Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
7050 Gall Blvd (116)
FLORIDA HOSPITAL Z PHYRHI S PHARMACY 797 RENOVATION Florida Hospital ephyrhills 7050 Gall Boulevard Zephyrhills, IF 33541 Client AHCA Code/ ]File Number. 23/100046 -Project ID Submission Number 106-00-1 Stage IIi PROJECT TEAM DIRECTORY OWNER Florida Hospital Zephyrhills 7050 Gall Boulevard Zephyrhills, Florida 33541 Phone: (813) 788-0411 ARCHITECT Burt Hill /Pollock Krieg Architects, Inc. 13099 South Cleveland Avenue, Suite 500 Fort Myers, Florida 33907 Phone: (239) 482-4761 Fax: (239) 482-0265 MEP ENGINEER Heery International, Inc 4700 Millenia Blvd. Suite 550 Orlando, FL 32839 Phone: (407) 992-6300 Fax: (407) 992- 6399 Industry standards (I.e. ASTM, ANSI, etc.) SHALL HAVE THE SAME FORCE AND EFFECT on performance of work as If copies were directly inserted into the Contract Documents or bound and published therewith. Comply with standards in effect as of the date of the Contract Documents, unless otherwise note or required by authorities having jurisdiction. CODES - All work shall conform to the following codes and ordinances: 2007 Florida Building Code, with the first and second 2009 amendments 2007 Florida Existing Building Code, with 2009 amendments 2007 Florida Plumbing Code, with 2009 amendments 2007 Florida Fuel Gas Code, with 2009 amendments 2007 Florida Mechanical Code, with 2009 amendments 2007 Florida Fire Prevention Code -2006 NFPA 101 Life Safety Plan - Chapter 18119 -2006 AIA Guidelines for Design and Construction - Local Codes and Ordinances where applicable and flood damage prevention ordinances SYMBOLS AND MATERIALS NOTE: The symbols here are specific to the Architectural Drawings as a whole. The Life Safety, Reflected Ceiling Plan and Roof Plan respectively include supplementary legends and drawing notes specific to those sheets. Refer to other disciplines for additional symbols. O WINDOW TYPE --; EARTH ELEVATION BENCHMARK GRANULAR FILL METAL REVISION AND NUMBER FINISH WOOD C.J.D CONTROL JOINT STUCCO OR GYPSUM BOARD 124 CONCRETE OR GRAVEL DOOR AND FRAME WITH DOOR NUMBER CONCRETE MASONRY UNIT (CMU) EXISTING DOOR ® PLYWOOD METAL STUD WALL ACOUSTIC CEILING TILE MASONRY WALL BATT OR SEMI -RIGID INSULATION EVALUATION 208 ROOM NAME AND NUMBER - RIGID INSULATION a— WALL TYPE ROUGH WOOD FRAMING OR BLOCKING LJ' "L 2x2 LAY -IN FLUORESCENT FIXTURE BUILDING SECTION 2x4 -IN FLUORESCENT FIXTURE —� LAY SECTION OR DETAIL ° FLUORESCENT UTILITY FIXTURE 0 RECESSED DOWNLIGHT ELEVATION R, SUPPLY AIR DIFFUSER <8>INTERIOR V RETURN AIR REGISTER ELEVATION NORTH FINISH CEILING ELEVATION (All elevations are A.F.F.) ® EXIT LIGHT NORTH ARROW 2x2 ACOUSTICAL CEILING TILE 2x4 ACOUSTICAL CEILING TILE GYPSUM BOARD ® MAGNETIC DOOR HOLDER VICINITY MAP , : Fna^saw bfaegkitc Rea r A. Paam"ewt eIONia fta B t, . F �a N iild i.i t' Yal e3ol�e:: Rd Norki, Ave '. r,. C ,I Lr Zr� Iyih+Ils e - L—d _•I .. �ak� �4 e .. ` 4 Project EV INDEX OF DRAWINGS A0.0 Cover Sheet ARCHITECTURAL A1,0 Life Safety Plan - First Floor A l . l ICRA Plan A2.0 Demolition Plan and Floor Plan A2.1 Reflected Ceiling Plan and Elevations and Schedules A2.2 Roof Plan and Details FIRE PROTECTION F2.1 Fire Protection Plan MECHANICAL MO.1 HVAC Legend and General Notes M2.1 HVAC Level 2 Demolition and New Work Plans M2.2 HVAC Roof New Work Plans M4.0 HVAC Details and Schedules M4.1 HVAC Controls PLUMBING P2.1 Plumbing Plans Demolition and New ELECTRICAL E2.0 Electrical Power - Level 2 Demolition and New Work E2.1 Electrical Lighting- Level 2 Demolition adn New Work Plans E3.0 Electrical Power - Level 3 New Work E4.0 Electrical Riser Details . . ..... ..... , 1 L ,:, Cr K SHALL CO IPLY V ITHA.LL 1 nEVMLING CODES, FLORIDA I UILDIN'i CODE. NATIOiiNAL ELECTRIC CODE XV-! C IT�r OF ZEPHYRHILLS ORDINANCES REVIEW DATE �� 8'- (O CITY OF ZEPHYRHILLS PLANS EXAMINER , V2 Project No. 10003.00 A0.0 0 2009 BH,P6 Architects, Inc. Y!6/2010 11!0649 AM ` d\,40 0 Cover Sheet.d.on SMOKE COMPARTMENTS / EXIT CALCULATIONS Compartment Compartment Area Occupancy Type Sq./ Ft. Occupant Number of Occupants 2A 19,737 S.F. Sleep 120 164 2B 18,677 S.F. Sleep 120 156 2C 4,583 S.F. Sleep 120 38 2D 18,410 S.F. Sleep 120 154 2E 8,781 S.F. Sleep 120 ( 73 2F 7,022 S.F. Sleep 120 59 2G 7,206 S.F. Sleep 120 60 2H 18.646 S.F. Sleep 120 156 21 17,840 S.F. Sleep 120 149 TOTAL SECOND FLOOR 120.902 S.F. 1009 EXIT UNITS REQUIRED -1009 x .3 - 303' EXIT UNITS PROVIDED - 534' BUILDING COVE ANALYSIS 1. CODES - All work shalt conform to the following codes and ordinances: - 2007 Florida Building Code, with the first and second 200 amendments - 2007 Florida Existing Building Code, with 2009 amendments - 2007 Florida Plumbing Code, with 2009 amendments - 2007 Florida Fuel Gas Code, with 2009 amendments - 2007 Florida Mechanical Code, with 2009 amendments - 2007 Florida Fire Prevention Code -2006 NFPA /0/ Llfe Safety Plan - Chapter 18119 -2006 AIA Guidelines for Design and Construction - Local Codes and Ordlnorces where applicable and flood damage prevention ordinances 2. Use and Occupancy Classification: As per FBC Chapter 3 and NFPA /01 Group 1.2 Project square footage 275 square feet J. Type of Construction: Type 1-8,Fully Sprinklered As per FBC Section 602 and NFPA 101 Table 8.1 Type 1 t3,3,21 4. Building Occupancy Building Occupancy per FBC Table 1004.1.2 120 and NFPA /0/ table 7.3.1.2 tin SF/Occupant!: Area 0 Comportment 28 18.677 SF Allowed Occupancy 156 5. Exit Calculations Permitted Proposed Max. Travel Distance: 300, 127'-10' Max. Dead End Corridor: 30, 30, Min. Corridor Width. 81'0' 8'-0' Min. Clear Opening of Exit Doors: 32, 32, Min. Stair Width: 81-0' 81-0' 6.. Interior Finish Requirements As per FBC Table 803.5 and NFPA /OI Table A 10.2.2 Exits. Type A Exit Access Corridors: Type A Rooms & Enclosed Spaces: Type A Project No. 10003.00 Al 00 © 2009 BH/PK Architects, Inc. 311612010 11:05:35 AM ...