Loading...
HomeMy WebLinkAbout20-90 D Fro p City of Ze h rh i I Is �pJ tY p y PERMIT NUMBER 5335 Eighth Street Zephyrhills, FL 33542 BGR-000090-2020 Phone: (813)780-0020 Fax: (813)780-0021 Issue Date: 06/09/2020 Permit Type: Building General (Residential) Property Number Street Address 1126 210010 09700 0190 38104 9Th Avenue Owner Information Permit Information Contractor Information Name: KATHRYN&ALVARO AMBROS Permit Type:Building General(Residential) Contractor: MOMENTUM SOLAR Class of Work:Electric Service Replacement/ Contractor: MOMENTUM SOLAR Address: 38104 9Th Ave Building Valuation: ZEPHYRHILLS,FL 33542 Electrical Valuation:$25,432.00 Phone: (813)364-3243 Mechanical Valuation: Plu luation: O(f � tal I• ton:$25,432.00 tal Fees:$250:74 Amount Paid:$250.74 QA Date Paid:6/9/2020 1:59:51 PM Project Description _ INSTALLATION SOLAR PHOTOVOLTAIC O ROOFTOP Application Fees Electrical Permit Fee $167.16 Electrical Plan Review Fee $83.58 REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner:Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. ot C* 100*41-1^ CONTRACTOR SIGNATURE PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION — 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 05/13/2020 07:42 AM Rcpt:2161230 Rec: 10.00 DS:0.00 IT:0.00 Nikki Alvarez-Sowles, Esq., Pasco County Clerk&Comptroller Permit Number: Folio/Parcel ID#: 1126210010097000190 Prepared by: Kristin Wiggins/Momentum Solar 6210 Hoffner Ave,Suite 1, Orlando, FL 32822 Return to: Momentum Solar 6210 Hoffner Ave,Suite 1 Orlando, FL 32822 NOTICE OF COMMENCEMENT State of Florida,County of The undersigned hereby gives notice that Improvement will be made to certain real property,and in accordance with Chapter 713, Florida Statutes,the following information is provided in this Notice of Commencement. 1. Description of property(legal description of the property,and street address if available) CITY OF ZEPHYRHILLS PB 1 PG 54 LOTS 19&20 BLOCK 97 OR 9278 PG 2168 2. General description of improvementAve Zephyrhilis Installation of photo voltaic solar panels on rooftop 3. Owner information or Lessee information if the Lessee contracted for the Improvement Name Kathryn and Alvaro Ambros Address 38104 9th Ave Zephyrhiils FI 33542 Interest in Property Owner Name and address of fee simple titleholder(if different from Owner listed above) Name N/A Address 4. Contractor Name Momentum Solar/Cameron Christensen Telephone Number 321-247-6073 Address 6210 Hoffner Ave, Suite 1, Orlando,;FL 32822 5. Surety(if applicable, a copy of the payment bond is attached) Name N/A Telephone Number Address Amount of Bond $ 6. Lender Name N/A Telephone Number Address 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by§713.13(1)(a)7, Florida Statutes. Name N/A Telephone Number Address 8. In addition to himself or herself,Owner designates the following to receive a copy of the Lienoes Notice as provided In§713.13(1)(b),Florida Statutes. Name N/A Telephone Number Address 9. Expiration date of notice of commencement(the expiration date will be 1 year from the date of recording unless a different date is specified) WARNING TO OWNER:ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713,PART I,SECTION 713.13,FLORIDA STATUTES,AND CAN. RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION.IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YO LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Owner Signature of Owner eases,or OWW' or Lessee's Authortzed Officer/Director/Partner/Manager Signatory's Title/O ice The foregoing instrument was acknowledged before me this 12 day of 05/20 by Kathryn Ambros mon ear name of person as Owner for Typed .officer,truetee,attorney in fact Name of party on b ehalf of whom Instrwent was executed 11tLc�n ��1+1 dL�T SigneliA ry Pu _Sk to of Florida Print,type.or stamp Milli lssloned name of Notary Pttbve Personally Known OR Produced ID X ry Public State of Florida Type of ID Produced D.L. Lauren E EI-Taher' Online OR In Person My commission GG 298001 ''� Fxpires 02/o42023 ari I ' 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department -7 Date Received Phone Contact for Permitting G / / d Owner's Name Kathryn Ambros Owner Phone Number 813-364-3243 Owners Address 1 38104 9th Ave Zephyrhills FI 33542 Owner Phone Number Fee Simple Titleholder Name I Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS 38104 9th Ave Zephyrhills FI 33542 LOT# 19&20 SUBDIVISION City of Zephyrhills PARCEL ID# 1126210010097000190 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED a NEW CONSTR e ADD/ALT = SIGN = = DEMOLISH INSTALL REPAIR PROPOSED USE = SFR 0 COMM = OTHER TYPE OF CONSTRUCTION = BLOCK Q FRAME = STEEL = DESCRIPTION OF WORK Installation of photovoltaic solar panels on rooftop. BUILDING SIZE SO FOOTAGE HEIGHT ®BUILDING $ 25,432.00 VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE 22.00A = PROGRESS ENERGY = W.R.E.C. Duke Energy / =PLUMBING $ IVl =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION =GAS = ROOFING 0 SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO 2 _ BUILDER COMPANY Momentum Solar/Cameron Christensen SIGNATURE REGISTERED I Y/ N I FEE CURREN I Y/N Address 16 License# I CVC57036 ELECTRICIAN COMPANY Momentum Solar/Matthew Franz SIGNATURE 4* 1 Y/ N FEE CURREN Address 1 0 •n er L. l License# F EC13008217 PLUMBER COMPANY SIGNATURE REGISTERED I Y/ N FEE CURREN I Y/N Address License# MECHANICAL COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Y/N Address License# OTHER COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN Address License# IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111111111 RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Storrnwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stonnwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ""PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement Is required. (A/C upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(PIoUSurvey/Footage) Driveways-Not over Counter If on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the"contractor Block"of this application for which they will be responsible. If you, as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction,I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S.117 OWNER OR AGEN ALA CONTRACTORi�/ Su CHId and swo to( r affirmed a ore me th' Su scri ed and swom to{{fi�r affirmed befo rme this� /� ao�}Dby ) S by lfcrv�eren (,r:S FanS?� o i are psor)ally known tom r has/have produced o i/are personally known to me or hasRrave produced LL as identification. as identification. (T / Notary Public Notary Public Commission No. i aO 0006 1 Commission No. Name of Note t pad, rite or st m e Na o a typed,printed or d ,Aar pu Notary Public�teate of Florida ypY o� Notary Public State of Florida ° ' N7, Lauren E EI-Taher Lauren E EI-Taher ., &� My Commission GG 29aoo1 r My Commission GG 29B001 .oF a� Expires 02/04J2023 ' o��c Expires02/04/2023 *sum City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: A me 6, �v kV7 5 d/h-Y,- Date Received: OS- 13 XZ9 r- 0 Site: Permit Type: i�S � � �, � I�P1 l G so b'y A to 1, 6^ yr-,W Y Approved w/no comments:❑ Approved w/the below comments: ❑ Denied w/the below comments: ❑ o�A This comment sheet shall be kept with the permit and/or plans. In mg ci 9 Date Contractor and/or Homeowner �j (Required when comments are present) Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net May 11,2020 Re:Proposed Photovoltaic Solar Panel Installation Kathryn Ambros 38104 9th Ave Zephyrhills,FL 33542 Dear Plan Reviewer: Certification:I have reviewed the engineering testing reports for the racking and attachments to be used on this project and I certify that the products are capable of supporting the code required loads and are suitable for this installation when installed in strict compliance with the manufacturers printed instructions. ,Regarding the solar panel array installation on the above referenced project please note that an inspection was performed by a representative of the Architect/Engineer of Record,and analysis of the existing structure was conducted.There is adequate structural capacity for the installation of the array with the following recommendations: 1.The array will be installed on the existing roof.The roof framing is constructed of 2"x6"wood rafters @24"o.c. spanning 107'with 1/2"plywood sheathing.The new array(See Site map by contractor)will add 2.63 Lb./Sf. overall to the roof.No additional structural support is required for the roof structure. 