HomeMy WebLinkAbout20-1191 1
City of Zephyrhills PERMIT NUMBER
5335 Eighth Street
p - Zephyrhills, FL 33542 BNR-001191-2020
. Phone: (813)780-0020
Fax: (813)780-0021 Issue Date: 01/14/2021
Permit Type: Building New (Residential)
Property Number Street Address
32 25 21 0040 01400 0040 17053 Steer Blade Drive
Owner Information Permit Information Contractor Information
Name: D R HORTON Permit Type:Building New(Residential) Contractor: D R HORTON INC
Class of Work:SFR Construct
Address: 12602 Telecom Dr Building Valuation:$160,000.00
TAMPA,FL 33637 Electrical Valuation:$8,200.00
Phone: (813)549-1968 Mechanical Valuation:$6,000.00
Plumbing Valuation:$9,500.00
Total Valuation:$183,700.00
Total Fees:$14,770.94
Amount Paid:$14,770.94
Date Paid:1/14/2021 1:40:20PMj
Project Description
CONSTRUCT SINGLE FAMILY 3,173 SQ FT-SILVERADO
Application Fees
Transportation Impact Fee-City $36.32 Mechanical Plan Review Fee $35.00
Plumbing Plan Review Fee $43.75 Driveway Fee $45.00
Address Fee $30.00 SIF 1 percent Fee $83.28
Transportation Impact Fee $3,595.68 Park Impact Fee-Single Familyfrownhome $769.56
Building Plan Review Fee $415.00 Electrical Permit Fee $81.00
Plumbing Permit Fee $87.50 School Impact Fee $8,328.00
Public Safety Impact Fee-Police $254.00 Public Safety Impact Fee-Admin $26.35
Electrical Plan Review Fee $40.50 Building Permit Fee $830.00
Mechanical Permit Fee $70.00
REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection,whichever is greater,for each subsequent reinspection.
Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permit required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner:Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in
accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
CONTRACTOR SIGNATURE PE IT OFFICE
PERMIT EXPIRES IN 6-MONTHS WITHOUT APPROVED INSPECTION—
CALL FOR INSPECTION`- 8•HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
INVOICE (INV-00002432)
• ■ CITY OF
ZEPHYRHILLS
BILLING CONTACT .
DAVID GUIDE `
f
D R HORTON INC
12602 TELECOM DR f
TAMPA, FL 33637
INVOICE NUMBER INVOICE DATE INVOICE DUE DATE INVOICE STATUS INVOICE DESCRIPTION
INV-00002432 01/11/2021 01/11/2021 Due NONE
REFERENCE NUMBER FEE NAME TOTAL
BNR-001191-2020 Address Fee $30.00
Building Permit Fee $830.00
Building Plan Review Fee $415.00
Driveway Fee $45.00
Electrical Permit Fee $81.00
Electrical Plan Review Fee $40.50
Mechanical Permit Fee $70.00
Mechanical Plan Review Fee $35.00
Park Impact Fee-Single Family/Townhome $769.56
Plumbing Permit Fee $87.50
Plumbing Plan Review Fee $43.75
Public Safety Impact Fee-Admin $26.35
Public Safety Impact Fee-Police $254.00
School Impact Fee $8,328.00
SIF 1 percent Fee $83.28
Transportation Impact Fee $3,595.68
Transportation Impact Fee-City $36.32
7053 Steer Blade Drive Zephyrhills, FL 33541 SUB TOTAL $14,770.94
REMITTANCE INFORMATION TOTAL $14,770.94
City of Zephyrhills
5335 8th Street
Zephyrhills, FL 33542
January 11,2021 5335 8th Street,Zephyrhills,FL 33542 Page 1 of 1
—. .~...�~ City of ZeohVFhi\\G-Permit/\oDlicatiDn Fux-813-780-0021
� Building Department
Date Received Permitting
F one Contact for
Owner's Addressi Iva ne Number
Owner Pho
Fee Simple Titleholder Name Owner Phone Number
Fee Simple Titleholder Address
JOB ADDRESS LOT#
SUBDIVISION PARCELID#
. . (OBTAINED FROM..~.... NOTICE)
_
WORK PROPOSED mawcoNSm F7 *DD/ALT �—� SIGN DEMOLISH
E5 r3L" ,
INSTALL F_] REPAIR
PROPOSED USE �--! � aFR [--\ oomM F--� OTHER
TYPE OfCONSTRUCTION - BLOCK �—\ FRAME �--� STEEL
'
=BU\LDING VALUATION OF TOTAL CONSTRUCTION
�--lEL��r�C�L AMP [--1 PRooRESaENERaY F--1 VV.R���
___.
F--lpLU| (NG
F--\MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION
~v ^ ~ w
�--\G/S [_�� ROOFING F—l � SPECIALTY OTHEROTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA [__]YES NO
ts3 kb
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
au8LDER COMPANY " fr�C I
SIGNATURE esG:STsnsu L�2_1�_� rse«unnsx L_YIN_J
Address Liconoo#
ELECTRICIAN COMPANY
SIGNATURE F neo/xrEneo _y/_h�_] ' psEcUeRsN [_11 NL�
Address License#
PLUMBER COMPANY 6
SIGNATURE REGISTERED _y/_N_] 'rsscuR-ntN [_yylV_-_\
Address License#
MECHANICAL COMPANY
SIGNATURE REGISTERED -(/'N_ pesnumnsN -r yiy _J
Address ) License#
OTHER COMPANY KabnDzla
SIGNATURE REa/nrsnso `V_N_] psscuRRE^
Address Liconao#
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building P\ano;(1)set of Energy Forms;R-O4V Permit for new construction,
Minimum ten(1o)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence Installed,
Sanitary Facilities&1 dumpstec Site Work Permit for subdivisions/large projects
COMMERCIAL -Attach(2)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new 'construction.
Minimum ten(1o)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary Facilities&I dumoster.Site Work Permit for all new projects.All commercial requirements mustme6t compliance
SIGN PERMIT Attach pq sets of Engineered P|ans.
**°°PROPERr/SURVEY required for all NEW construction, -
Fill out application completely.
Owner&Contractor sign back uy application,notarized
n over$2soo,a Notice cf Commencement isrequired. (/vC upgrades over*750n)
�
Agent(for the contractor)or Power of Attome�(for the owner)would be someone With notarized letter from owner autho
rizing same
OVERTHE COUNTER PERMITTING (copy ufvunhautmqu|�d)
Remofs if shingles Sewers Service Upgrades A/C Funces(P\nUSumoy/Foutage) ^
Driveways-Not over Counter ifon public medwmyo..nesdaROW
'
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
contractor is not licensed as.required by law, both the owner and contractor may be cited for a misdemeanor violation
under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing.Section at 727-847-
8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
contractor, that may be an indication that he is not properly.licensed and is not entitled to permitting privileges in Pasco
County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
permitting. It is further understood that Transportation Impact Fees'and Resource Recovery Fees must be paid prior to
receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
other than the"owner", I certify that I,have obtained a copy of the above described document and promise in good faith to
deliver it to the"owner" prior to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands, Water/Wastewater Treatment.
