Loading...
HomeMy WebLinkAboutSimons Rd11 PREPARED BY A TF— 6', n =, ,I I Ii I � i 1` ®I 3 N it I i i eff .fir of ZIFHYRHI J?M.; 00FIC:IAL ALL WORK SHALL COMPLY WITH PREVAILING CODES FLORIDA BUILDING CODE, NATIONAL ELECTRIC CODE, AND THE CITY OF ZEPHYRHILLS ORDINANCES PN____ TRICAL POWER DES GNS .. P.O,BOX 272517 TAMPA, FL 33688 TEL 813-600-5136 FAX 813-425-4882 E-MAIL: caHos@epd-fl.com CARLOS M. ORAMA, PE. ELECTRICAL ENGINEER PE #60205 CA #27385 ISSUE REVISIONS CLIENT Winward Building Group PROJECT Abbott Square ADDRESS Simons Rd Zephyrhills Florida SHEET NAME Site Plan JOB # BY E21-250 MAID ISSUE DATE 12-15-21 SCALE AS SHOWN THESE PLANS MAY NOT BE COPIED OR MODIFIED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER. COPYRIGHT R .. 020 • ° w .. V \'�,,,�„Y\ ,moo -• ii 1 i g ST TE OF/ CARLOS M. ORAMA, PE NOT VALID UNLESS SIGNED & EMBOSSED BY A REGISTERED ENGINEER 1 Key Plan I 125-4- SHEET E000 i jIII- - I9P�h:�P.�i r,3� i � n n�, rr � r... a�jr��:^r.i��i�wm�a�m�N���r����a1��n�rRn�������mrnm�®rni�in�inee�io�.�m�we���a�oeiM�����o�a€��rt��r�ai t � �� ire � �rrimims�r��n��!�FmPr,^A��rn^�a�.^�n�r�r�m^.��T�T^ii��i^ I t 1 I I I 1 I 1 1 NTED ON POST 1 1 I I C-1 t Power Plan - 1/B„-V_0„ Timber Structure 'B' Fol SPECIFIC NOTES: 1. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED AT FREEBOARD OR HIGHER. THIS IS BASE FLOOD ELEVATION PLUS TWELVE INCHES. CONSULT OWNER OR CIVIL ENGINEER OF RECORD, 2, ALL WORK ELECTRICAL WORK MUST BE IN COMPLIANCE WITH N.E.0 2017, FLORIDA BUILDING CODE 2020, 7TH EDITION, LOCAL ELECTRIC COMPANY AND AHJ, ELECTRICAL CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH THE SCOPE OF WORK BEFORE BIDDING ON THIS PROJECT. 3. ALL GROUNDING AND BONDING MUST BE IN COMPLIANCE WITH NEC ARTICLE 250 AND AHJ. 4. LOAD DATA IS BASED ON INFORMATION GIVEN TO THE ENGINEER AT THE TIME OF DESIGN. VERIFY ALL EQUIPMENT NAMEPLATE DATA BEFORE ORDERING. 5. ALL ELECTRICAL WORK FOR FABRICATED EQUIPMENT SHALL BE COMPLETELY WIRED BY THE EQUIPMENT MANUFACTURER TO A JUNCTION BOX OR PULL BOX, AND ALL ELECTRICAL WORK FROM PANEL BOARDS TO BE BY THE ELECTRICAL CONTRACTOR. 6. TYPEWRITTEN CIRCUIT INDEX SHALL BE AFFIXED INSIDE SURFACE OF PANELBOARD DOOR, CLEARLY INDICATING AREA AND LOAD SERVED BY EACH BRANCH CIRCUIT. 7. ELECTRICAL CONTRACTOR SHALL FURNISH ALL ELECTRICAL MATERIALS TO COMPLETE THIS PROJECT. 8. ENGRAVED, LAMINATED PLASTIC IDENTIFICATION PLATES SHALL BE FURNISHED AND INSTALLED ON ALL PANELS AND SWITCHGEAR. PLATES SHALL BE AFFIXED TO FRONT OF PANELS, INDICATING PANEL NAME, VOLTAGE AND AMPERAGE. 9. WHERE THE ENCLOSURE OR RACEWAY IS SUBJECT TO PHYSICAL DAMAGE, THE CONDUCTORS SHALL INSTALLED IN ELECTRICAL METALLIC TUBING, RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, RTRC-XW, SCHEDULE 80PVC CONDUIT, OR EQUIVALENT. 10. THE ELECTRICAL CONTRACTOR SHALL MEET AND COORDINATE WITH THE LOCAL POWER COMPANY AT THE SITE PRIOR TO CONSTRUCTION. AT THAT TIME, THE CONTRACTOR SHALL COORDINATE ALL RELATED WORK WITH THE UTILITY COMPANY'S RESPONSIBILITIES TO MEET THE OWNER'S. 11. ALL ELECTRICAL CONDUCTORS SHALL BE INSTALLED IN AN APPROVED RACEWAY, EMT, IMC, RIGID GALVANIZED CONDUIT OR SCHEDULE 40 P.V.C. TYPE 'NM', 'MC% ELECTRICAL NON-METALLIC TUBING, & FLEXIBLE METAL CONDUIT MAY BE USED FOR BRANCH CIRCUITING AS ALLOWED BY THE N.E.C. & AHJ. MAXIMUM NUMBER OF 120V CIRCUITS ALLOWED IN A COMMON CONDUIT SHALL BE SIX (6). THE CONTRACTOR SHALL STRICTLY CONFORM TO THE N.E.C. REQUIREMENTS OF DERATING FOR CONDUCTOR AMPACITY AND CONDUIT FILL. 12. WORK WITH LANDSCAPE DESIGNER/GC/LANDSCAPE INSTALLERS TO ENSURE LIGHT FIXTURE IS AT RIGHT LOCATION. SEE LANDSCAPE DESIGN PLANS. 13. ALL CONDUCTORS SHALL BE THHN/THWN TYPE. UNLESS OTHERWISE CONDUCTOR SIZE NOTED ON THE PLANS SHALL BE 2#12 THWN COPPER AND 1#12 COPPER GROUND IN 112"C. MC CABLE CAN BE USED ONLY IN AREAS ALLOWED BY NEC ARTICLE 330. 14. EXTERIOR DISCONNECTS SHALL BE NEMA3R RATED. INTERIOR DISCONNECTS SHALL BE NEMA1 RATED. ALL DISCONNECTS SHALL BE HEADY DUTY TYPE. GENERAL SCHEDULE CALLOUT SYMBOL VOLTS AMPS KVA CIRCUIT CALLBOX Q) 120V 1 P 2W 5 0.6 F-7 GM-1 ® 120V 1 P 2W 9.8 1.18 F-15 GM-1 120V 1 P 2W 9.8 1.18 F-9 GM-1 (5) 120V 1 P 2W 9.8 1.18 F-11 GM-1 120V 1 P 2W 9.8 1.18 F-13 IRRIGATION WELL PUMP �,— 240V 2P 2W 28 6.72 E-1,3 IRRIGATION WELL PUMP �-, 240V 2P 2W 40 9.6 F-2,4 RECEPTACLE SCHEDULE CALLOUT SYMBOL VOLTS FEATURES DESCRIPTION QUANTITY GFCI_WP 120V I 2W WP, GND DUPLEX RECEPTACLE 120V. 20A WITH 13 GROUND FAULT INTERRUPTING DEVICE. WEATHERPROOF PREPARED BY RRICAL POWER DESIGI iS RO.BOX 272517 TAMPA, FL 33688 TEL 813-600-5136 FAX 813-425-4882 E-MAIL carts@epd-fl.com CARLOS M. ORAMA, PE. ELECTRICAL ENGINEER PE #60205 CA #27385 ISSUE REVISIONS CLIENT Winward Building Group PROJECT Abbott Square ADDRESS Simons Rd Zephyrhills Florida SHEET NAME Power Plan JOB # BY E21-250 MAI ISSUE DATE 12-15-21 SCALE AS SHOWN THESE PLANS MAY NOT