2.The attachment system shall be secured to the roof and shall be in strict compliance with manufacturers printed instructions.The attachment system shall be UL 1703 approved tested.Provide 6 mil.vapor barrier between dissimilar metals.Provide water tight gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the system manufacturer's installation manual.The panel angle shall match the roof slope.Reference summary table below: Roof Type: Shingle Fastener Max Spacing(in.) Attachment System: "Ecofasten Solar""Rock-IT"® Wind Zone 1 Wind Zone 2 Wind Zone 3 min.5/16"x 4"long stainless-steel lags with a min. ' 48. 24 24 Fastener Info: embedment of 3"into the rafters 3.Solar Modules shall be UL-1703 rated.Refer to manufacturers specifications sheets. 4.Positive drainage of the system shall be so as not to void the existing roof warranty. 5.All aspects of the installation shall comply with the Florida Administrative Code,2017 Florida Building Code- Residential Sixth Edition,ASCE-7-10,2017 Florida Building Code—Energy Conservation,Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.All components used meet the criteria of the Florida Solar Energy Center. 6.Please refer to the attached structural calculations. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. L W. Daniel W.Dunzik,RA.LEED-AP73 •;� FL.Lie.No.AR98795 AR98795 A, . Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net May 11,2020 Gravity Load Calculation Criteria Structural Design Loads per ASCE 7-10 Dead Loads=10 psf+2.6 psf(new solar panels)= 12.6 psf Roof Live Load=20 psf Ground Snow Load=0 psf Wind Load Calculation Criteria Wind Loads per ASCE 7-10,Ch.30 method 1 Using an area of 10 SF,wind loads from Figure 30.5-1: Zone 1=-32.3 psf Roof Slope=17 degrees Roof Mean Height=15 ft Zone 2=-56.2 psf Basic Wind Speed=140 mph Zone 3=-83.1 psf Exposure.=B Per section 2.4.1,ASD combo=D+0.6W: Zone 1=2.6 psf+0.6(-32.3 psf)_-16.8 psf Zone 2=2.6 psf+0.6(-56.2 psf)_-31.1 psf Zone 3=2.6 psf+0.6(-83.1 psf)_-47.3 psf Check Attachment to Wood Rafter Use 5/16 dia.Lag screw w/3"embedment into 2 in.wide roof rafter Lag Screw Spacing: Lag Screw Tributary Area: Zone 1= 48"o.c.max Zone 1 =(48"o.c.max)^2/144= 16 SF Zone 2= 24"o.c.max Zone 2=(24"o.c.max)^2/144=4 SF Zone 3= 24"o.c.max Zone 3=(24"o.c.max)^2/144=4 SF Lag Screw Forces: W=2661b/in(Table 12.2A,2015 NDS) Zone 1= 16.8 psf x 16 SF=269 lb < W, OK Cd=1.6(Table 2.3.2,2015 NDS) Zone 2=31.1 psf x 4 SF=124 lb < W', OK Ct= 1 (Table 2.3.3,2015 NDS) Zone 3=47.3 psf x 4 SF=189 lb < W', OK W=W x embed x Cd x Ct W'=266 lb/in x 3 in.x1.6 x 1= 1276.8 lb powered by —— QCCIM QUat�7eate, -TOPBNANppy !D tint.400 120.19 587 Q.ANTUM r \�QY/ Higher Yield ECHNOLOGY:LOW Par surface area, LEVELiZED COST Power classes,and an efficiencower Bpg costs,hi OF ELECTRICITY Y rate of u higher INNOV p to 19.5 'QTIVEALL- `7: Optimal Yields, WEATHER TECHNOLOGY excellent to whatever the weather with w-llght and temperature behavior. '�. ENDURING HIGH PERFORMANCE ERFORMANCE Hot Yield security with Anti LID and Anti P . Spot Protect and Traceable Qua11 ID Te alit chnoiogYl, EXTREME.WEATHER High-tech aluminum RATING (5400Pa alloy frame,certified for hi )and-wind loads(4000 pa high snow © q RELiABL )regarding IEC. Inclusive 12E INVESTMENT linear Yeer product warranty and 25- performance guaranteez. Year STATE OF THE ART MOD ULE TECHNOLOGY Q.ANTUM DU and innovative combines cutting edge cell se wiring with paration 'APT wiring acc Q•ANTUM Technology_ 'Sae data sheet on ording to ISC/TS 62804_ rear for further tntormation 12015,method a(-1500V,168 h) ,T(H�E IDEAL.gOLU r ON FOR: Rooftop arrays on restdenttetbuttdtngs Engineered in Germany QVCLES, 4 All MECHANICAL SPECIFICATION Format 68.5 x 40.6 x 1.26in(Including frame) (1740 x 1030 x 32mm) eec(1740mm1 rso t3enmm) Weight 43.91bs(19.9kg) 3fl CHOmm) Front Cover 0.131n(3.2 mm)thermally pre-stressed glass with anti-reflection technology 4,om nenpPome°wn Iasmmt km, Beck Cover Composite film seal a■imm) Frame Black anodized aluminum '4na•am°mml Cell 6 x 20 monocrystalline Q.ANTUM solar half cells ® Junction Box 2.09-3.98 x 1.26-2.36 x 0.59-0.71in(53-101 x 32-60 x 15-18mm),Protection class IP67,with bypass diodes 1a°"ZJ :4srws°mm) Cable 4mm2 Soler cable;(+)t45.31n(1150 mm),(-)2t45.31n(1150 mm) Connector St5ubll MC4,Amphenol UTX,Renhe 05-6,Tongling TL-Cable01S, JMTHYJM601;IP68or Friends PV2e;IP67 .I 2a■•)s2mm) MAILAnump3mm1 UW 124.6 mm)I I°33�1■3 mm) ELECTRICAL-CHARACTERISTICS POWER CLASS 330 335 340 345_ MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-O W) PoweratMPP' PNPP [W] 330 335 340 345. E Short Circuit Current, Isc [A] 10.41 10:47 10.52 10.58 E Open Circuit Voltnge! Vcc IV] 40.15 40.41 40:66 40.92 E Current zt MPP I„o, [A] 9.91 9.97 10.02 10.07 Voltage at MPP V.'P IV) 33.29 .33.62 33.94 34.25 Efficiency' rl [%] t18.4 a18.7 119.0 2:19.3 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2 Pourer at MPP Pm" [W) 247.0 250.7 254.5 258.2 E Short Circuit Current Isc [A] 8.39 8.43 8.48 8.52 E Open Circuit Voltage Vcc IV] 37.86 38.10 38.34 38.59' `c Current at MPP I.PP (A] 7.80 7.84 7.89 7.93 Voltage at MPP VNyP IV] 31.66 31.97 32.27 32.57 'Measurement tolerances Pmm t3%;Isc;Vac 35%at STC:5000 W/m2,25t2°C,AM 1.5G according to IEC 60904-3.2800 W/m2,NMOT,spectrum AM 1.5 G O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE y- K ssa --T-____r-____1__-__-_____ aX °� �OCa13 ww _ At least 98%of nominal power during mm-- - first year.Thereafter max.0.54% z degradation per year.At least 93.1% iw w of nominal power up to SO years.At a LL z`z '° -----------"-'-. least 85%of nominal power up to 25years. c '0 --r-----r-----1-----7------ 10 ° m All data within measurement tolerenc- z w as.Full warranties In accordance with �0 :■■ 400 o■ ■°° sago o" i the warranty terms of the Q CELLS IRRADIANCE Iw/m9 K um sales organization of your respective o ■° country. '9 YEARS Typical module performance under low Irradlance conditions In n comparison toSTC conditions(25°C,1000W/m2) N TEMPERATURE COEFFICIENTS M Temperature Coefficient of I.c a [%/K] +0.04 Temperature Coefficient of V°c P [%/K] -0.27 Temperature Coefficient of P_, y [%/K] -0.36 Normal Module Operating Temperature NMOT [°F] 109t5.4(43f3°C) m 0 PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage V,y, IV] 1000 Safety Class I. p Maximum Series Fuse Rating [A DC] 20 Fire Rating C(IEC)/TYPE 2(UL) m Max.Design Load.Push/Pull' [Ibs/ft2] 75(360OPa)/55(266713a) Permitted Module Temperature -40°Fupto+185°F o Max.Test Load,Push/Pull3 [Ibs/ft2] 113(540OPa)/84(400013a) on Continuous Duty (-40°Cupto+85°C) a a,- 3See Installation Manual U QUALIFICATIONS AND CERTIFICATES --PACKAGING INFORMATION g UL 1703,VDE QualltyTested,CE-compllent,IEC 61215:2016,IEC 61730:2016, Number of Modules per Pellet 32 ° Application Class II,U.S.Patent No.9.893,215(solar cells) Number of Pallets per 53'Troller 28 ® Number of Pellets per 40'HC-Container 24 e DVE C:E c��us Pallet Dimensions(LxWx H) 71.5x45.3x46.9In(1815x1150x1190mm) QH11 Pallet Weight 1505lbs(683kg) 8 Note:Installation Instructions must be followed.See the installation and operating manual or contact our technical service department for further Information on approved Installation and use of this product. Henwha O CELLS America Inc. . 400 Spectrum Center Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748-5996 1 EMAIL InquiryQus.q-celis.com I WEBwww.q-calls.com/na Data Sheet Enphase Microinverters Region:AMERICAS The high-powered smart grid-ready -Enphase Enphase IQ 7 Micro' and'Enphase IQ 7+Micro" I-Q '7 -a nd IQ 7+ dramatically simplify the installation process while achieving the highest system efficiency.- :M Icroi nverterS Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy'M, Enphase IQ BatteryT", and the Enphase Enlighten`" monitoring and analysis software.. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install �— Lightweight and simple Faster installation with improved,lighter two-wire cabling- Built-in rapid shutdown compliant(NEC 2014&2017) Productive and Reliable i Optimized for high powered 60-cell and 72-cell*modules • More than a million hours of testing Class II double-insulated enclosure • UL listed 0 Smart Grid Ready • Complies with advanced grid support,voltage.and frequency ride-through requirements - Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) The IQ 7+Micro is required to support 72-cell modules. To learn more about Enphase offerings,visit enphase.com v.E N P H AS E. Enphase IQ 7 and IQ 7+ Microinverters . INPUT DATA(DC) IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Commonly used module pairings' 235 W--350 W+ 235 W-440 W+. Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V - Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V, 16'V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 04 PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak output power 250-VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage/range2 240 V/ 208 V/ 240 V/ - 208 V/ 211-264 V 183-229 V 211-264 V 163-229 V- Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms -5.8.Arms Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208.V @240 V @208 V Peak CEC efficiency 97.6% 97.6% 97.5% 97.3% CEC weighted efficiency 97.0% 97.0% 97.0% 97.0°i MECHANICAL DATA Ambient temperature range -400C to+65°C Relative humidity range 4%to 100%(condensing) Connector type(IQ7-60-2-US&IQ7PLUS-72-2-US) MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Connector type(IQ7-60-B-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B; CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio:See the compatibility calculator at https//enphase com/en-us/support/module-com atR ibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com u EN PHASE. @ 2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman,NJ.08558 908-972-3664 January 29,2018 Building Department Attn:Plan Reviewer Re:Proposed Photovoltaic Solar Panel Installation Dear Sir: I have reviewed the following documents related to the"EcoFasten Solar"ROCK-IT SYSTEM 4.0 and certify that the attachment system when installed in strict compliance with the manufacturers Installation Manual appropriate for this application and is in compliance with the latest building codes including Florida Administrative Code,2017 Florida Building Code-Residential Sixth Edition, ASCE-7-10,2017 Florida Building Code—Energy Conservation, Sixth Edition,2014 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.I make this certification for the following listed documents: 1. ROCK.-IT SYSTEM 4.0 Installation Manual 2. PZSE,Inc Structural Engineers Certification. 3. EcoFasten Solar Certificate No.US 82150026 4. ROCK-IT SYSTEM 4.0 Cut Sheet for Coupling,Hybrid Coupling,and Mount. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. Daniel W.Dunzik,RA,LEED-AP Fl.Lic.No.AR98795 � •+ AR98795 •� ��E®'�"� Cut- Sheet- .Rock-It-4.01isCoupling 1: Installation to be completed in.accordance with,manufacturer's.written specifications and installation instructions. .2 See.spec.sheet or contact manufacturer for detailed material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. 3.1.7in- C9. 0 {�} [80.54mm j ' TOOin j 177.80mm - i � 2.02in 2.14in 2.34in �51 .38i rlm] -L54.37mm i 59.3bmm] 2mm W - 35mm -40mm _wAL�'Il�]iE. �r 1 � e���t�»a7�I1�.��', 4741 W Polk Stree Ste.4 .�O1 �,�UARW.; Phoenix,AZ 85043 Toll.Free Phone 1.888.766.4273. Toll'Free Phone 1:877.859:3947 Material:See Spec Sheet Toll-Free Fax 1.888.766.9994 Toll Free Fax 1.888:766:9994 Scale: 1:4 6l28/2017 ASG: - EFS: x Cut Sheet - Rack-It-4.0-Hybrid Coupling 1. Installation to be completed in accordance with manufacturees.written specifications and installation instructions. 2. See:spec sheet or contact manufacturer for.detailed material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not.scale drawinggs. S. Subject to change without notice. I 3.a 6in ffi (9 0 G [80.29mrn} 7.00in - [I77.80mm] In 5.00in [127mm 2.14in a 2.341n d [51.38m_ m] [54.37mm]: . [59:36mm }� 32mm 35mm 40mm ALPINE PINE 4741 W Polk Street Ste.4 SRDS'=' - n► e� Ul�9Cu. Phoenix,AZ'85043 Toll_Free Phone 1.888.766.4273 Toll Free Phone-1.877.859.3947 Material:See Spec Sheet Toll Free Fax 1.888.766.9994 Toll Free Fax 1.888:766.9994 Scale: 1:1 6/28i2017 ASG: - EFS:x h r E .ROCK-.IT SY ST E IVI" -. RAIL-FREE RACKING UTILIZ25 ECOFa5Ten 50Lars PaTenTeD T2CHnOLOG�J u�V ��� Ee.a �,sten Solar "@ .� c asten o .r v committed to the connection Docu ment_Date:9.8.2017 Contents P& 1...................................................................................................................................................... Assets of Design Features System Components Pg..-2....................... ...................................................................................................... Rock It 4.0.Mount Assembly. Rock-it 4.0 Coupling Assembly Pg. 3 ............................................................................................................ Rock-4t 4.'0 Hybrid-Mount Assembly Rock-It-Clip SS Assembly Rockrittlip 2.0 Assembly Pg. 4.......................................................................................................................................................... Array Layout GreenFasten Flashing.Install-- Pg. 5........................................................................................................... ......................... Rock-It System 4.0 .0 Install Pg. 6................................................................................................................................................. Ground Lug.Install-- -Pg.-.7 .................................................................... ............................................................... ..... Rock-it.Clip SS Install , Rock4t Clio 2.0 Install Pg. 8-12............................................................................................................................... Standoff Spacihg'Tables Snow toad 0-20 psf Snow Load 21-30.psf Snow.Load 31-40 psf Snow Load 41-50 psf Snow Load 51,-60.psf Pg. 13 ................................................................................................................................... Grounding Information-- -Bonding Assembly and Bonding Path- P& 14......................................................................... ........................................ Thermal-Expansion and Bonding . Bracket:Spacing-_ Staggered,Layout -Cantilever Pg. 15.. . .............................................................. ..................................................................... System Specifications Eva luated,'Compatible:Modules ROCK-IT SYSTeM 4.0 Designed with the Installer-in mind. Ecol'asten Solar specializes-in Solar roof attachments that are fast and easy to Install;straightforward,secure and cost-effective.EcoFasten offers a wide variety of standard products as well as custom solutions,for a one-stop source for all of your rooftop anchoring needs. Products,are rigorously tested and approved above and beyond industry standards In-house.and by third party agencies, EcoFasten's patented'conical sealing System has been'in service In the snow guard and solar industries for two decades. FeaTures • New and Improved'design -North-South adjustabillty • -Fastest;easiest to-level.system on the market Only one toolrequired(1/2"cleep weltsocket): Integrated electrical bonding Vertical adjustment of 3",C- • SIMPLE-only 4 components sgsTem -com-ponenTS* - reauire.D Pei$ 1k -7 ROCK-IT SLIDe ROCKtIT 4.0 ROCK-IT 4.0 COUPUnG ROCK' IT 4.0 4' For comp sHinGLe MounT & LOaD-BearinG-FOOT .Array sKirr 8,For TlLe SYSTem com.ponenTS.* - OPTIona.L MOW > corasten.Solar ROCK-IT CLIP,SS (ReFer To PG.6) EcoFasten Solar products are protected by the following U.S.Patents: .8,151,522 8,153,700 8,181;398 8,166,713 8,146,299. -8,245,4S4 8,272,174 8225,SS7 9 -4.0- 8,209,914 'o10,018 9,134,040 9,175,478*9,212,833 ROCK-IT 4.0 Arra6i sKirT H jBnD mounT EnD.CaPS (En6.CaPS.00Me_ .(ReF=er_TO.PG.:5) Pre-insTaLteo on EasT ROCK-IT CLIP-2.0 ent)oF=smirr sec'nons) (Ref=er To PG.6) 1 *Components for use with 32mm-modules are available as special order.Components for use With 32mm modules are labeleclas such on- system packaging.Please refer to evaluated,compatible modules grid.on page 1 Sto Identify system compatible 32mm modules.