RS&H Architect's Supplemental Instruction Contractor: Berglund Construction Project: AdventHealth Zephyrhills Kitchen Renovation Reference: Contract A104 Drawing: Shop Drawing: Specification: Other: Q� ,V-- r-? 5-3, kr(-)i«,,,j UP *C1, 5D 1715 N_ Westshore Blvd, Suite 600 O 813-289-5550 ?ampa, Florida 33607 F 813 289-5550 rsandh.com ASI- 01 Date: 1-21-2021 AEP File No: 504-0226-000 Subject: Revision 4: Floor base and ceiling to wall protection WP-1 transition detail The work shall be carried out in accordance with the following supplemental instruction issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in Contract Sum or Contract Time. DESCRIPTION: See summary of revisions below. Refer to clouded revisions on attached sheets for additional information. 1. Sheet A104 • REVISE floor base to wall protection transition detail 3 per RFI 47 and mockup review. • ADD ceiling to wall protection detail for clarification • REVISE floor plan and schedule: QR-1 to Urethane cement floor • REVISE toilet room floor to QR-1 and wall paint to P-1 ATTACHMENTS: A104 By: Yoo-Jin Kim 1-21-2021 Name Date RS&H ASI #1 Page 1 of 1 RS&H Revision no. 5 Narrative — CCD#2 Kitchen & HVAC Renovation AdventHealth Zephyrhills 02-03-21 1715 Westshore Blvd Suite 000 O 813-289 5550 Tampa Florida 33607 3999 rsandh.com Narrative summary of revisions: The following are issued for revision/ clarification per RFIs PROJECT DRAWING REVISIONS: ARCHITECTURAL PH001— PHASING PLANS • Revised phasing plan 1 to omit work in Bakery area MECHANICAL M101- LEVEL 1 RENOVATION PLAN - PHASE 1- DUCTWORK • Revised exhaust ductwork in EVS room per RFI 48 • Revised airflow into EVS room and balanced undercut air flow in surrounding areas • Added verbiage to omit work in Bakery area until later Phase MD101- LEVEL 1 DEMOLITION PLAN - PHASE 1- DUCTWORK • Revised exhaust ductwork in EVS room per RFI 48 • Added verbiage to omit work in Bakery area until later Phase FIRE PROTECTION: FP101- NEW FLOOR PLAN - PHASE 1- FIRE PROTECTION • Added verbiage to omit work in Bakery area until later Phase ELECTRICAL: E101— LEVEL 1 RENOVATION PLAN — PHASE 1- POWER • Adjusted connections to power soak and booster pump per RFI 38 • Added verbiage to omit work in Bakery area until later Phase E401— PANEL SCHEDULES • Adjusted circuit designations. Note: Narrative descriptions of changes to the drawing are general in nature, refer to actual revised documents for the full extent of changes. End of Revision 05 Narrative FS&H In< FL Can Nos AAC001886.1626000456•rCC000210 RS&H Revision no. 5 Narrative — CCD#2 Kitchen & HVAC Renovation AdventHealth Zephyrhills 02-03-21 1715 Westshore Blvd Suite 600 O 813 289 5550 Tampa, Florida 33607 3999 rsandh.com