Loading...
HomeMy WebLinkAbout21-1691 City of Zephyrhills PERMIT NUMBER 5335 Eighth Street Zephyrhills, FL 33542 BGC-001691-2021 Phone: (813)780-0020 Fax: (813)780-0021 Issue Date: 03/22/2021 Permit Type: Building General (Commercial) Property.Number Street Address 04 26 21 0000 00100 0053 IDescription Simons Rd 04 26 21 0000 00100 0052 04 26 21 0010 12E Owner Information Permit Information Contractor Information Name: SMITH CATTLE&GROVES,INC Permit Type:Building General(Commercial) Contractor: LENNAR HOMES LLC Class of Work:Right of Way Temporary Use Address: Po Box 1536 Building Valuation: ZEPHYRHILLS,FL 33539-1536 Electrical Valuation: Phone: Mechanical Valuation: Plumbing Valuation: Total Valuation:$0.00 Total Fees: v Amount Paid: Date Paid: 0141 2,-( Project Description MIS SEE DESCRIPTION SIMONS RD-FEE WAIVED Application Fees REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. __�ri 17JA CONTRACTOR SIG�AT RE PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER LINCKS & ASSOCIATES, INC. Engineers Planners March 11, 2021 Jackie Boggs City of Zephyrhills - Building Department 5335 8Th Street Zephyrhills, FL 33542 RE: ROW Permit Application Project: Traffic Signal - Simons Road @ Eiland Blvd Lincks Project No. 19061 Dear Ms. Boggs, Please accept for review is our request for a Right of Way Use permit for Simons Road @ Eiland Blvd. Enclosed are the following: • Right-of-way Use Permit Application Two Sets of Construction Plans • Stormwater Tabulations with Basin Maps • Traffic Analysis If you have any questions or if additional information is required, please do not hesitate to contact me at ddesilet(aD-lincks.com or (813) 841-3050. LINCKS &ASSOCIATES, INC. ,David W. Desilet, P.E. Senior Project Manager 5023 West Laurel Street: Tampa,FL 33607 813 289 0039 Telephone 813 287'0674 Telefax www.Lineks.com Website' CITY OF ZEPHYRHILLS — BUILDING DEPARTMENT RIGHT-OF-WAY USE PERMIT (� DATE: March—IJ, 2021 PERMIT#: No construction under ground or above ground of any facility shall be accomplished on any City Rights of Way without written approval from the City Building Department.Any application for approval of construction operations on any City owned Rights of Way shall furnish a detailed drawing showing the complete scope of the proposed work in triplicate to the office of the Building Official for approval prior to the commencement of any work. A copy of this permit is to be kept readily available at the site of the work at all times. PARCEL ID#: 04-26-21-0000-00100-0053 & CITY ROAD Simons Rd 04-26-21-0010-12600-0020 LOCATION (Legal Description): See attached Legal descriptions. Permission is hereby granted to Parker Hirons of Lennar Homes, LLC For the construction and maintenance of: The addition of a Traffic Signal and associated intersection Improvements at Simons Rd & Eiland Blvd Subject to the following conditions: 1. The construction and maintenance of such utility shall not interfere with the property and rights of a prior occupant. 2. All work shall be done in keeping with the standards of the City Streets Department and under the supervision of the City Building Official,who will be notified at least one day prior to commencement of construction. 3. All materials and equipment shall be subject to inspection by the City Building Official. 4. During construction all safety regulations of the Department of Transportation shall be observed and the City shall be relieved of all responsibility from damage,of any nature arising from this permit.Subject to the same terms and conditions,the permit holder may take such safety measures, including placing and display of caution signs, as it may deem necessary in conduct of construction and maintenance work hereunder. It is the responsibility of the permittee to???? 5. All private and all City property shall be restored to its original condition as far as practical in the opinion of the City Building Official. 6. All underground crossing installations shall be laid at such depth as may be specified by the City Building Official. 7. The sketch covering the details of this installation shall be made a part of this permit. This permit is granted with the understanding that the applicant has notified all other utility users in the area covered by the permit and takes full responsibility for any damage incurred by prior installations as a result of his operations in order that they may safe guard their interests. 8. It is expressly stipulated that this permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or to vest any property right in said holder. 9. Whenever the City decides to further exploit the City Rights of Way,any or all said poles,wires,pipes,cables,or other facilities and appurtenances authorized hereunder,shall be immediately removed from said Rights of Way,or reset or relocated thereon as required by the City Building Official at the expense of the holder of this permit. 10. The holder shall save and keep the City harmless from any and all damages, claims, or injuries that may occur by reason of the construction, maintenance,and operation of said facility. 11. The holder shall complete the requestedwork within days or this permit shall become null and void. In the event the work requested is not completed upon the expiration date of this permit,the City shall have the right to complete such work and to charge the holder of the permit for all costs incurred in completed said work. 12. The holder shall post a cash or surety bond with the City Manager in the sum of$ dollars to guarantee performance of the obligations herein,.and to guarantee maintenance of the right-of-way described herein for a period of one (1) year following completion of the requested installation. In the event a surety bond is posted,the surety bond shall be made payable to the City and shall obligate the surety to hold the City harmless in the event the holder of this permit should fail to meet any of its obligations hereunder.The bond shall also indemnify the City for all court costs and reasonable attorneys fees in the event legal action is required to collect on said bond. SUBMITTED BY: (PERMITTEE) Parker Hirons of Lennar Homes, LLC (Director of Land Development) Signature&Title w- David W. Desilet(EOR) for Parker Hirons Address 4600 W Cypress St. T a FI 44607 8 3-574t5858 tP APPROVED B : J � CITY OF ZE�PHYRHILLSJ� yy� Utilities Supervisor Date > AF eaU C� -rope 541J LL- I J 7—j tFy P,6K1,6FAJTS . PublicWor Date ��m �Zr P� 9So�•5sv aN 4e-rlVl F/a, rY Building Dept Date C` GUEST—SIDE .252/WRI4Y City Manager Date CUTS 141.41aal & —A4K1 �r | | _—.—'m=rnxuPT88PNT , / � ' ' \ COMATSVVCOROF5E1/4OFNE1/4OF SEC THSO2DG34' 22"VVALGVVBDYOFE1/4OF SEC 4b9.34 \ FT FOR PO8THS89DGS2' 14"E3O.U3FTMOLTHSO2DG 34' 2J"VV PARALLEL WITH VV8DYOFE1/4 ' OF SEC 2O36.1OFTMOLT[...] . . ZEPHYRHILLS COLONY COMPANY LANDS PB 1 PG 55 PART OF TRACT 126 DESC AS BEG AT A POINT 15.00FT WEST OFSECDRUF'SVV1/4OF5E1/40F SECTION 4TH WEST 310.00FTTH NORTH 31O.8O FTTH EAST 210.UOFTTHSO[...] ` it a is as ial in, iot .all Dns ,led oity ,oU ' ACCESS MANAGEMENT ANALYSIS ABBOTT SQUARE Prepared For LENNAR HOMES Prepared By LINCKS & ASSOCIATES, INC. Engineers - Planners Tampa, Florida i ( , ACCESS MANAGEMENT ANALYSIS ABBOTT SQUARE Prepared For LENNAR HOMES I - Prepared By LINCKS &ASSOCIATES, INC. 5023.West Laurel Street Tampa, Florida 33607 813-289-0039 State of Florida Authorization No. EB0004638 March, 2021 Project No. 19061 P:E. P. 51555 Date _ LINCKS. & ASSOCIATES, INC. TABLE OF CONTENTS Page Introduction ......................................................................................................................1 TripGeneration ................................................................................................................1 Project Traffic Distribution ................................................................................................1 Budgeted Improvements..................................................................................................4 BackgroundTraffic...........................................................................................................4 Intersection Analysis ........................................................................................................8 Access Recommendations ............................................................................................13 Appendix LIST OF TABLES 1 Project Trip Generation 2 Estimated Intersection Level of Service (Signalized) .............................................. 