- www.ecofastensolar.com info@pcofastensolar.com 877-859-3947 _1 E. x ROCK-IT 4.0 MOUI'1T ASSC-MBLJ- NOTe: ITems 1-7 SHIP asseMBLeD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS 2 Rock-it 4.0 Mid-Clamp 6000 Series AL 3 Rock-It 4.0 Shelf 6000 Series AL 4 Flange Level Nut 300 Series SS i 5 Rock-It 4.0 Tie Plate 6000 Series AL 6 Rock-It Pedestal 6000 Series AL 7 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 1 8 3/8"ID Star Washer 300 Series SS 9 3/8"-16 x 3"Hex Tap Bolt 300 Series SS fti 14 +�J da ROCK-IT SLIDes are accePTaBLe BracKeTS For Use WITH ROCK-IT 4.0 (SOLD separaTeLY) ROCK-IT 4.0 COUPLING aSSP_MBLY. NOTe: ITems 1-3 SHIP assemBLeD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS --- 2 Rock-lt4.0 Coupling Mid-Clamp 6000 Series AL 3 Rock-It 4.0 Coupling Shelf 6000 Series AL 4 Rock-it Load Bearing Foot Clip 5 Rock-It Load Bearing Foot Base i i3; i I www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 2 ROCK-IT 4.0 HYBRID MOl.. nT AssemBLJ- NOTe: ITems 1-10 sl-IIP assemBLeD 1 Rock-it 4.0 Shelf 6000 Series AL (� 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL 10 3 Rock-It 4.0 Coupling Tie Plate6000 Series AL 4 Flange Level Nut 300 Series SS 5 Rock-It Pedestal 6000 Series AL 6 Rock-It Slide 6000 Series AL �.\ \ 7 3/8"-16 x 3"Hex Tap Bolt 300 Series SS ` 8 3/8"ID Star Washer 300 Series S I 9 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 10 5/16"-18 x 1.5"Hex Serrated Flange Bolt 300 Series SS Q I 4 I 5 I --_07 ROCK-IT CLIP SS ASseMBLY ROCK-IT CLIP 2.0 ASseMBLY NOTe: ITems 1-3 SHIP assemBLeD NOTe: ITems 1-3 SHIP assemBLeD 1 Stainless Steel Carriage Bolt-.313-18X.75 1 Rock-It Clip 2.0 12 Rock-It Clip SS 2 Stainless Steel Flange nut.313-18 3 Stainless Steel Flange nut.313-18 3 Bolt.3125-18x1x1-S f�\ / 2 1 �3, I www.ecofastensolar.com info@ecofastensolar.com 877-85973947 3 L array LagOUT • Find the required structural attachment points. Mark these using a-vertical(N=S)chalk line on-the- center of the-rafters. • Spacing may vary.depending upon project specific structural requirements;J.e:high snow and wind load areas may require lesser bracket spacing in the E-W axis vs.the-maximum spacing.Max spacing is 48"for_portrait orientation and-72".for landscape orientation.Consult project layout diagram for project specific bracket spacing on the roof.. • Install-Rock It Mounts.to predetermined mount spacing. • The Rock-it.Array Skirt sections are the width.of a typical 60.cell module-use the Rock-it Array Skirt as a.guide today out module placement. . Note:The distance between the rows of mounts is calculated by the module dimension N-5 plus 1 3/8" (35mm).Lag screw should be installed as close to center of exposed shingle as-possible. The minimum distance between,the lag screw and the-edge of the shingle is 1/2" GreenFaSTen"" FLaSHfnG InSTEILL 1 Locate the rafters and snap horizontal and vertical lines to markthe installation position for each GreenFasten flashing. 2. Drill a pilot hole(1%4"diameter)for the lag bolt Bacldll.with sealant.EcoFasten Solar recommends an.EPDM mastic «, 3 Insert the flashing so the top part is under the next row of shingles and pushed far . enough.upslope to prevent water infiltration through vertical joint in shingles.The,. leading edge.of flashing must butt against upper row of.nails to prevent turning. when torqued. 4 Line up pilot hole with GreenFasten flashing hole.. insert the lag.bolt through the EPDM.bonded.washer,the Rock-It slide,the gasketed. hole In the.flashing and into the rafter. Torque:The-range is.between 100-140 torque inch-pounds depending on the type of wood and.time ofyeanThe visual.indicatorfor proper torque is when the EPDM: on the underside of.the bonded washer begins to push out the sides as the washer compresses.If using an impact wrench to install the fasteners.be.careful not to over. torque the fastener.You may need to.stop and use a ratchet to finish'the install:_ *The Engineer of Record shell check capacity of rafter to support lag screw loading.- wwwecofastensolarcom info@ecofastensolarcom 877-859-3947 4 L ROCK-IT SYSTeI.1`1 4.0 I nSTa LL l k a 5 f4 I R&A 1 install Ectilcasten Solar Flashing with Rock-it.Mounts Follow EcoFasten solarinstall lrutruMors forflashing and brackethutail(GreenFasten shaven above). •Optimum vertical distance between tag bolts is 13/8'plus module dimension. •Set mounts on eve mostrowsothattheRodc-k Pedestal Isonthe5outhendofRock4tSilde. •Set mounts on all upper rows sothat the Rock:it Pedestal Ison the No"end ofRock4tSlide. 2 Install Rock-It Array Skirt onto Eave Mounts • Slide Rock-It Array Skirt into front channel on Rock-It Shelf. -.Array Skirt End Caps are pre-lmtalied on the East end of each skirt section,and are-used to-couple the skirt sections where needed(see Fig.A). Tighten Mid-Clamp bolt,clamping Rock-It Array Skirtto mount.Torque to 200 hrtbs.(130In-tbs.when installing with 32mm modules). _4 Install Rock-It Couplings(when Joining 4 panels with a Coupling,the use of,a load bearing foot Is.required) • Prior to mounting on the roof,snap Load Searing Foot into the bottom of Rock-It Coupling if required.. (Each Load Bearing Foot Is set to same height as the Rock-It Mounts,-adjust accordingly)- •.On eave row only,slide Rock=lt Array Skirt onto Rock-It Coupling Shelf.Torque to specified value. • NOTE:If a coupling lands on a rafter,the Hybrid Mounts should be used In place of theRock-It Coupling(refer to imageAa)', *Hybrid Mount can be made in the field by assembling a coupling to amount pedestal;or-by purchasing separately. C, Align and Straighten First Row of the Rock-it System with Rock-it Array Skirt •Use North-South adjustment of the Rock-It Pedestal to straighten RodWtArray Skirt and align module with Array Skirt •Torque screw on side ofRock-It Pedestal to150in-Ibsto secure itto the Rdck-ItSlide. Adjust Flange Level Nut to level the system(optional—ran be leveled during or after Installation). 6_9 install 1st Row of PV Modules •Slide upslapeRock-It Mounts down to engage top offirst module. •install RockttCoupiingson the upstope side ofIst row ofpanels. •Torque 2nd row of Mid{lamps an Rock-it Mounts and Rock=tt Couplings to specified value. •Install balance ofPV modules,ensuring thattheRodc-It Pedestals are In the appropriate position,then torque Mid-Camps to secure modules. 1.0 -Level the Rock-It System •When assembly Is complete,level the entilmsystem by adjusting Flange Level Nuts(Flange Level Nuts have no torque value): •Height between roof surface and underside of modules should be 3'or less,when Installed with Type 2 modules INSTALLATION NOTE:Modules should be'installed so that the junction box Is Installed upslope,away.fram theleading-edge of the array. wwwecofastensolarcom info@ecofastensolarcom 877=859-3947 5 GrounDinG LUG inSTaLL _ .. y-_' Necessary Components:. One of the following ground lugs(or any UL 2703 compliant.ground lug): Burndy CL50-1 TN Ground Lug(UL 2703-E351343 J UL 467-E999% ILSCO SGB-4 Ground Lug(UL 2703-E354420 /UL 467 E34440) 1LSCO GBL-4DBT(UL 2703-E354420 /_UL 467-.E34440) 1LSCO,GBL-4DBTH.(UL 2703 E354420 [UL 467-E34440) ILSCO GBL-4SS(UL 2703-E354420 /UL 467-E34440) Note:Drill and.deburr hole in Ground Lug prior to installation - 14 AWG-4 AWG Copper Ground Wire' Torque Values: - 8-32 x 0.5"Serrated Flange Head Bolt(300 Series SS), 14=1 GAWG=20 in-lbs. - 8-32-Serrated Flange-Nut(300 Series SS) 8 AWG=25 in-ibs. - 11/32"and 1/4"wrenches or ratchets/sockets 6-4 AWG=35 in-lbs. 1-Insert the flange bolt into the module ground hole:Place Star Washer-over bolt.Place ground lug over the bolfi.and Star Washer,and turn to desired orientation. 2. Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel'and tighten set screw to.complete assembly,, *Wire should be sized In accordance with the National Electrical-Code,-NFPA 70,Section 690.45,and a minimum of 1/4"clearance required between bare copper wire and aluminum. i° HI Drill hole'per.grounding lug manufacturers f= specifications'in the upsiope part of Rock-It Coupling V. for attaching grounding lug. Note:Deburr hole in Ground Lug and Rock-it Coupling prior to installation. wwwecofastensolarcom info@ecofastensolarcom 877-859�3947 6 R O C K-I T CLIP S S i n STa L L a Rccentat>fe btmmling Location] rep ...2*6tm.from. a I . Vnefion Roy I 1 Locate all,parts -Locate the Rock-It Clip'SS,micro-inverter/power optimizer;and the section of the module frame in which you.will be-mounting the micro inverter/power optimizer. See fig.A for acceptable mounting-locations. 