Loading...
HomeMy WebLinkAbout20-22661 r CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780-0020 22661 - BUILDING PERMIT PERMIT INFORMATION LOCATION INFORMATION Permit Number: 22661 Address: 7335 HIGHLAND LP / Permit Type: RE-ROOF ZEPHYRHILLS, FL. Class of Work: ROOF REPLACEMENT Township: Range: Book: Proposed Use: SINGLE FAMILY RESIDENTIAL Lot(s): Block: Section: Square Feet: Subdivision: OAK RUN Est. Value: Parcel Number: 34-25-21-0100-00000-0300 Improv. Cost: 12,040.74 OWNER INFORMATION Date Issued: 3/24/2020 Name: BURGOS, CHRISTOPHER Total Fees: 105.00 Address: 7335 HIGHLAND LP Amount Paid: 105.00 ZEPHYRHILLS, FL. 33541 Date Paid: 3/24/2020 Phone: 352-424-4902 Work Desc: REROOF SHINGLE CONTRACTORS APPLICATION FEES DYNASTY BUILDING SOLUTIONS LLC REROOF RESIDENTIAL 105.00 V Ins ections Required 17 DRY IN ROOF IN P TAPE JOINTS ROOF INSP FINAL REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each such subsequent reinspection. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CbNTIt CTOR SIGNATURE PERMIT OFFI R PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 i' Building Department Date Received Phone Contact for Permitting aaaaagas 3tiit- 2 Owner's Name Owner Phone Number {��2 0 Owner's Address I Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS LOT �#/� SUBDIVISION (,JQ� � PARCEL ID# r Z — oo0-()-bQ PD (OBTAINED FROM PFROFFERTY TAX NOTICE) WORK PROPOSED n NEW CONSTR B ADDIALT Q SIGN Q Q DEMOLISH IS��II INSTALL REPAIR PROPOSED USE = SFR = COMM = OTHER TYPE OF CONSTRUCTION = BLOCK QFyR�A�MEE� 1,STEEL Q.p DESCRIPTION OF WORK a'VwA `u 7 r 1 lr BUILDING SIZE SQ FOOTAGE D HEIGHT =BUILDING $ VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE = PROGRESS ENERGY = W.R.E.C. =PLUMBING $ =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION 11 =GAS ROOFING = SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS` FLOOD ZONE AREA =YES NO BUILDER COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Y/N Address License# ELECTRICIAN COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Address I License# PLUMBER COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Y/N Address I License# MECHANICAL COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Y/N Address License# OTHER C MPANY Lug SIGNATURE REGISTERED Y/N FEE CURREN I Y-1 N Address I License# a gas Ias gas I!-#"A"ill:li.n.is3N's Was sit gg'41'tl,aiaEi.iiilVlt'gavill_241'sI@'i aaaaa4VaaaI RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisionstlarge projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date.Required onsite,Construction Plans,Storrmwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ""PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement Is required.(A/C upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(PloYSurvey/Footage) Driveways-Not over Counter if on public roadways..needs ROW 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 e Building Department NOTICE OF DEED RESTRICTIONS:The undersigned understands that this permit may be subject to"deed"restrictions"which may be more restrictive than County regulations.The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES:If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations.If the contractor is not licensed as required by law,both the owner and contractor may be cited for a misdemeanor violation under state law.If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-8009. Furthermore,if the owner has hired a contractor or contractors,he is advised to have the contractor(s)sign portions of the"contractor Block"of this application for which they will be responsible.If you,as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES:The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended.The undersigned also understands,that such fees,as may be due,will be identified at the time of permitting.It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release.If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance.Furthermore,if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended):If valuation of work is$2,500.00 or more,I certify that 1,the applicant, have been provided with a copy of the"Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs.If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT:I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development.Application is hereby made to obtain a permit to do work and installation as indicated.I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction,County and City codes,zoning regulations,and land development regulations in the jurisdiction.I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance.Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction,I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application,for lots less than one (1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction.I understand that a separate permit may be required for electrical work,plumbing,signs,wells,pools,air conditioning,gas,or other installations not specifically included in the application.A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes.Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced.An extension may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension.If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.IF YOU INTENP TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING CE OF COMMEN FLORIDA JURAT(F.S.117.03) OWNER OR AGENT CONTRACTOR Subscribed and sworn to(or affirmed)before me this Subscribed and swo to(or. ore me i by by U1 - (('a �kkkq# C.& Who is/are personally known to me or has/have produced Who is/a rsonally kn to rrWor has/have produced as identification. as'dentification. Notary Public /+ r— Notary Public Commission No. Corn fission No. C- �S 4J Name of Notary typed,printed or stamped Name of ri hNotary Public State of Florida Gemma Duarte My Commission GG 963697 �* Expires 02/02/2024 UC#CBC1,262853 Installation Agreement and Details Uc #CCC1.330607 EAUILDINGSOL lN# 4.7.2001583 2XII __ Estimated Install Date Phone: (813) 321-3269 3914 US HWY 301 N.Ste 200 Tampa,FL 33619 " 2zQC;, Customer Information: � L 1 , • n,�n n Dater 3 1a(:�ao Insured Name: � la��cIYTOQO�' ��.XJf1lCrtJ Telephone Number: J cx lob Address: e= ��� Exterior Work: - interior Work/Notes: Shingle Type: Shingle Color: ��rs7-i� I {?1/ Drip Edge Color: f�/f Ridge Vent Type: Flat Roof: YES j Flat Roof$: Note:We do.not re-attach satellite dishes on the roof;Vile recommend.that you move the KEEP cLf DISPOS o i5 /N.A. dish to anew location.Your provider has special tools to calibrate the dish once it is removed. Roof Det JIs:(The insurance estimate defines the total scope of work to be completed) L'/25 30 50 year of greater shingle manufacturer warranty y' /*UPGRADE*new ridge ventilation system I/ 5 year"NO.LEAK:workmanship warranty *UPGRADE*Re-nail of roof decking New plumbing vent pipes./lead boots X *UPGRADE*secondary water barrier Counter Flashing/Steph Flashing[Valley metal per claim V/Permit and Trash haul off included Additional Terms/Financing: Install and Payment: First Check: $ tO Deductible: $ Depreciation: $ Upgrade: $ 3 Discounts: $ Due at Completion: TOTAL AGREEMENT: $ —S I understand that mydeductible'payment is due upon comple n o'my roof,unless otherwise noted.Additional wood costs are-my responsibility.We reserve the.right to adjust the total agreement as necessary based on wood usage,etc.Any supplemental funds released are'to be:paid to Dynasty Building Solutt Financing interest rate of_5S (Initial) 4 -7,0 S >( Uilt! . J ,3 .'2 Z040 Dynasty Building Solutions;LLC.Agent:Print Date Cu torner' ririt Date, W l 5—Z .1020 Dynasty Building Solutions, C Agent:Sign Date Cu o r Sign atu Date Many insurance checks are made payable to.multiple parties.It.is your responsibility as the policyholder and homeowner to make sure the check is properly endorsed prior to your installation.if endorsement at a local branch is not possible,a Dy , Building Solutions representative should complete a mortgage affidavit and gather the details about how to proceed with endorsement Updated 4119 Installation Agreement"and Details General Information: Delivery of Roofing Materials and Dumpster.Dynasty Building Solutions will have the roofing materials delivered and will place a dumpster in close proximity to your home to dispose of the existing roof,Please note;.if you need access to your vehicle and/or garage you may want to park in the street the night before your installation date and during the process to avoid being'biocked W'.Dynasty has the right to order excess material.All excess and left-over material will be property of contractor. Arrival of the Installation Crew.The-installation crew typically arrives between 7am and 10am.Atthat time,there may be multiple vehicles needed to set up and install your roof. Debris and Nails.It is,not uncommon for debris_to fall,in flower beds,shrubs;and bushes,Our installers will,use tarps to cover the perimeter`of the home as necessary and make every attempt to minimize any:coilateral damage.Please remove<any outdoor hanging items such as.plants,.chimes, pictures,etc.Pottery,Yard Lights,Christmas Lights,and decorations.sbould be taken down prior to the-install.Afterthe install,it is not uncommon to find a nail in your yard.Please minimize any outdoor activities where you may-be barefoot,children playing,mowing the lawn,etc.until you have had time to inspect the grounds after our crew departs.Dynasty Building Solutions will be held harmless fdr anydarnages that occur as.a result of nails not picked up by our crew and/or magnets.There are thousands of nails used on the average roof.it is not possible to account for every single nail. Final Clean up and Inspection.As theproject comes