Loading...
HomeMy WebLinkAbout38450 Valley Oaks Cira2 U Cn Q (D It to cu O O N N cM C O '0 N O a co v 0 Senior Apartments Picnic Pavilion Owner. FINLAY INTERESTS 13, LTD. The Brandywine Center I. 580 Village Boulevard, Suite 360 I West Palm Beach . Florida . 33409 P: 561.242.4814 I F: 561.242.5304 Architect. FORUM ARCHITECTURE & INTERIOR DESIGN, INC. 745 Orienta Avenue. Suite 1121 I Altamonte Springs . Florida . 32701 P: 407.830.1400 I F: 407.830.4143 I E: jchue@forumarchitecture.com Structural Engineer . MCLAREN ENGINEERING GROUP 5728 Major Boulevard, Suite 603 I Orlando . Florida. 32819 P: 407.354.54111 F: 407.354.5411 I E: roleck@mgmclaren.com P.M.E. Engineer. SGM ENGINEERING, INC. 935 Lake Baldwin Lane I Orlando. Florida. 32814 P: 407.767.5188 I F: 407.767.5772 I E: victor@sgmengineering.com Zephyrhills, FL 12/17/09 Bid Set 01/25/10 Misc. Coordination 03/02/10 Permit Set ............................. ;.................................- FORUME ARCHITECTURE & INTERIOR DESIGN, INC. PLANNING I ARCHITECTURE I INTERIOR DESIGN 745 orienta avenue, suite 1121 altamonte springs, fl 32701 phone: 407.830.1400 fax: 407.830.4143 AA0002731 www.forumarchitecture.com Meetinghouse at Zephyrhills Senior Apartments City of Zephyrhills, FL 0 i PROJECT NO. 09-2587 z c� N O o Picnic Pavilion W Title Sheet, Z Drawing Index LU & Issue History .............. U w x 0 Al 9,60 0 LL 0 WOOD STRUCTURAL PANEL (PLYWOOD) N FOUNDATION M GENERAL CODES 01 PLYWOOD USED FOR ROOF SHEATHING SHALL BE 5/8" APA RATED SHEATHING, EXP.1, APA IDENTIFICATION 01 FOUNDATIONS HAVE BEEN DESIGNED TO AN ALLOWABLE SOIL BEARING PRESSURE OF 2,000 PSF. SHOULD 01 CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES AND MUST NOTIFY FLORIDA BUILDING CODE - BUILDING 2007 W/ APPLICABLE SUPPLEMENTS INDEX 32/16, OR BETTER. CONDITIONS VARY FROM THE ASSUMED, THE ARCHITECT SHALL BE NOTIFIED BEFORE CONTINUATION OF ARCHITECT OF DISCREPANCIES INDICATED BY THESE DOCUMENTS FOUND DURING BIDDING AND PRIOR TO FLORIDA FIRE PREVENTION CODE 2007 EDITION WORK. PROCEEDING WITH THE WORK. NATIONAL ELECTRIC CODE 2008 EDITION FORUME 02 PLYWOOD SHALL BE NAILED TO JOISTS AS PER ROOF FASTENING ZONE PLAN. 03 USE PLYCLIPS OR OTHER EDGE SUPPORTS FOR ALL PLYWOOD SHEATHING. 04 PLACE FACE GRAIN IN DIRECTION OF SPAN (TRANSVERSE TO JOIST OR TRUSS SPAN). 05 LEAVE 1/16" SPACE AT ALL PLYWOOD PANEL END JOINTS AND 1/8" SPACE AT ALL PANEL EDGE JOINTS. MICROLL.AM® OR PARALLAMO BEAMS 01 MICROLLAMO OR PARALLAMO BEAMS ARE INDICATED ON DRAWINGS AS:LVL OR PSL. 02 MICROLLAMO BEAMS SHALL HAVE THE FOLLOWING MINIMUM PROPERTIES: E = 1.9X10"6PSI FB = 2,600 PSI FT = 1,555 PSI FC = 750 PSI FC, PARALLEL = 2,510 PSI FV = 285 PSI 03 BEAMS MUST BE LATERALLY SUPPORTED AT TOP. 04 MINIMUM BEARING LENGTH SHALL BE MINIMUM OF 1-1/2" AT ENDS AND 3-1/2" AT INTERMEDIATE SUPPORTS. 05 MULTIPLE MEMBERS SHALL BE FASTENED TOGETHER IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. TRUSSES 01 SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL OF ALL WOOD TRUSSES. 02 SHOP DRAWINGS SHALL SHOW CHORD AND WEB SIZES, STRENGTHS, STIFFENERS (AS REQUIRED), BEARING DETAILS, BRIDGING, BRACING, ERECTION NOTES AND DESIGN CALCULATIONS. TRUSSES SHALL BE DESIGNED TO MEET THE DESIGN LOADS SHOWN ON THE STRUCTURAL NOTES AND PLANS. MAXIMUM LIVE LOAD DEFLECTION SHALL BE LESS THAN 1/240 OF THE SPAN. MAXIMUM DEFLECTION UNDER FULL DESIGN LOAD SHALL BE LIMITED TO 1/180 OF THE SPAN. 03 ALL SHOP DRAWINGS, ERECTION DRAWINGS AND CALCULATIONS SHALL BEAR THE SEAL AND SIGNATURE OF A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF THIS PROJECT. 