BE COPIED OR MODIFIED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER. COPYRIGHT R O• ° 0 i - . wx CARLO5 M. ORAMA, PE NOT VALID UNLESS SIGNED & EMBOSSED BY A REGISTERED ENGINEER SHEET I r1, Power Plan - Heavy Timber Structure'C' �ti77 118"=v-0" 4 Power Plan - Heavy Timber Structure 'D' El 00 Tf FTM' ff117fff 1e 9_nWMF1 IFR'Illl;i�8E1�B %1 Power Plan - Gazebo and Entrance \� Ij 3132"=V-Q- O x O x O 0 i 0 SWITCH SCHEDULE CALLOUT SYMBOL QUANTITY Generic Switch $ 5 LUMINAIRE SCHEDULE CALLOUT SYMBOL LAMP DESCRIPTION MOUNTING INPUT VOLTS NOTES QUANTITY WATTS A (1) 8W ACCENT LIGHT MODEL: FLOOD 8 120V I 2W CONTROL FOR 14 KFL1-8L-20-4K7-WF-UNV-K-DB-JBR30-DB PHOTOCELL (ON) AND TIMER (OFF) F (1) 100W OUTDOOR CEILING FAN WITH LIGHT - CONSULT CEILING 100 120V 1 P 2W 9 WITH OWNER PREPARED BY OF ELECTRICAL PC7 JJER DESIGN P.O.BOX 272517 TAMPA, FL 33688 TEL 813-600-5136 FAX 813-425-4882 E-MAIL caHos@epd-fl.com CARLOS M. ORAMA, PE. ELECTRICAL ENGINEER PE #60205 CA #27385 ISSUE REVISIONS CLIENT Winward Building Group PROJECT Abbott Square ADDRESS Simons Rd Zephyrhilis Florida SHEET NAME Electrical Layout Gazebo/Sign JOB # BY E21-250 MAI ISSUE DATE 12-15-21 SCALE AS SHOWN THESE PLANS MAY NOT BE COPIED OR MODIFIED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER. COPYRIGHT R M. trtr•• CFJ�lS�• ''� r STATE ° CARLOS M. ORAMA, PE NOT VALID UNLESS SIGNED & EMBOSSED BY A REGISTERED ENGINEER SHEET E200 PREPARED BY PAL POWER DES#GNS " P.O.BOX 272517 TAMPA, FL 33688 TEL 813-600-5136 FAX 813-425-4882 E-MAIL: carlos@epd-fl.com CARLOS M. ORAMA, PE. ELECTRICAL ENGINEER PE #60205 CA #27385 ISSUE REVISIONS CLIENT Winward Building Group PROJECT Abbott Square ADDRESS Simons Rd Zephyrhills Florida SHEET NAME Villas Entrance Electrical JOB # BY E21-250 MAI ISSUE DATE 12-15-21 SCALE AS SHOWN THESE PLANS MAY NOT BE COPIED OR MODIFIED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER. COPYRIGHT R M°° '°• enlsF , 0 `°. STATE OF CARLOS M. ORAMA, PE NOT VALID UNLESS SIGNED & EMBOSSED BY A REGISTERED ENGINEER 1 Power Plan -Villas Entrance' 3132"=V-0" SHEET E300 RISER GENERAL NOTES: PREPARED BY 1. ALL GROUND ELECTRODES, CONDUCTORS AND COMPLETE GROUNDING SYSTEM MUST BE DONE IN COMPLIANCE WITH NEC STD #250 AND AHJ, 2. CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH THE WORK BEFORE BIDDING ON THIS PROJECT. 3. FAULT CURRENT WAS CALCULATED AT 20080 AMPS FOR A LOCAL TRANSFORMER. VERIFY WITH LOCAL ELECTRIC COMPANY AND NOTIFY ENGINEER IF DIFFERENT. 4. ALL EXTERIOR EQUIPMENT MUST BE RATED NEMA 3R OR BETTER. 5. CONSULT AND WORK WITH LOCAL ELECTRIC FOR FIELD LOCATIONS. NOTIFY ENGINEER WITH ANY CHANGES. 1 PANEL TYPICAL 0 100A BUS 60A MBC NEW 120/240V METER I 1P'3W NEMA 3R PROPOSED 1 "C UTILITY 3#4CU PAD MTD XFMR TRiser Diagram - 60A N.T.S VOLTAGE DROP SCHEDULE DEVICE FEEDER BRANCH CIRCUIT TOTAL VOLTAGE DROP VOLTAGE DROP WIRE SIZE LENGTH MAX VOLTAGE DROP WIRE SIZE A 0.06% #4 11' 0.29% (CKT 1) #12 0.34% B 0.08% #4 11' 0.18% (CKT 1) #12 0.26% C 0.09% #4 11' 0.18% (CKT 1) #12 0.27% D 0.06% #4 11' 0.22% (CKT 1) #12 0.28% E 0.59% #3 12' 1.04% (CKT 1,3) #8 1.63% F 0.43% #3 12' 2.99% (CKT 11) #12 3.42% #6G CU i ! I I I a e 60 AMP, 120/240V, 1P, 3W UNDERGROUND ELECTRICAL SERVICE 1 "C- 3#4 ALUMINUM CONDUCTOR EQUIVALENT: 1-1 /2" C- 3#2 AL. GROUND ROD N.T.S METAL FRAME OF BUILDING SERVICE -- EQUIPMENT ALL CONNECTIONS MADE WITHIN 5 FEET OF POINT OF ENTRANCE OF PIPE Riser N.T.S 10oA J/ A e *** CHANGE PER JOB *** #1/0 WG GROUNDING ELECTRODE CONDUCTOR (TYP. ALL) #6 AWG TO INCOMING TELEPHONE BOARD CONCRETE -ENCASED ELECTRODE '> 1;* s METAL UNDERGROUND WATER PIPE `-s D 100 AMP, 120/240V, 1 P, 3W UNDERGROUND ELECTRICAL SERVICE 1-1 /2"C- 3#3 ALUMINUM CONDUCTOR EQUIVALENT: 1-1/2" C- 3#1/0 AL. FAULT CURRENT SCHEDULE DEVICE FAULT AIC RATING L-N VOLTS UTILITY FED FROM FEEDER DIRECTLY CONNECTED MOTOR LOAD FAULT X R DEVICE FAULT X R SIZE X/ 1000` R/ 1000' LENGTH X R FAULT X R A 2,970 10,000 120V 2,970 0.02417 0.03238 METER A 3,217 0.02363 0.02887 #4 0.048 0.31 11' 0.0005 0.0035 B 2,428 10,000 120V 2,428 0.02569 0.04222 METER B 2,599 0.02515 0.03871 #4 0.048 0.31 11' 0.0005 0.0035 C 2,223 10,000 120V 2,223 0.02644 0.04705 METER C 2,369 0.0259 0.04354 #4 0.048 0.31 11' 0.0005 0.0035 D 2,936 10,000 120V 2,936 0.02425 0.0329 METER D 3,178 0.02371 0.02938 #4 0.048 0.31 11' 0.0005 0.0035 E 3,605 10,000 120V 3,493 0.02533 0.02321 METER E 3,747 0.02478 0.02029 #3 0.047 0.25 12' 0.0005 0.0029 112 1.039 0.2599 F 5,217 10,000 120V 4,969 0.02155 0.0109 METER F 5,340 0.021 0.007983 #3 0.047 0.25 12' 0.0005 0.0029 248 0.4687 0.1172 PELECTRICALPOWgERDEStG ROSOX 272517 TAMPA, FL 33688 TEL 813-600-5136 FAX 813-425-4882 E-MAIL caries@epd-fl.cam CARLOS M. ORAMA, PE. ELECTRICAL ENGINEER PE #60205 CA #27385 ISSUE REVISIONS CLIENT Winward Building Group PROJECT Abbott Square ADDRESS Simons Rd Zephyrhills Florida SHEET NAME Riser Diagram JOB # BY E21-250 MAI ISSUE DATE 12-15-21 SCALE I AS SHOWN THESE PLANS MAY NOT BE COPIED OR MODIFIED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER. COPYRIGHT R • EN •°° III I �0 •. STATE OF CARLOS M. ORAMA, PE NOT VALID UNLESS SIGNED & EMBOSSED BY A REGISTERED ENGINEER SHEET E400 _ - r �r � _ _ PREPARED BY A ROOM VOLTS 240/120V 2P 3W AIC 10,000 MOUNTING FLUSH BUS AMPS 100 MAIN BKR 60 FED FROM METER A NEUTRAL 100% LUGS STANDARD NOTE CKT CKT LOAD KVA CKT CKT LOAD KVA # BKR CIRCUIT DESCRIPTION A B # BKR CIRCUIT DESCRIPTION A B 1 20/1 LIGHTING 0.2 2 20/1 SPACE 0 3 20/1 RECEPTACLE 0.18 4 2011 SPACE 0 5 20/1 RECEPTACLE: 0.18 6 20/1 SPACE 0 7 20/1 SPACE 0 8 20/1 SPACE 0 9 20/1 SPACE 0 10 20/1 SPACE 0 11 20/1 SPACE 0 12 20/1 SPACE 0 13 20/1 SPACE 0 14 20/1 SPACE 0 15 20/1 SPACE 0 16 20/1 SPACE 0 17 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 0.38 0.18 CONN KVA CALC KVA CALC KVA LIGHTING 0.2 0.25 (125%) TOTAL LOAD 0.61 RECEPTACLES 0.36 0.36 (50%>10) BALANCED LOAD 2.54 A C ROOM VOLTS 240/120V 2P 3W AIC 10,000 MOUNTING FLUSH BUS AMPS 100 MAIN BKR 60 FED FROM METER C NEUTRAL 100% LUGS STANDARD NOTE CKT CKT LOAD KVA CKT CKT LOAD KVA # BKR CIRCUIT DESCRIPTION # BKR CIRCUIT DESCRIPTION A B A B 1 20/1 LIGHTING 0.2 2 20/1 SPACE 0 3 20/1 RECEPTACLE 0.18 4 20/1 SPACE 0 5 20/1 RECEPTACLE 0.18 6 20/1 SPACE 0 7 20/1 SPACE 0 8 20/1 SPACE 0 9 20/1 SPACE 0 10 2011 SPACE 0 11 20/1 SPACE 0 12 20/1 SPACE 0 13 20/1 SPACE 0 14 20/1 SPACE 0 15 20/1 SPACE 0 16 20/1 SPACE 0 17 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 0.38 0.18 CONN KVA CALC KVA CALC KVA LIGHTING 0.2 0.25 (125%) TOTAL LOAD 0.61 RECEPTACLES 0.36 0.36 (50%>10) BALANCED LOAD 2.54 A E ROOM VOLTS 240/120V 2P 3W AIC 10,000 MOUNTING FLUSH BUS AMPS 100 MAIN BKR 100 FED FROM METER E NEUTRAL 100% LUGS STANDARD NOTE CKT CKT LOAD KVA CKT CKT LOAD KVA # BKR CIRCUIT DESCRIPTION A B # BKR CIRCUIT DESCRIPTION A B 1 40/2 IRRIGATION WELL PUMP 3.36 2 20/1 SPACE 0 3 1 3.36 4 20/1 SPACE 0 5 20/1 LIGHTING 0.1 6 20/1 SPACE 0 7 20/1 LIGHTING 0.048 8 20/1 SPACE 0 9 20/1 RECEPTACLE 0.18 10 20/1 SPACE 0 11 20/1 SPACE 0 12 20/1 SPACE 0 13 20/1 SPACE 0 14 20/1 SPACE 0 15 20/1 SPACE 0 16 20/1 SPACE 0 17 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 3.64 3.41 CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 0.148 0.185 (125%) MOTORS 6.72 6.72 (100%) LARGEST MOTOR 6.72 1.68 (25%) RECEPTACLES 0.18 0.18 (50%>10) TOTAL LOAD 8.77 BALANCED LOAD 36.5 A B ROOM VOLTS 240/120V 2P 3W AIC 10,000 MOUNTING FLUSH BUS AMPS 100 MAIN BKR 60 FED FROM METER B NEUTRAL 100% LUGS STANDARD NOTE CKT CKT LOAD KVA CKT CKT LOAD KVA # BKR CIRCUIT DESCRIPTION A B # BKR CIRCUIT DESCRIPTION A B 1 20/1 LIGHTING 0.2 2 20/1 SPACE 0 3 20/1 RECEPTACLE 0.18 4 20/1 SPACE 0 5 20/1 RECEPTACLE 0.18 6 20/1 SPACE 0 7 20/1 SPACE 0 8 20/1 SPACE 0 9 20/1 SPACE 0 10 20/1 SPACE 0 11 20/1 SPACE 0 12 20/1 SPACE 0 13 20/1 SPACE 0 14 20/1 SPACE 0 15 20/1 SPACE 0 16 20/1 SPACE 0 17 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 0.38 0.18 CONN KVA CALC KVA CALC KVA LIGHTING 0.2 0.25 (125%) TOTAL LOAD 0.61 RECEPTACLES 0.36 0.36 (50%>10) BALANCED LOAD 2.54 A D ROOM VOLTS 240/120V 2P 3W AIC 10,000 MOUNTING FLUSH BUS AMPS 100 MAIN BKR 60 FED FROM METER D NEUTRAL 100% LUGS STANDARD NOTE CKT CKT LOAD KVA CKT CKT LOAD KVA # BKR CIRCUIT DESCRIPTION # BKR CIRCUIT DESCRIPTION A B A B 1 20/1 LIGHTING 0.2 2 20/1 SPACE 0 3 20/1 RECEPTACLE 0.18 4 20/1 SPACE 0 5 20/1 RECEPTACLE 0.18 6 20/1 SPACE 0 7 20/1 SPACE 0 8 20/1 SPACE 0 9 20/1 SPACE 0 10 20/1 SPACE 0 11 20/1 SPACE 0 12 20/1 SPACE 0 13 20/1 SPACE 0 14 20/1 SPACE 0 15 20/1 SPACE 0 16 20/1 SPACE 0 17 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 0.38 0.18 CONN KVA CALC KVA CALC KVA LIGHTING 0.2 0.25 (125%) TOTAL LOAD 0.61 RECEPTACLES 0.36 0.36 (50%>10) BALANCED LOAD 2.54 A F ROOM VOLTS 240/120V 2P 3W AIC 10,000 MOUNTING FLUSH BUS AMPS 100 MAIN BKR 100 FED FROM METER F NEUTRAL 100% LUGS STANDARD NOTE CKT CKT LOAD KVA CKT CKT LOAD KVA # BKR CIRCUIT DESCRIPTION A B # BKR CIRCUIT DESCRIPTION A B 1 20/1 LIGHTING, RECEPTACLE 0.392 2 50/2 IRRIGATION WELL PUMP 4.8 3 20/1 LIGHTING, RECEPTACLE 0.212 4 1 4.8 5 20/1 RECEPTACLE 0.18 6 20/1 SPACE 0 7 20/1 CALLBOX 0.6 8 20/1 SPACE 0 9 20/1 GM-1 1.18 10 20/1 SPACE 0 11 20/1 GM-1 1.18 12 20/1 SPACE 0 13 20/1 GM-1 1.18 14 20/1 SPACE 0 15 20/1 GM-1 1.18 16 20/1 SPACE 0 17 20/1 SPACE 0 18 20/1 SPACE 0 19 20/1 SPACE 0 20 20/1 SPACE 0 TOTAL CONNECTED KVA BY PHASE 7.72 7.96 CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 0.064 0.08 (125%) MOTORS 14.9 14.9 (100%) LARGEST MOTOR 9.6 2.4 (25%) RECEPTACLES 0.72 0.72 (50%>10) TOTAL LOAD 18.1 BALANCED LOAD 75.4 A ELECTRICAL POWER DES[GNS P.0.80X 272517 TAMPA, FL 33688 TEL 813-600-5136 FAX 813-425-4882 E-MAIL caHos@epd-fl.com CARLOS M. ORAMA, PE, ELECTRICAL ENGINEER PE #60205 CA #27385 ISSUE REVISIONS CLIENT Winward Building Group PROJECT I Abbott Square ADDRESS 11 Simons Rd Zephyrhills Florida SHEET NAME Panel Schedules JOB # BY E21-250 MAI ISSUE DATE 12-15-21 SCALE AS SHOWN 1 THESE PLANS MAY NOT BE COPIED OR MODIFIED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER. COPYRIGHT R �0 •`• STATE OF ?