12 3 Access Recommendations...................................................................................... 14 LIST OF FIGURES 1 Project Location......................................................................................................... 2 2 Project Traffic ............................................................................................................ 5 3 Existing Traffic........................................................................................................... 6 4 Redistributed Existing Traffic..................................................................................... 7 5 Peak Season Traffic.............................................................................................. 9 6 2028 Background Traffic..................................................................................... 10 7 2028 Background Plus Project Traffic................................................................. 11 8 Intersection Improvements.................................................................................. 15 LINCKS & ASSOCIATES, INC. INTRODUCTION The purpose of this report is to provide the Access Management Analysis for the proposed development located north of Eiland Boulevard and west of Simons Road in the City of Zephyrhills, Florida as shown in Figure 1. The property is proposed to be developed for the following land uses: • 429 Single Family Homes • 286 Townhomes The access for the project is proposed to be via two (2) full accesses to Simons Road. Lennar has entered into a Development Agreement with the City of Zephyrhills to provide a southbound right turn lane and signalize the intersection of Eiland Boulevard and Simons Road in conjunction with the development of the project. This analysis will evaluate the subject intersection in conjunction with the right of way use permit. TRIP GENERATION The trip generation utilized in this report was estimated based on data contained in the ITE Trip Generation Manual, 10th Edition, 2017. As shown in Table 1, the project is estimated to generate 6,091 daily trip ends. During the AM peak hour, the project is estimated to generate 438 trip ends with 107 inbound and 331 outbound, and during the PM peak hour, the project is estimated to generate 561 trip ends with 354 inbound and 207 outbound. PROJECT TRAFFIC DISTRIBUTION The distribution of the project traffic was estimated based on the Tampa Bay Regional 1 LINCKS & ASSOCIATES, INC. „j PIR- e�NonAslde Dr Y •�8�y1' ¢I I �Southside AvHa ^ 33 32 MPth Peak ES St ql� - Price Dr 34 Oak 4 3 Con N e Av. Ck 90NfJ E St _ St C f! + I-(.. Mand -f v Q latnel AMB v Tn'6al Sunshine„ Rd t srshine v yG _ Dana Pth 5 - T Av�� EI Av G _ Qv�.,,� O I Il� v gyres a Av ��,�,T�25S tin Smith Rd _,_ _#.ace.,-•� N~ j If �,, Imo/ rEm C O 'I '` �6,'r� �l IEM ZPROJECT ��-__�I �,11' 8L � o Tat HIDDEN Fpwbr CREEK LVER OAKS - COUNTCOUNTRYU ; CLUB SI GOLF nacc HIDDEN CREEK v----- _ ` "OAKS GOLF (COUNTRY 3 fs A cc: CLUB 5 4Lyn OM EILAN Geiger Deer Crer J ->smo $ A I ER S r '¢a J y t Gteenbe Ct A5 S 2 n L&I* v Ay -rr Av CmE r Av Cs .S J, 3 n7vra v CI AM h Of 3 v Oa ct 251 $ N brook -Or IDmela Av'^ Ialmta C b Ioganpmy U _VljbL441� Cen ry ice Dina A .,,)a�..�'-( 10 v Eun Eu „ ” a �.O Dalebr^ak AvB nnr 9 BE�M1IAR $ o� HRIbtoOk v �. �j, - o ;i Ifa ACRES(GO. $ a U _ CLB La E 8 ADETTcPARK .e LX Rill Aster Dr eus ^ Ni Dr Gekw 8d^a Ar I,C TNdene '� AV '� AV q „„ FJTeM Av = s t .1 D or n B„Ia Av Ka v Gra v Graa Av Cara Av Ct 36000 5„b C mw8th 2 QV San RATor, ul „5 Sllk =t Sardra v y R e 4 Or In _ to to Av Fern=_ Av A YI'1 Wk1<CL w Teakwood nut Av r -�'¢ M�a Q MOO �oph' Dr " O In lrpn a S T Dr . 5 re G (� B Y THa E van Monroe A ug a Betio Ct B L t 2 r sa R 6 2n G dragon N 1n 5 Ct q DrIn „ Dr 4 b Nkrnar 5 a Dr Bsnm R N s N Or Pin DrT r Ln aCw P lUl ¢ Smg u 1 1 Demes v 17 $ N I. Dr Mona § DibrL r Or Ind -- tsmo .Chem Dr Wa�InJ-Der Au 16 Hg�u�gh tl Drx 15 -- S . rbad Ln o $ 8 ¢ Estelle .gE s May s $ !Henderson c Somers � - tasdord E a Lacey Ln Rd ftw or Av Av FIGURE 1 PROJECT LOCATION 2 LINCKS & ASSOCIATES, INC. r T. TABLE 1 90 y PROJECT TRIP GENERATION (1) H O n .aj AM Peak Hour PM Peak Hour H ITE Daily Trip Trip ends Trip Ends Land.Use LUC Size Ends In Out Total In Out Total n Single Family 210 429 DU's 3,970 77 232 309 259 152 411 Townhomes 220 286 DU's 2,121 30 99 129 95 55 150 6,091 107 331 438 354 207 561 (1)Source: ITE Trip Generation Manual, 10th Edition, 2017. c,� i Planning Model. Figure 2 illustrates the AM and PM hour project traffic on the adjacent roadways. BUDGETED IMPROVEMENTS According to the City of Zephyrhills, Simons Road from Shelby Lynn Way to Fort King Road is proposed to be paved in 2021. According to the Pasco County Capital Improvement Plan (CIP) and FDOT Work Program, there are no capacity adding improvement budgeted for construction in the vicinity of the project. BACKGROUND TRAFFIC The background traffic utilized in this report was calculated as follows: 1) AM peak hour (7:00 AM to 9:00 AM) and PM peak hour (4:00 PM to 6:00 PM) turning movement counts were conducted at the following intersections: a) Eiland Boulevard and Simons Road b) Daughtery Road and Simons Road Figure 3 illustrates the existing traffic. 2) The existing traffic was redistributed assuming a diversion of traffic to Simons Road as a result of the proposed extension of Simons Road to Fort King Road in 2021. See Appendix of this report for redistribution of the traffic. Figure 4 illustrated the redistributed existing traffic. 3) Redistributed existing traffic was adjusted to peak season utilizing the FDOT Peak Season Adjustment Factors for Pasco County. -A\ . 4 LINCKS & ASSOCIATES, INC. LEGEND 12/23 = AM/PM PEAK HOUR TRAFFIC r c 0 z m N l A 34/21 —� 39/25\ h t� W- M M \\fn d1 M -o B � 101/63 1 T Fn 157/98 -z CO N °' co co Q in L 23/75 EILAND BLVD. 0/0 41/135 1 0/0 FIGURE 2 PROJECT TRAFFIC 5 LINCKS & ASSOCIATES, INC. LEGEND 12/23 = AM/PM PEAK HOUR TRAFFIC c C C Z a- 130/320 �9g 10/17 v i I r DAUGHTERY RD. 0 z 0 2 Ln N L 5/7 OLAND BLVD. .1 b 671/1060 39/45 958/865 FIGURE 3 EXISTING TRAFFIC g L-I LINCKS & ASSOCIATES, INC. LESS 12/23 = AM/PM PEAK HOUR TRAFFIC c_ c 0 z 130/320 44/65 DAUGHTERY RD. iA rh m m tD tp ci w n N L 5/7 OLAND BLVD. .1 b 585/941 145/145 849/765 FIGURE 4 REDISTRIBUTED EXISTING TRAFFIC 7 --AA \.LINCKS & ASSOCIATES, INC. I Figure 5 illustrates the peak season traffic. 4) A 1% annual growth rate was used to factor the peak season traffic to the buildout year of 2028. 5) The project traffic associated with The Oaks at Pasco and links of Silver Oaks were added to the volumes in #4 as background traffic. See Appendix for the project traffic for these projects. Figure 6 illustrates the 2028 background traffic and Figure 7 illustrates the 2028 background plus project traffic. INTERSECTION ANALYSIS Intersection analysis .was conducted for the AM and PM peak hours for the intersection of Eiland Boulevard and Simons Road. Table 2 provides the results for the signalized intersection analysis. Eiland Boulevard and Simons Road This intersection is currently unsignalized. As stated previously, the following improvements are proposed for the intersection: • Southbound Right Turn Lane • Signalization With these improvements, the intersection will operate at an acceptable Level of Service with the 2028 background plus project traffic, as shown in Table 2. AL 8 LINCKS & ASSOCIATES, INC. LEA 12/23 = AM/PM PEAK HOUR TRAFFIC c 0 z 139/342 Ze0�7 f- 47/70 i I r DAUGHTERY RD. oN �n K ZN O m m BLAND BLVD. .1 b 5/7 /1007 158/155 1 908/818 FIGURE 5 PEAK SEASON TRAFFIC 9 LINCKS & ASSOCIATES, INC. LEGEND 12/23 = AM/PM PEAK HOUR TRAFFIC c c 0 z C Or N z O 2 N�0,�N t— 13/32 EILAND BLVD. .1 b 676/1088 184/211 —? 981/883 —+ FIGURE 8 2028 BACKGROUND TRAFFIC JA AN L 10 LINCKS & ASSOCIATES, INC. LEGEND 12/23 = AM/PM PEAK HOUR TRAFFIC w c O Z T w �N -- A 34/21 T 39/25 " n c co Z Q N N M 20/13 1 ♦— 0/0 B —30/20 THE OAKS 101/63 `� j AT PASCO 0/0 _' co�inDRWY. 