Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
21-1594
ri—�nFun,�, City of Zephyrhills PERMIT NUMBER 5335 Eighth Street Zephyrhills, FL 33542 ELCMISC-001594-2021 Phone: (813)780-0020 Fax: (813)780-0021 Issue Date: 03/25/2021 Permit Type: Electric Service Replacement/Misc Property Number Street Address 05 26 21 0100 01200 0030 6777 Wagon Trail Street Owner Information Permit Information Contractor Information Name: WILLIAM&PATRICIA BRYK Permit Type:Electric Service Replacement/M Contractor: MOMENTUM SOLAR- Class of Work:Add/Alter Residential SOLAR Address: 6777 Wagon Trail St Building Valuation:$0.00 ZEPHYRHILLS,FL 33541 Electrical Valuation:$25,704.00 Phone: (321)247-6073 Mechanical Valuation: Plumbing Valuation: Total Valuation:$25,704.00 Total Fees:$252.78 Amount Paid:$252.78 J Date Paid:3/25/2021 2:11:16PM Project Description INSTALLATION ROOF MOUNT PHOTO VOLTAIC SOLAR PANEL Application Fees Electrical Permit Fee $168.52 Electrical Plan Review Fee $84.26 REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. Lr -- - -- alalol!�� CONT R SIGNATURE PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER INSTR#2021039127 OR BK 10288 PG 2019 Page 1 of 1 02/26/2021 08:33 AM Rcpt:2266332 Rec:10.00 DS:0.00 IT:0.00 Nikki AlvarezSowles,Esq.,Pasco County Clerk&Comptroller Permit Number: Follo/Parcel10#: 0528210100012000030 Prepared by. Lauren El-Taher/Momentum Solar Return to: UmariturnSnIar , 6210 HoffherAve Ste 100 Orlando FL 32822 NOTICE OF COMMENCEMENT State of Florida,County of The undersigned hereby gives notice that improvement will be made to certain real property:and in accordance with Chapter 713,Florida Statutes.the following Information is provided In this Notice of Commencement 1. Doscripticn of property(legal description of the property,and atrrBet address if available) SILVERADO RANCH SUBDIVISION PHASES 7.9B.11AAND 11B/8777 WAGON TRAIL STREET,ZEPHYRHILLS,FL=41 2. General dsscrlptlan of Improvernerrt Installation of photo volteke solar panel on roottoo, 3. Owner Information or Lessee information 9 the Lessee contracted for the improvement Name William 8 Patricia BVI AddressesTRAK S I ,FL W541 Interest In Property Owner Name and address of fee slmple Udeholdr(if different from Owner fistedabove) Name N/A Address 4. Contractor Name Momentum Solar Telephone Number (321)247-8073 Address 821C Hogner Ave Ste 100 Orierido FL 32822 _ 5. Surety(It applicable,a copy of the payment bond is atiadred)- -- Name N/A Telephone Number Address Amount of Bond $ 8. Lender Name N/A Telephare Nemiber Address 7. Pawns within the State of Florida deslpnated by Owner upon whom notices or other doaanents miry be served as provided by§713.13(1Na)7,Florida Stahfa& Name N/A Telephone Number Address 8. In addition to himself or herself,Owner deftisbss the following to recslve a copy of the Llenoes Noflce as provided in fR3.13(1)(b),Florida Statutes. Name N/A Telephone Number Address 9. Explratkx date of notice of comriencemerrt(thh0ration deb will be 1 year from the data of recording unless a different date Is spedfled) wARNITIO TO OWMX-ANv PAYIENi8 MADE BY THE OWNER AFTER THE EMMATK/N OF THE NOTICE OF ODNIIiQiaYQrrT ARE cons mmo mPROPBR PAYNEUM UNDER CHAPTER 70.PART 1.SECTION 71i.1l,FWRIDA!TAMES,AND CAN REauuT iN YOUR PAwn TWICE FOR WRWfBnmR TO YOUR PROPERTY.A NOTICE OF COIS039 M MUST BE RECORDED AND POSH ON THE JOB STE BEFORE THE FIRST B18PECTION.r YOU INTeNO TO OBTAIN MWCM M CONSULT Zy7u :ORAN A �F�E ENOW WORK OR RECOR =YOUR NOTICE OF COMNMrICWIBIT. // Owner Ipnettas of Owner ar Lessee,ar Owner's a Leeaeda Arr@roriaed rreper Signabryfs TR1erOmoe Tits foregoing Irriunent was edoirowledged beforo me this?4 day of 02=1 by William Elryk- inaaw name of person as for ran der p Im Name of party at beheff or Ars Xwhorn bunert was exacatad L f Nioole Schroer at Pldlle—ebb of Florida Pm%type;ar starM commisamed nine or Notary Public PersonalyKrwxm NICOLE SCHILLER Type of ID Produced nR arimbi Ad I n Driver's License %5 "f',-N,ta,yIn PersorW X orOn�hrs810netule Publl,State of Florida = Commission/HH 46180 M CammiealonExpirea September 23,2024 1110�� City of Zephyrhills PERMIT NUMBER ;4 5335 Eighth Street Zephyrhills, FL 33542 ELCMISC-001594-2021 Phone: (813)780-0020 Fax: (813)780-0021 Issue Date: :TN v� Permit Type: Electric Service Replacement/Misc Property Number Street Address 05 26 210100 01200 0030 6777 Wa on Trail Street Owner Information Permit Information or n orma t Name: WILLIAM&PATRICIA BRYK Permit Type:Electric Service Replacement/ Conractor: MOMENTUM SOLAR- Class of Work:Add/Alter Residential SOLAR Address: 6777 Wagon Trail St Building Valuation:$0.00 ZEPHYRHILLS,FL 33541 Electrical Valuation:$25,704.00 Phone: (321)247-6073 Mechanical Valuation: Plumbing Valuation: Total Valuation:$25,704.00 = Total Fees:$252.78 _r Amount Paid:$0.00 Date Paid: Project Description INSTALLATION ROOF MOUNT PHOTO VOLTAIC SOLAR PANEL Application Fees Electrical Permit Fee $168.52 Electrical Plan Review Fee $84.26 REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner:Your failure to record a notice of commencement may result in your paying twice for improvements to your property.If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. ala� CONTRACTOR SIGNATURE PE r IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City.of Zephyrhills Permit Application Fa:-813a80-0021 Building Department Date Received 021 Phone Contact for Permitting 321 247 6073 w I s If It ...lC Owners Name William&Patricia Bryk owner Phone Number (321)247 6073 Owners Address 6777 WAGON TRAIL ST Owner Phone.Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS 6777 WAGON TRAIL ST LOT# F SUBDIVISION Silverado Ranch PARCEL ID# 0526210100012000030 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED XNEW CONsTR ADDIALT = SIGN 0 Q DEMOLISH INSTALL e REPAIR PROPOSED USE = SFR 0 COMM = OTHER TYPE OF CONSTRUCTION = BLOCK 0 FRAME = STEEL Q DESCRIPTION OF WORK Installation of photo voltaic solar panel on rooftop BUILDING SIZE SQ FOOTAGE HEIGHT ®BUILDING $ VALUATION OF TOTAL COIN RF,TION $25704 ©ELECTRICAL IS AMP SERVICE = SS-ENE GR Y Q W. E.C. =F'LUMF3ING $ X Duke Energy =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION =GAS Q ROOFING Q SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO (✓ .BUILDER COMPANY Momentum Solar-Cameron Christensen SIGNATURE REGISTERED I Y/N I FEE CURREN Y/N Address 6210 Hoffner Ave Ste 100 Orlando FL 32822 License# CVC57036 ELECTRICIAN COMPANY Momentum Solar-Cameron Christensen SIGNATURE REGISTERED YIN. FEE CURREN I Y/N Address 6210 Hoffne ve It. 100 Orlando FL 32822. License# EC13008217 PLUMBER COMPANY SIGNATURE F REGISTERED YIN FEE CURREN Y/N Address License# MECHANICAL COMPANY SIGNATURE REGISTERED Y/N FEE CURREN I Y/.N Address License# OTHER COMPANY SIGNATURE REGISTERED Y/.N FEE CURREN .Y/N Address License# It I111'a RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)-set of Energy Forms;R-O-W Permit for new construction. Minimum ten(10)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans w/Silt Fence Installed, Sanitary Facilities&1 dumpster,Site Work Permit for subdivisionsnarge projects. COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Fortes.R=O-W Permit for new construction. Minimum ten'(10)working days after submittal date.Required onsite,Construction Plans,Stormwater Plans w/Silt Fence Installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. -PROPERTY SURVEY required for all NEW construction. Directi : _S S ____- %% _ _ _ons Fill out application completely., Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement Is required.(AIC upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter.from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades AIC Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW. 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Buriding Department NOTICE OF DEED RESTRICTIONS:The undersigned understands that this permit may be subject to"deed"restrictions"which may be more restrictive than County regulations.The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES:If the owner has hired a contractor or contractors to undertake work,they may be required to be licensed in accordance with state and local regulations.If the contractor is not licensed as required by law,both the owner and contractor may be cited for a misdemeanor violation under state law.If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-8009. Furthermore,if the owner has hired a contractor or contractors,he is advised to have the contractor(s)sign portions of the"contractor Block"of this application for which they will be responsible.If you,as the owner sign as the contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES:The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and 90-07,as amended.The undersigned also understands,that such fees,as may be due,will be identified at the time of permitting.It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a"certificate of occupancy'or final power release.If the project does not involve a certificate of occupancy or final power release,the fees must be paid prior to permit issuance.Furthermore,if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended):If valuation of work is$2,500.00 or more,I certify that 1,the applicant, have been provided with a copy of the"Florida Construction Lien Law—Homeowner's Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs.If the applicant is someone other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT:I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction,zoning and land development.Application is hereby made to obtain a permit to do work and installation as indicated.I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction,County and City codes,zoning regulations,and land development regulations in the jurisdiction.I also certify that I understand that the regulations of other government agencies may apply to the intended work,and that it is my responsibility to identify what actions I must take to be in compliance.Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone W"unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction,I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one(1) acre which are elevated by fill,an engineered drainage plan is required. If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction.I understand that a separate permit may be required for electrical work,plumbing,signs,wells,pools,air conditioning,gas,or other installations not specifically included in the application.A permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans,construction or violations of any codes.Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced.An extension may be requested,in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate justifiable cause for the extension.If work ceases for ninety(90)consecutive days,the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY.IF YOU INTEND TO OBTAIN FINANCING,CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NO"Q0CQMMENCEMENT. FLORIDA JURAT(F.S.117.03) OWNER OR AGENT CONTRACTOR Subscribed and swom to(or affirmed)before me this Subscribed and swom to(or affi ed)before me this by 2/24/2021 by Cameron Christensen Who islare personally known to me orhas/have produced Who is/are personally o to me or has/have pro ed as identification. ifitati n. Notary Public N)ary Public Commission No. Commi ion No. HH46180 Nicole Schiller Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped `"%Mia,' NICOLE SCHILLER _ Notary Public-State of Florida Commission q HH 46180 My Commission Expires Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net February 24,2021 Re:Proposed Photovoltaic Solar Panel Installation William Bryk 6777 WAGON TRAIL ST ZEPHYRHIILS,FL 33541 Dear Plan Reviewer: Certification:I have reviewed the engineering testing reports for the racking and attachments to be used on this project and I certify that the products are capable of supporting the code required loads and are suitable for this installation when installed in strict compliance with the manufacturers printed instructions. Regarding the solar panel array installation on the above referenced project please note that an inspection was performed by a representative of the Architect/Engineer of Record,and analysis of the existing structure was conducted.There is adequate structural capacity for the installation of the array with the following recommendations: 1.The array will be installed on the existing roof.The roof framing is constructed of 2"x4"wood trusses @24"o.c. spanning 207'with a top chord length of 23'with intermediate supports at 1/3rd points,making the effective longest span equals 79" with 1/2"plywood sheathing.The new array(See Site map by contractor)will add 2.63 Lb./Sff, overall to the roof.No additional structural support is required for the roof structure. 2.The attachment system shall be secured to the roof and shall be in strict compliance with manufacturers printed instructions.The attachment system shall be UL 1703 approved tested.Provide 6 mil.vapor barrier between dissimilar metals.Provide water tight gasket and sealant at all penetrations. Attachments shall follow panel rows as specified by the system manufacturer's installation manual.The panel angle shall match the roof slope.Reference summary table below: Roof Type: Shingle Fastener Max Spacing(in.) Attachment System: "Ecofasten Solar""Rock-IT'® Wind Zone 1 Wind Zone 2 Wind Zone 3 Fastener Info: min.5/16"x 4"long stainless-steel lags with a min. 48 32 32 embedment of 3"into the rafters 3.Solar Modules shall be UL-1703 rated.Refer to manufacturers specifications sheets. 4.Positive drainage of the system shall be so as not to void the existing roof warranty. 5.All aspects of the installation shall comply with the Florida Administrative Code,2020 Florida Building Code- Residential Seventh Edition,ASCE-7-16,2020 Florida Building Code—Energy Conservation,Seventh Edition,2017 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law.All components used meet the criteria of the Florida Solar Energy Center. 6.Please refer to the attached structural calculations. If you have any questions relating to this matter,please contact me at your earliest convenience.Thank you. OF ..to CO • L W. Daniel W.Dunzik,RA.LEED-AP 4 .• FL.Lic.No.AR98795 •. A 987 5 Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd.Skillman NJ.08558 908-872-3664 StudioGdesign@comcast.net February 24,2021 Gravity Load Calculation Criteria Structural Design Loads per ASCE 7-16 Dead Loads= 10 psf+2.6 psf(new solar panels)= 12.6 psf Roof Live Load=20 psf Ground Snow Load/Live Load=0 psf Wind Load Calculation Criteria Wind Loads per ASCE 7-16,Ch.30 method 1 Using an area of 10 SF,wind loads from Figure 30.5-1: Zone 1 =-36.5 psf Roof Slope=27 degrees Roof Mean Height= 15 ft Zone 2=-47.4 psf Basic Wind Speed= 140 mph Zone 3=-54.7 psf Exposure=B Per section 2.4.1,ASD combo=D+0.6W: Zone 1 =2.6 psf+0.6(-36.5 psf)_-19.3 psf Zone 2=2.6 psf+0.6(-47.4 psf)_-25.8 psf Zone 3=2.6 psf+0.6(-54.7 psf)_-30.2 psf Check Attachment to Wood Truss Use 5116 dia.Lag screw w/3"embedment into 2 in.wide roof rafter Lag Screw Spacing: Lag Screw Tributary Area: Zone 1 = 48"o.c.max Zone 1=(48"o.c.max)^2/144= 16 SF Zone 2= 32"o.c.max Zone 2=(32"o.c.max)^2/144=7.11 SF Zone 3= 32"o.c.max Zone 3=(32"o.c.max)^2/144=7.11 SF Lag Screw Forces: W=266lb/in(Table 12.2A,2015 NDS) Zone 1 =19.3 psf x 16 SF=309 lb < W', OK Cd= 1.6(Table 2.3.2,2015 NDS) Zone 2=25.8 psf x 7.11 SF= 183 lb < W', OK Ct=1 (Table 2.3.3,2015 NDS) Zone 3=30.2 psf x 7.11 SF=215 lb < W', OK W'=W x embed x Cd x Ct W'=266 lb/in x 3 in.xl.6 x 1 = 1276.8 lb i I ' Powered by i j r r Q. pt:A 11 f 330-345 DUO BLK--G6 ENDURING PERFOprOANCE .W�cFits Quality�,refttOd PaMoft- io . � am„ 10.aa03romm o2sa7 (� Q.ANTUM.TECH \tp/ Higher TECHNOLOGY'LOW LEVEL12ED Yield Per surface area; COS Power classes,and an efficiencyrat BpS co T OF EL rate of costs,higher ECTRICITY IN up to Y9.5,V6. NOVATiVE ALL-WEATHER TE Optimal yields,whale C Y excellent iow_ ver the weatherrith with ightand temperature behavior. �- ENDURING HIGH PERFORMANCE ERFORMANCE Hot-S Yield security with Anti LID_ pot Protect and Traceable and Anti PIQ Teehnoio �Quality 7ra.Qrn,. 9Y. EXTREME WEATHER RATING High-tech aluminum alloy frame; (5400Pa)and.wlnd loads certified forhigh snow A RELIABLE (4000Pa)regarding IEC. © Inclusive 12 INVESTMENT linear Year product warranty and Performance guarantee? 25'Year STATE OFT HE HE ART MODULET N1-DUO combines ECHNOt QGY and.innovative cutting wiring with Q.ANTUfy 9e cell separation see des,conditions"cordingechnolo9Y a Ses data sheet on rear for to IEc/7S 6280 turtherinformation 4 L2015,mgthod8(-i800V,168h)' THE IDEAL SOLUTION FOR: 6nRooftop erraYson residential buildings En9lneered in:Germany Q,Ckc.LLS. MECHANICAL SPECIFICATION _� TO Format 68.5 x 40.6 x 1.26in(Including frame) (1740 x 1030 x 32 mm) se s(irgomm( 3fl68'(■3°mm1 ]bD'(38°mm) Weight 43.9lbs(19.9kg) 1 x4b3'(116°mm) Front Cover 0.131n(3.2 mm)thermally pre-stressed glass with anti-reflection technology q.D°D mP■Py�q°SrT(gbmm) F m° Back Cover Composite film 3fler eazmm( Frame Black anodized aluminum Cell 6 x 20 monocrystalline O.ANTUM solar half cells ® gob•(io3omml Junction Box 2.09-3.98 x 1.26-2.36 x 0.59-0.711n(53-101 x 32-60 x 15-18 mm),Protection class IP67,with bypass diodes Cable 4mm2 Solar cable;(+)t45.31n(1150 mm),(-)t45.31n(1150 mm) e.Dmw�n°m i q.■emma�+(DEru�p Connector Steubli MC4,Amphenol UTX,Renhe 05-6,Tongling TL-CableOlS, JMTHY JM601;IP68 or Friends PV2e;IP67 »�I-ize•(�mmt DEaa•°b3o a■mmI ases(z■b mm(I�"►"asss'(ab mm� ELECTRICAL CHARACTERISTICS POWER CLASS 330 335 340 345 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5 W/-O W) Power at MPP' PMPP [W] 330 335 340 345 E Short Circuit Current' Isc [A) 10.41 10.47 10.52 10.58 E Open Circuit Voltage' VDc IV] 40.15 40.41 40.66 40.92 .S Current at MPP IMpP [A] 9.91 9.97 10.02 10.07 Voltage at MPP VMPp IV] 33.29 33.62 33.94 34.25 Efficiency' q [%] 218.4 t18.7 t19.0 2t19.3 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2 Power at MPP PMPP [W] 247.0 250.7 254.5 258.2 E Short Circuit Current Isc [A] 8.39 8.43 8.48 8.52 E Open Circuit Voltage VDc IV] 37.86 38.10 38.34 38.59 c Current at MPP IMPp [A] 780 7.84 789 7.93 Voltage at MPP VMPP IV] 31.66 31.97 32.27 32.57 'Measurement tolerances PMpp±3%;Isc;VDc±5%at STC:5000 W/m2,25±2°C,AM 1.5 G according to IEC 60904-3.2800 W/m2,NMOT,spectrum AM 1.5G Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE i a ■■ _ do�� At least 98%of nominal power during I I ww ,.e„.md.b..