HomeMy WebLinkAbout39735 Chancey Rd (2)MET
•
am
CL
Modular Building Walkway and Foun-datio s for:V Moil
0.4-28-2011
��
39735 Cha cey Road Zephyrhills, Florida
4'.4
0
0
EXISTING EXISTING EXISTING EXISTING
MODULAR MODULAR MODULAR MODULAR
GLA55ROOM CLA55ROOM CLASSROOM GLA55ROOM
EXISTING
MODULAR
CLASSROOM
-------------- ......... -----------------------
J.-------------- --------------- ----------- ------------ I --------------
I -- -------- ----- ------------ I ------------------------ - ----- ---------------
0
EXIST. 6'-0" GONG. SIDEWALK TO REMAIN
............................. ................................... ............................................. ............ ........ ... ..............................................
---------- -- I ------- -- --
N&SI NEW
NEW NEW
MODULAR MODULAR MODULAR MODULAR
CLASSROOM'CLASSROOM
CLASSROOM CLASSROOM
V_ L
L
NEW PAVED PARKING
I OT -5EE CIVIL DM=,.
FOR DETAILS
NEW 6-0" GONG. SIDEWALKS
ly
DETAILS (TYP)
SEE CIVIL DPS165. FOR
-----------
..... .......
---------- ----------
3: - ------ NEW NEW NEW
MODULAR MODULAR MODULAR
------ ----------- -- --
,tLK5 9
CLASSROOM GLA55ROOM ii CLASSROOM
Cie
-_ — --------
0
CITY OF %�_
pt4tvs ZEP�qRq
XAl►,g1�,r �r `' � C G
_S+AC 0���PPPDE, WORKSHALL
VAILING CODESCOMPLY WITHALL
CODE,
FLORIDA BUILDING sejA�JCTrr 'NATIONALELic Jd
OF2 'RICCODEAVD -d
L4 . • Bp RplHZ ORDI��NCES 0
e,�ard, r. 00 Uj ad :9
C
15
:g MEN%
ju y
Ln
-cs
en mo
GNSR4� NOTES
INDEX TO DRAWINGS
I. OCCUPANCY OF BUILDINGS -
GROUP 'B' BU51NE55 - INSTRUCTIONAL USE UP TO 4 HOUR5 OF U5E PER DAY.
ARCHITICTURAI,
2. AREA OF EACH MODULAR - 1,05651F
A -I OVERALL FLOOR PLAN
3. OCCUPANT CONTENT PER MODULAR = 46 a 205F/PER50N
A-2 ENLARGED TYPICAL FLOOR PLAN
4. PROVIDE GRAAL5PACE AGGE55 AND VENTILATION A5 FOLLOWS :
STRUCTURAL
CONFIDENTIAL -THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN
A. FOR EACH MODULAR, PROVIDE ONE PREMANUFACTUIRED AGGE55 5GUTTLE MIN. 16"x24"
5-1 5TRUGTURAL NOTES
IS CONFIDENTIAL AND MAY NOT BE DISCLOSED, COPIED, ALTERED OR
B. FOR EACH MODULAR, PROVIDE GRAHL 5PACE VENTILATION EQUAL TO I 5F FOR
5-2 PARTIAL FOUNDATION AND DECK FRAMING PLAN, DETAIL5
REPRODUCED TO ANY PERSONS EXCEPT AS PERMITTED IN WRITING BY:
EACH 150 5F, OR 7-1/25F TOTAL MINIMUM. VENTS ARE TO BE PREMANUFACTURED
PLUMBING
DYKES —JOHNSON ARCHITECTS,
INC.
VENT5 WITH CODE APPROVED RODENT RE515TANT SCREENING
06-06-2011
EQUALLY DI5TRIE3UTED ON ALL 4 5IDE5 OF MODULAR.
P-I OVERALL PLUMBING PLAN AND NOTES
2
THESE DRAWINGS ARE THE PROPERTY OF DYKES-JOHNSON ARCHITECTS, INC.
AND SHALL BE RETURNED UPON COMPLETION OF THE PROJECT. USE
rEECTfR10,44
3
OR COPY IS PERMITTED BY CONTRACT ONLY. ANY CHANGES TO THESE
DRAWINGS, REGARDLESS OF HOW MINOR, WITHOUT THE WRITTEN APPROVAL
4
OF DYKES-JOHNSON ARCHITECTS, INC. AND/OR CONSTRUCTION EXECUTED FROM
E-I OVERALL POPER PLAN AND NOTES
FROM THESE DRAWINGS WITHOUT THE EXPRESS APPROVAL OF DYKES-JOHNSON
FOR ANY
SHEET
ARCHITECTS INC OR ANY CHANGE IN THE SCOPE, DESIGN OR INTENT
�PERSON ACHITECTS SHALL
REASON BY ANY OTHER THAN DYKES-JOHNSON INC.,
TO
AUTOMAtICALLY RENDER DYKES-JOHNSON ARCHITECTS INC. HARMLESt ANY
Arl MS UITS, OR IITI�AT BY ANY I NTE A I N
Ii)OT8
. 9H U OU� P�21N U YH��IRRAWINGS TIH
_LDEF,ONSACCOM
ALL
CVR
'E SHOULD BE READ CARE LILLY FNATAIDDITIONAL CONDITION .
DOCUMENTS ARE INVALID UNLESS SIGNED & SEALED BY AN AUTHORIZED
AGENT OF DYKES-JOHNSON ARCHITECTS, INC.
IOF
0 OVERALL FL
OCR PLAN
`'
.°
MET
bm
a
V
°
04-2a-2011
m
c
c
m
V
C
0
V
0
p
i
u
oe
D
0U0
L2�mm
0
C
W
raw
V
�
m
�
C
�
t
�
AVM
V
L
M
1
06-06-2011
2
3
4
SHEET
A—1
OF 2
m
`
go
MET
sm
a
�
V
MDJ
-v
m
c
c
m
�
b
o
C�
L
7on
�
o
r
�
v
�
�r
U
0U0
N
f✓
G
e�
�
to
LU
o
"0
m
V
�
�
SUM
t
V
<
Q
M
1
06-06-2011
2
3
4
SHEET
A-2
OF 2
I I L _ II I I
GENERAL STRUCTURAL NOTES:
BUILDING CODES AND SPECIFICATIONS
1. Florida Building Code, 2007 Edition with 2009 Supplement
2. Building Code Requirements for Reinforced Concrete ACI 318-02
3. Building Code Requirements for Masonry Structures ACI 530-02/
ASCE 5-02/TMS 402-02
4. Specification for Structural Steel Buildings, AISC 9th Edition.
5. Structural Welding Code D1.1 (American Welding Society)
DESIGN LOADS
1. Live Loadsi
Timber Walk .......... 80 PSF
Modulars..................40 PSF
2. Wind Load;
Design Wind Speed, 120 MPH
FBC 2007, SECTION 1609
3. Dead Loads;
None
4, Other Loads;
Contractor shall submit cut sheets for all equipment including but not
limited to hvac package units, air handlers, generators and chillers.
Information shall include weight and any special support requirements.
DRAWINGS AND SPECIFICATIONS
1. Do not scale these drawings for dimensions not given.
2. Advise Architect of dimensional discrepancies between architectural
and structural drawings prior to commencing construction of affected elements.
3. Verify all existing field conditions and dimensions prior to commencing
construction.
4. These drawings are intended to be used in conjunction with those of other
trades including but not limited to architectural, mechanical, civil, etc.
Refer to drawings of other trades for details relating to the structural
components.
5. The Contractor shall carefully study and compare the Contract Documents
and shall at once report to the Architect any error, inconsistency or omission
he may discover. Bring any conflicts to the attention of the Architect for
resolution prior to commencing work on items affected.
6. The intent of the Contract Documents is to include all items necessary
for the proper execution and completion of the work. The Contract Documents
are complementary, and what is required by any one shall be as binding as if
required unless it is consistent therewith and is reasonably inferable therefrom
as being necessary to produce the intended results.
7. In the case of conflicting information, the Contractor shall assume the
more costly alternate, unless directed otherwise in writing.
8. I the case of ambiguous or missing information, the Contractor shall
assume a member size, quantity or quality consistent with similar areas in
the project, unless directed otherwise in writing.
9. The Contractor shall not be compensated for the addition of structural
components when the omission, mislabeling or other deficiency should
have been noted during the Bidding phase, and brought to the Architects
attention.
10. The Contractor shall perform no portion of the work at any time
without Contract Documents or, where required, approved shop drawings,
product data or samples for such portion of the work.
SHOP DRAWINGS
1. No structural drawings shall be reproduced for use as shop drawings.
2. All dimensional coordination shall be done by the Contractor and/or his
detailer
3. Detailer shall check all drawings for all attachments, clips, openings or
other work affecting structural members.
All items shall be shown on shop drawings.
4. Shop drawings shall be submitted to allow sufficient time for processing.
Six (6) sets of shop drawings shall be submitted for review.
5. Provide sufficient space on shop drawings near title box for stamps and
comments.
6. The shop drawings shall bear initials of detailer's checker and contractor prior
to submission.
7. Completed erection plans shall be submitted prior to or in conjunction with
detail drawings. But in no case shall detail drawings be submitted
prior to erection plans.
8. Contractor shall have shop drawings which have been satisfactorily reviewed
by the Architect and/or Engineer and confirmed b the Contractor
before proceeding with any work.
CONSTRUCTION SAFETY
1. These drawings do not include provisions to satisfy safety
requirements. Contractor is solely responsible for ensuring safety during
construction, and for conformance to all applicable OSHA Standards.
Job site visits by Engineer shall not constitute approval, awareness or
liability for any hazardous conditions.
2. Do not overload one segment or span of a beam continuous over several
supports. Beams should be loaded as gradually and evenly as possible until
the full load is in place.
3. Erection sequence shall be determined by the Contractor, and shall not
cause over stress or excessive deformation of structural members.
VALUE ENGINEERING
1. Any changes to the structure shall have been reviewed and approved in
writing by the Architect prior to commencing work on items affected.
FIELD MODIFICATIONS
1. Any changes to the structure shall have been reviewed and approved in
writing by the Architect prior to commencing work on items affected.
2. Any changes made without prior approval are subject to review by the
Architect. Contractor shall provide sketches, photographs and written
description of each deviation from the plans for the Architect's review.
FOUNDATIONS
1. Maximum net soil bearing pressure used for design ........ 2500 PSF
2. Notify Architect if footing excavation reveals unsuitable or unstable
soils, or materials or conditions not previously anticipated.
3. Consider the possible impact of groundwater on construction techniques,
using seasonal variations, any other site indicators and your
own judgment.
P❑RTLAND CEMENT CONCRETE
1, Concrete Quality and Placement)
Foundations and walls, 3000 psi, 3' to 5' slump
Filled cells in block, 2500 psi, 8' to 11' slump, 3/8' pea gravel
Slabs on Grade, 3000 psi, 3' to 5' slump
a. Fly ash shall not exceed 20 per cent by weight of total
cement content, if used.
b. Slump limits shall be strictly adhered to. Use superplasticizer
to increase workability, at contractors option.
c. Maximum mixing time (from hatching to placement)
Air temp less than 85°F, 90 minutes
Air temp 85°F to 90°F, 75 minutes
Air temp over 90°F, 60 minutes
d. Mix design shall be submitted for approval.
e. Concrete cylinder testing & reports are to be furnished by subcontractor.
2. Minimum Coveri
a. Footings, 3 in. to bottom and unformed sides, 2 in, to formed sides
b. Other, 2 in. to main reinforcing, 1 1/2 in, to ties and stirrups
3. Coordinate drawings of all trades for required embeds, openings and
accessories not shown herein.
4. All reinforcement shall be securely held in place by standard accessories
during concrete placement,
5. Bars shall be grade 60 conforming to ASTM A615,
6. Welded Wire Fabric shall conform to ASTM A185,
7. Detail and fabricate reinforcement in accordance with 'Manual of Standard
Practice for Detailing Reinforced Concrete Structures', ACI 315.
8. Provide minimum lap splice of 30 bar diameters, but not less than 24
inches, for all reinforcing bars, unless noted otherwise. Stagger splices in
adjacent bars at least 24 inches, except in beams and columns.
9. In wall footings, grade beams and bond beams, provide bent bars at
corners and intersections of the same number and size as the straight bars.
10. Exposed edges of beams and columns shall be chamfered 3/4 in. u.n.o.
11. See architectural drawings for locations of anchor slots in columns,
beams and concrete slabs.
CONCRETE SLAB ON GRADE
1. Intended usage is for pedestrian traffic only.
2. Compressive Strength at 28 clays ..... 3000 psi
3. Minimum thickness ..... 4 in.
4. Maximum slump at point of delivery ..... 4 in.
5. Maximum aggregate size ..... 1 in.
6. Entrained air content ..... 4.5%
7, Fill saw cuts with elastomeric sealant after cleaning with compressed air.
8. Welded Wire Fabric shall be WWF 6x6-W1.4xW1.4 in flat sheets, unless
otherwise noted, conforming to ASTM A185,
9. Place Welded Wire Fabric centered in depth of slab -on -grade unless noted
otherwise. Lap all mesh joints two full meshes.
10. Interrupt typical slab reinforcement at all construction and expansion
joints. See specific details for any dowels required for shear transfer.
11. Cut every other wire along the line of saw cut control joints prior to
placing concrete. Make saw cuts within 12 hours of concrete placement, or
as soon as cuts can be made without raveling.
12. Provide 1/2 in. preformed expansion joint material where slab abuts
vertical surfaces such as walls and columns.
13. See architectural drawings for exact locations of depressed areas in
slabs which are not shown or dimensioned on structural drawings.
14. Provide 6 mil vapor barrier under all slab -on -grade in enclosed space.
15. Apply curing compound to slab within two hours of completion of finishing
operations, Use liquid membrane forming compound complying with ASTM C309
Type 1 Class A. Follow manufacturers instructions.
16. Confirm that curing compound will not interfere with bonding of any
applied floor surface. If so, use wet burlap and trickle hoses.
17. It is recommended that the slabs be cast in long strips, and saw cut
transversely, in order to minimize shrinkage cracking.
CARPENTRY
1. ALL LUMBER SHALL BE SOUTHERN PINE No. 2. GRADE OR BETTER, WITH 19% MAXIMUM
MOISTURE CONTENT,
2. ALL LUMBER IN CONTACT WITH MASONRY OR CONCRETE, OR EXPOSED TO WEATHER,
SHALL BE PRESSURE TREATED,
3, PRESSURE TREATED LUMBERS SHALL COMPLY WITH AWPA C2 FOR LUMBER AND
TIMBERS AND AWPA C9 FOR PLYWOOD, USE PRESERVATIVE WITH 0,25 PCF RETENTION
FOR ABOVE GROUND AND 0.40 PCF FOR FRESH WATER OR S❑IL CONTACT USE.
4. MINIMUM FINISH REQUIREMENTS FOR METAL CONNECTORS AND FASTENERS!
A. INTERIOR EXPOSURE - GALVANIZED (1390).
B. .EXTERIOR EXPOSURE - PRESSURE TREATED GALVANIZED (G185), HOT DIP
GALVANIZED (HDG). OR STAINLESS STEEL (SST300).
a
c 3 -2 3 3 2 3
I
D
2 1 a DI a 1 2
I I I I
I I I I
c 3 2 -� 3 3
Ja
ZONES
a = 3O FT
NET WIND LOADS
FLOOR JOIST
COMPONENTs
ROOF ZONE
1
2
3
AND CLADDING
PRESSURE (Per)
96
E3
153
VERT. COMP.
9b
9b
U
14ORIL COMP.
-
-
I -
SUCTION (per)
-15b
-213
-213
VERT. COMP.
-5.8
-213
-213
14ORIZ COMP.
-
-
-
NET U IND LOADS
FLOOR BEAMS
COMPONENTS
ROOF ZONE
AND CLADDING
1
2
3
PRESSURE (Per)
9b
98
96
YM. COMP.
Sb
9b
Sb
WORM COMP.
-
-
-
SUCTION (per)
-ss
-roz
-rma
YM. COMP.
-158
-158
-158
NORIZ COMP.
-
-
-
GROSS WIND LOADS
FLOOR DECK
s
ROOF ZONE
AND CLADDNG
1
2
3
PRESSURE )per)
9b
153
53
VERT. COMP.
U
153
153
NORM COMP.
-
-
-
SUCTION 1peF)
-343r343COMP.
T.
-23D
-343COMP.
-
TERMITE PROTECTION NOTES:
I. A PERMANENT SIGN WHICH IDENTIFIES THE TERMITE
TREATMENT PROVIDER AND NEED FOR RE -INSPECTION
AND TREATMENT CONTRACT RENEWAL SHALL BE PROVIDED.
THE SIGN SHALL BE POSTED NEAR THE WATER HEATER OR
ELECTRIC PANEL.
2. CONDENSATE AND ROOF DOWN5POUT5 SHALL DISCHARGE
AT LEAST 1'-0" AWAY FROM BUILDING SIDE WALLS.
3. IRRI6ATION/5PRINKLER SYSTEMS INGLUDING ALL RISERS
AND SPRAY HEADS SHALL NOT BE INSTALLED WITHIN 1'-0--
OF THE BUILDING SIDE WALLS.
4. INITIAL TERMITE TREATMENT SHALL BE DONE AFTER ALL
EXCAVATION AND BACKFILL IS COMPLETE. SOIL DISTURBED
AFTER THE INITIAL TREATMENT SHALL BE RETREATED,
INCLUDING SPACES BOXED OR FORMED.
5. BOXED AREAS IN CONCRETE FLOORS FOR SUBSEQUENT
INSTALLATION OF TRAPS, ETC., SHALL BE MADE WITH
R PERMANENT METAL OPLASTIC FORMS. PERMANENT
FORMS MUST BE OF A SIZE AND DEPTH THAT WILL ELIMINATE
THE DISTURBANCE OF 501 L AFTER THE INITIAL TREATMENT.
b. MIN. 6 MIL VAPOR RETARDER MUST BE INSTALLED TO
PROTECT AGAINST DILUTION. IF RAINFALL OCCURS BEFORE
VAPOR RETARDER PLACEMENT, RETREATMENT IS REQUIRED.
7. CONCRETE OVERPOUR AND MORTAR ALONG THE FOUNDATION
PERIMETER MUST BE REMOVED BEFORE EXTERIOR SOIL
TREATMENT 15 PLACED.
8. SOIL TREATMENT MUST BE APPLIED UNDER ALL EXTERIOR
CONCRETE OR GRADE WITHIN 1'-0" OF THE STRUCTURE
51DEWALL5.
a. AN EXTERIOR VERTICAL CHEMICAL BARRIER MUST BE
INSTALLED AFTER CONSTRUCTION 15 COMPLETE INCLUDING
LAND56APIN6 AND IRRIGATION. ANY SOIL DISTURBED AFTER
THE VERTICAL BARRIER IS APPLIED SHALL BE RETREATED.