157/98 4iz c m �o� rn N O t M" t- 36/107 BLAND BLVD. d b 676/1088 225/346 1 -- 981/883 —► FIGURE 7 2028 BACKGROUND PLUS PROJECT TRAFFIC 11 - LINCKS & ASSOCIATES, INC. 1" Z n N 90 a H TABLE 2 O A a ESTIMATED INTERSECTION M LEVEL OF SERVICE N (SIGNALIZED) Z O 2028 Background Plus Project Traffic Intersection Period LOS Delay Eiland Blvd and AM B 18.4 Simons Rd PM C 32.7 N ACCESS RECOMMENDATIONS The recommendations included in this report are based on a field review of the site, the proposed site plan and the Access Management Analysis. The lengths of the left and right turn lanes were determined based on the FDOT Standard Plans Index 711-001. The access recommendations are summarized in Table 3 and are described in the following paragraphs: Eiland Boulevard and Simons Road Simons Road has full access to Eiland Boulevard. There are existing approximately 150 foot eastbound left turn lane and 320 foot westbound right turn lane. Eiland Boulevard is a three lane roadway with a two way left turn lane west on Eiland Boulevard. It is recommended the existing pavement marking be modified, as shown in Figure 8. The westbound right turn lane cannot be extended due to the Florida Medical Center access. Also, it is recommended a 420 foot southbound right turn lane be provided. JA AN L 13 LINCKS & ASSOCIATES, INC. i I I 1 TABLE 3 H 90 ACCESS RECOMMENDATIONS a OTurn Lane Queue Deceleration Total Existing n Intersection Movement Volume (1) Warranted? (2) Length 3 Length 4 Lenqth Lenqth a Eiland Blvd and EBL 225/346 Existing 225' 290' 515' 150' fA Simons Rd WBR 36/107 Existing 150' 290' 440' 320' Z SBR 304/308 Proposed 276' 145' 420' - A (1) See Figure 7, 2028 Background plus Project Traffic, of this report. - (2) Based on NCHRP 279 and NCHRP 457. (3) Queue length: Eiland Blvd and Simons Rd : EBL -SYNCHRO SimTraffic 95th Percentile Queue WBR-(107/30)X 1.5 X 25 = 134' Use 150' SBR -SYNCHRO SimTraffic 95th Percentile Queue (4) Based on FDOT Standard Plans Index 711-001 and the following posted speed limits: Simons Rd-30 MPH Eiland Blvd-45 MPH NORTH —____-- li � 1 f ; nts � � � ------ ----------------- r ----------------- f n 11 1 m0 IL 1, 1, � m �Z I, �F ;1 !',W s z 41 1 ✓ ' 1/ 'I 1, 1, 1' 1' 1' I� 1' 1� 1 'I SIMONS RD. �•I� ' 4 r � 1� 11 1 ,/ MDMTrjo �, 11 � 11 ° 11 11 s h 1 41 1 1 _ ' ; 1 li i i— i: it i II 11 = 4 11 �1 it I , I I' 11 1� �I 1� 11 1� " 11 11 1, 1, 11 ,i _ II li ------- 1, --- i 1 ti " 11 1 11 I I� 15 --A\.LINCKS & ASSOCIATES, INC. li APPENDIX LML4lCKS & ASSOCIATES, INC. � I I �t l SITE PLAN i t i LIMCCKS & ASSOCIATES, INC. ;'.:!'>..•ti"'.) .t••.S _ r'Ky_ v 4E., `G'l�'r•'YJ.;s t � ,t ���t y: •ci�:,C i�'..i-•• ( •�f��eiJ:r,{.`�'d, 4Q ai. .�1� ` i-'. - .o;if Y� W .. �..�., C'f( }'�r .. {� �_"� 'I i' •kc;'. iz ' $ � Ir^r'..`fir' ..:�: i - .?"! � l:; •,?+. 41 ... P ' ! it'l" fir, . '� � L. .�. .. :... •�, 4� 3� .1� r r�'=: -. ^li;' -. .u.L ., '+,' bra,• o :".'.. ti I �� r�.'•.." !,' !. s! f'f, j',7�'i•�i� .rG i��'`,'�� ;J'.,..a-7�`1_ ,, . b;, r'�:.• .'�®t1•�'i:�", ! I I. '.'—�,;�•,�`•® pe 9. " _ .:��:+ -,''s','..,',t;i,i :r't't,�,•r •Mlt h• ,y'�,, ,�,•,....�, I C }`: .Lt .',U�7;C_.il iSaii++, i t d.4r •. �VT 1;. - y `} ..• - •''• __ -: }i•_ ::,+ +fir ' �"'..- _ r :� - Car , .... 't. i:,O/.t�,, +f •�, _ j - rti4+J:: z y-.si'•YiD}♦ -_ - a 61iE/ .: "r I� I }} ' '• r _ i S� ..Ci � i •t:. � Yl2iVPi?(:. _'L sE�� _ •Y y', f.,• �� i 'L'.". - I ��f��}',:�'1�'t i.f,rr y;(fi i :l. -"5 •. ,� -� 'v y.rf rt,,; '.r'�t�;7".rl I' 7- ' •If •:.l..r;: ___ __ —- __ - L_ •tll•�sfi I _ - _ I I ��$Ia� -i -:.tom . ly _ .�J:".r:•: ;;�is ::!�'A^•:1�2.7Ra•',c9.T'�1?'r+'•}-� ��` _ ,i s ��..•`.'! ;; I �_ �•I 1,.�?'•'•^�:14Ft;.'�+_� :�►;,Pj;, -MY.!,�`C',��`''�r�f '�+ � !. ' '�-�:r:. "1i��.i- .`t,•:� ' I •� G- f,y„ { �.�3 .:1 QS ':.. �i: 'Y's: .:t-r •^• it.._..:. I - �•i ,7_;;.q*•,fir,-. �M::.+ii+,�;`tr:`��.•, t3�?�:��`�'.f` +11^, r-- :t'.+ri'..-�<~: - _- a 7'. : }j, S.l 'C�.e.^.••�y+1'.Y,'+ : �.,.•.��,;Jijr,�l :wT+ l"�'•( � +.�.�'i -I� :•ter" •`';+. - %�,,. 1(�i L.•K� ij,7:�-r, .C!!1, ^7r?��j,(�r�'.�:Y:j��4"+'y�'ll$ '1 �,•qrg, IG}'l l•.O ... ';�'^.r.., 7wl I••r''; 1.? •r.yr. I !,�{`[,s!G�"I,W�. . r t} ��.!, r':: F' } � I K: ,L" ,., Lv- ;, '{N'r;,. iv f:�f:" f4 �P4_ tL• i j •v ,7' :'�' bi," }t•,4.t:' j}.+'S .;:.+?.`.%l 'f+gK r +b,` ,•t%f�X..i:•,.1• ti? , _77 t;y., -_ '•Sf` ,.: — �r�{- •'.�,'i:.!� I N`.�r.i(.to i�'"�7,,'"�'.:'�i.• ' t':...:,�.:� ,C f— f + ,. .,lr?�': .l'.. +�`/y'y Sl.� ,.f. >'L'�]�.. • K�:ti''i! � •1� ..•. •! I i •�)ra+ 4.--.f: .+(-?fir.� t iB`'.'f ,`.''Kg.. •,G:: •�`�`'`,`+.�'' r 4}i�' •�{';+,7•. b- ..}yY:' c�'•-', ,,yy Eiland Blvd. I - -_,_.,..;.�- .�:' ',Ti•ift,.+t ... _�.?S`i. �,�^t:�V..._I,.'^:'`� .. .:$��11 �'`i _ ! ';=� Enginctring-Efivira=cntai ' NmerRcaotircc-suety ABBOTT SQUARE CONCEPTUAL SITE PLAN = _ 1030 C Ni Lb rill llf iLl 7ni NII7l Inl . TRIP GENERATION LINCKS & ASSOCIATES, INC. 'I I PERIOD SETTING Analysis Name; Naw Anatysis Project Noma: Abboit Square No Hate: 12/6/2010 City: statelProvinee: ZIPIPostal Code: Country: Client Noma: - Anatyxrs Name: Edition: Trip.Generatlon Manuel,10th Ed Land Use Independent Six* Time Period Method Entry Exit Total Variable 210-Single-Family Dwelling Units 429 Weekday Best Fit(LOG) 1885 1986 3970 Detached Housing Ln(T)=0.92Ln(X) 50% 50% (General +2.71 --, Uitiantsuburban) 220-Multifamily Dwelling Units 286 Weekday Best Fit(LIN) 1061 1060 2121 Housing-(Low-R1se) T=7.56(X"D.86 50% 50% (General UrbardSuburban) TRAFFIC REDUCTIONS Land Use Entryucttan Adjusted Entry Exit Reduction Adjusted Exit 210-Single•Family Detached Housing 0 VY less 0% 1965 220-Multifamily Housing(Low-Rise) 0% 1051 0% 1060 INT9RNAL TRIPS 210•Single-Family Detached Housing 220-Mu tifamlly Housing(Low-Rise) Fait 1985 Demand Exit: 0% (0) Balanced: Demand Entry: 0% (0) Entry 1061 _ Entry lass Demand Entry: 0°h (0) Baten0ced: Demand Exil: 0% (0) Exit 1060 210•.Single-Family Detached Housing Internal Trips Total Trips 220-Multifamily 'total External Trips Housing(Low-Rise) Entry 1985(100%) 0(0%) 0(0%) 1985(100%) --, Exit 1985 000%) D(0`yo) 0(0%) 1985(100`Yo) total 3970(100%) 0 (0%) 0(OV/0) 3970 (100%) 220-Multifamily Housing(Low-Rise) jTotal Trips Internal Trips Externai Trips . Total hitps,//iteteippli.org/prol'eetisttidylpiintpreview?buidwecaf!-993ia4c7i'3'f6f2eIBIcefldbb [2/6/2019 22D=IMuititaMIly Housing(Low Rtae) Internal Trips -Totat Trips 1210-Singio•Famlly .Total External Trips Datacha . cusing _ Entry 130(100%) 0(0%) �0(09G) 130.{1009L) Exit 199(100%) ,o(0%) ,o ON 199(100%) . Total 1129(100%) t 0 (_ [0(0%) 1129 (100%) EXTERNAL TRIPS Land Use t3ctemai Tripe Pass-byy. Piss-by Trips Ton-pass-by rips . . —i 210.Stngle-Family betached Housing 309 0 0 309 " 220-Multifamlly.Housing(Low•Rlse) 129 p 0 129 iTE DEVIATION DETAILS Weekday,Peak Hour of Adjacent Street Traffic,One Hour Between 7 and 9 a.m. Landuse No deviations From ITE. Methods No deviations from ITE, External Trips 210-Single-Famiy Detoched Housing(General Urban/Suburban) tTE does not recommend a particular pass-by%for this case. - 22Q-Multifamily housing(Low-Rise)(General Urban/Suburban). ITE does not recommend a particular pass-by%for this case. SUMMARY Total Entering 107 Total Exiting 331 Total Entering Reduction 0 Total ExitingReductfon 0 Total Entering Intornal Capture Reduction 0 Total Exiting internal Capture Reduction' 0 Total Entering Pass-by'Reduction 0 Total Exiting Pass-by Reduction b Total Entering Non-Pass-by Trips 107 . Total Exiting Non-Pass-by Trips 331" ht(l)s:/lltetripgen.org/I)rojectsiud}r/pi'iiitl>rev-ieW?quid=9d325e7300bi66e0f)e35afee0G2952f. 1/6/2019 PERIOD SETTING Analysis Name: NewAnalysis Project Name., Abbott Square No: Date: 1216/2019 Clty: StatWrovince: ZIP/Postal code: Country: Client Name: Analyst's Name: Editlon: Trip Generation Manual,loth Ed (ndepagdent and Use Variable Size Time Period Mrt:iod Entry Exit Tots( 210 Single-Famlly Dwelling Units 420 tMeekday;Peak Beat Fit(LOG) 259 152 ' 411 Detached Housing flour of Adjacent LnM 0.960(X)+0.2 63% 37% (General $treat Traffic, Urban/Suburban) One Hour 8atween 4 and 6 p.m. 220-MuJilfamlly Dwelling Units 286 Weekday,Peak 8est FI1(LOG) 95 55 150 Housing(Low-Rise) Hour of Adjacent Ln(T)-=0.89Ln(X) 63% 37% (General Street Traffic, +-6.62 Urban/Suburban) One Hour 9etween 4 and 6 p.m. TRAFF(G REbUCTIONS Land'Use Red xit du Adjusted Entry Exit Reduction Adjusted t 210-51hg(e-J=amity Detached Housing 0 95 259 0 46 152 220-Muldfamlly'Nousing(Low-Rise) 0% -95 0% 55 INTERNAL TRIPS 210-Single-Family Detached Housing 226-Muldfamily Housing((.ow-Rlse) Exit -162 Demand Exti: 0% {0) Balanced, Demand Entry: 0% (0) Entry 95 Entry 259 Demand Entry: 0% (0) Balanced: Demand Exit: 0% (0) Exit 55 210,!Single•Family Detached Housing Internal Trips Total Trips 220:-MultifamAy Total External Trips Housing(LoW Rlaa) Entry 259(100%) 0(0%) 0(0%) 259(100%) Wit . 