°..°...�. first year.Thereafter max.0.54% Da -------_________ it degradation per year.At least 93.1% ioo -- ----- ' w of nominal power up to 10 years.At w Q w zD '0 ----""-"--"---- least 85%of nominal power up to ; i i ' 20 25years. .o --------r---------------- �o F All data within measurement toleranc- es.Full warranties in accordance with 3co q■A ■qo ■oq ■000 0 9 the warranty terms of the G CELLS IRRADIANCE M1.9 8 o sales organization of your respective D q , ■, country. 9� YEARS Typical module performance under low Irradlance conditions In N comparison to STC conditions(25°C,1000W/m2) N 0 TEMPERATURE COEFFICIENTS m M Temperature Coefficient of Isc a [%/K] +0.04 Temperature Coefficient of VDc [%/K] -0.27 Temperature Coefficient of P_ y [%/K] -0.36 Normal Module Operating Temperature NMOT [°F] 109±5.4(43±3°C) m 0 PROPERTIES FOR SYSTEM.DESIGN ° Maximum System Voltage VsY.s IV) 1000 Safety Class I p Maximum Series Fuse Rating [A DC] 20 Fire Rating C(IEC)/TYPE 2(UL) w Max.Design Load,Push/Pull' [Ibs/ft'] 75(360OPa)/55(2667Pa) Permitted Module Temperature 40°Fupto+185°F c Max.Test Load,Push/PU113 [Ibs/ft2] 113(540OPe)/84(4000Pa) on Continuous Duty (-40°Cupto+85°C) 3See Installation Manuel U U QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION m UL 1703.VDE QualltyTested,CE-complient,IEC 61215:2016,IEC 61730:2016, Number of Modules per Pallet 32 8 Application Class 11.U.S.Patent No.9,893,215(solar cells) Number of Pellets per 53'Traller 28 ® Number of Pellets per 40'HC-Container 24 0 DVE C E c��us PalletDimensions(LxWxH) 71.5x45.3x46.91n(1815x1150x1190mm) _ O 11 Pellet Weight 1505lbs(683kg) S Note:Installation Instructions must be followed.See the Installation and operating manual or contact our technical service department for further Information on approved Installation and use' of this product. Hanwha O CELLS America Inc. 400 Spectrum Center Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748-5996 1 EMAIL Inqulry@us.q-cells.com I WEB www.q-cells.com/ne Data Sheet ' Enphase Microinverters Region:AMERICAS The high-powered smart grid-ready Enphase Enphase IQ 7 Micro"" and Enphase IQ-7+Micro'" IQ7an IQ 7+ dramatically simplify the installation process while achieving the highest system efficiency. Microinverters Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters.integrate with the Enphase IQ Envoy'M, Enphase IQ Battery', and the Enphase Enlighten'"' monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install Lightweight and simple • Faster installation with improved,lighter two-wire cabling Built-in rapid shutdown compliant(NEC 2014&2017) i Productive and Reliable Optimized for high powered 60-cell and 72-cell*modules More than a million hours of testing • Class II double-insulated enclosure • UL listed 0 Smart Grid Ready Complies with-advanced grid support,voltage and allfrequency ride through requirements Remotely updates to respond to changing m` grid requirements • Configurable for varying.grid profiles • Meets CA Rule 21 (UL 1741-SA) The IQ 7+Micro is required to support 72-cell modules. To learn more about Enphase offerings,visit enphase.com u.-E N P HAS E. Enphase IQ 7 and IQ 7+ Microinverters 1 ' INPUT DATA(DC) IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V 60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Isc) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 S PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per.brandh circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+.Micro!nverter Peak output power 250 VA 295 VA Maximum continuous output power 240 VA 290 VA Nominal(L--L)voltage/rangez 240 V% 208 V% 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47.-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A(L-L)branch circuit3 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) _Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6% 97.6% 97.5% 97.3% CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range -400C to+65°C Relative humidity range 4%to 100%(condensing) Connectortype(IQ7-60-2-US&IQ7PLUS-72-2-US) MC4(or Amphenol 144 UTX with additional Q-DCC-5 adapter) .Connector type(IQ7-60-B-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without.bracket) Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class 11 double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy: Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21.(UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at httos.//enphase cam/en-us/c_uRport/module-compatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Referto local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com v EN PHASE. @ 2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 Daniel W. Dunzik Architect LEED-AP 370 Burnt Hill Rd. Skillman, NJ.08558 908-872-3664 February 4,2021 Building Department Attn: Plan Reviewer Re:Proposed Photovoltaic Solar Panel Installation Dear Sir: I have reviewed the following documents related to the"EcoFasten Solar"ROCK-IT SYSTEM 4.0 and certify that the attachment system when installed in strict compliance with the manufacturers Installation Manual appropriate for this application and is in compliance with the latest building codes including Florida Administrative Code, 2020 Florida Building Code -Residential Seventh Edition, ASCE-7-16,2020 Florida Building Code—Energy Conservation, Seventh Edition,2017 National Electric Code,All Local Governing County and Municipal Ordinances adopted by reference or enacted by law. I make this certification for the following listed documents: 1. ROCK-IT SYSTEM 4.0 Installation Manual 2. PZSE,Inc Structural Engineers Certification. 3. EcoFasten Solar Certificate No. US'82150026 4. ROCK-IT SYSTEM 4.0 Cut Sheet for Coupling, Hybrid Coupling, and Mount. If you have any questions relating to this matter,please contact me at your earliest convenience. Thank you. Daniel W.Dunzik,RA. LEED-AP Fl. Lic.No.AR98795 Cut Sheet - Rock-It-4.0-Coupling 1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions. 2. See spec sheet or contact manufacturer for detailed material,finishes, and configuration options. 3.. Contact manufacturer for detailed layout. 4. Do not scale drawings. 5. Subject to change without notice. I l 1 3.17in F ® ® [K.54MMJ I i 7.00in .[177.80mm] l l i 2.02in 2.14in 2.34in { [51 .38mm] .[54.37mm] .[59.36mm] 32mm 35mm 40mm I i ALPINE �� 4741 W Polk Stree Ste.4 SNowGUARDS` EcoT`asteYl Solar Phoenix,AZ 85043, Toll Free Phone 1.888.766.4273 Toll Free.Phone 1.877.859.3947 Material:See Spec Sheet t Toll Free Fax 1.888.766.9994 Toll Free Fax 1.888.766.9994 Scale: 1:4 1 6/28/2017 1 ASG: - EFS.- x Cut Sheet - Rock-It-4.0-Hybrid Coupling 1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions. 2. See spec sheet or contact manufacturer for detailed material,finishes, and configuration options. j- 3. Contact manufacturer for detailed layout. ! 4. Do not scale drawings. 5. Subject to change without notice. � I f I 3.16in ® �. ® ® ® [80.29mm] I i I i I 7.00in 177.80mm I [ ] m I i I 5.00in [127mm]. I { i 1. i 2.02in 2.14in 2.34in I ] 54[ .37mm .[51 .38mm ] [.59.36mm] 32mm- �35mm 40mm ALPINE 4741 W Polk Street Ste.4 SNGUARDS"*EcoFasten Solar"' Phoenix,AZ 85043 I Toll Free Phone 1.888.766.4273 Toll Free Phone 1.877.859.3947 Material:See Spec Sheet ToII Free Fax 1.888.766.9994 Toll Free Fax 1.888.766.9994 Scale' 1:1 6/28/2017 1 ASG: - EFS: X - � i-` Y _ ROCK--IT SYSTE M� 4. O RAIL-FREE RACKING UTILIZes ECOFasTen SOLars PaTenTeD TeCHnOLOGY ®QI>EcoFasten. � Solar® 7 � 5 UA.>t -E. co asters oar® o* Committed to the connection Document Date:9.8.2017 Contents ` Pg. 1 .................................................................................................................................................... Assets of Design Features System Components Pg. 2................................................................................................................................ Rock-It 4.0 Mount Assembly Rock-It 4.0 Coupling Assembly Pg. 3 ....:,....:...................................................::............................................ Rock-It 4.0 Hybrid Mount Assembly Rock-It Clip SS Assembly Rock-It Clip 2.0 Assembly Pg. 4........................................................................................................................................................... Array Layout GreenFasten Flashing Install Pg. 5 ...................................................................._....................:........................................... Rock-It System 4.0 Install Pg: 6 .................................................................................................................................................. Ground Lug Install- Pg. 7 ........................................................................................................................................... Rock-It Clip SS Install Rock-It Clip 2.0 Install Pg. 8 -12 ............................................................................................................................. Standoff Spacing Tables Snow Load 0-20 psf Snow Load 21-30 psf Snow Load 31-40 psf Snow Load 41-50 psf Snow Load 51-60 psf Pg. 13 ..............................................................................................................a.................... Grounding Information Bonding Assembly and Bonding Path Pg. 14 .......................:...........:.............:.............................................................. Thermal Expansion and Bonding Bracket Spacing Staggered Layout Cantilever Pg. 15.. . ................................................................................................................................... System Specifications Evaluated, Compatible Modules ROCK-IT SJ- STeI"1"l 4.-0 , Designed.with the installer in mind.. EcoFasten Solar specializes.in solar roof attachments that are fast and.easyto install;straightforward,secure and cost-effective..EcoFasten offers a wide variety of standard products as well as,custom-solutions,fora-one-stop source. for all of your rooftop anchoring needs. Products are.rigorously.tested and approved above and-beyond industry standards in-house and.by third-party agencies. EcoFasten's patented conical sealing system has-been in service in.the:snow guard and solar.industries for"two decades. FeaTures. • New and.improved design • North-South adjustability Fastest,easiest to level system on the market • Only one tool-required(1/2"deep well-socket). • Integrated electrical bonding 0Vertical adjustment ofT'4" • SIMPLE-only 4 components SYSTem cOmPOnenTS* - reaulreD �i ROCK-IT SLIDe :ROCK-IT 4.0 ROCK-IT 4.0 COUPUnG -ROCK. IT 4.0 4" ror comp SHinGLe - Iv ounT & LOaD BearinG FOOT Array -SKIT-r 8" For TILe SYSTeI'1'l COmPOnenTS* - OPTIonaL i� ROCK-.IT.CLIP SS QWcoFasten Solar® N' (ReFer TO".RG. 6) Ec F sten Solar products are protected by the following U.S.Patents: 8,151,522 8,153,700 8,181,398.8,166,713 8,146,299 M ROCK-IT 4.0 8,209,914 8,245,454 8,272,174'8,225557 9,010,038 ROCK=IT 4.0 �% Array.SKIrT' 91134;040 9,175,478 9,212833 o CAPS.-HyBrio ounT (Eno caps TO PG. S) areinTeo E sT ROCK-IT CLIP 2:0 eno of sKirT secnons> (ReFer TO PG. 6) *Components for use with 32mm modules are available as special order.Components for use with 32mm.modules are labeled as such on .system packaging..Please refer to.evaluated;compatible modules grid on page 15 to identify system compatible 32mm-modules. www.ecofastensolar.com info@ecofastensolar.com 877.859-3947 1 rfs ROCK-IT 4.0- mounT ASSeMBLY NOTe: ITems 1-7 SHIP assemBLeD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS 2 Rock-It 4.0 Mid-Clamp 6000 Series AL .4zso , % 3 Rock-It 4.0 Shelf 6000 Series AL 4 Flange Level Nut 300 Series SS y� 5 Rock-It 4.0 Tie Plate 6000 Series AL 6 Rock-It Pedestal 6000 Series AL 7 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series SS ` 9 3/8"-16 x 3"Hex Tap Bolt 300 Series SS T ROCK-IT SLIDes are accePTaBLe BracKeTS For Use WITH ROCK-IT 4.0 (SOLD SeparaTeUJ) ROCK-IT 4.0 COUPLING aSSeMBLY NOTe: ITems 1-3 SHIP assemBLeD 1 5/16"-18 x 1.75"Hex Serrated Flange Bolt 300 Series SS 2 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL ® 3 Rock-It 4.0 Coupling Shelf 6000 Series AL 4 Rock-It Load Bearing Foot Clip 1 5 Rock-It Load Bearing Foot Base I I 5. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 2 ROCK-IT 4.0 HYBRID MOl.. nT ASSeMBLY NOTe: ITems 1-10 SHIP assemBLeD 1 Rock-It 4.0 Shelf 6000 Series AL 2 Rock-It 4.0 Coupling Mid-Clamp 6000 Series AL 2 10 3 Rock-It 4.0 Coupling Tie Plate6000 Series AL 4 Flange Level Nut 300 Series SS ® 5 Rock-it Pedestal 6000 Series AL 6 Rock-It Slide 6000 Series AL 7 3/8"-16 x 3"Hex Tap Bolt 300 Series SS 8 3/8"ID Star Washer 300 Series S 3 9 5/16"-18 x 3/8"Hex Serrated Flange Bolt 300 Series SS 10 5/16"-18 x 1.5"Hex Serrated Flange Bolt 300 Series SS 0 0 s e 6 7 ROCK-IT CLIP SS ASSeMBLY ROCK-IT CLIP 2.0 ASSeI'1'1BLY NOTe: ITems i-3 sHiP assemBLeD NOTe: ITems i-3 sHiP assemBLeD 1 Stainless Steel Carriage Bolt-.313-18X.75 1 Rock-It Clip 2.0 2 Rock-It Clip SS 2 Stainless Steel Flange nut.313-18 3 Stainless Steel Flange nut.313-18 3 Bolt.3125-18x1 x1-S 1 ® 2 I 1 '3 . �J www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 3 Array LaYOUT , • Find the required structural attachment points. Mark these using a vertical (N-S)chalk line on the , center of the rafters. • Spacing may vary depending upon project specific structural requirements;i.e.high snow and wind load.areas may require lesser bracket spacing in the E-W axis vs.the maximum spacing.Max spacing is 48"for portrait orientation and 72"for landscape orientation.Consult project layout diagram for project specific bracket spacing on the roof.. • Install Rock-It Mounts to predetermined mount spacing. • The Rock-It Array Skirt sections are the width of a typical 60 cell module—use the Rock-It Array Skirt as a guide to lay out module placement. Note:The distance between the rows of mounts is calculated by the module dimension N-S plus 1 3/8" (35mm).Lag screw should be installed as close to center of exposed shingle as possible. The minimum distance between the lag screw and the edge of the shingle is 1/2": GreenFasTenTM FLasHnG i.nsTaLL 1 Locate the.rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. 2 Drill a pilot hole(1/4"diameter)for the lag bolt.Backfill with sealant.EcoFasten Solar recommends an EPDM mastic. 3 Insert the flashing so the top part is under the next row of shingles and pushed far enough up slope to prevent water infiltration through vertical joint in shingles.The �! leading edge of flashing must butt against upper row of nails to prevent turning when torqued. 4 Line up pilot hole with GreenFasten flashing hole. Insert the lag bolt through the EPDM.bonded washer,the Rock-It slide,the gasketed hole in the flashing and into the rafter. Torque:The range is between 100-140 torque inch-pounds depending on the type of wood and time of year.The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses.If using an impact wrench to install the fasteners be careful not to over torque the fastener.You may need to stop and use a ratchet to finish the install. *The Engineer of Record shall check capacity of rafter to support lag screw loading.. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 4 ROCK-IT SYSTem 4.0 inSTaLL �•i Fig.A 1:. Install EcoFasten Solar Flashing with Rock-It-Mounts. •Follow EcoFasten Solar Install instructions forflashing and bracket install(GreenFasten shownabove). •-Optimum vertical distance between lag bolts is 13/B'plus module dimension. •Set mounts on eave most row so that the Rock-It Pedestal is on the South end of Rock-It Slide. • Set mounts on all upper rows so that the Rock-It Pedestal is on the North end of Rock-It Slide.. 2 Install Rock-It-Array Skirt onto.Eavee-Mounts • Slide Rock-lt Array Skirt into front channel on Rock-It Shelf. Array Skirt End Caps are pre-installed.on the East end of each skirt section,and are used to couple the skirt sections-where needed(see.Fig.A_). • Tighten Mid-Clamp bolt,*clamping Rock-It Array Skirt to mount:Torque_to 2001n-Ibs.(1301n-Ibs.when Installing with 32mm modules). 34 Install Rock-It Couplings(when joining panels with a Coupling,the,use of a load bearidg.foot is required)- • Prior to mounting on the roof,snap-Load Bearing Foot"into.the bottom of Rock-It Coupling If required. (Each Load Bearing Foot is set to same height as the Rock-It Mounts-adjust accordingly) • On eave'row only,slide Rock-It Array Skirt onto Rock-ItCoupling,Shelf.Torque to specified value. NOTE:If a coupling.lands on.a rafter,.the Hybrid Mount*should be used In place.of the Rock-It Coupling(refer to image3a). 'Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal,or by purchasing separately. 5 Align and Straighten'First Row-of the Rock-It System with Rock=lt Array Skirt- Use North-South adjustment of the Rock-it Pedestal to straighten Rock-It Array Skirt and align module with Array Skirt . •Torque screw on side of Rock-It Pedestal to 150 In-Ibs to secure it to the Rock-It Slide. •Adjust Flange Level Nut to level the system(optional—can be leveled during or after Installation). (� Install.1St Row ofPV Modules 6-9 • Slide.upslopeRock-It-Mounts down to engage top offirstmodule. • Install Rock-It Couplings on the upslope side of I st row of panels.. •Torque 2nd row of Mid{lamps on Rock-It Mounts and Rock-It Couplings to specified value. • Install.balance of PV modules,ensuring that the Rock-It Pedestals are Inthe appropriate position,then torque Mid-Clamps to secure modules. 