2 Install the Rock-It Clip SS • Slide the RockAt"Clip SS onto the lip of the.module frame. • Slide the.micro-inverter/power optimizer.into the opposite-lip of the.Rock:lt Clip SS. • Tighten the bolt to 150 in-lb minumum to clamp.the Rock it Clip SS to the module.frame and the- micro=inverter/power.optimiier to the Rock-it Clip SS. • Ensure that the-lip on-the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. ROCK. IT CLIP 2.O inSTaLL Inverter Flange Module Frame Rotk-lt=Clip 2.0 1 Locate all parts •Locate the Rock-it Clip 2.0,micro-inverter/power optimizer,and the section ofthe module frame in which you Will be mounting the micro-inverter/power optimizer. 2-Install the Rock-It Clip 2.0.(See below detail) • Slide the Rock-It Clip 2.0 onto the lip of the micro-inverter/power optimizer. •-Slide the_micro;inverter/power.optimizer.Into the opposite lip of the module frame. • Tighten the.bolt to 1.50 in-lb.to clamp the Rock-it Clip 2.0 to the module frame and the micro=inverter/power optimizer to the Rock-it Clip 2.0. • 'Ensure that.the lip on the clip is tight.against.the frame and that the micro-inverter/power optimizer flange is. tight against the clip flange to avoid rotation during tightening. wwwecofastensolarcom info@ecofastensolarcom 877-859-3947 7 Snow Load 0-20 psf Modules In Landscape --Wind Speed Exposure . 2:12<Roof Pitch<.6:12 7:12<Roof Pitch t 12:12 ASCE 7-05 ASCE 7-10 Category, 'Zone 1 Zone 2 Zone 3 Zone 1 Zone 2' Zone'3: B 159 93 59 85 mph 110 mph C 114 67 42 88 88 D 96 56 .35 74 74 B 146 85 54 91 90 mph 115 mph C 104 .61 38 98 80 80 -D 88 51 32 83- 68 68 B 123 72 45 95 95 100 mph 125 mph C 88 51 32 83 '68 . 68 D 74 43 27 70 57 57 B 98 57 36 93 76 76 110 mph 140 mph'. C- 70 41 26 66 54 54 D 59 34 22. 56 46 46. B 85 50 31_ 81 66 66 120 mph - 150,mph . C 61 36' . 22 .58- 47 47 D 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.)Values in above table,represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate ratter spacing .2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capbity=547#(per testing results) 4.)includes additional factor of safety of'1.5 for lag,pullout capacity 5:)Values based on a maximum module width of 40" .6.)Based on Risk Category ll(ASCE 7-10)structures less than 30 feet in height 7-)All adjustment factors are set to 1.No site specific engineering Is included in this table Snow Load 0 20 psf Wind S eed Exposure 2:12.<Roof Pitch.<6:12 1 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zonal Zonal, Zone 2 Zone 3. - B 91�__ 53_ f-_33_. 85 mph 110 mph C 65 38 24 61 110 D 55 _ .32 20 . , ,: _.A2, %32 . B 83i LL 49 30 90-mph 115 mph C 59 35 22 56 46 46 D 50 29 18 47 .38 38 17- -- � 41-- 26 54 .'5411 100 mph 125 mph C so 29 18 47 j : 39 39.E r. D 42- 26- . . 15 _ .. 0 _. 3 _ -32 t . B 56 33. 20 53 43 43 110 mph. 140 mph. C 40 23 14 38 31 31 D 34 19 12 32 26 26 ^B _ 49 18- - --18 46 i 37_7_37--_`" 120 mph 150 mph C 35 20 12 33 27 f 27 D 29 1.7 1 10 28 1 22 22 Notes: -Spacing Governed by-Snow load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2:)Maximum allowed spacing approved by-EcoFasten Solar is 48" 3.)Maximum allowed standoff.capclty=547#(per testing results) 4.)Includes-additional factor of safety of 1:5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on-Risk Category 11(ASCE 7-10)structures less than 30 feet in height. 7.)All adjustment factors are set to 1..No site specific engineering is Included in this table www.ecofastehsoiarcom info@ecofastensolarcom 877-859-3947 8 ! 4 -Snow Load 21-30,psf Modules in Landscape 'Wind Speed Exposure 2:12<Roof Pitch<6:12, 7:12.<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone.3 Zone .1 Zone 2 , Zone 3• . B 93 59 85 mph• 110 mph. C 67 42 D .96 56 35 B 85 54 -90 mph 115 mph C 104 61 38 D_ 88 51 32 B 72 45 100 mph 126 mph ' C 88 51 32 D 74 43 27 57 47 . B 98 57 36 110 mph 140 mph C 70 41 26 66 54 .54 D 59 34 22 56' 46 46 B 85 50 31 66 '66 120 mph 150 mph C 61 36, 22 58 47 47 D. 51 30 19 49 40 40 Notes: Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing In inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2:)Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.)Maximum allowed standoff capcity=547#(per testing results). 4.)Includes additional factor of safety of.1.5 for lag pullout capacity 5-)Values based on a maximum width of 40" 6.)Based on Risk Category 11(ASCE 7-10)'structures less than 30 feet in height 7.)All adjustment factors.are set to 1.No site specific engineering is Included In this table Snow Load 21-30. psf. Wind Speed Exposure 2:12<Roof*,Pitch<.6:12 7:12<Roof Pitch<.12:12 ASCE 7-05'ASCE,7-10 Cate o Zone 1 Zone 2 Zone 3 Zone 1 Zone 2• Zone 3 85 mph 110 mph C 65 k 38 24 - _ D_ �55. _.3? 20 B 49 30' 90 mph. . 115 mph C 59 35 22 D 50 29 _18 38 38 41---7 y 26� 100 mph 125 mph C 50 29 18 vl 39 D 42 �`6, 15 . . �.0 -'�;�32 ,t.f 32 B 56 33 20 110 mph 140 mph C 40 23 14 38 31- 31 D 34 19 12 32 .26 26 g_ _ 37 t" - 37 120 mph 150 mph w G 35 20 12 .33 27 27�. D 29 17 10 28 22 2Z, Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing In Inches for pullout forces only on EcoFasten Solar-standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#.(per testing results) 4.)Includes additional factor of safety of-1.5 for lag pullout capacity 5.):Values based on a.maximum module length of70" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height. 7.)All adjustment factors are set to 1.No site specific engineering isincluded in this table www.ecofastensoiarcom info@ecofastensolaccom 877-859-3.947 9 Snow Load 31-4.0 psf Modules in Landscape Wind Speed Exposure 2:12<Roof Pitch.<6:12 7:12<Roof Pitch.<12:12. ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone-1 Zone 2 Zone 3 B 59 85 mph' 110 mph C 67 42 D 56 35 B 54 90 mph 115 mph C 61 38 D 51 32 B 45. 100 mph 125 mph C 51 32 D 74 43 27 B ® 57 36 110 mph 140 mph C 70 41 26 D 59 34 22 46 46 B 50 31 120 mph 150 mph C 61 36 .22 47 47 D 51 30 .19 49 40 40 Notes: Spacing Governed by Snow Load 1.)Values In above table represent the.maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down.to meet appropriate rafter spacing 2.).Maximum allowed spacing approved by EcoFasten Solar Is 72" 3.)Maximum allowed-standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width.of 40" 6.)'Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to.1.No site specific engineering is included in this table Snow Load 31-40 psf Wind Speed Exposure 2:12.<Roof Pitch c-6:12 7-12<Roof Pitch ASCE 7-05 ASCE. Cate o. . Zone 1 -Zone 2 - Zone 3 Zone 1 - -Zone 2 Zone 3 85 mph 110 mph C i ;38 244; D B 49 30 90.mph 115 mph' C 35 22 D 29 18 - ---B--- 43R z 26 100 mph 125 mph C ` 29 ' 18 D 42_ 26. 1'5: B 33 20 110 mph 140 mph C 40 .23 14 D 34 19 .12 26' 26 --- - = - - -- - � -- .-e___ B 49 28- 120 mph 150 mph C 35 20 D 29 1 17 10 28 22 'a22Y=` Notes: -Spacing Governed by Snow Load 1.)Values In above table represent the maximum allowable spacing in inches for pullout forces only.on EcoFasten Solar standoff 2;)Maximum allowed spacing approved by EcoFasten Solar is 48" 3-)Maximum allowed standoff capcity=5479(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5-)Values based on a maximum module length of 70" 6.).Based on Risk Category II(ASCE 7-10)-structures less than 30 feet in height 7.)All adjustment factors are set to 1:No site specific engineering Is included in.this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 10 l � Snow Load 41-50 psf Modules in Landscape Wind.Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<-12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 59 85 mph 110 mph C 42 D 56 35. B 54 90 mph 115.mph C 61 38. D .51 32 B 45 100 mph 125 mph C 51 32 D 43 27 B 57 36 110 mph 140 mph C 41 26 D 59 34 22 46 46 B 50 31 120 mph 150 mph C 61 36 22 47 47 D 51 30 19 49 440 40 Notes: Spacing Governed by Snow Load 1.)Values in above table.represent the maximum allowable spacing in-inches for pullout forces only on EcoFasten-Solar standoff; however the designer must round down to meet appropriate rafter spacing. 