Loading...
HomeMy WebLinkAbout20-22532 CITY OF ZEPHYRHILLS 5335-8th ,Street (813)780-0020 22532 ELECTRICAL PERMIT PERMIT INFORMATION - LOCATION INFORMATION Permit#:22532 Issued: 2/25/2020 Address: 6416 COBBLE BLISS ST Permit Type: ELECTRICAL MISC ZEPHYRHILLS, FL. Class of Work: ELECTRICAL MISC Township: Range: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Sq. Feet: Est. Value: Book: Page: Cost: 25,798.50 Total Fees: 255.00 Subdivision: SILVERADO Amount Paid: 255.00 Date Paid: 2/25/2020 Parcel Number: 04-26-21-0110-00800-0070 , CONTRACTOR INFORMATION OWNER INFORMATION Name: MOMENTUM SOLAR Name: MOONEY, DERKAOUI TARA ELAM Addr: 8248 PARKLINE BLVD STE 100 Address: 6416 COBBLE BLISS ST ORLANDO FL 32809 ZEPHYRHILLS, FL 33541 Phone: (321)247-6073 Lic: Phone: 727-418-2728 Work Desc: INSTALLATION PHOTO VOLTAIC SOLAR PANEL ROOFTOP .APPLICATION FEES ELECTRICAL FEE 255.00 INSPECTIONS REQUIRED ROUGH ELECTRIC CONSTRUCTION POLE PRE-METER FINAL A61 REINSPECTION FEES:(c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. CONTRACTOR 6&PERNTM_05FFI?� PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application FaX813-780-0021 Building Department Date Received 2/10/2020 phone Contact for Permitting 321 247 3 Owner's Name Tara Mooney-Derkaoui Owner Phone Number 727 418-2728 Owner's Address 1 6416 Cobble Bliss Street Owner Phone Number I Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS 6416 Cobble Bliss Street LOT# SUBDIVISION Silverado Ranch PARCEL ID# 0426210110008000070 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED B NEW CONSTR B ADD/ALT = SIGN = = DEMOLISH INSTALL REPAIR PROPOSED USE = SFR = COMM = OTHER I PV Solar Installation TYPE OF CONSTRUCTION = BLOCK = FRAME = STEEL = DESCRIPTION OF WORK Installation of Photo voltaic solar panels on rooftop BUILDING SIZE SQ FOOTAGE HEIGHT IL BUILDINE�EG $1,699.65 VALUATION OF TOTAL CONSTRUCTION ')j�748a�p =ELECTRICAL $5,541.50 AMP SERVICE 26.00A = PR ESS ENERGY = W.R.E.C. =PLUMBING $ =MECHANICAL $ VALUATION OF MECHANICAL INST LLATIOI / =GAS = ROOFING Q SPECIALTY = O ER V �✓ FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO BUILDER COMPANF�� SIGNATURE REGISTEREFEE CURREN Y/N i Address License# �r�/ ELECTRICIAN / "COMPANY Momentum Solar SIGNATURE REGISTERED Y/ N FEE CURREN i Y/N Address 6210 Hoffner Ave Ste.100 Orlando,FL 32822 License# EC13008217 I PLUMBER COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Y/N Address I License# MECHANICAL COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Y/N Address License# OTHER COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Address License# 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. "PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500) `• Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter If on public roadways..needs ROW I I City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: M Date Received: 2-- Site: Permit Type: Approved Who comments: Approved w/the below comments: 0 Denied w/the below comments: El This corn fft sheet sh e kept with the permit and/or plans. VtFEB 1,8 2020 Kalvin S * er—Plans Examiner Date Contractor and/or Homeowner I (Required when comments are present) i NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. I UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner�has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the"contractor Block"of this application for which they will be responsible. If you, as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings, or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more, I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction,I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application,,for lots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. I If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F. 7. 3) OWNERORAGE ✓a d�a�u� CONTRACTOR Subscribed and sw m t r affirmed)befor Subscribed and swam to(or affirmed)before me this 2/10/2020 by ara Moonev-De /10�rkaoui /9o90 by Cameran Christensen i rs Who is/are personally known to me or has/have produced Who Pare eeonally known to me or has/have produced D.L as identification. as identification. (Z__\___ Notary Public Notary Public Commission No. GG298001 Commission No. GG298001 Lauren El-Taher Lauren El-Taher il4W d Name of Notarxtyped printfl oov 0% Notary Public State of Florida N. �{F'tr y el Notary Public State of Florida ' Lauren E EI-Taher Lauren E EI-Taher ` ;- r; ¢. ," a hRy Commission GG 298001 My Commission GG 298001 3" n � L 4� r Mom' Fx ires02104/2023 -VF Expires 02/04/2023 o F I 2/7/2020 04-26-21-0110-00800-0070 1 Pasco County Property Appraiser Parcel ID 04-26-21-0110-00800-0070 (Card: 1 of 1) Classification OO1b0-Single Family Mailing Address Property Value MOONEY DERKAOUI TARA ELAM Ag Land $0 6416 COBBLE BLISS ST Land $27,243 ZEPHYRHILLS, FL 33541 Building $216,223 Extra Features $2,419 Physical Address 6416 COBBLE BLISS STREET, Just Value $245,885 ZEPHYRHILLS, FL 33541 Assessed (Non-School Amendment 1) $245,885 Legal Description (First 200 characters) See Plat for this Subdivision Non-School Taxable Value $245,885 SILVERADO RANCH SUBDIVISION School District Taxable Value $245,885 PHASE 5A PB 78 PG 033 BLOCK 8 LOT 7 Jurisdiction CITY OF ZEPHYRHILLS Land Detail (Card: 1 of 1) Line Use 'Code Description Zoning,Units Type !Price 'Condition Value _1 010_OR CP1-1 SFR _ MPUD 6,0_00.00 SF $4.40 1.00 $26,400_ 2 010OR CP1-2 SFR MPUD ! 2,108.00 SF $0.40 1.00 $843 Additional Land Information Acres_ Tax Area FEMA Code Res Code Corn Code Condo Code __..----0.19 30SI --- --SLVR --- --'SLVR SLVR View Sketch Building Information - Use 0100-Single Family Residential (Card: 1 of 1) Year Built 2019 Stories 1.0 Exterior Wall 1 Concrete Block Stucco Exterior Wall 2 Roof Structure Gable or Hip Roof Cover Asphalt or Composition Shingle Interior Wall 1 Drywall Interior Wall 2 Flooring 1 Ceramic Clay Tile Flooring 2 Carpet Fuel Electric Heat Forced Air- Ducted /C Central Baths 3.0 Line .Code _ ;Description _ _ Sq. Feet _ Value -----1-------Y--BASO1 -.T-------LIVING AREA ---------�--_------ 2,576 -'—___—_-$193,534 2 FGR01 FINISHED GARAGE 652 $19,609—_-T 3 FOP01 FINISHED OPEN PORCH 162 $3,080 Extra Features (Card: 1 of 1) -----a------------- -----------------------------------__..--- Line vi r Units Value 1 ' RDWSWC ; DRVWAY/SIDEWALK CONC 2019 1,070 $2,419 Sales History Previous Owner: LENNAR HOMES LLC Month/Year 7 IBOok/Page Type DOR Code 'Condition Amount 11/2019 10013 / 2588 Warranty Deed 01 Vacant $285,000 07/2019 9938 / 0446 Warranty Deed 05 Vacant $326,500 09/2011 8606 76 Warrant Deed / 33 - —y 05 '— Vacant $0 i I search.pascopa.com/parcel.aspx?parcel=2126040110008000070 1/1 INSTR#202002209E OR BK I Q050 PG 935 Page 1 of 1 02/10/2020 09:37 AM Rcpt:2133615 Rec: 10.00 DS:0.00 IT:0.00 Nikki Alva rez�Sowles;Esq.,Pasco County Clerk&Comptroller I Permit Number: Folio/Parcel ID#: 0426210110008000070 Prepared by: Lauren EI-Taher/Momentum Solar 6210 Hoffner Ave,Suite 1, Orlando, FL 32822 ' Return to:_Momentum Solar 6210 Hoffner Ave,Suite 1 Orlando,FL 32822 NOTICE OF COMMENCEMENT State of Florida, County of The undersigned hereby gives notice that improvement will be made to certain real property,and in accordance with Chapter 713,Florida Statutes,the following information is provided in this Notice of Commencement. 1. Description of property(legal description of the property,and street address if available) Silverado Ranck Sub Ph 5A Pb 78 Pg 033 Blk 8 Lot 7/ 2. General description of Improvement 6416 Cobble Bliss St.Zephyrhills,FL 33541 Installation of photo voltaic solar panels on rooftop 1 3. Owner information or Lessee information if the Lessee contracted for the Improvement Name Tara Mooney-Derkaoui Address 6416 Cobble Bliss St.Zephyrhills, FL 33541 Interest in Property.Owner Name and address of fee simple titleholder(if different from Owner listed above) Name N/A Address 4. Contractor Name Momentum Solar/Cameron Christensen Telephone Number 321-247-6073 Address 6210 Hoffner Ave,Suite 1,Orlando, FL 32822 5. Surety(if applicable,a copy of the payment bond is attached) Name N/A Telephone Number Address Amount of Bond $ 6. Lender Name N/A Telephone Number Address 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by§713.13(1)(a)7,Florida Statutes. Name N/A Telephone Number Address 8. In addition to himself or herself,Owner designates the following to receive a copy of the Lienoes Notice as provided in§713.13(1)(b),Florida Statutes. Name N/A Telephone Number Address 9. Expiration date of notice of commencement(the expiration date will be 1 year from the date of recording unless a different date is specified) WARNING TO OWNER:ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713,PART I,SECTION 713.13,FLORIDA STATUTES,AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION.IF YOU INTEND TO OBTAIN flNANCING,CONSULT WITH Y DER OR MNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Owner SI of Owner or Lessee,or el's or ssee's Authorized Officer/Director/Partner/Manager Signatory's Title/Office The foregoing instrument was acknowledged before me this 10 day of 02/20 by Tara Mooney-Derkaoui mom year name of person as Owner for Type of authority,e.g.,officer,trustee,attorney In fact Name of party on behalf of whom Instrument was executed Signature of Notary Public—State of Florida Print,type,or stamp commissioned name of Notary Public Personally Known OR Produced ID X oP Notary Public S=r2 Lauren E 'ate of Type of ID Produced D.L. ;., My CommissioIn Person X or On-line SignatureExpires 02/042 I STATE OF FLORIDA,COUNTY OF PASCO THIS IS TO CERTIFY THAT THE FOREGOING IS A TRUE AND CORRECT COPY OF THE DOCUMENT 1 ve TirVwwat ON FILE OR OF PUBLIC RECORD IN THIS OFFICE }W an A W116S MY HAND AN F IAL SEAL THI DAY OF 1887 NIKKI ALVARE WLES, CLERK&COMPTROLLER 0. BY DEPUTY CLERK v Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net February 7,2020 Re:Proposed Photovoltaic Solar Panel Installation Tara Mooney-Derkaoui 6416 Cobble Bliss St. Zephyrhills,FL 33541 i Dear Plan Reviewer: Certification:I have reviewed the engineering testing reports for the racking and attachments to be used on this project and I certify that the products are capable of supporting the code required loads and are suitable for this installation when installed in strict compliance with the manufacturers printed instructions. Regarding the solar panel array installation on the above referenced project please note that anjinspection was performed by a representative of the Architect/Engineer of Record,and analysis of the existing structure was conducted.There is adequate structural capacity for the installation of the array with the following recommendations: i 1.The array will be installed on the existing roof.The roof framing is constructed of 2"W'wood trusses @24"o.c. spanning 25'8"with a top chord length of 27'10"with intermediate supports at 1/3rd points,making the effective longest span equals 10'6" with 1/2"plywood sheathing.The new array(See Site map by contractor)will add 2.63 Lb. /Sf overall to the roof.No additional structural support is required for the roof structure. I 2.The system shall be secured to the roof using the"Ecofasten Solar""Rock-IT"®attachment system.The installation shall be in strict compliance with manufacturers printed instructions.The attachment system shall be UL 1703 approved tested.The attachments shall be min.5/16"x 4"long stainless-steel lags with a min.embedment of 3" into the rafters.Attachments shall be @ 48"o.c.max.in roof wind zone 1,@ 24"o.c.max.in roof wind zone 2,&3, lags to alternate rafters.Provide 6 mil.vapor barrier between dissimilar metals.Provide water tight gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the system manufacturer's installation manual.The panel angle shall match the roof slope. 