Loading...
HomeMy WebLinkAbout7631 Gall Blvd (24)• EXISTING SQ FT: 2051831 ZEPHYRHILLS, FLORIDA CSP 2021 DATE: 10-1-21 STORE NO.: 0706-277 PROTO: 192 DRAWING INDEX, C1 COVER SHEET N1 GENERAL INFORMATION F-Alas] .IYyx"Lei ZT-AlI PHM1 MODULAR PHARMACY PLANS, ELEVATIONS AND SCHEDULES PHM2 MODULAR PHARMACY SECTIONS AND DETAILS PHM3 PHARMACY EQUIPMENT (FOR REFERENCE ONLY) PHM4 PANEL PLAN PHM5 PHASING PLANS (FOR REFERENCE ONLY) PHM5.1 PHASING PLANS (FOR REFERENCE ONLY) PHM5.2 PHASING PLANS (FOR REFERENCE ONLY) MECHANICAL M1 ENLARGED MECHANICAL PLANS ELECTRICAL EPHM1 ENLARGED ELECTRICAL PLANS BUILDING CODE SUMMARY NAME OF PROJECT: STREET ADDRESS: PROPOSED USE: CODES: BUILDING CODE: MECHANICAL CODE: PLUMBING CODE: ELECTRICAL CODE: FIRE CODE: ACCESSIBILITY CODE ENERGY: ZEPHYRHILLS, FLORIDA GENERAL REMODEL 7631 GALL BLVD. RETAIL 2020 FLORIDA BUILDING CODE 2020 FLORIDA MECHANICAL CODE 2020 FLORIDA PLUMBING CODE 2017 NEC 2020 FLORIDA FIRE CODE 2020 FLORIDA ACCESIBILITY CODE 2020 FLORIDA ENERGY CONSERVATION CODE OCCUPANCY: M-MERCANTILE; WHOLESALE OR RETAIL STORE (MAIN USE) - SECT. 309.1 S1-STORAGE AREA - SECT. 311.2 ALL WORK SHALL COMPLY WITH PREVAILING CODES FLORIDA BUILDING CODE, NATIONAL ELECTRIC CODE, AND THE CITY OF ZEPHYRHILLS ORDINANCES .. `: 'AL J p+enb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Architect of Record William Douglas Hurley Florida License No. AR 91919 Architect Ousiness Lic No. AA2600d940 UjU) N JXono w owo O ZWO azOz< Ww zwwww,§Hz=aoHy LLI a¢ §E5<g awz 0w 0 �N��a2=i"a~w Z fig; w-s"Oe'70 w H 0": 0 Oa" N w§<wUZOOQ zWai� ��3 x z �< Mzwo-ow`�o�0N __ oz;W,MW,awC0°wog d o=f wa,x azXUn= ~ =ww O¢Dz� waUww= H EN0 (Lo WC MwQF CV (A 00 Q cj O p o �'r- o m N a _ Cfl J o0 00 J °z o U, = M 0 N �o �co 0 � co IIIIIL N w w m Z co 2021 CSP I ISSUE BLOCK CHECKED BY: Checker DRAWN BY: SPS PROTO: 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE: 10-1-21 Q� A. 41 ?" TYPE OF CONTRUCTION: 116 UNPROTECTED (SPRINKLERED) PER SECT. 602.2 AND TABLES 601 AND 602 y, G ALLOWABLE AREA: UNLIMITED SECTION 507.2 AND 507.3 5. FIRE PROTECTION: BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM AND IS SURRONDED ON ALL SIDES BY 60 FEET MINIMUM OF PERMANENT OPEN SPACE Afl61918 AND COMPLIES WITH SECTION 507.3. UNLIMITED AREA CRITERIA IN APPLICABLE., ' Q,�,'. VOTE: ALL WOOD MATERIAL SHOWN IN THIS PROJECT SHALL BE FIRE RETARDANT TREATED WOOD (FRTW) IN ACCORDANCE WITH IBC SECTION 603.1. THIS INCLUDES 4LL SHEATHING AND "WOOD STUDS" NOTE: BUILDING WILL BE OCCUPIED DURING CONSTRUCTION, AREAS WILL BE SECTIONED OFF WITH DUST PARTITIONS OR SECURITY FENCING AS NEEDED. NOTE: EXISTING SQUARE FOOTAGE, EXISTING PATHS AND EGRESS WIDTH WILL NOT BE IMPACTED BY THE REMODEL SCOPE OF WORK JARCHITECTURAL: I MECHANICAL/ELECTRICAL/FIRE: I BUILDING REVIEW: I STORE ADDRESS- pb2 architecture + engineering 2809 AJAX AVENUE SUITE 100 ROGERS, ARKANSAS 72758 (479) 636-3545 pb2 architecture + engineering 2809 AJAX AVENUE SUITE 100 ROGERS, ARKANSAS 72758 (479) 636-3545 CITY OF ZEPHYRHILLS BUILDING DEPARTMENT WALMART STORE NO. 0706.277 5335 8TH STREET 7631 GALL BLVD. ZEPHYRHILLS, FLORIDA 33542 ZEPHYRHILLS, FLORIDA 33541 (813)780-0020 GENERAL SCOPE OF WORK • REPLACE FRONT COUNTER AT PHARMACY • RETROFIT A MODULAR HEALTH SERVICE ROOM AT PHARMACY Ll DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION COVER SHEET SHEET: C1 RESTROOM DOOR SYMBOLS ED 1/32" :RCASE ERING EIGHT OF LETTERING 6" MIN. TO 2" MAX. CORRESPONDING CONTRACTED (GRADE 2) BRAILLE SIGNS & IDENTIFICATION 1. THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE THE STANDARD USED TO IDENTIFY FACILITIES THAT ARE ACCESSIBLE TO AND USABLE BY PHYSICALLY DISABLED PERSONS AS SET FORTH IN TITLE III AND AS SPECIFICALLY REQUIRED IN THIS SECTION. 2. THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL CONSIST OF A WHITE FIGURE ON A BLUE BACKGROUND. THE BLUE SHALL BE EQUAL TO COLOR NO. 15090 IN FEDERAL STANDARD 595C. 3. FOR CHARACTER PROPORTION, THE UPPERCASE LETTER "0" SHALL BE USED TO DETERMINE THE ALLOWABLE WIDTH OF ALL CHARACTERS OF A FONT. THE WIDTH OF THE UPPERCASE LETTER "0" OF THE FONT SHALL BE 55 PERCENT MINIMUM AND 110 PERCENT MAXIMUM OF THE HEIGHT OF THE UPPERCASE LETTER "I". 4. MINIMUM CHARACTER HEIGHT SHALL COMPLY WITH 2O10 ADA TABLE 703.5.5. VIEWING DISTANCE SHALL BE MEASURED AS THE HORIZONTAL DISTANCE BETWEEN THE CHARACTER AND AN OBSTRUCTION PREVENTING FURTHER APPROACH TOWARDS THE SIGN. CHARACTER HEIGHT SHALL BE BASED ON THE UPPERCASE LETTER "I". CHARACTER HEIGHT MEASURED FROM THE BASELINE OF THE CHARACTER SHALL BE 5/8" (16 MM) MINIMUM AND 2 INCHES (51 MM) MAXIMUM. 5. CHARACTERS AND SYMBOLS SHALL CONTRAST WITH THEIR BACKGROUND. 6. WHEN RAISED CHARACTERS OR SYMBOLS ARE USED, THEY SHALL CONFORM TO THE FOLLOWING: A. CHARACTERS SHALL BE RAISED 1/32" MINIMUM AND SHALL BE SANS -SERIF UPPERCASE CHARACTERS. RAISED LETTERS SHALL BE DUPLICATED IN BRAILLE. B. RAISED CHARACTERS SHALL BE A MINIMUM OF 5/8" HIGH AND 2" MAXIMUM BASED ON THE HEIGHT OF THE LETTER "I" C. PICTORIAL SYMBOL SIGNS (PICTOGRAMS) SHALL HAVE TEXT DESCRIPTORS LOCATED DIRECTLY BELOW THE PICTOGRAM FIELD. PICTOGRAMS SHALL HAVE A FIELD HEIGHT OF 6" MINIMUM. PICTOGRAMS AND THEIR FIELDS SHALL HAVE A NON -GLARE FINISH. PICTOGRAMS SHALL CONTRAST THEIR FIELDS, WITH EITHER A LIGHT PICTOGRAM ON A DARK FIELD OR A DARK PICTOGRAM ON A LIGHT FIELD. 7. CONTRACTED (GRADE 2) BRAILLE SHALL BE USED WHEREVER BRAILLE IS REQUIRED. DOTS SHALL BE 0.090" (2.3 MM) TO 0.100" (2.5 MM) ON CENTER IN EACH CELL WITH 0.241" (6.1 MM) TO 0.300" (7.6 MM) SPACE BETWEEN CORRESPONDING DOTS IN ADJACENT CELLS. DOTS SHALL BE RAISED A MINIMUM OF 0.025" (0.6 MM) TO 0.037" (0.9 MM) ABOVE THE BACKGROUND. 8. WHEN PERMANENT IDENTIFICATION IS PROVIDED FOR ROOMS AND SPACES, RAISED LETTERS SHALL BE ACCOMPANIED BY BRAILLE. TACTILE CHARACTERS ON SIGNS SHALL BE LOCATED 48 INCHES (1220 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, MEASURED FROM THE BASE OF THE LOWEST TACTILE CHARACTER AND 60 INCHES (1525 MM) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, MEASURED FROM THE BASELINE OF THE HIGHEST TACTILE CHARACTER. WHERE A TACTILE SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE LOCATED ALONGSIDE THE DOOR AT THE LATCH SIDE. WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH ONE ACTIVE LEAF, THE SIGN SHALL BE LOCATED ON THE INACTIVE LEAF. WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH TWO ACTIVE LEAFS, THE SIGN SHALL BE LOCATED TO THE RIGHT OF THE RIGHT HAND DOOR. WHERE THERE IS NO WALL SPACE AT THE LATCH SIDE OF A SINGLE DOOR OR AT THE RIGHT SIDE OF DOUBLE DOORS, SIGNS SHALL BE LOCATED ON THE NEAREST ADJACENT WALL. SIGNS CONTAINING TACTILE CHARACTERS SHALL BE LOCATED SO THAT A CLEAR FLOOR SPACE OF 18 INCHES (455 MM) MINIMUM BY 18 INCHES (455 MM) MINIMUM, CENTERED ON THE TACTILE CHARACTERS, IS PROVIDED BEYOND THE ARC OF ANY DOOR SWING BETWEEN THE CLOSED POSITION AND 45 DEGREE OPEN POSITION. EXCEPTION: SIGNS WITH TACTILE CHARACTERS SHALL BE PERMITTED ON THE PUSH SIDE OF DOORS WITH CLOSERS AND WITHOUT HOLD -OPEN DEVICES. 9. SIGNS TO BE PROVIDED AT ALL PUBLIC MEN, WOMEN, FAMILY AND UNISEX RESTROOMS. ROOM NAME SHALL BE "RESTROOM" AT UNISEX TOILETS. I•� M C) Cn a U) 0 A SYMBOLS LEGEND X_XX REFERENCE AT KEYNOTE INDICATOR 10.1 KEYNOTE INDICATOR A KEYNOTE OR BLOCK OF X•XX KEYNOTES WITH A LEADER X.XX ATTACHED APPLY SPECIFICALLY X.XX TO THE ITEM, AREA, OR SURFACE TO WHICH THE LEADER IS POINTING SALES 100 IN ADDITION TO THE ROOM FINISH SCHEDULE, A KEYNOTE OR BLOCK X.XX X.XX OF KEYNOTES ATTACHED TO THE X.XX X.XX ROOM NAME TAG APPLY TO THE X.XX X.XX ENTIRE ROOM COLOR INDICATOR FULL AND PARTIAL 2-A2 SECTION INDICATOR EXTERIOR AND INTERIOR ELEVATION INDICATOR SALES Fl-0-0-1 ROOM NAME AND NUMBER A6 PARTITION TYPE INDICATOR 1Q1 DOOR INDICATOR OWINDOW INDICATOR OTV MONITOR An--- - COLUMN LINE INDICATOR jk 100'-0" HEIGHT ELEVATION INDICATOR 100'-0" PLAN ELEVATION INDICATOR 5 A2 ( I ENLARGED DETAIL INDICATOR l 5 A2 DETAIL INDICATOR TACTILE EXIT SIGN TACTILE SIGN REQUIREMENTS 1. A TACTILE SIGN STATING "EXIT' AND COMPLYING WITH ANSI A117.1 SHALL BE PROVIDED ADJACENT TO EACH DOOR TO AN EXIT PASSAGEWAY AND THE EXIT DISCHARGE. REF FLOOR PLANS FOR LOCATIONS. 2. FOR CHARACTER WIDTH, THE UPPERCASE LETTER "0" SHALL BE USED TO DETERMINE THE ALLOWABLE WIDTH OF ALL CHARACTERS OF A FONT. THE WIDTH OF THE UPPERCASE LETTER "0" OF THE FONT SHALL BE 55 PERCENT MINIMUM AND 110 PERCENT MAXIMUM OF THE HEIGHT OF THE UPPERCASE "I" OF THE FONT. (ANSI A117.1-2009: 703.3.6) CHARACTER HEIGHT MEASURED FROM THE BASELINE OF THE CHARACTER SHALL BE 5/8" (16 MM) MINIMUM AND 2 INCHES (51 MM) MAXIMUM BASED ON THE HEIGHT OF THE UPPERCASE LETTER "I". 3. CHARACTERS AND SYMBOLS SHALL CONTRAST WITH THEIR BACKGROUND. 4. CHARACTERS SHALL CONFORM TO THE FOLLOWING: 4.a. LETTERS AND NUMBERS ON SIGNS SHALL BE RAISED 1/32" MINIMUM AND SHALL BE SANS - SERIF UPPERCASE CHARACTERS ACCOMPANIED BY GRADE 2 BRAILLE. 4.b. RAISED CHARACTERS OR SYMBOLS SHALL BE A MINIMUM OF 5/8" HIGH AND A MAXIMUM OF 2". 5. CONTRACTED GRADE 2 BRAILLE SHALL BE USED. DOTS SHALL BE 0.090" (2.3 MM) TO 0.100" (2.5 MM) ON CENTER IN EACH CELL WITH 0.241" (6.1 MM) TO 0.300" (7.6 MM) SPACE BETWEEN CELLS. DOTS SHALL BE RAISED A MINIMUM OF 0.025" (0.6 MM) TO 0.037" (0.9 MM) ABOVE THE BACKGROUND. 6. CHARACTERS SHALL BE 48" MINIMUM ABOVE FINISH FLOOR MEASURED FROM THE BASE OF THE LOWEST TACTILE CHARACTER AND 60" MAXIMUM ABOVE FINISH FLOOR MEASURED FROM THE BASELINE OF THE HIGHEST TACTILE CHARACTER. 7, WHERE A TACTILE SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE ALONGSIDE THE DOOR AT THE LATCH SIDE. AT DOUBLE DOORS WITH ONE ACTIVE LEAF, THE SIGN SHALL BE LOCATED ON THE INACTIVE LEAF. AT DOUBLE DOORS WITH TWO ACTIVE LEAVES, THE SIGN SHALL BE TO THE RIGHT OF THE RIGHT-HAND DOOR. TACTILE SIGNS ARE PERMITTED ON THE PUSH SIDE OF DOORS WITH CLOSERS AND WITHOUT HOLD -OPEN DEVICES. SEE ALTERNATE SOLUTIONS FOR OTHER SCENARIOS. PREFERRED SOLUTION SIGNS CONTAINING TACTILE I I CHARACTERS SHALL BE I LOCATED SO THAT THERE IS AN 18"X18" CLEAR FLOOR AREA CENTERED ON THE TACTILE CHARACTERS ALTERNATE SOLUTIONS L L L A. WHERE THERE IS NO B. THE REQUIRED SIGNAGE MAY ALTERNATE LOCATION WALL SPACE ON THE BE INSTALLED SO THAT THE (NEAREST ADJACENT LATCH SIDE OF A SINGLE CLEAR FLOOR AREA IS BEYOND WALL, RIGHT HAND SIDE DOOR, OR TO THE RIGHT THE ARC OF ANY DOOR SWING OF OPENING PREFERRED) SIDE OF DOUBLE DOORS, BETWEEN THE CLOSED POSITION SIGNS SHALL BE ON THE AND 45 DEGREE OPEN POSITION. NEAREST ADJACENT WALL, ----\Yl --�r =-I-- LJ I C. WHEN SIGN IS REQUIRED AT A BANK OF DOORS, PLACE (1) SIGN BETWEEN JAMBS. IF JAMB IS NOT WIDE ENOUGH FOR SIGNAGE, PLACE (1) SIGN AT RIGHT SIDE OF BANK OF DOORS. 12" MIN E. WHERE WALL STANDARDS IMPEDE THE REQUIRED CLEAR FLOOR AREA, MOUNT SIGN DIRECTLY TO DOOR. ENSURE DOOR HAS AUTOMATIC CLOSER AND DOES NOT HAVE A HOLD -OPEN DEVICE. ALTERNATE LOCATION (NEAREST ADJACENT WALL, RIGHT-HAND SIDE OF OPENING PREFERRED) D. WHERE REFRIGERATED CASES OR FIXTURES IMPEDE THE REQUIRED CLEAN FLOOR AREA, MOUNT SIGNAGE TO THE END PANEL OF CASE OR OWNER PROVIDED END PANEL FOR HALF GONDOLAS AND WALL STANDARD FIXTURES. J 12" MIN F. AT EGRESS DOORS IN THE GARDEN CENTER WHERE THERE IS NOT AMPLE WALL SPACE FOR SIGNAGE, MOUNT SIGN DIRECTLY TO DOOR. ENSURE DOOR HAS AUTOMATIC CLOSER AND DOES NOT HAVE A HOLD -OPEN DEVICE. 'REFERRED RIGHT-HAND SIDE, kDJACENT TO DOOR) G. AUTOMATIC SLIDING DOOR LOCATIONS TACTILE SIGNAGE CANNOT BE LOCATED ON AUTOMATIC SLIDING DOOR PANELS. PANEL WIDTH TO MATCH OF WAREHOUSE RACK z 0 H w �- w ELEVATION PLAN H. WHERE WAREHOUSE RACKS IMPEDE THE REQUIRED CLEAR FLOOR AREA ADJACENT TO THE DOOR, PROVIDE 3/8" A-B PLYWOOD PANEL WITH EASED EDGES AND ATTACH TO THE END OF THE WAREHOUSE RACK USING (4) GALVANIZED CARRIAGE BOLTS, WASHERS AND LOCKNUTS. CARRIAGE BOLTS ARE TO BE SIZED PROPERLY TO ENSURE THE BOLT END DOES NOT PROTRUDE BEYOND THE TOP OF LOCKNUT AND PANEL IS SECURE. IN GROCERY SERVICE AND PREPARATION AREAS, PAINT PLYWOOD P33 UNO. SITE VERIFICATION REQUIREMENTS: 1. THE ARCHITECT HAS NOT MADE A SCOPE VISIT. MEASUREMENTS AND PHOTOGRAPHS OF EXISTING CONDITIONS AND THE ARCHITECTURAL DRAWINGS INDICATE EXISTING CONDITIONS BASED ON AS BUILT AND PROTOTYPICAL INFORMATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO THE SUBMISSION OF A BID AND TO THE COMMENCEMENT OF ANY WORK. NO ADDITIONAL COMPENSATION WILL BE PAID DUE TO THE CONTRACTOR'S FAILURE TO VERIFY EXISTING SITE CONDITIONS WHICH INCLUDE, BUT ARE NOT LIMITED TO, GRADES, EXTENT OF PAVING, OR UTILITIES. 2. ANY DISCREPANCY WITH THE EXISTING SITE CONDITIONS AND/OR THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION AND INSTRUCTION. THESE CONSTRUCTION DOCUMENTS HAVE BEEN DESIGNED AND DRAWN ASSUMING EXISTING BUILDING CONDITIONS MATCH THE ORIGINAL DRAWINGS. THE GENERAL CONTRACTOR, IMMEDIATELY UPON ARRIVAL AT THE SITE, SHALL VERIFY ALL EXISTING STRUCTURAL COLUMN DIMENSIONS, STRUCTURAL BEARING HEIGHTS, EXISTING DIMENSIONS, TOP OF MASONRY ELEVATIONS, ROOFING CONDITIONS (INCLUDING PARAPETS, SCUPPERS AND ROOF DRAINS), AND JOIST BEARING ELEVATIONS PRIOR TO THE FABRICATION OF ANY STRUCTURAL ITEMS. IF DISCREPANCIES ARE FOUND BETWEEN WHAT IS SHOWN ON THE DRAWINGS AND EXISTING FIELD CONDITIONS, CONTACT THE WALMART CONSTRUCTION MANAGER AND THE ARCHITECT IMMEDIATELY TO DETERMINE WHAT ACTION SHOULD BE TAKEN TO MATCH EXISTING CONDITIONS. THE BEGINNING OF STRUCTURAL STEEL FABRICATION BY THE GENERAL CONTRACTOR, STEEL FABRICATOR, OR JOIST MANUFACTURER MEANS ACCEPTANCE OF THE EXISTING CONDITIONS. 3. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES (WHETHER SHOWN OR NOT) PRIOR TO THE SUBMISSION OF A BID OR THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE WALMART CONSTRUCTION MANAGER OF THE DISCOVERY OF EXISTING UTILITIES NOT SHOWN OR NOTED ON DRAWINGS. 4. THE CONTRACTOR SHALL VERIFY AND MAINTAIN (REPAIR IF DAMAGED) EXISTING IRRIGATION SYSTEMS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. 5. THE CONTRACTOR SHALL FIELD LOCATE AND VERIFY ALL PROPERTY LINES, EASEMENTS, SETBACKS AND RESTRICTIONS. A REGISTERED SURVEYOR SHALL ESTABLISH ALL PROPERTY LINES AND SETBACKS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND CLEARLY FLAG PROPERTY LINES AND SETBACKS. IT REMAINS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO DETERMINE EXACT LOCATION OF ALL SAID BOUNDARIES. 6. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UNDERGROUND UTILITY SERVICES PRIOR TO ANY EXCAVATION. 7. THE CONTRACTOR SHALL VERIFY ALL GRADES AND PROPOSED FINAL GRADES. IF RAMPS, STOOPS, STAIRS, SIDEWALKS, FLATWORK OR PAVING ARE INSTALLED, VERIFY FINAL GRADES SURROUNDING THE NEW CONSTRUCTION AND ADJUST STAIR RISERS, RAMP LENGTHS, LIMITS OF PAVING, ETC., TO ACCOMMODATE THE REQUIRED RAMP SLOPE, RISER HEIGHTS OR PAVING AREAS. ALL RAMPS AND STAIRS SHALL MEET ADA-ADAAGS (OR ADOPTED HANDICAP ACCESSIBILITY REQUIREMENTS). IF THERE IS A CONFLICT IN FIELD CONDITIONS, NOTIFY WALMART CONSTRUCTION MANAGER AND THE ARCHITECT PRIOR TO THE CONSTRUCTION OR ORDERING OF MATERIALS. 8. NOT USED. 9. NOT USED. 10. NOT USED. 11. REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY TO WALMART AND THE ARCHITECT PRIOR TO MAKING ANY STRUCTURAL MODIFICATIONS OR ORDERING OF ANY MATERIALS. GENERAL CONSTRUCTION REQUIREMENTS: 1. ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL AND/OR STATE (IF APPLICABLE) BUILDING CODES, NATIONAL ELECTRIC CODE, ADA-ADAAG AND OTHER ADOPTED ACCESSIBILITY STANDARDS, OSHA, AND ALL APPLICABLE CODES, REGULATIONS, ORDINANCES AND AUTHORITIES HAVING JURISDICTION (AHJ). 2. PROVISIONS REGARDING THE USE OF GAS AND DIESEL EQUIPMENT WITHIN AN ENCLOSED BUILDING, FORMERLY INCLUDED IN THIS PARAGRAPH, ARE NOW INCLUDED IN SECTION 01351 - REGULATORY COMPLIANCE 3. PROVISIONS REGARDING CORDS FOR ELECTRICAL EQUIPMENT AND ROUTING OF EQUIPMENT CORDS AND HOSES, FORMERLY INCLUDED IN THIS PARAGRAPH, ARE NOW INCLUDED IN SECTION 01351 - REGULATORY COMPLIANCE 4. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO REVIEW THESE DOCUMENTS DOES NOT RELIEVE THE SUBCONTRACTOR OF ANY RESPONSIBILITY FOR PERFORMING WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. 5. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS REQUIRED AND/OR AS DIRECTED BY WALMART CONSTRUCTION MANAGER TO KEEP DUST AND MOISTURE FROM THE OPERATING AREAS OF THE STORE. 6. ANY DAMAGE TO WALMART'S PROPERTY, WHICH OCCURS DURING THE PROCESS OF CONSTRUCTION SHALL BE REPAIRED/REPLACED AT NO ADDITIONAL COST TO WALMART; THIS INCLUDES ALL MERCHANDISE. CONTRACTOR SHALL PAY THE COST FOR ALL DAMAGED MERCHANDISE. 7. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES KEEPING THE BUILDING SECURE FROM PERSONS, ENVIRONMENTAL ELEMENTS OR HAZARDS. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. THE CONTRACTOR SHALL OBTAIN PERMISSION FROM THE STORE MANAGER PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR THE OPENING (DEMOLITION) OF ANY EXTERIOR WALL. 8. THE CONTRACTOR SHALL KEEP THE WORK AREA CLEAN AND FREE OF DEBRIS AND REMOVE ALL TRASH AND DEBRIS FROM THE CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS MAY BE STORED IN THE EXISTING BUILDING OR IN ANY NEW ADDITION. 9. REMOVE ANY EXISTING EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES AS REQUIRED SHOWN OR NOT SHOWN, FOR THE INSTALLATION OF NEW CONSTRUCTION. PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING FINISHES. 10. REPAIR, RE-ROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE CONSTRUCTION PROCESS TO MAINTAIN NORMAL STORE OPERATIONS AND AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION. THIS INCLUDES ALL ITEMS SHOWN OR NOT SHOWN ON THE DRAWINGS. RESET EXISTING EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES OR RELATED ITEMS AS REQUIRED FOR PROPER OPERATION. 11. WHEN EQUIPMENT, FIXTURES, FURNISHINGS, ACCESSORIES, SERVICES, FINISHES OR SURFACES ARE TEMPORARILY REMOVED OR RELOCATED IN ORDER TO PERFORM WORK, THE CONTRACTOR IS RESPONSIBLE FOR RETURNING THEM TO THEIR ORIGINAL POSITION, RECONNECTION OF SERVICES AND APPROPRIATE MEANS OF ATTACHMENT UNLESS SPECIFICALLY DIRECTED TO DO OTHERWISE. 12. WHERE EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH AND REPAINT AS NECESSARY TO BLEND IN WITH ADJACENT WORK. COORDINATE WITH WALMART CONSTRUCTION MANAGER 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY ORDERING OF MATERIALS TO PROHIBIT DELAYS OF THE CONSTRUCTION SCHEDULE OF THIS PROJECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE DELIVERY OF MATERIALS IN A TIMELY MANNER. 14. NOT USED. 15. THE GENERAL CONTRACTOR SHALL RESPOND TO ALL REQUIREMENTS OF THE STRUCTURAL ENGINEER/ARCHITECT FOR VERIFICATIONS, RESPONSES, AND SUBMISSIONS. 16. IF MODIFICATION TO SPRINKLER SYSTEM IS REQUIRED THE GENERAL CONTRACTOR SHALL HIRE A LICENSED SPRINKLER CONTRACTOR. CONTRACTOR TO SUBMIT SIGNED AND SEALED SPRINKLER DRAWINGS FOR APPROVAL PRIOR TO ANY ALTERATION OF THE AUTOMATIC SPRINKLER SYSTEM. WORK TO BE DONE UNDER SEPARATE PERMIT. 17. ALL ADJACENT BUILDINGS (IF APPLICABLE) SHALL REMAIN IN SERVICE DURING DEMOLITION/CONSTRUCTION. 18. MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR CITY STREETS TO BE CLEANED IMMEDIATELY. 19. BUILDING COMPONENTS AFFECTED BY THE SCOPE OF WORK AND ALLOWED TO REMAIN SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. DEMOLITION REQUIREMENTS: 1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER AND IN STRICT ACCORDANCE WITH OSHA REGULATIONS. 2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS, FIXTURES, PLUMBING, PAVING, MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK AS SHOWN ON DRAWING OR AS REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. 3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF 6" ABOVE FINISH CEILING. 4. WHEN REMOVING EXISTING STRUCTURAL ITEMS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING, BRACING AND SUPPORT SYSTEMS TO KEEP THE EXISTING STRUCTURE INTACT AND IN A SAFE CONDITION. REFER TO SECTIONS 02023 AND 02251. 5. THE CONTRACTOR MAY NOT REMOVE THE BLOCK WALL IN A PROPOSED OPENING PRIOR TO THE ROOFING SYSTEM OVER THE NEW ADDITION BEING MADE WATERTIGHT. COORDINATE WITH THE WALMART CONSTRUCTION MANAGER AND THE STORE MANAGER TO SCHEDULE FOR DEMOLITION FOR NEW OPENINGS. 6. THE CONTRACTOR SHALL REMOVE ANY BUILDING SIGNAGE THAT INTERFERES WITH THE BUILDING ADDITION. WALMART WILL REINSTALL SIGNAGE OR ADD NEW SIGNAGE AT COMPLETION OF ADDITION. 7. NOTES INDICATING DEMOLITION WORK ARE NOT CONFINED SOLELY TO THE DEMOLITION PLANS. THE GENERAL CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS, INCLUSIVE OF SCHEDULES AND SPECIFICATIONS, TO DETERMINE FULL EXTENT OF DEMOLITION WORK. ABBREVIATION LEGEND pb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Architect of Record William Douglas Hurley Florida License No. AR 91919 Architect Business Lic No. AA26000940 y o oLL w w cwi o w z w W I US o ! w a } to 05I'o 0 o i0a w i 0 3 m O N �� 0 a o a o W > p F - j z 3 LL o W y Cr o a U-j O o W o za g co _ R. ga o � 5 5E S a o o o � W � a ? 0 8.0 . 0 a o N° O 0 CD U Q J J � cr m m a v V J o 00 U �J Q 0 to J (9 z °? w = M 0 C'4 0 Uj N w z m 2021 CSP ISSUE BLOCK GENERAL ABBREVIATIONS ABBR DEFINITION AB ANCHOR BOLT ACI AMERICAN CONCRETE INSTITUTE ACRYL ACRYLIC ADA AMERICANS WITH DISABILITIES ACT ADJ ADJACENT AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION ARCH ARCHITECTURAL ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS AWS I AMERICAN WELDING SOCIETY BFF BELOW FINISHED FLOOR BL BLOCK LINTEL BO BOTTOM OF BOS OF STEEL BRG BEARIM NG CJ T L CENTERLINE CLR CLEAR CM CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE CONST CONSTRUCTION CONT CONTINUOUS CU CONDENSING UNIT DIA DIAMETER DSD DIRECTS SHIPPING DELIVERY EAS ELECTRONIC ARTICLE SURVEILLANCE EDC ELECTRICAL DISTRIBUTION CENTER EIFS EXTERIOR INSULATION AND FINISH SYSTEM EF EXHAUSTFAN EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRICAL EQ EQUAL ETR EXISTING TO REMAIN EW EACH WAY EWC ELECTRIC WATER COOLER FDN FOUNDATION FF FINISHED FLOOR FRP FIBER REINFORCED PLASTIC FS FAR SIDE FTG FOOTING FV FIELD VERIFY GA GAUGE GC GENERAL CONTRACTOR GM_ GENERAL MERCHANDISE GR GROCERY GYP BD GYPSUM BOARD HC HANDICAP HDTV HIGH DEFINITION TELEVISION FISA- HEADED STUD ANGHOK HSS HOLLOW STRUCTURAL SECTION INFO INFORMATION ISO ISOLATION JBE JOIST BEARING ELEVATION JST JOIST JT JOINT KS1 KIPS PER SQUARE INCH L LENGTH LB POUNDS LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LONG LONGITUDINAL MAX MAXIMUM MAU MECHANICAL AIR UNIT ME MASONRY ELEVATION MECH MECHANICAL MEP MECHANICAL ELECTRICAL PLUMBING MFR MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MO MASONRY OPENING MTL METAL NIC NOT IN CONTRACT NO NUMBER NS NEAR SIDE NTS NOT TO SCALE Oc ON CENTER OD OUTSIDE DIAMETER OH OPPOSITE HAND PAF POWDER ACTUATED FASTENER PCF POUNDS PER CUBIC FOOT PFC PAINT, FIX, CLEAN PL PLATE PLAM PLASTIC LAMINATE PLANT PLASTIC PLF POUNDS PER LINEAR FOOT PMEJ PREMOLDED EXPANSION JOINT PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PVC POLYVINYL CHLORIDE QN QUANTITY RC REFRIGERATION CONTRACTOR SIGNAGE LEGEND SDI � SIGN Sim 00 SJ I 0 SPECS SIGN, REF NOTE 3. SS FF STD STRUC 1. REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL SYMBOL OF ACCESSIBILITY AT THE T&B FOLLOWING LOCATIONS: TEMP A. ACCESSIBLE ENTRANCES WHERE NOT ALL ENTRANCES ARE ACCESSIBLE THK B. ACCESSIBLE ROOMS WHERE MULTIPLE SINGLE -USER TOILETS ARE CLUSTERED AT A SINGLE LOCATION TO C. ACCESSIBLE CHECK-OUT AISLES WHERE NOT ALL AISLES ARE ACCESSIBLE. THE SIGN, WHERE PROVIDED, SHALL BE ABOVE TOC/TC THE CHECK-OUT AISLE IN THE SAME LOCATION AS THE CHECK-OUT AISLE NUMBER OR TYPE OF CHECK-OUT TOF IDENTIFICATION TOGB D. UNISEX TOILET AND BATHING ROOMS TOM E. ACCESSIBLE DRESSING, FITTING AND LOCKER ROOMS WHERE NOT ALL SUCH ROOMS ARE ACCESSIBLE TOP/TP 2. DIRECTIONAL SIGNAGE INDICATING THE ROUTE TO THE NEAREST LIKE ACCESSIBLE ELEMENT SHALL BE PROVIDED AT THE TOS FOLLOWING LOCATIONS. THESE DIRECTIONAL SIGNS SHALL INCLUDE THE INTERNATIONAL SYMBOL OF ACCESSIBILITY: TRANS A. AT EACH SEPARATE -SEX TOILET INDICATING THE LOCATION OF THE NEAREST UNISEX TOILET TYP UNO 3. TACTILE SIGNAGE SHALL BE LOCATED 48 INCHES (1220 MM) MINIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, VCPFC MEASURED FROM THE BASE OF THE LOWEST TACTILE CHARACTER AND 60 INCHES (1525 MM) MAXIMUM ABOVE THE FINISH VERT FLOOR OR GROUND SURFACE, MEASURED FROM THE BASELINE OF THE HIGHEST TACTILE CHARACTER. WHERE A TACTILE W SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE LOCATED ALONGSIDE THE DOOR AT THE LATCH SIDE. WHERE A TACTILE WM SIGN IS PROVIDED AT DOUBLE DOORS WITH ONE ACTIVE LEAF, THE SIGN SHALL BE LOCATED ON THE INACTIVE LEAF. WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH TWO ACTIVE LEAFS, THE SIGN SHALL BE LOCATED TO THE RIGHT OF THE RIGHT HAND DOOR. WHERE THERE IS NO WALL SPACE AT THE LATCH SIDE OF A SINGLE DOOR OR AT THE RIGHT SIDE OF DOUBLE DOORS, SIGNS SHALL BE LOCATED ON THE NEAREST ADJACENT WALL. SIGNS CONTAINING TACTILE CHARACTERS SHALL BE LOCATED SO THAT A CLEAR FLOOR SPACE OF 18 INCHES (455 MM) MINIMUM BY 18 INCHES (455 MM) MINIMUM, 9E4 TOP OF CONCRETE TOP OF PAVING VISION CENTER PAINT FIX DEFINITION LEGEND CENTERED ON THE TACTILE CHARACTERS, IS PROVIDED BEYOND THE ARC OF ANY DOOR SWING BETWEEN THE CLOSED FINAL MERCHANDISE PLAN - FINALIZED MERCHANDISE PRINT FROM WM POSITION AND 45 DEGREE OPEN POSITION. EXCEPTION: SIGNS WITH TACTILE CHARACTERS SHALL BE PERMITTED ON THE ALSO REFERRED TO AS THE DEAL BOX COPY PUSH SIDE OF DOORS WITH CLOSERS AND WITHOUT HOLD -OPEN DEVICES. 4. CHARACTER AND SYMBOLS OF SIGNS SHALL BE IN CONTRAST WITH THEIR BACKGROUND AND SHALL BE EGGSHELL, MATTE, OR OTHER NON -GLARE MATERIALS OR FINISHES. 5. ACCESSIBLE SIGNAGE SHALL USE GRADE 2 BRAILLE AND MUST COMPLY WITH ICC A117.1 SECTION 703.4 OR ADA SECTION 703.3. CHECKED BY: Checker DRAWN BY: Author PROTO: 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE: 10-1-21 1 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION GENERAL INFORMATION SHEET: N1 0 N J u- DOOR AND FRAME SCHEDULE DOOR FRAME FIRE MARK ROOM NAME NEW / ETR TYPE MATERIAL COLOR QTY NOMINAL SIZE GLASS TYPE NEW / ETR MATERIAL COLOR DETAIL RATING (MINIMUM) NOTES MARK WIDTH HEIGHT HEAD JAMB THRESHOLD 30OG PHARMACY NEW G1 HM-STL P162 1 3' - 0" T - 0" TEMPERED 1 NEW HM-STL P162 - - - -- 33 30OG 303B HEALTH SERVICE NEW G1 HM-STL P162 1 3' - 0" T - 0" TEMPERED 1 NEW HM-STL P162 - - - - 31,33 303B 303C HEALTH SERVICE NEW G1 HM-STL P162 1 3'-0" T - 0" TEMPERED 1 NEW HM-STL P162 - - - -- 32,33 303C DOOR SCHEDULE NOTES 31. PRE -INSTALLED FULL FROST BY MODULAR PANEL MANUFACTURER, 3M FILM FASARA MILKY MILKY SAN MAR)NO (SH2MAMM) 32. PRE -INSTALLED FROST BY MODULAR PANEL MANUFACTURER, 3M FILM FASARA MILKY MILKY SAN MARINO (SH2MAMM). 12" CLEAR BAND AT TOP AND BOTTOM. 