Loading...
HomeMy WebLinkAbout20-347 ED v Prone City of Zephyrhills PERMIT'NUMBER �_+ t 5335 Eighth Street Zephyrhills, FL 33542 BAR-000347-2020 ' F Phone: (813)780-0020 Fax: (813)780-0021 Issue Date: 07/20/2020 Permit Type: Add/Alter (Residential) Property Number Street Address 1126 21 0010 04900 0090 5843 17Th Street Owner Information Permit Information Contractor Information Name: ABRAHAM DELAMORA Permit Type:Add/Alter(Residential) Contractor: HOMEOWNER Class of Work:Add/Alter Residential Address: 5843 17Th St Building Valuation:$5,000.00 ZEPHYRHILLS,FL 33542 Electrical Valuation:$500.00 Phone: (352)999-9101 Mechanical Valuation:$800.00 Plumbing Valuation:$500.00 I —� Total Valuation:$6,800.00 Total Fees:$300.00 Amount Paid:$300.00 Date Paid:7/20/2020 3:30:58PM Project Description CONVERT GARAGE TO LIVABLE SPACE 26 X 23 Application Fees, Building Plan Review Fee $32.50 Electrical Permit Fee $45.00 Plumbing Permit Fee $45.00 Building Permit Fee $65.00 Electrical Plan Review Fee $22.50 Plumbing Plan Review Fee $22.50 Mechanical Plan Review Fee $22.50 Mechanical Permit Fee $45.00 REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner:Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. 61i CONTRA TOR SIGNATURE PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER DISCLOSURE STATEMENT FOR OWNER CITY OF ZEPHYRHILLS — BUILDING DEPARTMENT I, 0btG,LJj4A T)eA&-VVj 0�(o,- have read and fully understand and agree to the provisions of this instrument. The undersigned states and affirms that he or she is desirous of constructing, renovating, adding to or reroofing his or her own domicile, that he or she actually occupies, or will occupy by said domicile, and same is not for rent, lease or sale. That he or she shall comply with the following conditions: 1. That the owner and he or she alone shall act as the builder for all phases of construction. 2. That the owner will comply with all provisions of the City of Zephyrhills ordinances and codes pertinent to the building. 3. That in the event various phases of construction are subcontracted, he will engage only properly licensed subcontractors and will personally supervise such work. 4. That in the event the Building Inspector shall require corrections to be made, the owner will assume full responsibility to insure they are made, and upon completion will call for a reinspection before proceeding with the building. 5. That the owner shall assume full responsibility for the construction and will not expect supervision of his work from the City of Zephyrhills Building Department. 6. That prior to final inspection any additional fees, including reinspection fees, must be paid in full. A written request from this office shall constitute an official notice to pay additional fees. 7. That the owner shall comply with all City, State and Federal laws in regard to social security, workman's compensation, lien laws, etc., where applicable. 8. That the owner shall comply with all the safety codes issued by the Florida Industrial Commission. 9. State law requires construction to be done by licensed contractors. You have applied for a permit under an exemption to that law. The exemption allows you, as the owner of your property, to act as your own contractor with certain restrictions even though you do not have a license. You must provide direct onsite supervision of the construction yourself. You may build or improve a one-family or two-family residence or a farm outbuilding. You may also build or improve a commercial building, provided your costs do not exceed $75,000. The building or residence must be for your own use or occupancy. It may not be built or substantially improved if for sale or lease, which is a violation of this exemption. You may not hire an unlicensed person to act as your contractor or to supervise people working on your building. It is your responsibility to make sure that people employed by you have licenses required by state law and by county or municipal licensing ordinances. You may not delegate the responsibility for supervising work to a licensed contractor who is not licensed to perform the work being done. Any person working on your building who is not licensed must work under your direct supervision and must be employed by you, which means that you must deduct F.I.C.A. and withholding tax and provide worker's compensation for that employee, all as prescribed by law. Your construction must comply with all applicable laws, ordinances, building codes, and zoning r gulations. OWNER'S SIGNATURE DATE — -2b2o ADDRESS !; �k k (lS C- PHONE WITNESS An PERMIT I/Masterforms/OwnersAffidavit/NovO7 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 ' Building Department Date Received —7_,q_ 02f) _ Phone Contact for Permitting Owner's Name Owner Phone Number Owner's Address Ls, L 335q Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS ,—! ' "- ! LOT# SUBDIVISION PARCEL ID# (OBTAINED FROM PROPERTY TAX NOTICE) WORK-PROPOSED NEW CONSTR ADD/ALT Q SIGN Q Q DEMOLISH R INSTALL REPAIR PROPOSED USE = SFR 0 COMM Q OTHER . TYPE OF CONSTRUCTION [►� BLOCK FRAME = STEEL = DESCRIPTION OF WORK � A, 67 r V' `f' 0 r\- BUILDING SIZE 2e X23 SO FOOTAGE S HEIGHT �I =BUILDING $ Gad VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE = PROGRESS ENERGY 0 W.R.E.C. =PLUMBING Is S©0 I =MECHANICAL S �Q VALUATION OF MECHANICAL INSTALLATION} '` =GAS = ROOFING Q.. SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE�AREA =YES"'' NO BUILDER COMPANY D wt SIGNATURE REGISTERED Y/.N;` FEE CURREN Address License,# All ELECTRICIAN COMPANY SIGNATURE GISTERED Y/ N.,. :.,_,'FEE C.URREh Y/N Address License'# PLUMBER COMPANY Ql Gt/ r -SIGNATURE ������ ISTE�RED Y/'N. FEE CURREN Y%N Address / `Licerise#- MECHANICAL COMPANY SIGNATURE REGISTERED Y/ N"''' FEE CURREN Y/N Address License# OTHER SIGNATURE4d_zwiii� f7IRFG1STERED Y/ N. FEE CURREN Y/N Address 6- License# RESIDENTIAL Attach(2)Plot Plans;(2),sets:of,Building Plans;(1)set.of Energy Forms;R-O,W.Permit for new construction, Minimum ten(10)working days after submittal date: Required onsite;Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life.Safety Page;-(I)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working.days.after.submittal date. Required onsite,Construction Plans;:Stormwater Plans w/Silt Fence installed, Sanitary