjustabiltty Fastest,.easiest to level system on the market- only one tool required(1/2"deep well socket) • Integrated electrical bonding Vertical adjustment of 3"-4" • SIMPLE-only 4 components EVaWaTeD, COt'1'1PaTiBLe MO.DULes ModuleMerufacturer Model Type rx"used to Module Dimensions(mm) ModuleDimenstonsQn) . Downward Pressure Upward Pressure Down-siopeCesign 'Madmumdamp Indicate variable test) Deslgn Load(pst) Designload(psf)' Load(pst) spacing(In) Trina Solar TSM-xxx4W5.0G 1640 x992 x40. 64.95Px39.05"-L57" 33.3 33.3 20 72 Canadian Solar cs6P•xxlm 1638x922x40 644B"x38.66"xL57" 33.3 333 20 72 Canadian Solar CS6P-xxxP 1630x982x40 64.5'W8.7"x1.57' 33.3 33.3 20 72 Anko Solar XMioorP-60 1650 x 992 x 40 64961149.05"xL57" 30' so- 20 72 Jinko Solar JXMxxxM-GO .1650x992x40 64.96"49.05"4.57" 30 30 20' 72 Jinko Solar JKMrooPP-60 1650 x992 x 40 64.96"5A9.6s,,d s7" 30' 30 20 72'. JlnkoSolar JWxxxMM-60 1650x992x40 6"6"A9.05"x1.S7" 30 30 .20 72 .Ningi I Soler 'VL2xxP•29b 1650 x990 x40 64,96"x00.97"xL57" 30 30 20 72' LGElcetronles LG300=-N 1640x1000x35 64.57"09.97'xl.ee" -30' 30 20 72 . LG Elcetronlcs LG300N1K-G4 1640 x 1000 x 40 64.57'x39.3T'x1.57' 30 30 20 72 AxlteeSoler AGruxM/155-90S. 1640x992x40 9A5"x39.06NL38" so. _ 30 20 49 RECOM -ROM-2xx-6MB 1640 x992 x35 645049A5')CL37" -30 30 20 72 Silfab SLA21xP 1650X990X38 64.96"x3B37'xL49" 30 30 ZD 72. Solaria Power)(-mcR-W 1621 x 1056 x 40 63.89"01.53"i4l 57" -30 30 20 49 Hanwha-Q calls' QPRO 042xx 1GW x 1000 x 32'. 65.75"Y39.37'4.25" AD 30. 20 49 Hanwha•0 Cells' QPRO 042ot 19M x1000 x 92 65.75"x99.37'xL25" -30 3o. 20 72 Sunpreme GxB-3xxT 1670x997x40 65.75"49.25"xL57" 30 30 20 48 REC REC-xxx-GMB. 1675 x997x38 65.94"x39.25 xL5" 20 20 20 72 REC REC-xxx-CMB 1675x997x38 65.94"A9.251KL5" 30 -30 20 43 SolarWodd SW xxx Mono Black 1675 x961 x33 65.95"x37.8"xL30" 20 20 20 72 SolarWorld SW xxx Mono Black 167Sx961x33 65,95"x37.8"xL30" 3o 30 20 48 'Hanwha Q-cells 32mm modules to be used with special order Rock-It System components.Call.for details. ® EcoFa.Stel7 S®IarQ www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 16 a Cut Sheet - Rock-It-4.0-Mount 1: Installation to be completed In-accordance with-manufacturer's written specifications and installation instructions. 2. See spec sheet or-contact manufacturer for detailed.material,finishes,and configuration options. 3. Contact manufacturer for detailed•layout. 4. Do not scale drawings. 5. Subject to change without notice. o � 3.17in [80.54mmI " 2.50in �63.50mm I — 2.02in 2.14in 2.34in [51.38mm] [54.37mm] 59.36mm _- '32mm -- 35mm 40mm .. .11�LPINE - SnT��AltI7�.'�t;*E Fasten Solar�,. 4741 w Polk-Street Ste:4 ,zlJ Phoenix,AZ 85043 Toll Free Phone 1.888.766.4273v Toll Free Phone 1.877.859.3947 Material:.See Spec Sheet Toll Free Fax 1 A88.766:9994 Toll-Free'.Fax 1.888.766.9994 __- � - - ..... Scale: 1:2 6/28/2017 A$Ci: - EFS: X a Data Sheet Enphase Networking Enpflase The Enphase'IQ.Combiner 3T" with Enphase h IQ Envoy"' consolidates interconnection IQ�. ombiner 3 equipment into a-single enclosure and (X=1Q-AM1-240'3) streamlines PV and storage installations by providing a consistent, pre-wired solution for residential applications: It offers up-to four 2-pole.input circuits and-Eaton.BR series busbar assembly. Smart •.Includes IQ Envoy for communication L i i and control Flexible networking supports Wi-Fi, li J) Ethernet,or cellular • Optional AC receptacle available for.PLC bridge I ' ' •-Provides production-metering and optional consumption monitoring 11 �. - � Simple x" A Y kfs Reduced size from previous combiner • Centered mounting brackets support single stud mounting. Supports back and side conduit entry • '_ . Up to four-2-pole branch circuits for 240 VAC • plug-in breakers.(not included) 80 Atotal PV or storage branch circuits Reliable • Durable NRTL-certified NEMA.type- 3R enclosure Five=year warranty O` UL listed �o learn sTEo ore.about Enphase offerings,visit enphase.com EN P H AS E. Enphase IQ Combiner 3 MODEL NUMBER IQ Combiner 3 X-IQ=AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy"printed circuit board for integrated revenue-grade PV production metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2.5°i). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect" CELLMODEM-03(4G/12-year data plan) Plug and play industrial grade cellular modem with data plan.for systems up to 60- CELLMODEM-01.(3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US-Virgin Islands,. CELLMODEM-M1(46 based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.). Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5°i). Circuit.Breakers. Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. BRK-10A-2-240 Circuit breaker,2 pole,.10A,Eaton BR210 BRK-.15A-2-240 Circuit.breaker,2 pole,15A,Eaton BR215 BRK-20A-2P-240 Circuit breaker,2 pole,20A,.Eaton BR220 EPLC-01 Power line carrier(communication bridge pair),quantity 2 XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) - XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS Rating" Continuous duty. System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating .125 A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A' Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max.continuous current rating(input from,PV) 64 A Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions(WxHxD) 49.5 x 37.5.x 16.8 cm(19.5"x 14.75"x 6.63").Height is'21.06"(53.5 cm with mounting brackets).. Weight 7.5 kg(16.5 Ibs) Ambienttemperature range -40°C to+46°.0(-400 to 1150 F) Cooling Natural convection,plus heat shield Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors • 60 A breaker branch input: 4 to 1/0 AWG copper conductors • Main lug combined output: 10 to 2/0 AWG copper conductors • Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters(6,560-feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) Cellular Optional,CELLMODEM-01 (3G)or CELLMODEM-03(4G) or CELLMODEM-M1(4G based LTE-M) (not included). COMPLIANCE Compliance,Combiner UL 1741 CAN/CSA C22.2 No.107.1 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 *Consumption monitoring is required for Enphase Storage Systems. To learn more about Enphase offerings,visit enphase.com ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. ..,. E N P H A S E. 2018-09-13 Installation Manual Soltection RJw1 Rooftop Solar Junction Box Flashing Unit For Composition/Asphalt Shingle Roofs v. Manufactured by: Soltection: a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston,TX 77029 1-866-227-0577 www.soltection.com Soltection RJ-1 Installation Manual Page 1 TABLE OF CONTENTS INSTALLATION INSTRUCTIONS Contents IMPORTANT SAFETY INSTRUCTIONS........................................................................................................................4 SAFETY WARNINGS &CAUTIONS ..........................................................................................................................4 ELECTRICALPRECAUTIONS.................................................................................................................................... 5 MECHANICALPRECAUTIONS..................................................................................................................................5 PRODUCTINFORMATION .............................................................................................................................................. 6 OVERVIEW...................................................................................................................................................................... 6 PREP & PLACEMENT......................................................................................................................................................7 REQUIRED-TOOLS.......................................................................................................................................................7 PRODUCT PLACEMENT..............................................................................................................................................7 SPECIFICATIONS .......................................................................................................................................................... 11 MECHANICAL/ELECTRICAL................................................................................................................................... 11 TORQUERATINGS..................................................................................................................................................... 