Loading...
HomeMy WebLinkAbout21-1633 D Q� totu0tl=. City of Zephyrhills PERMIT NUMBER - �_ 5335 Eighth Street Zephyrhills, FL 33542 BGR-001633-2021 Phone: (813)780-0020 `t • Issue Date: 03/05/2021 Fax: (813)780-0021 Permit Type: Building General (Residential) Property Number Street Address 10 26 210120 00000 0610 37434 Castleberry Dr Owner Information Permit Information Contractor Information Name: JERRY LEE DANFORD REV TRST Permit Type:Building General(Residential) Contractor: CORNERSTONE PROS Class of Work:HVAC Changeout Address: 37434 Castleberry Dr Building Valuation:$0.00 ZEPHYRHILLS,FL 33542 Electrical Valuation:$0.00 / Phone: Mechanical Valuation:$7,512.00 Plumbing Valuation:$0.00 Total Valuation:$7,512.00 Total Fees:$77.56 Il Amount Paid:$77.56 Date Paid:3/5/2021 1:00:33PM Project Description A/C CHANGE 3.5 TON Application Fees Mechanical Permit Fee $77.56 REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and!Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date Received .Phone Contact for Permitting Owner,'s:Name Owner Phone Number Owner,'s:Address S-{'I Owner Phone Number . 1 If L LS Owner Phone Number JOB ADDRESS ���L3�( S-{�� �f se LOT# SUBDIVISION 01ta ARCEL,ID#1 �0 '240-21 - CZb^ (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT = SIGN = = DEMOLISH R INSTALL e, REPAIR PROPOSED USE' 0 SFR Q COMM = _-OTHER TYPE OPtONSTRUCTION = BLOCK-- Q FRAME 0 STEEL DESCRIPTION OF WORK r✓ Cif+ oL ` L, d l BUILDING SIZE SQ FOOTAGE HEIGHT =BUILDING $ VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL $ AMP SERVICE = DUKE ENERGY = W:R.-E:C. =PLUMBING $ 1�33 �AMECHANICAL $ -7S l 2 t VALUATION OF MECHANICAL INSTALLATION �j �2v. =GAS = ROOFING 0 SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA AYES BUILDER COMPANY SIGNATURE . REGISTERED Y/•N`" FEE CURREP Y/N Address License# ELECTRICIAN COMPANY SIGNATURE REGISTERED Y/ N FEE CURREN •Y/N Address License# PLUMBER ! COMPANY SIGNATURE REGISTERED Y/ N. FEE CURREN YTN. '. ' Address Liicceensse4 MECHANICAL COMPANY SIGNATURE REGISTERED - FEECURREt-- Y,/.N. . -_ Address"-- - - License,#r .0 N�g ILL,Lt OTHER COMPANY. - . SIGNATURE REGISTERED' Y/:N FEECURREII Address License# RESIDENTIAL Attach(2);Plot:Plans;;(2).sets of Building Plans;(1.)set of;Energy Forms;:R-.O-W-Permit,fornew construction„ Minimum ten(10)working days aftersubmitial-date. Required onsite,Construction Plans,:Stbrrnwater Plans w/-Silt Fence-installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for.new construction.. Minimum ten(10)working days after submittal date.'Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. . ""PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement is required. (A/C upgrades over$7500) Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING .(copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage)" Driveways-Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any Y applicable deed.restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR 'RESPONSIBILITIES: If the owner has hired'a contractor i or contractors-to-undertake-work, they may be required to be licensed in accordance with.st@tq>--a.nd local-.regulations.,r if the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or-intended contractor are uncertain-as to what licensing,:requirements..may_cipply-,for.i,he intended work, they are advised to contact the Pasco County.Building Inspection Division—Licensing Section at 727-847- 8009. - Furthermore., -if the.owner has,-hired'a,contractor. or contractors, he is advised,-to have the contractor(s) sign portions of the"contractor-Block" of this application--for which they will.be responsible. �If.,you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County, TRANSPORTATION6.IMP-ACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply-to the construction.of-new buildings, change of use in existing buildings, or expansion of existing buildings, as sp,pcified in Pasco County Ordinance number 9-07 and 90-07, as amended. The,.,iind6rsigiied..a,iso.underptands,-that sti6h fees, as-may be-due, will-be identified at the time of permitting. It is further understood that Transportation-Impact Fees and Resource Recovery Fees must be paid prior to receiving a "Certificate of occupancy" or final power release.. If the-,projiact does not'involve a certificate of occupancy or final.power.release; the fees:must be paid.prior to permit issuance. 