3.Solar Modules shall be UL-1703 rated.Refer to manufacturers specifications sheets. 4.Positive drainage of the system shall be so as not to void the existing roof warranty. 5.All aspects of the installation shall comply with the Florida Administrative Code,2017 Florida Building Code- Residential Sixth Edition,ASCE-7-10,2017 Florida Building Code—Energy Conservation,Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.All components used meet the criteria of the Florida Solar Energy Center. 6.Please refer to the attached structural calculations. If you have any questions relating to this matter,please contact me at your earliest convenience;Thank you. 401 Daniel W.Dunzik,RA.LEED-AP �j FL.Lic.No.AR98795 '• AR98795 xw- d/ f D AEG j Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net February 7,2020 i Gravity Load Calculation Criteria Structural Design Loads per ASCE 7-10 Dead Loads= 10 psf+2.6 psf(new solar panels)=12.6 psf Roof Live Load=20 psf Ground Snow Load=0 psf I Wind Load Calculation Criteria Wind Loads per ASCE 7-10,Ch.30 method 1 Using an area of 10 SF,wind loads from Figure 30.5-1: I Zone 1 =-32.3 psf Roof Slope=22 degrees Roof Mean Height= 15 ft Zone 2=-56.2 psf Basic Wind Speed= 140 mph Zone 3=-83.1 psf Exposure=B Per section 2.4.1,ASD combo=D+0.6W: Zone 1 =2.6 psf+0.6(-32.3 psf)_-16.8 psf Zone 2=2.6 psf+0.6(-56.2 psf)_-31.1 psf Zone 3=2.6 psf+0.6(-83.1 psf)_-47.3 psf Check Attachment to Wood Truss Use 5/16 dia.Lag screw w/3"embedment into 2 in.wide roof rafter Lag Screw Spacing: Lag Screw Tributary Area: Zone 1 = 48"o.c.max Zone 1=(48"o.c.max)^2/144= 16 SF Zone 2= 32"o.c.max Zone 2=(32"o.c.max)^2/144=7.11 SF Zone 3= 32"o.c.max Zone 3=(32"o.c.max)^2/144=7.11 SF Lag Screw Forces: W=266lb/in(Table 12.2A,2015 NDS) Zone 1=16.8 psf x 16 SF=269 lb < W', OK Cd=1.6(Table 2.3.2,2015 NDS) Zone 2=31.1 psf x 7.11 SF=221 lb < W', OK Ct=1 (Table 2.3.3,2015 NDS) Zone 3=47.3 psf x 7.11 SF=336 lb < W', OK W'=W x embed x Cd x Ct ; W'=266 lb/in x 3 in.x1.6 x!1=1276.8 lb i I I I Powered by D.Up Y" f i • . 1 QCEUs " �yviY Y°° O arety To•tev TOP OR",Py_ \ d/ o; •. 'EMOPE ID QO 3 8�O{p7 201.�' � 25 Q.ANT UM TECHNOLOGY*!O B Higher yield per surface LEVELISED COST OF Power classes, area;lower BOS ELECTRICITY and an efficient costs,higher INN X rate of up to 20.2%. VEALL Optimal -WEATHER TECHNOLOGY low-light Yield',whatever the weatheht and temperature with excellent behaviour. ENDURING HIGH PRFORMANCE Long E term yield security_ - 7 � TechnologYl Hot Spot with Anti LID Technology.Anti PID Protect and'Traceable EXTREME WEATHER RATING Quality Tra:QT,+ High-tech alumini m high snow alloy frame,certifi (5400 Pad and wind toads(q p ed f Pe A i RELIABLE►N Inclusive 12_ VESTMENT rw�. linear Year product warrant performance warran tyz Y and 25-year . STATE OF THE ART SAT MODULE TECHNOLOGY and innovativeM DUO combines cutting edge wiring with g tail separation paration 'RP7 test conditions according to tE UM Technology, 'see data sheet on rear for further InformS 62804-1;2015,method 8(-1500V,168h) anon. THE IDEAL SOLUTION FO3R: Rooftop arrays on "'UJ residential buildings Qo Rooftop arrays on `��,,! commercial Industrial buildings Engineered in Germany Qceus- i i MECHANICAL SPECIFICATION Format 66.31n x 39.41n x 1.261n(including frame) (1685mm x 1000mm x32mm) eea•Reesmml „B, =,FmPI 38.6a•IBa]mml Weight 41.21bs(18.7kg) Front Cover 0.13in(3.2mm)ther Compomallypre-stressed glass with 4:o�myPoom.onYrl4 I +U, a ompoection technology site film Back Cover 3,s.resrmml Frame Black anodized aluminum Cell 6 x 20 monocrystalline Q.ANTUM solar half cells cqr� L 3c.4•p000mml Junction Box 2.09-3.981n x 1.26-2.36In x 0.59-0.711n 1fpO"� (53-101mm x 32-60mm x 15-18mm),IP67,with bypass diodes Cable 4mm2 Solar cable;(+)t43.3in(1100mm),(-)a43.31n(1100 mm) E.DAw,.mn. 4.rnmamon lDEuaAI _b. Connector Staubli MC4,Amphenol UTX,Renhe 05-6,Tonglln TL-CableOlS,JMTHY JM601;IP68 or Friends PV2e;IP67 ue•re3.�1 DEfALIA a H I a.Ea•re4A I)I Io33s'rea.�t ELECTRICAL CHARACTERISTICS POWER CLASS 315 320 325 330 335 MINIMLIM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-0 W) Power at MPP' PMw [W] 315 320 325 330 335 E Short Circuit Current' Isc [A] 10.04 10.09 10.14 10.20 10.25 E Open Circuit Voltage' Vcc IV] 39.87 40.13 40.40 40.66 40.92 Current at MPP IMPP [A] 9.55 9.60 4.66 9.71 9.76 Voltage at MPP VMPP IV] 32.98 33.32 33.65 33.98 34.31 Efficiency' rl [%] a18.7 a19.0 z19.3 a19.6 2:19.9 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NM07 Power at MPP PMPP [W] 235.8 239.5 243.2 247.0 250.7 E Short Circuit Current ISO [A] 8.09 8.13 d.17 8.22 8.26 E Open Circuit Voltage Vcc IV] 3Z59 37.84 38109 38.34 38.59 c Current at MPP IMPP [A] 7.52 7.56 760 7.64 7.69 Voltage at MPP VMPP IV] 31.36 31.68 32i00 32.31 32.62 'Measurement tolerances PMPP t3%;Isc;Vcc t5%at STC:1000 W/m',25t2°C,AM 1.5G according to IEC 60904-3'3800 W/mz,NMOT,spectrum AM 1.5G Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE t least %of nominal power during hereafter max. �x'.. -- -----I I eSo ----------------- degradation o � os %it ---- I o foinapweptl0yarA --------------- least 85%of nominal power upto i ___ i ____ 4'� - 25 years. g .0 - I I -----J a 4.10 All data within measurement toleranc- .o ,nR .ao .Ro -~ °w as.Full warranties In accordance with Sao .Roo z �� the warranty terms of the Q CELLS IRRADIANCE IW/m'I o sales organisation of your respective 4 country.' �r3m,nwmrymr m YEARS Typical module performance under low Irfedlance conditions In o .eeonma am°'�'nmm�nma4utoKsw.�.3mq comparison to STC conditions(25'C,5000 W/m3) m 0 TEMPERATURE COEFFICIENTS m Temperature Coefficient of Is, a [%/K] +0.04 Temperature Coefficient of Vcc 9 [%/K] -0.27 m .Temperature Coefficient of PMPP V [%/K] -0.36 Normal Module Operating Temperature NMOT ['F] 109t5.4(43t3'C) . 0 PROPERTIES FOR SYSTEM DESIGN a Maximum System Voltage V3Ys IV] 1000(IEC)/1000(UL) Safety Class II o Maximum Series Fuse Rating [ADC] 20 Fire Rating C(IEC)/TYPE 2(UL) m Max.Design Load,Push/Pull' [Ibs/ft'] 75(3600Pa)/55(2667Pa) Permitted Module Temperature 40oFupto+185'F c Max.Test Load,Push/Pull' [Ibs/ft'] 113(5400 Pa)/84(4000 Pa) on Continuous Duty (-40'Cupto+85'C). a 'See Installation Manual m U D QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION UL 1703,VDE Quality Tested,CE-compliant,IEC 61216:2016,IEC 61730:2016, Number of Modules per Pallet -32 9 Application Class II,U.S.Patent No.9.893,215(solar cells) Number of Pallets per 53'Tretler 30 a ' c ® Number of Pallets per 40'HC-Container 26 a DVE. C ` C=us 7®1/ Pallet Dimensions(LxWxH) 69.3x45.3x46.91n(1760x1150x1190mm) U Pallet Weight 1415lbs(642kg). a Note:Installation Instructions must be followed.See the Installation and operating manual or contact our technical service department for further Information on approved installation and use of this product. Hanwho Q CELLS America Inc. 400 Spectrum Center Drive,Sulte 1400,Irvine,CA 92618.USA I TEL+1 949 748-5996 1 EMAIL InquiryQus.q-cells.com I WEB www.q-cells.cl m/ns Data Sheet Enphase Microinverters Region:AMERICAS i The high-powered smart grid-ready ..Enphase. Enphase IQ 7 Micro" anid Enphase IQ 7+.Micro'"" IQ -7 and 1Q 7+ dramatically simplify the,installation process while achieving the highest system efficiency. .Microinverters, Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters into with the Enphase IQ EnvoyTM, Enphase IQ I3attery'M, and the Enphase Enlighten'M monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading _ warranty of up to 25 years. I Easy to Install y Lightweight and simple l Faster installatioh with improved,lighter two-wire cabling Built-in rapid shutdown compliant(NEC 2014&2017) d Productive and Reliable • Optimized for high powered 60-cell and 72-cell*modules • More than a million hours of testing • Class II double-insulated enclosure • UL listed ENPHASE IQ 7 s Smart Grid Ready • Complies with advanced grid support,voltage and frequency ride-through requirements - Remotely updates to respond,to changing grid requirements • Configurable for varying.grid profiles • Meets CA Rule 21 (UL 1741-SA) The IQ 7+Micro is required to support 72-cell modules. i To learn more about Enphase offerings,visit enphase.com v:EN P H Qi S E. i Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA(DC)- IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV-array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit j OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage/range2 240 V/ 208.V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V i Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III G . AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency, 97.6°i 97.6 i 97.5% - 97.-3°i CEC weighted efficiency 97.0% 97.0% 97.0°i 97.0 i MECHANICAL DATA Ambient temperature range -400C to+65°C Relative humidity range 4%to 100%(condensing) Connector type(IQ7-60-2-US&IQ7PLUS-72-2-US) MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Connectortype(IQ7-60-B-US&IQ7PLUS 72-B-US) Friends PV2(MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Cooling. Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means -The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.Seethe compatibility calculator at-https7//enphase.com/en-us/suppori/module-compatabeioly. 1' 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Referto local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com -OZN.-EN PHAS-E. ©2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 i Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman, NJ.08558 ! 