04 LATERAL BRACING OF WEB MEMBERS SHALL INCLUDE A DIAGONAL BRACE (2" THICK NOMINAL) AT SPACING NOT TO EXCEED 20 FEET. ALL END BAYS SHALL BE DIAGONALLY BRACED. 05 BOTTOM CHORDS OF WOOD TRUSSES SHALL BE CONTINUALLY BRACED AT A SPACING NOT TO EXCEED 10 FEET, LOCATED AT OR NEAR A PANEL POINT. DIAGONAL BRIDGING SHALL BE INSTALLED AT END BAYS AND IN INTERMEDIATE BAYS AT 20 FEET SPACING. 06 THE TRUSS ERECTOR IS RESPONSIBLE FOR PROPER TRUSS HANDLING AND FOR TEMPORARY BRACING. ERECTION BRACING SHALL BE APPLIED AS EACH TRUSS IS PLACED IN POSITION. CARE MUST BE TAKEN TO STABILIZE THE FIRST TRUSS AND DIAGONAL BRACING IS NECESSARY TO AVOID PROGRESSIVE COLLAPSE. 02 ALL FOOTINGS SHALL BE PLACED DIRECTLY ON VIRGIN SOIL, OR CERTIFIED COMPACTED FILL. 03 CONCRETE FOR FOUNDATIONS: A 28 DAY COMPRESSIVE STRENGTH FOR CONCRETE SHALL BE AS FOLLOWS: FOOTINGS 3000 PSI SLAB ON GRADE 3000 PSI WALLS 3500 PSI B MAXIMUM CONCRETE SLUMP SHALL BE 4". C SLAB ON GRADE SHALL BE 5" THICK WITH WWF 6 x 6 -W1.4 x W1.4. SLAB SHALL BE FINISHED IN ACCORDANCE WITH ACI STANDARD 302 FOR CLASS 2 FLOORS. IN LIEU OF WWF, SLAB ON GRADE MAY CONSIST OF FIBER REINFORCED CONCRETE ACI 544.2R-89. D ALL CONCRETE SHALL BE MIXED, TRANSPORTED AND PLACED IN ACCORDANCE WITH ACI STANDARDS 318, 304 AND 301. E ALL REINFORCING BARS SHALL BE OF BILLET STEEL CONFORMING TO ASTM A615, GRADE 60. F ALL WELDED WIRE MESH SHALL CONFORM TO ASTM A185. G ALL VERTICAL SURFACES OF CONCRETE SHALL BE FORMED FOR WALLS AND FOOTINGS. H REINFORCING STEEL SHALL BE PLACED TO PROVIDE THE FOLLOWING MINIMUM CONCRETE COVER: SLAB ON GRADE 1-1/2" WALLS 2" FOOTINGS 3" I GRADE BEAMS SHALL BE FORMED ON SIDES. 04 ALL FILL SHALL BE PLACED IN 8 INCH LOOSE LIFTS (MAXIMUM) COMPACTED WITH VIBRATORY ROLLERS. FILL MATERIAL SHALL BE TESTED BY MODIFIED PROCTOR DENSITY METHOD (ASTM D1557) AND MUST QUALIFY AS SELECT, WITH LESS THAN 10% PASSING THROUGH THE NO.200 SIEVE. SOIL SHALL BE PLACED WITH MOISTURE CONTENT AND ENERGY TO PROVIDE 98% OF MAXIMUM DRY DENSITY BELOW SLABS ON GRADE, AND SOIL SHALL BE COMPACTED TO 98% 12" AND 24" BELOW STRIP FOOTINGS AND COLUMN FOOTINGS, RESPECTIVELY. IN PLACE DENSITY TESTS SHALL BE TAKEN FOR EACH 2,000 S.F. IN EACH LIFT. FOR ACCEPTANCE OF SOIL, AVERAGE OF DENSITY TESTS MUST EXCEED THE SPECIFIED COMPACTION. NO TESTS SHALL BE PERMITTED TO FALL BELOW 90% COMPACTION. 05 ALL EXTERIOR FOOTINGS SHALL BE PLACED A MINIMUM OF 2'-0" BELOW FINAL GRADE WHEN BEARING ON SOIL, UNLESS NOTED OTHERWISE ON THE FOUNDATION DRAWINGS. 06 WHERE NECESSARY, FOOTING STEPS SHALL BE CONSTRUCTED AT MAXIMUM SLOPE OF 1 VERTICAL TO 2 HORIZONTAL. 07 WHERE ROCK OUTCROPPINGS ARE ENCOUNTERED IN A BUILDING FOUNDATION BEARING ON SOIL, SUCH OUTCROPPING OR INTERFERENCE SHALL BE REMOVED TO A DEPTH 12 INCHES BELOW BOTTOM OF FOOTING AND REPLACED WITH CLEAN GRANULAR MATERIAL CONTAINING LESS THAN 5% SILT, COMPACTED TO 95% DENSITY PER MODIFIED PROCTOR METHOD. MAINTAIN A MINIMUM COVER OF 1'-6" TO BOTTOM OF CONCRETE 08 WHERE SOLID UNFRACTURED ROCK IS ENCOUNTERED FOR A WALL LENGTH OF AT LEAST 25 FEET, WALLS MAY BE POURED WITHOUT FOOTINGS BY TRENCHING 6 INCHES INTO THE ROCK AND PINNING THE WALL TO ROCK WITH #6 x T-0" LONG DOWELS AT 2'-8" ON CENTER, GROUTED INTO ROCK, EXTENDING V-6" INTO ROCK. NO FROST PROVISIONS ARE REQUIRED FOR THIS DETAIL. PROVIDE CONTROL JOINT IN WALL AT ANY TRANSITION BETWEEN ROCK BEARING AND SOIL BEARING CONDITIONS. 09 EXCAVATIONS SHALL BE DEWATERED TO A DEPTH OF AT LEAST 2 TO 3 FEET BELOW THE BOTTOM OF THE EXCAVATIONS TO ALLOW INSTALLATION OF FOOTINGS IN DRY ATMOSPHERE. 10 DIFFERENTIAL BACKFILL AGAINST FOUNDATION WALLS SHALL NOT EXCEED FOUR FEET UNTIL TOP BRACING OR FRAMEWORK HAS BEEN IN PLACE FOR A MINIMUM OF THREE DAYS. CANTILEVERED RETAINING WALLS MAY BE BACK -FILLED WITHIN 14 DAYS OF CONCRETE PLACEMENT, BUT IN NO CASE SHALL DIFFERENTIAL OF BACKFILL, BETWEEN OPPOSITE SIDES OF THE WALL, EXCEED THE FINAL DESIGN DIFFERENTIAL. 11 ALL BOTTOM OF FOOTING ELEVATIONS ARE SUBJECT TO CHANGE UPON INSPECTION OF SOIL CONDITION. ELEVATION OF ADJACENT FOOTINGS SHALL VARY ON A SLOPE NOT STEEPER THAN ONE VERTICAL TO TWO HORIZONTAL. 12 THE CONTRACTOR SHALL NOTIFY THE ENGINEER WHERE BOTTOM OF FOOTING ELEVATION IS CHANGED AND OBTAIN REVISED DESIGN OF THE FOUNDATION AND RETAINING WALLS AS REQUIRED. 13 A MINIMUM 6-MIL POLYETHYLENE VAPOR BARRIER BETWEEN THE BOTTOM OF THE FLOOR SLAB AND THE TOP OF THE COMPACTED SUBGRADE SHALL BE INSTALLED. LUMBER 01 ALL NEW LUMBER SHALL BE VISUALLY GRADED LUMBER, SOUTHERN YELLOW PINE NO.2 OR BETTER WITH MAXIMUM MOISTURE CONTENT OF 19% AND MINIMUM E=1,600,000 PSI IN ACCORDANCE WITH THE NATIONAL DESIGN SPECIFICATION (NDS) FOR WOOD CONSTRUCTION. 02 ALL LUMBER SHALL BEAR VISIBLE GRADE STAMPING. 03 ALL JOISTS BEARING ON MASONRY SHALL BE FIRECUT WITH MINIMUM BEARING LENGTH OF FOUR INCHES. 04 EXCEPT AS UPGRADED ON PLANS OR DETAILS, ALL LUMBER SHALL BE NAILED IN ACCORDANCE WITH THE NAILING SCHEDULE IN TABLE 2304.9.1 OF CHAPTER 23 OF THE 2007 FBC. 05 JOISTS SHALL BE FASTENED TO STEEL GIRDERS BY EITHER OF TWO ACCEPTABLE METHODS AS FOLLOWS EXCEPT AS NOTED AT'TIMBER CONNECTIONS' BELOW: i) A CONTINUOUS 2 x 6 NAILER PLATE SHALL BE BOLTED TO THE TOP FLANGE OF STEEL WITH 1/2 DIA. STAINLESS STEEL BOLTS AT 4'-0" ON CENTER, ON ALTERNATE SIDES OF WEB. JOIST SHALL BE TOENAILED TO PLATE WITH 3 8d NAILS PER JOIST. JOISTS FRAMING FROM OPPOSITE SIDES SHALL LAP AT LEAST SIX INCHES, AND BE SPIKED TOGETHER AND BLOCKED. II) A CONTINUOUS 2 x 4 NAILER PLATE SHALL BE BOLTED ABOVE THE BOTTOM FLANGE OF STEEL MEMBER WITH 1/2 INCH DIAM. BOLTS AT 4'-0" ON CENTER. JOISTS SHALL BE NOTCHED ON TOP TO PROVIDE CLEARANCE OF TOP FLANGE AND TO PROVIDE A SPACE OF AT LEAST 3/4" BETWEEN STEEL AND SUBFLOOR. MAXIMUM DEPTH OF NOTCH SHALL BE 1/4 THE DEPTH OF JOIST. 20 GAGE METAL TIE OR WOOD SCAB SHALL BE USED TO FASTEN OPPOSITE JOISTS TO ON ANOTHER. 02 DRAWINGS ARE DEVELOPED TO ILLUSTRATE SIZE, ASSEMBLY, RELATIONSHIP, QUANTITY, AND IDENTIFICATION OF BUILDING COMPONENTS. DOCUMENTS WORK IN CONJUNCTION WITH SPECIFICATIONS REGARDING EXACT REQUIREMENTS OF PRODUCTS, INSTALLATION QUALITY, STANDARD EXECUTION OF WORK, AND CLASSIFICATIONS. 03 ALL TRADES MUST REVIEW ALL CONSTRUCTION DOCUMENTS AND ARE RESPONSIBLE FOR ALL WORK ASSOCIATED WITH THEIR TRADES IN THESE DOCUMENTS. DO NOT BASE SCOPE OF WORK ONLY ON A REVIEW OF THE SHEETS TYPICALLY ASSOCIATED WITH THE TRADE'S SCOPE OF WORK. 04 DO NOT SCALE DRAWINGS. USE ONLY PRINTED DIMENSIONS. 05 THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS, SHALL VERIFY EXISTING TOPOGRAPHY AND GRADE ELEVATIONS, AND SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE PROJECT. 06 THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND HAVE CONTROL OVER CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES, INCLUDING ALL SAFETY PRECAUTIONS AND PROGRAMS, AND FOR COORDINATING ALL PORTIONS OF THE WORK. 07 ADDRESSES: APPROVED NUMBERS OR ADDRESSES SHALL BE PROVIDED FOR THE BUILDINGS SO THAT THE NUMBERS OR ADDRESS IS PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROADWAY. THE NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDRESS NUMBERS SHALL BE DETERMINED BY THE OWNER. 08 DIMENSIONS SHOWN ARE TO FACE OF CONCRETE MASONRY UNITS, FACE OF STUD, MASONRY OPENING, OR ROUGH OPENING AT STUD WALLS. 09 THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND SUBMITTING PRODUCT APPROVAL SHEETS AND DATA TO THE BUILDING DEPARTMENT IN THE FORM THE BUILDING DEPARTMENT REQUIRES FOR ANY PRODUCT SELECTION THAT IS CHANGED BY THE OWNER AND/OR THE CONTRACTOR FROM THE PRODUCT ORIGINALLY SPECIFIED AND SUBMITTED BY THE ARCHITECT. THE CONTRACTOR MUST FIRST SUBMIT THE NEW PRODUCT DATA TO THE ARCHITECT FOR REVIEW AND APPROVAL BEFORE SUBMITTING THE REQUIRED PRODUCT APPROVAL SHEETS AND DATA TO THE BUILDING DEPARTMENT. E GENERAL - SITE WORK 01 SOIL BEARING VALUES. FOUNDATION DESIGNS ARE BASED ON AN ESTIMATED SOIL BEARING VALUE OR ACTUAL VALUE AS SPECIFIED BY A GEOTECHNICAL ENGINEER AND NOTED ON THE DRAWINGS. FOUNDATIONS AND SLABS ARE DESIGNED TO UNIFORMLY BEAR ON WELL COMPACTED, WELL DRAINED NON -EXPANSIVE SOILS. A CERTIFIED SOILS ENGINEER SHALL REVIEW FOUNDATION DESIGNS, BUILDING LOADS, AND COMPARE WITH SUBSURFACE SOIL INVESTIGATION RECOMMENDATIONS. SHOULD ON -SITE OBSERVATIONS SHOW THAT FOOTINGS SHOWN HERE ARE NOT SATISFACTORY, THE ARCHITECT SHALL BE CONTACTED IMMEDIATELY FOR REVISED DESIGNS. 02 THE CONTRACTOR SHALL PROVIDE ALL OF THE FOLLOWING SITE REQUIRED ITEMS, BUT NOT LIMITED TO: SITE UTILITIES, SLEEVES, CONDUIT, PULL BOXES, STRUCTURAL BASES, FOOTINGS, ETC. DESCRIBED OR REQUIRED AS PART OF A COMPLETE SYSTEM ON CIVIL ENGINEERING, LANDSCAPE, SWIMMING POOL, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL OR PLUMBING DRAWINGS. COORDINATE FULLY WITH ALL UTILITY COMPANIES TO DETERMINE WHAT COMPONENTS ARE PROVIDED BY THE UTILITY COMPANIES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL ITEMS NOT SUPPLIED BY THE UTILITY COMPANY. 03 REFER TO CIVIL ENGINEERS SITE PLAN AND DETAILS FOR ACTUAL BUILDING LOCATIONS, FINISHED GRADES, FLOOR ELEVATIONS, UTILITIES, DRAINAGE, ETC. 04 REFER TO LANDSCAPE ARCHITECT AND/OR POOL DESIGNER'S PLANS FOR LANDSCAPING, FENCES, POOL DESIGN, IRRIGATION, EXTERIOR FURNISHINGS, TRAFFIC CONTROL, AND OTHER DECORATIVE LIGHT FIXTURES, ETC, 05 CLEARANCE BETWEEN EXTERIOR WALL COVERINGS AND FINAL GRADE ON THE EXTERIOR OF BUILDING SHALL NOT BE LESS THAN 6 INCHES, (U.N.O.) 06 NOTICE OF TERMITE PROTECTION. A PERMANENT SIGN WHICH IDENTIFIES THE TERMITE TREATMENT PROVIDER AND NEED FOR REINSPECTION AND TREATMENT CONTRACT RENEWAL SHALL BE PROVIDED. THE SIGN SHALL BE POSTED NEAR THE WATER HEATER OR ELECTRICAL PANEL. GENERAL - STRUCTURAL 01 THESE STRUCTURAL PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE APPLICABLE STRUCTURAL CHAPTERS OF THE 2007 FLORIDA BUILDING CODE (FBC). ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THIS CODE AND ALL LOCAL REQUIREMENTS. 02 DESIGN LOADS: A. SEE DESIGN CRITERIA ON STRUCTURAL DRAWING. B. FLOOR LIVE LOADS HAVE BEEN REDUCED IN ACCORDANCE WITH CODE FOR GIRDERS AND COLUMNS. C. WIND LOAD: SEE REQUIRED DESIGN WIND PRESSURES ON STRUCTURAL DRAWINGS. D. COMPONENTS AND CLADDING: SEE REQUIRED DESIGN WIND PRESSURES ON STRUCTURAL DRAWINGS. 03 ALL WORK SHALL BE COORDINATED WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS. CONFLICTS IN DIMENSION AND INTERFERENCE SHALL BE DIRECTED TO THE STRUCTURAL ENGINEER PRIOR TO CONSTRUCTION OF WORK. 04 THE CONTRACTOR SHALL CHECK THE BUILDING LOCATIONS WITH REGARD TO PROPERTY LINE AND VERIFY ALL EXISTING CONDITIONS PRIOR TO EXCAVATION AND SHOP DRAWING PREPARATION. NOTIFY THE ARCHITECT / ENGINEER OF ANY DISCREPANCIES. 