HomeMy WebLinkAbout20-43 E Mull City of Zephyrhills PERMIT NUMBER
5335 Eighth Street
Zephyrhills, FL 33542
ELCMISC-000043-2020
Phone: (813)780-0020
Fax: (813)780-0021 Issue Date: 05/04/2020
Permit Type: Electric Service Replacement/Misc
Property Number Street Address
02 26 210260 000001470 38716 Lansing Avenue
Owner Information Permit Information Contractor Information
Name: JACQUELINE COTE Permit Type:Electric Service ReplacementtMi& Contractor: MARTIN ELECTRIC
Class of Work:Add/Alter Residential
Address: 38716 Lansing Ave Building Valuation:
Phone: ZEPHYRHILLS,FL 33542 Total Fees:$50.00
Amount Paid:$50.00
Date Paid:05/04/2020
jProject Description
REPLACE 200 AMP SERVICES&POLE
Application Fees
Electrical Permit Fee $50.00
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 653.80(2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first relinspection,whichever is greater,for each subsequent reinspection.
Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permit required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner:Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans, Specifications add fee Must Accompany Application.All work shall be performed in
accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
lr
"W 14)QgL*y*r-
CONTRAC OR SIGNATURE PE IT OFFICEC)
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER.
813-780-0020 City of Zephyrhills Permit Application rax-oio-iov-uuci
Building Department
Date Received ` Phone Contact for Permitting
Owner's Name Ta C9 G !1 V Co Owner Phone Number
Owner's Address 3 9116 n9ing AV p Owner Phone Number
Owner Phone Number
JOB ADDRESS LOT# (�
SUBDIVISION eG PARCEL ID# O " d "2 - 0 26 0 " 0 — I N 7f✓
(OBTAINED FROM PROPERTY TAX NOTICE)
WORK PROPOSED e NEW CONSTR e ADD/ALT = SIGN DEMOLISH
INSTALL REPAIR
PROPOSED USE = SFR Q COMM = OTHER
TYPE OF CONSTRUCTION BLOCK
nn 0 FRAME = STEEL =
DESCRIPTION OF WORK Q C G 2-Oampseu i ce 4 P(21e,
BUILDING SIZE SID FOOTAGE= HEIGHT
=BUILDING $ VALUATION OF TOTAL CONSTRUCTION
r�qELECTRICAL $ h^ AMP SERVICE ?00 PIZ/-7- DUKE ENERGY 0 W.R.E.C.
=PLUMBING $ �J•(
=MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION
=GAS ROOFING 0 SPECIALTY = OTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA DYES NO
BUILDER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN Y/N
Address License#
ELECTRICIAN COMPANY A r+f El 2C 1`G C
SIGNATURE 1 6 REGISTERED Y/ N FEE CURREN Y/N Q
Address AjOX 3 7 D r-L,335 License# 13
3 8
PLUMBER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN
Address License#
MECHANICAL COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN Y/N
Address I License#
OTHER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN Y/N
Address License#
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction,
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects
COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction.
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance
SIGN PERMIT Attach(2)sets of Engineered Plans.
****PROPERTY SURVEY required for all NEW construction.
Directions:
Fill out application completely.
Owner&Contractor sign back of application,notarized
If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500)
Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage)
Driveways-Not over Counter if on public roadways..needs ROW
i
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
contractor is not licensed as required by law, both the owner and contractor may.be cited for a misdemeanor violation
under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
8009. Furthermore, if the owner has hired a �icontractor or contractors, he is advised to have the contractor(s) sign
portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
final power release, the fees must be paid prio to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
other than the "owner", I certify that I have obtained a copy of the above'described document and promise in good faith to
deliver it to the"owner" prior to commencement.,
CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
commenced prior to issuance of a permit and ,that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands, Water/Wastewater Treatment.
- Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
Watercourses.
- Army Corps of Engineers-Seawalls,iDocks, Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement.
- Federal Aviation Authority-Runways'
I understand that the following restrictions apply to the use of fill:
- Use of fill is not allowed in Flood Zone W" unless expressly permitted.
- If the fill material is to be used i l Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less than one (1)
acre which are elevated by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
permit issued shall be construed to be a license;to proceed with the work and not as authority to violate, cancel, alter, or
set aside any provisions of the technical codes,inor shall issuance of a permit prevent the Building Official from thereafter
requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid
unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension
may be requested, in writing, from the Building;Official for a period not to exceed ninety (90) days and will demonstrate
justifiable cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned.
WARNING TO OWNER: YOUR FAILURE TO' RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
FLORIDA JURAT(F.S. 117.03) 1
OWNER OR AGENT CONTRACTOR
Subscribed and sworn to(or affirmed)before me this Subscribed and sworn to(or affirmed)before me this
by by
Who is/are personally known to me or has/have produced Who is/are personally known to me or has/have produced
as identification. as identification.
Notary Public Notary Public
Commission No. Commission No.
i
i
Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped
I
arti* n Electri* c, Inc.
-Msured -Liceimed -.Bonded
P 0 Box 4')7 - Dade City, Florida 33526
14801 10"Street - Dade City, Florida 33523
PH (352) 521-3319 Fax (352) 521-0297 Lf C #EC 13 001")83 email - john@mailinclectriefl.coni
PROP Q51 L.
