Loading...
HomeMy WebLinkAbout20-22465 CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780-0020 ' 22465 BUILDING PERMIT PERMIT INFORMATION LOCATION INFORMATION Permit Number: 22465 Address: 38122 HENRY DR Permit Type: COMMERCIAL ZEPHYRHILLS, FL. Class of Work: ADD/ALT COMMERCIAL Township: Range: Book: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Square Feet: Subdivision: CITY OF ZEPHYRHILLS Est. Value: Parcel Number: 02-26-21-0080-OOA00-0070 Improv. Cost: 20,000.00 OWNER INFORMATION Date Issued: 2/20/2020 Name: CITY OF ZEPHYRHILLS Total Fees: 210.00 Address: 38122 HENRY DR Amount Paid: 210.00 ZEPHYRHILLS, FL. 33542 Date Paid: 2/20/2020 Phone: - Work Desc: SWAP OUT(3)ANTENNAS VERIZON FOR (3) INTEGRATED RADIOS CONTRACTORS APPLICATION FEES ASCEND WIRELESS NETWORKS INC BUILDING FEE 210.00 oc/v _Ins ectionW9equired FO TER 2ND ROUGH PLUMB I C INSULATION CEILING FOOTER BOND DUCTS INSULATED SEWER MISC. ROUGH ELECTRIC LINTEL MISC MISC. 1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC. DUCTS INSTALLED WATER MISC DRIVEWAY PRE-SLAB SHEATHING MISC. MISC. CONSTRUCTION POLE FRAME MISC. MISC. REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PERMIT OFFI R PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER INSTR#2020024845 OR BK 10052 PG 2651 Page 1 of 1 02/13/2020 11:36 AM Rcpt:2135102 Rec:10.00 DS:0.00 IT:0.00 Nikki AlvarezSowles,Esq.,Pasco County Clerk&Comptroller I� I 8266481132419 I Permit No. Parcel 10 No 02-28.21-008020A00-0070 E NOTICE OF COMMENCEMENT Slate of Florida County cc PescO I THE UNDERSIGNED hereby gives notice that imprwemem wR be made to cedeln real property,and in a oldance vlith Chepler713,Florida Statutes, the foliovAng Information is provided In this Notice of CommBneement: I 1. Description of Property:Parcel Identification No.0246r21.0080-0OA00-0070 j Street Address: 38122 Henry Dr 2. General Description of Improvement VEfiVANSO NRcpropos'ngm snep(3)onlennae For(3)[IfRY with integrated } VP led red osadd(3)RRUS,(t)O , and(1)hybrid.Final configuratian:(9)anterams,.(9)RRUS,(2)OVP,(2)hybrid,(12)coax.No charge W lease ground space 3. Owner information or Lessee irdarindon U the Lessee contracted for the improvement: Craven Cases USA.Inc.as agent forVedmn 4511 N.Himes M91ite_210 Tampa FL Address City slate Interest In Pmpedr. Terser Operemr Name of Fee Simple Titleholder. CITYOF ZEPHYRHILLS (If ddterenl[ram Oumer listed above) ZEPHYRHILLS FL q13 HM 6T Address city state a. Contractor. Ascend Wireless Networks Name 755 Business Park Blvd. Water Garden FL Address City SWfe Contractors Telephone No.: 40745"0474 S. Surely: Name Address City estate Amount OfBond:S Telephone No: 6. Lender. Name Address City State Lenders Telephone No_ 7, Persons within the state of Florida designated by the owner upon whom notices or oewr documents may be served as provided by Section 713.13(1)(a)(7).Florida Statutes: Nam. Address City Stale Telephone Number of Designated Perscm e. In addition to himself,the mvnef d0signales of to receive a copy of the Uenoes Notice as provided in Section 713,13(1)(b),Florida SWades. Telephone Number of Person or Entity Designated by Omer. 9. Eypiration date of Notice of Commencement(the wpiraticn dale may not be Were the wmpktion of construction and final paymerd to the contractor,but wN be one yearfrom the date of recording unless a different data Is spec fiad): ARE CONSIDEI'flNG TO RED IMPROPER NER: ANY PMENTS MADE BY AYMENTS UNDER CHAPTER711 ONVNER 3 PARTI,R THE�SEGTION713ATION 0.13.FLORDA NOTICE STATUTES.AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT(MIST BE CING,CONSULT WITH YOUED AND POSTED ON THE JOS SITE BEFORE R LENDER ORAN ATTORNEY BEFORE COMMENCINGrlRS OR RECORDINGF YOU YOUR 0 R NOTINTEND TO CE OFCOAIN MMENCEMENT. ENT. Under penalt Of podury I declare that l have read the foregoing notice of commencement and that the fads steed therein are true to the best of my knowledge and beflef. /1 � STATE COUNTY OF ��t// � COUNTY'OF 4 v „4• JASON R.SMITH signature of Ovmer or Lew-,or Ovmefe or Lessees Aulhodzed Offiwr0redoriPa;tnor/Manager Notary Public-State of Florida Commission f)66 919682 Real Estate Spedarst My Comm.Expires Oct 6,2023 slgnalorys Trl./011ke The foregoing i hd th UP11nnaUx "00 of February .2029 by Alex Van Vleenderen Real Estate Specialist (type of authority.e.g..officer.trustee,allomey In fad)for ' Crown Castle USA,Inc. (neme of party on behait loom tnstn eal was exacuted). Personalty Known OPS Produced Identification❑ Notary Signature_ Type of Identification Produced Name(Print)Jason R.Smith wpdalaibcslnoUceeommencemenl pcOS30O8 s 813-78041020 City of Zephyrhills Permit Application Fax-813-78MMI 8265481132419 2. Building Department �Data�-e�d 2"✓ Phone Contact for Perm ng_ 813 3423873 Owners Name Crown Castle USA as agent for Venzon Owner Phone Number 813.342,I873 owners address 4511 N Himes Ave,Ste 210 Tampa FL 3361 Owner Phone Number Fee Simple Titleholder Name I City Of Zephyrhills Owner Phone Number Fee Simple Titleholder address 1 5335 8th St Zephyrhins,FL 33540 JOB ADDRESS 38122 Henry Dr;Zephyrhills,FL 33542 LOTS SUBDIVISION PARCEL ID# 02-26-21-0080-0GA00.0070 (OBTAINED FROM PROPERTY TAX NOTICE) WORKPROPOSED B NEW CONSTRR ADDIALT SIGN Q Q DEMOLISH INSTALL REPAIR PROPOSED USE = SFR = COMM = OTHER TYPE OF CONSTRUCTION = BLOCK = FRAME = STEEL Q DESCRIPTION OF WORK RIZON LTE is proposing to swap(3)antennas for(3)[KRY with integrated radios],add(d)RRUS,(1)0VP and(1)hybrid BUILDING SIZE SO FOOTAGE HEIGHT <5 =BUILDING $ r J 20,000 VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE = PROGRESS ENERGY Q W.R.E.C. =PLUMBING =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION w'L =GAS Q ROOFING 0 SPECIALTY = OTHER v FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA AYES NO C/ ja V f BUILDER COMPANY Ascend Wireless Networks /�,} 1a SIGNATURE - REGISTERED I YIN I FEE CURREN .Y/N j •j " Address `56 Business Park Blvd.,Winter Garden,FL 34787 License#FCGC15211965 V' 1)I / ELECTRICIAN COMPANY SIGNATURE F REGISTERED I YIN I FEE CURREN L.XjNj Address License# ��• PLUMBER COMPANY SIGNATURE REGISTERED I YIN -1 FEE CURREN Y/N Address License# MECHANICAL COMPANY SIGNATURE REGISTERED .Y/N -FEE CURREN I Y I N Address License# OTHER COMPANY SIGNATURE REGISTERED I Y/N I FEE CURREN LZ/N Address I License# III111111tillIIIIIIIIIIIRillIIIIII1111.111111IfIIf111111111111111111 RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Sift Fence Installed, Sanitary Faculties&1 dumpster,Site Work Permit for subdivisionsAarge projects COMMERCIAL Attach(3)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms,R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans;Stormvrater Plans w/Sit Fence Installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. —PROPERTY SURVEY required for all NEW construction. DireeUons:• FBI out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notim of Commencement Is required. (AIC upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING .(Front of Application Only) Reroofs If shingles Sewers Service Upgrades A/C Fences(PloUSurvey/Footage) Driveways-Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit maybe subject to`deed'restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILJTIES: if the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building inspection Division--Licensing Section at 727-847 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s)sign portions of the"contractor Block'of this application for which they Will be responsible. If you,as the owner sign as the contractor,that may be an indication that he is not property licensed and Is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACTIU71UTIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be Identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. It the project does not Involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance. Furthermore,if Pasco County Water/Sewer Impact fees are due,they must be paid.prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 715,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeownees Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the'owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver It to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application Is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes,zoning regulations,and land development regulations In the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the Intended work,and that it Is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads,Wetland Areas and Environmentally Sensitive Lands,Water/Wastawater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of EngineersSeawalls,Docks,Navigable Waterways. Department of Health is Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency Asbestos abatement. Federal Aviation Authority-Runways. understand that the following restrictions apply to the use of fill: Use of fill is not allowed In Flood Zone"V°unless expressly permitted. - if the fill material is to be used In Flood Zone "A", it Is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material Is to be used In Flood Zone"A"In connection with a permitted building using stem wall construction,i certify that fill will be used only to fill the area within the stem wail. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill Is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application,for tots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER,1 promise in good faith to inform the owner of the permitting conditions set forth In this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs,wells, pools,air conditioning, gas, or other Installations not specifically included in the application. A permit Issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit Is suspended or abandoned for a period of six(6)months after the time the work is corrnnenced. An extension may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. a� a c WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT iN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT LdWTH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. C9 FLORIDA JURAT(F.S.117.03) a Z E OWNERORAGENT CONTRACTOR, - -- � to a bs '� n by Ito ft7r�n o this S cdbed y rn�(gr rr� d) 0� Is ITM Who is/are personail imown Lae r asthave produced o eare personaily known to m,a or hassthave prodduuce'd4 - tU 2 U) as identification, as identification. uJ ----� U U X W Notary Public Notary Public " Commission No.��4/7-0 mmrssion No. I:r = Name or Notary typed,printed or stamped Name of Notary typed,printed or LSGEY N STOVALL Commission#G420f504 uy Qr Expires April 16,2022 9�eirft,�` @�rti> 1luullv�iNonsY6crvtcol 2/14/2018 02-26-21-0080-OOA00-0070 I Pasco County Property Appraiser Data Current as Of: Weekly Archive - Saturday, February 10, 2018 Parcel ID 02-26-21-0080-OOA00-0070 (Card: 001 of 001) Classification 82 - Forests, Parks, recreational areas Mailing Address Property Value CITY OF ZEPHYRHILLS Ag Land $0 5335 8TH ST Land $23,836 ZEPHYRHILLS FL 33542-4312 Building $0 Physical Address Extra Features $3,079 38122 HENRY DRIVE ZEPHYRHILLS, FL 33542 lust Value $26,915 Legal Description (First 4 Lines) Assessed (Non-School Amendment 1) $26,915 See Plat for this Subdivision TYSON SUB PB 4 PG 109 POR Taxable Value $3,663 TR A DESC AS COM NE COR OF S 1/2 OF SW 1/4 TH S88DG 50MIN 15"W 1796.6 FT TH S 19.10 FT Jurisdiction City of Zephyrhills Land Detail (Card: 001 of 001) Line Use (Description Zoning Units Type Price Condition Value 1 0100 ~I SFR OOR4 0.12 AC $30,020.00 1.00 $3,602 2 0100 SFR OOR4 0.38 AC $30,020.00 1.00 $11,408 3 I _0.1.00 SFR OOR4 0.42 AC $30,020.00 0.70 $8,826 Additional Land Information _ Acres 0.92 Tax Area 30ZH FEMA X Residential Code 1ZHN.S2 Code _ Building Information - Use 00 - Unimproved (Card: 001 of 001) Unimproved Parcel 00 - Unimproved Extra Features (Card: 001 of 001) Line jDescription Year Units Value 1 CLFENCE 1975 6,368 $2,866 2 PUMPHSE 1975 240 $213 Sales History Previous Owner: N/A Month/Year Book/Page Type TOR Code Condition Amount 08/1975 0806 / 0104 Vacant $0 http://search.pascopa.com/parcel.aspx?sec=02&twn=26&rng=21&sbb=0080&blk=00A00&lot=0070&action=Submit 1/1 OR BK 49S9 A6 1 gR3a 5 of 7 SITE ID: A-2-GO82-G SITE NAME:City of Zephyrhills Y AMENDMENT NO.1 TO SITE AGREEMENT FOR LAND This Amendment No.1 To Site Agreement For Land (°Amendment") is entered into as of the date last signed by all parties hereto, and modifies and amends that Site Agreement for Land dated November 24, 1997 and fully-executed on 12/10/97 ("Site Agreement"), by and between the City of Zephyrhills ("Owner"), and APT Tampa/Orlando, Inc.,a Delaware corporation("APT"). NOW,THEREFORE, in consideration of the mutual covenants contained herein and for other good and valuable consideration,the receipt and sufficiency of which is hereby acknowledged and agreed,the parties hereto agree as follows: 1. Exhibit B to the Site Agreement is hereby amended and restated as follows: The attached Exhibit B(pages 1 and 2)shall now replace the existing Exhibit B. Except as expressly set forth above, all provisions of the Site Agreement remain unchanged and in full force and effect. In case of any inconsistencies between the terms and conditions contained in the Site Agreement and the terms and conditions contained herein, the terms and conditions herein shall control, and unless otherwise defined herein, have the same meaning as in the Site Agreement. IN WITNESS WHEREOF, each of the parties have executed this Amendment as of the date below their respective signatures. OWNER wt es s: City of Zephyrhills By. Print Name: G Print Name: n Print Title: C ou.uc« 2 tip Date: _ a7-ts-49 Print Name:�Z,ox'r Attest: Print Name L ung DSas Print Title: e.t 4 C.�zx Date- a.-1s-94 APT Witnesses• APT Tam rlando, Inc., Print Name: V �<<G�_ — Print Name: 4 r y "/ n 2. C• Print Title: ; 4,-e rw e oft�er•.1 '� •fy.: nPrint_name: 64%CAeCA9 Or_ Cnd� ER Date: 1:1 rou s1En in A ui tionlLe af\FINAL TEMPLATE%%g p g eeringWetwork OperationsulATA Oper\Site c9 s 9 endment No.1.doc 7-tPhAlP.I;A)S,4-) • 336y0 Site No.A-2-G-08-2� OR B-I;r--+019S PS I 92Z3Z3 Site Name:City of Zephyr Hills 6 of 7 REVISED EXHIBIT"B" Page I oft --------------------------- wwr me ter_ M BE F~e FM x&rW$OX fer &x V.- to us A Wwr Section Z Township 26 South, Range 21 East (NI- OR BK 409 3 P6 1 234 7 of 7 REVISED EXHIBIT "B" Page 2 of 2 LEGAL DESCR1PT1O1V OF PROPERTY: PROJECT AREA A PARCEL OF LAND LYING IN THE SOUTH 1/2 OF THE SOUTHWEST 1/4 OF SECTION 2. TOWNSHIP 26 SOUTH, RANGE 21 EAST, PASCO COUNTY, FLORIDA.-ALSO BEING A PORTION OF TYSON SUBDIVISION, ACCORDING TO THE MAP OR PLAT�AS RECORDED IN PLAT BOOK 4. PAGE 109, OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIOA; SAID PARCEL OF LAND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS; FOR A POINT OF REFERENCE, COMMENCE AT THE NORTHEAST CORNER OF THE SOUTH 1/2 .OF THE SOUTHWEST 1/4 OF SECTION 2. TOWNSHIP 26 SOUTH, RANGE 21 EAST, PASCO COUNTY. FLORIDA: THENCE S.88'50'15"W., ALONG THE NORTH LINE OF SAID SOUTH 1/2 OF THE SOUTHWEST 1/4 OF SAID SECTION -2. A DISTANCE OF 1796.6 FEET; THENCE S.00'00'00"E., A DISTANCE OF 19.1 FEET TO A POINT WHICH LIES ALONG SAID SOUTH RIGHT—OF—WAY_ LINE; THENCE S.89'18'10"W., ALONG SAID SOUTH RIGHT—OF—WAY LINE. 103.74 FEET TO A POINT OF BEGINNING;-THENCE S.01'44149"W.. 80.1 FEET; THENCE S.53-43'42"W., 21.6 FEET; THENCE N.88-15'11"W.. 76.3 FEET; THENCE N.00'00'44"W.. 89.3 FEET TO A POINT ALONG SAID SOUTH RIGHT—OF—WAY LINE; THENCE N.89'18'10"E.. ALONG SAID SOUTH RIGHT—OF—WAY LINE, 96.2 FEET TO THE POINT OF BEGINNING. SAID PROJECT AREA CONTAINING 8539 SQUARE FEET, MORE OR LESS. TOGETHER WITH A NON—EXCLUSIVE UTILITY EASEMENT.LYING. SEVEN AND ONE—HALF FEET TO THE RIGHT AND SEVEN ONE—HALF FEET TO THE LEFT OF A CENTERLINE BEING MORE PARTICULARLY'DESCRIBED AS FOLLOWS; FOR A POINT OF REFERENCE, COMMENCE AT THE NORTHEAST CORNER OF THE SOUTH 1/2 OF THE SOUTHWEST 1/4 OF SECTION 2, TOWNSHIP 26 SOUTH, RANGE 21 EAST, PASCO COUNTY. FLORIDA. THENCE S.88'50'15"W., ALONG THE NORTH LINE OF SAID SOUTH 1/2 OF THE SOUTHWEST 1/4 OF SAID SECTION 2. A DISTANCE OF 1796.6 FEET; THENCE S.00'00'00"E.. A DISTANCE OF 19.1 FEET TO A POINT WHICH LIES ALONG SAID SOUTH RIGHT—OF—WAY LINE; THENCE S.89'18'10"W.. ALONG SAID SOUTH RIGHT—OF—WAY LINE, 103.74 FEET; THENCE S.01'44'49"W., 80.1 FEET; THENCE THENCE S.5343'42"W., 21.6 FEET; THENCE N.88'15'11"W.. 25.6 FEET TO A POINT OF BEGINNING; THENCE 5.39'58'06"W., 52.35 FEET TO THE POINT OF TERMINATION. THE SIDELINES OF EASEMENT TO BE SHORTENED OR PROLONGED TO MEET AT ANGLE POINTS AND/OR BOUNDARY LINES. SAID UTILITY EASEMENT CONTAINS 785 SQUARE FEET, MORE OR LESS. AGREEMENT This Agreement("Agreement')is entered into by and between The CITY OF ZEPHYRHILLS,a municipality of the State of Florida,whose address is 5335 Eighth Sweet,Zephryhills,FL 33540-4312 (the "Owner")and APT Tampa/Orlando, inc., its successors and assigns ("APT"), providing for the granting and leasing of certain property interests'on the following terms and conditions: 1. APT shall have J ie right i to utilize space on the Owner's property located at Zephyrhills, Florida in the County of Pasco, and more particularly described on Exhibit"A" attached hereto ("Owner's Property') together with a non-exclusive right of access to Owner's Property as well as Owner's consent and permission for APT to connect such electricity,telephone and other utilities as may be necessary for the purpose of testing a temporary communications facility(the"Temporary Facility'). Such Temporary Facility shall be described on Exhibit IV attached hereto. 2. This Agreement shall commence on the earlier of thirty (30) days following execution of this Agreement by both parties or the day APT begins operation of the Temporary Facility on Owner's Property ("Commencement Date") and shall continue month to month thereafter until such time as Owner constructs a permanent tower on the Owner's Property. 6 ciT Hoz �p COMO S, 3. Owner and APT agree that Owner and APT are in the process of negotiating a permanent Site Agreement for the lease of certain property located at 6217 St Street, Zephyrhills, Florida for the purpose of installing,removing,maintaining and operating a communications facility,including a 197 foot self supporting tower. Upon execution of a permanent Site Agreement and completion of construction of the tower,this Agreement shall terminate and the relationship shall be governed by the permanent Site Agreement. 