- Southwest Florida Water Management District-Wells', Cypress Bayheads, Wetland Areas, Altering
Watercourses.
- Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement.
- Federal Aviation Authority-Runways.
I understand that the following restrictions apply to the use of fill:
- Use of fill is not allowed in Flood Zone W" unless expressly permitted.
- If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
- If fill material is to be used in any area, I certify that use of such fill Will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less than one (1)
acre which are elevated by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid
unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension
may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
justifiable cause for the extension. If work ceases for ninety(90) consecutive days, the job is considered abandoned.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER,OR AN ATTORNEY BEFORE RECORDING YOUR-NOTICE-OF—COMMENCEMENT ------ --
FLORIDA JURAT(F.S.117.03)
OWNER OR AGENT CONTRACTOR
Subscribed and sworn to(or affir d)befor me this Subscribed and sworn to(or affirmed)before me this
by St IAr- ln..c by
Who is/are personally known to me or has/have prodtzed Who is/are personally known to me or has/have produced
as identification. as identification.
)y7 Notary Public Notary Public
Commission No. Commission No.
Name of Notary typed,printed or st J Name of Notary typed,printed or stamped
L�AO Notary Public State of Florida
Michelle Moyes
My Commission GG 057321
Fxplrmt312l21/a020
D
Q
r
Single Family Dwelling
Plan Review Comments
1. F.F.E..shall.be a minimum of 8" above the road elevation and an engineered site plan.
2: Lots shall be graded to.comply with R401:3 of the F.B.C.
3. Compaction test required if 24 or more of fill dirt is brought in at any one place.
4: Tie in survey required before pouring concrete.
5: Driveways require.a R,O.W. use permit: All 4 sides of driveway thru the sidewalk shall have
expansion material.
6. All setbacks shall be met.
7: All.property markers shall be uncovered.and.marked at time of first inspection.
8: All A.D.A.requirements shall be met:
R. No electric,.plumbing;mechanical, or framing shall.be covered without an inspection.and
approval first:
10: All Garages shall comply with section R302:6 of the F.B.-C. (Fire Separation).
11. Appliances shall not be installed in a location where subject to in an cal.damage unless
protected by approved barriers. M303A of the F.B.0
12. Water heaters-shall comply with section P607.3 of the F.B.C.
13. Foundation supports for A/C units:shall.be raised at least 3" above finished grade. M1308:1
14:.Retuni air in all bedrooms. F.B:C. M1620.4
1.5. Smoke detectors.are to be installed in accordance with R313.1 of.the.FAC. .
16: All lazing requirements are to be iri accordance with R3b8:4 of the F:B:C:
g
17. All means of egress are to be-in accordance with R311 of-the F.B.C:
18. "Green.gypsum Board" shall not be used as a backer in showers or tubs. R702-4:2 F.B.C.
19._Combination-type AFCI breakers are required at all locations reguiririg an AFCI type breaker.
20. Carbon monoxide alarms will be required in new construction that.uses fossil-burning heating
or appliances or an attached garage. They shall be installed in accordance with the F B.C.
21. All plumbing,mechanical, and electrical shall be separate from unit to unit: This includes all
underground.plumbing and electric.
22. All 2016 N.E.C. Codes will be enforced.
23. Tamper-Resistant Receptacles in accordance with 406.11 0 f the 2016 N.E.-C
24. In accordance with the Land Development Code,lots_ -shall be sodded before final at least.10
feet aroqnd.m the structure:
25. R403.5.3Hot water.pipe.insulation, .
Insulation for hot.water pipe With a minimum thermal resistance (R-value) of R-3 shall be applied to the
followin
Piping 31;inch (1.9.1 mm) and larger in.nominal diameter..
Piping.serving more than one dwelling unit.
Piping located outside the conditioned space:
Piping from the:water heater to:a distribution manifold.
Piping.located under,a floor slab: .
Buried in piping.
Supply and return piping in recirculation systems other than demand recirculation systams.
-25.Blower door test shall be provided before C.O:
-,26.A copy ofthe-energy cacls shall be with permit at all runes
27, Conn offnal insulation report shall be provided ivith permit before final
28.No fence, pool or screen enclosure':is issued with this.permit
F.F.E:-Finished Floor Elevation
R.B.C-.:Florida Building Code 6 h Edition
R.O:W-Right of Way
A.D.A.-Americans with Disabilities Act.. N.EC.-National Electric.Code(2016)
PASCO COUNTY, FLORIDA
_ . Permit No. 1c�
Date Permitted
'Builder Name/Owner.Name t ) Control W
' r
County Parcel No. Z ; 2f t)()tA��AU D SubDly: �,�
Address/Location 70 cyl�2.r- blal C Al-
ClassMcationR'ype of Usq ,�i Y e
TRANSPORTATION IMPACT FEE Rate: S4.Ft Unit:
Exempt D Yes (Q No How Determined
Impact Fee Amount , Zone No. TAZ:
SCHOOL'IMPACT:FEE
Account (056) :Slag;, FamilyDetached•Hcuse Amount $
{857) _Mobllw Hb ne
(054) .Othar Residential
F 6g3)
Collelon`Fee
Exempt Yes. (Q No How Determined
PARKS:ANitRECREATION FEE
Land Account Land Credit Land Total
Recreation Account Recreation Credit Recreation Total
Zone ! TOTAL AMOUNT 2
'Exempt . ❑Yes []No How Determined
LIBRARY FEE
Land`Accounf Land Credit Land Total
Facility Account Facility Credit Facility Total
Exempt 0 Yes 0 No How Determined Total Amount
RESOURCE t»EE ERU
TOTAL AMOUNT
Prepared By Checked By
NO CER71FICgTE OF OCCUOANCYWILL:BE!ISSUEO.,OR-FINAL:INSOtCTION
P15001 IED UI L-,*H ;'COT 4t:Jlti190Uid-'11$TED HAVE:
BI,EN•,PAID•AND"
RECEWTED-FOkSY A'CENTRAL PERMI'wTINO'OFFlCE:OF PASCO`COUNTY
Acki(owledgement t�eiow,doas•not ln!pN acceptance,of.concurrence;Ut simpty;re iptot a,Dopy of'fhis;form;piecing
' Ilse tudtding F OYVt18S OA ttaBtSB of tl�s ses siiient acid tti 'condlttons of payment for sari b.