Facilities&'1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. "•'PROPERTY,SURVEY required for all NEW construction. `Directions: - ' Fill out application completely. Owner&Contractor sign.back of application,notarized If over$2500,a Notice of Commencement is required. (AIC upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles "ServicetUpgrad"-NC,"' "Fences(Plot/Survey/Footage) Driveways-Not oveft Counter if on'public road ways..needs,ROW 4 NOTICE'OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: -If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If.the contractor is not licensed as required by law, both the-owner and contractor may cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing.requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractors) sign portions of the "contractor Block" of this application for which they will be responsible. if.you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees-and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also.-understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance: Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to,permit.issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION.LIEN LAW(Chapter 713 Florida Statutes, as amended): If valuation of work is$2,500.00 or more, I certify that I, the applicant, have been provided-with a, copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner", I certiN.-that[have obtained'a copy of the above.described document and promise in good faith to deliver it to the"owner" prior to commencement.,.. CONTRACTOR'S/OWNER'S;AFFIDAVIT::.I certify:that all,the information in this application is accurate and.that all work will be done in compliance with all..applicable laws regulating.construction, zoning and land-development. Application is hereby .made to obtain a permit to do work'and" installation as indicated. I.,certify that no work.or installation has commenced.prior to.issuance of a permit and that.all work will be.performed to meet standards of all laws regulating construction; County._and City-codes,, zoning regulations,: and land''develo'pment-regulations in the jurisdiction. I also certify that l.understand that the regulations of other government agencies may apply to.the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: Department of.Environmental Protection-Cypress Bayheads, Wetland Areas.and Environmentally Sensitive Lands,-WaterMastewater Treatment. Southwest Florida Water Management District-Wells, cypress: Bayheads, Wetland Areas, Altering .Watercourses. Army Corps of Engineers-Seawalls; Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental 'Health Unit Wells; Wastewater Treatment, Septic Tanks. - US`Environmental.Protection AgencyAsbestos abatement. - , Federal Aviation Authority-Runways." I understand that-the following restrictions apply to the use of fill: Use of fill is not allowed in Flood,Zone.W"unless expressly permitted. - If the- fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the'State of Florida. . If,the fill material.is to be used'in Flood Zone "A in connection:with a-permitted,building .using stem wall consttuction;,l certify that fill will be used only to fill the area within the stem'wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties.-.,;If use.of-fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1). ..acre-which.are,.elevated by fill, an.engineered draina9e plan is required. , If I aim the:AGENY-`FOR':THE.-OW NER, I promise in good faith to inform the:owner of the permitting conditions set forth in this affidavit':priorao'-conimeneing.construction. I understand that a'separate permit.may be required for electrical work, plumbing;y:signs, wells :;pools-air"conditioning, gas, or other installations not.specifically included in the,application. A. permit issued shall,bey-construed to.be a license to proceed with the.work and not as authority to violate, cancel, alter, or set aside';any."provisions,,:of.the'technical.codes, nor shall issuance of..a permit prevent.the,Building Official from-thereafter requiring:a correction=of errors in plans, construction or violations'of any codes Every-permit issued shall become invalid unless tf e;work:authorized by,.such'permit is commenced within six months of permit issuance, or if work authorized,by the perrl it'-is suspended-or abandoned for a.period of six-.(6)months after1he time the work is commenced. An extension may be requested, in writing,:;from,,the Building Official for a:period-not to exceed ninety (90) days and will demonstrate justifiable cause forth"e.'extension' 'I work ceases.for ninety(90)consecutive days,the job is considered abandoned. WARNING TO.OWlI..YOUR-;.FAILURE-:TO RECORD A NOTICE.OF.COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE-FOR'iMPROVEMENTS.T YOUR'PROPERTY.:IF YOU1NTEND TO OBTAI NG, CONSULT WITH YOUR LENDER'OR AN•� ` :•O ,iRECORDING,-YOURiNOTIG ;CO ENCEMEN FLORIDA JURAT(F:S. OWNER OR AGEN CONTRACTOR bsc ed nd sw aorWrrQdcT)before a this S rib land sworn r affi ed)before I is 11�by YVI Q _��by at lM o s/arefersop�l(y known to me or has/hav duced Wh i are pers ally kn t e or has/have produced +'L �( ` as identification. as-Identification. Notary Public Notary Public Commission No. Commission No. /+ f CL C/o Name of Nota t ed, t Name of Notary c wiioi�roia CARLOS MALDONADO ;;:�""%4 •• CARLOS MALDONADO lg. '"; Commission#GG 346275 Commission#GG 346275 Expires June 18,2023 ;, Pq`.= Expires June 18,2023 Bonded Thm Troy Fain Insurance 800-385-7019 "9°.IR°' Bonded Thru Troy Fain Insurance 800.385.7019 1 ' City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: Y-A k, Date Received: b � Site: -�-S V 3 174 k S-) -- PermitType: -e— (c) Approved Who comments:❑ Approved w/the below comments: Denied w/the below comments: ❑ This comment sheet shall be kept with the permit and/or plans. JUL 5 2070 Ka itzer—Plans Examiner Date Contractor d/or=ents '(Required when are present) 1 r , FORM R405-2017 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance)Method Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the residential Simulated Performance Method shall include: ❑ This checklist ❑ A Form R405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report(one page)and an input summary checklist that can be used for field verification (usually four pages/may be greater). ❑ Energy Performance Level(EPL)Display Card(one page) . ❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 ❑ Mandatory Requirements(five pages). . Required prior to CO for the Performance Method: .