10. ALL BUILDINGS ARE REQUIRED TO HAVE PRE-GONSTRUGTION
TREATMENT.
II. A CERTIFICATE OF COMPLIANCE MUST BE 155UED TO THE
BUILDING DEPT. BY A LICENSED PEST CONTROL COMPANY
BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED. THE
CERTIFICATE OF COMPLIANCE SHALL STATE: THE BUILDING
HAS REGEIVED A COMPLETE TREATMENT FOR THE PREVENTION
OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN
ACCORDANCE WITH THE RULES AND LAWS OF THE FLORIDA
DEPARTMENT OF AGRICULTURE AND CONSUMER 5ERVIGE5.
12. AFTER ALL WORK IS COMPLETED, LOOSE WOOD AND FILL
MUST BE REMOVED FROM BELOW AND WITHIN 1'-0" OF THE
BUILDING. THIS INCLUDES ALL GRADE STAKES, TUB TRAP BOXES,
FORMS, SHORING OR OTHER GELLUL05E GONTAINING MATERIAL.
13. NO WOOD, VEGETATION, STUMPS, CARDBOARD, TRASH, ETC., SHALL
BE BURIED WITHIN I5-0" OF ANY BUILDING OR PROPOSED BUILDING.
10
MET
am
CL
L
v
MDJ
0
-0
m
C
IC
m
V
=
O
•F-
Q
t
�
�r
U
ce
Z)
4-
L
0
U
Vf
-epd
LOL
CL
ed
3
0
LU
0
z5
o
C
u
J
am
L-U
V
c�
Q
M
g
M
d =
C9
1
2
3
41
SHEET
S-i
OF 2
------------- ------
IF-
-- -------------------
- ---
t-* --- 11 ----- ------ *-*,*-",-,,*,"* ---- 11 -------- 11 --------- ------ 1 1-1-1-11-111-1
- - - - - - - - - - -
-1 1 ... 1-11-1-111-1-111-1* --- I *
- - - -
........................................
- - - -
* --------- *'*'*'* *** --- -- - ---- - **** ---
- - - - - - - -
* ------- --- -- -- * ------ **** ------------
- - - -
----- ---- I - - - - --- --- -
- - - - - - - -
- - - - - -
i
- - - - - - - tj
I
I I
I I I I I I i I I I I I I I I
I I I I i I I I
I I
I I I I I I I I
I I f I I I I I
U
- -
- - - - - - - -
F14
I
I
F14
I
I
F14
L__
_j
_j
L
F30
F30
F50
F30—
LL
IL -
CANTILEVER DECK BEAMS
TO MODULAR (TYP. ALL
DOORS AT DECK)
lb"Ab"Xa" c'MU
COL. BLOCK PIER
(TYPj
L
F30 "VF30
F30
F30
—I
F
1> F14
F14
LZF14
1
t -- — — — — — — — — —
—
___t
— — — — — — — —
- -
— — — —
IPL
---—
— — — — — — —
—
I I I
I
]111
11 1 1 1 1 1
1 1 1 1 1 t I I I I I I I I I
I I I 1 1 17-7
1 11
1
1
-777'"'
'-7-77-777
1 1 1
1 117-77-7-1
-- - - --
- - - - - - -
- - --
- - - -
- - --
-
- - -
- - - --
- -
- - - - - -
- - - - -
FIb
Fib F
Fib
FIb F r
17
FIb r
17
F16F r
P.T.2x10
(3
W
x
t
cV
P.T.2xIO
-A
P.T.2xIO
Fib
Fib
(OF,
I
FI(
F
F
u
LI:J
P.T.2xI0
u
Ll:-J
Ll:-J
u
Ll:-J
Li
L
P.T. 4x4 POST
P.T. 6"x5/
ND.
III
-
(01-011
-
f=4RT 14L
pouN=4roN Drmc< SRAM INCH PL4N
SCALE : 1/4" sm I'-011
GONDITION5 SHOWN ON THESE UNITS ARE TYPICAL FOR ALL
7 MODULAR BUILDIN65 TO BE PLACED ON THE SITE
FOR EACH MODULAR, PROVIDE ONE PREMANUFACTURED ACCESS 5GUTTLE MIN. 15"x24"
FOR EACH MODULAR, PROVIDE GRAY-L SPACE VENTILATION EQUAL TO I 5F FOR
EACH 150 5F, OR -7-1/25F TOTAL MINIMUM. VENT5 ARE TO BE PREMANUFACTURED
FOUNDATION VENTS WITH CODE APPROVED RODENT RE515TANT SCREENING
EQUALLY DISTRIBUTED ON ALL 4 SIDES OF MODULAR.
