ALL WORK SHALL COMPLY WITH PREVAILING
CODES FLORIDA BUILDING CODE,
NATIONAL ELECTRIC CODE,
AND THE CITY OF ZEPHYRHILLS
ORDINANCES
PN____
TRICAL POWER DES GNS ..
P.O,BOX 272517 TAMPA, FL 33688
TEL 813-600-5136 FAX 813-425-4882
E-MAIL: caHos@epd-fl.com
CARLOS M. ORAMA, PE.
ELECTRICAL ENGINEER
PE #60205 CA #27385
ISSUE REVISIONS
CLIENT
Winward Building
Group
PROJECT
Abbott Square
ADDRESS
Simons Rd
Zephyrhills
Florida
SHEET NAME
Site Plan
JOB # BY
E21-250 MAID
ISSUE DATE
12-15-21
SCALE
AS SHOWN
THESE PLANS MAY NOT BE COPIED OR
MODIFIED WITHOUT WRITTEN PERMISSION
FROM THE ENGINEER. COPYRIGHT R
.. 020
•
°
w
.. V \'�,,,�„Y\ ,moo -•
ii 1
i g ST TE OF/
CARLOS M. ORAMA, PE
NOT VALID UNLESS SIGNED & EMBOSSED BY
A REGISTERED ENGINEER
1 Key Plan
I 125-4-
SHEET
E000
i
jIII- -
I9P�h:�P.�i r,3� i � n n�, rr � r... a�jr��:^r.i��i�wm�a�m�N���r����a1��n�rRn�������mrnm�®rni�in�inee�io�.�m�we���a�oeiM�����o�a€��rt��r�ai t � �� ire � �rrimims�r��n��!�FmPr,^A��rn^�a�.^�n�r�r�m^.��T�T^ii��i^
I
t
1
I
I
I
1
I
1
1
NTED ON POST 1
1
I
I
C-1 t
Power Plan -
1/B„-V_0„
Timber Structure 'B'
Fol
SPECIFIC NOTES:
1. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED AT FREEBOARD OR HIGHER. THIS IS
BASE FLOOD ELEVATION PLUS TWELVE INCHES. CONSULT OWNER OR CIVIL ENGINEER OF
RECORD,
2, ALL WORK ELECTRICAL WORK MUST BE IN COMPLIANCE WITH N.E.0 2017, FLORIDA
BUILDING CODE 2020, 7TH EDITION, LOCAL ELECTRIC COMPANY AND AHJ, ELECTRICAL
CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH THE SCOPE OF WORK
BEFORE BIDDING ON THIS PROJECT.
3. ALL GROUNDING AND BONDING MUST BE IN COMPLIANCE WITH NEC ARTICLE 250 AND AHJ.
4. LOAD DATA IS BASED ON INFORMATION GIVEN TO THE ENGINEER AT THE TIME OF DESIGN.
VERIFY ALL EQUIPMENT NAMEPLATE DATA BEFORE ORDERING.
5. ALL ELECTRICAL WORK FOR FABRICATED EQUIPMENT SHALL BE COMPLETELY WIRED BY
THE EQUIPMENT MANUFACTURER TO A JUNCTION BOX OR PULL BOX, AND ALL ELECTRICAL
WORK FROM PANEL BOARDS TO BE BY THE ELECTRICAL CONTRACTOR.
6. TYPEWRITTEN CIRCUIT INDEX SHALL BE AFFIXED INSIDE SURFACE OF PANELBOARD DOOR,
CLEARLY INDICATING AREA AND LOAD SERVED BY EACH BRANCH CIRCUIT.
7. ELECTRICAL CONTRACTOR SHALL FURNISH ALL ELECTRICAL MATERIALS TO COMPLETE
THIS PROJECT.
8. ENGRAVED, LAMINATED PLASTIC IDENTIFICATION PLATES SHALL BE FURNISHED AND
INSTALLED ON ALL PANELS AND SWITCHGEAR. PLATES SHALL BE AFFIXED TO FRONT OF
PANELS, INDICATING PANEL NAME, VOLTAGE AND AMPERAGE.
9. WHERE THE ENCLOSURE OR RACEWAY IS SUBJECT TO PHYSICAL DAMAGE, THE
CONDUCTORS SHALL INSTALLED IN ELECTRICAL METALLIC TUBING, RIGID METAL CONDUIT,
INTERMEDIATE METAL CONDUIT, RTRC-XW, SCHEDULE 80PVC CONDUIT, OR EQUIVALENT.
10. THE ELECTRICAL CONTRACTOR SHALL MEET AND COORDINATE WITH THE LOCAL POWER
COMPANY AT THE SITE PRIOR TO CONSTRUCTION. AT THAT TIME, THE CONTRACTOR SHALL
COORDINATE ALL RELATED WORK WITH THE UTILITY COMPANY'S RESPONSIBILITIES TO
MEET THE OWNER'S.
11. ALL ELECTRICAL CONDUCTORS SHALL BE INSTALLED IN AN APPROVED RACEWAY, EMT, IMC,
RIGID GALVANIZED CONDUIT OR SCHEDULE 40 P.V.C. TYPE 'NM', 'MC% ELECTRICAL
NON-METALLIC TUBING, & FLEXIBLE METAL CONDUIT MAY BE USED FOR BRANCH
CIRCUITING AS ALLOWED BY THE N.E.C. & AHJ. MAXIMUM NUMBER OF 120V CIRCUITS
ALLOWED IN A COMMON CONDUIT SHALL BE SIX (6). THE CONTRACTOR SHALL STRICTLY
CONFORM TO THE N.E.C. REQUIREMENTS OF DERATING FOR CONDUCTOR AMPACITY AND
CONDUIT FILL.
12. WORK WITH LANDSCAPE DESIGNER/GC/LANDSCAPE INSTALLERS TO ENSURE LIGHT
FIXTURE IS AT RIGHT LOCATION. SEE LANDSCAPE DESIGN PLANS.
13. ALL CONDUCTORS SHALL BE THHN/THWN TYPE. UNLESS OTHERWISE CONDUCTOR SIZE
NOTED ON THE PLANS SHALL BE 2#12 THWN COPPER AND 1#12 COPPER GROUND IN 112"C.
MC CABLE CAN BE USED ONLY IN AREAS ALLOWED BY NEC ARTICLE 330.
14. EXTERIOR DISCONNECTS SHALL BE NEMA3R RATED. INTERIOR DISCONNECTS SHALL BE
NEMA1 RATED. ALL DISCONNECTS SHALL BE HEADY DUTY TYPE.
GENERAL SCHEDULE
CALLOUT
SYMBOL
VOLTS
AMPS
KVA
CIRCUIT
CALLBOX
Q)
120V 1 P 2W
5
0.6
F-7
GM-1
®
120V 1 P 2W
9.8
1.18
F-15
GM-1
120V 1 P 2W
9.8
1.18
F-9
GM-1
(5)
120V 1 P 2W
9.8
1.18
F-11
GM-1
120V 1 P 2W
9.8
1.18
F-13
IRRIGATION WELL
PUMP
�,—
240V 2P 2W
28
6.72
E-1,3
IRRIGATION WELL
PUMP
�-,
240V 2P 2W
40
9.6
F-2,4
RECEPTACLE SCHEDULE
CALLOUT
SYMBOL
VOLTS
FEATURES
DESCRIPTION
QUANTITY
GFCI_WP
120V I 2W
WP, GND
DUPLEX RECEPTACLE 120V. 20A WITH
13
GROUND FAULT INTERRUPTING DEVICE.
WEATHERPROOF
PREPARED BY
RRICAL POWER DESIGI iS
RO.BOX 272517 TAMPA, FL 33688
TEL 813-600-5136 FAX 813-425-4882
E-MAIL carts@epd-fl.com
CARLOS M. ORAMA, PE.
ELECTRICAL ENGINEER
PE #60205 CA #27385
ISSUE REVISIONS
CLIENT
Winward Building
Group
PROJECT
Abbott Square
ADDRESS
Simons Rd
Zephyrhills
Florida
SHEET NAME
Power Plan
JOB # BY
E21-250 MAI
ISSUE DATE
12-15-21
SCALE
AS SHOWN
THESE PLANS MAY NOT BE COPIED OR
MODIFIED WITHOUT WRITTEN PERMISSION
FROM THE ENGINEER. COPYRIGHT R
O• °
0
i -
. wx
CARLO5 M. ORAMA, PE
NOT VALID UNLESS SIGNED & EMBOSSED BY
A REGISTERED ENGINEER
SHEET I
r1, Power Plan - Heavy Timber Structure'C'
�ti77 118"=v-0"
4 Power Plan - Heavy Timber Structure 'D'
El 00
Tf FTM' ff117fff 1e 9_nWMF1 IFR'Illl;i�8E1�B
%1 Power Plan - Gazebo and Entrance
\� Ij 3132"=V-Q-
O
x
O
x
O
0
i
0
SWITCH SCHEDULE
CALLOUT SYMBOL QUANTITY
Generic Switch $ 5
LUMINAIRE SCHEDULE
CALLOUT
SYMBOL
LAMP
DESCRIPTION
MOUNTING
INPUT
VOLTS
NOTES
QUANTITY
WATTS
A
(1) 8W
ACCENT LIGHT MODEL:
FLOOD
8
120V I 2W
CONTROL FOR
14
KFL1-8L-20-4K7-WF-UNV-K-DB-JBR30-DB
PHOTOCELL (ON) AND
TIMER (OFF)
F
(1) 100W
OUTDOOR CEILING FAN WITH LIGHT - CONSULT
CEILING
100
120V 1 P 2W
9
WITH OWNER
PREPARED BY
OF ELECTRICAL PC7 JJER DESIGN
P.O.BOX 272517 TAMPA, FL 33688
TEL 813-600-5136 FAX 813-425-4882
E-MAIL caHos@epd-fl.com
CARLOS M. ORAMA, PE.