33. DOOR FRAMES AND DOORS ARE PRE -FINISHED BY MODULAR PANEL MANUFACTURER. FRAMES ARE PRE -INSTALLED IN PRE -MANUFACTURED WALL, GC TO INSTALL OWNER FURNISHED DOOR SLABS. ALL PLYWOOD ON SALES FLOOR SIDE OF i PARTITION TO BE PAINTED P131 INSTALL CONTINUOUS LAYER 6 MIL. POLY CLEAR SHEETING i FROM FLOOR TO ROOF DECK, OVERLAPPED AT JOINTS A MINIMUM OF 2'-0" AND CONTINUOUSLY TAPED AT ALL I 108'-0" AFF TOP OF PLYWOOD 2x BLOCKING BETWEEN STUDS, PROVIDE 2x BLOCKING BEHIND EACH HORIZONTAL JOINT IN THE PLYWOOD WALL COVERING AND ATTACH PLYWOOD TO STUDS AN BLOCKING AT 12" O.C. MAX, TYP 1/2" C/D PLYWOOD OVER 6 MIL. POLY CLEAR SHEETING FROM FLOOR TO V-0" AFF. INSTALL FULL SHEETS, LONG DIMENSION HORIZONTAL GC TO DESIGN ALL ANCHORING AND LATERAL SUPPORT FINISH FLOOR PROVIDE A MINIMUM 4'-0" WIDE 6'-8" HIGH DOOR IN DUST WALL PANELS FOR CONSTRUCTION ACCESS. ROLL UP POLY BY SECURING TO CEILING JOISTS DURING PHARMACY BUSINESS HOURS METAL STUDS AT 24" O.C.: WALLS UP TO 14'-0": 3 5/8" x 22 GA WALLS HIGHER THAN 14'-0": 6"x18GA vEMO AREA BUILD TEMPORARY WALLS PER THIS DETAIL OR PROVIDE EQUIVALENT PRE - MANUFACTURED MOVEABLE DUST WALLS - CONTINUOUS SEALANT AGAINST TRACK TEMPORARY BARRIER / DUST DRAPE 3/4" = 1'-01, REMOVE EXISTI CORNICE, TYP RELOCATE EXIST CONVEX MIRROF SHOWN DASHED OWNER FURNISHED, GC ' N . ':� :' :;::'• .':_ _ ,:,': INSTALLED WALL ,REF PLAN° � +` TRACK AND ARM 0 t iV v t fV PS7 66 5 INTERIOR ELEVATION NEW MODULAR CASEWORK AND PRIVACY WALLS FURNISHED BY OWNER INSTALLED BY GC, REF MANUFACTURERS INSTRUCTIONS 0 r i mn--, Tnr CONDUIT AND DATA L OWNER FURNISHED GC OWNER FURNISHED GC OWNER FURNISHED GC CHASE, TYP EACH SIDE INSTALLED CASH INSTALLED PENCIL DRAWER, INSTALLED COMPUTER DRAWER TYP OF 5 INSTALLED TIGHT TO PARTITION CABINET SECURE TO TYP OF (5) CASEWORK, TYP OF (5) )(RIGHT) INTERIOR ELEVATION 3/8" = 1'-01, MC\Ar%%1= GVIG`Ttkirl %A/AI 1 0 RIGHT) DEMOLITION PLAN 114" = V-0" a NEW PRE -FINISHED WALL ACTUAL PANEL SIZES MAY VARY BASED ON FIELD CONDITIONS, GC TO COORDINATE WITH PANEL MANUFACTURER GC TO REFERENCE MANUFACTURERS INSTALLATION DRAWINGS FOR SEQUENCE OF WALL INSTALLATION, ASSEMBLY, AND OVERSIZED PANELS THAT WILL NEED TO BE MODIFIED IN THE FIELD TO FIT. PHARMACY 300 ALL FINISHES MODULAR WALLS TO BE PREFINISHED P131. TOUCH-UP ALL REMAINING WALLS AS REQUIRED P131 INSTALL BASE FURNISHED BY PANEL MANUFACTURER ON MODULAR WALLS, REPAIR DAMAGED WALLS BOTH INTERIOR AND EXTERIOR TYP FLOOR ONLY REMOVE EXISTING CARPET FOR NEW WORK, PREP SURFACE AT NEW AREA FOR NEW CARPET C1 CARPET AND TRANSITION STRIP FURNISHED BY OWNER INSTALLED BY CONTRACTOR CEILING CEILING GRID TO REMAIN. MODIFY AS REQUIRED FOR NEW WORK ALL EXISTING CEILING TILE TO REMAIN CASEWORK FRONT COUNTER MILLWORK IS TO BE OWNER SUPPLIED, GC INSTALLED MODULAR MILLWORK EXISTING MILLWORK FINISHES ARE EXISTING TO REMAIN HEALTH SERVICE 303 WALL FINISHES MODULAR WALLS TO BE PREFINISHED P131. PAINT ALL REMAINING WALLS P131 INSTALL BASE FURNISHED BY PANEL MANUFACTURER ON MODULAR WALLS, INSTALL NEW PLASTIC BASE B9 ON GYP WALLS 48" HIGH PLASTIC LAMINATE PS7 ON ALL WALLS FLOOR REMOVE EXISTING FINISHES AND PREP SURFACE FOR NEW LVT2 TRANSITION STRIPS FURNISHED BY WALMART INSTALLED BY CONTRACTOR CEILING CEILING TO BE FURNISHED BY PANEL MANUFACTURER AND INSTALLED BY GC, FINAL CONNECTIONS BY GC PHARMACY CUSTOMER SIDE WALL FINISHES PAINT NEW EXTERIOR WALL AT PHARMACY P209 UP TO 14'-0" AND P162 ABOVE 14'-0" INSTALL NEW PLASTIC LAMINATE PS7 AND BASE DB5, INSTALL B9 BASE ON MODULAR CASEWORK REFERENCE ELEVATION 2-PHM1 FOR ADDITIONAL SCOPE OF WORK. FLOOR FINISHES REPAIR FINISHES AFFECTED BY SCOPE OF WORK MATCH EXISTING ADJACENT FINISHES. CEILING FINISHES AS APPLICABLE REPAIR FINISHES AFFECTED BY SCOPE OF WORK TO LIKE NEW CONDITION. EXISTING ROOF DECK 7 KEYNOTES 6.27 48" HIGH WAINSCOT 10.20 1 1/2"X1 1/2" ALUMINUM CORNER GUARD TO 48" AFF RESPONSIBILITY NOTES: • MODULAR WALL AND CEILING PANEL MANUFACTURER CONTACT IS HAINES, JONES & CADBURY, FURNISHING ALL MODULAR WALL PANELS AND CEILING PANELS, ASSOCIATED HARDWARE, PRE- FINISHED DOOR FRAMES AND DOOR SLABS WITH FILM INSTALLED, ALL DOOR HARDWARE, COILING SHUTTERS, ALL BASE, PRE -FINISHED PRIVACY WALLS ON 42HS AND WNM 42HS. COMPLETE INSTALLATION DRAWINGS. • MODULAR MILLWORK MANUFACTURER CONTACT IS HAINES, JONES & CADBURY, FURNISHING ALL NEW COUNTERTOPS AND PRE -FINISHED LEGS UNDERNEATH; ALL PLUG AND PLAY ELECTRICAL, CPU CABINETS AND PENCIL DRAWERS UNDERNEATH AT FRONT COUNTER AND PHARMACISTS BENCH; 42NC HS FURNISHING ENTIRE FRONT COUNTER SYSTEM, PRE - FINISHED, INCLUDING PRIVACY WALLS. COMPLETE INSTALLATION DRAWINGS. • OWNER FURNISHING CPU CAGES MOUNTED ON WALLS UNDER COUNTERS, ALL COMPUTER EQUIPMENT, BAG HOOKS AND CONSTRUCTION ITEMS TYPICALLY FURNISHED FOR A REMODEL. • GENERAL CONTRACTOR (GC) INSTALLING ALL OF THE ABOVE EXCEPT COMPUTER EQUIPMENT. FOR MODULAR WALL PANEL AND MODULAR MILLWORK COMPONENTS COORDINATION CONTACT: HAINES, JONES & CADBURY. CUSTOMER SERVICE (800) 459-7099, MODULAR@HJCINC.COM ABOVE 14'-0" CONTINUE PAINT P162 EACH SIDE OF THE PHARMACY 6 GC BUILT BULKHEAD SIM V ABOVE 14'-0" EXISTING LEDGE SYSTEM TO REMAIN EXISTING WALL (GC TO TAPE, MUD, AND PAINT) CENTER DIGITAL DISPLAY ABOVE 5 C DOOR ORIENTED VERTICALLY. BELOW 14'-0" INSTALL BRACKET SO DISPLAY P209 PHM2 COVERS ELECTRICAL AND DATA OUTLETS, OWNER PROVIDED .-__---- AND INSTALLED PS7 INSTALL WAINSCOT PS7 6.27 AND BASE DB5 ON RETURN FACE ALUMINUM CORNER GUARDS + + + + + . AT ALL OUTSIDE } + + + o o o ° } + + } }++ + + } CORNERS +` +++ }+ .20 10 }++++ ++++++} +++ +++}++ ++++'+ 10.20 MODULAR PLUG AND PLAY DB5 B9 NEW PS7 MODULAR CASEWORK AND DB5 WAINSCOT POWER SYSTEM FURNISHED BY PRIVACY WALLS FURNISHED BY OWNER GC INSTALLED CAREFULLY COORDINATE DATA AT CASEWORK OWNER, INSTALLED BY G.C. PRE -INSTALLED 3M FILM, FASARA MILKY AND ELECTRICAL AT NEW WAINSCOT PRE -INSTALLED AT MILKY SAN MARINO (SH2MAMM), MILLWORK AND EXISTING WALL, CASEWORK BY PANEL MANUFACTURER TYP EACH END INSTALL OWNER FURNISHED DOOR SLABS AND HARDWARE ONTO PREINSTALLED RIGHT PHARMACY EXTERIOR ELEVATION FRAMES IN THE MODULAR WALLS 3 1/4" = V-0" --- F --- ---�-- --- --- --- --- --- --- --- --- ---� z DUST CURTAIN TO DENOTE AREA OF CONSTRUCTION z z � I I I I w I 1 O I 14' HIGH MODULAR NEW MODULAR m I WALL PANELS CASEWORK AND I Q I FURNISHED BY OWNER PREDRILLED PRIVACY WALLS z I AND INSTALLED BY GC HOLES FOR FURNISHED BY OWNER I PHM4 AND INSTALLED BY GC oREF TYPIPMENT, F- I 42' - 1" I If z O 8 3-PHM1 I U I PRE -INSTALLED 3M FILM, 27' - 0 5/8" 2 1/16"LO I 04 I FASARA FINE CRYSTAL ITI co n (SH2FNCR), BY PANEL z M II MANUFACTURER, TYP O U z II AT ALL PANELS I J ALIGN < I I (I 48" HIGH I it o F WAINSCOT u o u o c o 0 o c ok F_ o II PS7 � F300GWRAP I U) 3/4" 8„ / 25' - 7" F.V. WAINSCOT TO TYP EA SIDE -----------------------------------------------------------------CORNER PANEL WALL TO MATCHALL THICKNESS, CRITICAL FOR I 4-PHM1JELS TO FIT � ai•r ai•r a:•tr aiwm"CLR WALL + N o 0 0 0)UST ZEF 6- PHM1 BELOW 5 _ � HEALTH El UST TAIN 14'-0" TYP PHM2 ABOVE r 6 14'-0" TYP PHM2 WALMART FURNISHED, GC INSTALLED EQUIPMENT RAIL. BOTTOM OF RAIL AT 26" AFF - ' a SERVICE ' � 303 RELOCATED MIRROR 303C \ MOUNT 2" BELOW CEILING EXISTING MILLWORK TO ih REMAIN PHARMACY m ArYX AIYX APir APYr O 71YAI \ fV TOILET 301 F0 N 1ODI4I.IT4f11 aD:•RYTOX aDYNL.r-M tODi ATL T011 aDY•RYTOM 4' - 0" CLR ELECTRICAL PANEL IS EXISTING 1' - 6" 4' - 1" 1' - -11 DUST WALL TO REMAIN (RIGHT) �PH�AR�MA�CY�P�LA�N 1/4" = 1'-01, 4'-1" 1V-6"1 4'-1" W-61 T-61/16" 11'- EXISTING MILLWORK TO REMAIN SATE EXISTING ALARM BOX (RED) ABOVE THE CEILING, USUALL` mr[: Aoce nG tiG%Ar WGAl ru eGovirrGe onneA nrr TrI rnnanwA p+enb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Architect of Record William Douglas Hurley Florida License No. AR 91919 Architect Business Lic No. AA26000940 0 D F O w120� ul 11 vNiHw2ZN- = W zzzLLPW,wEW��z W �F CTWWBtawl8s wa 3r.~ag�2Ewaa3w DEW . a0FX� 0<�Zw�vEwi 0 U. _:>0 Z- ZOQ �ir�� g�_joduti4ao a� D �z,2o_82_ww jpOX� YY xxa-0owo Mo4=xw wvwwF'L U �nilootnao9w�wwza�_: %0 a C7 CO Q O o _j LL m N a \v1 J o 00 �J J z -D -� Lu T M 0 N y CC)O U) LIJ N � W m z m 2021 CSP ISSUE BLOCK CHECKED BY: Checker DRAWN BY: Author PROTO: 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE: 10-1-21 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION MODULAR PHARMACY PLANS, ELEVATIONS AND SCHEDULES SHEET: PHM1 R 3/4" PLYWOOD BLOCKING IN PRE - MANUFACTURED WALL PRE -MANUFACTURED MODULAR CEILING PANEL 2"x2" ANGLE CONNECTION SUPPLIED BY PANEL MANUFACTURER, SECURE PER MANUFACTURERS INSTRUCTIONS PRE -MANUFACTURED MODULAR WALL PANEL SIMILAR CONDITION AT EXISTING STUD WALL, GC TO VERIFY PLYWOOD IS EXISTTNG 4 PANEL CONNECTION 3 -1-0 1. 1 7 WALL SECTION PRE -MANUFACTURED MODULAR WALL PANEL PHARMACY SIDE INSTALL 4" BASE FURNISHED BY PANEL 9'-0" MANUFACTURER AFF "L" TRACK AND HARDWARE FURNISHED BY PANEL MANUFACTURER,SECURE TO PANEL PER MANUFACTURERS INSTRUCTIONS GYPSUM BOARD EXTERIOR SIDE INSTALL 6" BASE FURNISHED BY PANEL MANUFACTURER SECURE BOTTOM TRACK TO FLOOR WITH TAPCON CONCRETE ANCHORS STAGGERED AT 2'-0" OC FURNISHED BY PANEL MANUFACTURER MODULAR WALL ATTACHMENT L1 1/2" x 1 1/2" x 16 GA CONT. ATTACH WITH (1) #10 TEK SCREW AT EACH LEG OF EACH STUD, TYP STRIP END OF STUD TO ALLOW FOR LAP AT HORIZONTAL BRACING (4) #10 TEK SCREWS MIN STUD TO STUD CONNECTION TYP UNO 6" x 18 GA CONTINUOUS TRACK ATTACHED TO JOIST CHORD WITH #12 TEK SCREWS AT 12" OC AT BOTH ENDS ATTACH 20 GAUGE TOP TRACK WITH #10 TEK SCREWS FOR 2 ROWS AT 24" OC TO METAL ROOF DECK - ROOFING SYSTEM UL 1 JLL 1 1/2" GYP BOARD TO DECK, 6" x 18 GAUGE METAL STUDS KEEP OPENINGS AROUND AT 32" OC PENETRATIONS TIGHT. 1 1 6" x 20 GAUGE METAL STUD BRACING AT 32" OC. (3) #10 3 5/8" x 20 GAUGE METAL TEK SCREW CONNECTION STUD CONTINUOUS AT AT EACH END MIDPOINT + + 6" X 20 GAUGE METAL STUD + AT 16" OC PHARMACY SIDE SALES 6" x 20 GAUGE METAL STUD 6" X 20 GAUGE METAL STUD BRACING AT EACH BAR AT 16" OC JOIST ATTACH EACH END WITH (2) #12 TEK SCREWS (7) #10 SCREWS INTO DECK EQUALLY SPACED ROOFING SYSTEM —� ------------- --- -- +� i + I ,�+ to 1 I 1 (3) #10 SCREWS, TYP I I 3" 2' -0" i i 1'- 0" 3" -11 lei I I I � I I I I I I I I I 600S162-43 AT I i 1/2" GYP BOARD TO DECK, 120C, TYP KEEP OPENINGS AROUND PENETRATIONS TIGHT. � I PHARMACY SIDE (7) #10 SCREWS INTO DECK EQUALLY SPACED ROOFING SYSTEM SALES PHARMACY SIDE (7) #10 SCREWS INTO DECK EQUALLY SPACED ROOFING SYSTEM --� - ----------- -- I + --- -- +. � I � � ` I I + (3) #10 + SCREWS, TYP I I I I 3" 2'- 0" I i I i 1' - 0" 3" 1/2" GYP BOARD TO DECK, KEEP OPENINGS AROUND PENETRATIONS TIGHT. CONT. NESTED 6" x 18 GAUGE STUD AND TRACK ATTACHED TO JOIST CHORD WITH (2) #12 TEK SCREWS EACH END TYP FULL LENGTH OF WALL ATTACH EACH VERTICAL STUD WITH (3) #10 TEK SCREWS PROVIDE ONE STUD DIRECTLY ADJACENT TO EACH SIDE OF EACH JOIST 6"X18 GAUGE PRE -MANUFACTURED CONTINUOUS STUD MODULAR WALL PANEL TRACK ATTACH TO EACH STUD WITH (2) #10 TEK SCREWS SALES PRE -LAMINATED GYPSUM BOARD L. I I I � I I 1 I I I I I 1 60OS162-43 AT I iL 1/2" GYP BOARD TO DECK, 120C, TYP i KEEP OPENINGS AROUND I I PENETRATIONS TIGHT. 1 I PHARMACY SIDE SALES (7) #10 SCREWS INTO DECK EQUALLY SPACED ROOFING SYSTEM +`-=i+ I I I I I • • I I 1' \ � 1 1 L \`�\ I I (3) #10 1 1 (3) #10 1 I SCREWS, TYP \ I+ +.I SCREWS, TYP ` ` I+ + I 3" 3'- 0" I+ i 3" 3'- 0" I+ I I I 1 I 1 60OS16243 AT 1110,i 1/2" GYP BOARD TO DECK, 60OS162-43 AT 1 120C, TYP I I KEEP OPENINGS AROUND 120C, TYP 1 1 PENETRATIONS TIGHT. I I I I PHARMACY SIDE SALES PHARMACY SIDE ATTACHMENT AND BRACING AT PARALLEL JOIST ATTACHMENT AND BRACING AT PERPENDICULAR JOIST TYPICAL BULKHEAD ATTACHMENTS 3" = 1'-01, �� 3/4" = V-0" ------------ --- ---- F`� + I I -- . • ` I 4 ` ` I `. 11-0�I I 1/2" GYP BOARD TO DECK, KEEP OPENINGS AROUND PENETRATIONS TIGHT. SALES MUD, TAPE AND FLOAT, TYP EXISTING GYPSUM BOARD GYPSUN J-MOLD VERTICP SLIP JOII AT SLIP , REF SPE EXISTIN( BOARD 6" METAL STUDS EXISTING PLYWOOD EXISTING 6" STUD WALL I BULKHEAD CONTROL JOINT 3" = PRE -LAMINATED GYPSUM BOARD SECURE PANEL TO STUD WALL PER MANUFACTURERS INSTRUCTIONS , i ALIGN GYPSUM BOARD I - I � - � r - EXISTING PLYWOOD - EXISTING STUD WALL EXISTING GYPSUM BOARD 6"x 20 GAUGE METAL STUD AT 16" OC 3 x 20 GAUGE METAL STUD BRACING 1L\ AT EACH BAR JOIST ATTACH EACH END 1 WITH (2) TEK SCREWS PHARMACY EXTERIOR WALLS AND SHEATHING MUST BE RUN TO DECK, GAPS AROUND PENETRATIONS MUST BE KEPT AT A MINIMUM TO ENSURE SECURITY 14'-0" `e' lip TO WALL PANEL M SEGMENTED BENT FLAT STOCK INSTALLED TIGHT TO EACH PANEL SECURE TOP OF PANELS PER MANUFACTURERS INSTRUCTIONS. DO NOT MECHANICALLY FASTEN MODULAR PANEL TO DEFLECTION TRACK MOUNT DEFLECTION TRACK LEVEL WITH THE FINISHED FLOOR. DO NOT FOLLOW ROOF SLOPE PHARMACY SIDE PRE -MANUFACTURED WALL PANEL, THICKNESS TO MATCH EXISTING, NO OFFSET IS PREFERRED, COORDINATE WITH PANEL MANUFACTURER. CAULK AND PAINT, TYP EXISTING 6" STUD WALL MODULAR WALL ATTACHMENT 3" = 1'-0" FOR ATTACHMENT AT BULKHEAD REF -- -- 2x2x18 GAUGE CONTINUOUS STEEL ANGLE ATTACH TO EACH STUD WITH (2) #10 TEK SCREWS BOTTOM TRACK 18 GAUGE 6" DEEP LEG DEFLECTION TRACK AT 14'-0" AFF MAX. COORDINATE EXACT HEIGHT WITH PANEL MANUFACTURER PER EXISTING CONDITIONS AND FIELD VERIFY PANELS FOR EXACT HEIGHT AND THICKNESS PRIOR TO INSTALLING L-BRACKET PRE -INSTALLED WITH GYP J-MOLD EDGE SLIP JOINT PRE -MANUFACTURED MODULAR WALL PANEL SALES SIDE DEFLECTION TRACK AT MODULAR PANEL 1 1/2" = 1'-0" p+enb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Architect of Record William Douglas Hurley Florida License No. AR 91919 Architect Business Lic No. AA26000940 w o O IX y ujWw0~O� W LLL v��w2Zt 0!Z0 D w _zLLw�'aW3r-z Lu y W w LL V U CC �Q Ittp:LLay Z a'U ow ww ¢g am w¢v��m �F-¢J2zQwuj Uf2 O 2 0FX:: O<LL Q0: %u w§ 0 c�wO��mp3iwCWc= 0< H 3C0Jod1.L.90 Qz g zw �a a�wooir3 pz opw—n.