Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20-431
m _r + City Of ZephyrhillS PERMIT NUMBER 5335 Eighth Street ,..k Zephyrhills, FL 33542 BGC-000431-2020 Phone: (813)780-0020 1^ Fax: (813)780-0021 Issue Date: 07/31/2020 Permit Type: Building General (Commercial) Property Number Street Address 12 26 21 0020 00400 0110 5626 20Th Street Owner Information Permit Information Contractor Information Name: Permit Type:Building General(Commercial) Contractor: DUKE ENERGY Class of Work:Right of Way Temporary Use Address: Building Valuation: Electrical Valuation: Phone: Mechanical Valuation: Plumbing Valuation: �1 Total Valuation:$0.00 Total Fees: Amount Paid: ✓ Date Paid: Project Description MIS SEE DESCRIPTION 20TH ST-FEE WAIVED Application Fees REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner:Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans, Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER WO'37190256 POLE REPLACEMENT MOT'S 102-602 Right of Way Use Permit CITY OF ZEPHYRHILLS BUILDING DEPARTMENT DATE: 07-13-20 PERMIT#: No construction under ground or above ground of any facility shall be accomplished on any City Rights of Way without written approval from the City Building Department.Any application for approval of construction operations on any City owned Rights of Way shall furnish a detailed drawing showing the complete scope of the proposed work in triplicate to the office of the Building Official for approval prior to the commencement of any work.A copy of this permit is to be kept readily available at the site of the work at all times. PARCEL ID: 12 26 21 0020 00400 0110 ROAD: 5626 20th St, CITY: Zephyrhills, FL LOCATION DESCRIPTION: on 70th St hetwppn 9th Ave and 7th Ave Permission granted to: Laurie Jackson Of: Duke Energy For the construction and maintenance of: Replace Pole due to shell rot Right of Way Use Permit CITY OF ZEPHYRHILLS BUILDING DEPARTMENT subject to the following conditions: 1.The construction and maintenance of such utility shall not interfere with the property and rights of a prior occupant. 2.All work shall be done in keeping with the standards of the City Streets Department and under the supervision of the City Building Official,who will be notified at least one day prior to commencement of construction. 3.All materials and equipment shall be subject to inspection by the City Building Official. 4.During construction all safety regulations of the Department of Transportation shall be observed and the City shall be relieved of all responsibility from damage of any nature arising from this permit. Subject to the same terms and conditions,the permit holder may take such safety measures,including placing and display of caution signs,as it may deem necessary in conduct of construction and maintenance work hereunder.It is the responsibility of the permittee to 5.All private and all City properly shall be restored to its original condition as far as practical in the opinion of the City Building Official. 6.All underground crossing installations shall be laid at such depth as may be specified by the City Building Official. 7.The sketch covering the details of this installation shall be made a part of this permit.This permit is granted with the understanding that the applicant has notified all other utility users in the area covered by the permit and takes full responsibility for any damage incurred by prior installations as a result of his operations in order that they may safe guard their interests. 8.It is expressly stipulated that this permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or to vest any property right in said holder. 