DATE RECEIVED BY
RECEIPT NO. DATE BY
4
FORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: Camden 2795 Elev D w Multi Gen Builder Name: DR orlon
Street: v�-i'_2� �� Q ,� 3 Permit Office: C(�/ (� �Lv
City,State,Zip: Zephyrhills, FL,3�v J"' Permit Number: O
Owner: pp�� i Jurisdiction: o((b 6o
Design Location: FL,Tampa V` County: Pasco(Florida Climate Zone 2)
1. New construction or existing New(From Plans) 9. Wall Types(2331.8 sgft.) Insulation Area
2. Single family or multiple family Single-family a.Concrete Block-Int Insul,Exterior R=4.1 1956.90 ft2
b.Frame-Wood,Adjacent R=13.0 374.89 ft2
3. Number of units,if multiple family 1 c.N/A R= ft2
4. Number of Bedrooms 4 d.N/A R= ft2
5. Is this a worst case? No 10.Ceiling Types (3024.0 sgft.) Insulation Area
a.Under Attic(Vented) R=30.0 2836.00 ft2
6. Conditioned floor area above grade(ft2) 2836 b.Knee Wall(Vented) R=19.0 188.00 ft2
Conditioned floor area below grade(ft2) 0 c.N/A R= ft2
11. Ducts R ft2
7. Windows(330.0 sgft.) Description Area a.Sup:Attic,Ret:Attic,AH:Main 6 529
a. U-Factor: Dbl,U=0.34 258.00 ft2
SHGC: SHGC=0.31
b. U-Factor: Dbl,U=0.55 72.00 ft2 12.Cooling systems kBtu/hr Efficiency
SHGC: SHGC=0.34 a.Central Unit 41.5 SEER:15.00
c. U-Factor: N/A ft2
SHGC: 13.Heating systems kBtu/hr Efficiency
d. U-Factor: N/A ft2 a.Electric Heat Pump 42.0 HSPF:8.50
SHGC:
Area Weighted Average Overhang Depth: 4.214 ft.
Area Weighted Average SHGC: 0.317 14.Hot water systems
8. Floor Types (2836.0 sgft.) Insulation Area a.Electric Cap:50 gallons
a.Slab-On-Grade Edge Insulation R=0.0 2836.00 ft2 EF:0.950
9 b. Conservation features
b.N/A R= ft2 None
c.N/A R= ft2 15.Credits Pstat
Glass/Floor Area: 0.116 rH
Total Proposed Modified Loads: 87.71 n ASS
Total Baseline Loads: 87.48
I hereby certify that the plans and specifications covered by Review of the plans and O�-VHE S ,q��
this calculation are in compliance with the Florida Energy specifications covered by this O
Code. calculation indicates compliance
A with the Florida Energy Code. (.. 1/q, ��;; € -•d;�`�;,,, O
PREPARED BY: cKiM�+� Before construction is completed
p
�� �
DATE: 11-20-20 this building will be inspected for
compliance with Section 553.908
I hereby certify that this building,as designed,is in compliance Florida Statutes. roc,
with the Florida Energy Code. Ob WE,
OWNER/AGENT: BUILDING OFFICIAL:
DATE: 0 f W1 2 XJ DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handle enclosure qualifies as
certified factory-sealed in accordance with R403.3.2.1.
-Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance wit(
it R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2).
11/20/2020 2:50 PM EnergyGaugeO USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 4
FORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project^Name: Camden 2795 Elev D w Multi Gen Builder Name: DR Horton
Street: -/v ` Permit Office:
City,State,Zip: Zephyrhills,FL,'3�` I " Permit Number:
Owner: j Jurisdiction:
Design Location: FL,Tampa `� County: Pasco(Florida Climate Zone 2)
1. New construction or existing New(From Plans) 9. Wall Types(2331.8 sqft.) Insulation Area
2. Single family or multiple family Single-family a.Concrete Block-Int Insul,Exterior R=4.1 1956.90 ft2
b.Frame-Wood,Adjacent R=13.0 374.89 ft2
3. Number of units,if multiple family 1 c.N/A R= ft2
4. Number of Bedrooms 4 d.N/A R= ft2
10.Ceiling Types (3024.0 sqft.) Insulation Area
5. Is this a worst case? No a.Under Attic(Vented) R=30.0 2836.00 ft2
6. Conditioned floor area above grade(ft2) 2836 b.Knee Wall(Vented) R=19.0 188.00 ft2
Conditioned floor area below grade(ft2) 0 c.N/A R= ft2
11. Ducts R ft2
7. Windows(330.0 sqft.) Description Area a.Sup:Attic,Ret:Attic,AH:Main 6 529
a. U-Factor: Dbl,U=0.34 258.00 ft2
SHGC: SHGC=0.31
b. U-Factor: Dbl,U=0.55 72.00 ft2 12.Cooling systems kBtu/hr Efficiency
SHGC: SHGC=0.34 a.Central Unit 41.5 SEER:15.00
c. U-Factor: N/A ft2
SHGC: 13. Heating systems kBtu/hr Efficiency
d. U-Factor: N/A ft2 a.Electric Heat Pump 42.0 HSPF:8.50
SHGC:
Area Weighted Average Overhang Depth: 4.214 ft.
Area Weighted Average SHGC: 0.317 14.Hot water systems
a.Electric Cap:50 gallons
8. Floor Types (2836.0 sqft.) Insulation Area EF:0.950
a.Slab-On-Grade Edge Insulation R=0.0 2836.00 ft2 b. Conservation features
b.N/A R= ft2 None
c.N/A R= ft2 15.Credits Pstat
Glass/Floor Area: 0.116 Total Proposed Modified Loads: 87.71 SS n /�
Total Baseline Loads: 87.48 rf1�7�7
I hereby certify that the plans and specifications covered by Review of the plans and �_'T14E S
this calculation are in compliance with the Florida Energy specifications covered by this g Off,
Code. calculation indicates compliance '�i,,'`%
with the Florida Energy Code. „ O
PREPARED BY: �1$lc �� Before construction is completed u �, •' " .
DATE: o tt-z2o this building will be inspected for IPj�y ,-'
compliance with Section 553.908
I hereby certify that this building,as designed,is in compliance Florida Statutes. ,
with the Florida Energy Code. Orb WE'��
OWNER/AGENT: BUILDING OFFICIAL:
DATE: DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handle enclosure qualifies as
certified factory-sealed in accordance with R403.3.2.1.
-Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2).