162(100%) 0(03'a) 0(0%) 152(100°d+) Total 411(100%) 0 (0%) 0(0%) 411 (100%) lit(ps.!/fietripgen.oi-g/pl-0*6ttidyfpjiiitl>review?guid=Ob4G8b158'07b441278c5afgflgOlf65 12/6/2019 I 1 I i TAMPA BAY REGIONAL PLANNING MODEL , LINCKS &.ASSOCIATE% INC. - -- ! --J TSRPM v8.2a E+C Model Network - Project Traffic Percent Distribution _ - • Project Centroid14 12 0 c, c - G C - 20 al ya _ 0 C a I r _ 4.5 0 1 06 0.6 06' 0.a 04 . . D — • 01 �: I 0.1 b rlg 132 19 03 0. i 02 a0 ,. 13) 27 I 20.7 )7.0 •011 .0.2 02 w 6 r. 008 )3 ay 45 5 ..r i+y5g•'6; StP o3 03 J.t ,p9 7.6 — a ZI ! �� c 01 9v .i 0.3 03 :� 02. •C._� 0:, 0 2 0.2 0.0 0• oJi 01 !� 10 10t d a 0.1 w •w c' w h 02 � c t'a 5+ 6.3^ io la 19 19 1.0 7,1 Oi C; J.! 0 34 39 19 39 r 1 37 36 1 p u 3d 0• 'r 09 i 4 � J 0.5 J TURNING MOVEMENT COUNTS LIMCKS & ASSOCIATES, INC. 4 N/S Street: ;Simons Rd: Speed:30 MPH N'7 National Data&Surve,.-ing Services to rD rn Site Code: 20-3034-003iT r Date: 01/23/2020 %�-�-3c3y•oo3 '�' Weather: SunnyCL IV . City: Zephyrhills County: Pasco . Count Times: 07:00-09:00 .16:00-18:00 Control: 1-Way Stop(SB) cri ro (o a vi V I Q QM Q p N QIOtOOOCONInm QN Q O - �mm-Ir mV, mV, Om O mo OQtNntMnvvtonvv F- g o I 0 C 0 0 0 0 030000a0CDC) po o 000O;poo0 300 00 C) p M O C 0ro c o N N r., O co Ocq MO c'+`1 .p 0 O �?.-1 .-i o o'M N O.-� 00 to V: Z CDC4 .-�V' .-�r1i.-�N N V- 3 N C) M O N CD ID C o O In o Q O W �i O �-�n 0�0 co �O n V' M ~00 ^ O V'n w N n M N ^N `+,m NOi ^ N N N NNN N N mO; O y •--�m lD O m .-,CD O a o CD $ o 0 o3000pi0opo 30 CD 0 op o300000000 300 po p O o 0 0 0 O 0 0 0 0 0 0 Cl CD w 0 0 p 0 O W 0 0 0 0 0 00 0 W Clo p 0 0 c i CD Vp p O O o ZoW0000000o Woo po zoWo000000o Woo pop, m o a, m mOR U o o o CO • J w M O M io In M o r� tu^ v�i rn p r Cn—.o"I m M M N ry 0 1�nD Qln1. O On 00 Mt0N MO11� LLJ Oo,N N0 M ON ^^,, .-� •ti N N N N.-1 N ,y 6 Q,0 N N N N.. N N N ,ti p�O y) Uo 0 .,..� m O to J .Ni tD V' J.-�W O J.-I M .-r .Ni N O M J.-�O t0 owr. tn0 tn� wr-, m O OLU- - - - - - wmvj V m 0 o C> o 0 CDp CD 0 p�o o o o o 0 0 0 (0 0 p o o�o o o olo o o o V) p O W •11���111 Q I .-oi of V ZOow mm O'p 00 M C 1n n � O\v OQ '0 N Inr, MN pU) 10V,. (n . M toS i� m O 0 m O M C c In S C A r—' E o C� S oCD Ul O F-p o o p...p �j p Q O p�j O p O p CD p CD p O p 0 1 CD 0 VI p p o G o (� •� O�� .�0 •-�i0 -MO wnc Nton OU)00ti .--IMN+--IO tj W� to V: { CD O CD cc O z 0 0 0 O.O p o p z 0 p 0 O z 0 0 0 0 0 0 0 0 z 0 p OO O Q p O a O ?oZ00000000 Zo moo ZoZ0000000o Zo ,may po 0 0 co o m o j C co m E_ f f ry N Z O Z 0 0 0 0 0 0 0 0 Z p O p CD O Z O O p O;O CD CD p Z O p 0 W M O CD C6 O O ran L O O CO > O Z 0 0 0 O 0 0 0 0 z 0 p 0 O Z 0 0 0 OI.O p p Z O O O E CS CD CD In N ff�fF �Ff .. .. .. .. ..C L Z �!'o O9O QQQ Q Q Q Q N H CL 7W..=.°. caa.e. �..�r.e W 0 n t to to 4 AVc a Ln 0vmv = �R 7i i o. � V97!T . a, J V V) nnnnCO co COO J V W = LL V'V'V'V•iln to tii to O V W = LL 3 p a Y 0 a Y CL 0Ul a as a 1�n m a 0 n a 0 Z > v v> Am va T > r A a < m va < a � & n � �^ SC vl�n nvl�.n .a .a .a a A a Sc 00cowm�l �lv�l C 0 O la W F+O x -N W r 0.A W F+O 7 d � < �3 �nOcnoviOvlo < �3 v ocnovloLno A Gp T °•m � � Su-m aaaDDaaa o v v v v v v v v (n* _ o r A In to 33333333 A r 3333.333 3 •• .. •. .. .. .. .. .. .. .. . O N 0 CDO 13 O O O Z O O O O O O ClO Z O O.O O Z O O O O O O O O Z O o r r C. r r �,in Op O QO O ja p V M rn 0oto oz 0000;0000Zoz ppo oz o000,0000Zo p 9 0 a 0 a 3 3 = W o toil O o aOo OO ;an O O p O p o 0 O Oj0 O C)C)z C:)Z 00 0 G O Z O O O O O O O O p O Z CL 0O 3 O O 3 O o o r.•t Op CD C) Op o000O000Co Cn O 0 ^� / p o f`Jy z V Vt V r O O N W'f-' r o O O LnO N93 V O W�-+ plr+ O r F+ p F•d• rt O Oc ` H.1• . ° O O OO O O 0 0 0 0 0 0 0 0 O O pO 0 O O O O OHO O O O O O 0 o C 3 V O -C{ w ° W �D ° OS w �N �OOA OInm ~ANN V A O� .p W; W�W O'lD lO W CO�OO o o 0 0 �M 00 DOS 00000000�C. 0 p DOS OO O'OIO OO OC O ,J�' F•� O p p O I•� O O Ov-N A-OD -� - �o�o -rrnp o W NrnM .`-v n�Nrntn14Mo NW ipV r wooni wf- r w 0 CD �w a W NO W-IN"J"J O OC3 fjV 1 a,V r 10- IQ N+ OINnNLn O Mtn rr 0 V N V ID 00 wO W G 0100�D 1D W t0 cn.-� D T CD o � o A co co ° a A 00 .4p m 0O oop 00000OoOpoa Op oo� OO000OOOrnoo <a o p n ° 0 oC.O oOc poppIoopaC0 oO opc pppo�popC)mC) ° O 0 00 00 0000l0000r` 00 00� 0000;0000 o 0 0 o _ 0- ID S{ N�.NIN NN NNNW CS OO 'D < r+f+r rlf+r Q�l N W W-1 %D N Lnn IV+(A O w W-1 O m N I S W W.A W'V QP S1 000-i O m rn d rt---III O W�D r+ V In p,� p o i O e t0 co w co cLq C, O rn0 O W No O W1-' N 1-�F` h+ .A 1+ O v Fes,. V O O N W;O O F+1-+ZE O O C1 N C . 00 V V O O W 0 o O.A O O O O o O C O O O OjO 0 0 0 O pp 0 O 0 0 0 O.O 0 0 0 0 W O p o I o io. O Wm0 cil �o�ol�riov�i� o� o� o Wp��mv�'iomiW-•� tail CO D vD ��n inm�oV oD r D r�.i> O.A NOW N IDr ODD r r r r r r I Q�IDN NNNNM 000 Ln m 0�O1�D 01I�I��DN W 0 u n O o c O O j CD O o j CD 0 0 0 0 0 0 o j O p p Op CD O O O O1O_o O O j o p 0 0 7 ' o 0 0 N A a m O o M m� 9 Zoe0000000 - po Zo3oo00.00 �0 3~ o0 CD o � opo N:" m lD Ln m W p ai Gi o o t; o 0 �+0 W 3 p r,ti wIN 01 ti Q t0 O rn in m ln,M ti N N cq CO 6! O, O Cn O � O i L a o 0 O O O O CD 0 3 0 0 0 0 O O 0 0 O p 0 O CD O C.Oj 0 0 0 0 O O p 0 0 0 o 0 O O w 0 0 0 O!O O O O W O D O O C. O w 0 0 0 OHO O O O W O CR p 0 OO O V o O O i O p 9 Z O w 0 0 0 O:O 0 0 0 W O p O Z O W 0 0 0 O O 0 0 0 W O q p o Cl) m 0 N 0 N Ln W co O N l!1 ul.m-� ti .N-� W coN V'rq � O y!j 1� Q�Q I� M N.-1 yl j'r- M N O, O CT p cn } o` �r WJ in O p O Uj00 oOlr+O - �j Mui �N OLj OON O'O N 00 W V'co N N O O O = a o O O O CD o 00 m mo 00� o Ln o 0 p CD o p o N Z O,CD0C) -!C)CD o �N� �N ZONO V'NOO -.aa �1�^ ADM �J p o 00 =O 0:) o n m Ln m rn ! A ri E o o o 0 �0�000 Oi0 p op tjOO pp �0�00000000 in CD pC3 �i rl 0 0 .O iOI o` o •,� O N 00000000 00 p CD p O O o C.o i p C, C:) -J 00 z p 71 o O O O Z O C.O CD CD O CD CDZ O O O p O Z O O o CD. CD O O Z O p 0 O O � ! ZpZ 0 0 0 0 0 0 0 0 Z O M O O j O Z 0 0 0 Oi0 0 0 0 Z O ''! O O O_' 0 Do O 0 Mf O O w m O m O m O = _ E a CDa p �n Zo�00000000 �o opo ZOZO000;0000 �o Lnpo 'w o v o o'tj o 0 mL o O L O z 0 O,o 0 0 0 o o z 0 p p O Z 0 0 0 O!O O O O Z O p 0 E aa o i 0 to N O C .. f N toaaaaaaG O ¢ ¢ ¢ ¢ ¢ W e S O G I WCV aL+ O�1 O l!1 O Ln p ? O V1 O 1f71O In O ll'10 -m7!fnv Y G o .-+m vo"+mv O U Vl ^ r' ^�:mmao� �V w = ¢ vcvvivi�iivivi JU w SQ J U. >p a Y ce > O a Yce W J K W S • J C' W S QIL aY FQ- a LU z F- IL C. i I National Data & Surveying Services Intersection Turning Movement Count Location: Simons Rd&Eiland Blvd City: Zephyrhills Project ID: 20-03034-003 Control: 0 Date: 1/2312020 Bikes 'NS/EW Streets:F- Simons Rd Simons Rd Eiland Blvd Eiland Blvd NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 0 0 0 0 0 0. 0 0 0 0 0 0 0 0 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 77*.00 All� 0 1 0 0 0 0 G 0 0 0 0 0 0 0 0 0 0 .0 M 7. 5 0 0 0 0 0 0 15 A 0 .1 AM 0 0 0 0 0 0 0 0 0 0 7 0 M 30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ,. ,",1 7. 0 0 0 0 0 .1.5 AM 0 0 0 0 0 0 0 0 0 0 0 0 -- -d- d- -, -0- .8: -- --6- 0 0 0 o 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:45 AM 0 a 0 0 0 .0 0 0 0 0 .0 0 0 0 0 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU 11 TOTAL TOTAL VOLUMES: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROACH Ws: PEAK HR: 07;30AM-03:30AM TOTAL PEAK HR VOL; 0- 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000. 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0, 0 0 .0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 .60,,P� 0 0 K 6 -6 0 6 -0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.45 pm 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 l NL NT NR NU SL ST SR SU EL Er ER EU WL WT WR WU TOTAL TOTAL VOLUMES: 0 0 0 0 0 0 0 0 0 0 0 a 0 1 0 0 1 APPROACH 0/h's fl 0.00% 100.00% 0.00% 0.00"j] PEAK HIR*,J 04:15 PM-05:15 PM TOTAL PEAK HR VOL: 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 0 PEAK HIR FACTOR:1 0.00- 0.000 0.000 0.000 0,000. 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 National Data & Surveying Services Intersection Turning Movement Count Location: Simons Rd &Eiland Blvd Project ID: 20-03034-003 City: Zephyrhills Date: 1/23/2020 Pedestrians (Crosswalks) NS/EW Streets:F Simons Rd Simons Rd Eiland Blvd Eiland Blvd A NORTH LEG SOUTH LEG EAST LEG WEST LEG -B WB EB WB NB SB NB SB- TOTAL 7:00 AM 0 0 0 0 0 0 .0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 D 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 8:00 AM 0 6— 0 0 0 0 d 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES: 0 0 0 0 0 0 0 0 0 APPROACH 0/b's: PEAK HR; 07.30 AM-08:30 AM TOTAL PEAK HRVOL: 0 0 0 0 0 0 0 0 0 PEAK HR FACTOR: NORTH LEG. SOUTH LEG EAST LEG WEST LEG B WB EB WB NB SB NB SB TOTAL 4:00 PM D 0 0 0 0 0 0 0 0 4:15 PM 0 0, 0 0 0 0 0 0 0 1�4:30 PM 0 0 0 0. 