9.Whenever the City decides to further exploit the City Rights of Way,any or all said poles,wires,pipes,cables,or other facilities and appurtenances authorized hereunder,shall be immediately removed from said Rights of Way,or reset or relocated thereon as required by the City Building Official at the expense of the holder of this permit 10.The holder shall save and keep the City harmless from any and all damages,claims,or injuries that may occur by reason of the construction,maintenance,and operation of said facility. 11.The holder shall complete the requested work within days,or this permit shall become null and void.In the event the work requested is not completed upon the expiration date of this permit,the City shall have the right to complete such work and to charge the holder of the permit for all costs incurred in completing said work. 12.The holder shall post a cash or surety bond with the City Manager in the sum of$ dollars to guarantee performance of the obligations herein,and to guarantee maintenance of the right-of-way described herein for a period of one(1)year following completion of the requested installation.In the event a surety bond is posted,the surety bond shall be made payable to the City and shall obligate the surety to hold the City harmless in the event the holder of this permit should fail to meet any of its obligations hereunder.The bond shall also indemnify the City for all court costs and reasonable attorneys fees in the event legal action is required to collect on said bond. Right of Way Use Permit CITY OF ZEPHYRHILLS BUILDING DEPARTMENT SUBMITTED BY: (Permittee): Duke Energy/Laurie Jackson Signature: Address: 4427 Pet Lane Suite 101 Lutz FL 33559 Phone#: S13-909-1255 APPROVED BY: Lo CITY OF ZEPHYRHILLS SJ Building Official: Public Works Date: Date: Utilities Supervisor 1 City Manager: Date: ?�7��jp� Date: w 0 USP: FUSE 2774951-1 Safety Reminders 1 Adverse Conditions I IPII:28.239735,-82.171374 c^uer. SAFETYFirst USP: RECLOSER 6631431 °� CAUTION: ri �,FRSeMALAtt:DUNT1fi�Y � ,. -JOINT USE PEDESTAL NEAR P1 CALL FOR INSPECTION WITH AN 8 .ncrnrcnRtxa , e.R -UNEVEN GROUND HOUR NOTICE AT 813-780-0020 J.14SARe ocNn1ON REMEMBER:Work zone area conditions may have changed for this job[Everyone is responsible for verifying the above safety information Is correct prior to any work being performed each day. a LdA,,i R TA ��-- 45 42 TO 2775134 70 RF — OLE-35-5 OL 40 5 I �— R/I O TX-25kVA-120/240V—C ' It R/I DG Y R/I -AN HOR } y—CITY-OF ZEgHYRHILLS I r Cl oLE-A�t43�7-30-6� - P(t -4��4`Z:,=3�-� JURISDICTION: °° DUKE ENERGY: - P1 ,I� a°ra°°a°°� ` TONY LOMELIN 352-341-7507 110- AL (S11) ENGINEERING PARTNER: ALBERTO CRUZ 321-316-4846 t POLL'-40%2( work Order NDmner 3719/256 Customer/Contact —_ 5626 I1 ContactPtwne ,1 I Job Site Address 5626 20TH ST 1 — — OUR SAVIOR - 'l- y city ZEPHYRHILLS LUTHERAN CHURCH I County PASCO s a e,zip FL.33542 1911 ADDRESS: — I _ Designer ALBERTO CRUZ 5626 20TH ST C" F- '�`"r 321-316-4846 Designer Pt—. ZEPHYRHILLS FL 33542 a SCOPE OF WORK:° GwItID C851 REPLACE POLE DUE TO SHELL ROT 8TH AVE P1 DIRECTION: W 12.4717.2kV Permit Reputed Yas_N0.- °CONSTRUCTION NOTES: GUY STAMP 1 °aa,'�a 1 P1 TO BE BUILT TO ENTERPRISE SPEC ry°°"°' 2 P1 IS ACCESSIBLE FROM 5626 20TH ST A LL 3 P1 NEEDS MOT r FL W. Apo:; 4 DISTANCE FROM EOP TO P1 IS APPROX 11 FT A 7 3 10 11 j ( DUKE Sheet ENERGY® seal—l"=60' ., WO#37190256Urth-rvi Cur" GL - �' t. • 4r i ,� iM,rn l}'!�^..��� �; �{� kl � �,��� /`r Y�y�''. � ��"�"� .Y.sJ�i�•-�.�t�,�-.r 1 P A i4ja 1f "�J..S Lei +i �Ky7: n�, �y _r...LJ.. � -r1'•r.1t Y�yJ �+ tl.ix��'* ��:�7fi Jt����(•Lrf' � Al �;�'�=��'hJr�r=� � '•1 • Y�•uJr�S-�{ sv J f . �3y tit �,,� 4,.p2+ii,�A„�,�' � t y. •c,.,� F vp ` y_3titf¢V'•!~ Y +D4 •�;'(+ i'L' • rjC '~- YS ?'}='gyp•_�. 4 't+���1�`u^t ` '�Y'h7• 6�'�I i�e111 y}l F- S;}� t ���. � r� ik•4" r.+ t ,�;• a-r-..y R 1; A,•'�� att s I 'yar J�.r . n 1. rla ij V I 1 = - M •p.r n f. .. Itni �� �� - ` �-�- ,.....•ter _. a ii �� v SHELL -• Google, lit Iq r' ly f t �j ''S� ••j r .y 'j"� �•w �j'�T1 r 4 fN `y_ •• Zs¢ ' :+�r'1� � .