Narrative summary of revisions: The following are issued for revision/ clarification per RFIs PROJECT DRAWING REVISIONS: ARCHITECTURAL PH001— PHASING PLANS • Revised phasing plan 1 to omit work in Bakery area MECHANICAL M101- LEVEL 1 RENOVATION PLAN - PHASE 1- DUCTWORK • Revised exhaust ductwork in EVS room per RFI 48 • Revised airflow into EVS room and balanced undercut air flow in surrounding areas • Added verbiage to omit work in Bakery area until later Phase MD101- LEVEL 1 DEMOLITION PLAN - PHASE 1- DUCTWORK • Revised exhaust ductwork in EVS room per RFI 48 • Added verbiage to omit work in Bakery area until later Phase FIRE PROTECTION: FP101- NEW FLOOR PLAN - PHASE 1- FIRE PROTECTION • Added verbiage to omit work in Bakery area until later Phase ELECTRICAL: E101— LEVEL 1 RENOVATION PLAN — PHASE 1- POWER • Adjusted connections to power soak and booster pump per RFI 38 • Added verbiage to omit work in Bakery area until later Phase E401— PANEL SCHEDULES • Adjusted circuit designations. Note: Narrative descriptions of changes to the drawing are general in nature, refer to actual revised documents for the full extent of changes. End of Revision 05 Narrative Rs&„ F1 Cert Nos AAC001886.1826000956•LCC000210 2 I 4 5 M C B R A M SERVE 1-..102 13 PATCH/ MATCH EXISTING FLOOR FINISH —7/ AP 1 FINISH PLAN El FLOOR FINISH KEY 2 MANUF. STYLE COLOR SIZE REMARKS LUXURY VINYL TILE LVT-1 AMERICAN BILTRITE CEO-03 DARK GREY 9" X 48" FIELD- REFER TO FLOOR PATTERN PLAN TEXAS GRANITE LVT-2 AMERICAN BILTRITE VTG-130 WHITE GREY 36" X 36" 6" INTEGRAL BASE. HEAT WELDED ROD VHW-45 TAUPE. MANUFACTURER REP CONTACT: BRYAN SHEET FLOORING VS-1 ALTRO STRONGHOLD #30 TO BE DETERMINED SEAMLESS WITH INTEGRAL COVE. BASE BID POLYMER MODIFIED T I C I PMC-1 EUCLID CHEMICAL MICRO-CRETE POLYMER MODIFIED P LSTAIN COLOR TO BE DETERMINED 4" INTEGRAL COVE. INTEGRALLY COLORED WITH THIN-CRETE C URETHANE CEMENT FLOOR SEALED CONCRETE QR-1 SC-1 SIKAFLOOR SCOFIELD SIKAFLOOR 22 NA PURCEM/ 507 SAND SELECT SEAL PLUS, CONCRETE SEALER GRAY CLEAR 7 6" INTEGRAL COVE. BID ALTERNATE #2 BASE VINYL BASE VB-1 JOHNSONITE TRADITIONAL WALL BASE 80 FAWN 4" REFER TO FINISH PLAN FOR LOCATION VINYL BASE VB-2 JOHNSONITE TRADITIONAL WALL BASE MATCH EXITING MATCH EXISTING REFER TO FINISH PLAN FOR LOCATION STAINLESS STEEL BASE SB-1 COVE BASE BRUSHED ST.STL. 6" TYPICAL SERVERY COUNTER BASE WALL PAINT P-1 SHERWIN WILLIAMS SW 7016, EGGSHELL MINDFUL GRAY FIELD PAINT PAINT P-1E SHERWIN WILLIAMS SW7675, SEMIGLOSS SEALSKIN Q FOR HOLLOW METAL DOORS AND FRAMES PORCELAIN TILE PROTECTIVE WALL COVERING PROTECTIVE WALL COVERING PT-3 WP-1 4 WP-2 TBD AM CLAD INPRO TBD AM GUARD 2MM ANTIMICROBIAL WALL PROTECTION IPC 405 RIGID VINYL SHEET TBD WHITE