\cd\AI.O Llfe Sofety,dgn iw oC3 1-N 4)T®T .in fi [sR F.E.C. 0 O H R _ 0 H H H n T®T a E I aw INFECTION CONTROL MEASURES: F.E.C. F O cow a o Os N� Yalr (OM Tar Talc roNP YAM t ` Sara g lU. RATE PRNKPIW E � a _ 41 Os � �7 h' 4) F.F.C. O oorat 0 I. The Controcoor shall obtain from the owner a copy of the Infection control risk assessment (/CRA) prepared for this project. The contractor shall review the requirements In this report and preform all work In accordance with those requirements. The contractor shall strictly adhere to the limits of the construction area, and where phasing applies shall adhere to the phasing plan. Any work outside the construction are shall be coordinated with the hospital and preformed in accordance with the /RCA report, under the supervision of the hospital's representative or other designated /CRA commltee officer. 2. To the extent that It Is required by the iCRA the contractor shall endeavor to maintain existing levels of Indoor air quality In areas surrounding and adjacent to the construction work zone, and elesewhere in the facility. It should be anticipated that the ICRA report will require measures to this effect including erection of construction zone barriers and provisions for negative air pressure In the construciion zone relative to other areas of the new facility. Failure to comply with construction and maintainance of constuctlon barriers will result In the cesation of work until the barriers are brought into compliance. J.See Mechanical plans for additional comments on negative pressure and monitoring requirements. 4. Any requirement for interuptlon or shut down of utilities made necessary by this construction shall be coordinated with the hospital at least one week prior to interuption. 5. Contractor shall endevor to minimize any disruption of surrounding areas of the hospital. 6. If fire olorm and / or sprinkler systems are shut down for four (4) hours or more, contractor to provide 'Fire Watch'. 7. If the structural steel fireproofing is damaged due to construction, then It shall be repaired to Its original fire rating. �vamaq H7S ® �® CKII PKCEOIW 2 IhI,�I Li-■■ WE Provide temporay construction barrier with temporary Y-O' x 7'-0' door with closer. refer to I A/1.1 All debis to be removed � 7 44 S'"N �' in covered carts P = /;fir C r MAW _ U LOAM P a Sticky Mat ` ® O 1�? ` g = sanfo swPrIEs PK Mr �ProJec ocotlon 7u. OWMATOV 0 1®1 o ° fdaP7 rZT> �T i oftumv O ® 7 MFECTION TrnrrRx Jw o 0 s NL 5 YECNAY VATOG Q ®1 4) ° O HIS 0 F.E.C. P to � S7MR LZ � p£AM �I 5 PKIEXr r4 W 4 P ❑ ISCYArtPY ANTE � 9 PATIENT R V = PATUF RXW 7 PATIENT R 09 6 d1 PKIENr RIDN MEAT FM N O PATIENT RXIW 5 V PATIENT RXW _ W P� 4i 12 13 PKIE P IEMr PKIE KIEMI PKIE k i5E RXW RYW RXW L—J� —_ � c J. nr. nr. ru. ir. QS 0 ra. O5 o H/$ STAFF �® (— PATIENT TOUT AM RAW ® N 5 NAM YIED S SWIM AARW b PKIEN7 O MW ovlNr (D RXW Ac7NIrY M7 ' TWY ® n7. s Nr< 0 TU. HIS caww T® ••w1R � SOY.•LAXEXAM SECL UfN. 77, ■t �� �� '■ice I n I• ■ I ■t ,, ,, �` ,, „ � , � >�i ■11 1� s sa a s- r 's I I Vim o l�l • �•� 1' — dice t , �- ranomte tow) H H rant to C� Fire retardant wood nailer Close open ducts with 6 mil poly Seal with duct tape Close ceiling space with 6 mil fire retai Poly Seal all joint penetrations with duct Seal around all pipe and duct penetrations in the partition and poly barrier with duct tape PRVATE sticol ceiling the (psum wall board h occupied side with paint '0 Go 3Y " Metal studs 4' Q.C. loints lth ram -tack )r equal TEMPORARY ICRA Ald 3/,- < /'-0- • CG.Io Project No. 10003.00 Al 0 1 © 2009 BH/PK Architects, Inc. /Ifi/P010 11:04:47 AY ... \Pharmacy\cd\AI-llcra,dgn aw INFECTION CONTROL MEASURES: F.E.C. F O cow a o Os N� Yalr (OM Tar Talc roNP YAM t ` Sara g lU. RATE PRNKPIW E � a _ 41 Os � �7 h' 4) F.F.C. O oorat 0 I. The Controcoor shall obtain from the owner a copy of the Infection control risk assessment (/CRA) prepared for this project. The contractor shall review the requirements In this report and preform all work In accordance with those requirements. The contractor shall strictly adhere to the limits of the construction area, and where phasing applies shall adhere to the phasing plan. Any work outside the construction are shall be coordinated with the hospital and preformed in accordance with the /RCA report, under the supervision of the hospital's representative or other designated /CRA commltee officer. 2. To the extent that It Is required by the iCRA the contractor shall endeavor to maintain existing levels of Indoor air quality In areas surrounding and adjacent to the construction work zone, and elesewhere in the facility. It should be anticipated that the ICRA report will require measures to this effect including erection of construction zone barriers and provisions for negative air pressure In the construciion zone relative to other areas of the new facility. Failure to comply with construction and maintainance of constuctlon barriers will result In the cesation of work until the barriers are brought into compliance. J.See Mechanical plans for additional comments on negative pressure and monitoring requirements. 4. Any requirement for interuptlon or shut down of utilities made necessary by this construction shall be coordinated with the hospital at least one week prior to interuption. 5. Contractor shall endevor to minimize any disruption of surrounding areas of the hospital. 6. If fire olorm and / or sprinkler systems are shut down for four (4) hours or more, contractor to provide 'Fire Watch'. 7. If the structural steel fireproofing is damaged due to construction, then It shall be repaired to Its original fire rating. �vamaq H7S ® �® CKII PKCEOIW 2 IhI,�I Li-■■ WE Provide temporay construction barrier with temporary Y-O' x 7'-0' door with closer. refer to I A/1.1 All debis to be removed � 7 44 S'"N �' in covered carts P = /;fir C r MAW _ U LOAM P a Sticky Mat ` ® O 1�? ` g = sanfo swPrIEs PK Mr �ProJec ocotlon 7u. OWMATOV 0 1®1 o ° fdaP7 rZT> �T i oftumv O ® 7 MFECTION TrnrrRx Jw o 0 s NL 5 YECNAY VATOG Q ®1 4) ° O HIS 0 F.E.C. P to � S7MR LZ � p£AM �I 5 PKIEXr r4 W 4 P ❑ ISCYArtPY ANTE � 9 PATIENT R V = PATUF RXW 7 PATIENT R 09 6 d1 PKIENr RIDN MEAT FM N O PATIENT RXIW 5 V PATIENT RXW _ W P� 4i 12 13 PKIE P IEMr PKIE KIEMI PKIE k i5E RXW RYW RXW L—J� —_ � c J. nr. nr. ru. ir. QS 0 ra. O5 o H/$ STAFF �® (— PATIENT TOUT AM RAW ® N 5 NAM YIED S SWIM AARW b PKIEN7 O MW ovlNr (D RXW Ac7NIrY M7 ' TWY ® n7. s Nr< 0 TU. HIS caww T® ••w1R � SOY.•LAXEXAM SECL UfN. 77, ■t �� �� '■ice I n I• ■ I ■t ,, ,, �` ,, „ � , � >�i ■11 1� s sa a s- r 's I I Vim o l�l • �•� 1' — dice t , �- ranomte tow) H H rant to C� Fire retardant wood nailer Close open ducts with 6 mil poly Seal with duct tape Close ceiling space with 6 mil fire retai Poly Seal all joint penetrations with duct Seal around all pipe and duct penetrations in the partition and poly barrier with duct tape PRVATE sticol ceiling the (psum wall board h occupied side with paint '0 Go 3Y " Metal studs 4' Q.C. loints lth ram -tack )r equal TEMPORARY ICRA Ald 3/,- < /'-0- • CG.Io Project No. 10003.00 Al 0 1 © 2009 BH/PK Architects, Inc. /Ifi/P010 11:04:47 AY ... \Pharmacy\cd\AI-llcra,dgn Remove exlsltng walls shown dashed from floor to 7'-2'a.f.f. Wall above to remain !move existing ok and cabinet p plumbing at floor. !toln existing cabinet be installed in new Ante am with new sink !vove existing binet and sink imbing to be ed for new sink !move existing refrigerator move existing doors d windows ,move existing flooring d ceiling NORTH I DEMOLITION PLAN A2.0 %4' = I'-0' NORTH 2 FLOOR PLAN N N n Uo z U kn • rl CO L N O N 00 U o, o �i N a Un o� P-1 tip' ' �,,,, N tD sue. M N N C) ok o o w a o_ o tn a�i h x = 0 Q U Z Q b o Q M o r Q 3 un q 0 O C� O U t� Cid W-4 N Cd CLO Cd o •� o o w w Project No. 10003.00 J11612010 11:04:17 AM ...\Pharmacy\cd\A2.0 Floorplan.dgn A260 © 2009 BH/PK Architects, Inc. DOOR SCHEDULE DOOR FRAME REMARKS DETAILS W Q Q Qz W J Oz Q SIZE zz- U_ ti HEAD JAMB TN,RSHLD I ALUM/ 100 3'-O' x 7'-0' 134' A GLASS kYNAR A ALUMN KYNAR 5/A2.1 5/A2.1 ALUM/ l01 3'-O' x 7'-0' A GLASS kYNAR A ALUMN KYNAR 5/A2.1 5/A2.1 ALUM/ 102 3'-0' x 7'-0' 1% A GLASS kYNAR A ALUMN KYNAR 5/A2.1 5/A2.1 ALL DOORS TO HAVE A STANLEY- MAGIC ACCESS OPERATOR LOCKS TO BE PROVIDED BY OWNER ALL DOOR TO HAVE POSITIVE LATCHING WITH LEVER HANDLES TYPE A ALUMINUM STOREFRONT WITH KYNAR FINISH ROOM F-INISH SCHEDULE NO. ROOM NAME FLOOR BASE WALLS CEILING REMARKS ti LU ULJ Z ~ N Z • DOT DENOTES = ti FINISH LOCATION cn ? 3 N v l00 CLEAN ROOM e • 101 ANTE ROOM • e e • 8'-0' 102 CHEMO MIX • e • • 8-0' ALL FINISHES TO BE CLASS A FIRE RATED CP 5 �FM 5'-3%2' l0' !3' 0 lo' ll'-ll%2' Verify all dimensions 1 STOREFRONT ELEVATION L. I 1 3'-8%8' .3'-9 3'-9, Verify all dimensions 2 STOREFRONT ELEVATION Soap dispenser provided by owner Paper towel dispenser �c provided by owner Relocated cabinet 6 CABINET ELEVATION �2.I/4" = 1'-O° hru- 'roducts Company is steel construction 118PT, typical two 4 Pass Thru- 2.1 Holco Products Company Stainless steel construction model 1818PT, typlcol two 5 A2.1 3'-9/8• _ 3'=0' 3' $fig ,n Verify all dimensions Aluminum storefront with tempered glass 3 STOREFRONT ELEVATION >tanley- Magic Access Operator on ;lean Room and Chemo Mix sides nstall per manufactures requirements ispended ceiling visting partition to remain )ove 7'-2' to deck above itch and repair as required uminum storefront nish to be selected hospital �H 5 STOREFRONT SECTION III— I LI-._ %/ I LL L/ V L I L-1 I I v t LI-ll r 114 ' = 1'-0' 'uorescent 1ht fixture kler head eturn A/C rifle I WHO M'S'A Project No. 10003.00 A2,01 © 2009 BH/PK Architects, Inc. I J11612010 11:03:55 AM ...\Pharmacy\cd\AZ-I.dgn &AO ulde wire fuminum angle xlsting membrane roofing to remain xisting metal deck 14' x 1'-0' steel plate nllta cstanYd ctc�eurebtoltsa9uminum angle nddd s eel p ate xisting roof i GUIDE WIRE SUPPORT DETAIL bv000 inP o� orokolpnobec dope rctor iD ma�n�din worrEnty 7 i,P/n/1l/1 11/17 nn All % 0{..............%-.%An_O ....0 4-. V-0'square roofing membrane patch sealed to existing roofing, typical 4 antlepandngseafrtl�g part an�le 2 CURB DETAIL bb Atote•, tt e. �worokof>°n be dope actor t0 mo�n a�n warren y oof membrane Eder flashing curb refer cal drawings � n, v„ ny , OOf Project No. 10003.00 A2.2 © 2009 BH/PK Architects, Inc. J/ FV/ LVIv 11:VJiG✓ n/Il ...V 17VI MUVI 1vv Inc. L , vv, wyn FIRE PROTECTION DEMOLITION PLAN LEVEL TWO Y8" = 1'-0" SPRINKLER BRANCH LINE OUTLET (SPRINKLER OUTLET SHALL BE TO THE SIDE, NOT DOWN.) O FLEXIBLE PIPE TEE CLAMP, CENTER ON TILES AS INDICATED ON ARCH. REFLECTED CEILING PLAN CEILING TILE CEILING GRID TEE FLEXIBLE PIPE OPTION PIPE CLAMP 1" CAST IRON - SCR. 90 DEG. ELL TYPICAL SPRINKLER HEAD w J i1 a Y Z U o m V �CO 1" CAST IRON SCR. 90 DEG. ELL OR TEE (AS REQ'D) U -- SPRINKLER BRANCH LINE PIPING (SPRINKLER OUTLET MAY BE TURNED DOWN, DEPENDING ON SITUATION.) 1" PIPING TO PENDENT SPRINKLER HEAD LINE OF SUSPENDED CEILING HARD PIPE OPTION SUPPLY DETAIL FOR.SEMI RECESSED SPRINKLER HEADS NTS FIRE PROTECTION NEW WORK PLAN LEVEL TWO y8" = 1' 011 LEGEND EXISTING PIPE NEW PIPE PIPING TO BE REMOVED NEW TO EXISTING LIMIT OF REMOVAL SPRINKLER SYMBOL DESCRIPTION SYMBOL SIZE TYPE RESP FINISH TEMP K-FACTOR O Y2 SSU Q/R BRASS 212 5.6 Y SSP- RECESSED Q/R CHROME 165 5.6 CONCEALED Q/R WHITE COVER PLT 165 5.5 GENERAL NOTES 1. THIS BUILDING SHALL BE PROTECTED THROUGHOUT BY AUTOMATIC SPRINKLERS. THE DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA 13, LATEST ENFORCEABLE EDITION. 2. ADHERE TO AND OBTAIN ALL PERMITS, LICENSES AND ALL GOVERNMENT REQUIREMENTS. 3. ALL AREAS SHALL BE FIRE SPRINKLERED. THIS SHALL INCLUDE ELEVATOR EQUIPMENT ROOMS, ELEVATOR SHAFT PIT, ELECTRICAL ROOMS, TELEPHONE ROOMS, AND ANY CONCEALED SPACES OF COMBUSTIBLE CONSTRUCTION. 4. REFER TO ARCHITECTURAL REFLECTED CEILING AND ELECTRICAL LIGHTING DRAWINGS FOR CEILING DESCRIPTIONS AND HEIGHTS. 5. THE LOCATIONS OF SIAMESE CONNECTION, RISERS, FEED MAINS, CROSS MAINS AND BRANCH PIPING WHERE SHOWN ON THE DRAWINGS IS APPROXIMATE. FINAL LOCATION IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE IN COMPLIANCE WITH THE SPECIFICATIONS AND ALL APPLICABLE CODES OR REGULATIONS. 6. PROVIDE HEADS GUARDS FOR SPRINKLERS IN ELECTRICAL ROOMS, ELEVATOR MACHINE ROOMS AND ANY HEADS THAT ARE SUBJECT TO MECHANICAL DAMAGE AND/OR BELOW T-0" 7. NOT ALL PIPING, VALVES AND APPURTENANCES ARE SHOWN ON PLANS. REFER TO PIPING AND RISER DIAGRAMS, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 8. INSPECTOR'S TEST CONNECTIONS SHALL BE PROVIDED FOR ALL ZONES SO THAT THE WATER FLOW SWITCH FOR EACH ZONE CAN BE TESTED. CONNECTIONS SHALL HAVE A MINIMUM 1 1/2 INCH OUTLET AND DRAIN VALVE LOCATED IN AN ACCESSIBLE LOCATION PIPED TO AN APPROVED LOCATION. 