05 IN CASE OF CONTRADICTION BETWEEN THE DRAWINGS, THE SPECIFICATIONS AND THE CODES, OR IF ANY CHANGE IS REQUIRED, THE CONTRACTOR SHALL INFORM THE ENGINEER IMMEDIATELY. NO CHANGE SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE ARCHITECT I ENGINEER. ACCESSIBILITY IN ADDITION TO CODES LISTED ABOVE, ACCESS TO AND THROUGH THIS AMENITY IS DESIGNED TO CONFORM TO THE FAIR HOUSING ACT OF 1988 AND AMENDMENTS AND FLORIDA ACCESSIBILITY CODE. SUMMARY BUILDING TYPE NO. OF BLDGS. A/C AREA NON A/C AREA TOTAL AREA PICNIC PAVILION 1 697 SF 697 SF N CODE COMPLIANCE OCCUPANCY TYPE U UTILITY CONSTRUCTION TYPE V-B AREA & HEIGHT LIMITATION (FBC-B TABLE 503): REQUIRED/ALLOWED PROPOSED MEAN HEIGHT 40' 14A 0" MAXIMUM NUMBER OF FLOORS 1 STORY 1 STORY MAXIMUM AREA 5,500 SF 697 SF FIRE PROTECTION (FBC-B TABLES 601 & 602): INTERIOR BEARING WALLS 0 HR 0 HR INTERIOR NON -BEARING WALLS 0 HR 0 HR COLUMNS 0 HR 0 HR BEAMS, GIRDERS & TRUSSES 0 HR 0 HR FLOOR/CEILING ASSEMBLY 0 HR 0 HR ROORCEILING ASSEMBLY 0 HR 0 HR EXTERIOR BEARING WALLS 0 HR 0 HR EXTERIOR NON -BEARING WALLS 0 HR 0 HR d; ARCHITECTURE & INTERIOR DESIGN, INC. PLANNING I ARCHITECTURE I INTERIOR DESIGN 745 orienta avenue, suite 1121 altamonte springs, fl 32701 phone: 407.830.1400 fax: 407.830.4143 AA0002731 www.forumarchitecture.com Meetinghouse at Zephyrhills Senior Apartments City of Zephyrhills, FL SET DISTRIBUTIONS: EDITED BY: JT z PROJECT NO. 09-2587 z 0 to LU Picnic Pavilion R General Notes w & Code Compliance w U W F- U X d0: A 19.61 0 LL 0 MAL-row 0 0 co u m ro n 0 0 6i m 0 0 N r- a 0 0 a Architectural Site Plan MONUMENT SIGN (BY OTH "�.. :. WIRE ROAD GARAGE TRASH COMPACTOR II ENCLOSURE 1 "=50'-0" NORTH 0 SHEET NOTES A REFER TO SHEET A1.03 FOR GENERAL NOTES B REFER TO CIVIL PLANS FOR ALL SIDEWALK LOCATIONS, HANDICAP PARKING AND ACCESSIBILITY DETAILS, AND BUILDING LOCATIONS C COORDINATE ENTRY GATE SYSTEM LOCATIONS AND REQUIREMENTS WITH SYSTEM MANUFACTURER D CONTRACTOR TO VERIFY CONDENSER PAD LOCATIONS WITH SITE CONDITIONS E FLORIDA YARDS 8 NEIGHBORHOOD CERTIFICATION IS REQUIRED ON ALL LANDSCAPING. 0 LEGEND BUILDING NUMBER 0X NO. OF UNITS X X BUILDING TYPE LOCATION OF UFAS UNITS N OF VISUAL / HEARINC IMPAIRED UNITS SITE PLAN HAS BEEN REVISED TO COORDINATE WITH CIVIL DRAWINGS. 9 1 FORUME ARCHITECTURE & INTERIOR DESIGN, INC. PLANNING I ARCHITECTURE I INTERIOR DESIGN 745 orients avenue, suite 1121 altamonte springs, fl 32701 phone: 407.830.1400 fax: 407.830.4143 AA0002731 www.forumarchitecture.com Meetinghouse at Zephyrhills Senior Apartments City of Zephyrhills, FL SET DISTRIBUTIONS: 11/25/09 Progress Sit., --- __ 12/09/09 60% Prog Set 12117109 Bid Set 03/02110 ........................ Permit t _........ _......................_................................................. _........... SHEET REVISIONS: 01/25/10 1 Misc. Coordination ......... EDITED BY: U i PROJECT NO. 09-2587 z U N LU Architectural Site Plan E w z ......................... w U w U 0 A2.01 LL N ASSEMBLIES E SHEET NOTES Co n W U U) a M 0 N cu M 0 N ti N c 0 a� 0 a rn CV m 11 '-0" TRUSS BRG 1x6 1 x4 aTy olumn Detail &a@. olumn Detail 3/4"=1'-0" 6"=1'-0"p. @ All Columns Siding To Trim Pavilion Reflected Ceiling Plan 1 /4"=1'-0" U a a 21 22 Pavilion Elevation Pavilion Roof Plan V-4"TYP. 23 1 /4"=1'-0" 1 /4"=1'-0" 1x4L04 E15 1 x8 04 q in N TYPE/RATING DESCRIPTION 0 TYP NON RATED FIBER CEMENT PANEL / TRIM BOARD OVER BUILDING WRAP 7/16" EXTERIOR GRADE WALL SHEATHING (15/32" P.T. PLYWD SHEATHING FIRST 4' 2x WOOD STUDS AT 16" OC i RC-1 TYP NON RATED 30 YEAR ARCHITECTURAL FIBERGLASS 1 ASPHALT SHINGLES ON 30# FELT 5/8" CDX EXTERIOR GRADE SHEATHING ROOF TRUSSES @ 24" OC (1) LAYER 5/8" EXTERIOR GRADE GYPSUM SHEATHING [: MAY NOT BE REFERENCED ON THIS SHEET A REFER TO SHEET Al9.61 FOR GENERAL NOTES B ALL TRIM TO BE SMOOTH TEXTURE, ALL HORIZONTAL LAP SIDING TO BE WOOD GRAIN TEXTURE C ROOF SLOPE 6:12, LINO D ALL FLASHING TO BE 26 GA. GALV. METAL, U.N.O. M KEY NOTES MAY NOT BE REFERENCED ON THIS SHEET 01 ROOF SYSTEM PER SPECS. 02 TYPICAL FASCIA TRIM: 2X8 ALUM. CLAD CONT. FASCIA BOARD W/ ALUM. DRIP EDGE ABOVE @ ROOF PERIMETER. 03 CONTINUOUS PERFORATED FIBER CEMENT SOFFIT AT EAVE OVERHANG WITH INSECT SCREEN 04 FIBER CEMENT TRIM BOARD. PROVIDE FLASHING AS NECESSARY 05 HEAVY DUTY PARK GRILL, MIRACLE #1104-8, SET IN CONCRETE FOOTING AS PER MFR's SPECS BUILDING TYPE: PP ATTIC SPACE: 06 ADA 46" SQUARE HEAVY DUTY ALL STEEL PICNIC REQUIRED NFA VENTILATION TABLE, HIGHLAND #166-1099, ANCHORED TO SLAB Attic area (Including Soffit): 765 SF NFA reqd (Attic Area / 150): 5.1 SF 07 46" SQUARE HEAVY DUTY ALL STEEL PICNIC TABLE, Total reqd ventilation area in SI (Net Free Area X 144): Upper portion reqd (Total Reqd Vent Area X 50%): 734.4 SI 367.2 Sl HIGHLAND #166-1007, ANCHORED TO SLAB Lower portion reqd (Total Reqd Vent Area - Upper Portion): 367.2 SI PROVIDED NFA VENTILATION - UPPER 08 ALUM. GUTTERS & DOWNSPOUTS WHERE INDICATED (3 ) 4 Ft Tamco Off -Ridge Vents X 138 SI/vent = 414 SI PROVIDED NFA VENTILATION - LOWER 09 22"X36" ATTIC ACCESS PANEL MFR: Hardie Model: Perforated Cement Board Soffit Total soffit material to be used: 105 LF 10 12" ROUND DECORATIVE FOAM LOUVER NFA of soffit material per LF: 5 / LF Total provided: 525 SI 11 FLUSH MOUNT EXTERIOR LIGHT 12 FIBER CEMENT STARTER STRIP 10 19 13 ONE-PIECE CORNER TRIM: lx4x4 14 FIBER CEMENT PANEL 15 FIBER CEMENT HORIZONTAL LAP SIDING: 6" 12 EXPOSURE 01 16 CONT. SEALANT 02 17 METAL FLASHING 18 SELF ADHERING MEMBRANE 08 .......... _ 03 19 FIBER CEMENT SHINGLE SIDING 20 OFF RIDGE VENT W/ INSECT SCREEN AS LISTED TO 13 MEET CODE 08 21 BUILDING WRAP 22 ROOFING FELT UNDERLAYMENT 23 ROOF SHINGLES 24 2X P.T. BLOCKING Pavilion Elevation 1'-0" 11'-0" Pavilion Floor Plan 1'-0" 37'-0 1 /2" 11'-0" V-0" 12'-0 1 /2" 1 /4"=1'-0" � rp 1 /4"=1'-0" FORUME ARCHITECTURE & INTERIOR DESIGN, INC. PLANNING I ARCHITECTURE I INTERIOR DESIGN 745 orienta avenue, suite 1121 altamonte springs, fl 32701 phone: 407.830.1400 fax: 407.830.4143 AA0002731 www.forumarchitecture.com Meetinghouse at Zephyrhills Senior Apartments City of Zephyrhills, FL SET DISTRIBUTIONS: 6 EDITED BY: JT t 0 ? PROJECT NO. 09-2587 z U) 0 Picnic Pavilion .................................................................................................................. Plans, Elevations z & Details ....... ........ w U W F- I U Al 9.62 0 LL 0 E FOOTING SCHEDULE co d N 0 Cal R O 0 N a 0 0 0- CM v M 01 � °DST w� a UL-A. ` CNN? PER 02 S HED LE footing Detail @ Slab Edge 1/2" SEE PLAN 2if� I 63 co w f z 02 PER SCHEDULE F-1 Footing Detail @ Column 3/4"=1'-0" SLOPE GRADE EXTEND TURNDOWN AS REQ. PER GRADING PLANS TO MAINTAIN MIN. DEPTH BELOW FIN. GRADE. COORDINATE W/ CIVIL DWGS. 3/4"=1'-0" FOUNDATION PLAN DIMENSIONED TO EDGE OF CONC. SLAB, TYP. FLOOR PLAN DIMENSIONED TO FACE OF STUD, TYP. MARK SIZE REINFORCEMENTS COMMENTS BOTTOM TOP L W D SHORT BAR LONG BAR SHORT BAR LONG BAR F-1 36" 36" 38" MIN. #3 TIES @ 24" O.C. 3 #5 --- 1 #5 F-2 CONT. 12" 20" --- 1 #5 --- --- r— F-2 —� I I I I I I I I I I IU; LL I I I 5'-111/2" I I 1 4'-111/2" 10 I C.J. - F-2 F-2 �I — JILL u- LL L — J LL IT-1 F-1 1 I I I 01 I I LL I I UL 1 a I I O I 1 U)4-1 I I 0'-0" I CENTER f --J ILL SLOPE SLOPE— LLI F-1 1 F I I w I a- 0 I 04 I I U. LL I I I I -1 1/4" 1 -1 F-1 E.O.S., TYP. F-11I ------------w LU---— — — — — — —ILLJ F-2 F-2 10'-11" 25'-1" 0 tV \* -0'-0" T.O.S. TYP SHEET NOTES MAY NOT BE REFERENCED ON THIS SHEET A. REFER TO SHEET A19.61 FOR GENERAL FOUNDATION NOTES KEY NOTES MAY NOT BE REFERENCED ON THIS SHEET 01. CONCRETE SLAB: 4" THICK MIN W/ 6X6 W1.4 X W1.4 WWF ON 6 MIL. VAPOR BARRIER LAP AND TAPE OVER TERMITE TREATED, WELL COMPACTED SOIL. BROOM FINISH ALL 02. FOUNDATION REINFORCEMENT PER SCHEDULE 03. 