ELECTRICAL ENGINEER
PE #60205 CA #27385
ISSUE REVISIONS
CLIENT
Winward Building
Group
PROJECT
Abbott Square
ADDRESS
Simons Rd
Zephyrhilis
Florida
SHEET NAME
Electrical Layout
Gazebo/Sign
JOB # BY
E21-250 MAI
ISSUE DATE
12-15-21
SCALE
AS SHOWN
THESE PLANS MAY NOT BE COPIED OR
MODIFIED WITHOUT WRITTEN PERMISSION
FROM THE ENGINEER. COPYRIGHT R
M.
trtr•• CFJ�lS�• ''�
r STATE °
CARLOS M. ORAMA, PE
NOT VALID UNLESS SIGNED & EMBOSSED BY
A REGISTERED ENGINEER
SHEET
E200
PREPARED BY
PAL POWER DES#GNS "
P.O.BOX 272517 TAMPA, FL 33688
TEL 813-600-5136 FAX 813-425-4882
E-MAIL: carlos@epd-fl.com
CARLOS M. ORAMA, PE.
ELECTRICAL ENGINEER
PE #60205 CA #27385
ISSUE REVISIONS
CLIENT
Winward Building
Group
PROJECT
Abbott Square
ADDRESS
Simons Rd
Zephyrhills
Florida
SHEET NAME
Villas Entrance
Electrical
JOB # BY
E21-250 MAI
ISSUE DATE
12-15-21
SCALE
AS SHOWN
THESE PLANS MAY NOT BE COPIED OR
MODIFIED WITHOUT WRITTEN PERMISSION
FROM THE ENGINEER. COPYRIGHT R
M°°
'°•
enlsF ,
0 `°. STATE OF
CARLOS M. ORAMA, PE
NOT VALID UNLESS SIGNED & EMBOSSED BY
A REGISTERED ENGINEER
1 Power Plan -Villas Entrance'
3132"=V-0"
SHEET
E300
RISER GENERAL NOTES:
PREPARED BY
1. ALL GROUND ELECTRODES, CONDUCTORS AND COMPLETE GROUNDING SYSTEM MUST BE
DONE IN COMPLIANCE WITH NEC STD #250 AND AHJ,
2. CONTRACTOR SHALL VISIT SITE AND BECOME FAMILIAR WITH THE WORK BEFORE BIDDING
ON THIS PROJECT.
3. FAULT CURRENT WAS CALCULATED AT 20080 AMPS FOR A LOCAL TRANSFORMER. VERIFY
WITH LOCAL ELECTRIC COMPANY AND NOTIFY ENGINEER IF DIFFERENT.
4. ALL EXTERIOR EQUIPMENT MUST BE RATED NEMA 3R OR BETTER.
5. CONSULT AND WORK WITH LOCAL ELECTRIC FOR FIELD LOCATIONS. NOTIFY ENGINEER WITH
ANY CHANGES.
1 PANEL
TYPICAL
0 100A BUS
60A MBC
NEW 120/240V
METER I 1P'3W
NEMA 3R
PROPOSED 1 "C
UTILITY 3#4CU
PAD MTD
XFMR
TRiser Diagram - 60A
N.T.S
VOLTAGE DROP SCHEDULE
DEVICE
FEEDER
BRANCH CIRCUIT
TOTAL VOLTAGE
DROP
VOLTAGE DROP
WIRE SIZE
LENGTH
MAX VOLTAGE DROP
WIRE SIZE
A
0.06%
#4
11'
0.29% (CKT 1)
#12
0.34%
B
0.08%
#4
11'
0.18% (CKT 1)
#12
0.26%
C
0.09%
#4
11'
0.18% (CKT 1)
#12
0.27%
D
0.06%
#4
11'
0.22% (CKT 1)
#12
0.28%
E
0.59%
#3
12'
1.04% (CKT 1,3)
#8
1.63%
F
0.43%
#3
12'
2.99% (CKT 11)
#12
3.42%
#6G CU
i !
I I
I
a e
60 AMP, 120/240V, 1P, 3W
UNDERGROUND ELECTRICAL SERVICE
1 "C- 3#4
ALUMINUM CONDUCTOR EQUIVALENT:
1-1 /2" C- 3#2 AL.
GROUND ROD
N.T.S
METAL FRAME
OF BUILDING
SERVICE --
EQUIPMENT
ALL CONNECTIONS
MADE WITHIN 5 FEET OF
POINT OF ENTRANCE OF
PIPE
Riser
N.T.S
10oA
J/ A e *** CHANGE PER JOB ***
#1/0 WG
GROUNDING
ELECTRODE
CONDUCTOR
(TYP. ALL)
#6 AWG TO
INCOMING
TELEPHONE BOARD
CONCRETE -ENCASED
ELECTRODE
'> 1;*
s
METAL UNDERGROUND
WATER PIPE
`-s D
100 AMP, 120/240V, 1 P, 3W
UNDERGROUND ELECTRICAL SERVICE
1-1 /2"C- 3#3
ALUMINUM CONDUCTOR EQUIVALENT:
1-1/2" C- 3#1/0 AL.
FAULT CURRENT SCHEDULE
DEVICE
FAULT
AIC RATING
L-N VOLTS
UTILITY
FED FROM
FEEDER
DIRECTLY CONNECTED MOTOR LOAD
FAULT
X
R
DEVICE
FAULT
X
R
SIZE
X/ 1000`
R/ 1000'
LENGTH
X
R
FAULT
X
R
A
2,970
10,000
120V
2,970
0.02417
0.03238
METER A
3,217
0.02363
0.02887
#4
0.048
0.31
11'
0.0005
0.0035
B
2,428
10,000
120V
2,428
0.02569
0.04222
METER B
2,599
0.02515
0.03871
#4
0.048
0.31
11'
0.0005
0.0035
C
2,223
10,000
120V
2,223
0.02644
0.04705
METER C
2,369
0.0259
0.04354
#4
0.048
0.31
11'
0.0005
0.0035
D
2,936
10,000
120V
2,936
0.02425
0.0329
METER D
3,178
0.02371
0.02938
#4
0.048
0.31
11'
0.0005
0.0035
E
3,605
10,000
120V
3,493
0.02533
0.02321
METER E
3,747
0.02478
0.02029
#3
0.047
0.25
12'
0.0005
0.0029
112
1.039
0.2599
F
5,217
10,000
120V
4,969
0.02155
0.0109
METER F
5,340
0.021
0.007983
#3
0.047
0.25
12'
0.0005
0.0029
248
0.4687
0.1172
PELECTRICALPOWgERDEStG
ROSOX 272517 TAMPA, FL 33688
TEL 813-600-5136 FAX 813-425-4882
E-MAIL caries@epd-fl.cam
CARLOS M. ORAMA, PE.
