Loading...
HomeMy WebLinkAbout20-1064 - ao H City of Zephyrhills PERMIT NunnBER —I' 5335 Eighth Street Zephyrhills, FL 33542 BNR-001064-2020 a. Phone: (813)780-0020 Fax: (813)780-0021 Issue Date: 12/17/2020 Permit Type: Building New (Residential) P.ro a Number >. ' `f hin .-� Street Acitlress " . 04 26 21 0130 01000 0220 6610 Cobble Bliss St - '.q�t�e3a. :�— SV�°`'---_- 1',A''3- -- ,••' Pt _. - :.,xr, }.JOwner;Information w Permitrtlnform_ation Contractorinformatl h< _ } Name: D R HORTON Permit Type:Building New(Residential) Contractor: D R HORTON INC Class of Work:SFR Construct Address: 12602 Telecom Dr Building Valuation:$160,000.00 TAMPA,FL 33637 Electrical Valuation:$8,200.00 Phone: (813)549-1968 Mechanical Valuation:$6,000.00 Plumbing Valuation:$9,500.00 Total Valuation:$183,700.00 Total Fees:$14,770.94 Amount Paid:$14,770.94 gq Date Paid:12/17/2020 1:05:13PM �- ��1 — Pa:.p 8ms�" y,y� rojectDescription.N6`r e ': a .. � r4:.. r'w.,k CONSTRUCT SINGLE FAMILY 3,713 SQ FT-SILVERADO Public Safety Impact Fee-Police $254.00 Address Fee $30.00 Transportation Impact Fee-City $36.32 Plumbing Plan Review Fee $43.75 Public Safety Impact Fee-Admin $26.35 Plumbing Permit Fee $87.50 Driveway Fee $45.00 School Impact Fee $8,328.00 Building Permit Fee $830.00 Electrical Permit Fee $81.00 Park Impact Fee-Single Family/Townhome $769.56 Mechanical Plan Review Fee $35.00 SIF 1 percent Fee $83.28 Electrical Plan Review Fee $40.50 Building Plan Review Fee $415.00 Transportation Impact Fee $3,595.68 Mechanical Permit Fee $70.00 REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection,whichever is greater,for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. "Warning to owner:Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing,consult with your lender or an attorney before recording your notice of commencement." Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 .HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER City of Zephyrhills Permit Application Fax 813-780-0021 Building Department D I ate Received Phone Contact for Permitting 6(v_(Daekorito CAw" Owner's Name Owner* Phone Number Owner's Addressl �7aphp 33 Owner Phone Number Fee Simple Titleholder Name ML Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS LOT# SUBDIVISION F_3 - i kie-mx\o PARCEL ID# NL4 -2-(e 7� 61-V5 MCOO 67M (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTRR ADD/ALT SIGN = DEMOLISH INSTALL REPAIR PROPOSED USE SFR Q COMM OTHER TYPE OF CONSTRUCTION BLOCK Q FRAME STEEL DESCRIPTION OF WORK :51M, 10 &V1d%4� rJfSiJ9rK_L BUILDING SIZE SQ FOOTAGE Zift HEIGHT =BUILD`IN`G. . . VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL AMP SERVICE PROGRESS ENERGY = WA.E.C. =PLUMBING =MECHANICAL VALUATIO N OF MECHANICAL INSTALLATION 0A rN* I =GAS Ey ROOFING 0 SPECIALTY OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO 9. (C) . . . . . . . . . . . . . . r 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . BUILDER COMPANY IV\ SIGNATURE o REGISTERED Y/ N FEP_CURRER L_LLN__j Address (007, f-COVA, 2)1- License# 1—CiE scmu I _R> :&Aq Elerfn-- L ELECTRICIAN # 01 COMPANY s SIGNATURE REGISTERED Y/ N FEE-CORREN Y-7 N I Address ,�4 _JbhIfts_VkWw %, ,4-n License# I Ec Q 039-1 S_ PLUMBER COMPANY A . SIGNATURE REGISTERED Y/ N 'FEECIJRRdh I YIN_ l L Address RZ-11 TZ !cerise# aw 1362s?— 6(4142- MECHANICAL COMPANY SIGNATURE REGISTERED VN I FEE CURREN -1"Y- N Address 15-q07 I)Dnjv� C� lLieWt 5­1 License# [a co 33 5. HER COMPANY NATURE REGISTERED FEE CURREN Y/N Address Net, pal 1-11 111111111 111 1 1 1 1 1 1 License#J cwl 2 5-_2 3-3 111111111111 11111- IMPI-1 111 -11 , ENTIAL - Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy-Forms;R-O-W Permit for new construction, - Minimum ten(10)working days after submittal-date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence Installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects ICIAL Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, Sanitary Facilities&I dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance 1IT Attach(2)sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW Construction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - oplication completely. Contractor sign back of application,notarized 500,a Notice of Commencement is required. (A/C upgrades over$7500) the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same LATER PERMITTING (copy of contract required) S Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired' a. contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as.required by law, both the owner and contractor may be cited fora misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing.Section at 727-847 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly.Iicensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees'and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more,I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner", I certify that I'have obtained a copy of the above described document and promise in good faith to deliver it to the"owner" prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify,what actions I must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, WaterMastewater Treatment. Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health -Unit-Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency-Asbestos abatement. Federal Aviation Authority-Runways. I understand that the following restrictions•apply to the use of fill: Use of fill is not allowed in Flood Zone"V" unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely .affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior, to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included-in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if-work authorized by the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days, the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE_FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO-OBTAIN-FINANCING;C-ONSUL-T- WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S.117.03) OWNER OR AGENT CONTRACTOR Subscribed and sworn to(or affirmed)beforp me this Subscribed and sworn to(or affirmed)before me this by��(n1 1�n na j n9 by Who is/are personally known tome or has/have prodbted Who is/are personally known to me or has/have produced f as identification. as identification. ."_414 Notary Public Notary Pub Commission No. Commission No. Name of Notary typed,printedJ Name of Notary typed,printed or stamped Poeo Notary Public State of Florida Michelle Moyes My Commission GG 057321 -Zot rt Expires 120/2020 w PASCO COUNTYo FLORIDA _ Permit No. t Date Permitted I I-LO--2 Z 6 Builder Name/Owner.Name &b 'COP'—e—rn Control W County Parcel No. L1(f 2 & 21:ID 130. 610()0 02-7o SubDiv: S., -ra-c Address/Location 6? l b 0-616b 2 s r r�Clessification/Type of Uso c5r�'1 TRANSPORTATION IMPACT FEE Rate: Sq.Ft Unit: Exempt n lies (] No How Determined impact Fee Amount $.'