FOOTING SCHED�Lr
MRK.
DIM.
DEPTH
REINP.
REMARKS.
F14
I'-4'xCONT.
1011
(2) #5 a BOTT. CONT.
Fib
I'-b'xIl_bll
I
1211
(2) #5 EA. WAY a BOTT.
F30
31-OlIX31-011
1211
(3) #5 EA. WAY a BOTT.
NOTES :
I. THE FOUNDATION FOR THE MODULAR BUILDIN65 15 rl>E!5lc7NErl> FOR GRAVITY LOAD ONLY, WITH A
TOTAL DEAD LOAD OF 44,000LB FOR EACH BUILDING. BUILDING SUPPLIER MUST PROVIDE
GROUND ANCHORS DESIGNED TO RE515T ALL THE EFFECTS OF WIND AND THE STABILITY REGUIREMENT5.
PROVIDE 516NED AND SEALED DRAWINGS AND C.ORRE5PONDINC7 GALGULATION5 TO ARCHITECT AND CITY
OF ZEPHYRHILL5 BUILDING DEPT.
CONT. PRE -FIN. MTL FLASHING.
CONT. MA5TIG SEAL
BEAM BY
MODULAR
SUPPLIER
lbxlb PILA5TER
SEE DET. 2/52
� S2 SCALE : 3/4" cc I'-011
H
4"xIb11"xa11 MU SPLIT
FACE VE ER 0
PERIMETEEi (TYP)
O
P.T. 4x4 POST
P.T. 2xb RAIL CONT.
BEVEL EDGES
CLEAR ANOD. ALUM.
HANDRAIL -I 1/2"DI A.
P.T. 2x2 BALLU5TER55—
@ 4" O.G. MAX -BEVEL
EDGES
P.T. 2x6 RAIL GONT.
BEVEL EDGES
5/4"xb" P.T. 01D. DECK
LAID WITH 3/5" MAX. JOINT
(2) 2xI0 13M. (1) 2xI0 EA. SIDE
OF P05T ---\
P.T. 2xI0 FLOOR FRAMING
WITH 5IMP50N X5210 HAN&ER5
(2) 3/4" THRUI BOLT
5IMP5ON ABA44
- - � --A - ply -1 -1
121-511
441-011
OUT/OUT OF BUILDING
141-811
121-811
I Ul
21-511
- — - — — - - — ----------- -
---------- * ------------------------------------------------------------------------------------
-- - ---------------------------------------------- * -------------------------------------------------
*,-*,*,**'***'*** -- ---- -------
--- -- - ----
-- * * - ---------
-
IL
0 w
U-
0
Lu Lu
Lu 0
0 D
8
ti-
U<-
- - -
- - - - - - - -
- - -
- - - - - - -
- - - - - - - -
- - - - - - - - - - - -
- - -
- - -
- - -
-
- - - - - - -
F14
- -
- - - -
- - - - - -
F14
I
- - - - -
I
- -
- - -
-
F14
L__
_j
L
F30
F30
F30
F50
I
I
N
o
-
CANTILEVER DECK BEAMS
TO MODU AR ALL
Ib"xIb"xa" GMU
DOOR5 AT
DECK)
COL. BLOCK PIER
(TYP)
F30
I
F50
F
\__
F30
7_7
F14
F14
>
F14
I
-
- - - - — -
- - - -
- -
a
uz
- - - -
-A
I I
I I 1 1 1 7-7 f I 1 1 Lj
I 17-7-77 1 _lL.Lf
- - ---
- - -
- --
- - - - - -
-
-
-
L - - - - --
-
- - - - - - --
-
- - - - -
-
- - - - - -
- - -
--
-
Fib
F 1 (60
FI& F rl--]
Fib [ r17
Fib r-.
I
FI&
F-Fl
LU
L
_J
P.T.2xI0 E
P.T.2xIO
q w p
d)
..x
Fib
FIb.
Flit b: F
F
Fib F
I
Fib
E:
u
Ll:-J
_j rl
u
Ll:-J
u
P.T.2xIO LIIJ
El I
I
P.T. 4x4 F105TJI
P.T. 6"x514" ND.
DECKIN6 (TYP-)
PL b"xI'-2"xI/2" WW PERPENDICULAR
ELEV. -7b.5' TO BEAM H/(2)1/2"d AB. K/3'
FIN. FLOOR BEND-Y�LDED TO PLATE ---\
R
16"Ab" GROUTED
PILASTER ki/ (4) #5 5EGTION
4 (4) #4 VERT.
4 (3) #3 TIE5
.96
r __� DET104111. 2
82 SCALE: 3/411
*4 a
(Typ�
#5 (TYaPJ
#5 a CORNER
(lyp)
bw
10
MET
bm
CL
04-28-2011
R
C!