❑ - Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report(usually one page) ❑ If Form R405 duct'leakage type indicates anything other than "default leakage" then a completed, Form R405 Duct Leakage Test Report(usually one page) 7/31/201 9 1 1:57:04 AM EnergyGauge®USA 6.0.03,(Rev.,1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software 'Page 1 of 1 FORM 13405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department,of Business and Professional Regulation - Residential Performance Method Project Name: Abraham-5843 17th St Builder Name: Street: 5843 17th St Permit Office:•:Zephyrhills City,State,Zip: Zephyrhills, FL,33542.. Permit-Number:141 Owner: Jurisdiction: 611600 Design Location: FL, Lakeland County: Pasco(Florida Climate Zone 2) 1. New construction or existing Addition 9. Wall Types(760:0 sgft.) Insulation Area 2. Single family or multiple family Single-family a. Face Brick-Block, Exterior R=4.1 760.00 ftz b. N/A R= ftz 3. Number of units,if multiple family 1 c. N/A R= ftz 4. Number of Bedrooms(Bedrms In Addition) 1(1) d. N/A R=. ftz 10.Ceiling Types (598.0 sgft.) Insulation Area 5. Is this a worst case? No a. Under Attic(Vented) R=30.0 598.00 ftz 6. Conditioned floor area above grade(ftz)' 598 -b. N/A'. R= ftz Conditioned floor area below grade(ftz) 0 c. N/A R= ftz 11.Ducts R ftz 7. Windows(30.0 sgft.) Description Area a. U-Factor: Dbl, U=0.57 30.00 ftz SHGC: SHGC=0.24 b. U-Factor: N/A {tz 12.Cooling systems 'kBtu/hr Efficiency SHGC: a.Central Unit - 9.0..SEER:18.00 c. U-Factor: N/A ftz SHGC: 13. Heating systems kBiu/hr Efficiency d. U-Factor: N/A ftz a. Electric Heat Pump 9.0 HSPF_:8.50 SHGC: Area Weighted Average Overhang Depth: 2.000 ft. Area Weighted Average SHGC: 0.240 14. Hot water systems-Replacement equipment 8. Floor Types (598.0 sgfi.) Insulation Area a. Electric ' Cap:40 gallons EF:0.950 a.Slab-On-Grade Edge Insulation R=0.0 598.00 ftz b. Conservation features b.N/A R= ftz None c. N/A R= ftz 15.Credits Pstat Glass/Floor Area: 0.050 Total Proposed Modified Loads: 15.06 PASS Total Baseline Loads: 20.16 I hereby certify that the plans and specifications covered by Review of the plans and O��[IiE S��?� this calculation are in compliance with the Florida Energy specifications covered bythis Code. calculation indicates compliance with the Florida Energy Code. PREPARED BY("! � � E-Calcs Plus, Inc. Before construction is completed DATE: July 15:202o this buildin will be inspected for compliance with Section 553.908 I hereby certify that this building, as designed,is in compliance Florida Statutes. with the Florida Energy Code. G'OD WE's¢`� OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handler unit manufacturer that the air handier enclosure qualifies as certified factory-sealed in accordance with R403.3.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2).(Exception may apply) 7/15/2020 8:25 AM EnergyGauge®USA 6.0.&(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: Abraham-584317th St Bedrooms: 1 Address Type: Street Address Building Type: User Conditioned Area: 598 Lot# Owner Name: Total Stories: 1 Block/Subdivision: #of Units: 1 Worst Case: No PlatBook: Builder Name: Rotate Angle: 0 Street: 5843 17th St Permit Office: Zephyrhills Cross Ventilation: No County: Pasco Jurisdiction: 611600 Whole House Fan: No City,State,Zip: Zephyrhills, Family Type: Single-family FL, 33542 New/Existing: Addition Comment: CLIMATE / Design Temp I,nt Design Temp Heating Design Daily Temp Design Location TMY Site 97.5% 2.5% Winter Summer Degree Days Moisture Range FL, Lakeland FL_LAKELAND_LINDER 34 92 70 75 973 48 Medium BLOCKS Number Name Area Volume 1 Entire House 598 5980 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 Addition BA 99 990 No 0 1 Yes Yes Yes 2 Addition Utility 108 1080 No 0 1 Yes Yes Yes 3 Adition BR 391 3910 No 2 1 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulatio Addition BA 11 ft 0 99 ft2 ____ 1 0 0 2Slab-On-Grade Edge Insulatio Addition Utility 21 ft 0 108ft2 ____ 1 0 0 3 Slab-On-Grade-Edge Insulatio Adition BR 44 ft 0 391 ft2 ---- 1 0 0 ROOF Roof ,_ Gable Roof Rad Solar SA Emitt Emitt Deck Pitch Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 Gable or Shed Composition shingles 616 ft2 74 ftz Medium N 0.8.5. - No 0.9 No 0 14 ATTIC V # . Type Ventilation Vent Ratio(1 in) Area RBS IRCC 1 Full attic Vented 150 598 ft2 N N 7/15/2020 8:25 AM EnergyGauge®USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 2 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic(Vented) Addition BA 30 Blown 99 ft2 0.1 Wood 2 Under Attic(Vented) Addition Utility 30 Blown 108 ft2 0.1 Wood 3 Under Attic(Vented) Adition BR 30 Blown 391 ft2 0.1 Wood WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Below Ornt TO Wall Typeo 1 W Exterior Face Brick-Block Addition BA 4.1 11 0 10 0 110.0 ft2 0 0 0.41 0 2 S Exterior Face Brick-Block Addition Utilit 4.1 9 0 10 0 90.0 ft2 0 0 0.41 0 3 W Exterior Face Brick-Block Addition Utilit 4.1 12 0 10 0 120.0 ft2 0 0 0.41 0 4 N Exterior Face Brick-Block Adition BR 4.1 4 0 10 0 40.0 ft2 0 0 0.41 0 5 E Exterior Face Brick-Block Adition BR 4.1 23 0 10 0 230.0 ft2 0 0 0.41 0 6 S Exterior Face Brick-Block Adition BR 4.1 17 0 10 0 170.0 ft2 0 0 0.41 0 WINDOWS Orientation shown is the entered,Proposed orientation. Wall Overhang V # Ornt ID Frame Panes NFRC U-Factor SHOO Imp Area Depth Separation Int Shade Screening 1 E 5 Metal Low-E Double Yes 0.57 0.24 N 30.0 ft2 2 fi 0 in 0 ft 6 in None None INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000445 697.7 38.3 72.03 .1637 7 - HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/Suppleme Split Singl HSPF:8.5 - 9 kBtu/hr 1 Ductless COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/Supplemental for Split Sing[ SEER:18 9 kBtu/hr cfm 0.7 1 Ductless HOT WATER SYSTEM # System Type SubType Location EF Cap Use Set Pni Conservation 1 Electric None Exterior 0.95 40 gal 40 gal 120 deg None 7/15/2020 8:25 AM EnergyGauge®USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 3 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT SOLAR HOT