` N911111%I CARLOS M. ORAMA, PE NOT VALID UNLESS SIGNED & EMBOSSED BY A REGISTERED ENGINEER SHEET I E500 63.47' { I/ LAKE / y 1 /• kfi WIDE CONCRETE TRAIL- / ?" I6' SEE SHEET HS2 FOR SQ. FT. AA :zr R100.00' / CONTRACTQA SHALL FLAG # 55.00' j CENTERJafGE OF MULCH TR I -p: POND I j LAND�APE ARCHITECT TO j REAW AND APPROVE LAYO j PRIOR TO TRAIL INSTALLATIO 4. 4' 3 3 PROPANE TANK - ' 2 i ' 00 R50RUN LINES TO HS4 :r . BBQ GRILL AND !, I FIREPLACE , 5 ' HS3 r Y 4 �•�f " --- R30.00' �' '? HEAVY TIMBER R75.00' BB �� E 3 STRUCTURE` ; R50.00' 28.68 2 18'` ' HS1 2.3 *'x KK WETLANDS SETBACK LINE - WETLANDS CALL BOX 1 rr I 7 I 1 '� i '.• G :' i'' HS15 t • / !! .- - ------------- \`---------------- --- - ---J _ z e ..... con LA UT CENTER IN , DI NSION MEDIAN DOUBLE SIDED ; FR M ONUMENT SIGN CE TERLINE OF CCLUMN TO . LINES ;.. ----------------- . • .. 50.00' e ------------ ---- ,O 04 I 1 1 G i Ya HS15 HS15 r SINGLE SIDED MONUMENT SIGN - EACH SIDE OF ROAD ' ' M I 1 ' ( I e POND I I � � ' � I I e I I 1 I r e ' 1 I 1 I e I ' I I e I I I e /j d • /IVII I e ___________________ ___-__--_____ I --------------------------- -- 6 WIDE LCHTRAIL- 3 38.6T LL r--------- ------ -_------_-------------�-----_--_-__----_-� _J r SEE SHEET '` I I 4 FOR SQ. FT. 1 695 SQ. FT. CLAY f' 1 19.60' BRICK PAVER PATIO • AA H H POND ~�- 720 SQ. FT. 6' WIDE �' LAYOUT DIMENSIONS FROM ONCRETE TRAIL R CENTERLINE OF OBJECT TO 5 ., R.O.W. LINE (TYPICAL) 2 �,.. ��• 4' � , I I 2 POND HS4 I W W N v i I F HS3 I ;' f. on 2 110.54' W F NCE AT LIFT STATION -% z ( Cl ENG. PLANS FOR DETAILS ... 28.12' J Gameroom SIDEWALK .: I OUT DIMENSIONS M ; Y , 12' I ' ENTERLINE OF OBJECT T c3� Q'.:='= 16 1 , 1 R.O.W. LINE (TYPICAL) ,> 8' o I r 407 SQ. FT. � `+ 95. 9' rl 32 8.00, CONCRETE � 19/='`"'�•• � DEWAL �; . _, : 22.00 I I 64.85' 44.00' 2 JI �sHS4 �!1 2 a. !0.00' HS3 HS3 1 ; 40.48 , HS14 F On.48' 2 I Wall T I 8' HS14 I r HS14 544 L.F Playground Pool wall %� a. PICKET FENCE WIT I 43.35' (4) 4' GATES WITH CCESS CFFs INY CONTROL DEVIC S Q 107.25' CG LAI 89' a' Amenity center and _ I I - pool Planter walls I AA HS7• ATCH BASIN - ;:`; 61,30' Shade structures EE CIVIL ENG. Ramp wall PLANS 19.87' 1 2 2.sa 4 y`, � L �t'• PLAYG UND MULCH /' LL I / n , V T LL k :: 89 I SEE INSET FOR 1:00' .82' 112.68' 1,fi6 L.F. 6' HT. SOLID r 17.92' POOL DECK 1 2 LAYOUT DIMENSION 6 ' ' ,OVC FENCE WITH (1) °j , , A'.5:.1 4' SINGLE SWING: Shade structures HS3 1 GATE AND (1) 8' F DOUBLE SWING a HS7 GATE 3 p 2 Z F O / Q E AA .: PRO ANE TANK - RUN ' ' P 3y LINE TO GRILLS 2 AA HS4 507 SQ. FT. CONCRETE I I SIDEWALK 2 2 1 u ;HS4 HS4 HS4 I a ` +! CLUBHOUSE AND POOL ALIGNED TO .00' ' i 7.001 18 30' RAMP SLOPE 30.00 6.00' S.00 APPROX.1:20 3.00 $Tpp 82.30 5.0 . 8.0012.3 1$.00' ,' 5.0 I� ' FIELD VERIFY R $.00' 60 HT, / 1 .00 � , � 5.00 � WALL , O 8.00' I �' 4.00 7.50' 18.50' i FLOW .00, I ` 5. 0'J 24" HT. RETAINING 1 1$.0 1 WALLS 00 r 77.67' 75.671 1:12RAMP 6.33' FIELD VERI ; 12.90' FIELD VERIF 94.00' % 5 00' ' � 18" HT. RETAINING WALLS 6.00' 1�1 48,00' FLOW o 18.50' CENTER LLI 12.00' ; , Q0' 14.25 1.50 FLOW 46.30 �' 18" RAISED 0 ° --� 7• 0 3 � Q $•0 LLI 36.00' 45 DEGREES LLI 52.00' TERRACE ONE •pp' POOL ISLAND -�- 30.0 10.0016.00 - LL ; LL� 7.00' 1 I ' 5.75' ■ 5.00' .00 5.75 I 24 00 1 p ppl 00 Io i 4.00' 24.2 12" TREADS WITH �° 0 4.00 3 6" RISERS 15.00 0 �� 23.21' 9.27' FIELD VERIFY 4 30.33' WALLS TO BE FINISHED WITH FIELD VERIFY ' 24.25' STUCCO TO MATCH BUILDING 8.67' ® STUCCO COLOR AND TEXTURE ON I I OO' ALL EXPOSED SIDES - LLI a CAP TO BE DOUBLE BULLNOSE 1 , 10.00 PRE -CAST CONCRETE "WHITE" WITH ' 1 1/2" OVERHANG EACH SIDE i I 5.00' 62.17' , 8 SQ I CENTERLINE OF 3o o NCRETE SIDEWALK �� CENTER ON LLI POOL AND FIELD 90 DEGREES PARKING LOT CLUBHOUSE ISLAND 93.25 ------------------ i 1 i i 1 �I POINT OF ORIGIN OF POOUBLDG. CENTERLINE I I CONTINUES AS CENTERLINE OF ROADWAY _ 1 � 1 � r �I CLUBHOUSEYOOL LAYOUT INSET CENTERLINE OF PARKING LOT ISLAND r W MATCHLINE SHEET HS7 g N 0 N O N rn 0 VL 11111 LW, -n-WMT i.. r I •r„ ILI r. Ls, rrr.na•i.m �, � • irucsuvi i .. �� � SCALE: 140� NORTH 0 20' 40' 80' -I 60' e 0� � I � I \\ I !� t 0 JACOB ZIMMERMAN, RLA REG. NO. FL LA 0001653 LANDSCAPI RCHITECT yAP1DSCgp sv¢49 �9gEW 2 f 9 n p LA0001653 y STATE y * OF FL 0 110 Y J � LL. Z CbOM -00 O i M N a .s3 ��Z Q � W N � d � C J 'a o A o� C4 .-. ti ti W Q A O U0 zz� I� Koo� ftj eIyou di . � Yu 9 REVISIONS: -1. 3/12/21 CITY REVIEW COMMENTS 2. 4/19/21 CITY REVIEW COMMENTS 3. 