10 Level the Rock-it System When assembly is complete,level the entire system by.adjusting Flange Level.Nuts(Flange Level Nuts have no torque value). • Height between roof surface and underside of modules should be 3°or less,when Installed withType 2 modules. INSTALLATION NOTE:Modules should be.lnstalled so.that the.junction box Is installed upslope,away from the leading edge of the array. wwmecofastensolarcom info@ecofastensolarcom 877-859-3947- 5 GrounDinG LUG InSTaLL Necessary Components: - One of the following ground lugs(or any UL 2703 compliant ground lug): Burndy CL50-1TN Ground Lug (UL 2703-E351343 / UL 467-E9999) ILSCO SGB-4 Ground Lug (UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4DBT(UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4DBTH (UL 2703-E354420 /UL 467-E34440) ILSCO GBL-4SS(UL 2703-E354420 /UL 467-E34440) Note:Drill and deburr hole in Ground Lug prior to installation - 14 AWG-4 AWG Copper Ground Wire* Torque Values: - 8-32 x 0.5"Serrated Flange Head Bolt(300 Series SS) 14-10 AWG=20 in-Ibs. - 8-32 Serrated Flange Nut(300 Series SS) 8 AWG=25 in-Ibs. - 11/32"and 1/4"wrenches or ratchets/sockets 6-4 AWG=35 in-Ibs. 1 Insert the flange bolt into the module ground hole.Place Star Washer over bolt.Place ground lug over the bolt and Star Washer,and turn to desired orientation. 2 Install Flange Nut. 3 Tighten Flange Nut/Bolt. 4 Place wire in Ground Lug channel and tighten setscrew to complete assembly. *Wire should be sized in accordance with the National Electrical Code,NFPA 70,Section 690.45,and a minimum of 1/4"clearance required between bare copper wire and aluminum. b Drill hole per grounding lug manufacturers specifications in the upslope part of Rock-It Coupling for attaching grounding lug. 1� Note:Deburr hole in Ground Lug and Rock-It Coupling prior to installation. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 6 ROCK-IT CLIP SS inSTa.LL AccePt.a5�z5,oim,ugLucatfois , r° t�c I �-- .2'Llin.from l . JuncaonBoy I 1 Locate all parts -Locate the Rock-It Clip SS,micro-inverter/power optimizer,and the section of:the module frame in which you will be mounting the micro-inverter/power optimizer. See fig.A for acceptable mounting locations. 2 Install.the Rock-It Clip SS • Slide the Rock-It Clip SS onto the lip of the module frame. • Slide the micro-inverter/power optimizer into the-opposite lip-Of the Rock-It Clip_SS. • Tighten the bolt-to 1-50 in=1b minumum to clamp the Rock-It Clip SS to the module frame and the micro-inverter/power optimizer to the Rock-It Clip SS. • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening. ROCK-IT CLIP 2.O inSTaLL Panel G.lass Inverter Flange e A Module Frame Rock-I1:401p 2.0 1 Locate all parts -Locate the Rock-it Clip 2.0,micro-inverter/power.optimizer,and the section of the module frame in which you will be mounting the micro-inverter/power optimizer. 2 Install.the Rock-At Clip 2.0(See below detail). • .Slide the Rock-It Clip 2.0 onto the lip of the micro-inverter/power.optimizer. • Slide the micro-inverter/power optimizer into the opposite lip of the module frame. • Tighten the bolt to 150 in-lb to clamp the Rock-It Clip 2.0 to the module frame.and the micro-inverter/power optimizer to the-Rock-It Clip 2.0. • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is tight against the clip flange to avoid rotation during tightening.- www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 7 Snow Load 0-20:psf Modules in Landscape Wind-Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch-<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 : Zone 3 Zone 1. : Zone 2 Zone 3 B 159 '93 59 85 mph ,11'0 mph C 114 67 42 88 88 D 96 56 _35 91 74 74 90 mph 115 mph C 104 61 38 98: 80 80 D 88 51 32 83 68- -68 B a 123 72 45 95 95 100 mph .125 mph ' C 88 51 32 83 68 68 — D_ 74 43 _ 2_7_ 70—.-- '57 57 - i --�B 98 57 36 93! � 76— 76 110.mph . . 140 mph- C 70. 41 26 66 54 54 D 59 34 22 56 46 46 B 85 50 31 81 66 66 120 mph 150 mph C '61 36 22• 58 '47 47 D 51 30 19 49 40 40 Notes: :Spacing Governed by Snow Load 1.)Values in above.table represent the maximum allowable spacing-in inches.for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.):Maximum allowed standoff capcity=547#(per testing results) 4:)Includes additional factor of safety of 1.5.for lag pullout capacity 5.)Values based.on'a,maximum module width of 40 6.)Based on Risk Category.II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors-are set to 1.No site specific engineering is included in this table Snow Load 0-20.psf Wind S eed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7=10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 91 53 33 85 mph 110 mph C 65 38 24 61 50 50 D 55 32 20 52 42 42 B 83 49 30 90-mph 115 mph C 59. 35 22- 56 46 46 D 50 29 18 47 38 38 B 70 41 26 54 54 100 mph 125 mph C 50 29 18 47 39 39 D 42___26 15 40 32 32 _ �- B 56 33 w 20 _ 53 v 43 43 m 110 mph -140 mph . C 40 23 14 38 31 31 D -34 19 12 32 26 26 B 49 28 18 46 37 37 120 mph 150 mph C 35 20 12 33 27 27 D 29 17 10 28 1 22 1 22 Notes: —Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for-pullout forces only on EcoFasten Solar.standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)-Maximum allowed standoff capcity.=547#(per testing.results) 4.),Includes additional factor.of safety of 1.5 for lag pullout capacity 5.)Values based on.a maximum module length of-70" 6:)Based on Risk Category 11(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in.this table. www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 8 Snow Load 21-30 .psf Modules in Landscape -Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch< 12:.12 ASCE 7-05, ASCE 7_10. Category. Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 93 59 68 68 85 mph 110 mph C 1 a 67 42 68 6 D 96 56 35 E8 68 B 1 0 85 54 8 6 90 mph 115'mph C 104 61 38 8 D 88 51 32 B 0 72 45 8 100 mph 125 mph C 88 51 32 68 D 74 43 27 68 57 57 B 98 57 36 68 6 110 mph 140 mph C 70 41 26 66 54 54 D 59 34 .22 56 46 46 ---- �.. -- - B 85---- -- 50_____31 — 8 --66 120 mph 150 mph C 61 36 22 58 47 47 D 51 30 19 49 40 40 Notes: ®Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed'spacing approved by EcoFasten Solar is 72" 3:)Maximum allowed.standoff capcity=.547#(per testing results) 4.)Includes additional factor of safety.of 1.5 for lag pullout capacity 5.)Values.based on a maximum module width of 40" 6.)Based on Risk Category.11(ASCE.7-10)structures less than 30 feet in height 7.)All adjustment factors are set to-I.No site specific engineering-is included in this table Snow.Load .21-30 psf Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12.< Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone'3 Zone 1 Zone-2 Zone 3 B 53 33 85 mph 110 mph C 65 38 24 55 -- B 49 30 90 mph 115 mph C 59 35 22. D 50 29 18 38 .38 B 41 26 100 mph 125 mph C 50 29 18 39 39 D 42 26 15 40 32 32 B 56 33 20 11.0 mph 140 mph' . C 40 23 14 38 31 31 D 34 19 12 32 26 26 B 49 28 18 37 37 120 mph 150 mph C 35 20 12 33 27 27 D 29 17 10 28 22 22 Notes: ®spacing.Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten-Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1:5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category II(ASCE 7-10)structures less than-30 feet in height 7.).All adjustment factors are set to 1.No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 9 L`1 Snow Load 31-40 psf Modules in Landscape Wind Speed Exposure 2:12<.Roof Pitch <6:12 7:12<Roof Pitch< 12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone:2 Zone 3 Zone 1 Zone 2 Zone 3 B 83 �6 59 85 mph 110 mph C 83 67 42 D 8- 56 _ 35__ 90 mph 115 mph - C 83 61 38 1 D 51 32 B 83 45 100 mph 125 mph C 6 51 32 D 74 43 27 •1 B 83 57 36 110 mph 140 mph C 70 41 26 D 59 34. .22. 46 46 B 83 50 31- 120 mph 150 mph C 61 36 22 47 47 D 51 30 19 49 40 40 Notes: ®Spacing Governed by Snow Load 1.)Values in-above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar.standoff, however the designer must round down to meet appropriate.rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6:)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.).AII adjustment factors are set to 1.No site specific engineering is included in this table. Snow Load'31-40 psf Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10. Category Zone.1 Zone 2 Zone 3 Zone 1 Zone 2 -Zone 3 B 33 85 mph 110 mph C 38 24 32_ --__ 20__ B 49 30 90 mph 115 mph C 35 22 D 29 18 B 41 26 100 mph 125 mph C 29 18 -D - - 42 --- 26 -_--15- - B 33 20 110 mph 140 mph C 40 23 14 D 34 .19 12 26 26 B 49 28 18 120 mph 150 mph C 35 20 12 27 27 D 29 17 10 28 22 22 Notes: Spacing.Governed by Snow Load 1.)Values in above table represent the maximum.allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing,approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5.for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category 11(ASCE 7-10)-structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 10 Snow Load 41-50 psf Modules in Landscape Wind Speed. Exposure 2:12<Roof Pitch<6:12 7:12<.Roof Pitch<12:12 ASCE 7-05 ASCE 7-10. Category Zone 1- Zone 2 Zone 3 -Zone 1 Zone:2 Zone 3 B ' 66 6• 59 85.mph 110 mph' C 6 6 42 D_ 6 56 35 B liiiiiiiffl6 1111111 54 5 5 90 mph -115 mph C 66 61 38 5 D 66 51 32 B 6 6• 45 100 mph 125 mph C 66 51 32 D 66 43 27 B 6 57 36 110 mph 140.mph C 6 41 26 D 59 34_ _ 22 46 46 120 mph 150 mph C 61 '36 22• 5 47 47 D 51 30 19 49 40 40 Notes: ®Spacing Governed by Snow Load 1.)Values in-above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the.designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=54.7#(per testing:results) 4:)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module width of 40" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.No site specific engineering is included in this table Snow Load 41-50 psf Wind Speed Exposure 2:12<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B 33 85 mph 110 mph C 38 24 D 32 20 B 30 90.mph 115 mph C 35 22- D 29 18 B 26 100 mph 125 mph C 29 18 -- - --- - - -- -D- — --26 - 15---- 13 33 20 110 mph 140 mph' C 23 14 D 19 12 B 28 18 120 mph 150 mph C 35 20 12 D 29 17 10 22 22 Notes: —Spacing Governed.by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches:for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) -4.)Includes additional factor of safety of 1.5 for.lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1.'No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 11 Snow Load.51-60 psf Modules in Landscape Wind Speed Exposure 2:12.<Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 B S`5 51111111111011111111134 85 mph 110 mph C 55 6 42 4 D 5• 35 34 B 55 55 54 4 90 mph 115 mph C 55 55 38 D 55 51 32 3 100 mph 125 mph C 51 32 3 D 5• 43 27 4 B 5" 36 3 110.mph 140 mph C 5 41 26 4 D 55 34 22 34 120 mph 150 mph C 5 36 22 D 51 30 19 4 Notes: ®Spacing Governed by Snow Load 1.)Values in above table represent the.maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff, however the designer must round down to meet appropriate rafter spacing 2.)Maximum allowed spacing approved by EcoFasten Solar is 72" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on.a maximum module width of 40" 6.)Based on Risk Category.11(ASCE 7-10)structures less than 30 feet in height 7.)All.adjustment factors are set to 1.No site specific engineering is included in-this table Snow Load 51-60 psf Wind Speed Exposure 2:12<.Roof Pitch<6:12 7:12<Roof Pitch<12:12 ASCE 7-05 ASCE 7-10 Category Zone 1 Zone 2 Zone 3 Zone 1 Zone 2 Zone'3 B 85 mph 110 mph C 24 D__.-._ 32 B 30 90 mph 115 mph C 22 _ D 29 18 B 26 100 mph 125 mph C 29 18 - --- D - 26 - B 20 110 mph 140 mph C 23 14 D _ 19 12 B 28 18 120 mph 150 mph C 20 12 D 29 17 10 Notes: -Spacing Governed by Snow Load 1.)Values in above table represent the maximum allowable spacing in inches for pullout forces only on EcoFasten Solar standoff 2.)Maximum allowed spacing approved by EcoFasten Solar is 48" 3.)Maximum allowed standoff capcity=547#(per testing results) 4.)Includes additional factor of safety of 1.5 for lag pullout capacity 5.)Values based on a maximum module length of 70" 6.)Based on Risk Category II(ASCE 7-10)structures less than 30 feet in height 7.)All adjustment factors are set to 1:No site specific engineering is included in this table www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 12 r 11 GrounDinG inForrnaTion � The rail-free Rock-It System maybe used to.mount and ground PV-modulesthat comply with UL 1703,only when that specific module has been. evaluated for mounting and grounding,in compliance with the included installation instructions. Note:Grounding lug must be visible to inspectors from-the-entire perimeter of the PV array. .Multiple Use Grounding.Pins Grounding pins within the Mid-Clamp are multiple use bonding/grounding devices..Modules will need to be adjusted if the Mid-.Clamps are loosened to.ensure there is"new"metal to.pierce into-upon retightening. Grounding Method Rock-It 4.0 Mount bonds N-S rows of modules Ro&K4.0 Coupling bonds E-W.rows.of modules Rock-It Array Skirt bonds E-W along the entire array when installed One Bumcly C1.50-1TN'ground lug is required per PV array,limited-to 300 modules placed in either portrait or landscape.orientation. BonDinG ASSeI`1'1BLy -anD BonDInG PATH Bond Path. .Grounding Lug �Coundu�cioit(E�GCFtlI^g Integrated Bonding- generanytoearth g ound. r. Rock-It Coupling ■ Rock-it Mount --Rock-It Array Skirt- .Bond Path -I-Bond'Path ® Grounding Lug '� Groundinglug EqulpmentGroundIng /~canductnr(EGC)• Equipment Grounding gennalytoearth Contluctar(EGC}. poumt generally to earth ground r. Rock-it coupling. 0 Rock-It Coupling ■ Rock-It Mount e_Rock-It Array Skirt ■Rock-It Mou'nt —Rock-It Array Skirt www.ecofast6nsolar.com: info@ecofastensolar.com 877-859-3947 13 THe.rmaL EXPansion anD BonDnG a A thermal expansion gap is required per each continuous 40'length.ofmodules. Bond Path Grounding Lug Omita coupling and leave a 2"gap in the Rock-it Array Skirt and also between �o=tort(EGC)- Grounding generally to earth the modules.at1hat-point. ground W Rock-It Coupling ■ Rock-It Mount -Rock-It Array Skirt BracKeT sPaonG Portrait Orientation Landscape Orientation �I I I Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. 32mm modules:Max east/west bracket spacing is 48"OC. Spacing may vary depending upon project specific structural requirements,i.e.high snow and wind load areas may require lesser spacing E-W than the maximum. .sTaGGereD LaYOUT canTlLever anD oFFseT Staggered Mounting Points H Cantilever Offse �> Rock-It Mount _Rock-It Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing. For portrait orientation installations,check layout prior to installing. The array layout instructions in this installation manual offer a general overview of layout. Periodically;due to a variety of Offset: Offset from all roof edges depends on wind speed,snow -factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 ROCK.-IT S Y STC. M 4.0 SYSTem SPeclFlCaTlonS Max No.of_Panels 300 Modules per ground lug Materials 300 Series Stainless, 6000 Series Aluminum Max System Voltage. 1000VDC Coating Black Andodization/Mill Finish Class A Fire.Rating With UL1703Type 1 Rated Lug Specifications BurndyCL504TN.Ground Lug Modules,see note below. .(UL Listing#KDER E9999) Leveling Range 34" Ground Wire 14 AWG-4 AWG Copper .Per above Lug spec. Ground Wire Rock-It Slide Comp Range 3" Max Module Size. 64.96"(1650mm)x Rock It Slide Tile 7" 39:05"(992mm)x 2"(50mmj Min/Max Roof Slope 1/2:12/12:12 Max Downforce/Uplift Rating 45 PSF Max-Anchor Spacing(35mm/40mm)• 72" Rock-It Mount Load Rating 547lbs with Single 5/16"Lag 3.0 Max Anchor Spacing(32mm) 48" Safety Factor .Skirt Box QTY .6 units. Slide Fastening Hole, 5/16"diameter Mount Box QTY 12.units Module Cantilever Maximum cantilever is.1/3 -Rock-It Slide Box QTY 50 units bracket spacing Coupling Box QTY 12.units Warranty .20Year Material and Workman- ship Codes:National Electric Code,ANSI/NFPA.70;NEC 250,NEC 690,IRC,IBC Standards:UL 2703:First Edition,UL 1703 EcoFisteF2Sulnr. --',,'�Ccniaucll Solar ROCK-fT SYSTEM , ROCK-IT SYSTEM MFG ID CODF-GGT-Q2-2016 FJLblODf:IlW 7010 _ _ CONFORMS T0 VL270] CONFORM6T0 UL 2703 iow un.mcsc2 ms1Mu1I� e"Nwuroarouanlwcz - - �_-^O Atf00ll�WllMSPf01GY0D11L6 The Ecol'asten Solar Rock-It System is a rooftop PV racking system consisting of 6000 Series Aluminum and 300 Series Stainless Steel components.-The Rock-it System includes the rack-components but does not include the PV.panels, inverters or electrical components.The PV modules to be used with Rock-it shall be certified under UL.1703.The system shall-be used on steep slope roofs mounted over a Class Afire rated roofing material and attached to the roof structure using-5/16`F diameter-,minimum4'long 300 series Stain less,Steel:lag bolts with minimum thread, embedment depth of 21/2"into the roof structure. Periodic re-inspection for.loose.components The system is subject.to-re-inspection-as-required'by-the PV-module manufacturer or by the Authority Having -Jurisdiction:Re=inspection,as required,should include evaluation.of any loose components-or loose fasteners..All loose components and fasteners should be-secured in accordance with these instructions.-The.system should also be evaluated for.any evidence of.corrosion.Any corrosion.should be removed.Any affected part should be cleaned.or replaced in accordance with these instructions.. �A ,Q,EcoFasten- Solar www:ecofastensolarcom info@ecofastensolar:com 877-85.9-3947 15 A a I FeaTures • Newand.improved.design North-South'adjustability • Fastest;easiest'to level'system on the market • Only.one to6l.required.(172"deep well socket) • Integrated electricalbonding Vertical adjustment.of.3"-4" • SIMPLE-only 4 components Eva-L aT'eD,: COI'1 pa T'I.BLe MODULes Model Type CY'used to' Downward Pressure. Upward Pressure. Down-slope Design. Module Manufacturer Indicate.variabletest)' Module Dim ens]ons(mm) . ModuleDimenslonson) Deslgn'Lbad(psf) Design Load(psf)_ Load(psf) Ma)imumdamp Spacing(in) Thna Solar TSM-xxx4W5,08 1640.x992:x40 64.95"49.05"x1.57" 33.3 33.3 .20 72 Canadian Sig ar CS6P-xxW 1638'x922x40 64.48:'x36.66"x1.57" 33.3 '.33.3 20' 72 Canadian Solar CSSP-xxxP 1638x982:x40' 64.5"x3B.7"x1;57' 33.3 33.3 20 72 JlnkoSolar JKMXXXP-60 1650 x992 x40 64.96"x39.05Nd.57" 30 "30 20 .72 Anko Solar JKMxxxM=60 1650x992.x40 649611x39.05")d',57" 30 30 20 72 JlnkoSolar JKMxxxPP-60 1650x992x40 64.96"x39.05"x1.57" 30 30 20. 72 1lnkoSolar JKMxx)IIM-60 1650'x992x40 64.96"x39.05"�d.57" 30 30. 20 72 VIrol Solar YL2xxP-29b 1650 x990 x40 64.96"x3B.97'x1.57" 30' 30 20 72' LG Elcetronlcs LG300NLGB3 1640 x 1000 x 35' 64.57"49.37N1.38" 30 30 20. 