WATER SYSTEM FSEC Collector Storage Cerl # Company Name System Model# Collector Model# Area Volume FEF None None ftz TEMPERATURES Programable Thermostat: Y Ceiling Fans: CoolingJan Feb Mar Apr May Jun X Jul rl Au rl Se [ ]Oct Nov Dec Heatin Jan Feb Mar f APr May, Jun 4 Jul AuSep [ ]Oct Nov DecVentin Jan Feb X Mar [X]A r [ Ma Jun [ Jul Aug Se .; Pq Oct X Nov Dec Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 60 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 '68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 66 68 68 PM 68 68 68 68 68 68 68 66 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ftz 0 ft 0.3 Addition BA Default(8 Ibs/sq.ft. ftz ft 0.3 Addition Utility Default(8 Ibs/s .ft. ftz ft 0.3 Adition BR 7/15/2020 8:25 AM EnergyGauge®USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 4 of 4 2017 EPL DISPLAY CARD ' ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* =75 The lower the Energy Performance Index, the more efficient the home. 1. New home or, addition 1. Addition 12. Ducts, location&insulation level a)Supply ducts R 2. Single-family or multiple-family 2. Single-family b) Return ducts R c)AHU location 3. No.of units(if multiple-family) 3. 1 4. Number of bedrooms 4. 1 13. Cooling system: Capacity 9.0 a)Split system SEER 18.0 5. Is this a worst case?(yes/no) 5. No b)Single package SEER c)Ground/water source SEER/COP 6. Conditioned floor area(sq. ft.) 6. 598 d) Room unit/PTAC EER e)Other 7. Windows,type and area a)U-factor:(weighted average) 7a. 0.570 b) Solar Heat Gain Coefficient(SHGC) 7b. 0.240 14. Heating system: Capacity 9.0 c)Area 7c. 30.0 a)Split system heat pump HSPF 8.5 b)Single package heat pump HSPF 8. Skylights c) Electric resistance COP a) U-f actor:(weighted average) 8a. NA d) Gas furnace, natural gas AFUE b) Solar Heat Gain Coefficient(SHGC) 8b. NA e) Gas furnace, LPG AFUE f)Other 9. Floor type,insulation level: a) Slab-on-grade(R-value) 9a. 0.0 b)Wood, raised (R-value) 9b. 15. Water heating system c)Concrete, raised (R-value) 9c. a) Electric resistance EF 0.95 b) Gas fired, natural gas EF 10.Wall type and insulation: c) Gas fired, LPG EF A. Exterior: d) Solar system with tank EF 1.Wood frame (Insulation R-value) 10A1. e) Dedicated heat pump with tank EF 2. Masonry(Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec% B.Adjacent: g)Other 1.Wood frame(Insulation R-value) 10131. 2. Masonry(Insulation R-value) 10132. 16. HVAC credits claimed (Performance Method) 11. Ceiling type and insulation level a) Ceiling fans a) Under attic 11 a. 30.0 b)Cross ventilation No b) Single assembly 11 b. c)Whole house fan No c) Knee walls/skylight walls 11 c. d) Multizone cooling credit d) Radiant barrier installed 11 d. No e) Multizone heating credit f) Programmable thermostat Yes *Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation,if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy saving features which will be installed (or exceeded) in this home before final inspection.Otherwise, a new EPL display card will be completed based on installed code compliant features. Builder Signature: Date: Address of New Home: 5843 17th St City/FL Zip: Zephyrhills, FL 33542 7/15/2020 8:25:50 AM EnergyGauge®USA 6.0.04(Rev.1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1 Florida Building Code, Energy Conservation, 6th Edition (2017) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods ADDRESS: 5843 17th St Permit Number: Zephyrhills, FL,33542 MANDATORY REQUIREMENTS See individual code sections for full details. SECTION R401 GENERAL R401.3 Energy Performance Level(EPL)display card(Mandatory)The building official shall require that an energy performance level(EPL)display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law(Section 553.9085, Florida Statutes)requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building.A copy of the EPL display card can be found in Appendix RD. R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402.4.5. Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to comply with Section C402.5. R402.4.1 Building thermal'enveldom building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. ® R402.4.1.1 InstallationThe components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table R402.4.1,1,as applicable to the method of construction.Where required by the code official,an approved third party,shall inspect all components and verify compliance. ❑ R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air changes per hour in Climate Zones 1 and 2,and three air changes per hour in Climate Zones 3 through 8.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure.of 0.2 inch w.g.(50 pascals).Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statutes,or,individuals licensed as set forth in Section 489.105(3)(f), (g)or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Exception: Testing is not required for additions,alterations,renovations,or repairs,of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors,fireplace and stove doors shall be closed, but not sealed,beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures. 3.Interior doors,if installed at the time of the test,shall be open. 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems,if installed at the time of the test,shall be turned off. 6.Supply and return registers,if installed at the time of the test,shall be fully open. ❑ R402.4.2 Fireplaces. New wood-burning fireplaces shall have tight-fitting flue dampers or doors,and outdoor combustion air.Where using tight-fitting doors on factory-built fireplaces listed and labeled in accordance with UL 127,the doors shall be tested and listed for the fireplace.Where using tight-fitting doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907. ® R402.4.3 Fenestration air IeakagdNindows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot(1.5 Us/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400 or AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. Exception: Site-built windows,skylights and doors. 7/15/2020 8:26 AM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 5 MANDATORY REQUIREMENTS - (Continued) ❑R402.4.4 Rooms containing fuel-burning appliances. In Climate Zones 3 through 8,where open combustion air ducts provide combustion air to open combustion fuel burning appliances,the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room,isolated from inside the thermal envelope.Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2,where the walls,floors and ceilings shall meet not less than the basement wall R-value requirement.The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403.The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential. ❑R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not more than 2.0 cfm(0.944 Us)when tested in accordance with ASTM E283 at a 1.57 psf(75 Pa)pressure differential.All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. SECTION R403 SYSTEMS R403.1 Controls. ❑ R403.1.1 Thermostat provision(Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. ❑ R403.1.3 Heat pump supplementary heat(Mandatory). Heat pumps having supplementary electric-resistance heat shall have controls that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load. ❑ R403.3.2 Sealing(Mandatory) All ducts,air handlers,filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered ducts or plenum chambers,shall be constructed and sealed in accordance with Section 0403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553,993(5)or (7), Florida Statutes,or individuals licensed as set forth in Section 489,105(3)(f), (g)or(i), Florida Statutes,to be"substantially leak free"in accordance with Section R403.3.3. ® R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design airflow rate when tested in accordance with ASHRAE 193. ❑ R403.3.3 Duct testing(Mandatory).Ducts shall be pressure tested to determine air leakage by one of the following methods: 1. Rough-in test:Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa)across the system,including the man air handler enclosure if installed at the time of the test.All registers shall be taped or otherwise sealed during the test. 2. Postconstruction test:Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa)across the entire system,including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. ❑R403.3.5 Building cavities(Mandatory). Building framing cavities shall not be used as ducts or plenums. ❑R403.4 Mechanical system piping insulation(Mandatory). Mechanical system piping capable of carrying fluids above 105°F(41°C)or below 55°F(13°C)shall be insulated to a minimum of R-3. ❑ R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage,including that caused by sunlight,moisture,equipment maintenance and wind,and shall provide shielding from solar radiation that can cause degradation of the material.Adhesive tape shall not be permitted. ❑ R403.5.1 Heated water circulation and temperature maintenance systems(Mandatory)Heated water circulation systems shall be in accordance with Section R403.5,1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls,temperature sensors and pumps shall be accessible.Manual controls shall be readily accessible. R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump.The system return pipe ❑ shall be a dedicated return pipe or a cold water supply pipe.Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy,The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. ❑ R403.5.1.2 Heat trace systems.Electric heat trace systems shall comply with IEEE 515.1 or UL 515.Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. 7/15/2020 8:26 AM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 2 of 5 MANDATORY REQUIREMENTS - (Continued) R403.5.5 Heat traps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets, External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3 1/2 inches(89 mm)in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies(Mandatory). R403.5.6.1.1 Automatic controls. Service water-heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum temperature setting range shall be from 100°F to 140OF(38°C to 600C). ❑ R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off.A separate valve shall be provided to permit the energy supplied to the main burner(s)of combustion types of service water-heating systems to be turned off. ® R403.5.6.2 Water-heating equipment. Water-heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation,Commercial Provisions,for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water-heating category.Solar water heaters shall meet the criteria of Section R403.5.6.2.1. R403.5.6.2.1 Solar water-heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors, and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol.Collectors in installed solar water-heating systems should meet the following criteria: 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal;and 2. Be installed at,an orientation within 45 degrees of true south. El R403.6 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code,Residential,or Florida Building Code,Mechanical,as applicable,or with other approved means of ventilation including:Natural,Infiltration or Mechanical means.Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. ® R403.6.1 Whole-house mechanical ventilation system fan efficacy.When installed to function as a whole-house mechanical ventilation system,fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where whole-house mechanical ventilation fans are integral to tested and listed HVAC equipment,they shall be powered by an electronically commutated motor. R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation shall meet the following criteria: 1, The design air change per hour minimums for residential buildings in ASHRAE 62.2,Ventilation for Acceptable Indoor Air Quality,shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall he provided to conditioned space from attics, crawlspaces,attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3. If ventilation air is drawn from enclosed space(s);then the walls of the space(s)from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19,space permitting,or R-10 otherwise. R403.7 Heating and cooling equipment(Mandatory). R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and indoor units(if split system)shall be submitted alorig with the sensible and total cooling capacities at the design conditions described in Section R302.1.This Code does not allow designer safety factors,provisions for future expansion or other factors that affect equipment sizing.System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed, TABLE