'Furthermore, if-Pasco County Water/Sewer Impact fees are.due;Ahey-must.be paid,prior to permit issuance in accordance with applicable Pasco County ordinances. - CONSTRUCTION.LIEN LAW(Chapter 713, Florida Statutes,as.iamended): If valuation of work is$2,600.011 or­mo e, I certify that 1, the applicant,-have been provided with a copy OU the "Florida Construction,Lien Law—Homeowner s Protection,-Guidq7 prepared by the Florida Department of Agriculture and Consumer Affairs. .4 the applicant.,is someone other than the"owner", I certify that-I have obtained a copy bf-the above described document and.promise in.good faith to': deliver it to the"owner"prior to.commencement,. CONTR,ACTOR!S/O.WNER!.S:,AFFIDAVIT:. I certify-that al[the information in this.applicationi,is.accurate and that all work will be done in compliance with all applicable laws regulating construction', zoning and land-development. Applicatid I n is hereby made to obtain a permit to do work- and installation as indicated. I certify that no work or installation has commenced-prior-to,Issuance pf a.,permit and.that all work will be performed to meet standards of all laws regulating construction, County-and City�.,codes,-`z,oning regulations, and land' development regulations in the jurisdiction'.. 1.:also certify that I understand that the regulations of other government agencies may-apply to-the intended work, and that lit is my responsibility to identify what actions I must take to be in compliance. Such agencies include-but are-not limited to; Department of Environmental Protection-Cypress Bayheads, Wetland Areas and-Environmentally Sensitive Lands,WaterMastewatet.Tteeitm.ent: !­i­ Southwest Florida Water Management District-Wells, Cypress -Bayheads,' Wetland Areas, Altering Watercourses. Army Corps of Engineers-Seawalls,' Docks, Navigable" Waterways, Department of Health & R6hab.fliiative Sei;vic6i1EhV'1t6hmentaI Health"'Unit Wells, Wastewater.:Treatment, . Sqpjlg Tanks. VS-'Environmental,Protection:A§dndy=A$b6st6srobat6ment.- Federal Aviation Authorfty-RUnways. I understand-that:the,following restrictions apply to.theuse 6f-fill: Use Of.fill-1s not allowed in Flood Zone,V"unless,expressly permitted. If the-fill material is to be used in Flood Zone "A", it is understood that a drainage plan-addressing a acom0ensating-,.volume''' e-will b submitted at time of,permiffing,which-is prepared.,by.a..professional engineer licensed by the State Of Florida. If the fill-material is to..be used 4n.Flood Zone "A in connection with a permitted building using stem[wall construction,,I certify that fill will be-used only to fill the area within the stem wall.. If fill material is to be used .in any area, I certify that use of such fill will not adversely affect adjacent properties. -If use.'Of.fill.is found to..adversely affect adjacent-properties,the owner may be cited-for violating y I the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which'are tiev6te'd.2,by'fill;'ran-I,6ngih"eered draiha6e,,plan-is required. If I am'.-the,-AGEN*,-"-Fdk::'T-HE,OWNER, I promise,in.good-f6ith,,to.;inform.-the-owner of-the permitting-conditions set fohKin this�,�affidavit:prior-.to,,.commencing construction. I understand.that a separate permit may be required for electrical work, plurftbihj,, signs.' wdIls-, 'air-conditioning -gas-,"or;."or.other installations-.n6t-,specific;al!y,included in the-applicatidin. A permit.issued-shall.,be-Qons.trued.-to be p license to proceed�.,withjthe work and not as autho—rity-joy'lolate, cancel, after, or set aside any pr6vWo'*hs_6f the46chhical bodet,,.non shall issuance-of a permit prevent the Building"Official from thereafter requiring a correbtfioinof--'errors in,"plans,construction or violations of-any codes. Every permit issued sh'allr become invalid unless the work authorized by­sqdh.,.0pr-mit is commenced Within six months of permit issuance, or if work authorize'd,by the:permit is suspended or abandoned for a period-of-six(6)months after-the,time'the-work is commenced. An extension may-be-requested, in writing, from the Building Official for a--.period not to exceed ninety(90) days and will demonstrate justifiable,cause for the extension. If,Work ceases for ninety(90)consecutive days,the job is considered abandoned. 1 WARNING--TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT.MAY RESULT IN-.'TOUR PAYINi3T*W'IdEF'OFt'IMPROVEMENTSTO�Y,OUR,PROPERTY. IF YOU rINTEN'D.TO.OB.TAIN FINANCING,:CONSULT WITHXQUR LENDER QR,*AN ATTORNEY BEFOREJRECORDING YOUR-NOTICE-OF COMMENCEMENT. FLORIDA JURAT(F.S.117 e7 OWNER OR AGENT CONTRACTOR pz' 1�*p(gr=Md)bef Subscribed and-sw subscribed and sworn to(or-affirmed),before.me this by zc�l by islare personally knownJq,,Ti or has/have produced" Who is/are personally known to me.or has/have-produced ---------------- as identift Eon. as identification. otary Public Notary'Public Commission Nr RR FNDAM.MCCLELLAN Commission No. P WCOMMISSION #GG 286216 EXIRM ItA11119Y",901% Name of Note Me P Name of Notary typed,-printed or stamped *". 