4. APT shall pay Owner the sum of per month, plus applicable sales tax,for the rights,!enumerated in this Agreement. Such sum shall be payable monthly, in advance,beginning on the Commencement Date and on the fast day of each month thereafter. If the Commencement Date is on a day other than the first day of the month, then such sum shall be prorated for the remainder of said month. 5. The following covenants and agreements are conditions of this Agreement and are acknowledged and agreed to by APT and Owner. A. APT agrees to repair at its sole cost and expense any damage to Owner's Property caused by APT in connection with the location, operation, maintenance of, and removal of the Temporary Facility, promptly but in no event later that thirty (30) days after receipt of written notice of damage by Owner. B. Owner reserves the right and privilege to use Owner's Property affected by this Agreement for normal purposes provided such use will not interfere with the use or occupation of Owner's Property by APT or APT's operations thereon, and provided also that except in cases of emergency Owner shall not have access to the Temporary Facility unless accompanied by APT personnel. C. Owner agrees to cooperate with APT in its efforts to connect the Temporary Facility to electric, telephone, or other necessary utility service at APT's sole cost and expense. Payment for said services to the Temporary Facility shall be APT's sole responsibility. D. This Agreement may be signed in counterparts by the parties hereto. E. RADON GAS:Radon is a naturally occurring radioactive gas that,when is has accumulated in a building in sufficient quantities,may present health risks to persons who are exposed to it over time. Levels of radon that exceed federal and state guidelines have been found in buildings in Florida Additional information regarding radon testing may be obtained from your county public health authority. F. APT shall pay all personal property taxes assessed against the APT Facilities and ad valorem taxes assessed against the Project Site,commencing in calendar year 1999 and continuing thereafter for the Initial Term of the Lease and any renewals thereof. 6. UTI MM. Payment for electric service and for telephone or other communication services to the APT Facilities shall be APTs responsibility. Owner agrees to cooperate with APT in its efforts to connect the APT Facilities to existing utility service at APTs expense. IN WITNESS WIIEREOF,the parries hereto bind themselves to this Agreement on the date and year above last written below. Owner Witnesses: City of Zephyrhills 1. �(wfiC. �` •� Print Name:s-f c°!/ rt F.��/i7 Q By; • N e:Alan Brio 2. X t Title:City Co it President tN e: Attest: P,�J. Address of ter: Print Name: Linda Boan Print Title:City Cleric 5335 Eighth Street [Corporate Seal] Zephyrhills,FL 33540 Date: Telephone No.: Facsimile No: Federal ID No.: APT Wit es: APT Tampa/Orlando,Inc. 1. Print �n S By: Name:Ton cDowell 2. Title:Director of Engineering and Print Name: Operations and Authorized Agent for APT Tampa/Orlando,Inc. STATE OF FLOINDA COUNTY OF &690 The foregpm' Agreement was ackno=4wr. before me on themday of 1997 by 4�iA as-' ' Nc, of The City of Zephyrhills,a municipality of the State of Florida.He4he is personally known to me or has produced as identification. commission exp' s: S' 2� Notary hblic-State of Florida Bl1DAD.Wo Commission Number I CS-a Ylj-4o [Seal] _ W omme" duet 1B, I STATE OF FLO COUNTY OF �1 The foregoing Agreement was acknowledged before me on the a day of 1997 by Tony McDowell, as Director of Engineering and Operations and Authorized gent �AXPT Tampa/Orlando, Inc., a Delaware corporation. He is ovally known to me or has produced as identification. TL 90L My commission expires: Nok Pu Iic-State of Florida Comm1 ' n Number. [Seal] DAWN STONE My Carom Ev.5J1v4mI Bonded By SerNw k* No.CC647810 PN:7ud'y Kwwn[)Omer LD. I ti SITE ID: A-2-G-082-G SITE NAME: City of Zephyrhills SITE AGREEMENT FOR LAND This Site Agreement For Land ("Agreement') entered into as of theIV day of , 1997, by and between CITY OF ZEPHYRHILLS, a municipality of the State of Florida,whose address is 5335 Eighth Street, Zephryhills, FL 33540-4312 ("Owner") and APT Tampa/Orlando, Inc., a Delaware corporation, whose address is 8410 W. Bryn Mawr, Suite 1100, Chicago, IL 60631-3486 ("APT'), provides for the granting and leasing of certain property interests on the following terns: For good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged and agreed,the parties hereto agree as follows: 1. PROPERTY. The property interests hereby leased and granted by Owner (individually and collectively, the"Project Site")shall include the following: [X] Real property comprised'of approximately 2,500 square feet of land("Premises"); [X] Non-exclusive easements required to run, maintain and operate utility lines and cables on and to the Premises;and [XI Non-exclusive easement across Owners Property (hereinafter defined) for access, ingress and egress to the Premises IN OR UPON THE Owner's real property("the Owner's Property"), located at 6217 81h Street, Zephryhills, FL 33540, in the County of Pasco, and legally described on Exhibit"A"attached hereto,which Owner's Property is subject,to APTs interest in the Project Site as set forth•in this Agreement. The Project Site is depicted and legally described on said Exhibit "B", attached hereto. All improvements made to the Project Site pursuant to this Agreement shall be known hereafter as the"APT Facilities". 2. TERM. The term of this Agreement shall be five (5) and a fraction years, with the first year commencing on the date APT begins construction of the APT Facilities ("Commencement Date")and terminating on the 31"day of December following the fifth annual anniversary of the Commencement Date (the "Initial Term"), unless otherwise terminated as provided in Paragraph 9. APT shall have the right to extend the term of this Agreement for four(4)successive five(5)year periods(the"Renewal Terms")on the same terms'and conditions as set forth herein. This Agreement shall automatically be extended for each successive Renewal Term on such same terms and conditions, unless APT notifies Owner in writing of its intention not to renew prior to commencement of the succeeding Renewal Term. 3. RENT. A. For the Initial Term, APT shall pay to Owner annual rent in the amount o ("Rent') in quarterly payments of on the first day of January,April, July and October, together with any applicable sales tax. If the obligation to pay Rent commences or ends on a day other than the first day of the quarter,then Rent shall be prorated on the basis of a ninety(90)day quarter and shall be delivered within 20 business days from the Commencement Date. B. For any Renewal Term, APT shall pay Rent in the amount of Rent to be paid during the previous term(whether the Initial Term or a Renewal Term), increased by an amount equal to a percentage of the Rent to be paid during such previous term, which percentage increase shall be computed and established for the entire current Renewal Tern at the beginning of each such Renewal Term by multiplying the number of years in the . previous term(whether the Initial Term or Renewal Term)times C. Rent shall be paid electronically via electronic wire transfer, direct deposit or other paperless means into a bank account to be designated by Owner. Owner may from time to time, designate another bank account for the deposit of Rent provided the request is made in writing and received by APT at least sixty (60) days in advance of any Rent payment date. R:\Legal\MAIL MERGE DOCUMENTS\Basic Package DocumentAMM_Conditional SA Land Rev 042397.doc 1 11/19 t SiTE ID: A-2-G-082-G ' SITE NAME:City of Zephyrhills 4' USE. The Project Site may be used for the purpose of installing, removing, replacing, maintaining and operating a communications facility, including but not limited to, a 197 foot self supporting tower, generally in, under, on and above the Project Site as shown on Exhibit "B", subject to such modifications and alterations as required by APT (collectively, the "Communications Facility", which Communications Facility, without limitation, shall constitute a portion of the APT Facilities), provided that APT shall not be required to occupy the Project Site. Owner shall provide APT with twenty-four(24) hour,seven(7)day a week,year-around access to the Project Site. APT shall pay all personal property taxes assessed against the APT Facilities and ad valorem taxes assessed against the Project Site, commencing in calendar year 1998 and continuing thereafter for the Initial Term of the Lease and any renewals thereof. Owner shall timely pay all real property taxes and assessments against the Owner's Property, but not the Project Site. APT shall not allow any construction or materialmen's liens to be placed on the Project Site or Owner's Property as a result of its work on the Project Site. APT, its agents and contractors, are hereby granted the right, at APTs sole cost and expense, to enter upon the Owner's Property and conduct such studies as APT deems necessary to determine the Project Site's suitability for APTs intended use. These studies may include surveys,soil tests,environmental evaluations, radio wave propagation measurements, field strength tests and such other analyses and studies as APT deems necessary or desirable. Owner shall cooperate with APT and execute all documents required to permit APTs intended use of the Project Site in compliance with zoning, land use, building and any other applicable regulations, whether local, state or federal in nature. Owner hereby appoints APT as its agent and attomey4n-fact for the limited purpose of making such filings and taking such actions as are necessary to obtain any desired zoning, land use approvals, building permits and/or any/other applicable permits and approvals. 5. UTILITIES. Payment for electric service and for telephone or other communication services to the APT Facilities shall be APTs responsibility. Owner agrees to cooperate with APT in its efforts to connect the APT Facilities to existing utility service at APTs expense. 6. REMOVAL OF APT FACILITIES! All personal property and trade fixtures of APT shall be removed by APT upon the termination of this Agreement Within thirty (30) days of the expiration or earlier termination of this Agreement, APT shall return the Project Site to the condition existing at the time of this Agreement's execution, reasonable wear and tear and loss by casualty, condemnation and other causes beyond APTs control excepted. Notwithstanding the foregoing, upon expiration or earlier termination of this Agreement,APT shall not be required to remove any foundation more than two(2)feet below grade level. 7. INSURANCE. APT shall maintain commercial general liability insurance insuring APT against liability for bodily injury, death or damage to personal property arising out of use of the Project Site by APT, with combined single limits of Owner shall maintain commercial general liability insurance insuring Owner against liability for bodily injury, death or damage to personal property arising out of its ownership, use and management of the Project Site and Owner's Property by Owner and Owner's agents, with combined single limits of . Any policy required to be obtained by any party hereto pursuant to this Paragraph shall contain a waiver of subrogation in favor of the other party hereto, to the extent required under Paragraph 10. Indemnity. 8. CONDITION OF PROPERTY. Owner represents that the Owner's Property and all improvements thereto, are in compliance with all building, life/safety, and other laws, ordinances, rules and regulations of any governmental or quasi-government autho ity. 9. TERMINATION. This Agreement may be terminated by APT at any time, in its sole discretion, by giving written notice thereof to Owner not less than 30 days prior to the Commencement Date. Further,this Agreement may be terminated by APT immediately, at any time, upon giving written notice to Owner, it (a) APT cannot obtain all governmental certificates, permits, licenses or other approvals (collectively, "Approval") required and/or any easements required from any third party; or(b)any Approval is canceled,terminated,expires or lapses; or(c)Owner fails to deliver any non-disturbance agreement or subordination agreement required by APT,or(d)Owner breaches a representation or warranty contained in this Agreement; or(e) Owner fails to have proper ownership of the Owner's Property and/or the Project Site and/or authority to enter into this Agreement; or(f)APT determines that the Owner's R:V-egalkMAIL MERGE DOCUMENTS\Basic Package DocumentAMM Conditional SA Land Revl 042397.doc 2 11/21 SITE ID: A-2-G-082-G SITE NAME:City of Zephyrhills Property contains substances of the type described in Section 11 of this Agreement; or(g)APT determines that the Project Site is not appropriate for its operations for economic, environmental or technological reasons, or(h) Owner fails to provide to APT complete and correct copies of any ground lease or other document pursuant to which Owner holds title to the Owner's Property. Such termination shall not constitute a waiver of APTs rights under Paragraph 15 of this Agreement 10. INDEMNITY. Owner and APT each indemnify the other against, and hold the other harmless from any and all costs (including reasonable attorney's fees and expenses) and claims, actions, damages, obligations, liabilities and liens which arise out of(a)the breach of this Agreement by the indemnifying party; and (b) the use and/or occupancy of the Project Site, or the balance of the Owner's Property, by such indemnifying party. This indemnity shall not apply to any claims, actions, damages, obligations, liabilities and liens arising from any negligent or intentional misconduct of the indemnified party and shall survive the termination of this Agreement 11. HAZARDOUS SUBSTANCES. Owner represents that Owner has no knowledge of any substance, chemical, or waste on the Owner's Property that is identified as hazardous, toxic or dangerous in any applicable federal, state or local law, ordinance, rule or regulation ("Hazardous Substances'). Owner shall hold APT harmless from and indemnify APT against any damage, loss, expense, response costs, or liability, including consultants' fees and any legal and court costs and attorneys' fees resulting from the presence of Hazardous Substances on, under or around the Owner's Property or resulting from Hazardous Substances being generated, stored, disposed of, or transported to, on, under, or around the Owner's Property as long as the Hazardous Substances were not generated, stored, disposed of, or transported by APT or its employees, agents or contractors.The terms of this paragraph shall survive the expiration or earlier termination of this Agreement 12. CASUALTY/CONDEMNATION. If any portion of the Owner's Property, Project Site or the APT Facilities is damaged by any casualty and such damage adversely affects APTs use of the Project Site or the APT Facilities, or if a condemning authority takes any portion of the Owner's Property and such taking adversely affects APTs use of the Project Site or the APT Facilities, this Agreement shall terminate as of the date of the casualty or the date on which title vests in the condemning authority, as the case may be if APT gives written notice of the same within thirty (30)days after APT receives notice of such casualty or taking. The parties shall be entitled to make claims in any condemnation proceeding for value of their respective interests in the Project Site(which for APT may include,where applicable, the value of the APT Facilities, moving expenses, prepaid rent, and business dislocation and relocation damages). Sale of all or part of the Project Site to a purchaser with the power of eminent domain in the face of the exercise of the power shall be treated as a taking by condemnation. 13. WAIVER OF OWNER'S LIEN. To the extent permitted by law, Owner hereby waives any and all lien rights it has or may have, statutory or otherwise, concerning the APT Facilities or any portion thereof which shall be deemed personal property for the purposes of this Agreement, regardless of whether or not the same is deemed real or personal property under applicable law. 14. QUIET ENJOYMENT. APT, upon payment of the Rent, shall peaceably and quietly have, hold and enjoy the Project Site. If, as of the date of execution of this Agreement or hereafter, there is any mortgage, or other encumbrance affecting Owner's Property, then Owner agrees to obtain from the holder of such encumbrance a Subordination, Non-Disturbance and Attomment Agreement pursuant to the terms of which APT shall not be disturbed in its possession, use and enjoyment of the Project Site. Owner shall not cause or permit any use of Owner's Property which interferes with or impairs the quality of the communication services being rendered by APT from the Project Site. Except in cases of emergency, Owner shall not have access to the Project Site unless accompanied by APT personnel. 