HomeMy WebLinkAbout20-22354 CITY OF ZEPHYRHILLS
5335-8TH STREET
(813)780-0020 22354
BUILDING PERMIT
Permit Number: 22354 Address: 38309 IRONWOOD PL
Permit Type: RE-ROOF ZEPHYRHILLS, FL.
Class of Work: ROOF REPLACEMENT Township: Range: Book:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Square Feet: Subdivision: DRIFTWOOD
Est. Value: Parcel Number: 02-26-21-021A-OOG00-0030
- `E
Improv. Cost:
77," MIN OR KiTIONWIMMIMISIMMI
Date Issued: 1/23/2020 M Name: STAHL PATRICIA A
Total Fees: Address: 38309 IRONWOOD PL
Amount Paid: ZEPHYRHILLS, FL. 33542-6623
Date Paid: Phone: (813)469-1727
Work Desc: REROOF SHINGLE ( PART OF BP#22203#26) FEE PAID
M _MARWM - . A'PPWIC JON CONTRACTOR
V.
SCOTT BLACKMAN ROOFING INC REROOF RESIDENTIAL 0.00
ctions Re wired -7 _K
DRY IN ROOF INSP
TAPE JOINTS ROOF INSP
FINAL
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each such subsequent reinspection.
NOTICE: In addition to the requirements of this permit,there maybe additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans,Specifications Must Accompany Application.All work shall be performed in accordance with
City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
,-tdrN_T):ZA&'f0_R SIGNATURE PERMIT OFFIVR
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
813-780-0020 City of Zephyrhills Permit Application Fax 813-780-0021
Building Department
f.
Date Received Phone Contact for Permitting.1..........
.......... rMXl3=IX1X=................Owner's Name Pa-MCkA Owner Phone Number
L
Owner's Address -TYO,,waa� Plo
c Owner Phone Number
Owner Phone Number
JOB ADDRESS 3g QC� 0a �I - LOT#c
30 SUBDIVISION �wxb 6-Z- PARCEL ID#
(OBTAINED FROM-PROPERTY TAX NOTICE)
WORK PROPOSED NEW CONISTRR ADD/ALT SIGN DEMOLISH
e INSTALL REPAIR
PROPOSED USE = SFR Q COMM OTHER
TYPE OF CONSTRUCTION BLOCK E—] FRAME STEEL = E-
I TIC�Ux,�
DESCRIPTION OF WORKS 1e
BUILDING SIZE SQ FOOTAGE HEIGHT
14.
=BUILDING
VALUATION OF'TOTAL CONSTRUCTION'
DUKE ENERGY' W.R.E.C.
=ELECTRICAL AMP SERVICE
=PLUMBING 1$ VV2
=MECHANICAL 1$ VALUATION OF MECHANICAL INSTALLATION
=GAS Q ROOFING SPECIALTY OTHER
FINISHED FLOOR ELEVATIONS' F— FLOOD ZONE AREA =YES NO
HHH!HHHH HHHHHHHi gHHHHHHH
BUILDER COMPANY
SIGNATURE REGISTERED Y/ N_J FEE CURREN . LyIN
Address License#
ELECTRICIAN COMPANY
SIGNATURE REGISTERED Y/ N_J FEE CURREN L_X
_L N_j
Address License# F—
PLUMBER COMPANY
SIGNATURE REGISTERED Y*/ N FEE CURREN
Address I License# F-
MECHANICAL COMPANY
SIGNATURE REGISTERED Y/ N _J FEE CURREN L_X/N
Address License#
OTHER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN Y N -
-7
Address OIAS)b License#1 s zs
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction,
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans wl Silt Fence installed,
Sanitary Facilities&1 dumpster,Site Work Permit for subdivisions/large projects
COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety page;(1)set of Energy Forms.R-O-W Permit for new construction.
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans wl Silt Fence installed,
Sanitary Facilities&I dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance
SIGN PERMIT Attach(2)sets of Engineered Plans.
****PROPERTY SURVEY required for all NEW construction.
Directions:
=OnS:
Fill out application completely.
Owner&Contractor sign back of application,notarized
If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500)
Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage)
Driveways-Not over Counter if on public roadways..needs ROW
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work, they may-be required to be licensed in-accordance With state and local regulations. If the
contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
under state law. If.the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
8009. Furthermore, if the owner has -hired a contractor or contractors, he is advised to have the contractor(s) sign
portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
use in existing.buildings, or expansion of existing-.buildings,,as-specified in Pasco-County Ordinance-number 89-07 and
-
90-07, as amended. The undersigned also understands,,that such fees, as may be due, will be identified at the time of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior. to
receiving a "certificate of occupancy" or final.,power release. If the project does not involve a certificate of-occupancy or
final power release, the.fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION.LIEN LAW(Chapter713,Florida Statutes, as amended):- If valuation of work is$2,500*00 or more, I
certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
Protection Guide" prepared by the Florida Department of Agriculture-and:Consumer Affairs. If the applicant is someone
other than the"owner', I certify that I have obtained a copy of the above described document and promise in good faith to
deliver it to the"owner'prior-to commencement.
CONTRACTOR'S/OWNERISAFFIDAVIT: I certify that all the information in,this application is accurate and that all work
will be done-in compliance with all applicable laws regulating construction, zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
commenced prior to issuance of a:permit and that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify.that I understand that the regulations of other government agencies may apply to the intended work, and that it is
my responsibility to identify what actions I must take to.be in compliance. Such agencies include but are not limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
-Lands,Water/Wastewater Treatment.
- Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
Watercourses.
- Army Corps,of Engineers-Seawalls, Docks, Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement.
- Federal Aviation Authority-Runways.
I understand.that the,following restrictions apply to the use of fill:
Use of fill is not allowed in Flood Zone W"unless-expressly permitted.
If the fill material is to-be used in Flood Zone "A", it is understood that a drainage plan addressing a
.compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
If the fill material is to be.used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
If fill material is to be used in any area, I certify that use' of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties,the owner maybe cited for violating
the conditions.of the building permit-issued under the attached permit-application, for lots less than one (1)
acre which are elevated-by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing-construction. I understand that a separate permit may be required for electrical work,
plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
permit issued shall be construed to-be a license to proceed with the work and not as authority to-violate, cancel, alter, or
set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
requiring a correction of errors in plans, construction or violations of any codes. Every,permit issued shall become.invalid
unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
may be requested, in writing, from thd Building Official for a period not to exceed ninety (90) days and will demonstrate
justifiable cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned;
WARNING TO,OWNER: YOUR FAILURE TO.RECORD A,NOTICE OF!COMMENCEMENT.MAY RESULT INYOUR
PAYING TWICE FOR-IMPROVEMENTS TO YOUR PROPERTY. IF Y.OU:INTEND TO-OBTAIN FINANCING,CONSULT
WITH:YOUR LENDER OR AN-ATTORNEY BEFORE'RECORDING.YOUR-NOTICE OF COMMENCEMENT.
FLORIDA JURAT'(F.S.117.03)
OWNER OR AGENT CONTRACTOR
Subscribed and sworn to(or affirmed)before me this Subscribed and sworn to(or affirmed)before me this
4y by
Who is/are personally known to me or has/have produced Who is/are personally known to me or has/have produced
as identification. as identification.
-Notary Public Notary Public
Commission No. Commission No.
Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped