Loading...
HomeMy WebLinkAbout7050 Gall Blvd (102)NO. DESCRIPTION DATE FLORIDA HOSPITAL ZEPHYRHILLS 7050 GALL BOULEVARD ZEPHYRHILLS, FL 33541 CLIENT CODE/ FILE NUMBER: 23-100046-118-1 Symbols Schedule of Drawings Symbols / Abbreviations INTERIOR ELEVATIONS) —ELEVATION IDENTIFICATION (NO ARROW MEANS ELEVATION NOT SHOWN) SHEET WHERE ELEVATION IS DRAWN Jl/A201 BUILDING SECTION —SECTION IDENTIFICATION ® (ARROW INDICATES VIEW OF SECTION) SECTION --SECTION IDENTIFICATION (ARROW INDICATES VIEW OF SECTION) A504 ---SHEET WHERE ELEVATION IS DRAWN ROOM IDENTIFICATION r Rom NAME ROOM NUMBER eag� DOOR IDENTIFICATION PARTITION IDENTIFICATION �f PARTITION TYPE, REFER TO PARTITION TYPES 2A SHEET FOR DETAILS. NEW PARTITION EXISTING PARTITION TO REMAIN = V EXISTING TO BE REMOVED WINDOW IDENTIFICATION Medical Symbols / Abbreviations V MEDICAL VACUUM 02 OXYGEN NO2 NITROUS OXIDE A MEDICAL COMPRESSED AIR N NITROGEN NCP NCP MGV MEDICAL GAS ZONE VALVE EVAC ANESTHESIA EVACUATION VACUUM MGA MEDICAL GAS ALARM PANEL OE ELECTRICAL OUTLET 0 SLC SURGICAL LIGHT CONTROL 0 EIP ENVIRONMENTAL INFORMATION PANEL 0 CB CODE BLUE 0 PP POWER DOOR OPERATOR PUSH PLATE ACTUATOR 0 PP —NC POWER DOOR OPERATOR ACTUATOR, NON — CONTACT TYPE BUILDING CLASSIFICATION OCCUPANCY TYPE (FBC): GROUP 1 - INSTITUTIONAL UNRESTRAINED (SBC309) OCCUPANCY TYPE (LSC): NEW HEALTHCARE OCCUPANCY (LSC CHAPTER 13) CONSTRUCTION TYPE: TYPE II (SBC 604)(FBC TABLE 600) TYPE II SPRINKLERED (LSC TABLE 13-1.6.2-1997) TYPE 1(332) NFPA 220 STORIES: AREA OF RENOVATION: 2 STORIES MAIN EXISTING: 4 STORIES PTD PAPER TOWEL DISPENSER TTD TOILET TISSUE DISPENSER GB GRAB BAR SND SANITARY NAPTKIN DISPENSER BCS FOLD DOWN BABY CHANGING SHELF FIRE PROTECTION STRUCTURAL FIRE RATINGS (GOVERNED BY FBC REQUIREMENTS FOR TYPE II CONSTRUCTION TABLE 600 AND SBC 503.2.6-1997): TABLE 600 (FBC 2014 ) EXISTING COLUMNS-31HR - UL X772 EXISTING FLOORS-2HR - UL D916 EXISTING BEAMS SUPPORTING FLOOR-3HR- UL N708 EXISTING ROOF -1 1/2 " HR. - UL P921 NEW COLUMNS-3HR - UL X772 NEW FLOORS-21HR - UL D916 NEW BEAMS SUPPORTING FLOOR-3HR- UL N708 NEW ROOF -1 1/2 HR. - UL P921 NEW VERTICAL SHAFTS - 2 HR. - UL U438 NEW FLOOR/ WALL EXPANSION JOINTS - 2 HR. - UL FW-D-1001 NEW FLOORTLOOR EXPANSION JOINTS - 2 HR. - UL FF-D-0007 NEW ROOF EXPANSION JOINTS - 2 HR, - UL 2079 NEW PERIMETER WALL - 2 HR. - UL CW-S-1002 ALL NEW STRUCTURAL STEEL COMPONENTS SHALL COMPLY TO RATING REQUIREMENTS PER TABLE 600 CONTRACTOR TO SUBMIT U.L. ASSEMBLY FOR EACH CONDITION FIRE PROOF DESIGN THICKNESS SHALL BE FOR UNRESTRAINED STRUCTURE FIRE SUPPRESSION SYSTEM: THE EXISTING FACILITY IF FULLY SPRINKLERED. THE RENOVATED AREAS WILL BE FULLY SPRINKLED General Drawings G101 TITLE SHEET, SCHEDULE OF DRAWINGS Architectural Drawings LS-001 OVERALL LIFE SAFETY PLAN— ENTIRE SECOND FLOOR A—ICRA INFECTIOUS CONTROL RISK ASSESSMENT PLAN A-100 OVERALL FIRST FLOOR PLAN A-101 ENLARGED FLOOR PLAN A-102 REFLECTED CEILING— STRUC TURAL FRAME PLAN & DETAILS A-103 ARCHITECTURAL DETAILS — Structural Drawings S-201 GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS STRUCTURAL FRAMING PLANS AND SECTIONS Plumbing Drawings P-0,1 GENERAL INFO, LEGENDS & SHEET INDEX P-1,1 PLUMBING AND MECHANICAL FLOOR PLAN Electrical Drawings E-01 GENERAL INFO, LEGENDS & SHEET INDEX — ELECTRICAL E-0.2 ELECTRICAL ONE —LINE DIAGRAM E-1,0 OVERALL FIRST FLOOR PLAN — ELECTRICAL E-1,1 ENLARGED CT ROOM PLAN — FIRST FLOOR — ELECTRICAL L-2,1 PANEL SCHEDULES E-3,1 ELECTRICAL SPECIFICATIONS Applicable Codes: 2017 FLORIDA BUILDING CODE 6TH EDITION 2017 FLORIDA BUILDING CODE 6TH EDITION EXISTING BUILDING 2017 FLORIDA BUILDING CODE PLUMBING 2017 FLORIDA BUILDING CODE MECHANICAL 2008 NATIONAL ELECTRICAL CODE 2017 FLORIDA FLORIDA BUILDING CODE ACCESSIBILITY 2017 FLORIDA FLORIDA BUILDING CODE TEST PROTOCOLS 2017 FLORIDA BUILDING CODE FUEL GAS 2017 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 FLORIDA PROPERTY MAINTENANCE CODE 2017 FLORIDA FIRE PREVENTION CODE 2010 GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF HEALTHCARE FACILITIES NFPA 1, FIRE PREVENTION CODE, 2004 NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2002 NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, 2000 NFPA 70, NATIONAL ELECTRIC CODE, 2005 NFPA 72, NATIONAL FIRE ALARM CODE, 2002 NFPA 80, FIRE DOORS, WINDOWS, 1999 NFPA 90A, INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS, 2002 NFPA 90B, INSTALLATION OF WARM AIR HEATING AND AIR CONDITIONING SYSTEMS, 2002 NFPA 101, LIFE SAFETY CODE, 2003 NFPA 110, EMERGENCY AND STANDBY POWER SYSTEMS, 2002 NFPA 220, TYPES OF BUILDING CONSTRUCTION, 1999 NFPA 221, FIRE WALLS AND FIRE BARRIER WALL, 2000 NFPA 241, SAFEGUARDING CONSTRUCTION, ALTERATIONS AND DEMOLITION OPERATIONS, 2000 NFPA 780, LIGHTNING PROTECTION CODE, 2001 UNDERWRITER'S LABORATORIES FIRE RESISTANCE DIRECTORY, LATEST EDITION UNDERWRITER'S LABORATORIES BUILDING MATERIALS DIRECTORY LATEST EDITION CT Room Equipment Renovation Interior Renovation REVIEW DATE Z u' CITY OF ZEPHYRHI PLAN EXAMINER* AHCA Stage 3, Construction Drawings Architecture / Interior Desi KWJ Architects, Inc. 1923 E 7th Ave Tampa FL 33605 (813) 760-1588 n Mechanical and Electrical Engineering TLC Engineering for Architecture 255 S Orange Ave #1600, Orlando, FL 32801 (407) 841-9050 Structural Engineering Master Consulting Engineers, Inc. 5523 W Cypress St. Suite 200Tampa FL 33607 (813)287-3600 Construction Manager To Be Determined 11 WORK SHALL COMPLY WITH PREVAILING 'ODES FLORIDA BUILDING CODE, NATIONAL ELECTRIC CODE, AND THE CITY OF ZEPHYRHILLS ORDINANCES Vicinity Maps a , ypen� a Kuwk Rd EdN!'s H.— 3 Allen Rd or t Allen Rd 0 0lm AIIH+ R P0.s Improx�l.nem 8 CAMBRIDGE v O QZC1 CLARN ESTATES 33 C.ma�agpa C r7 3 >Z Qv�w,est.p �,,, M„p War —Edge RV Rewi Kr41x G19 Are wldirNN.dgaa LAKEVIEW F._wON. Rd ZEPHYRHILLS KNOLL I KimY)hl, Ar. 9 SUPERCENTER a E g S Mom. ZEPHYRHILLS l'e11.N"dRn r,en,rondad rreggKrr,rwRd rrelhrondRd 3 Rc.a COMMONS ,} C.n A- $ S of «d a NgW1 Ara g g Id 2 ; Eeens � 4 OAK RUN `"TOWNVIEW RUANN ESTATES g r'1'na.."A.° N Renodsl MEDICA CR Swn —Rd 4 L—Aye ,ARTS CEN ER '� Ave � �f1or10. Tengle Ave EI SW � � lloepkY Z'aryih°ds V�erYnpM Aw ZEPHYRHILLS 0 Railedge F040110 or P.L. Are w 2 COLONY g 0aughtery Nd I7au Iaery Rd 0 1pr Ntl VALLEYDALE g n .L-0 r ACRESadkMge-E.1 a I; o (ODIKIE HEIGHTS »JAw 9' •, � egg (loben QCKreNQ # ?t .. �! E fforld. Mad<.I t ..d Did.. �ClMrcf.Mfr:. n SSC.I Ave g o .Aphlh SLEEPY HOLLOW 01. Are Zephyrhills i, _ gwa oiand Rl.d MOBILE ESTATES D North Ea°`d z ZEPHYR PARK uphyrMll. War scivoi Maypla A. W11Ke0 o oo d SCOCOUNTRY TTSDALE y�\ Y AIRE VILLAGEEW vd••wf.vvfACA yY DI yleplyANR. ©2 PoIbe ZEPHYR BREEZE 5�tl O.parmNnt INIS Pd.+Off OAK PARK ;' ZEPHYRHILLS, FLORIDA Key Plan V I INUUIII— I\QUIUIUI,.y JUILU E O M O N N 0C . > CCj 7 (� �0C � ^ M � M ': ct p � o > ct ct COW vJ oo � `CID 0In N o O J CD W � < cc °° U J W Z Q J w W z J Uj w 7 a 0 w w M QElf r, N CQl7 Y 4'F—m SEAT, Fto no 1"V .o 000� LING1 m eo uwAR009180G oo t� �ti� °000goa000pp0�b� �v a-4ti GREGORY T WEHLING, AIA AR 0091800 SHEET TITLE: GENERAL NOTE COVER PROJECT DATA DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: G-1.0 r SCRIPTION DATE O O M N `p O �-I 00 u o0 01, H N H L� N � � O W � O H � H U LU m U W� a ~_5 W W Z J W U ¢ � Q W 0 N LU La ia¢ SEAL OF PLO D00000 O/Q 'C ly T b HLING e 1. b O b ,,° AR0091800 ee,00�i �j ,e�y� ®oeeooaoeo°°°� � � I✓ &r as GREGORY T WEHLING, AIA AR 0091800 SHEET TITLE: Life Safety Plan - First Floor Level DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: LS-1 00 11111 NO. DESCRIPTION DATE n EXISTING ROOF OR FLOOR STRUCTURE FIRE TREATED 2'x4' NAILER �-- RIGID INSULATION WITH FOIL FACE BOTH SIDES SEAL PENETRATIONS AND DECK PERIMETER WITH DUCT TAPE. ffee RETREATED 2'x4' NAILER AFING UCT TAPE SEAL CONT. OTH SIDES CEILING PARTITION CONSTRUCTION o I t_ 5/8' TYPE 'X' GYP. BD. 25 GA. GALV. STL. STUDS 016' O.C. 5/8' TYPE 'X' GYP. BD. 3' SOUND ATTENUATION BLANKETS 0 ALL TEMPORARY PART11IONS OCCUPIED SIDE PAINT DRYWALL ON OCCUPIED SIDE W/ GLOSS LATEX ENAMEL DUCT TAPE SEAL CONT. BOTH SIDES FLOOR TEMPORARY WALL PARTITION TYPE O FIRE RATING: NONE 0 64 Lop;:�. !- OSTOR DECON SHWR O a CONSTRUCTION ACCESS ROUTE FROM CT ROOM TO EXTERIOR OF BUILDING - COORDINATE WITH OWNER FOR SPECIFIC ROUTE DEPENDENT ON TIME OF DAY AND ACTIVITIES F OPERATION. INFECTIOUS CONTROL NOTES: 1. THE GENERAL CONTRACTOR SHALL FULLY IMPLEMENT THE OWNER'S INFECTION CONTROL RISK ASSESSMENT (I.C.R.A.) SEE "OWNER PROVIDED ICRA" SHEETS. 2. CONTRACTOR SHALL MEET WITH THE OWNER TO REVIEW THEOWNER'S INFECTION CONTROL RISK ASSESSMENT (I.C.R.A.). THE CONTRACTOR SHALL COOPERATE WITH THE OWNER TO DETERMINE SPECIFIC REQUIREMENTS FOR THIS PROJECT AND SHALL IMPLEMENT ALL NECESSARY INFECTION CONTROL MEASURES AS DETERMINED BY THE I.C.R.A.. THE CONTRACTOR SHALL OBTAIN A COPY OF THE OWNER'S I.C.R.A. PRIOR TO BIDDING, AND SHALL REVIEW IT FOR REQUIREMENTS AFFECTING HIS BID. 3. INFECTION CONTROL MEASURES VARY BASED ON SPECIFIC CONDITIONS & LOCATIONS. QUESTIONS REGARDING INTERPRETATION OF THE REQUIREMENTS OF THE ICRA SHOULD BE DIRECTED TO THE OWNERS REPRESENTATIVES. 4-. REFER TO THE WALL TYPE SHEET FOR TEMPORARY CONSTRUCTION BARRIERS. 5. PROVIDE NEGATIVE AIR MACHINES IN COMPLIANCE WITH THE FOLLOWING: A. GENERAL DESCRIPTION: NEGATIVE AIR MACHINE WITH PRIMARY FILTER, SECONDARY FILTER, AND HEPA FILTER; 115V POWER SUPPLY; 2 SPEED; 12" DIAMETER INTAKE COLLAR. B. AIR FLOW RANGE: 1000 CFM (LOW SPEED); 1800 CFM (HIGH SPEED). C. NUMBER OF MACHINES: PROVIDE 6 AIR CHANGES PER HOUR IN CONSTRUCTION AREA. BASED ON ABOVE AIR FLOWS, PROVIDE THE GREATER OF EITHER 1 MACHINE FOR EVERY 16,000 CU. FT. OF CONSTRUCTION AREA OR THE NUMBER OF MACHINES REQUIRED TO MAINTAIN MINIMUM OF -0.03" W.C. PRESSURE BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT AREAS. D. PROVIDE MODEL FA200EC MANUFACTURED BY ADVANCED CONTAINMENT SYSTEMS, INC., (WWW.ACSUS.COM) OR EQUAL. E. CONNECT NEGATIVE AIR MACHINES TO A DEDICATED CRITICAL POWER CIRCUIT. F. EXTEND NEGATIVE AIR MACHINE DUCT TO ADJACENT CORRIDOR VIA 18" DIA. FLEX DUCT. CONTRACTOR TO COORDINATE ROUTE WITH OWNER. 6. PROVIDE MANOMETERS TO MONITOR NEGATIVE AIR PRESSURE IN WORK AREAS. 7. REVIEW THE VENTILATION REQUIREMENTS FOR THE CONSTRUCTION AREA FOUND ON THE MECHANICAL DRAWINGS PRIOR TO BEGINNING ANY DEMOLITION OR CONSTRUCTION ACTIVITY. NOTE: THE INFECTION CONTROL RISK ASSESSMENT CONTAINED ON THIS DRAWING WAS PROVIDED TO THE ARCHITECT BY THE OWNER'S INFECTION CONTROL RISK DIRECTOR. THE INFORMATION IS PROVIDED TO CONVEY TO THE CONTRACTOR THE OWNER'S INFECTION CONTROL REQUIREMENTS FOR THE CONSTRUCTION OF THIS PROJECT. THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THE EFFECTIVENESS OF THE INFECTION CONTROL MEASURES. LOCATION OF ELECTRICAL ROOM FOR NEW CRITICAL POWER REQUIREMENTS OF CT EQUIPMENT SEAL OFF EXISTING SEAL OFF EXISTING DOORWAY- DUST TIGHT FOR DOORWAY- DUST TIGHT FOR SAW CURING WITHIN ROOM SAW CUTTING WITHIN ROOM - I r TEMP I _— it i i PARTITION- ----------------- ._ — — - _ _ — _ — — SANITARY LINE TRENCH ! J e �I DUST CONTROL M � T I I I I I I I r- I LF 1J � I I I I I I C ADJACENT --- -� EQUIPMENT ROOM (UNUSED) - - 4PAR11110N _ _ _ _I— . _ _I_ - _ _ _ _ CONTRACTOR TO INSTALL ,TEMP;NEGATIVE AIR PRESSURE MACHINES PER OWNERS REQUIREMENTS I I II -r F_ I —'J TEMP \� TEMP PARTITION— .•....,.,.•. ' DUST CONTROL SEAL OFF EXISTING PARTITION- ---------- ,� DUST CONTROL - -- ---� bT DOORWAY- DUST TIGHT FOR PROVIDE STICKY MAT AT SAW CUTTING WITHIN ROOM e ENTRY TO CONSTRUCTION AREA ACCESS DOOR UPON MAJORITY OF DEMOL111ON COMPLETED. ICRA PLAN SCALE 1/4 If= 1'-0" �_7 - a cFEX o .... - - I I � - CONSTRUCTION ACCESS ROUTE FROM CT ROOM TO EXTERIOR OF -- -� BUILDING- COORDINATE WITH OWNER FOR SPECIFIC ROUTE - - - DEPENDENT ON TIME OF DAY FEc AND ACTIVITIES F OPERATION. r� = FE l 'v` ° �- FCC V ttT•[7n L— -._.— of r nun ­71-1 nU b ❑ nun `oOo oo oo 0 0 0 0 0 0 r.L In 10 all I ■ I1' i 11 N � - 01 in 6. 13 0 11 o FEC FEC twc 101 M O N • `,p O • � I� • � � V I 00 "l PT 110-4 O O O 000 p O N OIL r__01 cd ^ M O M � N G>� � nj O ,> V O � o O VJ H 20 w W O U = cl M_ J �W w 2 z W Z J W 3 U 0 40 LL w = j� LE, SEAL eeeeeoePL O ��.• GORY T. •.�� EHL-11 AR00918U0 of aatiaya L GREGORY T WEHLIN AR 0091800 SHEET TITLE: ICRA Plan CT Room Renovations DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: ICRA-1 NO. DESCRIPTION DATE U LOCATION OF EXISTING ELECTRICAL AND UPS ROOMS INTENDED TO REUSE EXISTING SERVICES FOR BASIC RECEPTACLES AND LIGHTING - EQUIPMENT BEING FED FROM OTHER ELECT ROOM. SEE ELECT DWGS FOR SPECIFIC DETAILS. T 9CCI1MTY OFFICE nr ON OFFICE _r aFFIa 10 Low,I II II II II �� Er � 1wl I EKAM 1402 CORR F 1501 Io - 1w510 HOED \ CLAN . SUPRY EKAM ,s. EN.NVORI110 Bb Mod I I (FUT. ELECT) TOOLS/ "T _ WORAMCAI - SHOP OF STO OFF. LEC OFFICE Skit I over AR M PPucs BRFEMMY BREEM MY J T PASS. I' OFF. 1-2DB FE I ®0❑ �F // I I BAKERY OFFICE PASS --� I FILE - i i LOC ORS HBusM.PWc aFFIiE YS. > I I COR0. � F Hrt sows e PASS 0 01.1DS— �_. I / �sT Comm DRY gTOp AT I i Rica OFFICE ' 1 1 PREP lPALIf � �------------------- ROOM aPoi AN FI4 Oar LOCATION OF EXISTING ELECTRICAL FOR 480V CRITICAL POWER TO EQUIPMENT CIRCUITS- SEE ELE CTRCAL PLANS FOR DETAILS ROUTI NG OF NEW ELECTRICAL CONDUIT FOR CT EQUIPMENT CRITICAL POWER. ❑ CONTRACTOR TO PATCH AND REPAIR O U © ANY PENETRATIONS THRU EXISTING FIRE RATED WALLS. our 12 w"Ift Lll� OPEN M eREE2EwAr OPEN AR D—IMMAY VYXLNIEG YAR,IA9 COP•1 OFF. n RDA o STAW ' o BREIKD MN AREA FIEC,RICq iA E7 MY SM. CONSILT — —._ — NEC"rtlCAL 4 4 R. - MECXL --_ _ ...._ COVERED jj qq�QQ qq��QQ qq•�QQ Cq��QQ WALK REFRIGERATOR oEnnANs a� L 7 o _m V'V V'V tlti E8 sY DETrtY SERMCES 1-102 9lPERMSOR 11UY LINE L� non 1 1d91�A91 R14 DIET _ OFFICE nunORo -OFFICE '8' � 1`> dFFlCE REiUMI MO DR aEEP E1EC VENGREG - Q RD1wr3 FEC ('1 1eu.. wrvc ssa• - , � RR NEN3• RA. OFFICE _\\ FEC _ u- CT WAN-1 -- - MALE MILET ' ELEVATOR LOBBY' DOC70R'3 Tom' �0 SdL $ pFpEO NTATION RECTORY VEST. MIND_- _TORFT j REST FYAT— CORR.OR l/-J-6 OFCMM iTINOw'.1 - ._ _. ....._ ELEV PIT [\� CORR. wow _ A.V.9TpEOFFICE Pu m I L� n� 5 �m ECWPmmT hwe "D - OFFICE OFFICE AREA OF EXISTING CT ROOM TO HAVE I T ft FULL EQUIPMENT CHANGEOUT AND FD RAo III GENERAL FINISHES. RAD --- - - car RY EXISTING MECHANICAL, ELECTRICAL 4„_ DRESS" AND FIRE PROTECTION SYSTEMS TO BE '" OFFICE _ll wrTYc REVISED ON AN AS NEEDED BASIS -- Oil PASSAGE CRASH ... - COMI. 00.9 MAMMO .._ _ T. 02B READING FEC P.A OFFICE O. IWTENI RM P.A.T. VIEW -- OFFICE RECEPT. -1 3VEST WORK/SORT PASSAGE U -- PAT. STORAGE _--_ - -- CEO OFFICE M• .. X.G "� PASSAGE STO. .. NGI NC - .. .. _ nT. DRESS Sim — OHITE — R.R.---- m I _... 1 _... _ ... .. .... f ROT — ._..J`_ jpl - OORMDOR ILT. STASI am T X SIXETW W OFFICE PASSAGE M LED] OFFICE w�1aniRjj --- T �. -J NUG MED. L` Waiting HOT LAM , ULTRA501RIG T `REAM \ STATUE TLT. MJJ \\ BeMe \ Of aRu scum a RA saLWD -- — a smt — ~_ H.C. UFT fEFY'E x171 EEl1BT - - ILG FNMY SEC. OFFICE OFFICE CONE. RIG. - SWNa� Carrldor /OFFICE OFF1fE CONE RO0F1LOUNOE ,EER Main M.I. L bby f Cany.a RECDMN6 LOAD" DOCK ❑ n II SOILED am AIR LREN BREUMY OPEN AIR BREE2EMY o MEAL OFFICE NYAC N.O.C. -2 �' Bb MM Bb MN a a n r POOL- —1 �a � BODY NOU7'C HYDM1- WHIRL- TIMAPY - --- POOL 1R'T L- 1R'T IIiIIT `LJ --__ ® STAFF 1H'T TRY AgE4/ PHIS THWY I-�-I OPEN Dlw mT STAFF TRY u REY.P'T OFFICE FFDS c'n HAND - IIl11APY - - u....c. •. ----- CLEAN salm ® RECEPTNAREA LIBRARY a - cT SC 7. STOR n_ CORRIDOR - - --- T. PUW1C PUBLIC 2-1� _ wt w AMU � J EIEY F1EY. EIEr. aos S-1 � S1aB b b OFFICE 7R'T - _ f ---C.T—y-� B-, �2 - Koft l bbr WT CORRICIDIR 2_101 OF E.W.C. AUO— ..... iWE DOOR � 10 I 1 OFFICE 8101t OFFICE Slpl. T 1RT LN CLO Canbv MVFK .Y _ UA'Y OCC 111ENY AIRILY LOBBY CONE. CENTER II/� ADL W MIATION STOR, rr OBSM PRESCHOOL BEDRM MICXEN cwdwm STDR. TRY 1RY OBV" n� T .ffl. - r_ INS . JAN CpR. RM /Camwt SRID------- aFr s„oP L1_ P�1Ic MITI; NOYLY Ll L� wrTWD COMMON 1111 Ear CARDIO-REHAB MACH C/R Gym RECEPTION - - ------ M. wa We M WO RfR;C� STAFF/ WORK COME. iXC R, STAR NOT OVERALL FIRST FLOOR PLAN SCALE 1 "= 20'-0" d" O M O/� w r/ •4BRIJ^J v+J O O W U � O goo O O ^ O p Cn ISSIBIRS-01 rIRS-IIII r� yLJ .� kn kn 0 � M U1 � � CIO N � O � O CIO Ct o w '- o O Q — W Go,°D 2 od F— W n a Uj a � J x W 3 U ao M 1..� = it: W w a SHEET TITLE: CT Room -Floor Plan- Locator Plan DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: A-1 00 FLUSH MOUNTED IN SLAB TRENCH DUCT- TURN UP AT NEW EQUIPMENT PER —� MANUFACTURES RECOMMENDATIONS AND DETAILS ALL 90 DEGREE TURNS TO BE CHAMFERED TO 45S DIVIDE INTO 3- EQUAL COMPARTMENTS PROVIDE FLUSH MOUNTED WATER PROOF COVER OVER TOP SURFACE OF DUCT- ALIGN WITH FINAL FLOOR FINISH WHERE APPROVED BY OWNER AND ENGINEER SAW CUT EXISTING SURFACE MOUNTED WIRE DUCT MAY BE SLAB TO INSTALL SUBSTITUTED WITH FOR IN SLAB NEW TRENCH DUCT INSTALLATION- LEGRAND OR EQUAL EXTENSION FLOOR DUCT EXTENSION DETAIL 4 DEMOLITION NOTES GENERAL NOTES I. PROVIDE A FULL TIME PERSON IN CHARGE OF MAINTAINING A CLEAN WORK AREA AND WHOSE RESPONSIBILITIES SHALL INCLUDE THE FOLLOWING: 1. CONTRACTOR IS RESPONSIBLE FOR REPAIR OF ALL EXISTING HOLES AND UNSEALED PENETRATIONS IN EXISTING RATED PARTITIONS WHICH ARE INCLUDED IN THIS MAINTENANCE OF NEGATIVE PRESSURE MACHINES IN THE WORK AREAS INCLUDING PROJECT. REFER TO NEW WORK FLOOR PLANS FOR LOCATION. INSPECT PARTITIONS PROPER OPERATION AND LOCATION, PROPER VENTING TO NON -OCCUPIED AREAS. PRIOR TO BIDDING. MAINTAIN A CLEAN AND DUST -FREE AREA. 2. REFER TO MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS FOR WORK OF OTHER TRADES NOT INDICATED ON ARCHITECTURAL DEMOLITION MONITOR AND RECORD NEGATIVE PRESSURE READINGS FROM MANOMETERS. READINGS DRAWINGS. SHALL BE TAKEN EVERY TWO HOURS AND AT THE BEGINNING AND END OF EACH WORK DAY. 3. WHERE IT IS NECESSARY TO REMOVE EXISTING CEILINGS TO INSTALL NEW ABOVE CEILING PIPING OR DUCTWORK, REPLACE EXISTING CEILING PANELS WITH NEW PANELS TO MATCH t. PROVIDE MANOMETERS TO MONITOR NEGATIVE AIR PRESSURE IN WORK AREAS. LOCATE EXISTING. REFER TO 'M'/'P'/'FP'/'MG' AND 'E' DRAWINGS FOR LOCATIONS. AS DIERECTED BY ARCHITECT. 4. REFER TO PHASING PLANS FOR PHASING REQUIREMENTS. S. PRIOR TO COMMENCEMENT OF WORK, INSPECT WORK AREAS FOR WET DRYWALL AND THE PRESENCE OF MOLD OR MILDEW OR OTHER HAZARDOUS MATERIAL. 5. CONTRACTOR IS RESPONSIBLE FOR ALL EXISTING PARTITION, FLOOR, AND ROOF REPORT FINDINGS TO ARCHTECT AND OWNER FOR DIRECTIONS ON REMOVAL PROCEDURES. DEMOLITION NECESSARY FOR INSTALLATION OF NEW DUCTWORK, PIPING AND ROOF EQUIPMENT. REFER TO 'M'/'P'/'FP'/'MG' AND 'E' DRAWINGS FOR LOCATIONS. I•. PROVIDE ADHESIVE SURFACED WALK -OFF MATTS AT THE EACH ENTRANCE TO A WORK AREA. 6. WHERE EXISTING DUCTWORK OR PIPING IS REMOVED, PATCH OPENINGS REMAINING IN EXISTING PARTITIONS TO MATCH EXISTING CONSTRUCTION AND RATING. REFER TO i. WORK SHALL BE PERFORMED ON SCHEDULE CONVENIENT TO THE OWNER. 'M'/'P'/'FP'/'MG' AND 'E' DRAWINGS FOR LOCATIONS. WORK INVOLVING EXCESSIVE VIBRATION, NOISE OR OTHERWISE INTERFERING WITH EMERGENCY DEPARTMENT FUNCTIONS SHALL BE PERFORMED AT NIGHT OR AT OTHER TIMES NOT INTERFERING WITH THE OWNER'S CONTINUING OPERATIONS. 3. AREAS ADJACENT TO THE PROJECT AREA SHALL BE OCCUPIED BY THE OWNER DURING CONSTRUCTION. CONSTRUCT WORK SO THAT OWNER'S CONTINUING OPERATIONS CAN BE MAINTAINED. ALL WORK AFFECTING PATIENT OCCUPIED AREAS SHALL BE PERFORMED AT A TIME CONVENIENT TO THE OWNER. MAINTAIN EMERGENCY EGRESS AND PUBLIC ACCESS TO ALL PATIENT AREAS DURING EACH PORTION OF THE WORK. 1. PROVIDE DUST PARTITIONS BETWEEN CONSTRUCTION AREAS AND OCCUPIED AREAS IN LOCATIONS INDICATED AND IN OTHER LOCATIONS AS THE NEED MAY ARISE. • " ZDFGDF 8. MAINTAIN NEGATIVE PRESSURE IN CONSTRUCTION AREAS DURING CONSTRUCTION. ------------------ LOCATE, MAINTAIN AND PROVIDE TEMPORARY POWER FOR OWNER FURNISHED NEGATIVE PRESSURE MACHINES. SAW CUT EXISTING SLAB TO 9• REQUIRED WORK WHICH IS LOCATED OUTSIDE OF THE GENERAL CONSTRUCTION LIMITS AND IN OCCUPIED AREAS SHALL BE ACCOMPLISHED SO AS NOT TO INSTALL NEW TRENCH DUCT INTERFERE WITH THE OWNER'S OPERATIONS. EXTENSION 2ND FLOOR STRUCTURE ABOVE --- -- -._ _ I I I SUSPENDED CEILING TO BE PROTECTED- I I REPLACED AS REQUIRED Q � 1 i ' �� FROSTED GLASS UPPER - - -'- -'- ,--;7 CABINET FACES S MILLWORK DETAILS TILED BACKSPLASH AT ON SHEET A401 NEW CABINETRY SOLID SURFACE COUNTERTOPS 0 0 PREMIUM LAMINATE CABINETS ON PLYWOOD SUBSTRATE 6" DIMENSIONAL VINYL BASE NEW VINYL PLANY FLOORING WALL CONTRACTOR TO COORDINATE INSTALLATION OF M ISCELLANIOUS EQUIPMENT CONDUIT FROM CONTROL RM EQUIPMENT TO OVERHEAD EQUIPMENT. VARIES FIRE RETARDANT 2X CKING AT MONITOR ARM ANY_\ WALL MOUNTED EQLN ENT - ACCESSORIES I I I � I I I I N I L, I INTEGRAL BASE INSTALLED AFTER MILLWORK BASE CABINET- FULLY ADHERE TO TOE KICK CONTROL ROOM DESKTOP ICT ROOM-2 PROTECT MURAL WALLS AT CT ROOM LOCATIONS FULL OVERLAY FULL OVERLAY _ CABINET DOOR CABINET DOOR DESIGN- 2 DESIGN- 2 CONCEALED HINGES CONCEALED HINGES PER DOOR PER DOOR ADJUSTABLE SOUD SURFACE SHELVES SOLID SURFACE DOOR FACES- DOOR FACES - TEMP GLASS io TEMP GLASS WHERE SHOWN IN i I WHERE ELEVATIONS IN ELEVATIONS S.S. PULLS AND S.S. PULLS ANC HARDWARE HARDWARE 2'-0" SOUR SURFACE co COUNTERTOPSdc \, S.S. UNDER \ MOUNT SINK s a _O O %'PLYWDOD I I per CONSTRUCIIONAT iv N UNEXPOSED SURFACES tp tD CONTRACTOR TO PROVIDE SHOPDRAWINGS FOR OWNER AND ARCHITECT REVIEW PRIOR TO FABRICATION. CT ROOM-2 DRAWER SECT'N CAB SECT'N W/ SINK CAB SECT'N ADJUSTABLE SHELVES co I s O i CV ROOM FINISH SCHEDULE RM NO ROOM NAME FLOOR WALLS BASE CEILING MATL NOTES N S E W MATL HEIGHT HEIGHT 101 R-CONTROL ROOM NEW-SVS GB GB GB GB LVB 6 22S 1 8 -0 102 R-CT ROOM-2 NEW-SVS MURAL MURAL MURAL MURAL LVB 6 22S I 8 -0 103 1 R-EQUIPMENT STORAGE GB GB STUCCOI GB i LVB 6 22S 1 8 -0 ALL CEILING GRID PANELS WITHIN ADJACENT AREAS TO BE REPLACED WITH ARMSTRONG FINE FISSURE TO MATCH EXISTING NEW FOORING TO MATCH VINYL PLANK MATERIAL AND COLOR INSTALLED THROUGHOUT THE RADIOLOGY DEPARTMENT- VERIFY MANUFACTURE AND COLOR W/ OWNERS SPECIFICATIONS I ■ ■ ■ ■ ■ SAW CUT SLAB FOR SANITARY ■ LINE CONNECTIONS- PA ICH i SAW CUT AND REPAIR EXISTING FLOOR FINISHES AS REQUIRED TO INSTALL NEW SANITARY LINES TO NEW SINK. SEE PLUMBING PLANS FOR EXACT ROUTING AND EXISTING SANITARY LINE LOCATIONS UNDER SLAB. VERTICAL STORAGE UNIT IN THIS LOCATION TO BE RELOCATED TO CT ROOM-1. CCORDINATE LOCATION - NTH OWNER ALL EXISTING WALLS ARE LEAD LINED CONSTRUCTION. ANY MODIFICATION SHALL BE REPAIRED TO MATCH ORIGINAL DESIGN / SPECIFICATIONS. / Q LEGRAND SURFACE MOUNTED WIRE DUCT SUBSTITUTIONS IN EXISTING MILLWORK TO BE LEIU OF IN SLAB IS ACCEPTABLE IF APPROVED BY OWNER REMOVED AND DISCARDED- PATCH AND ELECTRICAL ENGINEER PRIOR TO CONSTRUCTION. PAINT REPAIR WALLS BEYOND AS A CONTRASTING COLOR TO FLOOR FINISH FOR VISUAL REQUIRED. IDENTIFICATION. - ---- e n� ALL NON -FIXED EQUIPMENT TO B REMOVED AND COORDINATE STORAGE OR DISCARD WITH OWNER PRIOR TO CONSTRUCTION NEW CONTROL ROOM FLOOR DUCT EXTENSION TO ACCOMODATE DESK TO BE 1'L10" NEW EQUIPMENT LOCATION- SAW CUT AND PROVIDED -OWNER TO POUR IN PLACE CONCRETE FORM. COORDINATE WITH I I _ EQUIPMENT SUPPLIER. i_--------... N EXISTING CT EQUIPMENT TO BE REMOVED BY EQUIPMENT VENDOR 1 tF PRIOR TO CONSTRUCTION WITHIN 1THIS ROOM. ` ®� I I I I I I ._AI L-- - -- -------- F_ I n I I VERTICAL STORAGE UNIT IN THI -- LOCATION TO BE RELOCATED T CT ROOM-1. CCORDINATF L_ _ F'. BL nL.MV TL.v— r nu FLOOR FOR NEW VINYL PLANK FLOORING DEMOLITION- PLAN SCALE 1l4"=1'-0' Lfl:l� -4 [r, AR�.A OF W W ............................................................................................................................................,� CONSTRUCTION urw uu w�rw w / AND REPAIR CONC SLAB- NEW ■ FLOOR FINISH AS REQUIRED i FLOOR DUCT EXTE ■ ■ ■ ■ ■ ■ ■ ■ EXISTING- TIE INT PARTITION COMPAf X. DUCT CHASE IN FL XTEND WITHIN SLAB 0 OUNTED ON FLOOR SI OCATION AS SHOWN. e{` EQUIP. ROOM M I I � ENLARGE CT ROOM PLAN- FIRST FLOOR LEVEL SCALE 1l4"=1'-0" NO. DESCRIPTION DATE 0 PER OWNER/ CONTR 12-01-17 O M Q� �-1 Op0 O M � 41 ;..4 OO'' r-1 �1 W p'�.., [� p p » o O M � N 14 .014 cid O W � ,� � O O 0 � rrE..11� Fi W J_ � 0� U d J� LLI _j w F-- � Z z 0 J x W U it ula ¢ W O x ri W C" v� SEAL 0o0 0 e4e,' !_HLING g Oeee AR0091800 we�� v a $ti�y�`0 ! GREGORY T WEHLING, AIA AR 0091800 SHEET TITLE: Enlarged CT Room -Floor Plan DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: A-1 ■ 1 EXISIING 2ND FLOOR CONCRETE FLOOR STRUCTURE - ° a e a ao EXISTING SUSPLNDED CEILING 0 i Go DUCT FROM FLOOR ABOVE 5'-4" SLAB ON GRADE i RETURN AIR DUCT FROM FLOOR ABOVE --�— a ---_ - ° < e ° d $ a 0 CV COORDINATE ALL DETAILS OF STRUCTURAL FRAME AS SHOWN ON STRUCTURAL SHEET S- 201. CONIRACIOR TO FIEI.D VERIFY ALL EXISTING CONDITIONS ABOVE CEILING WHEN DEMOL111ON AND CEILING REMOVAL IS POSSIBLE TO GET ACCURATE DIMENSIONS. SHOP DRAWINGS TO BE SUBMITTED FOR REVIEW AND APPROVED PRIOR TO FABRICATION. SECTION DETAIL (cD, STRUCTURAL FRAME SUPPORT. PROVIDE NEW SLAB INM TO MATCH iINOONESS— REINFORCE NTH WELDED WIRE FABRIC AND FIBER REINFORCEMENT. REPLACE— REPAIR VAPOR BARRIER _ CINDER NEATH SEALING ALL SEAMS UPON POTTING INFIL SLAB— DOWEL INTO 061NIG SLAB EDGE W/ /4 BARS AT 12' OC BOTH SIDES OF TRENCH PROVIDE APPROVED COVER PLATE FOR TRENCH DURING CONSTRUCTION AND AT ELECTRICAL DUCT BANK AS PLUMBING AND ELECTRICAL DRAWINGS AND REQUIREMENTS TAKE PRECEDENT OVER ANY DETAILS WITHIN THE TRENCH OVER THOSE SHOWN ON ARCHITECTURAL DRAWINGS. DEPICTION IS FOR CLARIFICATION OF SCOPE OF WORK WITHIN THE UTIUTY EXTENSION PRO ECT. SLAB CUT DETAIL Al NEW TILE — DIRECT R04 ACMT TO MATCH OWN PATTERN AND 1N.E SPEC. OWNER TO FAMISH TILE. • E➢OSTING TILE — SEE TN.E PATTERN TO MATCH CASTING CONCRETE SLAB EXI W COMPACT FNL CLEAN COMPACTED FILL UPON NNSTALLAnON OF UIM LINES 4• SANITARY LINE— GRAVITY FED— SLOPE AND DEPTH PER PLUMBING DRAWINGS TRENCH DEPTH WILL VARY BASED ON DEPTH REQUITEMENT OF GRAVITY FED SANITARY LINES. SEE PLUMBING PLANS FOR DEPTH OF EXISTING LINES AT COINNEC11ON POINT 91HIN CORRIDOR, SCALE 3/411= 1'-0" SCALE 1 /4"= 1'-0" _- ---P . . - O (NO CLII_ING WORK WITHIN ADJACENT EQUIPMENT ROOM) PROPOSED LOCATION OF STRUCTURAL FRAMING REQUIRED TO SUSPEND MONITOR ARM SUPPORTS FROM FLOOR STRUCTURE ABOVE- SPANNING AROUND EXISTING — SUPPLY AND RETURN AIR DUCTS AND MISCFI-I ANIOUS WATFR I INFS. AI_I- FIXTURES SHOWN ARE EXISTING f0 REMAIN UNLESS SPECIFICALLY MODIFIED BY WORK PERFORMED UNDER M,E,P, SCOPE. O STRUCTURAL SUPPORT PLAN (NO WORK WITHIN CORRIDORS) (NO WORK WITHIN CORRIDORS) SCALE 1 /4"= 1'-0" 0 REFLECTED CEILING PLAN- FIRST FLOOR LEVEL SCALE 1l4'=1'-0' NO. DESCRIPTION DATE m PER AHCA COMMENTS 12-01-17 ItT p O M N `p O 006 00 u �i c O o 000 V C ;z O Coo po 4) H O � M � COD N 0 .0 CIS O W 4 O H p � LU W U C wLLI Q 9 Z i2 _ CD J W 3 U Ix a a0 W _ �LL ti L. MCIA co F Fj �EE(f RY T. '•p7 WEHLING e s °1 AR0091800 ���y°0®0esecoeoa�a®e,� V a�lti GREGORY T WEHLING, AIA AR 0091800 SHEET TITLE: Reflected Ceiling & Structural Support Plan DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: A-1 02 NO. DESCRIPTION DATE PLUMBING FIXTURE SCHEDULE SYMBOL LEGEND ABBREVIATIONS GENERAL NOTES SYMBOL DESCRIPTION SYMBOL DESCRIPTION 1. REFERENCE THE SPECIFICATIONS FOR MATERIAL AND EQUIPMENT INSTALLATION S-1 CA - COMPRESSED AIR CA - COMPRESSED AIR STANDARDS. SM1 SHOCK ARRESTER AFF -ABOVE FINISH FLOOR 2. THE PLUMBING INSTALLATION SHALL COMPLY WITH ALL STATE AND LOCAL CODES. =AV. _ - _ -ACID VENT AW - ACID WASTE SINGLE COMPARTMENT SELF RIMMING SINK CONSTRUCTED OF TYPE 30218-8 STAINLESS STEEL, 22' PISTON OPERATED, TYPE'K' COPPER BARREL WITH BRASS THREADED ADAPTOR. ALL JOINTS SHALL AW - ACID WASTE AV - ACID VENT 3. UTILITIES AND SERVICES INDICATED ARE TAKEN FROM VARIOUS OLD AND NEW SURVEYS, AS- X 19" X 5-1/2' DEEP. INTERIOR AND TOP SURFACES SHALL BE POLISHED TO A HIGH LUSTER FINISH. BE MADE WITH 95-5 LEAD FREE SOLDER. THE PISTON SHALL BE EQUIPPED WITH TWO (2)'0' RINGS TO _ _ _ CB - CATCH BASIN BUILT RECORDS AND FIELD INVESTIGATIONS. UNFORSEEN CONDITIONS PROBABLY EXIST _ =AW- _ _ - -BELOW GROUND ACID WASTE CD - CONDENSATE DRAIN PROVIDE SINK WITH STAINLESS STEEL CRUMB CUP STRAINER. PROVIDE FIXTURE PUNCHED FOR PROVIDE A PERMANENT MECHANICAL BARRIER BETWEEN FLUID AND PRE -LOAD AIR CHARGE. - - - AND NEW WORK MAY NOT BE FIELD LOCATED EXACTLY AS SHOWN ON DRAWINGS. 3-HOLE FAUCET INSTALLATION ON 4-INCH CENTERS. ARRESTORS MAY BE INSTALLED IN VERTICAL AND HORIZONTAL POSITION. CD - ABOVE GROUND CONDENSATE DRAIN CFH - CUBIC FEET PER HOUR COOPERATION WITH OTHER TRADES IN ROUTING AND BURIAL DEPTHS, AS DETERMINED CO -CLEANOUT DURING CONSTRUCTION, WILL BE NECESSARY. 8-INCH WIDESPREAD COMBINATION CHROME PLATED BRASS FAUCET, WITH RIGID GOOSENECK (5.3/8' THE ARRESTOR SHALL BE FULLY GUARANTEED FOR ENTIRE SYSTEM LIFE. _-CD-_ _ _ - - BELOW GROUND CONDENSATE DRAIN CONT - CONTINUATION WIDE) SPOUT AND 2.0 GPM LAMINAR FLOW REGULATOR, VANDAL RESISTANT 4-INCH WRIST BLADE DA -DENTAL AIR CW - DOMESTIC COLD WATER 4. FIELD VERIFY EXISTING INSTALLATIONS. MODIFY EXISTING PLUMBING SYSTEMS, WHICH ARE HANDLES WITH COLOR CODED INDEXES AND RENEWABLE SEATS IN MONEL, OUTLET OF SPOUT TO BE NOTE: DI - DEIONIZED WATER TO REMAIN ACTIVE, TO FACILITATE RECONNECTION AND EXTENSION OF THE NEW WORK. DI - DEIONIZED WATER DN - DOWN MINIMUM OF 5- INCHES ABOVE RIM OF FIXTURE. DS - DOWNSPOUT DV -DENTAL VACUUM 5. NOTIFY OWNER AT LEAST 24 HOURS PRIOR TO INTERRUPTING EXISTING SERVICE. SHOCKARRESTORS SHALL BE PROVIDED AT ALL FIXTURES AND BATTERIES OF FIXTURES WHETHER DWG - DRAWING SCHEDULE DISCONNECTION AND TIE-INS TO MINIMIZE DISRUPTION OF SERVICES. SERVICES 318 INCH I.P.S. CHROME PLATED ANGLE SUPPLY, LOOSE KEY STOP, REDUCER, WROUGHT BRASS OR NOT THEY ARE SHOWN ON THE DRAWINGS. _ _ _ - DOMESTIC COLD WATER EXIST OR (E) - EXISTING ARE NOT TO BE LEFT DISRUPTED DURING NON -NORMAL CONTRACTOR WORKING HOURS. DEEP BELL FLANGE ESCUTCHEON AND 1 /2" CHROME PLATED COPPER EXTENSION TUBE WITH SWEAT - DOMESTIC HOT WATER ETR - EXISTING TO REMAIN HEIT CONNECTION. BASIS OF DESIGN °F -DEGREE FAHREN-DOMESTIC HOT WATER RETURN FCO - FLOOR FAHREN 6. PLANS ARE NOT COMPLETELY TO SCALE. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT F- FLOOR DRAIN INTENDED TO INDICATE EXACT ROUTING. CONTRACTOR SHALL PROVIDE ANY ADDITIONAL CHROME PLATED 17 GAUGE 1-1/2 X 1-1/2 P-TRAP WITH CLEANOUT. PRECISION PLUMBING PRODUCTS - SC SERIES FOF - FUEL OIL FILL OFFSETS AND FITTINGS REQUIRED FOR PROPER INSTALLATION AND TO MAINTAIN FOF - FUEL OIL FILL CLEARANCES. VERIFY STRUCTURAL, MECHANICAL AND ELECTRICAL INSTALLATIONS AND BASIS OF DESIGN FOG - FUEL OIL GAGE FOG - FUEL OIL GAGE OTHER POTENTIAL OBSTRUCTIONS AND ROUTE PIPING TO AVOID INTERFERENCES. FOR - FUEL OIL RETURN FOR - FUEL OIL RETURN FOS - FUEL OIL SUPPLY 7. PROVIDE ALL OFFSETS AND FITTINGS AND MAKE CONNECTION TO SITE UTILITIES. SINK - ELKAY LRAD-2219/LK-99 FOS -FUEL OIL SUPPLY FOV -FUEL OIL VENT FAUCET -CHICAGO.78&E29VP _ FS - FLOOR SINK 8. CONCEAL PIPING ABOVE CEILINGS, WITHIN WALLS OR CHASES EXCEPT IN MECHANICAL - =FOV= _ _ _ - FUEL OIL VENT ROOMS OR AS SPECIFICALLY NOTED. SUPPLIES - MCGUIRE - H170LK - _ = G -GAS TRAP - MCGUIRE - 8912 G -GAS GPH - GALLONS PER HOUR GPM - GALLONS PER MINUTE 9. PROVIDE ACCESS PANELS FOR ALL VALVES CONCEALED IN WALLS OR ABOVE NON- GR - KITCHEN WASTE (GREASE) GR - KITCHEN WASTE (GREASE) ACCESSIBLE CEILINGS. A - MEDICAL COMPRESSED AIR HB - HOSE BIBB HD - HUB DRAIN 10. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND W V - MEDICAL VACUUM H- DOMESTIC HOT WATER FLOORS WITH U/L LISTED ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL TO OR N - NITROGEN H -DOMESTIC HOT WATER RECIRCULATING IE -INVERT ELEVATION EXCEED THE RATING OF THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS IE N20 - NITROUS OXIDE IW - INDIRECT WASTE FOR FINAL FINISHES. O -OXYGEN KW - KILOWATT 11. FLASH AND COUNTER -FLASH ROOF PENETRATIONS. LBS -POUNDS S - ABOVE GROUND SANITARY MA OR A -MEDICAL AIR 12. WHEN BEAM SLEEVE PENETRATIONS ARE NECESSARY, COORDINATE PENETRATIONS WITH =S= _ _ _ _ -BELOW GROUND SANITARY MV OR V -MEDICAL VACUUM ALL TRADES, THE ARCHITECT AND THE STRUCTURAL ENGINEER. MH -MANHOLE - SANITARY VENT NI OR N -NITROGEN 13. PROVIDE FOUNDATION PAD PENETRATION SLEEVES. ALLOW 1" MINIMUM CLEARANCE N20 -NITROUS OXIDE BETWEEN SLEEVE INSIDE SURFACE AND PIPE EXTERIOR. ST - ABOVE GROUND STORM NC - NORMALLY CLOSED =ST= - - - _ - BELOW GROUND STORM NIC - NOT IN CONTRACT 14. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS AND MOUNTING HEIGHTS. NO - NORMALLY OPEN STO - OVERFLOW STORM DRAIN NP - NON -POTABLE WATER 15. PROVIDE AUTOMATIC TRAP PRIMERS FOR FLOOR DRAIN TRAP SEALS. =STO= - - _ - BELOW GROUND OVERFLOW STORM NTS - NOT TO SCALE OD - OUTSIDE DIAMETER 16. PROVIDE AN AIR GAP, WHEN REQUIRED BY CODE, SERVING INDIVIDUAL FIXTURES, DEVICES, SW - SOFT COLD WATER OX OR O -OXYGEN APPLIANCES AND APPARATUS. VAC -VACUUM AIR PRV - PRESSURE REDUCING VALVE (AIR) PSI - POUNDS PER SQUARE INCH 17. ALL EXPOSED PIPE AND FITTINGS IN FINISHED AREAS SHALL BE CHROME PLATED. WO - WASTE OIL PVC - POLYVINYL CHLORIDE PIPE RD - ROOF DRAIN 18. MOUNT HOSE BIBBS 24" ABOVE FINISHED GRADE. WOV - WASTE OIL VENT RPBP - REDUCED PRESSURE BACKFLOW PREVENTOR M - WATER METER SAN - SANITARY 19. PROVIDE CLEANOUTS IN ACCORDANCE WITH ALL STATE AND LOCAL CODES. INSTALL SD - STORM DRAIN CLEANOUT WITH COVER FLUSH TO FINISH SURFACE. �"C-- - - - HOSE BIBB OR WALL HYDRANT SF - SQUARE FEET SH - SHEET 20. COORDINATE EXACT FLOOR DRAIN LOCATIONS WITH ARCHITECTURAL DRAWINGS. SET COI - CLEAN OUT PLUG ST - STORM FLOOR DRAINS BELOW FINISHED FLOOR TO ALLOW FOR FLOOR SLOPING TO THE DRAIN. STO - OVERFLOW STORM DRAIN C4 I F- -WALL CLEANOUT SW - SOFT COLD WATER 21. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (PANELS, TRANSFORMERS, ETC.) COI - WALL CLEANOUT V - VENT PRIOR TO ANY INSTALLATION. DO NOT ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS CO VAC -VACUUM UNDER ANY CIRCUMSTANCES. ANY PIPING RUN OVER PANELS SHALL BE RE-ROUTED AT NO - FLOOR CLEAN OUT VC - VACUUM CLEANING ADDITIONAL COST. VTR - VENT THRU ROOF FD W FD CC - FLOOR DRAIN WCO - WALL CLEANOUT 22. ALL WALL MOUNTED LAVATORIES SHALL BE ATTACHED TO FLOOR MOUNTED CARRIER WTR - WATER DESIGNED TO WITHSTAND A VERTICAL LOAD OF 250 POUNDS ON THE FRONT OF THE (p1 -ROOF DRAIN FIXTURE. FS M - FLOOR SINK 23. PROVIDE SANITARY WASTE, VENT, DOMESTIC WATER, ETC. ROUGH -IN AND MAKE FINAL Elm- SHUT-OFF VALVE IN VALVE BOX CONNECTIONS (TO INCLUDE PROVIDING ALL NECESSARY RELATED STOPS, VALVES, TRAPS, ETC. AND MAKE READY FOR USE) TO ALL EQUIPMENT, WHETHER FURNISHED BY THIS - SHUTOFF VALVE CONTRACTOR OR FURNISHED BY OTHERS. -�61 - BALL VALVE 24. PROVIDE CERTIFIED COPY OF MEDICAL GAS TEST REPORT AT FINAL A.H.C.A. INSPECTION. - CALIBRATED BALANCING VALVE -N-- - CHECK VALVE (SWING) -D�- -PRESSURE REDUCING VALVE - SOLENOID OPERATED VALVE - REDUCED PRESSURE BACKFLOW PREVENTER }-- - RELIEF OR SAFETY VALVE `*-bG' - GAS COCK - A - GAS PRESSURE REGULATOR ♦ G - SHUTOFF VALVE ON RISER SHEET NAME ISSUED rC -GAS COCK ON RISER P0.1 GENERAL INFO, LEGENDS & SHEET INDEX Yes - CONNECTION, TOP P1.1 PLUMBING AND MECHANICAL FLOOR PLAN Yes y -CONNECTION, BOTTOM G - ELBOW, TURNED DOWN - ELBOW, TURNED UP - TEE, TURNED UP - TEE, TURNED DOWN C - CAP - DIRECTION OF FLOW , = AP-XX - ALARM PANEL m. MAP-XX - MASTER ALARM PANEL I(.XX) M O-XX - MEDICAL GAS OUTLET U ICU MGV-XX - MEDICAL GAS VALVE BOX -s - CONNECT TO EXISTING Q-- o - DEMOLISH TO POINT INDICATED 1Q - REVISION REFERENCE 1 - DETAIL REFERENCE: TOP -DETAIL#, P2.01 BOTTOM -DRAWING# SHOWN ON NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT 2 IL � coo .50 �N� E L' m �CD04 o Ce-0 �� 4 Qti-ti� 0 COS z U rn 0 '-T c� � z 00 d� � .O t L LO W Z V W w ~ W Z u o` �a Z °C W rA r_� r•� Q 0 4-j �1 • J •� O O rTl r...4 0 �T v H -Uo g$ Lu U ° Q Fz W z 0 0 J x W 3 U oc W > a ¢p x ICE� W of Nab SEAT. Aaron Lee Johnson, P.E. Florida License #71576 �'• No 71576 •• 2 yt ; * •: it D: z '13 STATE OF 441% SHEET TITLE: GENERAL INFO, LEGENDS & SHEET INDEX DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: P0.1 it NO. DESCRIPTION DATE 2 0- 0 EXIST 2" V = -= SEXIST 1/2"0 EXIST I"*'EXIST 1r, EXIST 1 II II 1 II u EXIST 2"C EXIST 11 -EXIST 1 "HWR 17 1 /8," = 11.011 EXIST 2" SUPPLY u ROOM EXIST 1 1 H N EXIST 1 1/2"CW -EXIST 6" S- - EXIST 2"CW 1 ID 21/2" CW "7L 2112" HW FEC a Z VI' 2"S I III 11/2"CW j II 11THW i -EXIST 2112"CW EXIST 21/2"HW EXIST 314"HWR I EXIST EXIST 1/2"OX ;t CT SCAN-1 EXISTING TO REMAIN IV, 1A,1OX,1SL I 'C67,11f0extL, 6" S- TEMP PARTITION- OUST CONTROL CT SCAN-2 EXISTING TO REMAIN MEDICAL GAS VALVE BOX-/ EQUIP, TLT. ALCOVE RAD GRAVITY PIPING PLAN -1ST LEVEL - CT PLUMBING KEYNOTES P1 PROVIDE NEW PLUMBING FIXTURE, SANITARY AND VENT PIPING PROVIDE ALL NECESSARY HARDWARE AND FITTINGS FOR A COMPLETE INSTALLATION (TYPICAL). P2 CONNECT NEW VENT AND SANITARY PIPING AT LOCATION SHOWN ON PLANS. CONTRACTOR TO VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION. w 2 1 /8„ = 1 9-014 FEC CORR TEMPORARY PARTITION WALL EQUIP. TLT. ALCOVE RAD MECHANICAL FLOOR PLAN -1 ST LEVEL - CT MECHANICAL KEYNOTES M1 PROVIDE CERTIFIED TSB REPORT OF EXISTING AIR DISTRIBUTION DEVICES WITHIN PROJECT SCOPE. REBALANCE ADJACENT SPACES AS NECESSARY WITHOUT JEOPARDIZING AIRFLOW TO ARCHIVE DESIGN FROM WITHIN SCOPE BOUNDARY. M2 EXISTING TO REMAIN QUICK RESPONSE SPRINKLER HEAD. M3 PROVIDE A TEMPORARY NEPA FILTERED NEGATIVE AIR FAN FOR CONSTRUCTION AREA. MAINTAIN A 0.03" NEGATIVE PRESSURE IN THIS AREA RELATIVE TO THE ADJACENT SPACES. PROVIDE ADDITIONAL NEGATIVE AIR MACHINES AS REQUIRED TO ACHIEVE MINIMUM NEGATIVE PRESSURE. PROVIDE TEMPORARY DUST BARRIER PARTITIONS. ALL EXISTING RETURN AND EXHAUST REGISTERS LOCATED WITHIN THE RENOVATION AREA SHALL BE PROVIDED WITH TEMPORARY CONSTRUCTION FILTERS. ROUTE TEMPORARY 120FLEXIBLE DUCT FROM DISCHARGE OF HEPA UNIT TO OUTSIDE OF TEMPORARY BARRIER. FAN CRITERIA: MANUFACTURER HEPA-AIRE, MODEL-1800 PAS VARIABLE CFM - 1000 TO 1800 CFM ELECTRICAL:115 V,10 FLA ICRA CLASSIFICATION SCHEDULE CLASS 1 1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. 2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. 3. MINOR DEMOLITION FOR REMODELING. 1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. 2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. 3. SEAL UNUSED DOORS WITH DUCT TAPE. CLASS 11 4. BLOCK OFF AND SEAL AIR VENTS. 5. WIPE SURFACES WITH DISINFECTANT. ❑ 6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA 8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA 9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED, 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. 5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT. CLASS 111 6. VACUUM WORK WITH HEPA FILTERED VACUUMS. gf 7. WET MOP WITH DISINFECTANT. 8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. 1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. 2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. 3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. 5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. 6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. 7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. CLASS IV 8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT AND ❑ RELEASED BY SAFETY AND INFECTION CONTROL. 9. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. 10. WET MOP WITH DISINFECTANT. 11. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS, 13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE. Y-IN DIFFUSER NOTE: TO BE USED WHEN WINDOWS CANNOT BE TEMPORARILY REMOVED. 4'-10" BASIS OF DESIGN (PROVIDE EQUAL): MINTIE TECHNOLOGIES, INC, ECU CEILING CAVITY ENVELOPE -DURABLE CA STATE FIRE MARSHAL FLAME -RATED PVC SHEETING - HOSPITAL WHITE, EASY TO CLEAN WITH STANDARD CLEANER -ONE 20.5" DOOR -TWO CLEAR PANEL WINDOWS -14.0" x 40.0" -TWO NEGATIVE AIR PORTS 11.0" ROUND PORT WITH DRAWSTRING AND SEAL 3.5" ROUND HEPA VACUUM PORT WITH DRAWSTING AND SEAL -DOUBLE-REINFORCED FLOOR -CLEAR POUCH TO DISPLAY WORKANFECTION CONTROL PERMIT WEIGHT:15 POUNDS �iEPAVACUUM PC... WITH DRAWSTRING AND SEAL NEGATIVE AIR PRESSURE MACHINE &SCRUBBER i PORTABLE DUST ENCLOSURE 2 No Scale No Scale 0 too e r` E (�Nl� 8 M Q i 12 O CD .E_ Q �- QLL00 c0 z 0 a. .O t to Lu Z W W H W = Z u ZOC O W LL. .-T � � N 0 . 1.0 °o O W , 4 w � l r V • �/ ke) o o 4 w u Lu $� W U W F- _z J x W 3 U W as Q 1z w u, R5 Y SEAL Aaron Lee Johnson, P.E. Florida License #71576 ���` LEE '1111 JOA/ .� QUO G E IV tiS �. No 71576 ;CC :p STATE OF 4U .-' or SHEET TITLE: PLUMBING AND MECHANICAL FLOOR PLAN DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: Pi , 1 r NO. DESCRIPTION DATE as co N 0 0 ELECTRICAL SYMBOL LEGEND BASIC MATERIALS BASIC MATERIALS CONT. TELEPHONE/COMPUTER RACEWAY SYSTEM SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION Sa SINGLE POLE SWITCH - 0 CONDUIT TURNING UP UP X = MOUNTING (F)LUSH, (S)URFACE, (M)ODULAR FURNITURE ADAPTOR (P)OLE, F(L)OOR, & (R)ACEWAY (SUBSCRIPT INDICATES ITEM CONTROLLED) -*DN CONDUIT TURNING DOWN -N = # OF VOICE JACKS S3 THREE-WAY SWITCH N = # OF DATA JACKS CONDUIT STUB N = # OF FIBER PORTS S4 FOUR-WAY SWITCH N = # OF VIDEO PORTS -� CONDUIT CONTINUED SP SINGLE POLE SWITCH X N N N N COMMUNICATIONS "INFORMATION OUTLET" MTD. AT WITH PILOT LIGHT FLEXIBLE CONDUIT 410 ROOM # - OUTLET # RECEPTACLE HEIGHT UNLESS OTHERWISE NOTED. RECEPTACLE C = ABOVE THE COUNTER REFER TO SPECIFICATIONS FOR MANUFACTURER'S DUPLEX - - - - - EXISTING TO BE REMOVED W = WALL MOUNTED PART NUMBER. e- TWIST LOCK RECEPTACLE EXISTING TO REMAIN T SURGE PROTECTION TYPE (TVSS) EXISTING AFFECTED BY THIS PROJECT DUPLEX RECEPTACLE WITH - - - - FUTURE EACH HALF ON SEPARATE CIRCUIT (BREAKER SHALL BE TWO POLE WITH COMMON TRIP) NEW DUPLEX RECEPTACLE MOUNTED ABOVE COUNTER LIGHTING NURSE CALL SYSTEMS DUPLEX SAFETY RECEPTACLE MOUNT COVERPLATES WITH SPANNER HEAD SCREWS A FIXTURE DESIGNATION DUPLEX RECEPTACLE WITH TOP HALF SWITCHED LED / FLUORESCENT FIXTURE ENHANCED PATIENT STATION WITH INTEGRAL CODE BLUE AND STAFF ASSIST SIMPLEX RECEPTACLE (EWC DENOTES a �_ LOWER CASE LETTER INDICATES STAFF EMERGENCY STATION -� ELECTRIC WATER COOLER. COORDINATE WITH EWC EWC CONTROL CIRCUIT SWITCH LEG INSTALLER FOR MOUNTING HEIGHT) STAFF EMERGENCY ANNUNCIATOR CIRCUIT NUMBER GFI RECEPTACLE MOUNTED ABOVE COUNTER --® CODE BLUE EMERGENCY STATION TWO DUPLEX RECEPTACLES WITH COMMON COVER LED I FLUORESCENT FIXTURE DIAGONAL SHADING DENOTES © TO LIGHT FIXTURE CONNECTED TO CRITICAL BRANCH. CORRIDOR DOME LIGHT CEILING MOUNTED TWO DUPLEX RECEPTACLES WITH COMMON COVER HID OR LED I FLUORESCEN FIXTURE O CORRIDOR ZONE LIGHT MOUNTED ABOVE COUNTER EXIT LIGHT FIXTURE ISOLATED GROUND DUPLEX RECEPTACLE, ® DIRECTION ARROWS AS SHOWN IG (ORANGE DEVICE) (SHADED QUADRANT INDICATES FACE(S) OF FIXTURE) DUPLEX RECEPTACLE NOTE: TICK MARKS SHOWN ON ANY DEVICE REPRESENTS RECEPTACLE CONNECTED TO THE EMERGENCY CIRCUIT GENERAL DEMOLITION NOTES GENERAL NOTES (RED DEVICE) TYPICAL FOR ANY DEVICE IN LEGEND LIGHT SWITCHES SHALL BE MOUNTED 48 INCHES ABOVE FINISHED FLOOR TO CENTER LINE OF ® SPECIAL PURPOSE RECEPTACLE, RATING AS NOTED 1. DEVICE, UNLESS OTHERWISE NOTED. ® GROUND BAR 1. ALL DEVICES SHOWN ON DEMOLITION PLANS ARE EXISTING. REFER TO SYMBOL LEGEND FOR DEVICE DESCRIPTION. RECEPTACLES SHALL BE LOCATED 18 INCHES ABOVE FINISHED FLOOR TO CENTER LINE OF ® CABLE TRAY 2. DEVICE, UNLESS OTHERWISE NOTED. ABOVE COUNTER RECEPTACLES SHALL BE MOUNTED 6" 2. EXISTING CONDITIONS SHOWN ON THIS DRAWING ARE TAKEN FROM ORIGINAL ABOVE BACK SPLASH TO CENTERLINE OF DEVICE. JUNCTION BOX DRAWINGS AND FIELD INVESTIGATION. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. FIELD CONDITIONS SHALL GOVEN. 3. THE EQUIPMENT GROUNDING TERMINAL BARS OF THE NORMAL AND ESSENTIAL ELECTRICAL O CONDUIT SEAL -OFF FITTINGS 3. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE SYSTEM PANELBOARDS SERVING THE SAME PATIENT VICINITY SHALL BE BONDED TOGETHER WITH AN INSULATED, CONTINUOUS, COPPER CONDUCTOR NOT SMALLER THAN NUMBER 10. PROJECT AREA. IT IS INTENDED TO PROVIDE THE CONTRACTOR WITH A GENERAL ®C3 SURGE SUPRESSOR KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY 4. EQUIPMENT SHALL BE OF MATERIALS SUITABLE FOR AND RATED FOR THE ENVIRONMENT IN WHICH C3 = SERVICE ENTRANCE DEVICE DISCREPANCIES OR CONDITIONS NOT SHOWN ON THIS PLAN SHALL BE BROUGHT THEY ARE TO BE INSTALLED. B3 = DISTRIBUTION BOARD DEVICE TO THE ATTENTION OF THE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR ALL A3 = PANELBOARD DEVICE REQUIRED DEMOLITION WHETHER SHOWN ON THE PLANS OR NOT. 5. A. WORKING CLEARANCES FOR ELECTRICAL EQUIPMENT SHALL BE IN COMPLIANCE WITH NEC 110. SHUNT -TRIP BUTTON - FLUSH MOUNTED UNLESS 4. ALL CONDUITS SERVING OTHER SPACES OR FLOORS, THAT RUN THROUGH THE ® OTHERWISE NOTED NEMA 311 FOR EXTERIOR LOCATIONS PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION, SO AS NOT TO B. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO STRUCTURAL CEILING WITH CAUSE ANY DISRUPTION TO THESE OTHER SPACES. IT IS THE CONTRACTOR'S A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, RESPONSIBILITY TO INSURE THAT ALL CONDUITS, NEW OR EXISTING, WITHIN THE DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICALEQUIPMENT OR ARCHITECTURAL © POWER CONNECTION TO EQUIPMENT PROJECT AREA ARE PROPERLY SUPPORTED AND PROVIDED WITH BONDING 6, APPURTENANCES IN ACCORDANCE WITH NEC 408. BUSHING IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE. MAGNETIC MOTOR STARTER OR CONTACTOR CRITICAL AND LIFE SAFETY LIGHT SWITCHES SHALL BE ROUTED IN CONDUIT AND BOXES OTHER ® SIZE AS NOTED 5. ALL ITEMS REMOVED UNDER THIS PROJECT SHALL BE DISPOSED OR TURNED OVER 7. THAN THAT FOR THE NORMAL BRANCH. ESSENTIAL SYSTEM SWITCHES SHALL BE RED IN COLOR. TO THE OWNER AT THE OWNER'S DISCRETION. EDH-X ELECTRIC DUCT HEATER 8. PATIENT CARE AREAS SHALL BE PROVIDED WITH GROUNDING IN ACCORDANCE WITH NEC 517. �M/� 6. THIS CONTRACTOR SHALL PROVIDE ELECTRICAL FOR PHASING WORK AS REQUIRED OR DIRECTED BY THE ARCHITECT, REFER TO ARCHITECURAL PHASING PLAN. WHEN ELECTRICAL BOXES ARE LOCATED IN VERTICAL FIRE -RESISTIVE ASSEMBLIES, (CLASSIFIED MOTOR CONNECTION, NUMBER DENOTES HORSEPOWER TEMPORARY ELECTRICAL SERVICES (POWER,LIGHTING, NURSE CALL, FIRE ALARM, AS FIRE/SMOKE AND SMOKE PARTITIONS), THEY SHALL BE INSTALLED WITHOUT AFFECTING THE ETC) SHALL BE PROVIDED WHEN NEW WORK AFFECTS SERVICES NEEDING TO FIRE CLASSIFICATION. ALL OF THE FOLLOWING CONDITIONS SHALL BE MET: ®F VARIABLE FREQUENCY DRIVE REMAIN ACTIVE. IF FIRE ALARM SYSTEM CANNOT BE MAINTAINED IN THE CONSTRUCITON AREA, A FIRE WATCH SHALL BE PROVIDED. A. ALL ELECTRICAL BOXES SHALL BE METALLIC. ® DIRECT DIGITAL CONTROL PANEL 7, UNLESS OTHERWISE NOTED, ALL EQUIPMENT, WIRING DEVICES, LIGHT FIXTURES, B. BOX OPENING SHALL OCCUR ONLY ON ONE SIDE OF FRAMING SPACE. CONDUIT AND WIRE IN THE PROJECT AREA SHALL BE REMOVED. THE CONTRACTOR TRANSFORMER SHALL INVESTIGATE THE PROJECT AREA PRIOR TO BID TO DETERMINE ALL C. BOX OPENING SHALL NOT EXCEED 16 SQUARE INCHES. REQUIRED DEMOLITION. D. ALL CLEARANCES BETWEEN OUTLET BOX AND GYPSUM BOARD SHALL BE COMPLETELY ® AUTOMATIC TRANSFER SWITCH B. CONTRACTOR SHALL PROVIDE MEANS OF AUTOMATIC SMOKE DETECTION VIA FILLED WITH JOINT COMPOUND (OR OTHER APPROVED MATERIAL). IL INSTALLED SMOKE DETECTORS CONNECTED TO THE FACITLITY FIRE ALARMS SYSTEM FOR COVERAGE DURING NON -OCCUPIED PERIODS WITHIN THE E. PROVIDE A WALL AROUND OUTLETS LARGER THAN 16 SQUARE INCHES. THE INTEGRITY OF LEI30AR NON -FUSED DISCONNECT SWITCH, SIZE AS NOTED CONSTRUCTION AREA, IF DESIRED, A DOCUMENTED FIRE WATCH OF THE ENTIRE THE WALL RATING SHALL BE MAINTAINED. NF NF DENOTES NON -FUSED AREA PERFORMED IN INCREMENTS NO GREATER THAN ONE HOUR MAY BE I JC1 'OAR PERFORED PROVIDED THAT IT IS DOCUMENTED IN FULL ACCORDANCE WITH NPFA F. THE TOTAL AGGREGATE SURFACE AREA OF THE BOXES SHALL NOT EXCEED 100 SQUARE FUSED DISCONNECT 72. COORDINATE ACTIVITY IN FIELD WITH GENERAL CONTRACTOR. INCHES PER 100 SQUARE FEET. t[S] 20AF AR DENOTES AMP RATING OF SWITCH 9. "ETR" DENOTES EXISTING ELECTRICAL DEVICE TO REMAIN. G. OUTLET BOXES LOCATED ON OPPOSITE SIDES OF FIRE RESISTIVE ASSEMBLIES SHALL BE MCP AF DENOTES AMP FUSE SIZE SEPARATED BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES. SIZE /�# OF POLES `3013 H. OUTLET BOXES SHALL BE SECURELY FASTENED TO WALL FRAMING MEMBERS. UVI COMBINATION MAGNETIC MOTOR STARTER, 3R FACING SHALL BE CUT NOT TO EXCEED 118 INCH 0 SIZE AS NOTED, 3 POLE UNLESS OTHERWISE NOTED I. THE OPENING IN THE GYPSUM BOARD 9. BETWEEN THE EDGES OF THE OUTLET BOX AND THE EDGES OF THE OPENING. ENCLOSURE NEMA 1 UNLESS NOTED NON-METALLIC RACEWAYS SHALL NOT BE USED TO SERVE ANY PATIENT CARE SPACE. ALL NEMA STARTER SIZE RADIOLOGY NOTES 10. WIRING SHALL BE MECHANICALLY PROTECTED BY INSTALLATION IN METALLIC RACEWAYS. ^ BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, 11. ALL DEVICES SHALL BE MOUNTED VERTICAL, UNLESS OTHERWISE NOTED. CONTRACTOR SHALL REFER TO THE RADIOLOGY VENDOR DRAWINGS FOR ALL REQUIRED SURFACE MOUNTED ELECTRICAL WORK IN THOSE AREAS, THE VENDOR DRAWINGS IN CONJUCTION WITH THESE 12. ALL RECEPTACLES SHALL BE MOUNTED SUCH THAT THE GROUND PIN IS MOUNTED UP. DOCUMENTS SAHLL BE THE BASIS OF BID. All IDENTIFICATIONS INTHEVENDOR DRAWINGS BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, OF TUSTOMERICONTRACTOR" SHALL BE THE RESPONSIBILITY OF THE "CONTRACTOR". IT IS 13. THE NUMBER OF ARROWHEADS ON THE HOMERUNS DENOTES THE NUMBER OF CIRCUITS. FLUSH MOUNTED THE INTENTION OF THE VENDOR DRAWINGS THAT ALL WORK (LABOR, MATERIALS, ETC.) REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM SHALL BE PROVIDED. ALL NEW AND EXISTING PANELS AFFECTED BYTHIS PROJECT SHALL BE PROVIDED WITH A NEW BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, TYPE WRITTEN DIRECTORY. SURFACE MOUNTED THESE PLANS ARE INTENDED TO GIVE THE CONTRACTOR A GENERGAL KNOWLEDGE OF THE WORK ASSOCIATED WITH THE INTALLATION OF EQUIPMMENT IN THE SELECTED S, IT IS NOT INTENDED TO INDICATE ALL BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, -� C,O OR DIMENSIONS ORLOCATIONS OFEQUOLOGY CONNECTIONS, BOX SE ETC, PMENT. ALL EQUIPMENT SHALL E CODES FLUSH MOUNTED INSTALLED PER THE OWNER APPROVED MANUFACTURER'S INSTALLATION DRAWINGS. INSTALLATION SHALL BE COORDINATED IN FIELD WITH RADIOLOGY EQUIPMENT MANUFACTURER. EQUIPMENT MANUFACUTER SHALL SUPLLY 1. LIFE SAFETY CODE - NFPA 101(2012). BRANCH CIRCUIT CONDUIT CONCEALED ABOVE FIXED LENGTH CABLES, WHEREBY ALL MEASUREMENTS SHALL BE DETERMINED FROM ELECTRICAL THROUGH RUNS CEILING OR IN WALL. CONDUIT SHALL INCLUDE INDICATED ON VENDOR DRAWINGS, ANY CHANGES TO EQUIPMENT PLACEMENT OR TROUGH ROUTINGS AT JOB SITE WILL 2. NATIONAL ELECTRICAL CODE - NFPA 70 (2011). CAUSE THE DELIVERY OF INACCURATE AND ERRONEOUS CABLEE LENGTHS. THIS MAY RESULT IN ADDITOINAL COST FOR 3. NATIONAL FIRE PROTECTION ASSOCIATION 72 (2010); NATIONAL FIRE ALARM & SIGNALING CODE. PHASE, NEUTRAL AND GROUND CONDUCTORS REPLACEMENT CABLES AND DELAY EQUIPMENT INSTALLATION. COORDINATE PLACEMENT OF ALL EQUIPMENT WITH 4. NATIONAL FIRE PROTECTION ASSOCIATION 99 (2012). HEALTH CARE FACILITIES AS REQUIRED FOR CIRCUITS (UNLESS OTHERWISE NOTED). EQUIPMENT INSTALLER PRIOR TO ROUGH -IN. THE FOLLOWING MUST BE PERFOREDIPROVIDED AS REQUIRED: 5. BUILDING CODE: FLORIDA BUILDING CODE (2014 5TH EDITION). 6. FGI - GUIDELINES FOR DESIGN & CONSTRUCTION OF THE HEALTH CARE FACILITIES. (2010) BRANCH CIRCUIT CONDUIT CONCEALED IN SLAB, A. REDUNDANT GROUNDING FOR THE PATIENT CARE AREA VIA THE RACEWAY SYSTEM. THE 7. NFPA 90A, 2012 EDITION, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING & VENTILATING SYSTEMS. UNDERGROUND OR UNDER FLOOR. EQUIPMENT MUST BE FASTENED TO THE RACEWAY SYSTEM OR BE BONDED TO THE RACEWAY SYSTEM BY THE USE ELECTRICAL DRAWING INDEX �r _\ BRANCH CIRCUIT CONDUIT EXPOSED OF FLEXIBLE METAL CONDUIT OR BONDING STRAPS. B, SEPERATE RACEWAYS OR CONTINUOUS BARRIERS FOR THE SEPERATION OF INTERCONNECTING CABLES PER SHEET DESCRIPTION ISSUED CIF- GROUND OR GROUND ROD AS NOTED VOLTAGE RATING AND CLASS. POWER AND CLASS 1 CIRCUIT WIRING SHALL BE ROUTED TOTALLY SEPERATE FROM CLASS 2 AND CLASS 3 CIRCUIT WIRING. PROVIDE A CHART AND/OR WIRING DIAGRAM WITH MARKED CABLES TO EO.1 GENERAL INFO, LEGENDS & SHEET INDEX - ELECTRICAL Yes FACILITATE VERIFICATION OF THIS REQUIREMENT. THIS CHART MUST BE DEVELOPED BY THE EQUIPMENT EO.2 ELECTRICAL ONE -LINE DIAGRAM Yes CRITICAL BRANCH CONDUIT MANUFACTURER'S ENGINEERING DEPARTMENT. E1.0 OVERALL FIRST FLOOR PLAN - ELECTRICAL Yes L `\ E1.1 ENLARGED CT ROOM PLAN - FIRST FLOOR - ELECTRICAL Yes r- LIFE SAFETY BRANCH CONDUIT C. RACEWAY SHALL NOT BE EXPOSED, PROVIDE FLUSH MOUNTED WIREWAY AND CONCEALED CONDUIT. CIRCUIT BREAKERS, PANELBOARDS AND EPO STATIONS SHALL BE FLUSH MOUNTED. E2.1 IE3.1 PANEL SCHEDULES Yes EQUIPMENT BRANCH CONDUIT ELECTRICAL SPECIFICATIONS Yes NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT. CADDY FINISHED CEILING VOICE CABLE DATA CABLE CENTERED BETWEEN DOOR & CEILING WALL MOUNTED LIGHT FIXTURES (COORDINATE WITH ARCHITECT) AS NOTED ON PLANS hL EXIT ARCHITECT) CENTERED OVER DOOI --- PANELBOARD (WHERE APPLICABLE) ,FIRE HORN (OR CHIME) & LIGHT 80" AFF FROM BOTTOM OF DEVICE 1" CONDUIT -J DUPLEX 90" FA PULL STUB CONDUIT IN WALL. RECEPTACLE ABOVE CEILING. °o h 78" MAX. TO TOP DEVICE 4,4" AFF SINGLE GANG BOX WITH OUTLET PLATE AND JACKS n n REVIEW EACH n n LOCATION FOR HEIGHT n n REQUIREMENT. TYPICAL VOICE / DATA OUTLET No Scale NHD1-4 1'----ENGRAVED PANEL & CIRCUIT COLORED COVERPLATE (BY BRANCH) RED: CRITICAL, LIFE SAFETY, EQUIPMENT LETTERING IS WHITE IVORY: NORMAL BRANCH LETTERING IS BLACK TYPICAL SWITCH 3 1 MOUNTING HEIGHTS No Scale STATION h N 0 DUPLEX O RECEPTACLE SWITCH LOCATED IN 1 ALCOVE j 48" o h DUPLEX 0 ® 36" RECEPTA L Tr f AFF 18" c - h AFF SPECIAL POWER OUTLET \_ FINISHED FLOOR BASIS OF DESIGN (PROVIDE EQUAL): MINTIE TECHNOLOGIES, INC. OR IC600MOBVC MOBILE ICRA PACKAGE ABATEMENT TECHNOLOGIES ECU CEILING CAVITY ENVELOPE -DURABLE FL STATE FIRE MARSHAL FLAME -RATED PVC SHEETING, HOSPITAL WHITE, EASY TO CLEAN WI STANDARD CLEANER -ONE 20.5" DOOR -TWO CLEAR PANEL WINDOWS -14.0" x 40.0" NHD1-4 ENGRAVED PANEL & CIRCUIT -TWO NEGATIVE AIR PORTS -11.0" ROUND PORT WITH DRAWSTRING AND SEAL -3.5" ROUND HEPA VACUUM PORT WITH DRAWSTRING AND SEAL -DOUBLE-REINFORCED FLOOR COLORED COVERPLATE (BY BRANCH) -CLEAR POUCH TO DISPLAY WORK/INFECTION CONTROL PERMIT, WEIGHT 15 POUNDS RED: CRITICAL, LIFE SAFETY, EQUIPMENT REQUIRED FOR ALL"ABOVE CEILING" WORK IN CORRIDOR SYSTEM LETTERING IS WHITE SET UP PORTABLE DUST ENCLOSURE AT EACH CONSTRUCTION AREA INCORPORATE NEGATIVE AIR MACHINE AND PRESSURE MONITOR (TYPICAL). MAINTAIN A 0.03" NEGATIVE PRESSURE IN THE ENCLOSURE RELATIVE TO THE ADJACENT SPACE. ALL EXISTING REGISTERS WITHIN IVORY: NORMAL BRANCH ENCLOSURE AREA SHALL BE PROVIDED WITH CONSTRUCTION FILTERS. LETTERING IS BLACK FAN CRITERIA: MANUFACTURER - HEPA-AIRE, MODEL - PREDATOR 1200 PAS TYPICAL RECEPTACLE VARIABLE CFM -150 TO 900 CFM ELECTRICAL:115 VOLTS, 3.5 FLA PROVIDE AN INCLINED MANOMETER, DIFFERENTIAL PRESSURE TYPE, WITH WHITE FACE GAUGE AND BLACK LETTERS WITH MAXIMUM PRESSURE RANGE OF 0.1" W.G. THIS SHALL BE USED BY THE CONTRACTOR TO RECORD, ON A DAILY BASIS, THE NEGATIVE PRESSURE IN THE RENOVATION AREA RELATIVE TO THE ADJACENT SPACES. CLOSE DAMPERS AND TAPE CLOSED ALL RETURN GRILLES SERVING AREAS WITHIN CONSTRUCTION AREA, ISOLATING THE RENOVATION AREA FROM THE AIR HANDLER SYSTEM. ALL EXISTING EXHAUST REGISTERS LOCATED WITHIN THE RENOVATION AREA SHALL BE PROVIDED WITH TEMPORARY CONSTRUCTIONS FILTERS. UPON COMPLETION OF CONSTRUCTION, OPEN GRILLES AND RE -BALANCE TO ORIGINAL AIRFLOW. COVERPLATES & NAMEPLATES 4 1 PORTABLE DUST ENCLOSURE 2 No Scale No Scale 0 to E 07NCLO" 8' 45 O C3 O =mac QLLr.- 0 cm c0z =c� Oma LL z N �O L N W Z V IW W W = Zu �a Z� W rA r__11 rA O r�l O N M-a � � N 0 O 0 0 •� 0 O 0 rr� H H W s� r J eA ~ L1J -) J LLI I- z c� W 3 U w �aa x 9 U_ CK SEAL Christopher V. O'Hara, P.E. Florida License #66504 �0$.0111111 OP H ER�,,�, E � `��',�?�•' �` c NSF ;y-9,A V: No 66504 •'� STATE OF c4 O R SOP. SHEET nnE: GENERAL INFO, LEGENDS & SHEET INDEX - ELECTRICAL DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: E0,1 NO. DESCRIPTION DATE 11 SETS OF (4) 500KCMIL, M.? EXISTING SERVICE (65,000 AIC) 2771480V, 3-PHASE, 4W (59,738 SCA) a "NW" 4000 AMPS 4�0 ST NW-'. LSIG "JJ" 225 i 1200 300 (404/0 4 SETS OF - (1#4GND (4)400KCMIL, 2112' C. (1) 4/0 GND. T C. 70 2NHA (65,000 AIC) (3) #4, (34,475 SCA) (1)98 GND. 1 1/4' C. T-2NLA 45KVA 480V- 1201208V #4 (4) #210, (1#4 GND. 2" C. 1 HNDP (65,000 AK:) 150 (38,572 SCA) 84 2NLA "JJ" (10,000 AIC) 175 (3,390 SCA) YLSI 800 250 ) 800 600 T C3 GDP J((6,165,000, AIC;61 SCA 30 ) 2771480V, 3-PHASE, 4W 1200 AMPS 800 EXISTING 750KW GENERATOR 800 4 SETS OF (4) 500KCMIL, (1) 250KCMIL GND (AL) 31n" C. 250 Pi 600 ONE -LINE DIAGRAM GENERAL NOTES: 1. BREAKER TYPES INDICATED NEXT TO EACH BREAKER ARE BASED UPON SQUARE D ELECTRICAL EQUIPMENT. ONE -LINE DIAGRAM NOTES: 1O PROVIDE NEW BREAKER IN EXISTING PANELBOARD SPACE. SIZE AS INDICATED. O2 PROVIDE CIRCUIT BREAKERS WITH SHUNT TRIP ELEMENT, TO BE INTERCONNECTED WITH RADIOLOGY EMERGENCY STOP BUTTONS LOCATED ON VENDOR DRAWINGS. (4) 500KCMIL., 3 SETS OF 3 SETS OF (4) 500KCMIL., 3 SETS OF 2 SETS OF (4) 500KCMIL., 3 SETS OF 3 SETS OF (4) 500KCMIL., 3 SETS OF 2 SETS OF (1#2 GND (3) 350KCMIL, (3) 350KCMIL, (1#2 GND (3) 350KCMIL, (4) 350KCMIL, (1#2 GND (1#2 GND (3) 350KCMIL, (3) 350KCMIL, (3) 350KCMIL, (4) 350KCMIL, 3" C. (1)#210 GND (1)#210 GND 3" C. (1)#210 GND (1)#110 GND 3" C. (1)#210 GND (1)#2/0GND 3 C (tj#2IOGND (1#1/0GND 3" C. 3" C. 3" C. 3" C. 3" C. 3" C. 3" C. T C. EQB E003 ATS-LE ATS-CB ATS-EQ ATS-EAB ATS-ECB ATS-EQB ECB 400A, 4POLE 0 800A, 4POLE 800A, 3POLE 250A, 4POLE 800A, 4POLE 600A, 3POLE E003 65KAIC 65KAIC 65KAIC 65KAIC 65KAIC 65KAIC 480V,3P 480V,3P 480V,3P 480V,3P 480V,3P 480V,3P LIFE SAFETY CRITICAL 11 EQUIPMENT o LIFE SAFETY CRITICAL EQUIPMENT (27766 SCA) (28779 SCA) (28779 SCA) (27766 SCA) (28779 SCA) (28779 SCA) EAB (4) 500KCMIL., 3 SETS OF 3 SETS OF E003 (1#2 GND (3) 350KCMIL, (3) 350KCMIL, 3" C. (1)#M GND (1)00 GND T C. 3" C. 1 HLSDP 1 HCBDP 1 HEMP 277/480V, 3-PHASE, 4W (35,000 AIC) 277/480V, 3-PHASE, 4W 65,E AIC 2771480V, 3-PHASE, 4W 65,000 AIC)) 2771480V, 3-PHASE, 4W 18,627 SCA) �33,186 SCA) �33,186 SO 1200 AMPS ( 400 AMPS 800 AMPS 800 AMPS Q) 125 Q� 125 Q) 125 Q� 125 Q) 200 Q� 200 Q) Q) 175 • Q) 125 H(D 125 Q� 90 O� ST 225 Q) 225 (3) #210, (1) #6 GND. 2" C. T-1 NLDP 112.5KVA 480V- 120rMV _ #110 (4) 500KCMIL, (1) #1/0 GND. 4" C. 1NLDP (25,000 AIC) 1201208V, 