ELECTRICAL ENGINEER
PE #60205 CA #27385
ISSUE REVISIONS
CLIENT
Winward Building
Group
PROJECT
Abbott Square
ADDRESS
Simons Rd
Zephyrhills
Florida
SHEET NAME
Riser Diagram
JOB # BY
E21-250 MAI
ISSUE DATE
12-15-21
SCALE I
AS SHOWN
THESE PLANS MAY NOT BE COPIED OR
MODIFIED WITHOUT WRITTEN PERMISSION
FROM THE ENGINEER. COPYRIGHT R
• EN •°° III
I
�0 •. STATE OF
CARLOS M. ORAMA, PE
NOT VALID UNLESS SIGNED & EMBOSSED BY
A REGISTERED ENGINEER
SHEET
E400
_ -
r
�r � _ _
PREPARED BY
A
ROOM
VOLTS 240/120V 2P 3W
AIC 10,000
MOUNTING
FLUSH
BUS AMPS 100
MAIN BKR 60
FED FROM
METER A
NEUTRAL 100%
LUGS STANDARD
NOTE
CKT
CKT
LOAD KVA
CKT
CKT
LOAD KVA
#
BKR
CIRCUIT DESCRIPTION
A
B
#
BKR
CIRCUIT DESCRIPTION
A
B
1
20/1
LIGHTING
0.2
2
20/1
SPACE
0
3
20/1
RECEPTACLE
0.18
4
2011
SPACE
0
5
20/1
RECEPTACLE:
0.18
6
20/1
SPACE
0
7
20/1
SPACE
0
8
20/1
SPACE
0
9
20/1
SPACE
0
10
20/1
SPACE
0
11
20/1
SPACE
0
12
20/1
SPACE
0
13
20/1
SPACE
0
14
20/1
SPACE
0
15
20/1
SPACE
0
16
20/1
SPACE
0
17
20/1
SPACE
0
18
20/1
SPACE
0
19
20/1
SPACE
0
20
20/1
SPACE
0
TOTAL CONNECTED KVA BY PHASE
0.38
0.18
CONN KVA
CALC KVA
CALC KVA
LIGHTING
0.2
0.25 (125%)
TOTAL LOAD
0.61
RECEPTACLES 0.36
0.36 (50%>10)
BALANCED LOAD 2.54 A
C
ROOM
VOLTS 240/120V 2P 3W
AIC 10,000
MOUNTING
FLUSH
BUS AMPS 100
MAIN BKR 60
FED FROM
METER C
NEUTRAL 100%
LUGS STANDARD
NOTE
CKT
CKT
LOAD
KVA
CKT
CKT
LOAD
KVA
#
BKR
CIRCUIT DESCRIPTION
#
BKR
CIRCUIT DESCRIPTION
A
B
A
B
1
20/1
LIGHTING
0.2
2
20/1
SPACE
0
3
20/1
RECEPTACLE
0.18
4
20/1
SPACE
0
5
20/1
RECEPTACLE
0.18
6
20/1
SPACE
0
7
20/1
SPACE
0
8
20/1
SPACE
0
9
20/1
SPACE
0
10
2011
SPACE
0
11
20/1
SPACE
0
12
20/1
SPACE
0
13
20/1
SPACE
0
14
20/1
SPACE
0
15
20/1
SPACE
0
16
20/1
SPACE
0
17
20/1
SPACE
0
18
20/1
SPACE
0
19
20/1
SPACE
0
20
20/1
SPACE
0
TOTAL CONNECTED KVA BY PHASE
0.38
0.18
CONN KVA
CALC KVA
CALC KVA
LIGHTING
0.2
0.25 (125%)
TOTAL LOAD
0.61
RECEPTACLES 0.36
0.36 (50%>10)
BALANCED LOAD 2.54 A
E
ROOM
VOLTS 240/120V 2P 3W
AIC 10,000
MOUNTING
FLUSH
BUS AMPS 100
MAIN BKR 100
FED FROM
METER E
NEUTRAL 100%
LUGS STANDARD
NOTE
CKT
CKT
LOAD KVA
CKT
CKT
LOAD KVA
#
BKR
CIRCUIT DESCRIPTION
A
B
#
BKR
CIRCUIT DESCRIPTION
A
B
1
40/2
IRRIGATION WELL PUMP
3.36
2
20/1
SPACE
0
3
1
3.36
4
20/1
SPACE
0
5
20/1
LIGHTING
0.1
6
20/1
SPACE
0
7
20/1
LIGHTING
0.048
8
20/1
SPACE
0
9
20/1
RECEPTACLE
0.18
10
20/1
SPACE
0
11
20/1
SPACE
0
12
20/1
SPACE
0
13
20/1
SPACE
0
14
20/1
SPACE
0
15
20/1
SPACE
0
16
20/1
SPACE
0
17
20/1
SPACE
0
18
20/1
SPACE
0
19
20/1
SPACE
0
20
20/1
SPACE
0
TOTAL CONNECTED KVA BY PHASE
3.64
3.41
CONN KVA
CALC KVA
CONN KVA CALC KVA
LIGHTING
0.148
0.185 (125%)
MOTORS
6.72 6.72
(100%)
LARGEST MOTOR 6.72
1.68 (25%)
RECEPTACLES
0.18 0.18
(50%>10)
TOTAL LOAD
8.77
BALANCED LOAD
36.5 A
B
ROOM
VOLTS 240/120V 2P 3W
AIC 10,000
MOUNTING
FLUSH
BUS AMPS 100
MAIN BKR 60
FED FROM
METER B
NEUTRAL 100%
LUGS STANDARD
NOTE
CKT
CKT
LOAD KVA
CKT
CKT
LOAD KVA
#
BKR
CIRCUIT DESCRIPTION
A
B
#
BKR
CIRCUIT DESCRIPTION
A
B
1
20/1
LIGHTING
0.2
2
20/1
SPACE
0
3
20/1
RECEPTACLE
0.18
4
20/1
SPACE
0
5
20/1
RECEPTACLE
0.18
6
20/1
SPACE
0
7
20/1
SPACE
0
8
20/1
SPACE
0
9
20/1
SPACE
0
10
20/1
SPACE
0
11
20/1
SPACE
0
12
20/1
SPACE
0
13
20/1
SPACE
0
14
20/1
SPACE
0
15
20/1
SPACE
0
16
20/1
SPACE
0
17
20/1
SPACE
0
18
20/1
SPACE
0
19
20/1
SPACE
0
20
20/1
SPACE
0
TOTAL CONNECTED KVA BY PHASE
0.38
0.18
CONN KVA
CALC KVA
CALC KVA
LIGHTING
0.2
0.25 (125%)
TOTAL LOAD
0.61
RECEPTACLES 0.36
0.36 (50%>10)
BALANCED LOAD 2.54 A
D
ROOM
VOLTS 240/120V 2P 3W
AIC 10,000
MOUNTING
FLUSH
BUS AMPS 100
MAIN BKR 60
FED FROM
METER D
NEUTRAL 100%
LUGS STANDARD
NOTE
CKT
CKT
LOAD
KVA
CKT
CKT
LOAD
KVA
#
BKR
CIRCUIT DESCRIPTION
#
BKR
CIRCUIT DESCRIPTION
A
B
A
B
1
20/1
LIGHTING
0.2
2
20/1
SPACE
0
3
20/1
RECEPTACLE
0.18
4
20/1
SPACE
0
5
20/1
RECEPTACLE
0.18
6
20/1
SPACE
0
7
20/1
SPACE
0
8
20/1
SPACE
0
9
20/1
SPACE
0
10
20/1
SPACE
0
11
20/1
SPACE
0
12
20/1
SPACE
0
13
20/1
SPACE
0
14
20/1
SPACE
0
15
20/1
SPACE
0
16
20/1
SPACE
0
17
20/1
SPACE
0
18
20/1
SPACE
0
19
20/1
SPACE
0
20
20/1
SPACE
0
TOTAL CONNECTED KVA BY PHASE
0.38
0.18
CONN KVA
CALC KVA
CALC KVA
LIGHTING
0.2
0.25 (125%)
TOTAL LOAD
0.61
RECEPTACLES 0.36
0.36 (50%>10)
BALANCED LOAD 2.54 A
F
ROOM
VOLTS 240/120V 2P 3W
AIC 10,000
MOUNTING
FLUSH
BUS AMPS 100
MAIN BKR 100
FED FROM
METER F
NEUTRAL 100%
LUGS STANDARD
NOTE
CKT
CKT
LOAD KVA
CKT
CKT
LOAD KVA
#
BKR
CIRCUIT DESCRIPTION
A
B
#
BKR
CIRCUIT DESCRIPTION
A
B
1
20/1
LIGHTING, RECEPTACLE
0.392
2
50/2
IRRIGATION WELL PUMP
4.8
3
20/1
LIGHTING, RECEPTACLE
0.212
4
1
4.8
5
20/1
RECEPTACLE
0.18
6
20/1
SPACE
0
7
20/1
CALLBOX
0.6
8
20/1
SPACE
0
9
20/1
GM-1
1.18
10
20/1
SPACE
0
11
20/1
GM-1
1.18
12
20/1
SPACE
0
13
20/1
GM-1
1.18
14
20/1
SPACE
0
15
20/1
GM-1
1.18
16
20/1
SPACE
0
17
20/1
SPACE
0
18
20/1
SPACE
0
19
20/1
SPACE
0
20
20/1
SPACE
0
TOTAL CONNECTED KVA BY PHASE
7.72
7.96
CONN KVA
CALC KVA
CONN KVA CALC KVA
LIGHTING
0.064
0.08 (125%)
MOTORS
14.9 14.9
(100%)
LARGEST MOTOR
9.6
2.4 (25%)
RECEPTACLES
0.72 0.72
(50%>10)
TOTAL LOAD
18.1
BALANCED LOAD 75.4 A
ELECTRICAL POWER DES[GNS
P.0.80X 272517 TAMPA, FL 33688
TEL 813-600-5136 FAX 813-425-4882
E-MAIL caHos@epd-fl.com
CARLOS M. ORAMA, PE,
ELECTRICAL ENGINEER
PE #60205 CA #27385
ISSUE REVISIONS
CLIENT
Winward Building
Group
PROJECT I
Abbott Square
ADDRESS 11
Simons Rd
Zephyrhills
Florida
SHEET NAME
Panel Schedules
JOB # BY
E21-250 MAI
ISSUE DATE
12-15-21
SCALE
AS SHOWN
1
THESE PLANS MAY NOT BE COPIED OR
MODIFIED WITHOUT WRITTEN PERMISSION
FROM THE ENGINEER. COPYRIGHT R
�0 •`• STATE OF ?`
N911111%I
CARLOS M. ORAMA, PE
NOT VALID UNLESS SIGNED & EMBOSSED BY
A REGISTERED ENGINEER
SHEET I
E500
63.47' {
I/
LAKE
/
y
1
/•
kfi
WIDE CONCRETE TRAIL- /
?"