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3:)Maximum allowed standoff capcity=547#(per testing-results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a-maximum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering,is included in this table Snow Load 41-50 psf Wind Speed Exposure 2:12<Roof.Pitch.<6:12 7:12<Roof Pitch<12:12 ASCE M5 ASCE_7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B �$3 85 mph 110 mph C 38' ` ` 24 D _.,32. 20_ B 30 90 mph 115 mph C. 35 22 D 29 18 100 mph 125 mph C 29 18 D 26 15- B 33 20 110.mph 140 mph C 23 14 D 19 12 - B - 28 f8 120 mph' 150 mph C 35 20 12 D 29 17 10 22- Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout-forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar Is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4:),Includes additional factor of safety of 1.5 for lag pullout dapacity 5.)Values based on a maximum module length.of 70" 6.)Based on Risk Category If(ASCE 7-10)structures less-than 30 feet in height 7.).All adjustment factors are set to 1.No site specific engineering-is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 .11 T Snow Load-51-60.psf Modules in Landscape Wind Speed Exposure. 2:12 a Roof Pitch.<6:12 7:12<Roof Pitch e.12:12 ASCE 7-05- ASCE 7-10. Cate o . Zone 1 Zone-2- - Zone 3 . Zone 1 Zone 2 Zone.3 B - 85 mph. 110 mph C 42 D 35 B .54 90 mph 115-mph C 38 D 51' 32 B 45 . 100 mph 125 mph C '51 32. D .43 . 27 B 36 110 mph 140 mph C 41 26 D 34 22 B 50 31 120 mph . 150 mph C '36 22 D 51 30 19 Notes: Spacing Governed by Snow Load 1.)Values.In above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)includes additional factor of safety of 1.5 for lag_pullout capacity 5.)Values based'on a maximum module width of 40" .6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to'1.No site specific engineering Is included in this table Snow Load:51-60 psf Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Cate o . Zone.1 Zone 2. Zone 3 Zone.1- Zone 2r Zone.3 B 85 mph 110 mph C 1 24 D B 30 90 mph' . 115 mph C 22 D 29 18 B 26- 100 mph 125 mph C 29, 18 D 26 _15 _ B 20 110 mph. 140 mph C 23 14 D 19 12 18 4 120 mph k 150 mph C 20 12 =; D 29 i 17 t 10.._. Notes: -Spacing,Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing In Inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4:)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" .6.)Based.on Risk-Category II(ASCE 7-10).structures less than.30 feet In.height 7.)All adjustment factors are Set to 1.No site specific engineering.is included in this table www.ecofastensolar.com info@ecofastensolarcom 877-859-3947 12 GrounDinG inFormaTion The rail-free Rock-It System maybe used to mount and ground PV modules that complywith UL 1703,onlywhen that specific module has been evaluated for mounting.and grounding,in compliance with the included installation instructions. Note:Grounding lug must be visible to inspectors from theentire perimeter of the PV array. Multiple Use Grounding Pins Grounding pins within the Mid-Clamp are multiple use bonding/grounding devices.Modules will need to be adjusted if the Mid-Clamps are loosened to ensure there isrrnew"metal to pierce into upon retightening. Grounding Method- Rock-it 4.0 Mount bonds N75 rows of.modules Rock-It 4.0 Coupling bonds E-W rows of modules Rock-It Array Skirt bonds E-W along the entire array when installed One Burndy CL50-1 TN ground lug is required per PV array,limited to 300 modules placed in either portrait or landscape orientation. I BonDinG AssemBLY anD BonDInG PATH Band Path -* Grounding Lug �.0�;o(EG°d"E -Integrated Bonding -genera9yte eanh grannd i ® Rock-It Oeupting .E'Ratk•It Mojnt �•Rotk-IS Array Skirt I j Bond Path' Bond Path ® Grourxling Lug - ®'Grounding Lug EQu(Drnerr.Groundkrg [onduadr(EC--CI. (VGrarndl 'IA•mcxn. V C nd DrtEGQ- -Sencauytowr(h m'Rock-It Caupiing t w Rock-ItCoupQng ■ Rock-It Mounr •e..•o Rock4t Array skirt ■Rock4t Mount Rock-it Array Skirt' www.ecofastensolarcom 'Info@ecofastensolar.com 877-859-3947 13 e THermaL EXPansion. anD BonDinG A thermal expansion gap is required per each continuous 40'length.of modules. -- Bond Path ® Omit a coupling and leave a 2"gap in Graundingtug the Rock-It Array Skirt and also between �'_.Cones cto�G�"� the modules at that point. Vou d Rork-It Coupling- ■ Rock-It Mount _Rock=lt Array skirt BracKeT sPacinG Portrait Orientation Landscape Orientation I - ' I f J: i I Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. 32mm modules:Max east/west bracket spacing.is 48"OC. Spacing may vary depending upon project specific structural requirements;i.e..high snow and wind load areas may-require lesser-spacing E-W than the maximum. sTaG.GereD LaY.o.uT canTlLever an.D OFFseT Staggered Mounting:Points i s .,Rock-It Mount ®Rock-It.Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations,checklayout priorto'installing. The array layout instructions in this Instillation manualoffer a general overview of layout. Periodically,due to a variety of Offset:.Offset from all roof edges depends onwind speed,snow factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 14 R O C K- 1-T S J- S Te f'1'1 4.0 SYSTem sPeclFicaTions Max No.of Panels .300 Modules per ground lug Materials 300 Series Stainless, 6000 Series Aluminum Max System Voltage 1000VDC Coating BlackAndodization/Mill Finish Class A Fire Rating, With UL7703Type 1 Rated Lug Spedfications Bumdy CL50.1TN Ground Lug Modules;see note below. (UL Listing#KDER E9999) Leveling Range 34" Ground Wire 14 AWG-4 AWG Copper Per above Lug spec. Ground Wire Rock-It Slide Comp.Range 3" Max Module Size .64.96"(1650mm)x Rock-it Slide Mle 7" 39.05'(992mm)x 2"(50mm) Min/Max Roof Slope 1/2.12/12:12 Max Downforce/Uplift Rating 45 PSF Max Anchor Spacing(35mm/40mm) 72" Rock-It Mount Load Rating 547lbs with Single 5/16'Lag 3.0 Max Anchor Spacing(32mm) 48' Safety Factor Skirt Box QTY 6 units Slide Fastening Hole 5/16"diameter Mount Box QTY -12 units Module Cantilever Maximum cantilever is 1/3 Rock-It Slide Box QTY 50 units bracket spacing Coupling Box QTY 12 units Warranty 20Year Material and Workman ship Codes:National.Efectric Code;ANSVNFPA 70,NEC 250,NEC 690,IRC,IBC Standards:UL 2703:First Edition,UL 1703 I mCascenSolar. �.eOr45itlSOI3f ROCJt-fT SYSTEM "M IDCODE:GOT-QZ-2016 [CMfOM6T0 UL ZT0.1 GCXWWdSTDUL2703 V1N 4lT.MG:SE[t.SiMUO.�Y .ac.. "1WLL4{OPI"MfA1C1G5 MWIDIVtOTiYDG1II12 nA The EcoFasten Solar Rock-It System is a rooftop PV racking system consisting of 6000 Series Aluminum and 300 Series Stainless.Steel components.The Rock-It System Includes the rack components but does not Include the PV panels, inverters or electrical-components.The PV modules to be used with Rock-It shall be certified under UL 1703.The system shall be used on steep slope roofs mounted over a Class Afire rated roofing material and attached to the roof structure using:5/16".diameter,minimum 4"long 300 series Stainless Steel lag bolts with minimum thread embedment depth of 21/2"into the roof structure. Periodic re-inspection for loose components The system is subject to as required by the PV module manufacturer or.by the Authority.Having Jurisdiction.Re-inspection;as required,should include evaluation of any loose components or loose fasteners.All .loose components and fasteners should be,secured.in accordance with these instructions:The system should also be evaluated for any evidence of corrosion.Any corrosion should-be removed:Any affected part should be.cleaned or replaced in accordance with these instructions. I&4 A ®O'EcoFasten S®1a�r® -www ecofastensolar com info@ecofastensolar com 877-859-3947 15. 1 FeaTures • New and improved design' North-South adjustability • Fastest.easiest to level system on.the market •- Only one tool required.(t%2"deep well socket) • Integrated electrical bonding Vertical adjustment of 3"-4" • SIMPLE-only4 components EvaWaTeD; COMPaTiBLe. ► ODULes ModuleMarufacturer Modd.Type("x"usedto' '.Module Dimensions(mm) Module Dlmens'mspn). Downward pressure Upward Pressure Dowri4opecesivi um camp indlMe varlabletest) Deslgn Load(psfl Design Load(psf) 'Load(psf) Spacing(h) Trina Solar TSM-xxx4Px05.08. 