R403.6.1 WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM MINIMUM EFFICACY a AIRFLOW RATE MAXIMUIV (CFM) (CFM/WATT) (CFM) Range hoods Any 2.8 cfm/watt Any In-line fan Any 2.8 cfm/watt Any Bathroom,utility room 10 1.4 cfm/watt <90 Bathroom,utility room 90 2.8 cfm/watt Any For SI:1 cfm=28.3 Umin. a. When tested in accordance with HVI Standard 916 7/15/2020 8:26 AM EnergyGauge®USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 3 of 5 MANDATORY REQUIREMENTS - (Continued) ElR403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section 403.7,or the closest available size provided by the manufacturer's product lines.The corresponding latent capacity of the equipment shall not be less than the calculated latent load. The published value for AHRI total capacity is a nominal,rating-test value and shall not be used for equipment sizing.Manufacturer's expanded performance data shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry-bulb temperature for the load calculation(or entering water temperature for water-source equipment),the blower CFM provided by the expanded performance data,the design value for entering wet-bulb temperature and the design value for entering dry-bulb temperature. Design values for entering wet-bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s)is installed in an unconditioned space, Exceptions: 1. Attached single-and multiple-family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida-registered engineer,in attached single-and multiple-family units,the capacity of equipment may be sized in accordance with good design practice. R403.7.1.2 Heating equipment capacity. R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section R403.7.1.1,and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.7.1. R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.7.1. R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. ❑ R403.8 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403. R403.9 Snow melt and ice system controls(Mandatory) Snow-and ice-melting systems,supplied through energy service to the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F(10°C),and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40QF(4.8°C). ❑ R403.10 Pools and permanent spa energy consumption(Mandatory). The energy consumption of pools and permanent spas shall be in accordance with Sections R403.10.1 through R403.10.5. R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on-off switch that is an integral part of the heater mounted on the exterior of the heater,or external to and within 3 feet(914 mm)of the heater.Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater.Gas-fired heaters shall not be equipped with continuously burning ignition pilots. ❑ R403.10.2 Time switches.Time switches or other control methods that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors.Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operation. 2. Pumps that operate solar-and waste-heat-recovery pool heating systems. 3. Where pumps are powered exclusively from on-site renewable generation. ❑ R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor-retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating,computed over an operation season,is from site-recovered energy,such as from a heat pump or solar energy source,covers or other vapor-retardant means shall not be required. ❑ R403.10.4 Gas-and oil-fired pool and spa heaters. All gas-and oil-fired pool and spa heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013,when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. 7/15/2020 8:26 AM EnergyGaugeO USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 4 of 5 R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard. ® R403.11 Portable spas(Mandatov%e energy consumption of electric-powered portable spas shall be controlled by the requirements of APSP-14. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS R404.1 Lighting equipment(Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be high-efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high-efficacy lamps. Exception:Low-voliage lighting. R404.1.1 Lighting equipment(Mandatory)Fuel gas lighting systems shall not have continuously burning pilot lights. 7/15/2020 8:26 AM EnergyGauge@ USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 5 of 5 2017 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Abraham-5843 17th St Builder Name:. Street: 5843 17th St Permit Office: Zephyrhills City,State,Zip: Zephyrhills,FL,33542 Permit Number: Y U Owner: Jurisdiction: 611600 W S Design Location: FL, Lakeland U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. The air barrier in any dropped ceiling/soffit shall be aligned with the The insulation in any dropped ceiling/soffit Ceiling/attic insulation and an gaps in the air barrier shall be sealed. Y 9 p shall be aligned with the air barrier. Access openings,drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity with sealed. a material having a thermal resistance of R-3 per Knee walls shall be sealed. inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows,skylights The space between window/doorjambs and framing,and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above-garage subfloor decking,or floor framing cavity insulation and cantilevered shall be permitted to be.in contact with the top side floors) of sheathing,or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts,penetrations Duct shafts,utility penetrations,and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit,or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls,or insulation that on installation readily conforms to available space shall Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air-sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub-floor or drywall. [Concealed When required to be sealed,concealed fire sprinklers shall only be rinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire qnronkler cover dates and walls or ce*14nos. a.In addition,inspection of log walls shall be in accordance with the provisions of ICC-400. 7/15/2020 8:26 AM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 1 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: 611600 Permit#: Job In Builder:" Community: Lot: NA Address: 5843 17th St City: Zephyrhills State: FL Zip: 33542 Air Leakage,Test Re' sultS Passing results must rrteet either the Performance,Prescriptive,or ERl Method O "PRESCRIPTIVE METHOD-The building or dwelling unit"shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per,hour at a pressure of 0.2 inch mg..