0 0 0 0 0 4.45 PM 0 0 0 0 0 0 0 0 0 5:66 PM 0 0 0 0 0 6 0 b 5:15 PM 0 0 0 0 0 0 0 0 0 5:30:PM 0. 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 EB WB EB WB NB SB NB SB TOTAL TOTAL VOLUMES: 0 0 0 0 0 0 0 0 0 APPROACH 0/b's.: PEAK HR: 04:15 PM-05:15 PM TOTAL PEAK HR VOL: 0, 0 0 0 0 0 0 o- D PEAK HR FACTOR: Prepared by National Data&Surveyirig Services Simons Rd & Eiland Blvd Peak Hour Turning Movement Count ID: 20=03034-003 Simons Rd Day: Thursday City: Zephyrhills • • Date: 01/23/2020 UND rn 07:30 AM-08:30 AM AM 35 1 0 2 0 44 AM 07:00 AM-09:00 AM O c z -i = NONE NOON 0 0 0 0 0 NOON NONE m Y M Q — — a 04:15 PM-05:15 PM PM 58 1 0 5 , 0 52 rM 14:00 PM-01:00 PM o rn AM NOON PM 41 4 t 4 PM NOON AM 0 0 0 0 0 7 1 0 5 706 i 0 1118 a -- -- • ' • 0 1060 0 671 m > — - m • 0 0 0 b 0 0 0 ,` 0 0 0 CL 39 0 45 j 0 1710 0 2040 0 0 0 0 • W ----- AM NOON PM 958 0 865 ♦ 0 0.90 0.95 IZ -- 8701 0 960 0 0 0 0 0 0 0 0 j AM NOON PM 41 *1 t PM NOON AM Cars (AM) PM 0 0 i 0 0 0 PM HT (AM) m O NL —NOON O O O 1 O O NOON O o L 38J t 5 AM 0 0 0 0 0 AM 1 J t 0 9104 4-622 48 �► MW ♦ 49 0- NORTHBOUND ro O o 0 F Simons Rd 0 0 0 r Cars (NOON) HT(NOON) Z' z \Q Podostrians(Crosswalks) a� Z Z Z Z Z L c� �J O P`f a Z Q Q Z a 9,� O N/A J t N/A N/A-► +1 4- N/A O p N/A ♦ > 4- N/A N/A-i f r►r N/A *ACD 0 0 0 0 0 N/A -4 ♦ r►r.N/A 41 D D D F ZZ NOON 0 ♦ ♦ ♦ 0 NOON D D D AM AM Cars (PM) AM 00 -- 0 AM HT (PM) �,v NOON 0 0 NOON to O Lr1L PM 0 ♦ 4- 0 PM 4� + 4 o 0 0 0 0 0 �� ♦ L* L 0 43J � t7 � � J t 8354 "lP9P 4-11044 4 I o o I O 30 .E �' �.. 16 2y a z ¢ ¢ °z a �d O of �` r0 01 p ' r 0 QA 4po2 aoo� ep O 7000 0 0 0 � s Q LOCATION: Simons Rd&El land Blvd BlAid PROJECT ID: 4-0 CITY/STATE: Zephyrhills,FL DATE: 01/23/2020 37 44 t Peak-Hour:07:30 AM-08:30 AM 4- 2 7 23 i35 0 2 L Peak 15-Minute:07:45 AM-08:00 AM 2 9 00 00 4J ,� 4 . 4- 1, + L . 706 39 J' Peak Hour Factor t5 676 71 2fi j t 00 12 958 �► .90 4F.671 i so «► 4-7 3 097 0 , 0 goo 49 00 It 00 s0 0 0 0 � � '� 7 00 00 00 0 0 't' ♦ 0 0 00 Nationa]Data&Surveying Services 0 0 0 0 0 -01 0 4- 4 0 L � 0 1 t p 0 .� 4. 0 0 1 .� f 0 . ll � �. 0 zo•3c31•oa3 � � y o o � 1. � o a o 1--d 4- 1.01 4. 4a L 4) . 4 4L 1 J to J t. 0 4 0 z r 41 16-Min Count Simons Rd Simons Rd Eiland Blvd Elland Blvd Pariad Northbound Southbound Eastbound Westbound Hourly do0inning At Lott Thru R t U R' I Lott Thru R t U R' Lott Thru R t U R' I Loft Thru R t U R' Total Total 07:00 AM 0 0 0 0 1 0 8 0 7 193 0 0 0 115 1 0 325 1609 07:15 AM 0 0 0 0 1 0 13 0 5 180 0 0 0 177 1 0 377 1674 07:30 AM 0 0 0 0 _ 0 '0 9 0 6 234 0 0 0 .184 0 0 433 1710 {07�8 AM U� '�0 .O�a�fl',��3��"1 `�i•,A 0� 1�(1 <sOr' � , '``'"���•:�86' �`"y'c, is � r, 8F'(? .."'. �3 0 08:00 AM 0 0 0 0 0 0 8 0 16 225 0' 0 0 136 3 0 300 1624 08:15 AM 9 0 1 0 0. 1 0 8 0 5 233 0, 0 0 164 2 0 413 1234 08:30 AM 0 0 0 0 3 Q 16 0 6 100 0 0 0 172 0 0 387 821 08:45 AM 0 0 0 0 0 0 3 0 14 271 0 0 0 145 1 0 434 434 Peak 16-Min Northbound Southbound Eastbound Westbound Flowratos. Loh Thru R t U R' Lott Thru R t. U ..R' Lott Thru R t U R' I Loft Thru R t U R' Total AIIVohiclas. ;`0; 0. . .0;.:. -4 0.' .4 .:"0,. 84 1084 0 .: ;OE. D 740' 12, 0, Q9T13 :Hea,YTr4cks' '. :'0. . 0...,::.0. 0. .'0. 4.! 4. _ 64: ::...0' 0. . :76': 0 L4 ± Radestiio is �:. :. t? � Bicycles p•; '0 0,: ,0 0. .. 0:;,', 0 0' 'D : 0:. ';0;. 0•. Rallrbad; • St1i ed,Btisas _ ::.. : _ Pp r i ' I LOCATION: Simon7RUTEiland Blvd PROJECT ID: 20-08034-003 CITY/STATE: Zephyrhil15,FL DATE: 01/23/2020 ♦ 63 52 t Peak-Hour:04:15 PM-05:15 PM + 95 30 t Peak 15-Minute:04:30 PM-04:45 PM 00 �- � ♦ 4 L a ♦ #0 0 0 4 L 4. ilia 45 J, t 7 1067 20 44 S t-00 I$ Peak Hour Factor ass Q,9s ♦loco 35 15 010 0 �, ,r 0 670 35 00 r DO 34 l 1 J 00 00 00 00 National Data&Surveying Services 0 ♦ ♦ 0 0 1 t 0 0 -0, 4. 0 ,r ♦ ♦ t� -- 7 0 O F f+► 7 0 0 O F 4 4 L 2 J t' a -- j t 30 "', tii,�� 4. 16 0 Z ro ZN r 0 0 0 -1+1 F F` 15-Min Count -Simons Rd Simons Rd Elland Blvd Eiland Blvd Poriod Northbound Southbound Eastbound Wostbound Hourly BoOinning Al Lott Thru R t. U R' Loft Thru R t" U R' Loft Thru R t U R' Loft Thru R t U R' Towl Total 04:00 PM 0 0 0 0 0 0 7 0 11 205-" 0 0 0 242 1 0 466 2008 04:15PM 0 0 0 _ 0 0 " 0' 16 0 :13 219 0 0 0 274 4 0 526: 2040 03130 P " 0 0 J0, 0 0 1A 1�' {7 226 '0,,VTp 0 A46 Q 536 201& 04:45 PM 0' 0 .0 .0 1 0 14 0 : 9 226 0 0 0 220 1 0. 480 1935 moo PM 0 0 0 0 3 . 0 14 0 12 194 . 0 , 0 0 274 1 _ 0' 498 1914, 05:15 PM 0 0 0 0 2 0 17 0 12 233 0 0 0 236 2 - 0 502 1416 05:30 PM 0 0 0 0 1 0 15 0 10 203 0 0 0 224 2 0 455 914 05:45 PM 0. 0 0 0 0 0 10 0 13 222 0 0 0 210 4 0 1 450 1 459 Pook 15•Min Northbound .. 'Southbound Eastbound Wostbound - Flowralos Loft Thru R t U. R' Loft Thru R t U R' I Loft Thru R t U R• Lott Thru R t "U" R' Total --I IVohicles "0 0; 0 ,0:_ 12' "'0, 04,"' 0, •52, -904 0..,; "0; 0.- 1132• 16-- 0• "- 2180. Heavy Trucks_ ''0. 0 -..0. .0 a 16: B. - :40 :::p: ... 0" •20 "0 -..'. 84" .,. .. ;:: .,0.. 0, p. • 0 Pedeslriads 0,.. 0, O 0 0' 0: 0. 0 lY: :'0 0 ., 0 B1CyClas 0 .. . .. .- - - �'Sloppetl,Busos TAMPA BAY REGIONAL PLANNING MODEL RUNS FOR PHASE 1 AND 11 OF SIMONS ROAD IMPROVEMENT TBRPM v8.2a E+C Model Network_- 20.40 PSWT Volumes with Project(with Simmons to south only) 0 Protect Centrold ♦ sRiy♦ ♦♦ J449 10� 617 i - o - 1923 2443 - � 2G79 ` fASp` •�' v• l g y776_all 46 _g 1193 - N �• q ..J 13C uo 37r� 12309 ! 1248-1 8396 - 7632 1 Ls A, 4 \ � F 11J -6 h � 11139 a r `♦ a a 2057.0 20196 14732 � 73896 11944- a A i5G1a _ a tij5 00 / a♦ 291W 29175 �1 15514 1l241 066 � 3883 a r _ � •s i FI ♦'� 2 1 as a 91 i 77 J•'ice . 7 �• a / � i sos `aa / 18977 21977 21370 1 27393 21393 '20425 18695 tB453 103,3 �ffi - f. p�� '•?s R 6638 �yy , 732 � •u N < 1 0 0 t 377� Cf CUODQ (Licensed to•1"r r- 0 Datta) TBRPM v8.2a E+C Model Network - 2040 PSWT Volumes with Project (with Simmons through) Project Centrold ; -sit,-sit,. � � \ \ 4149 1362 G,7^g. 2 1872 2372 -. W 2D16 Ivs F ci til � 1 � 10S67 20937 10196 - 5159 8292 7522 1 lu M1 7 ••\ � ems`. M ; \ Iasi 13054 : 14509 r13031 24077 12217 \ � 1Jy i •iill +:' 5 16138 16138 32119 22315 Z111 925, 10891 10574 7 i 3999 \ . + 1 3,2M � — J i 1 21641 20939 20665 20665 '1980D"" 18%6 17568 58T1 5502 4803 1�29 OBIG (Licensed to Traf 0 Dntc1) TRAFFIC REDISTRIBUTION t LINCKS &, ASSOO➢ATES, ➢NC. OLAND BLVD. HANDCART RD. n is NORTH N W ' I! DEAN DAIRY RD. A - 2 O /S C O ;o C ,o 00 F— 0/0 0 vo 1 �► T f SIMONS RD. a o� v n !yj CA (� 0�86a ryl194 50/50 —� T C) o 59/50 � No 0`.PDo� - m v U Ln m O v o o 0/0 0/0 4--. 0/0 F- 0/0 aQ -ap v n Or11� y"43 m �► <50>/<50> -� {I T r p ' 0/0 —► n w o I T f (5s)/(5a) ��o '+ 0/0 00 0 > 0% —► 0 0 0 U.S. 301 ol v 0/0 -y 0 FDOT PEAK SEASON ADJUSTMENT FACTORS LIMCKS & ASSOCIATES, INC. 2018 PEAK SEASON tACTOR CATEGORY REPORT REPORT TYPE: ALL CATEGORY; 1400 PASCO COUNTYWIDE MOCF: 0.96 WEEK DATES PScF 1 01/01/2018 - 01/06/2018 0 1..03 2 01/07/2018 - 01/13/2018 1.02 1.06 3 01/14/2018 - 01h0/2018 1.05 1.09 4 01/21/2018 - 01/27--/2018 1.03 .07 =-U-27MVMls 1.01 1.05 * 6 02/04/2018 - 02/10/2016 0.99 1.03 * -7 02/111.2018 --02/1 * 8 02/28/2018 - 02/21/2018 0.96 1.00 * 9 02/25/2018 - 03/03/2018 0.95 0.99 *10 03/04/2018 - 03/10/2018 0.94 0.98 *11 03/11/2018 - 03/17/2018 0.93 0.97 *12 03/18/2019 - 03/24/2018 0.93 0,97 *13 03/25/2018 - 03/31/2618 0.94 0.98 *14 04YOl/2018 - 04/07/2018 0.95 0.99 *15 04/08/2018 -' 04/14/2018 0.96 1.00 t16 04/15/2018 - 04/21/2018 0.97 1 .01 *17 04/22/2018 - 04/28/2018 0.99 1..03 . *18 04/29/2018 - 05/05/2018 1.01 1.05 19 05/06/2018 - 05/12/2018 1.03 1.07 20 05/13/2018 - 05/19/2028 1.05 1.09 21 05/20/2018 - 05/26/2018 1.04 1.08 22 05/27/2018 - 06/02/2018 1.04 1.08 23 06/03/2018 - 06/09/2018 1.03 1.07 24 06/10/2018 - 06/16/2018 1.03 1.07 25 06/17/2018 - 06/23/2018 1.03 1.07 26 06/24/2018 - 0613012018 1.03 1 .07 27 07/01/2018 - 07/07/2018 1.03 1.07 28 07/08/2018 - 07/14/2018 1.03 1.07 29 07/15/2018 - 07/21/2028 1.04 1.08 30 07/22/2018 - 07/28/2018 1.03 1.07 31 07/29/2'018 - 08/04/2018 1.03 1.07 32 08/05/2018 08/11/2018 1.02 1.06 33 08/12/2018 - 08/18/2018 1.02 1.06 34 08'/19/2018 - 09/25/2018 1.03 1.07 35 08/26/2018 - 09/01/2018 1.04 1.08 36 09/02/2018 - 05/08/2018 1.05 1.09 37 69/09/2018 - 09/15/2018 1.06 1.10 38 09/16/2018 - 09/22/2018 1.04 1.08 39 09/23/2018 - 09/2c,/2018 1.03 1.07 40 09/30/2018 - 10/06/2018 1.02 1.06 41 10/07/2018 - 10/13/2018 1.01 1.05 42 10/14/2018 - 10/20/2018 1.00 1.04 43 10/21/2018 - 10/27/2018 0.99 1.03 44 20/28/2018 - 11/03/2018 0.98 1.62 45 11/04/2018 - 11/10/2018 0.97 1.01 46 1-2/11/2018 - 11/17/2018 0.97 1.01 47 11/18/2018 - 11/24f2018 0.97 1.01 48 11/25/2018 - 12/01/2018 0.90 1.02 49 12/02/2018 - 12/,-08/2018 0.98 1.02 50 12/09/2018 - 12/15/2018 0.99 1.63 51 12/16/2018 - 12/22/2018 1.01 1.05 52 12/23M18 - 1'2/29/2018 1.03 1.07 513 12/30/2018 - 12/31/20'18 1.05 1.09 PEAK SEASON 25-FES-2019 16:26:29 830UPD 7-1400-PKSEASON.TXT l BACKGROUND TRAFFIC . LIMCXS & ASSOCIATES, INC. LEGEND 12/23 = AM/PM PEAK HOUR.TRAFFIC DAUGHTERY RD. 0 �- 4/3 . �- 0/0 111 Q �00 2/2 '�.