+1�4�'7 4"..'4 i r ` r4�tt�f.:.-.•�` -_ �4�I'1•n" » s`�i ;`* i .' "Vy. iTA!.} u'r .: - - ',L n"�" 'r7�b�17"' �•aW u•1 .�r ifR' � r Ri • 1 ryq �• • ROAD WORK END AHEAD ROAD WORK A a a ' I ■ • ■ • a' B Taper Length=%L Work Area A'F See Table It END Table 71 ROAD ROAD WORK Taper Length - Shoulder WORK Device Spacing-japer Device spacing-Tangent 500' AHEAD SPEEDING FINES Sce Table! 5ee Table I SpeeY1.(ft) (.Ph) NotesDOUBLED ( DO UBLED mPh) 8' 70' 72' WREN WORKERS Shldr. Shldr. Shldr. PRESENT 25 28 35 42 Table I 30 40 50 60 L=WSr Device Spacing 35 55 68 82 60 Max.Distance Between Devices(ft.) 40 72 90 107 Speed Cones or Type 1, Type II 45 120 I50 180 (mph) Tubular Markers Barricades or Vertical 50 133 167 Z00 DISTANCE BETWEEN SIGNS Panels or Drums Spacing(ft.) Taper Tangent Taper Tangent 55 147 183 220 Speed 60 ISO 200 240 L=WS A B 25 25 50 25 50 40 mph or less 200 200 30 to 45 25 50 30 50 65 173 277 260 45 mph 350 350 50 to 70 25 50 50 100 70 187 233 1 280 50 mph or greater 500 500 `Midway between signs. 8 minimum shoulder width V3L= Length of shoulder taper in feet SYMBOLS GENERAL NOTES DURATION NOTES W= Width of total shoulder in feet (combined paved and unpaved width) ® Work Area 1.When four or more work vehicles enter the through traffic lanes in a one hour I.Signs and channelizing devices may be omitted if all of the period or less(excluding establishing and terminating the work area),the advanced following conditions are met: S= Posted speed limit(mph) ■ Channelizing Device(See Index 102-600) FLAGGER sign shall be substituted for the WORKERS sign.For location of flaggers a.Work operations are 60 minutes or less. and FLAGGER signs,see Index 102-603. b.Vehicles in the work area have high-intensity,rotating, flashing,oscillating,or strobe lights operating. [p Work Zone Sign 2.SHOULDER WORK sign may be used as an alternate to the WORKER symbol sign only on the side where the shoulder work is being performed. Lane Identification+Direction of Traffic 3.When a side road intersects the highway within the TTC zone,additional TTC devices shall be placed in accordance with other applicable TCZ fndexes. CONDITIONS 4.For general TCZ requirements and additional information,refer to Index 102-500. WHERE ANY VEHICLE,EQUIPMENT, WORKERS OR THEIR ACTIVITIES ENCROACH THE AREA CLOSER THAN 15'BUT NOT CLOSER THAN 2'TO THE EDGE OF TRAVEL WAY. LAST DESCRIPTION: REVISION ; FY 2020-21 INDEX SHEET n/o7/n w F�T� STANDARD PLANS TWO-LANE, TWO-WAY, WOII2l� O1�I 5H[Oi7LII�lEgt 102-602. 1 of 1 WO 37190256 POLE REPLACEMENT MOT'S 102-602 Right of Way Use Permit CITY OF ZEPHYRHILLS BUILDING DEPARTMENT DATE: 07-13-20 PERMIT#: No construction under ground or above ground of any facility shall be accomplished on any City Rights of Way without written approval from the City Building Department.Any application for approval of construction operations on any City owned Rights of Way shall furnish a detailed drawing showing the complete scope of the proposed work in triplicate to the office of the Building Official for approval prior to the commencement of any work.A copy of this permit is to be kept readily available at the site of the work at all times. PARCEL ID: 12 26 21 0020 00400 0110 ROAD: 5626 20th St, CITY: Zephyrhills, FL LOCATION DESCRIPTION: on 70th St hPtwPPn 9th AvP and 7th AvP Permission granted to: Laurie Jackson Of. Duke Energy For the construction and maintenance of: Replace Pole due to shell rot Right of Way Use Permit CITY OF ZEPHYRHILLS BUILDING DEPARTMENT subject to the following conditions: 1.The construction and maintenance of such utility shall not interfere with the property and rights of a prior occupant. 2.All work shall be done in keeping with the standards of the City Streets Department and under the supervision of the City Building Official,who will be notified at least one day prior to commencement of construction. 