0
0
0
ur
77
(j
Cie
0
cd
L2 �m.
cd
� Q V
0 ob
'd
tow
45
5- ol
u I Ij
AV3
Ln y;
<
1
06-06-2011
2
3
41
SHEET
S-2
of 2
I
I 1 11 1 1 1 1 1 1 1 1 111 1 1 I I I III 11 1 ' 1 II 1 1 II 1 1 1 1 1 1 11 1 1 1 I'leml 11 of I
EXIST. G.O.
INV.72.0'
(VERIFY) —
TIE INTO EXIST. —
GO. INV. IN EX15T.
5.5. LINE
10 ��uM151NG PLAN
SCALE: 3/32 " = V -011
PLUMBING GENERAL NOTES
1. THE REQUIREMENTS OF THE GENERAL CONDITIONS AND SUPPLEMENTARY
GENERAL CONDITIONS SHALL APPLY TO ALL PLUMBING WORK.
INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2007 FLORIDA
BUILDING CODE WITH 2O09 AMENDMENTS, STATE AND LOCAL CODES AND
THE LATEST AMENDMENTS THERETO.
2. THE WORK COVERED BY THIS SECTION OF THESE SPECIFICATIONS
CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT, MATERIALS AND
SERVICE NECESSARY FOR AND REASONABLY INCIDENTAL TO THE
PROPER COMPLETION OF ALL PLUMBING WORK SHOWN ON THE DRAWINGS
AND SPECIFIED. MATERIALS OR PRODUCTS SPECIFIED BY TRADE
NAME, MANUFACTURER'S NAME OR CATALOG NUMBER SHALL BE
INTERPRETED AS ESTABLISHING A STANDARD OF QUALITY AND
DESIGN. SUBSTITUTIONS SHALL NOT BE ALLOWED UNLESS THEY ARE
SUBMITTED FOR REVIEW TO USE AND APPROVED BY THE ARCHITECT.
FIXTURES BY ELJER, KOHLER OR AMERICAN —STANDARD ARE APPROVED
EQUAL.
4. PLUMBING CONTRACTOR SHALL COORDINATE WITH ARCHITECTURAL,
CIVIL, STRUCTURAL, ELECTRICAL, FIRE PROTECTION, MECHANICAL AND
ALL OTHER TRADES FOR PIPE ROUTING AND EQUIPMENT PLACEMENT. AVOID
INTERFERENCE WITH ARCHITECTURAL FEATURES, BEAMS, FOOTINGS,
WINDOWS, ETC. NOTIFY ARCHITECT IMMEDIATELY OF ANY CONFLICTS.
SLEEVES SHALL BE INSTALLED WHERE PIPING PASSES THROUGH STRUCTURE.
5. CONTRACTOR SHALL KEEP A RECORD OF THE LOCATIONS OF ALL
CONCEALED WORK AND UPON COMPLETION OF THE JOB, SHALL SUPPLY AS —
BUILT DRAWINGS SHOWING IN COLORED PENCIL ON BLACK LINE PRINTS ANY
DEVIATION FROM THE ORIGINAL DRAWINGS. THESE DRAWINGS SHALL
INDICATE DIMENSIONS OF BURIED UTILITY LINES FROM BUILDING WALLS.
6. ALL WORK SHALL BE GUARANTEED, BOTH MATERIAL AND
INSTALLATION, FOR A PERIOD OF ONE YEAR FROM ACCEPTANCE BY OWNER.
SANITARY, WASTE AND VENT PIPING
1. SANITARY, WASTE AND VENT PIPING SHALL BE SCHEDULE 40 PVC
(ASTM-2665) WITH APPROVED PVC SOLVENT WELDED FITTINGS. COMPLY
WITH FLORIDA BUILDING CODE. PVC PIPING SHALL NOT BE RUN IN
RETURN AIR PLENUM OR FIRE RATED ASSEMBLIES.
2. ALL SOIL AND WASTE PIPING, 2-1/2" AND SMALLER, SHALL BE
SLOPED AT 1/4" PER FOOT. LARGER WASTE PIPING SHALL BE SLOPED AT
1 /8" PER FOOT.
3. TEST SANITARY, WASTE AND VENT PIPING BY A 10' WATER COLUMN
FOR TWENTY—FOUR (24) HOURS OR AS REQUIRED BY THE BUILDING
DEPARTMENT.
WATER PIPING
1. WATER PIPING SHALL BE (CPVC) CHLORINATED POLYVINYL
CHLORIDE PLASTIC PIPE AND TUBING (ASTM-2846) WITH APPROVED CPVC
SOLVENT WELDED FITTINGS. COMPLY WITH FLORIDA BUILDING CODE.
2. THE SITE SUBCONTRACTOR SHALL PROVIDE THE BACKFLOW PREVENTOR
AND THE WATER METER.