I6'
SEE SHEET HS2 FOR SQ. FT.
AA
:zr
R100.00'
/
CONTRACTQA SHALL FLAG
#
55.00'
j
CENTERJafGE OF MULCH TR
I
-p:
POND
I j
LAND�APE ARCHITECT TO
j
REAW AND APPROVE LAYO
j
PRIOR TO TRAIL INSTALLATIO
4. 4'
3 3
PROPANE TANK -
' 2
i
' 00 R50RUN LINES TO
HS4
:r
.
BBQ GRILL AND
!,
I
FIREPLACE
,
5
'
HS3
r
Y 4
�•�f
" ---
R30.00' �'
'? HEAVY
TIMBER
R75.00'
BB
�� E
3 STRUCTURE`
;
R50.00'
28.68
2
18'`
'
HS1
2.3
*'x
KK
WETLANDS
SETBACK
LINE
- WETLANDS
CALL BOX 1 rr I 7
I 1
'� i '.• G :' i'' HS15
t • / !!
.- - ------------- \`---------------- --- - ---J _ z e
..... con LA UT
CENTER IN , DI NSION
MEDIAN DOUBLE SIDED ; FR M
ONUMENT SIGN CE TERLINE OF
CCLUMN TO
. LINES
;..
----------------- . • .. 50.00'
e
------------ ----
,O 04 I
1 1 G i Ya
HS15 HS15 r
SINGLE SIDED MONUMENT
SIGN - EACH SIDE OF ROAD
' ' M
I
1 ' (
I e
POND I
I � �
' � I
I e
I I
1
I r e
'
1 I
1
I e
I ' I
I e
I I
I e
/j d • /IVII
I
e
___________________ ___-__--_____ I
--------------------------- --
6 WIDE
LCHTRAIL- 3 38.6T LL r--------- ------
-_------_-------------�-----_--_-__----_-� _J r
SEE SHEET '` I I
4 FOR SQ. FT.
1
695 SQ. FT. CLAY f' 1 19.60'
BRICK PAVER PATIO
•
AA
H H
POND ~�-
720 SQ. FT.
6' WIDE �' LAYOUT DIMENSIONS FROM
ONCRETE TRAIL R CENTERLINE OF OBJECT TO
5 ., R.O.W. LINE (TYPICAL)
2 �,.. ��• 4' � , I I
2 POND
HS4 I
W
W
N v i I
F HS3 I
;' f. on 2
110.54'
W F NCE AT LIFT STATION -%
z ( Cl ENG. PLANS FOR DETAILS ... 28.12'
J Gameroom
SIDEWALK .: I
OUT DIMENSIONS M ; Y , 12' I '
ENTERLINE OF OBJECT T c3� Q'.:='= 16 1 ,
1
R.O.W. LINE (TYPICAL)
,> 8' o I r
407 SQ. FT. � `+ 95. 9' rl 32 8.00,
CONCRETE � 19/='`"'�•• �
DEWAL �; . _, : 22.00 I I
64.85' 44.00' 2
JI �sHS4
�!1 2 a. !0.00' HS3 HS3 1 ;
40.48
, HS14 F On.48' 2 I
Wall T I
8' HS14 I r
HS14
544 L.F Playground
Pool wall %� a. PICKET FENCE WIT
I 43.35' (4) 4' GATES WITH CCESS
CFFs INY CONTROL DEVIC S
Q 107.25'
CG LAI 89'
a'
Amenity center and
_
I
I -
pool Planter walls
I AA
HS7•
ATCH BASIN - ;:`; 61,30'
Shade structures EE CIVIL ENG. Ramp wall
PLANS 19.87' 1 2 2.sa
4 y`, � L �t'• PLAYG UND MULCH /'
LL I
/ n ,
V T LL k :: 89 I
SEE INSET FOR
1:00' .82' 112.68'
1,fi6 L.F. 6' HT. SOLID r 17.92' POOL DECK 1 2
LAYOUT DIMENSION 6 '
' ,OVC FENCE WITH (1) °j ,
, A'.5:.1
4' SINGLE SWING: Shade structures HS3 1
GATE AND (1) 8' F
DOUBLE SWING a HS7
GATE 3 p 2
Z F O / Q E
AA
.: PRO ANE TANK - RUN '
'
P 3y LINE TO GRILLS 2
AA HS4
507 SQ. FT.
CONCRETE I I
SIDEWALK 2 2 1
u ;HS4 HS4 HS4 I
a ` +! CLUBHOUSE AND POOL ALIGNED TO
.00' '
i
7.001 18 30' RAMP SLOPE
30.00 6.00' S.00 APPROX.1:20
3.00 $Tpp 82.30
5.0
. 8.0012.3 1$.00'
,' 5.0 I� ' FIELD VERIFY R $.00'
60 HT, / 1 .00 � , � 5.00 �
WALL ,
O 8.00' I
�' 4.00 7.50' 18.50' i FLOW .00, I
` 5. 0'J 24" HT. RETAINING
1 1$.0 1 WALLS 00 r
77.67' 75.671 1:12RAMP 6.33' FIELD VERI ; 12.90' FIELD VERIF 94.00'
% 5 00' ' �
18" HT. RETAINING WALLS 6.00' 1�1 48,00'
FLOW o 18.50'
CENTER LLI 12.00' ; , Q0'
14.25 1.50 FLOW 46.30
�' 18" RAISED 0 °
--� 7• 0 3 � Q $•0 LLI 36.00' 45 DEGREES LLI 52.00'
TERRACE ONE •pp'
POOL ISLAND -�- 30.0 10.0016.00 - LL ; LL� 7.00' 1 I '
5.75'
■ 5.00' .00 5.75 I 24 00 1 p ppl 00
Io i 4.00'
24.2
12" TREADS WITH �° 0 4.00 3 6" RISERS 15.00 0
�� 23.21' 9.27' FIELD VERIFY 4 30.33' WALLS TO BE FINISHED WITH
FIELD VERIFY ' 24.25' STUCCO TO MATCH BUILDING
8.67' ® STUCCO COLOR AND TEXTURE ON I I
OO' ALL EXPOSED SIDES -
LLI a CAP TO BE DOUBLE BULLNOSE 1 ,
10.00 PRE -CAST CONCRETE "WHITE" WITH
' 1 1/2" OVERHANG EACH SIDE i I
5.00' 62.17'
, 8 SQ I CENTERLINE OF 3o
o
NCRETE SIDEWALK �� CENTER ON LLI POOL AND FIELD
90 DEGREES
PARKING LOT CLUBHOUSE
ISLAND
93.25
------------------
i 1
i i 1
�I
POINT OF ORIGIN OF POOUBLDG. CENTERLINE I I
CONTINUES AS CENTERLINE OF ROADWAY
_ 1 �
1 �
r
�I
CLUBHOUSEYOOL LAYOUT INSET
CENTERLINE OF PARKING LOT ISLAND
r
W
MATCHLINE SHEET HS7
g
N
0
N
O
N
rn
0
VL
11111 LW, -n-WMT i.. r I •r„ ILI r. Ls, rrr.na•i.m �, � • irucsuvi i .. �� �
SCALE:
140�
NORTH
0 20' 40' 80' -I 60'
e
0�
�
I
�
I
\\
I
!�
t
0
JACOB ZIMMERMAN, RLA
REG. NO. FL LA 0001653
LANDSCAPI RCHITECT
yAP1DSCgp
sv¢49 �9gEW 2 f 9 n
p LA0001653 y
STATE y
* OF
FL 0 110
Y
J �
LL.
Z
CbOM
-00
O
i M N
a
.s3
��Z
Q
�
W
N
� d
� C J
'a o
A
o�
C4 .-.
ti
ti
W
Q
A
O
U0
zz�
I� Koo� ftj eIyou di .
� Yu 9
REVISIONS:
-1. 3/12/21
CITY REVIEW COMMENTS
2. 4/19/21
CITY REVIEW COMMENTS
3. 8/2/21
HARDSCAPE
PLANS ADDED
4•
DRAWN BY: JAZ
DATE: 11/6/2o
20009
HARDSCAPE
PLAN
HS5
s
■
1/2" EXPANSION JOINT
WING WALL
MAXIMUM SLOPE
30 DEGREES
EXPANSION JOINT WITH JOINT SEALANT
4" THICK CONCRETE SIDEWALK
TRANSITIONS TO 6" THICK
#4 VERTICAL REBAR
30" O.C.
THICKENED EDGE BEAM
COMPACTED SUBGRADE —� S
3000 PSI POURED��-
CONCRETE HEADWALL
(6) #4 REBAR CONTINUOUS
ATTACH TO CAGE WITH METAL TIES
#4 REBAR CAGE- 8" HT. x 24" WIDTH -
VERTICAL AND HORZ. REBAR AT 30" O.C.-
HOLD 3" OFF BOTTOM OF POUR
U
my 'o
�_im=A MIM I
FOOTING EXTENDS TO LIMIT
OF WING WALL SEE PLAN VIEW
DECKING SEE DOCK A
CONSTRUCTION PLANS
JOIST - SEE DOCK
CONSTRUCTION PLANS
1 % SLOPE
SIMPSON STRONG TIE
FSA- HOT DIPPED GALVANIZED
FOUNDATION ANCHOR- PLACE ONE
ANCHOR AT EACH JOIST
2" AIR GAP
FINISH GRADE ON LOWER
SIDE OF HEADWALL- BLEND
GRADE WITH GRADE AT END
OF SLOPED WING WALLS
ATTACH TO HEADWALL WITH
(2) 6" LONG 1/2" DIAMETER EXPANSION BOLT
EXPDXY BOLT INTO CONCRETE HEADWALL
'r 3-0" =-
rDOCK1 CONCRETE HEADWALL- CONNECTION TO WOOD
HS13 1" _ v-o°
SIMPSON STRONG TIE H0212
(2) " x 12" # 27oc
SIMPSON STRO TIE CB66
COLUMN BASE SET IN COLU POUR
CENTER ON CONCRETE C UMN
SLOPE TOP OF COLUMN
AWAY FROM CENTER TO
SHED RAINWATER- 2% SLOPE -
SET CULUMN BASE LEVEL
rumups
WIN
or
Nd
2" x 6" DECKING
3" x 12"
SIMPSON STRON/RIES
6" x 6" W
/- HEIGHT
3000 PSI POURED CONCRETE COLUMN
FINISH GRADE
6"
24" DIAMETER ROUND 3000 PSI CONCRETE
COLUMN REINFORCED WITH (3) #5 VERTICAL
REBAR- TRIANGULAR PATTERN -
STIRRUPS AT MAX'. 18" O.C. VERTICALLY FOR
STABILITY DURING POUR
r- HOLD REBAR 3" FROM EDGE OF POUR
" " - * (3) #5 HORZ. EBAR AT 15"
2 CO CRETE COLUMN SECTI
HS13 1 1/ = v-0°
mi
a
0
0
a
z
0
N
0
N
COMPACTED SUBGRADE
® DELETED FROM PROJECT
NOTES
1. \GNED
IGNED TO SUPPORT 100 PSF LIVE LOAD + 10 PSF DEAD LOAD. DECK IS NOT DESIGN FOR VEHICULAR TRAFFIC.
2. DESIGNED WITH A SOIL BEARING CAPACITY OF 3000 PSF.
3. CTURAL LUMBER TO BE #2 PRESSURE TREATED SOUTHERN PINE. ALL DECKING AND RAILS SHALL BE #1 PRESSURE
UTHERN PINE WITH EASED (SANDED) EDGES.
4. S L MEET THE REQUIREMENTS OF ASTM F 1667. BOLTS SHALL MEET THE REQUIREMENTS OF ANSI/ASME B1.8.2.1
5. OF PO TS SHALL BE FIELD TREATED WITH AN AMERICAN WOOD PROTECTION ASSOCIATION RECOMMENDED PRODUCT
R NAPHT NATE)
6. ER TO BE P ED TO BE CROWN SIDE UP.
LIMITS OF WOOD DECK
HS1
13
EXPANSION J
DOCKAND OCK
PERMITTING T INCLUDED
IN CONTRACT (BOTHERS)
a
\ 9'-6 9
16
6-34'
6-3-4'"O
9-6g"
16
d
WING WALL AT 45 DEGREE ANGLE
TO HEADWALL- SLOPE AT 30 DEGREE MAX.
ADJUST FINISH GRADE TO PROVIDE
MAX. 5% SLOPE ON CONCRETE SIDEWALK
AND ALLOW FOR BEAM DIMENSION OVER
WING WALL FOOTING
COLUMNS AND CONC. HEADWALL
2
S13
18" DIAMETER CONCRETE FOOTING (TYPICAL)
ADJUST FINISH GRADE TO PROVIDE
MAX. 5% SLOPE ON CONCRETE SIDEWALK
AND ALLOW FOR BEAM DIMENSION OVER
WING WALL FOOTING
PROVIDE BLOCKING BETWEEN SIMPSON
STONE TIE AC6 MAX AND POST
ALL SPLICES IN BEAMS TO BE CENTERED
® d OVER POSTS. SPLICED CONNECTIONS SHALL
HAVE SIMPSON STRONG TIE PC66 POST CAPS
m
LIMIT OF DECKING
2" x 12" RIM JOIST ACH WITH (3) 3.5" 10d RING SHANK
HOT DIPPED GA ANIZED NAILS AT EACH JOIST OR BEAM
2" x 12" JOISTS - ATTACH TO BEAMS WITH SIMPSON
STRONG TIE HU212-HDG FACE MOUNT HANGERS
9-616"
MAX MAXIMUM ON CENTER
JOIST JOIST SPACING = 24"
SPAN SPACE JOIST EQUALLY
POST AND BEAM (BELOW)
JOIST LAYOUT
3
HS13
CUT DECK BOARDS
AT CORNERS TO PROVIDE
NO LESS THAN 1/2 BOARD
WIDTH- LOCATE CUT BOARD(S)
AWAY FROM CORNER
WOOD DECK
DESIGN CRITERIA
1. DESIGN LIVE LOAD = 100 PSF
2, DESIGN WIND SPEED = 140 MPH
3. EXPOSURE "C"
4. STRUCTURE IS AN OPEN STRUCTURE
5. Gpc=0
6. VELOCITY PRESSURE = 36.3 PSF
7. UPLIFT = 50.8 PSF ROOF ZONE 3, 43.6 PSF ROOF Z E 2
8. BASED ON THE 2020 FLORIDA BUILDING CODE & SCE 7-16
DOCK AND DOCK
PERMITTING NOT INCLUDED
IN CONTRACT (BY OTHERS)
3" x 12" ROUGH SAW (NON -DIMENSIONAL)
BEAM - (OPTIONA SE OF (2) 2" x 12"
LUMBER) ATTA TO POST
WITH SIMPSO STRONG TIE AC6 MAX
HOT DIPPE GALVANIZED FILL
HOLES H 3.5" 16d HOT DIPPED
GA LV ZED NAILS 4'
MAX. BEAM SPAN
CENTER BEAM ON POST
a 6" x 6" POST - ATTACH TO FOOTING
WITH SIMPSON STRONG TIE H0212
COLUMN BASE- STAINLESS STEEL
(2) 5/8" THROUGH HOT DIPPED GALVANIZED
° BOLTS WITH WASHERS
4 ON BOLT HEAD AND NUT
2" x 4" DIAGONAL BRACE ATTACH TO
ALL PERIMETER POSTS- SECURE WITH
(1) 112 DIAMETER THROUGH BOLT
WITH WASHER AT BOLT HEAD AND NUT
FOR EACH CONNECTION- ATTACH TO
BEAMS AT 45 DEGREE ANGLE - PROVIDE
BLOCKING AT ATTACHMENT LOCATION
BOTTOM OF DIAGONAL BRACE TO
BE ATTACHED TO POSTS
AT MIDPOINT IN POST
ATTACH TO JOISTS WITH SIMPSON STRONG TIE
MTSM TWIST STRAPS FOR LOCATIONS
WHERE BRACING IS PERPENDICULAR TO
BEAMS
DIAGONAL BRACES EXTEND OUT 20"
IN BOTH DIRECTIONS FROM POST
POST BEAMS - BRACING
2" x 4" DECK BOARDS- ATTACH TO
E ACH JOISTS WITH 3.5" 10d HOT
DIPPED GALVANIZED RING SHANK
ATTACH PERIMETER DECK
NAILS- TWO NAILS PER JOIST
BOARD RUNNING PARALLEL
RID JOIST WITH 3.5" 10d HOT
RING
3/16" GAP BETWEEN ALL DECK BOARDS
LS
SHANK NA8" O.C.