9. PROVIDE ACCESS PANELS TO ALL VALVES ABOVE NON- ACCESSIBLE CEILINGS AND CHASES. 10. ALL VALVES ON THE FIRE PROTECTION SYSTEM TO BE ELECTRICALLY SUPERVISED. TYPE AND EXACT LOCATION OF FLOW AND SUPERVISORY SWITCHES SHALL BE ACCOMPLISHED BETWEEN THE DIFFERENT RESPONSIBLE TRADES. 11. PROVIDE A PERMANENTLY ATTACHED NAME TAG STATING THE REQUIRED DESIGN CRITERIA FOR EACH HYDRAULICALLY DESIGNED SYSTEM. 12. ALL SPRINKLER HEADS MOUNTED IN CEILING SHALL BE LOCATED A MINIMUM OF 4" AWAY FROM ANY WALLS, CEILING HEIGHT CHANGES OR ANY OTHER VERTICAL INTERSECTING STRUCTURAL SURFACE. 13. PROVIDE SPRINKLERS ABOVE AND BELOW EXPOSED DUCTWORK 48" OR WIDER. 14. PROVIDE ADDITIONAL OFFSETS OR FITTINGS REQUIRED FOR PROPER INSTALLATION, COORDINATION WITH OTHER TRADES, AND/OR TO MAINTAIN PROPER CLEARANCES. VERIFY STRUCTURAL, MECHANICAL, ELECTRICAL INSTALLATIONS TO AVOID OBSTRUCTIONS OR INTERFERENCE WITH FIRE PROTECTION PIPE ROUTING. 15. FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE WALLS. FIRESTOPPING SHALL BE OF A U.L. LISTED ASSEMBLY. 16. SPRINKLER HEADS ARE TO BE COORDINATED WITH ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES, CEILING SYSTEMS AND STRUCTURAL SYSTEM. 17. SPRINKLER SHOP DRAWINGS SHALL BE SUBMITTED TO ARCHITECT. NO INSTALLATION SHALL BE PERMITTED UNTIL SPRINKLER SHOP DRAWINGS HAVE BEEN APPROVED. 18. DESIGN CRITERIA: A. ALL LIGHT HAZARD AREAS (OFFICES, TREATMENT ROOMS, ETC.) SHALL BE HYDRAULICALLY DESIGNED FOR A DENSITY OF 0.10 GPM/SQ. FT. OVER THE MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND SHOULD INCLUDE A 100 GPM INSIDE HOSE STREAM ALLOWANCE. B. ALL ORDINARY HAZARD AREAS (MECHANICAL ROOMS, STORAGE AREAS, ETC.) SHALL BE HYDRAULICALLY DESIGNED FOR A DENSITY OF 0.20 GPM/SQ. FT. OVER THE MOST HYDRAULICALLY REMOTE 1,500 SQ. FT. AND SHOULD INCLUDE A 100 GPM INSIDE HOSE STREAM ALLOWANCE AND A 150 GPM OUTSIDE HOSE STREAM ALLOWANCE. 20. UNLESS OTHERWISE NOTED, ALL SPRINKLER HEADS TO BE QUICK RESPONSE. Project No. 10003.00 F2. I $DATE$ $TIME$ $FILER$ 2009 BH/PK Inc HEATING &AIR CONDITIONING SYMBOLS t L m _ SYMBOL DESCRIPTION I SYMBOL DESCRIPTION I SYMBOL DESCRIPTION SINGLE LINE DOUBLE LINE EXHAUST OR RELIEF AIR DUCT -UP (SOLID) DOWN (DASHED) RETURN OR OUTDOOR AIR DUCT - UP (SOLID) DOWN (DASHED) SUPPLY OR DISCHARGE AIR DUCT - UP (SOLID) DOWN (DASHED) UP (DN) CHANGE OF ELEVATION IN —� DIRECTION OF AIR FLOW - UP OR DN (DOWN) 20x12 DUCT SIZE - FIRST 20xl2 FIGURE IS SIDE SHOWN DUCT END - CAPPED ELBOW WITH TURNING VANES RADIUS ELBOW - WITH TURNING VANES FOR DUCT WITH R=30" OR MORE ABBREVIATIONS XX /XXX 0 SMOKE DETECTOR - DUCT MOUNTED VOLUME DAMPER DUCT TRANSITION FLEXIBLE CONNECTION SA DIFFUSER IN BOTTOM OF DUCT EA OR RA REGISTER OR GRILLE AS INDICATED IN BOTTOM OF DUCT TYPE DESIGNATION DIFFUSER, REGISTER, GRILLE AIRFLOW, CFM ROOM PRESSURE MONITOR SINGLE LINE DOUBLE LINE STANDARD BRANCH - SUPPLY, RETURN OR EXHAUST WITH VOLUME DAMPER AS INDICATED NAME DUCT SYSTEM DESIGNATION E (NAME) I EXISTING DUCT SYSTEM DESIGNATION FLEXIBLE METAL DUCT 0 THERMOSTAT/TEMPERATURE SENSOR DUCT MOUNTED THERMOSTAT/SENSOR O HUMIDITY SENSOR ROUND DUCT - UP ROUND DUCT - DOWN LIMIT OF DEMOLITION POINT OF CONNECTION - NEW TO EXISTING GENERAL NOTES -MECHANICAL AHU AIR HANDLING UNIT N.C. NO NORMALLY CLOSED 1. THESE GENERAL NOTES APPLY TO ALL M SERIES DRAWINGS. 11. PAINT FLAT BLACK THE INSIDE OF ALL DUCTWORK VISIBLE THROUGH DIFFUSERS, GRILLES, NUMBER AND REGISTERS. BCS BUILDING CONTROL SYSTEM N.O. NORMALLY OPENED 2. NOT ALL SYMBOLS, ABBREVIATIONS AND NOTES MAY BE USED FOR THIS PROJECT. 12. ALL DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. BTUH BRITISH THERMAL UNITS PER HOUR OA OUTSIDE AIR OAI OUTSIDE AIR INTAKE 3. PROVIDE OFFSETS AND TRANSITIONS IN DUCTWORK AND PIPING AS REQUIRED TO AVOID 13. CONCENTRATE LOADS AT JOIST/BEAM LOCATIONS. PROVIDE ANGLE BRACES CFM CUBIC FEET OF AIR PER MINUTE OC ON CENTER INTERFERENCE AT NO ADDITIONAL COST TO THE OWNER. WHERE CONCENTRATED LOADS OCCUR AT OTHER LOCATIONS. RA RETURN AIR 4. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. DB DEGREE DRY BULB TEMPERATURE RTU ROOF TOP UNIT PROVIDE TRANSITIONS TO FINAL TO EQUIPMENT. MAKE FINAL CONNECTION TO 14. COORDINATE ALL DOOR UNDER -CUTS INDICATED AND REQUIRED FOR PROPER AIR DIA DIAMETER EQUIPMENT, UNLESS OTHERWISE INDICATED. FIELD VERIFY ALL DIMENSIONS BEFORE MOVEMENT. DN DOWN S SMOKE DETECTOR FABRICATION OF WORK. DX DIRECT EXPANSION gq SUPPLY AIR 15. USE RADIUS DUCTWORK ELBOWS WHERE POSSIBLE. PROVIDE TURNING VANES FOR SF SUPPLY FAN 5. EXACT LOCATION OF DIFFUSERS, GRILLES AND REGISTERS SHALL BE COORDINATED WITH SQUARE ELBOWS IN SUPPLY AIR DUCTWORK AND A$ INDICATED. EA EXHAUST AIR SPEC SPECIFICATION THE REFLECTED CEILING PLANS BEFORE INSTALLATION. PROVIDE SYMMETRY WITH THE EAT ENTERING AIR TEMPERATURE SQ FT SQUARE FEET ROOM LIGHTING SYSTEMS. EDB EF ENTERING DRY BULB TEMPERATURE EXHAUST FAN SP STATIC PRESSURE 6. VERIFY DIFFUSER, GRILLE AND REGISTER MOUNTING FRAME TYPES WITH THE CEILING 16. FIRE -SAFE PIPE AND DUCTWORK PENETRATIONS OF ALL FIRE RATED AND SMOKE EWB ENTERING WET BULB TEMPERATURE TYPES. MATCH FRAME TYPE WITH CEILING CONFIGURATION. RESISTIVE CONSTRUCTION. COORDINATE WITH LIFE -SAFETY PLANS. TD TEMPERATURE DIFFERENCE EX EXISTING TEMP TEMPERATURE 7. DUCTWORK SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO UNDERSIDE OF BEAMS AND 17. MOUNT ROOM THERMOSTATS AND OTHER CONTROL DEVICES AT 48-INCHES AFF, FC FLEXIBLE CONNECTION T STAT TSP THERMOSTAT TOTAL STATIC PRESSURE JOISTS. UNLESS OTHERWISE INDICATED. FD FIRE DAMPER NP TYPICAL FF FINAL FILTER 8. PROVIDE ACCESS DOORS OR PANELS IN CEILING AND WALLS TO PERMIT SERVICE TO 18. INSTALL ALL EQUIPMENT LEVEL AND PLUMB. PROVIDE BLOCKING AND FT FOOT OR FEET UC DOOR UNDERCUT DAMPERS, VALVES, AND CONCEALED EQUIPMENT. HARDWARE AS REQUIRED. HP HR HORSEPOWER V VENT 9. DUCT FITTINGS ARE INDICATED SYMBOLICALLY. REFER TO DETAILS FOR CONFIGURATION . 19 WORK SHALL BE COORDINATED WITH ALL OTHER TRADES. ROUTING OF DUCTWORK AND PIPING ARE INDICATED TO SHOW GENERAL INTENT. CLEARANCES BETWEEN CEILING AND HOUR VD VOLUME DAMPER, MANUAL OF FITTINGS TAPS AND CONNECTIONS. DUCT CONSTRUCTION SHALL COMPLY WITH SMACNA CONSTRUCTION STANDARDS. STRUCTURE ARE MINIMAL IN SEVERAL LOCATIONS. COORDINATE WITH OTHER TRADES VIB. ISO. VIBRATION ISOLATOR PRIOR TO FABRICATION OF WORK. IN INCH, INCHES 10. PROVIDE FLEXIBLE CONNECTIONS BETWEEN DUCTWORK AND FANS/AIR HANDLING LAT LEAVING AIR TEMPERATURE W WIDTH, WIDE EQUIPMENT. LDB LEAVING DRY BULB TEMPERATURE WB WET BULB TEMPERATURE LRA LOCKED ROTOR AMPS W/ WITH LWB LEAVING WET BULB TEMPERATURE W/0 WITHOUT LWT LEAVING WATER TEMPERATURE WC WATER COLUMN WG WATER GAUGE MIN MINIMUM Project No. 10003.00 MOO I $DATE$ $TIME$ $FILEA$ © 2009 BARK Architects, Inc. DEMOLITION PLAN )EMOLITION NOTES: PRIOR TO DEMOLITION, MEASURE AND RECORD AIR & WATER QUANTITIES IN UTILITIES REQUIRED TO MAINTAIN OPERATION WITH -IN AND BEYOND EACH DEMOLITION PHASE UNTIL AFFECTED AREAS ARE DEMOLISHED. MAINTAIN THESE QUANTITES THROUGHOUT EACH DEMOLITION PHASE. MAINTAIN EXISTING AIR HANDLING UNIT AHU-2 IN OPERATION UNTIL ITS DEMOLITION PHASE IS COMPLETE. BLANK -OFF AND SEAL RETURN AIR INTAKES SERVING EACH DEMOLISHED AREA IN ORDER TO PREVENT GENERATED CONSTRUCTION DEBRIS FROM BEING RECIRCULATED TO OCCUPIEI SPACES DURING DEMOLITION / CONSTRUCTION PHASE. BLANK -OFF AND SEAL ANY SA, RA AND/OR EA DUCTS BEING DEMOLISHED AND REMAINING WITHIN THE CONSTRUCTION AREA. MAINTAIN NEGATIVE RELATIVE AIR PRESSURE IN DEMOLITION PHASE AREA. MINIMUM, HEPA- -FILTERED EXHAUST AIR QUANTITY SHALL BE 0.5 TO 0.75 CFM/SQ. FT. UTILIZE MULTIPLE NEGATIVE AIR UNITS, AS NECESSARY, TO MAINTAIN NEGATIVE PRESSURE. PROVIDE REQUIRED MAKE-UP AIR FROM A SEPARATE SOURCE. FANS IDENTIFIED TO BE DEMOLISHED, IN DEMOLITION AREA, AND/OR EXISTING ROOF EXHAUST FANS AND THEIR ROOF OPENINGS MAY E UTILIZED FOR AIR DISCHARGE UNTIL DEMOLITION PHASE IS COMPLETE. DO NOT UTILIZE EXISTING EXHAUST RISERS THAT SERVE OTHER SPACES OR OTHER LEVELS IN BUILDING. NEW ROOF OR WALL OPENINGS BEING CREATED FOR CONSTRUCTION MAY BE UTILIZED FOR AIR DISCHARGE. VERIFY NEGATIVE RELATIVE AIR PRESSURE IN THE CONSTRUCTION SPACE BY MAINTAINING A WRITTEN LOG, TAKEN AT REGULAR INTERVALS, POSTED FOR REVIEW, AT SITE OF CONSTRUCTION DEMOLISH ALL DUCTWORK, PIPING AND ANCILLARY DEVICES WITHIN AREA OF DEMOLITION UNLESS OTHERWISE NOTED. ALL BRANCH DUCTS BEING DEMOLISHED FROM MAIN TRUNK DUCTS SHALL HAVE BRANCH CONNECTION OPENINGS PATCHED, SEALED AND INSULATED TO MATCH EXISTING DUCTWORK. DEMOLISH ALL ABANDONED DUCTWORK, DAMPER; PIPING AND ANCILLARY DEVICES IN DEMOLITION AREA UNLESS OTHERWISE NOTED. PATCH AFFECTED WALLS TO MATCH EXISTING OR NEW CONSTRUCTION, AS PROJECT DICTATES. CAP BRANCH PIPING AT RISER ISOLATION VALVES. IF VALVES ARE NOT INSTALLED, PROVIDE GATE VALVE AND BLIND FLANGE. NEW WORK PLAN RELOCATED AIR DEVICES TO (102�AND ANTE ROOM (101)- CTI N INC. BAULIN TUBE )NT AT ABOVE DOOR LEVEL. - PROVIDE AIRFLOW TUBE MODEL BOVE DOOR LEVEL. f0 BE RELOCATED. REFER i FOR DETAILS. polvROUS Project No. 10003.00 M201 SCALE 4" =1'-0" $DATE$ $TIME$ $FILEA$ SCALE %" =1'-ON © 2009 BH/PK Architects, Inc. gir 40"T's FURNMON1 I 1 I I i I 0 NEW WORK PLAN SCALE %" =1'-0" EF-1 EXISTING DUCT SUPPORTS. STRUCTURAL / SEE DETAIL 3 \\\ COLUMN CAP ON SHEET M4.0 \ (TYPICAL) \ / / / / RTU-1 / / SEE DETAIL 4 ON SHEET M4.0 0 FOR ANCHORING I �xi I 1 ❑ ❑ D D SF-1 OUTSIDE AIR INTAKE E F-4 NEW WORK NOTES: 1. ANCHOR ROOFTOP EQUIPMENT AS DETAILED ON SHEET M4.0. 2. INSTALL ROOFTOP UNIT OUTSIDE AIR INTAKE AT MINIMUM 3'-0" ABOVE FINSIHED ROOF. 3. MAINTAIN OUTSIDE AIR INTAKE A MINIMUM 25'-0" FROM ANY EXHUAST (FAN) OUTLETS. 4. MAINTAIN OUTSIDE AIR INTAKES A MINIMUM 25'-0" FROM ANY PLUMBING VENTS. IF VENT OUTLETS ARE ABOVE OUTSIDE AIR INTAKE, MINIMUM DISTANCE CAN BE 10'-0". 5. RUN CONDENSATE PIPING TO ROOF DRAIN. ANCHOR CONDENSATE PIPING TO ROOF. 6. REFER TO ARCHITECTURAL DRAWINGS FOR ROOFING AND FLASHING DETAILS. Project No. 10003.00 M2.02 $DATE$ $TIME$ $FILEA$ © 2009 BH/PK Architects, Inc. VOLUME DAMPER BEARING o U- o J w W EA, RA FLOW f --► SA FLOW BRANCH DUCT QUADRANT LOCKING LEVER 45 ° EXIT PROVIDE CORNER PIECES TO CLOSE OPENINGS TRUNK DUCT EXHAUST/ RETURN/ SUPPLYAIR DUCT BRANCH DETAIL NO SCALE SQUARE THROAT KADIUS ELbUW t ELBOW WITH VANES (CENTERLINE R = 32 = STD RADIUS) NOTE: DUCTWORK HAS BEEN SHOWN USING SQUARE ELBOWS. RADIUS OR RADIUS WITH VANES MAY BE USED AT CONTRACTOR'S OPTION. NOTE: PROVIDE REQUIRED ELBOWS AND TRANSITIONS TO CONNECT TO BRANCHES. MINIMUM DUCT WIDTH SHALL NOT BE LESS THAN 4". SUPPLY DUCT INSULATED FLEXIBLE _ METAL DUCT DIAMETER'D' AS INDICATED ON DRAWINGS ti TRANSITION T I TO ROUND FILTER FAN MODULE FILTER FAN HANGER. SUSPEND INDEPENDENTLY grow"'manowNi PROVIDE ADJUSTABLE CLAMP TO PERMIT REMOVAL OF DUCT FOR FILTER MAINTENANCE TYPICAL FLEXIBLE METAL DUCT TO FILTER FAN MODULE 2 NO SCALE MAXIMUM DIAMETER OF TAP LESS THAN OR EQUAL TO AIR WAY SUPPLY TRUNK RADIUS ELBOW WITH VANES TAP DIAMETER EXCEEDS AIR WAY SUPPLY TRUNK VOLUME DAMPERS TYPICAL ELBOWS AND SPLITTER DETAIL NO SCALE TAP AT END OF RECTANGULAR DUCT RUN SUPPLY TRUNK 45° ENTRY RECTANGULAR TAP EXHAUST DUCT STACK 1" ANNULAR AIR GAP GUIDE WIRE SUPPORT (3 POINTS) WEATHERPROOF FLEXIBLE CONNECTION EXHAUST DUCT DUCT CURB EQUIPMENT SUPPORTS ANCHORED TO ROOF DECK SIMILAR TO AHU ANCHOR SPIN -IN TAP DAMPER SOLID OR FLEXIBLE DUCT AS APPLICABLE RECTANGULAR TAP SIZE SHALL BE THE EQUIVALENT DUCT SIZE OF ROUND DUCT TRANSITION TO ROUND SOLID OR FLEXIBLE DUCT AS DAMPER APPLICABLE TRANSITION FITTING DAMPER DUCT LINING WHERE APPLICABLE NOTES: 1. DETAILS APPLY TO TAPS FOR INDIVIDUAL VARIABLE VOLUME BOXES (OF ALL TYPES), SINGLE AIR TERMINAL DEVICES & OTHER BRANCH RUNS USING ROUND DUCT. 2. FOR TAPS SERVING INDIVIDUAL VARIABLE VOLUME BOXES (ALL TYPES), THE DAMPER SHALL BE OMITTED. 