HomeMy WebLinkAbout20-22633 CITY OF ZEPHYRHILLS
c 5335—8TH STREET
(813)780-0020 22633
BUILDING PERMIT
PERMIT INFORMATION LOCATION INFORMATION
Permit Number: 22633 Address: 6107 SILVER OAKS DR
Permit Type: MECHANICAL ZEPHYRHILLS, FL.
Class of Work: A/C CHANGEOUT Township: Range: Book:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Square Feet: Subdivision: SILVER OAKS
Est. Value: Parcel Number: 03-26-21-0120-00000-1250
Improv. Cost: 5,021.87 OWNER INFORMATION .
Date Issued: 3/18/2020 Name: GONNELLA, PAUL A
Total Fees: 70.00 Address: 6107 SILVER OAKS DR
Amount Paid: 70.00 ZEPHYRHILLS, FL. 33542
Date Paid: 3/18/2020 Phone: (864)252-6770
Work Desc: A/C CHANGE OUT 4 TON
CONTRACTORS APPLICATION FEES
ACE HEATING & COOLING A/C CHANGEOUT 70.00
DUCTS INSTALLED Ins ections Required
DUCTSINSULATED
FINAL
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80 (2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each such subsequent reinspection.
NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that
maybe found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans,Specifications Must Accompany Application.All work shall be performed in accordance with
City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
-PUNTRA&OR NATURE PERMIT OFFICkR
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021
Building Department
Date Received Phone Contact for Permitting au AJA) (a, 11(
IEalttaa >EsOwner's Name a�ff IF * ff IF & Owner Phone Number
— (�-p d
Owner's Address to 1 C>'7 6 0 Owner Phone Number
Fee Simple Titleholder Name F Owner Phone Number
Fee Simple Titleholder Address I
JOB ADDRESS (c) 1\)6y- loa�s '1105 FL_ LOT#
SUBDIVISION PARCEL ID#I I
(OBTAINED FROM PROPERTY TAX NOTICE)
WORK PROPOSED NEW CONSTR ADD/ALT SIGN DEMOLISH
e INSTALL F__1 REPAIR
PROPOSED USE Q SFR Q COMM OTHER
TYPE OF CONSTRUCTION Q BLOCK FRAME STEEL
DESCRIPTION OF WORK
BUILDING SIZE SQ FOOTAGE HEIGHT
�-
-X jL
=BUILDING VALUATION OF TOTAL CONSTRUCTION
=ELECTRICAL $ AMP SERVICE PROGRESS W.R.E.C.
=PLUMBING 1$ ,7
Iv Ll� 33
ECHANICAL 1$ 02 VALUATION OF MECHANICAL INSTALLATION
GAS ROOFING E:J SPECIALTY OTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO
BUILDER COMPANY
SIGNATURE REGISTERED Y/N FEE CURREN
Address I License#
ELECTRICIAN COMPANY
SIGNATURE REGISTERED Y/N FEE CURREN Y/N
Address License#
PLUMBER COMPANY
SIGNATURE REGISTERED Y/N FEE CURREN Ly.!N�
Address License#
MECHANICAL COMPANY C
SIGNATURE REGISTERED FEE CUR
Address wamm License# F&4P__iv7;3e9,3
OTHER COMPANY
SIGNATURE REGISTERED Y/N _J FEE CURREN LYLN_J
Address I License#
1 1-11111 at It a 1,11111.111111 11t1E,l 111,14
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction,
Minimum ten(10)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary Facilities&I dumpster;Site Work Permit for subdivisions/large projects
COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction.
Minimum ten(10)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans w/,Silt Fence installed,
Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance
SIGN PERMIT Attach(2)sets of Engineered Plans.
****PROPERTY SURVEY required for all NEW construction.
SS"
Directions:
Fill out application completely.
Owner&Contractor sign back of application,notarized
if over$2600,a Notice of Commencement is required.(A/C upgrades over$7500)
Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage)
Driveways-Not over Counter if on public roadways..needs ROW
013-780-0020 City of Zephyrhil|s Permit Application Fo»813-780-0021
` Building Department
NOTICE VFDEED RESTRICTIONS:The de i ed understands thathis permit may be subject to"deed" which may be more km
than County regulations.The undersigned assumes responsibility for compliance with any applicable deed restrictions,
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES:If the owner has hired a contractor or contractors to undertake work,they
may be required to be licensed in accordance with state and local regulations.If the contractor is not licensed as required by law,both the owner and
contractor may be cited for a misdemeanor violation under state law.If the owner or intended contractor are uncertain as to what licensing requirements
may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-8009.