(3r 60✓)— Zone No. TAZ: SCHOOL IMPACT FEE Account (05t3) Stngte-Remtty Detached House Amount $ (057) -Mobite Home i (058) Other_Residentiat 123), Collectlon Fee- ` Exempt (�Yes.,[]No How Determined PARKS AND'RECREATION FEE` Land Account Land Credit Land Total Recreation Account Recreation Credit Recreation Total Zone TOTAL AMOUNT $ '• / ,9 Exempt ❑Yes ❑No How Determined` LIBRARY FEE ., Land Account Land Credit Land Total Facility Account Facility Credit Facility Total Exempt ❑Yes 0 No How Determined Total Amount RESOURCE FEE ERU' TOTAL AMOUNT Prepared By ` *� Checked By NO CERTIFICAT.4- ,F OCOUPANOYWIl t;HE ISSUED-OR:FINAL,INSPECTION PERFORMEDIUNTtL`'THE':T�'Tftl:AMOUNTS IISTED-HAVE' BAERf.AID-AND; RECEIPTED-FOR BY A CENTRAL PERMITTING OFFICE-OF PASCO COUNTY Aciaiawiedgamantpalow loss.not Imply arxxiptenc@ of ao=rrance,.but elrnplyr Wlpt of e_coov of.thle forth,Placing the buNfig'permitawnwen'nodce of this ameament and that donif hs of payment forsame, DATE RECEIVED BY RECEIPT NO. DATE BY D k Single Family Dwelling Plan Review Comments 1. F.F.E. shall be a minimum of 8" above the road elevation and an engineered site plan. 2; Lots shall be graded to comply with R401.3 of the F:B.C. 3. Compaction test required if 24"or more of fill.dirt is brought in at any one place. 4: Tie in survey required before pouring concrete. 5. Driveways require.a R.O.W. use permit. All 4 sides of driveway thru the sidewalk shall-have expansion material.. 6: All setbacks shall be met. 7. Ail property markers shall be uncovered.and marked at time of first inspection. & All&D.A. requireriients shall be niet; . 9: No electric,plumbing; mechanical, or.framing shall be.covered without an inspection and approval f rst: 10:All Garages shall comply with section R302.6 of the F.B.-C. (Fire Separation). 11. Appliances shall not be installed in a location where subject to mechanical damage unless protected by approved barriers. M303.4 of the F.B.0 12. Water heaters shall comply with section P607.3 of the F:B:C., l 3: Foundation supports for A/C units shall be raised_ at least 3" above finished grade. M 1308;1 14.. Return air in all bedrooms. F.B.C. M1620.4 l 5. Smoke detectors are to be installed in accordance with R3.13:1 of the F.B.C. 16: All glazing reguirerrients are to be in accordance with R308A of the F.B-C. 17. All means of egress are to be in accordance with R3l I of the F.B.C. . . 18. "Green gypsum board" shall not be used as a backer in showers or tubs.R702.4.2 F.B.C. 10. Combination-type AFCI breakers are required at all locations regu1nn an AFCI type breaker. 20. Carbon monokide alarms will be required iri new construction that uses fossil-burning heating or appliances or an attached garage. They shall be installed in accordance with the F.B.C. 21. All plumbing,mechanical, and electrical shall'be separate from unit to unit. This includes all underground plumbing and electric. 21 All 2016 N.-E.C. Codes will be enforced. 23. Tamper- Resistant.Receptacles in accordance with 406.11 of.the 201.6 N.E.0 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 feet around the structure: 25.-R403.5,3Hot water pipe insulation. Insulation for hot water pipe-with'a minimum thermal resistance (R-value) of R-3 shall be applied to the following: Piping:3/;inch (19.1 mm) and larger in.nominal diameter. Piping serving more than:one dwelling unit: Piping Located outside the conditioned space: Piping from the'water heater to.a distribution manifold; Piping:located under.a floor slab,. Buried in piping, Supply and return piping in recirculation systems other than demand recirculation systems. 25:-Blower:door test shag be provided before C.O. 26.A copy of the enemy cacls shall be with'permit at all times 27.. Cope ofTnahinsuladon report shall be provided ivith permit before final 28. No fence, pool or screen enclosure :is issued with:this.permit` F.F.E.-Finished Floor Elevation F.B.C--Florida Building Code 6a'Edition R.O.W.-Right of Way A.D.A.-Americans with Disabilities Act . N.E.C.-National Electric Code(2016) PLOT PLAN DESCRIPTION:(AS FURNISHED) LOT 22, BLOCK 10, SILVERADO RANCH SUBDIVISION PHASE 5B AS RECORDED IN PLAT BOOK 81, PAGE(S) 69-73, OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIDA. ON LOT CALCULATIONS LOT = 7.475 SQ. FT. LIVING AREA = 2.836 SO. FT. GARAGE = 619 SQ. FT. ENTRY = 65 SQ. FT. LANAI = 193 SQ. FT. PATIO = 0 SO. FT. DRIVEWAY = 574 SQ. FT. A/C PAD = 12 SO. FT. WALKWAY = 23 SQ. FT. o IMPERVIOUS = 58% = 4322 SQ. FT. SOD - 3,153 SO. FT. Z OFF LOT CALCULATIONS RIGHT OF WAY - 1138 SQ. FT. 1" = 30' DRIVE APRON = 373 SO. FT. GR P!HIC SCALE PUBLIC S/W - 325 SO. FT. 0 15 30 SOD = 440 SO. FT. TOTALS AREA = 8.613 _ SQ. FT. DRIVEWAY = 947 SO. FT. SIDEWALK = 348 SQ. FT. SOD - 3.593 SO. FT. PC ILOT 21 BLOCK 10 I I =3 S86'58'21"E 9ee I 1 I N 115.00' S .:. o O 1 m BCD I.;.:: r.-: ar o co 1. rn ir cn COD 10 Q a I 20.5' ^83' $"Br HIU y� .I I -.:•c'. in rc I x F 10.0' O.O .0< Uo F— gZ I �....y CL i 1.0 10.0' N I m n c' .OS.: I D: 21•5' 64.0' O a sZ _ N S865B'2;1 1 30.00' °� N86'58'21"W •� 115.00 a $ ' I m I PREPARED FOR: N I BLOT 210 I fI R'HORR1N a t�� t cs�ll, I BUILDING SETBACKS PT FRONT: 20' REAR: 15' SDE: 7.5' SIDE STREET: 20' NOTES: 1. ELEVATIONS SHOWN ARE PER LOT GRADING PLANS PROVIDED BY THE CLIENT. LEGEND: 2. ELEVATIONS ARE BASED ON NAVD 1988 DATUM. —• —• — BUILDING SETBACK LINE PI POINT OF INTERSECTION 3. FOR ALL LOTS WHERE SIDE—YARD —— PC POINT OF CURVATURE cEN1ERUNE PT POINT OF SETBACKS ARE LESS THAN 7.50 FEET, A MINIMUM 5.00 FOOT WADE DRAINAGE AND —--— RIGHT of war LINE RP RADIUS POINT PRC POINT OF REVERSE CURVATURE ACCESS EASEMENT IS REQUIRED PER PASCO XX•XX PROPOSED ELEVATION PCC POINT OF COMPOUND CURVATURE COUNTY LAND DEVELOPMENT CODE. TYP TYPICAL PROPOSED DRAINAGE FLOW CS CONCRETE SLAB THIS PLOT PLAN IS INTENDED FOR PERMITTING PURPOSES ;•:;�'�' CONCRETE PER PLAT EO ONLY. THIS IS NOT INTENDED FOR THE CONSTRUCTION OF (C PB PLAT BOOK THE PROPOSED HOUSE. REFER TO HOUSE PLAN AND A/C AIR CONDITIONER P,S PAGES OPTION LIST FOR CONSTRUCTION. ALL BUILDING SET BACK S/W SIDEWALK SQ. FT. SQUARE FEET LINES SHOWN HEREON IS PER DATA FURNISHED BY CLIENT F.E.M.A. FEDERAL EMERGENCY MANAGEMENT AGENCY AND IS FOR INFORMATIONAL PURPOSES ONLY. F.I.R.M. FLOOD INSURANCE RATE MAP NAVD NORTH AMERICAN VERTICAL DATUM THIS IS NOT A SURVEY NGVD NATIONAL GEODETIC VERTICAL DATUM D&UE DRAINAGE&UTILITY EASEMENT THIS IS A PLOT PLAN ONLY PDE PRIVATE DRAINAGE EASEMENT PUE PUBLIC UTIUTY EASEMENT FLOOD NOTE: SURVEYOR NOTES: I HAVE ExAMINED THE F.I.R.M. MAP NO.12101CO28BF, 1. THE SURVEYOR HAS NOT ABSTRACTED THE DATED SEPTEMBER 26,2014, AND FOUND THE SUBJECT PROPERTY LAND SHOWN HEREON FOR EASEMENTS, RIGHT APPEARS TO UE IN ZONE'X', AREAS DETERMINED TO BE OUTSIDE THE OF WAY, RESTRICTIONS OF RECORD WHICH 0.2%ANNUAL CHANCE FLOODPUdN. THE SURVEYOR MAKES NO MAY AFFECT THE TITLE OR USE OF THE LAND. GUARANTEES AS TO THE ABOVE INFORMATION. PLEASE CONTACT THE LOCAL F.E,M.A. AGENT FOR VERIFICATION. 