SHARKSKIN 0350 TBD 48" X 96" 48" X 96" TYPICAL PIZZA OVEN WALL, U.N.O. INSTALL TILE STACKED VERTICALLY TYPICAL IN KITCHEN AND DISHROOM. FULL HEIGHT - TOP OF THE WALL BASE TO CEILING. THERMOFORMED CORNERS, 2 PART H- DIVIDER TRIMS. WET AREA WALL APPLICATION TYPICAL IN KITCHEN PASSAGE AND TOILET ROOMS. REFER TO SHT A401 CEILING ACOUSTICAL CEILING ACT-1 ARMSTRONG KITCHEN ZONE TILE #673 Q WHITE 24" X 24"X5/8" ACOUSTICAL CEILING GRID ACT-1A ARMSTRONG PRELUDE XL WHITE 15/16" EXPOSED NO GASKET REQUIRED 1 ACCESSORIES CORNER GUARD CG-1 ALTRO CORNER GUARD STAINLESS STEEL SEE FINISH PLAN FOR LOCATIONS MILLWORK PLASTIC LAMINATE PL-1 WILSONART 7966K-12 5TH AVE ELM 2 TYPICAL VERTICAL SURFACE, U.N.O. PLASTIC LAMINATE PL-2 FORMICA ARTISAN FINISH OILED OLIVEWOOD 5481-43 TYPICAL VERTICAL SURFACE AT SERVERY COUNTERS SOLID SURFACE SS-1 WILSONART 9204CE MORNING ICE 2 TYPICAL HORIZONTAL SURFACE, U.N.O. QUARTZ SURFACING QS-1 TBD TBD MATCH EXISTING TYPICAL HORIZONTAL SURFACE AT RETAIL COUNTER TERMINATE WALL PROTECTION PANEL (WP-1) ABOVE CEILING GRID MECHANICALLY FASTEN GRID THROUGH THE CLADDING TO WALL SUBSTRATE. ALLOW FOR EXPANSION AND CONTRACTION. EACH PENETRATION PILOT HOLE NEEDS TO BE SLIGHTLY LARGER THAN THE ANCHOR/ FASTENER. NOTCH H-DIVIDER TRIM AT EACH TOUCH POINT SILICONE SEALANT ACT TO WALL PANEL DETAIL SCALE: 1 1/2" = V-0" AM GUARD WALL PROTECTION PANEL (WP-1) SUBSTRATE TRANSITION J TRIM. SILICONE SEALANT SILICONE SEALANT _—Vol MIN. 6" COVED UP THE WALL 3 BASE DETAIL SCALE: N.T.S. MATERIAL CODE LEGEND ACC ACCESSORIES IB INTEGRAL BASE MVB MILLWORK VINYL BASE TB TILE BASE VB VINYL BASE C CEILING TILE PT PORCELAIN TILE GT GLASS TILE MT METAL MOSAIC TILE QR QUARTZ/ RESIN ST STONE TILE SVT SOLID VINYL TILE VS SHEET FLOORING P PAINT PL PLASTIC LAMINATE LVT LUXURY VINYL TILE VS VINYL SHEET SS SOLID SURFACE WC WALLCOVERING WP WALL PROTECTION EXP EXPOSED CEILING RS&H 1715 N. Westshore Blvd., Suite 600 Tampa, Florida 33607 -3999 813-289-5550 Fax 813-289-0263 www.rsandh.com FL Cert. Nos. AAC001886 * IB26000956 5620 * LCC000210 * GB238 Advent Health PROJECT TITLE: KITCHEN RENOVATION ADVENTHEALTH ZEPHYRHILLS PROJECT ADDRESS: 7050 Gall Blvd. Zephyrhills, FL 33541 SEAL 0 F F(O,pi ioo—JIN K74f AR95652 i SIGNATURE 11*M7R1gi NO. DESCRIPTION DATE 1 REVISION NO.1 6/15/20 2 ADDENDUM NO.1 7/17/20 4 ASI NO.1 1/21/21 DATE ISSUED: 03/20/2020 REVIEWED BY: YK DRAWN BY: YK/KN DESIGNED BY: JS PROJECT NUMBER: 504- 0226- 000 0 2018 RS&H, INC. SHEET TITLE: FINISH PLAN AND SCHEDULE SHEET ID: Al 04 8 0 8 16 PROJECT STATUS: SCALE: 1/8" = V-0" CONSTRUCTION DOCUMENTS N SCALE: 1/8" = V-0" Copyright 0 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved. r 3 4 5 t 2 I 3 4 I 5 I C A A a co N io N O N N CEP PROPOSED CONDUIT ROUTING FROM NEW ELEC ROOM TO EXISTING CEP. RUN CONDUIT UP BUILDING THRU EXISTING ELEC/MECH ROOM AND THEN UNDERGROUND TO EXISTING CEP. CONDUIT RUN IS APPROXIMATELY 200 FEET. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO DETERMINE EXACT CONDUIT ROUTING AND LENGTH. OPEN COURTYARD LEVEL 1 RENOVATION - PHASE 1 - POWER SCALE: 1/8" = 1'-0" AREA OF WORK PER OWNER REQUEST, REMOVE SCOPE OF WORK IN THE BAKERY AREA FROM PHASE 1: REMOVAL OF EXISTING HOODS, CONSTRUCTION OF WALL AND DOOR, CEILING, LIGHTS, POWER, EF1-1, AND ASSOCIATED DUCTWORK TO ENCLOSE POT/ DISHWASH AREA. THIS PORTION OF WORK WILL BE MOVED TO LATER PHASE (PHASE 2), REVISED PHASING PLAN (A/MEP/FP) TO BE ISSUED UPON OWNER NOTICE -TO -PROCEED TO START OF PHASE 2 CONSTRUCTION. OPEN AIR BREEZEWAY A OPEN AIR BREEZEWAY GENERAL POWER PLAN NOTES 1 VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT WITH MANUFACTURER'S RECOMMENDATIONS PRIOR TO INSTALLATION OF EQUIPMENT. MODIFY LAYOUT AS REQUIRED PER MANUFACTURER'S SPACE REQUIREMENTS. 2 COORDINATE FINAL LOCATIONS OF ALL DIVISION 23 EQUIPMENT IN FIELD WITH DIVISION 23. FIELD LOCATIONS SHALL DICTATE. 3 COORDINATE MOUNTING HEIGHTS AND LOCATIONS OF ALL DEVICES WITH ARCHITECTURAL ELEVATIONS AND CASEWORK. 4 REFER TO KITCHEN VENDOR DRAWINGS FOR EXACT LOCATIONS AND REQUIREMENTS OF ALL EQUIPMENT, ELECTRICAL DEVICES, AND ELECTRICAL CONNECTIONS 5 ALL ELECTRICAL WORK IN PROJECT SCOPE SHALL BE NEW. NO ELECTRICAL DEVICES, CONDUIT OR WIRE SHALL BE RE USED, 6 CONTRACTOR SHALL INVESTIGATE ALL REQUIREMENTS OF EXISTING EQUIPMENT TO BE RELOCATED. PROVIDE NEW ELECTRICAL CONNECTIONS AS NECESSARY, 7 REFER TO WIRE SIZE CHART ON DETAIL SHEET FOR WIRE SIZES, POWER PLAN NOTES (CODED NOTES) 1 PROVIDE SURGE PROTECTION FOR BRANCH CIRCUIT(S) EXITING/ENTERING THE BUILDING. SURGE PROTECTORS MUST BE UL LISTED. REFER TO SPECIFICATION FOR FUTHER INFORMATION. COORDINATE EXACT LOCATION IN FIELD PRIOR TO ROUGH -IN. DESIGN SELECTION: 480V/3P - DYTEK: ZEUS D50-277/4803Y, 1200 P -DYTEK DTK-120HW, 277V-1 P PHILLIPS 929000665202 OR APPROVED EQUAL. 2 PROVIDE LIGHTNING PROTECTION FOR ROOF MOUNTED MECHANICAL AND HVAC EQUIPMENT. CEP APPROXIMATE LOCATION OF MSB AND EQB RS&H 1715 N. Westshore Blvd., Suite 600 Tampa„ Florida 33607-3999 904-256-2500 Fax 904-256-2503 www.rsandh.com FL Cert. Nos. AAC001886' 1626000956 5620 " LCC000210 * GB238 �T LC ENGINEERING S O L U T I O N S® 255 S. Orange Avenue Suite 1600 Orlando, FL 32801 P 407.841.9050 www.tic-engineers.com COA 15 0 Copyright 2019 TLC Engineering Solutions, Inc. TLC Project No.: 119333 THINK. LISTEN. CREATE. PROJECT TITLE: KITCHEN RENOVATION ADVENTHEALTH ZEPHYRHILLS PROJECT ADDRESS: 7050 Gall Blvd. Zephyrhills, FL 33541 Christopher