3-PHASE, 4W (5,959 SCA) 400 AMPS "LD" 400 LSI "HD" "HD" •H 125_125 �� 125 _ 2NLDP (1#4 GND (1#4 GND (1#4 GND 21/2" C. 21/2" C. 21/2' C. (4) #2, (1#6 GND. 1 114" C. (4) , (4) #-, (1#3GND. (1#3GND. 112" C. 1/2' C. I -45 1 3HL8 (3) #210, (1) #6 GND. 2' C. I I i i i I I 1 1 (4) 5WKCMI , 1AHP 1 BHP 1 CHP 213HP 1 HLS 2HLS (1) #1/0 GND. (66,000 AIC) (66,000 AIC) (66,000 AIC) (65,000 AIC) (36,000 AIC) (35,000 AIC) 4" C. (26,797 SCA) (26,797 SCA) (26,797 SCA) (26,797 SCA) (3) #6, (11,698 SCA) (11,698 SCA) 1 CLDP (1 #10 GND. 1" C. (26,000 AIC) 1201208V, 3.PHASE, 4W T1 G (5,889 SCA) 400 AMPS 75KVA "LD" 400480V- 1201208V _ #4 HD" 125 _ > bHD" 125 i 125 T-1 CLDP 112.5KVA 480V- 120/208V (1)#M GND 2" C. (1)#210 GND 2' C. 125A HJ, LSI (65,000 AIC) (26,873 SCA) CT SCAN-1 (4) #1, (1#4 GND. 1/2' C. 1HCB (65,000 AIC) (25,041 SCA) 1 HCBDP LOAD SUMMARY EXISTING LOAD 110 KVA ADDED LOAD 70.0 KVA TOTAL LOAD 180.0 KVA 216.5 AMPS (3) #1, (4) #410, (4) #410, (1#6GND. (1#4 GND. (1#1 GND. 2" C. 21/2" C. 2117 C. [70 1HEQ 2HEQ 3HEQ ((1�i8 GND. 65,000 AIC) (3) #4, (65,000 AIC) (65,000 AIC) (1�i8 GND. ((16,076 SCA) (21,455 SCA) (21,641 SCA) G 11/4" C. 1 1/4' C. T1 D T2C 45KVA45KVA 480V- 480V- 12WMV 120/208V #4 #4 (4) #2, ELEV. #1 (4) no, (4) #2, (1)#8 GND. (35,000 AIC) ((1#4 GND. (1j#8 GND. 1 1/2" C. (16,076 SCA) 2" C. 4�i410 4�1410 4�4l0 (1#4 GND (1#4 GND (1#4 GND 100 _ i 2 10C. 2117 C. 210 C. 15o i 150 1 NLB LOAD SUMMARY 1 CLB 1 LLS 1 LEQ 2LEQ LOAD SUMMARY (10,000 AIC) (10,000 AIC) (10,000 AIC) 84 184 &4 EXISTING LOAD 18.2 KVA EXISTING LOAD 13 KVA (3,121 SCA) 84 84 84 (3,220 SCA) (3,302 SCA) ADDED LOAD 1.8 KVA ADDED LOAD 2.0 KVA 1 NLA 1 NLB 1 NLC TOTAL LOAD 20.0 KVA TOTAL LOAD 15.0 KVA 1 CLA 1 CLB 1 CLC (10,000 AIC) (10,000 AIC) (10,000 AIC) 55.5 AMPS 41.6 AMPS (10,000 AIC) (10,000 AIC) (10,000 AIC) (5,089 SCA) (5,089 SCA) (5,089 SCA) (5,036 SCA) (5,036 SCA) (5,036 SCA) PARTIAL ELECTRICAL ONE -LINE DIAGRAM (WEST SERVICE 0 CD E f�NtGN . M 12 C � Ln > C t o �Q c0 ug2 tm C.) 0 O0-.Or co LO LO N gD W Z � V W w I- W = Zu Q ZCC. O W Lj_ rA •1 C� M N � � Cn O � w � O O W eA °' W 3 V Ir W Qa 0 x ; W OCen uw Qa SEALChristopher V. O'Hara, P.E. Florida License #66504 OP H ERI 0'��, 46- V' No 66504 •'9 yt ; STATE OF SHEET TITLE: ELECTRICAL ONE -LINE DIAGRAM DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: EO,2 ELECTRICAL. PLAN NOTES (CODED NOTES) 1 EXISTING PANELBOARD AFFECTED BY SCOPE OF WORK. NO. DESCRUMON DATE N ti llll F / 10 ISbLAT ON !II l I OFFICE II• . I I r II i I I 1 / n OFFICE c -/ DECON ,> SHWR ° ° _ w 00 STOR v = o� -- i -- — I 0 � I n OVERALL ELECTRICAL PLAN 1ST LEVEL 3/32" = 1'-0" iFED I T� i �- JAN I MAMMO I FUTUR� RAD �VI(ttIVVtt I 7 I � _ CONTROLRM. CORRIDOR Sim I I 10,' iI - T-Tt--7- EQUIP. /I ALCOVE RAID 1,77— EXTERNAL SERVICE CORRIDOR I_ DISPLAY SERVERY 1_102 1HEQDP iHCBDP IHLSDP ±HEQ ' TT1DD TRICAL T,BHP coo — I Ilii 1HNDP G FEC 2 EXISTING ELEC RM (NORTH) -1ST LEVEL 1 /41'= 1-0" MAY VENDING! FEC TRAY RETURN FEC I 1 101 II II II � j� I , SOIL. <1zII I UTILITY CORRIDOR it i SCRUBI --- II STRESS CI FAN SUPPLIES CONTROL E E A-- --- - - n ENLARGED ELEC RM -1ST LEVEL \,7-/ 1 /4" = 1'-0" W A (n�LQ E I 0 � Ln QLLoo �O Lva_ LZ. LL r O LID lli N Lu Z ce u W w t— W = Z u z W W (n � - 8 U v W a � I— z J W U oc S'ALChdstopher V. O'Hara, P.E. Florida License #66504 OpHlFp 0��i, �'�G E N S y,9'��i �• ,Z' : �' 6• • 'p �� V: No 66504 '•:� • �� :••• .c TAT E OF.:** /ONA�c SHEET TITLE: OVERALL FIRST FLOOR PLAN - ELECTRICAL DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: El mO Y/Yl 1 ,�.A. w.•n4ai.,I1�1��1 FEC ' F CORD ■ I ■ ■ CT SCAN-1 SUPLm^-Y i ----- �I I CORRIDOR CONTROL RM. h. - ' CT SCAN-2 DEMOLISH EXISTING; - �' —SURFACE M ; I � ECHO WIREWAY AI PROVIDE - _ - - 11TILI1v NEW AS REQUIRED FOR SEPRATION OF CABLING BY VOLTAGE i �- CLASSIFICAT�N. ' I' ■ DIAGDP-44,46,48 1 I; - Na - ETR - - r—i Lr - ( / I © ETR 4 ETR ® COI ISH EXISTING ETR ■ ETR ENCLOSED CIRCUIT FF l ETR BREAKER BACK TO SOURCE. DEMOLISH ALL _ ASSOCIATED COMPONENTS, CONIIt,�� WIRE, ETC. i II N C. ■ TLT- MAMMO 2 ELECTRICAL DEMO PLAN 1ST LEVEL CT ; CORR FEC CORRIDOR 1HCBDP 8j r ' 1411 I/ 1� 53 38 C�'� 1 CLB- 32 C I S�'ETR -7T - -- - F ■ �/ 0 ETR F ■ ® * ® CORRIDOR ■ - --- ---. T _ — - --- - - _. r EQUIP. T i ALCOVE � a � T L ,O E I P,AJ r .�I MAMMO O POWER &SYSTEMS PLAN 1ST LEVEL CT FEC CORK a: CORRIDOR RECIRCUIT ALL EXISTING 2 X 2 FIXTURES TO - qlprvTrgquTum a! VERIFY VOLTAGE AND FIND CLOSEST CRITI BRANCH PANEL. a t]I, CONTROL RM. CT SCA C f SCAN-2 I� a a I� o it `a ob ob -- ;I C, fI ECHO TRACTOR IS TO OVIDE ADI� ALTERNATE TQ r 1, _ I, UTILITY a a III LACE ALL 2 X 2 LIHTING IN THE CT ROOD-WI`t=H1� SOIL.I o ob ob LED. REMOVE DOWN bGHTS. PROVIDE- NEW DIMMER --- SWITCHES. ECIFICATION. WILLIAMS: LPT-22-L30-S-AF1209 IM-UNV �I ® ® a Q 8 3)LIGHTING PLAN 1ST LEVEL CT 1 /8" = 1'-0" GENERAL DEMOLITION NOTES 1 ALL DEVICES SHOWN ON THIS PLAN ARE EXISTING. REFER TO SYMBOL LEGEND FOR DEVICE DESCRIPTION. 2 EXISTING CONDITIONS SHOWN ON THIS DRAWING ARE TAKEN FROM ORIGINAL DRAWINGS AND FIELD INVESTIGATION. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. FIELD CONDITIONS SHALL GOVERN. 3 THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT AREA, IT IS INTENDED TO PROVIDE THE CONTRACTOR WITH A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THIS PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED DEMOLITION WHETHER SHOWN ON THE PLANS OR NOT. 4 ALL CONDUITS SERVING OTHER SPACES OR FLOORS, THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION, SO AS NOT TO CAUSE ANY DISRUPTION TO THESE OTHER SPACES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL CONDUITS, NEW OR EXISTING, WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED AND PROVIDED WITH BONDING BUSHINGS IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE. 5 ALL ITEMS REMOVED UNDER THIS PROJECT SHALL BE DISPOSED OF OR TURNED OVER TO THE OWNER AT THE OWNER'S DISCRETION. UNLESS OTHERWISE NOTED, ALL EQUIPMENT, WIRING DEVICES, LIGHT FD(TURES, CONDUIT AND WIRE IN THE PROJECT AREA SHALL BE REMOVED AND BE DISPOSED OF OR TURNED OVER TO THE OWNER AT THE OWNER'S DISCRETION. THE CONTRACTOR SHALL INVESTIGATE THE PROJECT AREA PRIOR TO BID TO DETERMINE ALL REQUIRED DEMOLITION. 6 THIS CONTRACTOR SHALL PROVIDE ELECTRICAL FOR PHASING WORK AS REQUIRED OR DIRECTED BY THE ARCHITECT, REFER TO ARCHITECTURAL PHASING PLAN. TEMPORARY ELECTRICAL SERVICES (POWER, LIGHTING, NURSE CALL, FIRE ALARM, ETC) SHALL BE PROVIDED WHEN NEW WORK AFFECTS SERVICES NEEDING TO REMAIN ACTIVE. IF FIRE ALARM SYSTEM CANNOT BE MAINTAINED IN THE CONSTRUCTION AREA, A FIRE WATCH SHALL BE PROVIDED. 7 CONTRACTOR SHALL PROVIDE MEANS OF AUTOMATIC SMOKE DETECTION VIA INSTALLED SMOKE DETECTORS CONNECTED TO THE FACILITY FIRE ALARM SYSTEM FOR COVERAGE DURING NOW OCCUPIED PERIODS WITHIN THE CONSTRUCTION AREA IF DESIRED, A DOCUMENTED FIRE WATCH OF THE ENTIRE AREA PERFORMED IN INCREMENTS NO GREATER THAN ONE HOUR MAY BE PERFORMED PROVIDED THAT IT IS DOCUMENTED IN FULL ACCORDANCE WITH NFPA 72. COORDINATE ACTIVITY IN FIELD WITH GENERAL CONTRACTOR. 8 "ETR" DENOTES EXISTING ELECTRICAL DEVICE TO REMAIN. GENERAL POWER & SYSTEMS PLAN NOTES 1 REFER TO ARCHITECTURAL ELEVATIONS AND CASEWORK DRAWINGS FOR FINAL MOUNTING HEIGHTS AND INSTALLATION REQUIREMENTS OF ALL DEVICES. UNLESS NOTED OTHERWISE, ARCHITECTURAL ELEVATIONS SHALL DICTATE MOUNTING HEIGHTS OF ALL FIXTURES. 2 VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT WITH MANUFACTURER'S RECOMMENDATIONS PRIOR TO INSTALLATION. REFER TO EQUIPMENT MANUAL FOR ALL INSTALLATION REQUIREMENTS. 3 COORDINATE INSTALLATION OF ELECTRICAL CONNECTIONS WITH O.F.C.1. MEDICAL. COLUMN PRIOR TO BEGINNING ROUGH -IN OF AREA 4 CONTRACTOR SHALL REFER TO FIRE ALARM AND MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE SMOKE DAMPERS. FIRE SMOKE DAMPERS SHALL BE POWERED AT 120V DERIVED FROM THE POWER SUPPLY FOR EACH AHU IN ACCORDANCE WITH THE ELECTRICAL DETAILS. PROVIDE LOCAL DISCONNECTING MEANS (I.E. TOGGLE SWITCH) AT EACH FIRE SMOKE DAMPER LABELED WITH THE AHU SERVING THE DAMPER. ELECTRICAL PLAN NOTES (CODED NOTES) 1 PROVIDE NEW ENCLOSED CIRCUIT BREAKER. REFER TO ONE -LINE FOR BREAKER AND WIRE SIZE. CONTRACTOR TO CONFIRM IF EXISTING ENCLOSED CIRCUIT BREAKER FRONT TRIM IS COMPATIBLE WITH NEW CIRCUIT BREAKER AND ACCEPTABLE FOR REUSE. IF NOT, PROVIDE NEW COVER PLATE WITH NEW ENCLOSE CIRCUIT BREAKER. COORIDINATE FINAL FINISH WITH ARCHITECT. 2 PROVIDE 120V,10 ELECTRICAL CONNECTION FOR CEILING MOUNTED MONITOR. REFER TO VENDOR DRAWINGS FOR MORE INFORMATION. CONTRACTOR TO FIELD VERIFY EXACT LOCATION AMD REQIREMENTS ABOVE CEILING. 3 PROPOSED LOCATION OF SHUNT TRIP BUTTONS. COORDINATE WITH FINAL VENDOR DRAWINGS FOR EXACT LOCATION AND REQUIREMENTS. GENERAL LIGHTING PLAN NOTES 1 REFER TO ARCHITECTURAL ELEVATIONS FOR FINAL MOUNTING HEIGHTS OF ALL DEVICES. UNLESS NOTED OTHERWISE, ARCHITECTURAL ELEVATIONS SHALL DICTATE MOUNTING HEIGHTS OF ALL FIXTURES. 2 REFER TO ARCHITECTURAL CEILING PLAN FOR EXACT LOCATION OF ALL LIGHT FIXTURES. 3 COORDINATE LOCATIONS AND MOUNTING HEIGHTS OF ALL DEVICES WITH ARCHITECTURAL DRAWINGS AND CASEWORK ELEVATION DRAWINGS. 4 SURFACE MOUNTED RACEWAY IS NOT PERMITTED FOR INTERCONNECTION BETWEEN MULTIPLE UNDERCALINET LIGHT FIXTURES. BACKFEED ALL FIXTURES. TYPICAL FOR ALL LOCATIONS. 5 PROVIDE ENGRAVED LIGHT SWITCH COVER PLATES. REFER TO DETAIL FOR MORE INFORMATION. NO. DESCRIPTION DATE O c0 � OCD C-4 a � Ln C = � n Qtir cap- .00 q� w� c CLL =fitU� n_ 0 = SS co Ln uO N as w Z V W W F-- W = Z u �a Z 0 W �.. VJ r­01 R3 ^ M y O O O O O O O[—� 4 w U F � F- W O J ti M U ° H z � .J x W 3 U cc a Qo W W Wa SEALChristopher V. O'Hara, P.E. Florida License #66504 �Op H ER '�ii % 5� . 0 �i �`V•r�\•' �•\ G E N SF 'yq'p'�• 10. No 66504 -'-v �: STATE O ,(�' SHEET TITLE: ENLARGED CT ROOM PLAN - FIRST FLOOR - ELECTRICAL DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: E 1 0 1 ■NO. DESCRPTION DATE EXISTING SQUARE D I -LINE HCP Name: 1 HCBDP MAIN BREAKER: AMPS (EXISTING CRITICAL BRANCH) MAIN LUGS: 800 AMPS Project Name: PH CT RENO PHASE: 3 Project Number: 117489 WERE: 4 Fed From: ATS-CB K.A.I.C.: 65 AMPS Location: SURGACE MID: X FLUSH MID: 208/120V 480Y/277V X 240/120V C N K 0 T Load T Identification ( Trip Poles E N S 0 1 2LCBDP VIA T2B 40.0 400 A 3 2 SPARE 0.0 250 A 1 3 SPARE 0.0 250 A 1 4 2HCB 25.0 400 A 3 5 1 HCB 19.6 250 A 3 6 SPARE 0.0 50 A 1 7 SPARE 0.0 70 A 1 1 8 NEW CT 140.0 125 A 3 9 ICLDP VIA T-1CLDP 58.2 175 A 3 10 SPACE 0.0 - -- 11 SPACE 0.0 -- -- 12 SPACE 0.0 -- -- 13 SPACE 0.0 -- -- 14 SPACE 0.0 -- -- 15 SPACE 0.0 -- -- 16 SPACE 0.0 -- -- Total Connected Load: 282.8 kVA CONN. DEMAND DEMAND LOAD... FACTOR LOAD... Lighting - Hospital 8.9 kVA 40.00% 3.6 kVA Receptacle 57.0 kVA 58.77% 33.5 kVA Total Connected Load: 282.8 kVA Motor 0.0 kVA 0.00% 0.0 kVA Total Demand Load: 184.0 kVA Heating 0.0 kVA 0.00% 0.0 kVA Total Demand Amps: 221 A Cooling 0.0 kVA 0.00% 0.0 kVA Other 76.9 kVA 100.00% 76.9 kVA Elevator 0.0 kVA 0.00% 0.0 kVA Spare 0.0 kVA 0.00% 0.0 kVA X-Ray 140.0 kVA 50.00% 70.0 kVA Kitchen Equipment - Non -Dwelling Unit 0.0 kVA 0.00% 0.0 kVA Notes: 1. UTILIZE EXISTING SPACE FOR NEW LOAD. EXISTING PANELBOARD SQUARE 'D' NQOD MAIN BREAKER: AMPS 3 POLE MAIN LUGS: 225 AMPS K.A.I.C.: 10 AMPS SURFACE MID: X FLUSH MTD: Name: 3 PHASE Project Name: 4 WIRE Project Number: X 208Y/120V Fed From: 480Y/277V Location: 240/120V 1 CLB (EXISTING CRITICAL BRANCH) PH CT RENO 117489 1CLDP ELEC 1307 N T C T Load Name Trip Poles A B C Poles Trip Load Name C T N O 1 RECEPTACLE OBSERVE CARE 1162 20 A 1 1.2 0.2 1 20 A RECEPTACLE PYXIS WORK AREA 1008 2 3 RECEPTACLE OBSERVE CARE 1162 20 A 1 1.2 0.4 1 20 A RECEPTACLE WORK AREA 1008 4 5 RECEPTACLE OBSERVE CARE 1162 20 A 1 1.2 0.6 1 20 A RECEPTACLE NURSE STATION 1225 6 7 RECEPTACLE NURSE STATION 1105 20 A 1 0.6 0.2 1 20 A RECEPTACLE NURSE STATION 1225 8 9 RECEPTACLE NURSE STATION 1105 20 A 1 0.8 0.2 1 20 A RECEPTACLE NURSE STATION 1225 10 11 RECEPTACLE NURSE STATION 1105 20 A 1 0.2 0.2 1 20 A RECEPTACLE NURSE STATION 1225 12 13 RECEPTACLE NURSE STATION 1105 20 A 1 0.2 0.2 1 20 A RECEPTACLE BREAK 1223 14 15 RECEPTACLE REF NURSE STATION... 