Loading...
HomeMy WebLinkAbout7809 Gall Blvd (4)PROJECT TEAM CLIENT REPRESENTATIVE: CBRE 201 SOUTH COLLEGE ST 17TH FLOOR CHARLOTTE, NC 28244 PH: (305) 970-8163 CONTACT: MICHAEL FISHER AUTHORIZED AGENTS: INFINITY ENGINEERING GROUP, LLC 1208 E. KENNEDY BOULEVARD SUITE 230 TAMPA, FL 33602 PH: (813) 434-4770 FAX: (813) 445-4211 CONTACT: TODD STICKLER ARCHITECT: INFINITY ENGINEERING GROUP, LLC 1208 E. KENNEDY BOULEVARD SUITE 230 TAMPA, FL 33602 PH: (678) 480-9445 FAX: (813) 445-4211 CONTACT: AMY OGONOWSKI ENGINEER OF RECORD: INFINITY ENGINEERING GROUP, LLC 1208 E. KENNEDY BOULEVARD SUITE 230 TAMPA, FL 33602 PH: (813) 327-5089 FAX: (813) 445-4211 CONTACT: NISIT SAPPARKHAO ELECTRICAL ENGINEER: INFINITY ENGINEERING GROUP, LLC 1208 E. KENNEDY BOULEVARD SUITE 230 TAMPA, FL 33602 PH: (704) 800-0560 FAX: (813) 445-4211 CONTACT: ANDREW MOHR STRUCTURAL ENGINEER: INFINITY ENGINEERING GROUP, LLC 1208 E. KENNEDY BOULEVARD SUITE 230 TAMPA, FL 33602 PH: (813) 434-4770 FAX: (813) 445-4211 CONTACT: RAJYA POGAKU FLORIDA PRODUCT APPROVAL INFORMATION PRODUCT CATEGORY / SUBCATEGORY MANUFACTURER APPLICATION NUMBER ARCHITECTURAL WALL PANELS FIBER ELEMEX CERAMITEX CERAMIC FACADE SYSTEM FL26341-RO CEMENT SIDING r-A EP11YR111.L..LS NO.R.. p riH VICINITY MAP PASCO COUNTY 7809"(31 ALL BLVD, ZEPHYRHILLS, FL 33541 PARCEL ID: 34-25-21-0150-00000-0020 INFINITY ENGINEERING GROUP) IAX 1208 ]East Kennedy nedy Boulevard Suite 230 Tampa, Florida 33602 [P] 813.434.4770 [1]: 813.445.4211 www,legroup. Ilet Certificate of Authorization No. 27889 IEG JOB NO.280-22.00 1.1 i3Ea s' Ufa NL$f' S FPPA KH�1 E. a%I �._ . a ' a Fa � � ♦r .`. NO 640 ST OF :�We ` ,A 1 g GRAPHICS SYMBOLS LEGEND GENERAL PLAN SYMBOLS CEILING / LIGHTING SYMBOLS POWER / COMMUNICATION SYMBOLS EXISTING PARTITION TO CEILING MOUNTED EXIT REMAIN SIGN WALL DUPLEX OUTLET EXISTING PARTITION TO SPRINKLER WALL QUAD OUTLET T - - BE REMOVED X X EXISTING DOOR TO sp; SPEAKER WALL DUPLEX - REMAIN `-' DEDICATED X EXISTING DOOR TO BE O CAMERA WALL TELE-DATA - �.� REMOVED C X SINGLE ROUND RECESSED WALL TELE-DATA - DUAL NEW DOOR OX FIXTURE X -� SQUARE RECESSED WALL TELEPHONE X FIXTURE X INTERIOR PARTITION n SQUARE RECESSED oX FLOOR DUPLEX OUTLET v TOP / B OT.O ELEVATION MARKER X WALL -WASH FIXTURE PARTITION TAG `�" X PENDANT FIXTURE OX FLOOR QUAD OUTLET f WALL MOUNTED FIXTURE AV FLOOR AV OUTLET ROOM NAME X X NUMBERI-� ROOM TAG UNDER -CABINET X F------ s CQ WALL JUNCTION BOX X FIXTURE 1 KEYNOTE TAG 2X4 LED FIXTURE JIQ FLOOR JUNCTION BOX X X UMBE DOOR TAG FLOOR TELE-DATA - X 1X4 LED FIXTURE *X SINGLE P WINDOW/ GLAZING TAG ® FLOOR TELE-DATA - ®X FLOOR X 2X2 LED FIXTURE RX REQUEST TO EXIT X BUTTON EXTERIOR ELEVATION TAG A-X.X UTILITY STRIP FIXTURE M� MOTION SENSOR X SURFACE MOUNTED EMERGENCY FIXTURE ® MAGNETIC LOCK X A-X.X X X INTERIOR ELEVATION TAG ACCESS PANEL CARD READER � i ES ELECTRIC STRIKE L,( X SECTION TAG A-X.X SUPPLY GRILLE EH ELECTRIC HINGE X EL ELECTRIC LOCK A-X.X '~I DETAIL TAGS HT AV WALL AV OUTLET XX RETURN GRILLE �.�. A-X.X HTC AV WALL AV CONTROL SIM PANEL ALIGN EXHAUST FAN HTa- WALL CABLE OUTLET ALIGN TO ESTABLISHED ❑O SURFACES EQUIPMENT TAG FIRE SAFETY SYMBOLS TYPE CEILING TAG R FIRE ALARM PULL STATION NEIGH FINISH w FIRE ALARM STROBE WALL FINISH TAG BASE FIRE ALARM FLOOR IN411 HORN/STROBE �J PATTERN / GRAIN © FIRE ALARM PHONE DIRECTION MATERIAL TRANSITION FEC FIRE EXTINGUISHER CABINET FE FIRE EXTINGUISHER CANISTER REVISION BUBBLE so SMOKE DETECTOR REVISION DELTA HEAT DETECTOR NOT IN CONTRACT WOOD BLOCKING OR SHIM WOOD FRAMING -CONTINUOUS FINISHED WOOD BATT INSULATION i SEMI -RIGID INSULATION - FIRE SAFING RIGID INSULATION SPRAY -ON FIRE SAFING OR INSULATION COMPRESSIBLE FILLER CERAMIC TILE PLASTER WITH METAL LATH GYPSUM BOARD FINISH WOOD FLOORING TERRAZZO FINISH I CARPET & PAD , i 1. THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHER CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, AND 40. THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES ORDINANCES, CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT, OR FOR ALL SPECIFIED MATERIALS & EQUIPMENT REQUIRED TO PERFORM THE ON THE DRAWINGS, AND REQUIRED BY LOCAL BUILDING AUTHORITIES. THE MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH WORK UPON RECEIPT OF THE CONTRACT DOCUMENTS. SHOULD THE GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH AN EXAMINATION BEEN AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE ON -TIME TO AS "THE CODE." THE CONTRACTOR SHALL REPORT ANY INCONSISTENCIES, MADE. THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AND COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL DISCREPANCIES ARCHITECT IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO INTERPRETATION PRIOR TO PERFORMING THE WORK. AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR TO FINALIZING BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE. BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. 2. WHERE APPLICABLE TO PROJECT SCOPE, THE GENERAL CONTRACTOR SHALL 41. SUBSTITUTION OF ALL "EQUALS" SHALL BE ONLY AS APPROVED BY THE CONTACT BUILDING MANAGEMENT TO DETERMINE THE RULES OF THE 16. THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS ARCHITECT. WHERE THE TERM "OR EQUAL" IS USED THE ARCHITECT SHALL BE BUILDING RELATIVE TO CONSTRUCTION; WHEN AND HOW DELIVERIES CAN BE ON THE JOB SITE AND REPORT ANY AND ALL DISCREPANCIES AND/OR THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION FURNISHED MADE, WHAT PHASES AND TYPES OF CONSTRUCTION MAY BE DONE ON UNUSUAL OR HIDDEN CONDITIONS TO THE ARCHITECT PRIOR TO FINALIZING BY THE CONTRACTOR. SUBSTITUTIONS MUST BE ACCEPTED IN WRITING REGULAR OR OVERTIME BASIS, AND IN GENERAL ANY SPECIAL BUILDING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. THE GENERAL BEFORE THEY MAY BE USED. REQUIREMENTS WHICH WILL AFFECT THE COST OF ALL WORK BORNE BY THE CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, EXCLUSIONS, GENERAL CONTRACTOR. ALL WORK SHALL CONFORM TO ALL BASE BUILDING OR MODIFICATIONS TO THE PROJECT DURING THE BID SELECTIONS PERIOD. 42. THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE STANDARD SPECIFICATIONS AND BUILDING REGULATIONS, WHICH THE ANY AND ALL LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS NOT ITEMIZED ARCHITECT, FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. IF THE CONTRACTOR SHALL OBTAIN PRIOR TO SUBMISSION OF BID. IN THE BID PROPOSAL DOCUMENTS ARE PRESUMED "INCLUDED", IN WHICH CONTRACTOR, THE OWNER, OR THE OWNER'S REPRESENTATIVE SUBSTITUTES CASE NO ADDITIONAL MONIES WILL BE ALLOCATED FOR THIS WORK. A MATERIAL, METHOD OF ATTACHMENT, REVISES A CONSTRUCTION DETAIL, 3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE OR IN ANY WAY ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO SUB -CONTRACTORS' RECEIPT OF COMPLETE SETS OF CONSTRUCTION 17. ALL WORK COSTS SUBMITTED FOR THIS PROJECT ARE FURNISHED WITHOUT THESE DOCUMENTS, WITHOUT THE WRITTEN ACCEPTANCE OF THE DOCUMENTS, AS WELL AS ALL FUTURE ADDENDA, BULLETINS, FIELD OBLIGATION; THE CLIENT RESERVES THE RIGHT TO ACCEPT OR REJECT ANY ARCHITECT, SUCH ACTION WILL RELIEVE THE ARCHITECT OF ANY DIRECTIVES AND CHANGE ORDERS. PROPOSAL OR PART OF ANY COST SUBMITTED. RESPONSIBILITY OR LIABILITY INCLUDING, BUT NOT LIMITED TO, AESTHETIC CONSEQUENCES, SUBSEQUENT FAILURES) AND PERSONAL OR PROPERTY 4. THE CONTRACTOR SHALL COORDINATE THE STORAGE OF MATERIALS AND 18. WHERE APPLICABLE TO PROJECT SCOPE, EXISTING CONSTRUCTION AND DAMAGE ATTRIBUTABLE TO THIS CHANGE. SHALL PROVIDE PROTECTION AS NECESSARY TO PREVENT VANDALISM AND DIMENSIONS SHOWN ARE PER EXISTING DRAWINGS. ALL EXISTING LOSS OF MATERIALS BY THEFT OR DAMAGE SUSTAINED DUE TO EXPOSURE TO INFORMATION MUST BE VERIFIED IN THE FIELD. NEITHER THE OWNER NOR 43. REVIEW OF A SPECIFIC ITEM SHALL NOT CONSTITUTE A REVIEW OF AN INAPPROPRIATE ENVIRONMENTAL CONDITIONS AND WILL REPAIR & REPLACE THE ARCHITECTS ARE RESPONSIBLE FOR ACCURACY OF EXISTING ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. DAMAGE OR LOSSES AT THE CONTRACTOR'S EXPENSE WITHOUT CHARGE TO INFORMATION. EXISTING CONSTRUCTION CONDITIONS IN AREAS WHERE NEW THE OWNER. WORK IS NOT PLANNED MAY BE NOT COMPLETELY SHOWN. 44. SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR INADEQUATE MAY BE RETURNED WITHOUT ACTION. COSTS INCURRED FOR 5. WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL 19. WITHIN ONE (1) WEEK (5 BUSINESS DAYS), OF THE AWARD OF THIS THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. BE OCCUPIED DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL: CONTRACT, PRIOR TO MOBILIZATION FOR ANY WORK, THE CONTRACTOR A. CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY 45. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR OF CONSTRUCTION OPERATIONS, ACCESS TO TENANT SPACES AND THE PHASES OF THE WORK, AND ALL RELATED WORK FOR THE COMPLETION OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS, OF THE PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD REQUIREMENTS OF THESE CONTRACT DOCUMENTS, UNLESS THE ARCHITECT B. CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIBLE TIMES, LENGTH OF TIME FOR EACH PHASE, ITS START AND COMPLETION, IS NOTIFIED, AND SPECIFICALLY APPROVES, OF THE DEVIATIONS AT THE TIME ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING. WITH A PROJECTED COMPLETION DATE. OF SUBMISSION. C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS OF ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WITHOUT 20. CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEETINGS 46. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S OBLIGATION PRIOR NOTIFICATION AND APPROVALS. PROPERLY PROTECT ALL FLOORS, REQUIRED BY THIS CONTRACT. FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR ERRORS AND MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS SUBJECT TO OMISSIONS IN THE SUBMITTALS, INCLUDING "FIELD MEASURE." CONSTRUCTION TRAFFIC. SHOE WIPING MATS WILL BE INSTALLED AT ALL 21. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLIC SPACES. ALL WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING AUTHORITIES' 47. CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, WHETHER ACTIVE AREAS SHALL BE KEPT CLEAN AND FREE FROM DEBRIS. SPECIFICATIONS FOR BUT NOT LIMITED TO, GUTTERS, SIDEWALKS, POLES, DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR, ARCHITECT D. ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF AND OTHER STRUCTURES, INCLUDING THE REMOVAL OR RELOCATION OF OR OWNER, SHALL BE DOCUMENTED BY THE ARCHITECT AND APPROVED, PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS NECESSARY EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN ON PLANS OR PRIOR TO EXECUTION. TO PREVENT INJURY, NOISE, DUST AND INCONVENIENCE TO OTHER NOTED OTHERWISE. TENANTS, THE PUBLIC, AND TO PREVENT DAMAGE TO ADJACENT 48. SHOULD THE GENERAL CONTRACTOR CLAIM THAT AN ISSUE, DIRECTED CONSTRUCTION WHICH IS TO BE LEFT IN PLACE. 22. CREATE AND IMPLEMENT AN EROSION AND SEDIMENTATION CONTROL PLAN REVISION, OR CHANGE TO THE ORIGINAL CONTRACT INVOLVES ADDITIONAL E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL MEASURES FOR ALL SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE PROJECT. COST UNDER HIS CONTRACT, HE SHALL GIVE WRITTEN NOTICE WITHIN A OF THE SHEET METAL AND AIR CONDITIONING NATIONAL CONTRACTORS THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION PERIOD OF NOT MORE THAN THREE (3) WEEKS (15 BUSINESS DAYS), BUT ASSOCIATION (SMACNA) IAQ GUIDELINES FOR OCCUPIED BUILDINGS REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAL PERMIT OR LOCAL SHALL NOT PROCEED TO EXECUTE THE WORK UNTIL WRITTEN APPROVAL FOR UNDER CONSTRUCTION, 2ND EDITION 2007, ANSI/SMACNA 008-2008 STANDARDS AND CODES, WHICHEVER IS MORE STRINGENT. THE CHANGE REQUEST IS RECEIVED. NO SUCH CLAIMS WILL BE VALID UNLESS (CHAPTER 3). PROTECT STORED ON -SITE AND INSTALLED ABSORPTIVE SO MADE. NO PAYMENT FOR SUCH CLAIMS WILL BE MADE UNTIL FINAL MATERIALS FROM MOISTURE DAMAGE. 23. ALL REQUIRED PERMITS MUST BE OBTAINED FROM ALL APPLICABLE SETTLEMENT. F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING AUTHORITIES HAVING JURISDICTION PRIOR TO START OF CONSTRUCTION. CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY 49. ALL CLAIMS FOR ADDITIONAL WORK WILL BE SUBMITTED IN WRITING FOR REPORTING VALUE (MERV) OF 8 MUST BE USED AT EACH RETURN AIR 24. ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY THE CLIENT'S APPROVAL. THE CONTRACTOR SHALL INCLUDE A COMPLETE GRILLE. OF THE CONTRACTOR, U.N.O. NARRATIVE DESCRIPTION OF THE WORK TO BE PERFORMED AS WELL AS MATERIALS TO BE USED, THE AREA OR SPACE BEING WORKED IN, AND UNDER 6. AS APPLICABLE TO PROJECT SCOPE, ALL CUTTING, CHASING, DRILLING OR 25. THE GENERAL CONTRACTOR SHALL PAY THE EXPENSES FOR ALL WHOSE AUTHORIZATION THE WORK TO BE PERFORMED WAS INITIATED. DEMOLITION OF WALLS, SLABS, ETC. REQUIRING THE USE OF JACKHAMMERS TRANSPORTATION, HOISTING AND ELEVATOR USE CHARGES ON ALL OR OTHER HEAVY HAND OR POWER TOOLS SHALL BE PERFORMED AFTER MATERIALS OR EQUIPMENT TO THE POINT OF USE, AND SHALL BE 50. THE PRESENCE OF A REPRESENTATIVE OF THE ARCHITECT ON THE JOB SITE REGULAR BUSINESS HOURS ON AN OVERTIME BASIS IF NECESSARY, UNLESS RESPONSIBLE FOR ALL UNLOADING, CHECKING AND STORAGE OF THE SAME IN DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL OF ANY WORK. THE THE BUILDING MANAGEMENT AND ANY AFFECTED TENANTS PROVIDE A CONNECTION WITH THIS CONTRACT. CONTRACTOR SHALL CALL TO THE ATTENTION OF THE ARCHITECT, IN WRITTEN WAIVER EXPRESSLY PERMITTING OTHERWISE. WRITING, ALL SPECIFIC ITEMS FOR WHICH ARCHITECT'S REVIEW IS 26. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY ALL REQUIRED. 7. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR COSTS FOR TEMPORARY WATER, PLUMBING, POWER, LIGHTING, HEATING OR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK. 51. UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR SHALL PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS PREPARE A "PUNCHLIST" OF CORRECTIONS AND UNSATISFACTORY AND/OR REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO 27. DO NOT SCALE THESE DRAWINGS; WRITTEN DIMENSIONS SHALL GOVERN. INCOMPLETE WORK FOR REVIEW BY THE ARCHITECT. NORMAL WORKING HOURS. THE CONTRACTOR SHALL PROVIDE PUBLIC SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED, PROTECTION, AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT. 52. THE CONTRACTOR SHALL MAINTAIN AT THE SITE, ONE RECORD COPY OF ALL HAVING JURISDICTION, UNTIL CLIENT ACCEPTANCE OF THE PREMISES. DRAWINGS, PERMITS, SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL 28. LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE PLANS AND CHANGES DURING CONSTRUCTION. ACCESS TO THESE SHALL BE PROVIDED 8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROVISION ELEVATIONS. INFORM ARCHITECT OF DISCREPANCIES PRIOR TO PROCEEDING FOR THE USE OF ALL TRADES, CLIENT REPRESENTATIVES AND THE AND MAINTENANCE OF ALL BRACING, SHORING, ENCLOSURES, BARRIERS OR WITH WORK. ARCHITECT, DURING ALL PHASES OF CONSTRUCTION. SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK. 29. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' 53. DURING THE COURSE OF CONSTRUCTION, ACTUAL LOCATIONS SHALL BE RECOMMENDATIONS. ANY DIFFICULTIES ARE TO BE REPORTED TO THE INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DRAWINGS FOR 9. WHERE APPLICABLE BY PROJECT SCOPE, DURING THE ENTIRE CONSTRUCTION ARCHITECT IMMEDIATELY. ALL RUNS OF MECHANICAL AND ELECTRICAL WORK INCLUDING CONCEALED PERIOD, ALL EXITS, EXIT LIGHTING, FIRE PROTECTION DEVICES AND ALARMS WORK WHICH DEVIATES FROM THE DRAWINGS. UPON COMPLETION OF THE SHALL BE CONTINUOUSLY MAINTAINED IN CONFORMANCE WITH LOCAL 30. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL WORK PROJECT, INCLUDING ALL PUNCH -LIST ITEMS, THIS INFORMATION SHALL BE BUILDING CODE AND OTHER GOVERNING ENTITY REQUIREMENTS. U.N.O., ALL PERFORMED FOR A MINIMUM PERIOD OF ONE (1) YEAR AS SPECIFIED IN THE NEATLY TRANSFERRED BY THE CONTRACTOR TO A SET OF DRAWINGS, WHICH EXISTING, SERVICES AND DEVICES SHALL REMAIN ACTIVE. CONSTRUCTION CONTRACT. ALL DEFECTS OCCURRING IN THE WARRANTEE SHALL BE MARKED "AS BUILT SET" AND COPIES SHALL BE PROVIDED TO BOTH PERIOD SHALL BE CORRECTED AT NO ADDITIONAL COST.. THE OWNER AND THE ARCHITECT. WITHIN THREE (3) WEEKS (15 BUSINESS 10. THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE DAYS) OF THE RECEIPT OF THE "AS BUILT SET," APPROVAL FOR FINAL BUILDING OWNER. INCLUDING, BUT NOT LIMITED TO, WINDOWS, FLOOR AND 31. THE CLIENT, ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM PAYMENT TO THE CONTRACTOR SHALL BE GRANTED OR REASONABLE CAUSE CEILING FINISHES, PUBLIC TOILETS, ELEVATORS, DOORS & BUCKS, PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL SHOWN WHY SUCH APPROVAL HAS BEEN DENIED. ELECTRICAL AND AIR-CONDITIONING EQUIPMENT. THE CONTRACTOR SHALL TIMES DURING NORMAL WORKING HOURS. PROTECT ADJOINING PROPERTY. DAMAGE CAUSED BY THE CONTRACTOR'S 54. PRIOR TO THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL WORK OR WORKMEN MUST BE MADE GOOD, IN A TIMELY FASHION. PATCHING 32. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS' AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT THE COST NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE NOTED AS NOT IN CATALOG, OPERATING INSTRUCTIONS, START-UP CHECK LISTS, MAINTENANCE OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR CONTRACT (N.I.C.). UNLESS OTHERWISE NOTED ON THESE DRAWINGS OR IN INSTRUCTIONS AND SIMILAR DATA, AS WELL AS ALL GUARANTEE(S) FOR ALL ALL SUB -CONTRACTORS. IF THE CONTRACTOR FAILS TO COMPLETE THE THE SPECIFICATIONS AS BEING NOT IN CONTRACT OR EXISTING, ALL ITEMS, EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE REPAIRS IN A TIMELY FASHION, SAID REPAIRS WILL BE MADE BY A MATERIALS, ETC. AND THE INSTALLATION OF SAME ARE A PART OF THE CONTRACTOR UNDER THIS CONTRACT, AND SHALL ORIENT AND INSTRUCT CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK CONTRACT DEFINED BY THESE DRAWINGS AND SPECIFICATIONS. THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH CHARGED ACCORDINGLY. EQUIPMENT. 33. MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER 11, THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER, THE CONSTRUCTION OF ANY PART OF THE WORK, SHALL BE INCLUDED AS IF THEY 55. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT TENANT, AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS FOR WERE INDICATED IN THE DRAWINGS, UNLESS OTHERWISE AGREED UPON. THAT MOLD, ASBESTOS, OR OTHER ENVIRONMENTAL HAZARD IS UNCOVERED. THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL OR WHERE THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY THE OWNER SHALL RETAIN A QUALIFIED CONSULTANT WHO SHALL ARRANGE FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF, OR SUFFERED WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE FOR THE PROMPT IDENTIFICATION, TESTING, TREATMENT, REMEDIATION AND WHILE ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE EXECUTION BUILDING CODE, OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE STORAGE OF THE MOLD OR ASBESTOS AS REQUIRED BY LAW AND GOOD OF THE WORK; THE CONTRACTOR SHALL WELL AND TRULY DEFEND THE WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE CONSTRUCTION PRACTICES. THE ARCHITECT SHALL BEAR NO RESPONSIBILITY OWNER, TENANT AND ARCHITECT AND SHALL PAY ALL MONIES AWARDED FOR FURNISHED IN ALL CASES. FOR WORK RELATED TO THESE MATERIALS. SUCH DAMAGES OR INJURIES (INCLUDING DEATH), ALL COSTS INCLUDING ATTORNEY'S FEES SUSTAINED, AND SHALL OBTAIN A FULL ACQUAINTANCE 34. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH 56. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR AND RELEASE IN FAVOR OF THE OWNER, TENANT AND ARCHITECT, UNLESS MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE -CONSUMER LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS MATERIALS. THE SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE OF THE OWNER, (POST-INDUSTRIAL) AND POST -CONSUMER RECYCLED CONTENT. THE CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE CARRYING TENANT, ARCHITECT, ITS AGENTS OR EMPLOYEES. CONTRACTOR SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH OF THE BUDGET AND SHALL NOT PURCHASE ANY COST -ADDING MATERIAL OR MATERIALS. 12. THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE PAY A PREMIUM (MORE THAN FAIR MARKET VALUE) WITHOUT ARCHITECT AND OF ANY WORK, NOR FOR THE MEANS AND METHODS OF CONSTRUCTION OWNER ACKNOWLEDGEMENT AND APPROVAL. 57. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY CHOSEN BY THE CONTRACTOR OR ANY SUB -CONTRACTORS, NOR SHALL THE INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES HAVING ARCHITECT GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS. 35. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH JURISDICTION AND COMPLYING WITH STATUTORY REQUIREMENTS FOR MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT DISABILITY AND WORKMEN'S COMPENSATION. 13. THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE DURING SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR MARKET VALUE AND THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK FROM DO NOT PRESENT RISK TO THE PROJECT SCHEDULE. DAMAGE. IMMEDIATELY PRIOR TO OCCUPANCY, THE CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA INCLUDING, BUT NOT LIMITED 36. FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE TO, WET WIPING OF FURNITURE, AND CASEWORK, WASHING AND WAXING OF BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS, THE CONTRACTOR SHALL VCT FLOORING AND THE VACUUMING OF CARPET. ALL CLEANING SHALL BE IN FURNISH MATERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE. ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS. 37. DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR 14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD CONDITIONS. REQUIRED SUB -CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK. IT IS EXPECTED THAT THE CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WITH 38. ALL WORK SHALL BE EXECUTED IN A PROFESSIONAL MANNER BY TRADES THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT PERSONS SKILLED IN THEIR RESPECTIVE TRADES AND IN ACCORDANCE WITH ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY. THE INDUSTRY STANDARD TRADE PRACTICES. 15. BIDDERS, BEFORE SUBMITTING PROPOSALS, SHALL VISIT AND CAREFULLY 39. ALL WORK SHALL BE PLUMB, LEVEL AND TRUE. THE CONTRACTOR SHALL LAY EXAMINE THE AREA AFFECTED BY THE WORK TO FAMILIARIZE THEMSELVES OUT ALL WORK AND ESTABLISH ALL POINTS, GRADES, LINES AND LEVELS AND WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT ASSUME FULL RESPONSIBILITY FOR THE SAME. THE EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE N o N ti 0 0 z U a 0 m o � N w d � 0 LL w D U) 0 z INFINITY ENGINEERING GROTTY', LLC 1208 East Kennedy Boulevard Suite 230 Tampa, Florida 33602 [p]. 813,434.4770 [fl: 813.445.4211 www.iegroup.net FL Cert. of Auth. No. 27889 r NISIT SAPPARKHAO, P.E. FL EG. NO . 64085 No b408ST .�. nt LO TZ M L+_ O J z = U _J a. W = N j 00 0 J W N a a o @ 00 a) I- E M z a 0 n am F- W W F_ O z J ct W z W IF -Project No. Sheet 280-22.00 /� A-N. 1 _ Date AS NOTED Scale AS NOTED F- — — — — — I I I I - -- - - --- - ----------------- ----------- 8 A-9.1 EQ EQ M I CONSTRUCTION KEYNOTES: '1 PROVIDE NEW UPSEND VAT SYSTEM. UTILIZE EXISTING POWER/DATA FEEDS FROM REMOVED ITM FOR POWER AND DATA AT UPSEND VAT. 2 j NEW CONCRETE ISLAND INFILL. MATCH EXISTING DEPTH, TOP TO BE FLUSH WITH EXISTING ISLAND. REFER TO 5/A-9.1 FOR EXPANSION JOINT DETAIL. 3 i DIAGRAMMATICAL ROUTE OF VAT TUBE ABOVE CANOPY/CEILING INTO BAKING CENTER. VENDOR TO FIELD FIT VAT TUBE AROUND EXISTING HAVC AND ELECTRICAL WORK AS REQUIRED TO ACHIEVE FINAL PLACEMENT AT TELLER LINE AS SHOWN ON 1/A-2.2. 4 `, VAT ENCLOSURE SEE SHEET A-9.1 FOR MORE INFORMATION. ALIGNMENT AND POSITION OF ENCLOSURE IS TO BE CENTERED AROUND VAT TUBE. COORDINATE ENCLOSURE LOCATION WITH VAT VENDOR & TUBE ROUTING. 5 'j 4" STEEL PIPE BOLLARD FILLED WITH CONCRETE. REFER TO 3/A-9.1 FOR MORE INFORMATION AND DIMENSIONS. REFER TO 7/A-9.1 FOR LAYOUT DIMENSIONS. "6 ' NEW LED LANE SIGNAGE BY VENDOR. UTILIZE EXISTING POWER/DATA FROM REMOVED SIGNAGE PER 1/A-2.1. SEE 2/A-2.2 FOR MORE INFORMATION. 2 %�22 1.9 SCALE CONSTRUCTION PLAN - CANOPY 1/4"=1'-0" 2 — CONSTRUCTION SHEET NOTES A. AT NO TIME DURING CONSTRUCTION SHALL WORK IN PROGRESS BE LEFT IN A CONDITION THAT WILL REDUCE OR IMPEDE REQUIRED ACCESS TO PATH OF EGRESS OR EXIT. B. ALL WORK SHALL BE IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL BUILDING CODES, REGULATIONS, ORDINANCES AND STANDARDS INCLUDING ADA AND OR OTHER HANDICAP ACCESSIBILITY CODES. C. CONTRACTOR SHALL COORDINATE WITH THE OWNER'S VENDORS REGARDING SCHEDULING AND SEQUENCING OF THE WORK. D. REVIEW ALL DRAWINGS, MANUALS AND NOTES BEFORE COMMENCING WORK. E. ALL DIMENSIONS ARE TO FINISH FACE OF WALL U.N.O. F. DIMENSIONS SHOWN AS V.I.F SHALL BE VERIFIED BY THE CONTRACTOR IN THE FIELD. CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCY IN DIMENSIONS PRIOR TO PROCEEDING WITH THE WORK IN THAT AREA. G. DRYWALL FINISHING: COMPLY WITH MANUFACTURE'S PRINTED INSTRUCTIONS AND SPECIFICATIONS, EXCEPTION: COMPLY WITH MORE STRINGENT REQUIREMENTS OF GYPSUM ASSOCIATION GA-216 RECOMMENDED SPECIFICATION FOR THE APPLICATION AND FINISHING OF GYPSUM BOARD. H. CONTRACTOR SHALL CONFIRM AND COORDINATE PLACEMENT OF ALL BLOCKING FOR MILLWORK, LIGHTS, EQUIPMENT, SHELVING, ETC. PRIOR TO CLOSING WALLS. I. PENETRATIONS IN GYPSUM BOARD CONSTRUCTION ABOVE FINISHED CEILING SHALL BE EFFECTIVELY SEALED TO PREVENT SOUND LEAKAGE AT ACOUSTICAL PARTITIONS AND AT DEMISING PARTITIONS, UNLESS OTHERWISE NOTED. J. CONTRACTOR SHALL COORDINATE STUD LOCATIONS W/OUTLET DIMENSIONS PRIOR TO CLOSING WALLS WITH GYPSUM BOARD. K. WHERE A CHANGE OF PLANE OF a " OR MORE OCCURS, SUBMIT NOTIFICATION OF THE INSTANCE AND RECOMMENDATION FOR PROVIDING A CORRECTION AND SMOOTH TRANSITION TO THE A/E FOR REVIEW. L. FIXTURES AND/OR EQUIPMENT FURNISHED AND INSTALLED BY G.C. UNLESS OTHERWISE SPECIFIED. SEE EQUIPMENT AND FIXTURE SCHEDULE. M. SEE MEP DRAWINGS FOR LOCATIONS OF ALL CONDUIT. /MA DEMOLITION KEYNOTES: REMOVE EXISTING ITM. SALVAGE DATA AND ELECTRICAL FOR NEW VAT PER 2/A2.1. COORDINATE WITH OWNER FOR ITM STORAGE LOCATION. 2 REMOVE EXISTING BOLLARDS ASSOCIATED WITH ITM. PATCH AND REPAIR CONCRETE ISLAND TO LIKE NEW FINISH. 3 i EXISTING CURB TO REMAIN - PROTECT DURING CONSTRUCTION. (4 EXISTING BUILDING COLUMN TO REMAIN - PROTECT DURING CONSTRUCTION. 5l? EXISTING BOLLARD TO REMAIN - PROTECT DURING CONSTRUCTION. 6 i EXISTING CANOPY ABOVE TO REMAIN. REFER TO 2/A2.1 & 1/A4.1 FOR NEW CONSTRUCTION AT CANOPY. \71, EXISTING ATM, BOLLARDS AND ISLAND TO REMAIN. j 8 SAWCUT AND REMOVE PORTION OF ATM ISLAND AS REQUIRED TO RUN NEW POWER AND DATA FROM EXISTING ITM STUB UP TO NEW VAT LOCATION. g REMOVE EXISTING TELLER CONNECT SIGNAGE. SALVAGE POWER/DATA - FOR REUSE AT NEW SIGNAGE PER 2/A-2.1. E SCAL DEMOLITION PLAN - CANOPY SCALE 1 DEMOLITION SHEET NOTES A. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO COMPLETE THE WORK IN ACCORDANCE W/ THE CONTRACT DRAWINGS. B. PRIOR TO DEMOLITION WORK, REVIEW ALL DRAWINGS W/ OWNER'S REPRESENTATIVE REGARDING DEMOLITION OR PRESERVATION OF ANY CRITICAL SYSTEMS AND HOW TO HANDLE THESE DURING THE DEMOLITION PERIOD. C. PRIOR TO DEMOLITION WORK CONSULT W/ DATA AND TELEPHONE COORDINATOR TO IDENTIFY SPECIFIC ITEMS TO BE LEFT IN PLACE. D. GENERAL CONTRACTOR SHALL PROTECT AND MAINTAIN OPERATION OF ALL FIRE PROTECTION SYSTEMS AND DEVICES, INCLUDING BUT NOT LIMITED TO SMOKE DETECTION DEVICES, SPEAKERS AND FIRE ALARM BOXES. ALL DEVICES DAMAGED DURING DEMOLITION SHALL BE IMMEDIATELY REPAIRED TO OPERATIONAL STATUS. ALL REPAIRS SHALL BE IN COMPLIANCE W/ ALL APPLICABLE CODES. E. PATCH AND REPAIR EXISTING CONSTRUCTION WHERE AFFECTED BY DEMOLITION. WORK SHALL BE PROPERLY RESTORED, ALIGNED AND REPAIRED SO AS TO LEAVE NO EVIDENCE OF DEMOLITION OR REMODELING WORK. AREAS OUTSIDE OF THE CONTRACT LIMITS AFFECTED BY DEMOLITION AND NEW CONSTRUCTION TO BE REPAIRED SO AS TO LEAVE NO EVIDENCE OF THE WORK. REFINISH TO MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN. NORTH 0 2'-0" 4'-0" 8'-0" SCALE: 1 /4" = 1 "-0" N O N h MMOIN 2 M z U a z z n o � w Mn a m 0 w w n U) b z INFINITY ENGINEERING GROUP, LLC 1208 East Kennedy Boulevard Suite 230 Tampa, Florida 33602 [p]: 813.434.4770 [4:813,445.4211 www.iegroup.net FL Cert. of Auth. No. 27889 aTa❑ .... ........ NISIT SAPPARKHAO, P.E. FL• REC. NO. 64085 4 No 640' a i w 3� E O F s : , 0 4 0 on \O, hater - r d' Ln z � co M U- Q J z Q O Z z i O_z C _ �O J a J I— = N OU W = m Q �— W J Q Z a N 0 O C 00 ~ o z U a) asz o F (U (D n u) Project No. Sheet 280-22.00 Date AS NOTED A-2. 1 Scale AS NOTED SCALE SECTION AT CANOPY 1/4"=1'-0" 3 CONSTRUCTION SHEET NOTES A. REFER TO SHEET A-2.1 FOR CONSTRUCTION PLAN NOTES. CONSTRUCTION KEYNOTES: (1 `i DIAGRAMMATICAL ROUTE OF VAT TUBE ABOVE CANOPY/CEILING INTO BAKING CENTER. VENDOR TO FIELD FIT VAT TUBE AROUND EXISTING HVAC AND ELECTRICAL WORK AS REQUIRED TO ACHIEVE FINAL PLACEMENT AT TELLER LINE AS SHOWN ON 1/A-2.2 & A-4.1. 2�i NEW VAT SYSTEM AT TELLER COUNTER - COORDINATE WITH VENDOR. UPSEND UNIT IS TO BE INSTALLED OVER/ABOVE TELL-R-TV DEVICE. BOLLARD PER PLAN SCALE EXTERIOR ELEVATION 1 1/4„=11-0" 2 NORTH 0 2'-0" 4'-0" 8'-0" SCALE: 1 /4" = 1'-0" N O N Ih � 0 Z U a z Q N F- — C � O N W d N O LL w D U) Jr INFINITY ENGINEERING E,IE RI NG GROUP, LLC 1208 East Kennedy Boulevard Suite 230 Tampa, Florida 33602 [p]: 813.434.4770 [9: 813 }45.4211 www.iegroup.net FL Cert. of Auth. No. 27889 low- 'w Jm NISIT SAF?P�ARKHAO, P.E. "F REG. NO. 64085 No 64085 -0 : cc:: Y✓ STAT OF • •.41 Date LO � r v) j cM M .. z z 0 �- LL Q u� J I- O J_ z = Z LLI U O rr^^ VJ CL � W = W N U to o = �z O "N 0 LLJ 100 J z �— Q\ Q < O / M � U LLJ E w z U N 2 N L d � 'Project No. Sheet 280-22.00 /� Date AS NOTED A-2.2 Scale AS NOTED E REFLECTED CEILING PLAN SCALE .0„ 2 REFLECTED CEILING PLAN KEYNOTES: �1 PROVIDE VAT TUBE TRIM PIECE AT CEILING AS REQUIRED FOR VAT SYSTEM. PATCH/PAINT GYP TO MATCH ADJACENT AS REQUIRED FOR NEW WORK. 2 VAT ENCLOSURE SEE SHEET A-9.1 FOR MORE INFORMATION. ALIGNMENT AND POSITION OF ENCLOSURE IS TO BE CENTERED AROUND VAT TUBE. COORDINATE ENCLOSURE LOCATION WITH VAT VENDOR & TUBE ROUTING. .3 EXISTING CANOPY LIGHT FIXTURE TO REMAIN. PROTECT DURING CONSTRUCTION. 4, DIAGRAMMATICAL ROUTE OF VAT TUBE ABOVE CANOPY/CEILING INTO - BAKING CENTER. VENDOR TO FIELD FIT VAT TUBE AROUND EXISTING HAVC AND ELECTRICAL WORK AS REQUIRED TO ACHIEVE FINAL PLACEMENT AT TELLER LINE AS SHOWN ON 1/A-2.2. 5 PROVIDE LOCKABLE ACCESS PANEL AS SHOWN. COORDINATE KEYING REQUIREMENTS WITH OWNERS REP. E SCAL REFLECTED CEILING PLAN SCALE 1 REFLECTED CEILING PLAN SHEET NOTES A. COORDINATE THE WORK OF ALL TRADES INVOLVED IN CEILING WORK TO ENSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING SUSPENSION SYSTEM, ETC., NECESSARY TO MAINTAIN THE EXISTING FINISHED CEILING HEIGHTS. VERIFY IN FIELD. B. PROVIDE (UL) LABELED DEVICES THROUGHOUT, INCLUDING FIXTURES, ASSOCIATED TRIM, FIXTURE LAMPS, AND SEISMIC BRACING AS REQUIRED. C. LIGHT FIXTURES, EXIT SIGNS, SPRINKLERS AND OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE U.N.O. D. PROVIDE CEILING ACCESS AS REQUIRED FOR EQUIPMENT AND SYSTEM MAINTENANCE, MATCH ADJACENT CEILING FINISH U.N.O. E. ARCHITECTURAL DRAWINGS DETERMINE LOCATION AND HEIGHTS OF CEILING TYPES, LIGHT FIXTURES, AND ASSOCIATED ITEMS, U.N.O. F. REFER TO ENGINEERING DRAWINGS FOR LIGHTING SCHEDULES, CIRCUITING, WIRING LAYOUT, AND ADDITIONAL INFORMATION. G. ALL SPECIFIC INFORMATION CONCERNING INSTALLATION OF VARIOUS ABOVE -CEILING ELEMENTS ARE TO BE FOUND IN THE HVAC, ELECTRICAL AND LIGHTING DRAWINGS. H. NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS WITH MAIN RUNNERS, DUCTS, STRUCTURES, HVAC, AND/OR CONDUIT, PRIOR TO FRAMING FOR LIGHTING. ANY DISCREPANCIES BETWEEN ARCHITECTS CEILING GRID LOCATION & ACTUAL FIELD CONDITIONS ARE TO BE CLARIFIED WITH THE ARCHITECT PRIOR TO FRAMING. I. INSTALL LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR COVER OVER LOUVER, LENS, BAFFLE AND THE LIKE, TO AVOID FIXTURE SOILING OR DAMAGE, FIXTURES SHALL BE MAINTAINED CLEAN AND AS NEW; LAMPS SHALL BE NEW AT PROJECT COMPLETION. J. REFER TO ENGINEERING DRAWINGS FOR LIFE SAFETY DEVICES REQUIRED BY CODE AND EMERGENCY LIGHT FIXTURES. ENGINEERING DRAWINGS SHALL ALSO GOVERN LOCATION OF THESE DEVICES. K. AT ALL LOCATIONS OF PERFORATED RETURN AIR GRILLES: ALL WIRING, CABLING, ETC. TO BE HELD CLEAR OF OPEN LINE OF SIGHT THROUGH GRILLE. L. ALL SWITCHES AND DIMMERS SHALL BE LOCATED 48" ABOVE FINISHED FLOOR TO TOP OF SWITCH U.N.O. M. MULTIPLE SWITCHES AT ONE LOCATION SHALL BE GANGED TOGETHER AND FINISHED WITH ONE COVER PLATE U.N.O. N. COLOR OF LIGHT SWITCH DEVICES, OUTLETS AND COVER PLATES TO BE WHITE; U.N.O. OR AS RESTRICTED BY CODE. O. NO SWITCHES OR THERMOSTATS TO BE LOCATED BEHIND DOORS OR FURTHER THAN 6" PAST THE ADJACENT DOOR FRAME. PROVIDE WALL BRIDGING AS REQUIRED, U.N.O. P. NO STROBES OR THERMOSTATS SHALL BE LOCATED IN THE CENTER OF A WALL. ALL STROBES SHALL BE PLACED OFF CENTER IN WALL AT 80" A.F.F. TO THE CENTERLINE OF THE STROBE. REFER TO ENGINEERING DRAWINGS FOR THERMOSTAT POSITIONS AND LOCATION. Q. GYPSUM BOARD CEILINGS LOCATED IN RESTROOMS, KITCHENS, OR OTHER DAMP AREAS TO BE MOLD AND MOISTURE RESISTANT TO MEET ASTM STANDARDS. N O N ti N z U a z z Q � � o N W a a') Of O LL w D U) U) 0 z INFINITY ENGINEERING GROUP, LLC 1208 Fast Kennedy Boulevard Suite 230 Tampa) Florida 33602 [p]; 813.434.4770 [fl. 813.445.4211 www.iegroup.net FL Cert. of Auth. No. 27889 ❑aTa � NISIT SAPPARKHAO, P.E. FL REG..NO. 64085 I \GENS® a No 640 ST E OF ;1JJ� Dale- LO z M ch � V- O J J z = U) _Z _J J a W = W N U d 0 co �— � W � U N c� LL) o LL M E 00 W z U ai F o a (D _r_ v) 'Project No. Sheet ` 280-22.00 Date A— A . 1 AS NOTED L•� Scale AS NOTED A 3" EXHAUST W 1 CHECK VALVE REQUIRED OVER. OPERATOR UNIT 11-7 1 /4" PNEUMATIC VAT TUBE CERAMITEX PANEL CLIP CERAMITEX PANEL TO MATCH CANOPY (BASALT GREY) CFMF BY VENDOR WITH 1 LAYER 5/8" SHEATHING BUILDING MEMBRANE CFMF BOX BEAM BY VENDOR EQ EQ SCALE 6 ENCLOSURE DETAIL I 1"=11-011 0 LLJ w g W J J O o _ m J Ln O OP LW a d- O F- U_ 0 a O R 4y2" NOTES: 1. SIDEWALK EXPANSION JOINTS TO BE ALL TIES TO CONCRETE OTHER THAN DRIVEWAYS. MAXIMUM SPACING SHALL BE 50-FOOT, 2. EXPANSION JOINT MATERIAL SHALL BE ASPHALT FIBER IMPREGNATED PREFORMED JOINT FILLER, TO FULL DEPTH OF CONCRETE. COVER MANUFACTURER: POST GUARD A) TYPE: 4.5" DOME TOP BOLLARD COVER B) COLOR: CANADIAN GREY; 4" DIAMETER STEEL PIPE BOLLARD WITH BOLLARD COVER. FILL PIPE WITH 3,000 PSI CONCRETE, TYP. PRIME STEEL BOLLARD WITH ZINC PRIMER SIKA FLEX' SIKA FLEX 2-C SEALANT 429 PRIMER BACKER ROD: ETHAFOAM "SM" . • d. d • • y • •. • d • •. • • .d , _ .. •. EXPANSION JOINT FILLER SEAL TITS FIBRE OR APPROVED EQUAL EXPANSION JOINT NTSLE 5 PROPOSED CONCRETE ISLAND 4x4 WIRE WELDED Z MESH U iLMATCH EXISTING i ! GC TO FILL JOINT ` WITH BITUMINOUS f c � 3" 1' 0" 1 0"^ 1'-01, _ 1'-0" 3" H- JOINT FILLER, TYP. 1 #5 DIA. CONTINUOUS REINFORCING, TYP. SCALE 8 CONCRETE ISLAND DETAIL 3/411 = 11-0" EXISTING PANEL SYSTEM TO BE MODIFIED TO FIT AROUND VAT ENCLOSURE. BID ALT: PROVIDE NEW PANELS TO MATCH ADJACENT (BASALT GREY) AS REQUIRED FOR VAT ENCLOSURE. COORDINATE WITH VENDOR i FLASHING WITH SEALANT CERAMITEX METAL PANEL ... VH I I UDr- �' CERAMITEX PANEL SYSTEM 4 CFMF FRAMING FROM CANOPY \ \ STRUCTURAL STEEL AS REQUIRED TO SUPPORT VAT ENCLOSURE FRAMING CERAMITEX CLIP SYSTEM BACKER ROD AND SEALANT EXISTING FINISHED CANOPY CFMF/ KICKER TO STRUCTURE ABOVE SCALE ENCLOSURE DETAIL AT CANOPY 1 1 1/2"=V-0" 2 B4050.TOP FITTING 4-112' DIA. & 2 114' DIA. CLEAR ACRYLIC TUBES T9719 8FT. STD LENGTH T9720 OPTIONAL I2FT. D OVERHEAD )R:UNIT 99-914 4K4" J-BOX UNDER COUNTER IN OPERATOR KNEE SPACE AUDIO IVIDEO-CABLES TO EXIT HERE �.� BUILDING$ TURBINE PACK INSIDE `ELECTRICAL-i CUSTOMER UNIT SUPPLY !I i ! CONDUFr #2-FOR LOW VOLTAGE DEPTH. !' SINTER CONN ECT&AU D 10l VI DEO. I I CON DU IT #1 FOR POWER 120VOLT, 60HZ, 20 AMP DEDICATED BRANCH CIRCUIT REQUIRED FOR EACH CUSTOMER UNIT. EXISTING METAL DECK/STRUCTURE ABOVE EXISTING STRUCTURAL STEEL TO SUPPORT VAT ENCLOSURE FRAMING CFMF KICKER TO METAL DECK ABOVE AS -- REQUIRED CFMF HANGER FROM STRUCTURAL STEEL TO SUPPORT VAT ENCLOSURE FRAMING MODIFY EXISTING CERAMITEX PANEL TO FIT NEW ENCLOSURE. BID ALT: IF EXISTING PANEL IS UNABLE TO BE MODIFIED FOR VAT ENCLOSURE, PROVIDE NEW TO MATCH EXISTING (PERLA). COORDINATE WITH VENDOR PROVIDE FLASHING AS SHOWN. MIN 6" LAP WITH BUILDING MEMBRANE SEALANT AT FLASHING 3/4" PLY ON CFMF VAT TUBE CERAMITEX PANEL SYSTEM TO MATCH CANOPY i (BASALT GREY) CFMF FRAMING AND BOX BEAM BY CFMF r j VENDOR. VENDOR TO PROVIDED S/S DRAWINGS AND CALCS FOR VAT ENCLOSURE FRAMING CONTINUOUS SHEATHING AND BUILDING - MEMBRANE TO WRAP ALL PENETRATIONS EXISTING PANEL SYSTEM TO BE MODIFIED TO ACCOMODATE VAT ENCLOSURE. IF EXISTING PANEL IS UNABLE TO BE MODIFIED, PROVIDE NEW TO MATCH ADJACENT 4' ISLAND WIDTH 20' MIN. 73i4" CURB TO 4" TUBE. CENTER &UNDERGROUND I CONDUIT ACCESS. 4" CURS TO \ STUB UP CONDUIT 1" MAX FRONT OF BASE ""-" "' \ ABOVE ISLAND SURFACE. TRAFFIC FLOW ENTRY LIMITEDT04-1l2"'DIA. SPEAKER & AREA AT CUSTOMER UNIT MICROPHONE ©© BRIGHT PLAYER BY I' mil OTHERSIfRUIST IT DUAL CONTROLS CALLISEND " " ..� OPTIONAL TWO-WAY VIDEO UNIT MODELS: 57 OR 17 5/B• GHT (4) GUARD POSTS RECOMMENDED ♦ 4" DIA. x 24' H IGH MIN. PLACE AS SHOWN (MA71. & LABOR, BY OTH ERS) 6• � 1 f 4' 123/8 WIDTH �'— I TYPICAL UPSEND DETAILS NTSLE 7 PROVIDE 5/8" INTERIOR GYP AROUND PENETRATIONS. PAINT TO MATCH EXISTING ADJACENT ENCLOSURE DETAIL AT BUILDING SCALE 11 1/2"=1'-0" N O N � Z U z Q E-- N — C � O w W a a') 0 LL W U) D �- 0 z INFINITY ENGINEERING GROUP, LLO 1208 :East Kennedy Boulevard Suite 230 Tampa, Florida 33602 [P]: 813.434.4770 [11: 813.445.4211 www.iegroup.net FL Cert. of Auth. No. 27889 ❑aTa i,gi­ NISIT SAPPARKHAO, P.E. FL.REC .-NO. 64085 , /64 `� �� LO cM M LL CJ7 OJ J_ Z r = '^ V) J = N W = m n_ W J -' Na a M o') p 00 E ~ z 2 i= CL Project No, Sheet 280-22.00 j� A-9. 1 Date AS NOTED Scale AS NOTED 1 I i POWER SYMBOLS: LIGHTING SYMBOLS: SPECIAL SYSTEMS SYMBOLS: ABBREVIATIONS: NOTE: A COMPLETE LIST OF RECEPTACLE SYMBOLS IS SHOWN FOR THE DUPLEX RECEPTACLE ONLY. OTHER RECEPTACLE SYMBOLS WILL FOLLOW THE SAME SHADING CONVENTION AS THE DUPLEX RECEPTACLE, UNO. CENTER HATCH: ISOLATED GROUND RECEPTACLE OUTER HATCH: GFCI RECEPTACLE RIGHT HATCH: CONTROLLED RECEPTACLE 20A, 125V, RECEPTACLE (NEMA 5-20R), WALL MTD (SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT) D =DUAL SWITCHED H = HALF SWITCHED TR =TAMPER RESISTANT U =RECEPTACLE WITH USB OUTLET WP = WEATHERPROOF WR = WEATHER RESISTANT 20A, 125V, IG DUPLEX RECEPTACLE (NEMA 5-20R), WALL MTD 20A, 125V, GFCI DUPLEX RECEPTACLE (NEMA 5-20R), WALL MTD 20A, 125V, CONTROLLED DUPLEX RECEPTACLE (NEMA 5-20R), WALL MTD 20A, 125V, RECEPTACLE ON EMERGENCY CIRCUIT (NEMA 5-20R), WALL MTD (SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT) ® ® 20A, 125V, RECEPTACLE (NEMA 5-20R), FLOOR MTD (SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT) ® ®® 20A, 125V, RECEPTACLE ON EMERGENCY CIRCUIT (NEMA 5-20R), FLOOR MTD (SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT) 20A, 125V, RECEPTACLE (NEMA 5-20R), CEILING MTD (SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT) �] [] 20A, 125V, RECEPTACLE ON EMERGENCY CIRCUIT (NEMA 5-20R), CEILING MTD (SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT) FB MULTI -SERVICE, FLOOR BOX, FLUSH MNT (SEE SPECS OR NOTES) FB = FLOOR BOX FF =FURNITURE FEED PT MULTI -SERVICE, POKE-THRU, 2 HR. FIRE -RATED, FLUSH MNT (SEE SPECS OR NOTES) PT =POKE-THRU FF =FURNITURE FEED cB MULTI -SERVICE, CEILING BOX WITH PROJECTOR MOUNT (SEE SPECS OR NOTES) F{] MULTI -SERVICE, WALL BOX, RECESSED MNT (SEE SPECS OR NOTES) SPECIAL PURPOSE RECEPTACLE (SEE EQUIPMENT SCHEDULE OR NOTES) (WALL MNT LEFT, FLOOR MTD RIGHT) ® SPECIAL PURPOSE RECEPTACLE ON EMERGENCY CIRCUIT (SEE EQUIPMENT SCHEDULE OR NOTES) (WALL MNT LEFT, FLOOR MTD RIGHT) ®OA 60A, 480V, 3PH, WELDING RECEPTACLE, WALL MTD (� DROP CORD (SEE SPECS OR NOTES) (Jo POWER POLE (SEE SPECS OR NOTES) ® RECEPTACLE RACEWAY / PLUG MOLD F-O JUNCTION BOX, WALL MTD WP Q JUNCTION BOX WP = WEATHERPROOF Q JUNCTION BOX, FLOOR MTD Q JUNCTION BOX, EXPLOSION PROOF 30 3NF L0 SAFETY SWITCH, 30A, 3-POLE, NON -FUSED 330 20 Lm SAFETY SWITCH, 30A, 3-POLE, FUSED @ 20A ® STARTER OR MOTOR CONTROLLER t.CEKI STARTER, COMBINATION W/ DISC. SWITCH Q TRANSFORMER ELECTRICAL PANEL / ENCLOSURE AS NOTED ON PLAN DRAWINGS (SURFACE MTD LEFT, RECESSED MTD RIGHT) ELECTRIC UTILITY METER GROUNDING BUSBAR (SEE SPECS OR NOTES) �)P UTILITY POWER POLE NOTE: REFER TO LIGHTING FIXTURE SCHEDULE FOR FIXTURE TYPES AND SENSOR SCHEDULE FOR SENSOR TYPES. REFER TO PLAN DRAWINGS FOR ADDITIONAL SYMBOLS. A: CAPITAL LETTER ADJACENT TO FIXTURE = TYPE a: LOWERCASE LETTER = SWITCHING GROUP EM: EMERGENCY LIGHTING IS DESIGNATED BY AN "EM" ADJACENT TO THE FIXTURE AND/OR A "HALF SHADED" OR "FULL SHADED" FIXTURE SYMBOL NL: NIGHT LIGHTING (UNSWITCHED FIXTURE) $xx SWITCH, 20A, 120/277V, TOGGLE TYPE, U.N.O. a,b,c,... =SWITCHING GROUP BLANK =SINGLE POLE 2 =DOUBLE POLE 3 =THREE-WAY 4 =FOUR-WAY D =DIMMER SWITCH K =SINGLE POLE KEY OPERATED M =MOTOR RATED MA =MAINTAINED CONTACT MO =MOMENTARY CONTACT P =SINGLE POLE W/ PILOT LIGHT P2 =DOUBLE POLE W/ PILOT LIGHT RC = REMOTE CONTROL T =TIMER OPERATED SWITCH WP = WEATHERPROOF ( xx OCCUPANCY SENSOR, WALL MTD I xx LOW VOLTAGE DIGITAL SWITCH, WALL MTD oP LIGHTING CONTROL DEVICE DP =DIMMABLE POWER PACK (ON/OFF WITH DIMMING) PP =POWER PACK (ON/OFF) RP = AUX. RELAY PACK (ON/OFF) GW = GATEWAY PS = POWER SUPPLY BR =BRIDGE LC = LIGHTING CONTACTOR TC =TIME CLOCK MS =MOTION SENSOR PC = PHOTOCELL P� PLUG LOAD CONTROLLER (ON/OFF) ePc EMERGENCY POWER CONTROLLER °s OCCUPANCY SENSOR, CORNER MTD os OCCUPANCY SENSOR, CEILING MTD os DAYLIGHT SENSOR, CEILING MTD @ COMBINATION OCCUPANCY / DAYLIGHT SENSOR, CEILING MTD 2'X4' LAY -IN TROFFER 2'X2' LAY -IN TROFFER 0 1'X4' LAY -IN TROFFER I-0 STRIP/CHANNEL FIXTURE TRACK LIGHTING W/ DIRECTIONAL HEADS O DOWNLIGHT, CEILING MTD <® <� WALL WASHER, CEILING MTD -{- LIGHT FIXTURE, CEILING MTD }-}r LIGHT FIXTURE, WALL MTD WALL PACK Oi SINGLE HEAD AREA LIGHT FIXTURE, POLE MTD DgeZ TWIN HEAD AREA LIGHT FIXTURE, POLE MTD 0 EXHAUST FAN =U EMERGENCY WALL PACK (BUG EYE) (WALL MTD LEFT, CEILING MTD RIGHT) ® EXIT SIGN, SINGLE FACE (ARROW