to a close the crew will go into a"final clean-up"mode;They will pick up as much roof debris as possible and pass large magnets around your home Iman attempt to get all.roofing.debris..It is our intention to leave the property as clean and safe a& possible,Mowing your lawn,prior to installation is very helpful•and allows the,magnet to collect(pull)better. Installation Date.Our:production department will contact to confirm the date for-"the installation.Installations are:based on material availability, weather,availability of crews,etc. Many H.O:A:'s require shingle type and color approval.Ii is the'responsibility of the customer-to get these approvals prior to the installation date.Dynasty Building Solutions"is not liable-for any damages associated with the H.O.A. or approval/fines/requirements. Wood Replacement.Dynasty Building Solutions will remove'the existing roof system,inspect wood decking'for possible defects and is required by Florida Building Code to replace any rotted wood underneath.Sagging wood is not considered rotten and will.not be automatically replaced-without your written consent.Replacement sheets will be billed at$50.00 per sheet,which covers the cost of the wood and the labor to install it.Please note, that wood is typically not included'in any insurance claim.Plywood tan be billed at$65 per sheet. Extensive Noise and Vibration. As with any exterior home project,there will be a substantial amount of noise.If you have children or pets that are sensitive to sound,please make arrangements accordingly,Extensive vibration is a normal;partof roof.replacement.Customer assumes liability for any "spider"cracks that mayappear in the ceiling.or walls during this process.Such vibrations may also cause objects to fall,nails to pop,and other damage. We also recommend that you remove any mirrors,pictures,or other delicate wall decor duringthe installation process.Dynasty Building Solutions assumes"no responsibility for these items. Roofing Accessories.Dynasty Building Solutions.will be replacing.lead boots,vent stacks,turbines,etc.on your roof.Dynasty is not liable for any damages associated with normal and routine replacement of these items,If brittle plumbing is determined to be the cause of the leak,Dynasty is to be held harmless. Satellite Dish.As the customer is responsible,you are responsible for.contacting the satellite.provider after your new roof system is installed.A calibration is often required after a dish has been handled.. 3 i i i S e� y Custo gnature Date Customer Signature: Date Dynasty Building:Solutions,LLC 3914 US H WY 301 W Ste 200 Tampa;FL 33619 813-321-3269 www.dynastybuildingsolutions.com P8 CCC1330607 and CBC1262853 dw TERMS AND CONDITIONS 1, Generall.This proposal is subject to change without notice and isadtomaticallywithdfawn with a self-adhered underlayment,and Customer agrees to indemnify and hold on the 15"day following the"date.of issue if not accepted in writing and a copy of'thils: harmless Contractor for any and all damages arising outof said condition. ' proposal returned to Dynasty Building:,Solutions,LLC(°Contractor').If the customer 6. Restrictions, and Requirements..Contractor shall carry workers compensation, cancels this.prior to the start of work,.Customer is liable for 20%of the total Agreement automobile liability,,commercial general liability and any other insurance required by law, price as liquidated damages,because Contractor is unable to:aocurately measure its In the event that state;county,or municipal codes:or regulations_require work not damages for the cancellation of theAgreement By executing this Agreement Customer expressly set.forth in this Agreement or that differs materially from that generally and Contractor agree that the liquidated damages amount is not a penalty.Contractor, recognized as inherent in work of the character provided for in this Agreement,all extra reserves the right to withdraw this proposal atany time priorto its acceptance orto cancel costs for Contractor's labor and materials shall be the sole obligation of the Customer.If this Agreement prior to commencing work ifthe:cost to complete the work varies from the substrate roof condition results in ponding pursuant to the Building Code and the initial standard pricing due to a typographical or mathematical error.As usedin this modifications are required to correct the roof so ponding will not occur,Contractor will Agreement,(a)the word"or"is not exclusive,(b)'the word including°bs.always without notify Customer immediately.Prior to executing this Agreement,Customer shall notify limitation,(c)"days"means calendar days and(d)singular words include plural and.vic6 Contractorin writing of all property and deed restrictions and/or covenants that relate to versa. :or restrict the improvements contained in this Agreement Contractor shall not be 2. Access.Customer shall provide Contractor with adequate access to electricity and other responsible.for work,performed that does not comply with or conform to the property utilities as needed,the work site,and the work area adjacent to the structure,Contractor restricllons or covenants.:Customer shall pay Contractor for all work performed in disclaims any and all liability for the grading,leveling,slope or construction ofthe roof violation of any covenantor restriction if Customer failed to notify Contractor in writing deck, the roofing system; structure andlor appurtenances. Customer represents to prior to executing this Agreement. Contractor that all of the existing surfaces are suitable to receive the-materials Identified. 