3. FOR TAPS SERVING INDIVIDUAL AIR TERMINAL DEVICES LOCATED WHERE TAPS WILL NOT BE ACCESSIBLE A DAMPER AT THE AIR TERMINAL SHALL BE SUBSTITUTED FOR THE DAMPER AT THE TAP. 6 �NOUS CT CTAP DETAILSALE EXHAUST FAN SCHEDULE MARK CFM FAN MOTOR CONTROL TYPE SERVICE BASIS OF DESIGN REMARKS ESP (IN. VC) RPM SIZE HP NO. SPD V O MANUFACTURER AND MODEL NUMBER EF-1 1,100 2.60 2387 3/4 1 480 3 BAS UTILITY EXHAUST GREENHECK SWB-210-7 SERVES CHEMO ROOM EXHUAST HOOD. CONTINUOUS RUN, NO SHUTDOWN AIR HANDLING UNIT SCHEDULE MARK EVAPORATOR FAN COOLING ELECTRIC HEATING ELECTRICAL BASIS OF DESIGN REMARKS SA CFM OA CFM ESP (" M) TOTAL MBH SENS MBH KW # OF _--_---_— STAGES LAT ----o.-----_ (F) FLA MCA V 0 MANUFACTURER AND MODEL NUMBER RTU-1 1,450 600 2.4 97.3 45.8 --- - 26.9 480 3 TRANE MORGANIZER MODEL OHC120E HIGH OA UNIT, HOT GAS BYPASS, MERV 8PRE-FILTER AHU-2 2,500 400 -- --- -- �- -- EXISTING TRANE AHU IN MECHANICAL ROOM BALANCE TO PROJECT PARAMETERS A A 24„ ROOF SCREW EXHAUST STACK TO CHANNEL APPROX. 5" O.C. 1". CHANNEL (2'-0" LONG) SKIP WELD TO EXHAUST DUCT A SECTION NOTE: PROVIDE WARNING SIGN ON FAN AS FOLLOWS: CAUTION: BIO-HAZARD: CHEMICAL HOOD ROOM EXHAUST. TAKE PRECAUTIONS WHEN SERVICING THIS FAN. EXTEND STACK MIN. 7'-0" ABOVE FINISHED ROOF DISCHARGE DUCT, FULL SIZE. WEATHER HOOD NOTE: PROVIDE EXHAUST FAN. ANCHOR FOR HURRICANE \ PROTECTION VIBRATION ISOLATORS MASON INDUSTRIES TYPE SLF (TYPICAL) 3 CHEMO HOOD FAN MOUNTING DETAIL NO SCALE THROUGH -BOLT AHU TO CURB AT WOOD NAILER (TYPICAL) SEE ARCHITECTURAL ROOF CURB DETAIL ROOF DECK ANCHOR ROOF —CURB TO DECK WITH THRU-BOLT WITHIN 6 INCHES OF CORNER THEN TWO FEET ON CENTER (TYP. ALL SIDES) ROOFTOP A/C UNIT PREFAB CURB TO BE BOLTED DIRECTLY TO ROOF DECK ROOFTOP A/C UNIT DETAIL NO SCALE DIFFUSER, REGISTER AND GRILLE SCHEDULE NOTES: 1. UNIT SIZE IS BASED ON AIRFLOW (CFM) AS INDICATED IN THE SCHEDULE BELOW FOR EACH TYPE DESIGNATION. 2. THE LISTING OF A PARTICULAR SIZE IN THE SCHEDULE DOES NOT MEAN THAT IT IS ACTUALLY USED ON THIS PROJECT. 3. PROVIDE ONLY THOSE UNITS INDICATED BY TYPE AND CFM ON THE PLANS. 4. BRANCH DUCT SIZES TO THE DIFFUSERS, GRILLES AND REGISTERS SHALL CONFORM TO THIS SCHEDULE UNLESS NOTED SCHEDULE UNLESS NOTED OTHERWISE ON THE PLANS. 5. AT THE CONTRACTORS' OPTION, BRANCH DUCTS MAY BE ROUND OR RECTANGULAR. 6. FOR ROUND NECK DIFFUSERS THE BRANCH DUCT SIZE SHALL BE EITHER THE NECK SIZE INDICATED OR OR THE EQUIVALENT RECTANGULAR BRANCH SIZE INDICATED. 7. FOR SQUARE AND RECTANGULAR DIFFUSERS, GRILLES AND REGISTERS, THE BRANCH DUCT SHALL BE SIZED AS INDICATED, WITH A TRANSITION TO THE ACTUAL NECK SIZE AT THE UNIT. HOWEVER, IF SPACE IS AVAILABLE, THE FULL NECK SIZE MAY BE USED FOR THE ENTIRE BRANCH RUN. 8. ROUND BRANCH DUCTS MAY BE USED FOR SQUARE OR RECTANGULAR DIFFUSERS, GRILLES AND REGISTERS PROVIDING A REGISTERS PROVIDING A SUITABLE TAPERED TRANSITION IS USED AND THE EQUIVALENT ROUND SIZE FOR FOR THE LISTED BRANCH DUCT SIZE IS USED. 9. DUCT SIZES INDICATED ARE THE AIR SIDE OPENING DIMENSIONS. INCREASE SHEET METAL DIMENSIONS AS REQUIRED FOR LINING OR OTHER FACTORS. 3 +S W-11-11-1 SERIES:FA FIXED BLADE GRILLE, 3/4" SPACING FOR RETURN, EXHAUST OR TRANSFER BASED ON TITUS 350 RL NECK RECTANGULAR MINIMUM MAXIMUM SIZE BRUNCH DUCT REMARKS AIRFLOW (CFM) AIRFLOW (CFM) (in x in) (IN x IN) 0 120 22 X 10 SEE PLAN 125 260 22 X 10 SEE PLAN 265 470 22 X 10 SEE PLAN 475 530 22 X 22 SEE PLAN 535 730 22 X 22 SEE PLAN 735 810 22 X 22 SEE PLAN 815 960 22 X 22 SEE PLAN 965 1100 22 X 22 SEE PLAN - - qY1��� . e ... �i >�� rA T ,. .v'' �.-. `. "' ���-•."�.f yw-o� . .J iq. ,� Via., W SERIES:FF FILTER FAN MODULE BASED ON AMERICAN AIR FILTER MODEL FM2-LE RECTANGULAR MINIMUM MAXIMUM WIDTH LENGTH BRANCH DUCT REMARKS AIRFLOW (CFM) AIRFLOW (CFM) (IN.) (IN.) (INAN) 0 300 24 24 10" ROUND PROVIDE OPTIONAL DUCT CONNECTION 301 750 24 48 12" ROUND PROVIDE OPTIONAL DUCT CONNECTION ROOF DECK Y8"O BOLT THRU CURB 3"x3"xY4' FRAME PROVIDE 3"x3"x/° HEADER BELOW ALL CURBS Project No. 10003.00 NOTES: 1. UNIT MINIMUM SEER =13.0 2. UNIT DESIGN PARAMETERS — EDB = 81, EWB = 71, LDB = 49.3, LWB = 48.0, EVAP FAN HP = 3 HP, POWERED CONVENIENCE OUTLET, OUTSIDE AIR HOOD. $DATE$ $TIME$ $F/LEA$ M4.0 0 2009 BH/PK Architects, Inc. DEFINITIONS: - - -L INS i ell �& 0 Na CLEAN ROOM OH T Q, P XOA ROOFTOP UNIT POINTS LIST SA EXHAUST FAN OCCUPANCY SCHEDULE: HARDWARE 1O SOFTWARE INPUT OUTPUT NIGHT SETBACK SCHEDULE: DIGITAL ANALOG DIGITAL ANALOG ALARMS O APPLICATION PROGRAMS O NOTES: OALL HARDWARE AND ALARM POINTS SHALL BE REMOTELY REPRESENTED ON THE LCD PANEL LOCATED IN THE CONTROL ROOM O2 ALL APPLICATION 0 PROGRAMS SHALL BE ►� FULLY FUNCTIONAL USING � U 0 DATA APPLICABLE w w w ~ m F— TO THIS PROJECT. _ u- >> j o w a w w OSIGNAL FROM ONE SENSOR w w j w r? v N¢ o MAY BE SHARED co � Q U a '-'-' a a w � z w � co� v � a � W w � � � Q o Ce 0 O } Z Q cu w AMONG SEVERAL UNITS. ~ z w w w v o ¢ o- O _¢ Q O Y z w D a E- g ? a.¢ o w z_ui U w gce p O O 0 O w= O 0 cn o U w U Q Q O W v p LL. O W w g Q O Q Z Q p Z U Z p J p Z J O U W 0 lL O Q J _ W J Q z W Q 2 Q W z w i- U o W W w O J J J w o Lu 2 Z = o w w Z �_ w Q w o O a LU w w cn cn C'1 m O~ _� z p U co ¢¢ w �- ¢ LL cn U w p z~ ¢ _J Q w EQUIPMENT DESCRIPTION RTU-1 • • • • • • • • • • FAN • • • • • • • EF-1 • • DIRECT EXPANSION COOLING COIL • • • • FILTERS DAMPERS • ' • 1. ON A START COMMAND THE OUTSIDE AIR AND RETURN DAMPERS SHALL GO TO THEIR NORMAL OPEN POSITIONS. AFTER A 20 SECOND (ADJUSTABLE) DELAY, THE EVAPORATOR FAN SHALL START AND RUN CONTINUOUSLY. 2. A FLOW SWITCH IN THE FAN DISCHARGE SHALL PROVE AIRFLOW. IF NO FLOW IS INDICATED, AN ALARM SIGNAL SHALL BE SENT TO THE BAS. 3. A SPACE TEMPERATURE SENSOR (T-1) SHALL BE USED TO SEQUENCE HEATING AND COOLING. 4. IN THE COOLING MODE THE SPACE TEMPERATURE SENSOR (T-1) SHALL STAGE THE COMPRESSORS TO MAINTAIN SETPOINT. HOT GAS BYPASS SYSTEM SHALL CONTROL SPACE HUMIDITY AND VARYING LOAD CONDITIONS. 5. IN THE HEATING MODE THE SPACE TEMPERATURE SENSOR (T-1) SHALL MODULATE COMPRESSORS TO MAINTAIN SETPOINT. 6. WHEN THE SMOKE DETECTOR (SD-1 ) DETECTS PARTICLES OF COMBUSTION, THE UNIT SHALL NOT SHUT DOWN, BUT AN ALARM CONDITION SHALL BE INDICATED. 7. WHEN THE FIRE ALARM SYSTEMS INDICATES AN ALARM THE UNIT SHALL NOT SHUT DOWN BUT AN ALARM CONDITION SHALL BE INDICATED. 