—'nowog wwaIZ�F'3� a, WL w CIO M050 085?Eo' 00 � �� CQ _0 O p o LL m N G \ �./ 1 �J (1) Q O ao to co -J (7 z o M 0 Z� (p O N LL n' m 0 Lij N w m M z CO 0 2021 CSP I ISSUE BLOCK I CHECKED BY: Checker DRAWN BY: Author PROTO: 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE: 10-1-21 1 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION MODULAR PHARMACY SECTIONS AND DETAILS SHEET: PHM2 D-REMOTE MONITOR— V-137— F: D-RXTV01 D-REMOTE MONITOR D-RXPC 11 DATA AND VOICE PLAN IS FOR REFERENCE ONLY, PLAN MAY NOT MATCH D-REGXX D-REG40 D-REG42 D-RXPC01 D-RXPCO2 D-REG41 D-RXPCO4 D-RXZP01 D-RXZP02 D-RXPC03 D-RXZP04 V-134 V-135 D-RXZP03 V-138 V-136 o• D-RXPC06 D-RXSFP01 D-RXZP06 D-RXPC07 D-RXPC08 V-139 D-RXLP01 V-140 F--\ V-133 D-RXZP07 \— D-RXZP09 D-RXZP08 RIGHT) PHARMACY DATA /VOICE PLAN D-REGXX D-RXPC05 D-RXZP05 V-141 D-RXLP02 D-REG79 0 D-RXPC09 0 V-239 ° D-REG80 D-RXPC 10 D-RXZP 11 D-RXZP010 RIGHT) HEALTH SERVICES ROOM DATA SCHEDULE CABLE LOCATION TYPE 42 C HS 42 NC 42 NC HS DT 42 NC HS SD 42 P HS 42 PI 42 PI HS 42 HS AZ D-REG40 PHARMACY REGISTER X X X X X X D-RE041 PHARMACY REGISTER X X X X X X X X D-REG42 PHARMACY REGISTER X X X X X X X X D-REG79 PHARMACY REGISTER X X X X X X X X D-REG80 PHARMACY REGISTER X D-REMOTE MONITOR PHARMACY HSR MONITOR X X X X X X D-RXLP01 PHARMACY PRINTER X X X X X X X X D-RXLP02 PHARMACY PRINTER X X X X X X X X D-RXPC01 PHARMACY TERM X X X X X X X X D-RXPCO2 PHARMACY TERM X X X X X X X X D-RXPC03 PHARMACY TERM X X X X X X X X D-RXPC04 PHARMACY TERM X X X X X X X X D-RXPC05 PHARMACY TERM X X X X X X X X D-RXPC06 PHARMACY TERM X X X X X X X X D-RXPC07 PHARMACY TERM X X X X X X X X D-RXPC08 PHARMACY TERM X X X X X X X X D-RXPC09 PHARMACY TERM X X X X X D-RXPC10 PHARMACY TERM X X X X X D-RXPC11 PHARMACY TERM X X X X X D-RXPC12 PHARMACY TERM X X X X D-RXPC13 PHARMACY TERM X X D-RXSFP01 PHARMACY PRINTER X X X X X X X X D-RXTV01 PHARMACY MESSAGE BOARD X X X X X X X X D-RXZP01 PHARMACY PRINTER X X X X X X X X D-RXZP02 PHARMACY PRINTER X X X X X X X X D-RXZP03 PHARMACY PRINTER X X X X X X X X D-RXZP04 PHARMACY PRINTER X X X X X X X X D-RXZP05 PHARMACY PRINTER X X X X X X X X D-RXZP06 PHARMACY PRINTER X X X X X X X X D-RXZP07 PHARMACY PRINTER X X X X X X X X D-RXZP08 PHARMACY PRINTER X X X X X X X X D-RXZP09 PHARMACY PRINTER X X X X X X X X D-RXZP10 PHARMACY PRINTER X X X X X X X X D-RXZP11 PHARMACY PRINTER X X X X X X D-RXZP12 I 1PRINTER X X X X X X VOICE SCHEDULE CABLE LOCATION TYPE PHONE MODEL 42 C HS 42 NC 42 NC HS DT 42 NC HS SD 42 P HS 42 PI 42 PI HS 42 HS AZ V-133 PHARMACY DESK 7960 X X X X X X X X V-134 PHARMACY WALL 7960 X X X X X X X X V-135 PHARMACY WALL 7960 X X X X X X X X V-136 PHARMACY WALL 7960 X X X X X X X X V-137 PHARMACY-HSR DESK 7960 X X X X X X V-138 PHARMACY WALL 7960 X X X X X X X X V-139 PHARMACY DESK 7960 X X X X X X X X V-140 PHARMACY DESK 7960 X X X X X X X X V-141 PHARMACY WALL 7960 X X X X X X X X V-145 PHARMACY DESK 7960 X X X X V-239 PHARMACY DESK 7960 X X X X X X POWER Al DATA CHA COMPUTE CABINET 2'x3' CUSTOMER SPACE: NO EQUIPMENT IN THESE AREAS � RIGHT PHARMACY EQUIPMENT PLAN SPECIFIC PROJECT LAYOUTS MAY VARY FROM WHAT IS SHOWN IN PROTO. EXISTING TO REMAIN UNO. TA CHASE EQUIPMENT SCHEDULE PH0001 DESK PHONE PH0002 WALL PHONE PH0003 DEBIT READER PH0004 SIGNATURE PAD PH0005 RX HAND HELD SCANNER PH0006 POS HAND SCANNER PH0007 RX IMAGE SCANNER PH0009 POS FLAG DISPLAY PH0010 DISPLAY PHARMACIST / TECH LICENSES AND PERMITS PH0012 RX VIDEO HEADSET CONSOLE PH0013 RX CPU PH0014 REGISTER CPU PH0015 ZEBRA PRINTER PH0016 2 DRAWER FILE BELOW PH0018 REGISTER PRINTER PH0019 SENSORMATIC CPU PH0020 SENSORMATIC PH0021 REGISTER KEYPAD MONITOR PH0022 LASER PRINTER BELOW PH0024 CASH DRAWER PH0025 VISUAL VERIFY RACK PH0028 PHARMACY SAFE (OWNER PROVIDED) PH0030 5 DRAWER FILE BELOW PH0031 RX PC FLAT PANEL MONITOR PH0032 KEYBOARD AND MOUSE PH0035 EQUIPMENT TREE (POST OWNER PROVIDED, GC INSTALLED) PH0036 EQUIPMENT ARM PH0037 VGA SWITCH PH0041 SHREDDER BELOW PH0042 UNDERCOUNTER REFRIGERATOR PH0043 UNDERCOUNTER FREEZER PH0045 WALL MOUNTED CPU BOX PH0053 PRINTER STAND W/ CASTERS LOW PH0054 PHARMACY REFRIGERATOR - TRUE PHO128 SAFE TIME DELAY SENSOR p+enb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone:479.636.3545 Fax: 479.636.1209 LU W ->,9w 0 O Wazoz � zWw, 'Lu z V-- AEDt-OZ9'U a3<�Q5jp1aa o gto �O0uw 02a- LL LLOww03Zyzow ZZ0 9azw3zN -Q �� Uz.JoW00(„QZ�¢ ;1�-woo :D 0-� Yw-a-wOw ywI�z,O ¢Lzwv°wuwo�m��=) 8gw� N 0) %0 O CO CO 0 O CiD Oo 0 LL m N a Co .I Ur Z .0 o M w o (0 O N � H N 0 CL NW m z m 2021 CSP ISSUE BLOCK CHECKED BY: Checker DRAWN BY: Author PROTO: 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE: 10-1-21 Z O W U Z W w W U— LU O LL PHARMACY EQUIPMENT (FOR REFERENCE ONLY) SHEET: PHM3 FIRE SPRINKLER ROUGH IN PRE CUT BY PANEL MANUFACTURER — MEP ITEMS FURINISHED AND PRE- INSTALLED IN PANELS BY MANUFACTURER 6'-8" 2'-4" 2'-0" 2'-4" RTRN 12x12 LIGHT CEILING PANEL FIRE CEILING PANEL 2' - 6 3/4" PANEL TP2 9 LIGHT HVAC 12x12 CEILING 4'-6" PANEL DP5 8 ELEVATION 01 SUGGESTED MECHANICAL AND LIGHT LOCATIONS. MANUFACTURER TO COORDINATE ACTUAL LOCATION WITH STRUCTURAL COMPONENTS J W 'v z c�+ d CD Z U J -1 co J_ W U - v M rn J f` W z a ' 0 U co z J w U 5'- 13/4" PANEL DP8 3 ACTUAL PANEL SIZES MAY VARY BASED ON FIELD CONDITIONS, GC TO COORDINATE WITH PANEL MANUFACTURER GC TO REFERENCE MANUFACTURERS INSTALLATION DRAWINGS FOR SEQUENCE OF WALL INSTALLATION AND ASSEMBLY SOME PANELS WILL BE OVER SIZED AND WILL NEED TO BE MODIFIED TO FIT IN THE FIELD, COORDINATE WITH VENDOR FOR INSTRUCTIONS 'V _ 4 Zr^11 AI -. A11 PANEL PP2 2 PANEL DP6 1 I I I I I I I L C I N S I I I I I I I I I I I I 8n CV 01 10 OTHER SIDE ELEVATION 02 EP4 CP1-L 4 5 ELEVATION 03 PHARMACY EXTERIOR A /�lll /� V rl f� l I\• rf /1 A A A GC TO MUD, TAPE, AND PAINT PRE -FINISHED F PRE -FINISHED 20 GAUGE SHEET METAL PRE -FINISHED F PHARMACY INTERIOR EPS FLAME SPREAD: 15 SMOKE DEVELOPED: 150-250 1 1 /2" = 1'-0" THIS SHEET IS FOR REFERENCE ONLY, REFER TO MANUFACTURER'S INSTALLATION DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND SPECIFIC DETAILS ON THE MODULAR WALLS AND COMPONENTS. ALL WALL PANELS AND CEILING PANELS FURNISHED BY OWNER, GC INSTALLED. SALES SIDE OF PANELS ARE PRE LAMINATED WITH GYPSUM, GC TO TAPE, MUD, AND PAINT. INTERIOR SIDES OF PANELS ARE PREFINISHED, GC TO CAULK SEAMS WHERE MODULAR WALLS MEET AT INSIDE OF PHARMACY AND HEALTH SERVICES ROOM FOR MODULAR WALL PANEL COORDINATION CONTACT: HAINES, JONES & CADBURY. CUSTOMER SERVICE (800) 459-7099, MODULAR@HJCINC.COM FOR MODULAR WALL PANEL COORDINATION PHARMACY INTERIOR OMC CId11QLl Cr% 7f1 r'AI if' ITT CIJI-CT RAE=AI PHARMACY INTERIOR PANEL DESIGNATION INDICATOR KEY PLAN N►p1 F— PANEL DESIGNATION 3 TYPICAL ORDER OF ASSEMBELY THE ORDER OF ASSEMBELY IS BASED ON PROTYPICAL SITUATIONS AND IS FOR INFORMATIONAL PURPOSES, REFER TO THE MANUFACTURERS INSTRUCTIONS SPECIFIC TO THE JOB FOR ACTUAL ORDER p+enb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Architect of Record William Douglas Hurley Florida License No. AR 91919 Architect Business Lic No. AA26000940 w tw' o m no WWU.> z fw 0 ywW$z�F-�y in o z D LLYUa3-1z 0. zo�WawoQ w0tFwiCo0)aao5Oao= z 3-LL20w--.a'(7pW.p z 0 OOWL WIol=-00 ZCLU4to 1 a w 1- 0 (1) Zr a�a=2zJ JWWoad3 a oo}woc�W'na 'W00 g � wUj 04�z oV1a� -W nInic�omao�7tr�a¢ZF N % 0 /�Q �—J C D 0 0 Q r-q O o O H LL m N a V J O � I J 0 z o Mo N 2N CO H CO O / 0- Uj N Lu w m z in 2021 CSP ISSUE BLOCK CHECKED BY: Checker DRAWN BY: Author 0 0 0 0 0 0 0 0 0 0 2' - 6 3/4" OF 4' - 6" 01 5' -1 3/4" 0 0 0 ® 00 00 0 0 PROTO: 192 PANEL or PANEL PANEL PROTO CYCLE: 8-27-21 PANEL TO MATCH / DOCUMENT DATE: 10-1-21 EXISTING WALL THICKNESS TP2 DP5 DP8 9 8 �1'-4" e 3 BLOCKING FOR CEILING PANELS , 1 ELEV. 01 o \ L CEILING PANEL w W CL2 N 0 --- 7 ------------->— CEILING w PANEL CL1 6 ---------------------- r---------------T_—___—_--__--_—T_—__—________--T---_—__—__--__—T__—__—_—__- I I I 1 1 1Sx41!' I 1Tx4r I 1rx4r I 1Sx4ir I lrx9Y . m 0 0 0 0 -- r-------__----_-1 \ I I I I I I I I I I I I wxw wxw I wxw I I wxw I I wxw I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i I I I I I I I I I I I I 11 I I I I I I I I I I I I -__-____ I 11 I 1 11 1 1 11 1 1 11 1 1 11 1 I I I I I I I I I I I I I I I I I I I I� II I I� II I I� II I 1� II I I� II I i I t� II I I� II I I� II I I� II I 1� II I r 1 I II I I II I I II I 1 II I I II I r o I I I I I I I I I I f I 1 I I I I I I I L________ ________ I II 17---------------r II 17--------------- r II 17--------------- r II Iq----------p I II fi--------------- n I I I II 10Dx4rLxr4M II 11 II 10Dx46'Lx74'H II 11 II 10'Dx0'Lxr4M II 11 I II 10Dx8YLxr4m II I I I II 10Dx4xr-cm 11 I II 11---------------L 11 11---------------L II 1--------------- LI If IJ--------- -� I II 11---6'L-----------1 RIGHT) MODULAR PANEL PLAN (FOR REFERENCE ONLY) 10.03. 21 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION PANEL PLAN SHEET: PHM4 SHEET NOTES 1. THIS SHEET FOR REFERENCE ONLY, REFER TO CONSTRUCTION DOCUMENTS FOR THE COMPLETE SCOPE OF WORK architecture +engineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 OVERVIEW 1. THE NIGHT BY NIGHT PHASING PLAN IS INTENDED TO BE A GUIDE AND MAY NOT OCCUR IN CONSECUTIVE NIGHTS W > >o �wo-� DEPENDING ON AHJ AVAILABILITY TO INSPECT. THIS PROJECT CAN ONLY TAKE 6-7 DAYS TO COMPLETE AND MUST BE W W W o PHASED SO PHARMACY IS OPERATIONAL EACH MORNING AND PHARMACIST IS ONLY REQUIRED 4-5 NIGHTS. w W z o z Cl C0 C HOKFWUa F- 2. IT IS CRITICAL THAT THE PHARMACY IS SECURE AND OPERATIONAL EACH MORNING. � W N w, W w.- W 3 � o 3. TRADES WILL NEED TO REVISIT AS EACH PHASE IS BEING DEMOED OR CONSTRUCTED. cr a. a 3 a 3 w a w a 0 o w 4. PARTIAL TEMPORARY DUST WALLS WILL BE NEEDED PER PLANS. TEMPORARY DUST DRAPES WILL BE REQUIRED ir Uy a C a >.z z ¢ m l cWi i a > TO PROTECT PHARMACY AND SALES MERCHANDISE. THE DUST DRAPES MUST BE REMOVED EVERY MORNING SO O a o ¢ a W LL W THAT THE PHARMACY AND SALES AREAS ARE OPERATIONAL. O � �S Z N go i a W E o o mpzo PHARMACY PHASING GENERAL NOTES g NJw`LLN�� W ¢ 2 r2 Z J c J W W p o a' acf) Loan �zw��-Bzm�=g SwWoQ.OLL WUWW W (REFER TO N1 AND SPECIFICATION SECTION 01700 FOR ADDITIONAL REQUIREMENTS.) DN a 00 0-0 ¢ _ w m ¢ GENERAL REQUIREMENTS: 1. FEDERAL AND STATE LAWS AND REGULATIONS REQUIRE EXCEPTIONAL EXECUTION AND COMPLIANCE WHEN PERFORMING CONSTRUCTION ON MEDICAL PHARMACY FACILITIES. OPERATIONAL CONSIDERATIONS FOR EXISTING AFTER WALMART REQUIRE THAT THE STRUCTURAL, MILLWORK, EQUIPMENT INSTALLATION AND PHARMACY SECURITY MODIFICATIONS OF EACH PHASE IS TO BE COMPLETED IN A SINGLE NIGHT. THE PHARMACY MUST BE OPERATIONAL BY NEXT MORNING OPENING. THE NEW INTERIOR AND FRONT WALL DOOR PASSAGE TO THE PHARMACY OPERATION MUST BE INSTALLED AND SECURE PRIOR TO MORNING OPENING. INTERIOR FINISHES OF THE HEALTH TREATMENT ROOM MAY BE COMPLETED ON THE SECOND NIGHT. DUE TO THOSE STRINGENT REQUIREMENTS, SPECIFIC REQUIREMENTS AND RECOMMENDATIONS ARE OFFERED IN THIS DOCUMENT TO FACILITATE UNDERSTANDING AND THE AVOIDANCE OF WORK TRADE CONFLICTS POTENTIALLY IMPACTING SUCCESS WITHIN THE RESTRICTIVE TIMELINE. 2. COMPLY WITH WALMART CONSTRUCTION MANAGER AND WALMART STORE PLANING FIELD PROJECT MANAGER REQUIREMENTS FOR WORK WITHIN THE BUILDING. SPECIFIC REQUIREMENTS WILL BE DISCUSSED BY THE WALMART CONSTRUCTION MANAGER AND WALMART STORE PLANING FIELD PROJECT MANAGER AT THE PRE - CONSTRUCTION CONFERENCE. 3. MAINTAIN A SAFE ENVIRONMENT FOR CUSTOMERS AT ALL TIMES. THE ADJACENT SALES AREA SHALL REMAIN IN SERVICE DURING DEMOLITION/CONSTRUCTION. 4. DUST AND DEBRIS SHALL NOT BE TRACKED INTO SALES AREA. SHOULD SUCH AN INCIDENT OCCUR, CLEAN IMMEDIATELY, USING APPROPRIATE METHODS AND FORCES. MEDICATION MUST BE PROTECTED FROM DUST AND DEBRIS AT ALL TIMES. 5. THE PHARMACY MUST BE FULLY CLEANED AND OPERATIONAL FOR NORMAL BUSINESS BY Gam EACH DAY. THE PHARMACIST MUST BE PRESENT FOR ALL ACTIVITIES WITHIN THE PHARMACY, ACCESS TO THE PHARMACIST WILL BE LIMITED AND MUST BE PRE ARRANGED THROUGH WM CONSTRUCTION MANAGER AND STORE PLANNING. DEMOLITION REQUIREMENTS: 1. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS, FIXTURES, PLUMBING, SPRINKLERS, MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK SHOWN ON JOB OR AS REQUIRED FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. 2. DURING DEMOLITION AND RECONSTRUCTION, COORDINATE WITH THE WALMART CONSTRUCTION MANAGER AND WALMART STORE PLANNING FIELD PROJECT MANAGER LOCATIONS OF ANY NECESSARY TRAFFIC SAFETY BARRIERS OR BARRICADES AND DUST DRAPES WITH THE SCOPE AND PHASING OF THE WORK. 3. WHEN REMOVING EXISTING STRUCTURAL ITEMS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING, BRACING, AND SUPPORT SYSTEMS TO KEEP THE EXISTING STRUCTURE INTACT AND IN A o� SAFE CONDITION. REFER TO SECTION 02023 AND 02251. 041 PRE -CONSTRUCTION MOBILIZATION REQUIREMENTS 1. UPON AWARD OF CONTRACT AND NOTICE TO PROCEED (NTP) MOBILIZATION ACTIVITIES WILL COMMENCE. WORK TO BE SCHEDULED AS FAR IN ADVANCED AS POSSIBLE, WITH SUFFICIENT FLEXIBILITY, TO ALL ADJUSTMENT TO MEET UNFORESEEN CIRCUMSTANCES. ISSUE BLOCK 2. PRE -CONSTRUCTION ACTIVITIES SHOULD PROCEED A MINIMUM OF A WEEK PRIOR TO START OF •�„ CONSTRUCTION. �v GENERAL CONTRACTOR RESPONSIBILITY LOGISTICS A. SCHEDULING 1. COORDINATE THE UNIQUE ASPECTS OF THIS CONSTRUCTION AND PHASING WITH THE LOCAL JURISDICTION BUILDING AND ELECTRICAL INSPECTORS TO ASCERTAIN ANY REQUIREMENTS POTENTIALLY IMPACTING THE OVERNIGHT CONSTRUCTION, LOW VOLTAGE, CABLING AND ELECTRICAL REVISIONS. 2. THOROUGHLY BRIEF ALL BIDDING TRADE SUB -CONTRACTORS ON ALL ASPECTS OF THE PHARMACY PRE -WORK, AND THE "OVERNIGHT COMPLETION" REQUIREMENT FOR BOTH OPERATION & NEXT DAY SECURITY. 