Loading...
HomeMy WebLinkAbout20-22633 CITY OF ZEPHYRHILLS c 5335—8TH STREET (813)780-0020 22633 BUILDING PERMIT PERMIT INFORMATION LOCATION INFORMATION Permit Number: 22633 Address: 6107 SILVER OAKS DR Permit Type: MECHANICAL ZEPHYRHILLS, FL. Class of Work: A/C CHANGEOUT Township: Range: Book: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Square Feet: Subdivision: SILVER OAKS Est. Value: Parcel Number: 03-26-21-0120-00000-1250 Improv. Cost: 5,021.87 OWNER INFORMATION . Date Issued: 3/18/2020 Name: GONNELLA, PAUL A Total Fees: 70.00 Address: 6107 SILVER OAKS DR Amount Paid: 70.00 ZEPHYRHILLS, FL. 33542 Date Paid: 3/18/2020 Phone: (864)252-6770 Work Desc: A/C CHANGE OUT 4 TON CONTRACTORS APPLICATION FEES ACE HEATING & COOLING A/C CHANGEOUT 70.00 DUCTS INSTALLED Ins ections Required DUCTSINSULATED FINAL REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that maybe found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. -PUNTRA&OR NATURE PERMIT OFFICkR PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date Received Phone Contact for Permitting au AJA) (a, 11( IEalttaa >EsOwner's Name a�ff IF * ff IF & Owner Phone Number — (�-p d Owner's Address to 1 C>'7 6 0 Owner Phone Number Fee Simple Titleholder Name F Owner Phone Number Fee Simple Titleholder Address I JOB ADDRESS (c) 1\)6y- loa�s '1105 FL_ LOT# SUBDIVISION PARCEL ID#I I (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT SIGN DEMOLISH e INSTALL F__1 REPAIR PROPOSED USE Q SFR Q COMM OTHER TYPE OF CONSTRUCTION Q BLOCK FRAME STEEL DESCRIPTION OF WORK BUILDING SIZE SQ FOOTAGE HEIGHT �- -X jL =BUILDING VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE PROGRESS W.R.E.C. =PLUMBING 1$ ,7 Iv Ll� 33 ECHANICAL 1$ 02 VALUATION OF MECHANICAL INSTALLATION GAS ROOFING E:J SPECIALTY OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO BUILDER COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Address I License# ELECTRICIAN COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Y/N Address License# PLUMBER COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Ly.!N� Address License# MECHANICAL COMPANY C SIGNATURE REGISTERED FEE CUR Address wamm License# F&4P__iv7;3e9,3 OTHER COMPANY SIGNATURE REGISTERED Y/N _J FEE CURREN LYLN_J Address I License# 1 1-11111 at It a 1,11111.111111 11t1E,l 111,14 RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&I dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans w/,Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. SS" Directions: Fill out application completely. Owner&Contractor sign back of application,notarized if over$2600,a Notice of Commencement is required.(A/C upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW 013-780-0020 City of Zephyrhil|s Permit Application Fo»813-780-0021 ` Building Department NOTICE VFDEED RESTRICTIONS:The de i ed understands thathis permit may be subject to"deed" which may be more km than County regulations.The undersigned assumes responsibility for compliance with any applicable deed restrictions, UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES:If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations.If the contractor is not licensed as required by law,both the owner and contractor may be cited for a misdemeanor violation under state law.If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-8009. Furthermore,if the owner has hired a contractor or contractors,he is advised to have the contractor(s)sign portions of the"contractor Block"ofthis application for which they will be responsible.If you,as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATUON ]A8PACT/UTIL|TlES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees andReoo Recovery Fees | to the ot cui of new buildings,change of use in existing buildings, expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended.The undersigned also understands,that such fees,as may be due,will be identified at the time of perrnitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release,If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance.Furthermore,if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended):If valuation of work is$2,500.00 or more,I certify that 1,the applicant, have been provided with a copy of the"Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs.If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT:I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development.Application is hereby made to obtain a permit to do work and installation as indicated.I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction,County and City codes,zoning regulations,and land development regulations in the jurisdiction.I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance.Such agencies include but are not limited to: - Department ofEnvironmental Protection-Cypress Bayhaodo. Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. ' Southwest Florida Water Management District-Wells, Cypress Bayheodo, Wetland Anaaa. /Ub*hng VVoteromunaea. ' - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. - Department of Health @ Rehabilitative 8amicea/Enviponnnenta| Health Unit-WeUe, VVaabavvobar Treatment, Septic Tanks. - U8 Environmental Protection Agency-Asbestos abatement. ' Federal Aviation Authority-Runvvayn. |understand that the following restrictions apply(o the use of fill: ' Use uf fill in not allowed |n Flood Zone"V"' unless expressly permitted. - If the fill material is to be used in Flood Zone "A". it is understood that o drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with e permitted building using stem vvaU construction, | certify that fill will be used only to fill the area within the stem wall. - If fill mobeho| is to be used in any area, | oerUh/ that use of such fi|| will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent propartimo, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevatedrequired. If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction..understand that"separate permit//mvuurequo:u^n:lecnica/wpm.pmmbing.,gnx.wells.pumxai,conomon/ng.gawm other installations not spacifioa||yincluded in the application.A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring o correction o[errors in plans,construction or violations uf any des Every it issued shallbecn invalid unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced.An extension may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered WARNING TO OWNER: YOUR FAILURE T0 RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY' IF YOU INTEND TO OBTAIN FINANCING, CONSULT QUOTE ACE Heating&Cooling 1315 Hobbs St A 4A rV 0 Tampa FL 33619 iaLk./AL� Phone:813-657-8818 3/18/2020 0000046243 Heating & Cooli14813-657-6378 CAC1 81389;�—, ",Air Conditioning Excellence Paul Gonnella 6107 Silver Oaks Dr ZephyrhIIIs FL 33542 i),62,10MA= 925%' MI- T - 4M—01 ' COD Greg S. Remove old system and take away. Install new AMANA Split system. Use existing ducts, drain lines, copper lines, electrical. Install new digital tstat. Provide new concrete pad for condenser to sit on if needed. Pull require permits for job..$5521.87 minus$500 for the col '$5021.87 be financed 12 months plan Model AH#ASPT49C14 Model Condenser#ASZ1 40481 System Size:4ton SEER Rating: 14seer System type: heat pump KW:8 HORIZONTAL Install 24 Gauge pan REQUIRED 10 Year All Parts Warranty I Year bor Warranty, CXO oc -Ino(Z' C Thank you for choosing ACE TOTAL $0.00