908-872-3664 January 29,2018 Building Department Attn:Plan Reviewer Re:Proposed Photovoltaic Solar Panel Installation Dear Sir: I have reviewed the following documents related to the"EcoFasten Solar"ROCK-IT SYSTEM 4.0 and certify that the attachment system when installed in strict compliance with the manufacturers Installation Manual appropriate for this application and is in compliance with the latest building codes including Florida Administrative Code,2017 Florida Building Code-Residential Sixth Edition, ASCE-7-10,2017 Florida Building Code—Energy Conservation, Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.I make this certification for the following listed documents: 1. ROCK-IT SYSTEM 4.0 Installation Manual. 2. PZSE,Inc Structural Engineers Certification. 3. EcoFasten Solar Certificate No.US 82150026 4. ROCK-IT SYSTEM 4.0 Cut Sheet for Coupling,Hybrid Coupling, and Mount. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. i ()F. AR98795 Q • Daniel W.Dunzik,RA.LEED-APB'• 6L Fl.Lic.No.AR98795 I Cut Sheet - Rock-It-4:0-Coupling 1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions. 2. See_spec.sheet or contact manufacturer for detailed-material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. I 3.17in C� ® ® ® [80.54mm j 7.00in [177.80mm; i i 2.02in 2.14in 2.34in_ I� ,r51..38mm] [54.37mm I �59.36mm] : 32mm 35mm 40mm � ALPINE��.�,, ' r ' +c�� t�r�'SoI� '�' 4741 W-Polk Stree Ste._4 SNVVGIJARI�S Phoenix,AZ 85043 Toll.Free Phone 1.888.766.4273 Toll Free Phone 1.877.859:3947 Material:See Spec Sheet -Toll Free Fax-1.888.766.9994 Toll Free Fax 1.888.766.9994 - Scale:-1:4 si2s/2oii,7 ASG: - EFS: x. Cut Sheet - Rock-It-4.--O. Hybrid Coupling: 1. Installation to be completed in accordance with:manufacturer's written specifications and installation instructions. 2. See spec.sheet or.contact manufacturer for.detailed.material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. i I ' 3.-16in ® ® ® [80.29mm] 7.00in - [177.80mm] rn . o0 gl 5:OOin (127mm I 2.02in o 2.:1:4in 2.34in. o [51.38mm] [54.37mm] [59.36mm] 32mm 35mm ALPINE L� 4741 W Polk Street Ste.4 r3N� V l LRDS-4 ten-Solar Phoenix,AZ-85043 Toll Free Phone 1.888.766.4273 Toll-Free Phone-1,877.859.3947 Material:See Spec Sheet Toll Free Fax 1.888.766.9994 Toll Free Fax 1:888.766.9994 Scale: 1:1 6/28/2017 Ei'$: .X. i *Y �rW .77 Rt�-C K-IT SYSTEw4.Q RAIL-FREE RACKING UT1uzeS ECOFaSTen SOLars PaTenTeD T2G!-nOLOGy i UxEcoFvi ten Solar I i I II . I 1� I I I 1 I I A. V. n ol"',ar@ � o Committed-to the connection i I I I 1 Document Date:9.8.2017 i i I i Contents P& 1...................................................... .......................... ....... ........................................................ Assets-of.Design -Features System Components Pg. 2 ........................................................................................................................... Rock-It 4.0 Mount Assembly Rock-It 4.0 Coupling Assembly- . , pg. 3 ............................................................................................................. Rock-it 4.0 HybridMount Assembly Rock4t Clip SS Assembly Rock-it:Clip 2.0-Assembly P&.4........................................................................................................................................................... Array Layout GreenFasten Flashing Install Pg. 5..................................................................................................................................... Rock-It System 4.0 Install Pg.'6......;........................................................................................ .................................... .............. Ground Lug.Install Pg. 7 ..................................................................................................................................I........ Rock-it-Clip SS Install .Rock-It-Clip 2.0 Install Pg.-8-12 ............................................................................................................................. Standoff Spacing Tables Snow Load 0-20 psf Snow.Load 121-30.psf Snow:Load 31-40 psf Snow Load-41-50 psf Snow load 51-60.psf Pg. 13 ................................................................................................................................... Grounding Information, . Bonding Assembly and Bonding Path ................................................................................................................ Thermal Expansion and-Bonding Bracket:Spacing Staggered Layout Cantilever Pg. 15.. . .............................................................................................................................. System.Specifications EvalUated, Compatible:Modules i ROCK-IT SySTeM 4.0 Designed with the installer in mind. EcoFasten Solar specializes in solar roof attachments that are fast and-easy.to install;straightforward,secure and cost-effective.EcoFasten offers a wide variety of:standard products as well as custom solutions,for a one-stop source for all of your rooftop anchoring needs. Products are rigorously tested and approved above and beyond industry standards in-house:and by third party agencies. EcoFasten's patented conical sealing system has been in service in the.snow guard and solar industries for two decades. FeaTures • New and improved design • North-South adjustability • Fastest,easiest to level system on the market • Only one tool.required(1/2"deep well socket) Integrated electrical.bonding • Vertical adjustment of 3"-4 • 'SIMPLE-only 4 components SySTem ComPonenTS* - reauire.D - a look ROCK-IT SLIDe ROCK-IT 4.0 ROCK-IT 4.0 COUPLInG ROCK-IT 4.0 4" For ComP SHinGLe MOUnT & LOaD-BearinG I== Array sKirT 8" For TILe SYSTem col' ponenTs* - OPTIonaL ROCK-IT.CLIP SS QD�c� aserl Solar® (ReFer To PG.6) - EcoFasten Solar products are protected bythe following US.Patents:. 8,151,522 8,153,700 8,181;398 8,166,713 8,146;299 ' ROCK-17 4.0 8,209,914 U45,454 8,272,174 8,225;557 9,010,038 ROCK-IT 4.0 Array SKIr r 9,134,040 9,175rt78 9,212,833 H�JBrID mounT Er1D CAPS (ReFer TO.PG.:5) saa� come e neEsT ROCK-IT CLIP 2.0 ens of smirr secnons) (ReFer TO PG. 6) *Components for use with 32mm modules are available as special order.Components for use with 32mm modules are labeled as such.on system packaging.Please refer.to evaluated;.compatible modules grid on page 15 to Identify system compatible 32mm modules. I www.ecofastensolar.com. lnfo@ecofastensolar.com 877-859-3947 1 �I i I j L ROCK-IT 4.0 mounT ASSeMBLY NOTe: ITems 1-7; sHlp assemBL.eD �. 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS r 2 Rock-It 4.0 Mid-Clamp 6000 Series AL. 3 Rock-It 4.0 Shelf 6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock-it 4.0 Tie Plate 6000 Series AL ' �. 6 Rock-It Pedestal 6000 Series AL 7 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series SS 9 3/8"-16 x 3"Hex Tap Bolt 300 Series SS ef ROCK-IT SLIDes are accePTaBLe BracKeTS For ! r� Use WITH ROCK-IT 4.0 (SOLD separaTeLg) ROCK-IT 4.0 COUPLING aSSeMBLY NOTe: ITems 1-3 sHll=,assemBLeD i 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS 2 Rock-It 4.0 Coupling Mid-Clamp'6000 Series AL 3 Rock-It 4.0 Coupling Shelf 6000 Series AL 4 Rock-It Load Bearing Foot Clip 5 Rock-It Load Bearing Foot Base �• I i -i C3i i I � www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 2 II ROCK-IT 4.0 HYBRID mounT ASSemBLY : NOTe: ITems 1-10 SHIP assemBLeo 1 Rock-It 4.0 Shelf 6000 Series AL 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL 3 Rock-It 4.0 Coupling Tie Plate6000 Series AL - 4 Flange Level Nut 300 Series SS' �® 5 Rock-it Pedestal 6000 Series AL `�114 6 Rock-it Slide 6000 Series AL 7 3/8"-16 x 3"Hex Tap Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series S 9 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 10 5/16"-18 x 1.5"Hex Serrated Flange Bolt 300 Series SS o I 9 i �`0 I ROCK-IT CLIP SS ASSeI'1'1BLJ- ROCK-IT CLIP 2.0 ASSeMBLY NOTe: ITems 1-3 SHIP assemBLeD NOTe:.ITems 1-3 SHIP assemBLeo i 1 Stainless Steel Carriage Bolt-.313-18X.75 1 Rock-It Clip 2.0 2 Rock-It Clip SS 2 Stainless Steel Flange nut.313-18 3 Stainless Steel Flange nut.313-18 3 Bolt.3125-18x1x1-S 0 www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3 I II I Array- Lag OUT • Find the required structural attachment points. Mark these using a vertical(WS)chalk line on the center of the rafters. • Spacing may vary depending upon project specifics -structural requirements;:- high snow and-wind load areas may require lesser bracket spacing.in °4 the E-W axis vs.the maximum spacing.Max spacing is 48"for.portrait orientation and 72"for landscape orientation:Consult project layout diagram-for project specific bracket spacing on the roof. • Install.Rock It Mounts to predetermined mount spacing. • The Rock-It Array Skirt sections are the width.of a typical 60-cell module.-use the Rock-it Array Skirt as a.guide to lay out module placement. Note:The distance between*the rows,of mounts is calculated by the module dimension N=S plus 1 3/8" (35mm).Lag screw should-be installed as close to center.of exposed shingle as possible.The minimum. distance between the lag screw and the.edge of the shingle is 1/2" GreenFasTen` FLaSHinG STaLL i Locate the rafters and snap horizontal and.vertical line's to mark the installation position for each GreenFasten flashing. " 2. Drill a pilot hole(1/4"diameter)for the lag bolt Backfill.with sealant.EcoFasten Solar recommends an.EPDM mastic. 3 Insert the flashing so the top part is under the next row of shingles and pushed far . enough up slope to prevent water infiltration through- ertical joint Inshingles.The leading edge of flashing must butt against upper row of nails to prevent turning. �. when torqued. 4. Line up pilot hole with GreenFasten flashing hole. Insert the lag bolt.through the EPDM.bonded washer,the Rock-it slide,the gasketed. hole in the flashing and into the rafter. Torque:The range Is.between.100-140 torque inch-pounds depending on the type of wood and time ofyear.The visual.Indicator for proper torque is when the EPDM on the underside of the-bonded washerbegins to push out the sides as the washer compresses:If using an Impactwrench to install the fasteners.be careful not to.over torque the fastener.You may.need to stop and.use a ratchet to finish the install.. *The Engineer of Record shall check capacity of rafter to support lag.screw loading. wwwecofastensolarcom info@ecofastensolar.com $77-859-3947 4 i i ! a ROCK-IT SYSTert"l 4.Q iI'1STEILL i ti -.Xn 1 r q R&A Instal)EcoFasten Solar Flashing with-Rock-It Mounts •Follow EcoFasten Solar Install instructions forflashing and bracket Install(GreenFasten shown above). •Optimum vertical distance behveen lag bolts is 1 3/8',plus module dimension. •Set mounts oneavemostrowsothat the Rock-it Pedestal Is ontheSouthendofRock-itSilde. •Set mounts on all upper rows sothatthe Rodk4t:Pedestal Is on the North end of Rodk4t Slide. 