7, Customer.Protection of Property,Customer shall be solely responsible forany damage in the scope of work. Customer shall provide Contractor with access to deliver to curbs,walkways,driveways,structures;septic tanks,HVAC,utility lines,pipes,gutters, and/or remove materials and debris. Prior to the commencement of work; landscaping,appurtenapoes,or other real or personal propertyat the project location Customer shall provide Contractorwith.access to the interior of the structurei.upon during.construction.Contractor shalt not be responsible for cracks of any kind in the reasonable notice by Contractor, to inspect the.premises for stains,, ceiling ceiling due to the,performance of Contractors work onthe property.Contractor shall not damage and/or structural damage. Contractor shall not be responsible for any be responsible for any damage caused bydust or debris caused by,Contractors work, preexisting stains, ceiling damage and/or structural damage, Customer shall Contractor.shall.notbe.responsible for,:damage to person(p)or property caused by nails provide Contractor with all information necessary to prepare the Notice of on the property.Customer shall take the appropriate precautions to protect the property Commencement. Customer andlor owner shall hold harmless and indemnify and to avoid damages or injury caused by nails.Contractors warranty does not include Contractor from all damages, liabilities, attorney's fees and other expenses roof file slippage on a mortar or foam type file roof system on roofs with a pitch greater incurred as a result of the Customer and/or.Customer's failure to fulfill its than 4/12,that are not mechanically .fastened. Customer.agrees that,under no obligations under this paragraph. circumstances shall Contractor be held liable forwater intrusion that occurs from the date 3. Payment Terms,By signing this Agreement,.Customer gives Contractor the.right to Contractor commences work on the project.through the date of completion of such work. obtain a credit check on the signatory. Contractor reserves the right,to require a deposit Customer be responsible for removing,Installing,and re-positioning satellite in excess of 10%,and Customer.hereby agrees to waive the requirements:of Florida dish(es),solar panei(s),lightning rod(s);etc.Customer shall be responsible{or Statute 489.126' Customer agrees topay interest at;the rate of 1 1/2_%:per month damage to lighting fixtures,_mirrors, pictures,frames,and-other such items not (ANNUAL PERCENTAGE RATE OF 18%),unless otherwise required by laity,on the customarily permanently affixed,as'the.§6 items can fall,if not firmly attached to balance of any and all unpaid amounts.Payments received shalt be applied first to the wall or cefling.,Customer shall secure and protectall personal items in`advance interest on,all outstanding invoices and then to the principal amount'of the oldest rot construction and shall protect or remove all wall hangings until the work is outstanding invoices. The total Agreement .amount, including the charges for. complete.. Contractor shall not'be responsible for lost, stolen, or damaged changes/extras outside the scope of workfdentified hereln,shall be payable to Contractor personal items and wall hangings. Unless otherwise specified,there is no specific In accordance with the Agreement. No portion of the,agreed upon payment may be completion date for Contractors work. Contractor will perform the work within a Withheld,back charged or used,as a.setoff of the agreed upon payment amount without: :reasonable fime•and in a workmanlike manner.The cost for testing and abatement of the written consent of Contractor.Customer acknowledg6s•and agrees that.It.has,an. asbestos and lead:is the sole responsibility of the Customer.As part of the roofing independent obligation to pay Contractor, If Customer,does. not make payment, process,,odofs and.emissions from roofing products will be released and noise will be Contractor shall be entitled to recover from Customer all costs of coliectionancurred by generated.Customer.shall be responsible for indoor airquatty during the work and shall Contractor, including