� ! T r �\ 8/5 --► O v o ,� r� to ui a O G� z M Q a ti 20/14 �- 30/19 PROJECT r � o`er CR t% a I 9� % v rr� +-- 10/6 'L 4/12 t_ 0/0 Cs v C] �-- 1/3 �� r-9/6 <-- 0/0 c- 4/12 0/0 GIEGER RD. / --► -,op 0/0 0/0 o 0 0/0 3/2 r6/4 m . . 0 N t'r3 O Q tq Q L 0/0 F-- 0/0 w` r- 0/0 ?/¢ T r S.R. 54 0/0 => a ac - Z. FIGURE A=2 o THE OAKS AT PASCO PROJECT TRAFFIC i PERIOD SETTING Analysis Name: New Analysis Project Name: THE OAKS AT PASCO No: Date: 2/13/2020 City: StatelProvince: Zip/Postal Code_: Country: Client Name: Analyst's Name: KE Edition: Trip Gen Manual,10th Ed Land Use Independent Size Time Period Method Entry . Exit Total Variable 210-_Single-Family Dwelling Units 87 Weekday Best Fit(LOG) 458 457 915 Detached Housing Ln(T)=0.92Ln(X) 50% 50% (General +2.71 -- Urban/Suburban) i TRAFFIC REDUCTIONS Land Use Entry Reduction Adjusted Entry Exit Reduction Adjusted Exit 210-Single-Family Detached Housing 0% 458 0% 457 . EXTERNAL TRIPS Land Use External Trips Pass-b % Pass-by Trips Non-pass-by p Y Y P Trips 210-Single-Famlly Detached Housing 91.5 0 0 915 ITE.DEVIATION DETAILS Weekday Landuse No deviations from ITE. Methods, No deviations from iTE. External Trips 210-Single-Family Detached Housing(General Urban/Suburban) ITE does not recommend a particular pass-by%for this case: I SUMMARY I t Total Entering 458 Total Exiting 457 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal.Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 0 Total Exiting Pass-by Reduction p Total Entering Non-Pass-by Trips 458 Total Exiting Non-Pass-by Trips 457 r PERIOD SETTING Analysis Name: New Analysis Project Name: THE OAKS AT PASCO No: Date: 2/13/2020 City: State/Province: zip/Postal Code: Country: Client Name: Analyst's Name: KE Edition: Trip Gen Manual, 10th Ed Land Use Independent Size Time Period Method Entry Exit Total Variable 210-Single-Family Dwelling Units 87 Weekday,Peak Best Fit(LIN) 17 50 67 Detached Housing Hour of Adjacent T=0.71 (X)+4.8 25% 75% (General Street Traffic, Urban/Suburban) One Hour Between 7 and 9 a.m, TRAFFIC REDUCTIONS En Land Use Red ction Adjusted Entry Exit Reduction Adjusted Exit 210-Single-Family Detached Housing 0% 17 0% 50 EXTERNAL TRIPS Land Use External Trips Pass-b % Pass-by Trips Non-pass-by y p Trips 210-Single-Family Detached Housing 67 0 0 67 ITE DEVIATION DETAILS Weekday,Peak Hour of Adjacent Street Traffic,One Hour Between 7 and 9 a.m. Landuse No deviations from ITE. Methods No deviations from ITE. External Trips 210-Single-Family Detached Housing(General Urban/Suburban) ITE does not recommend a particular pass-by%for this case. SUMMARY , Total Entering 17 Total Exiting 50 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 0 Total Exiting Pass-by Reduction 0 Total Entering Non-Pass-by Trips 17 Total Exiting Non-Pass-by Trips 50 0 l PERIOD SETTING Analysis Name: NewAnalysls Project Name: THE OAKS AT PASCO No: Date: 2/13/2020 City: Stafe/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: KE Edition: Trip Gen Manual, 10th Ed Land Use independent Size Time Period Method Entry Exit Total Varlable 210-Single-Family Dwelling Units 87 Weekday,Peak Best Fit(LOG) 56 33 89 Detached Housing HourofAdjacent Ln(T)=0.96Ln(X)+0.2 63% 37% (General Street Traffic, Urban/Suburban) One Hour Between 4 and 6 p.m. TRAFFIC REDUCTIONS Land Use Retry ed ctlon En Adjusted Entry Exit Reduction Adjusted Exit 210-Single-Family Detached Housing 0% 56 0% 33 EXTERNAL TRIPS Land Use External /o Pass- Pass- Tri s b b Non-pass-by p Y' y Trips p Trips 210-Single-Family Detached Housing 89 0 0 89• ITE DEVIATION DETAILS Weekday,Peak Hour of Adjacent Street Trafflc,One Hour Between 4 and 6 p.m. Landuse No deviations from ITE. Methods No deviations from ITE. External Trips 210-Single-Family Detached Housing(General Urban/Suburban) ITE does not recommend a particular pass-by%for this case. SUMMARY SITE CONSTRUCTION PLANS FOR THE -OAKS AT PASCO PROJECT EILAND'BLVD.&.SIMONS ROAD LOCATION CITY OF. PROJECT ZEPHYRHILLS, FLORIDA 33542 ZEPHYRHILLS' LOCATION PAS CO COUNTY PARCEL I.D.NUMBER:'04-26-21-0000-00100-0070 AERIAL1 PARCEL I.D.NUMBER:04-26-21-0000-00100-0080 PARCEL I.D.NUMBER:04-26-21-0020-00000-0090' SHEET.INDEX SHEETS 'SHEET SHEET DESCRIPTION I LEGAL DESCRIPTION REVISED NO _ C0/ COVER SHEET ............. CO2 GENERALNOTES i .n,.._,...,,....- ..,...,.........-. ,c....,.............�... C0Y EXISTING CONDITIONS PLAN C04 ?RASTER SITE PUN 1 COS LOT UVOUT PUli•A I - _ - - C06 LOT LAYOUT PUN-6 .—..«..,...,.-... ....... . .... •-- .• .` .`.: C07 LOTUYOUTPLAWC C08 UTILITY PLAN•A CD9 -UTILITY PLAN-8 1 ...,...-......-..---.,•,......- ............ -.-...•.:.�..:.:............ - CtO UTILITY PUN.0 •• - CIE PAVING,GRADING.AND DRAINAGE PLAN•A j — - PROJECT - C12 PAVING.GRADING.AND DRAINAGE PLAN.8 C13 PAVING,GRADNG,AND DRAINAGE PLAN•C ,:, « LOCATION C14 STORMWATER POLLUTION PREVENTION PUN•A I - C[S STORLiYlA7ER POLLUTION PREVENTION PLAMB j C16 STORI.LWATER POLLUTION PREVENTION PL-+W-C i + -- ... .• _ „ ..r .-Y-V F .... ...,.... C17 STORLIWATER POLLUTION PREVENTION DETAILS C1SIGNING AND STRIPING PUN a [ Cl:9 PLAN AND PRO IL ? .........m.-...--•............. - --...-........._,.....,:....... C2 PUN AND PROFILE . i •.--....«: .,,,�..«,.«..,.�.,, .-•.• -•. C21 Putt AND PROFILE C22 CONSTRUCTION DETAILS LOCATION MAP C23 ZEPHYRHILLS WATER DETAILS ! n C24 ZEPHYRHILLS SEWER DETAILS { - - C25 POND CROSS SECTIONS SECTION 4-TOWNSHIP 26S-RANGE 2 1 E C76 POND CROSS SECTIONS _ C27 POND CROSS SECTIONS 'Ti TREE PUNTING PUN - ..,....,,.., _..r. .-_- •.«... r. -._.........._... REVISIONS i 1 t UTILITY PROVIDERS WATER N TTURAL'GAS -P01�7ER �. PREPARED13Y /.an• •s ry..�r ry'sufr _ - ( �..,kl a�•rocs•r• rt icm+nxnav n.cl lwmt.c-�c[ o PROJECT.TEAM CORNELISO� "" al^i' r�r.aivfnx:rrx +,.au torso Jauulurpa 1 :[rnlYgls 111:a} I,N'`rl IvVi -`Z frYolS rt.•'+, ,� DEVELOPER ENGINEERING& "` "� : rs11.,,, °•yo. i CML ENGINEER UN001YNER SURVEYOR* r.yf ic•elw n:.r,r alas t-r nwl ciru.�[i.(Y.(ylR^p;)ffr,'a'G:u twt cwan[arcEtx•.af of>.r uu _``,"'%'•`415�rr'.Y r_ 1 Ua�nA.laurttaiz�ttk:llc .,..flrv.[Y:+f[:�.af4•a-.,,: „r, ,a»a,-.,, ,•,<.::,,>w DESIG;Y,INC. PHONE ' t ;.i`':c...oruo.m cr+„K+uw.t.uvl,...,rr cv�*nr�wrn^ :frsr?a^<.s:,.`,Y'••,. SE4ti'ER '1. i ciu,r:»,r[)^r.. ;r•+r.--s.�is��: r�+nri:v-:.n1� ::'�:•r p-..: :•dro-.r..;.-•.c. Y. a•.�r anouM�. r�.nra.cruuursu•.:.r. • I tr.µ t%1(T�•.ICtI!, [yµ rRa•�y.,c�'�,vr,„a.rlvr Cyµ arz:fSat>IT,%,.>t•v L�:�t•�r11Ya�••ry•'�m,f.r;•, � ••1.• .r,�;i; „}, .r.x,. >a, .> ✓i S4Y4T/'.0 ntv.: �,,,,,o���J�y�, .�C• -rn•;: �5v a-•r.. � •T^tM1•srne, �':�n ra.r�n srs[, �a•� ."- . ' Y [ . a.-..�rt�" _���-r>:•'A M.fryn`ttoirt�• rrvraa:,.:Sa>r �rph,,1 `tt.)?.la —_ . furl AL'+YC3 Tm•.:•ri:•t r•• t'aµ.£oR I.YVfAY'>:v-:v CtU>.Y.4�tivW{+E �_ S, } f .-r . r• � �;�� �\� -�. �` ,ram t� '+ . Sri / � rrl�+ •• � rt�' , `� �� y. #�� `S• tit_ . �� �� ��r/f�- � t , • F ] D REAL ESTATE Uc ��� LEGS 12/23 - AM/PM PEAK HOUR TRAFFIC DAUGHTERY RD. 0/0 o a _ 3/9 Q a 2/2 (� +-- 2/1 +-- 6/2 8/5 U) 10/33 -� 2 i/2 z � A B N A .N N g ci PROJECT o c 0 In oa r� tj� r� 010�0 ma's' o 't� �� -L- 0/0 +— 10/6 N I- 4/12 0/0 c c!!' o s— 1/3 o N l 10/7 0/0 4f12 1 0/0 4/12 7/23 � o/��: GIEGER RD. 0/0 3/2 � T 0/0o\r 6/4 ..� t\v o 0 J . ID M Z 0% t us a 4-- 0/0 0/0 1/4 -s S.R. 54 0f0 --► °% � duo 0 1 o✓ 4 FIGURE A-3 LINKS AT SILVER OAKS 0 0 PROJECT TRAFFIC PERIOD SETTING Analysis Name; Now Analysis Project Name: Links at Silver Oaks No: Date: 2113/2020 City: Statb/Province: Zlp/Postal Code: Country: Client Name: Analyst's Name: KE Edition: Trip Gen Manual,10th Ed Land Use Independent Size Time Period Method Entry Exit Total Variable 210-Single-Family Dwelling Units 92 Weekday Best Fit(LOG) 482 481 963 Detached Housing Ln(T)=0.92Ln(X) 60% 60% (General +2.71 Urban/Suburban) TRAFFIC REDUCTIONS Land Use Reduction Adjusted Entry Exit Reduction Adjusted Exit 210-Single-Family Detached Housing 0% 482 0% 481 EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips Non-pass-by rips ass-by 210-Single-Family Detached Housing 963 0 0 903 ITE DEVIATION DETAILS Weekday Landuse No deviations from ITE. Methods - No deviations from ITE. External Trips 210-Single-Family Detached Housing(General Urban/Suburban) ITE does not recommend a particular pass-by%for this case. SUMMARY Total Entering 482 Total Exiting 481 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction. 