3/4/2021 Cornerstone Pros Proposed by:Jason Jerry Danford 3 Braunstein 37434 Castleberry Drive 4946 land o lakes blvd Zephyrhills,FI 33542 land o lakes,fl 34638 Tel:8137829470 Tel:8139494445 Jerry.danford@icloud.com jason.b@comerstonepros.com ppOONOmONING•PLUMBING•ELECryUGt comerstone pros Install Address:Same ump LBETTER Your Investment: ==� $100/MO* I with approved credit FDaikin (, ' Included Deductions: II •CASH DISCOUNT($223.21) 1_ i.. Daikin Honeywell DZ16SA0421 �: i ASPT471314 TH621OU2001 -16 SEER -Fixed S eed " -T6 Pro Net investment after all p available discounts -Single-Stage i -Air Handler/ - -Programmable Thermostat 2h/1 C 5-1-1 7 572 Heat Pump -12 Year Limited Warranty Unit Replacement -12 Years Limited Warranty Parts 1412 Year Limited Warman y Unit Replacement Financing Details: -12 Years Limited Warranty Pans + Min 1.32%minimum payment A � 9.99%APR Payment based on 120 Mos SPECIAL INCLUSIONS: 5 KW Heater Heat Pump Materials 12 Year Parts 1 Year Labor *12 Year All Parts&1 year Labor *No Lemon Guarantees,Outdoor Unit Replacement if the compressor fails within the 6 year period from install*One Year Craftsmanship Guarantee- Cornerstone will stand behind the quality of the installation.*24 Hour Response time Service Guarantee 7 days a week.* Apples to apple Guarantee we will match any competitors written quote apples to apples*One Complimentary AC system tune- up at the end of the first year.* Eligible for 12 months no interest financing or 9.99 interest for 10 years financing. httpsJ/s3.amazonaws.com/ceproposals-production/ceproposals/proposals/hardeopy/H VACproposals.com-1500110-customer-Spring-Template-2021—... 1/5 3/4/2021 Cornerstone Pros AVAILABLE UPGRADES & OPTIONS To order your Upgrade(s)&Option(s),please click on the box J t a1pcONg1T10NING-PLUMBING+ELE IC AC _.i UPGRADE 11(APPROVED and included in the price) J $295.00 Available for:BETTER Ecobee or Nest thermostat t I UPGRADE 2(DECLINED by the customer and not included in the price) $1,200.00 $ Available for:BETTER 12 Year Laborfwarragty Assurecare i �4 ":UPGRADE 3(APPROVED and included in the price) I $0.00 P 1 Available for:BETTER Vertical Air Handler t �6 ! f F; UPGRADE 4(APPROVED and included in the price) $0.00 tr Available for.-,'BETTER ySurge protection for condenser unit UPGRADE 5(APPROVED and included in the price) $0.00 it Available for.'BETTER Fresh Alre single bulb UV lamp r` https://s3.amazonaws.com/ceproposals-production/ceproposals/proposals/hardcopy/HVACproposals.com-1500110-customerSpring-Template-2021—... 3/5 3)4/2021 Comerstone Pros 15.I,the consumer,understand the terms and conditions of the third parry finance company that I have selected to finance this project with and understand that once the project is complete all payments for the project and payment issues will be directed to the third party finance company that was selected by the consumer. Cornerstone assumes no responsibility with the finance contract that was signed by the consumer with the third party finance company. ; 16.I,the consumer,understand the terms and conditions of the Renew Financials PACE program,including but not limited to the program description,how the program and payment terms work and what type of work and/or services qualify for the finance program.Cornerstone Pros uses Renew Financial as a recommendation to consumers if denied for traditional financing. If the consumer agrees to use the Renew Financial PACE program,they waive their right to the three day right of rescission.Cornerstone Pros is not responsible for any misunderstanding of the program and/or the program terms and has provided the consumer with all program details and contact information for Renew Financial. -By signing below you,the consumer,agree to all statements above and waive the right to seek legal action against Cornerstone Pros for any reason regarding the Renew Financial PACE Program Cornerstone Pros proposes.hereby tb4urnish and install the equipment and materials as described above on the terms and conditions N,, provided herein.This proposal is good for thirty(30)days from the date hereof but may be accepted at any later date at the sole discretion of Cornerstone Pros. 1 Spring Template 2021-3.5 ton•Date Created:03-03-2021 r, PP / 11J I Payment Options Cashl / ;� 11 Jerry L.Danford March 4,2021 https://s3.amazonaws.com/ceproposals-production/ceproposals/proposals/hardeopy/HVACproposals.com-1500110-customer-Spring-Template-2021—... 5/5