attomey's.fees, costs, and expenses incurred whether or not hold Contractor harmless,indemnify and defend Contractor from any and all claims, lifigation is initiated.Collection matters maybe processed through litigation orarbitration :actions,proceedings,and complaints arising out of or relating to fumes,,odors;and/or at Contractors sole discretion.If there is an increase in the price of materials charged to. the indoor airqualilly during Contractor's performance of the work.If Customer requests the Contractor in excess of five p6/oypercent,subsequent to making this.Agrpie rent, Contractor to install permanent safety brackets to the subject roofing system, then the price set forth in this Agreement shall be increased without the need fora written Customer hereby authorizes Contractor and its subsidiaries,affiliates,employees, change order oramendment to the Agreement to reflectthe price increase and additional agents, suppliers, and subcontractors to.have sole access.to use the safety direct cost to the Contractor. Contractor"shall submit written documentation of'the, brackets during Contractor's performance of the work. Accordingly, Customer Increased charges to the.Customer.If Customer fails to pay Contractor in accordance hereby releases,,acquits and forever discharges,and shall indemnify and defend With this Agreement,then Contractor may,at its sole discretion,suspend performance of Contractor from any and all claims, demands,damages, rights, and causes of all work,,suspend,shipments and/or warranties:until full payment is made, and/or action of every kind,nature and descriptiorrwhatsoever,arising out of or by reason terminate this Agreement if a suspension occurs that is not caused solely by,the of or in any manner connected with the unauthorized use of the safety brackets Contractor, the Agreement turn shall be increased by the amount of contractors by the Customer or any third party, reasonable costs of shut-down delay and start-up.The parties acknowledge add agree 8. Choice of Law,Venue and Attorney's Fees,ThisAgreement shall be.govemed by the that the substitution of materials and price adjustments may be required based on .laws of the State 4Florida.Vanue of any proceeding arising out of this Agreement shall I changes in material availability and the cost to obtain and deliver materials to,the project be Hillsborough; Florida.The non-prevailing party in.any legal orequitable action between the date of this Agreement and the delivery date:in'such event,Contractorand arising outof or relating to this Agreement including.arbitration,administrative;appellate Customer work together in good faith.to identify substitutematerialsthat are similar andfor bankruptcy proceedings shall reimburse the'prevajling:party:on demand for all in price and quality and that do not cause an increase:to the Agreement amount If fattomey's:fees,costs,and expenses•incurred by the prevailing party in connection with Customer selects substitute materials that increase the Agreement amount,then the the action., j Agreement will be adjusted to reflect the additional costs incurred by the Contractor to 9. Arbitration.If a dispute shall arise between Contractor and Customer with respectto purchase and deliver the materials. 'any matters or questions arising out of or relating to this Agreementorthe,breach thereof, 4. Site Conditions.Should the Contractor discover concealed or unknown conditions in the such dispute,other than:collection matters,shall be decided by arbitration administered existing,structure that vary from those conditions ordinarily encountered and.generally by and in accordance with the:Construction Industry Arbitration Rules of the American recognized as Inherentiri the work of the characterIdentified in this Agreement,then the Arbitration Association,This Agreement to arbitrate shall be.specifically enforceable Agreement amount shall"be equitably adjusted upon notice thereof from time Contractor under the prevailing arbitration law.The award rendered by the arbitrators shall be final, to the Customer. 'and judgment maybe enfered upon it in any Court having jurisdictic h,thereof. 