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 0 Total Exiting Pass-by Reduction 0 Total Entering Non-Pass-by Trips 482 Total Exiting Non-Pass-by Trips 461 i PERIOD SETTING Analysis Name: New Analysis Project Name: Links at Silver Oaks No: Date: 211=020 City: State/Province: Zip/Postal Code: Country: Client Name: Analysts Name: KE Edition: Trip Gen Manual.10th Ed Land Use Independent Size Time Period Method Entry Exit Total Variable 210-Single-Family Dwelling Units 92 Aftekday, Peak Best Fit(LIN) is 62 70 Detached Housing Hour of Adjacent T=0.71 (X)+4.8 2611/a 74% (General Street Traffic, Urban/Suburban) One Hour Between 7 and 9 a.m. TRAFFIC REDUCTIONS Land Use Redryction.Ent Adjusted Entry 9xit Reduction Adjusted Exit u 210 Single-Family Detached Housing 0% 18 0% 52 EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips Non-pass-by Trips 210-Single-Family Detached Housing 70 0 0 70 ITE DEVIATION DETAILS Weekday,Peak Hour of Adjacent Street Traffic,One Hour Between 7 and 9 a.m. Landuse No deviations from ITE. Methods No deviations from ITE. External Trips 210-Single-Family Detached Housing(General Urban/Suburban) ITE does not recommend a particular pass-by%for this case. SUMMARY Total Entering 18 Total Exiting 52 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 0 Total Exiting Pass-by Reduction 0 Total Entering Non-Pass-by Trips 18 Total Exiting Non-Pass-by Trips 52 1 ' i PERIOD SETTING Analysis Name: New Analysis Project Name: Links at Silver Oaks Na: Date: 2/13/2020 City: State/Provinde: Zip/Postal Code: Country: Client Name: Analyst's Name: KE Edition: Trip Gen Manual,10th Ed Land Use Independent Size Time Period Method Entry Exit Total Variable 210-Single-Family Dwelling Units 92 Weekday,Peak Best Fit(LOG) 59 35 94 Detached Housing Hour of Adjacent LnM=0.96Ln(X)+0.2 63% 37% (General Street Traffic, Urban/Suburban) One Hour Between 4 and 6 p.rn, TRAFFIC REDUCTIONS Land Use Entry Adjusted Entry Exit Reduction' Adjusted Exit Reduction 210-Single-Family Detached Housing 0% 59 0% 35 EXTERNAL TRIPS. Land.Use External Pass trips s Pass-by% Trips Nonwpass.by Y p Trips - 210-Single-Family Detached Housing 94 0 0 94 ITE DEVIATION DETAILS Weekday,Peak Hour of Adjacent Street Traffic,One Hour Between 4 and 6 p.m. Landuse No deviations from.[M' Methods No deviations from ITE, E xtemal Trips 210-.Single-Family Detached Housing(General Urban/Suburban) ITE does not recommend.a particular pass-by%for this case. r SUMMARY Total Entering 59 Total Exiting 35 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 0 Total Exiting Pass-by Reduction 0 Total Entering Non-Pass-by Trips 59 Total Exiting Non-Pass-by Trips 35 1 1 SITE CONSTRUCTION PLANS •aay .FOR LINKS AT SILVER OAKS =- 15 jL :TON OJECT SIMONS ROAD ZEPHYRHILLS FLORIDA 33542 HILLS PROJECT ' LOCATION PASCO COUNTY t (� PARCEL I.D.:NUMBER:04-26-21-0000-0010D•0021 PARCEL I.D.NUMBER:0426 21-0000-00100.0050 • PARCEL I.D.NUMBER:34-25-21-0020.00000-00A0 ''\ - ^""' PARCEL I.D.-NUMBER:.03-26-21-0000.00100-0020 SHEET INDEX I SHEETS SHEET SHEErMSCRIPTION LEGAL DESCRIPTION: . �_ wwnwwwnmaw.n � � ..,. REVISED NO. . .r L :S9Y63' AA_ A Ccol D2 COVERSHEET S j T•\fNlllMMrdOOwatlfTKalarLLTtl.av�w\Miwrna axwwr Rno.a.w+rriwaLrRnwTwwu.wcnww .�nu Lwow.na.oiu.cnarr.+a..av�.wrseaeQa.. e'er cm. EMYINGCONOSAONSP[AN mwrw:wRTeawrt«1MiaK114.asw.Rlloe �.. - .umawur ww\wo.wmwarrs.awae.o�av" Asa CD3 1USTtRSREPLAN .roosw.wwo\wr^ua..cr+�wa.oaarwwasL wuwaTRw�e L\w\ewRu.wroRa.oaeaw e 'e$ L>6 LOTUYOITTPLANA wRva wwn+.�^waniawrctvaawa arLrwa.ouLa - ar.aT murw3rwRaywaowaw\�raurvaarrL A COB LOT LAYOUT PLIMFD i r>rwYrtMNCraaa\c�aarrcfarmRRrTa\wo\.a .. rawar.avwwiRt aau.aevwwR..\aa•aaRra•r A e COT FLAN- LOTlA -0 LAN wm.a.Lrn..c\u.imLwaianR�ae.so.cr.aaauna MA OOB lJi1LfTY.RJW,II afrfvar\nwvwsaaTrw�aRstrrrwwR [ .arwT.Lawavv..riwrawwsruawwusv.Re�a ddAb d CW UM3iY PLAN-8 nRw..aaayaavrw\\n: aRwvra�vlRRr+ra�r�arii{ ..urnie�o.w..Rw.aeTi\tvvrRna.orrrwvaiRcwwa "-�" MS A CSO IJT1L1iY1'WiC w.uar a.rLrnwnawnawwrYrw\Raaaa.aauarawR .e AMM C1t PAVING,GMUNO.RM OWW"EPGW.A .mwwawwrrfaravwana.sa\vavwrR.wnanerR a arcaaovarRc>waaarwiwwawnnfwwrtwaus�wr y e C12 PAVING.GRAD0IG,AND0MI"EPTATIY .nwapfTwrrwra\aamwo.paamu�awws �aLn.�c.monnom.ma..a,aww..\ou.RTia PROJECT t_ A e6A A C73 PAvriD.ORADNQAND DauruGEPIAI+.c IWa.M a aaLaagawaTar,awrr\d\aarw:R awTaRr. t Le.nv�wnnnus Lrrrafwuswauiv Rwnu 6S a Ct4 PWIAtAPROFILE .. f maLr rnwmwarsrw.awrn.srwiFwaamY a LOCATION wn.ae.na.w,:aaasw.awiauaRaR.wse�X.— 'N d CIS PLAIIA FROME' r - on�ravnw.i m~ii LL w uvwwr iwou�iM' RA'a CIB PLANAlAPROFRE ;'. aorgerw.Riaaasra.vn�mf.wwrwaowaarroa . i .Rw\Rwra..rrawwrcrorrn rsasAawo�aaeawew� AAA C17 P1ANA EAM O IM t noav�ataL�ra•wr.s.oweosaw...a.R.a ......+ el6A CIE ST�VAGE/WD STRIPING R1tN �I OWJf em.frtlt L9VI�.aan.oRllr.RCfweLM>M`` wwaw\wraoswwanoarr\waaa:.rta.amnaumr m Y e• C19 'EROSIONCONTROLPUW e na°"iawrarYr�"`aiu�ariw�•.'a`av O1w P d C20 EROSIGNCOMROLDVAILS $`. -TarnunnarowrwR.a�� .- e A►�a C2I PONOCRDSSSECTIONs j w�aaowmaroawwaTo+rwaaa A C22 I,EP1iY1W1ISSAIOTAW3EWMWrAX3. LOCATION MAP d C23 Z.EMMINISWATERDETAKS ! wwwmwraonawaoao�ua i� PUB �.� A& CZA CONSTFamoNDETAW 11�T3!!•L ' wR..Teuo.so.<..Rawaww.aatiunrwawc«as SECTION3•TOYVNSHIP2BS-RANGE2IE d AS C2'+ CONSTftUCI0t+0ETAl4` r+�wsxwrr,,awaaaRa„rw,earxr.RrnwLwar,vrLwwsvR a+a ue n.rur�oroswo.awmwsocnrr\om.w. A C2E. FlAODPUINCOMPENSATIOH PUN y'.i .uw..awwR.aweaa+.aw.araawurrro� zKa+w R,Lo,a,om iw�s rtn»,iea .SEC710N4-TOWNSHIP 263-RANGE 2tE 9 anw.s....o\�rtnrvawwc.wea.rw\mmw,..w.wa w A C27 LIMSTATION DETALS=QTYOFZEPHVAWU.S.wwww..ra.Y.sa.Lwa.nr^nwm•.no.+nr iKOgwKQ�PwKMIo.rCats• SE�SION.34-TOWNSHIP 25-RANCaE 2SF. A ag LIFT5TAT IINOTM-CTTYCP?EPHVFMLI,S RewsioNs ' 1 IRiRi\YaawaRlerR'L.LarL1{OMrRTFfFrpKgo. . IO.wIaTOwKlY.ii�lOaaffR.taWRPlrwA\Aw<�\ •Y4G�Y•�\itiwKw\.O.a9 blw6av�P laa ayLawO varawa w ... -a weKr""< :.�w•..c w. e I TR 1 .S{ WPOfI�OCR\Mil®fYYrrrK¢ �\K.wrn w aw R wal0 w K M. e . aK iaq wr wwtl wra.wlY a'w na a7•R Ha A wy.Rgrn.+auTrrawrv.eL. rraTwra awcua a MiDiifarMap\l mwwe aa\R RLow K aaM RRa A RiORaLO®ITaOf/mLC.II tt P31NC 91C/f1.01arip MO MaC�P IO1 flUM1LTOI M IWCm a IOI LYIM.OI RO4.Yq W4CalV7 �, �I.�r.wfTay.nbTre< �`wiwa mwa ry rwlr wY.R a•a1.m r H RI►raRnRwT Ya Re 2M u0.w IaX ILL waauaa\aia.t VB>35 Onair=lC10m�a K�e'�ma�+wf W, no,>*mnaaw rferx wewmnrw3w/aobeonaa - aalwdwTl6a�awTr Riaw3 LL a\t SRof\fi CawQl faJlaaaYf[awirnamaMa aYnliOPw�CR1l t•IM?w-�VYbM . LTTIurrPROVIOERs W aawia.w.m.a .. r\•aawa.T.L PREPARED BY W�nwua �R awL 8 �CORNEISON maKcasae M max" m cpa.rcavnTau\aaw. apa\GT:aMna1G.Q PROJECT TEAM aRarr+Taerw\e awtura\a paunlr� io..+aicnma uransTw 3OMraain9U mod.cco i� I DEVELCIve Cmimr-Mm uroowRo+; SURVO Tt ENGINE6WNGA nesnaTRrx noaLaaa+rT nacwwTwu a *+y�' OO.iIaR RLrwaaITM.LLC COr4aa\aOtYl►rlal►1\aC ilaT(pt111RKI1\b1aaTA. MYOwtRNLFG O•CaOPpPKw.wa\allltf {Mr[�YmI aK:O.nwanraTpfaoawsv� - is I mn.Qa.r,wwn mnraawa�mnaanrc \waoatltaran\aarTae mnfcaw,wc\w.L DESIG INL _ R twalT^\to.aN.WR]a0 1MRRofarwaR .To6.1RRSV.. .�.wrL.NaK a 2ffl?0W A A"rV.0 am OmfJl K' wRw m�MMd.v.a �a Yu �R` �fi 1 mw+waa Yro nw�w\wanaw wna:pnwanr �oaW+.errn aa» .i wcr:Kn:mm. naicwlam\w nacpnufRr 3L)3 GW 5.AV 117MTVRli n asl\i .i9aACTJ-Tm R. 00aT\Gaano.9nY.nwa, <_ f tfL•.u3'-7RT�GO�-013-7W"M3 - —ITW ana bMtRam y4j�/�M��•,laa"1ss.TL #(� - aur:wweemefr TW10NO�OaTaam\oiC00Y' �at\roaulwralafll,m\ mTmfnav 9raawa.(RMIT . f CM10 l4 aV6rl•Lf1o%M E woCwfnawa rrYCmiraaa\ ('3\Na LCQ11I4iT701{�E a.uar+nwm\w..as.wa ow:s�ar�ra..a<ew_ .. 'n rtaaeaT .. °ryiw[rDlpl,.lYLrUVW,ip.76a,'f�/rKM�7i541 CJN.irRanlWty iW/Millen 737n Kll...rl� ��:.e r..rwir.......r.ee< r ry q \ 1�s-.r• 11''.II 4. �14• � -_ Ala �. `. a •'i• 1 '�a}• •,' Y E r ; ' � 1.1 � f j1l:• �7 7 � ' 7 1 , ■j 1 � �ta:�f„ �� i �} n i� t o MIX 1 �M c R. •'`4 .-1'� ,-•��Y�'{1';:.''i n• 1 4L. i•.`'{, lip ■y��11]A�������iat�€�I� ffi �v 1 .�T� E4 � j�2■ r 8 � •,., �� .:.Iq` 1Tf.'�'�"'""..,,f', y'yn�'1�. •lY•�'' �A���� � l+i' r8#�11!i+■�■ •, N ''rr�j�ll•'■-r.'i [f ,... �f• 7��' ,f yllii �� pit lot mil... . .. let. • ` Iplplllllr� • � , 2h1 ��q �` an rkucnwc %� ` ` " m LIN' TSILVEROAKS ��GYCU7[6A1xiGl ■ ' 4,�i��• `. • arrro. R- ...