Date: 2/19/2020 A
Attn: Al Stewart A A o P_ 30-C UV _e &+a
309-883-0115 DC) C->—
I LOD DL 0
Sleepy Hollow Mobile Home Park
1 5 �'
38741 County Road 54 Af:�
Zephyrhil.1s, FL f) a- 4L0 _ 9l _
r
Office: 813-782-1111
Job: Replace service & pole Lots 147/148
1) Demo existing equipment
2) Install new concrete pole
3) Install new grounding,per code
4) Install new 2 gang* meter pack
5) Install 2 new weatherproof panels with rn'aln breakers to feed existing houses, Allow for J-box
to be installed below new panels to extend wires feeding houses to new mains If needed
6) Pull permit
7) Schedule power company and inspection
Total price: $2,050.00 Terms: 100% upon completion
(Votes:
1) No power company fees included
2) Existing wiring to home's to be reused as is — add j-boxes-and taps at services If needed to
reach new mains
3) Power will be off all day each time we change out
Authorized Signature: 'k" Date: 'Z
John B. Kinsman
Owner
Resideiltial - Cominei,cial Mdustrial
I �► 4 City of Zephyrhills ° ¢PEkM1T,-NUMBER` <,
5335 Eighth Street
Zephyrhills, FL 33542 ELCMISC-000044-2020
Phone: (813)780-0020
y t" Fax: (813)780-0021 Issue Date: 05/04/2020
Permit Type: Electric Service Replacement/Misc
r..
Properly Number' StreetAdd s
lres
02 26 210260 000001480 38722 Lansing Avenue
Owner Information ' Permit Information Contractor'Information
Name: JUDY WYSOCKI Permit Type:Electric Service Replacement/Mis, Contractor: MARTIN ELECTRIC
Class of Work:Add/Alter Residential
Address: 38722 Lansing Ave Building Valuation:
ZEPHYRHILLS,FL 33542
Total Fees:$50.00
Phone: Amount Paid:$50.00
Date Paid:05/04/2020
PiMe`ct'Description
REPLACE 200 AMP SERVICE&POLE
Application Fees „
Electrical Permit Fee $50.00
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each subsequent reinspection.
Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county,and there may be additional permit required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner:Your failure to record a notice of commencement may result in your paying twice for
improvements to your property.If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in
accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
V9 m Olt b8a
CONTRACT R SIGNATURE PE r11T OFFICE
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
813-780-0020 City of Zephyrhills Permit Application ✓ rax-o io-iou-uuz i
Building Department qq
Date Received Phone Contact for Permitting -
Owner's Name ,S ri Owner Phone Number
ki
Owner's Address 22 L-an5incr Ave Owner Phone Number
Owner Phone Number
JOB ADDRESS Q LOT# O
SUBDIVISION GQ 'OW PARCEL ID# V -�V -2 t- 0260 -D0w0-I U
(OBTAINED FROM PROPERTY TAX NOTICE)
WORK PROPOSED R
NEW CONSTR= ADD/ALT = SIGN = DEMOLISH
INSTALL REPAIR
PROPOSED USE = SFR = COMM = OTHER
TYPE OF CONSTRUCTION 0pp BLOCK = FRAME (1Y�V(I 0`` STEEL
G DESCRIPTION OF WORK cl e. 20 J G
BUILDING SIZE I I SO FOOTAGE= HEIGHT
=BUILDING $ VALUATION OF TOTAL CONSTRUCTION
ELECTRICAL $ I Oa C AMP SERVICE zDG) � DUKE ENERGY = W.R.E.C.
=PLUMBING $ J
=MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION
=GAS ROOFING Q SPECIALTY = OTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO
BUILDER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN
Address License#
ELECTRICIAN COMPANY Q��n I L C r i'c- (� C
SIGNATURE REGISTERED Y/ N FEE CURREN Y/N
Address o I ��✓ License# I EC 13 00 13 83
PLUMBER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN
Address i License#
MECHANICAL COMPANY
SIGNATURE REGISTERED Y/ N FEE CURREN Y/N
Address License#
OTHER COMPANY
SIGNATURE REGISTERED Y/ N_J FEE CURREN
Address License#
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction,
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects
COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction.
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans wl Silt Fence installed,
Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance
SIGN PERMIT Attach(2)sets of Engineered Plans.
****PROPERTY SURVEY required for all NEW construction.
Directions:
Fill out application completely.
Owner&Contractor sign back of application,notarized
If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500)
*' Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage)
Driveways-Not over Counter if on public roadways..needs ROW
i
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
8009. Furthermore, if the owner has hired a!contractor or contractors, he is advised to have the contractor(s) sign
portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
contractor, that may be an indication that he is!,not properly licensed and is not entitled to permitting privileges in Pasco
County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
use in existing buildings, or expansion of existing buildings, as specified in Pasco County.Ordinance number 89-07 and
90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
deliver it to the"owner" prior to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
commenced prior to issuance of a permit and'that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands, Water/Wastewater Treatme hit.
- Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas; Altering
Watercourses. j
- Army Corps of Engineers-SeawallsJDocks, Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement.
- Federal Aviation Authority-Runways.
I understand that the following restrictions apply,to the use of fill:
- Use of fill is not allowed in Flood Zone W" unless expressly permitted.
If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in!Flood Zone °A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less than one (1)
acre which are elevated by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction.! I understand that a separate permit may be required for electrical work,
plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
requiring a correction of errors in plans, constriction or violations of any codes. Every permit issued shall become invalid
unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension
may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
justifiable cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
FLORIDA JURAT(F.S. 117.03)
OWNER OR AGENT CONTRACTOR
Subscribed and sworn to(or affirmed)before me this Subscribed and sworn to(or affirmed)before me this
by by
Who is/are personally known to me or has/have produced Who is/are personally known to me or has/have produced
as identification. as identification.
Notary Piblic Notary Public
Commission No. Commission No.
Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped
i