INDICATES DIRECTION OF EGRESS) (WALL MTD LEFT, CEILING MTD RIGHT) IQI e EXIT SIGN, DOUBLE FACE (ARROW INDICATES DIRECTION OF EGRESS) (WALL MTD LEFT, CEILING MTD RIGHT) EXIT SIGN W/ COMBINATION EMERGENCY LIGHT, SINGLE FACE (ARROW INDICATES DIRECTION OF EGRESS) (WALL MTD LEFT, CEILING MTD RIGHT) NOTE: UNLESS NOTED OTHERWISE, PROVIDE OVERSIZED JUNCTION BOX AND 1" EMPTY CONDUIT WITH PLASTIC INSULATING BUSHINGS AND PULL STRING STUBBED MIN. 6" INTO ACCESSIBLE CEILING SPACE, COORDINATE WITH LV CONTRACTOR FOR FINAL REQUIREMENTS. �X TELEPHONE OUTLET, WALL MTD X =NUMBER OF TELEPHONE PORTS v DATA OUTLET, WALL MTD Y =NUMBER OF DATA PORTS XY 0 COMBINATION TELE/DATA OUTLET, WALL MTD X =NUMBER OF TELEPHONE PORTS Y =NUMBER OF DATA PORTS FV @ TELEPHONE OUTLET (FLOOR MTD LEFT, CEILING MTD RIGHT) F ® DATA OUTLET (FLOOR MTD LEFT, CEILING MTD RIGHT) F ® COMBINATION TELE/DATA OUTLET (FLOOR MTD LEFT, CEILING MTD RIGHT) WIRELESS ACCESS POINT (CEILING MTD LEFT, WALL MTD RIGHT) ® TELEPHONE BACKBOARD (TBB) F-Q INTERCOM OUTLET QM INTERCOM STATION BLANK = REMOTE M =MASTER Av Av AUDIO / VIDEO DEVICE (WALL MTD LEFT, CEILING MTD RIGHT) AV =AUDIO / VIDEO OUTLET M =MICROPHONE OUTLET SM =SECURITY MONITOR OUTLET TV =TELEVISION OUTLET V = VOLUME CONTROL AMP SOUND SYSTEM AMPLIFIER I -Os SPEAKER (WALL MTD LEFT, CEILING MTD RIGHT) AUDIBLE NOTIFICATION DEVICE B = BELL C =CHIME G =GONG LB I BUZZER c[D/ BELL & BUZZER COMBINATION AUDIBLE NOTIFICATION DEVICE H =HORN S =SIREN BT AUXILIARY SYSTEM DEVICE BT =BELL RINGING TRANSFORMER R = RELAY D = ELECTRIC DOOR OPENER LV =LOW VOLTAGE TRANSFORMER 1-0 ANNUNCIATOR B� B� INDICATOR LIGHT (WALL MTD LEFT, CEILING MTD RIGHT) BL = BURGLAR ALARM LIGHT F Q CLOCK M M =MASTER DF = DOUBLE FACE S =COMBINATION SPEAKER oc PVM SECURITY DEVICES DC =DOOR CONTACT GB =GLASS BREAK DETECTOR HD =HEAT DETECTOR HU =HOLD-UP BUTTON KP = KEY PAD MD =MOTION DETECTOR PB =PANIC BUTTON PVM =PUBLIC VIEW MONITOR SD =SOUND DETECTOR SEC =SECURITY CONTROL PANEL VS = VIBRATION SENSOR WC = WINDOW CONTACT cR ACP ACCESS CONTROL DEVICE ACP = ACCESS CONTROL PANEL CR =CARD READER ES =ELECTRIC STRIKE ML =MAGNETIC LOCK PS =PROXIMITY SENSOR PWR =POWER SUPPLY RX =REQUEST EXIT PUSH BUTTON SECURITY CAMERA (WALL MTD LEFT, CEILING MTD RIGHT) PTZ =PAN/TILT/ZOOM BX =BOX D =MINI DOME BL =BULLET WP = WEATHERPROOF Q • •j F------1 PUSHBUTTON STATION (BUTTONS REPRESENTED BY SOLID DOTS) IJH NORMAL / EMERGENCY CALL BUTTON PUSH BUTTON F0 0 THERMOSTAT (WALL MTD LEFT, CEILING MTD RIGHT) A AMPERE GRS GALVANIZED RIGID STEEL PH PHASE AFC AVAILABLE FAULT CURRENT HOA HAND -OFF -AUTO PNL PANEL AFCI ARC FAULT CIRCUIT INTERRUPTER IG ISOLATED GROUND PWR POWER AFF ABOVE FINISHED FLOOR JB JUNCTION BOX RECEP RECEPTACLE AFG ABOVE FINISHED GRADE KVA KILOVOLT -AMPERE RM ROOM AHJ AUTHORITY HAVING JURISDICTION KW KILOWATT SCCR SHORT CIRCUIT CURRENT RATING AIC AMPERE INTERRUPTING CAPACITY L.S.I.G. LONG, SHORT, INSTANTANEOUS, GROUND SW SWITCH ATS AUTOMATIC TRANSFER SWITCH FAULT TRIP SWBR SWITCHBOARD BLDG BUILDING LTG LIGHTING SWGR SWITCHGEAR BRKR BREAKER MCA MINIMUM CIRCUIT AMPS TBB TELEPHONE BACKBOARD C CONDUIT MCB MAIN CIRCUIT BREAKER TELCO TELEPHONE COMPANY CKT CIRCUIT MCC MOTOR CONTROL CENTER TELE TELEPHONE CLG CEILING MCCB MOLDED CASE CIRCUIT BREAKER TGB TELECOMMUNICATIONS GROUNDING BUSBAR CPT CONTROL POWER TRANSFORMER MCP MOTOR CIRCUIT PROTECTOR TMGB TELECOMMUNICATIONS MAIN GROUNDING CT CURRENT TRANSFORMER MDP MAIN DISTRIBUTION PANEL BUSBAR CU COPPER MFS MAXIMUM FUSE SIZE TYP TYPICAL CTR CENTER MGB MAIN GROUNDING BUSBAR UG UNDERGROUND EA EACH MLO MAIN LUG ONLY UNO UNLESS NOTED OTHERWISE EG EQUIPMENT GROUND MOCP MAXIMUM OVERCURRENT PROTECTION UPS UNINTERRUPTIBLE POWER SUPPLY EGC EQUIPMENT GROUNDING CONDUCTOR MTD MOUNTED V VOLT EM EMERGENCY MTS MANUAL TRANSFER SWITCH VIF VERIFY IN FIELD EOL ELECTRONIC OVERLOAD N.C. NORMALLY CLOSED W/ WITH FDR FEEDER N.O. NORMALLY OPEN W WIRE FLA FULL LOAD AMPS NL NIGHT LIGHT WP WEATHERPROOF GEC GROUNDING ELECTRODE CONDUCTOR NTS NOT TO SCALE WR WEATHER RESISTANT GFI GROUND FAULT INTERRUPTER OCPD OVERCURRENT PROTECTION DEVICE XFMR TRANSFORMER GFCI GROUND FAULT CIRCUIT INTERRUPTER OH OVERHEAD GND GROUND P POLE RACEWAY SYMBOLS: HOMERUN CIRCUIT TO PANELBOARD - LV - LOW VOLTAGE CABLE - CONDUIT BURIED CONDUIT CONCEALED CONDUIT EXPOSED FLEXIBLE CONDUIT o- CONDUIT UP c_ CONDUIT DOWN p CONDUIT SEAL -OFF CONDUIT TEE BODY r CONDUIT EL BODY T CONDUIT CAP u CONDUIT SLEEVE WITH BUSHINGS PB PULL BOX HH HAND HOLE CODES IN EFFECT(FL): ALL WORK SHALL BE IN STRICT ACCORDANCE WITH: • NATIONAL ELECTRICAL CODE - 2017 • FLORIDA BUILDING CODE - 2020 (7TH EDITION) • ASHRAE 90.1 - 2016 • INTERNATIONAL ENERGY CONSERVATION CODE - 2015 WORK AND EQUIPMENT UNDER THIS DIVISION SHALL BE IN STRICT COMPLIANCE WITH THE CODES, STANDARDS, AND PRACTICES LISTED HEREIN. THEIR RESPECTIVE DATES ARE FURNISHED AS THE MINIMUM REQUIREMENTS (UNLESS OTHERWISE DETERMINED BY THE LOCAL AUTHORITIES HAVING JURISDICTION). ELECTRICAL SHEET INDEX E-0.1 ELECTRICAL LEGEND AND ABBREVIATIONS E-0.2 ELECTRICAL GENERAL NOTES E-0.3 ELECTRICAL SPECIFICATIONS E-1.1 ELECTRICAL PLANS E-2.1 ELECTRICAL RISER AND DETAILS N o N O � f6 0 0 z U EL o z a) a N 0 `D w a w 0 LL w D U) W :i izo INFINITY ENGINEERING GROUT', LLC 1208 East Kennedy Boulevard Suuite 230 Tampa, Florida 33602 [p]: 813.434.4770 [f]: 813.445.4211 www.legrouup.net EL Cert. of Auutlu. No. 27889 ANC, RP. E. e v p 7 ° S ATE °°iij N N ®B99iYfF`=-° Date L M z L Q ( 0 U) O _j Z z z 2 p_ 2 rrwnn V _) J W = N T m .�,n GENERAL NOTES: 1. PRE -BID SITE VISIT: CONTRACTOR PROPOSING TO UNDERTAKE WORK UNDER THIS DIVISION SHALL VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES OF ALL CONDITIONS THAT EFFECT THE WORK AND COST THEREOF AND EXAMINE THE DRAWINGS AS RELATED TO THE SITE CONDITIONS. BIDDERS WHO DO NOT VISIT THE SITE MAY BE UNILATERALLY NOT PERMITTED TO SUBMIT A BID IF THE OWNER SO DESIGNATES. 2. BID TERMS AND CONDITIONS: THE ELECTRICAL CONTRACTOR SHALL OBTAIN A FULL SET OF PLANS AND SPECIFICATIONS FROM THE GENERAL CONTRACTOR PRIOR TO BID. CONSIDERATION WILL NOT BE GRANTED FOR ANY ALLEGED MISUNDERSTANDINGS OF THE AMOUNT OF WORK TO BE PERFORMED. TENDER OF PROPOSAL SHALL CONVEY FULL AGREEMENT TO THE ITEMS AND CONDITIONS INDICATED IN THE PLANS AND SPECIFICATIONS. ANY DISCREPANCIES OR OMISSIONS FOUND IN THE CONTRACT DOCUMENTS OR DOUBT AS TO THE INTENT THEREOF, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT IN WRITING TO OBTAIN CLARIFICATION FROM THE ENGINEER AND/OR OWNER'S REPRESENTATIVE PRIOR TO SUBMITTING PROPOSAL FOR WORK. WHERE CLARIFICATION CANNOT BE PROVIDED PRIOR TO BID, THE CONTRACTOR SHALL ASSUME THE MORE EXPENSIVE METHOD FOR THE BID. WITHOUT FORMAL AUTHORIZATION, THE ARCHITECT AND OWNER RESERVE THE RIGHT TO REQUIRE THE MORE RESTRICTIVE SPECIFICATION. 3. EXCLUSIONS: MATERIAL AND LABOR EXCLUDED BY THE ELECTRICAL CONTRACTOR SHALL NOT RELIEVE THE GENERAL CONTRACTOR FROM PROVIDING SAME. 4. COMPLETE SYSTEM: FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, TRANSPORTATION, SUPERINTENDENTS AND SERVICES REQUIRED TO CONSTRUCT, INSTALL, AND MODIFY THE ELECTRICAL SYSTEMS AS HEREIN SPECIFIED AND SHOWN ON THESE DRAWINGS FOR A COMPLETE AND FULLY OPERATIONAL SYSTEM. COORDINATE WORK TO BE PERFORMED OR INSTALLED BY OTHERS AFFECTING THE ELECTRICAL WORK AND FURNISH AND INSTALL ALL NECESSARY STEEL SHAPES, BLOCKING, ANCHORS, SLEEVES, HANGERS, ETC. FOR ATTACHING OR CONNECTING ELECTRICAL WORK TO RELATED WORK OF OTHER TRADES. ALL ITEMS NOT SPECIFICALLY MENTIONED HEREIN OR NOT INDICATED IN THE DRAWINGS, WHICH ARE NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION, SHALL BE PROVIDED WITHOUT ADDITIONAL EXPENSE TO THE OWNER. DRAWINGS AND SPECIFICATIONS DO NOT UNDERTAKE TO INDICATE EVERY ITEM OF MATERIAL, EQUIPMENT, OR LABOR REQUIRED TO PRODUCE A COMPLETE AND PROPERLY OPERATING INSTALLATION. 5. PERMITS: OBTAIN ALL NECESSARY PERMITS, LICENSES, AND INSPECTIONS AS REQUIRED BY ANY OF THE FOREGOING AUTHORITIES AND PAY FOR ALL OTHER COSTS IN CONNECTION WITH THE WORK. 6. INSPECTIONS: CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED AND APPROVED BY ELECTRICAL INSPECTOR AND/OR ARCHITECT/ENGINEER. 7. REGULATIONS: ALL ELECTRICAL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE LATEST ADOPTED NATIONAL ELECTRICAL CODE (NEC) AND ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCAL BUILDING CODES, RULES, REGULATIONS AND AUTHORITIES HAVING JURISDICTION. 8. WORKMANSHIP: ALL WORK SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH APPLICABLE NECA STANDARDS SUBJECT TO THE APPROVAL OF THE OWNER OR OWNER'S AUTHORIZED REPRESENTATIVE. RACEWAY, FIXTURES, AND WIRING DEVICES SHALL BE PROPERLY ALIGNED, LEVELED, PLUMBED AND SUPPORTED. RACEWAY SHALL BE GROUPED AND INSTALLED IN RUNS WHICH ARE PARALLEL AND PERPENDICULAR WITH BUILDING LINES. 9. COORDINATION: PRIOR TO COMMENCEMENT OF WORK, EXAMINE ALL CONSTRUCTION DRAWINGS AND SPECIFICATIONS AND COORDINATE WITH ALL OTHER TRADES INCLUDING GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, LOW VOLTAGE CONTRACTOR, AND SECURITY CONTRACTOR IN ORDER TO BECOME FAMILIAR WITH ALL ASPECTS OF THE DESIGN AFFECTING THE ELECTRICAL WORK AND TO CONFIRM SITE SPECIFIC INSTALLATION REQUIREMENTS. REFER TO ARCHITECTURAL DRAWINGS AND EQUIPMENT CUT SHEETS FOR EQUIPMENT POWER/CONTROL REQUIREMENTS, CONNECTIONS, WIRING DEVICE TYPE, MOUNTING HEIGHTS, MEANS OF ATTACHMENT, AND LOCATIONS OF ALL NEW EQUIPMENT AND ELECTRICAL DEVICES. FIELD VERIFY EXACT NAMEPLATE DATA ON ALL EQUIPMENT FURNISHED UNDER OTHER DIVISIONS AND/OR BY THE OWNER PRIOR TO THE INSTALLATION OF ELECTRICAL WORK AND MAKE ANY ADJUSTMENTS TO OUTLETS, CONDUITS, WIRE, AND/OR CIRCUIT BREAKER/FUSE RATINGS AS REQUIRED TO MATCH EQUIPMENT ACTUALLY FURNISHED. 10. EQUIPMENT AND DEVICE LOCATIONS: LOCATIONS ON THE ELECTRICAL PLANS ARE APPROXIMATE. EXACT LOCATIONS SHALL BE DETERMINED FROM ARCHITECTURAL PLANS, SECTIONS, AND ELEVATIONS. FINAL LOCATION OF EQUIPMENT AND DEVICES TO BE COORDINATED WITH ARCHITECT, OWNER, AND/OR OWNER'S REPRESENTATIVE. VERIFY STUB -UP LOCATION FOR ALL UNDER SLAB CONDUITS PRIOR TO ROUGH -IN. 11. UTILITIES: UTILITY COORDINATION INFORMATION SHOWN ON THE DRAWINGS SHALL BE CONSIDERED PRELIMINARY. COORDINATE WITH LOCAL POWER COMPANY AND TELCO (TELEPHONE/CABLE/INTERNET) PROVIDERS FOR SERVICE REQUIREMENTS AND VERIFY FINAL POINT OF CONNECTION PRIOR TO MOBILIZATION IN THE FIELD. NOTIFY UTILITIES OF COMMENCEMENT OF WORK AND MAKE ALL ARRANGEMENTS FOR TEMPORARY AND PERMANENT SERVICES. PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR TO MEET UTILITY REQUIREMENTS. INCLUDE ALL ASSOCIATED COSTS TO SET-UP AND COORDINATE TEMPORARY AND PERMANENT ELECTRIC AND TELCO SERVICES IN BID. ALL MATERIALS MUST BE APPROVED BY THE LOCAL UTILITY. IF REQUIRED, THE ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT SYSTEMS FOR UTILITY MEDIUM VOLTAGE FROM UTILITY PRIMARY TO POINT OF 12. 13. 14 15. 17 W 21 INTERCEPTION AT EDGE OF PROPERTY LINE. TEMPORARY POWER: PROVIDE TEMPORARY SERVICE FOR LIGHTING, POWER EQUIPMENT (DRILLS, SAWS, ETC.), AND CONTRACTOR MOBILIZED WORK TRAILERS. VERIFY TEMPORARY SERVICE REQUIREMENTS WITH GENERAL CONTRACTOR. TEMPORARY LIGHTING AND POWER SHALL MEET OSHA REQUIREMENTS AND LOCAL CODE. INTERRUPTION OF SERVICE: COORDINATE ALL WORK REQUIRING INTERRUPTION OF SERVICE (POWER, SECURITY, DATA, FIRE ALARM, ETC) WITH ALL AFFECTED PARTIES, INCLUDING BUT NOT LIMITED TO GENERAL CONTRACTOR, BUILDING OWNER AND/OR LANDLORD, TENANT(S), AND OWNER AND/OR OWNER'S REPRESENTATIVE AND OBTAIN WRITTEN PERMISSION FROM SAID PARTIES AT LEAST 48 HOURS PRIOR TO SHUT DOWN. PROVIDE NOTICE TO ALL OTHER TRADES OF ALL SCHEDULED INTERRUPTIONS. ALL OUTAGES OR INTERRUPTIONS SHALL BE KEPT TO MINIMUM DURATION. PROVIDE TEMPORARY SERVICE DURING OUTAGE WHEN REQUIRED BY AFFECTED PARTIES. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE PERSONNEL FOR FIRE AND SECURITY WATCH DURING OUTAGES TO FIRE AND SECURITY SYSTEMS. PRODUCTS: ALL ELECTRICAL MATERIALS SHALL BE NEW EXCEPT WHERE SPECIFICALLY NOTED AS EXISTING TO BE REUSED. MATERIAL AND METHODS OF INSTALLATION SHALL CONFORM TO THE STANDARDS OF UNDERWRITERS LABORATORIES, INC. (UL), ANSI, NFPA, ADA, AND ALL OTHER APPLICABLE LOCAL ORDINANCES. DEFECTIVE EQUIPMENT AND/OR EQUIPMENT DAMAGED DURING INSTALLATION AND/OR TESTING SHALL BE REPLACED OR REPAIRED IN A MANNER MEETING THE APPROVAL OF THE ARCHITECT AND THE ENGINEER. PROPOSED EQUIPMENT SHALL BE NRTL LISTED, LABELED, OR APPROVED. SHOP DRAWINGS AND SUBMITTALS: SUBMIT MANUFACTURER'S STANDARD PRODUCT INFORMATION, PERFORMANCE SPECIFICATIONS, ELECTRICAL RATINGS, PHYSICAL DIMENSIONS, AND OTHER INFORMATION NECESSARY FOR ENGINEER TO ENSURE COMPLIANCE WITH SPECIFICATIONS. SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL PRIOR TO ORDERING AND INSTALLING ANY EQUIPMENT. SUBMITTALS AND SHOP DRAWINGS SHALL CLEARLY INDICATE ITEMS TO BE REVIEWED BY HIGHLIGHTING, AND ITEMS NOT TO BE REVIEWED SHALL BE CROSSED OUT. SUBMITTALS WITHOUT HIGHLIGHTING AND CROSSED OUT ITEMS SHALL NOT BE REVIEWED. ALL SUBMITTALS MUST BE RECEIVED BY THE ENGINEER WITHIN 30 DAYS OF CONTRACT AWARD TO THE GENERAL CONTRACTOR; NO EXCEPTIONS. EQUIPMENT ORDERED OR INSTALLED WITHOUT A FAVORABLY REVIEWED SUBMITTAL IS DONE AT THE CONTRACTOR'S OWN RISK. VALUE ENGINEERING SUBMITTALS: VALUE ENGINEERING SUBMITTALS SHALL BE LABELED AS SUCH AND INDICATE A 'DEDUCT' OR CREDIT BACK TO THE OWNER. VE SUBMITTALS NOT CLEARLY LABELED OR NOT INCLUDING A DEDUCT SHALL BE REJECTED. SUBSTITUTION AND ALTERATIONS: THERE SHALL BE NO DEVIATION FROM THE REQUIREMENTS HEREIN WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER. CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL COSTS INCURRED RESULTING FROM SUBSTITUTION OF EQUIPMENT AS WELL AS THE PERFORMANCE AND SPACE REQUIREMENTS OF SUCH EQUIPMENT. SUBSTITUTIONS AND ALTERATIONS OF OTHER DISCIPLINE'S EQUIPMENT: SUBSTITUTED AND ALTERED EQUIPMENT BY OTHER DISCIPLINES SHALL INCLUDE ALL MATERIAL AND LABOR COSTS FOR ELECTRICAL CONTRACTOR TO PROVIDE COMPLETE AND FULLY FUNCTIONAL SYSTEMS TO ACCOMMODATE THESE SUBSTITUTED AND ALTERED EQUIPMENT. THESE ADDITIONAL ELECTRICAL COSTS MUST BE ABSORBED BY THE OTHER DISCIPLINE'S CONTRACTOR IN ORDER FOR THE SUBSTITUTED OR ALTERED GEAR TO BE ACCEPTED. FAULT CURRENT PROTECTION: ALL EQUIPMENT SHORT CIRCUIT CURRENT RATINGS (SCCR) AND OVERCURRENT PROTECTIVE DEVICE AMPERE INTERRUPTING CAPACITY (AIC) RATINGS SHALL BE GREATER THAN THE AVAILABLE FAULT CURRENT AT EACH RESPECTIVE PIECE OF EQUIPMENT. COORDINATE EQUIPMENT SCCR AND OVERCURRENT PROTECTIVE DEVICE AIC RATINGS WITH POWER COMPANY. OBTAIN THE AVAILABLE FAULT CURRENT AT TRANSFORMER SECONDARY FROM THE POWER COMPANY AND PROVIDE PROPOSED EQUIPMENT SCCR AND OVERCURRENT PROTECTIVE DEVICE AIC RATINGS FOR ENGINEER APPROVAL. OVERCURRENT PROTECTIVE DEVICES AIC RATINGS SHALL BE FULLY RATED WITH A MINIMUM 10% MARGIN BETWEEN THE CALCULATED FAULT LEVEL AND THE SPECIFIED SHORT CIRCUIT RATING OF THE EQUIPMENT UNO ON PLANS. VOLTAGE DROP: WIRE SIZES SPECIFIED IN THESE PLANS ARE MINIMUM WIRE SIZES. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INCREASING WIRE SIZES BASED ON ACTUAL CIRCUIT LENGTH TO MAINTAIN VOLTAGE DROP AT A MAXIMUM OF 3% FOR BRANCH CIRCUITS AND 2% FOR FEEDERS, THE CUMULATIVE VOLTAGE DROP FROM THE SOURCE TO THE END DEVICE SHALL NOT EXCEED 5% OF NOMINAL SYSTEM VOLTAGE. WIRING: ALL CONDUCTORS CARRYING 50 VOLTS OR MORE SHALL BE MINIMUM #12 AWG, CU, UNO. PROVIDE DUAL RATED TYPE THHN-THWN FOR ABOVE GROUND AND TYPE THWN OR XHHW FOR BELOW GROUND, COORDINATE INSULATION TYPES WITH ENVIRONMENTAL CONDITIONS, NEC REQUIREMENTS, AND CONDUIT FILL REQUIREMENTS. CONDUCTORS #12 AND #10 SHALL BE SOLID, CONDUCTORS #8 AND LARGER SHALL BE STRANDED. ALL CONDUCTOR SIZES ARE BASED ON COPPER WITH 600C INSULATION FOR CIRCUITS RATED 100A OR LESS AND 750C FOR CIRCUITS RATED MORE THAN 100A. 22. LOW VOLTAGE WIRING: LOW VOLTAGE WIRING FOR SPECIAL SYSTEMS IS PERMITTED TO BE FREE -WIRED ONLY ABOVE ACCESSIBLE CEILINGS AND BELOW RAISED FLOOR SYSTEMS, UNO, FREE -WIRED CABLE SHALL BE UL LISTED, PLENUM RATED. LOW VOLTAGE WIRING IN OPEN CEILINGS, HARD CEILINGS, WALLS, PASSING THROUGH ADJACENT TENANT SPACES, OR ROUTED UNDERGROUND OR BELOW SLAB SHALL BE INSTALLED IN CONDUIT. LOW VOLTAGE WIRING IS NOT SHOWN ON PLANS, UNLESS SPECIFICALLY CALLED OUT. 23, COLOR CODING: FOR EXISTING WIRING SYSTEMS, COLOR CODING SHALL FOLLOW EXISTING SITE REQUIREMENTS. FOR NEW INSTALLATIONS OR WHERE EXISTING INSTALLATIONS DO NOT HAVE A COLOR CODING CONVENTION, THE FOLLOWING SYSTEMS OF COLOR CODING SHALL BE STRICTLY ADHERED TO AND FOLLOWED THROUGHOUT: CONDUCTOR 480Y/277V, 3-PH 2O8Y/120V, 3-PH 240D/12OV, 3-PH 240/120V, 1-PH PHASE A: BROWN BLACK BLACK BLACK PHASE B: ORANGE RED ORANGE RED PHASE C: YELLOW BLUE BLUE --- NEUTRAL: GRAY WHITE WHITE WHITE EQUIPMENT GROUND: GREEN GREEN GREEN GREEN ISOLATED GROUND: --- GREENNELLOW GREENNELLOW GREENNELLOW 24. SHARED CIRCUIT NEUTRALS: SHARED CIRCUIT NEUTRALS SHALL NOT BE USED UNLESS INDICATED OTHERWISE ON PANEL SCHEDULE. WHERE USED, CIRCUIT BREAKER HANDLE TIES SHALL BE PROVIDED TO DISCONNECT POWER TO EACH PHASE CONDUCTOR OF THE SHARED NEUTRAL CIRCUIT. 25. GROUNDING: ALL CIRCUITS SHALL BE PROVIDED WITH AN INSULATED GREEN COPPER EQUIPMENT GROUND CONDUCTOR SIZED PER NEC. THE EQUIPMENT GROUND CONDUCTOR SHALL BE INCREASED IN SIZE BY EQUAL PROPORTION TO THE PHASE CONDUCTORS WHENEVER THE PHASE CONDUCTORS HAVE BEEN UPSIZED TO MAINTAIN ACCEPTABLE VOLTAGE DROP LEVELS. EQUIPMENT GROUNDS SHALL BE BONDED TO ALL EQUIPMENT AND DEVICES. USE OF METALLIC CONDUIT SHALL NOT TAKE THE PLACE OF AN EQUIPMENT GROUND CONDUCTOR. 26. CONDUIT: ALL WIRING SHALL BE INSTALLED IN CONDUIT, MINIMUM 1/2" FOR INDOOR AND 3/4" FOR OUTDOOR AND UNDER SLAB. EMT IS ACCEPTABLE WITH COMPRESSION FITTINGS ONLY. ALL HOMERUNS SHALL BE HARD PIPED. MC IS ACCEPTABLE FOR FIXTURE WHIPS ONLY. ALL CONDUIT AND WIRING SHALL BE CONCEALED IN FLOORS, WALLS, AND/OR CEILINGS UNLESS SPECIFICALLY NOTED OTHERWISE OR WHERE APPROVED BY ARCHITECT, LANDLORD AND/OR OWNER / OWNER'S REPRESENTATIVE. CHANNEL EXISTING WALLS WHERE REQUIRED. WHERE CONDUITS ARE UNABLE TO BE CONCEALED, HARD PIPED CONDUIT SHALL BE USED AND PAINTED TO MATCH ADJOINING SURFACE. 27. UNDERGROUND CONDUITS: MINIMUM BURIAL DEPTH SHALL BE 24" TO TOP OF CONDUIT. PROVIDE DETECTABLE WARNING TAPE WHERE REQUIRED BY AHJ OR CODE. 28. ROUTING: FOR CLARITY, CONDUIT ROUTING SHOWN IS SYMBOLIC AND DIAGRAMMATIC. INSTALL CONDUIT TO FIT ACTUAL FIELD CONDITIONS. 29. OPEN CEILINGS: IN AREAS WITHOUT CEILINGS OR WHERE ANY CONDUITS, CONDUCTORS, FEEDERS, OR LOW VOLTAGE CABLING IS VISIBLE, ALL WIRING SHALL BE HARD PIPED IN CONDUIT. BX, AC, AND MC CABLE OR FLEX CONDUIT ARE NOT PERMITTED. CONDUITS SHALL BE ROUTED TIGHT TO DECK EITHER PARALLEL OR PERPENDICULAR TO BUILDING LINES, GROUPED ALONG STRUCTURAL MEMBERS, AND DROP AT POINT OF CONNECTION. MAINTAIN 1-1/2" CLEARANCE FROM ROOF DECK PER NEC 300.4(E). WHERE EXPOSED TO VIEW, ALL MATERIALS (CONDUIT, JUNCTION BOXES, ETC.) SHALL BE INSTALLED IN AN ORDERLY FASHION AND SHALL BE CLEAN, FREE FROM ALL VISIBLE MARKINGS, AND PAINTED TO MATCH ADJOINING SURFACE. JUNCTION BOXES SHALL HAVE CIRCUIT NUMBERS WRITTEN ON THE INSIDE OF THE JUNCTION BOX COVER. 30. PENETRATIONS: CONTRACTOR SHALL INSPECT AREA OF WORK AND PERFORM GROUND PENETRATING RADAR (GPR) SCAN OR X-RAY ALL PROPOSED PENETRATIONS PRIOR TO WORK TO DETERMINE EXACT LOCATIONS OF STRUCTURAL REINFORCEMENT OR EMBEDDED SYSTEMS. COORDINATE FLOOR AND WALL PENETRATIONS WITH STRUCTURAL ENGINEER. ALL PENETRATIONS SHALL BE SEALED BY APPROVED MEANS TO PREVENT ENERGY LOSS AND MOISTURE AND RODENT INTRUSION. 31. FIRE -RATED PENETRATIONS: ALL PENETRATIONS THROUGH FIRE -RATED SLABS AND/OR PARTITIONS SHALL BE SEALED WITH A UL LISTED FIRE -RATED ASSEMBLY OF EQUAL OR GREATER RATING THAN THAT OF THE EXISTING SLAB OR PARTITION. 32. TRENCHING: FIELD VERIFY UNDERGROUND UTILITIES PRIOR TO TRENCHING. ALL PROPOSED EXCAVATION IN THE VICINITY OF EXISTING UTILITIES, PIPING SYSTEMS, OR SIMILAR SHALL BE HAND EXCAVATED. HAND EXCAVATE IN THE VICINITY OF EXISTING TREES WHERE TRENCHING MAY DAMAGE TREE ROOT SYSTEM. 33. SLEEVES: SLEEVES AND SLEEVE SEALS SHALL BE PROVIDED AT PENETRATIONS OF WALL ASSEMBLIES. 34. SUPPORTS: ALL CONDUIT AND CABLING SHALL BE PROPERLY SUPPORTED AS REQUIRED BY CODE. 35. REPAIRS: THE CONTRACTOR SHALL REPAIR ALL WALL, CEILING, FLOOR, OR ROOF OPENINGS WHICH ARE CREATED BY DEMOLITION OR PENETRATION. THE REPAIRS SHALL BE WITH MATERIAL AND FINISHES TO MATCH EXISTING ADJACENT UNDISTURBED FINISHED SURFACES. 36. IDENTIFICATION: ALL ELECTRICAL DISTRIBUTION EQUIPMENT, TRANSFORMERS, PANELBOARDS, AND OTHER ENCLOSED EQUIPMENT SHALL BE IDENTIFIED AS INDICATED IN THE CONTRACT DOCUMENTS. SAID IDENTIFICATION SHALL CONSIST OF PERMANENTLY ATTACHED ENGRAVED LAMINATED PLASTIC NAMEPLATES. EACH BRANCH CIRCUIT OVERCURRENT PROTECTION DEVICE SHALL BE IDENTIFIED BY CIRCUIT NUMBER AND SCHEDULED INSIDE PANEL DOOR WITH A TYPEWRITTEN CIRCUIT DIRECTORY. EACH BRANCH CIRCUIT SPLICE OR TERMINATION SHALL BE IDENTIFIED BY PANEL AND CIRCUIT DESIGNATION SHOWN ON THE JUNCTION OR OUTLET BOX, OR UPON INDIVIDUAL WIRES IN CASES WHERE MORE THAN ONE OF EACH PHASE CONDUCTOR OCCUR. RECEPTACLES AND SWITCH COVER PLATES SHALL BE LABELED WITH PANEL AND CIRCUIT DESIGNATION USING TYPEWRITTEN CHARACTERS OF CONTRASTING COLOR (BLACK OR WHITE) ON CLEAR ADHESIVE BACKED LABELS OR FACTORY ENGRAVED COVER PLATES. 37. PANEL CLEARANCE: MAINTAIN ALL WORKING SPACE AND DEDICATED EQUIPMENT SPACE CLEARANCES AS REQUIRED BY ARTICLE 110 OF THE NEC. GENERAL CONTRACTOR SHALL COORDINATE BETWEEN TRADES SO THAT NO FOREIGN SYSTEMS ARE LOCATED IN THE DEDICATED EQUIPMENT SPACE. IN THE EVENT THAT FOREIGN SYSTEMS ARE INSTALLED ABOVE A PANEL'S DEDICATED EQUIPMENT SPACE, THE GENERAL CONTRACTOR SHALL ABSORB THE COST TO RELOCATE THE FOREIGN SYSTEMS. 38. WIRING DEVICES: WIRING DEVICES AND COVER PLATES SHALL BE DECORA STYLE OF COLORS SELECTED BY THE ARCHITECT OR INTERIOR DESIGNER. GANG ADJACENT DEVICES WITH A SINGLE ONE-PIECE COVER PLATE, UNO. FOR REMODELS, ALL DEVICES AND COVER PLATES WITHIN THE CONTRACT AREA SHALL BE REPLACED WITH NEW DECORA STYLE DEVICES AND COVER PLATES, UNO. 39. CLEANING: UPON COMPLETION OF WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC. ALL EQUIPMENT AND DEVICES SHALL BE CLEANED AND POLISHED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SOAP AND WATER CLEANING OR OTHER METHODS THAT LEAVE A FILM SHALL BE CORRECTED UPON REQUEST BY THE ENGINEER OR ARCHITECT. 40. TESTING: THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND DEMONSTRATE TO THE OWNER ITS PROPER OPERATION. AT THE TIME OF FINAL INSPECTION AND TESTS, ALL CONNECTIONS AT PANELBOARDS, CONTROL PANELS, DEVICES, AND EQUIPMENT AND ALL SPLICES MUST BE COMPLETED. EACH BRANCH CIRCUIT AND ITS RESPECTIVE CONNECTED EQUIPMENT MUST TEST FREE OF SHORT CIRCUITS. 41. TRAINING: OWNER AND/OR OWNER'S REPRESENTATIVE SHALL BE TRAINED ON THE USE OF ANY NEW ELECTRICAL EQUIPMENT AND LIGHTING CONTROLS PRIOR TO FINAL ACCEPTANCE. 42. FINAL ACCEPTANCE: AT THE END OF CONSTRUCTION, A FINAL WALK-THROUGH SHALL BE PERFORMED. ALL DEFICIENCIES IDENTIFIED DURING FINAL INSPECTION SHALL BE CORRECTED. 43. CERTIFICATES OF APPROVAL: ALL CERTIFICATES OF APPROVAL SHALL BE IN DUPLICATE, DELIVERED TO THE ARCHITECT, AND BECOME THE PROPERTY OF THE OWNER. 44. PROJECT RECORD DOCUMENTS: THE ELECTRICAL CONTRACTOR SHALL MAINTAIN AT THE SITE, FOR THE OWNER, ONE COPY OF ALL DRAWINGS, ADDENDA, APPROVED SHOP DRAWINGS, REVISIONS AND OTHER MODIFICATIONS IN GOOD ORDER AND MARKED TO RECORD ALL CHANGES MADE DURING CONSTRUCTION. THE SET OF DRAWINGS AND OTHER INFORMATION SHALL BE DELIVERED TO THE OWNER WITHIN 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE AND ONE COPY GIVEN TO THE ENGINEER UPON COMPLETION OF WORK. DRAWINGS SHALL INCLUDE AT A MINIMUM: A. A SINGLE -LINE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND B. FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION. 45. OPERATIONS AND MAINTENANCE (O&M) MANUALS: PROVIDE TWO COPIES OF OPERATIONS AND MAINTENANCE MANUALS TO THE BUILDING OWNER IN HARD COPY AND ELECTRONIC FORMAT. HARD COPIES SHALL BE COMPILED AND ORGANIZED IN A BINDER. THE MANUALS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING: A. SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE, B. OPERATING AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED. C. NAMES AND ADDRESSES OF AT LEAST ONE QUALIFIED SERVICE AGENCY. D. WARRANTY INFORMATION. 46. WARRANTY: THE ENTIRE ELECTRICAL SYSTEM INSTALLED UNDER THIS CONTRACT SHALL BE HANDED OVER IN PROPER WORKING ORDER. ANY WORK OR MATERIALS WHICH DEVELOP DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR, WITHIN ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE SHALL BE REPLACED WITHOUT CHARGE. IF MATERIALS HAVE A STANDARD WARRANTY GREATER THAN ONE YEAR, THE MANUFACTURER'S STANDARD WARRANTY SHALL APPLY. BENEFICIAL USE SHALL NOT BE CONSTRUED AS FINAL ACCEPTANCE. THE ELECTRICAL CONTRACTOR SHALL, DURING THE ONE YEAR GUARANTEE PERIOD, BE RESPONSIBLE FOR THE PROPER REPAIR AND ADJUSTMENTS OF ALL ELECTRICAL SYSTEMS AND EQUIPMENT, APPARATUS, DEVICES, ETC. INSTALLED BY HIM, AND DO ALL WORK NECESSARY TO ENSURE EFFICIENT AND PROPER FUNCTIONING. N o N O m cc � z a Q In 0 �O .N w a > 0 w w U) 6 z INFINITY ENGINEERING GROUP, LLC 1208 East Kennedy Boulevard Suite 230 Tampa, Florida 33602 [p]: 813.434.4770 [fl: 813.445.E-2ifl www.iegroup.net FL Cert. of Auth. No. 27889 d' LO m F'- L_ W O � LIJ z z = W W J = W _J W J = N Q O Uz = 0000 NW J U N (D W Q C M o 00 J W M z U N o U1 a` <n Project No. Sheet 280-22.00 C E-O.2 Date AS NOTED Scale AS NOTED PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section. 1.02 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS A. Equipment, fixtures, material and installation shall conform to the requirements of the local Building Department, the serving utility companies, the National Electrical Code, National Electrical Safety Code, Life Safety Code, Occupational Safety and Health Act, and applicable national, state and local codes, ordinances and regulations. B. All equipment shall be equal to or exceed the minimum requirements of NEMA, IEEE, and UL. C. Should any change in Drawings or Specifications be required to comply with governmental regulations, the Contractor shall notify Architect/Engineer prior to execution of the Work. The work shall be carried out according to the requirements of such code in accordance with the instruction of the Architect/Engineer and at no additional cost to the Owner. D. The provisions of Standards, Codes, Laws, Ordinances, etc., shall be considered minimum requirements. In case of conflict between their published requirements, the Owner's Representative shall determine which is to be followed and his decision shall be binding. Specific requirements of this specification or the drawings, which exceed the published requirements, shall take precedence over them. 1.03 FEES A. All local fees, permits, and services of inspection authorities shall be obtained and paid for by the Contractor. The Contractor shall cooperate fully with local companies with respect to their services. Contractor shall include in his bid any costs to be incurred relative to power service (primary and/or secondary) and telephone service. 