11/20/2020 2:50 PM EnergyGaugeO USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 4
v
=
11/20/20202:50RN EnergyoaugnG)USA n�.02(Rev1),FlaRovonrFocmh Edition pm17l Compliant Software Page cof4
�
�
11/20/20202:50Rw EnergyGougoD USA nxVu(Rov 1) RoRooan1rFocmh Edition(2o17) Compliant Software Page ou|*
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
HEATING SYSTEM
V # System Type Subtype Speed Efficiency Capacity Block Ducts
1 Electric Heat Pump/ None Slngl HSPF:8.5 42 kBtu/hr I sys#1
COOLING SYSTEM
V # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts
1 Central Unit/ None Sing] SEER:15 41.5 kBtu/hr 1245 cfm 0.75 1 sys#1
HOT WATER SYSTEM
V # System Type SubType Location EF Cap Use SetPnt Conservation
1 Electric None Garage 0.95 50 gal 70 gal 120 deg None
SOLAR HOT WATER SYSTEM
V FSEC Collector Storage
Cert # Company Name System Model# Collector Model# Area Volume FEF
None None ft2
DUCTS
Supply---- ----Return---- Air CFM 25 CFM25 HVAC#
V # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool
1 Attic- 6 529 ft2 Attic 99 ft2 Default Leakage Main - (Default) (Default) I I
TEMPERATURES
Prograrnable Thermostat:Y Ceiling Fans:
Cool!'ng Jan Feb Mar Apr May Jun Jul Au Sep Oct Nov Dec
Jun
9
H Jan Feb M Apr May n Jul Aug Sep Oct Nov Dec
V Jan H Feb M Apr May Jun Jul Aug Sep Oct Nov Dec
Thermostat Schedule: HERS 2006 Reference Hours
Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12
Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80
PM 80 80 78 78 78 78 78 78 78 78 78 78
Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78
PM 78 78 78 78 78 78 78 78 78 78 78 78
Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
Heating(WEH) AM 66 66 66 66 66 68 68 68 68 .68 68 68
PM 68 68 68 68 68 68 68 68 68 68 66 66
MASS
Mass Type Area Thickness Furniture Fraction Space
Default lbs/sq.ft. 0 ft2 Oft 0.3 Main
11/20/2020 2:50 PM EnergyGauge@ USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 4 of 4
,
�
' 2D|7EPL DISPLAY CARD
ENERGY PERFORMANCE LEVEL (EPU ) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX° = 100
The lower the Energy Performance Index, the more efficient the home.
1.New home or,addition 1._New(From Plans) 12.Ducts,location&insulation level
a)Supply ducts R 6.0
2.Single-family urmultiple-family 2._SingleLfami y b) Return ducts R6.0
o)AHUlocation Main
3.No.of units(if muhip\o-fami|y) 3. 1__
4.Number ofbedrooms 4. 4 13.Cooling system: Capuoity___41.5
a)Split system SEER______
5.|o this a worst case?(yes/no) 5. 1No_ b)Single package SEER____
o) Ground/water source SEER/COP
______
0.Conditioned floor area(aq.ft.) 8. 283U6 d) Room unit/PTAC EER_______
o)Othor 15.0
7.Windows,type and area
a) U-factnr(wmkJhtedaverage) 7a`_-0L386_
b)Solar Heat Gain Coefficient(SHGC) 7b. 0.312�_ 14. Heating system: C dy__�2.0
o)Aoea 7o` 330.0 u)Split system heat pump HSPF______
b)Single package heat pump HSPF
8.Skylights o) Electric resistance COp______
a) U-faotor:(weightedaverage) 8a. 0&_ d)Gas furnace, natural gas AFUE_____
b)Solar Heat Gain Coefficient(SH8C) 8b` NA a)Gas furnace, LPG AFUE______
f)Other 0.50
S.Floor type,insulation level:
a)S|ab-on'gmdo(R-vaue) 8a. 0.0 _
b)Wood,raised(N+a\ue) Sb. 15.Water heating system
o)Concrete,raised(R'vedue) 8u. a)Electric resistance EF0.l5
b)Gas fired, natural gas EF_______
1K Wall type and insulation: u)Gas fired,LPG EF_______
A.Exterior: d)Solar system with tank EF______
1.Wood frame(Insulation R'va|ue) 1OA1` o) Dedicated heat pump with tank EF�____
2.Masonry(Insulation R-adu*) 1QA2. 4.1 0 Heat recovery unit HeatRen%�______
B.Adjocont: g) Other
1.Wood frame(Insulation R'walue) 1UB1. -1l.0L--
2. Masonry(Insulation R'va)ue) 10B2`_______
10. HVAC credits claimed(Performance Method)
11'Ceiling type and insulation level u)Ceiling fans
a) Under attic 11a` 30.0 b)Cross ventilation No�
b)Single assembly 11b` u)Whole house fan No
d Knee walls/skylight walls 11u` 1j9.0_ d)K4u|Uznna cooling credit
d) Radiant barrier installed 11d. Yes e) kXu|tizono heating credit
f) Programmable thermostat Yes
*Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy
saving features which will be installed (or exceeded) in this home before final inspection.Otherwise,a new EPL
display card will b completed based res.
Builder Signature:
Address c*New Home: 74City/FLZip:
11/20/20202:50:27PN EnorgyGauom@ USA s.o.u*(lav 1)-BaRano017FBCmh Edition(2017)Compliant Software Page 1of1
Florida Building Code, Energy Conservation, 6th Edition (2017)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: Permit Number:
Zephyrhills,FL,
MANDATORY REQUIREMENTS See individual code sections for full details.
V SECTION R401 GENERAL
R401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.Florida law
(Section 553.9085,Florida Statutes)requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans
and specifications submitted to demonstrate code compliance for the building.A copy of the EPL display card can be found in Appendix RD.
R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
R402.4.1 Building thermal enveloW building thermal envelope shall comply with Sections R402.4A.1 and R402.4.1.2.
The sealing methods between dissimilar materials shall allow for differential expansion and contraction.
R402.4.1.1 Installation.The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table R402.4.1.1,as applicable to the method of construction.Where required
by the code official,an approved third party shall inspect all components and verify compliance.
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2,and three air changes per hour in Climate Zones 3 through 8.Testing shall be conducted in
accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.(50 pascals).Testing shall be conducted by either
individuals as defined in Section 553.993(5)or(7),Florida Statutes,or individuals licensed as set forth in Section 489.105(3)(f),(g)or(1)or
an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions,alterations,renovations,or repairs,of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or
other infiltration control measures.
2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended
infiltration control measures.
3.Interior doors,if installed at the time of the test,shall be open.
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5.Heating and cooling systems,if installed at the time of the test,shall be turned off.
6.Supply and return registers,if installed at the time of the test,shall be fully open.
R402.4.2 Fireplaces. -New wood-burning fireplaces shall have tight-fitting flue dampers or doors,and outdoor combustion air.Where
El using tight-fitting doors on factory-built fireplaces listed and labeled in accordance with UL 127,the doors shall be tested and listed for the
fireplace.Where using tight-fitting doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907.
