PERMIT INFORMATION LOCATION INFORMATION
Permit Number: 22478 Address: SIMONS RD
Permit Type: MISC ZEPHYRHILLS, FL.
Class of Work: RIGHT-OF-WAY Township: Range: Book:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Square Feet: Subdivision: CITY OF ZEPHYRHILLS
Est. Value: Parcel Number: 04-26-21-0000-00100-0050
Improv. Cost: OWNER INFORMATION
Date Issued: �13/2020 Name: PRIORITY DEV INC/LINKS OF S.O.
Total Fees: Address: SIMONS RD
Amount Paid: C V4 ZEPHYRHILLS, FL. 33542
Date Paid: Vk Phone:
Work Desc: MIS SEE DESCRIPTION - PARCEL 0426210000399000010 - FEE WAIVED
CONTRACTORS APPLICATION FEES
DUKE ENERGY
Ins ections Required
FOOTER 2ND ROUGH PLUMB MISC INSULATION EIL N
FOOTER BOND DUCTS INSULATED SEWER MISC.
ROUGH ELECTRIC LINTEL MISC MISC.
1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC.
DUCTS INSTALLED WATER MISC DRIVEWAY
PRE-SLAB SHEATHING MISC. MISC.
CONSTRUCTION POLE FRAME MISC. MISC.
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each such subsequent reinspection.
NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans, Specifications Must Accompany Application.All work shall be performed in accordance with
City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BtFORE C.O.
Ld
CO RA TOR SIG ATURE PERMIT OFFI R
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
CITY'OF ZEPHYRHILLS-BUILDING DEPARTMENT
DATE:2-10-2020 RIGHT-OF-WAY USE PERMIT PERMIT#
No construction under ground or above ground of any facility shall:be accomplished on-any City Rights of Way without written approval'from the.
City Building.Department.Any application for approval'of construction operations'on any.City owned-Rights of Way shall furnish a'detailed drawing
showing the complete.scope of the,proposed work in triplicate to the office of the Building Official for approval prior to the commencement of any work.A
copy of this permit is to be kept readily available at the site.of the work:at all:times.
PARCEL I.D.# 04-26-21-0000-39900-0010 CITY ROAD Simons Rd
DATE 2-10-2020
.LOCATION(Legal Description):
COM AT THE SE CDR OF THE SW1/4 OF THE NE1/4'OF SEC 4 TH NO2DEGOTI3"E 119.02FT TH S89DEG52'15"W 33.25FT TO
YOB TH S89DEG52'15"W 600.44FT TH NO2DEG07"13"E 600.46FT TH N89DEG52'1WE 600.46FT TH S02DEGO5'39"W 159.44FT TH S02DEG10-56"W 389.90FT TH SolDEG44'57"W 51.13FT '
TO THE POB
Permission is hereby granted to Darryl Foshee of Duke Energy
for the construction and maintenance of-
Installdtion of 2-4"conduits under Simons Rd to seive the transformer for the Sarah Venda Berg Tennis Center.
_subject to.the following conditions:'
1. The construction and maintenance of such utility,shall not interfere with,the property and rights of a prior occupant.'
2. All"work shall be done in keeping with the standards'of the City.Streets Department and under the supervision of the City Building Official,who
will be notified at least one day prior to commencement of construction.
3. All materials and equipment shall be subject to inspection bytheCiBuildingOfficialty
4: 'During,construction ails afety regulations of-the Department of Transportation shall be observed and the City shall be relieved'of all• '.
responsibility from damage of any.unture:arising from this•permiL Subject to the same terms and'coaditions;the permit holder may take such.safety
measures,including placing and display of caution signs,as it may deem'necessary in conduct of construction and maintenance work hereunder:.It is the:
responsibility'of:the permittee to????
5. All private and all City,properly shall be:restored to its original condition as far as practical in the opinion of the City Building Official.
6. All underground crossing installations shall be laid at such depth as may be specified by the City Building Official.
7. The sketch covering the details of this installation shall be made a part of this permit.This permit is'granted with the understanding that the
applicant has notified all other utility users.in the area covered by the permit and takes full responsibility for any damage incurred by prior,installations as a
result of his operations in order that they May safe guard their interests:
8.' If is expressly stipulated that this permit is'a license'for permissive use only and that the placing of facilities upon public property pursuant to
this permit shall not operate to create or to vest any property right in said holder.
9. 'Whenever the City decides to further exploit the City Rights of Way,any.dr all said:poles,wires,pipes,cables,or other facilities and .
appurtenances authorized hereunder,shall'be immediately removed from said Rights'of Way,or reset or relocated thereon as required by the City Building
Official at the expense of the holder.of.this permit.,
10.'The holder shall save and:keep the City harmless from any and all damages,claims,or injuries that may occur by reason of the construction,
maintenance;and operation of said facility.
11. The holder shall complete the requested work within 60 -days or this permit shall become null and void:In the event thework
:requested is not completed upon the.expiration date of this permit'the City shall have the right to complete such work and to'charge the holder of the,permit
for all'costs incurred in completing said work
12. The'holder shall.post a cash or surety bond with the City Manager.in the sum of S 0.00 dollars to guarantee performance of the
obligations herein,and to guarantee.maintenance of the right-of-way-described herein for a period of one f l)year.following completion of the requested
-installation.In the event a surety,bond is posted,the surety bond shall:be'made-payable.to the City and shall obligate the surety to,hold the.City harmless'in
the event the holder of this permit should fail to meet any of its obligations.hereunder.The bond shall also'indemnify-the City for:all court,costs and . .
reasonable attorneys fees in the event legal-action is'required to collect on said bond.
SUBMITTE_D ZY:
(Permittee)Darryl Foshee /
'Signature&Title•�GL'� y � Zee, Sr.Engineering Tech y�
Address Duke Energy 36453 Eiland Blvd.:Zephyrhills;33541.'
APPROVED BY:
CITY OF ZEPHYRHILLS «' t ,
F SERENE
NxiCONSTRUCTION
AUTHORIZED USER
City of Zephyrhills Florida
I Benjamin D Roddey IV herby authorize Daniel O'Donnel to be an authorized agent for
Serene Construction LLC and to sign documents related to the permitting and
construction process.
Benjamin D Roddey IV
----
Benjamin Roddey, MGR,Serene Construction LLC
813.377.4888 ext 101
Licensed Commercial, Residential and Rooting Contractor
CBC-1262528/CCC-1331981
ben@serene.me
www.goserene.com
1�
IRENE A DOWNES
State of Florida-Notary Public
•= Commission q GG 15789
My Commission Expues
OF4,%,'�` July 26, 2020
a n,..
26-22
Serene Construction LLC
PUBLIC
75 N Woodward Ave#88120 Tallahassee FL 32313
# c Tel: (813)3774888 / Email:h uilcl c rem n..me