1640 x992 x40 64.95"x39.05"•L57" 39.3. 33.3 20 72 Canadian Solar CSSP-VW 1638x922x40 6L48"x38.66"xL57" 33.3 33.9 20. '12 CanadlanSdar CS6P-1ootP 1639x982x40 '64.5'W8.7"XL57' 33.3 $3.3 20 72. JlnkoSolar JKMx;Qdx60 1650x992x40. 6AS61149.05"i1.57" 30 30 20 .72 JlnkoSolar. JKMxxxM-6D 1650x992x40 64.96"iG9.G5"xLs7" 30. 20 20 72 ' Jlnko Solar JKMiatia'R60 1650 x992 x 40 64.96"PS9.05"id.57" 30 30 ZO 72- JlnkoSolar. JKMxxXMM-60 1650x992x40• 6"W!iG9.05"x1.57"- 30 30 20 72 PIngllSolar bmP-291: 1650x990x40 6C96"x38STxL57" 30 - 30 20 72' LGEloatronlcs. LG3001AGS3' 1640x11100x35 64.57"309.97'x1.38" 30 30 20 72 LG Eledronles LG300N1K-G4 1640 x 1000 x 40 64 57"x39 37'x1.57' 30 30 20 72 Aidtee Solar. AGxxxM/15"05' 1640 x992 x40 64.5"x39.06'h1.38" an. 30 20. 48 RECOM RCM-2xx-6MB 1640x992x35 64.56"JG9A5:'iQ.37"' 30 .30 20 72 silfab- SLA211P 1650 x 990 x 38 64.96"4897'xL49" 30 30 20 72 Solaria PowerW maR40C 1621 x 1056 x 40 63.89"01.53"x1.57" 30 .30 20 -48 Hamvha--Q Calls' O,PBO G42xx - 1670 x 1000 x 32 65.75'W9.371id.25" 30 30 20. 48 Hanwha-Q Calls* 0,PR0 042xx' 16M x 1000 x 32 65.75"x99.37 id.25" 30 30 20 72 __Sunpreme' GxB-3xxT 1670x997x40- 65.75'i09.25"x1.57" '30 30 20 .48 REC REC-M-6ma. 1675x997x38 65.94"x39.25 x2.S' 20 20 20 72 REC. REC-xxx-GMa 1675x997x38 65.94149.25"&S" so' .30 20 .48. Solarworld SW xxx Mono Black 1675 x961 x33 65.95"x37.B"xL30" 20 20 20 72' Solarworld SW xxx Mono Black 1675 x961 x 93 65.95"x97.0"Wo" 30 30 20 48 •Hanwha Q-Cells 32mm modules to be used with special order Rock-It System components.Call for details. _303,>EcoFasten Solar www.ecofa.stensolarcom info@ecofastensolarcom: 877 859-39.47 16 . L Cut: Sheet -Rock-lt-4.o-Mount 1.: Installation to be completed In accordance with.manufacturer's written specifications and installation instructions. 2. See spec sheet or.contact manufacturer for detailed.material,finishes,and configuration options. 3. Contact manufacturer for detailed layout. 4. Do not scale drawings, 5. Subject to change-without notice. 0 3.17in . [80.54mmI 2:50in 63.50mm j °V v 2.02in 2.14in, 2.34in [51.38mm 1'54.37mm1 i 59.36mm; 32mm 35mm 40mm 4741 W Polk Street Ste:4 � � r;� riaL�: Phoenix,AZ 85043 Toll-Free Phone 1.888.766.4273 Toll Free Phone 1.877.859.3947 Material-See Spec Sheet Toll Free Fax 1.888.766:9994 Toll Free-Fax 1.888.766.9994 _.......--- -.. . ._ Scale: 1:2 6/28/2017 ASG: - 'EFS: x i Data Sheet Enphase Networking EnphaSe The Enphase IQ.Combiner-3'm with Enphase . IQ Envoy'"' consolidates interconnectibn- IQCombiner 3 equipment into a-single enclosure and (X=IQ-AM1-240-3) streamlines PV and'storage.installations.by providing.a consistent, pre-wired solution-for residential-applications. It offers up to four- 2-pole input circuits and.Eaton-BR series busbar assembly. Smart w �I�• •.Includes IQ-Envoy for communication and control LI, i _. . i} ! •.Flexible networking supports Wi--Fi, Ethernet,or cellular Optional'AC.receptacle available for.PLC bridge U j Provides production metering and optional consumption monitoring . : Simple _L Reduced size.from previous combiner r� �• , Centered mounting_brackets support single- stud mounting.- Supports back and,side conduit entry Up.to four Zpole branch circuits for 240 VAC 99 plug-in breakers(not included) 80 A total PV or storage branch circuits Reliable • Durable,NRTL-certified NEMA.type. 3R enclosure ��. Five-year warranty ® UL listed LISTED,. To learn more about Enphase offerings,visit enphase.com To PHAS E. t ' Enphase IQ Combiner 3 MODEL NUMBER IQ Combiner 3 X-IQ-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy'".printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2.5%). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect" CELLMODEM-03(4G/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-M1(4G based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5%). Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. BRK-10A-2-240 Circuit breaker,2 pole,.10A,Eaton BR210 BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 EPLC-01 Power line carrier(communication bridge pair),quantity 2 XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating 125 A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max.continuous current rating(input from PV) 64 A Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions(WxHxD) 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6.63").Height is 21.06"(53.5 cm with mounting brackets). Weight 7.5 kg(16.5 Ibs) Ambient temperature range -400 C to+460 C(-400 to 1151 F) Cooling Natural convection,plus heat shield Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors 60 A breaker branch input: 4 to 1/0 AWG copper conductors Main lug combined output: 10 to 2/0 AWG copper conductors Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude To 2000 meters(6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) Cellular Optional,CELLMODEM-01 (3G)or CELLMODEM-03(4G) or CELLMODEM-M1 (4G based LTE-M) (not included) COMPLIANCE Compliance,Combiner UL 1741 CAN/CSA C22.2 No.107.1 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 *Consumption monitoring is required for Enphase Storage Systems. To learn more about Enphase offerings,visit enphase.com ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. E N P H A S E. 2018-09-13 `� • 0 • -s r � O h rF . . 1 �. •�� � a u *.� ice. a°• '.s 4 �• i, - ' ^ TABLE ��� �m���uN�N������N�N����� N ��&0~�N '��� ����� CONTENTS N ��� ' H���� � M��� �������������� uon��� u a=mu=o�a=u u om�'mnm mo`o�� m �`m�m�� m mn��mnm�� Contents ' IMPORTANT SAFETY INSTRUCTIONS........................................................................................................................4 SAFETY WARNINGS &CAUTIONS ..........................................................................................................................4 ELECTRICALPRECAUTIONS....................................................................................................................................S WNECHANICA�- PRECAUTIONS-------------------------------------------. S PRODUCT INFORMATION ------------------------------------_---------- 6 OVERVIEW.------------------------------------------------------- 6 PREP & PLACE0QENT--------------------------------------------------7 REQUIRED TOOLS.............................................---------- ...... --------_--_---.------.7 PRODUCTPLACEMENT..............................................................................................................................................7 SPECIFICATIONS ---------------------------------------------------. 11 MECHANICAL/ELECTRICAL................................................................................................................................... 11 TORQUERATINGS..................................................................................................................................................... 11 WARRANTIES: Seller warrants to Buyer that products and any services furnished hereunder will be` free from defects in material,workmanship and title and will be of the kind and quality specified in Seller's written quotation.The foregoin- g ohoU apply only to failures to meet said warranties(excluding any defects in title)which'appear within two years from the date of shipment hereunder. The conditions of any tests shall be mutually agreed upon and Seller ohnU be notified of, and may be represented at all tests,that may be made.The warranties and remedies set forth herein are conditioned upon (a)proper storage, installation, use and mainbennnma, and conformance with any applicable recommendations of Seller and (b) Buyer promptly notifying Seller of any defects and, if required,_promptly making the product available for.correction. If any product of service fails to meet the foregoing warranties(except title), Seller shall thereupon correct.any such failure either ot its option, (i)by repairing defective or damaged part or parts of the products, or(ii)by making available, F.O.B,. Seller's plant or other point of shipment,any necessary repaired mr replace mmnt parts.Where a failure cannot ben corrected by Seller's reasonable efforts,the parties will negotiate an equitable adjustment in price. The preceding paragraph sets forth the exclusive remedies for claims (except as to title) based on defect in or failure. of pnodu�aoroan/iceo;whether the claim is in contnoct, indemnib/,warranty,tort(including Seller's.negligence), strict UabV|b/ or otherwise and however instituted. Upon the expiration of the warranty period, all such liability h U terminate and Buyer shall have o reasonable time,within thirty days afterthe warranty.period,to give written notice of any defects which appeared during the warranty period. Except as set forth in Article 2, "Patents," the foregoing warranties are exclusive and in lieu-of all other wmnontima, whether written, ona|, implied or statutory. NO IMPLIED STATUTORY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE SHALL APPLY. 