FiR402.4.3 Fenestration air Ieakage.Windows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per
square foot(1.5 Us/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400 or
AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer.
Exception: Site-built windows,skylights and doors.
11/20/2020 2:50 PM EnergyGauge®USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 5
`
`
MANDATORY REQUIREMENTS ~ (Co|tinUm0
��2.4.4 Rooms containing fuel-burning appliances. In Climate Zones 3 through 8,where open combustion air ducts provide combustion air to
opencombustion fuel b ing appliances,the appliances d combustion airin
enclosed in a room,isolated from inside the thermal envelope.Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2,where the walls,floors and ceilings shall meet not less than the basement wall R-value requirement.The door into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403,The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions:
1. Direct vent appliances with both intake and exhaust pipes installed continuous mthe outside.
o. Fireplaces and stoves complying with Section R402.4.2 and Section R 1006 of the Florida Building Code,Residential.
�lR4uu�.5 Recessed fighting. Recessed l i i installed i h building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not
more than u.00hn(0.e44tested in accordance with ASTM E283 at a 1.57 psf(75 Pa)pressure differential.All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
R4uo1 Controls. SECTION����� � R403 SYSTEMS
n R403.1.1 Thermostat provision(Mondatpn0. At least one thermostat shall be provided for each separate heating and cooling system.
�l 8oum�.mUa�pump supp|amao��»eo (Mandatory). He�pumps hav�guup�emen���nv�c~mu��ncahmgah� m�(havaoon�
�� that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load.
�l R4ou.o.x Sealing Umandator0 All ducts,air handlers,filter boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts or plenum chambers,shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5)or
(7),Florida Statutes,or individuals licensed as set forth in Section 489.105(3)(f),(g)or(i),Florida Statutes,to be"substantially leak free"in
accordance with Section H«oo.a.o.
�7 n403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
o,the design airflow rate when tested in accordance with AaHR4E1no.
84mm.o.3 Duct testing(mmndmory). Ducts shall be pressure tested to determine air leakage by one of the following methods:
I Rough-in test:Total leakage shall bo measured with a pressure differential ofu.1 inch vug.(u5 Pa)across the system,including the
manufacturer's air handler enclosure if installed at the time of the test.All registers shall be taped or otherwise sealed during the test.
c. Postconstruction test:Total leakage shall be measured with a pressure differential of 0.1 inch we(us Pa)across the
entire system,including the manufacturer's air handler enclosure.Registers shall be taped or othenvise sealed during the
test.
Exceptions:
1. Aduct air leakage test shall not be required where the ducts and air handlers are located entirely within the building
thermal envelope.
u. Duct testing is not mandatory for buildings complying by Section«nam this code.
A written report of the results of the test shall be signed by the party conducting the test and provided to the cocle-official.
��
��
B4oV.3/xoui|dm0cavMmoyMoudatunN. Building framing cavities shall not bo used ao ducts mplenums.
n403.4 Mechanical system piping Insulation(Mandatory). Mechanical system piping capable of carrying fluids above 1o5°F(41^C)
or below a5~F(1o^C)shall ue insulated mo minimum ofR-o.
�l e4n3.41 Protection o,piping insulation. Piping insulation exposed to weather shall be protected from damage,including that
caused by sunlight,moisture,equipment maintenance and wind,and shall provide shielding from solar radiation that can cause
degradation nf the material.Adhesive tape shall not bopermitted.
�l o4uo.s� no�adna�rmnvu|ouon and�mpen�vmmoin�nanceova�mmVmaou�nnA' Heated water�mm�mnsvo�mosmmuem
�� accordance with Section R403.5.1.1.Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2.
Automatic controls,temperature sensors and pumps shall be accessible.Manual controls shall be readily accessible.
�l Rvuxm.1.1m|n,u|o�nnsystems. Heated w�o,cimui��nnymomoshall bopm�dodv�havimu|a�vn pump.The system onum
�� pipe shall boa dedicated return pipe vra cold water supply pipe.Gravity and the,mmoiphun circulation systems shall uoprohibited.
Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the
occupancy.The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and
when there iono demand for hot water.
R4mm.e.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE o1o.1 urULs1s.Controls for such systems
shall automatically adjust the input to the heat tracing to maintain the desired water temperature in the piping inaccordance
with the times when heated water is used in the occupancy.
11/20/20202:50PM EnergyoaugemuaA s000(nay. 1)'RaReuoo1rF8cnm Edition(on17) Compliant Software Page 2mu
MANDATORY REQUIREMENTS - (Continued)
R403.5.5 Heat traps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 1/2 inches(89 mm)in the hot water distribution line and cold water line located as close as possible
to the storage tank.
R403.5.6 Water heater efficiencies(Mandatory).
R403.5.6.1.1 Automatic controls. Service water-heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum temperature
setting range shall be from 1001F to 140°F(38°C to 60°C).
EJ R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be.provided to permit the power supplied to
electric service systems to be turned off.A separate valve shall be provided to permit the energy supplied to the main burners)of
combustion types of service water-heating systems to be turned off.
R403.5.6.2 Water-heating equipment. Water-heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code,Energy Conservation,Commercial Provisions,for the type of equipment installed.
Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate
water-heating category.Solar water heaters shall meet the criteria of Section R403.5.6.2.1.
El R403.5.6.2.1 Solar water-heating systems. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors,
and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol.Collectors in installed solar
water-heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal;and
2. Be installed at an orientation within 45 degrees of true south.
R403.6 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the
Florida Building Code,Residential,or Florida Building Code,Mechanical,as applicable,or with other approved means of ventilation
including:Natural,Infiltration or Mechanical means.Outdoor air intakes and exhausts shall have automatic or gravity dampers that
close when the ventilation system is not operating.
❑ R403.6.1 Whole-house mechanical ventilation system fan efficacy. When installed to function as a whole-house mechanical
ventilation system,fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where whole-house mechanical ventilation fans are integral to tested and listed HVAC equipment,they shall be
powered by an electronically commutated motor.
R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation
shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2,Ventilation for Acceptable
Indoor Air Quality,shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces,attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed space(s),then the walls of the space(s)from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19,space permitting,or R-10
otherwise.
R403.7 Heating and cooling equipment(Mandatory).
El
R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies,
based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and
indoor units(if split system)shall be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1.This Code does not allow designer safety factors,provisions for future expansion or other factors that
affect equipment sizing.System sizing calculations shall not include loads created by local intermittent mechanical ventilation such
as standard kitchen and bathroom exhaust systems.New or replacement heating and cooling equipment shall have an efficiency
rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed.