2 Install Rock-It Array Skirt onto Eave Mounts • Slide Rock-it Array Skirt Into front channel on Rock-It Shelf. •.Array Skirt End Caps are pre-Installed on the East end of each skirt'section,and are used t -couple.the skirt sections where needed{see Fig.A}. Tighten Mid-Clamp bolt,damping Rock-lt Array Skirt to mount:Torque to 200 inabs:(1301n-lbs.when Installing with 32mm modules). _4 Instail Rock-it Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot Is required) • Prior to mounting on the roof,snap Load Bearing Foot into the bottom of.Rockdt Coupling if required._ (Each Load Bearing Foot Is set to same height as the Rock-it Mounts-ad)ust accordingly)-. On eave row only,slide Rock-it Array Skirt onto Rock-It Coupling SheltTorque to specified value, • NOTE.If a coupling lands on a rafter,the Hybrid Mount!should be used In place ofthe Rock-It Coupling(refer to image.3a). *Hybrid Mount can be made in the.fleld by assembling a coupling to a mount pedestal;or by purchasing separately. 5Align and Straighten'First Row of the Rock-it System with Rock-It Array Skirt •Use North-Southadjustmerit ofthe Rock4t Pedestal to straighten Rock4t Array Skirt and allgn module with ArraySIdrL •Torque screwon side ofRock-it Pedestal to'150lndbsto secure ttto the RockdtSlide. •Adjust Flange Level Nut to level the system(optional—can be leveled during orafterinstaliaUon}• i 6_9 Install 1 St Row of.PV Modules. •Slide upslope Rock-it Mounts down to engage top offirst module. •install Rock-it Couplings on the upslopestdeof 1st row of paneis. -Torque 2nd row of Mid-Clamps on Rock-@ Mounts and Rock-it Couplings to specified value. •Install balance ofPV modules,ensurin g that the Rock4t Pedestals aye In the appropriate position,then torci ue Mid-Clamps to secure modules. 1-0 Level the Rock-it System -when assemblyls complete;ievel the entire system byadjusting-Flange Level Nuts(Flange Level Nuts have no torque value). • Height between roofsurface and underside of modules should be 3"or less,when Installed with Type 2 modules INSTALLATION NOTE:Modules should.be Installed so that the Junction box is Installed upslope,away.from the leading edge of the array. www.ecofastensolarcom info@ecofastensolaccom 877=859-3947 5 i GrounDnG LUG nSTaLL .a f Necessary Components: - One of the following ground lugs(or any UL 2703.compliant ground lug): Burndy CL50-17N Ground'Lug-(UL 2703-E351343./ UL-467-E9999) ILSCO SGB-4 Ground Lug(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4DBT.(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4DBTH(UL 2703-E354420-/UL 467-E34440) ILSCO GBL=4SS(UL 2703-E354420 /UL 467-E34440) Note:Drill and-deburr hole in Ground Lug prior to installation - 14 AWG-4 AWG Copper Ground Wire* Torque Values: - 8-32.x 0.5"Serrated Flange Head Bolt(300 Series SS) 14=10 AWG=26 in-Ibs. - 8-32 Serrated Flange Nut(300 Series SS) 8 AWG=25 in-Ibs. - 11/32°and 1/4"wrenches or ratchets/sockets 6-4 AWG=.3.5 in'-Ibs. 1 Insert the flange bolt into the module ground.hole.Place Star Washer over bolt.Place ground lug over the bolt and Star Washer,and-turn to desired orientation. 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel-and tighten setscrew to complete assembly., *Wire should be sized in accordance with.the National Electrical Code,NFPA 70,Section 690A5,and a minimum of 1/4"clearance required between bare copper wire and aluminum. i" Drill.hole per.grounding lug manufacturers. k,V specifications in the upsiope part of Rock-It Coupling for attaching grounding lug. yr. ,:� •,:fy; .. ,, ug ` Note:Deburr hole in Ground Lug and Rock-It Coupling prior to installation. www.ecofastensolarcom info@ecofastensolar.com 877-859-3947 6 i i i ROCK-IT CLIP SS inSTaLL .RcceAtab�rhtounl�ng�aatom l .2'him,from _ _ ( . icncfioo-Boy 1 ri, Nr i 1. Locate all parts -Locate the Rock=It-Clip SS,micro-inverter/power optimizer;and the section ofthe module frame in which you will be mounting the micro-inverter/power optimizer. See fig.A for.acceptable mounting locations. 2 Install the Rock It Clip SS • Slide the Rocklt Clip SS onto the lip of the module frame. • Slide'the micro-inverter/power optimizer Into the opposite lip of the-Rock-It Clip SS. • Tighten the bolt-to 150 in-lb minumum to clamp the Rock-it Clip SS to the module frame and the micro:inverter/power optimizer to the Rock-it Gip SS. • .Ensure that.the-lip on-the clip is tight against the frame and that the micro inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening.. i ROCK-IT CLIP 2.0--inSTaLL Inverter Flange "'��"`'� ;fin•.. Module-Frame i Rock--Clip-2.0' 1 Locate all parts Locate the Rocklt Clip 2.0,micro-Inverter/power optimizer,and the section of the module frame in which you will be mounting the micro-inverter/power optimizer. 2,Install the Rock-it Clip 20(See below detail). • Slide the Rock-It Clip 2.0 onto the.lip of the micro-inverter/power optimizer. • Slide the.micrainverter/power optimlzer into the opposite lip of the-module frame. • Tighten the bolt to 150 in-lb to clamp the Rock-It Clip 2.0 to the module frame and the micro-inverter/power optimizer to the Rock-It.Clip 2.0. • Ensure that.the lip on the clip is tight against the frame and that the micro-Inverter/power optimizer flange is. tight against the clip flange to avoid rotation during tightening. www.ecofastensolar.com irifo@ecofastenscilar.com 877=859-3947 . 7 r o I Snow Load 0-20 psf. Modules in Landscape -Wind Speed Exposure 2:12<Roof Pitch<.6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone,1 Zone 2'. Zone'3 B 159 93 59 85 mph 110 mph C 114 67 42 88 88 D 96 56 35 '91 74 74 B 146, 85 54 90 mph 115 mph C 104 61 38 98 80 80 D 88 51 32 83 68 68 B 123 72 45 95 95 100 mph 125 mph C 88 51 32 . 83' . '68 68 D 74 43 27 70 , . 57 .57 B 98' 57 36 93 76 76 110 mph 140 mph C 70 41 26 66 54 54 D 59' 34 22 56 46 46. B .85 .50 31. . 81 66 66 120 mph 150 mph C 61 36 22.: 58' 47 47 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.)Values in above table.represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet-appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety.of 1:5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet In height 7.)Al adjustment-factors are set to 1.No site specific engineering is included in this table Snow Load 0-20 psf i Wind Speed Exposure 2:12<Roof Pitch.<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 _ Zone 3 Zone.1 Zone 2 Zone 3 B 91 85 mph 110 mph C 65 38 24 61 50 1 - 450 _ ) D 55 _ _ 32 20 w52: _s42;. 2 B 83 49 30 90-mph 115 mph C 59 35 22 56 46 46 D 50 29 18 47 38 38 - - - — r---- • WV:, • B , - - - 70—� _ 41 5.4 100 mph 125 mph C 50 29 18 47 39 39R D 42 _ _ 26 J _15 _ y _40 32 32LL__+ B 56 33 20 53 43 43 110 mph 140 mph C 40 23 14 38 31 31 D 34 19 12 32 26 26 28 - 18 — ~_ 46 ,---37—"- 120 mph 150 mph C 35 20 12 33 27 27 D 29- 17 10 28 22 22 Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed.standoff capcity=547#(per testing results) 4.)Includes.additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1..No site specific engineering Is Included in this table www.ecofastensolar.com info@ecofastensolarcom 877-859-3947 8 Snow Load 21-30 psf Modules in Landscape Wind Speed Exposure 2:12�c Roof Pitch c.6:12. 7:;12 c Roof-Pitch c 12;12 ASCE 7-05 ASCE 7-40 Category -Zone 1 Zone 2 Zdne.3 Zone 1- Zone 2 B 93 59 85 mph 110 mph C 67 . 42 D 96 . 56 35 B 85 54 90 mph 115 mph C 104 61 38 D 88 51. 32 B 72 445 100 mph 125 mph C 88 51 32 D 74 43 27 57 57 B 98 57 36 110 mph 140 mph C 70 41 26 54 54 D .59 34 22 56 46 46 B 85 50 31 66 86 120 mph 150 mph C. 61 36 22 58 47 47 D 51 30 .1$ 49, 40 40' , Notes: Spacing-Govemed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is-72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on,a maximum module width of 40" 6.)Based on Risk-Category II(ASCE 7-10)structures less then 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering Is Included in this table Snow Load 21-30 psf Wind S eed -Exposure 2:12 c Roof Pitch c 6:12 1 7:12 c Roof Pitch<.12:12 ASCE 7-05' ASCE 7-10 Cate o Zone 1 Zone 2 Zone 3 1 Zone 1 Zone 2. Zone 3 85 mph 110 mph C 65 38 24 D_ .55-- B 49 30' 90 mph 115 mph C 59 35 22 D 50 29 18 38 38 ---r - 'Cl— 26 1 100 mph 125 mph C 50 29 18 � 39 y,j;;. > 39 D 42 _ 26__ - . 15_ 40 32 •' 32 B 56 33 20 110 mph 140 mph C 40 23 14 38 31 3.1 D 34 19 12 32 26 26 37— - - :3Tf 120 mph 150 mph C 35 20 12 33 27 2T D 29 17 10. '28 22 2Z Notes: Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing In inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed.standoff capcity=547#(per testing'results) 4.)Includes additional factor of safety of.1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1:-No site specific engineering is included in this table www.ecofastensolarcom info@ecofastensoiarcom 877-859-3947 9 Snow Load 31-4.0 psf Modules in Landscape P Wind Speed Exposure 2:12<Roof Pitch-<6:12 7:12<-Roof Pitch-<12:12. ASCE 7-05 ASCE 7-10 Category Zone 4 Zone 2 Zone 3 Zone-1 Zone 2 Zone 3 B 59 85 mph 110 mph -C 67 42 D 56 35 B 54 90 mph 115 mph C 61 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 74, 43 27 B 57 36 1-10 mph 140 mph C 70 41 26 D .59 34 22 46 B 50 31 120 mph 150 mph C 6.1 36 .22 47 47 D .51 30 . 19 J 4% . 40 40 Notes: . Spacing Governed by Snow Load 1:)Values in above table represent the.maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down.to meet appropriate rafter spacing 2.-),Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) -4.)Includes additional factor of safety of 1.5 for lag pullout,capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)Structures less than 30 feet In height 7.)All adjustment factors are set to 1.No site-specific engineering Is Included in this table Snow Load 31-40 psf Wind Speed Exposure 2:12.<Roof Pitch<.6:12 1 7:12<Roof Pitch -12" ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 . Zone 3 .B � 3 `85 mph 110 mph C a 38` § 24 D ... .32___ 20 B 49 30 90 mph 115 mph C 35 22 D 29 18 26 100 mph 125 mph C 29 .18 D -42_w �9 26_ 15_ B 33 20_ 110 mph 140 mph C 40 23 14 D 34 19 12 26 26 B 120 mph 150 mph C 35 20 12 27 `42,7 D 29 17 10 2$. 22 Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum.allowable spacing in.inches for pullout.forces only.on EcoFasten Solar standon 2J Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor-of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.).Based on Risk Category II(ASCE 7-10)-structures less then 30 feet In height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 10 i Snow Load 41-50 psf Modules In Landscape Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12;c Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 11 Zone 2 Zone 3 B 59 . 