15. DEFAULT. Except as expressly limited herein, Owner and APT shall each have such remedies for the default of the other party hereto as may be provided at law or equity following written notice of such default and failure to cure the same within thirty(30)business days. Upon default by Owner and upon written notice to Owner and subject to all applicable cure periods provided to Owner in this Agreement ( and if no such notice and cure period is provided, following thirty (30) days written R:U.ega1WIAIL MERGE DOCUMENTS\Basic Package DocumentAMM Conditional SA Land Rev1 042397.doc 3 11/19 SITE ID: A 2-G-082-G SITE NAME:City of Zephyrhills notice to Owner and opportunity to cure), in addition to any other rights and remedies available to APT at law or in equity,APT shall be entitled to cure said default and to set-off and offset any and all sums, costs, expenses, fees (including reasonable attomey's fees)and damages incurred by APT in effecting such cure against Rent and any other sums due or thereafter coming due from APT to Owner under this Agreement 16. MISCELLANEOUS. A Owner represents and warrants that Owner has full authority to enter into and sign this Agreement and has good and marketable title to the Owners Property. B. APT represents and warrants that it is duly authorized to do business in Florida and that the_ undersigned signatory for APT is fully authorized by APT to enter into this Agreement on behalf of APT. I C. This Agreement supersedes all prior discussions, negotiations and agreements between the parties hereto and contains all agreements and understandings between the Owner and APT regarding the subject matter of this Agreement This Agreement may only be amended by a writing signed by both parties. Exhibits"A"through"C"are hereby incorporated into this Agreement by reference. D. This Agreement may be signed in counterparts by the parties hereto. E. The terms and conditions of this Agreement shall extend to and bind the heirs, personal representatives, successors and assigns of Owner and APT. F. The prevailing party in any action or proceeding to enforce the terms of this Agreement shall be entitled to receive its reasonable attorneys'fees and other reasonable enforcement costs and expenses from the non-prevailing party. G. Simultaneously herewith or on or before the Commencement Date, Owner shall execute and acknowledge and deliver to APT for recording a memorandum of this Agreement("Memorandum") in the form of Exhibit "C". Owner hereby grants APT permission to insert the effective date of this Agreement into the Memorandum after execution of the Memorandum. H. APT may assign this Agreement or sublet the Project Site (in whole or in part) at any time and from time to time without Owners consent. No assignment or subletting shall release APT from any of the obligations arising under this Agreement 1. Notices shall be in writing and sent by United States Mail, postage prepaid, certified or registered with return receipt requested or by any nationally-recognized overnight courier service to the address set forth beneath the signature of each party below. Any such notice shall be deemed given when deposited in the United States Mail or delivered to such courier service. J. This Agreement shall be construed in accordance with the laws of the State of Florida. K. Each party agrees to fumish to the other,within ten (10) days after request, such truthful estoppel information as the other may reasonably request. L. Owner and APT each represent that they have not been represented by a real estate broker or other agent in this transaction. Each party shall indemnify and hold the other party harmless from any claims for commission, fee or other payment by such broker or any other agent claiming to have represented a party herein. i M. Tower shall be free of all material and mechanics liens. N. The parties hereto warrant and represent, each to the other, that the matters of fact contained herein are true and accurate. R:\L.egal\MAIL MERGE DOCUMENTS\Basic,Package DocumentAMM_Conditional SA Land Rev1 042397.doc 4 11/19 . SITE ID: A 2-G-082-G SITE NAME: City of Zephyrhills O. RADON GAS: Radon is a naturally occurring radioactive gas that, when it has accumulated in a building in sufficient quantities, may present health risks to persons who are exposed to It over time. Levels of radon that exceed federal and state guidelines have been found in buildings in Florida. Additional information regarding radon and radon testing may be obtained from your county public health unit. P. APT has the right but not the obligation from time to time to pay any taxes, judgments, liens, assessments and/or any other charges outstanding which are levied upon Owner or the Owner's Property and which are or in the future could become liens upon the Owner's Property, in whole or in any part(individually and collectively, `Liens'). In the event that APT satisfies or pays any such Liens, in whole or in part, APT shall have the right but no duty to set off and offset any and all amounts.so paid against Rent and any other sums payable or to become payable pursuant to the terms of this Agreement("Rent and Other Charges"). If APT elects to set off or offset the amounts paid by APT against Rent and Other Charges, immediately upon demand, Owner shall reimburse APT for all sums paid by APT which exceed such Rent and Other Charges. In the event that APT elects not to set off or offset the amounts paid by APT against Rent and Other Charges, immediately upon demand,Owner shall reimburse APT for all amounts paid by APT. APTs rights to satisfy or pay liens(in whole or in part)and then to set off and offset as described in this subparagraph include the right of APT to pay and set off and offset any and all attorney's fees incurred by APT in connection with making such payments and/or obtaining such full or partial satisfactions. Q. Co-location Agreements. APT shall be permitted to enter into agreements with third parties wherein such third parties are permitted to co-locate on the Communications Facility(a"Co-location Agreement). The following shall apply with respect to any Co-location Agreement entered into by APT: 1. In the event that APT ermits a third arty to co-locate on the Communications Facility, APT shall pay to Owner of all amounts collected as rent-under the terms of such Co-location Agreement. These amounts shall be due and payable to Owner within twenty (20) days after such amounts are collected by APT. Failure to make any such payment to Owner shall be considered a default under this Agreement and shall entitle Owner to the same rights as in the event of a default in the payment of Rent. 2. No Co-location Agreement signed by APT shall extend beyond the Term of this Agreement without the Owner's prior written consent, which shall not be unreasonably withheld or delayed. If APT elects to extend this Agreement for one or more Renewal Terms, then, no Co-location Agreement executed by APT shall extend beyond such Term, as extended. In the event that APT terminates this Agreement prior to the end of either such period as permitted under the terms of Paragraph 9,APT shall immediately assign any and all surviving Co-location Agreements to Owner, which assignment shall be effective as of the termination date of this Agreement R:1Lega11MAIL MERGE DOCUMENTS1Basic Package DocumentswM Conditional SA Land Rev[042397.doc. 5 1 l/19 SITE ID: A-2-G-082-G SITE NAME: City of Zephyrhills IN WITNESS WHEREOF,the parties hereto bind themselves to this Agreement on this �`� day of 1997. OWNER Witnesses: CITY OF ZEPHYRHILLS,a municipality of the State of FI da By. Print—e: 3 �' .ft�i Alan Bre ' ,City Council President Social Security o: TtNe* d S . M J '4"i0 � Date:i 1. Attes Print Name: � S /,.Or Linkla Boan, City Clerk Social Security No: dnt Na Date: /l-a 7 y Address of Owner: 5335 Eighth Street Zephryhilis, FL 33540-4312 Telephone No.: Facsimile No.: APT Witnesses: APT TAMPA/ORLANDO,INC. I. tN By. Print Name: Toffy R. McDowell Its: Director Engineering and Operations 2. L. 02QQ and Authorized Agent Print Name: L]ac,+OLA) C. V COOC. [Corporate Seal] Address of APT. Real Estate Department Date: lam.•/ D . 7 American Portable Telecom, Inc. PO Box 31793 Chicago, IL 60631-0793 With copy to: APT Tampa/Orlando, Inc. Real Estate Manager 5907-B Hampton Oaks Parkway Tampa, FL 33610 R:\Legal\MAIL MERGE DOCUMENTS\Basic Package Documents\MM_Conditional SA Land Rev 042397.doc 6 11/19 SITE ID: A-2-G-082-G SITE NAME: City of Zephyrhifis EXHIBIT"A"TO SITE AGREEMENT LEGAL DESCRIPTION OF THE OWNER'S PROPERTY* Gas wml CO)AW WAV Ar 1W NaRnjvEg CWU OF JW SWW 1/2 or JW SMMMM 1/4 OF=WN A TMWW 26 5M 94AW 21 Mr. w Asca axw, nmat MW N BC` 15- E W.52 FEET&OW TW AMM LW OF HE SOM f12 OF 7W-SWPMW 1/4 OF SM=Z 7NOXE SMU 25 FEET MR A MW OF 56MM SW AW LWV ON ThE SOUN MW-1W—JUr Lmr OF KMy D&V& MUVX RW N WWW E 2W FRT&M 7W SOIM WW-W-MY LYE OF WW MVE yteiCr SM 200 FEE& TMVE S W3W Jr W. 200 FEET. TMW#=T8 200 MT To THE puff OF BEMWWG. 9M A PMWN OF rMN WMMW AS pB=0W#[FW&XK PAGE 10 PLO CUAWY PUMWZ& 2.,. It is agreed by Owner and APT that the proper and precise legal description for the Owner's Property will be corrected,if necessary, and that the correct legal description may be placed on this Exhibit'A'and/or that this fLhibVA x may be replaced to reflect such proper and precise legal description by APT unilaterally. R:\LegaI)b1AIL MERGE DOCUNIENTS\Basic Package DocumentAMM-Conditional SA Land Rev I 042397.doc 7 11/19 61/11 8 OOP'L6EZb0 lAod Pu`I VS IEuoptpao�y�y�s;uaumooQ aSexoEd o1S9ERS,LHMIn30U g�J?I�I ZIdT�I1[e$a"I12I 'saBllpsd 1dV OW J0/Pu9 auS IDOWd e4;itJJedad SAWAO s4JJOAO uapJpsulkfNIAey so.Wxxpne le;uewWGAOd dq p9mgj4o+d JJ;deoxo L9!)leaJ ueoyy ustp ssel Juavtie ou ul;nq s;uewyadep ery pue eolfod&upnlu!'smp owns 181uewWGA06 algMldde aW dq perinbeu y44m eW eq lla4s ldV dq pesn Jo o;'polueB;uawasee JO pea SSa70a due Jo qm •f, seppoigne 1e1ueww9no6 elgaolidde etp Aq perinbal awep p 9W aq Us4s OPS Joalad e4;Jo pue Apadad s "mo Jo sear punoq e47 uI04 sallllloed 1dV e4;Jo)POINGS 'E 'OPS POwd a4;JO SalJllload 1dV 041 Jo s&*%8JP uopangsuoo llgigxe sl4;loll a;nasgns pus eoeldel dgaJeJellun dew!o/pue a;1S joofwd a4; 6olwes o;solgeo Pug soup APragn pug sser6g'SSGJ&g Jw s;uewesse aWnpxe-uou 61Il4io4s '94S;Wald etp Jo dawns a 4gl4xe slip jW ey4.pgns pug aoaldal dlleJelellun dew'uoydo alos SM Ja UdV'kmAuw&a of peWvyo sl Agl4xe s1414oJ4M Juewngsul 94;W 6ul4Jduo 6ulpumsy;"YoN .Z ;uowpuewe joipue uo.q&Vpow 4 S Jo S11818P a4J WM Ps lla4s lu01uMV14014M PaJwol sl dpadad siauMO a4;4o14M ul 14unoO e1p Jo spJooel oilgnd e4J W-LdV Aq Aau&s Juewngsul ug NIPMa Aq selgeo pus snug Aplq►+-vJ Juewesea awsnpxeuou e4J Jo uogeaol e4J e&mW fo dJuap '4sggaiSe W 1dV Aq dpeJe;eilun Pepuawo Joypue Pay►Po+u eq uopdo elm s,1dy Je:taw Pa;emdroou/d1MJ sl J1914xe s14J JuewruJsu!4o14M oiu/pua pa4osge sl pglgxs qun 40l4m(q Juawngsul a41 ! S910N WD W 3RM:IM 3MMD5 Mf ShMVLWO 20WO AHM oMS WMVA SIM JD JNW V at LW SrZS ID 3:bYIW V 3 JMRSbf N M7BI 3MQU 006999 3o JMW V o!Y331 alas 3o 3d r&w Y 3 AMODS N)M 3209•J U S6M JO 30,IYJ570 v 3 J7M=S 3"MMfCJ 30N M'3%W A&M do 30 AM 10 M all MOW S37)ON JMrd v D1 J33Z SZ.40 37 Y M1 V 3 JM W M)S NZ MMM-M art"jo 3r'r nw v Z NC=JD f/1 JS71M1U1o6 3u J0 Z/1 Hwas DNS Jo 347 HtlIDN 3Ht OkOD/?S1Aspa x Ian1 31[#n Wwv Amw 03M Ive 1Z 3wm 7wi0S 91 dhsmW 7 NWW JO►/l 1S7WIt=3 w.io Z/1 mm 3H J7 new JS35i111L'ODl 3u JY 3aN31D w 37mam JD law v mu -%W7 l SY MWMM AZYM MMMd 300.'M38 3N74UW V A JJ37 3d W LW JM?-390 MIM ON IWO 39 of 133E JAN-ZM M MW WU716MM AM 311E MV-*W V RM k}1Li= sS37 W 38M h3331 AVVS 1761 SN WKO JM313SYJ W3XV MS 7XXONW 31 JO bWd r 01 Jai! 9Y6T do-MWZ 1 Y A OO.D7.00 x my-mm lai ww Jo 32Am v 3.0avast N mw iwa ow ww JO 37N sm Y 3.,mm d N 39A1w 3 ou JD JMN Y M J33J om Jo 33wma V 3.odo0D6 N MW 33139 1321 SM JO 3JW&W V 3 4o.0000 S 3nNe=3209-:),%ea AMM Jo 3n AVY fWW 3U Orr _W7 NINON 341 DWW 3 SLOSSO N MVJ 3MG V3WU'1UMM DMW Im 11 3=m 31m 9Z d3W001 7:NDUO3S.37 r/1 JSdMNolos im Jo T,/1 mm 3U Jo I13P aw lSTdMI1sm 3$JY 33Wom 3�Jo JNON v wit -SAMnM SY 038fl, a ATIJYMGl M 3M1 MW.3WWM v A LM 311i W M JIM-3io ONr x3w CKV Tmo 30 W J337 imi"Zo ON ADM SM7 V OAMid SS31g /SMWM M!b13MSM SMWV 3WS XW-AYIM Y HUW MMo3001 3SM W 301f1'133!37MM oast SNMNW VM JZMW OW WORM JD 1~39 IM IM ZZW M 30k1R.40 v A J1,91AIM H NW30A a*M IM JO 3XVKW V 3.0-M.10 N NAU 3D•M 47M Z9'1R d0 3DNYJ90 V 3 rWfAT It JO 304311 1331 1m 3mww Y 3 J 1 lAr S mw 31 M!1 am ww Jo 3waw Y A A.W!9 WN 3=9,IM 0Nra79 J0 JMOd Y W nW bS-,&J7 XWJSM1 V I paw N ME 32M am mm JO 30Nnw Y 7.mmw S 3M HW 3M M saW AMM JD Mn MA MM 3R aMM m ADM AN Y 12 J33!S;r do 33(aw v 3.'ARAM s NM Slam%W ZSY99 JD 33M4?v d NDUTIS-V A/1 113VUW S 30 JD Z,/1 IU=M Jo 3MA M MN 3H1 vow 3 AA Ma x MW 3mg Vm"xas10D amm %W IC 324Y WhMS 99 dWM Y NVUM JD 11/1 JMN MOS 3U Jo Z/1 M M]S 3l1 Jo MCC IMUM N 3U JY 32 M M 3aNY M J0 DOW Y MI --'SW MJ SV MMW A7y"MM 31W1 MW GM 30'[17MMM GM Vt MOd AW7W GMW J9 SaVOM 3MV 3*JO'601 301N'►MW IM M MMO M+ SV 1YU M drW 3U 03 O WM=V 79MSbtla M JMU JO NOUWd Y MW OSW VMM A MIW OMW'JSYJ 1Z 3MM WUM 9i JEWO i 7 M MMN JD*/1 Isa4 05 311 JD r/1 IUnos w m mm am do-mm Y Y3JD'Z'�8d•' .311S 10.9rO dd 3H1 d0 N011dWDS30 ONd H013HS ZJo t GB9d 1N3W331]JV 311S 01 w8..1181HX3 SIII4JA4doZ10 Apo:3WVN 31IS J-Z80-J-Z-V =a1311S SITE ID: A-2-G-082-G SiTE NAME:City of Zephyrhilis EXHIBIT"B"TO SITE AGREEMENT Page 2 of 2 SKETCH AND DESCRIPTION OF THE PROJECT SiTE: Legal description of property to be attached. t i i InwarIh> aa�rIlsWVW 1 i J 1 iARaw 9 1:86 1 •+ 1 kJL 11 � tf 1 i� 1 frW rt i �rt�- ; Im i 1 1 E � t 4w i r -Sur 1 a I i J Sr M I ssdLon.Z„ South ROW41 Sf Bare! Notes. 1. The instrument to which this exhibit is attached and into which instrument this exhibit is fully incorporated,may,at APTs sole option,be modified and/or amended unilaterally by APT to establish, clarffy or change the location of the nonexclusive easement for utility lines and cables by recording an instrument signed by APT in the public records of the County in which the Owners Property Is located, which instrument shall set forth the details of such modification and/or amendmenL 2. Notwithstanding anything in the instrument which this exhibit is attached to the contrary,APT,at its sole option,may unilaterally replace and substitute for this exhibit a survey of the Project Site, showing non-exclusive easements for ingress, egress and utility fines and cables to service the Project Site and/or may unilaterally replace and substitute for this exhibit construction drawings of the APT Facilities of the Project Site. 3. Setback of the APT Facilities from the boundaries of Owners Property and of the Project Site shall be the distance required by the appficable governmental authorities. 4. Wdth of any access read or easement granted to or used by APT, shall be the width required by the applicable governmental authorities,including police and fire departments but in no event less than fifteen feet(15)except ff prohibited by governmental authorities having jurisdiction over the Owners Property,the Project Site and/or the APT Facilities. RALega11MAIL MERGE DOCUMENTS\Basic Package DocumentslMM Conditional SA Land Revl 042397.doc 9 11119 SITE ID: A-2-G-082-G SITE NAME: City of Zephyrhills EXHIBIT"C"TO SITE AGREEMENT THIS INSTRUMENT PREPARED BY AND RETURN TO: Corporate Legal Review APT Tampa/Orlando, Inc. 5907-B Hampton Oaks Parkway Tampa, FL 33610 MEMORANDUM OF SITE AGREEMENTILEASE FOR LAND THIS MEMORANDUM OF SITE AGREEMENTILEASE FOR LAND ( "Memorandum") is made and entered into by and between CITY OF ZEPHYRHILLS, a municipality of the State of Florida, with an address of 5335 Eighth Street as"Owner", and APT Tampa/Oriando, Inc., a Delaware corporation, with an address of 8410 W. Bryn Mawr, Suite 1100, Chicago, IL 60631-3486, "APT". 1. PREMISES. Owner and APT have entered into a Site Agreement for Land dated as of . 1997 (together with any amendments and modifications thereto, the"Site Agreement"), whereby Owner has leased and APT hasj hired those certain premises Pasco County, Florida, consisting of, among other things, approximately 2,500 square feet of land, as depicted and legally described on Exhibit "A" attached hereto and hereby incorporated into this Memorandum and certain easements(the"Project Site'). 2. TERM. The initial term of the Site Agreement shall be a period of five (5) and a fraction years commencing as of the "Commencement Date," as defined herein below, and terminating on the 31st day of December following the fifth (5th)annual anniversary of the Commencement Date unless otherwise terminated as provided in the Site Agreement("Initial Terra'). 3. RENEWAL OPTIONS. In addition to the Initial Term and on and subject to the terms of the Site Agreement, the Site Agreement term may be automatically extended for four (4) consecutive periods of five (5) years each. Each such extension shall be known hereinafter as a"Renewal Term." Hereinafter, the Initial Term, together with any and all Renewal Terms, shall be known as the"Term"of the Site Agreement. 4. COMMENCEMENT. The "Commencement Date" is the date on which APT begins construction of the APT Facilities (as defined in the Site Agreement). Accordingly, unless otherwise specifically stated here: . the Commencement Date shall be the date of APT's filing of a Notice of Commencement in the public records of the county in which the Project Site is located. R:\Legal\MAIL MERGE DOCUMENTS1Basic,Package Documents\MM Conditional SA Land Rev 042397.doc 10 11/19 SITE ID: A-2-G-082-G SITE NAME: City of Zephyrhills 5. LEASE INCORPORATED. All of the terms, conditions, provisions and covenants of the Site Agreement are hereby incorporated herein as if fully set forth in this Memorandum. To the extent that any of the terms hereof are inconsistent with the terms of the Site Agreement, the terms of the Site Agreement shall control. In the event that an inspection of or reference to the full terms, conditions, provisions or covenants of the Site Agreement is desired or necessary, a request for such inspection should be made to the Owner at the address set forth above, stating the name and address of the person and/or entity requesting the inspection, and setting forth the reason for the inspection. The Owner may permit or refuse such inspection in its sole and absolute discretion. IN WITNESS WHEREOF, Owner and APT have executed this Memorandum as of the date and year set forth below their respective signatures. Signed, sealed and delivered OWNER: in the presence of: Witnesses. CITY OF ZEPHYRHILLS,a municipality of the State of Florida 1. By: Print Name: Alan Brenia, City Council President 2. Date: Print Name: 1. Attest: Print Name: Linda Boan, City Clerk 2. Date: Print Name: TENANT: Witnesses: APT Tampa/Orlando,Inc.,a Delaware corporation 1. By: Printed Name: Name: Tony R. McDowell Title: Director, Engineering and Operations 2. and Authorized Agent Printed Name: [Corporate Seal] Date: R:\Legal\MAIL MERGE DOCUMENTS\Basic Package Documents\MM Conditional SA Land Rev 042397.doc 11 11/19 SITE ID: A-2-"82-G SITE NAME:City of Zephyrhills STATE OF FLORIDA COUNTY OF The foregoing Memorandum of Agreement was acknowledged before me on this day of 199_, by Alan Brenta, as City Council President of the City of Zephyrhills,Florida. He is personally known to me or has produced as identification. My commission expires: Notary Public-State of Florida [Seaq Commission Number. STATE OF FLORIDA COUNTY OF The foregoing Memorandum of Agreement was acknowledged before me on this day of 199_, by Linda Boan as City Clerk of the City of Zephyrhiils, Florida. She is personally known to me or has produced as-identification. My commission expires: Notary Public-State of Florida [Seaq Commission Number. STATE OF FLORIDA COUNTY OF The foregoing instrument was acknowledged before me on this day of 1997, by Tony R. McDowell, as Director, Engineering and (,Operations and Authorized Agent, of APT Tampa/Orlando, Inc., a Delaware corporation. He is personally known to me or has produced as identification. My commission expires: i Notary Public-State of Florida [Seal] Commission Number. RALega1\MAIL MERGE DOCUMENTS\Basic Package Documents\MM Conditional SA Land Rev 1 042397.doc 12 11/19 5I/I 1 Cl DOP•L6£Z170 IRON Purl VS luuol)!Puo:j-vmsjuaumoou 02exoud 3lSBfl\S.L113MoOQ ag-daw 11VW\jESO-n:2i SS37 6D 390M aW 3N071OS M SNMINQ7 1N 1YMW AUM CNS 790tIf4ddll13i 30 IMOd V OL 1331 STZS d0 9MYM Y-J .90.9S.bt N fiM 3 10a :MWI Wg 30 JMW Y at IM 6OYi .JO-4 MYIS)a V SOXOD6 N mm 3Vm 'Im aswi 40 39NVIM V 3,pa0 m s 3th AW 31M3f1i 'AW AWM 30 3N17 AM tW=311 MM 5317 tl M lMd V Of I33d SZ d0 3MY15t0 V'3 JAC= S NM 31 hM rM ZTL99 do 3MVISKI Y Z N011035 JO t/1 JS3Mki=Ski 30 z/1 HIIIOS OM 30 3W NINON 3kI ON07Y 3 SX,OS.90 N WIN 3204 V WD Li iUN W WSW 1SY3 iZ 3MM 'N!