1.04 SCOPE OF WORK A. This division of the specifications covers the electrical systems of the project. It includes work performed by the electrical trades as well as trades not normally considered as electrical trades. B. Provide all incidentals, equipment, appliances, services, hoisting, scaffolding, supports, tools, supervision, labor consumable items, fees, licenses, etc., necessary to provide complete systems. Perform start-up and checkout on each item and system to provide fully operable systems. C. Examine and compare the Electrical Drawings with these specifications, and report any discrepancies between them to the Architect/Engineer and obtain from him written instructions for changes necessary in the work. At time of bid the most stringent requirements must be included in the bid. D. Examine and compare the Electrical Drawings and Specifications with the Drawings and Specifications of other trades, and report any discrepancies between them to the Architect/Engineer and obtain from him written instructions for changes necessary in the work. At time of bid, the most stringent requirements must be included in said bid. E. Install and coordinate the electrical work in cooperation with other trades installing interrelated work. Before installation, make proper provisions to avoid interferences in a manner approved by the Architect/Engineer. All changes required in the work of the Contractor, caused by his neglect to do so, shall be made by him at his own expense. F. It is the intent of the Drawings and Specifications to provide a complete workable system ready for the Owner's operation. Any item not specifically shown on the Drawings or called for in the Specifications, but normally required to conform with the intent, are to be considered a part of the Contract. G. All materials furnished by the Contractor shall be new and unused (temporary lighting and power products are excluded) and free from defects. All materials used shall bear the Underwriter's Laboratory, Inc. label provided a standard has been established for the material in question. H. Except for conduit, conduit fittings, outlet boxes, wire and cable, all items of equipment or material shall be the product of one manufacturer throughout the entire project. Multiple manufacturers will not be permitted. 1.05 REFERENCES A. Utilize the following abbreviations and definitions for discernment within the Drawings and Specifications. 1. Abbreviations a) NEC National Electrical Code. b) OSHA Occupational Safety and Health Act. c) ANSI American National Standards Institute. d) NFPA National Fire Protection Association. e) ASA American Standards Association. f) IEEE Institute of Electrical and Electronics Engineers. g) NEMA National Electrical Manufacturers Association. h) UL Underwriters' Laboratories, Inc. i) IES Illuminating Engineering Society. j) ICEA Insulated Cable Engineers Association. k) ASTM American Society of Testing Materials. 1) ETL Electrical Testing Laboratories, Inc. m) CBM Certified Ballast Manufacturers. n) EIA Electronic Industries Association. o) LED Light Emitting Diode. p) OEM Original Equipment Manufacturer. 1.06 DEFINITIONS A. "PROVIDE" means to supply, purchase, transport, place, erect, connect, test, and turn over to Owner, complete and ready for regular operation, the particular Work referred to. B. "INSTALL" means to join, unite, fasten, link, attach, set up, or otherwise connect together before testing and turning over to Owner, complete and ready for regular operation, the particular Work referred to. C. "FURNISH" means to supply all materials, labor, equipment, testing apparatus, controls, tests, accessories, and all other items customarily required for the proper and complete application for the particular Work referred to. D. "WIRING" means the inclusion of all raceways, fittings, conductors, connectors, tape, junction and outlet boxes, connections, splices, and all other items necessary and/or required in connection with such Work. E. "CONDUIT" means the inclusion of all fittings, hangers, supports, sleeves, etc. F. "AS DIRECTED" means as directed by the Architect/Engineer, or his representative. G. "CONCEALED" means embedded in masonry or other construction, installed behind wall furring or within double partitions, or installed above hung ceilings. 1.07 COORDINATION OF THE WORK A. Certain materials will be provided by other trades. Examine the Contract Documents to ascertain these requirements. B. Carefully check space requirements with other trades and the physical confines of the area to insure that all material can be installed in the spaces allotted thereto including finished suspended ceilings and the spaces within the existing building. Make modifications thereto as required and approved. C. Transmit to other trades all information required for work to be provided under their respective Sections in ample time for installation. D. Wherever work interconnects with work of other trades, coordinate with other trades to insure that all trades have the information necessary so that they may properly install all the necessary connections and equipment. Identify all items of work that require access so that the ceiling trade will know where to install access doors and panels. E. Coordinate, project and schedule work with other trades in accordance with the construction sequence. F. The Drawings show only the general run of raceways and approximate location of outlets. Any significant changes in location of outlets, cabinets, etc., necessary in order to meet field conditions shall be brought to the immediate attention of the Architect/Engineer and receive his approval before such alterations are made. All such modifications shall be made without additional cost to the Owner. G. Obtain from the Architect/Engineer in the field the location of such outlets or equipment not definitely located on the Drawings. H. Circuit "tags" in the form of arrows are used where shown to indicate the home runs of raceways to electrical distribution points. These tags show the circuits in each home run and the panel designation. Show the actual circuits numbers on the finished record drawings and on panel directory card. Where circuiting is not indicated, Electrical Subcontractor must provide required circuiting in accordance with the loading indicated on the drawings and/or as directed. I. Adjust location of conduits, panels, equipment, pull boxes, fixtures, etc. to accommodate the work to prevent interferences, both anticipated and encountered. Determine the exact route and location of each raceway prior to fabrication. 1. Right -of -Way: a) Lines that pitch have the right-of-way over those that do not pitch. For example: steam, condensate, and plumbing drains normally have right-of-way. Lines whose elevations cannot be changed to have right-of-way over lines whose elevations can be changed. b) Make offsets, transitions and changes in direction in raceways as required to maintain proper headroom in pitch of sloping lines whether or not indicated on the Drawings. J. Wherever thei sufficient f h bidding Drawings, work s of su icient complexity, prepare additional Detail Drawings to scale similar to that o the g g , prepared on tracing medium of the same size as Contract Drawings. With these layouts, coordinate the work with the work of other trades. Such detailed work to be clearly identified on the Drawings as to the area to which it applies. Submit for review Drawings clearly showing the work and its relation to the work of other trades before commencing shop fabrication or erection in the field. K. Coordinate with the local Electric Utility Company and the local Telephone Company as to their requirements for service connections and provide all necessary materials, labor and testing. L. Coordinate with contractors for work under other Divisions of this specification for all work necessary to accomplish this contractor's work. 1.08 EXAMINATION OF SITE A. Prior to the submitting of bids, the Contractor shall visit the site of the job and shall familiarize himself with all conditions affecting the proposed installation and shall make provisions as to the cost thereof. Failure to comply with the intent of this paragraph will in no way relieve the contractor of performing all necessary work shown on the Drawings. 1.09 PROGRESS OF WORK A. The Contractor shall order the progress of his work to conform to the progress of the work of other trades and shall complete the entire installation as soon as the conditions of the building will permit. Any cost resulting from the defective or ill-timed work performed under this section shall be borne by the Contractor. 1.10 DELIVERY, STORAGE, AND HANDLING A. Ship and store all products and materials in a manner that will protect them from damage, weather and entry of debris. If items are damaged, do not install, but take immediate steps to obtain replacement or repair. Any such repairs shall be subject to review and acceptance of the Architect/Engineer. B. Deliver materials in manufacturer's unopened container fully identified with manufacturer's name, trade name, type, class, grade, size and color. C. Store materials suitably sheltered from the elements, but readily accessibly for inspection by the Architect/Engineer until installed. Store all items subject to moisture damage in dry, heated spaces. 1.11 EQUIPMENT ACCESSORIES A. Provide supports, hangers and auxiliary structural members required for support of the work. B. Furnish and set all sleeves for passage of raceways through structural, masonry and concrete walls of floors and elsewhere as will be required for the proper protection of each raceway passing through building surfaces. C. Wall mounted equipment may be directly secured to wall by means of steel bolts. Maintain at least 1" air space between equipment and supporting wall. Groups or arrays of equipment may be mounted on adequately sized steel angles, channels, or bars. Prefabricated steel channels providing a high degree of mounting flexibility, such as those manufactured by Kindorf, Glob-Strutt and Unistrut, may be used for mounting arrays of equipment. 1.12 OPERATIONS AND MAINTENANCE MANUALS A. General: Provide operations & maintenance (O&M) manuals in accordance with the Contract Documents. 1. Provide two (2) copies of each manual. 2. Manuals shall be 8-1/2 inches X 11 inches in hard cover 3-ring loose-leaf binders. 3. Manuals shall be complete and in Owner's hands prior to turning building over to Owner and at least 10 days prior to instruction to operating personnel. B. Provide manufacturer's literature as regularly published by the respective manufacturers for proper preventative and comprehensive maintenance. C. Provide O&M manuals including but not limited to the following. 1. Alphabetical list of all system components, with the name, address, and 24-hour phone number of the company responsible for servicing each item during the first year of operation. 2. Operating instructions for complete system including: a) Normal starting, operating, and shut -down. b) Emergency procedures for fire or failure of major equipment. c) Summer and winter special procedures, if any. d) Day and night special procedures, if any. 3. Maintenance instruction including: a) Proper lubricants and lubricating instructions for each piece of equipment, and date when lubricated. b) Necessary cleaning, replacement and/or adjustment schedule. 4. Manufacturer's data for each piece of equipment including: a) Installation instructions. b) Drawings and specifications. c) Parts list; including recommended items to be stocked. d) Complete wiring diagrams. e) Marked or changed prints locating all concealed parts and all variations from the original system design. f) Test and inspection certificates. D. Refer to individual specification sections for additional O&M requirements. 1.13 RECORD DOCUMENTS A. During construction, keep an accurate record of all deviations between the work as shown on Drawings and that which is actually installed. Keep this record set of prints at the job site for review by the Architect/Engineer. B. Upon completion of the installation and acceptance by the owner, transfer all record drawing information to one neat and legible set of prints. Then deliver them to the Architect/Engineer for transmittal to the Owner. C. Provide in each main electrical switchboard room a framed copy under glass of the appropriate Single Line Riser Diagram as reviewed by the electrical engineer. Media shall be a high quality presentation type paper. Blueprints or other media which fade shall not be used. 1.14 GUARANTEE A. Guarantee all material and workmanship for a period of one (1) year from date of final acceptance by the Owner, except that where guarantees or warranties for longer terms are specified herein, such longer term to apply. Within 24 hours after notification, correct any deficiencies that occur during the guarantee period at no additional cost to the Owner, all to the satisfaction of the Owner and Architect/Engineer. Obtain similar guarantees from subcontractors, manufacturers, suppliers and subtrade specialists. PART 2 - PRODUCTS 2.01 MATERIALS A. Applicable equipment and materials shall be listed by Underwriters' Laboratories and Manufactured in accordance with ASME, NEMA, ANSI or IEEE standards, and as approved by local authorities having jurisdiction as mentioned in Division 1. B. If products and materials are specified or indicated on the Drawings for a specific item or system, use those products or materials. If products and materials are not listed in either of the above, use first class products and materials, subject to approval of Shop Drawings where Shop Drawings are required or as approved in writing where Shop Drawings are not required. C. All equipment capacities, etc. are listed for job site operating conditions. All equipment sensitive to altitudes or ambient temperatures to be Berated and method of derating shown on Shop Drawings. Where operating conditions shown differ from the laboratory test conditions, the equipment to be derated and the method of Berating shown on Shop Drawings. 