2X P.T. BOT. PLATE. W/ 1/2" x 10" ANCHOR BOLT @ 24" OC OR AS SHOWN = EGEND — — — — — — EDGE OF FOOTING BELOW EDGE OF SLAB -P"'h' IVATA wren =ul=ul �� �I=III= �/ ENGINEERING �Il=0-1,V GROUP FL CofA #7992 5728 Major Blvd., Suite 603, Orlando, FL 32819 Tel. (407) 354-5411 Fax (407) 354-3466 Web Site: www.mgmclaren.com FORUME ARCHITECTURE & INTERIOR DESIGN, INC. ' PLANNING I ARCHITECTURE I INTERIOR DESIGN 745 orienta avenue, suite 1121 altamonte springs, fl 32701 phone: 407.830.1400 fax: 407.830.4143 AA0002731 www.forumarchitecture.com Meetinghouse at Zephyrhills Senior Apartments City of Zephyrhills, FL SET DISTRIBUTIONS: EDITED BY: JT PROJECT NO. 09-2587 Picnic Pavilion ............................ Foundation Plan & Details . ..... ..... Slab Edge Detail. 1 1 /2"=1'-0" Pavilion Foundation Plan 1 /4"=1'-0" Oleck FL PE #52514 S19,63 BEAM / HEADER ANCHORAGE ROOF DESIGN FACTORS co can a L0 N 0 N ti N 0 v 0 a 3 v rn J,11'-Q" SS BRG. IYI11 Y. r,"""*Framing Detail 3/4"=1'-0" � 1 1 Soffit Section 1 1 /2"21'-0" 1 111-01, TRUSS BRG. 4 19.64 SHEET NOTES MAY NOT BE REFERENCED ON THIS SHEET HEADER SIZE HEADER TO SUPPORT STUDS ROOF SLOPE = 70<RS<270 UP TO 4'-0" (2) SIMPSON MSTA15 ((1) ON EACH SIDE) L = 20.1 FT A. REFER TO SHEET A19.61 FOR GENERAL FRAMING 4'-l" TO 8'-0" (2) SIMPSON MSTI26 ((1) ON EACH SIDE) B = 20.1 FT NOTES > 8'-1" (2) SIMPSON MSTI27 ((1) ON EACH SIDE) EAVE = 10.0 FT MEDIAN ROOF HGT = 13.5 FT B. REFER TO SHEET Al9.62 FOR ASSEMBLIES BEAM / HEADER LEGEND END ZONE STRIP = 3.0 FT VELOCITY PRESSURE = 27.91 PSF KE Y NOTES TAG SIZE DESCRIPTION B-1 (2)1 3/4"xl 1 7/8" LVL MAY NOT BE REFERENCED ON THIS SHEET B-2 (2) 2X12 SYP#2 W/ CONT. 7/16" FLITCH ROOF ZONE WIND PRESSURE 01 CONCRETE SLAB: 4" THICK MIN. W/ 6X6 W1.4 X W1.4 ZONE AREA (SQ FT) COEFFICIENT DESIGN PRESSURES (+l-) WWF ON 6 MIL. VAPOR BARRIER LAP AND TAPE OVER **FASTEN PLYS W/ 2 ROWS OF 16d NAILS @ 12" OC, EA. PLY TERMITE TREATED, WELL COMPACTED SOIL. BROOM BEAM /HEADER SUPPORT SCHEDULE 10 1.0 20.3 -32.3FINISH ALL 20 1.0 18.5 -31.4 JACK STUDS KING STUDS ZONE 1 50 100 1.0 1.0 16.1 14.3 -30.2 02 PREFAB GABLE END TRUSS W/VERTIC ALS @ 16" OC HEADER SIZE PER SIDE PER SIDE REMARKS -29.3 UP TO 4'-0" 1 1 UNO > 100 1.0 14.3 -29.3 4'-1" TO 8'-0" 2 2 LINO ......... ....... 10 1.0 20.3 . -56.2 . 03 2X P.T. BOT. PLATE. W/ 1/2" x 10" ANCHOR BOLT @ 24" > 8'-111 3 3 UNO 20 1.0 18.5 -51.7 OC OR AS SHOWN **MAINTAIN NUMBER OF VERTICAL MEMBERS FROM TOP ZONE 2 50 1.0 16.1 -45.7 LEVEL TO FOUNDATION 100 1.0 14.3 -41.2 04 REFER TO SCHEDULE FOR STUD REQUIREMENTS @ > 100 1.0 14.3 41.2 EA. END OF BEAMS ROOF TRUSS LOADING 10 1.0 20.3 -83.1 TCLL = 20 20 1.0 18.5 -77.7 05 PREFAB WD. ROOF TRUSSES @ MAX. 24" OC, TCDL = 25 ZONE 3 50 1.0 16.1 -70.5 SIMPSON H5 @ EA TRUSS BRG., (1) SIMPSON MTS12 BCLL = - - - 100 1.0 14.3 -65.1 OR (2) SIMPSON H5 @ GIRDERS, ROOF PITCH AS > 100 1.0 14.3 -65.1 NOTED ON PLAN BCDL = 10 TOTAL = 55 USI = - - - ROOF OVERHANG WIND PRESSURE 06 (2) SIMPSON H5 EACH TRUSS (2) MTS12 @ GIRDER SPACING = 24" OC ZONE AREA (SQ FT) COEFFICIENT DESIGN PRESSURES (+l-) TRUSS TO DOUBLE TOP PLATE CONNECTION (UNLESS OTHERWISE NOTED) 10 1.0 -65.7 4'-0" 4'-011 4'-011 20 1.0 -65.7 07 (2) SIMPSON LTSA24S EACH END OF BEAM TO STUDS *4 ZONE 2 50 1.0 -65.7 (@ TOP OF COLUMN SECTION) 100 1.0 -65.7 3 __ 3 3 3 3 3 > 100 1.0 -65.7 08 SIMPSON HTT16 W/ 1/2" A.B. W/ 7" MIN. EMBEDMENT _ 10 1.0 -110.0 -1 20 1.0 -98.0 09 (2) X 1/2" ANCHOR BOLT.W/ 7" MIN. EMBEDMENT O i ZONE 3 50 1.0 -81.3 100 > 100 1.0 1.0 -68.7 10 DOUBLE TOP PLATE, TYP. 3 -68.7 4'-0" PANELEDGES PANEL FIELD O 10d NAILS @ 4" O.C. 10d NAILS @ 8" O.C. Q 10d NAILS @ 4" O.C. 10d NAILS @ 6" O.C. Q 10d NAILS @ 4" O.C. 10d NAILS @ 6" O.C. NOTE: USE 10D RING SHANK NAILS IN ZONE 3 IF MEAN ROOF HGT. IS GREATER THAN 25' Roof Fastenina Zone Plan Typical 1 /16"=l'-O" WALL OPENING PRESSURE ZONE AREA (SQ FT) COEFFICIENT DESIGN PRESSURES 10 1.0 35.3 -38.2 20 1.0 33.7 -36.7 ZONE 4 50 1.0 31.6 -34.6 100 1.0 30.0 -33.0 > 100 1.0 30.0 -33.0 10 1.0 35.3 47.2 20 1.0 33.7 44.0 ZONE 5 50 1.0 31.6 -39.8 100 1.0 30.0 -36.7 > 100 1.0 ........ ......... 30.0 -36.7 *IF AREA FALLS BETWEEN TWO VALUES INTERPOLATE OR USE PRESSURES ASSOCIATED WITH SMALLER AREA STRAPPING SCHEDULE UPLIFT REQ CONNECTOR MODEL NO. MAX LOAD 0-775 LBS (1) LTS12 775 LBS 775-1000 LBS (1) MTS12 1000 LBS 1000-1455 LBS (1) MTS12 + (1) H5 1455 LBS 1455-2000 LBS (2) MTS12 2000 LBS 2000-2455 LBS (2) MTS18 + (1) H5 2455 LBS SINGLE -PLY GIRDER (1) HTS20 1450 LBS DOUBLE -PLY GIRDER (2) HTS20 2900 LBS 11 46 KNEE BRACE 12 CONT. PERFORATED FIBER CEMENT SOFFIT AT ALL EAVE OVERHANGS W/ INSECT SCREEN 13 2x8 ALUM CLAD CONT. FASCIA BOARD WI ALUM DRIP EDGE 14 BEAM OR HEADER AS PER SCHEDULE ON FRAMING PLANS. SEE STRUCTURAL FOR DETAILS 15 CONT. 2 X 4 BLOCKING (P.T. WHEN USED ON EXT.) 16 FIBER CEMENT TRIM BOARD 17 (4) 3l8" DIA. LAG SCREWS; 3" PENETRATION 18 SIMPSON HETA18 @ BOTTOM 19 ONE PIECE CORNER TRIM 1x4x4 20 FIBER CEMENT PANEL 21 FIBER CEMENT HORIZONTAL LAP SIDING 22 CONT. SEALANT 23 CONT. NON -PERFORATED FIBER CEMENT SOFFIT AT GABLES 24 FIBER CEMENT SHINGLE SIDING LEGEND HEADER OR BEAM WALLS BELOW DESIGN CRITERIA PER CODE (MINIMUM) BASIC WIND VELOCITY = 110 MPH IMPORTANCE FACTOR = 0.77 EXPOSURE CATEGORY = C INTERNAL PRESSURE COEFFICIENT = 0.0 VELOCITY PRESSURE = 17.23 PSF WDESIGN CRITERIA FOR PROJECT BASIC WIND VELOCITY = 140 MPH IMPORTANCE FACTOR = 1.0 EXPOSURE CATEGORY = C INTERNAL PRESSURE COEFFICIENT = 0.0 VELOCITY PRESSURE = 27.91 PSF _P"6' M1 •����Mcipren 11111111111NGINEERING 41=111''�� GROUP FL CofA #7992 5728 Major Blvd., Suite 603, Orlando, FL 32819 Tel. (407) 354-5411 Fax (407) 354-3466 Web Site: www.mgmclaren.com FORUME L 0 0 ARCHITECTURE & INTERIOR DESIGN, INC. PLANNING I ARCHITECTURE I INTERIOR DESIGN m 0 0 745 odenta avenue, suite 1121 altamonte springs, fl 32701 phone: 407.830.1400 06 fax: 407.830.4143 2 AA0002731 www.forumarchitecture.com Meetinghouse at Zephyrhills Senior Apartments City of Zephyrhills, FL EDITED BY: JT PROJECT NO. 09-2587 Picnic Pavilion ... ......... ..... . Framing Plan & Details Column Section 1 "=1'-0" 1 Pavilion Section 1 /2"=1'-0" Pavilion Roof Framing Plan 1 /4"=1'-0" 4 R.F. Oleck FL FE #52514 S19-64 FORUME +78' C-15 0 LIGHTING FIXTURE SCHEDULE TYPE DESCRIPTION VOLTAGE LAMPS REMARKS A EXTERIOR CEILING MOUNTED FIXTURE WHITE ACRYLIC DIFFUSER 120 2—CFT13W GX23 RATED FOR WET LOCATION (SEAL) -� SGM ENGINEERING, INC. MEP CONSULTING ENGINEERS 935 Lake Baldwin Lane TEL• (407) 767-5188 Baldwin Park FAX:(407) 767-5772 Orlando, Florida 32814 $ A* EB-00006208 J/ / l NESTOR D KMMNEZ—FL61756 Project number. 29122 www.agmengineering.com Copyright a 2009 SGM Engineering, Inc. ARCHITECTURE & INTERIOR DESIGN, INC. PLANNING I ARCHITECTURE I INTERIOR DESIGN n 9 745 orienta avenue, suite 1121 u altamonte springs, fl 32701 phone: 407.830.1400 d fax: 407.830.4143 AA0002731 www.forumarchitecture.com Meetinghouse at Zephyrhills Senior Apartments i City of Zephyrhills, FL i SHEET REVISIONS: EDITED BY: E 19,65 1 A r c4 ,VOL alkn 14'