85 mph 110 mph C 42 D 56 35. B 54 90 mph 115.mph C 61 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 43 27 B 57 36 110 mph -140 mph C 41' 26. D 59 34 22 46 46 B 50 31 120 mph 150 mph C 61, 36 22 47 '47 D 51' 30 19 49' .40 40 Notes: ®.Spacing Governed by Snow Load 1.)Values in above table.represent the maximum allowable spacing in Inches for pullout forces oniylon EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing j 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing.results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to-1.No site specific engineering is Included in this table Snow Load 41-50 psf Wind Speed Exposure 2:12<Roof,Fitch a 6:12 7:12<Roof Pitch a 12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 1 Zone 3 Zone 1 Zone 2 Zone 3 B 33 85 mph 110 mph C .381 24 D ,_324. 20 B 30 90 mph 115 mph C 35 22 D 29- 18 B - --2s 100 mph . 125 mph C 29 18 D 26 15 - B 33 20 110 mph 140 mph C 23 14 D 19 .12 - B - 28 120 mph 150 mph C 35 20 12 D 29 17 10 .. �� .„22' MP Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category.II(ASCE 7-10)structures less than 30 feet in height 7.).Ail adjustment factors are set to 1.No site specific engineering.is Included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 .11 i -Snow Load-51-60.psf Modules in Landscape Wind Speed Exposure. 2:12<Roof Pitch.<6:12 7:12<Roof Pitch-<12:12 ASCE 7-05.ASCE 7-10. Cate o Zone 1 Zone 2 .Zone 3 Zone 1; Zone 2 B 85 mph 110 mph C 42 D 35 B 54 90 mph 115-mph C 38 D 51 32 B 45 100 mph 125 mph C 51 32 D 43 27 B 36 110 mph 140 mph C 41 26 D 34 22 B 50 31 120 mph 150 mph C 36 22 D 51 30 19 Notes: Spacing Governed by Snow Load 1.)Values In above table-represent the maximum allowable spacing In Inches for pullout forces.only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2-)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4:)Includes additional factor of safety of 1.5 for lag.pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering Is Included in this table Snow Load 51-60 psf Wind Speed Exposure 2:12 a Roof Pitch<6,12 7:12<-Roof Pitch<12:12. ASCE-7-05 ASCE 7-10. Category Zone 1 Zone 2 Zone 3 Zone-1- Zone 2 Zone.3 85 mph 110 mph C , 24 a D ; 3.2 20 B 30 90 mph 115 mph C 22 D 29 18 - B -- 26-_- 100 mph 125 mph C 29; 18 D .. '26 15 B 20 110 mph 140 mph- . C 23 14 D 19 12 _ - - - - - B -18- 120 mph 150 mph C 20 12 D 29, 17 10_ < Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing In Inches for pullout forces only on EcoFasten Solar standofl 2.)Maximum aliowed.spacing-approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of T.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based.on Risk Category II(ASCE 7-10)structures less than.30 feet in height 7.)All adjustment factors are set to 1.No.site specific engineering Is included In this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 12 I : GrounDinG. inFormaTlon The rail-free Rock-it System may be used to mount and ground PV modules that comply with UL 1703,onl i when that specific module has been evaluated for mounting and grounding,in compliance with the included installation instructions. Note:Grounding lug must be visible to inspectors from the entire perimeter of the PV array. Multiple Use Grounding Pins Grounding pins within the Mid-Clamp are multiple use bonding/grounding devices.Modules will need to be adjusted if the Mid=Clamps are loosened to.ensure there is"newr'metal to pierce into upon retightening. Grounding Method Rock-it 4.0 Mount bonds N-S rows of.modules Rock-It 4.0 Coupling bonds E-W rows of modules Rock-It Array Skirt bonds E-W along the entire arraywhen installed .One Burndy CL50-1 TN ground lug is required per PV array,limited to 300.modules placed in either portrait.or landscape orientation, BonDInG- AssemBLJ anD BonDInG PaTH i Bond Path Grounding Lug r-Equ�men Gr°�ndlrE Integrated Bonding c°nlvctor fGrot ganutseratyto earth gro 1 on Rock-It Coupling ■ Rock-it Monrt RQCk-It May Skirt I I , -I Bond Path 1 Bond Path -- — to Grounding Lug Grounding Lug C�ulomerx GrounlUg /— Cawumor(W-0 C° ppmmentGi4GC}.ill kercralk l°cu"r "r �nductor ng Maun! 8. C�Ilyt°°ath wd ® Rock•It Coupling o Rcck-I[CoupMg ■ Rock-It Mount .�..Rock-It May Skirt ■RoWt Mount Rock-It array Skfrt' -www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 13 F THermaL EXPansion anD BonDInG A thermal expansion gap is required per each continuous 40'length of modules. --- Bond Path Grounding Lug -Omit a coupling and leave a 2"gap in the Rock-it Array Skirt and also between / --Equipment i G�`� the modules at that point. Wou d � Rock-it Coupling r Rock-it Mount Rock-it Array Skirt i BracKeT sPacinG .Portrait Orientation Landscape.Orientation ji i I i 1 i I Maximum east/west bracket spacing is 48"OC. Max east/west bracket)spacing is 72"OC. 32mm modules:Max east/west'bracket spacing.is 48"OC. i Spacing may vary depending upon project specific structural requirements;i.e.high snow and wind load areas may.require lesser spacing E-W than the maximum.- ; sTaGGereD Lai ouT canTILever an.D oFFseT Staggered Mounting.Points i ®Rock-It'Mount ®Rock-It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For porthait orientation installations,check layout.priorto installing. The array layout instructions in this Installation manual offer a general overview of layout. Periodically,.due to a variety of Offset:Offset from all roof edges depends on-wind speed,snow factors(roof obstacles,shading,etc,)other layouts are required. loads,local fire and building codes per location www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 14 i i I ROCF<- IT SYSTeM 4.0 sysTem speclFicaTlons I Max No.of Panels .300,Modules per ground lug Materials 300 Series Stainless, 6000 Series Aluminum Max System Voltage 1000VDC Coating Black Andodization/Mill Finish Class A Fire Rating With UL1703Type 1 Rated Lug Specifications Bumdy CL50-1TN Ground Lug Modules,see note below. ;. (UL Listing#KDER E9999) Leveling Range. 3-4" 'Ground Wire 14 AWG 4 AWG Copper Per above Lug spec, Ground Wire -Rock-It Slide Comp.Range 3" Max Module Size 64.96"(1650mm)x Rock-lt Slide Tile 7' 39.05'(992mm)x 2"(50mm) Min/Max Roof Slope '1/2:12/12:12 Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing(35mm/mmm) 72" Rock-it Mount Load Rating 547lbs with Single 5/16'Lag 3.0 Max Anchor Spacing(32mm) 48" Safety Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16"diameter Mount Box CITY 12 units -Module Cantilever Maximum cantilever is 1/3 Rock-It Slide Box MY 50 units bracket spacing Coupling Box QTY 12 units Warranty 20Year Material and Workman- ship Codes:National,Electric'Code;ANSI/NFPA 70,NEC 250,NEC 690,IRC,IBC Standards:UL 2703:First Edition,UL 1703 solar Emr-w-Sol" " 1xoa-gym STEM MFG ID CODE'W"34016 CONSo6MSTDVl710) WNFGHMSTOUL2703 uL04l_mpSrMl11TC9 . r..a.. LNLLLLf011UMDMILV6S r....--n•O AEO(u�NTNYt�CYA\ m• The EcoFasten Solar Rock-It System is a rooftop PV racking system consisting of 6000 Series Aluminum and 300 Series Stainless-Steel components.The Rock-It System includes the.rack components but does not include the PV panels,, inverters or electrical components.The PV modules to be used with Rock-It shall be certified under UL 1703.The system shall be used on steep slope roofs mounted over a Class Afire rated roofing material and attached to the roof structure using:5/16"diameter,minimum 4"long 300 series Stainless Steel lag-bolts with minimum thread embedment depth of 21/2"into the roof structure. Periodic re-inspection for loose components The system is subject to re-inspection as required by the PV module manufacturer or.by the Authority.Having Jurisdiction:Re-inspection,.as required,should include evaluation of any loose components or loose fasteners.All loose components and fasteners should be.secured.in accordance with these instructions:The system should also'be evaluated for.any evidence of corroslon.Any corrosion should be removed.Any affected part should.be cleaned or replaced in accordance with these instructions. i o0zEc6rasten.Solar° www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 _15. I i i 1 FeaTures • New and improved design • North-South adjustability • Fastest,.easiestto level system on the market • Only one tool required.(1/2"deep well socket) • Integrated electrical bonding Vertical adjustment of 3"-4 • SIMPLE-only 4 components I EVaWaTe.D, CompaTIBLe MODULes ModileManufacturer Model Type rx"used to Module Dimensions(mm) Module Dimens;onsQn)- Downward Pressure Upward Pressure Down-siopeoeslW1 .Maximum Camp indlcatevariabletest) DesignLoad(psf) DeslgnLwd(pso Load(psf) Spadng(In) Trina Solar TSM-xxx4PJm5.08 1640 x 992 x40 6495"49A5"•1.57" 33.3- 1333 20 72 09nadlan Solar C56P•xxxM 1638 x 922 x 40 64,46"48.66"457" 33.3 1333- 20- .72 Canadian Sdar C5SP-xxxP 1638 x 982 x 40 64 5"1W8.7 k1.5T' 33.3 133.3 20 72. Jlnko Solar XMI=P-60 1650'x992x40 64961,49.05"xL57" 30 30 20 72 Jlnko Solar JKMxxxM-60 1650 x 992 x.40 6496"x39.05"457" 30 30 20 72 JlnkoSolar J10AMep-60 1650x992x40 64.96"x39.05"1157" 30 30 20 72' Jlnko Solar JKMxxxMM-60 1650x992x40 6496"r09.051'4.57" 30 i 30 .20 72 YinolSolar -YLImP-296 1650x990x40 64.96"x38S7"xL57" 30 1 30 20 72 LG Elcetronlcs LG300NiGB3 1640 x 2000 x 35 6457"x39.87IN1.88" 30 30 20 72 LG Elcetro les LG30DN1K-G4 1640 x 1000 x 40 6457"49aT UT' 30 1 30 20 72_ AxitecSolar AC-xxxM/156.605. 1640x992x40 645"x39.00(L3B" so. 30 20 48 RECOM R(M-2xx-6MB 1640X992x35 6456`49A5"x1.37" 30 30 20 72 sllfab SLA2xxP 1650x990x3B 64.96"4887'xL49" 30 130 '20 72 Solana Power)o-oaR-BX 2621 x 1056 x 40 69.89"01.53"xL57" 30 1 30' 20 48 Hamvho-Q Calls' 0,PRO G42xx 1670 x 1000 x 32. 65.75"49.3714.25" 30 1 30. 20 48 Hanwha-Q Cells* C,PRO G42xx 1970 x 1000 x 32 65.75"x99Xr'xL29" 30 1 30_ 20 72 Sunprwne GxB-3xxT 1670 x997x40 65.75'S69.25'9d.57' 30 30 20 .48 REC REC-xxx-6Ma 1675x997x3B 65.94"x39.25x1.5" 20 20 20 72 REC. REC-xxx-GMB 1675 x997 x3B 65.94•x39.25"xL5" 30' 30 20 .48 SolarWorld SW xxx Mann Black 1675 x961 x33 65.95"x37.8"x1:30" 20 20 20 72' SolarWorld SW.xxx Mono Block 1675x961x33 65,95"x37.B"xL30" 30 30 20 48. •Hanwha Q-Cells 32mm modules to be used with special order Rock-It System components.-Call for details. Qq�Q EcoFasten- Solar -www.ecofastensolarcom info@ecofagtensolar.com 877-859-39.47 16 i Cut Sheet - Rock-It-4.0-Mount 1: Installation to be completed In accordance with manufacturer's written specifications and installation instructions. 2. See spec sheet or contact manufacturer for.detalled-material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. UL i i 3.17in [80.54rnm] 2.50in. 63.50mm j [ I I fcl) I I 2.02in 2.14in 2.34in [51.38mm] i 54.37mml59.36mm 32mm — 35mm 4.0mm ALPINE r� I+ t r�S��a�'�'. 