® DELETED FROM PROJECT
E\ONA
CK BOARD RUNS TO
BJOIST LOCATIONS ONLY
AOARD TO JOIST
TCENT BOARD- GAP BUTT
J. ALL DECK BOARD TO
RUM OF FOUR JOISTS
DECKING
NOTES:
1. WILLIAM G. REIDY IS SIGNING AND SEALING FOR
STRUCTURAL ENGINEEERING ONLY
2. DESIGN CRITERIA BASED ON 2020 FLORIDA BUILDING
CODE 7th EDITION & ASCE 7-16.
DESIGN WIND SPEED: 140 MPH
EXPOSURE "C"
WIND PRESSURE: 36.3 PSF
WILLIAM G. REIDY, P.E.
REG. NO. 35605
PROFESSIONAL ENGINEER
�a
A
4
Q
F
b
Qgo
W
E
0
T
L
J
U.
M La
diOCN'j)
Q HOC
O
04
d 0aka
F- m
2 t'9 -,a=
Q Viz
W % 4)
N Cc
G N O J
z 'a CO
N �
SM
N
h
BIKno ftsbelow.w�kW aefore you dig.
REVISIONS:
1. 3/12/21
CITY REVIEW COMMENTS
2. 4/19/21
CITY REVIEW COMMENTS
3. 8/2/21
HARDSCAPE
PLANS ADDED
4. 11/26/21
STRUCTURAL ENGINEERING
MODIFICATION- DELETE DEC
DRAWN BY: IAZ
DATE: 1116120
20009
HARDSCAPE
DETAILS
fisi 3
2" PRE -CAST
CONCRETE WALL CAP- —
PROVIDE MIN. 1%SLOPED TOP
0' 12
STUCCO VENEER OVER
PLASTIC LATHE - COLOR
AND TEXTURE
TO MATCH CLUBHOUSE
BOTH SIDES OF WALL
5'-0"
ADJUST COVER OVER FOOTING TO
MINIMIZE CUT BLOCK COURSES
FINISH GRADE
A 6"MIN. ARC. I
10" MAX.
NOTES:
1, FILL ALL CMU CELLS WITH CONCRETE.
2. PROVIDE #1 GAUGE HORIZONTAL REINFORCING AT 24" O.0 VERTICAL
ON WALL SEGMENT.
#5 REBAR CONTINUOUS, INFILL KNOCK -OUT
BLOCK WITH CONCRETE -
25" OVERLAP ON ALL SPLICES
#5 BAR IN FILLED CELL,
24" O.C.
25" OVERLAP ON ALL SPLICES
8" X 8" X 16" CMU WALL
PROVIDE #1 GUAGE HORIZONTAL
RENINFORCING AT 24" O.C.
VERTICALLY (EVERY THIRD COURSE)
3'-6" CONCRETE PAVER - SEE SCHEDULE OF
SITE FURNISHINGS AND STRUCTURES
TIE ALL REBAR CONNECTIONS WITH METAL TIES
#5 REBAR DOWEL @ 24" O.C.
(3) #5 HORIZONTAL REBAR CONTINUOUS,
i I— II —I I HOLD REBAR 3" OFF BOTTOM AND
=ill—II�f fII� EDGE OF POUR
#5 TRANSVERSE REBAR AT 24" O.C.- HOLD
1 Q ii1 • a �" 3" OFF BOTTOM AND EDGE OF POUR A
111 11 (=1 f 3000 PSI POURED CONCRETE
FOOTING- CONTINUOUS
3'-01
4 COMPACT SUBGRADE AT ALL
FOOTING LOCATIONS
1 RETAINING WALL AT POOL
HS14 1 1/2" =1'4'
MASONRY COLUMN WITH
FINISH GRADE
a.
Q
0
d
0
N
0
N
0
U
EXIT SIDE VEHICULAR GATES
1/2" GAP FOR HINGE BRACKET -
GATE FABRICATOR/INSTALLER SHALL BE
RESPONSIBLE FOR SIZING GATE HINGES AND
PROVIDE OWNER A WARRANTY ON THE ABILITY
OF THE HINGES TO SUPPORT THE WEIGHT OF THE GATE
5' WIDE CONCRETE
SIDEWALK
2" WHITE PRE -CAST
CONCRETE WALL CAP -
PROVIDE MIN. 1% SLOPED TOP
#5 VERTICAL REBAR IN FILLED CELL,
SEE FOOTING DETAIL FOR LOCATION -
25" OVERLAP ON ALL SPLICES
STUCCO OVER PLASTIC LATHE
MATCH COLOR AND TEXTURE
OF CLUBHOUSE WALLS —T:z
A6" MIN.
10" MAX.
2-0" OR
V-6"
2'-2" OR
#5 REBAR CONTINUOUS, INFILL KNOCK -OUT
BLOCK WITH CONCRETE
-12, 8 X 8" X 16" CMU WALL.
3-0"
WALL SECTION
—PROVIDE #1 GUAGE HORIZONTAL
RENINFORCING AT 1ST AND 3RD
BLOCK COURSE ABOVE FOOTING
#5 REBAR DOWEL @ 32" O.C.
ADJUST COVER OVER FOOTING TO
�— MINIMIZE CUT BLOCK COURSES
(3) #5 HORIZONTAL REBAR CONTINUOUS,
�- HOLD REBAR 3" OFF BOTTOM AND
EDGE OF POUR
#5 TRANSVERSE REBAR AT 32" O.C.- HOLD
3" OFF BOTTOM AND EDGE OF POUR A
3000 PSI POURED CONCRETE
FOOTING- CONTINUOUS
COMPACT SUBGRADE AT ALL
FOOTING LOCATIONS
2 18" AND 24" HT. RETAINING WALLS AT POOL
H S 14 1 /211 =11-011
24" SQUARE MASONRY COLUMN -
AT TOP AND BOTTOM CONCRETE SLAB
EXIT GATE
4 VILLA GATED ENTRANCE ELEVATION
H S 14 1/8" = 11-0°
FOUR RAIL
CAITOV CIMC %/CLJ 1(�I II A 0 fl— ATCC
LGATE STOP ANGLE BRACKET
AT TOP AND BOTTOM
ENTRANCE GATE
STONE VENEER
FILL ALL VOIDS WITH
CONCRETE
i— VENEER WALL TIES
COLUMN
HORSE PROVIDE 3" GAP BETWEEN
FENCE FENCE POST AND COLUMN
.G
r'
r
rrr
r
•.i. i
r
r
rrr
4'-6" 6-0" rr
�!
r
r
r'
r
r
rr
rri
r
r
r.
r
r
r
rr
FAUX STACKED STONE VENEER -
rr
CULTURED STONE PRO -FIT
LEDGESTONE COLOR: 'MOJAVE'
I I�I i II I I ! i I ,., ,..: I �I I la-J � i�-�.I.� I I _ I I�_I��� j I i I I� !1f 1--�_=.LI, i I. I ° I ,_�� • •" ° � : °, . .. ° '
! �I i 1 I I MITI III 11-�II—�LII LfI�TIIITTI I I 4
I— 3-61�
SQUARE
COLUMN SECTIO
s FENCE CONNECTION TO COLUMN
HS14 1 1/2" = 1-4'
NOTES:
1. FILL ALL CMU CELLS WITH CONCRETE.
2. PROVIDE #1 GAUGE HORIZONTAL REINFORCING AT 24" O.0 VERTICAL
ON WALL SEGMENT.
2" PRE -CAST
CONCRETE WALL CAP- #5 REBAR CONTINUOUS, INFILL KNOCK -OUT
PROVIDE MIN. 1 % SLOPED TOP BLOCK WITH CONCRETE -
25" OVERLAP ON ALL SPLICES
_12,
#5 BAR IN FILLED CELL
STUCCO VENEER OVER 24" O.C.
PLASTIC LATHE -COLOR 25" OVERLAP ON ALL SPLICES
TO MATCH VILLA BUILDINGS
TEXTURE: DASH (ROUGHCOAT)
BOTH SIDES OF WALL „
8 X 8 X 16 CMU WALL
PROVIDE #1 GUAGE HORIZONTAL
RENINFORCING AT 24" O.C.
VERTICALLY (EVERY THIRD COURSE)
6-0"
#5 REBAR DOWEL @ 24" O.C.
TIE ALL REBAR CONNECTIONS WITH METAL TIES
ADJUST COVER OVER FOOTING TO
MINIMIZE CUT BLOCK COURSES
FINISH GRADE
1.F
(3) #5 HORIZONTAL REBAR CONTINUOUS,
_
HOLD REBAR 3" OFF BOTTOM AND A
6" MIN—E—
f l ll=
I—
I I
EDGE OF POUR
i i �L
Y
,.
•'
#5 TRANSVERSE REBAR AT 24" O.C. HOLD
, I.