2.02 SUBSTITUTION OF MATERIALS OR EQUIPMENT A. All requests for substitution of materials or equipment shall be made in writing by the Contractor. The request must be in the Engineers office not less than 10 days prior to the bid date. Samples of proposed substitute materials or equipment shall be submitted to the Engineer for review whenever they are requested. Bids shall be based only upon the specified materials and equipment, or substitutes that have received written acceptance from the Engineer prior to the bid. B. Wherever the words "for approval" or "approved" are used in regard to manufactured specialties, or wherever it is desired to substitute a different make or type of apparatus for that specified, submit all information pertinent to the adequacy and adaptability of the proposed apparatus, and secure Architect/Engineer's acceptance before apparatus is ordered. C. Wherever quantities or a definite make and size of apparatus is specified, the make and size of apparatus which is proposed must conform substantially (in regard to the operating results) to that specified or implied. Same shall apply to important dimensions relating to operation of apparatus in coordination with the rest of the system, or to properly fitting it into available space conditions. Any substitution of equipment or apparatus shall include all necessary revisions, as required to complete the installation. D. Acceptance of substitutions, for equipment specified herein, will not be given merely upon submission of manufacturer's names and will be given only after receipt of complete and satisfactory performance data covering the complete range of operating conditions in tabular and graphical form. Furnish complete and satisfactory information relative to equipment dimensions, weight, etc. Acceptance of all equipment specified or shown on the Drawings, or substitutions submitted for that specified or shown on the Drawings, will be granted if such equipment, in the opinion of the Architect/Engineer, conforms to the performance requirements, space conditions, weight requirements and quality requirements. Any additional construction and design costs incurred as a result of an accepted substitution shall be borne b the Contractor. The opinion and judgement of the Y p Y p J 9 Architect/Engineer shall be final, conclusive, and binding. 2.03 SHOP DRAWINGS A. Prepare and submit detailed Shop Drawings for materials systems, and equipment as listed herein including locations and P p 9 , Y9 sizes of all openings in floor decks, walls, and floors. B. The Work described in any Shop Drawing submission shall be carefully checked for all clearances (including those required for maintenance and servicing),field conditions maintenance of architectural conditions and proper coordination with all trades n p p c o t des o the job. Each submitted Shop Drawing shall include a certification that all related job conditions have been checked and that no conflict exists. C. All drawings shall be submitted sufficiently in advance of field requirements to allow ample time for checking and resubmittal as may be required. All submittals shall be complete and contain all required and detailed information. D. Acceptance of any submitted data or Shop Drawings for material, equipment apparatus, devices, arrangements, and layout shall not relieve Contractor from responsibility of furnishing same of proper dimensions and weight, capacities, sizes, quantity, quality and installation details, to efficiently perform the requirements and intent of the Contract. Such acceptance shall not relieve Contractor from responsibility for errors, omissions, or inadequacies of any sort on submitted data or Shop Drawings. E. Each Shop Drawing shall contain the following information. 1. Provide general information on each copy of the submittal. a) Project title. b) Reference to the applicable drawing and specification article. c) Contractor and supplier identification, addresses and telephone numbers. d) Submittal Date. 2. Certification that the contractor has reviewed the submittal. 3. Refer to individual specification sections for additional information requirements. F. Shop Drawing submittals shall be provided for each specific material, system, or equipment as identified herein. 1. As a minimum, make submittals on the following items: a) Raceways, conduit & wire b) Wiring devices and plates c) Switchboards d) Transformers e) Panelboards f) Fuses g) Disconnect switches h) Motor control centers i) Motor controllers, starters, and contactors j) Lighting fixtures, lamps k) Instrumentation, metering equipment 1) Special systems - fire alarm, security, CCTV, intercom, etc. 2. Refer to individual specification sections for additional submittal requirements. PART 3 - EXECUTION 3.01 INSTALLATION B. Follow manufacturer's instructions for installing, connecting, and adjusting all equipment. Provide one copy of such instructions to the Architect/Engineer before installing any equipment. Provide a copy of such instructions at the equipment during any work on the equipment. Provide all special supports, connections, wiring, accessories, etc. C. Use mechanics skilled in their trade for all work. D. Keep all items protected before and after installation. Clean up all debris. E. Before commencing Work, examine all adjoining, underlying, etc., Work on which this Work is in any way dependent for perfect workmanship and report any condition which prevents performance of first class work. Become thoroughly familiar with actual existing conditions to which connections must be made or which must be changed or altered. 3.02 PREMIUM TIME WORK A. The following Work shall be performed at night or weekend other than holiday weekends as directed and coordinated with the Owner. 1. All tie-in, cut -over and modifications to the existing electrical system and other existing system requiring tie-ins or modifications shall be arranged and scheduled with the Owner to be done at a time as to maintain continuity of the service and not interfere with normal building operations. 3.03 EXCAVATION, TRENCHING AND BACKFILL A. Provide excavation for the Work. Excavate all material encountered, to the depths indicated on the drawings or required. Remove from the site, excavated materials not required or suitable for backfill. Provide grading, as may be necessary, to prevent surface water from flowing into trenches or other excavations. Remove any water accumulating therein. Provide sheeting and shoring as may be necessary for the protection of the Work and for the safety of personnel. B. Provide trenches of widths necessary for the proper execution of the Work. Grade bottom of the trenches accurately to provide uniform bearing and support the Work on undisturbed soil at every point along its entire length. Except where rock is encountered, do not excavate below the depths indicated. Where rock excavations are required, excavate rock to a minimum overdepth of four (4") inches below the trench depths indicated on the Drawings or required. Backfill overdepths in the rock excavation and unauthorized overdepths with loose granular, moist earth, thoroughly machine tamped, to a compaction level of at least 95 percent to standard protector density or 75 percent relative density or as specified by the Architect. Whenever unstable soil that is incapable of properly supporting the Work, as determined by Architect/Engineer, is encountered in the bottom of the trench, remove soil to a depth required and backfill the trench to the proper grade with coarse sand, fine gravel, or other suitable material. C. Excavate trenches for utilities to a depth that will provide the following minimum depths of cover from existing grade or from indicated finished grade, whichever is lower, unless otherwise specifically shown. 1. Primary electric service: four (4) feet (minimum) 2. Secondary electric service: two (2) feet (minimum) 3. Telephone service: two (2) feet (minimum) D. Trenches shall not be placed within ten (10) feet of foundation or soil surfaces which must resist horizontal forces. E. Do not backfill trenches until all required tests have been preformed and the installation observed by the Engineer. Comply with the requirements of other sections of these specifications. Backfill shall consist of non -expansive soil with Limited porosity. Deposit in six (6") inch layers and thoroughly and carefully tamp until the Work has a cover of not less than one (1) foot. Backfill and tamp remainder of trench at twelve (12") inch intervals until complete. Uniformly grade the finished surface. Backfill and tamp with compaction at least equal to the surrounding area. 3.04 CUTTING, PATCHING AND REPAIRING A. The work shall be carefully laid out in advance. Where cutting, channeling, chasing or drilling of floors, walls, partitions, ceilings or other surfaces is necessary for the proper installation, support or anchorage of raceway, outlets or other equipment, the work shall be carefully done. Any damage to the building, piping, equipment or defaced finish plaster, woodwork, metalwork, etc. shall be repaired by skilled mechanics of the trades involved at no additional cost to the Owner. B. Where conduits, mounting channels, outlet, junction, or pull boxes are mounted on a painted surface, or a surface to be painted, they shall be painted to match the surface. Whenever support channels are cut, the bare metal shall be cold galvanized. 3.05 DEMOLITION AND CONTINUANCE OF EXISTING SERVICES A. All existing electrical services not specifically indicated to be removed or altered shall remain as they presently exist. B. Should any existing services interfere with new construction, the Contractor shall (after obtaining written approval from the Architect/Engineer) alter or reroute such existing equipment to facilitate new construction. C. Under no circumstances shall existing services be terminated or altered unless deemed necessary by the Architect/Engineer or specified herein; also, prior to altering any existing situation, the Contractor shall notify the Owner in writing giving two (2) weeks advance notice of planned alteration. D. It shall be solely the Contractor's responsibility to guarantee continuity of present facilities (with respect to damage or alteration due to new construction) and any unauthorized alteration to existing equipment shall be corrected by the Contractor to the Architect/Engineer's satisfaction at the Contractor's expense. 3.06 CLEANING UP A. Contractor shall take care to avoid accumulation of debris, boxes, crates, etc., resulting from the installation of his work. Contractor shall remove from the premises each day all debris, boxes, etc., and keep the premises clean. B. Contractor shall clean up all fixtures and equipment at the completion of the project. C. All switchboards, panelboards, wireways, trench ducts, cabinets and enclosures shall be thoroughly vacuumed clean prior to energizing equipment and at the completion of the project. Equipment shall be opened for observation by the Architect/Engineer as required. 3.07 WATERPROOFING A. Avoid, if possible, the penetration of any waterproof membranes such as roofs, machine room floors, basement walls, and the like. if such penetration is necessary, perform it prior to the waterproofing and furnish all sleeves or pitch -pockets required. Advise the Architect/Engineer and obtain written permission before penetrating any waterproof membrane, even where such penetration is shown on the Drawings. B. If Contractor penetrates any walls or surfaces after they have been waterproofed, he shall restore the waterproof integrity of that surface as directed by the Architect/Engineer at his own expense. 3.08 SUPPORTS A. Support work in accordance with the best industry practice and the following. B. Include supporting frames or racks extending from building structure for work indicated as being supported from walls where the walls are incapable of supporting the weight. In particular, provide such frames or racks in electric closets. C. Include supporting frames or racks for equipment, intended for vertical surface mounting, which is required in a free standing position. D. Supporting frames or racks shall be of standard angle, standard channel or specialty support system steel members. They shall be rigidly bolted or welded together and adequately braced to form a substantial structure. Racks shall be of ample size to assure a workmanlike arrangement of all equipment mounted on them. E. Nothing, (including outlet, pull and junction boxes and fittings) shall depend on electric conduits, raceways, or cables for support except that threaded hub type fittings having a gross volume not inexcess 10 0 cubic inches may be supported from heavy wall conduit, where the conduit is securely supported from the structure within five inches of the fitting on two opposite sides. F. Nothing shall rest on, or depend for support on, suspended ceilings media (tiles, lath, plaster, as well as splines, runners, bars and the like in the plane of the ceiling). G. Provide required supports and hangers for conduit, equipment, etc., so that loading will not exceed allowable loadings of structure. 3.09 FASTENINGS T GS A. Fasten electric work to building structure in accordance with the best industry practice and the following. B. Floor or pad mounted equipment shall not be held in place solely by its own dead weight. Include anchor fastening in all cases. C. For items which are shown as being ceiling mounted at locations where fastening to the building construction element above is not possible, provide suitable auxiliary channel or angle iron bridging, tying to the building structural elements. 3.10 TESTING EQUIPMENT AND MATERIALS A. The Contractor shall provide all testing instruments, equipment and all materials, connections, labor, etc., required to perform tests. B. Test all circuits, fixtures, equipment, and systems for proper operation and freedom from grounds, shorts and open circuits before acceptance is requested. C. Measure voltage at panelboards and outlets after the building is fully occupied. Make final transformer tap adjustments based on these measurements. D. Perform all tests required by local authorities, such as tests of life safety systems, in addition to tests specified herein. E. Perform tests required by other specification sections. N N 0 0 z U iz a a N 2 � o w T a (D 0 LL w n U) U) 0 z INFINITY ENGINEERING GROUP, LLC 1208 East Kennedy Boulevard( Suite 230 Tampa, Florida 33602 [p]: 813.434.4770 Tfl: 813.445.4211 www.iegroup.net FL Cert. of Auth. No. 27889 ❑aTa ANDRE,Ws, MOHR, P.E. � E% N l�W,3077 7° C 10 �: Date d' v7 M M J f- U_ o Z -� J = QO Z W U_ (- W = N r< U o U u- = m � U 0- W � J W W N (D W a o W 0 ~ z � F- Q a W W roject No. Sheet 280-22.00 E-0.3 DateAS I NOTED Scale AS NOTED ELECTRICAL SCOPE OF WORK -VERIFY EXISTING CONDITIONS. -DISCONNECT EXISTING ATM. -INSTALL NEW VAT SYSTEM HA1000-XLR WITH HEATER AND TWO-WAY VIDEO UNIT. -CONNECT CUSTOMER SIDE VAT TO CIRCUIT PREVIOUSLY USED FOR ATM. -IF EXISTING CIRCUIT IS GREATER THAN 20A, CHANGE OUT BREAKER TO 1-POLE 20A CIRCUIT WITH MATCHING AIC RATING. -REUSE DATA CONDUITS AS NEEDED. -CONNECT TELLER SIDE CONNECTIONS PER DETAIL. -UPDATE PANEL SCHEDULE OF MODIFIED PANEL. KEYED NOTES: Q DEMOLITION OF ATM: ATM TO BE REMOVED. COORDINATE DISCONNECTION OF POWER AND DATA WITH GC. DRESS AND LABEL CONDUITS AND WIRES FOR REUSE. REFER TO ELECTRICAL PLAN ON THIS SHEET FOR ADDITIONAL INFORMATION. j� AUDIO -VIDEO CABLES: PROVIDE 4"X4" J-BOX UNDER COUNTER IN OPERATOR KNEE SPACE FOR AUDIO/VIDEO CABLES. MAKE CONTINUOUS RUN FROM VAT CUSTOMER UNIT. SEE DETAILS ON SHEET E-2.1 FOR ADDITIONAL INFORMATION. QCAT5 INTERCONNECT: CONNECT CAT 5 CABLE FROM VAT OPERATOR UNIT TO 4X4 J-BOX IN OPERATOR KNEE SPACE. MAKE CONTINUOUS RUN FROM VAT CUSTOMER UNIT. SEE DETAILS ON SHEET E-2.1 FOR ADDITIONAL INFORMATION. OVAT UNIT: ROUTE CONDUIT AND WIRES AS REQUIRED FROM THE DEMOLITION TO NEW UNIT LOCATION. CONNECT VAT TO CIRCUIT INDICATED. REFER TO PANEL SCHEDULE FOR WIRE SIZING. CONFIRM WIRE SIZES ARE ADEQUATE CIRCUIT BREAKER. jD MONITOR: PROVIDE RECEPTACLE FOR MONITOR. CONNECT DATA FOR MONITOR FOR VAT UNIT. DEMOLITION NOTES: 1. COORDINATION: DRAWINGS ARE TO BE USED ONLY AS A GUIDELINE FOR DEMOLITION. COORDINATE ALL DEMOLITION WORK WITH OTHER TRADES, WITH NEW WORK INDICATED ON CONSTRUCTION PLANS, AND WITH ACTUAL FIELD CONDITIONS. 