5. Sealed Attic:Liabiiity Exclusion:Contractor shall not be liable for any roof or 10. Jury Trial.Waiver.In the event there is,litigation over the enforcementof a collection structural related issue arising out of.or relating to combining a sealed attic system matteror construction lien,the parties,KNOWINGLY,VOLUNTARILY,IRREVOCABLY AND INTENTfONALLY�WANE THE RIGHT TO A TRIAL,BY JURY IN RESPECT TO 1 ©f 2 i CUSTOMER INITIALS TERMS AND CONDITIONS ANY LITIGATION ARISING OUT OF OR PERTAINING TO THE AGREEMENT;OR Contractor or third parties,and agrees to indemnify and hold harmless Contractor from ANY COURSE OF CONDUCT,COURSE OF DEALINGS;.8TATEMENTS'(WHETHER an and all'Claims arising out of or relating to Mold. VERBAL OR WRITTEN),OR ACTIONS OF ANY PERSON OR PARTY RELATED TO 18. Pre-Existing Conditions. Customer acknowledges that Contractor will be repairing THIS AGREEMENT;THIS IRREVOCABLE WAIVER OF THE RIGHT TO A JURY work that was previously.damaged by mold,water,termites,or other conditions rP,re- TRIAL BEING A MATERIAL INDUCEMENT FOR THE PARTIES TO•ENTER.INTO Existing Conditions') unrelated to the work performed by Contractor. Accordingly, THIS AGREEMENT Contractor disclaims all liability for'all claims,disputes,rights,losses,damages,causes 11, Damage Limitation. In no event,whether based on contract,warranty(express or of action,or controversies CClaims°)pertaining toPre-Existing Conditions,whether those implied),tort,federal or state statute or otherwise arising from or relating to the work and Claims arise in.law;equity,contract,warranty,tort,or'federal or-state statutory claims. services performed under the Agreement; shall Contractor be liable for special, Customer is solely liable and responsible for all damages, whether actual or consequential,punitive,or indirect damages, including loss of use or loss of profits, consequential,arising out of or relating to Pre-Existing Conditions. Contractor and Customer agree to allocate certain of the risks so that,to the fullest extent 19. Working Hours.The proposal is based upon the performance of all work during permitted by law,Contractors total aggregate liability to.Customer is limited.to the dollar Contractor's regular working hours,excluding weekends and National holidays.Extra amount of the Agreement for any and.all injuries,damages;claims;expenses or claim charges will be made for overtime and all work performed other than during Contractor's expenses including attorneys'fees arising out of or relating to.this Agreement regardless regular working hours if required.by Customer. of whether it is based in warranty, tort, contract, strict liability, negligence, errors, 20, Materials.All materials and work shall be furnished in acoordance,with.normal industry omissions,or from any other muse or causes. tolerances for color, variation, thickness, size,.weight, amount, finish, texture and 12. Warranties. Unless otherwise provided: THERE ARE NO EXPRESS.OR IMPLIED Performance standards.Specified•quantilies are intended to represent an average over WARRANTIES WHATSOEVER INCLUDING BUT NOT LIMITED TO THE IMPLIED the entire roof area.Contractor is not responsible for the actual verification of4echnic011 WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR specificationsof product manufacturers,t.e.,.R.value,ASTMorUL compliance,but rather PURPOSE:All waranties/guarantees provided by Contractor,if any,shall be deemed the materials used are represented as such by the manufacturer.Metal roofing and null and void if Customer fails to strictty adhere to the.payment termsXntained`ln the espedally lengthy flat span sheet metal panels will often exhibit waviness,commonly Agreement All warranties and guarantees,if any,provided under the Agreement are referred to as'oil-canning"Oil-canning pertains to aesthetics and not the performance solelyfor the original Customer and are non-transferable,unless otherwise agreed to by of the panels andis not controlled by the Contractor,Contractor is not responsible:foroil- Customer and Contractor in writing.Any.express warranty,provided,if any,by Contractor canning or,aesthetics.Oil-canning shall not be grounds to withhold.payment or reject is the sole and exclusive remedy for alleged construction defects,in lieu.of all other panels of the typespecthed.Title to roofing products passes to the Customer when said remedies,implied or statutory.Warranties to be issued.upon completion and,full products:are delivered to the job site:In the.event of;impending,high wind.conditions; payment of this Agreement.If there is a breach in the applicable Manufacturer's hurricanes,tornados,orother adverse-weather conditions,if Contractor is requested to warranty according to the stated terms and conditions of the warranty supplied,at removelrepositfon product from%on thejobsite,Contractor shallusetts reasonable efforts that moment; this would simultaneously void Contractor's,warranty"and all.of (subject. to weather conditions, life/safety concerns and manpower/equipment Contractor's responsibility,and liability to.correct,supplement,rectify,fix,etc.any constraints)to comply-with the•request Customer agrees to promptly pay Contractor for and all issue(s)as a result of the breach in the Manufacturer's warranty: these extras services.Contractor is not responsible for defective products if Contractor 13. "Claims:It is Customer's duty to notify"Contractor in writing within three Olydays of the did not know such products were defective prior to the installation of same.