Furthermore,if the owner has hired a contractor or contractors,he is advised to have the contractor(s)sign portions of the"contractor Block"ofthis
application for which they will be responsible.If you,as the owner sign as the contractor,that may be an indication that he is not properly licensed and is
not entitled to permitting privileges in Pasco County.
TRANSPORTATUON ]A8PACT/UTIL|TlES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees andReoo Recovery Fees | to the ot cui of new buildings,change of use in existing buildings,
expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended.The undersigned also understands,that
such fees,as may be due,will be identified at the time of perrnitting. It is further understood that Transportation Impact Fees and Resource Recovery
Fees must be paid prior to receiving a"certificate of occupancy"or final power release,If the project does not involve a certificate of occupancy or final
power release,the fees must be paid prior to permit issuance.Furthermore,if Pasco County Water/Sewer Impact fees are due,they must be paid prior
to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended):If valuation of work is$2,500.00 or more,I certify that 1,the applicant,
have been provided with a copy of the"Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of
Agriculture and Consumer Affairs.If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described
document and promise in good faith to deliver it to the"owner"prior to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT:I certify that all the information in this application is accurate and that all work will be done in compliance with
all applicable laws regulating construction,zoning and land development.Application is hereby made to obtain a permit to do work and installation as
indicated.I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all
laws regulating construction,County and City codes,zoning regulations,and land development regulations in the jurisdiction.I also certify that I
understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I
must take to be in compliance.Such agencies include but are not limited to:
- Department ofEnvironmental Protection-Cypress Bayhaodo. Wetland Areas and Environmentally Sensitive
Lands, Water/Wastewater Treatment.
' Southwest Florida Water Management District-Wells, Cypress Bayheodo, Wetland Anaaa. /Ub*hng
VVoteromunaea. '
- Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
- Department of Health @ Rehabilitative 8amicea/Enviponnnenta| Health Unit-WeUe, VVaabavvobar Treatment,
Septic Tanks.
- U8 Environmental Protection Agency-Asbestos abatement.
' Federal Aviation Authority-Runvvayn.
|understand that the following restrictions apply(o the use of fill:
' Use uf fill in not allowed |n Flood Zone"V"' unless expressly permitted.
- If the fill material is to be used in Flood Zone "A". it is understood that o drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with e permitted building using stem vvaU
construction, | certify that fill will be used only to fill the area within the stem wall.
- If fill mobeho| is to be used in any area, | oerUh/ that use of such fi|| will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent propartimo, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less than one (1)
acre which are elevatedrequired.
If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to
commencing construction..understand that"separate permit//mvuurequo:u^n:lecnica/wpm.pmmbing.,gnx.wells.pumxai,conomon/ng.gawm
other installations not spacifioa||yincluded in the application.A permit issued shall be construed to be a license to proceed with the work and not as
authority to violate,cancel,alter,or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from
thereafter requiring o correction o[errors in plans,construction or violations uf any des Every it issued shallbecn invalid unless the work
authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit is suspended or abandoned for a
period of six(6)months after the time the work is commenced.An extension may be requested,in writing,from the Building Official for a period not to
exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered
WARNING TO OWNER: YOUR FAILURE T0 RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY' IF YOU INTEND TO OBTAIN FINANCING, CONSULT
QUOTE
ACE Heating&Cooling
1315 Hobbs St
A
4A rV
0 Tampa FL 33619
iaLk./AL� Phone:813-657-8818 3/18/2020 0000046243
Heating & Cooli14813-657-6378
CAC1 81389;�—,
",Air Conditioning Excellence
Paul Gonnella
6107 Silver Oaks Dr
ZephyrhIIIs FL 33542
i),62,10MA= 925%' MI- T - 4M—01 '
COD Greg S.
Remove old system and take away. Install new AMANA Split
system. Use existing ducts, drain lines, copper lines,
electrical. Install new digital tstat. Provide new concrete pad
for condenser to sit on if needed. Pull require permits for
job..$5521.87 minus$500 for the col '$5021.87 be
financed 12 months plan
Model AH#ASPT49C14
Model Condenser#ASZ1 40481
System Size:4ton
SEER Rating: 14seer
System type: heat pump
KW:8
HORIZONTAL Install 24 Gauge pan REQUIRED
10 Year All Parts Warranty
I Year bor Warranty,
CXO oc
-Ino(Z'
C
Thank you for choosing ACE
TOTAL $0.00