20 A 1 A 0.2 0.2 1 20 A RECEPTACLE REF NURSE STATION... 16 17 RECEPTACLE 20 A 1 0.8 0.4 1 20 A RECEPTACLE NURSE STATION 1219 18 19 RECEPTACLE 20 A 1 0.2 0.6 1 20 A RECEPTACLE ELEV. 10E1 20 21 RECEPTACLE 20 A 1 0.8 0.2 1 20 A NCTC COMM 1019 22 23 1 RECEPTACLE 20 A 1 0.2 0.8 1 20 A RECEPTACLE COMM 1019 24 25 RECEPTACLE VEST 1147 20 A 1 0.2 0.2 1 20 A OTHER COMM 1019 26 27 RECEPTACLE 20 A 1 0.2 0.8 1 20 A RECEPTACLE COMM 1019 28 29 RECEPTACLE 20 A 1 0.4 0.8 1 20 A RECEPTACLE COMM 1019 30 31 RECEPTACLE 20 A 1 0.6 0.8 1 20 A CT SCAN 1 MONITOR 32 1 33 RECEPTACLE 20 A 1 0.6 0.8 1 20 A RECEPTACLE CT CONTROL ROOM 34 1 35 1 RECEPTACLE 20 A 1 1.0 0.8 1 20 A RECEPTACLE CT SCAN 1 36 1 37 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 38 39 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 40 41 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 42 43 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 44 45 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 46 47 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 48 49 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 50 51 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 52 53 SPARE 20 A I 0.0 0.0 1 20 A SPARE 54 55 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 56 57 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 58 59 SPACE -- -- 0.0 0.0 -- -- SPACE 60 61 SPACE -- - 0.0 0.0 -- -- SPACE 62 63 SPACE -- -- 0.0 0.0 - - SPACE 64 65 SPACE -- -- 0.0 0.0 -- -- SPACE 66 67 SPACE -- -- 0.0 0.0 - - SPACE 68 69 SPACE -- - 0.0 0.0 -- - SPACE 70 71 SPACE -- --L 0.0 0.0 -- -- SPACE 72 73 SPACE -- -- 0.0 0.0 -- -- SPACE 74 75 SPACE -- -- 0.0 0.0 -- -- SPACE 76 77 SPACE -- - 0.0 0.0 - -- SPACE 78 79 SPACE -- -- 0.0 0.0 - -- SPACE 1801 81 SPACE 1 0.0 0.0 - - SPACE 1821 83 SPACE -- -- 0.0 1 0.0 1 1 SPACE 1841 Phase Connected Load: 5.2 kVA 6.4 kVA CONN. DEMAND DEMAND LOAD... FACTOR LOAD... Lighting - Hospital 0.0 kVA 0.00% 0.0 kVA Receptacle 17.8 kVA 78.09% 13.9 kVA Motor 0.0 WA 0.00% 0.0 kVA Heating 0.0 WA 0.00% 0.0 kVA Cooling 0.0 kVA 0.00% 0.0 kVA Other 1.2 kVA 100.00% 1.2 kVA Elevator 0.0 WA 0.00% 0.0 kVA Spare 0.0 kVA 0.00% 1 0.0 kVA X-Ray 0.0 kVA 0.00% 0.0 kVA Kitchen Equipment - Non -Dwelling Unit 1 0.0 WA 0.00% 0.0 kVA Notes: 1. CONNECT NEW LOAD TO EXSTING SPARE BREAKER 7.4 kVA Total Connected Load: 19.0 kVA Total Demand Load: 15.1 kVA Demand Amps: 42 A EXISTING PANELBOARD SQUARE 'D' NQOD MAIN BREAKER: AMPS _ POLE MAIN LUGS: 225 AMPS K.A.I.C.: 10 AMPS SURFACE MID: X FLUSH MID: Name: 3 PHASE Project Name: 4 WIRE Project Number: X 208Y/120V Fed From: 480Y/277V Location: 240/120V 1 NLB (EXISTING NORMAL BRANCH) PH CT RENO 117489 1NLDP ELEC 1307 N C T Load Name Trip Poles A B C Poles Trip Load Name C T N T 1 RECEPTACLE PEDS PLAY 1001 20 A 1 1.0 1.0 1 20 A RECEPTACLE 2 3 RECEPTACLE WAITING 1002 20 A 1 1.2 1.0 1 20 A RECEPTACLE REGIST 1025 4 5 RECEPTACLE WAITING 1002 20 A 1 1.0 0.8 1 20 A RECEPTACLE 6 7 RECEPTACLE WAITING 1002 20 A I 0.2 1.0 1 20 A RECEPTACLE OBSERVE CARE 1162 8 9 RECEPTACLE COFFEE WAITING 1002 20 A I 0.2 0.6 1 20 A RECEPTACLE OBSERVE CARE 1162 10 11 RECEPTACLE COFFEE WAITING 1002 20 A 1 0.2 0.8 1 20 A RECEPTACLE OBSERVE CARE 1162 12 13 RECEPTACLE VENDING WAITING 1002 20 A 1 0.2 1 1.2 1 20 A RECEPTACLE CLEAN 1104 14 15 RECEPTACLE VENDING WAITING 1002 20A, 1 0.2 1.0 1 20 A RECEPTACLE NURSE STATION 1105 16 17 RECEPTACLE EWC WAITING 1002 20 A 1 0.2 0.2 1 20 A RECEPTACLE ICE NURSE STATION... 18 19 RECEPTACLE CORRIDOR 20 A 1 1.0 0.2 1 20 A RECEPTACLE COFFEE NURSE STA.... 20 21 RECEPTACLE OFFICE 1007 20 A 1 1.0 0.6 1 20 A RECEPTACLE CORR I IC4 22 23 RECEPTACLE SECURITY 1006 20 A 1 0.8 0.2 1 20 A RECEPTACLE NURSE STATION 24 25 RECEPTACLE WORK AREA 1008 20 A 1 0.8 0.8 1 20 A RECEPTACLE NURSE STATION 26 27 RECEPTACLE ICE WORK AREA 1008 20 A 1 0.2 0.8 1 20 A RECEPTACLE NURSE STATION 28 29 1 RECEPTACLE OFFICE 1301 20 A 1 1 1.0 0.2 1 20 A RECEPTACLE NURSE STATION 30 31 RECEPTACLE OFFICE 1302 20 A 1 0.8 0.8 1 20 A I RECEPTACLE CIRCULATION 1014 32 33 RECEPTACLE RECEPT 1303 20 A 1 0.6 0.2 1 20 A I RECEPTACLE RECEPT 1303 34 35 RECEPTACLE CONF 1304 20 A 1 0.8 0.4 1 20 A RECEPTACLE BLOOD GAS ROOM 36 37 RECEPTACLE TLT 1305 20 A 1 0.8 0.2 1 20 A RECEPTACLE MEDS 38 39 RECEPTACLE NURSE STATION 1225 20 A 1 0.8 0.0 1 20 A SPARE 40 41 RECEPTACLE CORR 12C4 20 A 1 1.0 0.0 1 20 A SPARE 42 43 RECEPTACLE BREAK 1223 20 A 1 0.6 0.0 1 20 A SPARE 44 45 RECEPTACLE NURSE STATION 1219 20 A 1 0.6 0.0 1 20 A SPARE 46 47 RECEPTACLE ICE NURSE STATION... 20 A 1 0.2 0.0 1 20 A I SPARE 48 49 RECEPTACLE COFFEE NURSE STA.... 20 A 1 0.2 0.0 1 20 A SPARE 50 51 RECEPTACLE 20 A 1 0.4 0.0 1 20 A SPARE 52 1 53 RECEPTACLE CT SCAN 1 20 A 1 1.0 0.0 1 20 A SPARE 54 1 55 RECEPTACLE CT CONTROL ROOM 20 A 1 0.8 0.0 1 20 A SPARE 56 57 SPARE 20 A 1 0.0 0.0 1 M A SPARE 58 59 SPACE -- -- 0.0 0.0 -- -- SPACE 60 61 SPACE -- -- 0.0 0.0 7 7-- -- SPACE 62 63 SPACE -- -- 0.0 0.0 -- -- SPACE 6411 65 SPACE - -- 0.0 0.0 - -- SPACE 66 67 SPACE - -- 0.0 0.0 -- -- SPACE 68 69 SPACE - --J 0.0 0.0 -- -- SPACE 70 71 SPACE - -- 0.0 0.0 -- -- SPACE 72 73 SPACE -- -- 0.0 0.0 -- -- SPACE 74 75 SPACE -- -- 0.0 0.0 -- -- SPACE 76 77 SPACE - -- 0.0 0.0 -- -- SPACE 78 79 SPACE - -- 0.0 0.0 -- SPACE 80 81 SPACE -- -- 0L..0 0.0 -- -- SPACE 82 83 SPACE - -- 0.6 0.0 -- -- SPACE 84 Phase Connected Load: 11 6 kVA 9.4 kVA CONN. DEMAND DEMAND LOAD... FACTOR LOAD... Lighting - Hospital 0.0 kVA 0.00% 0.0 kVA Receptacle 29.7 kVA 66.82% 19.9 kVA Motor 0.0 kVA 0.00% 0.0 kVA Heating 0.0 kVA 0.00% 0.0 kVA Cooling 0.0 kVA 0.00% 0.0 kVA Other 0.0 kVA 0.00% 0.0 kVA Elevator 0.0 kVA 0.00% 0.0 kVA Spare 0.0 kVA 0.00% 0.0 kVA X-Ray 0.0 kVA 0.00% 0.0 kVA Kitchen Equipment - Non -Dwelling Unit 0.0 kVA 0.00% 0.0 kVA Notes: 1. CONNECT NEW LOAD TO EXISTING SPARE BREAKER 8.8 kVA Total Connected Load: 29.7 kVA Total Demand Load: 19.9 kVA Demand Amps: 55 A 0 E o A N N 8 c'M o U C CJo¢ ¢ U_ . - rr O 29 ti L .O LOU) N W w Z� v p� ILLI W UJ = Z u �a Z � o- W r4 CA •;3, N I..L4 CIO O 0 W ,MM� W O 0 0�. o cn LU W ° eU �? A W a � Z u� c`8 x W 3 U � W Q x W ij:-� W cc 9 SEAL Christopher V. O'Hara, P.E. Florida License #66504 tt,Op H EFJ 0, , V: • No 66504 .'7 -0 SIP STATE OJF .� �i��.S�,C O R J�:-i SHEET TITLE: PANEL SCHEDULES DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: E201 I NO. DESCRIPTION DATE N. 1. THE WORK REQUIRED UNDER THIS DIVISION SHALL INCLUDE ALL MATERIALS, LABOR, TOOLS, EQUIPMENT, TRANSPORTATION, INSURANCE, TEMPORARY PROTECTION, TEMPORARY LIGHTING, SUPERVISION AND INCIDENTAL ITEMS ESSENTIAL FOR PROPER INSTALLATION AND OPERATION, EVEN THOUGH NOT SPECIFICALLY MENTIONED OR INDICATED BUT WHICH ARE USUALLY PROVIDED OR ARE ESSENTIAL FOR PROPER INSTALLATION AND OPERATION OF ALL ELECTRICAL SYSTEMS THE ELECTRICAL SYSTEM REQUIRED UNDER THIS DIVISION CONSISTS BASICALLY OF, BUT IS NOT LIMITED TO THE FOLLOWING: LIGHTING SYSTEM, POWER SYSTEM, ALARM SYSTEM, POWER DISTRIBUTION, EQUIPMENT CONNECTIONS, ACCESS PANELS, EMPTY CONDUIT SYSTEMS AND ALL REQUIRED WIRING. 2. GIVE ALL NOTICES, FILE ALL PLANS, PAY ALL FEES, OBTAIN ALL PERMITS, ALL LICENSES, INSPECTIONS, RE -INSPECTIONS AND APPROVALS FROM AUTHORITIES HAVING JURISDICTION. INCLUDE ALL FEES IN THE BID 3. A. SPECIAL ATTENTION IS CALLED TO THE FACT THAT WORK INVOLVED IS IN CONNECTION WITH EXISTING BUILDINGS WHICH REMAIN IN OPERATION WHILE WORK IS BEING PERFORMED. WORK MUST BE DONE IN ACCORDANCE WITH THE PRIORITY SCHEDULE. SCHEDULE WORK FOR A MINIMUM OUTAGE TO OWNER. CONTRACTOR SHALL CLOSELY COORDINATE WITH THE HOSPITAL PRIOR TO COMMENCING WORK AND DURING CONSTRUCTION FOR POWER ANDIOR SYSTEM OUTAGES AS WELL AS GENERAL REQUIREMENTS. RECEIVE WRITTEN ACCEPTANCE FROM THE OWNER NO LATER THAN 7 DAYS IN ADVANCE OF ALL POWER OUTAGES. CONTRACTOR SHALL WORK DURING OFF HOURS (EVENINGS & WEEKENDS) WHEN DEEMED NECESSARY BY THE HOSPITAL. PROTECT EXISTING BUILDINGS AND EQUIPMENT DURING CONSTRUCTION. B. CONTRACTOR SHALL VERIFY IF THERE IS ANY PIPING, FIXTURES OR OTHER ITEMS IN THE EXISTING BUILDING WHICH MUST BE REMOVED OR RELOCATED IN ORDER TO PERFORM THE ALTERATION WORK. BID SHALL INCLUDE ALL REMOVAL AND RELOCATION REQUIRED FOR COMPLETION OF THE ALTERATIONS AND THE NEW CONSTRUCTION. C. ALL EXISTINGINEW CONDUIT AND CABLES WITHIN THE AREA OF RENOVATION SHALL BE PROVIDED WITH PROPER SUPPORTS. D. ALL EXISTING ELECTRICAL WHICH IS DESIGNATED FOR REWORKING OR REQUIRES RELOCATION, REPAIR OR ADJUSTMENT SHALL CONFORM TO ALL APPLICABLE CODES AND SHALL BE TREATED AS NEW WORK COMPLYING TO ALL PARTS OF THIS SPECIFICATION. E. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED PROGRAMMING FOR CONNECTION TO EXISTING SYSTEMS INCLUDING BUT NOT LIMITED TO FIRE ALARM AND NURSE CALL. 4. ALL MATERIALS SHALL BE NEW AND FREE OF DEFECTS, AND SHALL BE U.L. LISTED, BEAR THE U.L. LABEL OR BE LABELED OR LISTED WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY, WHERE NO LABELING OR LISTING SERVICE IS AVAILABLE FOR CERTAIN TYPES OF EQUIPMENT, TEST DATA SHALL BE SUBMITTED TO PROVE TO THE ENGINEER THAT EQUIPMENT MEETS OR EXCEEDS AVAILABLE STANDARDS, AFTER TEST DATA IS SUBMITTED AND TENTATIVELY APPROVED, THE CONTRACTOR SHALL PAY FOR ANY REQUIRED FIELD LUSTING ANDIOR CORRECTIVE WORK REQUIRED BY THE FIELD LISTING INSPECTOR IF ALLOWED BY THE AHJ. 5. PROVIDE SHOP DRAWING SUBMITTALS TO THE ARCHITECTIENGINEER FOR APPROVAL FOR ALL MATERIAL PROVIDED UNDER THIS DIVISION. EQUIPMENT SHALL NOT BE ORDERED PRIOR TO APPROVAL FROM THE ARCHITECTIENGINEER. 6. COORDINATION STUDY: ALL PANELBOARD AND CIRCUIT BREAKERS SHALL MATCH THE EXISTING TYPE, AIC RATING, AND MANUFACTURER. ANY DISCREPANCIES OR CONFLICTS IN THE SPECIFIED EQUIPMENT SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER DURING BID FOR FORMAL CLARIFICATION. 7. PROVIDE AND INSTALL ALL ELECTRICAL SYSTEMS AND ANY NECESSARY ACCESSORIES AS PER NEC AND LOCAL CODES WHETHER SPECIFIED HEREIN OR SHOWN ON DRAWINGS OR NOT. THE CONTENT OF THESE SPECIFICATIONS (DIVISION 26) AND CONTRACT DOCUMENTS IN GENERAL ONLY REFERS TO WORK REQUIRED ABOVE AND BEYOND THE REQUIREMENTS OF THE NEC AND LOCAL CODES. 8. DRAWINGS ARE DIAGRAMMATIC. COORDINATE FINAL EQUIPMENT LOCATIONS WITH GOVERNING ARCHITECTURAL AND STRUCTURAL DRAWINGS. LAY OUT BEFORE INSTALLATION SO THAT ALL TRADES MAY INSTALL EQUIPMENT IN SPACES AVAILABLE. PROVIDE COORDINATION AS REQUIRED FOR INSTALLATION IN A NEAT AND WORKMANLIKE MANNER. 9. CHECK SITE AND EXISTING CONDITIONS THOROUGHLY BEFORE BIDDING. ADVISE ENGINEER OF DISCREPANCIES OR QUESTIONS NOTED. WHERE EXISTING CONDITIONS ARE DISCOVERED WHICH ARE NOT IN COMPLIANCE WITH THE CODES AND STANDARDS, THE CONTRACTOR SHALL SUBMIT PROPER DOCUMENTATION TO THE ARCHITECT FOR CLARIFICATION AND CORRECTIVE WORK DIRECTION. EXISTING CONDITIONS SHALL NOT REMAIN WHICH WILL CREATE A DISAPPROVAL OF THE RENOVATED AREA. 10. ALL EXISTING CONDUIT AND CABLE PENETRATIONS SHALL BE PROPERLY FIRE TREATED PER CODE AND SPECIFICATION REQUIREMENTS. THE CONTRACTOR SHALL THOROUGHLY INSPECT ALL EXISTING LOCATIONS AND INCLUDE THE COST OF PATCHING AND REPAIR IN HIS PROPOSED CONSTRUCTION COST. 11. PROVIDE FIELD SUPERINTENDENT WHO HAS HAD A MINIMUM OF FOUR (4) YEARS PREVIOUS SUCCESSFUL EXPERIENCE ON PROJECTS OF COMPARABLE SIZES AND COMPLEXITY. SUPERINTENDENT SHALL BE PRESENT AT ALL TIMES THAT WORK UNDER THIS DIVISION IS BEING INSTALLED OR AFFECTED. SUPERINTENDENT SHALL HAVE PASSED A PROCTORED H.H. BLOCK JOURNEYMAN EXAM WITH 75% GRADE OR BETTER AND SHALL BE A LICENSED JOURNEYMAN. A RESUME OF THE SUPERINTENDENTS EXPERIENCE SHALL BE SUBMITTED TO ENGINEER BEFORE STARTING WORK. AT LEAST ONE MEMBER OF THE ELECTRICAL CONTRACTING FIRM SHALL HOLD A STATE MASTER CERTIFICATE OF COMPETENCY. 