11 WARRANTIES: Seller warrants to Buyer that products and any services furnished hereunder will be free from defects in material,workmanship and title and will be of the kind and quality specified in Seller's written quotation.The foregoing shall apply only to failures to meet said warranties(excluding any defects in title)which appear within two years from the date of shipment hereunder. The conditions of any tests shall be mutually agreed upon and Seller shall be notified of, and may be represented at, all tests that may be made.The warranties and remedies set forth herein are conditioned upon (a)proper storage, installation, use and maintenance, and conformance with any applicable recommendations of Seller and (b) Buyer promptly notifying Seller of any defects and, if required, promptly making the product available for correction. If any product of service fails to meet the foregoing warranties (except title), Seller.shall thereupon correct any such failure either at its option, (i)by repairing any defective or damaged part or parts of the products,or(ii)by making available, F.O.B. Seller's plant or other point of shipment,any necessary repaired or replacement parts.Where a failure cannot be corrected by Seller's reasonable efforts, the parties will negotiate an equitable adjustment in price. The preceding paragraph sets forth the exclusive remedies for claims (except as to title) based on defect in or failure of products or services;whether the claim is in contract, indemnity,warranty,tort(including Seller's negligence), strict liability or otherwise and however instituted. Upon the expiration of the warranty period, all such liability shall terminate and Buyer shall have a reasonable time,within thirty days after the warranty period,to give written notice of any defects which appeared during the warranty period. Except as set forth.in Article 2, "Patents," the foregoing warranties are exclusive and in lieu of all other warranties, whether written, oral, implied or statutory. NO IMPLIED STATUTORY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE SHALL APPLY. Seller does not warrant any products or services of others which Buyer has designated. www.soltection.com Soltection R1-1 Installation Manual Page 3 IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONS & SAFETY WARNINGS PRIOR TO INSTALLATION NOTE: SAVE THESE INSTRUCTIONS This manual contains important instructions that shall be followed during.installation and maintenance of the Soltection.RJA rooftop junction box with flashing. LETHAL.VOLTAGES ARE PRESENT DURING THE INSTALLATION, OPERATION AND SERVICE OF THIS EQUIPMENT. PROPER PRECAUTIONS MUST BETAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . i SAFETY WARNINGS & CAUTIONS ■ Only.qualified personnel or licensed electricians should install this product and the instructions herein are provided for those individual(s)only. ■ To. reduce-the risk of electric shock, injury, or death, all electrical wiring and connections must be performed by qualified personnel. ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper precautions must be taken at all times to ensure the safety of the service personnel. • Follow state and federal Occupational Safety and Health Administration (OSHA)..guidelines and regulations when installing this product. ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations as well as for installation best-practices. ■ Install this apparatus in accordance with i4NSl/NFPA.70; National Electrical Code (NEC)..Follow all national or local-electrical codes. ■ Install, operate, and use this product in.a manner consistent Vith.the instructions provided:.Failure to follow the procedures indicated may result in roof leaks, property damage,.or consequential damage. www.soltection.com Soltection RJ-1 Installation Manual Page 4 CAUTION ELECTRICAL PRECAUTIONS- ■ Ensure all electrical conductors are at zero voltage potential before installing or servicing this unit-. ■ Never break contact on.a circuit without using.the appropriate disconnect device. ■ Follow established lockout and-tagout procedures for all electrical conductors prior to servicing. ■ Beware.of power lines in the vicinity of-the roof,.where Jnadvertent.contact may result in electrocution,. .personal injury, or.death. ■ When.disconnecting.source.or supply.circuits,.provide sufficient time as stated in the.power electronics manufacturer's instruction manual in.-order to.ensure_discharge of all conductors in.the circuit. Always verify the-integrity and proper installation of the electrical components prior to energizing electrical circuits. ■ Non-metallic enclosures do not provide.grounding means between conduit connections. The-use of grounding.hubs and jumper wires are required. ■ -Grounding must be sized-per NEC requirements, and is the responsibility.of the installer.