-As such, occurrence of any claim,defect or deficiency arisirip.out of work,.services or materials. Contractor is not responsible for any costs,damages,claims,etc.,,associated with any provided by Contractor under this Agreement(Cocurrence').Failure.o►the Customer to; remedlation of supposed harm caused bya:defective product.A defective product shall provide written notice of the Occurrence shall result in the Customer•waNing all claims not be grounds to withhold payment"or reject the worts performed by Contractor. that may be brought against Contractor arsin4 out of or nalatinq to the.Occurrence, 21. Construction and Interpretation.Each provision of the Agreement shall be construed including claims arising in law,equity,contract warranty(express or implied):tort or as R both parties mutually drafted this Agreement If a provision of this Agreement(orthe federal or state statutory claims. application of it)is.held by a.court or arbitrator to be invalid or unenforceable;that 14. Acts of God.'Contractor shall not-be responsible for loss,damage or delay caused by provision will be deemed separable from the remaining provisions of the Agreement,will 1 circumstances beyond its reasonable control,including but"not limited to acts:of,God, be reformedlenforced totheextent that it.is valid and enforceable,and Will hot affect the E weather,accidents,fire,vandalism,federal,"state or local law,regulation or order,strikes, validity or interpretation"of.the:-other provisions or the application of that provision to a j jurisdictional disputes,failure or delay of'transportation,shortage of or inability to obtain person or circumstance to which it is valid. and enforceable. Headings are for tj materials,equipment or labor,changes in the workand'detays caused.by others.in the, convenience,only and do not affect interpretation.This Agreement.records the entire i event of these occurrences,Contractor's time for performance under this proposal shall "agreement of the parties and supersedes any previous or contemporaneous agreement, be extended for a time sufficient to permit oompletion.of the Work: understanding,or representation,oral or written,by the parties.All documents/exhibits 15. Unforeseen Decking Lines.Installation of a new roof to the deck area of the referred to in this Agreement are integral partof the Agreement and are incorporated building requires nails andlor screws to tie inserted into.the deck area.By code, 'by reference..This Agreement incorporates the;documents entitled.'Proposal/Contract,' electrigal, telephone.and security wiring and air conditioning wiring and lines "Statutory Warnings," "Limited Workmanship Warranty, (f applicable), and 'Work should not be'installed directly beneath the roof deck: If Customer is aware of Authorization"(if applicable),as well as arty othef document.signed by both parties as i these.or any other such lines,Customer must notify Contractor immediately as the part of.this Agreement.Customer represents'that it has read and fully understood the Contractor will not be.responsible for the puncture of improperly installed lines or Contract Documents,orhas had an opportunity to consult with counsel,priorto.executing lines within three inches of,the roof deck,Customer accepts full responsibility for this Agreement.In the event of a conflict between this Agreement and any other Contract. any repair or replacement that may:be necessary. Document,the order of precedence is Work Autho&6tion(to the extent ft exists)followed 16. Customer Delay, The Parties agree that the Contractor should be,permitted to by these terms and-conditions. execute Its work without interruption.If Contractors work is delayed at:any time by any act or neglect of Customer and/or Customer's representatives, employees, agents,guests,or invitees,or any other contractor empioyed by the Customer,or.by any changes ordered in the work,then Contractor shali.be reimbursed or paid for.all additional costs"or damages incurred as a result.This shall include damages related to lost use of equipment caused by the delay. 17. Disclaimer, Contractor disclaims.all liability for all claims, disputes, rights, losses, damages, causes of action or controversies("Claims') pertaining to mildew, algae, j fungus,mold,and/or other indoor air allergens("Mold")including Claims arising out.or ` relating to the detection,removal,disposal,,orremedtation of Mold,Whether those Claims, arise:in law,equity,contract;warranty,tort;.orfederal orstate statutory clallns,and whether those Claims are based on the acts or omissions of Contractor or individuals'or entities-under-Contractor's control.The Customer is solely liable and responsible for all damages;whether actual or oonsequentiai;.caused by Mold and.iricurred by Customer, s i 2 of 2 CUSTOMER INITIAL. DYNASTY BUILDING SOLUTIONS., LLC i 3914 US Hwy 301 N.Unit 200 Tampa,FL 33619 B U I L D I N G S O LU T I O N S Office(844)573-0857 