/)OS 9Z d4157UM 'Z NWXS 10 t/1 1S3M f=34f 30 Z/1 HMS Ski 30 N3 wo IS3dIRMN im lY 3ahN3 ww 37NKELM A INW V mu SAID W SV 03SMS10 A79VInC1)I21Yd 3 W aMW - W7N31 W V j0 1M-Wl 01 IM JW-3N0 AUS OW 1W N Ski 01 IM 37YN-3N0 ONY NZW=71N311 M AM 3N57103-iMON V MM HM3= 3S37 NO-'MOM '133J 3 IDS fz61 SWWW IN03M Ss3 V OBIS 7 aPtIMM JO IMIOd V M IM 99'6r 3D.30NYJS)Q V iM .QO.WM N NM 3W.AU -M SL'i5f 3O 30WIM V ! ,MOa&t Al MW 31hGM !MJ 9679 30 32MSM V �l .OaOO.06 N 3/1wMW 33M 'JmwVw 30 JNW V 01 mi ort6 30 30hftvO V '3 .DaDO.06 N MW 3M3 U 1W 9L79 30.3YMSIO V�r.00.WM S MMINOD 30I1C1Ifi 'JVW A&M JO 3W AM MnOS M MM asVt99 JD3W vz mmos jo 0NVI ls w nas"eo�Hinz aw jo 3M7 NINON Stu SNOW 3 ,91,0599 N MV 371ti4N1.'ytDM073 AfW?O9 03SYd IM It 391IYL• RMS 91 dpWAO-t z NO)IMS-40 t/1 IS3AWI)Os 3W 30 z/1 hulas 3m d0 SAM I531N UVON m lY 39N37fNm WORM dd lwj Y mi $AI07701 SY 03MM.L7BYIfnI M 3MM&M 3NIRI311M Y JO IM 3ki 0! I333 JM 3W ONY MW ON 2MN 3MI M IR-f JM.RPC MY 1VC3 N SM7 1050dLE0d SS3bW/SMM WU INWSY3 S9=.lVM O13-WK V HIM M"l 3m w 3dom am 32M1O1S om SNNd m V3W 123M ms V NNM O 3o JhA7d'M at lm LrZS 3o 3'ONYIM Y iM .1l.s M N NMI 30Ap{Ffi M 99.9P 30 3WVlSI0 V 3 .O.M10 N WIM 32+ZM IM Z9'IZ 30 30WJW V$ AXMT N 30 3209 'I333J I'm 301V1R.m Y 13 .1ISISO s AIM 3209 im wos 30 39 fam Y AI .60 t/.lo S NM 320a '911R)UI gm 3O Ind V OL M SS•zt x mIVISIO Y ,OQOOm N NII)I--imm 1M 6S'ol 3a 30a nm V -3 .0amw s 3J MhW 30PO1I 'A+YZ!(i A21Nt9I 30 3W AA Hlnos 3 a 9N0'IY m N01lIM MCI Y V!Im SZ 30 3mm V I jai= s mw 3o ou 'l33I ZT199 i0 3MVIW V Z AEUMS d0 t/1 MWMW 3d 3D Z/1 HV= OW 30 3W7 HI2W Ski ONM 3 Si.0M N NNN 3XM YMVY :UNlI0,7 O=d z/I MM 3M 1D N31UM IMWU IaM M IV 33W3R/Ya7 3;??N aM JO IIBOOd V Wi 's UMU SY Q3>32MD A721YYMSVd 3210 MW aM 10 73OM an 1+OWU :lll'A W OXVd 30 SObIQJM MW 3W JO '602 30Yd 't JAM IM M MMEMY SV IVId 80 dW 3k1 01 -Mh=Y'J1=I)OEYIS MMU JO N XLWd Y MM O67Y"1WL3 : MO OOSYd 1SY3 19 3MM HM 99 ahWOM 7 NOItON 3O t/I I MMMS Ski 30 4/1 HIM Ski NN MI ONWI 3O"I3 VW Y Z 10 6 aBed sll!LpALIdazlo A:!o:3Wdh 311S V 3l414x3 J-Zeo-J-Z d :al 31.IS SITE ID: A 2-G-082-G SITE NAME City of Zaephyrhiiis Exhibit A Paige 2 of 2 i Hr'IxO f i ttlY A494E i A4'FiYrM7fi1( 'r dM ar ..—.�— j i (r i v 1 � I I �icr=tt_�ttL__ r; ��' rrr i r sr r f r�--SAT-r 'ram r 6 i r�ror r � S"*= Toutnd* 26 Zozdk Amigo 2f brit RiLegaIIMAIL MERGE DOCUMENTS\Basic Package Documents\MM—Conditional SA Land Rev1 442397.doc 14 11/19 ,v +v Date: October 21, 2019 % / FL COM 31011 William Barrett Tower Engineering Professionals Crown Castle 326 Tryon Road 8000 Avalon Blvd., Suite 700 Raleigh, NC 27603 Alpharetta, GA 30009 (919) 661-6351 Subject: Structural Analysis Report Carrier Designation: Verizon Wireless Co-Locate Carrier Site Number: 132419 Carrier Site Name: Apt Zephyrhills Crown Castle Designation: Crown Castle BU Number: 826548 Crown Castle Site Name: Pasco County (VS) Crown Castle JDE Job Number: 591508 Crown Castle Work Order Number: 1800309 Crown Castle Order Number: 506095 Rev. 0 Engineering Firm Designation: TEP Project Number: 48167.314456 Site Data: 38122 Henry Drive,Zephyrhills, Pasco County, FL 33542 Latitude 28° 14'S2.9", Longitude-82' 11'9.4" 190 Foot-Self Supporting Tower Dear William Barrett, Tower Engineering Professionals is pleased to submit this "Structural Analysis Report" to determine the structural integrity of the above-mentioned tower. The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have determined the tower stress level for the structure and foundation, under the following load case, to be: LC7: Proposed Equipment Configuration Sufficient Capacity This analysis utilizes an ultimate 3-second gust wind speed of 137 mph as required by the 2017 Florida Building Code, 6th Edition. Applicable Standard references and design criteria are listed in Section 2-Analysis Criteria. Structural analysis prepared by: Gautam Sopal, E.I. / CDC . \ I11 Respectfully submitted by: c E N RsF Ttio �/ , p ZG aQ' ,yam Q No. 77387 r Adam M. Amortnont, P.E. * *— STATE OF <G � i�P0� FL pR1pP %/ONA lilini GATI: d C1t'1 CWZly "•DiAfG OF'FfC'IAL� October 21,2019 190-ft Self Supporting Tower Structural Analysis Report CCI BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 2 TABLE OF CONTENTS 1) INTRODUCTION 2)ANALYSIS CRITERIA Table 1 - Proposed Equipment Configuration Table 2-Other Considered Equipment 3)ANALYSIS PROCEDURE Table 3- Documents Provided 3.1) Analysis Method 3.2) Assumptions 4)ANALYSIS RESULTS Table 4-Section Capacity (Summary) Table 5-Tower Component Stresses vs. Capacity 4.1) Recommendations 5)APPENDIX A tnxTower Output 6)APPENDIX B Base Level Drawing 7) APPENDIX C Additional Calculations N / OP�` GENSFT�00�ilozl-19 Zz- No. 77387 -p STATE OF ���ll t 111111�� Electronic Copy tnxTower Report-version 8.0.5.0 October21,2019 190-ft Self Supporting Tower Structural Analysis Report CCI BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 3 1) INTRODUCTION This tower is a 190-ft self supporting tower designed by Valmont Microflect. The tower has been modified per reinforcement drawings prepared by Tower Engineering Professionals in July of 2013. All information provided to TEP was assumed to be accurate and complete. 2) ANALYSIS CRITERIA TIA-222 Revision: TIA-222-H Risk Category: II Wind Speed: 137 mph Exposure Category: C Topographic Factor: 1.0 Service Wind Speed: 60 mph Table 1 -Proposed Equipment Configuration Center Number Number Feed Mounting Line of Antenna Antenna Model of Feed Line Level (ft) Elevation Antennas Manufacturer (ft) Lines Size(in) i ( 6 I JMA Wireless IMX06FRO860-02 w/Mount Pipe 3 Ericsson KRY901369_CCIV2 3 Ericsson RRUS 32 62 160.0 160.0 3 Ericsson RRUS 32 B66 14 1-5/8 3 Ericsson RRUS 4449 B5/612 1 Raycap RRFDC-3315-PF-48 1 Raycap RVZDC-6627-PF-48 3 Site Pro 1 VFA14-HD Mount Table 2-Other Considered Equipment Center Number Number Feed Mounting Line of Antenna Antenna Model of Feed Line Level (ft) Elevation Antennas Manufacturer Lines Size(in) (ft) i 4 I Cellmax CMA-BDHH/6521/EO-6 Technologies w/Mount Pipe ! 4 Andrew SBNHH-1 D65C w/Mount Pipe 4 Nokia FHFB 2 Nokia ( FRIE 1 7/8 194.0 6 Andrew j E15SO8P77 1 1-1/4 190.0 4 Nokia FRIG 6 1-5/8 i 8 Andrew ECC1920-VPUB 6 2-1/4 3 Nokia FXFB 1 Raycap DC4-48-60-8-20E-00 1 Raycap RNSNDC-7771-PF-48 j 190.0 1 Tower Mounts Platform Mount [LP 102-1] tnxTower Report-version 8.0.5.0 October 21,2019 190-ft Sell Supporting Tower Structural Analysis Report CCI BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 4 Center Number Number Feed Mounting Line of Antenna Antenna Model of Feed Line Level (ft) Elevation Antennas Manufacturer Lines,' Size(in) (ft) DBXNH-6565B-R2M 3 I Andrew w/Mount Pipe_ 6 Commscope NNHH-65B-R4_CCIV2 w/Mount Pipe 3 Commscope SBJAH4-1 D65B-DL w/Mount Pipe , 3 Andrew E15S09P78 175.0 3 Ericsson RRUS 32 { 3 Ericsson RRUS 32 B2 3 5/16 3 Ericsson RRUS 32 B66 3 3/8 i 171.0 3 Ericsson FRRUS 4449 B5/B12 6 3/4 6 7/8 t 3 Ericsson RRUS 4478 B14 CCIV2 12 1-5/8 ! 6 Raycap DC2-48-60-0-9E 2 Raycap r DC6-48-60-18-8C 1 Raycap DC6-48-60-18-8F 3 Site Pro 1 Puck 3 Kenwood T1326KT12 Tie Back 171.0 3 Site Pro 1 SFS-V Stabilizer Kit 6 Generic 1 2-7/8"OD x 8' Mount Pipe 1 Tower Mounts i Sector Mount [SM 503-3] 3 Ericsson 800MHz SMR Filter 3 Ericsson ( RRUS 11 150.0 3 Ericsson RRUS 31 B25 1 148.0 9 RFS Celwave ACU-A20-N 3 1-1/4 j 3 Ericsson F Air 6488 B41 w/Mount Pipe 149.0 3 RFS Celwave APXVERRI8-C w/Mount Pipe 1 j 148.0 3 Site Pro 1 VFA12-HD-SPT KMW 140.0 140.0 3 Communications HB-X-AW-23-33-OOT 6 1-5/8 1 Tower Mounts f Sector Mount [SM 402-3] 3) ANALYSIS PROCEDURE Table 3- Documents Provided Document Remarks Reference Source j Geotechnical Report Nodarse &Associates, Inc. 3497292 I CCISites Tower Foundation Drawings Valmont Microflect 3497291 CCISites Tower Manufacturer Drawings Valmont Microflect 3675014 CCISites Tower Reinforcement Drawings Tower Engineering Professionals 3946359 CCISites Post-Modification Inspection F Tower Engineering Professionals 4460699 CCISites tnxTower Report-version 8.0.5.0 October 21,2019 190-ft Self Supporting Tower Structural Analysis Report CCI BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 5 3.1) Analysis Method tnxTower (version 8.0.5.0), a commercially available analysis software package, was used to create a three-dimensional model of the tower and calculate member stresses for various loading cases. Selected output from the analysis is included in Appendix A. 3.2) Assumptions 1) The tower and foundation were built and maintained in accordance with the manufacturer's specification. 2) The configuration of antennas, transmission cables, mounts and other appurtenances are as specified in Tables 1 and 2, and the referenced drawings. 3) All tower components are in sufficient condition to carry their full design capacity. 4) Serviceability with respect to antenna twist, tilt, roll, or lateral translation, is not checked and is left to the carrier or tower owner to ensure conformance. 5) All antenna mounts and mounting hardware are structurally sufficient to carry the full design capacity requirements of appurtenance wind area and weight as provided by the original manufacturer specifications. It is the carrier's responsibility to ensure compliance to the structural limitations of the existing and/or proposed antenna mounts. TEP did not perform a site visit to verify the size, condition or capacity of the antenna mounts and did not analyze antennas supporting mounts as part of this structural analysis report. 6) When applicable, the effective projected area (EPA) of appurtenances was determined by computation fluid dynamics (CFD)testing performed by Crown Castle.TEP assumes the means and methods used to determine the EPA's yields results that follow the intent of TIA-222-H and are accurate and complete. 7) The following material grades were assumed: a) Tower Legs:ASTM A53-13-46 b) Tower Bracing: ASTM A36 c) Anchor Rods:ASTM A615-75 8) The existing base plate grout was not considered in this analysis. 9) TEP assumed the soil properties for the bottom layer of caisson from 40-ft to 42-ft to match the properties of soil layer above. This analysis may be affected if any assumptions are not valid or have been made in error. Tower Engineering Professionals should be notified to determine the effect on the structural integrity of the tower. 4) ANALYSIS RESULTS Table 4-Section Capacity(Summary) Section Elevation(ft) Component Type Size Critical P(lb) 4)P.n . (lb) % Pass/Fail No. Element Capacity T1 I 190-180 I Leg I Pipe 2.5 STD I 3 -14574 ( 56559 I 25.8 l Pass T2 180-160 Leg PIPE 3.5 STD 21 -62598 101716 61.5 Pass T3 160-140 Leg Pipe 5 STD i 51 ( -124606 165270 I 75.4 Pass T4 140-120 Leg Pipe 8 STD 75 -194337 347310 I 56.0 Pass T5 120-113.333 1 Leg I Pipe 8 STD 99 I -217173 347310 62.5 Pass T6 1 113.333- Leg Pipe 8 STD 111 -240315 347310 69.2 Pass 106.667 T7 106.667-100 1 Leg Pipe 8 STD 120 -261611 347310 75.3 Pass T8 7 100-80 Leg Pipe 10 STD(SCH40) { 129 -323189 484378 66.7 Pass T9 80-70 Leg Pipe 10 STD(SCH40) 147 k -356560 484378 73.6 Pass T10 70-60 Leg Pipe 10 STD(SCH40) 159 -389555 484378 80.4 Pass T11 60-40 Leg Pipe 12 STD f 168 -456498 602433 { 75.8 F Pass tnxTower Report-version 8.0.5.0 October 21,2019 190-ft Self Supporting Tower Structural Analysis Report CC/BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 6 Section Critical" %. Elevation(ft) Component Type Size P(lb) ., �Pa„o„ (lb) Pass/Fail No. Element_ Capacity T12 i 40-30 I Leg I Pipe 12 STD 186 { -489570 ( 602433 I 81.3 l Pass T13 30-20 Leg Pipe 12 STD + 198 i -522243 602433 i 86.7 Pass T74 20 0 Leg Pipe 12 XH 207 588158 794335 i 74.0 Pass T1 190-180 Diagonal L1 3/4x1 3/4x3/16 10 -3914 8758 I 44.7 Pass T2 180-160 Diagonal L2x2x3/16 28 I -8329 12785 65.1 Pass j 71.3(b) T3 160-140 Diagonal 2L2 1/2x2 1/20/160/8 58 -11795 52593 22.4 Pass 57.7(b) T4 140-120 Diagonal L3x3x3/16 84 -12306 22202 55.4 Pass 74.8(b) T5 1120-113.333 Diagonal L3x3x3/16 108 I -12645 21099 59.9 Pass i 76.8(b) T6 1 113.333- Diagonal L3x3x3/16 117 -12617 19950 63.2 Pass 106.667 1 1 78.9(b) T7 1106.667-100 1 Diagonal 2L3x3x3/16x1/2 126 -14262 61700 23.1 Pass 43.0(b) T8 100-80 Diagonal L3 1/2x3 1/2x1/4 138 I -16900 27303 61.9 Pass 63.7(b) T9 1 80-70 Diagonal L3 1/2x3 1/2x1/4 156 -16375 25401 64.5 Pass i 66.1 (b) F-7701 70-60 Diagonal 2L31/2x31/2x1/4x1/2 165 -18669 19019 21.0 Pass E 37.6(b) T11 60-40 Diagonal L3 1/2x3 1/2x3/8 177 -19565 30929 63.3 Pass T12 40-30 Diagonal L3 1/2x3 1/2x3/8 195 -18640 29065 64.1 Pass T13 30-20 Diagonal 21-3 1/2x3 1/2x3/8x1/2 i 204 -21674 110283 19.7 Pass 1 I 30.1 (b) T14 20-0 Diagonal L4x4x3/8 I 216 -22039 35179 62.6 Pass T1 190-180 Top Girt L3 1/2x3 1/2x1/4 4 -1550 29785 5.2 Pass 17.6(b) T2 180-160 Top Girt L3 1/2x3 1/2x1/4 23 32 52541 0.2 Pass 0.4(b) T3 160-140 Top Girt L3 1/20 1/2x3/8 53 E 216 73715 0.3 Pass 1.1 (b) T4 140-120 Top Girt L3 1/2x3 MOM 76 I -2392 30403 7.9 Pass 20.6(b) T5 P 20-113.333 Top Girt L4x4x3/8 100 -1944 34432 5.6 Pass 15.7(b) T8 100-80 Top Girt L4x4x3/8 I 130 -3871 25694 15.1 Pass 21.6(b) T9 80-70 Top Girt L5x5x5/16 148 -4044 34145 11.8 Pass i ( 31.6(b) T11 60-40 Top Girt L5x5x5/16 169 I -5520 27177 20.3 Pass 35.8(b) T12 40-30 Top Girt L5x5x5/16 187 -5199 22493 23.1 Pass 33.7(b) T14 20-0 Top Girt L5x5x5/16 I 208 ( -5476 18589 29.5 Pass 36.0(b) Summary Leg(T13) I 86.7 Pass I Diagonal 78.9 Pass i (T6) Top Girt 36.0 Pass (T14) Bolt 78.9 Pass Checks RATING= 86.7 Pass tnxTower Report-version 8.0.5.0 October 21,2019 190-ft Self Supporting Tower Structural Analysis Report M BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 7 Table 5-Tower Component Stresses vs. Capacity-LC7 Notes Component Elevation (ft) %Capacity Pass/Fail 1,2 Anchor Rods - I 58.5 Pass 1,2 Base Foundation Soil Interaction - 69.8 Pass 1,2 Base Foundation Structural - 25.7 Pass Structure Rating (max from all components)= 86.7% Notes: 1) See additional documentation in"Appendix C-Additional Calculations"for calculations supporting the%capacity listed. 2) Rating per TIA-222-H Section 15.5 4.1) Recommendations 1) If the load differs from that described in Tables 1 and 2 of this report,the referenced drawings, or the provisions of this analysis are found to be invalid, another structural analysis should be performed. 2) The tower and its foundation have sufficient capacity to carry the proposed load configuration. No modifications are required at this time. tnxTower Report-version 8.0.5.0 October 21,2019 190-ft Self Supporting Tower Structural Analysis Report CCI BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 8 APPENDIX A TNXTOWER OUTPUT tnxTower Report-version 8.0.5.0 L94q n_ I R DESIGNED APPURTENANCE LOADING I ELEVATION TYPE ._L___.._E6AT19N CMA-BOMV6521/EO-0Wu_ua Pip°_ !190 4a9 1351512 II)1 a ! CMA-BOHHTS21lE06 WMoud Plea -!I" IIMIS ddd9 133912 '1)t CMA-BDHM6521/E06tl Mput%pe E15S09P78 i1]1 CMA-BDMW6521E0-0WMout Pi190 EI5509P]B ---I1)t — `,' • I RNSNOGT)11-PF48 --_______ :190 29'Dm.zB'PI �___ ___1171 W_ ( 5BNHH-1065C IFW-Pipe IN 23'DIa.z6 P' ?11I _ SBNHK1Dfi5C WpaiP IN IMIZ•ol ..Pipe il]I ss--D65CWWm P .190 2a•pMa t2-R Pip I]I SBNHR1065C W W-14 190 2a•pia a 12A P'a 1171 FHFB 190 2a•Oia z/2-R%_ I1]t IW8 i190 2121W1(ht..V- 1171._...—. L600A_ FNFB 190 Iz trzn llhl/aadV• 11]t 1 FHFB ;IN 1121 L212Qm'.z a—i'--------1171 _ m l i I ECcIsW-VPIB ------— i INSeebr Meat N5033 1171 „} ! 21 ECC1920NPUB _ ;190 JMWOSFRDSW02WMw4%pa 1,60 6 ECCI 92D-VPUB IN MKOGFFKW"2WM Pi 116D N A FRIG 1190 M%06FFg86002 W MqN 1160 _ FRG 1190 RRFDCJ3ISPF�B 1160 FRIG 190 RMS 32 62 FKFB — 190 RRUS3282 160 I 21� _ -_ FINKRM1369_CCNZ 160 1 FRE 119D KFVr%I369_CCN2 1,60 FRE i no I KRT901369 CCN2 1160_ 1d0,OR EISMAPTr 190 'nvzoC 62]-PF48 16D 0,7 2 EIS508M 190 �RRUS-90S912 1160 EISSOOM 190 Mll5 tta9 BS912 16D E1S508PT1 I90 RRI15 dM9 B5912 160 OCad84p840E-00 1190 RRU532 B66 160 42.d'aM 190 1,60 • d 2.P xart Pipe 190 I(2h 2.P Ou.�6d I60 i _ 190 2 zd•Oia.a641 IN 24.Om x64t PI 'IN 1,60 2d•pmx64l Pipe 190 Sim P!.2HM a-HD 160 120•D'Rz60 Poe t" ISIM Pm1 VFA16-HO 160 • 6La°4er_ _ 190 Slm Prpl VFAld-IIO 160 H I 1pDR pov—Mwt P102.1 —_ II90 ""ERfl18CWMp Pi 1dB $ DBKNHa56584RMtl Moffat Pi 't]t AP%VEMIBCWMout Pi td8 DBKNHb565B-R2MWM—Ipi 1171 A.ERRIBCWMpua Pi 1d8 R I)SX-565II-MIA OMR Pi '171 AN 6488 Bdt WW-P, 1d8 SBJAHd-1D65B-0LW—,IPm9 1171 AR6d888d1tlMpvt Pipp 1dB SB1AHa-1O65BCLWMoua A 't)1 AR WBB BrI W W-pi 11da _ SBJAHd-1DSSB-DLWW a 171 RR11531825 148 2 NNHH65B rtI CC w/Molar Pl I171 R.311325 ld8 d 1067R 2 MiHH65&M CCN2"pi_ 1171 RflUS 31"1ld8 2 NNHH658-.CCN2 w/MOMt% 171 MIA II lab $ I - DC248b0-0-9E 1171 MIA 11 148 DC24B000)E 171 MIA II lab 1 1W OM1 2DC24"fi E 1171 ACU-N2PN It8 DC24BL E 1171 QIACUA2PN lab OC248-0DO'9E 1171 ACU-A2Pf! Id8 RRUSad78BI6 CC 171 t100MHi5Nfl Fagr Id8 2 I H Q MUS 4478 Bl a_CCN2 .171 600MHLSMRFEBr 148 IBi11S t47891a CCN2 1171 BDOMH25MRF01r I48 DC 408 IBOF 171 24•D'az80MOMt Pi 148 t• MUS32 1)1 2a•Ofaz80M°Nt Pi I08 MU532 11]t 2d•DIaaMMoMPi 168 RRU5 32 171 1 Sim Pm 1 VFA1241O Id8 RRIS 32 ON I]t I SRp Pm 1 VFA124CO Id8 (2)MU532866 Il]t 15im Pml VFA12-H0 148 ,`� FF 3282 171 11®-K-AW-20J T 140_ BOOR RRU531 B2 1171 Ilex-AW, 33-0OT 11d0 OC648SP186C tTl 11 X AW.23-33-00T 141 g j is a _ Dc648-0P1 B8C 1171 SMWL4o MdON 140 „ a RRUSd449B51312 171 SYMBOL LIST 70.0 ft SIZEMSIZE B M31 12n1dx1 MATERIAL STRENGTH FOR AS3A46 d614 6)I� A36 36k4 EY 58 kv TOWER DESIGN NOTES 1.Tower is located in Pasco County,Florida 2 Tower designed for E)Posae C to the TIA-222-H Slardard. 