12. PROVIDE ALL REQUIRED COORDINATION AND SUPERVISION WHERE WORK CONNECTS TO OR IS AFFECTED BY WORK OF OTHERS, AND COMPLY WITH ALL REQUIREMENTS AFFECTING THIS DIVISION. 13. SUITABLY PROTECT ALL EQUIPMENT FURNISHED UNDER THIS DIVISION DURING CONSTRUCTION. RESTORE ALL DAMAGED SURFACES AND ITEMS TO 'LIKE NEW CONDITION BEFORE A REQUEST FOR SUBSTANTIAL COMPLETION INSPECTION. 14. THE WORK REQUIRED UNDER THIS DIVISION SHALL INCLUDE A ONE-YEAR GUARANTEE. THIS GUARANTEE SHALL BE BY THE CONTRACTOR TO THE OWNER FOR ANY DEFECTIVE WORKMANSHIP OR MATERIAL WHICH HAS BEEN FURNISHED UNDER THIS CONTRACT AT NO COST TO THE OWNER FOR A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OF THE SYSTEM. THIS GUARANTEE SHALL NOT INCLUDE LAMPS IN SERVICE. THE PROVISIONS OF GUARANTEE TO THE OWNER AT THE "DEMONSTRATION OF COMPLETED AFTER ONE MONTH FROM DATE OF SUBSTANTIAL COMPLETION OF THE SYSTEM.' 15. PERFORM VERIFICATION WORK AS REQUIRED TO SHOW THAT THE SYSTEM IS OPERATING CORRECTLY IN ACCORDANCE WITH CONTRACT DOCUMENTS AND MANUFACTURER'S LITERATURE. ALL VERIFICATION SHALL BE DONE AFTER 3-DAY FULL OPERATIONAL PERIOD. ALL WORK ON THE SYSTEM SHALL BE COMPLETED, AND ALL FORMS AND OTHER INFORMATION SHALL. BE SUBMITTED FOR APPROVAL ONE WEEK BEFORE THE REQUEST FOR FINAL INSPECTION OF THE BUILDING. 16. WHERE THE REQUIREMENTS OF ANOTHER DIVISION, SECTION, OR PART OF THESE SPECIFICATIONS EXCEED THE REQUIREMENTS OF THIS DIVISION, THOSE REQUIREMENTS SHALL GOVERN. 17. THE ENTIRE INSTALLATION SHALL BE IN HOT DIPPED RIGID GALVANIZED CONDUIT, OR ELECTRIC METALLIC TUBING, UNLESS SPECIFICALLY NOTED OTHERWISE. RIGID METAL GALVANIZED CONDUIT SHALL BE USED IN ALL DAMP OR WET LOCATIONS OR WHERE SUBJECT TO MECHANICAL DAMAGE. ELECTRIC METALLIC TUBING SHALL HAVE STEEL COMPRESSION TYPE COUPLINGS AND BE USED INSIDE OF BUILDINGS AND ONLY IN DRY AREAS WHERE NOT EXPOSED TO MECHANICAL DAMAGE. MINIMUM CONDUIT SIZE FOR ALL SYSTEMS SHALL BE 3/4'. PROVIDE INSULATED BUSHINGS AT ENDS OF ALL CONDUITS. ALL CONDUITS AND BACKBOXES SHALL BE COLOR CODED TO MATCH EXISTING HOSPITAL STANDARDS. SUPPORT CONDUIT IN ACCORDANCE WITH THE NEC. LISTED WHIPS FOR LIGHTING FIXTURES SHALL BE ALLOWED NO LONGER THAN V-0' IN LENGTH. 18. BRANCH CIRCUIT AND FEEDER CONDUCTORS FOR ELECTRIC POWER SHALL BE COPPER TYPE THHNITHWN INSULATION FOR BRANCH CIRCUITS AND THWN INSULATION FOR FEEDERS, UNLESS SPECIFICALLY NOTED OTHERWISE. SIZES #12 AND SMALLER SHALL BE SOLID, #10 AND LARGER STRANDED. NO ALUMINUM WIRING SHALL BE PERMITTED. ALL WIRE SHALL BE SIZE SHOWN ON THE DRAWINGS. IF NO SIZE IS SHOWN, WIRE SHALL BE MINIMUM NO. 12, EXCEPT THAT BRANCH 'HOMERUNS' OVER 50 FT. IN LENGTH SHALL BE MINIMUM NO. 10. WIRE IN VICINITY OF HEAT -PRODUCING EQUIPMENT SHALL BE TYPE XHHW INSULATION. ALL WIRING SHALL BE MANUFACTURED IN THE USA. WIRING SHALL BE COLOR CODED ACCORDING TO EXISTING HOSPITAL STANDARDS. USE OF MULTI -WIRE BRANCH CIRCUIT CONFIGURATIONS ARE NOT PERMITTED. ALL BRANCH CIRCUITS SPECIFIED SHALL BE PROVIDED WITH A DEDICATED NEUTRAL. CONDUCTOR EACH SIZED TO MATCH THE CORRESPONDING PHASE CONDUCTORS FOR THE BRANCH CIRCUIT. 19. EACH THREE-PHASE CIRCUIT SHALL BE RUN IN A SEPARATE CONDUIT UNLESS OTHERWISE SHOWN ON THE DRAWINGS. CONDUIT SHALL NOT BE INSTALLED EXPOSED UNLESS OTHERWISE NOTED. WHERE CIRCUITS ARE SHOWN AS 'HOME -RUNS' ALL NECESSARY FITTINGS AND BOXES SHALL BE PROVIDED FOR A COMPLETE RACEWAY INSTALLATION. NEUTRAL CONDUCTORS SHALL NOT BE SHARED BETWEEN CIRCTUITS AND THEREFORE ALL CIRCUITS REQUIRING A NEUTRAL CONDUCTOR SHALL EACH RECEEVE A DEDICATED NEUTRAL SIZED TO MATCH THE CORRESPONDING PHASE CONDUCTORS. 20. OUTLET BOXES SHALL BE ONE PIECE OR PROJECTION WELDED, GALVANIZED STAMPED STEEL FOR GANG SIZES REQUIRED. SECTIONAL BOXES ARE NOT ACCEPTABLE. BOXES SHALL BE 4' SQUARE AND 1-1/2' DEEP GENERALLY. LARGER BOXES SHALL BE USED AS REQUIRED BY CODE. 21. ALL RECEPTACLES SHALL BE 20 AMP HOSPITAL GRADE, STANDARD DUPLEX GROUNDING TYPE. SWITCHES SHALL BE SPECIFICATION GRADE, 20 AMP,120/277 VOLT AND SHALL BE OF THE SILENT OPERATING TYPE. GFCI RECEPTACLES SHALL BE HOSPITAL GRADE, UL RATED CLASS A, GROUP 1. COVER PLATES SHALL BE STAINLESS STEEL FINISHED. ALL WIRING DEVICE COVER PLATES INCLUDING BUT NOT LIMITED TO RECEPTACLES AND SWITCHES SHALL BE ENGRAVED WITH THE BRANCH CIRCUIT IDENTIFICATION AS REQUIRED (I.E. 'PANELNAME'.'CIRCUIT NUMBER'. COVERPLATES SHALL BE STAINLESS STEEL WITH BLACK INFILLED LETTERS FOR NORMAL BRANCH AND RED INFILLED LETTERS FOR EMERGENCY BRANCHES. RECEPTACLES AND SWITCHES SHALL HAVE IVORY FINISH FOR NORMAL BRANCH DEVICES AND RED FINISH FOR CRITICAL BRANCH DEVICES. APPROVED MANUFACTURER: PASS & SEYMOUR, LEVITON, HUBBELL 22. ALL EQUIPMENT SHALL BE FIRMLY MOUNTED USING APPROVED HANGERS ATTACHED TO STRUCTURAL PORTIONS OF THE BUILDING. SUPPORTING WITH TIE WIRE IS PROHIBITED. LIGHT FIXTURES RECESSED IN CEILINGS SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE INDEPENDENT OF THE CEILING SYSTEM. DIVISION 26 SPECIFICATIONS 23. IN GENERAL, ALL ELECTRICAL EQUIPMENT (METALLIC CONDUIT, MOTOR FRAMES, PANELBOARDS, ETC.) SWILL BE BONDED TOGETHER WITH A GREEN INSIAATED COPPER SYSTEM GROUNDING CONDUCTOR IN ACCORDANCE WITH SPECIFIC RULES OF ARTICLE 250 OF THE N.E.C. BONDIING CONDUCTOR THROUGH THE RACEWAY SYSTEM SHNL BE CONTINUOUS FROM EACH WIRING DEVICE OR EQUIPMENT TO PANEL GROUND BAR OF EACH PANELBOARD. PROVIDE GROUND BAR BOLTED TO THE CAN OF EXISTING PANELS WITHOUT A GROUND BAR ALL RACEWAYS SHALL HAVE AN INSULATED COPPER SYSTEM GROUND CONDUCTOR THROUGHOUT THE ENTIRE LENGTH OF CIRCUIT INSTALLED WT1M CONDUIT PER NEC 517.13. GROUNDING CONDUCTOR SHALL BE INCLUDED IN TOTAL FILL IN DETERMINING CONDUIT SIZES, EVEN THOUGH NOT INCLUDED OR SHOWN ON DRAWINGS. 24. A. MOLM CASE CIRCUIT BREAKERS : ALL PANELBOARD BRANCH CIRCUIT BREAKERS SHALL BE BOLT -ON THERMAL -MAGNETIC MOLDED CASE TYPE. BREAKERS SHALL BE 1, 2 OR 3 POLE WITH AN INTEGRAL CROSSBAR TO ASSURE SIMULTANEOUS OPENING OF ALL POLES IN MULT141OLE CIRCUIT BREAKERS. BREAKERS SHALT. HAVE AN OVERCENTER,TRIP-FREE,T000LE-TYPE OPERATING MECHANISM WITH QUICK. MAKE, QUICK -BREAK ACTION AND ACTIVE HANDLE INDICATION. HANDLES SWILL HAVE 'ON','OFP, AND 'TRIPPED' POSITIONS. BOLT -ON CIRCUIT BREAKERS SHALL BE ABLE TO BE INSTALLED IN THE PANELBOARD WITHOUT REQUIRING ADDITIONAL MOUNTING HARDWARE. 120/20 VOLT CIRCUIT BREAKERS SHALL HAVE INTERRUPTING RATINGS A MINIMUM OF 10,000 IN SYMMETRICAL AMPERES AT 240VAC. 277MO VOLT CIRCUIT BREAKERS SHALL HAVE INTERRUPTING RATINGS A MINIMUM OF 18,000 RMS SYMMETRICAL AMPERES AT 600VAC. 28. RECORD DRAWINGS: AT THE COMPLETION OF WORK, CONTRACTOR SHALL PROVIDE TWO SETS OF RECORD'AS-BUILT DRAWINGS IN ACCORDANCE WITH DIVISION 1, SHOWING THE ACTUAL LOCATION OF ALL EQUIPMENT INSTALLED INCLUDING UNDERGROUND CONDUITS AND JUNCTION BOXES. 26. CONTRACTOR SHALL CLOSELY COORDINATE WITH THE HOSPITAL PRIOR TO COMMENCING WORK AND DURING CONSTRUCTION FOR POWER ANDIOR SYSTEM OUTAGES AS WELL AS GENERAL REQUIREMENTS. A SEVEN (7) DAY NOTICE SHALL BE GIVEN FOR ALL POWER OUTAGES. CONTRACTOR SHALL WORK DURING OFF HOURS (EVENINGS & WEEKENDS) WHEN DEEMED NECESSARY BY THE HOSPITAL. 27. GROUND TESTING: CONTRACTOR SHALL PERFORM A COMPLETE EQUIPOTENTIAL GROUND TEST IN ACCORDANCE WITH NFPA 99 UPON THE COMPLETION OF ALL BRANCH CIRCUITS TO THE PANELS SPECIFIED. GROUND TEST SHALL BE IN A TYPED WRITTEN FORMAT FOR ISSUANCE TO MCA AT THE 100% INSPECTION. TEST SHALL BE PERFORMED IN ALL AFFECTED PATIENT -CARE AREAS. 28. COLOR CODING : COLOR CODE ALL POWER AND LIGHTING CABLE. COLOR CODE THE WIRE BY USING COLORED PLASTIC TAPE, PAINTING THE ENDS ACCESSIBLE AT JUNCTION OR PULL BOXES, OR OTHER METHOD ACCEPTABLE TO THE ENGINEER USE THE FOLLOWING CHART AS APPLICABLE; 1201208 277/480 CONDUCT VOLTS NCO DUCTOR VOLTS PHASE A BLACK PHASE A BROWN PHASE B RED PHASE B ORANGE PHASE C BLUE PHASE C YELLOW NEUTRAL WHITE NEUTRAL GRAY EQUIRGROUND GREEN EQUIPAROUND GREEN 29. COLOR CODING OF RACEWAYSIBOXES: ALL BOXES AND ENCLOSURES SHALL BE MARKED SO AS TO BE READILY IDENTIFIED AS PART OF THE SYSTEM FOR WITH IT SERVES. CONDUIT AND BOXES, INCLUDING BACK BOXES. PANELS, ETC. SHALL BE SPOT PAINTED. CONDUITS SHALL BE IDENTIFIED TO WITHIN 6' OF THE BOX OR ENCLOSURE. PROVIDE SPOT PAINTING BINDS AT ALL CONDUIT COUPLING LOCATIONS OR EVERY IT-0' WHICHEVER IS LESS ALONG WITHIN 6' OF EACH SIDE OF WALLS AND FLOOR THAT THE CONDUIT PENETRATES. THE FOLLOWING COLOR CODES SHALL BE USED UNLESS OTHERWISE REQUIRED TO MATCH EXISTING COLOR CODING; BLACK: NORMAL BROWN: MISCELLANEOUS COMMUNICATIONS PURPLE: ESSENTIAL DISTRIBUTION BLUE: TELEPHONSCOMPUTER YELLOW: LIFE SAFETY BRANCH WHITE: NURSE CALL ORANGE: CRITICAL BRANCH LIGHT PINK: TV GREEN: EQUIPMENT BRANCH GREY: PAGING RED: FIRE ALARM BRANCH BEIGE: PHYSIOLOGICAL MONITORING 30, EQUIPMENT IDENTIFICATION: LOCATIONS: PROVIDE NAMEPLATES FOR EACH UNIT OF THE FOLLOWING CATEGORIES OF ELECTRICAL WORK: A. SWITCHBOARD, PANELBOARDS, ELECTRICAL CABINETS AND ENCLOSURES. (1) PROVIDE A NAMEPLATE OUTSIDE ABOVE THE DOOR (IF EQUIPPED WITH ONE) LISTING ITS DESIGNATION, BRANCH, VOLTAGE AND CIRCUIT NUMBER (2) PROVIDE AN ENGRAVED PHENOLIC PLASTIC LAMINATE NAMEPLATE: (NORMAL BRANCH: BLACK WANHITE LETTTERS) (CRITICAL BRANCH: ORANGE W/WHITE LETTTERS) (EQUIPMENT BRANCH: GREEN W/WHITE LETTTERS) (LIFE SAFETY BRANCH: YELLOW WIWHITE LETTTERS) (3) NAMEPLATE SIZE SHALL MATCH EXISTING. B. ACCESS PANEUDOORS TO ELECTRICAL FACILITIES. C. MOTOR STARTERS. D. ALL WIRING DEVICES COVERPLATES INCLUDING BUT NOT LIMITED TO RECEPTACLES AND SWITCHES SHALL BE REPLACED WITH NEW 302 STAINLESS STEEL COVERPLATES, AND ENGRAVED IN BLACK FOR NORMAL AND RED FOR EMERGENCY BRANCHES WITH THE BRANCH CIRCUIT IDENTIFICATIONS AS REQUIRED (I.E.'PANELNAME' - CIRCUIT NUMBERI, E. ALL EXIT LIGHTS TO HAVE LABELS MADE (WHITE WIRED LETTERS) AND INSTALLED ON CANOPY OF FIXTURE WITH PANELNAME - CIRCUIT NUMBER F. ALL AUTOMATIC DOOR CONTROLLERS TO HAVE LABELS MADE (WHITE WIRED LETTERS) AND INSTALLED BY DOOR CONTROL ENCLOSURE (LOCATED BELOW THE CEILING) WITH PANELNAME - CIRCUIT NUMBER. 1000 GDP-CB2 SQUARE D, ME 800.0 AT/800 AP Settings Phase LTPU (0.5-1.0 x P) 1.0 (800A) LTD (2-24 Sec.) 11 STPU (2-10 x P) 6.0 (4800A) STD (0.1-0.5 Sec.) .1 (1"2t Off) INST (3-12 x P) 8.0 (6400A) wo MSB-CB4 SQUARE D, ME 800.0 AT/800 AP Settings Phase LTPU (0.5-1.0 x P) 1.0 (800A) LTD (2-24 Sec. ) 24 STPU (2-10 x P) 3 (2400A) STD (0.1-0.5 Sec.) .5 (1^2t Off) 10 INST (3-12 x P) 8.0 (6400A) 1, 0.10 CURRENT IN AMPERES 1 HCBDP-CB6 SQUARE D, HJ 150.0 AT/150 AP Settings Phase Ir (50-150A); tr (Fixed)125 (125A); Fixed Isd (1.5 - 10 x Ir); tsd 10 (1250A); Fixed Ii (1.5 - 15 x In) 12 (1800A) NEW -CT -ECM SQUARE D, HJ 150.0 AT/150 AP Settings Phase Ir (50-150A); tr (Fixed) 125 (125A); Fixed Isd (1.5 - 10 x Ir); tsd 10 (1250A); Fixed Ii (1.5 - 15 x In) 12 (1800A) 0.01 0.5 1 10 100 1K NEW CT.tcc Ref. Voltage: 480V Current in Amps x 1 10K m Z CD m O Z CD 0 t�D A' CON�N d 8 9 r�.-OCR. Cb > C �Ch N 7 ¢U_oa =O­ $ pzau- R .O L N W Z V W w W = Z u �a Z� o W rA r- � O � R3 M N rA O o O w "..0 �M W CC3 p co H W U d •D z W a F- z 0 W 3 U �c W a _ LL Q W w a 9, Y SEAL Christopher V. O'Hara, P. E. Florida License #166504 OP H ER f OI , V:No 66504 •.'7 ' O R I O C?� , �t STATE OF l --t,v,0 N A� ��.� SHEET TITLE: ELECTRICAL SPECIFICATIONS DATE: 10/25/17 SCALE: AS SHOWN SHEET NO.: E3w 1 > - T---------------- i c 0