(50 Pascals)in Climate Zones 1"and 2. Q' PERFORMANCE or ERI METHOD-The.building or dwelling unit'shall be'tested`and verified as haying an air leakage:"rate of not exceeding the selected ACH(50)value,as shown on Form R405-2017(Performance)or R406-2017-.(FRI),section-labeled as infiltration,sub-section ACH50. ACH(50)specified.on Form R405-2017-Energy,,Ga1c(Performance)or R40672017;(ERI):, 7.000 x 60 _ 5980 = Method for calculating building volume: CFM(50) Building Volume ACH(50) O Retrieved from architectural plans 1-1 PASS 19 Code software calculated When ACH(50)is less than 3, Mechanical Ventilation installation O Field measured and calculated must be verified by building department. R402.4.1.2 Testing.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7),Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f),(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors,fireplace and stove doors shall be closed, but not sealed,beyond the intended weatherstripping or other infiltration control measures. 2.Dampers including exhaust,intake, makeup air,back draft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures. 3.Interior doors,if installed at the time of the test,shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems,if installed at the time of the test,shall be turned off. 6. Supply and return registers, if installed at the time of the test,shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 7/15/2020 8:26:24 AM EnergyGaugeO USA 6.0.04(Rev.1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1 Manual 5 Compliance Report Job: Abraham-684317tnSt E-Calcs Date: Jul 14,2020 Plus,Inc. Entire House By: E-Caics Plus,Inc. E-Calcs Plus, Inc. 9250 Corkscrew Rd,Suite 8,Estero,FL 33928 Phone:239.810.6106 Email:edca_ecalcsplus.com Web:www.ecalcsplus.com License:HERS Rater ID 0757810 • S 1 For: Abraham-5843 17th St, Abraham Servindelamora 5843 17th St, Zephyrhills, FL Zooling Equipmen Design Conditions Outdoor design DB: 91.9°F Sensible gain: 6913 Btuh Entering coil DB: 75.0°F Outdoor design WB: 75.3°F Latent gain: 1289 Btuh Entering coil WB: 62.5°F Indoor design DB: 75.0°F Total gain: 8201 Btuh Indoor RH: 50% Estimated airflow: 300 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split ASHP Manufacturer: Mitsubishi Electric Model: MUZ-HM09NA2***+MSZ-HM09NA*** Actual airflow: 300 cfm Sensible capacity: .7397 Btuh 107%of load Latent capacity: 1534 Btuh 119%of load Total capacity: 8931 Btuh 109%of load SHR: 83% Heathjq • • Design Conditions Outdoor design DB: 20.2°F Heat loss: 14798 Btuh Entering coil DB: 70.0°F Indoor design DB: 70.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split ASHP Manufacturer: Mitsubishi Electric Model: MUZ-HM09NA2***+MSZ-HM09NA*** Actual airflow: 300 cfm Output capacity: 10900 Btuh 74%of load Capacity balance: 33 OF Supplemental heat required: 3898 Btuh Economic balance: -99 OF . Meets all requirements of ACCA Manual S. -( wrightsofit- 2020-111-15 07:13:50 Right-Suite®Universal 2019 19.0.20 RSU28254 Pagel ACCA ..43 17th StXAbraham-5843 17th St 7.14.2020.rup Calc=MJ8 Front Door faces: E Project Summary Job: Abraham-5843 17th St E_CalcSEntire Date: Jul 14,2020 E n tl re H O u S e By: E-Calcs Plus,Inc. b Plus,Inc. E-Calcs Plus, Inc. 9250 Corkscrew Rd,Suite 8,Estero,FL 33928 Phone:239.810.6106 Email:eric@ecalcsplus.com Web:www.ecalcsplus.com License:HERS Rater ID 0757810 Pro"ect Information For: Abraham -5843 17th St, Abraham Servindelamora 5843 17th St, Zephyrhills, FL Notes: Desicin Information Weather: :Washington R. Reagan AP, DC, US Winter Design Conditions Summer Design Conditions Outside db 20 OF Outside db 92 OF Inside db 70 OF Inside db 75 OF Design TD 50 OF Design TD 17 OF Daily range M Relative humidity 50 % Moisture difference 41 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 14798 Btuh Structure 6913 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 14798 ,Btuh Use manufacturer's data y Rate/swing multiplier 1.00 Infiltration Equipment sensible load 6913 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 1289 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ft2) 598 598 Equipment latent load 1289 Btuh Volume(ft3) 5980 5980 Air changes/hour 0.61 0.32 Equipment Total Load (Sen+Latj 8201 Btuh Equiv. AVF(cfm) 61 32 Req. total capacity at 0.70 SHR 0.8 ton Heating Equipment Summary Cooling Equipment Summary, Make Mitsubishi Electric Make Mitsubishi Electric Trade Mitsubishi Electric Trade Mitsubishi Electric Model MUZ-HM09NA2*** Cond MUZ-HM09NA2*`* AHRI ref 201754644 Coil MSZ-HM09NA*** AHRI ref 201754644 Efficiency 8.5 HSPF Efficiency 12.0 EER, 18 SEER Heating input: Sensible cooling 6300 Btuh Heating output 10900 Btuh @;470F Latent cooling 2700 Btuh . Temperature rise 33 OF Total cooling 9000 Btuh Actual air flow 300 cfm Actual air flow 300 cfm Air flow factor 0.020 cfm/Btuh Air flow factor 0.043 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.84 Capacitybalance point=33 OF Backup: Carrier AFUE 100 Input= 10 kW, Output=34121 Btuh, 100 AFUE Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. a, 41A- wNghtsolPt� 2020-Jul-15 07:13:50 a•,•-�, Right-Suite@ Universal 2019 19.0.20 RSU28254 Page l ACCA ...43 17th StlAbraham-5843 17th St 7.14.2020.rup Calc=MJ8 Front Door faces: E Load Short Form Job: Abraham-5843 170n St E-CalcS Date: Jul 14,2020 Plus,Inc. Entire House By: E-Calcs Plus,Inc. E-Calcs Plus, Inc. 9250 Corkscrew Rd,Suite 8,Estero,FL 33928 Phone:239.810.6106 Email:er c@ecalcsplus.com Web:www.ecaicsplus.com License:HERS Rater ID 0757810 Project • • For: Abraham-5843 17th St,Abraham Servindelamora 5843 17th St, Zephyrhills, FL Design Information Htg Clg Infiltration Outside db(°F) 20 92 Method Simplified Inside db(OF) 70 75 Construction quality Average Design TD(OF) 50 17 Fireplaces 0 Daily range - M Inside humidity(%) 50 50, Moisture difference(gr/lb) 43 41 HEATING EQUIPMENT. COOLING EQUIPMENT Make Mitsubishi Electric Make Mitsubishi Electric Trade Mitsubishi Electric Trade Mitsubishi Electric Model MUZ-HM09NA2*** Cond MUZ-HM09NA2*** AHRI ref. 201754644 Coil MSZ-HM09NA*** AHRI ref 