8. THE EXHAUST FAN EF-1 SHALL START AND RUN CONTINUOUSLY. A FLOWSWITCH IN THE FAN SHALL PROVE AIRFLOW. IF NO FLOW IS INDICATED, AN ALARM SIGNAL SHALL BE SENT TO THE BAS. ROOFTOP UNIT -ELECTRIC - RTU-1 AND EXHAUST FAN EF-1 FULL OPEN POSITION: THE MAXIMUM POSSIBLE OPEN POSITION OF A VALVE OR DAMPER. FULL CLOSED POSITION: THE MINIMUM POSSIBLE OR SHUT OFF POSITION OF A VALVE OR DAMPER. MAXIMUM OPEN POSITION: THE MAXIMUM OPEN POSITION REQUIRED FOR A VALVE OR DAMPER AS INDICATED BY THE SCHEDULED OPERATING CAPACITY OR BY THE CONTROL SEQUENCE. MINIMUM OPEN POSITION: THE MINIMUM OPEN POSITION REQUIRED FOR A VALVE OR DAMPER AS INDICATED BY THE SCHEDULED OPERATING CAPACITY OR BY THE CONTROL SEQUENCE. SET POINT: THE DESIRED OPERATING POINT FOR A PARAMETER, AS DETERMINED BY MANUAL INPUT OR AUTOMATICALLY IN ACCORDANCE WITH THE CONTROL SEQUENCE. FIELD DETERMINED SET POINT: THE DESIRED OPERATING POINT FOR A PARAMETER, AS DETERMINED BY FIELD CONDITIONS, SUCH AS ACTUAL OPERATING POINTS, ACTUAL PRESSURE DROPS, OR OTHER FIELD DETERMINED VALUES. BAS: BUILDING AUTOMATION SYSTEM. GENERAL NOTES: 1. THESE GENERAL NOTES APPLY TO ALL CONTROL DIAGRAMS AND SEQUENCES AS WELL AS ALL WORK RELATED TO THE HVAC CONTROLS INDICATED ON OTHER M-SERIES DRAWINGS. 2. THE DIAGRAMS, POINT LISTS AND CONTROL SEQUENCES DESCRIBE THE REQUIRED SEQUENTIAL OPERATIONS OF SYSTEMS AND MAJOR COMPONENTS. THEY DO NOT DEFINE IN DETAIL THE OPERATION OF MINOR COMPONENTS, RELAYS, SWITCHES OR OTHER SMALL DEVICES REQUIRED FOR THE PROPER FUNCTIONING OF THE CONTROL SYSTEM. INCORPORATE ALL SUCH ITEMS IN ORDER TO PROVIDE PROPER OPERATION OF CONTROL COMPONENTS AND EQUIPMENT. 3. THE SEQUENCES OF OPERATION DESCRIBE CHANGES IN CONTROL FUNCTIONS AS OPERATING CONDITIONS VARY IN A PARTICULAR MANNER, SUCH AS RISING ROOM TEMPERATURE. UNLESS OTHERWISE STATED, THE SEQUENCES SHALL BE REVERSED WHEN THE OPERATING CONDITIONS REVERSE, SUCH AS WHEN THE RISING ROOM TEMPERATURE BEGINS TO FALL. 4. CONTROL DEVICE SET POINTS SHALL BE MANUALLY ADJUSTABLE OVER THEIR ENTIRE CONTROL RANGE. SET POINTS MAY BE FACTORY SET, BUT SHALL BE FIELD ADJUSTABLE. SPECIFIED SET POINTS SHALL TAKE PRECEDENCE OVER FACTORY SETTINGS. 5. WHERE THE CONTROL SEQUENCE INDICATES AN AUTOMATIC RESET PROCEDURE, THE SET POINT SHALL INDICATE THE NORMAL START-UP CONDITION. 6. TEMPERATURE, AIR FLOWS, PRESSURES AND SIMILAR DATA SHOWN ON CONTROL DIAGRAMS ARE NOMINAL VALUES SO THAT TYPICAL DIAGRAMS MAY BE USED. SEE EQUIPMENT SCHEDULES FOR DATA DIRECTLY APPLICABLE TO INDIVIDUAL EQUIPMENT ITEMS. WHERE NOTED, VALUES SHALL BE FIELD MEASURED OR CALCULATED IN ACCORDANCE WITH THE PROCEDURE INDICATED. 7. LOCATE THERMOSTATS AND OTHER DEVICES REQUIRING OCCUPANT MONITORING OR ADJUSTMENT AT AN ELEVATION 4'4' ABOVE FINISHED FLOOR, IN ACCORDANCE WITH ADA REGULATIONS. SENSORS WITH NO EXTERNAL ADJUSTMENTS SHALL BE MOUNTED 4'-6" ABOVE FINISHED FLOOR. 8. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. INTERFACE EQUIPMENT AND WIRING SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 9. CEILING ACCESS PANELS AND DUCT ACCESS PANELS SHALL BE PROVIDED, WHERE REQUIRED, TO SERVICE DAMPERS, HEATERS, VALVES AND OTHER CONCEALED EQUIPMENT. 10. CONTROL WIRE AND CONDUIT SHALL BE SUPPLIED AND INSTALLED UNDER DIVISION 15, AND SHALL COMPLY WITH N.E.0 AND DIVISION 16 SPECIFICATIONS. 11. DIVISION 16 SHALL PROVIDE POWER WIRING AND CONDUIT FROM POWER PANELS TO CONTROL SYSTEM EQUIPMENT. DIVISION 16 SHALL PROVIDE THE BREAKER. COORDINATE POWER REQUIREMENTS WITH DIVISION 16. 12. CONTROL SYSTEMS SUPPLIER SHALL WIRE FROM DRY CONTACTS IN FIRE ALARM PANEL AS REQUIRED FOR INTERFACE BETWEEN FIRE ALARM SYSTEM AND HVAC CONTROL SYSTEMS. 13. CONTROL SYSTEM SHALL BE AN EXTENSION OF THE EXISTING FACILITY SYSTEM AND COMPONENTS. OUTSIDE AIR INTAKE DUCT SUPPLY AIR DUCT SYMBOLS O TEMPERATURE SENSOR RETURN AIR DUCT O RELATIVE HUMIDITY SENSOR /0 PILOT LIGHT DISP DIGITAL DISPLAY TEMPERATURE HOA HAND -OFF -AUTOMATIC SWITCH SENSOR SW MANUAL SWITCH p PRE- FINAL FILTER FILTER x x NOTES: 1. ALL ITEMS SHOWN ON LEGEND MAY NOT BE USED. 2. MULTIPLE DEVICES ARE INDIVIDUALLY IDENTIFIED WITH NUMERIC SUBSCRIPTS. NO SIGNIFICANCE IS ATTACHED TO THE ORDER OF NUMBERING. NUMBERS MAY BE OMMITED FROM THE NUMERICAL SEQUENCE. Project No. 10003.00 M491 $DATE$ $TIME$ $FILEA$ © 2009 BH/PK Architects, Inc. PLUMBING DEMOLITION PLAN LEVEL TWO Ys" =1'-0" PLUMBING LEGEND o, Ilk DESCRIPTION SANITARY SEWER VENT PIPING COLD WATER HOT WATER EXISTING TO BE REMOVED LIMIT OF REMOVAL NEW TO EXISTING PLUMBING NEW WORK PLAN LEVEL TWO y8" = 1 011 GENERAL NOTES ABBREVIATIONS 1. THE FOLLOWING NOTES ARE GENERAL IN NATURE AND PERTAIN TO THE ENTIRE PROJECT. WHERE THERE ARE EXCEPTIONS, ADDITIONS, OR SAN REVISIONS TO THESE NOTES SUCH EXCEPTIONS, ADDITIONS OR REVISIONS ARE SO NOTED ON THE PARTICULAR DRAWING THEY OCCUR. V 2. PIPING IS SHOWN IN SCHEMATIC FORM. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. CW 3. REFER TO ARCHITECTURAL PLANS FOR LOCATION OF ALL EQUIPMENT. HW 4. ACCESS PANELS SHALL BE PROVIDED, WHERE REQUIRED, TO SERVICE VALVES AND OTHER MECHANICAL EQUIPMENT. 5. ALL VALVES IN CORRIDORS SHALL BE LOCATED V- 0" AWAY FROM WALLS CLEAR OF SOFFITS UNLESS NOTED OTHERWISE. 6. STORM AND SANITARY PIPING 3" AND LARGER SHALL BE SLOPED AT 1/8" PER FOOT UNLESS NOTED OTHERWISE. 7. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS CERTIFIED DRAWINGS. FIELD VERIFY AND COORDINATE ALL DIMENSIONS PRIOR TO FABRICATION. 8. UNLESS NOTED OR OBVIOUS OTHERWISE, PIPE RUNS SHOWN OCCUR IN THE CEILING SPACE OF THE LEVEL INDICATED ON PLANS, ON TO EXISTING & WATER LINES DEMOLITION NOTES 1. WHERE EXISTING CONDITIONS ARE SHOWN, THEY HAVE BEEN DERIVED FROM AVAILABLE DRAWINGS AND REPRESENT THE ENGINEER'S BEST ESTIMATE OF ACTUAL CONDITIONS BUT HAVE NOT IN ALL CASES BEEN VERIFIED BY FIELD INVESTIGATION. 2. THE CONTRACTOR SHALL NOT ASSUME THAT EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE COMPLETE AND ACCURATE REPRESENTATIONS OF THE EXISTING PLUMBING SYSTEMS. THE CONTRACTOR SHALL VISIT THE JOB SITE AND BECOME FAMILIAR WITH THE SITE CONDITIONS BEFORE SUBMITTING A BID. ANY ADDITIONAL WORK CAUSED DUE TO LACK OF KNOWLEDGE OF EXISTING SYSTEMS SHALL BE DONE AT NO ADDITIONAL EXPENSE TO THE OWNER. IF AGREEABLE TO THE OWNER, THE CONTRACTOR CAN ESTABLISH LINE ITEM COSTS FOR POSSIBLE DEMOLITION ITEMS THAT ARE UNABLE TO BE IDENTIFIED WITH REASONABLE INVESTIGATION. 