TABLE R403.6.1
WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION AIRFLOW RATE MINIMUM MINIMUM EFFICACY a AIRFLOW RATE MAXIMU
(CFM) (CFM/WATT) (CFM)
Range hoods Any 2.8 cfm/watt Any
In-line fan Any 2.8 cfm/watt Any
Bathroom,utility room 10 1.4 cfm/watt <90
Bathroom,utility room 90 2.8 cfm/watt Any
For SI:1 cfm=28.3 L/min. a. When tested in accordance with HVI Standard 916
11/20/2020 2:50 PM EnergyGaugeO USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 3 of 5
'
. .
MANDATORY REQUK8REMENTS ~ (Continued)
�l R403.7.1.1uooling equipment capacity, Cooling only equipment shall be selected so that its total capacity is not less
than the calculated total load but not more than 1]ntimes greater than the total load calculated according to the procedure selected in
Section*oaJ.or the closest available size provided by the manufacturer's product lines.The corresponding latent capacity of the
equipment shall not bo less than the calculated latent load.
The published value for AHRI total capacity is a nominal,rating-test value and shall not be used for equipment sizing.Mamunmmm/m
expanded performance data shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation(or entering water temperature for water-source equipment),the blower CFM provided by the expanded
performance data,the design value for entering wet-bulb temperature and the design value for entering dry-bulb temperature.
Design values for entering wet-bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall bo adjusted for return side gains if the return dmm($ia installed inan unconditioned space.
Exceptions:
1. Amochedoinmle-and muresidential equipment sizing may be selected so that its cooling capacity is less than the
calculated total sensible load but not less than eo percent of that load.
2.
When signed and sealed by a Florida-registered engineer,in attached single-and multiple-family units,the capacity of
equipment may bo sized in accordance with good design practice.
R4no.7.1-2 Heating equipment capacity.
�� R400.7.1.o.1 Heat pumps. Heat sizing shaUbo based on�e cooling mquimmonmavo�:u|�odaocv�inox/aouUon
�� R400J.1.1,and the heat pump total cooling capacityshall not bo more than 1.1s times greater than the design cooling load even i[
the design heating load is1.10 times greater than the design cooling load.
[l noo3.z1'o.r Electric resistance furnaces. Electric resistance furnaces shall be sized within 4kwo[the design
requirements calculated according tv the procedure selected in Section R4uuz1.
�l n*oo.�1.o�Fossil b/Whea�ngaquipmon� The capacity fossil
o� m�heating mqu�mm*w�hnamo dr
aft uum�
�� shall not be less than the design load calculated in accordance with Section R403.7.I.
�l Roou.7.1.oEmm capacity nequimufor special occasions. Residences e ih mmeawcooling orhoahngoqu� �mon�oap� �onan
�� intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas,
2. A variable capacity system sized for optimum performance during base load periods is utilized.
�7 Bono.8 Systems serving multiple dwelling units 0mandaton0' Systems serving multiple dwelling units shall comply with Sections
C4nu and c*o4m the|FCo—'Commorcia|Provisions in lieu vf Section R4oa.
Fl R4ou.e Snow melt and ice system uonmn|m<Mendomon0 Gn��and ice'm�Unqsystems,supplied�muohenergy oomioom the building,
�� shall include automatic controls capable of shutting off the system when the pavement temperature io above 5o"F(1o°q.and no
precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40*F(4VC).
�l a«V3.1u Pools and permanent spa eu�g consumption(Mandatory). The eme�younoumpdunm pools and permanent spas
�� shall bain accordance with Sections R400.1o.1 through R4ou.1o.a
�� gonn'1o.1Heo�m' The a�o�cpuwa /ohe�om shall bocmnon//odbyamadi�uoceaoiNemn*ffowimn that�an
�� integral part o the heater mounted on the exterior of the heater,or external to and within 3 feet(914 mm)of the heater.Operation
of such switch shall not change the setting of the heater thermostat.Such switches shall be in addition to a circuit breaker for the
power to the heater.Gas-fired heaters shall not be equipped with continuously burning ignition pilots.
Roo3.1u.c Time switches. Time switches or other control methods that can automatically turn off and on according ma preset schedule
shall be installed for heaters and pump motors.Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require m-hou,pump operation.
u. Pumps that operate solar-and waoto'homt-mvuvory pool heating systems.
u. vV here pumps are powered exclusively from on-site renewable generation.
�7 R403.10.3oovnrs. Outdoor heated swimming pools and outdoor permanent spas shall ue equipped with a vapor-retardant cover vnmau
the water surface vru liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for heating,computed over an operation season,is from site-recovered
onorgy,such as from a heat pump or solar energy source,covers or other vapor-retardant means shall not be required.
n400'1o'«Gas-and ox�imd pool and opohootonw' *Kgas-and oi|'�mdpool and spa hemtomsh�|have o minimum thenna|
�7
efficiency n/oc percent for heaters manufactured on or after April 16,oo1u.when tested in accordance with ANSI zo1.os.Pool
heaters fired by natural mLP gas shall not have continuously burning pilot lights.
11/20/20202:50PM snvrgyaauQw@uGA Vooe(nov.1)'F|uReauo17F8omh Edition(oo17) Compliant Software Page 1ufo
R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is
required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard.
R403.11 Portable spas(Mandatoryl)he energy consumption of electric-powered portable spas shall be controlled by the
requirements of APSP-14.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
R404.1 Lighting equipment(Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be
high-efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high-efficacy lamps.
Exception:Low-voltage lighting.
R404.1.1 Lighting equipment(Mandatory).Fuel gas lighting systems shall not have continuously burning pilot lights.
11/20/2020 2:50 PM EnergyGaugeO USA 6.0.02(Rev. 1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 5 of 5
2017'- AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Camden 2795 Elev D w Multi Gen Builder Name: DR Horton
Street: Permit Office:
City,State,Zip: Zephyrhills,FL, Permit Number: U
Owner: Jurisdiction: _
Design Location: FL,Tampa U
COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA
General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall
The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material.
requirements Breaks or joints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit
Ceiling/attic the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier.
Access openings,drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity
sealed. with a material having a thermal resistance of R-3
Knee walls shall be sealed. per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows,skylights The space between window/doorjambs and framing,and
and doors skylights and framing shall be sealed.-
Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated.
Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to
(including insulation. maintain permanent contact with the underside of
above-garage subfloor decking,or floor framing cavity insulation
and cantilevered shall be permitted to be in contact with the top side
floors) of sheathing,or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation
a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace
Shafts,penetrations Duct shafts,utility penetrations,and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be out to fit,or narrow
Narrow cavities cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation Air sealing shall be provided between the garage and conditioned spac 3s.
Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building
shall be sealed to the drywall. thermal envelope shall be air tight and IC rated.
Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls,or insulation that on
installation readily conforms to available space shall
Putp.nd hi-hind piping and wiring,
Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall
on exterior wall tubs shall separate them from the showers and tubs. be insulated.
Electrical/phone box or The air barrier shall be installed behind electrical or communication
exterior walls boxes or air-sealed boxes shall be installed.
HVAC register boots HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub-floor or drywall.
Concealed When required to be sealed,concealed fire sprinklers shall only be
sprinklers sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
a.In addition,inspection of log walls shall be in accordance with the provisions of]CC-400.
11/20/2020 2:50 PM EnergyGauge@ USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 1
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: Permit#:
t
Builder: DR Horton Community: Lot: 4/14
Address:
City: Zephyrhills State: FL Zip:
9•Ahbk T
*-
ull etest O- wpdfl W-io� 'W
C-lima
1:
;-ithe-'.�bld.bted-i --4 5'��1714,�O-Q'- '17
x 60 26375 Method for calculating building volume:
CFM(50) Building Volume ACH(50) 0 Retrieved from architectural plans
FIPASS 40 Code software calculated
When ACH(50) is less than 3,Mechanical Ventilation installation 0 Field measured and calculated
L must be verified by building department.
R402.4.1.2 Testing.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.(50 Pascals)
Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f),(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official,Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration
control measures.
2.Dampers including exhaust,intake,makeup air,back draft and flue dampers shall be closed,but not sealed beyond intended infiltration control
measures.
3.Interior doors,if installed at the time of the test,shall be open.
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5.Heating and cooling systems,if installed at the time of the test,shall be turned off.
6.Supply and return registers,if installed at the time of the test,shall be fully open.
7
TO 6-1
Company Name: Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification#: Issuing Authority:
11/20/2020 2:50:46 PM EnergyGauge@ USA 6.0.04(Rev. 1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1
-��- Manual S Compliance Report
wrightsoft® Date:
Entire House By:
Plan: Plan 2795 Camden
Progressive Air Systems, Inc
5907 Dasher Ct,Port Richey,FL 34668 Phone:727-847-3898 Fax:727-815-3399 License:CAC033669
lop
• • •
For: DR Horton
Lot 4 Blk 14 Silverado, Zephyrhills, FL
• • • • o
Design Conditions
Outdoor design DB: 91.2°F Sensible gain: 34477 Btuh Entering coil DB: 77.1'F
Outdoor design WB: 77.1 of Latent gain: 5203 Btuh Entering coil WB: 63.6°F
Indoor design DB: 75.0°F Total gain: 39680 Btuh
Indoor RH: 50% Estimated airflow: 1383 cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split ASHP
Manufacturer: Bryant Model: 215BNA042+FX4DN(B,F)043
Actual airflow: 1383 cfm
Sensible capacity: 33904 Btuh 98%of load
Latent capacity: 5871 Btuh 113%of load
Total capacity: 39775 Btuh 100%of load SHR: 85%
• • •
Design Conditions
Outdoor design DB: 40.0°F Heat loss: 32296 Btuh Entering coil DB: 69.2°F
Indoor design DB: 70.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipmenttype: SpIitASHP
Manufacturer: Bryant Model: 215BNA042+FX4DN(B,F)043
Actual airflow: 1383 cfm
Output capacity: 37812 Btuh 117%of load Capacity balance: 33 °F
Supplemental heat required: 0 Btuh Economic balance: -99 of
Backup equipment type: Elec strip
Manufacturer: Model:
Actual airflow: 1383 cfm
Output capacity: 9.6 kW 102%of load Temp. rise: ' 22 of
Meets are all requirements of ACCA Manual S.
.► wri htsoft® 2020-Nov-20 14:age I
9 Right-Suite®Universal 2017 17.0.21 RSU25554 Page
'C'� ...tsoft Files\SF Tampa\2795 w Multi gen suite.rup Calc=MJ8 House Front faces:SE
'
=
. «������ Job:
+ w, rightsoft ��~~
°= ~="`~^ � " ~=""" o�a���m�
~~..�... .~..u=e By:
pmn' p�nu�u�onmuon
Kommg�ssive��r ��ys��ms, Knc '
oom Dasher nt,Port Richey,pILu4mmPhone:727**7-e98 Fax:727*15-339 uomnso:oAC0000e
For: DR Horton
Lot 4B|h 14 Si|verodo' ZephyrhiUs, FL
Ht9 Cig Infiltration
Outsidedb 40 91 Method Simplified
Inside db, 70 75 Construction quality Semi-tight
Design TD ("F) 30 16 Fireplaces O
Daily range ' L
Inside humidity 58 50
Moisture difference(gr/|b) 26 54
HEATING EQUIPMENT COOLING EQUIPMENT
Make Bryant Make Bryant
Trade LEGACY LINE PURON Hp Trade LEGACY LINE PUBON HP
Model 215BNA042 Oond 2158NA042
AHR| ref Coil FX41)N(B.F)043
AHR| ref
Efficiency 8.5HSPF Efficiency 12.5 EER' 158EER
Heating input Sensible cooling 31125 Btuh
Heating output .42000 Btuh C@47^F Latent cooling 10375 Btuh
Temperature rise 28 OF Total cooling 41500 Btuh
Actual air flow 1383 ofm Actual air flow 1383 ofm
Air flow factor 0.043 cfn/Btuh Air flow factor 0.040 ofn/8tuh
Static pressure 0.50 in H20 Static pressure 0.50 in H20
Space thermostat Load sensible heat ratio 0.87
Capacity balance point=33"F
Backup:
ROOM NAME Area Htg load Clg load Htg AVF Cig AVF
' dining" /': 1874 1231 uo +9
UedX 165 1701 1814 78 E8
bathU | 36 | 736 | 336 | 32 | 13
B3vanity / 33 | O | O | 0 | 0
Calculations approved byACOAtomeet all requirements of Manual J0hEd.
'
^
^ bed2 181 4606 8643 197 148
Other equip loads 0 0
Latent cooling 5203
Calculations approved byACOAto meet all requirements of Manual J0hEd.
FORM R405-2017
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative(Performance)Method
Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the
residential Simulated Performance Method shall include;
❑ This checklist
❑ A Form R405 report that documents that the Proposed Design complies with Section
R405.3 of the Florida Energy Code. This form shall include a summary page
indicating home address, a-ratio and the pass or fail status along with summary
areas and types of components, whether the home was simulated as a worst-case
orientation, name and version of the compliance software tool, name of individual
completing the compliance report(one page)and an input summary checklist that can
be used for field verification(usually four pages/may be greater).