8/2/21 HARDSCAPE PLANS ADDED 4• DRAWN BY: JAZ DATE: 11/6/2o 20009 HARDSCAPE PLAN HS5 s ■ 1/2" EXPANSION JOINT WING WALL MAXIMUM SLOPE 30 DEGREES EXPANSION JOINT WITH JOINT SEALANT 4" THICK CONCRETE SIDEWALK TRANSITIONS TO 6" THICK #4 VERTICAL REBAR 30" O.C. THICKENED EDGE BEAM COMPACTED SUBGRADE —� S 3000 PSI POURED��- CONCRETE HEADWALL (6) #4 REBAR CONTINUOUS ATTACH TO CAGE WITH METAL TIES #4 REBAR CAGE- 8" HT. x 24" WIDTH - VERTICAL AND HORZ. REBAR AT 30" O.C.- HOLD 3" OFF BOTTOM OF POUR U my 'o �_im=A MIM I FOOTING EXTENDS TO LIMIT OF WING WALL SEE PLAN VIEW DECKING SEE DOCK A CONSTRUCTION PLANS JOIST - SEE DOCK CONSTRUCTION PLANS 1 % SLOPE SIMPSON STRONG TIE FSA- HOT DIPPED GALVANIZED FOUNDATION ANCHOR- PLACE ONE ANCHOR AT EACH JOIST 2" AIR GAP FINISH GRADE ON LOWER SIDE OF HEADWALL- BLEND GRADE WITH GRADE AT END OF SLOPED WING WALLS ATTACH TO HEADWALL WITH (2) 6" LONG 1/2" DIAMETER EXPANSION BOLT EXPDXY BOLT INTO CONCRETE HEADWALL 'r 3-0" =- rDOCK1 CONCRETE HEADWALL- CONNECTION TO WOOD HS13 1" _ v-o° SIMPSON STRONG TIE H0212 (2) " x 12" # 27oc SIMPSON STRO TIE CB66 COLUMN BASE SET IN COLU POUR CENTER ON CONCRETE C UMN SLOPE TOP OF COLUMN AWAY FROM CENTER TO SHED RAINWATER- 2% SLOPE - SET CULUMN BASE LEVEL rumups WIN or Nd 2" x 6" DECKING 3" x 12" SIMPSON STRON/RIES 6" x 6" W /- HEIGHT 3000 PSI POURED CONCRETE COLUMN FINISH GRADE 6" 24" DIAMETER ROUND 3000 PSI CONCRETE COLUMN REINFORCED WITH (3) #5 VERTICAL REBAR- TRIANGULAR PATTERN - STIRRUPS AT MAX'. 18" O.C. VERTICALLY FOR STABILITY DURING POUR r- HOLD REBAR 3" FROM EDGE OF POUR " " - * (3) #5 HORZ. EBAR AT 15" 2 CO CRETE COLUMN SECTI HS13 1 1/ = v-0° mi a 0 0 a z 0 N 0 N COMPACTED SUBGRADE ® DELETED FROM PROJECT NOTES 1. \GNED IGNED TO SUPPORT 100 PSF LIVE LOAD + 10 PSF DEAD LOAD. DECK IS NOT DESIGN FOR VEHICULAR TRAFFIC. 2. DESIGNED WITH A SOIL BEARING CAPACITY OF 3000 PSF. 3. CTURAL LUMBER TO BE #2 PRESSURE TREATED SOUTHERN PINE. ALL DECKING AND RAILS SHALL BE #1 PRESSURE UTHERN PINE WITH EASED (SANDED) EDGES. 4. S L MEET THE REQUIREMENTS OF ASTM F 1667. BOLTS SHALL MEET THE REQUIREMENTS OF ANSI/ASME B1.8.2.1 5. OF PO TS SHALL BE FIELD TREATED WITH AN AMERICAN WOOD PROTECTION ASSOCIATION RECOMMENDED PRODUCT R NAPHT NATE) 6. ER TO BE P ED TO BE CROWN SIDE UP. LIMITS OF WOOD DECK HS1 13 EXPANSION J DOCKAND OCK PERMITTING T INCLUDED IN CONTRACT (BOTHERS) a \ 9'-6 9 16 6-34' 6-3-4'"O 9-6g" 16 d WING WALL AT 45 DEGREE ANGLE TO HEADWALL- SLOPE AT 30 DEGREE MAX. ADJUST FINISH GRADE TO PROVIDE MAX. 5% SLOPE ON CONCRETE SIDEWALK AND ALLOW FOR BEAM DIMENSION OVER WING WALL FOOTING COLUMNS AND CONC. HEADWALL 2 S13 18" DIAMETER CONCRETE FOOTING (TYPICAL) ADJUST FINISH GRADE TO PROVIDE MAX. 5% SLOPE ON CONCRETE SIDEWALK AND ALLOW FOR BEAM DIMENSION OVER WING WALL FOOTING PROVIDE BLOCKING BETWEEN SIMPSON STONE TIE AC6 MAX AND POST ALL SPLICES IN BEAMS TO BE CENTERED ® d OVER POSTS. SPLICED CONNECTIONS SHALL HAVE SIMPSON STRONG TIE PC66 POST CAPS m LIMIT OF DECKING 2" x 12" RIM JOIST ACH WITH (3) 3.5" 10d RING SHANK HOT DIPPED GA ANIZED NAILS AT EACH JOIST OR BEAM 2" x 12" JOISTS - ATTACH TO BEAMS WITH SIMPSON STRONG TIE HU212-HDG FACE MOUNT HANGERS 9-616" MAX MAXIMUM ON CENTER JOIST JOIST SPACING = 24" SPAN SPACE JOIST EQUALLY POST AND BEAM (BELOW) JOIST LAYOUT 3 HS13 CUT DECK BOARDS AT CORNERS TO PROVIDE NO LESS THAN 1/2 BOARD WIDTH- LOCATE CUT BOARD(S) AWAY FROM CORNER WOOD DECK DESIGN CRITERIA 1. DESIGN LIVE LOAD = 100 PSF 2, DESIGN WIND SPEED = 140 MPH 3. EXPOSURE "C" 4. STRUCTURE IS AN OPEN STRUCTURE 5. Gpc=0 6. VELOCITY PRESSURE = 36.3 PSF 7. UPLIFT = 50.8 PSF ROOF ZONE 3, 43.6 PSF ROOF Z E 2 8. BASED ON THE 2020 FLORIDA BUILDING CODE & SCE 7-16 DOCK AND DOCK PERMITTING NOT INCLUDED IN CONTRACT (BY OTHERS) 3" x 12" ROUGH SAW (NON -DIMENSIONAL) BEAM - (OPTIONA SE OF (2) 2" x 12" LUMBER) ATTA TO POST WITH SIMPSO STRONG TIE AC6 MAX HOT DIPPE GALVANIZED FILL HOLES H 3.5" 16d HOT DIPPED GA LV ZED NAILS 4' MAX. BEAM SPAN CENTER BEAM ON POST a 6" x 6" POST - ATTACH TO FOOTING WITH SIMPSON STRONG TIE H0212 COLUMN BASE- STAINLESS STEEL (2) 5/8" THROUGH HOT DIPPED GALVANIZED ° BOLTS WITH WASHERS 4 ON BOLT HEAD AND NUT 2" x 4" DIAGONAL BRACE ATTACH TO ALL PERIMETER POSTS- SECURE WITH (1) 112 DIAMETER THROUGH BOLT WITH WASHER AT BOLT HEAD AND NUT FOR EACH CONNECTION- ATTACH TO BEAMS AT 45 DEGREE ANGLE - PROVIDE BLOCKING AT ATTACHMENT LOCATION BOTTOM OF DIAGONAL BRACE TO BE ATTACHED TO POSTS AT MIDPOINT IN POST ATTACH TO JOISTS WITH SIMPSON STRONG TIE MTSM TWIST STRAPS FOR LOCATIONS WHERE BRACING IS PERPENDICULAR TO BEAMS DIAGONAL BRACES EXTEND OUT 20" IN BOTH DIRECTIONS FROM POST POST BEAMS - BRACING 2" x 4" DECK BOARDS- ATTACH TO E ACH JOISTS WITH 3.5" 10d HOT DIPPED GALVANIZED RING SHANK ATTACH PERIMETER DECK NAILS- TWO NAILS PER JOIST BOARD RUNNING PARALLEL RID JOIST WITH 3.5" 10d HOT RING 3/16" GAP BETWEEN ALL DECK BOARDS LS SHANK NA8" O.C. ® DELETED FROM PROJECT E\ONA CK BOARD RUNS TO BJOIST LOCATIONS ONLY AOARD TO JOIST TCENT BOARD- GAP BUTT J. ALL DECK BOARD TO RUM OF FOUR JOISTS DECKING NOTES: 1. WILLIAM G. REIDY IS SIGNING AND SEALING FOR STRUCTURAL ENGINEEERING ONLY 2. DESIGN CRITERIA BASED ON 2020 FLORIDA BUILDING CODE 7th EDITION & ASCE 7-16. DESIGN WIND SPEED: 140 MPH EXPOSURE "C" WIND PRESSURE: 36.3 PSF WILLIAM G. REIDY, P.E. REG. NO. 35605 PROFESSIONAL ENGINEER �a A 4 Q F b Qgo W E 0 T L J U. M La diOCN'j) Q HOC O 04 d 0aka F- m 2 t'9 -,a= Q Viz W % 4) N Cc G N O J z 'a CO N � SM N h BIKno ftsbelow.w�kW aefore you dig. REVISIONS: 1. 