3. GC TO HAVE A PRE -CONSTRUCTION CONFERENCE, AT THE JOBSITE WITH ALL STAKEHOLDERS, THREE WEEKS PRIOR TO THE START OF PHARMACY CONSTRUCTION DATE. 4. COORDINATE WITH PHARMACIST FOR A ONE HOUR AFTER CLOSING OPPORTUNITY FOR EACH TRADE TO EXAMINE THE INTERIOR OF THE PHARMACY TO SCOPE AND PLAN THEIR WORK AS A CONSTRUCTION TEAM. 5. IF DATA CABLE & ELECTRICAL TRADESMEN DETERMINE A NEED TO PERFORM PRE -INSTALLATION OF WIRING TO MEET THE OVERNIGHT REQUIREMENT; COORDINATE WITH PHARMACIST FOR A TWO HOUR PERIOD AFTER CLOSING TO PERFORM ROUGH INSTALLATION & STAGING OF WIRING. 6. COORDINATE WITH STORE PLANNING THE GONDOLA MOVE OF ANY MERCHANDISE FIXTURES NECESSARY TO CONSTRUCT WALLS. 7. SCHEDULE RELOCATION OF AP PANEL WITH WALMART AP TEAM. 8. CHECK IN MODULAR COMPONENTS. 9. COORDINATE WITH STORE PLANNING THAT ALL EQUIPMENT AND RACKS ARE CERTIFIED AND ONSITE. B. STAGING 1. VERIFY AVAILABLE STAGING AREA, INSIDE OF THE STORE, FOR CONSTRUCTION AND CONFIRM LAYOUT OF DUST PARTITIONS AND DUST DRAPE. 2. VERIFY AVAILABLE STAGING AREA, INSIDE OF THE STORE, FOR MODULAR COUNTERS, WALLS, EQUIPMENT AND RACKS. 3. MARK LOCATION OF WALLS, FRONT COUNTERS AND ALL PRIVACY WALLS ON THE FLOOR TO BE READY FOR NEW CONSTRUCTION, SPRAY WITH CLEAR COAT. 4. SCOPE ROUTE OF ASSEMBLY MOVEMENT OF UNITS FROM STAGING TO PHARMACY INSTALL LOCATION AND COORDINATE REMOVAL OF ANY OBSTACLES WITH STORE PLANNING FIELD PROJECT MANAGER. FIELD VERIFICATION 1. VERIFY ABOVE CEILING AND CONFIRM IF THERE ARE WALLS TO DECK OR CEILING JOISTS AND WIRE MESH. 2. VERIFY OPENING DIMENSIONS WHERE FRONT COUNTERS WILL INSTALL. 3. VERIFY LOCATION OF AP PANEL, TYPICALLY IN CEILING NEAR RESTROOM. STORE PLANNING RESPONSIBILITY J Z 1. COORDINATE WITH GC ANY EQUIPMENT OR RACK RELOCATION & SUPPORT REQUIRED FOR THE OVERNIGHT O PHASING OF THE PROJECT. W 2. ARRANGE FOR OVERNIGHT PHARMACIST PRESENCE. U Z DATA CABLING AND ASSET PROTECTION (AP) RESPONSIBILITY LU 1. SURVEY SCOPE OF WORK AND DEVELOP PLAN FOR PRE -ROUGH -IN INSTALLATION FROM REGISTER EQUIPMENT w RACK ROOM AND STAGING OF CABLE ABOVE CEILING GRID. �- 2. INSURE ALL COMPONENTS ARE ORDERED IN A TIMELY MANNER AND SECURED ON -SITE. Uj I..L ELECTRICIAN RESPONSIBILITY 0 LL � 1. REVIEW PLANS AND SCOPE WORK EARLY TO DETERMINE REQUIREMENTS PARTICULAR TO WORK PREVIOUSLY A DONE ON SPECIFIC PROJECT. of 2. DETERMINE IF J-BOX INSTALLATION IS PERMITTED FOR RELOCATING SWITCH OR POWER RECEPTACLES. cv 3. VERIFY WITH INSPECTOR WHAT INSPECTIONS WILL BE REQUIRED BASED ON SCOPE OF WORK. DEFINE SCHEDULE FOR INSPECTIONS. 4. WILL INSPECTOR (FOR A FEE) COME ON CALL DURING THE NIGHT TO APPROVE ELECTRICAL REVISIONS IF NOT, �- IS IT POSSIBLE TO POWER Existing LIGHTS AND NEW REGISTERS WITHOUT AN INSPECTION UNTIL THE FOLLOWING a DAY(s) n 5. VERIFICATION OF KEY ELECTRICAL COMPONENTS AND ROUTING PRIOR TO NIGHT ONE, LOCATE ELECTRICAL LL PANEL AND ANY COMPONENTS CURRENTLY ROUTED UNDER SLAB. cn 6. THE PHARMACY FREEZERS AND REFRIGERATORS MUST REMAIN ON AT ALL TIMES. IF POWER TO THE PANEL MUST BE TURNED OFF, PROVISIONS MUST BE MADE TO PROVIDE POWER TO THE UNITS 7. VERIFY LOCATION OF ALL ELECTRICAL PANELS USED FOR PHARMACY POWER PHASING w N1 PLANS (FOR 0 REFERENCE C ONLY) C E U O t N .N- N C d Cz SHEET: a) PHM5 U PRE -CONSTRUCTION NIGHT 1 NIGHT 2 NIGHT 3 NIGHT 4 NIGHT 5 NIGHT 6 AND 7 (WEEK PRIOR) • GC TO COORDINATE WITH ALL WORK WILL BE DONE ON THE "NO WORK" THE GOAL IS TO COMPLETE AS INSTALL THE FRONT COUNTER COMPLETE ALL WORK ON THE INSIDE FINAL FINISHES AND COMPLETE TRADES AND VENDORS ON EXTERIOR AND INTERIOR OF THE MUCH WORK DONE ON THE INCLUDING MODULAR WALLS AND OF THE PHARMACY, INCLUDING ALL PROJECT. NIGHT 2 IS RESERVED FOR JOIST SCHEDULING, STAGING AND FIELD PHARMACY. INTERIOR OF THE PHARMACY AS COUNTERTOP. WORK MUST BE REMAINING FINISHES, FINAL VERIFICATION, PRIOR TO EXTENSIONS. POSSIBLE PRIOR TO OTHER TRADES DONE BY 3AM FOR CABLING TO EQUIPMENT, AND PILL BAYS PAINT EXTERIOR OF PHARMACY. CONSTRUCTION START COMPLETE CABLING AND ALARM TEAMS TO NEEDING ACCESS, FOR EXAMPLE, CONTINUE. INSTALLATION, AS NEEDED. THIS IS AS MUCH AS IS POSSIBLE. PRE -PULL AND STAGE ABOVE DEMO THE BULKHEAD AND EXTEND REMOVE CARPET, REMOVE AND THE LAST NIGHT A PHARMACIST IS FINISH INSIDE OF HEALTH SERVICES CEILING THE JOISTS. REINSTALL PILL BAYS AND FILL INSTALL MODULAR PANELS AND AVAILABLE FOR WORK ON THE ROOM. • GC TO CHECK IN ALL MODULAR PODS, REPLACE CARPET AND PAINT. DOORS REQUIRED TO SECURE INSIDE OF THE PHARMACY. COMPONENTS AND VERIFY ALL PRE -PULL ELECTRICAL FOR COMPLETE AS MUCH AS IS PHARMACY EQUIPMENT AND RACKS ARE ONSITE FOLLOWING EVENINGS POSSIBLE TO PREP FOR NIGHT 3 INSTALL HSR MODULAR WALLS, PRIOR TO START OF CONSTRUCTION WORK, FOR EXAMPLE, LAYOUT IT IS CRITICAL THAT THE NEW MODULAR CEILING, EQUIPMENT AND • COMPLETE AS MUCH AS IS EXTENTS OF MODULAR WALLS ON EQUIPMENT AT THE FRONT ANY REMAINING POWER, • GC TO COORDINATE WITH STORE POSSIBLE TO PREP FOR FOLLOWING FLOOR TO BE SURE THERE ARE NO COUNTER WORK STATIONS AND MECHANICAL, FIRE, AND DATA. PLANNING THE RELOCATION OF NIGHT WORK, FOR EXAMPLE, ISSUES, SPRAY WITH CLEAR COAT PHARMACISTS BENCH ARE SALES FLOOR RACKS. LAYOUT EXTENTS OF MODULAR TO KEEP FOR INSTALLATION ON OPERATIONAL BY OPENING OF PREP EXTERIOR OF PHARMACY FOR WALLS ON FLOOR TO BE SURE NIGHT 3. BUSINESS IN THE MORNING. PAINT. • GC TO COORDINATE RELOCATION THERE ARE NO ISSUES, SPRAY WITH OF SALES FLOOR LIGHTING CLEAR COAT TO KEEP FOR PRESTAGE AS MUCH TRADE WORK INSTALL CEILING TILE, LIGHTS AND PHARMACY MUST BE SECURABLE AFFECTED BY DEMO AND NEW INSTALLATION ON THE INTERIOR OF THE MECHANICAL SYSTEMS. WITH OUT A PHARMACIST PRESENCE CONSTRUCTION. PHARMACY AS POSSIBLE INCLUDING LOCKS AND ALARMS. • COORDINATE PHARMACY CLEAN UP, COORDINATE INSPECTION ON RESTROOM MUST BE KEPT EXISTING WALL IN HEALTH SERVICE ACCESSIBLE FOR DATA AND ROOM WHERE BLOCKING, ELECTRICAL BOXES, STORE NOW ELECTRICAL, DATA IS ADDED SECURE ITEMS SUCH AS PRINTER PAPER OUTSIDE OF PHARMACY. ACCESS TO PHARMACY WILL BE LIMITED, NO PHARMACIST OR ACCESS TO A PHARMACIST MUST BE PRESENT PHARMACY WILL BE AVAILABLE rn 0 O n � 0 O o IL m N Co J ro �.J V J Q O Co J Ur Z o _ w Ch � Co CO � 0 Nw m Z m 2021 CSP � CHECKED BY: Checker DRAWN BY: Author PROTO: 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE: 10-1-21 0 N COORDINATE WITH TRADES ANY WORK THAT CAN BE PRE -STAGED ABOVE THE CEILING, COIL ELECTRICAL CONDUITS AND WHIPS, DATA AND TELEPHONE, AND RELOCATE ANY PANELS OR UTILITIES THAT WILL BE AFFECTED BY THE SCOPE OF WORK ALARM PANEL TO BE RELOCATED ---------- ----------- F---------- --------- T------� I I irxa I ux•r I it xs I 0 0 E 0 0 9 a )RE -PULL CABLE AND ALARM. GC TO PREPARE AS MUCH ITEMS AS )OSSIBLE FOR FOLLOWING EVENINGS. t I I I I I I I ar.■r I s►w l I ■r■■► i 1 ■r■r I i se■x I I I I I I I I 1 I I I I I I i I I II I 1 I I I 1 1I I IF II I I II I I II I I II I I II I I II I 1++II I III I III I III I IItl I lill I III I III I III I I�11 I III I I II I I II I I 11 I 1 II I 1 II 1 11\\\UUU���HIII IIII I I I I I I I I I ! I I ! I I 1 I I I I II__—______ II I 1 II {r ! I I wCNR■7VN I I Mo■Ut■7VN l l ro■IL■)VN I I I M I L■7VN �j I I I �I; *o■�■ _..IL _--------- JLJ .1.------- (RIGHT) NIGHT 1 1/41' = 1'-0" 09:00 CABLE TEAM CONSTRUCTION START OR 1 HR AFTER PHARMACY CLOSE. FIELD VERIFY WITH 21 STORE PLANNING AND PHARMACY MANAGER FOR NIGHTLY CLOSE TIME 21:00 - 03:00 INSTALL AND STAGE CABLING ABOVE GRID 22:00 23:00 -- 09:00 ASSET PROTECTION ONSITE 01 21:00 - 06:00 AP, RELOCATE ALARM PANEL 03:00 - 06:00 06L TONE AND LABEL CABLING OFFSITE EXISTING CABLES I 21:00 00:00 04:00 06:00 06:00 TIMELINE VALIDATION 1 TIMELINE VALIDATION 2 CRIT POINT 1 CRIT POINT 2 ASSET PROTECTION NIGHT 1 - PREP WORK OFFSITE NIGHT #1 (AT LEAST ONE NIGHT PRIOR TO CONSTRUCTION BEGINNING ANY RX WORK): PHARMACIST REQUIRED AP TECH TO RELOCATE ALARM PANEL CABLE TEAM TO PRE -PULL ALL NEW DATA CABLE AND STAGE ABOVE CEILING CABLE TEAM TO TONE AND LABEL EXISTING CABLING JOTF TO CONTRACTOR- OMIT NIGHT 21 IF STORE DOES NOT HAVE CEILING JOIST EXTEND JOISTS AND SECURITY MESH TO LINE OF PRE - MANUFACTURED WALL PANEL LOCATIONS, FIELD VERIFY ALL DIMENSIONS, COORDINATE THOROUGHLY WITH MANUFACTURED WALL PANEL LOCATIONS COVER ALL EQUIPMENT _ EXPOSED TO DUST ON THE FRONT COUNTER AND ALL ADDITIONAL FIXTURES / EQUIPMENT II I L II I II INSTALL DUST DRAPE FOR I JOIST EXTENSION 0 F---------- 7---------- 1----------- F--------- 7------ I I----------+---------+---------+----------r------1 vxt I wxr I w.w 1 axw 1 wxw i 0 0 0 0 1:1 PHARMACY ACCESS REQUIRED FOR JOIST EXTENSION I I I I ■/'xf► Y■■► s►■■r I I I I I II I I II I I 11 I I 11 I I II I I II I I II I All I IIll I III 1 III 1 III I I !I I I II 1 I II I III I III I III I I II wn■Rnvn II tro■R■� JI II I I 1 I NeM i i ■I'Of I I L�J I I L�J I I I Iit I II 1 I � II I I II I I 11 I I 11 I I II I I 11 I I II I I -------- 11 I II I I --- _-- I I II I I II INSTALL PLASTIC DUST BARRIER OVER PHARMACY THE PHARMACY MUST BE CLEAN, SECURE, AND AND SALES MERCHANDISE. REMOVE EACH MORNING OPERATIONAL AND ALL NECESSARY ITEMS READY SO PHARMACY CAN BE OPERATIONAL FOR INSPECTION NIGHT 2 (JOISTS 1 /4" = 1'-0" 20:00 GC CONSTRUCTION INSTALL START BEGIN INSTALLING DUST WALL 21:00 GC LOCATE LINE OF NEW FRONT WALL, BEGIN DEMO OF EXISTING BULKHEAD m 00 23:00 00:00 01 02:00 03: FRIDAY NIGHT CONSTRUCTION START OR 21:00 - 07:00 1 HR AFTER PHARMACY CLOSE. FIELD GC BULKHEAD DEMOLITION AND VERIFY WITH STORE PLANNING AND EXTENDED JOIST INSTALLED PHARMACY MANAGER FOR NIGHTLY CLOSE TIME NIGHT 2 - FRIDAY NIGHT #2: PHARMACIST REQUIRED, PHARMACY IS NO LONGER SECURE GC TO DEMOLISH BULKHEAD AS REQUIRED FOR JOIST EXTENSION GC TO EXTEND BULKHEAD NOTE TO CONTRACTOR: NIGHT 93 OMITTED- RESERVED FOR NEW PILLBAYS AND FILL PODS IF APPLICABLE ALL CONSTRUCTION DEBRIS AND MATERIALS TO BE REMOVED AND CLEANED UP CLEANING COMPLETI COMPLETE SATURDAY MORNING PHARMACY OPEN parcb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 w aim I'- o � F-p0 Ww�o� W 0 vi0�iii-aOZOU � w tzw��waz3l-z LL w LL w B a EDWHT3,2" w 3 ¢g'�` am¢mpm RWQ�Zp QirKUq�-K Oa65C Oa 6'.-0- LL� �VOO w wp Z 3UU. w-:)OzUtp Z� w 3Q 0 O c9 OKK w p Z ~ zU)-JJ0dLLCO <Uap a=izp�pQv� wo��� d OO¢w=a5i2wos � LU cf w'LCO SNUO .0 N a) %0 C: D n Q Q O o LLJ>r-0 m a a �J J o m o J J 0 z r W M p N tD �/ F- � cn O� N W m z m 2021 CSP ISSUE BLOCK CHECKED BY: Checker DRAWN BY: Author PROTO: 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE: 10-1-21 J Z O rLLI V Z L1J w U_ LU w w O LL PHASING PLANS (FOR REFERENCE ONLY) SHEET: PHM5.1 INSTALL PLASTIC DUST BARRIER OVER PHARMACY AND SALES MERCHANDISE. REMOVE EACH MORNING SO PHARMACY CAN BE OPERATIONAL REMOVE EXISTING WALLS, MILLWORK, AND DOORS SHOWN DASHED n I ` I \ I REMOVE EXISTING \ u DROP-OFF EQUIPMENT IF POWER TO THE FRONT REMOVE MILLWORK SHOWN COUNTER IS I THE SLAB, _ DASH REMOVE ON SE BEING DEMOED. CAP ND REROUTE />� EXISTI G EQUIPMENT TO B THRU THE WA' L REMO ED AND STORED FO ° - REUSE ° -- I III I II ®-- -- --�L- ® --- I / I ------------------------------------------------------------------- --,------- ---------r -----I ,rx+r +r=aa ,rxr ,rxar 0 0 0 o El -- - = - REMOVE LIGHTS AND MECHANICAL AFFECTED BY NEW WORK f.REMOVE PORTION OF CEILING AS REQUIRED FOR �-sue_-_� LF IT 1 NEW WORK II I _- tOO xM1.xTV1, _ — I, I.- — 10'9x N'LxTOH I ,POa Y•tx7�'H ,j ,OD=iTLxT4H ! E (RIGHT) NIGHT 4 DEMO- 1/4" = 1'-0" INSTALLED NEW MILLWORK AND ASSOCIATED EQUIPMENT -- RUN POWER FROM THE WALL TO END PRIVACY WALL AND NEW COUNTERS - - - PANEL INSTALL MODULAR / WALL PANELS NEW MODULAR CASEWORK AND PRIVACY WALLS FURNISHED BY OWNER AND INSTALLED BY GC RELOCATE DROP-OFF EQUIPMENT TO THE FRONT CO NTERS o o .0 o 0 .0- ------------------------------------------------------------------ m 0 0 0 0 r V i PAINT REMAINING INTERIOR PHARMACY -- - I REPLACE REMAINING CARPETLL — r-- --- I i I I - \ x,x I � :x I I xxx I � n xz�• I _ L_ J L J 1 I�— 1= _ ��1= � � 1 1 I I �— I - III I III I III I �II T 1 I I II II II IIIuIIuII II L ,voxrt:TOH-- Mxft'LOWK- ,wxwtxra,+ - ,°'°xartxra„ I ,r°xatxrar, ! -------------------------J rINSTALL PLASTIC DUST BARRIER OVER PHARMACY AND SALES MERCHANDISE, REMOVE EACH MORNING SO 19 30 - 20 00 PHARMACY CAN BE OPERATIONAL STORE PLANNING RE- INSTALL FRONT COUNTER EQUIPMENT 2000 CABLE TEAM DE- CABLE TEAM DE -INSTALL RIGHTNIGHT 4 INSTALL FRONT FRONT COUNTER DATA. 00 00 - - - COUNTER DATA, THEN RX BENCH DATA START RX BENCH AND 1 /4" = 1'-O" RX BENCH 19:30 20:00 STOP TEST NEW CONNECTIONS � - ONS>\ \ / /VVALL GC DEMO RX FOR HS ROOM SUNDAY NIGHT CONSTRUCTION START 0 1 HR AFTER PHARMACY CLOSE. FIELD VERIFY WITH STORE PLANNING AND PHARMACY MANAGER FOR NIGHTLY CLOSE TIME - FINISH EXTERIOR MUD AND TAPE AND PAINT NO ACCESS TO PHARMACY / � 1 INSTALL FINAL FINISHES TO HEALTH SERVICE ROOM - \ 21 00 TIMELINE VALIDATION 1 RUN POWER THE WALL TC PRIVACY WAI NEW COUNTE IVIVrI 1 11t VCIVIIJ NIGHT 4 0430 SP RE -INSTALL FRONT ALL CONSTRUCTION DEBRIS COUNTER EQUIPMENT AND AND MATERIALS TO BE 05:30 BRING SYSTEMS ONLINE REMOVED AND CLEANED UP DATA INSTALL 05:30 FRONT COUNTER CABLE DROP AND TEST CLEANING DEAD COMPLETE — 22:00 23 0 00:00 01:00 02:00 03:00 J 04: 1930-20:00 IC DEMO FRONT COUNTER AND REINSTALL NEW COUNTER, START INSTALLATION OF MODULAR / WALL PANELS, CEILING AND COMPLETE UPPER BULKHEAD FOR HS ROOM 0400 CRIT POINT 1 05:00 06-.0 05:00 VALIDATE RX IS SECURE 0600 CRIT POINT 2 NIGHT 4 - SUNDAY NIGHT #4: PHARMACIST REQUIRED CABLE TEAM TO DE -INSTALL EXISTING FRONT COUNTER DATA CABLE STORE PLANNING FPS TO DE -INSTALL ALL EXISTING FRONT COUNTER SYSTEMS EQUIPMENT GC TO START DEMO OF EXISTING PHARMACY WALL WHERE NEW HS ROOM WILL BE BUILT GC DEMO EXISTING FRONT COUNTER AND INSTALL NEW FRONT COUNTER CABLE TEAM TO REINSTALL DATA CABLE TO NEW FRONT COUNTER TEST NEW CONNECTIONS STORE PLANNING TO RE -INSTALL FRONT COUNTER SYSTEMS EQUIPMENT AND BRING ALL SYSTEMS ON