'Seller does not warrant any products or omnvioeo of others which Buyer has designated. . vvww.soltection.com So|tectionRJ-1 Installation VNanua| Page ' L IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONSPRIOR TO INSTALLATION NOTE: SAVE THESE INSTRUCTIONS This manual contains important instructions that shall be followed during installation and maintenance of the Soltection RJ-1 rooftop junction box with flashing. LETHAL VOLTAGES ARE PRESENT DURING THE INSTALLATION, OPERATION AND SERVICE OF THIS EQUIPMENT. I.APROPER PRECAUTIONS MUST BE TAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . r SAFETY WARNINGS & CAUTIONS ■ Only qualified personnel or licensed electricians should install this product and the instructions herein are provided for those individual(s) only. ■ To reduce the risk of electric shock, injury, or death, all_electrical wiring and connections must be performed by qualified personnel. ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper precautions must be taken at all times to ensure the safety of the service personnel. • Follow state and federal Occupational Safety and Health Administration (OSHA) guidelines and regulations when installing this product. ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations as well as for installation best practices. ■ Install this apparatus in accordance with ANSI/NFPA 70, National Electrical Code (NEC)..Follow all national or local electrical codes. ■ Install, operate, and use this product in a manner consistent with the instructions provided. Failure to follow the procedures indicated may result in roof leaks, property damage, or consequential damage. www.soltection.com Soltection RJ-1 Installation Manual Page 4 NPIMMU, ELECTRICAL PRECAUTIONS Ensure all electrical conductors.are.at zero,voltage potential before installing-or servicing this unit: Never-break contact on.a circuit without using.the appropriate disconnect device. ■ Follow established lockout and.tagout procedures for all electrical conductors prior-to servicing. ■ Beware of.power lines in the vicinity of the roof,.-where.inadvertent-.contact may result in electrocution, personal injury, or death. • When.disconnecting source.or supply circuits,-provide.sufficient time.as stated in the power.electronics, manufacturer's=instruction manual in.order to ensure discharge of'all conductors in the circuit. • Always verify the integrity and proper installation of the electrical components prior to energizing electrical. circuits. ■ Non-metallic enclosures do not provide.grounding means between conduit-connections. The use of grounding,hubs and jumper wires are required. ■ -Grounding must be sized per NEC.requirements, and is the responsibility.of the installer. MECHANICAL PRECAUTIONS ■ When drilling into-an attic.space,.ensure.that: electrical wires,. mechanical obstructions, or potential electrical hazards are.removed from.. the vicinity and-direction of the.drill. Do not, install if-the .roof-is wet, frosted; or- covered by ice or snow.. ■ If any part of this product-becomes damaged- • remove.and destroy the.entirety of the unit. .Failure,to do so may result.in fire,. property damage, personal injury; electrocution, .or death. ■ Do not use the product to anchor fall protection equipment. www.soltection.com Soltection RJ-1 Installation(Manual. Page 5 PRODUCT INFORMATION OVERVIEW ■ The Soltection RJ-1 Residential Rooftop Junction Box is a flashed roof penetration designed to protect electrical conductors entering the rooftop/attic. It is made of a high-strength UV-resistant and UV- stabilized polymeric material. ■ The RJ-1 enclosures comes fully equipped with a slotted DIN rail mounted inside the enclosure designed for mounting of DIN rail accessories, such as terminal-blocks. ■ A four position ground bar is also provided as a means to form a bond between the solar array mounted on the roof and the building. CORNER SCREWS MOLDED COVER PLASTIC SCREW FOR GROUND BAR AFFIXING DIN RAIL GROUND BAR . o 0 0 0 0 MOLDED BASE DIN RAIL www.soltection.com Soltection RJ-1 Installation Manual Page 6 PREP & PLACEMENT REQUIRED TOOLS ✓ Shingle Ripper Bar ✓ Phillips Screwdriver ✓ Lumber Crayon ✓ Uni-Bit ✓ Hole Saw or Spade Bit ✓ Utility Knife ✓ Roofing.Sealant +RAFTER- -- PRODUCT PLACEMENT • Identify the location and placement.of the flashing on the_roof as shown. The product may be mounted beneath the array or adjacent to the array. DO-NOT LOCATE THE PRODUCT DIRECTLY OVER A RAFTER TO ENSURE THE RAFTER DOES NOT INTERFERE WITH THE WIRING Remove template from packaging ENTRY-INTO THE ATTIC and use in Step.2 STEP 1. www.soltection.com Soltection RJ-1 Installation Manual Page 7 WNM - d ♦ iyti' . ' iMv rib ri Y • �S{`�'Gti'�.ii• Position the top edge of the template 112" Trace and continue using a lumber crayon to the above the 1st course of shingle as shown. bottom of the 2nd course. Cut along lines and remove shingles. STEP 2 STEP 3 lk ��� ; ti.#M RECCOMENDED LOCATION FOR CONOUII ENTP.V INTO ROOF ter',''V7,,,,\,' 7 RAISED AREA INS. ± MOLDED BASE gF Remove any roofing nails beneath the 15c, 2nd,or DRILL PILOT HOLE 3ro course of tile that obstructs the position of Slide RJ-1 Junction box into place where you the roof flashing. cut shingle template.The image above shows STEP 4 where you will drill in the next step STEP 5 www.soltection.com Soltection RJ-1 Installation Manual Page'8 r' I Awl 'S yq x •�TIirxl �� c<, ;• 'j /Cars ti�+cy .P��;�•".���f:rx42c'�.lr�v��5'�y�.���"lx�,ik�i+�°vf*'�t r i�Ir,}�7x r L���171.,,'k�l�`i}•'0 t y„���27 F.� A 'fi M w•' ,.� - .. • • 0 0 • • • Remove RJ-1,flip it over,wipe it clean&apply Reinstall Unit. Use the two supplied Decking a bead of roofing sealant to the underside of the Screws to mount the flashing to the roof. flashing unit. Ensure that it's placed in the Torque to the specification indicated in the "Upside-down U"Shape to support engress specifications. Refer to Table T2(page 10)for water protection,AS SHOWN. the proper tightening torques. STEP 10 STEP 11 POPULATE RJA • Populate the RJ-1 unit using the appropriate wire connectors,terminal i` K blocks, or other necessary components. • Ensure that the components installed are rated for and are suitable for the intended purpose. • The RJ-1 unit is provided with multiple standoffs which can accommodate accessories to be mounted. Step 11 . A Install the cover onto the top of the enclosure. Tighten 4 cover screws to the Torque value indicated in Table T3(see page 10) STEP 12 www.soltection.com Soltection 11J-1 Installation Manual Page 10 t . SPECIFICATIONS MECHANICAL/ ELECTRICAL ■ Product Certifications: UL508A ■ Enclosure Rating:Type.4X ■ Attic.Conduit Pass:Through Connector Size Range: 1/2 -.1" ■ Max.Side Wall Conduit Size: 1" ■ Maximum Current: N/A ■ Maximum Voltage:N/A ■ Ambient Operating.Temperature: -35C to 75C TORQUE. RATINGS Table T1:Ground-Bar Connection;.Wire Range.:#4 to#.14, 4 Usable Connections o 0 0 'Wire Size Tightening Torque(lb- in 4-6.AWG. -35 8 AWG 30 10-14 AWG 25 Table T1 Table T2:-Mountifi Screw, Mounting to Decking, 2 Provided Ti htenin .Torque Ib4n 15-20 Table T3:Torque Values, Cover/Lid�Screws.,4 Provided, Captive [TighteningTorque Ib-in 11 www.soltection.com Soltection 11J-1 Installation Manual. Page 11 soltection TM. by vy n c kie r Soltection is a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston, TX 77029 1-866-227-0577