3.Tower designed for a 137 mph basic wind in accordarce with the TIA-222-H Standard. 0 4.Deflections are based upon a 60 mph wircl. 1 m 5.Tower Risk Category If. 1 a - 6.Topographic Category 1 with Crest Height of 0.00 I1 7.TOWER RATING:86.7% 3 doors $ aDOR - _� ALL REACTIONS AREFACTORED ht4X CORNER REACTIONSATaASE.' 2341E DOWN.,6052671b SHEAR'603051b UPLIFT.--SM699Ib SHEAR.,-14249111 AX14L a 83932111 J , SHFlIR MOMENT 97378Ib 1 10665544/bR 4RL TOROUE9254316-/t REACTIONS-137mph WIND u o a � L e l m s 6 0 Tower Engineering Professionals °Pasco Count VS BU 826548 326 Tryon Road P1pi---No.46167.314456 Raleigh,NO 27603 G081R`Crown Castle Cra—by.'Wcrook Tower Erganalry Proleseime5 phone:(919)661-6351 Cp;7 TIA-222-H Daw:10121/19 5ma'NTS FAX 919 661-6350 PaOe�,,,,,,,,,,o,M•,�,,,,,, o �•v NO.E-1 tnxTower Job Page Pasco County (VS) (BU 826548) 1 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Tower Input Data The main tower is a 3x free standing tower with an overall height of 190.00 ft above the ground line. The base of the tower is set at an elevation of 0.00 ft above the ground line. The face width of the tower is 8.00 ft at the top and 21.33 ft at the base. This tower is designed using the TIA-222-H standard. The following design criteria apply: Tower is located in Pasco County,Florida. Tower base elevation above sea level:91.00 ft. Basic wind speed of 137 mph. Risk Category II. Exposure Category C. Simplified Topographic Factor Procedure for wind speed-up calculations is used. Topographic Category: 1. Crest Height: 0.00 ft. Deflections calculated using a wind speed of 60 mph. Pressures are calculated at each section. Tower analysis based on target reliabilities in accordance with Annex S. Load Modification Factors used: Kes(Fw)=0.95. Stress ratio used in tower member design is 1.05. Local bending stresses due to climbing loads,feed line supports,and appurtenance mounts are not considered. Options Consider Moments-Legs Distribute Leg Loads As Uniform Use ASCE 10 X-Brace Ly Rules' Consider Moments-Horizontals Assume Legs Pinned Calculate Redundant Bracing Forces Consider Moments-Diagonals Assume Rigid Index Plate Ignore Redundant Members in FEA Use Moment Magnification Use Clear Spans For Wind Area SR Leg Bolts Resist Compression Use Code Stress Ratios Use Clear Spans For KL/r All Leg Panels Have Same Allowable Use Code Safety Factors-Guys Retension Guys To Initial Tension Offset Girt At Foundation Escalate Ice Bypass Mast Stability Checks Consider Feed Line Torque Always Use Max Kz Use Azimuth Dish Coefficients Include Angle Block Shear Check Use Special Wind Profile Project Wind Area of Appurt. Use TIA-222-H Bracing Resist.Exemption Include Bolts In Member Capacity Autocalc Torque Arm Areas Use TIA-222-H Tension Splice Exemption Leg Bolts Are At Top Of Section Add IBC.6D+W Combination _ _ _ __Pokes Secondary Horizontal Braces Leg Sort Capacity Reports By Component Include Shear-Torsion Interaction Use Diamond Inner Bracing(4 Sided) Triangulate Diamond Inner Bracing Always Use Sub-Critical Flow SR Members Have Cut Ends Treat Feed Line Bundles As Cylinder Use Top Mounted Sockets SR Members Are Concentric Ignore KLJry For 60 Deg.Angle Legs Pole Without Linear Attachments Pole With Shroud Or No Appurtenances Outside and Inside Corner Radii Are Known tnxTower .lob Pasco County (VS) (BU 826548) Page 2 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed b Phone:(919)661-6351 Crown Castle g y FAX.(919)661-6350 CdCrOOIC Wind 180 Leg A Wind 90 Leg C Z Leg B Face C Wind Normal Triangular Tower Tower Section Geometry Tower Tower Assembly Description Section Number Section Section Elevation Database Width of Length Sections h h h Tl 190.00-180.00 8.00 1 10.00 72 180.00-160.00 8.00 1 20.00 T3 160.00-140.00 8.00 1 20.00 T4 140.00-120.00 9.67 1 20.00 T5 120.00-113.33 11.33 1 6.67 T6 113.33-106.67 11.89 1 6.67 T7 106.67-100.00 12.44 1 6.67 T8 100.00-80.00 13.00 1 20.00 T9 80.00-70.00 14.67 1 10.00 T10 70.00-60.00 15.50 1 10.00 T11 60.00-40.00 16.33 1 20.00 T12 40.00-30.00 18.00 1 10.00 T13 30.00-20.00 18.83 1 10.00 T14 20.00-0.00 19.67 1 20.00 Tower Section Geometry cont'd Tower Tower Diagonal Bracing Has Has Top Girt Bottom Girt Section Elevation Spacing Type K Brace Horizontals Offset Offset End ft R Panels in in T1 190.00-180.00 5.00 X Brace No No 0.0000 0.0000 b tnxTower Jo Pasco County (VS) (BU 826548) Page3 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Tower Tower Diagonal Bracing Has Has Top Girt Bottom Girt Section Elevation Spacing Type K Brace Horizontals Offset Offset End ft ft Panels in in T2 180.00-160.00 5.00 X Brace No No 0.0000 0.0000 T3 160.00-140.00 6.67 X Brace No No 0.0000 0.0000 T4 140.00-120.00 6.67 X Brace No No 0.0000 0.0000 T5 120.00-113.33 6.67 X Brace No No 0.0000 0.0000 T6 113.33-106.67 6.67 X Brace No No 0.0000 0.0000 17 106.67-100.00 6.67 X Brace No No 0.0000 0.0000 T8 100.00-80.00 10.00 X Brace No No 0.0000 0.0000 T9 80.00-70.00 10.00 X Brace No No 0.0000 0.0000 T10 70.00-60.00 10.00 X Brace No No 0.0000 0.0000 Tl l 60.00-40.00 10.00 X Brace No No 0.0000 0.0000 T12 40.00-30.00 10.00 X Brace No No 0.0000 0.0000 T13 30.00-20.00 10.00 X Brace No No 0.0000 0.0000 T14 20.00-0.00 10.00 X Brace No No 0.0000 0.0000 Tower Section Geometry cont'd Tower Leg Leg Leg Diagonal Diagonal Diagonal Elevation Type Size Grade Type Size Grade ft Tl 190.00-180.00 Pipe Pipe 2.5 STD A53-B-46 Equal Angle Ll 3/4x1 3/4x3/16 A36 (46 ksi) (36 ksi) T2 180.00-160.00 Pipe PIPE 3.5 STD A53-B-46 Equal Angle L2x2x3/16 A36 (46 ksi) (36 ksi) T3 160.00-140.00 Pipe Pipe 5 STD A53-B-46 Double Equal 21-2 1/2x2 1/20/160/8 A36 (46 ksi) Angle (36 ksi) T4 140.00-120.00 Pipe Pipe 8 STD A53-B-46 Equal Angle 1,300/16 A36 (46 ksi) (36 ksi) T5 120.00-113.33 Pipe Pipe 8 STD A53-B-46 Equal Angle L3x3x3/16 A36 (46 ksi) (36 ksi) T6 113.33-106.67 Pipe Pipe 8 STD A53-B-46 Equal Angle L3x3x3/16 A36 (46 ksi) (36 ksi) T7 106.67-100.00 Pipe Pipe 8 STD A53-B-46 Double Equal 2L3x3x3/16xl/2 A36 (46 ksi) Angle (36 ksi) T8 100.00-80.00 Pipe Pipe 10 STD(SCH40) A53-B-46 Equal Angle L3 1/20 1/2xl/4 A36 (46 ksi) (36 ksi) T9 80.00-70.00 Pipe Pipe 10 STD(SCH40) A53-B-46 Equal Angle L3 1/20 1/2xl/4 A36 (46 ksi) (36 ksi) T10 70.00-60.00 Pipe Pipe 10 STD(SCH40) A53-B-46 Double Equal 2L3 1/20 1/2xl/4xl/2 A36 (46 ksi) Angle (36 ksi) Tl1 60.00-40.00 Pipe Pipe 12 STD A53-B-46 Equal Angle L3 1/20 1/2x3/8 A36 (46 ksi) (36 ksi) T12 40.00-30.00 Pipe Pipe 12 STD A53-B-46 Equal Angle L3 1/2x3 1/2x3/8 A36 (46 ksi) (36 ksi) T13 30.00-20.00 Pipe Pipe 12 STD A53-B-46 Double Equal 2L3 1/20 l/2x3/8xl/2 A36 (46 ksi) Angle (36 ksi) T14 20.00-0.00 Pipe Pipe 12 XH A53-B-46 Equal Angle L4x4x3/8 A36 (46 ksi) (36 ksi) Tower Section Geometry cont'd tnxTower Job Page Pasco County (VS) (BU 826548) 4 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX.(919)661-6350 cdcrook Tower Top Girt Top Girt Top Girt Bottom Girt Bottom Girt Bottom Girt Elevation Type Size Grade Type Size Grade ft TI 190.00-180.00 Equal Angle L3 1/20 1/2xl/4 A36 Solid Round A36 (36 ksi) (36 ksi) T2 180.00-160.00 Equal Angle L3 1/20 1/2xl/4 A36 Solid Round A36 (36 ksi) (36 ksi) T3 160.00-140.00 Equal Angle L3 1/20 MOM A36 Solid Round A36 (36 ksi) (36 ksi) T4 140.00-120.00 Equal Angle L3 1/20 1/20/8 A36 Solid Round A36 (36 ksi) (36 ksi) T5 120.00-113.33 Equal Angle L4x4x3/8 A36 Solid Round A36 (36 ksi) (36 ksi) TS 100.00-80.00 Equal Angle L4x4x3/8 A36 Solid Round A36 (36 ksi) (36 ksi) T9 80.00-70.00 Equal Angle L5x5x5/16 A36 Solid Round A36 (36 ksi) (36 ksi) TI 1 60.00-40.00 Equal Angle L5x5x5/16 A36 Solid Round A36 (36 ksi) (36 ksi) T12 40.00-30.00 Equal Angle L5x5x5/16 A36 Solid Round A36 (36 ksi) (36 ksi) T14 20.00-0.00 Equal Angle L5x5x5/16 A36 Solid Round A36 (36 ksi) (36 ksi) Tower Section Geometry cont'd Tower Gusset Gusset Gusset Grade Adjust.Factor Adjust. Weight Mult. Double Angle Double Angle Double Angle Elevation Area Thickness Af Factor Stitch Bolt Stitch Bolt Stitch Bolt (perface) A, Spacing Spacing Spacing Diagonals Horizontals Redundants ft fta in in in in TI 0.00 0.3750 A36 1.03 1 1.05 0.0000 0.0000 36.0000 190.00-180.00 (36 ksi) T2 0.00 0.3750 A36 1.03 1 1.05 0.0000 0.0000 36.0000 180.00-160.00 (36 ksi) T3 0.00 0.3750 A36 1.03 1 1.05 Third-Pt 0.0000 36.0000 160.00-140.00 (36 ksi) T4 0.00 0.5000 A36 1.03 1 1.05 0.0000 0.0000 36.0000 140.00-120.00 (36 ksi) T5 0.00 0.5000 A36 1.03 1 1.05 0.0000 0.0000 36.0000 120.00-113.33 (36 ksi) T6 0.00 0.5000 A36 1.03 1 1.05 0.0000 0.0000 36.0000 113.33-106.67 (36 ksi) T7 0.00 0.5000 A36 1.03 1 1.05 Thud-Pt 0.0000 36.0000 106.67-100.00 (36 ksi) T8 0.00 0.5000 A36 1.03 l 1.05 0.0000 0.0000 36.0000 100.00-80.00 (36 ksi) T9 80.00-70.00 0.00 0.5000 A36 1.03 1 1.05 0.0000 0.0000 36.0000 (36 ksi) TIO 0.00 0.5000 A36 1.03 1 1.05 Third-Pt 0.0000 36.0000 70.00-60.00 (36 ksi) T11 0.00 0.5000 A36 1.03 1 1.05 0.0000 0.0000 36.0000 60.00-40.00 (36 ksi) T12 0.00 0.5000 A36 1.03 1 1.05 0.0000 0.0000 36.0000 40.00-30.00 (36 ksi) T13 0.00 0.5000 A36 1.03 1 1.05 Third-Pt 0.0000 36.0000 30.00-20.00 (36 ksi) T14 20.00-0.00 0.00 0.5000 A36 1.03 1 1.05 0.0000 0.0000 36.0000 (36 ksi) to xTower Job Page Pasco County (VS) (BU 826548) 5 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX.(919)661-6350 Cdcrook Tower Section Geometry cont'd K Factors' Tower Cale Cale Legs X K Single Girts Horiz. Sec. Inner Elevation K K Brace Brace Diags Horiz. Brace Single Solid Diags Diags Angles Rounds X X X X X X X ft y Y Y Y Y y y Tl Yes No I 1 I I I I I I 190.00-180.00 1 l 1 1 1 1 1 T2 Yes No I I I I 1 I 1 1 180.00-160.00 1 1 I 1 1 1 1 T3 Yes No I I 1 I I 1 1 1 160.00-140.00 1 1 I 1 1 1 1 T4 Yes No I I I I 1 1 1 1 140.00-120.00 1 1 1 1 1 1 1 T5 Yes No I 1 I 1 1 1 1 1 120.00-113.33 1 1 1 1 1 I 1 T6 Yes No 1 I 1 I I I 1 1 113.33-106.67 1 1 1 1 1 1 1 T7 Yes No I I 1 1 1 I 1 1 106.67-100.00 1 1 1 1 1 1 I T8 Yes No I I I 1 1 1 1 1 100.00-80.00 I 1 1 1 1 1 1 T9 Yes No 1 1 1 1 1 1 1 1 80.00-70.00 1 1 1 1 1 1 1 TIO Yes No 1 1 1 1 1 1 1 1 70.00-60.00 1 1 1 1 1 1 1 Tll Yes No 1 1 1 1 1 1 I I 60.00-40.00 1 1 1 1 1 1 1 T12 Yes No I 1 I 1 1 1 1 1 40.00-30.00 1 1 1 1 I 1 1 T13 Yes No 1 I 1 I I I 1 1 30.00-20.00 1 1 1 I 1 1 1 T14 Yes No 1 1 I I 1 I 1 I 20.00-0.00 1 1 1 1 1 1 1 'Note:Kfactors are applied to member segment lengths.K-braces without inner supporting members will have the Kfactor in the out-of-plane direction applied to the overall length. Tower Section Geometry cont'd Tower Leg Diagonal Top Girt Bottom Girt Mid Girt Long Horizontal Short Horizontal Elevation ft Net Width U Net Width U Net Width U Net U Net U Net U Net U Deduct Deduct Deduct Width Width Width Width in in in Deduct Deduct Deduct Deduct in in in in T1 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 190.00-180.00 T2 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 180.00-160.00 T3 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 160.00-140.00 T4 0.0000 I 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 140.00-120.00 b tnxTower Jo Pasco County (VS) (BU 826548) Page6 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Tower Leg Diagonal Top Girt Bottom Girt Mid Girt Long Horizontal Short Horizontal Elevation ft Net Width U Net Width U Net Width U Net U Net U Net U Net U Deduct Deduct Deduct Width Width Width Width in in in Deduct Deduct Deduct Deduct in in in in T5 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 I20.00-113.33 T6 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 113.33-106.67 T7 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000, 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 106.67-100.00 T8 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 100.00-80.00 T9 80.00-70.00 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 T10 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 70.00-60.00 Tll 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 60.00-40.00 T12 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 40.00-30.00 T13 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 30.00-20.00 T14 20.00-0.001 0.0000 1 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 0.75 0.0000 ' 0.75 Tower Section Geometry cont'd Tower Leg Leg Diagonal Top Girt Bottom Girt Mid Girt Long Horizontal Short Horizontal Elevation Connection ft Type Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. in in in in in in in TI Flange 0.7500 4 0.5000 2 0.5000 1 0.6250 0 0.6250 0 0.6250 0 0.6250 0 190.00-180.00 A325N A325N A325N A325N A325N A325N A325N T2 Flange 0.8750 4 0.5000 2 0.5000 1 0.6250 0 0.6250 0 0.6250 0 0.6250 0 180.00-160.00 A325N A325N A325N A325N A325N A325N A325N T3 Flange 1.0000 6 0.7500 1 0.7500 1 0.0000 0 0.6250 0 0.6250 0 0.6250 0 160.00-140.00 A325N A325X A325N A325N A325N A325N A325N T4 Flange 1.5000 4 0.6250 2 0.6250 1 0.6250 0 0.6250 0 0.6250 0 0.6250 0 140.00420.00 A325N A325N A325N A325N A325N A325N A325N T5 Flange 1.5000 0 0.6250 2 0.6250 1 0.0000 0 0.6250 0 0.6250 0 0.6250 0 120.00-113.33 A325N A325N A325N A325N A325N A325N A325N T6 Flange 1.5000 0 0.6250 2 0.6250 0 0.0000 0 0.6250 0 0.6250 0 0.6250 0 113.33-106.67 A325N A325N A325N A325N A325N A325N A325N 17 Flange 1.5000 6 0.6250 2 0.6250 0 0.6250 0 0.6250 0 0.6250 0 0.6250 0 106.67-100.00 A325N A325X A325N A325N A325N A325N A325N T8 Flange 1.5000 6 0.7500 2 0.7500 1 0.6250 0 0.6250 0 0.6250 0 0.6250 0 100.00-80.00 A325N A325N A325N A325N A325N A325N A325N T9 80.00-70.00 Flange 1.5000 0 0.6250 2 0.6250 1 0.0000 0 0.6250 0 0.6250 0 0.6250 0 A325N A325N A325N A325N A325N A325N A325N T10 Flange 1.5000 6 0.6250 2 0.6250 0 0.6250 0 0.6250 0 0.6250 0 0.6250 0 70.00-60.00 A325N A325X A325N A325N A325N A325N A325N Tll Flange 1.5000 6 0.7500 2 0.7500 1 0.6250 0 0.6250 0 0.6250 0 0.6250 0 60.00-40.00 A325N A325N A325N A325N A325N A325N A325N T12 Flange 1.5000 0 0.7500 2 0.7500 1 0.0000 0 0.6250 0 0.6250 0 0.6250 0 40.00-30.00 A325N A325N A325N A325N A325N A325N A325N T13 Flange 1.5000 6 0.7500 2 0.6250 0 0.6250 0 0.6250 0 0.6250 0 0.6250 0 30.00-20.00 A325N A325X A325N A325N A325N A325N A325N b tnxTower Jo Pasco County (VS) (BU Page 826548) 7 of 31 Tolver Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX.(919)661-6350 Cdcrook Tower Leg Leg Diagonal Top Girt Bottom Girt Mid Girt Long Horizontal Short Horizontal Elevation Connection ft Type Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. Bolt Size No. in in in in in in in T14 20.00-0.00 Flange 2.2500 0 0.7500 2 0.7500 1 0.6250 0 0.6250 0 0.6250 0 0.6250 0 A615-75 A325N A325N A325N A325N A325N A325N Feed Line/Linear Appurtenances - Entered As Round Or Flat Description Face Allow Exclude Component Placement Face Lateral At # Clear Width or Perimeter Weight or Shield From Type Offset Offset Per Spacing Diameter Leg Torque ft in (Frac FW) Row in in in plf Calculation **Safety** Safety Line B No No At(CaAa) 190.00- -8.0000 0.45 1 1 0.3750 0.3750 0.22 3/8 0.00 Climbing B No No Af(CaAa) 190.00- -8.0000 0.45 1 1 3.0000 3.0000 4.00 Ladder(Af) 0.00 **A Face** 942-98887-1F A No No At(CaAa) 148.00- 0.0000 0.42 3 3 0.5000 1.3000 1.26 XXX(I-1/4) 0.00 Feed Line A No No Af(CaAa) 150.00- 0.0000 0.45 1 1 3.0000 3.0000 4.00 Ladder 0.00 MLE Hybrid A No No At(CaAa) 160.00- 2.5000 -0.3 2 2 0.5000 1.6250 1.07 9Power/18Fib 0.00 er RL 2(1 5/8") LCF158-50JL( A No No Ar(CaAa) 160.00- 0.0000 -0.25 12 12 0.5000 1.9800 0.52 1 5/8") 0.00 Feed Line A No No Af(CaAa) 160.00- 0.0000 -0.25 1 1 3.0000 3.0000 4.00 Ladder 0.00 **B Face** LDF7-50A(I- B No No Ar(CaAa) 171.00- 0.0000 -0.3 12 12 0.5000 1.9800 0.82 5/8") 0.00 LDF5-50A(7/ B No No At(CaAa) 171.00- 2.5000 -0.26 6 6 0.5000 1.0900 0.33 8") 0.00 ATCB-BOI(5/ B No No At(CaAa) 171.00- 3.2000 -0.34 3 3 0.3150 0.3150 0.07 16") 0.00 FB-L98B-002- B No No At(CaAa) 171.00- 2.5000 -0.34 2 2 0.3937 0.3937 0.06 XXX(3/8) 0.00 WR-VG86ST- B No No Af(CaAa) 171.00- 2.5000 -0.3 3 3 0.7950 0.7950 0.58 BRD(3/4) 0.00 FB-L98B-002- B No No Ar(CaAa) 171.00- 0.0000 -0.36 1 1 0.3937 0.3937 0.06 XXX(3/8) 0.00 WR-VG86ST- B No No Ar(CaAa) 171.00- 2.5000 -0.36 3 3 0.5000 0.7950 0.58 BRD(3/4) 0.00 Feed Line B No No Af(CaAa) 171.00- 2.5000 -0.3 1 1 3.0000 3.0000 4.00 Ladder 0.00 **C Face** LDF7-50A(I- C No No Ar(CaAa) 140.00- 0.0000 0.45 6 6 0.5000 1.9800 0.82 5/8") 0.00 Feed Line C No No Af(CaAa) 140.00- 0.0000 0.45 I 1 3.0000 3.0000 4.00 Ladder 0.00 *** LDF5-50A(7/ C No No Ar(CaAa) 190.00- 0.0000 0.05 1 1 0.5000 1.0900 0.33 8) 0.00 LDF12-50(2-1 C No No Ar(CaAa) 190.00- 0.0000 -0.02 6 6 0.5000 2.3500 1.22 /4) 0.00 Job Page t3& Tower Pasco County (VS) (BU 826548) 8 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX.•(919)661-6350 CdcrOOk Description Face Allow Exclude Component Placement Face Lateral # # Clear Width or Perimeter Weight or Shield From Type Offset Offset Per Spacing Diameter Leg Torque ft in (Frac FW) Row in in in plf Calculation LDF6-50A(1- C No No At(CaAa) 190.00- 2.5000 -0.05 1 1 0.5000 1.5500 0.60 1/4) 0.00 LDF7-50A(1- C No No At(CaAa) 190.00- 0.0000 0.02 6 6 0.5000 1.9800 0.82 5/8") 0.00 Feed Line C No No Af(CaAa) 190.00- 0.0000 0 1 1 3.0000 3.0000 4.00 Ladder 0.00 Feed Line/Linear Appurtenances - Entered As Area Description Face Allow Exclude Component Placement Total CAAA Weight or Shield From Type Number Leg Torque ft Aft plf Calculation *a Feed Line/Linear Appurtenances Section Areas Tower Tower Face AR AF CAAA CAAA Weight Section Elevation In Face Out Face h ft, ft, ft, ft, lb Tl 190.00-180.00 A 0.000 0.000 0.000 0.000 0 B 0.000 0.000 5.375 0.000 42 C 0.000 0.000 33.620 0.000 172 T2 180.00-160.00 A 0.000 0.000 0.000 0.000 0 B 0.000 0.000 58.915 0.000 302 C 0.000 0.000 67.240 0.000 343 T3 160.00-140.00 A 0.000 0.000 72.140 0.000 318 B 0.000 0.000 98.322 0.000 479 C 0.000 0.000 67.240 0.000 343 T4 140.00-120.00 A 0.000 0.000 81.820 0.000 403 B 0.000 0.000 98.322 0.000 479 C 0.000 0.000 101.000 0.000 522 T5 120.00-113.33 A 0.000 0.000 27.273 0.000 134 B 0.000 0.000 32.774 0.000 160 C 0.000 0.000 33.667 0.000 174 T6 113.33-106.67 A 0.000 0.000 27.273 0.000 134 B 0.000 0.000 32.774 0.000 160 C 0.000 0.000 33.667 0.000 174 T7 106.67-100.00 A 0.000 0.000 27.273 0.000 134 B 0.000 0.000 32.774 0.000 160 C 0.000 0.000 33.667 0.000 174 T8 100.00-80.00 A 0.000 0.000 81.820 0.000 403 B 0.000 0.000 98.322 0.000 479 C 0.000 0.000 101.000 0.000 522 T9 80.00-70.00 A 0.000 0.000 40.910 0.000 202 B 0.000 0.000 49.161 0.000 240 C 0.000 0.000 50.500 0.000 261 T10 70.00-60.00 A 0.000 0.000 40.910 0.000 202 B 0.000 0.000 49.161 0.000 240 hnxTower Job Page Pasco County (VS) (BU 826548) 9 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 Tower Tower Face AR AF CAA CIAA Weight Section Elevation In Face Out Face h f2 f, f2 f2 lb C 0.000 0.000 50.500 0.000 261 Tll 60.00-40.00 A 0.000 0.000 81.820 0.000 403 B 0.000 0.000 98.322 0.000 479 C 0.000 0.000 101.000 0.000 522 T12 40.00-30.00 A 0.000 0.000 40.910 0.000 202 B 0.000 0.000 49.161 0.000 240 C 0.000 0.000 50.500 0.000 261 T13 30.00-20.00 A 0.000 0.000 40.910 0.000 202 B 0.000 0.000 49.161 0.000 240 C 0.000 0.000 50.500 0.000 261 T14 20.00-0.00 A 0.000 0.000 81.820 0.000 403 B 0.000 0.000 98.322 0.000 479 C 0.000 0.000 101.000 0.000 522 Feed Line Center of Pressure Section Elevation CPX CPZ CPX CPZ Ice Ice ft in in in in TI 190.00-180.00 1.8948 7.8063 1.8942 7.8026 T2 180.00-160.00 3.0531 -4.4938 3.0018 -4.4030 T3 160.00-140.00 -2.1750 -8.1894 -2.0955 -7.8988 T4 140.00-120.00 -7.3344 -8.2833 -7.0306 -7.9283 T5 120.00-113.33 -7.2893 -8.3377 -7.0383 -8.0372 T6 113.33-106.67 -8.4534 -9.5607 -8.0557 -9.0955 T7 106.67-100.00 -8.7310 -9.8913 -8.3164 -9.4048 T8 100.00-80.00 -8.8894 -10.0905 -8.4310 -9.5509 T9 80.00-70.00 -8.8164 -10.1182 -8.4206 -9.6422 T10 70.00-60.00 -10.3622 -11.7510 -9.7469 -11.0287 T11 60.00-40.00 -9.9753 -11.4055 -9.4142 -10.7365 T12 40.00-30.00 -9.7822 -11.2956 -9.2990 -10.7083 T13 30.00-20.00 -11.5975 -13.2109 -10.8325 -12.3062 T14 20.00-0.00 -10.8272 -12.5140 -10.2456 -11.8062 Shielding Factor Ka Tower Feed Line Description Feed Line K. K. Section Record No. Segment Elev. No Ice Ice TI 2 Safety Line 3/8 180.00- 0.6000 0.6000 190.00 TI 3 Climbing Ladder(Af) 180.00- 0.6000 0.6000 190.00 TI 23 LDF5-50A(7/8) 180.00- 0.6000 0.6000 190.00 TI 24 LDF12-50(2-1/4) 180.00- 0.6000 0.6000 190.00 TI 25 LDF6-50A(1-1/4) 180.00- 0.6000 0.6000 190.00 TI 26 LDF7-50A(I-5/8") 180.00- 0.6000 0.6000 190.00 TI 29 Feed Line Ladder 180.00- 0.6000 0.6000 190.00 tn.xTower Job Page Pasco County (VS) (BU 826548) 10 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 Tower Feed Line Description Feed Line K. K. Section Record No. Se ment Elev. No Ice Ice T2 2 Safety Line 3/8 160.00- 0.6000 0.6000 180.00 72 3 Climbing Ladder(Af) 160.00- 0.6000 0.6000 180.00 T2 I I LDF7-50A(1-5/8") 160.00- 0.6000 0.6000 171.00 T2 12 LDF5-SOA(7/8") 160.00- 0.6000 0.6000 171.00 T2 13 ATCB-BO1(5/16") 160.00- 0.6000 0.6000 171.00 72 14 FB-L98B-002-XXX(3/8) 160.00- 0.0000 0.0000 171.00 T2 15 WR-VG86ST-BRD(3/4) 160.00- 0.0000 0.0000 171.00 72 16 FB-L98B-002-XXX(3/8) 160.00- 0.6000 0.6000 171.00 T2 17 WR-VG86ST-BRD(3/4) 160.00- 0.6000 0.6000 171.00 T2 18 Feed Line Ladder 160.00- 0.6000 0.6000 171.00 T2 23 LDF5-50A(7/8) 160.00- 0.6000 0.6000 180.00 T2 24 LDF12-50(2-1/4) 160.00- 0.6000 0.6000 180.00 T2 25 LDF6-50A(1-1/4) 160.00- 0.6000 0.6000 180.00 T2 26 LDF7-50A(1-5/8") 160.00- 0.6000 0.6000 180.00 T2 29 Feed Line Ladder 160.00- 0.6000 0.6000 180.00 T3 2 Safety Line 3/8 140.00- 0.6000 0.6000 160.00 T3 3 Climbing Ladder(Af) 140.00- 0.6000 0.6000 160.00 T3 5 942-98887-1FXXX(1-1/4) 140.00- 0.6000 0.6000 148.00 T3 6 Feed Line Ladder 140.00- 0.6000 0.6000 150.00 T3 7 MLE Hybrid 9Power/18Fiber 140.00- 0.6000 0.6000 RL2(15/8") 160.00 T3 8 LCF158-50]L(1 5/8") 140.00- 0.6000 0.6000 160.00 T3 9 Feed Line Ladder 140.00- 0.6000 0.6000 160.00 T3 11 LDF7-50A(I-5/8") 140.00- 0.6000 0.6000 160.00 T3 12 LDF5-50A(7/8") 140.00- 0.6000 0.6000 160.00 T3 13 ATCB-BO1(5/16") 140.00- 0.6000 0.6000 160.00 T3 14 FB-L98B-002-XXX(3/8) 140.00- 0.0000 0.0000 160.00 T3 15 WR-VG86ST-BRD(3/4) 140.00- 0.0000 0.0000 160.00 T3 16 FB-L98B-002-XXX(3/8) 140.00- 0.6000 0.6000 160.00 T3 17 WR-VG86ST-BRD(3/4) 140.00- 0.6000 0.6000 160.00 T3 18 Feed Line Ladder 140.00- 0.6000 0.6000 160.00 T3 23 LDF5-50A(7/8) 140.00- 0.6000 0.6000 160.00 b tnxTower Jo Pasco County (VS) (BU 826548) Page11 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tn'on Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX:(919)661-6350 Cdcrook Tower Feed Line Description Feed Line Ka & Section Record No. Se meet Elev. No Ice Ice T3 24 LDF12-50(2-1/4) 140.00- 0.6000 0.6000 160.00 T3 25 LDF6-50A(1-1/4) 140.00- 0.6000 0.6000 160.00 T3 26 LDF7-50A(1-5/8") 140.00- 0.6000 0.6000 160.00 T3 29 Feed Line Ladder 140.00- 0.6000 0.6000 160.00 T4 2 Safety Line 3/8 120.00- 0.6000 0.6000 140.00 T4 3 Climbing Ladder(Af) 120.00- 0.6000 0.6000 140.00 T4 5 942-98887-IFXXX(I-1/4) 120.00- 0.6000 0.6000 140.00 T4 6 Feed Line Ladder 120.00- 0.6000 0.6000 140.00 T4 7 MILE Hybrid 9Power/18Fiber 120.00- 0.6000 0.6000 RL2(15/8") 140.00 T4 8 LCF158-50JL(1 5/8") 120.00- 0.6000 0.6000 140.00 T4 9 Feed Line Ladder 120.00- 0.6000 0.6000 140.00 T4 11 LDF7-50A(1-5/8") 120.00- 0.6000 0.6000 140.00 T4 12 LDF5-50A(7/8") 120.00- 0.6000 0.6000 140.00 T4 13 ATCB-BO1(5/16") 120.00- 0.6000 0.6000 140.00 T4 14 FB-L98B-002-XXX(3/8) 120.00- 0.0000 0.0000 140.00 T4 15 WR-VG86ST-BRD(3/4) 120.00- 0.0000 0,0000 140.00 T4 16 FB-L98B-002-XXX(3/8) 120.00- 0.6000 0.6000 140.00 T4 17 WR-VG86ST-BRD(3/4) 120.00- 0.6000 0.6000 140.00 T4 18 Feed Line Ladder 120.00- 0.6000 0.6000 140.00 T4 20 LDF7-50A(1-5/8") 120.00- 0.6000 0.6000 140.00 T4 21 Feed Line Ladder 120.00- 0.6000 0.6000 140.00 T4 23 LDF5-50A(7/8) 120.00- 0.6000 0.6000 140.00 T4 24 LDF12-50(2-1/4) 120.00- 0.6000 0.6000 140.00 T4 25 LDF6-50A(1-1/4) 120.00- 0.6000 0.6000 140.00 T4 26 LDF7-50A(1-5/8") 120.00- 0.6000 0.6000 140.00 T4 29 Feed Line Ladder 120.00- 0.6000 0.6000 140.00 T5 2 Safety Line 318 113.33- 0.6000 0.6000 120.00 T5 3 Climbing Ladder(Af) 113.33- 0.6000 0.6000 120.00 T5 5 942-98887-IFXXX(1-1/4) 113.33- 0.6000 0.6000 120.00 T5 6 Feed Line Ladder 113.33- 0.6000 0.6000 120.00 T5 7 MLE Hybrid 91?ower/18Fiber 113.33- 0.6000 0.6000 RL2(15/8") 120.00 t32xTower Job Page Pasco County (VS) (BU 826548) 12 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Trvon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX:(919)661-6350 1 1 CdCrOOI( Tower Feed Line Description Feed Line K„ Ka Section Record No. Segment Elev. No Ice Ice T5 8 LCF158-50JL(1 5/8") 113.33- 0.6000 0.6000 120.00 T5 9 Feed Line Ladder 113.33- 0.6000 0.6000 120.00 T5 11 LDF7-50A(1-5/8") 113.33- 0.6000 0.6000 120.00 T5 12 LDF5-50A(7/8") 113.33- 0.6000 0.6000 120.00 T5 13 ATCB-BO1(5/16") 113.33- 0.6000 0.6000 120.00 T5 14 FB-L98B-002-XXX(3/8) 113.33- 0.0000 0.0000 120.00 T5 15 WR-VG86ST-BRD(3/4) 113.33- 0.0000 0.0000 120.00 T5 16 FB-L98B-002-XXX(3/8) 113.33- 0.6000 0.6000 120.00 T5 17 WR-VG86ST-BRD(3/4) 113.33- 0.6000 0.6000 120.00 T5 18 Feed Line Ladder 113.33- 0.6000 0.6000 120.00 T5 20 LDF7-50A(1-5/8") 113.33- 0.6000 0.6000 120.00 T5 21 Feed Line Ladder 113.33- 0.6000 0.6000 120.00 T5 23 LDF5-50A(7/8) 113.33- 0.6000 0.6000 120.00 T5 24 LDF12-50(2-1/4) 113.33- 0.6000 0.6000 120.00 T5 25 LDF6-50A(1-1/4) 113.33- 0.6000 0.6000 120.00 T5 26 LDF7-50A(1-5/8") 113.33- 0.6000 0.6000 120.00 T5 29 Feed Line Ladder 113.33- 0.6000 0.6000 120.00 T6 2 Safety Line 3/8 106.67- 0.6000 0.6000 113.33 T6 3 Climbing Ladder(Af) 106.67- 0.6000 0.6000 113.33 T6 5 942-98887-1FXXX(1-1/4) 106.67- 0.6000 0.6000 113.33 T6 6 Feed Line Ladder 106.67- 0.6000 0.6000 113.33 T6 7 MLE Hybrid 9Power/18Fiber 106.67- 0.6000 0.6000 RL 2(1 5/8") 113.33 T6 8 LCF158-50JL(1 5/8") 106.67- 0.6000 0.6000 113.33 T6 9 Feed Line Ladder 106.67- 0.6000 0.6000 113.33 T6 11 LDF7-50A(1-5/8") 106.67- 0.6000 0.6000 113.33 T6 12 LDF5-50A(7/8") 106.67- 0.6000 0.6000 113.33 T6 13 ATCB-BO1(5/16") 106.67- 0.6000 0.6000 113.33 T6 14 FB-L98B-002-XXX(3/8) 106.67- 0.0000 0.0000 113.33 T6 15 WR-VG86ST-BRD(3/4) 106.67- 0.0000 0.0000 113.33 T6 16 FB-L98B-002-XXX(3/8) 106.67- 0.6000 0,6000 113.33 T6 17 WR-VG86ST-BRD(3/4) 106.67- 0.6000 0.6000 113.33 tnxT®W eY Job Page Pasco County (VS) (BU 826548) 13 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Tower Feed Line Description Feed Line K. Ka Section Record No. Segment Elev. No Ice Ice T6 18 Feed Line Ladder 106.67- 0.6000 0.6000 113.33 T6 20 LDF7-50A(I-5/8") 106.67- 0.6000 0.6000 113.33 T6 21 Feed Line Ladder 106.67- 0.6000 0.6000 113.33 T6 23 LDF5-50A(7/8) 106.67- 0.6000 0.6000 113.33 T6 24 LDF12-50(2-1/4) 106.67- 0.6000 0.6000 113.33 T6 25 LDF6-50A(1-1/4) 106.67- 0.6000 0.6000 113.33 T6 26 LDF7-50A(I-5/8") 106.67- 0.6000 0.6000 113.33 T6 29 Feed Line Ladder 106.67- 0.6000 0.6000 113.33 T7 2 Safety Line 3/8 100.00- 0.6000 0.6000 106.67 T7 3 Climbing Ladder(Af) 100.00- 0.6000 0.6000 106.67 17 5 942-98887-IFXXX(1-1/4) 100.00- 0.6000 0.6000 106.67 T7 6 Feed Line Ladder 100.00- 0.6000 0.6000 106.67 17 7 MLE Hybrid 9Power/1 gFiber 100.00- 0.6000 0.6000 RL 2(I 5/8") 106.67 T7 8 LCF158-50JL(1 5/8") 100.00- 0.6000 0.6000 106.67 77 9 Feed Line Ladder 100.00- 0.6000 0.6000 106.67 T7 11 LDF7-50A(I-5/8") 100.00- 0.6000 0.6000 106.67 77 12 LDF5-50A(7/8") 100.00- 0.6000 0.6000 106.67 T7 13 ATCB-BOl(5/16") 100.00- 0.6000 0.6000 106.67 77 14 FB-L98B-002-XXX(3/8) 100.00- 0.0000 0.0000 106.67 T7 15 WR-VG86ST-BRD(3/4) 100.00- 0.0000 0.0000 106.67 T7 16 FB-L98B-002-XXX(3/8) 100.00- 0.6000 0.6000 106.67 T7 17 WR-VG86ST-BRD(3/4) 100.00- 0.6000 0.6000 106.67 T7 18 Feed Line Ladder 100.00- 0.6000 0.6000 106.67 77 20 LDF7-50A(1-5/8") 100.00- 0.6000 0.6000 106.67 T7 21 Feed Line Ladder 100.00- 0.6000 0.6000 106.67 T7 23 LDF5-50A(7/8) 100.00- 0.6000 0.6000 106.67 T7 24 LDF12-50(2-1/4) 100.00- 0.6000 0.6000 106.67 77 25 LDF6-50A(I-1/4) 100.00- 0.6000 0.6000 106.67 17 26 LDF7-50A(1-5/8") 100.00- 0.6000 0.6000 106.67 T7 29 Feed Line Ladder 100.00- 0.6000 0.6000 106.67 T8 2 Safety Line 3/8 80.00-100.00 0.6000 0.6000 T8 3 Climbing Ladder(Af) 80.00-100.00 0.6000 0.6000 huT over .lob Pasco County (VS) (BU 826548) Page 14 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Tower Feed Line Description fO.O Line Ka K. Section Record No. rit Etev. No ke ke T8 5 942-98887-1FXXX(i-1/4) 100.00 0.6000 0.6000 T8 6 Feed Line Ladder 100.00 0.6000 0.6000 T8 7 MLE Hybrid 9Power/I8Fiber 100.00 0.6000 0.6000 RL 2(15/8") T8 8 LCF158-50JL(15/8") . -100.00 0.6000 0.6000 T8 9 Feed Line Ladder 80.00-100.00 0.6000 0.6000 T8 11 LDF7-50A(I-5/8") 80.00-100.00 0,6000 0.6000 T8 12 LDF5-50A(7/8") 80.00-100.00 0.6000 0.6000 T8 13 ATCB-BO1(5/16") 80.00-100.00 0.6000 0.6000 T8 14 FB-L98B-002-XXX(3/8) 80.00-100.00 0.0000 0.0000 T8 15 WR-VG86ST-BRD(3/4) 80.00-100.00 0.0000 0.0000 T8 16 FB-L98B-002-XXX(3/8) MOO-100.00 0.6000 0.6000 T8 17 WR-VG86ST-BRD(3/4) 80.00-100.00 0.6000 0.6000 T8 18 Feed Line Ladder 80.00-100.00 0.6000 0.6000 T8 20 LDF7-50A(I-5/8") 80.00-100.00 0.6000 0.6000 T8 21 Feed Line Ladder MOO-100.00 0.6000 0.6000 T8 23 LDF5-50A(7/8) 80.00-100.00 0.6000 0.6000 T8 24 LDF12-50(2-1/4) 80.00-100.00 0.6000 0.6000 T8 25 LDF6-50A(1-1/4) 80.00-100.00 0.6000 0.6000 T8 26 LDF7-50A(I-5/8") 80.00-100.00 0.6000 0.6000 T8 29 Feed Line Ladder 80.00-100.00 0.6000 0.6000 T9 2 Safety Line 3/8 70.00-80.00 0.6000 0.6000 T9 3 Climbing Ladder(Af) 70.00-80.00 0.6000 0.6000 T9 5 942-98887-1 FXXX(1-1/4) 70.00-80.00 0.6000 0.6000 T9 6 Feed Line Ladder 70.00-80.00 0.6000 0.6000 T9 7 MLE Hybrid 9Power/I8Fiber 70.00-80.00 0.6000 0.6000 RL 2(1 5/8") T9 8 LCF158-5WL(I5/8") MOO-80.00 0.6000 0.6000 T9 9 Feed Line Ladder 70.00-80.00 0,6000 0.6000 T9 I LDF7-50A(1-5/8") 70,00-80.00 0.6000 0.6000 T9 12 LDF5-50A(7/8") 70.00-80-00 0.6000 0.6000 T9 13 ATCB-B01(5/16") 70.00-80.00 0.6000 0.6000 T9 14 FB-L98B-002-XXX(3/8) 70.00-80.00 0.0000 0.0000 T9 15 WR-VG86ST-BRD(3/4) 70.00-WOO 0.0000 0.0000 T9 16 FB-L98B-002-XXX(3/8) 70.00-80.00 0.6000 0.6000 T9 17 WR-VG86ST-BRD(3/4) 70.00-80.00 0.6000 0.6000 T9 18 Feed Line Ladder 70.00-80.00 0.6000 0.6000 T9 20 LDF7-50A(I-5/8") 70.00-80.00 0.6000 0.6000 T9 21 Feed Line Ladder 70.00-80.00 0.6000 0.6000 T9 23 LDF5-50A(7/8) 70.00-MOO 0.6000 0.6000 T9 24 LDF12-50(2-1/4) 70.00-80.00 0.6000 0.6000 T9 25 LDF6-50A(1-1/4) 70.00-80.00 0.6000 0.6000 T9 26 LDF7-50A(i-5/8") 70.00-80.00 0.6000 0.6000 T9 29 Feed Line Ladder 70.00-90.00 0.6000 0.6000 T10 2 Safety Line 3/8 60.00-70.00 0,6000 0.6000 TIO 3 Climbing Ladder(Af) 60.00-70.00 0.6000 0.6000 TIO 5 942-98887-IFXXX(I-1/4) 60,00-MOO 0.6000 0.6000 T10 6 Feed Line Ladder 60.00-70.00 0.6000 0.6000 T10 7 MLE Hybrid 9Power/I8Fiber 60.00-70.00 0.6000 0.6000 RL 2(1 5/8") T10 8 LCF158-50JL(1 5/8") 60.00-70.00 0.6000 0.6000 TIO 9 Feed Line Ladder 60.00-70.00 0.6000 0.6000 T10 11 LDF7-50A(I-5/8") 60.00-70.00 0.6000 0.6000 T10 12 LDF5-50A(7/8") 60.00-70.00 0.6000 0.6000 TIO 13 ATCB-BOI(5/16") 60.00-70.00 0.6000 0.6000 T10 14 FB-L98B-002-XXX(3/8) 60.00-MOO 0.0000 0.0000 T10 15 WR-VG86ST-BRD(3/4) WOO-70.00 0.0000 0.0000 T10 16 FB-L98B-002-XXX(3/8) 60.00-70.00 0.6000 0.6000 TIO 17 WR-VG86ST-BRD(3/4) 60.00-MOO 0.6000 0.6000 T10 18 Feed Line Ladder 60.00-70.00 0.6000 0.6000 T10 20 LDF7-50A(1-5/8") 60.00-70.001 0.60001 0.6000 TIO 21 Feed Line Ladder I 60.00-MOO 1 0.60001 0.6000 tnxTower ,lob Page 15 of 31 Pasco County (VS) (BU 826548) Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 Tower Feed Line Description Feed Line K. K. Section Record No. Segment Elev. No Ice Ice TI0 23 LDF5-50A(7/8) 60.00-70.00 0.6000 0.6000 T10 24 LDF12-50(2-1/4) 60.00-70.00 0.6000 0.6000 TIO 25 LDF6-50A(1-1/4) 60.00-70.00 0.6000 0.6000 TIO 26 LDF7-50A(I-5/8") 60.00-70.00 0.6000 0.6000 TI O 29 Feed Line Ladder 60.00-70.00 0.6000 0.6000 Tit 2 Safety Line 3/8 40.00-60.00 0.6000 0.6000 Tl l 3 Climbing Ladder(Af) 40.00-60.00 0.6000 0.6000 T11 5 942-98887-1 FXXX(I-1/4) 40.00-60.00 0.6000 0.6000 Tl 1 6 Feed Line Ladder 40.00-60.00 0,6000 0.6000 TI 1 7 MLE Hybrid 9Power/18Fiber 40.00-60.00 0.6000 0.6000 RL 2(1 5/8") Tl l 8 LCF158-50IL(1 5/8") 40.00-60.00 0.6000 0.6000 T11 9 Feed Line Ladder 40.00-60.00 0,6000 0.6000 Tit 1 I LDF7-50A(I-5/8") 40.00-60.00 0.6000 0.6000 Tl l 12 LDF5-50A(7/8") 40.00-60.00 0.6000 0.6000 TI 1 13 ATCB-BO1(5116") 40.00-60.00 0.6000 0.6000 Tl 1 14 FB-L98B-002-XXX(3/8) 40.00-60.00 0.0000 0.0000 TI 1 15 WR-VG86ST-BRD(3/4) 40.00-60.00 0.0000 0.0000 Tl 1 16 FB-L98B-002-XXX(3/8) 40.00-60.00 0,6000 0.6000 Tl I 17 WR-VG86ST-BRD(3/4) 40.00-60.00 0.6000 0.6000 Tl 1 18 Feed Line Ladder 40.00-60.00 0.6000 0.6000 Tl 1 20 LDF7-50A(I-5/8") 40.00-60.00 0.6000 0.6000 Tl 1 21 Feed Line Ladder 40.00-60.00 0.6000 0.6000 Tl l 23 LDF5-50A(7/8) 40.00-60.00 0.6000 0.6000 Till 24 LDF12-50(2-1/4) 40.00-60.00 0.6000 0.6000 Tll 25 LDF6-50A(I-1/4) 40.00-60.00 0.6000 0.6000 Tit 26 LDF7-50A(1-5/8") 40.00-60.00 0.6000 0.6000 Tl 1 29 Feed Line Ladder 40.00-60.00 0.6000 0.6000 T12 2 Safety Line 3/8 30.00-40.00 0.6000 0.6000 T12 3 Climbing Ladder(An 30.00-40.00 0.6000 0.6000 Tit 5 942-98887-IFXXX(I-1/4) 30.00-40.00 0.6000 0.6000 T12 6 Feed Line Ladder 30.00-40.00 0.6000 0.6000 T12 7 MLE Hybrid 9Power/18Fiber 30.00-40.00 0.6000 0.6000 RL 2(1 5/8") T12 8 LCF158-50JL(1 5/8") 30.00-40.00 0.6000 0.6000 T12 9 Feed Line Ladder 30.00-40.00 0.6000 0.6000 T12 11 LDF7-50A(1-5/8") 30.00-40.00 0.6000 0.6000 T12 12 LDF5-50A(7/8") 30.00-40.00 0.6000 0.6000 T12 13 ATCB-BO1(5/16") 30.00-40.00 0.6000 0.6000 T12 14 FB-L98B-002-XXX(3/8) 30.00-40.00 0.0000 0.0000 T12 15 WR-VG86ST-BRD(3/4) 30.00-40.00 0,0000 0.0000 T12 16 FB-L98B-002-XXX(3/8) 30,00-40.00 0.6000 0.6000 T12 17 WR-VG86ST-BRD(3/4) 30.00-40.00 0.6000 0.6000 T12 18 Feed Line Ladder 30.00-40.00 0,6000 0.6000 TI2 20 LDF7-50A(1-5/8") 30.00-40.00 0.6000 0.6000 T12 21 Feed Line Ladder 30.00-40.00 0.6000 0.6000 T12 23 LDF5-50A(7/8) 30.00-40.00 0.6000 0.6000 T12 24 LDF12-50(2-1/4) 30.00-40.00 0.6000 0.6000 TI2 25 LDF6-50A(I-1/4) 30.00-40.00 0.6000 0.6000 T12 26 LDF7-50A(1-5/8") 30.00-40.00 0.6000 0.6000 TI2 29 Feed Line Ladder 30.00-40.00 0.6000 0.6000 T13 2 Safety Line 3/8 20.00-30.00 0.6000 0.6000 T13 3 Climbing Ladder(Af) 20.00-MOO 0.6000 0.6000 T13 5 942-98887-1FXXX(1-1/4) 20.00-30.00 0.6000 0.6000 T13 6 Feed Line Ladder 20.00-30.00 0.6000 0.6000 T13 7 MLE Hybrid 9Power/18Fiber 20.00-MOO 0.6000 0.6000 RL 2(1 5/8") T13 8 LCF158-50JL(1 518") 20.00-30.00 0.6000 0.6000 T13 9 Feed Line Ladder 20.00-30.00 0.6000 0.6000 T13 i I LDF7-50A(I-5/8") 20.00-30.00 0.6000 0.6000 T13 12 LDF5-50A(7/8") 20.00-30.OU 0.60001 0.6000 T13 13 ATCB-BOI(5/16"} 20.00-30.40 0.60001 0.6004 t"x 4 owes Job Page Pasco County (VS) (BU 826548) 16 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 Tower Feed Line Description Feed Line K. K. Section Record No. Segment Elev. No Ice Ice T13 14 FB-L98B-002-XXX(3/8) 20.00-30.00 0.0000 0.0000 T13 15 WR-VG86ST-BRD(3/4) 20.00-30.00 0.0000 0.0000 T13 16 FB-L98B-002-XXX(3/8) 20.00-30.00 0.6000 0.6000 T13 17 WR-VG86ST-BRD(3/4) 20.00-30.00 0.6000 0.6000 T13 18 Feed Line Ladder 20.00-30.00 0.6000 0.6000 T13 20 LDF7-50A(I-5/8") 20.00-30.00 0.6000 0.6000 T13 21 Feed Line Ladder 20.00-30.00 0.6000 0.6000 T13 23 LDF5-50A(7/8) 20.00-30.00 0.6000 0.6000 T13 24 LDF12-50(2-1/4) 20.00-30.00 0.6000 0.6000 T13 25 LDF6-50A(1-1/4) 20.00-30.00 0.6000 0.6000 T13 26 LDF7-50A(I-5/8") 20.00-30.00 0.6000 0.6000 T13 29 Feed Line Ladder 20.00-30.00 0.6000 0.6000 T14 2 Safety Line 3/8 0.00-20.00 0.6000 0.6000 T14 3 Climbing Ladder(At) 0.00-20.00 0.6000 0.6000 T14 5 942-98887-IFXXX(I-1/4) 0.00-20.00 0.6000 0.6000 T14 6 Feed Line Ladder 0.00-20.00 0.6000 0.6000 T14 7 MLE Hybrid 9Power/18Fiber 0.00-20.00 0.6000 0.6000 RL 2(1 5/8") T14 8 LCF158-50JL(1 5/8") 0.00-20.00 0.6000 0.6000 T14 9 Feed Line Ladder 0.00-20.00 0.6000 0.6000 T14 11 LDF7-50A(1-5/8") 0.00-20.00 0.6000 0.6000 T14 12 LDF5-50A(7/8") 0.00-20.00 0.6000 0.6000 T14 13 ATCB-BOl(5/16") 0.00-20.00 0.6000 0.6000 T14 14 FB-L98B-002-XXX(3/8) 0.00-20.00 0.0000 0.0000 T14 15 WR-VG86ST-BRD(3/4) 0.00-20.00 0.0000 0.0000 T14 16 FB-L98B-002-XXX(3/8) 0.00-20.00 0.6000 0.6000 T14 17 WR-VG86ST-BRD(3/4) 0.00-20.00 0.6000 0.6000 T14 18 Feed Line Ladder 0.00-20.00 0.6000 0.6000 T14 20 LDF7-50A(I-5/8") 0.00-20.00 0.6000 0.6000 T14 21 Feed Line Ladder 0.00-20.00 0.6000 0.6000 T14 23 LDF5-50A(7/8) 0.00-20.00 0.6000 0.6000 T14 24 LDF12-50(2-1/4) 0.00-20.00 0.6000 0.6000 T14 25 LDF6-50A(1-1/4) 0.00-20.00 0.6000 0.6000 T14 26 LDF7-50A(1-5/8") 0.00-20.00 0.6000 0.6000 T14 29 Feed Line Ladder, 0.00-20.00 0.6000 0.6000 Discrete Tower Loads Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Horz Adjustment Front Side Leg Lateral Vert ft ft fr' f, lb ft fr **190** CMA-BDHH/6521/EO-6 w/ A From 4.00 0.0000 190.00 No Ice 10.32 5.43 101 Mount Pipe Centroid-Fa 0.00 ce 4.00 CMA-BDHH/6521/EO-6 w/ B From 4.00 -30.0000 190.00 No Ice 10.32 5.43 101 Mount Pipe Centroid-Fa -7.00 ce 4.00 CMA-BDHH/6521/EO-6 w/ B From 4.00 60.0000 190.00 No Ice 10.32 5.43 101 Mount Pipe Centroid-Fa 7.00 ce 4.00' Job Page �12. �f1WeY Pasco County (VS) (BU 826548) 17 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX.(919)661-6350 Cdcrook Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Horz Adjustment Front Side Leg Lateral Vert ft ft lb ft ft CMA-BDHH/6521/EO-6 w/ C From 4.00 30.0000 190.00 No Ice 10.32 5.43 101 Mount Pipe Centroid-Fa 0.00 ce 4.00 RNSNDC-7771-PF-48 B From 4.00 -30.0000 190.00 No Ice 3.20 1.03 19 Centroid-Fa -7.00 ce 4.00 SBNHH-1D65C w/Mount A From 4.00 0.0000 190.00 No Ice 5.56 4.47 83 Pipe Centroid-Fa -7.00 ce 4.00 SBNHH-1D65C w/Mount A From 4.00 90.0000 190.00 No Ice 5.56 4.47 83 Pipe Centroid-Fa 7.00 ce 4.00 SBNHH-1D65C w/Mount B From 4.00 60.0000 190.00 No Ice 5.56 4.47 83 Pipe Centroid-Fa 0.00 ce 4.00 SBNHH-ID65C w/Mount C From 4.00 30.0000 190.00 No Ice 5.56 4.47 83 Pipe Centroid-Fa -7.00 ce 4.00 FHFB A From 4.00 0.0000 190.00 No Ice 3.63 2.39 53 Centroid-Fa -7.00 ce 4.00 FHFB A From 4.00 90.0000 190.00 No Ice 3.63 2.39 53 Centroid-Fa 7.00 ce 4.00 FHFB B From 4.00 60.0000 190.00 No Ice 3.63 2.39 53 Centroid-Fa 0.00 ce 4.00 FHFB C From 4.00 30.0000 190.00 No Ice 3.63 2.39 53 Centroid-Fa -7.00 ce 4.00 (2)ECC1920-VPUB A From 4.00 0.0000 190.00 No Ice 0.46 0.17 8 Centroid-Fa 0.00 ce 4.00 (2)ECC1920-VPUB B From 4.00 -30.0000 190.00 No Ice 0.46 0.17 8 Centroid-Fa -7.00 ce 4.00 (4)ECC1920-VPUB C From 4.00 30.0000 190.00 No Ice 0.46 0.17 8 Centroid-Fa -3.50 ce 4.00 FRIG B From 4.00 -30.0000 190.00 No Ice 2.39 0.97 57 Centroid-Fa -7.00 ce 4.00 (2)FRIG B From 4.00 60.0000 190.00 No Ice 2.39 0.97 57 Centroid-Fa 7.00 ce 4.00 FRIG C From 4.00 30.0000 190.00 No Ice 2.39 0.97 57 Centroid-Fa -7.00 ce 4.00 FXFB A From 4.00 0.0000 190.00 No Ice 3.54 1.02 55 Centroid-Fa 0.00 ce 4.00 (2)FXFB C From 4.00 30.0000 190.00 No Ice 3.54 1.02 55 Centroid-Fa -3.50 ce 4.00 FRIE A From 4.00 0.0000 190.00 No Ice 3.54 1.01 55 Centroid-Fa 0.00 ce 4.00 tnxTower Job Page Pasco County (VS) (BU 826548) 18 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Phone:(919)661-6351 Designed by FAX.(919)661-6350 Crown Castle CdcrOOk Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Harz Adjustment Front Side Leg Lateral Vert h h lb ft h FRIE C From 4.00 30.0000 190.00 No Ice 3.54 1.01 55 Centroid-Fa 0.00 cc 4.00 (2)E15SO8P77 A From 4.00 0.0000 190.00 No Ice 0.46 0.20 8 Centroid-Fa 0.00 cc 4.00 (2)E15S08P77 B From 4.00 -30.0000 190.00 No Ice 0.46 0.20 8 Centroid-Fa -7.00 ce 4.00 E15S08P77 B From 4.00 60.0000 190.00 No Ice 0.46 0.20 8 Centroid-Fa 7.00 cc 4.00 E15SO8P77 C From 4.00 30.0000 190.00 No Ice 0:46 0.20 8 Centroid-Fa 0.00 ce 4.00 DC448-60-8-20E-00 A From 4.00 0.0000 190.00 No Ice 0.72 0.70 13 Centroid-Fa -7.00 cc 4.00 (4)2.4"x 4-ft pipe A From 4.00 0.0000 190.00 No Ice 0.00 0.87 15 Centroid-Fa 0.00 ce 2.00 (4)2.4"x 4-ft pipe B From 4.00 0.0000 190.00 No Ice 0.00 0.87 15 Centroid-Fa 0.00 cc 2.00 (4)2.4"x 4-ft pipe C From 4.00 0.0000 190.00 No Ice 0.00 0.87 15 Centroid-Fa 0.00 ce 2.00 2.4"Dia x 6-ft Pipe A From 4.00 0.0000 190.00 No Ice 1.43 1.43 22 Centroid-Fa -2.00 cc 3.00 2.4"Dia x 6-ft Pipe B From 4.00 0.0000 190.00 No Ice 1.43 1.43 22 Centroid-Fa 0.00 ce 3.00 (2)2.4"Dia x 6-ft Pipe C From 4.00 0.0000 190.00 No Ice 1.43 1.43 22 Centroid-Fa 0.00 ce 3.00 8'Ladder A From 2.00 0.0000 190.00 No Ice 1.53 5.33 97 Centroid-Fa 0.00 ce -4.00 Platform Mount[LP 102-1] C None 0.0000 190.00 No Ice 60.49 60.49 3780 **171** DBXNH-6565B-R2M w/ A From Leg 4.00 -60.0000 171.00 No Ice 4.09 3.30 72 Mount Pipe -6.00 4.00 DBXNH-6565B-R2M w/ B From Leg 4.00 -60.0000 171.00 No Ice 4.09 3.30 72 Mount Pipe -6.00 4.00 DBXNH-6565B-R2M w/ C From Leg 4.00 -60.0000 171.00 No Ice 4.09 3.30 72 Mount Pipe -6.00 4.00 SBJAH4-1D65B-DL w/ A From Leg 4.00 -60.0000 171.00 No Ice 5.51 4.38 91 Mount Pipe -2.00 4.00 SBJAH4-ID65B-DL w/ B From Leg 4.00 -60.0000 171.00 No Ice 5.51 4.38 91 Mount Pipe -2.00 4.00 SBJAH4-ID65B-DL w/ C From Leg 4.00 -60.0000 171.00 No Ice 5.51 4.38 91 b tnxTower Jo Pasco County (VS) (BU 826548) Page19 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Description Face Offset Offsets: Azimuth Placement CAA CAAA Weight or Type Hon Adjustment Front Side Leg Lateral Vert ft 0ft ftz ftz lb ft ft Mount Pipe -2.00 4.00 (2)NNHH-65B-R4_CCIV2 A From Leg 4.00 -60.0000 171.00 No Ice 7.55 4.23 110 w/Mount Pipe -4.00 4.00 (2)NNHH-65B-R4_CCIV2 B From Leg 4.00 -60.0000 171.00 No Ice 7.55 4.23 110 w/Mount Pipe -4.00 4.00 (2)NNHH-65B-R4_CCIV2 C From Leg 4.00 -60.0000 171.00 No Ice 7.55 4.23 110 w/Mount Pipe -4.00 4.00 DC2-48-60-0-9E A From Leg 4.00 -60.0000 171.00 No Ice 0.99 0.60 16 -6.00 4.00 DC248-60-0-9E A From Leg 4.00 -60.0000 171.00 No Ice 0.99 0.60 16 -2.00 4.00 (2)DC2-48-60-0-9E B From Leg 4.00 -60.0000 171.00 No Ice 0.99 0.60 16 -6.00 4.00 DC2-48-60-0-9E B From Leg 4.00 -60.0000 171.00 No Ice 0.99 0.60 16 -6.00 4.00 DC2-48-60-0-9E C From Leg 4.00 -60.0000 171.00 No Ice 0.99 0.60 16 -2.00 4.00 RRUS 4478 B14_CCIV2 A From Leg 4.00 -60.0000 171.00 No Ice 2.02 1.25 59 -6.00 4.00 RRUS 4478 B14_CCIV2 B From Leg 4.00 -60.0000 171.00 No Ice 2.02 1.25 59 -6.00 4.00 RRUS 4478 B 14_CCIV2 C From Leg 4.00 -60.0000 171.00 No Ice 2.02 1.25 59 -6.00 4.00 DC6-48-60-18-8F A From Leg 4.00 -60.0000 171.00 No Ice 1.21 1.21 33 -2.00 4.00 RRUS 32 A From Leg 4.00 -60.0000 171.00 No Ice 2.86 1.78 55 -2.00 4.00 RRUS 32 B From Leg 4.00 -60.0000 171.00 No Ice 2.86 1.78 55 -2.00 4.00 RRUS 32 C From Leg 4.00 -60.0000 171.00 No Ice 2.86 1.78 55 -2.00 4.00 RRUS 32 B66 A From Leg 4.00 -60.0000 171.00 No Ice 2.74 1.67 53 -2.00 4.00 (2)RRUS 32 B66 B From Leg 4.00 -60.0000 171.00 No Ice 2.74 1.67 53 0.00 4.00 RRUS 32 B2 A From Leg 4.00 -60.0000 171.00 No Ice 2.73 1.67 53 -2.00 4.00 (2)RRUS 32 B2 B From Leg 4.00 -60.0000 171.00 No Ice 2.73 1.67 53 tn Job Page xTower Pasco County (VS) (BU 826548) 20 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX.(919)661-6350 CCjCfOO1( Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Harz Adjustment Front Side Leg Lateral Vert ft ft lb ft h 0.00 4.00 DC6-48-60-18-8C A From Leg 4.00 -60.0000 171.00 No Ice 1.14 1.14 26 -2.00 4.00 DC6-48-60-18-8C B From Leg 4.00 -60.0000 171.00 No Ice 1.14 1.14 26 -6.00 4.00 RRUS 4449 B5/B 12 A From Leg 4.00 -60.0000 171.00 No Ice 1.97 1.41 71 -2.00 4.00 RRUS 4449 B5B 12 B From Leg 4.00 -60.0000 171.00 No Ice 1.97 1.41 71 -2.00 4.00 RRUS 4449 135/13 12 C From Leg 4.00 -60.0000 171.00 No Ice 1.97 1.41 71 -2.00 4.00 E15S09P78 B From Leg 4.00 -60.0000 171.00 No Ice 0.75 0.34 17 6.00 4.00 (2)E15S09P78 C From Leg 4.00 -60.0000 171.00 No Ice 0.75 0.34 17 0.00 4.00 (2)2.9"Dia.x 8'Pipe A From Leg 4.00 0.0000 171.00 No Ice 2.30 2.30 46 4.00 0.00 (2)2.9"Dia.x 8'Pipe B From Leg 4.00 0.0000 171.00 No Ice 2.30 2.30 46 4.00 0.00 (2)2.9"Dia.x 8'Pipe C From Leg 4.00 0.0000 171.00 No Ice 2.30 2.30 46 4.00 0.00 2.4"Dia x 12-ft Pipe A From Leg 4.00 0.0000 171.00 No Ice 2.86 2.86 40 3.00 0.00 2.4"Dia x 12-ft Pipe B From Leg 4.00 0.0000 171.00 No Ice 2.86 2.86 40 3.00 0.00 2.4"Dia x 12-ft Pipe C From Leg 4.00 0.0000 171.00 No Ice 2.86 2.86 40 3.00 0.00 (2)L2 1/2x2 1/2xl/4 x 4'-4" A From Leg 2.00 0.0000 171.00 No Ice 1.68 1.68 18 0.00 0.00 (2)L2 1/2x2 1/2xl/4 x 4'-4" B From Leg 2.00 0.0000 171.00 No Ice 1.68 1.68 18 0.00 0.00 (2)L2 1/2x2 1/2x1/4 x 4'-4" C From Leg 2.00 0.0000 171.00 No Ice 1.68 1.68 18 0.00 0.00 Sector Mount[SM 503-31 C None 0.0000 171.00 No Ice 30.43 30.43 1691 **160** (2)MX06FRO860-02 w/ A From Leg 4.00 -60.0000 160.00 No Ice 8.84 7.49 112 Mount Pipe -3.00 0.00 (2)MX06FRO860-02 w/ B From Leg 4.00 0.0000 160.00 No Ice 8.84 7.49 112 Mount Pipe 4.50 Job Page t32X�'IpW�Y Pasco County (VS) (BU 826548) 21 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX:(919)661-6350 1 1 cdcrook Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Harz Adjustment Front Side Leg Lateral Vert ft 0 ft ftz ft2 lb ft ft 0.00 (2)MX06FRO860-02 w/ C From Leg 4.00 -40.0000 160.00 No Ice 8.84 7.49 112 Mount Pipe -3.00 0.00 RRFDC-3315-PF-48 A From Leg 4.00 -60.0000 160.00 No Ice 3.36 2.19 21 3.00 0.00 (2)RRUS 32 B2 A From Leg 4.00 -60.0000 160.00 No Ice 2.73 1.67 53 3.00 0.00 RRUS 32 B2 B From Leg 4.00 0.0000 160.00 No Ice 2.73 1.67 53 3.00 0.00 KRY901369_CCIV2 A From Leg 4.00 -60.0000 160.00 No Ice 1.16 0.77 23 3.00 0.00 KRY901369_CCIV2 B From Leg 4.00 0.0000 160.00 No Ice 1.16 0.77 23 3.00 0.00 KRY901369_CCIV2 C From Leg 4.00 40.0000 160.00 No Ice 1.16 0.77 23 3.00 0.00 RVZDC-6627-PF-48 A From Leg 4.00 -60.0000 160.00 No Ice 3.79 2.51 32 3.00 0.00 RRUS 4449 B51B 12 A From Leg 4.00 -60.0000 160.00 No Ice 1.97 1.41 71 3.00 0.00 RRUS 4449 B51B 12 B From Leg 4.00 0.0000 160.00 No Ice 1.97 1.41 71 3.00 0.00 RRUS 4449 B5B 12 C From Leg 4.00 -40.0000 160.00 No Ice 1.97 1.41 71 3.00 0.00 RRUS 32 B66 B From Leg 4.00 0.0000 160.00 No Ice 2.74 1.67 53 3.00 0.00 (2)RRUS 32 B66 C From Leg 4.00 -40.0000 160.00 No Ice 2.74 1.67 53 3.00 0.00 (2)2.4"Dia.x 6-ft A From Leg 4.00 0.0000 160.00 No Ice 1.43 1.43 22 3.00 0.00 (2)2.4"Dia.x 6-ft B From Leg 4.00 0.0000 160.00 No Ice 1.43 1.43 22 -3.00 0.00 (2)2.4"Dia.x 6-ft C From Leg 4.00 0.0000 160.00 No Ice 1.43 1.43 22 3.00 0.00 Site Pro I VFA14-HD A From Leg 2.00 0.0000 160.00 No Ice 14.40 9.20 672 0.00 0.00 Site Pro I VFA14-HD B From Leg 2.00 0.0000 160.00 No Ice 14.40 9.20 672 0.00 0.00 Site Pro I VFA14-HD C From Leg 2.00 0.0000 160.00 No Ice 14.40 9.20 672 0.00 tn Job Page xTowe� Pasco County (VS) (BU 826548) 22 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC 27603 Client Designed by Phase:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Horz Adjustment Front Side Leg Lateral Vert ft ft ft, f 2 lb ft h 0.00 **148** APXVERRI8-C w/Mount A From Leg 4.00 0.0000 148.00 No Ice 4.60 4.01 83 Pipe 0.00 1.00 APXVERRI8-C w/Mount B From Leg 4.00 0.0000 148.00 No Ice 4.60 4.01 83 Pipe 0.00 1.00 APXVERRI8-C w/Mount C From Leg 4.00 0.0000 148.00 No Ice 4.60 4.01 83 Pipe 0.00 1.00 AIR 6488 B41 w/Mount Pipe A From Leg 4.00 0.0000 148.00 No Ice 6.20 3.54 127 6.00 1.00 AIR 6488 B41 w/Mount Pipe B From Leg 4.00 0.0000 148.00 No Ice 6.20 3.54 127 6.00 1.00 AIR 6488 B41 w/Mount Pipe C From Leg 4.00 0.0000 148.00 No Ice 6.20 3.54 127 6.00 1.00 RRUS 31 B25 A From Leg 4.00 0.0000 148.00 No Ice 1.62 1.28 56 0.00 2.00 RRUS 31 B25 B From Leg 4.00 0.0000 148.00 No Ice 1.62 1.28 56 0.00 2.00 RRUS 31 B25 C From Leg 4.00 0.0000 148.00 No Ice 1.62 1.28 56 0.00 2.00 RRUS I I A From Leg 4.00 0.0000 148.00 No Ice 2.79 1.19 51 0.00 2.00 RRUS 11 B From Leg 4.00 0.0000 148.00 No Ice 2.79 1.19 51 0.00 2.00 RRUS 11 C From Leg 4.00 0.0000 148.00 No Ice 2.79 1.19 51 0.00 2.00 (3)ACU-A20-N A From Leg 4.00 0.0000 149.00 No Ice 0.07 0.12 1 0.00 2.00 (3)ACU-A20-N B From Leg 4.00 0.0000 148.00 No Ice 0.07 0.12 1 0.00 2.00 (3)ACU-A20-N C From Leg 4.00 0.0000 148.00 No Ice 0.07 0.12 1 0.00 2.00 800MHz SMR Filter A From Leg 4.00 0.0000 148.00 No Ice 0.65 0.22 9 0.00 2.00 800MHz SMR Filter B From Leg 4.00 0.0000 148.00 No Ice 0.65 0.22 9 0.00 2.00 800MHz SMR Filter C From Leg 4.00 0.0000 148.00 No Ice 0.65 0.22 9 0.00 2.00 2.4"Dia x 8-ft Mount Pipe A From Leg 4.00 0.0000 148.00 No Ice 1.90 1.90 29 t3ZxTower Job Page Pasco County (VS) (BU 826548) 23 of 31 Tolver Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Harz Adjustment Front Side Leg Lateral Vert ft .ft f>� ft� lb ft ft -6.00 0.00 2.4"Dia x 8-ft Mount Pipe B From Leg 4.00 0.0000 148.00 No Ice 1.90 1.90 29 -6.00 0.00 2.4"Dia x 8-ft Mount Pipe C From Leg 4.00 0.0000 148.00 No Ice 1.90 1.90 29 -6.00 0.00 Site Pro 1 VFA12-HD A From Leg 2.00 0.0000 148.00 No Ice 13.20 9.20 658 0.00 0.00 Site Pro I VFA12-HD B From Leg 2.00 0.0000 148.00 No Ice 13.20 9.20 658 0.00 0.00 Site Pro 1 VFA12-HD C From Leg 2.00 0.0000 148.00 No Ice 13.20 9.20 658 0.00 0.00 **140** HB-X-AW-23-33-OOT A From Leg 4.00 -60.0000 140.00 No Ice 3.52 3.52 44 6.00 0.00 HB-X-AW-23-33-OOT B From Leg 4.00 -60.0000 140.00 No Ice 3.52 3.52 44 6.00 0.00 HB-X-AW-23-33-OOT C From Leg 4.00 -60.0000 140.00 No Ice 3.52 3.52 44 6.00 0.00 Sector Mount[SM 402-3] A None 0.0000 140.00 No Ice 18.87 18.87 851 Load Combinations Comb. Description No. 1 Dead Only 2 1.2 Dead+1.0 Wind 0 deg-No Ice 3 0.9 Dead+1.0 Wind 0 deg-No Ice 4 1.2 Dead+1.0 Wind 30 deg-No Ice 5 0.9 Dead+1.0 Wind 30 deg-No Ice 6 1.2 Dead+1.0 Wind 60 deg-No Ice 7 0.9 Dead+I.0 Wind 60 deg-No Ice 8 1.2 Dead+1.0 Wind 90 deg-No Ice 9 0.9 Dead+1.0 Wind 90 deg-No Ice 10 1.2 Dead+I.0 Wind 120 deg-No Ice 11 0.9 Dead+1.0 Wind 120 deg-No Ice 12 1.2 Dead+1.0 Wind 150 deg-No Ice 13 0.9 Dead+1.0 Wind 150 deg-No Ice 14 1.2 Dead+1.0 Wind 180 deg-No Ice 15 0.9 Dead+1.0 Wind 180 deg-No Ice 16 1.2 Dead+1.0 Wind 210 deg-No Ice 17 0.9 Dead+1.0 Wind 210 deg-No Ice Job Page t�t'xI Uwer Pasco County (VS) (BU 826548) 24 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX:(919)661-6350 cdcrook Comb. Description No. 18 1.2 Dead+1.0 Wind 240 deg-No Ice 19 0.9 Dead+1.0 Wind 240 deg-No Ice 20 1.2 Dead+1.0 Wind 270 deg-No Ice 21 0.9 Dead+1.0 Wind 270 deg-No Ice 22 1.2 Dead+1.0 Wind 300 deg-No Ice 23 0.9 Dead+1.0 Wind 300 deg-No Ice 24 1.2 Dead+1.0 Wind 330 deg-No Ice 25 0.9 Dead+1.0 Wind 330 deg-No Ice 26 Dead+Wind 0 deg-Service 27 Dead+Wind 30 deg-Service 28 Dead+Wind 60 deg-Service 29 Dead+Wind 90 deg-Service 30 Dead+Wind 120 deg-Service 31 Dead+Wind 150 deg-Service 32 Dead+Wind 180 deg-Service 33 Dead+Wind 210 deg-Service 34 Dead+Wind 240 deg-Service 35 Dead+Wind 270 deg-Service 36 Dead+Wind 300 deg-Service 37 Dead+Wind 330 deg-Service Maximum Tower Deflections - Service Wind Section Elevation Horz. Gov. Tilt Twist No. Deflection Load ft in Comb. ° T1 190-180 4.807 27 0.2318 0.0200 T2 180-160 4.315 27 0.2271 0.0213 T3 160-140 3.370 27 0.2026 0.0239 T4 140-120 2.569 27 0.1683 0.0238 T5 120-113.333 1.873 26 0.1443 0.0209 T6 113.333-106.667 1.663 26 0.1350 0.0194 T7 106.667-100 1.466 26 0.1251 0.0178 T8 100-80 1.291 26 0.1146 0.0167 T9 80-70 0.827 26 0.0911 0.0127 T I0 70-60 0.630 26 0.0784 0.0105 Tl 1 60-40 0.472 26 0.0652 0.0093 T12 40-30 0.219 26 0.0425 0.0059 TI 3 30-20 0.126 26 0.0307 0.0041 T14 20-0 0.068 26 0.0186 0.0032 Critical Deflections and Radius of Curvature - Service Wind Elevation Appurtenance Gov. Deflection Tilt Twist Radius of Load Curvature ft Comb. in oft 190.00 CMA-BDHH/6521/EO-6 w/Mount 27 4.807 0.2318 0.0200 445363 Pipe 171.00 DBXNH-6565B-R2M w/Mount 27 3.877 0.2185 0.0226 50660 Pipe 160.00 (2)MX06FRO860-02 w/Mount 27 3.370 0.2026 0.0239 26818 Pipe 148.00 APXVERR18-C w/Mount Pipe 27 2.874 0.1813 0.0242 37903 140.00 HB-X-AW-23-33-OOT 27 2.569 0.1683 0.0238 53933 tnxl'®wer Job Page 25 of 31 Pasco County (VS) (BU 826548) Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 Maximum Tower Deflections - Design Wind Section Elevation Hor. Gov. Tilt Twist No. Deflection Load ft in Comb. ° T1 190-180 23.779 4 1.1434 0.0993 T2 ISO-160 21.349 4 1.1208 0.1055 T3 160-140 16.682 4 1.0015 0.1184 T4 140-120 12.720 4 0.9327 0.1180 T5 120-113.333 9.272 4 0.7143 0.1037 T6 113.333-106.667 8.227 4 0.6682 0.0961 77 106.667-100 7.252 4 0.6195 0.0879 T8 100-80 6.386 2 0.5675 0.0828 T9 80-70 4.091 2 0.4509 0.0627 T10 70-60 3.116 2 0.3879 0.0520 Tl 1 60-40 2.336 2 0.3223 0.0458 T12 40-30 1.083 2 0.2103 0.0290 T13 30-20 0.623 2 0.1518 0.0205 T14 20-0 0.335 2 0.0920 0.0157 Critical Deflections and Radius of Curvature - Design Wind Elevation Appurtenance Gov. Deflection Tilt Twist Radius of Load Curvature ft Comb. in ft 190.00 CMA-BDHH/6521/EO-6 w/Mount 4 23.779 1.1434 0.0993 113126 Pipe 171.00 DBXNH-6565B-R2M w/Mount 4 19.188 1.0793 0.1120 10411 Pipe 160.00 (2)MX06FRO860-02 w/Mount 4 16,682 1.0015 0.1184 5467 Pipe 148.00 APXVERRI8-C w/Mount Pipe 4 14.226 0.8968 0.1200 7708 140.00 HB-X-AW-23-33-OOT 4 12.720 0.8327 0.1180 10936 Bolt Design Data Section Elevation Component Bolt Bolt Size Number Maximum Allowable Ratio Allowable Criteria No. Type Grade Of Load Load Load Ratio ft in Bolts per Bolt per Bolt Allowable lb lb Tl 190 Leg A325N 0.7500 4 2543 30101 0.084 1.05 Bolt Tension Diagonal A325N 0.5000 2 1950 4996 0.390 1.05 Member Block Shear Top Girt A325N 0.5000 1 1529 8265 0.185 1.05 Member Bearing T2 180 Leg A325N 0.8750 4 13202 41556 0.318 1.05 Bolt Tension Diagonal A325N 0.5000 2 4123 5505 0.749 1.05 Member Block Shear Top Girt A325N 0.5000 1 32 8265 0.004 1.05 Member Bearing T3 160 Leg A325N 1.0000 6 17859 54517 0.328 1.05 Bolt Tension Diagonal A325X 0.7500 1 10872 17944 0.606 1.05 Member Block Shear Top Girt A325N 0.7500 1 216 18923 0.011 1.05 Gusset Bearing tnxTower Job Pasco County (VS) (BU 826548) Page26 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 Section Elevation Component Bolt Bolt Size Number Maximum Allowable Ratio Allowable Criteria No. Type Grade Of Load Load Load Ratio ft in Bolts per Bolt per Bolt Allowable lb lb T4 140 Leg A325N 1.5000 4 42670 126472 0.337 1.05 Bolt Tension Diagonal A325N 0.6250 2 6044 7697 0.785 1.05 Member Block Shear Top Girt A325N 0.6250 1 2984 13806 0.216 1.05 Bolt Shear T5 120 Diagonal A325N 0.6250 2 6208 7697 0.806 1.05 Member Block Shear Top Girt A325N 0.6250 1 2283 13806 0.165 1.05 Bolt Shear T6 113.333 Diagonal A325N 0.6250 2 6378 7697 0.829 1.05 Member Block Shear T7 106.667 Leg A325N 1.5000 6 38722 126472 0.306 1.05 Bolt Tension Diagonal A325X 0.6250 2 6954 15395 0.452 1.05 Member Block Shear T8 100 Leg A325N 1.5000 6 47944 126472 0.379 1.05 Bolt Tension Diagonal A325N 0.7500 2 8366 12506 0.669 1.05 Member Block Shear Top Girt A325N 0.7500 1 4288 18923 0.227 1.05 Member Bearing T9 80 Diagonal A325N 0.6250 2 8065 11623 0.694 1.05 Member Block Shear Top Girt A325N 0.6250 1 4333 13050 0.332 1.05 Member Bearing T10 70 Leg A325N 1.5000 6 57837 126472 0.457 1.05 Bolt Tension Diagonal A325X 0.6250 2 9170 23245 0.394 1.05 Member Block Shear T11 60 Leg A325N 1.5000 6 67626 126472 0.535 1.05 Bolt Tension Diagonal A325N 0.7500 2 9671 18759 0.516 1.05 Member Block Shear Top Girt A325N 0.7500 1 5921 15769 0.375 1.05 Member Bearing T12 40 Diagonal A325N 0.7500 2 9158 18759 0.488 1.05 Member Block Shear Top Girt A325N 0.7500 1 5573 15769 0.353 1.05 Member Bearing T13 30 Leg A325N 1.5000 6 77161 126472 0.610 1.05 Bolt Tension Diagonal A325X 0.7500 2 10598 33495 0.316 1.05 Gusset Bearing T14 20 Diagonal A325N 0.7500 2 10854 18759 0.579 1.05 Member Block Shear Top Girt A325N 0.7500 1 5962 15769 0.378 1.05 Member Bearing Compression Checks Leg Design Data (Compression) Section Elevation Size L L KI/r A P �P Ratio No. P. ft ft ft in2 lb lb OP. Tl 190-180 Pipe 2.5 STD 10.00 5.00 63.3 1.7040 -14574 53866 0.271 K=1.00 T2 180-160 PIPE 3.5 STD 20.00 5.00 44.9 2.6795 -62598 96872 0.6461 K=1.00 T3 160-140 Pipe 5 STD 20.02 6.67 42.7 4.2974 -124606 157400 0.7921 K=1.00 T4 140-120 Pipe 8 STD 20.02 6.67 27.3 8.3993 -194337 330771 0.5881 K=1.00 T5 120-113.333 Pipe 8 STD 6.67 6.67 27.3 8.3993 -217173 330771 0.6571 K=1.00 Job Page U491lt"XT e� Pasco County (VS) (BU 826548) 27 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle FAX:(919)661-6350 CC1Cf001( Section Elevation Size L L Kl/r A P OP Ratio No. P ft ft ft in' lb lb OP. T6 113.333- Pipe 8 STD 6.67 6.67 27.3 8.3993 -240315 330771 0.7271 106.667 K=1.00 77 106.667-100 Pipe 8 STD 6.67 6.67 27.3 8.3993 -261611 330771 0.791 1 K=1.00 T8 100-80 Pipe 10 STD(SCH40) 20.02 10.01 32.5 11.9656 -323189 461312 0.701 1 K=1.00 T9 80-70 Pipe 10 STD(SCH40) 10.01 10.01 32.5 11.9656 -356560 461312 0.7731 K=1.00 T10 70-60 Pipe 10 STD(SCH40) 10.01 10.01 32.5 11.9656 -389555 461312 0.8441 K=1.00 Tl 1 60-40 Pipe 12 STD 20.02 10.01 27.4 14.5790 -456498 573746 0.7961 K=1.00 T12 40-30 Pipe 12 STD 10.01 10.01 27.4 14.5790 -489570 573746 0.8531 K=1.00 T13 30-20 Pipe 12 STD 10.01 10.01 27.4 14.5790 -522243 573746 0.910 1 K=1.00 T14 20-0 Pipe 12 XH 2O.02 10.01 27.7 19.2423 -588158 756510 0.7771 K=1.00 1 P /op,controls Diagonal Design Data (Compression) Section Elevation Size L L KI/r A P OP Ratio No. P. ft ft ft in2 lb lb OP. T1 190-180 Ll 3/4x1 3/4x3/16 9.43 4.41 146.0 0.6211 -3914 8341 0.4691 K=0.95 12 180-160 L2x2x3/16 9.43 4.35 129.6 0.7150 -8329 12176 0.6941 K=0.98 T3 160-140 2L2 1/2x2 1/20/160/8 11.52 5.51 85.0 1.8000 -11795 50089 0.235 1 K=1.00 T4 140-120 L3x3x3/16 12.91 6.00 120.7 1.0900 -12306 21145 0.5821 K=1.00 T5 120-113.333 L3x3x3/16 13.39 6.24 124.4 1.0900 -12645 20094 0.6291 K=0.99 T6 113.333- L3x3x3/16 13.87 6.49 128.1 1.0900 -12617 19000 0.6641 106.667 K=0.98 T7 106.667-100 2L3x3x3/16xl/2 14.36 6.74 86.0 2.1797 -14262 58762 0.2431 K=1.00 T8 100-80 L3 1/20 1/2xl/4 17.41 8.18 136.4 1.6900 -16900 26003 0.6501 K=0.96 T9 80-70 L31/201/2xl/4 18.10 8.56 141.4 1.6900 -16375 24191 0.6771 K=0.96 TIO 70-60 2L31/201/2xl/4xl/2 18.80 8.92 98.0 3.3750 -18669 84780 0.2201 K=1.00 T11 60-40 L3 1/20 MOM 20.23 9.51 155.2 2.4800 -19565 29456 0.6641 K=0.93 T12 40-30 L3 1/20 1/20/8 20.96 9.88 160.1 2.4800 -18640 27681 0.6731 K=0.93 T13 30-20 2L31/201/2x3/8xl/2 21.69 10.25 114.6 4.9688 -21674 105031 0.2061 K=1.00 T14 20-0 L4x4x3/8 23.19 11.01 156.3 2.8600 -22039 33503 0.658 1 K=0.93 Job Page tnxT Tower Pasco County (VS) (BU 826548) 28 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 1 P /oP Controls Top Girt Design Data (Compression) Section Elevation Size L L KI/r A P OP Ratio No. P. ft ft ft in' lb lb OP Tl 190-180 L3 1/20 1/2xl/4 8.00 7.55 130.6 1.6900 -1550 28367 0.0551 K=1.00 T4 140-120 L3 1/2x3 MOM 9.67 8.96 156.6 2.4800 -2392 28955 0.083 1 K=1.00 T5 120-113.333 L4x4x3/8 11.33 10.38 158.0 2.8600 -1944 32793 0.0591 K=1.00 T8 100-80 L4x4x3/8 13.00 12.01 182.9 2.8600 -3871 24470 0.1581 K=1.00 T9 80-70 L5x5x5/16 14.67 13.53 163.3 3.0300 -4044 32519 0.1241 K=1.00 Tll 60-40 L5x5x5/16 16.33 15.16 183.0 3.0300 -5520 25883 0.2131 K=1.00 T12 40-30 L5x5x5/16 18.00 16.67 201.2 3.0300 -5199 21422 0.2431 K=1.00 KL/R>200(C)-187 T14 20-0 L5x5x5/16 19.67 18.33 221.3 3.0300 -5476 17704 0.309 1 K=1.00 KL/R>200(C)-208 'P u /OP.controls Tension Checks Leg Design Data (Tension) Section Elevation Size L L KI/r A P OP. Ratio No. P ft ft ft in2 lb lb OP. T1 190-180 Pipe 2.5 STD 10.00 5.00 63.3 1.7040 10171 70548 0.1441 T2 180-160 PIPE 3.5 STD 20.00 5.00 44.9 2.6795 52808 110933 0.4761 T3 160-140 Pipe 5 STD 20.02 6.67 42.7 4.2974 107154 177914 0.6021 T4 140-120 Pipe 8 STD 20.02 6.67 27.3 8.3993 170681 347729 0.4911 T5 120-113.333 Pipe 8 STD 6.67 6.67 27.3 8.3993 191543 347729 0.551 1 T6 113.333- Pipe 8 STD 6.67 6.67 27.3 8.3993 212548 347729 0.6111 106.667 17 106.667-100 Pipe 8 STD 6.67 6.67 27.3 8.3993 232334 347729 0.6681 T8 100-80 Pipe 10 STD(SCH40) 20.02 10.01 32.5 11.9656 287664 495377 0.5811 T9 80-70 Pipe 10 STD(SCH40) 10.01 10.01 32.5 11.9656 317541 495377 0.641 1 T10 70-60 Pipe 10 STD(SCH40) 10.01 10.01 32.5 11.9656 347023 495377 0.701.1 Tl 1 60-40 Pipe 12 STD 20.02 10.01 27.4 14.5790 405758 603569 0.6721 T12 40-30 Pipe 12 STD 10.01 10.01 27.4 14.5790 434594 603569 0.7201 T13 30-20 Pipe 12 STD 10.01 10.01 27.4 14.5790 462969 603569 0.7671 T14 20-0 Pipe 12 XH 2O.02 10.01 27.7 19.2423 519010 796629 0.6521 Job Page t- -1 -wet' Pasco County (VS) (BU 826548) 29 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tnlon Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX:(919)661-6350 P /op.controls Diagonal Design Data Tension Section Elevation Size L L Kl/r A P op Ratio No. P ft ft ft in lb lb Op. Tl 190-180 Ll3/4x13/4x3/16 9.43 4.41 102.3 0.3779 3900 16440 0.237' T2 180-160 L2x2x3/16 9.43 4.35 87.9 0.4484 8246 19504 0.4231 T3 160-140 2L2 1/2x2 1/20/160/8 11.52 5.51 87.1 1.1039 10872 48020 0.226 1 T4 140-120 L3x3x3/16 12.91 6.00 79.2 0.7120 12088 30973 0.3901 T5 120-113.333 L3x3x3/16 13.39 6.24 82.3 0.7120 12416 30973 0.401 1 T6 113.333- L3x3x3/16 13.87 6.49 85.4 0.7120 12756 30973 0.412' 106.667 T7 106.667-100 2L3x3x3/16xl/2 14.36 6.74 88.6 1.4238 13908 61937 0.225' T8 100-80 L3 1/2x3 1/2xl/4 17.41 8.18 92.6 1.1034 16732 48000 0.3491 T9 80-70 L31/201/2xl/4 18.10 8.56 96.4 1.1269 16130 49019 0.3291 T10 70-60 2L3 1/20 1/2xl/4x1/2 18.80 8.92 100.2 2.2500 18340 97875 0.187' Tl1 60-40 L3 1/20 1/20/8 20.23 9.51 109.3 1.6139 19343 70205 0.2761 T12 40-30 L3 1/20 1/20/8 20.96 9.88 113.4 1.6139 18317 70205 0.261 1 T13 30-20 2L3 1/20 1/2x3/8xl/2 21.69 10.25 117.1 3.2344 21195 140695 0.151 1 T14 20-0 L4x4x3/8 23.19 11.01 109.6 1.8989 21709 82602 0.2631 1 P /op,controls Top Girt Design Data Tension Section Elevation Size L L. Kl/r A P OP Ratio No. P ft ft ft in2 lb lb op� Tl 190-180 L3 1/20 1/2x1/4 8.00 7.55 85.4 1.1503 1529 50039 0.031 ' T2 180-160 L3 1/2x3 1/2x1/4 8.00 7.55 85.4 1.1503 32 50039 0.001 ' T3 160-140 L3 1/20 MOM 8.00 7.40 86.0 1.6139 216 70205 0.003' T4 140-120 L3 1/20 1/2x3/8 9.67 8.96 103.2 1.6491 2984 71734 0.0421 T5 120-113.333 L4x4x3/8 11.33 10.38 103.6 1.9341 2283 84132 0.027 1 T8 100-80 L4x4x3/8 13.00 12.01 119.8 1.8989 4288 82602 0.0521 T9 80-70 L5x5x5/16 14.67 13.53 105.2 2.0967 4333 91207 0.0481 T11 60-40 L5x5x5/16 16.33 15.16 118.0 2.0674 5921 89933 0.066' T12 40-30 L5x5x5/16 18.00 16.67 129.5 2.0674 5573 89933 0.062' T14 20-0 L5x5x5/16 19.67 18.33 142.2 2.0674 5962 89933 0.0661 P /op,controls Section Capacity Table Section Elevation: Component Size Critical P pP.14- % Pass No. f< Type Element lb 1b Capacity Fail Tl 190-180 Leg Pipe 2.5 STD 3 -14574 56559 25.8 Pass T2 180-160 Leg PIPE 3.5 STD 21 -62598 101716 61.5 Pass T3 160-140 Leg Pipe 5 STD 51 -124606 165270 75.4 Pass T4 140-120 Leg Pipe 8 STD 75 -194337 347310 56.0 Pass trd Job Page xTowe� Pasco County (VS) (BU 826548) 30 of 31 Tower Engineering Project Date Professionals TEP No. 48167-.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC 27603 Client Designed by Phone:(919)661-6351 Crown Castle cdcrook FAX.(919)661-6350 Section Elevation Component Size Critical P OPa11.w % Pass No. ft Type Element lb lb Capacity Fail T5 120-113.333 Leg Pipe 8 STD 99 -217173 347310 62.5 Pass T6 113.333- Leg Pipe 8 STD ill -240315 347310 69.2 Pass 106.667 T7 106.667-100 Leg Pipe 8 STD 120 -261611 347310 75.3 Pass T8 100-80 Leg Pipe 10 STD(SCH40) 129 -323189 484378 66.7 Pass T9 80-70 Leg Pipe 10 STD(SCH40) 147 -356560 484378 73.6 Pass TI O 70-60 Leg Pipe 10 STD(SCH40) 159 -389555 484378 80.4 Pass Tl 1 60-40 Leg Pipe 12 STD 168 -456498 602433 75.8 Pass T12 40-30 Leg Pipe 12 STD 186 -489570 602433 81.3 Pass T13 30-20 Leg Pipe 12 STD 198 -522243 602433 86.7 Pass T14 20-0 Leg Pipe 12 XH 207 -588158 794335 74.0 Pass T1 190-180 Diagonal L13/4x13/4x3/16 10 -3914 8758 44.7 Pass T2 180-160 Diagonal L2x2x3/16 28 -8329 12785 65.1 Pass 71.3(b) T3 160-140 Diagonal 2L2 1/2x2 1/20/160/8 58 -11795 52593 22.4 Pass 57.7(b) T4 140-120 Diagonal L3x3x3/16 84 -12306 22202 55.4 Pass 74.8(b) T5 120-113.333 Diagonal L3x3x3/16 108 -12645 21099 59.9 Pass 76.8(b) T6 113.333- Diagonal L3x3x3/16 117 -12617 19950 63.2 Pass 106.667 78.9(b) T7 106.667-100 Diagonal 2L3x3x3/16xl/2 126 -14262 61700 23.1 Pass 43.0(b) T8 100-80 Diagonal L3 1/20 1/2xl/4 138 -16900 27303 61.9 Pass 63.7(b) T9 80-70 Diagonal L31/201/2x1/4 156 -16375 25401 64.5 Pass 66.1(b) TIO 70-60 Diagonal 2L3 1/20 1/2x1/4xl/2 165 -18669 89019 21.0 Pass 37.6(b) T11 60-40 Diagonal L31/201/ OM 177 -19565 30929 63.3 Pass T12 40-30 Diagonal L3 1/20 MOM 195 -18640 29065 64.1 Pass T13 30-20 Diagonal 21,31/201/2x3/8xl/2 204 -21674 110283 19.7 Pass 30.1(b) T14 20-0 Diagonal L4x4x3/8 216 -22039 35179 62.6 Pass T1 190-180 Top Girt L3 1/20 1/2xl/4 4 -1550 29785 5.2 Pass 17.6(b) T2 180-160 Top Girt L3 1/2x3 1/2xl/4 23 32 52541 0.2 Pass 0.4(b) T3 160-140 Top Girt L3 1/20 1/20/8 53 216 73715 0.3 Pass 1.1(b) T4 140-120 Top Girt L3 1/20 1/2x3/8 76 -2392 30403 7.9 Pass 20.6(b) T5 120-113.333 Top Girt L4x4x3/8 100 -1944 34432 5.6 Pass 15.7(b) T8 100-80 Top Girt L4x4x3/8 130 -3871 25694 15.1 Pass 21.6(b) T9 80-70 Top Girt L5x5x5/16 148 -4044 34145 11.8 Pass 31.6(b) Tl 1 60-40 Top Girt L5x5x5/16 169 -5520 27177 20.3 Pass 35.8(b) T12 40-30 Top Girt L5x5x5/l6 187 -5199 22493 23.1 Pass 33.7(b) T14 20-0 Top Girt L5x5x5/l6 208 -5476 18589 29.5 Pass 36.0(b) Summary Leg(T13) 86.7 Pass Diagonal 78.9 Pass (T6) Top Girt 36.0 Pass (T14) tnxTo 9 er Job Page Pasco County (VS) (BtJ 826548) 31 of 31 Tower Engineering Project Date Professionals TEP No. 48167.314456 10:28:19 10/21/19 326 Tryon Road Raleigh,NC27603 Client Designed by Phone.(919)661-6351 Crown Castle Cderook FAX.(919)661-6350 Section Elevation Component Size Critical P op n— % Pass No. .h Type Element lb lb Capacity Fail Bolt Checks 78.9 Pass RATING= 86.7 Pass Program Version 8.0.5.0-11/28/2018 Pile:C:Rlsers/cdcrook/DesktoptTNX Tower Run/48167-Pasco County(VS)/826548_1800309_LC7.eri October 21,2019 190-ft Self Supporting Tower Structural Analysis Report CCI BU No 826548 TEP Project Number 48167.314456, Order 506095, Revision 0 Page 9 APPENDIX B BASE LEVEL DRAWING tnxTower Report-version 8.0.5.0 9 (PROPOSED EQUIPMENT CONFIGURATION) (OTHER CONSIDERED EQUIPMENT) (14) 1-5/8' TO 160 FT LEVEL (3) 1-1/4'TO 148 FT LEVEL LEG C O00 LEG • 0 . O 0 (OTHER CONSIDERED EQUIPMENT) OTHER CONSIDERED EQUIPMENT) t (3) 5/16-TO 171 FT LEVEL �6) 1-5/8'TO 140 FT LEVEL • (3) 3/8'TO 171 FT LEVEL (6) 3/4'TO 171 FT LEVEL (6) 7/B'TO 171 FT LEVEL • • (12) 1-5/8'TO 171 FT LEVEL • • • (OTHER CONSIDERED EQUIPMENT) 1) 7/B'TO 190 FT LEVEL 1) 1-1/4-TO 190 FT LEVEL (6) 1-5/8'TO 190 FT LEVEL • (6) 2-1/4'TO 190 FT LEVEL • LEG B BUSINESS UNFF:826548 TOWER ID:C-BASELEVEL October 21,2019 190-ft Self Supporting Tower Structural Analysis Report M BU No 826548 TEP Project Number 48167.314456, Order 506095,Revision 0 Page 10 APPENDIX C ADDITIONAL CALCULATIONS tnxTower Report-version 8.0.5.0 AbCk ASCE 7 Hazards Report AMMICAN SOCIETY OF CA ENGINM Address: Standard: ASCE/SEI 7-10 Elevation: 91 ft(NAVD 88) No Address at This Risk Category: II Latitude: 28.248028 Location Soil Class: D-Stiff Soil Longitude: -82.185944 Y 11 O 1 rii-i�,l.,l � ���_ ' • t ,L t ' � • !fit ), ��^. -�N � ., \+� r%`.�Etk,r F' ChHsna'E' ' '• - .. 3::;{f_ •. ��I�t`y`•d�<��'�`{rc: rye.+ '3. '� i i'.��', F i ':t.,�' - - _ a'' \ ..:-� �: •`-.%'6"�. •r 't• ':'fir, ..�, - :}.;. tt .a',• - --- --...---- -- --_- ----q,•-- ^` - ' - .f a+.:-`,` �t•t'. - '1 3-� tr'fia g1, Ef,•i- 'n - - - _ - - - t/J" !{•� of k0'A var..' '¢ '% 9 furcod' r+r'..c.T.r^_S\ _ ,,`j �i itct -7-t f,'� �_,'.; m• »g iv °�y" + rY �0.i i ^!.' ,i+AP t?t:k/~ - ' } I•�t _ _ Wind Results: Wind Speed: 137 Vmph 10-year MRI 78 Vmph 25-year MRI 93 Vmph 50-year MRI 104 Vmph 100-year MRI 114 Vmph Data Source: ASCE/SEI 7-10, Fig. 26.5-1A and Figs. CC-1—CC-4, incorporating errata of March 12, 2014 Date Accessed: Fri Oct 18 2019 Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear interpolation between contours. Wind speeds are interpolated in accordance with the 7-10 Standard.Wind speeds, correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability= 0.00143, MRI =700 years). Site is in a hurricane-prone region as defined in ASCE/SEI 7-10 Section 26.2. Glazed openings need not be protected against wind-borne debris. Mountainous terrain, gorges, ocean promontories, and special wind regions should be examined for unusual wind conditions. https://asce7hazardtool.online/ Page 1 of 3 Fri Oct 18 2019 AM 19M u Ab!%Lk AMERICAN SOCIM OF CMl ENGINEERS Seismic Site Soil Class: D-Stiff Soil Results: Ss 0.068 Sos 0.072 S, 0.034 So, 0.055 Fa 1.6 TL 8 F 2.4 PGA: 0.032 SMs 0.108 PGA M : 0.051 SM, 0.083 FPGA 1.6 Ie 1 Seismic Design Category A 0.11 MCER Response Spectrum 003_ Design Response Spectrum___ FEE"—- ---- 0. +10- s 1 /� 0.07.. .... _.. _ 0-06 0.07--1.. 0.06- 0.0.. 0.05— 0.03- o 02 0.02 0.01 0 t 2 3 4 5 6 7 $ 9 0 1 2 3 4 5 6 7 8 9 Sa(9)vs T(s) Sa(9)vs T(s) Data Accessed: Fri Oct 18 2019 Date Source: USGS Seismic Design Maps based on ASCE/SEI 7-10, incorporating Supplement 1 and errata of March 31, 2013, and ASCE/SEI 7-10 Table 1.5-2. Additional data for site-specific ground motion procedures in accordance with ASCE/SEI 7-10 Ch. 21 are available from USGS. httos://asce7hazardtool.onlinel Page 2 of 3 Fri Oct 18 2019 ASCE AMERICAN SOCIETY OF CML ENGINEERS Ice Results: Ice Thickness: 0.00 in. Concurrent Temperature: 25 F Gust Speed: 30 mph Data Source: Standard ASCE/SEI 7-10, Figs. 10-2 through 10-8 Date Accessed: Fri Oct 18 2019 Ice thicknesses on structures in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values. Values provided are equivalent radial ice thicknesses due to freezing rain with concurrent 3-second gust speeds, for a 50-year mean recurrence interval, and temperatures concurrent with ice thicknesses due to freezing rain. Thicknesses for ice accretions caused by other sources shall be obtained from local meteorological studies. Ice thicknesses in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values. The ASCE 7 Hazard Tool is provided for your convenience,for informational purposes only,and is provided"as is"and without warranties of any kind.The location data included herein has been obtained from information developed,produced,and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE 7 standard.While ASCE has made every effort to use data obtained from reliable sources or methodologies,ASCE does not make any representations or warranties as to the accuracy,completeness,reliability, currency,or quality of any data provided herein.Any third-party links provided by this Tool should not be construed as an endorsement, affiliation,relationship,or sponsorship of such third-party content by or from ASCE. ASCE does not intend,nor should anyone interpret,the results provided by this Tool to replace the sound judgment of a competent professional,having knowledge and experience in the appropriate field(s)of practice,nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE 7 standard. In using this Tool,you expressly assume all risks associated with your use.Under no circumstances shall ASCE or its officers,directors, employees,members,affiliates,or agents be liable to you or any other person for any direct,indirect,special,incidental,or consequential damages arising from or related to your use of,or reliance on,the Tool or any information obtained therein.To the fullest extent permitted by law,you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE 7 Hazard Tool. httos://asce7hazardtool.online/ Page 3 of 3 Fri Oct 18 2019 Project 1 1 BU # 826548 Site Name Pasco County(VS) Order# 506095 Rev. 0 . Tower1 1 Tower Tye I . Self-Support TIA-222 Revj H El Apply TIA-222-H Section 15.5 Applied Loads Comp. Uplift Axial (k) 605.27 533.70 Shear(k) 60.31 54.25 Anchor Rod 1 Data Quantity: 6 - Diameter in): 2.25 Material Grade: _: A615-75 Fy=75 ksi Fu=100 ksi Grout Considered: No lar(in): 2.625 Eta Factor, n 15.:, - Thread Type: . N-Included Configuration: Symmetrical Anchor • 1 1 Results Axial, Pu_c(kips) 100.88 Shear, Vu (kips) 10.05 Moment, Mu (kip-in) 17.15 Axial Cap., TPn_c (kips) 243.75 Shear Cap., 4)Vn (kips) 73.13 Moment Cap., OMn (kip-in) 94.70 Stress Rating 58.5% Pass CClplate-version 3.6.0 Analysis Date: 10/21/2019 Drilled Pier Foundation CROWN BU#.1826548 CASTLE Site Name:I Pasco County. VS �✓ Order Number:506095 Rev.0 TIA-222 Revison: 'H TowerType:j Self Su ort-,. Analysis Results Check Limitation •.. Soil Lateral Capacity Compression Uplf/t App yT A-222- Section 15.5: • 17 omp. p D w t trom TOC ❑ '- Moment(kip-ft)I Soil Safety Factor 17.56 19.52 Axial Force(kips)1. 605.2671 533.699 Max Moment(kip-ft) 843.86 759.12 Shear Force(kips)l 60.3051 54.249 Rating" 7.2% 6.5% Soil Vertical Capacity Compression p!ft Material Pr erties Skin Friction(kips) 784.61 566.19 Concrete Strength,'c •, 4 ksi End Bearing(kips) 406.73 Rebar Strength,Fy: 60 ks .-Weight of Concrete(kips) 216.30 162.22 Total Capacity(kips) 1191.34 728.42 DesignPier Axial(kips) 821.57 533.70 Depth 42 ft Rating" 65.7% 69.8% - - - - - -- - Ext.Above Grade 0.5 ft Reinforced Concrete Capacity Compression p ilt Pier Section 1 Critical Depth(ft from TOC 21.40 19.06 From 0.5'above grade to42'belowgrade Critical Moment(kip-ft) 842.67 751.89 Pier Diameter, 6 ft Critical Moment Capacity 4497.82 2785.44 Rebar Quantity 26 Rating' 17T 25.711. Rebar Size 9 Clear Cover to Ties 3 in Soil Interaction Rating' 69.8% Tie Size 4 Structural Foundation Rating" 25.71l. 'Rating per TIA-222-H Section 15.5 Soil Profile Groundwater De th n/a ft I #of La ers 5 Calculated Calculated Ultimate Skin Ult.Gross Angle of; Ultimate Skin Top Bottom '.Thickness Y:on Yaonncee Cohesion, Ultimate Skin Ultimate'Skin'. Friction Comp Bearing SPT Blow ; Layer ,Friction Friction Uplift, Soil Type (ft) (ft) '• (ft) (pcf) - (pcf) (ksf) FrictiorrComp FrictiorrUplift Override Capacity Count' (degrees) . Override(ksf) , .'(ksf) (ksf) (ksf). � (ksf) ' 1 0 3 3 110 150 0 0.000 0.000 0.00 .. 0,00 Cohesionless 2 3 : 12 9 110 150 30 '0.000 0:000 _ - 0,50 0.35 Cohesionless 31 121, 301 18 - -1151 1501 '25• 0.000 0.000 1;50 1.05 Cohesionless 4 30 40 10 . 100 150 0.5 10 0.689 0.689 2.00 1.50 Silt 5 40 '421 21 ',.1001 1501 0.5 _-10 '03451 0.745• Z001 1.50 - ; 19181 1 Silt Version 2.1.1