- MECHANICAL. PRECAUTIONS When drilling into an attic-.space,.ensure.that electrical wires, mechanical obstructions, or potential electrical hazards are removed from the vicinity and direction of the drill. Do .not, install. if the .roof is wet, frosted, or covered by ice or snow. ■ If an art of this product becomes damaged • YP P 9 remove and destroy the entirety of the unit. .Failure.to do so may result r in fire,.property damage, personal injury, electrocution, or death. ■ Do not use the product to anchor fall protection equipment. www.soltection.com Soltection RJ-1 Installation Manual Page S. PRODUCT INFORMATION OVERVIEW The Soltection RJ-1 Residential Rooftop Junction Box is a flashed roof penetration designed to protect electrical conductors entering the rooftop/attic. It is made of a high-strength UV-resistant and UV- stabilized polymeric material. ■ The RJ-1 enclosures comes fully equipped with a slotted DIN rail mounted inside the enclosure designed for mounting of DIN rail accessories, such as terminal blocks. ■ A four position ground bar is also provided as a means to form a bond between the solar array mounted on the roof and the building. CORNER SCREWS MOLDED COVER PLASTIC SCREW FOR GROUND BAR AFFIXING DIN RAIL GROUND BAR 0 0 0 0 0 MOLDED BASE DIN RAIL www.soltection.com Soltection RJ-1 Installation Manual Page 6 A PREP & PLACEMENT REQUIRED TOOLS ✓ Shingle IZpper Bar ✓ Phillips Screwdriver ✓ Lumber Crayon ✓ Uni-Bit ✓ Hole Saw or Spade Bit ✓ Utility Knife ✓ Roofing Sealant RAFER - .PRODUCT PLACEMENT • Identify the location and placement of the. flashing on the roof as shown.The product may be mounted beneath the array or _ adjacent to the array. a DO NOT LOCATE THE PRODUCT DIRECTLY. OVER A RAFTER TO -ENSURE THE-RAFTER. --DOES NOT INTERFERE m — WITH THE WIRING Remove template from packaging ENTRY INTO THE ATTIC and use in Step.2 STEP 1. www.soltection.com Soltection RI-1 Installation Manual Page 7 r� h w�.�. III -•�{ h\a Position the top edge of the template 1/2" Trace and continue using a lumber crayon to the above the 1st course of shingle as shown. bottom of the 2nd course. Cut along lines and remove shingles. STEP 2 STEP 3 RECCOMENDED LOCATION FOR CONDUIT ENTRY INTO ROOF RAISED AREA IN MOLDED BASE Remove any roofing nails beneath the 1st, 2nd, or DRILL PILOT HOLE 31d course of tile that obstructs the position of Slide RJ-1 Junction box into place where you the roof flashing. cut shingle template.The image above shows STEP 4 where you will drill in the next step STEP 5 www.soltection.com Soltection 11J-1 Installation Manual Page 8 lli„ 4 6 t i S a`��t r � \ y z 4 •Y 4. �;i�e}{r?�arS�c�'�r^z•ri�S'YS ��ti� ��xF^�'"7'^«rr�'�,:*� hr , �•t � • 4 y ti,4J£' I I Remove RJ-1,flip it over,wipe it clean&apply . Reinstall Unit. Use the two supplied Decking a bead of roofing sealant to the underside of the Screws to mount the flashing to the roof. flashing unit. Ensure that it's placed in the' Torque to the specification indicated in the "Upside-down U"Shape to support.engress specifications. Refer to Table T2(page 10)for water protection,AS SHOWN. the proper tightening torques. STEP 10 STEP 11 POPULATE RJ-1 t is�, ��•.��5 • Populate the RJ-1 unit using the appropriate wire connectors, terminal ` r� kit blocks, or other necessary components. x . • Ensure that the components installed are rated for and are suitable for the intended , purpose. • The RJ-1 unit is provided with multiple standoffs which can accommodate accessories to be mounted. Step 11 . A Install the cover onto the top of the enclosure. Tighten 4 cover screws to the Torque value indicated in Table T3(see page 10) STEP 12 www.soltection.com Soltection RJ-1 Installation Manual Page 10 4 . SPECIFICATIONS .MECHANICAL/ ELECTRICAL ■ -Product Certifications: UL508A • Enclosure Rating:.Type.4X ■ Attic.Conduit Pass Through Connector Size Range:1/2"—1" ■ Max:Side Wall Conduit-Size: 1" ■ Maximum Current:-NIA Maximum Voltage:-N/A ■ Ambient Operating Temperature: 45C to 75C TORQUE. RATINGS Table T1:Ground Bar Connection;Wire Range:#4 to#14,4 Usable Connections' 0 o 0 0 Wire Size Tightening Torque(lb in) 44 AWG 35 8 AWG 30 10-14 AWG 25 Table T1 Table T2: Mounting Screw, Mounting to Deckin , 2 Provided Tightening,Tor ue Ib-in 1.15-20 Table T3:Torque Values, Cover/Lid-Screws-, 4 Provided, Captive Tightening Torque(lb-In 11 www.soltection.com Soltection RJ-1 Installation Manual Page 11. TM so-Itectolon .by vynckier Soltection is a division of Vynckier Enclosure'Systems,- Inc. 271 McCarty Street Houston,TX 77029 1=866-227-0577