4741 W Polk Street Ste;4 SNUARDS'' Phoenlx,AZ 85043- i Toll-Free Phone 1.888.766.4273 Toll Free Phone 1.877.859.3947 Material:-See Spec Sheet Toll Free Fax 1.888.766.9994 Toll Free.Fax 1.888.766.9994 -- Scale: 1:2 6/28/2017 ASG: - EFS: x I I Data Sheet Enphase Networking i Enphase The Enphase IQ Combiner 3T" with Enphase IQ Envoy"' consolidates Interconnection IQ. Combiner 3 -equipment into a single I-enclosure and (X-1Q-AM1-240-3) streamlines PV and storage installations by providing.a consistent, Pre-wired solution for residential applications! It offers up to four, 2-pole input circuits and Eaton BR series busbar-assembly. Smart Includes IQ Envoy for communication t i and control L� • Flexible networking supports Wi-Fi; Ethernet,or cellular I• i t--�- �-- Optional fAC.receptacle available for PLC 3 ' bridge (,�! E^ •M# ' Provides production metering and optional consumption monitoring e„•• Simple Reduced size from previous combiner Centered mounting_brackets;support single stud mounting ` Supports back and side conduit entry _a • Up.to four 27pole branch circuits for 240 VAC plug-in.breakers.(not included) i• _. _w _ 80 A total PV or storage branch circuits Reliable • Durable NRTL-certified NEMA type 3R enclosure • Five-year warranty UL • UL listed FISTED #M E N P H A S E. To learn more about Enphase offerings,visit enphase.com i s i Enphase IQ Combiner 3 MQDEL NUMBER IQ Combiner 3 X-IQ-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy"printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and optional*consumption'monitoring(+/-2.5%). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect" J CELLMODEM-03(4G/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-MI(4G based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5%). Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BIR250,and BR260 circuit breakers. BRK-10A-2-240 Circuit breaker,2 pole,1 OA,Eaton BR210 BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 EPLC-01 Power line carrier(communication bridge pair),quantity 2 XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating 125 A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max.continuous current rating(input from PV) 64 A Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions(WxHxD) 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6.63").Height is 21.06"(53.5 cm with mounting brackets). Weight 7.5 kg(16.5 Ibs) Ambient temperature range -400 C to+460 C(-400 to 1150 F) Cooling Natural convection,plus heat shield Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors • 60 A breaker branch input: 4 to 1/0 AWG copper conductors Main lug combined output: 10 to 2/0 AWG copper conductors Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters(6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) Cellular Optional,CELLMODEM-01 (3G)or CELLMODEM-03(4G) or CELLMODEM-M1(4G based LTE-M) (not included) COMPLIANCE Compliance,Combiner UL 1741 CAN/CSA C22.2 No.107.1 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 *Consumption monitoring is required for Enphase Storage Systems. To learn more about Enphase offerings,visit enphase.com ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. E N P H A S E. 2018-09-13 %%0001 Installation Manual Soltection RJ=1 Rooftop Solar Junction Box Flashing Unit For Composition/Asphalt Shingle Roofs v Manufactured by: Soltection: a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston,TX 77029 1-866-227-0577 www.soltection.com Soltection RJ-1 Installation Manual Page 1 TABLE OF CONTENTS INSTALLATION INSTRUCTIONS Contents IMPORTANT SAFETY INSTRUCTIONS......................................................................!............................................:....4 SAFETY WARNINGS & CAUTIONS..........................................................................................................................4 ELECTRICAL PRECAUTIONS..................................................................................1................................................. 5 MECHANICALPRECAUTIONS.................................................................................................................................. 5 PRODUCTINFORMATION............................................................................................L................................................ 6 i OVERVIEW....................................................................................................................:................................................. 6 PREP & PLACEMENT....................................................................................................!.................................................7 REQUIREDTOOLS....................................................................................................................................................... 7 PRODUCTPLACEMENT..............................................................................................................................................7 SPECIFICATIONS .......................................................................................................................................................... 11 MECHANICAL/ELECTRICAL................................................................................................................................... 11 .TORQUE RATINGS..................................................................................................................................................... 11 WARRANTIES: Seller warrants to Buyer that products and any services furnished hereunder will be free from defects in material,workmanship and title and will be of the kind and quality specified in Seller's written quotation.The foregoing shall apply only to failures to meet said warranties(excluding any defects in title)which appear within two years from the date of shipment hereunder. The conditions of any tests shall be mutually agreed upon and Seller shall be notified of, and may be represented at, all tests that may be made.The warranties and remedies set forth herein are conditioned upon(a)proper storage, installation, use and maintenance, and conformance with any applicable recommendations of Seller and (b) Buyer promptly notifying Seller of any defects and, if required, promptly making the product available for corrections. If any product of service fails to meet the foregoing warranties (except title), Seller shall thereupon correct any such failure . either at its option, (i)by repairing any defective or damaged part or parts of the products, or(ii)by making available,-F.O.B. Seller's plant or other point of shipment,any necessary repaired or replacement parts.Where a failure cannot be corrected by Seller's reasonable efforts,the parties will negotiate an equitable adjustment in price. The preceding paragraph sets forth the exclusive remedies for claims (except as to title).based on defect in or failure of products or services;whether the claim is in contract, indemnity,warranty,tort(including Seller's negligence),strict liability or otherwise and however instituted. Upon the expiration of the warranty period, all such liability shall terminate and Buyer shall have a reasonable time,within thirty days after the warranty period,to give written notice of any defects which appeared during the warranty period. Except as set forth in Article 2, "Patents," the foregoing warranties are 'exclusive and in lieu of all other warranties, whether written, oral,implied or statutory. NO IMPLIED STATUTORY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE SHALL APPLY. Seller does not warrant any products or services of others which Buyer has designated. www.soltection.com Soltection RJ-1 Installation Manual Page 3 I i IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONS & SAFETY WARNINGS PRIOR , INSTALLATION NOTE: SAVE THESE INSTRUCTIONS This manual contains important instructions that shall be followed during installation and maintenance of the Soltection RJ-1 rooftop junction box with flashing. LETHAL VOLTAGES ARE PRESENT DURING THE INSTALLATION, OPERATION AND SERVICE OF THIS EQUIPMENT. PROPER PRECAUTIONS MUST BE TAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . SAFETY WARNINGS & CAUTIONS ■ Only qualified personnel or licensed electricians should install this product and the instructions herein are provided for those individual(s)only. ■ To reduce the.risk of electric shock, injury, or death, all electrical wiring and connections must be performed by qualified personnel. ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper precautions must be taken at all times to ensure the safety of the service personnel. ■ Follow state and federal Occupational Safety and Health Administration (OSHA) guidelines and regulations when installing this product. ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations as well as for installation best practices. ■ Install this apparatus in accordance with ANSI/NFPA 70, National Electrical Code (NEC). Follow all national or local electrical codes. ■ Install, operate, and use this product in a manner consistent with the instructions provided. Failure to follow the procedures indicated may result in roof leaks, property damage,',or consequential damage. www.soltection.com Soltection RJ-1 Installation Manual Page 4 i j► CA.UTI�JN -ELECTRICAL-PRECAUTIONS Ensure all electrical conductors.are-at zero.-voltage potential=before installing or servicing this unit. ■ Never break contact on.a circuit without using.the appropriate disconnect device. ■ Follow established lockout and.tagout procedures for.all electrical conductors prior-to servicing. ■ Beware.of power--lines in the vicinity-of-the roof, where-.inadvertent.contact may result in electrocution, .personal injury,or.death. j I ■ When.disconnecting-.source.or.supply circuits, provide.sufficient time.as stated in the.power electronics manufacturer's:instruction manual in.order to-.ensure discharge of.all condiuctors in,the circuit.- Always verify the integrity and proper installation of the electrical components prior to energizing electrical circuits. ■ Non-metallic enclosures do not provide.grounding means between conduit .connections.-The use of grounding.hubs and jumper wires are required, ■ -Grounding must be sized per NEC-requirements, and is the responsibility f the installer. -MECHANICAL PRECAUTIONS ■ When drilling into-an attic-.space,.ensure-that electrical wires,, mechanical obstructions, or potential electrical-hazards are.removed from the vicinity and direction of the drill. Do-not install -if the roof is wet,.frosted, or covered by ice or snow. i ■ If.any part of this product becomes damaged, • remove,and:destroy the- entirety of the unit.. Failure.to do so may result in, fire, property damage, personal injury, electrocution, .or death. ■ Do not use the product to anchor fall protection equipment. www.soltection.com Soltection RJ-1 Installation Manual Page 5 I I i E PRODUCT INFORMATION OVERVIEW ■ The Soltection RJ-1 Residential Rooftop Junction Box is a flashed roof penetration designed to protect electrical conductors entering the rooftop/attic. It is made of a high-stirength UV-resistant and UV- stabilized polymeric material. ■ The RJ-1 enclosures comes fully equipped with a slotted DIN rail mounted jnside the enclosure designed for mounting of DIN rail accessories, such as terminal blocks. ■ A four position ground bar is also provided as a means to form a bond between the solar array mounted on the roof and the building. CORNER SCREWS I MOLDED COVER I iPLASTIC SCREW FOR GROUND BAR I i AFFIXING DIN RAIL GROUND BAR I 00 O O O I MOLDED BASE DIN RAIL i i i www.soltection.com Soltection RJ-1 Installation Manual Page 6 I i PREP & PLACEMENT REQUIRED TOOLS I I ✓ Shingle Ripper Bar ✓ #2 Phillips Screwdriver ✓ -Lumber Crayon ✓ Uni-Bit ✓ Hole Saw or Spade Bit ✓ Utility Knife ✓ Roofing Sealant 1 .. I• .