72. LG Elcetronlcs . LG300N1K-G4' 1640 x 1000 x 40 6457"49.3716.57" 30 30 20 72 Axitec Solar 7).W/156.60S 1640 x992 x40. 64.5"x39,06"x1.38" 30 30 20 48' RECOM RCN-2xx-6MB .1640 x992'x35 64.56"x39.05N1.37" 30 30 20 72 Sllfab SLA2xxP 1650.x990x38 64:96"x38.97'x1.49." 30 30 20 72 Solaria PowerXrmaR-BX 1621'x1056x40 69,89"x41.5VC.57" '30 30' 20 48 Hanwha-Q Cells* aPRO.G42xx 1670 x 1000 x 32. 65,75"x39.37'x1.25" -30 30 .20 48. Hanwha-,QOells• 0,PRO G4'2xx. 1670x1000x32' 65.75"x39.37'x1.25" 30 _ 30 20- 72.: Sunpreme GxB-3xxT '1670 x997 x40 65,75"x39.25"x1.57" 30 30' Z- 46 REC REC-xxx-6MB 1675x997x38 65.94"x39.25'k1.5" 20 20 20. 72. REC REC-xxx-6MB- 1675x997x3B 65.94"x39.25"x1.5" 30 30 20 48 SolarWorld SWxxx Mono Black. 1675x961-x33 65.95"x37.8"x1.30" 20- 20 '20 72 SolarWorid SWxxxMonoBlack .1675 x 961.x 33 65.95"x37.B"x1.30" 30 3o 20 48 'Hanwha Q-Cells 32mm modules to be used with special order Rock-lt System components.Call for details. ®a D ®O EcoFasten Solar www.ecofastensolarcom info@ecofastensolar.com 877-85973947 16 Cut Sheet Rock-It-4.040unt A 1. Installation to be completed in accordance with manufacturer's written specifications and installation instructions. ! 2. See spec sheet-or contact manufacturer_for detailed material-,finishes, and configuration.options. 3. Contact manufacturer for detailed layout. 4: Do not scale drawings. { 5. Subject to change without notice. i O I i ® i j i 3.1-7in I' [80.54mm] 2:50in f [63.50mm] I I i i i i I i i } a I I 2.02in 2.14in 2.34in [51 .38mm] [54.37mm] [59.36mm] j i 32mm 35mm 40mm i i I ALPINE . z' 4741 W.Polk Street Ste.4 j ^Ecol'asten Solar SNowGUARDS Phoenix,AZ 85043 j Toll Free Phone.1.888.766.4273 Toll Free Phone 1.877.859.3947 Material:See Spec Sheet Toll-Free-Fax 1.888.766.9994. Toll Free Fax 1.888.766.9994 Scale: 1:2 1 6/28/2017 1 A$G: - EFS: X i Data Sheet Enphase Networking Enphase The Enphase IQ Combiner 3"' with Enphase (� .- IQ Envoy' consolidates-interconnection- equipment�+®Il'lbltlel' 3 equipment into a single enclosure and- (X-1Q-AM1-240=3) streamlines PV and storage installations.by providing:a consistent,-pre-wired solution for residential applications: It offers up to four 2-pole.input circuits and Eaton BR series busbar assembly. Smart d1 Includes.IQ Envoy for communication I and control Flexible networking supports Wi-Fi, Ethernet,or cellular Optional AC.receptacle available for PLC Li bridge . .i Provides production metering and optional consumption monitoring . Simple • Reduced size from previous combiner Centered mounting brackets support single stud mounting Supports back and side conduit entry Y • Up.to four 2-pole branch circuits for.240 VAC plug-in.breakers-(not included) 80 A total PV or storage branch circuits Reliable • Durable NRTL=certified NEMA#ype 3R enclosure • Five-year warranty U` • UL listed To learn LISTED' ore about Enphase offerings,visit enphase.com � E N P H AS E. Ehphase IQ. Combiner.3 A ' MODEL NUMBER.' IQ Combiner 3 X-IQ-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy'printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2.5%). ACCESSORIES and.REPLACEMENT PARTS(not included,order separately). Enphase Mobile Connect" CELLMODEM-03(4G/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 -'CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-M1(4G based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Consumption Monitoring*CT CT-200-SPLIT Split core current transformers.enable whole home consumption metering_(+/-2.59io). Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. BRK-10A-2-240 Circuit breaker,2 pole,10A,Eaton BR210 BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 EPLC-01 Power line carrier(communication bridge pair),quantity 2 XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) XA=ENV.PCBA=3 Replacement IQ Envoy-printed circuit board,(PCB)for Combiner 3• ELECTRICAL SPECIFICATIONS Rating Continuous duty 'System.voltage 120/240 VAG,.60 Hz Eaton BR series busbar rating 125 A Max.continuous current rating(output to grid) 65.A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers.only(not.included). Max.continuous current rating(input from PV) 64 A Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoybreaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy MECHANICAL DATA Dimensions(WxHxD) 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6.63").Height is 21.06"(53.5 cm with mounting brackets).. Weight 7.5 kg(16.5 Ibs) Ambient temperature range -400 C to+46°C(40°to 115-F) Cooling Natural convection,plus heat shield Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction Wire sizes •.20 A to 50-A breaker inputs: 14 to 4 AW.G copper.conductors • 60 A.breaker branch input: 4 to 1/0 AWG copper conductors • Main lug.combined output:.10 to"2/0 AWG copper.conductors • Neutral and ground: 14to 1/0 copper.conductors Always.follow local code requirements for conductor sizing.- Altitude To 2000 meters(6,560 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi 802.11b/g/n Ethernet. Optional,802.3,-.Cat5E(or Cat 6)-UTP Ethernet cable(not included). Cellular Optional,CELLMODEM-01 (3G)or CELLMODEM-03(4G) or CELLMODEM-M1(4G based LTE-M) (not included) COMPLIANCE Compliance,Combiner UL 1741 CAN/CSA C22.2 No.107.1 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) Compliance,IQ.Envoy. UL 60601-1/CANCSA 22.2 No.61010=1 *Consumption monitoring is required for Enphase Storage Systems. To learn more about Enphase offerings,visit enphase.com. ©.2018 Enphase Energy.All rights reserved.All trademarks or brands In this document are registered by their respective owner. n .E N P H A S E. 2018.09-13 �� A � Installation Manual Soltection - RJ4 Rooftop Solar Junction Sox Flashing Unit _ For Composition/Asphalt-Shingle Roofs v. F. • Manufactured by: Soltection: a division of Vynckier Enclosure Systems, Inc. 271 McCarty Street Houston,TX 7.7029 1-866-227-0577 www.soltection.com Soltection RJ-1 Installation Manual Page 1 TABLE OF CONTENTS INSTALLATION INSTRUCTIONS Contents IMPORTANTSAFETY INSTRUCTIONS........................................................................................................................4 SAFETY WARNINGS &CAUTIONS ..........................................................................................................................4 ELECTRICAL PRECAUTIONS....................................................................................................................................5 MECHANICAL PRECAUTIONS.................................................................................................................................. 5 PRODUCTINFORMATION.............................................................................................................................................. 6 OVERVIEW...................................................................................................................................................................... 6 PREP & PLACEMENT...................................................................................................................................................... 7 REQUIREDTOOLS....................................................................................................................................................... 7 PRODUCT PLACEMENT..............................................................................................................................................7 SPECIFICATIONS .......................................................................................................................................................... 11 MECHANICAL/ ELECTRICAL................................................................................................................................... 11 TORQUERATINGS..................................................................................................................................................... 