LINE GC TO START INSTALLATION OF THE NEW MODULAR WALL PANELS AND MODULAR CEILING PANELS AND START UPPER BULKHEAD CONSTRUCTION FOR HS ROOM ------------------------------------------------------------------ r---- T---------T- T --r I----------+---------+--------- ---- --- -----F------� m 0 0 0 0 I I \ xxx I xxx I I xxx I I xxx I I x:x I I I I I I I I I I I I I I I I I - L J L J L J L�J _ I II I I II I I II I I II I I II I - - I II I I II I I II I I 11 I I II I I I I I I I I I I I I I I I I I I I I I I II I I II I I II I I II I I II I III I I;I II I III I III I III I I g l l I I g l l I i I I I I I I I I I I i II --------- I II -------- i II I --------- II I -----01 EI I II I ---- I II II I I mvxnt,roa I I im.4 txra�, I I tov:wtxra, I I I I ,00:m,ne„ I I I I ,00xatxnn, (RIGHT) NIGHT 6 AND 7 07:00 0800 09.00 COMPLETE MONDAY MORNING PHARMACY OPEN I Y I VJ 11 1 %a /\ I V L.J IT AP TO COMPLETE RELOCATION OF PHARMACY DOOR ENTRANCE PANEL INSTALL / BULKHEAD ABOVE PANEL PANEL i / \------------------------------- ---------- 4------ i z CEILING PANEL Q Cl. CEILING PANEL INSTALL MODULAR CEILING PANELS I I I 0 0 0 0 r - - - - - - r----� r----� r----� x,x I I I x:x I I I I I I xxx I I I I I I x,x I I I I I I x,x I I I I I L J I I L J I I LFJ I I LFJ I fl I I II I I II I I II I i II I I II I I it I I II I I 11 I I 11 I I I I I I II I I I I I I II I I I I I I II I I I I I I II I I I I I I II I I I I I I I I I I All I I I I [n, 1 II I I I I I II I I I I I ti I I I II I I I I 1411 I I I a it I II I I II I _ _ I I I T II I I --_-_---- --------- mox,etxra�, --------- avxatxwx --------- ,voxwtxT+a„ ,00xm.,rex - __ ,eoxrtxna„ (RIGHT) NIGHT 5- PART 1 1 /4" = 1'-0" - - (RIGHT) NIGHT 5 - PART 2 1/4" = 1'-0" INSTALL PLASTIC DUST BARRIER OVER PHARMACY AND 7 SALES MERCHANDISE, REMOVE EACH MORNING SO PHARMACY CAN BE OPERATIONAL 04 00 ALL CONSTRUCTION DEBRIS BEGIN INSTALLATION OF AND MATERIALS TO BE HEALTH SERVICES DATA AND REMOVED AND CLEANED UP 21 00 RX MONITOR DATA 21 00 AP COMPLETE RX CLEANING CABLE TEAM DOOR ENTRANCE 00:00 -E 0500 COMPLETE ONSITE PANEL GC TO COMPLETTEEEXTERIOR CABLE DROP DEAD WORK AND PAINTING 1900 2000 21:00 22:00 23:00 00:00 01.00 02 00 0300 0400 05:00 06:00 07:00 08:00 091:00 MONDAY NIGHT CONSTRUCTION START COMPLETE TUESDAY OR 1 HR AFTER PHARMACY CLOSE. FIELD MORNING PHARMACY VERIFY WITH STORE PLANNING AND NIGHT 5 - MONDAY OPEN PHARMACY MANAGER FOR NIGHTLY CLOSE TIME NIGHT #5: PHARMACIST MAY BE REQUIRED ANY WORK NOT COMPLETED TO BE FINALIZED GC TO COMPLETE EXTERIOR WORK, FINAL FINISHES AND PAINTING CABLING TO INSTALL HEALTH SERVICES DATA AND EXTERIOR RX MONITOR/DATA PHARMACY SCOPE OF WORK COMPLETE p+enb2 hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 DoCr ~ =o wo wwLLFO>- W U d LLJ O HOB �ZFLLO, (n 0 zwF-wwwa Lz" z � aQ 3�og�atQo�w a�9w¢O�Ow>�rz�a x >¢>�O°�wn�c�owwoi�p Z y[�LL Zc� D O z Z�2Z�z i- D_ qw 0 _LU �ZFKp-zO Q �U) LLw o�aoZI ooi oQw�(�uwiowog �w-z��O�wa7Nw T m w 0 a O �LLX wc� w wm= H DN L)0 CL0wtt-OfcrCF- N O O 0 O O p o > ~ '' LL m N d 00 ) _j o `+0 J J — 0 z Of r j w p o N 2 O � H Cn f � \L� W N w W Co D z m 2021 CSP ISSUE BLOCK CHECKED BY. Checker DRAWN BY. Author PROTO. 192 PROTO CYCLE: 8-27-21 DOCUMENT DATE. 10-1-21 Z O Lli U Z W W L.L Nw 1..1 O Ll- PHASING PLANS (FOR REFERENCE ONLY) SHEET PHM5.2 1" TEE WITH PLUG FIRE PROTECTION CONTRACTOR SHALL INSTALL PIPE THROUGH HOLE RESERVED FOR SPRINKLER INSTALLATION. NOTE TO CONTRACTOR: PROVIDE A SIGN WITH THE FOLLOWING STATEMENT AND ATTACH TO THE TOP OF THE AUTOMATED EQUIPMENT. "FLEXIBLE DROP IS PRESSURIZED. PRIOR TO REMOVING FIRE SPRINKLER DRAIN FIRE PROTECTION SYSTEM AND 1" DROP" L L = W/4, 4" MIN NOTES: 1. SPIN -IN FITTINGS W/ SCOOPS ARE NOT ACCEPTABLE. 2. REF PLANS FOR RUNOUT SIZES. 3. 450 LEAD IN. SELF TAPPING SCREWS BRANCH DUCT FITTING 12" = 1'-0" SUPPLY FROM WET PIPE SPRINKLER SYSTEM INSTITUTIONAL MODEL FLEXIBLE SPRINKLER DROP CORRUGATED STAINLESS STEEL HOSE WITH STAINLESS STEEL BRAID 4' LENGTH. WALL PLATE DO NOT ATTACH TO UNIT ADJUSTABLE HUB MULTI -PORT BRACKET INSTALL AS LOW AS POSSIBLE INSTALL AS LOW AS POSSIBLE METAL STUD E). APPROPRIATE RIGID SURFACE). I IS 1" PENDENT SPRINKLER NO ESCUTHEON REQUIRED PHARMACY CEILING 3" LOADS MUST BE HUNG WITHIN 3" OF PANEL POINTS OF EXISTING STRUCTURAL JOISTS - TOP BEAM CLAMP TYP TOP CHORD OF JOIST ROOF THREADED ROD TYP RECTANGULAR DUCT -J �-2"x2"x1/4" ANGLE BOTTOM OF OR 1 5/8"x1 5/8" STRUCTURE RECTANGULAR DUCT UNISTRUT PERPENDICULAR TO STRUCTURE OPTIONAL ROUTING IN CONCEALED AREAS -1 HEALTH SERVICES CEILING DIFFUSER -- SUPPLIED AND INSTALLED BY PANEL MANUFACTURER 12"x12" FACE SIZE 8" ROUND NECK SIMILAR TO TITUS TDC 150 CFM FINAL DUCTWORK CONNECTION TO PRE -INSTALLED DIFFUSER BY GENERAL CONTRACTOR SPRINKLER HEAD SUPPLIED AND INSTALLED BY PANEL MANUFACTURER CEILING RETURN GRILLE - SUPPLIED AND INSTALLED BY PANEL MANUFACTURER 12"x12" FACE SIZE 8" ROUND NECK SIMILAR TO TITUS 50F 150 CFM BOTTOM OF STRUCTURE TWIST STRAP 16 GAUGE GALV STEEL BAND (2" WIDE) ROUND DUCT 3" LOADS MUST BE HUN WITHIN 3" OF PANEL POINTS OF EXISTING STRUCTURAL JOISTS ROUND SUPPLY AIR DUCT 450 LOAD RATED FASTENERS ROOF 2"x7x1/4" ANGLE OR 1 5/8"x1 5/8" 6" UNISTRUT lo HANGER STRAP - 1" MIN. 60" MAX. L•J SHEET METAL SCREWS TYP RECTANGULAR DUCT PARALLEL TO STRUCTURE LOAD RATED FASTENERS ROOF L-9 ANGLE OR 1 5/8"x1 5/8" UNISTRUT DUCT SUPPORT BAND SAME SIZE AS STRAP a2"x2"x1/4" 010 0� �6° 45° SUPPLY REGISTER, REF FLOOR PLAN FOR SIZE AND LOCATION, MOUNT REGISTERS @ 30 DEGREE ANGLE DOWN FROM HORIZONTAL IN STOCKROOM AREA AND @ 15 DEGREE ANGLE DOWN FROM HORIZONTAL IN SALES AREA, EXCEPT THOSE SHOWN ON BOTTOM OF DUCT ON THE PLAN PERPENDICULAR TO JOIST PARALLEL TO JOIST DUCT SUPPORT AND GRILLE 12" = V-0" INSTALL DAMPER IN VERTICAL AT 24" MAX ABOVE CEILING BALANCE TO 930 CFM _ REMOVE DIFFUSER AND PORTION OF EXISTING DUCTWORK SHOWN DASHED RTU ETR GENERAL NOTES 1. THE DESIGN SHOWN ON THESE CONTRACT DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY THE AUTHORITY HAVING JURISDICTION AND TO PROVIDE GUIDANCE FOR BIDDING. SUBMIT COMPLETE FIRE SPRINKLER SHOP DRAWINGS AS REQUIRED BY CONTRACT DOCUMENTS TO THE OWNERS DESIGNATED REVIEWERS. BASE SPRINKLER DESIGN UPON THESE DRAWINGS AND AS REQUIRED BY THE SPECIFICATIONS. SHOP DRAWINGS MUST INCLUDE ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATIONS METHODS, MATERIAL DATA, AND ADDITIONAL INFORMATION NECESSARY TO CLARIFY THE INTENT OF INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZE, SPRINKLER SPACING, AND SYSTEM CONFIGURATION AS SHOWN. ALTERNATE MATERIALS MUST BE SENT TO THE FIRE PROTECTION ENGINEER OF RECORD OR VIA THE RFI PROCESS AND MUST BE APPROVED IN RECORD DOCUMENTS PRIOR TO BID. 2. COORDINATE LOCATIONS OF FIRE PROTECTION COMPONENTS, INCLUDING PIPING, ALARMS, DRAINS, TEST POINTS, ETC. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS. OBSTRUCTION TO SPRINKLER DISCHARGE MUST BE CONSIDERED DURING SHOP DRAWING PRODUCTION AND INSTALLATION; ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 3. CONTRACTOR MUST VISIT THE BUILDING SITE TO DETERMINE THE FULL EXTENT OF THE EXISTING FIRE PROTECTION WORK AND EXISTING CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE DISCONNECTIONS, REMOVALS, RELOCATIONS AND/OR RECONNECTIONS OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, AND CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. NO EXTRA COMPENSATION WILL BE PAID FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR ALLOWANCE. 4. SUBMIT A REQUEST FOR INFORMATION FOR QUESTIONS REGARDING THE FIRE PROTECTION DOCUMENTS PER RFI PROCESS LOCATED IN THE FIRE PROTECTION SPECIFICATIONS. 5. NEUTRALIZATION WALLS, IF PROVIDED, ARE SHOWN ON THE ARCHITECTURAL DRAWINGS. REFER TO MECHANICAL DRAWINGS FOR NEUTRALIZATION WALL PENETRATION DETAIL. 6. PENETRATIONS OF "RATED ASSEMBLIES" SHALL BE FIRE STOPPED WITH AN APPROVED MATERIAL PER METHODS REQUIRED BY PROJECT SPECIFICATIONS AND THE AUTHORITY HAVING JURISDICTION. MECHANICAL SYMBOLS 18"x12" RECTANGULAR DUCT 18" WIDE BY 12" DEEP 12" 0 12" DIAMETER ROUND DUCT SUPPLY DUCT IN SECTION RETURN OR EXHAUST DUCT IN SECTION ELBOW WITH TURNING VANES TEE WITH TURNING VANES ROUND (OR OVAL) ELBOW VOLUME/BALANCE DAMPER SUPPLY AIR DIFFUSER WITH ROUND SUPPLY DUCT RETURN OR EXHAUST AIR DIFFUSER WITH ROUND DUCT 24"x24" CD 450 BRANCH DUCT AND/OR NECK SIZE DIFFUSER OR GRILLE TYPE CFM 0 THERMOSTAT @S TIMER O TEMPERATURE SENSOR CONNECT TO EXISTING ETR EXISTING TO REMAIN FD FIRE DAMPER EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS -BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. GENERAL NOTES CONT. 7. THE FIRE PROTECTION ENGINEER OF RECORD SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR SHALL THEY BE REQUIRED TO SUPERVISE THE CONDUCT OF THE WORK, THE CONSTRUCTION PROCEDURES FOLLOWED BY THE CONTRACTOR, SUBCONTRACTORS, THEIR RESPECTIVE EMPLOYEES OR ANY OTHER PERSON AT THE JOB SITE OTHER THAN THAT OF THE ENGINEERING FIRM'S EMPLOYEES. 8. CONTRACTOR MUST REVIEW ALL CONSTRUCTION DOCUMENTS PRIOR TO BID. SHOULD MODIFICATIONS TO THESE PLANS BECOME NECESSARY TO PROPERLY COORDINATE THE SYSTEM WITH ALL OTHER TRADES, IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL OF THE CHANGES FROM BOTH THE AUTHORITY HAVING JURISDICTION AND THE OWNER'S DESIGNATED REVIEW CONSULTANT IN ADDITION TO OBTAINING THE NECESSARY APPROVALS, THE CONTRACTOR MUST MAKE NOTE OF ANY FIELD OR COORDINATION CHANGES ON THE INSTALLATION DRAWINGS, AND THEN MUST PROVIDE A SET OF AS -BUILT DRAWINGS ONCE COMPLETE. 9. CONTRACTOR MUST VERIFY ALL DROP DOWN LOCATIONS AT EXTERIOR WALLS WITH THE PROJECT MANAGER PRIOR TO INSTALLATION. 10. ALL PIPING MUST BE COORDINATED AROUND FRAMING MEMBERS AND PROPERLY INSTALLED INSIDE THE BAR JOIST. 11. CONTRACTOR SHALL ROUTE PIPING AROUND ALL OBSTRUCTIONS AND PROVIDE SPRINKLER PROTECTION UNDER OBSTRUCTIONS, AS DETAILED IN NFPA 13 STANDARDS AS PART OF THE FIELD COORDINATION AT NO ADDITIONAL COST TO OWNER. 12. ALL SPRINKLER DEFLECTOR DISTANCE REQUIREMENTS SHALL BE IN ACCORDANCE TO THE STANDARDS OUTLINED IN NFPA 13. 13. ALL PIPING PASSING THROUGH CMU WALLS SHALL BE INSTALLED WITH ONE INCH CLEARANCE ON ALL SIDES. (CORE DIAMETER EQUAL TO PIPE +2"). ALL CORES SHALL BE COORDINATED WITH STRUCTURAL REINFORCING. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CORING WITH PROPER CLEARANCE AT ALL CMU WALLS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A TWO INCH CLEARANCE AROUND ALL PIPING PASSING THROUGH CONCRETE SLABS. THE SPRINKLER CONTRACTOR SHALL FILL ALL CLEARANCES WITH APPROVED MASTIC. 14. PROVIDE FLUSHING CONNECTIONS IN ACCORDANCE WITH THE STANDARDS OUTLINED IN NFPA 13. 15. PROVIDE ALL NECESSARY OFFSETS, RISES OR DROPS IN PIPING AND AUXILIARY DRAINS REQUIRED BY BUILDING CONDITIONS. 16. EXAMINE THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES, ELEVATIONS, CLEARANCES, ETC. 17. ARCHITECTURAL AND ELECTRICAL BACKGROUND INFORMATION IS SHOWN FOR COORDINATION PURPOSES ONLY. REFER TO THE CONTRACT DOCUMENTS FOR LOCATIONS, SIZES AND QUANTITIES OF OTHER TRADE WORK. 18. SPRINKLER SPACING SHALL BE PER NFPA 13 UNLESS OTHERWISE NOTED ON PLANS AND/ OR PROTECTION CRITERIA LEGEND. 19. INTERFACE SPRINKLER SYSTEM WITH FIRE PROTECTION SUPERVISORY SYSTEM. 20. ALL MATERIALS SHALL BE UL LISTED OR FM APPROVED. SPRINKLER PIPE SHALL BE MANUFACTURED TO STANDARDS RECOGNIZED BY NFPA 13., THREADED PIPE SHALL HAVE A CORROSION RESISTANCE RATING OF 1.0 OR GREATER. CRIMP -TYPE COUPLINGS SHALL NOT BE USED. THREADABLE THINWALL PIPE WITH CORROSION RESISTANCE RATING OF LESS THAN 1.0 SHALL BE USED ONLY WITH ROLL GROOVE FITTINGS. 21. IF REQUIRED, PROVIDE 24 VOLT AC, ELECTRIC BELL, MODEL NO. PBA248, ELECTRIC BELL BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI, LOCATE AS REQUIRED BY AUTHORITIES HAVING JURISDICTION. PROVIDE NEW DOUBLE POLE VANE TYPE FLOW DETECTOR, MODEL NO. VSR-F, BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI. SET ADJUSTABLE DELAYED SIGNAL AT 30 SECONDS. MOUNT WATER FLOW INDICATORS NO HIGHER THAN 6 FEET ABOVE FINISH FLOOR. 22. ALL SPRINKLER SYSTEMS THAT ARE TO BE MODIFIED SHALL BE HYDROSTATICALLY TESTED PER NFPA 13 PRIOR TO SPRINKLER SYSTEM MODIFICATION AND SHALL BE RE -HYDROSTATICALLY TESTED AFTER COMPLETION OF WORK. 23. DO NOT HANG OR SUPPORT ANY LOADS OR MAKE ANY ATTACHMENTS TO THE METAL ROOF DECK OR JOIST BRIDGING. 24. SAMMY SCREWS ARE NOT PERMITTED. 25. CEILING FLANGES ARE NOT PERMITTED. 26. PROVIDE RETAINING STRAPS ON HANGERS WHERE REQUIRED. 