3.All materials and equipment shall be subject to inspection by the City Building Official. 4.During construction all safety regulations of the Department of Transportation shall be observed and the City shall be relieved of all responsibility from damage of any nature arising from this permit.Subject to the same terms and conditions,the permit holder may take such safety measures,including placing and display of caution signs,as it may deem necessary in conduct of construction and maintenance work hereunder.It is the responsibility of the permittee to 5.All private and all City properly shall be restored to its original condition as far as practical in the opinion of the City Building Official. 6.All underground crossing installations shall be laid at such depth as may be specified by the City Building Official. 7.The sketch covering the details of this installation shall be made a part of this permit.This permit is granted with the understanding that the applicant has notified all other utility users in the area covered by the permit and takes full responsibility for any damage incurred by prior installations as a result of his operations in order that they may safe guard their interests. 8.It is expressly stipulated that this permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this permit shall not operate to create or to vest any property right in said holder. 9.Whenever the City decides to further exploit the City Rights of Way,any or all said poles,wires,pipes,cables,or other facilities and appurtenances authorized hereunder,shall be immediately removed from said Rights of Way,or reset or relocated thereon as required by the City Building.Official at the expense of the holder of this permit 10.The holder shall save and keep the City harmless from any and all damages,claims,or injuries that may occur by reason of the construction,maintenance,and operation of said facility. 11.The holder shall complete the requested work within days,or this permit shall become null and void.In the event the work requested is not completed upon the expiration date of this permit,the City shall have the right to complete such work and to charge the holder of the permit for all costs incurred in completing said work. 12.The holder shall post a cash or surety bond with the City Manager in the sum of$ dollars to guarantee performance of the obligations herein,and to guarantee maintenance of the right-of-way described herein for a period of one(1)year following completion of the requested installation.In the event a surety bond is posted,the surety bond shall be made payable to the City and shall obligate the surety to hold the City harmless in the event the holder of this permit should fail to meet any of its obligations hereunder.The bond shall also indemnify the City for all court costs and reasonable attorneys fees in the event legal action is required to collect on said bond. I Right of Way Use Permit CITY OF ZEPHYRHILLS BUILDING DEPARTMENT SUBMITTED BY: ` (Permittee): Duke Energy/Laurie Jackson Signature: Address: 4427 Pet Lane Suite 101 Lutz FL 33559 Phone#: Ri 3-909-1255 APPROVED BY: CITY OF ZEPHYRHILLS Building Official: Public Works: Date: Date: Utilities Supervisor City Manager: Date: Date: Q USP: FUSE 2774951-1 Safety Reminders/Adverse Conditions P1:28.239735,-82.171374 SAFETYFirst USP: RECLOSER 6631431 (9Q' CAUTION: �PERSOMALACCOeNTARLIY C� -JOINT USE PEDESTAL NEAR P1 CALL FOR INSPECTION WITH AN 8 �ACRVECMIRO 3,y E,+ -UNEVEN GROUND HOUR NOTICE AT 813-780-0020 ►NA}PRO RECOOMRON , REMEMBER:Work zone area conditions may have changed for this jobs Everyone is responsible for verifying the above safety information Is correct prior to any work being performed each day. ............... ......... amme......m ....mm. ...................... mmm ` gTH AVE P1 RETAG 1 -- —� 453422 TO 