3. ALL EXISTING PLUMBING FIXTURES REMOVED ARE TO BE RETURNED TO THE OWNER. 4. ALL HANGERS, SUPPORTS AND ASSOCIATED FITTINGS INDICATED TO BE DEMOLISHED ABOVE GRADE ARE TO BE REMOVED IN THEIR ENTIRETY. DEACTIVATED POINTS OF CONNECTION ON ACTIVE LINES ARE TO BE CAPPED. PLUMBING FIXTURE SCHEDULE MARK DESCRIPITION L-1 JUST MODEL B-21429 STAINLESS STEEL SINK 3 HOLES ON 4" CENTERS, SPEAKMAN SEF-1800-8 EYESAVER FAUCET WITH 4" WRIST BLADE HANDLES AND 8" GOOSENECK SPOUT. MCGUIRE #C8872C CAST BRASS "P" TRAP WITH CLEAN OUT WITH BRASS CRAFT #SCR1912AC LOOSE KEY ANGLE STOPS. ZURN CARRIER #Z-1231 WITH FLOOR MOUNTED BEARING PLATE. UNIT TO BE SUPPLIED WITH TRUEBRO HANDICAP LAV-GUARD INSULATION PLUMBING NEW WORK PLAN LEVEL THREE Y8" =1'-0" Project No. 10003.00 P2,9 I $DATE$ $TIME$ $FILEA$ 0 2009 BWPK Architects, Inc. -T lit jLaR Itt 2LC1(CRITICAL) . . E ti 2LL1 (LIFE SAFETY) I 1 } # 3� , T 2LN1 (NORMAL) - r 3 it f 1 { I jj EE ,7 ,i i .... ._i ....� ti r � , i� � t E4.: I 29 0 2LC1-24 I E �LCi m� 0 �t 2LCl-28 1 !. ; # j € { _..w _ _ f t - t E. O1- � i E ._ ' 4 , �i _ E,, 1LE112 IO 5 �E E_ F � f .-_..-_. f ___ ...-..__ -� — —iE E zIt - ---- --- I L f F t , i t2t� 1 i € R I kt i 1 i _ DEMOLITION PLAN SCALE %' =1'-0" DEMOLITION PLAN NOTES. 1Q REMOVE EXISTING RECEPTACLE ALONG WITH ASSOCIATED CONDUIT AND WIRE. SECURE CIRCUIT ABOVE CEILING FOR RECONNECTION TO NEW DEVICES BEING INSTALLED. 02 DISCONNECT EXISTING HOOD AND SECURE CIRCUIT FOR RECONNECTION TO NEW DEVICES BEING INSTALLED. Q3 EXISTING RECEPTACLE TO REMAIN. u J -�� y - t 29, I i 2LC;161 i i = i "l L L i — 1 i 1 ( t j { I 3€E 1 f f 4 3i3 i� m NEW WORK PLAN SCALE %" =1'-0" NEW WORK PLAN NOTES. 1Q EXISTING RECEPTACLE TO REMAIN. PROVIDE AND INSTALL NEW RECEPACLE AT 80' A.F.F. FOR FUME HOOD. RECONNECT TO EXISTING CIRCUIT LEFT FROM DEMOLITION. Q3 PROVIDE AND INSTALL CONDUIT AND WIRE FOR NEW FILTER FANS LOCATED IN CEILING. TERMINATE WIRES TO DISCONNECT INTEGRAL TO FAN. PROVIDE AND INSTALL CONDUIT AND WIRE FOR NEW POWER DOOR OPERATORS. TERMINATE POWER TO OPERATOR CONNECTION OVER DOOR. COORDINATE INSTALLATION OF DOOR OPERATOR PUSH BUTTONS PROVIDED WTIH DOOR. SEE ARCHITECTURAL DRAWINGS FOR DETAILS. 44 1 ptl = t t t� f IC I i t t E t f . t t i J , �i i r o i e i �N Du C- �1 3 ss� ii •__. t � ic� 1=E� --- �.Y 1 t t . 3 , 2LC1 (CRITICAL) 2LL1 (LIFE SAFETY) 2LN1 (NORMAL) ojmt No. 10003.00 E2,00 $DATE$ $TIME$ $FILER$ 1 © 2009 BH/PK Architects, Inc. I t®rurm IN, , ti {� 2LC1 (CRITICAL) q 2LL1 (LIFE SAFETY) i — 2LN1 (NORMAL) lick ., zc ! �,...-r' , i, 1111 1 I ' l i: 4 1 i j i �d�``• +i J DEMOLITION PLAN SCALE %" = V-0" DEMOLITION PLAN NOTES: 1Q REMOVE EXISTING LIGHT FIXTURE AND SAVE FOR RE -USE. SECURE CIRCUIT FOR RECONNECTION FOLLOWING NEW CEILING INSTALLATION. Q2 REMOVE EXISTING SWITCHES ALONG WITH ASSOCIATED CONDUIT AND WIRE. PATCH WALL. ---------------------------------------- ------- ----- _ ---- _ I , 41 �_l j ----- it 2LC1 (CRITICAL) dill OU N.,: u ,. 2LL1 (LIFE SAFETY) ' ------ - Y TO EXIST. V -�— 2LN1 NORMAL ( ) ---- h NORMAL. TO EXIST -- — LTG. CKT CRITICAL LTG. CKT. _.tis:sxl. `I I I ! � I I � O i y I ii : 7 I j I k r.: I( 1104:1 - ----- , 3 r t P 1. r _._.--._-.. i l NEW WORK PLAN SCALE %" = V-0" NEW WORK PLAN NOTES: 1Q RE -INSTALL LIGHT FIXTURE REMOVED DURING DEMOLITION. RECONNECT TO EXISTING LIGHTING CIRCUIT AND PROVIDE NEW SWITCH AS SHOWN. 2Q INSTALL NEW LIGHT FIXTURE TO MATCH EXISTING. FIXTURE SHALL BE EQUAL TO DAYBRITE #SG243MRS12D, 2x4, 3-LAMP LAY -IN STATIC TROFFER. CONNECT TO EXISTING CIRCUIT AS SHOWN. Q3 COORDINATE SWITCH LOCATION WTIH NEW STOREFRONT STRUCTURE. SEE ARCHITECTURE DRAWINGS FOR EXACT LOCATION. rl N i�l N n U o U a bA •� N O N 00 U o, � o ^� N N to a, 3 [� �MN Val � O Ewa 10 N � n N po ITS C >a�D CD O N um, CON C m a .. AN,p Co mmEoto 10 CN ivm 2 o la 2aOv Q •o rn y Or ID p u w V ~ Q m O A ct N � � U w0 � H � a� ►—+ Z N O � 0 � O w � W Project No. 10003.00 Ell $DATE$ $TIME$ $FILEA$ 1 © 2009 13"K Architects, Inc. F "OFIVERA KAO NEW EF-1 NEW ROOFTOP UNIT lfl-)T .. ._...._ ... ._..... ..... ._.- ---- ...__._-..... ... ...... ............ . .. _.._-- ---.. ............ ._...-._. ._-.. _.. .. _. _.._-__-.......v.__._.__..._._.._..._.._�........_�..�._.._.�..� --------------------- ---.�♦ 1 1 ' 1 I 1 1 1 1 , PANEL1HE1 1 I 1 I 1 1 1 1 1 1 1 1 �- - - - - - - - - - THESE ROOMS ARE LOCATED ON LOWER LEVEL 1 I , t - 1 2 1 1 I t 1 ,�.-------------------------- �•r, PLAN NOTES: 1Q PROVIDE CONDUIT AND WIRE FROM NEW 15 AMP, 3-POLE BREAKER IN EXISTING PANEL 1 HE1 TO NEW EXHAUST FAN. INSTALL NEW DISCONNECT AT FAN AND TERMINATE ALL CONNECTIONS. SEE RISER DIAGRAM FOR CONDUIT AND WIRE. Q PROVIDE CONDUIT AND WIRE FROM NEW 35 AMP, 3-POLE BREAKER IN EXISTING PANEL 1 HE1 TO NEW ROOF TOP UNIT. TERMINATE ALL WIRES TO DISCONNECT PROVIDED WITH UNIT. SEE RISER DIAGRAM FOR CONDUIT AND WIRE. Q3 BOND NEW ROOF TOP EQUIPMENT TO EXISTING LIGHTNING PROTECTION SYSTEM USING NFPA 72 APPROVED CONNECTIONS. ® CONNECT NEW FIRE ALARM DUCT SMOKE DETECTOR IN ROOF TOP UNIT SUPPLY DUCT TO EXISTING FIRE ALARM PANEL. DUCT DETECTOR SHALL INITIATE ALARM, BUT WILL NOT SHUT DOWN UNIT. Project No. 10003.00 $DATES $TIMES $FILEA$ ,,'€ l rl' f:'r-, l E3.0 © 2009 BIUPK Architects, Inc. 4 SECOND FLOOR FIRST FLOOR LOWER LEVEL 2LN1 RISER 1 NOTES: 1Q SHUNT -TRIP Q2 GENERATOR E-STOP T-1 1HN11 11LE1 3Q EXISTING LIFE SUPPORT TRANSFER SWITCH & PANEL TO REMAIN IN EXISTING HOSPITAL. ® EXISTING EQUIPMENT BRANCH TRANSFER SWITCH & PANEL TO REMAIN IN EXISTING HOSPITAL. 21-C11 1 2LL1 T-2 1LN2 T-4 EAST ADDITION I I EXISTING HOSPITAL T-3 1 LN3 I 11 HN2 TO LIGHTING ]D s Q5 3-POLE, 30 AMP, CIRCUIT BREAKER © 3-POLE, FUSIBLE DISCONNECT WITH 80 AMP FUSES 7Q 3-POLE, 50 AMP, CIRCUIT BREAKER EMCC 600 AMP PARTIAL RISER DIAGRAM 2 CRITICAL LIFE SAFETY EQUIP. ATS-EQ (600 AMP) ATS-CB (200 AMP) ATS-LS (100 AMP) 3 EXIST. 750KVA 208Y/120V XFMR TO EXIST. -I X-RAY LOADS PARTIAL RISER DIAGRAM 1 ........._ ---- ..,..... , w . ,.__ . ,...-- ..—. —.—. —.,.ww. , , v �9-1. EXIST. 300KVA 208Y/120V GEN SET Project No. 10003.00 E4,0 $DATE$ $TIME$ $FILER$ © 2009 BH/PK Architects, Inc. .� ,, _ •31 � •