27. CONTRACTOR IS TO COORDINATE FINAL SPRINKLER HEAD LOCATIONS AND PIPE ROUTING SUCH THAT THEY DO NOT INTERFERE WITH NOR RECEIVE DAMAGE FROM THE NORMAL OPERATIONS OF THE AREA. 28. THE CONTRACTOR SHALL DIVERT ALL DRAINS AND INSPECTORS TEST CONNECTION DISCHARGE AWAY FROM FINISHED SURFACES AND PIPE TO APPROVED DRAIN LOCATIONS. ROUTE DISCHARGE TO NEARBY GREENSPACE OR STORM WATER DRAIN BY USE OF BACKWASH HOSE.. THE CONTRACTOR WILL BE BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR CLEANING OF RUST STAINS ON PAVEMENT,/CONCRETE DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM DRAINS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. p+enb2 hitecture ginee(ng 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Engineer of Record Joshua Dale McCall, P.E. Florida License No. 79905 COA License No. 26880 w uw w �"6w w Do Wwop> � co O W,-) aw""R� J ­ww�z�-aazm w w wz F-tnLLlllLLp�p W� wa~¢g�awaaiom 0 ��c�Zza�W��=a> U_ aFEmaot-O=>a~� z <990 -u we oW�o=p ~ ZdJ�oot,TwFQp �Qia-w��w`no�ZN 0 w 0-JUtgJ�Wp0E 4 pOiww¢�x�QMzacwn=g ~ T U)W oQ p cr U. X W U Uj W WS2 � HpNUpwmoWmJwKa1- m H z J Cl) z 0 U N rn 00 Q CD C:D Q 0 O 0 LjL 0 ti O 0 m N o w O J o a J J Q z w N= LL COO 00 o O CL N N w N w m 0 z m 0 ISSUE BLOCK CHECKED BY: JDM DRAWN BY: CMW PROTO: 192 PROTO CYCLE: 08-27-21 DOCUMENT DATE: 10-01-21 �Q N - E MCC'9 No. 79905 0 STATE of �ORIDP �k 10/5/2021 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION ENLARGED MECHANICAL PLANS PENDENT SPRINKLER WITH FLEXIBLE PIPING 12" = 1'-0" PHARMACY HVAC- PLAN 1/4" = 1'-0" SHEET: m 1 ELECTRICAL SYMBOLS GENERAL MODULAR NOTES LEGEND 04.24.20 (SYMBOLS APPLY ONLY WHEN USED ON DRAWINGS) 1. COORDINATE AREA OF EXISTING CEILING GRID TO SYMBOL DESCRIPTION BE REPLACED WITH GENERAL CONTRACTOR. LIGHT FIXTURE COORDINATE ANY REQUIRED ELECTRICAL WORK FO =1/0 O (WALL MOUNTED/CEILING MOUNTED) INCLUDING REMOVAL OF EXISTING FIXTURES. MAINTAIN EXISTING LAYOUT, CIRCUITRY, AND CONTROLS UNLESS OTHERWISE NOTED. O LIGHT FIXTURE LIGHT FIXTURE, NIGHT LIGHT 2 VOLUMETRIC LIGHT FIXTURE 3 17 ZA TRACK LIGHTING / ® EXIT FIXTURE (WALL MOUNTED/CEILING MOUNTED) 4 / coy EMERGENCY LIGHT (WALL MOUNTED/CEILING MOUNTED) aN / EMERGENCY LIGHT REMOTE HEADS (WALL MOUNTED/CEILING MOUNTED) SINGLE POLE SWITCH $3 3-WAY SWITCH 5 $4 4-WAY SWITCH $K KEYED SWITCH 6 $D DIMMER SWITCH *VS VARIABLE SPEED SWITCH $M MANUAL MOTOR SWITCH $0S SINGLE POLE OCCUPANCY SENSOR SWITCH $OS2 DOUBLE POLE OCCUPANCY SENSOR SWITCH ( ( OS ) CEILING MOUNTED OCCUPANCY SENSOR SWITCH, FOUR -DIRECTION SENSING 7. LIGHT FIXTURE SCHEDULE "OW" FIXTURES AND LAMPS ARE FURNISHED BY THE OWNER FOR INSTALLATION BY THE CONTRACTOR. "GC" FIXTURES AND LAMPS ARE FURNISHED AND INSTALLED BY THE CONTRACTOR. TYPE SUPPLIED BY DESCRIPTION VENDOR / MANUFACTURER MODEL VOLTAGE INPUT VA COLOR TEMP LIGHT SOURCE LAMP QTY MOUNTING COUNT 9 OW 2' x 2' VOLUMETRIC TROFFER CREE INC ZR22C-40L-40K-10V-FD 120/277 32 VA 4000K INTEGRAL LED RECESSED 2 17 OW EMERGENCY LIGHT REXEL INC EVHC61DP-WM 120/277 3 VA - INTEGRAL LED - WALL 1 COORDINATE WITH GENERAL CONTRACTOR FOR PHARMACY DEMOLITION REQUIREMENTS. ELECTRICAL CONTRACTOR TO COORDINATE WITH GENERAL CONTRACTOR ON ACTUAL PHASING OF PHARMACY CONSTRUCTION. REUSE EXISTING COUNTER BRANCH CIRCUITRY AS MUCH AS POSSIBLE. ELECTRICAL CONTRACTOR TO RELOCATE ALL DRIVE THRU EQUIPMENT POWER AND DATA AS REQUIRED. COORDINATE WITH GENERAL CONTRACTOR AND CONSTRUCTION MANAGER.PROVIDE LISTED HANDLE -TIE BETWEEN FRONT COUNTER CIRCUIT BREAKERS THAT SHARE COMMON NEUTRAL FOR SIMULTANEOUS TRIP. PHARMACY REFRIGERATION SYSTEMS TO REMAIN ENERGIZED DURING ALL PHASES OF CONSTRUCTION. PHARMACIST BENCH CAN BE RELOCATED PER THE FOLLOWING MAXIMUM DIMENSIONS, AS NEEDED TO RELOCATE THE POWER POLE THAT IS PLACED OPPOSITE END OF BENCH FROM HEALTH SERVICE ROOM TO MISS OBSTRUCTIONS IN THE CEILING ABOVE POWER POLE (LIGHTING AND/OR DIFFUSERS). THE BENCH CAN SLIDE A MAXIMUM 6" TO EITHER SIDE. THE BENCH MUST BE A MINIMUM OF 4'-0" FROM FRONT OF WILL CALL TO THE FRONT COUNTER, AND A MINIMUM OF 4'-0" FROM REAR OF WIRING DIAGRAM BENCH TO FILL POD. COORDINATE WITH GENERAL CONTRACTOR PRIOR TO PHARMACIST BENCH GROUND �-) (BARE OR GREEN) ANCHORING LINE 1 (BLACK) PROVIDE LISTED HANDLE -TIE BETWEEN FRONT LINE 2 ( (RED) COUNTER CIRCUIT BREAKERS THAT SHARE LINE 3 ( (BLUE) COMMON NEUTRAL FOR SIMULTANEOUS TRIP. NEUTRAL (WHITE) WALL MOUNTED OCCUPANCY SENSOR 8. BRANCH CIRCUITRY AT FRONT COUNTER TO BE OS SWITCH, ONE -DIRECTION SENSING RUN THROUGH SIDEWALLS. COORDINATE DEVICE TRA MOUNTING WITH JUNCTION BOXES PRE INSTALLED BUIL RECEPTACLE, DUPLEX IN PANELS. MANU RECEPTACLE DUPLEX 9 VENDOR FURNISHED MODULAR POWER MOUNTED HORIZONTALLY 16 RECEPTACLE, GFI 0 RECEPTACLE, DUPLEX FLUSH FLOOR RECEPTACLE, DUPLEX ISOLATED 0 GROUND FLUSH FLOOR 1 RECEPTACLE, DOUBLE DUPLEX }� RECEPTACLE, DUPLEX ll ISOLATED GROUND 1 RECEPTACLE, DOUBLE DUPLEX, U NSITION BETWEEN DING WIRING AND FACTURED WIRING DISTRIBUTION INCLUDES ALL REQUIRED LINE N L1 G N L2 G ENTRY CABLES, POWER -TO -POWER CABLE (LINE 1) (LINE 2) ASSEMBLIES, POWER DISTRIBUTION MODULES, POWER STRIPS AND OUTLETS. REFER TO MANUFACTURER'S INSTRUCTIONS FOR PROPER MODULAR MOUNTING OF MODULAR POWER DISTRIBUTION. 0. WHEN MAKING FINAL CONNECTIONS, ELECTRICAL 6 NTS CONTRACTOR TO CONNECT DEVICES TO MODULAR POWER IN THAT SECTION OF COUNTER ONLY. DO NOT CONNECT TO OTHER SECTIONS OF FRONT COUNTER. 1. ELECTRICAL CONTRACTOR TO INSTALL VENDOR FURNISHED 50' WHIP FOR PHARMACIST BENCH IF ISOLATED GROUND PANELBOARD BEING USED TO SERVE WHIP CIRCUITS IS MORE THAN 50' CIRCUIT FEET, RECEPTACLE, SIMPLEX TWIST LOCK, L5-15R, UNO ELECTRICAL CONTRACTOR TO SPLICE FEEDER TO WHIP PER NEC. DO NOT SPLICE WHIP IF PANELBOARD IS LESS THAN 50' CIRCUIT FEET RECEPTACLE, SIMPLEX TWIST LOCK, ISOLATED GROUND, L5-15R, UNO FROM PHARMACIST BENCH. RECEPTACLE, DUPLEX TWIST LOCK, IZPI , PANELBOARD NOTES Q 40- RECE RECEPTAACLCL E, DUPLEX TWIST LOCK, ISOLATED GROUND, L5-15R, UNO 08.28.20 RECEPTACLE, SPECIAL 1. RECEPTACLE, SIMPLEX 2' RECEPTACLE, PLUG -MOLD O JUNCTION BOX 3. (WALL MOUNTED/CEILING MOUNTED) THERMOSTAT O (WALL MOUNTED/CEILING MOUNTED) 4 O ALARM JUNCTION BOX, 5. (WALL MOUNTED/CEILING MOUNTED) ALARM JUNCTION BOX, 6. ® FOR REMOTE TEST/RESET (WALL MOUNTED/CEILING MOUNTED) OS SMOKE DETECTOR 7. Eh NON -FUSED DISCONNECT 8. FUSED DISCONNECT 9. EQUIPMENT CONNECTION POINT 1 (PROVIDED WITH EQUIPMENT) 1 CIRCUIT, CONCEALED IN WALLS OR CEILING, E INDICATES EXISTING WIRING CIRCUIT, CONCEALED IN SLAB FLOOR, E INDICATES EXISTING WIRING CIRCUIT, EXPOSED, E INDICATES EXISTING WIRING 1 ------------ LOW VOLTAGE WIRING F--i CONDUIT SLEEVE 1 = FLUSH MOUNTED PANELBOARD 1 SURFACE MOUNTED PANELBOARD 1 - TELEPHONE / DATA BOX FOR ISD 1 LOW VOLTAGE CABLE 1 BOX FOR OTHER © TELEPHONE, FLUSH FLOOR 1 O MOTOR z TELEPOWER POLE 1 PUSH BUTTON 2 BUZZER SAIL SWITCH HSS JUNCTION BOX 2 ( KI HORN/STROBE DH DOOR HOLD OPEN 2 ETC TIME CLOCK ABBREVIATIONS 2 a, b, c LOWER CASE LETTERS INDICATE SWITCHING CONFIGURATION 2 AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE C CONDUIT CCT CIRCUIT CIF CEILING FAN CW CASH WRAP EC ELECTRICAL CONTRACTOR EF EXHAUST FAN 2 ETR EXISTING TO REMAIN EWC ELECTRIC WATER COOLER G GROUND GC GENERAL CONTRACTOR GFEP GROUND FAULT EQUIPMENT PROTECTION G GFI GROUND FAULT CIRCUIT INTERRUPTER 1 HD HAND DRYER IG ISOLATED GROUND LCU LIGHTING CONTROL UNIT NL NIGHT LIGHT NTS NOT TO SCALE 2 REC REFRIGERATION ELECTRICAL CONTRACTOR RC REFRIGERATION CONTRACTOR RH RADIANT HEATER Sc SECURITY CAMERA TR TAMPER RESISTANT TYP TYPICAL 3 UH UNIT HEATER UNO UNLESS NOTED OTHERWISE WH WATER HEATER WP WEATHER PROOF WR WEATHER RESISTANT MODULAR WHIP WIRING: 2 CIRCUIT WHIPS WITH UPS: ELECTRICAL CONTRACTOR TO WIRE WHIP'S TO LINE 1, LINE 2, NEUTRAL AND ISOLATED GROUND. 3 CIRCUIT WHIPS (NO UPS): ELECTRICAL CONTRACTOR TO WIRE WHIP'S TO LINE 1, LINE 2, LINE 3, NEUTRAL, AND GROUND. REFER TO MODULAR POWER WIRING DIAGRAM 6-EPHM1. TERMINATE GROUND ON ISOLATED GROUND BUS. CIRCUITS FEEDING FRONT COUNTER INSTALL LOCKING DEVICE (LOCK -OFF FOR ARE SUPPLIED VIA ONE WHIP. EXTEND ° MAINTENANCE). LOCKING DEVICE SHALL BE UL FEEDERS AND SPLICE TO WHIP PER NEC. LP-a,b,c LISTED. MANUFACTURER SHALL MATCH EXISTING 16.145 PANELBOARD MANUFACTURER. LU2 w INSTALL LOCKING DEVICE (LOCK -ON FOR CRITICAL 16.145 LOAD). IG w 2 1 3 2 POWER AND DATA FOR GFI BREAKER FOR PERSONNEL PROTECTION (5MA). DIGITAL DISPLAYS, +104" AFF. GFI BREAKER FOR EQUIPMENT PROTECTION (30MA). P P P VA CONDUCTOR SIZE HAS BEEN INCREASED FOR HEALTH VOLTAGE DROP. SIZE EQUIPMENT GROUNDING SERVICES P® w CONDUCTOR PROPORTIONATELY PER NEC. ROOM LP 16.145 16.451 REFER TO ONE -LINE DIAGRAM FOR AVAILABLE FAULT CURRENT FOR INTERRUPT RATINGS. +24" N L3 G GROUND LINE 1 LINE 2 ISOLATED GROUND NEUTRAL TRAP BUIL MANU WIRING DIAGRAM WITH ISOLATED GROUND (BARE OR GREEN) (BLACK) _ (RED) (GREEN WITH YELLOW STRIPE) (WHITE) UU lSITION BETWEEN DING WIRING AND FACTURED WIRING (LINE 3) N Li IG (LINE 1G) POWER WIRING DIAGRAM "1 3m, 2 1 0 0 REFER TO ONE -LINE DIAGRAMS FOR WIRE SIZES. /d HEALTH SERVICES RECEPTACLES, SWITCHES, FACTORY WIRED TO LOAD. DATA BOXES AND THEIR CORRESPONDING COVER PLATES SHALL BE WHITE NYLON. 0. BREAKER SHALL BE HIGH MAGNETIC TYPE. L LP 1. BREAKER REMOVAL - FIELD VERIFY CIRCUIT 16.145 P® BREAKER IS NOT SERVING AN EXISTING LOAD. IF NO EXISTING LOAD, REMOVE CIRCUIT BREAKER AND PROVIDE FILLER PLATE. IF BREAKER IS SERVING A LOAD, IDENTIFY LOAD SERVED. UPDATE CIRCUIT IDENTIFICATION SCHEDULE AS "SPACE" OR INDICATE LOAD SERVED. 2. DUAL TAP SOLENOID OPERATED BREAKER. CONNECT EMERGENCY/NIGHT LIGHTING TO UNSWITCHED TOILET TERMINATION. 3. EXISTING CIRCUIT AND/OR CIRCUIT BREAKER. ■ 4. ROUTE CIRCUIT THROUGH CONTACTOR. n 5. PROVIDE INTERLOCK WIRING WITH EXHAUST HOOD n ANSUL SYSTEM. 6. RELOCATED CIRCUIT FROM EXISTING PANELBOARD. 7. PROVIDE BLANK CIRCUIT BREAKER FILLER PLATE PHARMACY POWER PLAN FOR EXPOSED SPACE IN PANELBOARD. 9. 0. 1. 2. 4. 5. /� T 1 /4" = V-0" 8. PROVIDE U.L. LISTED OVERCURRENT DEVICE TO COORDINATE AND MAINTAIN MANUFACTURER'S SERIES RATED SYSTEM. HEALTH SERVICES RECEPTACLES, SWITCHES, EXISTING CIRCUIT BREAKER TO REMAIN. VERIFY DATA BOXES AND THEIR CORRESPONDING CONDITION OF CIRCUIT BREAKER TO ENSURE THAT IT COVER PLATES SHALL BE WHITE NYLON. IS OPERATIONAL AND MEETS ALL U.L. RATINGS. ROUTE CIRCUIT THROUGH EXISTING LCU CABINET UTILIZING EXISTING RELAY AND CONTROLS. UPDATE P$ JUNCTION BOX FOR LCU IDENTIFICATION SCHEDULE WITH LOAD P$OS/D SWITCH PRE -INSTALLED IDENTIFICATION. BY MODULAR MANUFACTURER. SOLENOID OPERATED CIRCUIT BREAKER. REFER TO ENERGY MANAGEMENT PLANS FOR CIRCUIT LUTRON MAESTRO 0-10V DIMMER/VACANCY BREAKER CONTROL. SENSOR MS-Z1 01 -V-IV. PROGRAM FOR MANUAL ON AT 100% LIGHT LEVEL AND 15 MINUTE TIME EXISTING LOAD - TRACE EXISTING CIRCUIT, IDENTIFY DELAY. WIRE PER MANUFACT R R'S LOAD AND UPDATE CIRCUIT IDENTIFICATION RECOMMENDATIONS. SCHEDULE FOR LOAD SERVED. IF CIRCUIT IS NOT IN P USE, REFER TO PANELBOARD NOTE (11). ab DIMMING CONTROL ROUTED 3. ROUTE CIRCUIT THROUGH ENCLOSED GFI BREAKER TO FIXTURE, TYP OF 2. FOR PERSONNEL PROTECTION (5MA). HEALTH SPARE - FIELD VERIFY CIRCUIT BREAKER IS NOT SERVICES Q a SERVING AN EXISTING LOAD. IF NO EXISTING LOAD, S ROOMS - PROVIDE LOCK OFF DEVICE TO LOCK SPARE 17 a BREAKER IN THE OFF POSITION. IF BREAKER IS 0 SERVING A LOAD, IDENTIFY LOAD SERVED. UPDATE LIGHTING LIGHTING FIXTURE SUPPLIED C CIRCUIT IDENTIFICATION SCHEDULE AS "SPARE" OR OWNER AND INSTALLED BY INDICATE LOAD SERVED. PANEL MANUFACTURER. FINAL e EXISTING LOAD - TRACE EXISTING CIRCUIT, IDENTIFY CONNECTIONS BY E.C. TYP OF 2. LOAD AND UPDATE CIRCUIT IDENTIFICATION 16.470 SCHEDULE FOR LOAD SERVED. IF CIRCUIT IS NOT IN o USE, REFER TO PANELBOARD NOTE (24). 16.125 E ENERAL NOTES: 16.102 b NEW OVERCURRENT PROTECTIVE DEVICES PLACE IN EXISTING PANELBOARDS OR DISTRIBUTION BOARDS 0 SHALL MATCH THE TYPE AND AIC RATING OF EXISTING OVERCURRENT PROTECTION DEVICES IN SAID BOARD. E.C. SHALL TRACE ALL ELECTRICAL CIRCUITS FOR TOILET EVERY EXISTING PANELBOARD AFFECTED BY THIS 'I] -I PROJECT. IDENTIFY LOADS ON EACH CIRCUIT. I PROVIDE A COMPLETE TYPEWRITTEN CIRCUIT ° C N L2 G NOT (LINE 2G) USED EXISTING ELECTRICAL DEVICES NOT SHOWN TO REMAIN D-REG40 D-RXPCO2 D-RXPC01 D-RXZP02 D-RXZP01 V-135 V-134 D-RXTV01 CIRCUITRY NOTED WITH "W" INDICATES PRE- MONITOR MANUFACTURED WHIP. E.0 TO PROVIDE V-137 CONNECTION TO WHIP AS SHOWN. COORDINATE EXACT LOCATION AND CIRCUIT CONFIGURATION OF HEALTH WHIP WITH ARCHITECTURAL DRAWINGS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. SERVICES ROOM WIRING BETWEEN MODULAR OUTLETS PROVIDED BY MANUFACTURER, FINAL CONNECTION BY GENERAL CONTRACTOR TYP, REF °ARCH DWGS. ° P-d,e,f pq in 16.145 X�aO� ���� Q��� w ROUTE MANUFACTURER G1G1G1G 3 2 1 2 1 PROVIDED WHIP THROUGH N21 WALL PENETRATION AT 2'-4" AFF TO EC INSTALLED ® ® ® JUNCTION BOX LOCATED IN WALL ABOVE CEILING. CONNECT TO CIRCUITRY AS SHOWN, TYP OF 2. ROVIDE 2" CONDUIT WITH PULL _ IRE IN WALL FROM EC INSTALLED o NCTION BOX MOUNTED 2'-6" AFF O ABOVE ACCESSIBLE CEILING 0 o SPACE, TYP OF 2. PHARMACY ° a ADDITION UNLESS NOTED KEYNOTES GENERAL LIGHTING NOTES GENERAL NOTES 01.31.20 08.28.20 1. EXIT SIGN MOUNTING 1. FURNISH AND INSTALL ALL MATERIALS, EQUIPMENT, AND LABOR, 16.101 REPLACE ALL LIGHT LENSES WITH NEW A. WALL FIXTURE: CENTER 12" ABOVE DOOR FOR A COMPLETE INSTALLATION IN ALL RESPECTS, READY FOR PRISMATIC ACRYLIC LENS FOR ALL LAY -IN LIGHT OPENING. INTENDED USE AND IN STRICT ACCORDANCE WITH NEC, NESC, FIXTURES IN THIS AREA. B. CEILING FIXTURE: ON CEILING OR AT HEIGHT STATE, AND LOCAL CODES, AND MANUFACTURER'S 16.102 FURNISH AND INSTALL NEW TUBE GUARDS AND SPECIFIED ON DRAWINGS. RECOMMENDATIONS. PAY ALL NECESSARY FEES AND PERMITS. CAPS ON ALL EXPOSED LAMPS IN THIS AREA. C. PENDANT FIXTURE: MATCH HEIGHT OF EXISTING 16.125 EXISTING LIGHT FIXTURES TO REMAIN UNLESS PENDANT MOUNTED EXIT SIGNS. IF STORE DOES A. NO CIRCUITRY SHALL BE ALLOWED TO BE ROUTED ACROSS THE NOTED OTHERWISE. NOT HAVE PENDANT MOUNTED EXIT SIGNS, THEN ROOF OR THE EXTERIOR SIDE OF THE EXTERIOR WALLS. 16.126 EXISTING LIGHT FIXTURE TO BE DEMOLISHED. PENDANT MOUNT SIGN 24" BELOW BOTTOM OF B. ALL EQUIPMENT SHALL BE UL LISTED WHERE APPLICABLE. 16.145 CONNECT CIRCUIT(S) TO EXISTING BRANCH BAR JOIST. C. ARRANGE ALL WORK TO MINIMIZE DISRUPTIONS TO STORE CIRCUITRY. MINIMUM WIRE SIZE AND D. VERIFY MOUNTING HEIGHT WITH AHJ. OPERATIONS. COORDINATE ALL DISRUPTIONS WITH WALMART PANELBOARD CIRCUIT ARE NOTED. VERIFY SIZE, E. COORDINATE LOCATIONS OF EXIT SIGNS TO CONSTRUCTION MANAGER AND STORE MANAGER. RATING AND CONDITION OF EXISTING BRANCH ENSURE STORE SIGNAGE DOES NOT OBSTRUCT D. CONTRACTOR SHALL VERIFY ALL WALL FINISH THICKNESS CIRCUIT CONDUIT AND WIRE PRIOR TO USE TO THEIR VIEW. BEFORE INSTALLING BOXES. FURNISH AND INSTALL EXTENDED ENSURE THAT THEY MEET REQUIRED SIZE, AND F. THE USE OF TRITIUM BASED RADIOACTIVE EXIT BOXES OR BOX EXTENDERS WHERE REQUIRED. ALL U.L. RATINGS AND REPLACE AS REQUIRED. SIGNAGE IS PROHIBITED. E. CONTRACTOR SHALL VERIFY THAT ALL AFFECTED PANELBOARDS HAVE CIRCUIT BREAKER KNOCKOUTS 16.451 PROVIDE EMT WITH PROPERLY INSTALLED 2. EMERGENCY LIGHT FIXTURE INSTALLATION PROPERLY COVERED ANDTHAT ALL TRIM IS IN GOOD COMPRESSION OR SET -SCREW TYPE FITTINGS A. WALL FIXTURE: 12" BELOW FINISHED CEILING OR CONDITION, ALLOWING NO ACCESS TO LIVE PARTS. AND AN INSULATED EQUIPMENT GROUNDING +10'-0" IN AREAS OF EXPOSED STRUCTURE, CONDUCTOR FOR ALL RACEWAYS SERVING THIS UNLESS NOTED OTHERWISE. 