❑ Energy Performance Level(EPL)Display Card(one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements(five pages)
Required prior to CO for the Performance Method:
❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 -
one page)
❑ A completed Envelope Leakage Test Report(usually one page)
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
Form R405 Duct Leakage Test Report(usually one page)
11/20/2020 4:01:36 PM EnergyGauge@ USA 6.0.04(Rev.1)-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1
PLOT PLAN
DESCRIPTION:(AS FURNISHED)
LOT 4, BLOCK 14, SILVERADO RANCH SUBDIVISION PHASE 10A
AS RECORDED IN PLAT BOOK 80, PAGE(S) 107-112, OF THE PUBLIC RECORDS OF PASCO COUNTY, FLORIDA.
ON LOT CALCULATIONS
LOT = 10.377 SO. FT.
Curve Table LIVING AREA = Z836 SO. FT.
GARAGE = 619 SQ. FT.
Chord Bearing Chord Curve III Length Radius Delta ENTRY = 65 SO. FT.
Ct 108.34! 270.00 22*33'5-r N46*4-r25"E 105.65' LANAI = 193 SO. Fr.
0. - MULTI WAY = 25 SO. FT.
C2 272-95! 300.00' 52'0749' N25'5'r46"E 26&64? DRIVEWAY = 637 SQ. FT.
84 .00.
C3 87.W 300,00' 16'48'31* N43ZW25E 87-52! A/C PAD = 12 SO. FT.
C C4, q ISS . 00. WALKWAY = 0 SO. FT.
4 165.21' 300.W 35&08" N17*35'28"F IRZ35'1 IMPERVIOUS = 42X
ee 4387 SO. Fr.
SOD - 5.990 SQ. FT.
OFF LOT CALCULATIONS
RIGHT OF WAY oe 1976 SO. FT.
DRIVE APRON oe 373 SQ. FT.
PUBLIC S/W = 537 SQ. FT.
TOTALS GRA= 1,066 SO. FT. 1" C S30'
AREA = 12,353 SO FT. 15 30
DRIVEWAY - 1.010 SQ: FT.
SIDEWALK = 537 SO. FL
SOD - 7.056 SQ. FT.
A, %K 32.1
A,
0 -k
Dc
JK
O
r.
cp.
vo
LA-
0110
0.
4.00
(P
&0'
4D
cj
0
L
43 N .......
41
PREPARED FOR: jam ' k,
�
B-H-H0190N AA31.22 0'
SO
BUILDING SETBACKS C<11
FRONT- 20' All" .7.4101
REAR: 15'
SIDE. 5! (50' LOTS)
7.5' (55' & 60' WIDTH LOTS)
SIDE STREET- 15' LEGEND:
BUILDING SETBACK LINE PI POINT OF INTERSECTION
NOTES: PC POINT OF CURVATURE
1. ELEVATIONS SHOWN ARE PER LOT GRADING CENTERLINE PT POINT OF TANGENCY
PLANS PROVIDED BY THE CLIENT. RIGHT OF WAY LINE RP RADIUS POINT
PRC POINT OF REVERSE CURVATURE
7- ELEVATIONS ARE BASED ON NAVD 1988 PROPOSED ELEVATION PCC POINT OF COMPOUND CURVATURE
DATUM. TYP TYPICAL
PROPOSED DRAINAGE FLOW CS CONCRETE SLAB
P PER PLAT
THIS PLOT PLAN IS INTENDED FOR PERMITTING PURPOSES CONCRETE ic)) CALCULATED
ONLY. THIS IS NOT INTENDED FOR THE CONSTRUCTION OF PB PLAT BOOK
THE PROPOSED HOUSE. REFER TO HOUSE PLAN AND A/C AIR CONDITIONER PGS PAGES
OPTION LIST FOR CONSTRUCTION. ALL BUILDING SET BACK S/W SIDEWALK SO.Fr. SOUARE FEET
LINES SHOWN HEREON IS PER DATA FURNISHED BY CLIENT F.E.M.A. FEDERAL EMERGENCY MANAGEMENT AGENCY
M.
AND IS FOR INFORMATIONAL PURPOSES ONLY. NAND
FLOOD INSURANCE RATE MAP
NORTH AMERICAN VERTICAL DATUM
NGVD NATIONAL GEODETIC VERTICAL DATUM
THIS IS NOT A SURVEY Dd:UE DRAINAGE&U71UTY EASEMENT
PRIVATE DRAINAGE
THIS IS A PLOT PLAN ONLY POE PUE PUBLIC UTILITY EASEMENTEASEMENT
�F_LOOD NOTE: SURVEYOR NOTES:
I HAVE D(AMINED THE F.I.R.M.MAP NO. 12101CO286F, 1. THE SURVEYOR HAS NOT ABSTRACTED THE
DATED SEPTEMBER 26,2014.AND FOUND THE SUBJECT PROPERTY LAND SHOWN HEREON FOR EASEMENTS, RIGHT
APPEARS TO LIE IN ZONE'X.AREAS DETERMINED TO BE OUTSIDE THE OF WAY, RESTRICTIONS OF RECORD WHICH
0.2X ANNUAL CHANCE FLODDPLAJN. THE SURVEYOR MAKES NO MAY AFFECT THE 71MI OR USE OF THE LAND.
GUARANTEES AS TO THE ABOVE INFORMATION. PLEASE CONTACT THE
LOCAL RLM.A.AGENT FOR VERIFICATION. 2. NO UNDERGROUND IMPROVEMENTS HAVE BEEN
LOCATED EXCEPT AS SHOWN.
BEARING BASIS:
BEARINGS SHOWN HEREON ARE BASED ON THE NORTHEASTELRY LINE 3. NOT VAUD WITHOUT THE AUTHENTIC
OF LOT 4 BLOCK 14 BEING S5-M2!21-W,PER FLAT. ELECTRONIC SIGNATURE AND THE AUTHENTIC
ELECTRONIC SEAL OF A FLORIDA LICENSED
M F—:=F=:;,* I 4C,- .och,. SURVEYOR AND MAPPER.
(FIELD DATE:) REVISED: SURVEY I•
4 .
DigitallysignedbyJamoV08olman
SCALE, 10 m 30 FEET
MAPPINC3 INC. AMERKAN SURVEYING&MAPPING,
INC,m=JamesWiloleman,
APPROVED BY: CERTIFICATION OF AUTHORIZATION NUMBER LB#6393 O
3191 MAGUIRE BOULEVARD, SUITE 200
diite:2020.11.1
0
08:13:21-OS'00' THE
JOB NO. 200647 LOT 4,BLOCK 14 ORLANDO,FLORIDA 32803 Adobe A-bt—i11.0.23 FIRM
(407) 426-7979
DRAWN BY. RMS PLOT PLAN 11-05- 20 JSO WWW.AMERICANSURVEYINGANDMAPPING.COM JAMES W. BOLEMAN PSM# 6485 DATE