3/12/21 CITY REVIEW COMMENTS 2. 4/19/21 CITY REVIEW COMMENTS 3. 8/2/21 HARDSCAPE PLANS ADDED 4. 11/26/21 STRUCTURAL ENGINEERING MODIFICATION- DELETE DEC DRAWN BY: IAZ DATE: 1116120 20009 HARDSCAPE DETAILS fisi 3 2" PRE -CAST CONCRETE WALL CAP- — PROVIDE MIN. 1%SLOPED TOP 0' 12 STUCCO VENEER OVER PLASTIC LATHE - COLOR AND TEXTURE TO MATCH CLUBHOUSE BOTH SIDES OF WALL 5'-0" ADJUST COVER OVER FOOTING TO MINIMIZE CUT BLOCK COURSES FINISH GRADE A 6"MIN. ARC. I 10" MAX. NOTES: 1, FILL ALL CMU CELLS WITH CONCRETE. 2. PROVIDE #1 GAUGE HORIZONTAL REINFORCING AT 24" O.0 VERTICAL ON WALL SEGMENT. #5 REBAR CONTINUOUS, INFILL KNOCK -OUT BLOCK WITH CONCRETE - 25" OVERLAP ON ALL SPLICES #5 BAR IN FILLED CELL, 24" O.C. 25" OVERLAP ON ALL SPLICES 8" X 8" X 16" CMU WALL PROVIDE #1 GUAGE HORIZONTAL RENINFORCING AT 24" O.C. VERTICALLY (EVERY THIRD COURSE) 3'-6" CONCRETE PAVER - SEE SCHEDULE OF SITE FURNISHINGS AND STRUCTURES TIE ALL REBAR CONNECTIONS WITH METAL TIES #5 REBAR DOWEL @ 24" O.C. (3) #5 HORIZONTAL REBAR CONTINUOUS, i I— II —I I HOLD REBAR 3" OFF BOTTOM AND =ill—II�f fII� EDGE OF POUR #5 TRANSVERSE REBAR AT 24" O.C.- HOLD 1 Q ii1 • a �" 3" OFF BOTTOM AND EDGE OF POUR A 111 11 (=1 f 3000 PSI POURED CONCRETE FOOTING- CONTINUOUS 3'-01 4 COMPACT SUBGRADE AT ALL FOOTING LOCATIONS 1 RETAINING WALL AT POOL HS14 1 1/2" =1'4' MASONRY COLUMN WITH FINISH GRADE a. Q 0 d 0 N 0 N 0 U EXIT SIDE VEHICULAR GATES 1/2" GAP FOR HINGE BRACKET - GATE FABRICATOR/INSTALLER SHALL BE RESPONSIBLE FOR SIZING GATE HINGES AND PROVIDE OWNER A WARRANTY ON THE ABILITY OF THE HINGES TO SUPPORT THE WEIGHT OF THE GATE 5' WIDE CONCRETE SIDEWALK 2" WHITE PRE -CAST CONCRETE WALL CAP - PROVIDE MIN. 1% SLOPED TOP #5 VERTICAL REBAR IN FILLED CELL, SEE FOOTING DETAIL FOR LOCATION - 25" OVERLAP ON ALL SPLICES STUCCO OVER PLASTIC LATHE MATCH COLOR AND TEXTURE OF CLUBHOUSE WALLS —T:z A6" MIN. 10" MAX. 2-0" OR V-6" 2'-2" OR #5 REBAR CONTINUOUS, INFILL KNOCK -OUT BLOCK WITH CONCRETE -12, 8 X 8" X 16" CMU WALL. 3-0" WALL SECTION —PROVIDE #1 GUAGE HORIZONTAL RENINFORCING AT 1ST AND 3RD BLOCK COURSE ABOVE FOOTING #5 REBAR DOWEL @ 32" O.C. ADJUST COVER OVER FOOTING TO �— MINIMIZE CUT BLOCK COURSES (3) #5 HORIZONTAL REBAR CONTINUOUS, �- HOLD REBAR 3" OFF BOTTOM AND EDGE OF POUR #5 TRANSVERSE REBAR AT 32" O.C.- HOLD 3" OFF BOTTOM AND EDGE OF POUR A 3000 PSI POURED CONCRETE FOOTING- CONTINUOUS COMPACT SUBGRADE AT ALL FOOTING LOCATIONS 2 18" AND 24" HT. RETAINING WALLS AT POOL H S 14 1 /211 =11-011 24" SQUARE MASONRY COLUMN - AT TOP AND BOTTOM CONCRETE SLAB EXIT GATE 4 VILLA GATED ENTRANCE ELEVATION H S 14 1/8" = 11-0° FOUR RAIL CAITOV CIMC %/CLJ 1(�I II A 0 fl— ATCC LGATE STOP ANGLE BRACKET AT TOP AND BOTTOM ENTRANCE GATE STONE VENEER FILL ALL VOIDS WITH CONCRETE i— VENEER WALL TIES COLUMN HORSE PROVIDE 3" GAP BETWEEN FENCE FENCE POST AND COLUMN .G r' r rrr r •.i. i r r rrr 4'-6" 6-0" rr �! r r r' r r rr rri r r r. r r r rr FAUX STACKED STONE VENEER - rr CULTURED STONE PRO -FIT LEDGESTONE COLOR: 'MOJAVE' I I�I i II I I ! i I ,., ,..: I �I I la-J � i�-�.I.� I I _ I I�_I��� j I i I I� !1f 1--�_=.LI, i I. I ° I ,_�� • •" ° � : °, . .. ° ' ! �I i 1 I I MITI III 11-�II—�LII LfI�TIIITTI I I 4 I— 3-61� SQUARE COLUMN SECTIO s FENCE CONNECTION TO COLUMN HS14 1 1/2" = 1-4' NOTES: 1. FILL ALL CMU CELLS WITH CONCRETE. 2. PROVIDE #1 GAUGE HORIZONTAL REINFORCING AT 24" O.0 VERTICAL ON WALL SEGMENT. 2" PRE -CAST CONCRETE WALL CAP- #5 REBAR CONTINUOUS, INFILL KNOCK -OUT PROVIDE MIN. 1 % SLOPED TOP BLOCK WITH CONCRETE - 25" OVERLAP ON ALL SPLICES _12, #5 BAR IN FILLED CELL STUCCO VENEER OVER 24" O.C. PLASTIC LATHE -COLOR 25" OVERLAP ON ALL SPLICES TO MATCH VILLA BUILDINGS TEXTURE: DASH (ROUGHCOAT) BOTH SIDES OF WALL „ 8 X 8 X 16 CMU WALL PROVIDE #1 GUAGE HORIZONTAL RENINFORCING AT 24" O.C. VERTICALLY (EVERY THIRD COURSE) 6-0" #5 REBAR DOWEL @ 24" O.C. TIE ALL REBAR CONNECTIONS WITH METAL TIES ADJUST COVER OVER FOOTING TO MINIMIZE CUT BLOCK COURSES FINISH GRADE 1.F (3) #5 HORIZONTAL REBAR CONTINUOUS, _ HOLD REBAR 3" OFF BOTTOM AND A 6" MIN—E— f l ll= I— I I EDGE OF POUR i i �L Y ,. •' #5 TRANSVERSE REBAR AT 24" O.C. HOLD , I. °; " 4 3" OFF BOTTOM AND EDGE OF POUR 4 1'-0" j I " 4' _� 3000 PSI POURED CONCRETE _ _ FOOTING -CONTINUOUS 1 - I _.I I—I-1-1 3-0" COMPACT SUBGRADE AT ALL A FOOTING LOCATIONS 4 VILLA VEHICULAR ENTRANCE WALL SECTION H S 14 1121E = 1 L-v 6 HT. PEDESTRIAN GATE NO ACCESS CONTROL O VVILIC k1ul'A r1rz 1 C n vivi I ui v-w a_ SIDEWALK NOTES: 1. FILL ALL BLOCK BELOW GRADE WITH CONCRETE. 