- .. ,....- - RAFTER PRODUCT PLACEMENT • Identify the location and placement of the -flashing on the-roof as shown. The product - - may be mounted beneath the array or adjacent to the array. - - .y DO NOT LOCATE THE -PRODUCT DIRECTLY. OVER k RAFTER TO- ENSURE THE RAFTER. DOES NOT INTERFERE "WITH THE WIRING Remove template from packaging ENTRY INTO TH E.ATTIC and use in Step 2 STEP 1. www.soltection.com Soltection RJ-1 Installation Manual Page 7 i I - r NOW �1 w a �s7tSij; a,1 Kc��f• x ; �' 7 w-� I .T�Frt 1`f1 .1.ryf f s: RECCOMENDELOCATION FOR, O • INTO ROOF lsg � 14r f: , .�r .•� l.,yferl.} �, MOLDED 1 ■ hNl r •\ '�a �J, :its 1}1 7j f Y. Yf. t SY�.. .+ +A�' ry • •'f fin. 'lip �. .. • ll ASr _5. • 1 ,0 - I 4 Remove RJ-1,flip it over,wipe it clean&apply Reinstall Unit. Use the two supplied Decking a bead of roofing sealant to the underside of the Screws to mount the flashing to the roof. flashing unit. Ensure that it's placed in the Torque to the specification indicated in the "Upside-down U"Shape to support engress specifications. Refer to Table T2(page 10)for water protection,AS SHOWN. the proper tightening torques. STEP 10 STEP 11 POPULATE RJA • Populate the RJ-1 unit using the appropriate wire connectors, terminal =" blocks, or other necessary components. • Ensure that the components installed are rated for and are suitable for the intended purpose. • The RJA unit is provided with multiple standoffs which can accommodate accessories to be mounted. Step 11 . A Install the cover onto the top of the enclosure. Tighten 4 cover screws to the Torque value indicated in Table T3(see page 10) STEP 12 www.soltection.com Soltection RJ-1 Installation Manual Page 10 I SPECIFICATIONS i MECHANICAL[ ELECTRICAL ■ -Product Certifications: UL508A ■ Enclosure Rating: Type.4X ■ Attic.Conduit Pass Through Connector Size Range: 1/2"—.1" ■ Max. Side Wall Conduit-Size: 1" ■ Maximum Current: N/A • Maximum Voltage: N/A ■ Ambient Operating Temperature: -35C to 75C TORQUE. RATINGS Table T1: Ground Bar Connection'.Wire Range: #4 to#14, 4 Usable Connections oo� o. 0 'Wire Size Tightening Torque(lb- in 4-6.AWG 35 8 AWG 30 10-14 AWG 125 Table T1 Table T2: Mounting Screw, Mounting to Deckin , 2 Provided Tightening Tor ue Ib-in 1.15-20 i Table T3: Torque Values,.Cover/Lid.Screws , 4 Provided, Captive Ti htenin Torque (lb-in 11 www.soltection.com Soltection RJ-1 Installation Manual Page 11 I I i TM soltect ion by vy n c kie r Soltection is a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston,TX 77029 1-866-227-0577 I i i i SYSTEM INFORMATION CLIMATIC&GEOGRAPHIC DESIGN CRITERIA TABLE PLAN KEY momentumR3012( momentumMODULE HANWHA Q.PEAK DUO BLK-G5 315 SOLAR �'1 PAGE . SPEED(MPH) 144 PV-1.1 ATTI!�HMENT DETAU. INVERTER ENPHASE 1Q7-60-2-US PRO CUSTOM SOLAR LLC D.B.A.MOMENTUM SOLAR 325 HIGH STREET,METUCHEN,NJ 08840 RACKING ECOFASTEN ROCK-IT SYSTEM TOPOGRAPHIC EFFECTS B (732)902-6224 PV-2 ROOF LAYOUT MOMENTUMSOLAR.COM PV-3 SYSTEM SIZE (DC) 8.19 KW SPECIAL WIND REGION NO PROFESSIONAL PV-3.1 ELECtRIcAL CANT. LOCATION 28.2500531,-82.2182202 WIND BORNE DEBRIS ZONE 2 ENGINEERING PV-3.2 EQUIPMENT LABELS GENERAL NOTES: SEISMIC DESIGN CATEGORY C THIS PV SYSTEM HAS BEEN DESIGNED TO MEET THE MINIMUM DESIGN STANDARDS CLIMATE ZONE 2A i/ FOR BUILDING AND OTHER STRUCTURES OF THE ASCE 7-10, 6TH EDITION 2017 WIND EXPOSURE CATETORY B ���'� ' FLORIDA RESIDENTIAL CODE, 6TH EDITION 2017 FLORIDA BUILDING CODE, 6TH1 EDITION 2017 FLORIDA FIRE PREVENTION CODE, NEC 2014 AND ALL LOCAL CODES & e • ' . ORDINANCES. • Q ROOF SHALL HAVE NO MORE THAN TWO LAYERS OF COVERING IN ADDITION TO THE SOLAR EQUIPMENT. INSTALLATION OF SOLAR EQUIPMENT SHALL BE FLUSH MOUNTED, PARALLEL TO AND ST AE OF HANWHA Q.PEAK DUO BLK-GS 315 NO MORE THAN 6-INCHES ABOVE THE SURFACE OF THE ROOF. i o 315 WATT MODULE -'tt. •.atoRt • 0��.` 3 3994"X 6" ANY PLUMBING VENTS ARE NOT TO BE CUT OR COVERED FOR SOLAR EQUIPMENT �� �NA �SS/ SEE ATASHE j INSTALLATION. ANY RELOCATION OR MODIFICATION OF THE VENT REQUIRES A ///// 1•;,���� PLUMBING PERMIT AND INSPECTION. I It ALL DESIGN, CALCULATIONS ARE PERFORMED BY DANIEL DUNZIK REGISTERED BILL OF MATERIALS ARCHITECT. FLORIDA STATE STATUTE 471.003(3) PROVIDES THAT LICENSED ALL WORK 8HALL COMPLY ARCHITECTS ARE EXEMPTED FROM THE PROVISIONS OF CHAPTER 471 ENGINEERING WITH PRE/Au MODULES 26 AND NOT PRECLUDED FROM PERFORMING ENGINEERING SERVICES FOR INTEGRATED CODES FLORIDA BUILDING CODE, SYSTEMS AND SERVICES THAT ARE INCIDENTAL TO BUILDINGS AND STRUCTURES. NA71OI1��,E �IC CODE, INVERTERS 26 0� $ CLAMP ASSEMBLY 81 INVERTER PLACEMENT: COUPLING ASSEMBLY 38 SYSTEM UTILIZES "ENPHASE" MICRO-INVERTERS WITH RAPID SHL`TDOWN CONTROL BONDING CUP 8 LOCATED ON THE BACK SIDE OF EACH MODULE. 'EVi� SOLAR CONTRACTOR C/• / �"O4 fNTR CT R LICNSEN SKIRTS 8 Iyy CE1tT[FIED SOUR CON MOMENT LICENSE NtNABER:CVC57036 STRUCTURAL STATEMENT: PLAL Zr�p D. SU"T"NA` sn8 NAkM aLw. SUITE 307,ORLANDO FL.32819 ENPHASE COMBINER BOX iwV CUSTOMER INFORMATION THE EXISTING STRUCTURE IS ADEQUATE TO SUPPORT THE NEW LOADS IMPOSED BY 1N. EATON 60A FUSIBLE AC 1 THE PHOTOVOLTAIC MODULE SYSTEM INCLUDING UPLIFT&SHEAR.EXISTING RAFTER TARA -DERKAOUI-M544960 DISCONNECT SIZES &DIMENSIONS CONFORM TO 6TH EDITION 2017 FLORIDA RESIDENTIAL CODE 6416 COBBLE BLISS STREET 40A FUSES 2 FBC, Residential 2017 ZEPHYRHILLS,F!33541 MOUNTING BRACKETS AND HARDWARE MEET OR EXCEED FLORIDA CODE 727 418-2728. 35A BACKFEED BREAKER 1 REQUIREMENTS FOR THE DESIGN CRITERIA OF THE TOWN. PV SYSTEM INFORMATION TABLE R301 .2.1 .3 SYSTEM SIZE(DC):8.19 KW 26 MODULES:HANWHA Q.PEAK DUO WIND SPEED CONVERSIONSa BLK-65 315 26 INVERTERS:ENPHASE IQ7-60-2-US Vit 110 115 120 130 140 150 160 170 180 190 200 PROJECT INFORMATION Vasd 85 89 93 101 108 116 124 132 139 147 155 INITIAL DATE: 2/1/2020 DESIGNER:511 For SI: 1 mile per hour = 0.447 m/s. DATE: DESIGNER: REV: DATE: DESIGNER: a. Linear interpolation is COVER permitted. PAGE PV- 1 SEE ATTACHMENT SCHEDULE iii FOR MAXIMUM CANTILEVER moATIIT 5Th M� `M 1. ALL WIND DESIGN CRITERIA ARE FOR LOW SLOPE ROOFS,GABLE AND HIP ROOFS COUPLING 'wQ tF F, u l SOLAR CONSIDERED FROM AN ANGLE OF MIN.9.5°( )TO MAX.45°O NOT TO EXCEED ATTACHM GOOFENT 30'MEAN ROOF HEIGHT ATTACHED WITH FASTENERS AS SPECIFIED BY THE E#1SIIBIw tt9�fl MANUFACTURER. MKS PRO CUSTOM SOLAR LLC D.B.A.MOMENTUM SOLAR I I FASW 1,, \ / J' 325 HIGH STREET,METUCF" NJ 08840 2. SPAN TABLES ARE DERIVED FROM MECHANICAL LOAD TESTS PERFORMED BY THE SOLAR MODULE p32�MSOLAR4 MANUFACTURERS INDEPENDENT TESTING AGENCIES ON BEHALF OF THE MOMENTUMSOLAR.COM MANUFACTURER. PROFESSIONAL 3. ROOF SEALANTS SHALL CONFORM TO ASTMC920 AND ASTM 6511 I I I 1 ENGINEERING 4. ATTACHMENTS ARE MANUFACTURED BY ECOFASTEN SOLAR,PHOENIX,ARIZONA. GUTTE AND ALL ATTACHMENTS SHALL BE INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURERS PRINTED INSTRUCTIONS. MINIMUM 5"SPACING TO GUTTER ROCK-IT TO RAFTER ATTACHMENT SPACING SCHEDULE ECOFASTEN SOLAR ROCK-IT 4.0 MOUNTING DETAIL *AU.MODULES TO BE INSTALLED IN LANDSCAPE ORIENTATION ECOFASTEN SOLAR ROCK-IT 4.0 RAIL-LESS MOUNTING SYSTEM ALA CO/Ofl 5 SII,E AS YIMEAcm IIT'OFASD S%NO ONLY IN WIND ZONES IN 1 ALLED &UP. INTEGRATED WITH FLASHING,COUPLINGS AND ADJUSTABLE w s N SwCV EIDNtNK'f nI M INID " ///�� CLAMP ATTACHMENTS t1�IIIIi ULTIMA `�ATTACHMENT DETAIL FOR SLOPED ;� 4 �f�/, DESIGN ROOF ZONE 1 ROOF ZONE 2&3 COMP. SHINGLE ROOF o CEN$ WIND MAX.SPAN/MAX. MAX.SPAN/MAX. �. SPEED CANTILEVER CANTILEVER (INCHES) (INCHES) _ * = MPH SEE ATTACHMENT SCHEDULE ASS iK.j 125 48"O.C./16"MAX. 32"O.C./12"MAX. FOR MAXIMUM CANTILEVER 130 48"O.C./16"MAX. 32"O.C./12"MAX. y 2 Q•� 140 48"O.C./16"MAX. 24"O.C./10"MAX. COUPLING on IOiAB 1/2 LAC t ST AT �� •• �` CLAMP& I is 1D IIiI o M ii(► �COR10P �� 150 48"O.C./16"MAX. 24"O.C./8"MAX. 160 48"O.C./12 MAX. 22 O.C./8"MAX. ATTACHMENT ° RIFBtM DECK'AID /i,`, IONAU ��` 170 48 O.C./12"MAX. 19"O.C.I8"8"MAX. TABLE REFLECTS ATTACHMENT SPACINGS THAT EXCEED MANUFACTURERS RAFTER SPECIFICATIONS FOR WIND LOADS AS PER ASCE 07-10. RISK CATEGORY II SOLAR MODULE TOPOGRAPHIC EFFECTS B,C,&D AND ROOF WIND ZONES 1,2,&3.ROOF ZONES 2&3 ARE WITHIN 48"OF ANY OUTER EDGE, HIP,RIDGE,OR GUTTER LINE FOR STRUCTURES 30'-0" OR LESS MEAN ROOF HEIGHT. GUTTER GUTTER ® ( I ® ® AL CI NtPUBIa SVdL E AS IIWAC'MIEB BY"atFASU S I%NO IiSTA1LED N SWT CDI twa III WMWACm F ID SIEt 1CAlp15 Y I W GUTTE ATTACHMENT DETAIL FOR SOLAR CONTRACTOR m LOW-SLOPED ROOFGMERDN 5EN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER:CVC57036 5728 MAJOR BLVD SUITE 307,ORLANDO FL.32819 ® RIDGE RIDGE (2' ® MINIMUM 5"SPACING TO GUTTER CUSTOMER INFORMATION ® ®® ECOFASTEN SOLAR ROCK-IT 4.0 MOUNTING DETAIL "AS C I y/,p ECOFASTEN SOLAR ROCK-IT 4.0 RAIL-LESS MOUNTING SYSTEM ATfl SU I TARA MOONEY-DERKAOUI-MS44960 Y INTEGRATED WITH FLASHING,COUPLINGS AND ADJUSTABLE � - 6416 COBBLE BLISS STREET CLAMP ATTACHMENTS m w m ATTAOM NO RASA 5/ SMM ZEPHYRHILLS,FL 33541 61110/51AS'm T8 DECK 727 418-2728 ® (2) GUTTER (2) GUTTER ® KCK PV SYSTEM INFORMATION 'l3DOFI� SYSTEM SIZE(DC):8.19 KW ROOF WIND ZONES AS PER IRC R301.2(7) /_/_/ B�MODl1t.E5:HANWHA Q.PEAK DUO MAXIMUM SOLAR ARRAY ELEVATION:4.25" ROOF ZONES 2&3 ARE 48"FROM OUTER ROOF EDGES, 26 INVERTERS:ENPHASE IQ7-60-2-US RIDGES,HIPS,RAKES,AND GUTTER EDGES FOR STRUCTURES MAXIMUM CLAMP ATTACHMENT SPACING:48" BELOW 30'-O"MEAN ROOF HT. I � COUPLING CLAM PROTECT INFORMATION INITIAL DATE: 2/7/2020 DESIGNER:SN SOLID BLOCKING Au S__E AS t WAC DC+ A SIL*"MB REV: DATE: DESIGNER: BETWEEN JOISTS I8tMJTh NSUCT PJN Ill MUASS PUIUSTIICAIO6, REV. DATE: DESIGNER: zM W ATTACHMENT DETAIL FOR ROOFS ATTACHMENT DETAIL AREA WHERE RAFTERS NOT AVAILABLE ��- ■ • SCALE: 3/32" = 1'-O ROOF PANEL COUNT TILT AZIMUTH SHADING COBBLE BLISS STREET Rl 26 21• 182• 91% momentum FRONT OF RESIDENCE DRIVEWAY SOLAR PRO CUSTOM SOLAR tic D.B.A.MOMENTUM SOLAR 325 HIGH STREET,METUCHEN,NJ 08840 (732)902-6224 MOMENTUMSOLAR.COM PROFESSIONAL ENGINEERING CB ELECTRICAL EQUIPMENT Ii IllONA` FIRE SETBACK (36" VENTILATION, 36" ROOF ACCESS) (TYP) SOLAR CONTRACTOR SOLAR INSTALLER NOTES: Ri HAS FLAT RAFTERS OM""��1SEN CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER:CVC57O36 MOMENTUM SOLAR 6'-6 5728 MAJOR BLVD. SUITE 307.ORLANDO FL.32819 SYMBOL LEGEND CUSTOMER INFORMATION TARA MOONEY-DERKAOUI•MS44960 0 MSP MAIN SERVICE PANEL ® CHIMNEY 6416 COBBLE BLISS STREET ZEPHYRHILLS,FL 33541 O 0 O SP SUB-PANEL � SKYLIGHT (727)418-2728 n o PV SYSTEM INFORMATION GROUND ACCESS � UTILITY ME` l VENT SYSTEM SIZE(DC):8.19 KW 0 0 0 o 0 GROUND 26 MODULES:HANWHA Q.PEAK DUO AC AC DISCONNECT 0 PIPE VENT BLK-G5 315 DISC 0 0 b d 0 0 26 INVERTERS:ENPHASE K17-60-2-US Rl UDC UTILITY DISCONNECT f-f--) FAN f 0 I ID r I I 9 I I °! I 0 I I I [ ]LC LOAD CENTER 4) SATELLITE DISH PROJECT INFORMATION GUTTER c0 INITIAL DATE: 2/7/2020 DESIGNER:SN -1" N3R NEMA 3R BOX W/ENVOY-S FIRE SETBACKS AS PER 6TH 8-72 D EDITION 2017"PC REV: DATE: DESIGNER: i REV: DATE: DESIGNER: T-7*" CB COMBINER BOX MIN 3'x3'GROUND ACCESS 2 POINT NOTE: ROOF LAYOUT MODULE �� PITCH DIRECTION 1. ROOF COVERING MATERIAL IS COMPOSED OF SINGLE LAYER ASPHALT COMPOSITE SHINGLE. 