3. A SERVICE VALVE SHALL BE PROVIDED ON THE DOMESTIC WATER
WHERE WATER ENTERS THE BUILDING.
4. TEST ALL WATER PIPING AT 100 PSIG FOR TWENTY—FOUR (24) HOURS
OR AS REQUIRED BY CODE.
5. STERILIZE ALL WATER PIPING IN ACCORDANCE WITH HEALTH
DEPARTMENT REGULATIONS AND AMERICAN WATER WORKS SPECIFICATIONS.
6. WATER SERVICE PIPING SHALL BE SLEEVED AT LEAST 60" HORIZ. FROM THE
SEWER PIPE CENTERLINE ON BOTH SIDES OF WHERE THE WATER SERVICE
PIPE CROSSES A SEWER PIPE. SEE FLORIDA PLUMBING CODE 603.2.
`'
.o
MET
am
a
=
V
MDJ
m4-28-2011
m
c
c
m
O
V
�
V
Jw
C
O
77
'o
U
ori
�
u-
C
ed
�d
Q
3
0
C
V
O
Q
In
�
M
1
06-06-2011
Z
3
4
SHEET
P-1
OF
300, - #1/0
400' - #2/0
ALL WIRING TO BE GOPPER THHN
OVER4LL FLE
ELECTRICAL CONTRACTOR TAKE NOTE
ELEGTRIGAL CONTRACTOR SHALL ENSURE
NEUTRAL -GROUND BOND IN PANELS FOR
MODULAR UNITS 15 NOT PROVIDED.
CTRICAL PLAN
n
5GHEDULE
__fDANELf30AfzZE)
Aw
loo
FUNCTION
ACTUAL LOAD
DEMAND
DESIGN LOAD
TOTAL LIGHTING
TOTAL RECEPTACLE
200
200
TOTAL A/O
TOTAL MISCELLANEOUS
II7600
117600
CONNECTED LOAD
I17800
TOTAL DESIGN LOAD
117800
CONNECTED LOAD 117500 ! 240 = 4gIA I
35K AIG
25200 1 1 25200
DESIGNATIONS:
PANEL B
LOCATION:
MOUNTING:
5URFAGE
VOLT5, AMP5, PHA5E:
I20/240/I h
MAINS, 51ZE 4 TYPE:
600A MOB
PANEL TYPE:
SQUARE D NQOD OR EQUAL
NOTES
O UTILITY COMPANY POLE MOUNTED TRANSFORMER WITH 120/240 VOLT
SECONDARY. EC SHALL COORDINATE INSTALLATION WITH UTILITY
COMPANY.
O PULL BOX PROVIDED AND INSTALLED BY UTILITY COMPANY.
O SERVICE CONDUCTORS AND CONDUIT PROVIDED AND INSTALLED BY
UTILITY COMPANY.
(2) PARALLEL RUNS OF 3"C WITH (3) 350 MCM THHN EACH.
SO 600 AMP SELF-CONTAINED OR K-BASE METER SOCKET.
GROUNDING ELECTRODE CONDUCTOR TO CONSIST OF #2/0 COPPER,
GROUND IN ACCORDANCE WITH NEC. ALL CONCEALED CONNECTIONS
SHALL BE BY IRREVERSIBLE CONNECTION AND ALL CONCEALED
CONNECTIONS SHALL BE LISTED FOR THE INSTALLED USE.
70 (7) SEPARATE RUNS - EACH TO CONTAIN (3)#2 & (1)#6CU IN 2" PVC
CONDUIT. EACH RUN TO CONNECT TO POINT -OF -CONNECTION FOR
EACH MODULAR UNIT. CONNECTION BY ELEC. CONTRACTOR.
SECONDARY SURGE ARRESTOR (120/240V, I PHASE, 3 WIRE) WITH
"OWHX" LISTING.
9O EC SHALL PROVIDE (2) 4" X 4" X 8' CONCRETE PEDESTALS WITH
UNISTRUT MOUNTED HORIZONTALLY BETWEEN BOTH PEDESTALS TO
MOUNT SERVICE MAINS AND WIREWAY.
10 600 AMP 120/240 VOLT, SERVICE ENTRANCE RATED, NEMA 3R, 24 CIRCUIT
MAIN CIRCUIT BREAKER PANEL. PROVIDE PLAQUE INDICATING
"SERVICE MAIN".
C
ELECTRICAL RISER DIACsRAM
NOT TO SCALE
Nm .°
MET
I`
a
L
ci
Mt�J
°
-v
04-29-20„
m
c
c
m
L
Y
�r
u
Cie
0
N
0
f✓
Lo
C
e�
�
o
C
�
V
m
�
�
V
AVM
-cs
Q
M
1
06-06-2011
2
3
4
SHEET
E-1
OF 1