2. PROVIDE #1 GAUGE HORIZONTAL REINFORCING GRID AT 24" O.C. VERTICALLY 21/2" THICK PRECAST WHITE CONCRETE COLUMN CAP EPDXY TO TOP OF CMU COLUMN WITH 112 DIA, ANCHOR AT AT CENTER EMBEDDED 3" MIN. INTO COLUMN KNOCK -OUT BLOCKS ON TOP COURSE OF COLUMN- WITH /-- #5 REBAR BENTS- FILL ALL CELLS WITH CONCRETE // COLUMN REINFORCED WITH ���2TSQUARE (4) #5 REBAR- ONE AT EACH CORNER FILL ALL VOIDS CONTAINING REBAR WITH CONCRETE CMU COLUMN PROVIDE #1 GUAGE HORIZONTAL -� -"�— RENINFORCING AT 24" O.C. VERTICALLY EVERY THIRD COURS E) SE ALTERNATE CMU DIRECTION EVERY OTHER COURSE UNTIL B SAFETY PROTECTION ON VERTICAL REBAR BLOCK WORK BEGINS LO (4) #5 REBAR DOWELS- 25" OVERLAP ON ALL SPLICES TIE ALL REBAR CONNECTIONS WITH METAL TIES FINISH GRADE HOLD REBAR 3" FROM EDGE OF POUR COMPACTED SUBGRADE " I 3000 PSI POURED CONCRETE FOOTING _ X 36" X 1'-0" REI REINFORCE WITH (3) #5 REBARS EACH WAY TOP AND BOTTOM TYPICAL MASONRY COLUMN WITH STONE VENEER FILL ALL VOIDS WITH CONCRETE VENEER WALL TIES FAUX STACKED STONE VENEER - CULTURED STONE PRO -FIT LEDGESTONE COLOR: 'MOJAVE' NOTES: 1. FILL ALL BLOCK BELOW GRADE WITH CONCRETE. 2. PROVIDE #1 GAUGE HORIZONTAL REINFORCING GRID AT 24" O.C. VERTICALLY 21/2" THICK PRECAST WHITE CONCRETE COLUMN CAP EPDXY TO TOP OF CMU COLUMN WITH 1/2 DIA. ANCHOR AT AT CENTER EMBEDDED 3" MIN. INTO COLUMN KNOCK -OUT BLOCKS ON TOP COURSE OF COLUMN- WITH #5 REBAR BENTS- FILL ALL CELLS WITH CONCRETE COLUMN REINFORCED WITH (4) #5 REBAR- ONE AT EACH CORNER FILL ALL VOIDS CONTAINING REBAR WITH CONCRETE 24" SQUARE CMU COLUMN PROVIDE #1 GUAGE HORIZONTAL y RENINFORCING AT 24" O.C. VERTICALLY (EVERY THIRD COURSE) ALTERNATE CMU DIRECTION EVERY OTHER COURSE SAFETY PROTECTION ON VERTICAL REBAR UNTIL BLOCK WORK BEGINS - (4) #5 REBAR DOWELS- 25" OVERLAP ON ALL SPLICES TIE ALL REBAR CONNECTIONS WITH METAL TIES FINISH GRADE j1 I I I HOLD REBAR 3" FROM EDGE OF POUR 3000 PSI POURED CONCRETE FOOTING 1— i i 16—i —I I IEd_ I h� i in I 1=I i�� i I I I� 3'-6" X 3'-6" X V-0" 3'-6" REINFORCE WITH (3) #5 REBARS EACH WAY TOP AND SQUARE BOTTOM TYPICAL COLUMN SECTION COMPACTED SUBGRADE 3 VILLA VEHICULAR ENTRANCE COLUMN SECTION HS1.4 I 1/211 = 11.0/1 <";0 COLUMN CAP WGS6 ISOMETRIC WALL CAP ISOMETRIC 3 SEC 2IL SEC 4-10 4'-816" 4'-0" 04=61-10- • - ■s1r,���■=lid■ ll STRUCTURAL BRICK 1'-64 (BELOW STRUCTURAL BRICK f 0-416 3'-6" U-416" 3'-6" COLUMN FOOTING (BELOW) PRECAST CONCRETE COLUMN CAP o 'i Ii T I i SECTION 2 3/8" MORTAR JOINTS P. m` ) 0 -118„ #5 VERTICAL REBAR 4 15/16" O.C. SECTION 1 NOTES: 1. STRUCTURAL BRICK- "BRONZE STONE' NORMAN BRICK DISTRIBUTED BY COASTAL OLD CASTLE. (813) 886-7761 2. MODULAR BRICK- "BEALE STREET" MANUFACTURED BY PINE HALL BRICK - DISTRIBUTED BY COASTAL OLD CASTLE. (813) 886-7761 3. COLUMN CAP- "PC-16" MANUFACTURED BY AAA CAST STONE (941) 721-8092 www.aaacaststone.com 4. WALL CAP- "WC-16" MANUFACTURED BY AAA CAST STONE (941) 721-8092 www.aaacaststone.com PROVIDE VERTICAL EXPANSION JOINTS AT 50' ON CENTER #5 VERTICAL REBAR IN FULLED CELL, SEE FOOTING DETAIL FOR LOCATION - 25" OVERLAP ON ALL SPLICES PROVIDE #1 GUAGE HORIZONTAL REINFORCEMENT GRID AT FIVE COURSE INTERVALS (3) #5 HORIZONTAL REBAR CONTINUOUS, HOLD REBAR 3" OFF BOTTOM AND EDGE OF POUR #5 TRANSVERSE REBAR AT 24" O.C.- HOLD 3" OFF BOTTOM AND EDGE OF POUR 3000 PSI POURED CONCRETE FOOTING- CONTINUOUS COMPACT SUBGRADE AT ALL FOOTING LOCATIONS SOLID MODULAR BRICK (BELOW) 0'-10" PRECAST CONCRETE WALL CAP MODULAR BRICK- OFFSET LAYOUT TO CREATE DENTAL BLOCKS AT TOP OF WALL 0'-44„ MIDPOINT OF WALL 0'-44' STRUCTURAL BRICK (BELOW) 0'-1 �2' 0'-51 ' 2 #5 VERTICAL REBAR 11 7 8 O.C. WALL FOOTING (BELOW) 7 STRUCTURAL BRICK WALL H S 14 1/2" = 1 °-o" NOTES: 1. WILLIAM G. REIDY IS SIGNING AND SEALING FOR STRUCTURAL ENGINEEERING ONLY 2. DESIGN CRITERIA BASED ON 2020 FLORIDA BUILDING CODE 7th EDITION & ASCE 7-16. DESIGN WIND SPEED: 140 MPH EXPOSURE"C" WIND PRESSURE: 36.3 PSF WILLIAM G. REIDY, P.E. REG. NO. 35605 PROFESSIONAL ENGINEER j]ip I► E O r V o*9 U M v O A O M Z a = 0 0 NV� ON a d t J � a Q E M m pU[ eft Z w 4) Q tla 4) `p3 N0J z *� 00 Nr t'7 o M N � N Kno what'sbelow. F, P0 all before you dig. REVISIONS: 1. 3/12/21 CITY REVIEW COMMENTS 2. 4/19/21 CITY REVIEW COMMENTS 3. 8/z/21 HARDSCAPE PLANS ADDED 4. 