2. NO UNDERGROUND IMPROVEMENTS HAVE BEEN BEARING BASIS: LOCATED EXCEPT AS SHOWN. BEARINGS SHOWN HEREON ARE BASED ON THE CENTERLINE OF STELLA A!ihA 3. NOT VALID WITHOUT THE AUTHENTIC VAST STREET BEING NO3v1'39'E, PER PLAT. ELECTRONIC SIGNATURE AND THE AUTHENTIC A M E R I CA N ELECTRONIC SEAL OF A FLORIDA LICENSED (FIELD DATE:) REVISED: SURVEYOR AND MAPPER. SU RV I-.Y 1 N G y Digitally signed by JamesW Meman SCALE: 1'- 30 FEET 's';:"•� DN:-US,1t=Flosida,k0dl do, $c MAPPING INC. 3 S �"} o AMERICAN SURVEYING& APPROVED BY: J9 'MAPPING,INC.c James W CERTIFICATION OF AUTHORIZATION NUMBER LB/6383 '�,ti;am, }i ���"•. 200848 LOT 22 BLOCK 3191 MAGUIRE BOULEVARD, SUITE 200 •'{" emaiklboleman@asm—poratexom FOR '`^.:+"� Date:zozo.oe.oa Js:tese oaoa THE JOB NO. 10 ORLANDO. FLORIDA 32803 FIRM DRAWN BY- O58 2020 JC WWW.AMERICANSURVEYlNGANDMAPPING.COM JAMES W. BOLEMAN PSM 6485 OATE PLOT PLAN 08 03 FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida:Department of Business and Professional Regulation - Residential Performance Method Proj' t.N C mdren 279 Elev D 1 Builder Name: DR Horton Street: (0(010 CO b[� 1�7sS 5- � Permit Office: City,State,Zip: Zephyrhills,FL,335� Z Permit Number `fir Owner: Jurisdiction: . 40 �� Design Location: FL;Tampa County: Pasco( offaClimate Zone 2) 1. New construction or existing New(From Plans) 9. Wall Types(2338.8 sqft.) Insulation Area 2.'Single family or multiple family Single-family a.Concrete Block-Int Insul,Exterior R=4.1 1945.20 ft2. b.Frame-Wood,Adjacent R=13.0 393.56 ft2 3. Number of units,if multiple family 1 c.N/A R= 2 ft 4. Number of Bedrooms 4 d.N/A R= ft2. 5. Is this a worst case? No 10.Ceiling Types (3041.0 sgft.) Insulation Area a.Under Attic(Vented) R=30.0 2836.00 ft2 .. 6. Conditioned floor area above grade(ft2) 2836 b.Knee Wall(Vented) R=19.0 205.00 ft2 Conditioned floor area below grade'(ft2) 0 c.N/A R= ft2 11.Ducts R ft2 7. Windows(330.0 sgft.) - Description Area a.Sup:Attic,Ret:Attic,AH:Main 6 529 a. U-Factor: Dbl,U=0.34 258.00 ft2 SHGC: SHGC=0.31 b. U-Factor: Dbl,U=0.55 72.00 ft2 12.Cooling.systems kBtu/hr Efficiency SHGC: SHGC=0.34 a.Central Unit 41.5 SEER:15.00 c. U-Factor: N/A ft2 SHGC: 13.Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a.Electric Heat Pump 42.0 HSPF:8.50 SHGC: Area Weighted Average Overhang Depth: 4.214 ft. Area Weighted Average SHGC: 6.317 14.Hot water systems a.Electric Cap:50 gallons 8. Floor Types (2836.0 sgft.) Insulation Area EF:0.950 a..Slab-On-Grade Edge Insulation R=0.0 2836.00 ft2 b. Conservation features b.N/A R= ft2 None c.N/A R= ft2 15.Credits Pstat Glass/Floor Area: 0.116 Total Proposed Modified Loads: 86.45 PASS Total Baseline Loads: 87.49 I hereby certify that the plans and specifications covered by Review of the plans and. 09"iHE$?,gp� this calculation are in compliance with the Florida Energy specifications covered by this Code. calculation indicates compliance with the Florida Energy Code. PREPARED BY: LMb- A&;&, Before construction is completed s� DATE: this building will be inspected for y compliance with Section 553.908 I herebycertify that this building,as designed,is in compliance Florida Statutes. y 9, 9 p with the Florida Energy Coodde�f,�� OD WrET� OWNER/AGENT: / BUILDING OFFICIAL: DATE: M 7 DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.3.2.1. -Compliance requires an Air Barrier.and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no.greater than 7.00 ACH50(R402.4.1.2). 8/10/2020 1:30 PM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 4 FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: C mden 2795 Elev D Builder Name: DR Horton Street: lob10 (C) 31- 9. v Permit Office: City,State,Zip: Zephyrhills,FL,3 3S� 2 Permit Number: Owner: Z I Jurisdiction: Design Location: FL,Tampa County: Pasco(Florida Climate Zone 2) 1. New construction or existing New(From Plans) 9. Wall Types(2338.8 sqft.) Insulation Area 2. Single family or multiple family Single-family a.Concrete Block-Int Insul,Exterior R=4.1 1945.20 ft2 b.Frame-Wood,Adjacent R=13.0 393.56 ft2 3. Number of units,if multiple family 1 c.N/A 2 R= ft 4. Number of Bedrooms 4 d.N/A R= ft2 5. Is this a worst case? No 10.Ceiling Types (3041.0 sqft.) Insulation Area a.Under Attic(Vented) R=30.0 2836.00 ft2 6. Conditioned floor area above grade(ft2) 2836 b.Knee Wall(Vented) R=19.0 205.00 ft2 Conditioned floor area below grade(ft2) 0 c.N/A R= ft2 11.Ducts R ft2 7. Windows(330.0 sqft.) Description Area a.Sup:Attic,Ret:Attic,AH:Main 6 529 a. U-Factor: Dbl,U=0.34 258.00 ft2 SHGC: SHGC=0.31 b. U-Factor: Dbl,U=0.55 72.00 ft2 12.Cooling systems kBtu/hr Efficiency SHGC: SHGC=0.34 a.Central Unit 41.5 SEER:15.00 c. U-Factor: N/A ft2 SHGC: 13.Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a.Electric Heat Pump 42.0 HSPF:8.50 SHGC: Area Weighted Average Overhang Depth: 4.214 ft. Area Weighted Average SHGC: 0.317 14.Hot water systems 8. Floor Types (2836.0 sgft.) Insulation Area a.Electric Cap:50 gallons a.Slab-On-Grade Edge Insulation R=0.0 2836.00 ft2 EF:0.950 9 b. Conservation features b.N/A R= ft2 None c.N/A R= ft2 15.Credits Pstat Glass/Floor Area: 0.116 f1�7J Total Proposed Modified Loads: 86.45 PASS SS Total Baseline Loads: 87.49 I hereby certify that the plans and specifications covered by Review of the plans andTx E sx, �. this calculation are in compliance with the Florida Energy specifications covered by this Code. calculation indicates compliance sri�rr , with the Florida Energy Code. PREPARED BY: L a Before construction is completed w :r-0 DATE: 2-10-20 this building will be inspected for compliance with Section 553.908 I hereby certify that this building, as designed,is in compliance Florida Statutes. . with the Florida Energy Code O.:y � OWNER/AGENT: / BUILDING OFFICIAL: DATE: �1 DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.3.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2). 