Fax(813)333-9697 www.dynastybuildingsolutions.com 03/24/2020 Reference: Authorization Form to City of Zephryhills Address: 2321 Towery Trail Lutz, FL 33549 To whom it may concern, I authorize my agent Yessica Y Villafranca Valdez to pull, edit and address any permits on my behalf Edwin Huertas (license holder)for license number CCC1330607 for the reference jurisdiction/county above. Shall you have further questions or immediate assistance, please contact me directly at(813) 417-1702. Edwin Hu 4 , ontractor/License) State of `F)D nl &f9—, County of 166you�� , 1 The foregoing instrument was acknowledged before me this Z day of 202-b by as name of party on behalf of whom instrument was executed) who is personally Known 71 Produced Identification type of identification as Notary ° Notary Puble Stets at Florida (Signature of Notary Public) Gamma Duarte My COMMiaaion GG 05M7 qi Egtiraa o2/o2/2024 (Print, Type, or Stamp Commissioned Name of Notary Public): Dynasty Building Solutions, LLC Lic#CCC 1330607 INSTR#ZUZUU44t3U7 OR EIK 7 UUby PG ZV Z j Page 1 of 1 03/13/2020 10:05 AM Rcpt:2144653 Rec:10.00 DS:0.00 IT:0.00 { Nikki AlvarezSowles,Esq.,Pasco County Clerk&Comptroller AFTER RECORDING-REMiN TO PERMIT NUMBER: NOTICE OF COMMENCEMENT The undersigned hereby gives notice that improvement will be made to certain real property,and in accordance with Chapter 713. Florida Statutes,the following information is provided in this Notice of Commencement. 1. DESCRIPr10N OF PROPERTY(Legal description of the property&street address,if available)TAX FOLIO NO.: //��(y'� SUBDIVISION BLOCK _TMCrI.OT BLDG�Oflrr L/wV 2.GENERAL DESCR VriONOFIMPROVEMENT:?00p 124 ejCjrjAn& 3. OWNER INFORMATION OR LESSEE INFFOR•a—fAT10N I/F�(T/,I{E LEgSS�lEEpCONTRACTE2D FOR TIIE I PR1OVEMEMt�J n e Name and addmss.V.P �U/troth r LU�Nr/J� w �•/7/ �C/ Z&� b Interest in propety. I e Nemeand addrev offs timpletideholder(ifdifiuent fmm 0\�ner listed obove): / t 4. fl.CONTRACTOR-S NAME: eu AuW Commelor s oddress� I /1 rr/I b.Phorrc numbers: S. SURETY tlfapplimble,a copy ofthe payment bud isatlachcd)- IGX�/1QA1TL aofq a N—c n d address: b.Phone wmb-.. c A—rd of band-S 6.a.LENDER'S NAME; Lender'snddren: LPhone number 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by Section 713.13(1)(a)7.,Florida Statutes: e.Name end eddress b.Phone wmbere ofdmgnmed persaru: S.a.In addition to himselfor herself,Owner designates of to receive a copy ofthe Lienor's Notice as provided in Section 713.13(I)(b),Florida Statutes. b Phone wmber of perean or entity designated by Owner. 9. Expiration date of notice of commencement(the expiration date will be I year from the date of recording unless a different date is specified): WARNING TO OWNER ANY PAYMENTS MADE BY THE OWNER A�'FR TIE WMATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CfLAPTER 713 PART f SECTION 713 13 FLORR7A STA TES AND AN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROP RTY A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOH SITE BEFORE THE FIRST INSPECTION IF YO INTEND TO OBTAIN FINANCING-CONSII T W .YOUR LENDER OR AN ATTORNEY BEFORE OMMENCIN WORK OR RE RDING rYOUR NOT( E OFCOMMENCEMENT, .Ohris �(Siinal Owner or Lessee,or Owner's or Lessee's (Print Name add Provide Signatory's Ted{e/OfGce) Aathy ized 0 r/Director/Partner/Manager) State of County of l n ►\ The foregain instrume hVsts acknowledged before me this �day of� �,20 (�n Xby as (namo of, n} (type of au orlty;...e.g.offittr,trustee,attorney in fact) (•,/ for {' name ofparty n behalfof whom in ant was executed) Personally Known_or Produced Identification Type ofldentif ion Produced ti A BROOKE E LUPISMY COMMISSION#GG344270 (Signature ofNotary Public) EXPIRES:JUN 29,2021 (Print,Type,or Stamp Commissioned Name ofNotary Public) Bonded We*1st State Insurance Rev.10-I5-12 Zephyrhills,FL Roof Affidavit Roofing Inspection Affidavit City of Zephyrhills Phone:813-780-0020 5335 8th Street,Zephyrhills,FL 33542 Permit Number .226611� Name Edwin Huertas —I am licensed under Chapter 468,Florida Statutes as a(n): C,)Architect Building Inspector k4 Contractor Engineer License Number ICCC1330607 Personal Inspection];at, I personally inspected the: [3/23/2020 Dry in Flashing and Drip Edge Roof Deck Nailing —Check which was used: 30 Pound Felt Peel and Stick Other If other,please explaim, Address of Roof Inspection 7335 Highland Loop Zephyrhills,FL 33541 Based upon that examination,I have determined the installation was done according to the Hurricane Mitigation Retrofit Manual(Based on Section 553.844,Florida Statutes). Signature 4LI, L State of Florida County of P'%We Sworn to&SubscribMKvforc This Day Public State of NA-y ftl� id- 1-7 ZDZJQ Gemma Duarte My Commission GG 95369 Ex :7 pires 02/02/2024 �A hftps://www.ci.zephyrhills.fl.us/FormCenter/Print?formlD=75&Preview=YES&Save=False&savedProgress[D= -� -~� f . .:,: . . . �:,� . .,-.4 ..-