201754644 Efficiency 8.5 HSPF Efficiency 12.0 EER, 18 SEER Heating input Sensible cooling 6300 Btuh Heating output 10900 -Btu h@470F Latent cooling 2700 Btuh Temperature rise 33 OF Total cooling 9000 Btuh Actual air flow 300 cfm Actual air flow 300 cfm Airflow factor 0.020 cfm/Btuh Air flow factor 0.043 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.84 Capacitybalance point=33 OF Backup: Carrier AFUE 100 Input= 10 kW Output=34121 Btuh 100 AFUE ROOM,NAME Area Htg load Clg load Htg AVF Clg AVF (fF) (Btuh) (Btuh) (cfm) (cfm) Addition BA 99 2069 1305 42 57 Addition Utility 108 3822 1670 77 72 Adition BR 391 8908 3938 181 171 Entire House d 598 14798 6913 300 300 Other equip loads 0 0 Equip. @ 1.00 RSM 6913 Latent cooling 1289 TOTALS 598 i 14798 8201 300 300 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -Fj&- wrightsoft- 2020-Jul-15 07:13:50 � A_.,4.ws -7 1— Rig ht-Suite®U niv ersal 201919.0.20 RSU28254 Pagel .1.9m ...43 17th StlAbraham-5843 17th St 7.14.2020.rup Calc=MJ8 Front Door faces: E Building Analysis Job: Abraham-6843 17th St E-Calcs Date: Jul 14,2020 Plus,Inc. Entire House By: E-Calcs Plus,Inc. E-Calcs Plus, Inc. 9250 Corkscrew Rd,Suite 8,Estero,FL 33928 Phone:239.810.6106 Email:eric@ecalcsplus.com Web:www.ecalcsplus.com License:HERS Rater ID 0757810 Project • • For: Abraham -5843 17th St, Abraham Servindelamora 5843 17th St, Zephyrhills, FL Design Conditions Location: Indoor: Heating Cooling Washington R. Reagan AP, DC, US Indoor temperature(OF) 70 75 Elevation: 10 ft Design TD(OF) 50 17 Latitude: 390N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 42.6 41.0 Dry bul b(OF) 20 92 Infiltration: Dailyrange(OF) - 16 ( M ) Method Simplified Wetbulb(°F) - 75 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 0 Component Btuh/ft2 Btuh %of load Walls 7.1 5199 35.1 Glazing 28.4 852 5.8 IrfiItalian Doors 0 0 0I Ceilings 1.6 953 6.4 Floors 7.5 4466 30.2 Infiltration 4.4 3329 22.5 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 G !10ROM Adjustments 0 Wings. Total 1 1 147981 100.0 Component Btuh/ft2 Btuh %of load Walls, 2.7 1983 28.7 Glazing 28.3 849 12.3 Doors 0 0 0 Wall Ceilings 1.7 1028 14.9 lnternd Cams Floors 0 0 0 Infiltration 0.8 593 8.6 Ducts 0 0 Ventilation 0 0 Internal gains 2460 35.6 Blower 0 0 GEdng Adjustments 0 Infiltration Total 1 1 69131 100.0 Ceilings Latent Cooling Load= 1289 Btuh Overall U-value=0.118 Btuh/fF--°F Data entries checked. uvrightsoft- 2020-Jul-15 07:13:50 ..w« ••�- Right-Suite®Universal 2019 19.0.20 RSU28254 Page 1 ...43 17th{ShAbraham-5843 17th St 7.14.2020.rup Calc=MJ8 Front Door faces: E a� First Floor ExistinC Addition BA Adition BR Addition Utility Job M Abraham -5843 17th St E-Calcs Plus, Inc. Scale: 1 : 97 Performed by E-Calcs Plus, Inc,for: Page 1 Abraham-5843 17th St 9 5843 17th St 9250 Corkscrew Rd,Suite 8 Right-Suite®Universal 2019 Zephyrhills,FL Estero,FL 33928 19.0.20 RSU28254 Phone:239.810.6106 2020-Jul-15 07:14:13 wvvw.ecalcsplus.com eric@ecalcsplus.com ...ham-5843 17th St 7.14.2020.rup INSTR#2020115711 OR BK 10139 PG 3753 Page 1 of 1 07/20/2020 04:17 PM Rcpt:2183559 Rec: 10.00 IDS:0.00 IT:0.00 Nikki Alvarez-Sowles,Esq_P_asco_County Clerk&Comptroller AFrER RECnRnING-RETURN TO PERMIT NUMBER: NOTICE OF COMMENCEMENT The undersigned hereby given notice that improvement will be made to certain real property,and in accordance with Chapter 713, Florida Statues the following information is provided in the Notice of Commencement. /� q 1. DESCRIPTION OF PROPERTY(Legal dtscriplion&street address,if available)TAX FOLIO NO.:��—2&`2 i `ocl i Q..-o 4 qoo SUBDIVISION BLOCK TRACT LOT BLDG UNIT 5%A3 1-It"' St 2e0h(.b,M Px,- 335'91 2.GENERAL DESCRIPTION OF IMPROVEMENT: G cr�r�AP C&0VP-�Sio+r. 3. OWNERLVFORMATION: n.Nanx-Ptoca1aan- )•CtI'V�UI��1.Q. b.Address Cgta3 - l� "S+ 2epin y 6..C(k a Interest inProperty d.Naar and address of fee simple attaholder(if other lhmr Owner) 4. CONTRACTOR'S NAME,ADDRESS AND PHONE NUMBER: � 1 54b: cos rL 3-6 .o-. 5. SURETY'S NAME,ADDRESS AND PHONE NUMBER AND BOW AMOUNT: . 6. LENDER'S NAM&ADDRESS AND PHONE NUMBER: 7. Persons within the Sane of Florida designated by Owner upon whom notices or other documents maybe served as provided by Section 713.13(1)(a)7.,Florida Statutes: NAME,ADDRESS AND PHONE NUMBER: 8- In addition to himself or herself,Owner designates the following to receive a copy of the Lienor's Notice as provided inSection 713.13(1)(b),Florida Statutes: NAME,ADDRESS AND PHONE NUMBER: 9.Expiration date of notice of commencement(the expiration date is 1 year from the date of recording unless a different date is specked): 20_ WARNING TO OWNER ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARr CONSIDCRL'D IMPROPER PAYMENTS DCR CHAPTLR 713 pART L SEMON 713 13 FLORIDA STATUTES AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE 108 SITE BEFORE THEPMST INSPECTION 1F YOU INTEND TO OBTAIN FINANCING CONSULT OR RECORDING YOUP,NOTICECO WENCEMENT ' r" � rgm of Ow ern Print Name and Provide gmatory's Title/Office Owner's Authorized Officer/Director/Partner/Manager State of Florida County of Broward �7 J The foregoing instrument was acknowledged before me this Z� day oft 4 20 Br A-.brrc.luf..m See om �a,no.p. as f)-L6 Y1110--lr (name of person) (type of authority•...e.g.officer,trustee,attorney in fact) For (name of party on behalf of whom instrument was executed) . p n type of identification:" JACQUELINE BOGES rr ;;..........=Coinfiissbn#GO 276457 u�l �: o`'Expires December 12„2022 - -•.. ... .1:1.6ibatlqdAf Notary Public) Banded Tlw Troy Fain lnsuiaawi*380019 Under Penalties of perjury,I declare that I have read the foregoing and that the facts in it are true to the best of my knowledge and belief(Section 92.525,Florida Statutes). - Signature(s)of Owaer(s)or Owner(s)'Authorized Outer/Director/Partner/Manmger who signed abave: BY B'_... Re".os-09-07(s.Reeordmg) JACQUELINE BOGES Commission#GG 276457 • o`•'Expires oecetr& 12,2022 '•'EOF� "' BotldedRn Troy Fatelnsurance800-U&.7019 Ic �� » ��'C► State Of Florida,County Of Pasco This is to certify that the foregoing is a true and correct COPY of the document on file or of public record in this office. In TcdlS'e 7''^ust ' 4', ,. Witness my hand and��official seal + + day of__—�' �88P Nikki Alvarez-Sowies,Esq., erk&Comptroller Pasc unty,Flori t0�` ,Deputy Clerk AF F By