2775134 I RFS - POLE-35-5 ` 1 I I - POLE-40-5 R/I - OH-TX-25kVA-120/240V-C —' R/I -ANCHOR �r _�— —�— I -AVIAN EQ CITY—OF ZEPHYRHILLS E-AI` _, `4;IS7-30-6 PC __ � -35-= JURISDICTIOPL� DUKE ENERGY: c~n f 110 ' L�C� P1 � 1103 -�_�� 1r0 RL (S�) mmm RmmmPo � TONY LOMELIN 352-341-7507 M f— I ENGINEERING PARTNER: ALBERTO CRUZ 321-316-4846 POLL'-4005M5-3- 5 Work Order Number 37190256 �� >! � (LslomadCoDlRcl 5626 c.RtectPb.. Z Job Site Address 5626 20TH ST OUR SAVIOR ✓ J I couRry ZEPHYRHILLS LUTHERAN CHURCH PASCO Stete,zip FL,33542 911 ADDRESS: o N oeeigner ALBERTO CRUZ 5626 20TH ST I ��� Deeigna,PhonB 321-316-4846 ZEPHYRHILLS, FL 33542 ®© m T y ma SCOPE OF WORK: VE �, a—itID C851 REPLACE POLE DUE TO SHELL ROT 8TH A P1 DIRECTION: W , A;� 1z.a7n.2kv p ��-- —1 Repull Yaa—N-_ CONSTRUCTION NOTES: GUY STAMP ` P—�° 1 P1 TO BE BUILT TO ENTERPRISE SPEC Pm ATyp°Ma7 2 P1 IS ACCESSIBLE FROM 5626 20TH ST FL W A LL °®r""T"D°'N°' 3 P1 NEEDS MOT. ` P—TYVeN.A 4 DISTANCE FROM EOP TO P1 IS APPROX 11 FT f A 7 3 10 11 ` I (DUKE Sheet 7 ENERGY® smie-l._60. n Ell N99ZO6 L LC#OM _- max- , 1 +Yti ��,' •�`r {. .r f t r.,s• y.�, S� f tt i• s.��. '..•��'F7 :y y ''rLr iN xd'L r f—Alm ;1!',.s�'•i � �' '�• •1 • ice. r l 1 t ss, x. "s"�'}S•:?�.r t'p �' ,��,at.,�3'"�s'� ',�-�.•.}��y��,,�. rL•.= '�' ,��4-tr"J •'`G ,,yam` :a,.4''�P ;+pp ��.i`,•,.� Fr: t � Y.'�.Jr��=fr. u`� •�i,�� :trr . ...y� .sa. r+i � r�dy4o,•'.�' � r T.��.c i '�- it y ,�, •� _ a �" -•^,�y-�y5— _ter So- pqg ... • Google r let r �,.•.16 -ITr'•�'k 7� ''�F'�" 'R w_ r - 21-ST S`V ---t ROAD WORK END AHEAD ROAD WORK A _ a a b b I ■ ■ ■ e_ to B Taper Length=%L Work Area K' See Table n END Table II ROAD RDAD WORK Taper Length - Shoulder WORK Device Sparing-Taper Device Spacing-Tangent 500 See Table I See Table I YL(ft) AHEAD SPEEDING FINES mph) 8' 10' 12' Notes DOUBLED WHEN WORKERS Shldr. Shldr. Shldr. PRESENT 25 18 35 42 Table 1 30 40 50 60 L=WSr Device $ acin 35 55 68 B2 60 Max.Distance Between Devices(ft.) 40 72 90 107 Speed Cones or Type 1 or Type 11 45 120 150 180 (mph) Tubular Markers Barricades or Vertical 50 133 167 200 DISTANCE BETWEEN SIGNS Panels or Drums Spacing(ft.) Taper Tangent Taper Tangent 55 147 183 220 Speed L=WS A B 25 25 50 25 50 60 160 200 140 40 mph or less 200 200 30 to 45 25 50 30 50 65 173 217 260 45 mph 350 350 50 to 70 25 SO 50 100 70 187 233 280 50 mph or greater 500 500 'Midway between signs. 8 minimum shoulder width %L= Length of shoulder taper in feet SYMBOLS GENERAL NOTES DURATION NOTES W= Width of total shoulder in feet (combined paved and unpaved width) ® Work Area 1.When four or more work vehicles enter the through traffic lanes in a one hour 1.Signs and channelizing devices may be omitted if all of the period or less(excluding establishing and terminating the work area).the advanced following conditions are met: S= Posted speed limit(mph) ■ Channelizing Device(See Index 102-600) FLAGGER sign shall be substituted for the WORKERS sign.For location of flaggers a.Work operations are 60 minutes or less. and FLAGGER signs,see Index 102-603. b.Vehicles in the work area have high-intensity,rotating, flashing,oscillating,or strobe lights operating. D3 Work Zone Sign 2.SHOULDER WORK sign nay be used as an alternate to the WORKER symbol sign only on the side where the shoulder work is being performed. r� Lane Identification+Direction of Traffic 3.When a side road Intersects the highway within the TTC zone,additional TTC devices shall be placed in accordance with other applicable TCZ Indexes, CONDITIONS 4.For general TCZ requirements and additional information,refer to Index 102-600. WHERE ANY VEHICLE,EQUIPMENT, WORKERS OR THEIR ACTIVITIES ENCROACH THE AREA CLOSER THAN 75'BUT NOT CLOSER THAN 2'TO THE EDGE OF TRAVEL WAY. R LAST 20 DESCRIPTION: REVISION FY 2020-21 IN SHEET 11/oUn w F�T� STANDARD PLANS TWO-LANE, TWO-WAY, WORK ON SHOULDER 102-602 I Of 1