2. PROVIDE SEALS AT RACEWAY PENETRATIONS AS FOLLOWS: ROOM TO COMPLY WITH NEC, HEALTH CARE B. PENDANT FIXTURE: BOTTOM CHORD OF BAR A. FIRE RATED WALLS: SEAL PER SPECIFICATIONS FOR FIRE FACILITIES. JOIST OR AT HEIGHT SPECIFIED ON DRAWINGS. STOPPING. 16.470 FURNISH AND INSTALL NEW 20 AMP, 120 VOLT C. REMOTE HEAD FIXTURE: HEADS CENTERED B. NEUTRALIZATION AREA: SEAL PER MECHANICAL DETAIL. CIRCUIT(S). FEED FROM PANELBOARD AS ABOVE DOOR OPENING +9'-0", UNLESS NOTED C. FREEZER/COOLER BOXES: SEAL WITH EXPANDING FOAM INDICATED. PROVIDE 20A-1 P CIRCUIT BREAKER OTHERWISE AND BATTERY PACK MOUNTED ON SEALANT. IF NEEDED. E.C. SHALL MATCH MANUFACTURER, INTERIOR SIDE OF WALL 12" BELOW FINISHED D. EXTERIOR: REFER TO ARCHITECTURAL DOCUMENTS FOR TYPE AND AIC RATINGS OF EXISTING CIRCUIT CEILING OR AT BAR JOIST IN AREAS OF EXPOSED SEALING REQUIREMENTS AT ALL EXTERIOR MOUNTED DEVICES, BREAKERS. STRUCTURE. FIXTURES, ENCLOSURES, AND RACEWAY PENETRATIONS. 16.492 E.C. SHALL COORDINATE WITH GENERAL D. REFER TO MANUFACTURER'S WRITTEN CONTRACTOR AND ARCHITECTURAL INSTRUCTIONS. ALLOW BATTERY TO CHARGE 3. PROVIDE A SEPARATE EQUIPMENT GROUNDING CONDUCTOR (SIZE DEMOLITION PLANS THE EXTENT OF ELECTRICAL CONTINUOUSLY FOR A MINIMUM OF 24 HOURS PER NEC) IN PVC TYPE CONDUIT, POWER AND LIGHTING CIRCUITS, DEMOLITION. REMOVE UNUSED DEVICES, BEFORE INITIAL TESTING. ISOLATED GROUND CIRCUITS, OR AS SHOWN ON PLANS. CONDUIT BOXES, CONDUITS, AND WIRING BACK TO E. AFTER EMERGENCY LIGHT HAS BEEN POWERED SHALL BE SIZED PER NEC BASED ON THWN 600 VOLT COPPER ORIGINATING JUNCTION BOXES OR DO NOT TURN OFF FOR EXTENDED PERIODS OF SINGLE CONDUCTORS, PLUS THE EQUIPMENT GROUNDING PANELBOARDS. REFERENCE POWER PLANS FOR TIME. CONDUCTOR. CIRCUITRY TO BE REUSED. DEMOLITION SHALL NOT AFFECT ACTIVE CIRCUITS. IF CIRCUIT IS 3. EXIT SIGNS, EMERGENCY LIGHTS AND NIGHT LIGHTS 4. WIRING DEVICES: DEVICE MOUNTING HEIGHTS ARE FROM FINISHED DEMOLISHED ALL THE WAY TO PANELBOARD, SHALL NOT BE SWITCHED. FLOOR TO CENTER OF OUTLET BOX UNLESS NOTED OTHERWISE ON REMOVE CIRCUIT BREAKER AND REPLACE WITH PLANS. COORDINATE THE STANDARD MOUNTING HEIGHTS WITH FILLER PLATE. UPDATE TYPEWRITTEN CIRCUIT 4. IN AREAS OF OPEN STRUCTURE, MOUNT STRIP MASONRY: DIRECTORY IDENTIFYING CIRCUIT AS "SPACE". FIXTURE TO BOTTOM CHORD OF BAR JOIST, UNLESS A. SWITCHES +44" COORDINATE EXACT REQUIREMENTS WITH NOTED OTHERWISE. B. RECEPTACLES +20" EXISTING CONDITIONS PRIOR TO BID. C. VOICE/DATA +20" 16.775 E.C. SHALL DISCONNECT, EXTEND, AND 5. PROVIDE SEPARATE BOXES FOR GANGED SWITCHES RECONNECT ALL ELECTRICAL CIRCUITRY FOR ON SEPARATE BRANCH CIRCUITS. 5. WIRING SHALL INCLUDE FINAL CONNECTION TO ALL EQUIPMENT IN NEW OR RELOCATED EQUIPMENT. REFERENCE CONFORMANCE WITH EQUIPMENT SUPPLIER WIRING DIAGRAMS. POWER PLANS AS APPLICABLE. VERIFY 6. FIXTURES DENOTED WITH "ABS' ARE TO BE CONDITION OF BRANCH CIRCUIT, CONDUIT, AND FASTENED ON UNISTRUT CHANNELS MOUNTED TO 6. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN UPDATED AND WIRE PRIOR TO USE TO ENSURE THAT THEY THE BOTTOM SIDE OF THE TOP CHORD OF BAR COMPLETE TYPEWRITTEN CIRCUIT IDENTIFICATION SCHEDULE FOR MEET ALL U.L. RATINGS AND REPLACE AS JOISTS. LOCATE THE FIXTURES RUNNING EVERY PANELBOARD AFFECTED BY THIS PROJECT. REQUIRED. COORDINATE THIS PROCESS WITH PERPENDICULAR TO BAR JOISTS WITHIN BAR JOISTS CONSTRUCTION MANAGER TO MINIMIZE WEBBING SPACES. DO NOT FASTEN FIXTURE OR 7. NEW OVERCURRENT PROTECTIVE DEVICES INSTALLED IN EXISTING DOWNTIME. LABEL ALL ASSOCIATED UNISTRUT CHANNELS TO ROOF DECK. PANELBOARDS OR DISTRIBUTION BOARDS SHALL MATCH THE TYPE PANELBOARD SCHEDULES TO REFLECT LOAD AND AIC RATING OF EXISTING OVERCURRENT PROTECTIVE DESCRIPTIONS. GENERAL POWER NOTES DEVICES. 8• BRANCH CIRCUIT CONDUCTORS SHALL BE MINIMUM #12 AWG D-REG4 D-REG42 UNLESS NOTED OTHERWISE IN SCHEDULES. WHERE 20A BRANCH D-RXPC03 D-RXPC04 07,26.19 CIRCUITS HAVE #8 AND LARGER WIRE SPECIFIED, #10 AWG WIRE 1. TELEPOWER POLE(S): MOUNT JUNCTION BOX(ES) TO D-RXZP03 D-RXZP04 SHALL BE USED FOR THE FINAL CONNECTION (15-FT MAXIMUM). D-RXLP02 V-138 TOP SIDE OF BOTTOM CHORD OF BAR JOIST. INSTALL g WHERE BRANCH CIRCUITS ARE GROUPED, SIZE CONDUIT AND V-1 6 D-RXPC05 FURNISHED POWER POLE AND TERMINATE WIRING DERATE CURRENT CARRYING CONDUCTORS PER NEC. RXZP05 TO JUNCTION BOX. PROVIDE UNISTRUT SUPPORTS V-141 AND HARDWARE TO SECURE TELEPOWER POLE 10. PROVIDE UL LISTED HANDLE TIES ON ALL MULTIWIRE BRANCH PLUMB TO BUILDING STRUCTURE. REF POWER POLE CIRCUITS PER NEC REQUIREMENTS. e e e e CONNECTION DETAIL. 2. PROVIDE LIQUID -TIGHT FLEXIBLE METAL CONDUIT 11. SUPPORTS FROM STRUCTURE: NO ATTACHMENT OF ANY TYPE SHALL BE MADE TO BRIDGING OR JOIST WEB MEMBERS. UTILIZE R AND WIRING FROM DISCONNECT SWITCH OR ONLY THE TOP AND BOTTOM CHORDS FOR SUPPORTING THE 0 0 0 JUNCTION BOX TO EQUIPMENT KNOCKOUT ELECTRICAL SYSTEM INSTALLATIONS. ELECTRICAL CONNECTION POINT. 3. WHERE EQUIPMENT NAMEPLATE PROTECTIVE 12. DEVICES SHOWN ON COOLER/FREEZER PANELS SHALL BE SURFACE MOUNTED UNLESS NOTED OTHERWISE. SEAL DEVICES TO DEVICE RATING DIFFERS FROM SIZE PROVIDED, COOLER/FREEZER PANELS WITH SILICONE SEALANT. NOTIFY WALMART CONSTRUCTION MANAGER IMMEDIATELY TO COORDINATE RESOLUTION. 13. SURFACE MOUNTED CONDUIT ON COOLER/FREEZER PANELS OR IN FOOD PREP AREAS SHALL BE INSTALLED WITH GALVANIZED 1/2" 4. ELECTRONIC FIRE PROTECTION/SECURITY ALARM STANDOFF CONDUIT HANGERS TO ALLOW FOR CLEANING. BOXES AND CONDUITS SHOWN ON POWER PLANS SHALL BE PROVIDED UNDER THIS CONTRACT. IN OTHERWISE THE 14. ONLY FEEDER CIRCUITS NOTED ON THE ONE LINE DIAGRAM AND ` L n FOLLOWING GENERAL NOTES APPLY: BRANCH CIRCUITS NOTED BY LEGEND SHALL BE INSTALLED UNDER A. ALL ALARM JUNCTION BOXES SHALL BE SLAB. PROVIDE EXTERIOR COATED GRC BENDS ON ALL CONDUIT PHARMACY TELECOM PLAN 4"X4"X2-1 /8" MINIMUM. RUNS THAT HAVE 45 DEGREE BENDS OR GREATER. REFER TO 5 B. ALARM RACEWAYS SHALL BE 3/4" MINIMUM WITH SPECIFICATION SECTION 16.100 FOR UNDER SLAB. 1/8" = 1'-0" PULL WIRE AND INSULATING BUSHINGS AT END OF VERTICAL RACEWAY RUN. 15. SEISMIC ZONE REQUIREMENTS. PROVIDE EXPANSION COUPLINGS AND BRACING FOR ELECTRICAL EQUIPMENT AS REQUIRED BY C. VERTICAL RACEWAYS FROM ALARM BOXES LOCAL CODES. SHALL BE EITHER CONCEALED INSIDE WALL OR SURFACE MOUNTED (TO MATCH JUNCTION BOX 16. EXISTING ELECTRICAL AND ALARM: MOUNTING). ALL VERTICAL RUNS SHALL BE A. WHERE DEMOLITION OR NEW CONSTRUCTION INTERRUPTS TURNED 90-DEGREES AT TOP SIDE OF BOTTOM EXISTING ELECTRICAL CIRCUITS FEEDING EXISTING EQUIPMENT, CHORD OF BAR JOIST AND EXTENDED DEVICES, OR LIGHTING TO REMAIN, BUT NOT SHOWN ON HORIZONTALLY TO A LOCATION ACCESSIBLE BY DRAWINGS, PROVIDE LABOR AND MATERIALS TO REWORK VERTICAL FLOOR TYPE LIFT. CIRCUITRY, AS REQUIRED, TO MAINTAIN EXISTING OPERATION. 5. UPON COMPLETION OF ELECTRICAL INSTALLATION B. IF DEMOLITION OR NEW CONSTRUCTION WILL DISRUPT AND PRIOR TO ENERGIZING CIRCUIT: EXISTING UNDERGROUND SERVICES (ELECTRICAL, TELEPHONE, A. INSPECT WIRE AND CABLE FOR PHYSICAL PARKING LOTLIGHTING CIRCUITRY, ETC.) PROVIDE ALL MATERIALS AND LABOR AS REQUIRED TO REROUTE, SLEEVE, DAMAGE. OR OTHERWISE REWORK THESE SERVICES TO MAINTAIN THEIR B. PERFORM CONTINUITY TEST. EXISTING OPERATION ELECTRICAL C. VERIFY PROPER PHASING CONNECTION TO ALL C. EXERCISE CAUTION AROUND ALARM AND SECURITY CABLES ° DEVICES AND THREE PHASE MOTOR LOADS. DURING DEMOLITION AND CONSTRUCTION. PROTECT ALARM REF 4- EPHM1 CIRCUITRY AND SECURITY CABLES FROM ACCIDENTAL DAMAGE SO THAT SYSTEMS 16.775 N OPERATIONAL AT ALL TIMES. - 16.492 -- 20A WIRE SIZING SCHEDULE D. DISPOSE OF ALL REMOVED MATERIALS, UNLESS OTHERWISE ��-�I-----�£C r----T ; NOTED. _ - ---------------------� III �� - - - - - I ����- - - - - -�-� I r 17. EXISTING ELECTRICAL DEMOLITION: o f _ ___ ___ _____________ _ ALL WIRE SIZES SHOWN ON PLANEL SCHEDULES AND C ; -----------------------' A. GENERAL: REMOVE OR RELOCATE EXISTING ELECTRICAL _ PLANS ARE INTENDED TO BE MINIMUM ACCEPTABLE EQUIPMENT, CONDUIT AND CONDUCTORS AS INDICATED ON WIRE SIZE. THE DRAWINGS, OR ONLY AS REQUIRED BY DEMOLITION. ' I ; a THE FOLLOWING SCHEDULE IS TO BE USED TO SIZE REMOVE ALL PANELBOARDS, DISCONNECT SWITCHES, BOXES, '-------�---\ -- -----; WIRE FOR 20 AMP CIRCUITS (120 AND 277 VOLT). RELAYS, TIME SWITCHES, LIGHTS, DEVICES, ETC., WHICH WILL �- LENGHTS (IN FEET) ARE INTENDED TO BE MAXIMUM. NOT BE REUSED. `' -- PHARMACY B. SALES FLOOR: REMOVE UNUSED POWER DROP CONDUIT, lyl I� Ij I lyl lid^ �i1^ �i 0 0 0 0 F7 NL TOILET n FINAL CONNECTIONS: WHERE 20A BRANCH CIRCUITS CONDUCTORS AND RELATED DEVICES SERVING SALES AREA HAVE #8 AND LARGER WIRE CALLED OUT, #10AWG WIRE GONDOLAS BEING RELOCATED OR REMOVED. EXISTING y y MAY BE USED FOR THE FINAL CONNECTION (15' MAX.). CONDUIT AND CONDUCTORS MAY BE REUSED FOR NEW POWER DROPS WHERE SIZE, RATING, AND CONDITION MEET REQUIREMENTS INDICATED ON PLANS AND ALL U L RATINGS REMOVE ALL UNUSED CONDUIT AND CONDUCTORS BACK TO POINT OF ORIGIN WHENEVER FEASIBLE. IF CIRCUIT IS NOT REUSED, REMOVE CIRCUIT BREAKER AND REPLACE WITH FILLER PLATE. EXCEPTION: DISTRIBUTION AND POWER SWITCH PHARMACY DEMO POWER PLAN BREAKERS SHALL BE ETR AS "SPARE". PROVIDE HANDLE LOCK OFF DEVICE TO LOCK "SPARE" CIRCUIT BREAKER IN THE "OFF" 1/8" = V-0" POSITION. UPDATE TYPEWRITTEN CIRCUIT IDENTIFICATION 0X 0 0 ° 16.125 NL PHARMACY 16.492 16.101 °U 16.126 --- � I III I ° UUNL 107 107 107 flo IDENTIFICATION SCHEDULE FOR EVERY AFFECTED PANELBOARD. ALL NOTED OTHERWISE. R ENTWISE DEVICES ARE NEW UNLESS PHARMACY LIGHTING PLAN NOTED OTHERWISE. n 1/4" = 1'-0" 120 VOLT #12 #10 #8 #6 1-5 AMPS 200 FT. 325 FT. 490 FT. 770 FT. 6-10 AMPS 100 FT. 160 FT. 245 FT. 385 FT. 11-15 AMPS 70 FT. 110 FT. 165 FT. 255 FT. 277 VOLT #12 #10 #8 #6 1-5 AMPS 480 FT. 760 FT. 1170 FT. 1865 FT. 6-10 AMPS 240 FT. 380 FT. 585 FT. 930 FT. 11-15 AMPS 1 160 FT. 250 FT. 390 FT. 1 620 FT. SCHEDULE AS "SPACE" OR "SPARE". C. CONDUIT AND WIRING TO BE ABANDONED IN CEILING SPACES AND OTHER NON-PUBLIC AREAS (I.E., THROUGH STOCKROOM AREA): CUT WIRING LOOSE AND REMOVE FROM RACEWAY(S), LEAVING RACEWAY(S) IN PLACE. CONDUIT TO BE ABANDONED IN WALLS OR FLOORS SHALL BE REMOVED BACK TO FINISHED SURFACE AND CAPPED INSIDE. REPAIR SURFACE(S) TO MATCH ADJACENT. D ALL CIRCUIT BREAKERS EREMOVED.REMOVECIRCUITRVING BRANCH CIRCUITS TO BE LEGEND FOR MODULAR REMOVED SHALL A SO E. COMPONENTS BREAKER AND REPLACE WITH FILLER PLATE. EXCEPTION: DISTRIBUTION AND POWER SWITCH BREAKERS SHALL BE ETR AS "SPARE". PROVIDE HANDLE LOCK OFF DEVICE TO LOCK "SPARE" CIRCUIT BREAKER IN THE "OFF" POSITION. UPDATE RECEPTACLE INSTALLED TYPEWRITTEN CIRCUIT IDENTIFICATION SCHEDULE AS "SPACE" IN POWER STRIP OR "SPARE". E. DEMOLISHED FLUORESCENT LIGHT FIXTURES: REFER TO POWER STRIP SELECTIVE SITE DEMOLITION SPECIFICATION FOR DISPOSAL OF LIGHT FIXTURE. MODULAR POWER DISTRIBUTION F. BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK 1 2 3 1 SYSTEM FURNISHED BY VENDOR, SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR INSTALLED BY E.C. CREATING DAMAGE OF ANY KIND IN THE FUTURE. NUMBER DENOTES WHICH CIRCUIT 18. DATA AND PHONE CONDUIT INSTALLATION MILESTONE DATE: THE RECEPTACLE IS ATTACHED TO. ALL RACEWAY AND CONDUIT SLEEVES FOR DATA AND PHONE CABLING TO BE INSTALLED 3 WEEKS PRIOR TO CONTRACT VOICE/DATA BOX PRE -INSTALLED BY VP SUBSTANTIAL COMPLETION DATE. MODULAR MANUFACTURER. 19. ETHERNET CABLE: A FURNISH AND INSTALL JUNCTION BOXES AS SHOWN ON PLANS �� P OUTLET, BOX, AND WIRING BETWEEN DEVICES PRE -INSTALLED BY MODULAR PROVIDE CONDUIT AS REQUIRED BY LOCAL CODES AND/OR _ _ _ _ _ _ _ _ _ _ _ III T - \ �I _ MANUFACTURER. E.C. TO MAKE FINAL ORDINANCES. TYP_ 16.125 1F CONNECTION AS REQUIRED. B. ETHERNET CABLE IS FURNISHED BY OTHERS. C. ELECTRICAL CONTRACTOR SHALL INSTALL CABLE IN POWER OA ALARM SYSTEM JUNCTION BOX PRE- POLES. D. ELECTRICAL CONTRACTOR SHALL INSTALL OTHER CABLE AS P INSTALLED BY MODULAR 16.125 MANUFACTURER. DIRECTED BY WALMART CONSTRUCTION MANAGER. o o TYP 16.125 W PRE -MANUFACTURED WHIP. E.C. TO ANL H ANL TH Ell PROVIDE CONNECTION TO WHIP AS PH RM Cy SHOWN. 25 " IG W PNL-#1 G W PNL-#1,#2,#3 OILET CIRCUITS INDICATED IN HOMERUNS FOR MODULAR EQUIPMENT CORRESPOND TO LINE #'S IN DETAIL 4- PHARMACY DEMO LIGHTING PLAN EPHM1. 1 /8" = V-0" 2 p+enb hitecture gineering 2809 Ajax Avenue Suite 100 Rogers Arkansas 72758 Phone: 479.636.3545 Fax: 479.636.1209 Engineer of Record Keith Allen Williams, P.E. Florida License No. 64983 COA License No. 26880 UJ > >o irWo�� j WwZ�a�zczn� cc xzLLmW�aW¢UO ¢ Ir .. �.. fA LL_W OLLort W a¢ �rorwa�Qo�w wwa}o;11 w �nmm O LL mFn r�ZzaaWg�=a> a - - cn LLo�Lt:,O 3W�°1ZZo U --WUOaQ2dJ aa dwz=¢ . ¢¢ao�OQ w�W wwz¢3iZOOa oo0MTz¢w05 u Nw. =cn IZO;,�CWaMwHwFUo(na0wEwcJcccc¢ N rn %0 Q CD C.:D 0 0% E O � -1 O > 0 .. N (%% J o a- Jmo Q z =0w a CV)O o C/) N 0 = o N G�g w N 6= w m 2 D z m > 2021 CSP ISSUE BLOCK CHECKED BY: KAW DRAWN BY: BMS PROTO: 192 PROTO CYCLE: 08-27-21 DOCUMENT DATE: 10-01-21 Wit 4 .% ,ENS No. 64983 t 11 STATE OF 44/ -4 10/05/2021 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR CONSTRUCTION PHARMACY ELECTRICAL PLANS SHEPHM1