°;
"
4
3" OFF BOTTOM AND EDGE OF POUR 4
1'-0" j I
" 4'
_�
3000 PSI POURED CONCRETE
_
_
FOOTING -CONTINUOUS
1 -
I _.I I—I-1-1
3-0"
COMPACT SUBGRADE AT ALL
A
FOOTING LOCATIONS
4 VILLA VEHICULAR ENTRANCE WALL SECTION
H S 14 1121E = 1 L-v
6 HT. PEDESTRIAN GATE
NO ACCESS CONTROL
O VVILIC k1ul'A r1rz 1 C n vivi I ui v-w a_
SIDEWALK
NOTES:
1. FILL ALL BLOCK BELOW GRADE
WITH CONCRETE.
2. PROVIDE #1 GAUGE HORIZONTAL
REINFORCING GRID AT 24" O.C.
VERTICALLY
21/2" THICK PRECAST WHITE CONCRETE COLUMN CAP
EPDXY TO TOP OF CMU COLUMN WITH 112 DIA, ANCHOR
AT AT CENTER EMBEDDED 3" MIN. INTO COLUMN
KNOCK -OUT BLOCKS ON TOP COURSE OF COLUMN- WITH
/-- #5 REBAR BENTS- FILL ALL CELLS WITH CONCRETE
// COLUMN REINFORCED WITH
���2TSQUARE
(4) #5 REBAR- ONE AT EACH CORNER FILL ALL
VOIDS CONTAINING REBAR WITH CONCRETE
CMU COLUMN
PROVIDE #1 GUAGE HORIZONTAL
-� -"�— RENINFORCING AT 24" O.C.
VERTICALLY EVERY THIRD COURS
E)
SE
ALTERNATE CMU DIRECTION EVERY OTHER COURSE
UNTIL B
SAFETY PROTECTION ON VERTICAL REBAR
BLOCK WORK BEGINS LO
(4) #5 REBAR DOWELS- 25" OVERLAP ON ALL SPLICES
TIE ALL REBAR CONNECTIONS WITH METAL TIES
FINISH GRADE
HOLD REBAR 3" FROM EDGE OF POUR
COMPACTED SUBGRADE
" I 3000 PSI POURED CONCRETE FOOTING _
X 36" X 1'-0" REI
REINFORCE WITH (3) #5 REBARS EACH WAY TOP AND
BOTTOM TYPICAL
MASONRY COLUMN WITH
STONE VENEER
FILL ALL VOIDS WITH
CONCRETE
VENEER WALL TIES
FAUX STACKED STONE VENEER -
CULTURED STONE PRO -FIT
LEDGESTONE COLOR: 'MOJAVE'
NOTES:
1. FILL ALL BLOCK BELOW GRADE
WITH CONCRETE.
2. PROVIDE #1 GAUGE HORIZONTAL
REINFORCING GRID AT 24" O.C.
VERTICALLY
21/2" THICK PRECAST WHITE CONCRETE COLUMN CAP
EPDXY TO TOP OF CMU COLUMN WITH 1/2 DIA. ANCHOR
AT AT CENTER EMBEDDED 3" MIN. INTO COLUMN
KNOCK -OUT BLOCKS ON TOP COURSE OF COLUMN- WITH
#5 REBAR BENTS- FILL ALL CELLS WITH CONCRETE
COLUMN REINFORCED WITH
(4) #5 REBAR- ONE AT EACH CORNER FILL ALL
VOIDS CONTAINING REBAR WITH CONCRETE
24" SQUARE CMU COLUMN
PROVIDE #1 GUAGE HORIZONTAL
y RENINFORCING AT 24" O.C.
VERTICALLY (EVERY THIRD COURSE)
ALTERNATE CMU DIRECTION EVERY OTHER COURSE
SAFETY PROTECTION ON VERTICAL REBAR
UNTIL BLOCK WORK BEGINS
- (4) #5 REBAR DOWELS- 25" OVERLAP ON ALL SPLICES
TIE ALL REBAR CONNECTIONS WITH METAL TIES
FINISH GRADE
j1 I I I HOLD REBAR 3" FROM EDGE OF POUR
3000 PSI POURED CONCRETE FOOTING
1— i i 16—i —I I IEd_ I h� i in I 1=I i�� i I I I� 3'-6" X 3'-6" X V-0"
3'-6" REINFORCE WITH (3) #5 REBARS EACH WAY TOP AND
SQUARE BOTTOM TYPICAL
COLUMN SECTION COMPACTED SUBGRADE
3 VILLA VEHICULAR ENTRANCE COLUMN SECTION
HS1.4 I 1/211 = 11.0/1
<";0
COLUMN CAP WGS6
ISOMETRIC WALL CAP
ISOMETRIC
3
SEC
2IL
SEC
4-10
4'-816"
4'-0"
04=61-10-
• - ■s1r,���■=lid■
ll
STRUCTURAL BRICK 1'-64
(BELOW
STRUCTURAL BRICK
f
0-416
3'-6"
U-416"
3'-6"
COLUMN FOOTING (BELOW)
PRECAST CONCRETE COLUMN CAP
o 'i Ii T I
i
SECTION 2
3/8" MORTAR
JOINTS P.
m` )
0 -118„
#5 VERTICAL REBAR
4 15/16" O.C.
SECTION 1
NOTES:
1. STRUCTURAL BRICK- "BRONZE STONE' NORMAN BRICK DISTRIBUTED BY
COASTAL OLD CASTLE. (813) 886-7761
2. MODULAR BRICK- "BEALE STREET" MANUFACTURED BY PINE HALL BRICK -
DISTRIBUTED BY COASTAL OLD CASTLE. (813) 886-7761
3. COLUMN CAP- "PC-16" MANUFACTURED BY AAA
CAST STONE (941) 721-8092 www.aaacaststone.com
4. WALL CAP- "WC-16" MANUFACTURED BY AAA
CAST STONE (941) 721-8092 www.aaacaststone.com
PROVIDE VERTICAL EXPANSION JOINTS
AT 50' ON CENTER
#5 VERTICAL REBAR IN FULLED CELL,
SEE FOOTING DETAIL FOR LOCATION -
25" OVERLAP ON ALL SPLICES
PROVIDE #1 GUAGE HORIZONTAL
REINFORCEMENT GRID AT FIVE
COURSE INTERVALS
(3) #5 HORIZONTAL REBAR CONTINUOUS,
HOLD REBAR 3" OFF BOTTOM AND
EDGE OF POUR
#5 TRANSVERSE REBAR AT 24" O.C.- HOLD
3" OFF BOTTOM AND EDGE OF POUR
3000 PSI POURED CONCRETE
FOOTING- CONTINUOUS
COMPACT SUBGRADE AT ALL
FOOTING LOCATIONS
SOLID MODULAR BRICK (BELOW)
0'-10"
PRECAST CONCRETE WALL CAP
MODULAR BRICK- OFFSET LAYOUT TO
CREATE DENTAL BLOCKS AT TOP OF WALL
0'-44„
MIDPOINT OF WALL
0'-44'
STRUCTURAL BRICK (BELOW)
0'-1 �2'
0'-51 '
2
#5 VERTICAL REBAR
11 7 8 O.C.
WALL FOOTING (BELOW)
7 STRUCTURAL BRICK WALL
H S 14 1/2" = 1 °-o"
NOTES:
1. WILLIAM G. REIDY IS SIGNING AND SEALING FOR
STRUCTURAL ENGINEEERING ONLY
2. DESIGN CRITERIA BASED ON 2020 FLORIDA BUILDING
CODE 7th EDITION & ASCE 7-16.
DESIGN WIND SPEED: 140 MPH
EXPOSURE"C"
WIND PRESSURE: 36.3 PSF
WILLIAM G. REIDY, P.E.
REG. NO. 35605
PROFESSIONAL ENGINEER
j]ip
I►
E
O
r V
o*9
U M v
O
A O M
Z a = 0 0 NV�
ON
a d t J
� a
Q E
M m
pU[ eft Z
w 4)
Q tla 4)
`p3 N0J
z *� 00
Nr
t'7
o M
N �
N
Kno what'sbelow.
F, P0
all before you dig.
REVISIONS:
1. 3/12/21
CITY REVIEW COMMENTS
2. 4/19/21
CITY REVIEW COMMENTS
3. 8/z/21
HARDSCAPE
PLANS ADDED
4. 11/26/21
STRUCTURAL ENGINEERING
MODIFICATIONS
DRAWN BY: JAZ
DATE: 11/6/20
20009
HARDSCAPE
DETAILS
11siq.
1JIIC
ADJUST SOIL
COVER FOR
GRADE CHANGES
(2) 2" x 10"
PRESSURE TREATED
PINE BEAMS - WITH
SEMI -TRANSPARENT
WOOD STAIN
BEVEL CUT END OF POSTS AT 45 DEG.