2. LOCKOUT/TAGOUT: VERIFY ALL SOURCES OF ELECTRICAL POWER TO AREA OF WORK ARE DISCONNECTED AND LOCKOUT/TAGOUT PROCEDURES ARE FOLLOWED PER OSHA REQUIREMENTS. 3. NOT IN CONTRACT AREAS: LOCATE, IDENTIFY, AND PROTECT ELECTRICAL SERVICES (E.G. POWER, LIGHTING, CONTROL, COMMUNICATION, SECURITY, SIGNAL, LIFE SAFETY, AND FIRE ALARM) PASSING THROUGH DEMOLITION AREA AND SERVING OTHER AREAS OUTSIDE THE RENOVATION LIMITS. MAINTAIN SERVICES TO AREAS OUTSIDE DEMOLITION LIMITS. WHEN SERVICES MUST BE INTERRUPTED, INSTALL TEMPORARY SERVICE FOR AFFECTED AREAS. 4. CONTINUITY OF SERVICE: ANY CIRCUITS FEEDING THROUGH DEVICES OR EQUIPMENT BEING REMOVED, RELOCATED, REWORKED, OR ABANDONED AND SERVING OTHER ELECTRICAL DEVICES, AND/OR EQUIPMENT SHALL BE MAINTAINED BY REWORKING EXISTING WIRING TO RESTORE CONTINUITY OF THE INTERRUPTED CIRCUITS. 5. LIFE SAFETY: EXISTING EMERGENCY LIGHTING, EGRESS LIGHTING, AND FIRE ALARM SYSTEM AND NOTIFICATION APPLIANCES SHALL BE SALVAGED, MAINTAINED IN PROPER OPERATION, AND RECONFIGURED AS REQUIRED TO COMPLY WITH APPLICABLE CODES AND STANDARDS FOR EACH PHASE OF CONSTRUCTION. 6. CODE VIOLATIONS: NOTIFY ENGINEER UPON DISCOVERY OF ANY EXISTING CODE VIOLATIONS FOR CORRECTIVE ACTIONS. 7. EXISTING CIRCUITRY: THE CONTRACTOR MAY REUSE EXISTING CIRCUITRY AS FIELD CONDITIONS PERMIT AND WHERE DESIGN INTENT CAN BE MET. EC SHALL VERIFY THAT TOTAL NEW LOAD DOES NOT EXCEED 80% OF THE BREAKER CONTINUOUS CURRENT RATING. 8. COMPLETE REMOVAL: ELECTRICAL EQUIPMENT AND DEVICES SHALL BE REMOVED COMPLETE INCLUDING CONDUIT, WIRE, HANGERS, AND SUPPORTS BACK TO SOURCE. 9. PROTECTION BARRIERS: PROTECT ADJACENT MATERIALS INDICATED TO REMAIN. INSTALL AND MAINTAIN DUST AND NOISE BARRIERS TO KEEP DIRT, DUST, AND NOISE FROM BEING TRANSMITTED TO ADJACENT AREAS. REMOVE PROTECTION AND BARRIERS AFTER DEMOLITION IS COMPLETE. 10. SALVAGE FOR REUSE: EXISTING EQUIPMENT NOTED TO REMAIN OR BE RELOCATED SHALL BE SALVAGED, REPAIRED, AND CLEANED FOR FUTURE USE. REPLACE MISSING HARDWARE OR DAMAGED EQUIPMENT AS REQUIRED. 11. STORAGE: CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, PRESERVATION, STORAGE, AND PROTECTION OF ALL EQUIPMENT AND DEVICES DESIGNATED TO BE REMOVED AND REINSTALLED. EQUIPMENT SHALL BE STORED IN A MANNER TO AVOID DAMAGE UNTIL REINSTALLED. 12. OWNER RETENTION: THE CONTRACTOR SHALL REMOVE ALL EQUIPMENT NOT INDICATED TO BE REUSED TO A DESIGNATED LOCATION AT THE PROJECT SITE. AFTER THE EQUIPMENT HAS BEEN ASSEMBLED FOR THE OWNER'S INSPECTION AND POSSIBLE RETENTION, ALL EQUIPMENT NOT TO BE RETAINED BY THE OWNER SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR. 13. PANELBOARD CIRCUIT DIRECTORY: ALL PANELBOARDS SHALL BE FURNISHED WITH REVISED TYPEWRITTEN CIRCUIT DIRECTORY CARDS WITH THE EQUIPMENT AND SPACE SERVED PROPERLY DESIGNATED. EXISTING EQUIPMENT SHALL BE RE -IDENTIFIED AS REQUIRED TO COORDINATE WITH PROPOSED DESIGN. 14. SPARED OUT CIRCUITS: BRANCH CIRCUIT BREAKERS MADE SPARE AS A RESULT OF DEMOLITION ACTIVITIES SHALL BE SWITCHED TO THE 'OFF' POSITION AND LABELED AS "SPARE". 15. RAISED CEILINGS: WHERE ARCHITECTURAL CEILINGS ARE TO BE RAISED, THE EC SHALL REWORK EXISTING OVERHEAD CONDUIT AND CONDUCTORS, IF ANY, TO ALLOW FOR THE CEILING TO BE RAISED. 16. HARD CEILINGS: WHERE NEW HARD CEILING IS TO BE INSTALLED, EC SHALL REWORK AND RELOCATE ALL JUNCTION BOXES OUT FROM ABOVE NEW HARD CEILING. NEW JUNCTION BOX LOCATIONS SHALL BE IN AN ACCESSIBLE AREA ABOVE CEILING. DEMOLITION / NEW WORK LEGEND: DISCONNECT AND REMOVE/RELOCATE EXISTING DEVICES, FIXTURES, AND EQUIPMENT TO ACCOMMODATE THE PROPOSED DESIGN INTENT. REFER TO THE FULL SET OF DEMOLITION AND PROPOSED PLANS FROM ALL TRADES FOR ADDITIONAL NOTES AND REQUIREMENTS. ALL DEVICES, FIXTURES, AND EQUIPMENT SHOWN ON THE PROPOSED ELECTRICAL PLANS ARE NEW UNLESS NOTED OTHERWISE WITH THE BELOW DESIGNATIONS. (d) SUBSCRIPT DENOTES EXISTING TO BE REMOVED. DISCONNECT AND REMOVE WIRE AND CONDUIT BACK TO SOURCE. MAINTAIN SERVICE TO REMAINING DEVICES. (e) SUBSCRIPT DENOTES EXISTING TO REMAIN. MAINTAIN SERVICE VIA EXISTING CIRCUIT. (n) SUBSCRIPT DENOTES NEW. (r) SUBSCRIPT DENOTES EXISTING TO BE RELOCATED. MATCH EXISTING WIRING AND CONDUIT AND EXTEND TO PROPOSED LOCATION. WIRING DEVICES SHALL BE PROVIDED WITH NEW DEVICES AND COVER PLATES TO MATCH NEW WORK. LIGHT FIXTURES SHALL BE CLEANED AND RE-LAMPED. (er) SUBSCRIPT DENOTES EXISTING DEVICE/FIXTURE TO BE REPLACED IN SAME LOCATION AS EXISTING. DISCONNECT AND REMOVE EXISTING DEVICE/FIXTURE AND MAINTAIN SERVICE VIA EXISTING CIRCUIT. RECONNECT NEW DEVICE/FIXTURE TO EXISTING CIRCUIT. WIRING DEVICES SHALL BE REPLACED WITH NEW DEVICES AND COVER PLATES TO MATCH NEW WORK. LIGHT FIXTURES SHALL BE REPLACED WITH NEW FIXTURES PER LIGHTING FIXTURE SCHEDULE. — — — — DASHED LINES INDICATE EXISTING TO BE REMOVED, EXISTING TO BE RELOCATED, OR EXISTING TO BE REPLACED ON DEMOLITION PLAN. DARK LINES INDICATE NEW, EXISTING TO BE RELOCATED, OR EXISTING TO BE REPLACED ON PROPOSED PLAN. LIGHT LINES INDICATE EXISTING TO REMAIN. GRAY SHADED AREAS INDICATE "NOT IN CONTRACT (N.I.C.)" AREAS. MAINTAIN CONTINUITY OF EXISTING SERVICES. N o N O 2 t0 0 (9 z U a z z v aCK N � o A W j � a 0 U- w 7) U) 0 z INFINITY ENGINEERING GROUP, LLC 1208 East Kennedy Boulevard Suite 230 Tampa, Florida 33602 [p]: 813.434.4770 [ff']. 813.445.4211 www.iegroup.net EL Vert. of Autln. No. 27889 IM ANDREW MOHR, P.E. FIL .9NQ- 753077 MO `G s®,�SSj0v°rr , d' U0 M M U) LL Z O J J J o- Q = N U � OJO U NW a. Q W Q N o J W a co 00 � a) c z v F- U N O d N L � Project No. Sheet 280-22.00 E-1 1 Date AS NOTED • Scale AS NOTED PANELBOARD: RP (EXISTING) BUS AMPS: 225A SECTION: I FAULT CURRENT,- AIC RATING: LOCATION: EXISTING EXISTING ELECTRICAL RM ICKTI DESCRIPTION CONDUCTOR & CONDUIT BREAKER VOLTAWS/PHASE \ADLTAMPSIPHASE BREAKER ::�CONDUCTOR &CONDUIT DESCRIPTION CKT LOAD CONN. VA DIF LOAD CONN. VA DF TOTAL PHASE A- VA 17,200 MOTORS 1 00 LARGEST MOTOR —i _25 CONN. AMPS 126 TOTALIDEMAND PANEL RP SCHEDULE SCALE 2 120 3"EXHA&ST vV/CHECK VALVE REQUIRED OVER OPERATOR UNIT PVC 0RMETAL TUBING AVAILABLE 2U^MINIMUM RADIUS BENDS B5353 CEILING TRIM WALL DIRECTLY BEHIND CUSTOMER UNIT 4"CURB TO FRONT OpBASE C L CURB WIDTH | h 15^M|N. B4050 TOP FITTING 4" ISLAND WIDTH CLEAR ACRYLIC TUBES tN 20" MIN. T9719 8FT. STD LENGTH 7y4" CURB TO TUBE CENTER CONDUITACCESS 4"CURBTO STUB UP CONDUIT 1" MAX FRONT OF BASE -ABOVE ISLAND SURFACE. TRAFFIC FLOW ENTRY LIMITED TO 4-1/2" DIA. STANDARD OVERHEAD SPEAKER & AREA AT CUSTOMER UNIT OPERATOR UNIT 99-914 MICROPHONE IN :1 CAT5 INTERCONNECT CONTINUES TO ABOVE DUAL CONTROLS OPERATOR CEILING CALLISEND OPTIONAL TWO-WAY VIDEO UNIT SHOWN Sena MODELS: 5517 OR 6517 4X4" J-BOX UNDER COUNTER 46%" (4) GUARD POSTS IN OPERATOR KNEE SPACE HEIGHT RECOMMENDED AUDIO /VIDEO CABLES |N� PLACE AS SHOWN BY OTHERS) BUILDINGS TURBINE PACK INSIDE ELECTRICAL CUSTOMER UNIT SUPPLY � INTERCONNECT & AUDIO / VIDEO DEPTH WIDTH CONDUIT #1FOR P0NR 3"EXHA&ST vV/CHECK VALVE REQUIRED OVER OPERATOR UNIT PVC 0RMETAL TUBING AVAILABLE 2U^MINIMUM RADIUS BENDS B5353 CEILING TRIM WALL DIRECTLY BEHIND CUSTOMER UNIT 4"CURB TO FRONT OpBASE C L CURB WIDTH | h 15^M|N. B4050 TOP FITTING 4" ISLAND WIDTH CLEAR ACRYLIC TUBES tN 20" MIN. T9719 8FT. STD LENGTH 7y4" CURB TO TUBE CENTER CONDUITACCESS 4"CURBTO STUB UP CONDUIT 1" MAX FRONT OF BASE -ABOVE ISLAND SURFACE. TRAFFIC FLOW ENTRY LIMITED TO 4-1/2" DIA. STANDARD OVERHEAD SPEAKER & AREA AT CUSTOMER UNIT OPERATOR UNIT 99-914 MICROPHONE IN :1 CAT5 INTERCONNECT CONTINUES TO ABOVE DUAL CONTROLS OPERATOR CEILING CALLISEND OPTIONAL TWO-WAY VIDEO UNIT SHOWN Sena MODELS: 5517 OR 6517 4X4" J-BOX UNDER COUNTER 46%" (4) GUARD POSTS IN OPERATOR KNEE SPACE HEIGHT RECOMMENDED AUDIO /VIDEO CABLES |N� PLACE AS SHOWN BY OTHERS) BUILDINGS TURBINE PACK INSIDE ELECTRICAL CUSTOMER UNIT SUPPLY � INTERCONNECT & AUDIO / VIDEO DEPTH WIDTH CONDUIT #1FOR P0NR - 12OVOLT.ODHZ'2OAMP THESE DRAWINGS ARE THE PROPERTY op*Aw/LTowSAFE GO. DEDICATED BRANCH CIRCUIT AND SHALL NOT ocREPRODUCED REQUIRED FOR EACH CUSTOMER UNIT. onCOPIED oxUSED ^sTHE BASm FOR MANUFACTURE OR SALE OF APPARATUS WITHOUT PERMISSION 1> THIS DETAIL IS INCLUDED TO CONVEY THE ELECTRICAL POWER, CONTROLS, AND LOW VOLTAGE WIRING DESIGN INTENT. 3) VAT DETAIL |GTYPICAL AND DOES NOT NECESSARILY REPRESENT THE EXACT INSTALLATION OF THIS PROJECT REFER TOARCHITECTURAL PLANS FOR EXACT UPGENCVOOVVN8ENDVAT TUBE CONFIGURATION. ' 3) FIELD ROUTE POWER, CONTROLS, AND LOW VOLTAGE WIRING AND CONDUIT BASED ON FIELD CONDITIONS. 4) WHERE THE NEW VAT IS BEING INSTALLED IN PLACE OF AN EXISTING TO BE REMOVED ATM, REUSE EXISTING CONDUIT PATHWAYS AND ELECTRICAL BRANCH CIRCUITS WHERE POSSIBLE AND EXTEND TONEW VAT LOCATION AGREQUIRED. 5) ANY NEW RACEWAY SHALL BE ROUTED CONCEALED. WHERE EXPOSED CONDUITS CANNOT BE AVOIDED, RG8 CONDUITS SHALL BE PROVIDED, ROUTED OUT OF CUSTOMER VIEW, AND PAINTED T{}MATCH ADJOINING SURFACE. O> VAT CUSTOMER UNIT SHALL BEPROVIDED WITH MIN 2#12.#13EG.|N3/4"CWITH ADEDICATED 1'P{}LE.2OACIRCUIT BREAKER AND AMIN 1''CWITH LOW VOLTAGE AND AV CABLING PRE MANUFACTURER REQUIREMENTS. VAT WIRING REQUIREMENTS I SCALE 3 i N.T.S. I PANEL SCHEDULE E NOTES: 1PROVIDE PANELBOARDAGSPECIFIED ONELECTRICAL PANEL SCHEDULES AND RISER DIAGRAM. 2, CONTRACTOR SHALL ENSURE ALL NEC WORKING SPACE AND DEDICATED EQUIPMENT SPACE CLEARANCES ARE PROVIDED PER NEC 110. IF FIELD CONDITIONS DO NOT ALLOW FOR ADEQUATE CLEARANCE AT THE LOCATION SHOWN DNTHE PLANS, THE CONTACTOR SHALL PROPOSE AN ALTERNATE LOCATION FOR REVIEW AND APPROVAL BYENGINEER PRIOR TOROUGH-IN OFPANEL. 3. FIELD COORDINATE INSTALLATION WITH OTHER TRADES TOENSURE N{} FOREIGN SYSTEMS ARE LOCATED WITHIN THE DEDICATED EQUIPMENT SPACE {}FTHE ELECTRICAL EQUIPMENT. 4. ALL BUSING SHALL BECOPPER. 5. BOLT -ON BREAKERS ONLY. 8. PROVIDE D0OR-|N-D{)ORTRIM. 7. PROVIDE TYPEWRITTEN CIRCUIT DIRECTORY CARD. 8. ALL PANELBOARD8 SHALL BE SUPPLIED FROM THE SAME MANUFACTURER. 8. IN EXISTING INSTALLATIONS, NEW CIRCUIT BREAKERS SHALL MATCH EXISTING IN TYPE AND A1C RAT|NG, UNO. 10LOAD TYPES |NDESCRIPTION ASFOLLOWS: BOLD TEXT NEW LOAD, VV|RE, CONDU|T, CIRCUIT BREAKER (A8 APPLICABLE) GRAY TEXT EXISTING LOAD, WIRE, CONDUIT, CIRCUIT BREAKER (AS APPLICABLE) TDREMAIN (DLD>(-#) RELOCATED CIRCUIT FROM OLD PANEL'X'.C|RCU|T'#' CLG COOLING EVVH ELECTRIC WATER HEATER HTG HEATING KIT KITCHEN LTG LIGHTING M|SC MISCELLANEOUS KATR MOTOR REC RECEPTACLE REF REFRIGERATION 8|{3N G|GNAGE 11. CIRCUIT BREAKER TYPE ABBREVIATIONS AREAS FOLLOWS: AFC| ARC -FAULT CIRCUIT INTERRUPTER F/RED RED MARKING, U(]NHARDWARE, & "FIRE ALARM CIRCUIT" GFC| GROUND -FAULT CIRCUIT INTERRUPTER GFPE 3QmAEQUIPMENT GROUND FAULT PROTECTION HT2 HANDLE TIE FOR SHARED NEUTRAL CIRCUIT (2POLE) HT3 HANDLE TIE FOR SHARED NEUTRAL CIRCUIT (3POLE) UON LOCKABLE "LOCK ON" HANDLE HARDWARE UDFF LOCKABLE "LOCK OFF" HANDLE HARDWARE TAN TANDEM SHNT SHUNT TRIP SPD SURGE PROTECTION DEVICE CIRCUIT BREAKER UNIT SVVO SWITCH DUTY RATED 8VVN SWITCHED NEUTRAL 12 CIRCUIT BREAKER FURNISHED A8FOLLOWS: ETR EXISTING TO REMAIN FVV FACTORY WIRED NEW NEW TDMATCH EXISTING REM REMOVE EXISTING AND PROVIDE NEW 13. LOAD FUNCTION A8 FOLLOWS: CONT CIRCUIT CONTROLLED BYCONTACTOR HOOD CIRCUIT CONTROLLED BYHOOD FIRE SUPPRESSION SYSTEM TIC CIRCUIT CONTROLLED BYTIME CLOCK PHO CIRCUIT CONTROLLED BYPHOTOCELL LCP CIRCUIT CONTROLLED BYLIGHTING CONTROL PANEL L/C CIRCUIT CONTROLLED BYLIGHTING CONTACTOR 14. ABBREVIATIONS: SR SEE RISER �eGR0UwD TXFMR O ml0Y PARTIAL ELECTRICAL RISER DIAGRAM SCALE 1 ELECTRICAL LEGEND: M ER REFER TO ELECTRICAL RISER DIAGRAM FOR ADDITIONAL NOTES AND (d) SUBSCRIPT DENOTES EXISTING TO BE REMOVED. (e) SUBSCRIPT DENOTES EXISTING TO REMAIN. (n) SUBSCRIPT DENOTES NEW. (r) SUBSCRIPT DENOTES EXISTING TO BE RELOCATED. — — — — DASHED LINES INDICATE EXISTING TO BE REMOVED OR EXISTING TO BE RELOCATED. LIGHT LINES INDICATE EXISTING TO REMAIN. DARK LINES INDICATE NEW. ELECTRICAL LOAD ANALYSIS LOADS TO BE REMOVED LOAD (VA) QUANTITY TOTAL LOAD TO BE REMOVED 3000 VA LOADS TO BE ADDED LOAD (VA) QUANTITY TOTAL LOAD TO BE ADDED 2160 VA NET CHANGE IN LOAD DUE TO RENOVATION WORK: - ELECTRICAL CONTRACTOR SHALL VERIFY CAPACITY OF EXISTING ELECTRICAL SERVICE AND CONTACT ENGINEER OF RECORD IN CASE OF ANY DISCREPANCIES. RISER DIAGRAM EXISTING ELECTRICAL SERVICE: RISER DIAGRAM AND SCHEDULES ARE BASED C}NTHE BEST INFORMATION AVAILABLE. THE ELECTRICAL CONTRACTOR SHALL VERIFY THAT ALL EXISTING EQUIPMENT TO REMAIN IS IN GOOD WORKING CONDITION AND HAS ADEQUATE LOAD CAPACITY AND PHYSICAL SPACES/SPARES TO ACCOMMODATE THE NEW LOADS. ALL EQUIPMENTS SHALL BEINSPECTED PRIOR TDBID AND ANY DISCREPANCIES SHALL BEBROUGHT TO THE ENGINEERS ATTENTION IMMEDIATELY. w An of 1-1 �-j INFINITY ENGINEERING GROUP, LLC 1208 East Kennedy Boulevard Suite 230 Tampa, Florida 3360% Ami813.434.4770 D0:0D3.445.4211 xpww.meg7vmp.00z FL Cert. of Auth. No. 27889 00 LU rProject No. Sheet 280-22.00 Date AS NOTED E-2.1 Scale AS NOTED