2. REFER TO LAYOUT DETAIL DRAWING PV-3 FOR ALL ROOFTOP DIMENSIONS. _ _ rWDPRESSURE ZONE LINES.REFERTO D%_2 FOR ADDITIONAL INFO PV MODULE RATINGS INVERTER RATINGS VOLTAGE DROP CALCULATIONS MODULE MAKE HIANWHA INVERTER MAKE ENPHASE FORMULA USED PER NEC 2014 HANDBOOK 215.2(A)(4) WHERE APPLICABLE momentum MODEL Q.PEAK DUO MODEL IQ7-60-2-US WIRE RUN Vmp Imp R L(FT) VD %VD WIRE SIZE SOLAR BLK-65 315 MAX OUTPUT POWER 240W BRANCH TO ]-BOX 240.00 13 1.98 85.58 4.406 1.84% 12 AWG MAX POWER 315W PRO CUSTOM SOLAR LLC D.B.A.MOMENTUM SOLAR OPEN DC VOLTAGE 48V J-BOX TO LOAD 325 HIGH STREET, 02-622EN,NJ 08840 OPEN CIRCUIT VOLTAGE 40.29V CENTER 240.00 26 1.24 50.00 3.224 1.34% 10 AWG (732)MSOLA24 MOMENTUM50LAR.COM MPP VOLTAGE 33.46V NOMINAL AC VOLTAGE 240V PROFESSIONAL LOAD CENTER TO AC 240.00 32.5 0.778 3.00 0.152 0.06% 08 AWG SHORT CIRCUIT CURRENT 9.89A MAX AC CURRENT 1A DISCONNECT ENGINEERING MPP CURRENT 9.41A CEC INVERTER EFFICIENCY 97% AC DISCONNECT TO 240.00 32.5 0.778 10.00 0.506 0.21% 08 AW6 NUMBER OF MODULES 26 NUMBER OF INVERTERS 26 INTERCONNECTION UL1703 COMPLIANT YES UL1703 COMPLIANT YES I NEC 705.12(D)(2)(3)(b)120%RULE PV BREAKER (1.25 x INVERTER OUTPUT)+MAIN OCPD 5 BUS RATING x 1.20 1 i # OF MODULES THIS SOLAR PHOTOVOLTAIC SYSTEM COMPLIES WITH THE 2017 `\ 11//' SUB PANEL PER BRANCH FLORIDA BUILDING CODE AND THE 2014 NATIONAL ELECTRICAL CODE BREAKER SIZE UP TO 16 20A (1.25 x 26)+200≤200 x 1.20 ♦♦ • A�1 �i��� 26 HANWHA Q.PEAK DUO BLK-G5 315 315W MODULES PAIRED WITH 26 ENPHASE IQ7-60-2-US MICRO-INVERTERS • i C STAT OF j/` BRANCH GRCUIT A EXISTING SQUARED �i��tZ's' X10�� i3 MICRO-tNVERTER5 UTILITY 225A SUB PANEL 240 V BRANCH CIRCUIT B METER ��1 1111111�� 13 MICRO-INVERTERS GRID ENPHASE 80A - + - + AC COMBINER SOLAR CIRCUIT BOX DISCONNECTING MEANS N _____ EATON 60A FUSIBLE AC DISCONNECT SOLAR CONTRACTOR 8 Q fl 74 Q LI CAMERON CMSTENsrM niLJll CERTIFIED SOUR CONTRACTOR LICENSE NUMBER:CVC57036 MOMENTUM SOUR 5728 MAJOR BLVD. SUITE 307,ORLANDO FL.32819 ROOF 10A BREAKER POWER CUSTOMER INFORMATION JUNCTION (ENVOY) 40A FUSES =GROUND TAM MOONEY-DERKAOUI-MS44960 BOX 2A-B 20A BREAKER(A)3 3 EXISTING 200A 6416 COBBLE BUSS STREET TERMINATION CAP 20A BREAKER(B) METER MAIN ZEPHYRHILLS,FL 33541 INSTALLED ON 200A BREAKER 727 418-2728 END OF CABLE PV SYSTEM INFORMATION SYSTEM SIZE(DC):8.19 KW 26 MODULES:HANWHA Q.PEAK DUO BLK-G5 315 berated Inverter NEC Design Ground Ground Wire 26 INVERTERS:ENPHASE IQ7-60-2-US Wire Temp. Wire Temp. Conduit NOC(A) T e Wire Tag Conduit Wire Qty Gauge Wire Type Rating Ampacity(A) Derate Fill Derate Ampacity(A) Qty Correction Current(A) SizeType vRo>Ecr><NwwunoN 1 OPEN AIR 2 12 AWG Trunk Cable 90°C 30 0.96 1 28.80 13 1 1.25 16.25 12 AWG Trunk Cable INITIAL DATE: 2/7!2020 DESIGNER:SM 2A 1" PVC 2 10 AWG THWN-2 75°C 35 0.96 0.8 26.88 13 1 1.25 16.25 08 AWG THWN-2 REV: DATE: DESIGNER: 2B 1" PVC 2 10 AWG THWN-2 75°C 35 0.96 0.8 26.88 13 1 1.25 16.25 08 AWG THWN-2 REV: DATE: DESIGNER: 3 1" PVC 3+G 08 AWG THWN-2 75°C 50 0.96 1 48.00 26 1 1.25 32.50 08 AWG THWN-2 THREE LINE DIAGRAM PV-3 NOTE: LETTER"G" IN WIRE QTY TAB STANDS FOR GROUNDING CONDUCTOR. ELECTRICAL NOTES: 22. WORKING CLEARANCES AROUND THE EXISTING AND NEW ELECTRICAL EQUIPMENT WILL 1. ALL CALCULATIONS FOR VOC,VMAX,IMP AND ISC HAVE BEEN BE MAINTAINED IN ACCORDANCE WITH NEC ARTICLE 110.26. CALCULATED USING THE MANUFACTURED STRING CALCULATOR 23. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT PER momentum BASED ON ASHRAE 2%HIGH AND EXTREME MINIMUM TEMPERATURE NEC ARTICLE 300.6(C)(1)AND ARTICLE 310.8(D). SOLAR COEFFICIENTS. 24. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET 2. THE ENTIRE ARRAY IS BONDED ACCORDING TO(NEC 690.46-250.120 LOCATIONS PER NEC ARTICLE 310.8(C). 325 HIGH vRo cusroM SOLAR STREET, D.B.A.A.MOMENTUM SOLAR PARAGRAPH C).THE GROUND IS CARRIED AWAY FROM THEMETUCHEN,N,NI 08840 (732)902-6224 GROUNDING LUG USING#6 BARE COPPER WIRE OR#8 THWN-2 COPPER 25. TOTAL AREA OF ALL CONDUCTORS,SPLICES,AND TAPS INSTALLED AT ANY CROSS MOMENTUMSLAR�M WIRE. SECTION OF THE WIRING DOES NOT EXCEED 75%OF THE CROSS SECTIONAL AREA OF PROFESSIONAL THE SPACE. NEC 312.8(2). ENGINEERING 3. THIS SYSTEM COMPLIES WITH NEC 2014 26. SYSTEM IS CONSIDERED AN AC MODULE SYSTEM.NO DC CONDUCTORS ARE PRESENT IN 4. BRANCH CIRCUIT CALCULATION FOR WIRE TAG 1 DISPLAYS THE CONDUIT,COMBINER,JUNCTION BOX, DISCONNECT.AND COMPLIES WITH 690.6-NO DC LARGEST BRANCH CIRCUIT IN SYSTEM.OTHER BRANCH CIRCUITS DISCONNECT AND ASSOCIATED DC LABELING ARE REQUIRED. SHALL HAVE LOWER DESIGN CURRENT THAN THE ONE SHOWN. IN ADDITION,VOLTAGE DROP CALCULATIONS FROM PANELS TO THE 27. SYSTEM COMPLIES WITH 690.12 RAPID SHUTDOWN AND ASSOCIATED LABELING AS PER COMBINER BOX SHALL BE SHOWN IN A SIMILAR FASHION 690.56(C).AC VOLTAGE AND SYSTEM OPERATING CURRENT SHALL BE PROVIDED 690.52. 5. ALL CONDUCTORS ARE SIZED BASED ON NEC 2014 ARTICLE 310 28. CONDUCTORS IN CONDUIT ARE AC CONDUCTORS BRANCH CIRCUITS AND NOT PV \e%\fix I I `i /!1 f� SOURCE CIRCUITS.690.6. IVj " 6. ALL EQUIPMENT INSTALLED IS RATED AT 75°C ', 29. ALL GROUNDING SHALL COMPLY WITH 690.47(A)IN THAT THE AC MODULES WILL COMPLY �� GENE 7. INVERTER NOC(NOMINAL OPEN CURRENT)OBTAINED FROM WITH 250.64. EQUIPMENT DATASHEET 30. NO TERMINALS SHALL BE ENERGIZED IN THE OPEN POSITION IN THIS AC MODULE - * * '- 8. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL SYSTEM 690.17,690.6. • LOCAL AND NATIONAL CODE REQUIREMENTS. �T OF � STT OF 31. WHERE APPLICABLE: INTERCONNECTION SHALL COMPLY WITH 705.12(D)(3), •. 'LORtO '' O2� 9. EACH MODULE MUST BE GROUNDED ACCORDING TO USER 705.12(D)(2)(3)(B),705.12(A)AS PERMITTED BY 230.86(6) "#4' c . INSTRUCTIONS '"i7FONAL ' \\ 32. ALL WARNING SIGNS OR LABELS SHALL COMPLY WITH 2 14 NEC SIGN(S) LABEL(S) 0 EC ARTICLE 110.21 B . ( ) 1 11 10. ALL EQUIPMENT SHALL BE LISTED PER NEC 690.4(D) /III LABEL WARNINGS SHALL ADEQUATELY WARN OF THE HAZARD. LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT,AND LABELS REQUIRED SHALL BE 11. PER NEC 690.17,PROVIDE A WARNING SIGN AT ALL LOCATIONS WHERE SUITABLE FOR THE ENVIRONMENT. TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION>SIGN SHALL READ*WARNING-ELECTRIC SHOCK 33. PV POWER CIRCUIT LABELS SHALL APPEAR ON EVERY SECTION OF THE WIRING SYSTEM HAZARD-DO NOT TOUCH TERMINALS-OR EQUIVALENT. THAT IS SEPARATED BY ENCLOSURES,WALLS, PARTITIONS,CEILINGS,OR FLOORS. TABLE 1: 12. PER NEC 705.10,PROVIDE A PERMANENT PLAQUE OR DIRECTORY SHOWING ALL ELECTRIC POWER SOURCES ON THE PREMISES AT MAKE MODEL VOLTAGE CONDUCTOR CONDUCTOR SOLAR CONTRACTOR SERVICE ENTRANCE. RATING RANGE MAIN RANGE TAP CAMERON CHRISTENSEN - ILSCO IPC 4006 600 V 4/0-4 AWG 6-14 AWG CERTIFIED SOLAR ODNTRACTOR LICENSE NUMBER:CVC57036 MOMENTUM SOLAR 13. INTERCONNECTION METHOD SHALL COMPLY WITH NEC 690.64 5728 MAJOR BLVD. SUITE 307,ORLANDO FL.32819 ILSCO IPC 4020 600 V 4/0-2 AWG 2/0-6 AWG CUSTOMER INFORMATION 14. AND OPTION FOR A SINGLE CIRCUIT BRANCH TO BE SPLIT INTO TWO SUB-CIRCUIT BRANCHES IS ACCEPTABLE. INSTRUCTIONS FOR LINE TAPS TARA MOONEY-DERKAOUI-MS44960 6416 COBBLE BUSS STREET 15. ALL CONDUCTORS MUST BE COPPER. ZEPHYRHILLS,FL 33541 FIGURE 1: 727 41&2728 16. NEUTRAL AND EQUIPMENT GROUNDING CONDUCTOR BONDED AS PER 1. ADJUST THE CONNECTOR NUT TO PV SYSTEM INFORMATION NEC 250.24(C). SUITABLE LOCATION """*' 2. PUT THE BRANCH WIRE INTO THE CAP SYSTEM SIZE(DC):8.19 KW 17. EQUIPMENT GROUNDING CONDUCTOR IS CONNECTED TO A SHEATH FULLY 26 MODULES:HANWHA MPEAK DUO GROUNDING ELECTRODE SYSTEM PER 250.54(D). 3. INSERT THE MAIN WIRE, IF THERE ARE BUC-65 315 TWO LAYS OF INSULATED LAY IN THE 26 INVERTERS:ENPHASE IQ7-60-2-US 18. FUSES FOR PV DISCONNECT HAVE AIC RATINGS OF 200KA AC AND 20KA MAIN CABLE,SHOULD STRIP A CERTAIN DC. LENGTH OF THE FIRST INSULATED LAY FROM INSERTED END PR07ECTINFORMAnON 19. SUPPLY SIDE CONNECTION SHALL BE MADE USING ILSCO INSULATION 4. TURN THE NUT BY HAND,AND FIX THE INITIAL DATE: 2/7/2820 DESIGNER:SN PIERCING CONNECTORS(IPC).MAKE,MODEL,AND RATING OF CONNECTOR IN SUITABLE LOCATION. 5. SCREW THE NUT WITH THE SLEEVE REV: DATE: DESIGNER: INTERCONNECTION CAN BE SEEN ON TABLE 1 BELOW. SPANNER. REv: DATE: DESIGNER: 20. METHOD OF INTERCONNECTION CAN BE SEEN IN FIGURE 1. 6. SCREW THE NUT CONTINUALLY UNTIL THE TOP PART IS CRACKED AND ELECTRICAL CONT. 21. UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL PHOTOVOLTAIC DROPPED DOWN SYSTEM COMPONENTS LOCATED AT THE SERVICE ENTRANCE. PV-3. 1 ALL WARNING SIGN(S)OR LABEL(S)SHALL COMPLY WITH 2014 NEC ARTICLE 110.21(B).LABEL WARNINGS SHALL ADEQUATELY WARN OF THE HAZARD.LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT,AND LABELS REQUIRED SHALL BE SUITABLE FOR THE ENVIRONMENT. TAG LABEL QUANTITY LOCATION NOTE EXAMPLES © n tum SOLAR PRO CUSTOM SOLAR LLC D.B.A.MOMENTUM SOLAR j b+ 1 MAIN SERVICE POINT OF INTERCONNECTION 325 HIGH STREET,METUCHEN,N]08840 j �•�' PANEL (732)902-6224 MOMENTUMSOLAR.COM PROFESSIONAL ENGINEERING ® t - - LPi.• 1 COMBINER BOX 1 AT ANY JUNCTION BOX OR DC COMBINER IF USED ♦``�I1111111/lf/'/ CENgF © 1 JUNCTION BOX 1 AT ANY JUNCTION BOX OR DC COMBINER IF USED '0 �` © -,O• a 7 aa2 •� tv; �ONAI. � �♦♦ 1IIilll►1 - ! !• • 1 OF EACH AT FUSED AC •• • - • DISCONNECT �• li • 1 AC DISCONNECT COMPLETE VOLTAGE AND CURRENT VALUES ON • • • DISCONNECT LABEL SOLAR CONTRACTOR CAMERON CHRISTENSEN - f •• CERTIFIED SOLAR CONTRACTOR LICENSE NUMBER:CVC57036 MOMENTUM SOLAR 5728 MAJOR BLVD. SUITE 307,ORLANDO FL.32819 O CUSTOMER INFORMATION TARA MOONEY-DERKAOUI-M544960 6416 COBBLE BUSS STREET • -• • - 1 MAIN DISCONNECT 1 OF EACH AT BUILDING MAIN ZEPHYRHILLS,FL 33541 • • • • • PANEL DISCONNECT PANEL 727 418-2728 PV SYSTEM INFORMATION SYSTEM SIZE(DC):8.19 KW . �• � 26 MODULES:HANWHA QPEAK DUO - • • BLK-GS 315 • • .• 26 INVERTERS:ENPHASE 1Q7-60-2-US 1 UTILITY METER 1 AT UTILITY METER �a QPROJECT INFORMATION INITIAL DATE: 2/7/2024 DESIGNER:SN REV: DATE: DESIGNER: e.w wr w "* •- REV: DATE: DESIGNER: 1 AT EVERY SEPARATION BY •A!� E MULTIPLE AC CONDUITS ENCLOSURES/WALLS/ EQUIPMENT LABELS PARTITIONS/CEILINGS/FLOORS OR NO MORE THAN 10 PV-3■ 2