11/26/21 STRUCTURAL ENGINEERING MODIFICATIONS DRAWN BY: JAZ DATE: 11/6/20 20009 HARDSCAPE DETAILS 11siq. 1JIIC ADJUST SOIL COVER FOR GRADE CHANGES (2) 2" x 10" PRESSURE TREATED PINE BEAMS - WITH SEMI -TRANSPARENT WOOD STAIN BEVEL CUT END OF POSTS AT 45 DEG. A SIMPSON STRONG TIE APDT2-6 ` EACH SIDE OF POST - WITH THROUGH BOLTS COLOR: "BLACK" 8"x8"x10' PRESSURE TREATED PINE POST - WITH SEMI -TRANSPARENT WOOD STAIN 2" THICK PRECAST CONCRETE WALL CAP COLOR: "WHITE" —� SIMPSON STRONG TIE A 6" APG (4 PER POST) _ POST BASE SIDE PLATES COLOR: "BLACK" 2 1" THICK PRECAST CONCRETE CAP COLOR: "WHITE" PROVIDE SLOPE AWAY FROM POST FAUX STACKED STONE VENEER - CULTURED STONE PRO -FIT LEDGESTONE COLOR: 'MOJAVE' FINISH GRADE • • HS15 SECTION THROUGH MIDPOINT OF SIGN 8 GUAGE 4" x 4" x 4" GALVANIZED STEEL "U" CHANNEL - WELD 45 DEG. CORNERS A 3" x 3" x 16" STEEL TUBE WELDED LIMITED GRINDING OF WELDS TO SIGN FRAME TO PRODUCE RUSTIC APPEARANCE PROVIDE SPACERS PAINTED FINISH COLOR: "BLACK' AT BOLT LOCATIONS PAINTED FINISH "BLACK" DOUBLE SIDED SIGN A 8" x 6" BOLTS THROUGH AT GATED ENTRY TO ADD TEXT BEAMS AND STEEL "VILLAS AT" ABOVE SUPPORT - PAINT "BLACK" ABBOTT SQUARE HARDWARE TEXT t UCH UP AFTER TIGOHTENING BOLTS V-5" MATERIALS AND FINISHES 14'-3$"-MAY VARY DUE TO VENEER THICKNESS DIMENSIONED ELEVATION ENTRANCE SIGN 1/2" = 1--0" I II VIJI I l.Al i/1VL NOTES: 1. FILL ALL BLOCK BELOW GRADE WITH CONCRETE. 2. PROVIDE #1 GAUGE HORIZONTAL REINFORCING GRID AT 24" O.C. VERTICALLY COLUMN REINFORCED WITH (4) #5 REBAR BENTS - FILL ALL CELLS WITH CONCRETE 24" SQUARE CMU COLUMN PROVIDE #1 GUAGE HORIZONTAL RENINFORCING AT 24" O.C. VERTICALLY (EVERY THIRD COURSE) 4" x 4" x 10' BLACK LOCUST OR DOUBLE KILN DRIED CEDAR STACKED INTO "U" CHANNEL - WELD CORNERS OF "U" CHANNEL AFTER STACKING TIMBERS - SELECT LUMBER TO NOT BE WARPED APPLY CLEAR STAIN PRIOR TO LETTER/ LOGO INSTALLATION 6" BOLTS FOR COLUMN CONNECTION A • • 6" SOLID ALUMINUM LETTERS WITH ANCHORS TO IMBED INTO LUMBER - PRE -DRILL HOLES WITH TEMPLATE FROM LETTER MANUFACTURER PAINTED FINISH - COLOR: "BLACK" (2) SINGLE SIDED SIGNS AND (2) DOUBLE SIDED SIGNS REQUIRED DOUBLE SIDED SIGN AT GATED ENTRY TO ADD TEXT "VILLAS AT" ON SIGN FACE PINEAPPLE GROVE'NAILHEAD' PATTERN SURFACE MOUNT WITH EPDXY 12" SQUARE MEDALLION MODEL # 125M-097 CHROMECAST METALIZED FINISH- COLOR: "BRiTE COPPER" www.pineapplegrove.com 3" x 3" STEEL TUBE WELDED TO SIGN FRAME IMBED TUBE MIN. 6" INTO CMU WALL PAINTED FINISH "BLACK" _• I! CAULK JOINTS TO PREVENT WATER INTRUSION } ••. <: d. _ 3-0" SQUARE A PRECAST CONCRETE COLUMN CAP EPDXY TO TOP OF CMU COLUMN - COLUMN CAP TO INCLUDE MULTIPLE SEGMENTS TO ALLOW POST THROUGH COLUMN KNOCK -OUT BLOCKS ON TOP COURSE OF COLUMN- WITH /— #5 REBAR BENTS- FILL ALL CELLS WITH CONCRETE ALTERNATE CMU DIRECTION EVERY OTHER COURSE SAFETY PROTECTION ON VERTICAL REBAR UNTIL BLOCK WORK BEGINS - (4) #5 REBAR DOWELS- 25" OVERLAP ON ALL SPLICES TIE ALL REBAR CONNECTIONS WITH METAL TIES FINISH GRADE ADJUST COVER OVER FOOTING TO MINIMIZE CUT BLOCK COURSES HOLD REBAR 3" FROM EDGE OF POUR COMPACTED SUBGRADE 3000 PSI POURED CONCRETE FOOTING 3'-0" X 3'-0" X V-0" REINFORCE WITH (3) #5 REBARS EACH WAY TOP AND BOTTOM TYPICAL SIGN COLUMN SECTION 2" PRE -CAST CONCRETE WALL CAP - PROVIDE MIN. 1 % SLOPED TOP MATCH/ COORDINATE PROFILE AND COLOR WITH COLUMN CAP #5 VERTICAL REBAR IN FILLED CELL, SEE FOOTING DETAIL FOR LOCATION - — 25" OVERLAP ON ALL SPLICES 2" CAP WITH 1 1/2" _ OVERHANG FAUX STACKED STONE VENEER - CULTURED STONE PRO -FIT LEDGESTONE COLOR:'MOJAVE' d e <a 1'-0" d a :•' I TIE ALL REBAR CONNECTIONS WITH METAL TIES I - 3-01- ---- I SIGN WALL SECTION #5 REBAR CONTINUOUS, INFILL KNOCK -OUT BLOCK WITH CONCRETE 8" X 8" X 16" CMU WALL —PROVIDE #1 GUAGE HORIZONTAL RENINFORCING AT 24" Q.C. VERTICALLY (EVERY THIRD COURSE) ADJUST COVER OVER FOOTING FOR GRADE CHANGES FINISH GRADE (3) #5 HORIZONTAL REBAR CONTINUOUS, HOLD REBAR 3" OFF BOTTOM AND ��— EDGE OF POUR #5 TRANSVERSE REBAR AT 24" O.C.- HOLD '— 3" OFF BOTTOM AND EDGE OF POUR 3000 PSI POURED CONCRETE FOOTING- CONTINUOUS COMPACT SUBGRADE AT ALL FOOTING LOCATIONS 8" x 8" POST VERTICAL REINFORCEMENT BARS (TYPICAL) (MAXIMUM 24 O.C. r— 8" x 8" POST CMU BLOCKS FOR SIGN WALL 4. i 4 3'-0'I • • • • • •. a 'a, ','q�.y •.: •:. '. .•' < • d a end. •e'' `a , • • �. .e. a a •. • d!. • a e • • d '� e' ' •ee <, d 'a ®," a }.. .e ' . e' $ q ' <. d A •e . e •< d .. .< • e.. A < . • < .. • •d ..<.' a a .. e: .° a 'q • e �'•. a' : d .. �-- 16-6" -- A SIGN BASE FOOTING #5 VERTICAL REBAR COLUMN % AT ALL CORNERS STONE VENEER STONE COLUMNSIGN WALL VENEER WALL TIES #5 VERTICAL REBAR FILL ALL CELLS 'WITH CONCRETE SECTION THROUGH SIGN BASE A O ale < Q w E 0 T O �C L cM I C W m w O lM Q 3 0 p 10 N G1 m 4 cn Q Q E z ch 0 a 1e�Z Q a� � d �o -0 T N t7 O O M N .-. ti N ti C3 Q Q Z �[ Zmm W-j Z^' cz 0 z CL Q Kno wh tefore'sbelow. fall you dig. REVISIONS: NOTES: 1. 3/12/21 1. WILLIAM G. REIDY IS SIGNING AND SEALING FOR CITY REVIEW COMMENTS STRUCTURAL ENGINEEERING ONLY 2. 4/19/21 2. DESIGN CRITERIA BASED ON 2020 FLORIDA BUILDING CITY REVIEW COMMENTS CODE 7th EDITION & ASCE 7-16. DESIGN WIND SPEED: 140 MPH 3 S/2/21 EXPOSURE"C" HARDSCAPE WIND PRESSURE: 36.3 PSF PLANS ADDED 4. 11/26/21 STRUCTURAL ENGINEEERING MODIFICATIONS DRAWN By: JAZ WILL' G. REIDY, P.E. DATE: 11/6/20 REG. NO. 35605 PROFESSIONAL ENGINEER 20009 HARDSCAPE i DETAILS HS 1.5 al �