8/10/2020 1:30 PM EnergyGaugeO USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: Camden 2795.Elev D Bedrooms: 4 Address Type: Lot Information Building Type: : User Conditioned Area: -2836 Lot# 22110 Owner Name: Total Stories: 1 Block/Subdivision: Silverado #of Units: 1 Worst Case: No PlatBook: Phase 10A- Builder.Name: DR Horton Rotate Angle: 270 Street: Permit Office: Cross Ventilation: County: Pasco . Jurisdiction: Whole House Fan: City,State,Zip: Zephyrhills, Family Type: Single-family FL, New/Existing: New(From Plans) Comment: Garage L Face W CLIMATE / Design Temp Int Design Temp Heating, Design Daily Temp . V Design Location TMY Site 97.5% 2.5% Winter Summer Degree.Days Moisture Range FL,Tampa FL_TAMPA_INTERNATI 39 91 70 75 645.5 54 Medium BLOCKS Number Name Area Volume 1 Blockl 2836 26374.8 SPACES Number Name Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled . Heated 1 Main 2836 26374.8 Yes .5 4 1 Yes Yes Yes - FLOORS # Floor Type Space Perimeter R-Value Area Tile Wood .Carpet 1 Slab-On-Grade Edge Insulatio Main 248 ft 0 2836 ft2 ---- 0.5 0 0.5 ROOF / Roof Gable Roof Rad Solar SA Emitt Emitt Deck Pitch V # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 Hip Composition shingles 3072 ft2 0 ft2 Dark Y 0.92 No 0.9 No 0 22.6 ATTIC V # Type Ventilation Vent Ratio(1 in) Area RBS IRCC 1 Full attic Vented 300 2836 ft2 Y N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic(Vented) Main 30 Blown 2836 ft2 0.11 Wood 2 Knee Wall(Vented) Main 19. Blown 205 ft2 0.11 Wood 8/10/2020 1:30 PM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 2 of 4 FORM R405-2017' INPUT SUMMARY CHECKLIST REPORT WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar. Below 1 N=>W. Exterior Concrete Block-Int Insul Main 4.0999 20 4 9 4 189.8 ft2 0 0.6 0 2 E=>N Exterior Concrete Block.-Int Insul Main - 4.0999 64 1 9 4 598.1 ft2 0 0.6 0 3 S=>E Exterior Concrete Block-Int Insul Main 4.0999_ 50 0 9 4 466.7 ft2 0 .0.6 0 4 W=>S Exterior Concrete Block-Int Insul Main 4.0999 74 0 9 4 690.7 ft2 0 0.6 0 5 N=>W Garage Frame-Wood Main 13 29 0 9 4 270.7 ft2 0.23 0.01 0 6 W=>S Garage Frame-Wood Main 13 2 0 - 9 4 18.7 ft2 0.23 0.01 0 7 E=>N Garage Frame-Wood Main 13 11 2 9 4 104.2 ft2 0.23 0.01 0 DOORS. # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft - In 1.. N=>W. Insulated Main None .4 3 8 24 f0 2 N=>W Wood Main . None .46 2 8 8 .21.3 ft2 WINDOWS Orientation shown is the entered orientation => changed to As Built rotated 270 degrees). Wall Overhang V # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 N=>W 1 Vinyl Low-E Double Yes 0.34 0.31 N 30.0 ft2 1 ft 0 in 1 ft 0 in None Exterior 5 2- E=>N 2 Vinyl Low-E Double Yes 0.34 0.31 N 45.0 ft2 1 ft 0 in Oft 11 in None Exterior 5 3. E=>N 2 Vinyl Low-E Double. Yes 0.34 0.31 N 18.0 ft2 1 ft 0 in 0 ft 11 in None Exterior 5 4 S=>E 3 Vinyl Low-E Double Yes 0.34 0.31 N 45.0 ft2 1 ft 0 in Oft 11 in None Exterior 5 5 S=>E 3 Vinyl Low-E Double Yes 0.34 0.31 N 22.5 ft2 1 ft 0 in 0 ft 11 in None Exterior 5 6 S=>E 3 Metal Low-E Double Yes 0.55 0.34 N 72.0 ft2 10 ft 0 in 0 ft 2 in None Exterior 5 7 W=>S 4 Vinyl Low-E Double .Yes 0.34 0.31 N 22.5 ft2 19 ft 4 in 0 ft 2 in None Exterior 5 8 W=>S 4 Vinyl Low-E,Double Yes 0.34 0.31 N 75.0 ft2 1 ft 0 in Oft 11 in None. Exterior 5 GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation .1 619.13ft2 619.13ft2 62.2ft 9.3ft 0. INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000414 3077.1 168.93 317.69 .1609 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ None. Sing[ HSPF:8.5 42 kBtu/hr 1, sys#1 8/10/2020 1:30 PM EnergyGaugeO USA 6.0.02(Rev.1)-FlaRes2017.FBC 6th Edition(2017) Compliant Software Page 3 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ None Sing[ SEER:15 41.5 kBtu/hr 1245 cfm 0.75 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 . . Electric None . .. Garage 0.95 50 gal 70 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage, Cert # Company Name System Model# Collector Mode[# Area Volume FEF None None ftz DUCTS ----Supply---- Return---- Air CFM 25 CFM25 HVAC# V # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 : Attic 6 529 ftz Attic 99 ftz Default Leakage Main (Default) (Default) 1 1 TEMPERATURES Programable Thermostat:Y Ceiling Fans: Cooling �]Jan ]Feb, Mar Apr May Jun Jul Au Se Oct r 1 Nov Dec Heatin lX]Jan lXl Feb f Mar Apr ` May ` Jun l Jul 4 AuSep E Oct [X]Nov f X}Dec Ventingl 1 Jan [ ]Feb [X]Mar Apr `- May [ Jun [ Jul [ Aug Se lX]Oct [[[XXX]]]Nov [ ]Dec Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 .12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80. 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 . 78 Cooling(WEH). AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 . 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default 8 Ibs/s .ft. 0 ft2 Oft 0.3 Main 8/10/2020 1:30 PM EnergyGaugeO USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 4 of 4 2017 EPL DISPLAY CARD ENERGY.PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 99 The lower the Energy Performance:index, the:more efficient.the-home. 1.New home or,addition 1. New(From Plans) 12. Ducts, location &insulation level a)Supply ducts R 6.0 2.Single-family or multiple-family 2. Single-family b) Return ducts R 6.0 c)AHU location Main 3.No.of units(if multiple-family) 3.- 1 4. Number of bedrooms 4-. 4 13.Cooling system: Capacity. 41.5 a) Split system SEER 5. Is this"a worst case?(yes/no) 5. No b) Single package SEER c) Ground/water source SEER/COP 6.Conditioned floor area(sq.ft.) 6. 2836 d) Room unit/PTAC EER e)Other 15.0 7.Windows,type and area a) U-f actor:(weighted average) 7a. 0.386 b)Solar Heat Gain Coefficient(SHGC) 7b. 0.317 14. Heating system: Capacity 42.0 c)Area 7c. 330.0 a)Split system heat pump HSPF b)Single package heat pump HSPF 8.Skylights c) Electric resistance COP a) U-factor:(weighted average) 8a. NA d) Gas furnace, natural gas AFUE b)Solar Heat Gain Coefficient(SHGC) 8b. NA e) Gas furnace, LPG AFUE f)Other 8.50 9. Floor type, insulation level: . a)Slab-on-grade(R-value) 9a. 0.0 b)Wood, raised(R-value) 9b. 15.Water-heating system c)Concrete,raised(R-value) 9c. a) Electric resistance EF 0.95 b) Gas fired, natural gas EF 10.Wall type and insulation: c)Gas fired, LPG EF A.Exterior: d) Solar system with tank EF 1.Wood framee-(Insulation R-value) - 1OA1. e) Dedicated heat pump with tank EF 2. Masonry(Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec% B.Adjacent: g)Other 1.Wood frame(Insulation R-value) 1081. 13.0 2. Masonry.(Insulation R-value) 10132. 16.HVAC credits claimed(Performance Method) 11.Ceiling type-and insulation level a) Ceiling fans . a)Under,attic 11 a. 30.0 -b)Cross ventilation No b) Single assembly 11 b. c)Whole house fan No c) Knee walls/skylight walls 11 c. 19.0 d) Multizone cooling credit d) Radiant barrier installed 11 d. Yes e) Multizone heating credit f) Programmable thermostat Yes 'Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy saving features which will be installed(or exceeded) in this home before final inspection.Otherwise,a new EPL display card will be completed based on installed code compliant features. Builder Signature: I Date: gl 1 Address of New Home: City/FL Zip: Zephyrhills. FL -33 n / _ 8/10/2026 1;30:54 PM EnergyGaugeO USA 6.0.04(Rev. 1) FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1 Florida Building Code, Energy Conservation, 6th Edition (2017) Mandatory Requirements.for Residential Performance, Prescriptive and ERI Methods ADDRESS: Permit Number: Zephyr hills,FL, . . MANDATORY REQUIREMENTS See individual code.sections for full details. ✓. SECTION R401 GENERAL R401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) display card be completed and certified by the builder,to be accurate and correct before final approval of the building for occupancy.Florida law (Section 553.9085,Florida Statutes)requires the EPL display card to be included as an addendum to each sales contract for both-presold and nonpresold residential buildings.The EPL display.card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit.The-building official,shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building.A copy of the EPL display card can be found in Appendix RD. a . R402.4 Air.leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the.requirements of Sections R402.4.1 through R402.4.5. Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to comply with"Section C402.5. R402.4.1 Building thermal enveloy)be building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. R402.4.1.1 Instal lation.The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table R402.4.1.1,as applicable to the method of construction.Where required by the code official,an approved third party shall inspect all components and verify compliance. ❑ R402:4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding.seven air changes per hour in Climate Zones 1 and 2,and three air changes per hour in Climate Zones 3 through 8.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.(50 pascals).Testing.shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statutes,or individuals licensed as set forth in Section 489.105(3)(f),(g)or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided_to the code official.Testing shall be performed at any time after creation-of all penetrations of the building thermal envelope. Exception: Testing is not required for additions,alterations,renovations,or repairs,of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal-envelope. During testing: 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures: 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures. 3.Interior doors,if installed at the time of the test,shall be open. 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5.Heating and cooling systems,if installed at the time of the test,shall be turned off. 6.Supply and return registers,if installed at the time of the test,shall be fully open. R402.4.2 Fireplaces. New wood-burning fireplaces shall have tight-fitting flue dampers or doors,and outdoor combustion air.Where using tight-fitting doors on factory-built fireplaces listed and labeled in accordance with UL 127,the doors shall be tested and listed for the fireplace.Where using tight-fitting doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907. R402.4.3 Fenestration air Ieakage.Windows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per . square foot(1.5 Us/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400 or AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. Exception: Site-built windows,skylights and doors. 8/10/2020 1:31 PM EnergyGauge®USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1.of-5 MANDATORY REQUIREMENTS - (Continued) ETR402.4.4 Rooms containing fuel-burning appliances. In Climate Zones 3 through 8,where open combustion air ducts provide combustion air to open combustion fuel burning appliances,,the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room,isolated from inside the thermal envelope.Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2,where the walls,floors and ceilings shall meet not less than the basement wall R-value requirement.The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R463.The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R,8. Exceptions: 1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code,Residential. ❑R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and,unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not more than 2.0 cfm(0.944 Us)when tested in accordance with-ASTM E283 at a 1.57 psf(75 Pa)pressure differential.All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. SECTION R403 SYSTEMS, R403.1 Controls. ❑ R403.1.1 Thermostat provision(Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. ❑ R403.1.3 Heat pump supplementary heat(Mandatory). Heat pumps having supplementary electric-resistance heat shall have.controls that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load. ❑ R403.3.2 Sealing(Mandatory) All ducts,air handlers,filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered ducts or plenum chambers,shall be constructed and sealed in accordance with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5)or (7),Florida Statutes,or individuals licensed as set forth in Section 489.105(3)(f),(g)or(1),Florida Statutes,to be"substantially leak free"in accordance with Section R403.3.3. ❑ R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design airflow rate when tested in accordance with ASHRAE 193. ❑ R403.3.3 Duct testing(Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods: 1, Rough-in test:Total leakage shall be measured with a pressure differential of 0.1 inch w.g.(25 Pa)across the system,including the manufacturer's air handler enclosure if installed at the time of the test.All registers shall be taped or otherwise sealed during the test. 2. Postconstruction test:Total leakage shall be measured with a pressure differential of 0.1 inch w.g.(25 Pa)across the entire system,including the manufacturer's air handler enclosure.Registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. .-2. Duct testing is not mandatory for buildings complying by Section 405 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. ❑R403.3.5 Building cavities(Mandatory). Building framing cavities shall not be.used as ducts or plenums. ❑R403.4 Mechanical system piping insulation(Mandatory). Mechanical system piping capable of carrying fluids above 1050F(41°C) or.below 550F(130C)shall be insulated to a minimum of R-3. ❑ R403.4.1 Protection of piping insulation. -Piping insulation exposed to weather shall be protected from damage,including that caused by sunlight,moisture,equipment maintenance and wind,and shall provide shielding from solar radiation that can cause degradation of the material.Adhesive tape shall not-be permitted. R403.5.1 Heated water circulation and temperature maintenance systems(Mandatory). Heated water circulation systems shall be in accordance with Section R403:5.1.1.Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls,temperature sensors and pumps shall be accessible.Manual controls shall be readily accessible. R403.5.1.1 Circulation systems. Heated water circulation systems shall be,provided with a circulation pump.The system return ❑ pipe shall be a dedicated return pipe or a cold water supply pipe.Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy.The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515.Controls for such systems ❑ shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. 8/10/2020 1:31 PM EnergyGaugeO USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 2 of 5 MANDATORY REQUIREMENTS - (Continued) ❑ R403.5.5 Heat traps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a `downward and upward,bend of at least 3'/2 inches(89 mm)in the hot water distribution line and cold waterline located as close as possible to the storage tank. R403.5.6 Water heater efficiencies(Mandatory). ❑ R403.5.6.1.1 Automatic controls. Service water-heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable_temperature settings for the intended use.The minimum temperature setting range.shall be from 100°F to 140OF(38°C to 600C). R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric-service systems to be turned off.A separate valve shall be provided to permit the-energy supplied to the main burner(s),of combustion types of service water-heating systems to be turned off. El R403:5.6.2 Water-heating equipment. Water-heating equipment installed,in residential,units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code,Energy Conservation,Commercial Provisions,for the type of equipment installed. Equipment used.to provide heating functions as.part of a combination system shall satisfy.all stated requirements for the appropriate water-heating category.Solar water heaters shall meet the criteria of Section R403.5.6.2.1. OR403.5.6.2.1 Solar water-heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems.Solar collectors shall be tested in accordance,with ISO Standard 9806,Test Methods for Solar Collectors, and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol.Collectors in installed solar water-heating systems should meet the following criteria: 1: Be installed with a tilt angle between 10 degrees.and 40 degrees of the horizontal;and 2. Be installed at an orientation within 45 degrees of true south. R4016.Mechanical ventilation(Mandatory). The building shall be provided with-ventilation that meets the requirements of.the- Florida Building Code,Residential,or Florida Building Code,Mechanical,as applicable,or with other.approved means of ventilation including:Natural,Infiltration or Mechanical means.Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. R403.6.1 Whole-house mechanical ventilation system fan efficacy. When installed to function as a whole-house mechanical ventilation system,fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where whole-house mechanical ventilation fans are integral to tested and listed HVAC equipment,they shall be powered by an electronically commutated motor. Ri%U&6.2 Ventilation air.- Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation shall meet the following criteria: . 1.. The design air change.per hour minimums for residential buildings in ASHRAE 62.2,Ventilation for Acceptable Indoor Air Quality,shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics, crawlspaces,attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3• If ventilation air is drawn from enclosed space(s),then the walls of the space(s)from,which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R`19,space permitting,or R-10 otherwise. R403.7 Heating and cooling equipment(Mandatory). R403.7.1 Equipment sizing.. . Heating.and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies; based on building,loads for the directional orientation of the building.The manufacturer and model number of the outdoor and indoor units(if split system)shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1.This Code does not allow designer safety factors,provisions for future expansion or other factors that- -affect equipment sizing.System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems.New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE R403.6.1. WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM MINIMUM EFFICACY a AIRFLOW RATE MAXIMU (CFM) (CFM/WATT) (CFM) Range hoods Any 2.8 cfm/watt Any In-line fan Any 2.8 cfm/watt Any .Bathroom,utility room 10 1.4 cfm/watt <90 Bathroom,utility room 90 2.8 cfm/watt Any For SI:1 cfm=28.3 Umin. a. When tested in accordance with HVI Standard 916 8/10/2020 1:31 PM EnergyGauge@ USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 3 of 5_ e MANDATORY REQUIREMENT_ S - (Continued) ❑ R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but-not more than 1.15 times greater than the total load calculated according to the procedure selected in. Section 403.7,or the closest available size provided by the manufacturer's product lines.The corresponding latent capacity of the equipment.shall not be less than the calculated latent load. The published_value for AHRI total capacity is a nominal,rating-test value:and shall not be used for equipment sizing.Manufacturer's expanded performance data shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry-bulb - temperature for the load calculation(or entering water terriperature,for water-source equipment),the blower.CFM provided by the expanded performance data,the design value for entering wet-bulb temperature and the design value for entering dry-bulb temperature. Design values for entering wet-bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s)is installed in an unconditioned space. Exceptions: 1. Attached single-and multiple-family residential equipment sizing may be selected so that its cooling capacity is less-than the calculated total sensible load but not less than 80 percent of that load. 2. When signed'and sealed by a Florida-registered engineer,in attached single-and multiple-family units,the capacity of equipment may be sized in accordance with good design practice. R403.7.1.2 Heating equipment capacity. ❑ R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section R403.7.1:1;and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. ❑ R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design - requirements calculated according to the procedure selected in Section R403.7.1. ❑ R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance.with Section R403.7.1. R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an ❑ intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. R403.8 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections . ❑ C403 and C404 of the IECC—Commercial Provisions in lieu of Section-R403. ❑ R403.9 Snow melt and ice system controls(Mandatory) Snow-and ice-melting systems,supplied through energy service to the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F(10°C),and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40oF(4.8°C). ❑ R403.10 Pools and permanent spa energy consumption(Mandatory). The energy consumption of pools and permanent spas, shall be in accordance with Sections R403.16.1 through R403.10.5. R403.10.1 Heaters.: The electric power to heaters shall be controlled by a readily accessible on-off switch that is an ❑ integral part of the heater mounted on the exterior of the heater,or external to and within 3 feet(914 mm)of the heater.Operation of such switch shall not change the setting of the heater thermostat.Such switches shall be in addition to a circuit breaker for the power to the heater.Gas-fired heaters shall not be equipped with continuously burning ignition pilots. - ❑ R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule shall.be installed for heaters and pump motors.Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operation. 2. Pumps that operate solar-and waste-heat-recovery pool heating systems. 3. Where pumps are-powered exclusively from on-site renewable generation. R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor-retardant cover on or at El the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating,computed over an operation season,is from site-recovered energy,such as from a heat pump or solar energy source,covers or other vapor-retardant means shall not be required. R403.10.4 Gas-and oil-fired pool and spa heaters. All gas-and oil-fired pool and spa heaters shall have a.minimum thermal ❑ ..efficiency of 82 percent for heaters manufactured on or after April 16,2013,when tested in accordance with ANSI Z 21.56.Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. 8/10/2020 1:31 PM EnergyGaugeO USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 4 of 5 R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance . with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard.ri - R403.11 Portable spas(Mandatorg)he energy consumption of electric-powered portable spas shall be controlled by the requirements of APSP-14. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS R404.1 Lighting equipment(Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be high-efficacy lamps or not less than 75.percent of the permanently installed lighting fixtures shall contain only high-efficacy lamps. Exception:Low-voltage lighting. R404.1.1 Lighting equipment(Mandatory).Fuel gas lighting systems shall not have continuously burning pilot lights. 8/10/2020 1:31 PM EnergyGauge@ USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 5 of 5 2017- AIR BARRIER AND INSULATION.INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Camden 2795 Elev.D Builder Name: DR Horton Street: Permit Office: City,State,Zip: Zephyrhills, FL, Permit Number: Y U Owner: Jurisdiction: w Design Location: FL;Tampa v COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall The exterior.thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings,drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows,skylights The space between window/door jambs and framing,and and doors skylights and framing shall be sealed. Rim joists' Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above-garage subfloor decking,or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing,or continuous insulation installed on . the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts,penetrations. Duct shafts,utility penetrations,and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit,or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls,or insulation that on installation readily conforms to available space shall Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air-sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub-floor or drywall. Concealed When required to be sealed,concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids a.In addition,inspection of log walls shall be in accordance with the provisions of ICC 400. 8/10/2020 1:31 PM EnergyGauge®USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 1 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method.Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: Permit#- :Job Information Builder: DR Horton Community: Lot: 22/10 Address: City: Zephyrhills State: FL Zip: Air Leakage TeSt ReSUItS Passing resu/ts must:nJeet:either the Perforrnance;-Prescriptive, or ERI Method 0 PRESCRIPTIVE METHOD-The building or dwelling unit shall be.tested and verified As having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 inch w.g.(50 Pascals)in Climate Zones T and 2. Q' PERFORMANCE or ERI'METHOD-The•building:or dwelling_unit,'shall:be testedand Verified as having an air leakage tate.of riot.exceeding- the selected ACH(5O)walue,as§hown on'Forrn R405;20;1T(Performance)or R406-201:7(ERI),section labeled as infilttation;sub-section ACH50. ACH(50)specified on Form R405=2017-Energy Calc(Performance)or''R406 2017(ERl); 7.000 x 60 = -2.091128E35 = Method for calculating building volume: CFM(50) Building Volume ACH(50) O Retrieved from architectural plans PASS 0 Code software calculated When ACH(50)is less than 3,Mechanical Ventilation installation O Field measured and calculated must be verified by building department. R402.4.1.2 Testing.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.(50 Pascals) Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7),Florida Statues.or individuals licensed as set forth in Section 489.105(3)(0,(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During-testing: I.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures. 2.Dampers including exhaust,intake,makeup air,back draft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures. 3.Interior doors,if installed at the time of the test,shall be open. 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5.Heating and cooling systems,if installed at the time of the test,shall be turned off. 6.Supply and return registers,if installed at the time of the test,shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results_are in accordance with the 2017 6th Edition Florida Building Code .Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification#: Issuing Authority: 8/10/2020 121:21 PM EnergyGauge®USA 6.0.04(Rev. 1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Pagel of 1 - wrightsofto Manual S Compliance Report oa Entire-House By: Progressive Air Systems, Inc Plan: 2795Camden 5907 Dasher Ct,Port Richey,FL 34668 Phone:727-847-3898 Fax:727-815-3399 License:CAC033669 Project • • For: DR Horton Lot 22 Blk 10 Silverado, Zephyrhills, FL Cooling Equipment Design Conditions Outdoor design DB: 91.2°F Sensible gain: 32883 Btuh Entering coil DB: 77.3°F Outdoor design WB: 77.1 OF Latent gain: 5478 Btuh Entering coil WB: 63.7°F 'Indoor design DB: 75.0°F Total gain: 38361 Btuh Indoor RH: 50% Estimated airflow: 1383 cfm Manufacturer's Performance Data at-Actual Design Conditions Equipment type: Split ASHP - Manufacturer: Bryant Model: 215BNA042****A+FX4DN(B,F)043 Actual airflow: 1383 cfm Sensible capacity: 33898 Btuh 103%of load Latent capacity: 5894 Btuh 108%of load Total capacity: 39792 Btuh 1040/o of load SHR: 85% Heating Equipment Design Conditions Outdoor design DB: 40.0°F Heat loss: 32298 Btuh . Entering coil DB: 69.2°F Indoor design DB: 70.0°F Manufacturer's Performance Data.at Actual Design Conditions Equipment type: Split ASHP Manufacturer: Bryant Model: 215BNA042****A+FX4DN(B,F)043 Actual airflow: 1383 cfm Output capacity: 37812 Btuh 117%of load Capacity balance: 33 OF Supplemental heat required: 0 Btuh Economic balance: -99 OF Backup equipment type: Elec strip Manufacturer: Model: Actual airflow: 1383 cfm Output capacity: 9.6 kW 102%of load Temp. rise: 22 OF Meets are all requirements of ACCA Manual S. wri htsoft' 2020-Aug-1013:31:39 Q. Right-Suite®Universal 2017 17.0.21 RSU25554 Page 1 ...esktop\Jill\Wrightsoft Files\DR Horton\2795.rup Calc=MJ8 House Front faces: W Load Short Form Job: - 1- wrightsoft Date: Entire House By: Progressive Air Systems, Inc Plan: 2795 Camden 5907 Dasher Ct,Port Richey,FL 34668 Phone:727-847-3898 Fax:727-815-3399 License:CAC033669 Project • • For: DR Horton :Lot 22 Blk 10 Silverado, Zephyrhills, FL Design Information Htg Clg Infiltration Outside db(OF) 40 91 Method Simplified Inside db(OF) 70 75 Construction quality Semi-tight Design TD (OF) 30 16 Fireplaces 0 Daily range - L Inside humidity.(%) 50 50 Moisture difference(gr/lb) 26 54 HEATING EQUIPMENT COOLING EQUIPMENT Make Bryant Make Bryant Trade LEGACY LINE PURON HP Trade LEGACY LINE PURON HP Model 215BNA042****A Cond 215BNA042****A AHRI ref 3647406 Coil FX4DN(B,F)043 AHRI ref 3647406 Efficiency 8.5 HSPF Efficiency 12.5 EER, 15 SEER Heating input Sensible cooling 31125 Btuh Heating output 42000 Btuh @ 47OF Latent cooling 10375 Btuh. Temperature rise 28 OF Total cooling 41500 Btuh Actual air flow 1383 cfm Actual air flow 1383 cfm Air flow factor' 0.043 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.86 Capacity balance point=33 OF Backup: In ut= 10 kW, Out ut=32847 Btuh, 100 AFUE ROOM NAME Area Htg load Clg load Htg AVF. Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) master bed 285 4595 4981 197 209 kitchen/cafe 345 3249 4333 139 182 M bath 120 1592 1023 68 43 toilet 21 0 01 0 0 M wic 68 95 152 4 6 bed/multi room 196 2028 1572 87 66 bath2 52 88 140 4 6 wic 38 0 0 0 0 multi/living 250 2765 2597 118 10b greatroom 620 7110 8648 304 364 dining/flex 175 1883 1253 81 53 bed3 165 1761 1408 75 59 bath3 36 739 350 32 15 B3 vanity 33 0 0 0 .0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. i htsoft 2020-Aug-1013:31:39 wr 9. Right-Suite®Universal 2017 17.0.21 RSU25554 Page 1 +�...esktop\Jill\Wrightsoft Files\DR Horton\2795.rup Calc=MJB House Front faces: W bed2 181 4628 4260 198 179 foyer 77 1402 1049_ 60 44 A/C closet 22 0 0 0 0 laundry 79 123 928 5 39 powder 41 240 189 10 8 Entire House d 2804 .32298 32883 1383 1383 - Other equip loads 0 0 Equip. Qa 1.00 RSM 32883 Latent cooling 5478 TOTALS 2804 32298 38361 1 1383 1383 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. C wri htsofta 2020-Aug-1013:31:39 �. 9 Right-Suite®Universal 2017 17.0.21 RSU25554 Page 2 J+CX ...esktop\Jill\Wrightsoft Files\DR Horton\2795.rup Calc=MJ8 House Front faces: W o This combination qualifies for a Federal Energy CERTIFIEDEfficiency Tax Credit when placed in service between Feb 17,2009 and Dec 31,2016. Certificate of Product Ratihgs AHRI Certified Reference,Number: 9639828 Date: 11/7/2016 Product: Split.System: Heat Pump.with Remote Outdoor Unit-Air-Source Outdoor Unit Model Number:215BNA042*0**A* Indoor Unit Model Number: FX4DN(B,F)043L Manufacturer: BRYANT HEATING AND.COOLING SYSTEMS Trade/Brand name: BRYANT HEATING AND COOLING SYSTEMS Series name: LEGACY11NE HP Manufacturer responsible for the rating of this system combination is BRYANT HEATING AND COOLING SYSTEMS Rated as follows in accordance with AHRI Standard 210/240-2008 for Unitary Air-Conditioning and Air-Source Heat Pump Equipment and-subject-to verification:of rating accuracy;by AHRI-sponsored,.independent,third party testing - . - Cooling Capacity._(Btuh): z j;41500 _ _. _-... _ .�.%,. ' { f _. . - EER-Rating,(Cooling). _f _ -=< ` 12.50 w' ; S.. i r i —J -.- t - .SEER Rating-(Cooling): r , Heating Capacity(Btuh) 47 F: 42000, 'L,"N _"`'''• " i 4:'a Region IV HSPF Rating (Heating): 8.50 Heating Capacity(Btuh).Qa:.17.-F.: 26400 :. Ratings followed by an asterisk(•)indicate a voluntary rerate of previously published data,unless accompanied with a WAS,which Indicates an involuntary rerate. DISCLAIMER AHRI does not endorse the product(s)listed on this Certificate and makes no representations,warranties or guarantees as to,and assumes no responsibility for, the products)listed on this Certificate.AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s),or the unauthorized alteration of data listed on this Certificate.Certified ratings are valid only for models and configurations listed In the directory at www.ahridirectory.org. TERMS AND CONDITIONS This Certificate and its contents are proprietary products of AHRI.This Certificate shall only be used for Individual,personal and am confidential reference purposes.The contents of this Certificate may not,In whale or In part,be reproduced;copied;disseminated; entered Into a computer database;or otherwise utilized,in any form or manner or by any means,except for the user's Individual, personal and confidential reference. AIR-CONDITIONING,HEATING, CERTIFICATE VERIFICATION &REFRIGERATION INSTITUTE The Information for the model cited on this certificate can be verified at www.ahridirectory.org,click on"Verify Certificate"link we make life better'" . and enter the AHRI Certified Reference'Number and the date on.which the certificate was Issued, which Is listed above,and the Certificate No.,which Is listed at bottom right IFICATE NO.: 891238 ©2014 Air-Condltloning,Heating,and Refrigeration Institute CERT 131230234999 FORM R405-2017 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative(Performance)Method Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the residential Simulated Performance Method shall include: ❑ This checklist ❑ A Form R405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report(one page)and an input summary checklist that can be used for field verification(usually four pages/may be greater). ❑ Energy Performance Level(EPL)Display Card(one page) ❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 ❑ Mandatory Requirements (five pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report(usually one page) ❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed Form R405 Duct Leakage Test Report(usually one page) 8/10/2020 1:08:37 PM EnergyGauge@ USA 6.0.04(Rev. 1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1