•.u�.rl L��L:S _}+��7wS1G+7.16C ti r"qe ulllla ,i • w.�n ■ae wrt mul r�i�Z:aiR.l�iClr,1�� -- ".�,e.nw a7s» wwurr MASTEREITEPIAN COD REALESTATEINVESTMER,LIC PASCO COUNTY CIP LIRICKS & ASSOCIATES, INC. RS-ROUTE STUDY D-DESIGN fir, ,rf�_— R 17 1 It Is (:I'7I It:01 9 z I I It'_'I R-RIGHT OF WAY C-CONSTRUCTION UILD RSF-ESSURFACING(FDOT) � TRANSPORTATION CAPITAL IMPROVEMENT PROJECTS PDE-PROJECTDEVELOPMEIT+ENVIRONMENTAL ry �O - 2�yg -� - ENV-ENVIRONMENTAL MITIGATION .r 202 LL L'-LANDSCAPING. .•''• � DSC-DESIGN&CONSTRUCTION ,{• i RSA-ROAD SAFETY AUDIT .1 _• f T+SS Ili .............. it •__ —=_d ' ... .._ — - '•fix y i ��"�....+•'I �� I"—�"__-� ' '�'�••- _ _ --ti 0. is ^P LIGHTING FOOT RESURFACING PROJECTS Q BIKE/PED OVERPASS Pasco County,Florida Ceggraphic 1.f r wiz Systems .4V ATMS)ITS Iy COUNTY PROJECTS(2025-2029) FDOT FUNDED INTERCHANGE ��� Engineering Services AP COUNTY PROJECTS(2020-2024) PENNY FOR PASCO BIKEJPEDTRAILS {+ COUNTY INTERSECTION IMPROVEMENTS(2020-2024) r.V Pasco County Transportation *-h��LANDSCAPING PENNY FOR PASCO PROJECTS O PENNY FOR PASCO INTERSECTION IMPROVEMENTS 'Capital Improvement Projects `tires FOOT FUNDED SIDEWALK PROJECT �q SIGNALIZATION PROJECTS 2020-2029 6'W TRANSPORTATION IMPROVEMENTS(STATE FUNDED) CR,xnr D> to21rois FOOT PROJECTS O FOOT ROUNDABOUT INTERCHANGE Cma,.f e. KDr i1 (Con.b—tioa Ontrida 5 Year CIP-Date Tenfad") Q COUNTY ROUNDABOUT -' MOBILITY FEE COLLECTION/BENEFIT DISTRICT J BRIDGE _ c.. :.s•e.sT r..•+n.n .a.-.�.,w�.. w.,., ...... .... ti..... w,:w x. Do v _ INTERSECTION ANALYSIS LAMM LINCKS & ASSOCIATES, KHC. Timings OGU5�020 Eil �d �� Si Rd Lane Configurations t t Traffic Volume(voh) 226 881 676 36 94 304 Future Volume(vph) 226 981 678 36 94 304 Confl.Pads.��r.�, Cunfl.Bikes(#/hr) Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Growth Factor 100% 100% 100% 100% 100% 100% Heavy Vehicles(%) 2% 2% 2% 2% 296 2% Bus 8|ockagox(#hr) 0 O O O O 0 Parking (#hr) Mid-Block Traffic %) 0% 0% 096 Shared Lane Traffic 86\ Turn Type pm+pt NA NA Ponn Perm Over Protected Phases 7 4 .8 7 Permitted Phases 4 8 8 Detector Phase 7 4 8 8 6 7 Switch Phase Minimum Initial(s) 5.0 5.0 5.0 6.0 5.0 5.0 Minimum Split 9.5 23.6 23.5 23.5 23.5 9.5 Total Split(s) 24.0 82.0 68:0 68.0 28.0 24.0 Total Split(%) 20.0% 76.7% 567% 56J% 23.3% 20.0% Yellow time kA 3.5 3.5 3.5 3.6 3.5 3.5 All-Red Timo(s) 1.0 2.0 2.0 2.0 2.0 1.0 Lost Time AduokA 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Timo(s) 4.5 6.5 6.6 5.6 5.5 4.6 Lead/Lag Lead Lag Lag Lead Loud'LogOptimize? Yes Yes Yes Yea Recall Mode None None None None Min None / Act Effct Green(o) 52.4 51.3 342 34.2 10.5 12,2 Actuated g/CRatio 0.71 0.70 0.46 0.48 0.14 0.17 wtRoUo 0.57 0.82 0.85 0.06 0.41 0.61 Control Delay 14.0 14.1 FJ 3.0 38.0 10.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 total Delay 14.0 14.1 27.7 3.8 38.8 10.0 LOS B B C A O B Approach Delay 14.1' 26.6 16.8 AppmuchLOS B C B Cycle Length: 120 Actuated Cycle Length:73.6 Natural :0O Control pActuated-Uncoordinated Maximum wt Ratio:0.8@ Intersection Signal 18�' '|ntersoctionLDG:B Intersection Capacity Utilization G8.2% ICU Level of Service C | Analysis Period hnin\16 AM PEAK HOUR-SCENARIO 1'2028 BACKGROUND PLUS PROJECT TRAFFICO2/1912020 Synchro1OReport KE Page Timings 25: Eiland Blvd & Simons Rd 06/15/2620 Splits and Phases: 25:Eiland Blvd&Simons Rd '�04 06 07 08 AM PEAK HOUR-SCENARIO 1-2028 BACKGROUND PLUS PROJECT TRAFFIC 02/19/2020 Synchro 10 Report - KE Page 2 Timings 25: Eiland Blvd & Simons Rd 02102/2021 7, T 4� 11 6 Wlt 7ro U_�, T_t T 17 Lane Configurations + 34-6--- 1%08,8.1:,- . 107- 3 "�:3687 TA16 ­j 6 y.ql4me(YpO 3 - ------- ...... Future Volume.(yph) 346 883 1088 107 63 308 Confl.Peels. Confl.Bikes(#/Ihr).. P&ak Hour Factor 0.97 0.97 0..97,-:- 0:97- 0.97' .0.97:. Growth Factor 100% 100% 100% 100% 100% 2%.1 2%: '2% Upavy'Vehicles_(%q).: 2% - 2 Ovo Bus Blockages #/hr) 0 0 0 0 0 0 Parking..(i, #/-- ..hr Mid-Block Traffic(%) 0% 0% 0% "s,har6d, Lane-Traffic*':?6/.,i-,-.T Turn Type pm+Rt__ NA NA Perm Perm Over '4- ...'8 Permitted Phases 4 8 6 Detector 7 ' 4. - 8: � . -, -6 P , 7 7., 8. - Switch Phase inimu 5-0 5'0': 5-.'0, 5 O Minimum Split(s) 9.5 23.5 23.5 23.5 23.5 9.5 Total 7- 73:0 :24.0,, 23.0 Total Split(%) 19.2% 80.0% 60.8% 60.8% 20.0% 19.2% 3�6, 3 ;5 5;' Y. --------- All-Red Times 1.0 2.0 2.0 2.0 2.0 1.0 ..0 Total Lost Time(s) 4.5 5.5 5.5 5.5 5.5 4.5 � L' g Tea L! Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None . ..--wo­n-e-- .-A-on'6`.- �n ,, Act Effct Green(s) 91.6 90.6 67.6 67.6 9.4 18.5 .-,L0!.§,1 0. v/c Ratio 0.98 0.60 0.99 0.11 0.43 0.62 -121" Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 2.4.7., • -6• LOS E A D A E B Approach LOS C l D C IhWgda Fri Cycle.Length: 120 7 7 .7 771,7 -.7 a Natural Cycle: 150 Tn n7:7 ------ ControlT Uncbor ina Maximum v/c Ratio:0,99 �66rsebtlon Int&section iritersection Capacity Utilization 93.5_% . ICU Level of Service F 77 A 0 PM PEAK HOUR-SCENARIO 1-2028 BACKGROUND PLUS PROJECT TRAFFIC 02/19/2020 Synchro 10 Report KE Page 1 Timings 25: Eiland Blvd & Simons Rd 02/02/2021 Splits and Phases: 25:Eiland Blvd&Simons Rd —4 64 96 5 24�s;�i�i'��1:"_` 23'sC �:��' 73ts"`�i�'ii�'n�t3" f�°' # .•` PM PEAK HOUR-SCENARIO1-2028 BACKGROUND PLUS PROJECT TRAFFIC 02/19/2020 Synchro 10 Report KE Page 2 Queuing and Blocking Report 01/29/2021 Intersection: 25: Eiland Blvd & Simons Rd Movement - - EB'TV EB .WBr Directions Served L T T R L R Maximum Queue(ft) 146 239 353 � 91 236 210 Average Queue(ft) 75 97 226 22 115 156 95th Queue(ft) .149 20-5 371 113: 284- 239 Link Distance(ft) 1286 1944 1249 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(A) 160 320 : 200 Storage Blk Time O 2 2 2 0 9 -- - - Queuing Perfalty.(Veh) 15 4 1 0 9. AM PEAK HOUR-SCENARIO 1-2028 BACKGROUND PLUS PROJECT TRAFFIC SimTraffic Report KE Page 1 Queuing and Blocking Report 02/02/2021 Intersection: 25: Eiland Blvd & Simons Rd Directions Served L T T R L R Maximum'Queue(ft) -174 471. 674 -: 295 453' 218 Average Queue(ft) 134 212 402 81 227 192 ,741 . 280 :'266- Link Distance(ft) 1286 1944 1249 Upstream 81 Time (i )".Queuing.Pena-Ity,(yeh) Storage Bay_Pist,(ft).: 150- ...320, 200:: Storage Blk Time(%) 19 1 16 0 0 38 d fi ue 61 P b-n-a-It y��h)'j -'-1164 0 24.� y( PM PEAK HOUR-SCENARIO 1-2028 BACKGROUND PLUS PROJECT TRAFFIC SimTraffic Report KE Page 1 FDOT STANDARD PLANS INDEX 711-001 ( O. MCKS & ASSOCIATES, BB C. 6' e t Marking 1Sea r TURN LANES • CURBED AND UNCURBED MEDIANS Mooeta 2 1S 2S URBAN CONDITIONS AURAL CON07IONS Pasted Brake To Tatat Brake To Tatat Clearance Clearance Clearance rang Distance St p Decet. Distance Stop Deco). Distance Taper SO (mpSpehl Oi6tanr! Distance DisCanre Distance Begin Lana Line 6•White � L, Stop Bar((t Requlred) L, Lr L L. Lr L Lr Queue Length•• G x90 TO' 7S IaS }1D ^-- — 35 80, TS ISS 120' — — 40 as, 1017 18S 13Y —� -- SINGLE LEFT TURNS ••Dueee Length is Measured From 45 104 139 2+0' 160, IesW 160' The Median Nose Radfat Paint Or. 50 129 — �290' tgS When A.Stop Bar is Required.From The Stop Bar. SS 14.7 -- 23O 6'Pavement H6Yk11p (See Note 2) X60 170' -- — 220' IS 6•White �1 NOTE:When Installing tape Nnes for turn longs,use the dfinensfoos In Me Plans, t or use the above values for turn lanes net dimensioned!n the Plans. �4 Begin Lane L(fle 1 Arrow Less Than 72S Taper 10P Begin Lane Line I^----j Lt queue Length Lr (Measured From Stop Bar Location) 6•White 2S L 2 A,-..% varies 1?S to 223 i 61 Pavement Marking 24'White(Trp)6•White 5•Hfn, 2S (See Note 2) IS /2'White(3'-97 r �a S 6•White 3 Arrows re Gater Than 223'fSee Note 4) 12'White R •S•Mtn. ( •S-Min, •S'Min. •S.Min. ' 25' ( 6-White it -S-'Mi.. f 'S'Min. 25'i Through Lane Becomes Exclusive Laffturn 1 ARROW SPACING 6-Pavement Narking (See Nate 21 NOTES: 1.This Index also applies to right turn tones. f 6'White Jol2.Make pavement marking yellow tar left-turn lanes and white for right-turn Wes. 3.See Sheet I far-S•value. 4.Space arrows evenly,between the first and Through Lane Becomes Optional Left Turn last arrow with a minimum spacing of•s between arrows. DOUBLE LEFT TURNS S.far turn tones greater than 225'Jn length, use a minimum or three arrows.Use additional arrows in accordance with the Plans or as S directed by the Engineer.Space arrows evenly throughout the available length with a minimum spacing of-S•between arrows. TURN LANIF MARKINGS L45T 20 DESCRIPTION: FY 2020-2I INDEX �Of 1'REv15roN F �TS7 ANDARD PLANSPAVEMENT MARKINGS 23