A SIMPSON STRONG TIE APDT2-6 `
EACH SIDE OF POST -
WITH THROUGH BOLTS
COLOR: "BLACK"
8"x8"x10'
PRESSURE TREATED
PINE POST - WITH
SEMI -TRANSPARENT
WOOD STAIN
2" THICK PRECAST CONCRETE WALL CAP
COLOR: "WHITE" —�
SIMPSON STRONG TIE
A 6" APG (4 PER POST) _
POST BASE SIDE PLATES
COLOR: "BLACK"
2 1" THICK PRECAST CONCRETE CAP
COLOR: "WHITE" PROVIDE SLOPE
AWAY FROM POST
FAUX STACKED STONE VENEER -
CULTURED STONE PRO -FIT
LEDGESTONE COLOR: 'MOJAVE'
FINISH GRADE
• •
HS15
SECTION THROUGH MIDPOINT OF SIGN
8 GUAGE 4" x 4" x 4" GALVANIZED STEEL
"U" CHANNEL - WELD 45 DEG. CORNERS A 3" x 3" x 16" STEEL TUBE WELDED
LIMITED GRINDING OF WELDS TO SIGN FRAME
TO PRODUCE RUSTIC APPEARANCE PROVIDE SPACERS
PAINTED FINISH COLOR: "BLACK' AT BOLT LOCATIONS
PAINTED FINISH "BLACK"
DOUBLE SIDED SIGN
A
8" x 6" BOLTS THROUGH
AT GATED ENTRY
TO ADD TEXT
BEAMS AND STEEL
"VILLAS AT" ABOVE
SUPPORT - PAINT
"BLACK"
ABBOTT SQUARE
HARDWARE
TEXT
t UCH UP AFTER
TIGOHTENING BOLTS
V-5"
MATERIALS AND FINISHES
14'-3$"-MAY VARY DUE TO VENEER THICKNESS
DIMENSIONED ELEVATION
ENTRANCE SIGN
1/2" = 1--0"
I II VIJI I l.Al i/1VL
NOTES:
1. FILL ALL BLOCK BELOW GRADE
WITH CONCRETE.
2. PROVIDE #1 GAUGE HORIZONTAL
REINFORCING GRID AT 24" O.C.
VERTICALLY
COLUMN REINFORCED WITH
(4) #5 REBAR BENTS - FILL
ALL CELLS WITH CONCRETE
24" SQUARE CMU COLUMN
PROVIDE #1 GUAGE HORIZONTAL
RENINFORCING AT 24" O.C.
VERTICALLY (EVERY THIRD COURSE)
4" x 4" x 10' BLACK LOCUST
OR DOUBLE KILN DRIED CEDAR
STACKED INTO "U" CHANNEL -
WELD CORNERS OF "U" CHANNEL
AFTER STACKING TIMBERS -
SELECT LUMBER TO NOT BE WARPED
APPLY CLEAR STAIN PRIOR TO LETTER/
LOGO INSTALLATION
6" BOLTS FOR COLUMN CONNECTION A
• • 6" SOLID ALUMINUM LETTERS
WITH ANCHORS TO IMBED INTO
LUMBER - PRE -DRILL HOLES WITH
TEMPLATE FROM LETTER MANUFACTURER
PAINTED FINISH - COLOR: "BLACK"
(2) SINGLE SIDED SIGNS AND (2) DOUBLE SIDED SIGNS REQUIRED
DOUBLE SIDED SIGN AT GATED ENTRY TO ADD TEXT "VILLAS AT" ON SIGN FACE
PINEAPPLE GROVE'NAILHEAD' PATTERN
SURFACE MOUNT WITH EPDXY
12" SQUARE MEDALLION MODEL # 125M-097
CHROMECAST METALIZED FINISH- COLOR: "BRiTE COPPER"
www.pineapplegrove.com
3" x 3" STEEL TUBE WELDED
TO SIGN FRAME
IMBED TUBE MIN. 6" INTO CMU WALL
PAINTED FINISH "BLACK"
_• I! CAULK JOINTS TO PREVENT WATER INTRUSION
} ••. <: d.
_ 3-0"
SQUARE
A
PRECAST CONCRETE COLUMN CAP
EPDXY TO TOP OF CMU COLUMN - COLUMN
CAP TO INCLUDE MULTIPLE SEGMENTS TO
ALLOW POST THROUGH COLUMN
KNOCK -OUT BLOCKS ON TOP COURSE OF COLUMN- WITH
/— #5 REBAR BENTS- FILL ALL CELLS WITH CONCRETE
ALTERNATE CMU DIRECTION EVERY OTHER COURSE
SAFETY PROTECTION ON VERTICAL REBAR
UNTIL BLOCK WORK BEGINS
- (4) #5 REBAR DOWELS- 25" OVERLAP ON ALL SPLICES
TIE ALL REBAR CONNECTIONS WITH METAL TIES
FINISH GRADE
ADJUST COVER OVER FOOTING TO
MINIMIZE CUT BLOCK COURSES
HOLD REBAR 3" FROM EDGE OF POUR
COMPACTED SUBGRADE
3000 PSI POURED CONCRETE FOOTING
3'-0" X 3'-0" X V-0"
REINFORCE WITH (3) #5 REBARS EACH WAY TOP AND
BOTTOM TYPICAL
SIGN COLUMN SECTION
2" PRE -CAST
CONCRETE WALL CAP -
PROVIDE MIN. 1 % SLOPED TOP
MATCH/ COORDINATE PROFILE
AND COLOR WITH COLUMN CAP
#5 VERTICAL REBAR IN FILLED CELL,
SEE FOOTING DETAIL FOR LOCATION - —
25" OVERLAP ON ALL SPLICES
2" CAP WITH 1 1/2" _
OVERHANG
FAUX STACKED STONE VENEER -
CULTURED STONE PRO -FIT
LEDGESTONE COLOR:'MOJAVE'
d e <a
1'-0" d
a :•' I
TIE ALL REBAR CONNECTIONS
WITH METAL TIES
I - 3-01- ---- I
SIGN WALL SECTION
#5 REBAR CONTINUOUS, INFILL KNOCK -OUT
BLOCK WITH CONCRETE
8" X 8" X 16" CMU WALL
—PROVIDE #1 GUAGE HORIZONTAL
RENINFORCING AT 24" Q.C.
VERTICALLY (EVERY THIRD COURSE)
ADJUST COVER OVER FOOTING
FOR GRADE CHANGES
FINISH GRADE
(3) #5 HORIZONTAL REBAR CONTINUOUS,
HOLD REBAR 3" OFF BOTTOM AND
��— EDGE OF POUR
#5 TRANSVERSE REBAR AT 24" O.C.- HOLD
'— 3" OFF BOTTOM AND EDGE OF POUR
3000 PSI POURED CONCRETE
FOOTING- CONTINUOUS
COMPACT SUBGRADE AT ALL
FOOTING LOCATIONS
8" x 8" POST VERTICAL REINFORCEMENT BARS
(TYPICAL) (MAXIMUM 24 O.C. r— 8" x 8" POST
CMU BLOCKS FOR SIGN WALL
4.
i 4
3'-0'I • • • • •
•. a 'a, ','q�.y •.: •:. '. .•' < • d a end. •e'' `a ,
• • �. .e. a a •. • d!. • a e • •
d '� e' ' •ee <, d 'a ®," a }.. .e ' . e' $ q ' <.
d A •e . e •< d .. .< • e.. A < .
• < .. • •d ..<.' a a .. e: .° a 'q • e �'•. a' : d ..
�-- 16-6" --
A SIGN BASE FOOTING
#5 VERTICAL REBAR
COLUMN % AT ALL CORNERS
STONE VENEER
STONE
COLUMNSIGN WALL VENEER WALL TIES
#5 VERTICAL REBAR
FILL ALL CELLS
'WITH CONCRETE
SECTION THROUGH SIGN BASE
A
O
ale
<
Q
w
E
0
T
O �C
L
cM
I C
W m w
O lM
Q 3 0 p
10
N
G1 m
4
cn Q
Q E
z ch 0
a 1e�Z
Q a�
� d
�o
-0
T
N t7
O
O M
N .-.
ti
N
ti
C3
Q
Q
Z
�[
Zmm W-j
Z^'
cz
0
z
CL
Q
Kno wh tefore'sbelow.
fall you dig.
REVISIONS:
NOTES: 1. 3/12/21
1. WILLIAM G. REIDY IS SIGNING AND SEALING FOR CITY REVIEW COMMENTS
STRUCTURAL ENGINEEERING ONLY
2. 4/19/21
2. DESIGN CRITERIA BASED ON 2020 FLORIDA BUILDING CITY REVIEW COMMENTS
CODE 7th EDITION & ASCE 7-16.
DESIGN WIND SPEED: 140 MPH 3 S/2/21
EXPOSURE"C" HARDSCAPE
WIND PRESSURE: 36.3 PSF PLANS ADDED
4. 11/26/21
STRUCTURAL ENGINEEERING
MODIFICATIONS
DRAWN By: JAZ
WILL'
G. REIDY, P.E. DATE: 11/6/20
REG. NO. 35605
PROFESSIONAL ENGINEER 20009
HARDSCAPE
i DETAILS
HS 1.5
al �