11 WARRANTIES: Seller warrants to Buyer that products and any services furnished hereunder will be free from defects in material,workmanship and title and will be of the kind and quality specified in Seller's written quotation.The foregoing shall apply only to failures to meet said warranties (excluding any defects in title)which appear within two years from the date of shipment hereunder. The conditions of any tests shall be mutually agreed upon and Seller shall be notified of, and may be represented at, all tests that may be made.The warranties and remedies set forth herein are conditioned upon (a)proper storage, installation, use and maintenance, and conformance with any applicable recommendations of Seller and (b) Buyer promptly notifying Seller of any defects and, if required, promptly making the product available for correction. If any product of service fails to meet the foregoing warranties(except title), Seller shall thereupon correct any such failure either at its option, (i)by repairing any defective or damaged part or parts of the products, or(ii)by making available, F.O.B. Seller's plant or other point of shipment, any necessary repaired or replacement parts.Where a failure cannot be corrected by Seller's reasonable efforts, the parties will negotiate an equitable adjustment in price. The preceding paragraph sets forth the exclusive remedies for claims (except as to title) based on defect in or failure of products or services;whether the claim is in contract, indemnity,warranty, tort(including Seller's negligence), strict liability or otherwise and however instituted. Upon the expiration of the warranty period, all such liability shall terminate and Buyer shall have a reasonable time,within thirty days after the warranty period,to give written notice of any defects which appeared during the warranty period. Except as set forth in Article 2, "Patents," the foregoing warranties are exclusive and in lieu of all other warranties, whether written, oral, implied or statutory. NO IMPLIED STATUTORY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE SHALL APPLY. Seller does not warrant any products or services of others which Buyer has designated. www.soltection.com Soltection RJ-1 Installation Manual Page 3 IMPORTANT SAFETY INSTRUCTIONS . D ALL INSTRUCTIONS & SAFETY WARNINGS PRIOR TO INSTALLATION NOTE: SAVE THESE INSTRUCTIONS This manual contains important instructions that shall be followed. during.installation and maintenance of the- Soltection RJ-1 rooftop-junction box with flashing. 1ALETHAL.VOLTAGES ARE.PRESENT DURING THE INSTALLATION, OPERATION AND:SERVICE OF THIS EQUIPMENT. PROPER PRECAUTIONS MUST BETAKEN AT ALL TIMES TO ENSURE THE SAFETY OF THE SERVICE PERSONNEL. . SAFETY WARNINGS & CAUTIONS • Only qualified personnel or licensed electricians should install this product and the instructionsherein are provided-for those individual(s)only. ■ To reduce the.risk of electric shock, injury, or death, all electrical wiring and connections must be performed by qualified personnel. ■ Lethal voltages are present during the installation, operation, and servicing of this equipment. Proper precautions must be taken at all times to ensure the safety.of the service personnel. ■ Follow state and federal. Occupational Safety and Health Administration (OSHA) .guidelines- and regulations when installing this product. ■ Utilize proper Personal Protective Equipment(PPE)as required per national and local regulations-as well as for installation best practices. ■ Install this.apparatus-in accordance with ANSI/NFPA 70., National Electrical Code. (NEC). Follow.all national or local.electrical codes. ■ Install, operate, and use this product in.a.manner consistent with.the instructions provided: Failure to follow the procedures indicated may result in roof leaks,-property damage,-or-consequential damage. www.soltection.com Soltection RJ-1 Installation Manual Page 4 + 1 1� CAUTION ELECTRICAL PRECAUTIONS ■ Ensure all electrical conductors.are-at zero voltage potential-before installing or servicing this unit-. ■ Never break contact on a.circuit without using.the appropriate disconnect device. ■ Follow established lockout and.tagout procedures for-all electrical conductors prior to servicing. ■ Beware of power-.lines in the vicinity of the roof,.where.inadvertent.contact may result in electrocution,. personal injury,.or death. ■ When disconnecting source-or supply circuits, provide sufficient time as stated in the.power.electronics manufacturer's instruction manual in order to-ensure discharge of all conductors-in the circuit. • Always verify the integrity and proper installation-of the electrical components prior to energizing electrical. circuits. ■ Non-metallic enclosures do not provide.grounding means between conduit connections. The use of grounding hubs and,jumper wires are required. ■ Grounding must be sized per NEC requirements, and is the responsibility of the installer. MECHANICAL PRECAUTIONS ■ When drilling into an attic space, ensure that electrical wires, mechanical obstructions, or potential electrical hazards are removed from the vicinity and direction of the drill. ■ Do not install if the roof is wet, frosted, or covered by ice or snow. ■ If any part of this.product becomes damaged, • remove and.destroy the entirety of-the unit. Failure--to do so may result in fire, property damage, -personal injury, electrocution, or death. ■ Do not use the product to anchor fall protection equipment. www.soltection.com Soltection R]-1 Installation-Manual Page 5 PRODUCT INFORMATION OVERVIEW ■ The Soltection RJ-1 Residential Rooftop Junction Box is a flashed roof penetration designed to protect electrical conductors entering the rooftop/attic. It is made of a high-strength UV-resistant and UV- stabilized polymeric material. ■ The RJ-1 enclosures comes fully equipped with a slotted DIN rail mounted inside the enclosure designed for mounting of DIN rail accessories, such as terminal blocks. ■ A four position ground bar is also provided as a means to form a bond between the solar array mounted on the roof and the building. CORNER SCREWS MOLDED COVER PLASTIC SCREW FOR GROUND BAR AFFIXING DIN RAIL GROUND BAR 0 0 0 0 0 MOLDED BASE DIN RAIL www.soltection.com Soltection RJ-1 Installation Manual Page 6 PREP, & PLACEMENT REQUIRED TOOLS ✓ Shingle Ripper Bar ✓ #2 Phillips Screwdriver ✓ Lumber Crayon ✓ Uni-Bit ✓ Hole Saw or Spade Bit ✓ Utility Knife ✓ Roofing Sealant RAFTER-,, PRODUCT PLACEMENT 0 Identify the location and placement of the flashing on the roof as shown. The product may be mounted beneath the array or adjacent to the array. DO NOT-LOCATE THE PRODUCT DIRECTLY OVER A RAFTER TO- ENSURE THE'RAFTER DOES NOT INTERFERE WITH THE WIRING- Remove template from packaging and use in Step,2 ENTRY.INTO THE ATTIC STEP 1 www.soltection.com Soltection RJ-1 Instillation Manual Page 7 •4 yy�ry 2a�•r e't Position the top edge of the template 1/2" Trace and continue using a lumber crayon to the above the 1st course of shingle as shown. bottom of the 2nd course. Cut along lines and remove shingles. STEP 2 STEP 3 I RECCOMENDED LOCATION FOR . CONDUIT ENTRY INTO ROOF— O / O RAISED AREA III MOLDED BASE.-= a, Remove any roofing nails beneath the 1st, 2nd,or DRILL PILOT HOLE 31d course of file that obstructs the position of Slide RJ-1 Junction box into place where you the roof flashing. cut shingle template.The image above shows STEP 4 where you will drill in the next step STEP 5 www.soltectioh.com Soltection 11J-1 Installation Manual Page 8 }A Y 1�airSN �+%`i. ,F�_ ��,t g•�NK we I+;lllt�AA�,�d�iia�.�� �i �fS,+,'i�•n<�t;t'yr�� + �'''"r�+„ \� xL^'(,5�� rj� +�hk��,. ''$�s�.: i.4��•��� �S'?��r' ♦ i n` ?.a� i�. f'•,�,ti$ `�S�' ' r a t� `°..K'� �x g•" �y�'.''�}r���S��1 f. rot i e � 3` b b4C �1f a, 41 anti. 1�t ,,1 1,•e+" 4;i }� tI {px..Aye F y 1! � 1.: ,Mr`' {t t,.'<�_r�✓ �,.'�t{.`i at 11¢" y r ttN JL,r a fla A.F t•t R�♦��F i.\A y!SS'7 7O 1TAX!at t,�Qr•Jl ab��,rqf vlM t�s k'ft T?���'�,'j f' .. ,E �� Jr Lyt+�r r x +�'al r tl iv,J's'F'tE T'�• h /I � .q � � raL s�;S�.�a��r f a'1• �' 'Y A4 r���? �+y ��r�ylti a 5 W,1 T ti'� ky Lt y Cn } ri �� T' {` r{ 1Af•? .r 7f g' t mow!, �! F �{•` >-7� t��t �Y S.1e• r Gfs t.�i �* tN.�� F R a y�' • • �fit�,j�z-�� 7`y,•¢� S.''q a ��,.,,7t4z,� '� ��y5��.�� _ - _ rr tyT L*-ut ♦ :, n iy '�"r t' •�'1i i "L. �;., 3 t:'Zk +fj: - �71 VI iipg— � 'c q•,rd "`x",.f' zjr. ' sh 4 t LyA•";''�Y�,ri .rC1�`'�r yf�e,�r• iv�.�f.aY a� � Jy t�- ,y 4,-�w �tk_.if`'ry,Y3yA' . 'y,; w`yS 'C �pl • �� t M ✓}��l��y NOW am ". v ra • � • • 1 S' Remove RJ-1,flip it over,wipe it clean &apply Reinstall Unit. Use the two supplied Decking a bead of roofing sealant to the underside of the Screws to mount the flashing to the roof. flashing unit. Ensure that it's placed in the Torque to the specification indicated in the "Upside-down U"Shape to support engress specifications. Refer to Table T2(page 10)for water protection,AS SHOWN. the proper tightening torques. STEP 10 STEP 11 POPULATE RJA • Populate the RJ-1 unit using the .t ,: appropriate wire connectors, terminal �w ;.. blocks, or other necessary components. ``r' }° • Ensure that the components installed are rated for and are suitable for the intended s ` purpose. • The RJA unit is provided with multiple standoffs which can accommodate accessories to be mounted. Step 11 . A Install the cover onto the top of the enclosure. Tighten 4 cover screws to the Torque value indicated in Table T3(see page 10) STEP 12 www.soltection.com Soltection RJ-1 Installation Manual Page 10 SPECIFICATIONS MECHANICAL/ ELECTRICAL ■ Product Certifications:-UL508A ■ Enclosure Rating:Type 4X ■ Attic.Conduit Pass Through Connector Size Range: 112"—1" ■ Max:Side Wall Conduit Size: 1" ■ Maximum Current: N/A ■ Maximum Voltage:N/A ■ Ambient Operating.Temperature: -35C to 75C TORQUE. RATINGS Table T1:Ground-Bar Connection,,Wire Range:#4 to#14, 4 Usable Connections 0 0 0 Wire Size Tightening Torque(lb- in 4-6.AWG 35 8 AWG 30 10-14 AWG 25 Table T1 Table T2: Mounting Screw, Mounting to Deckin , 2 Provided Ti htenin .Torque Ib4n 1.15-20 Table T3: Tor ue Values, Cover/Lid Screws.,4 Provided, Captive Tightening Torque Ib-In - 11 www,.soltection.com Soltection R]-1 Installation Manual. Page 11 ■ TM so-Itection by vynckier Soltection is a division of-Vynckier Enclosure.Systems, Inc. 271 McCarty Street Houston, TX 77029 1-86&227-0577