V. O'Hara, P.E. Florida License #66504 %%%��,0 HER �` 5� • O O' No 66504 C14 13 STATE OF ' 4U� m lo i o ••'• p p Digitall�,s� byZC0fi TvV® a •l Ir�ARA CC DN: CN= hlE�hfi �� OU=A0141 13D07, M O=TLC ENGIN twNG f3A00 NS, C=US N Date: 2021.02.04 13:24:59-05'00' LiJ 0 0 CU IH Z W J 0 Q 0 2 Q REVISIONS NO. DESCRIPTION DATE 1 REVISION 1 06/15/2020 2 ADDENDUM NO.1 07/17/2020 3 CCD #1 01/07/2021 5 CCD #2 02/03/2021 DATE ISSUED: 03/20/2020 REVIEWED BY: CVO DRAWN BY: MA DESIGNED BY: MA PROJECT NUMBER: 504- 0226- 000 0 2019 RS&H, INC. SHEET TITLE: LEVEL 1 RENOVATION PLAN - PHASE 1 - POWER SHEET ID: E101 PROJECT STATUS: CONSTRUCTION DOCUMENTS Copyright 0 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved. N 3 4 5 2 3 4 5 M■ M■ 9 A DESIGN SELECTION: SQUARE ' D' NF PANELBOARD MAIN BREAKER: AMPS _ POLE MAIN LUGS: 250 AMPS K.A.I.C.: 65 AMPS SURFACE MTD: X FLUSH MTD: 3 PHASE 4 WIRE 208V/120V X 480V/277V 24OV/120V Name: Project Name: Project Number: Fed From: Location: NHK (NEW NORMAL BRANCH) MSB (LOCATED IN CEP) ELEC. 116A N C TLoad Name Trip Poles A B C Poles Trip Load Name C T N O 1 LIGHTING - HOSPITAL 20 A 1 0.4 0.0 1 20 A SPARE 2 3 TEMP WASHER 30 A 3 0.0 0.0 1 20 A SPARE 4 5 1 0.0 0.0 1 20 A SPARE 6 7 -- -- -- 0.0 0.0 1 20 A SPARE 8 9 T-NLK 125 A 3 14.6 0.0 1 20 A SPARE 10 11 -- 1 -- -- 32.2 0.0 1 20 A SPARE 12 13 -- -- -- 22.7 0.0 1 20 A SPARE 14 15 0.0 1 20 A SPARE 16 17 0.0 1 20 A SPARE 18 19 0.0 1 20 A SPARE 20 21 EF2-1 20 A 1 3 2.8 0.0 1 20 A SPARE 22 23 -- -- -- 2.8 0.0 1 20 A SPARE 24 25 -- -- -- 2.8 1 0.0 1 20 A SPARE 26 27 EF2-3 15 A 3 0.3 0.0 1 20 A I SPARE 28 29 -- -- -- 0.3 0.0 1 20 A SPARE 30 31 -- -- -- 0.3 0.0 1 20 A SPARE 32 33 EF2-2 15 A 3 0.9 0.0 1 20 A SPARE 34 35 -- -- -- 1 0.9 0.0 1 20 A SPARE 36 37 -- -- -- 0.9 0.0 1 20 A SPARE 38 39 AHU-3A 15 A 3 - 0.3 0.0 1 20 A I SPARE 40 41 -- -- -- 0.3 0.0 1 20 A SPARE 42 43 -- -- -- 0.3 0.0 1 20 A SPARE 44 45 LIGHTING - HOSPITAL 20 A 1 0.1 0.0 1 20 A SPARE 46 47 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 48 49 SPARE 20 A 1 1 0.0 0.0 1 20 A SPARE 50 51 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 52 53 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 54 55 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 56 57 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 58 59 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 60 61 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 62 63 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 64 65 SPARE 20 A 1 1 0.0 0.0 1 20 A SPARE 66 67 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 68 69 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 70 71 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 72 73 SPARE 20 A 1 0.0 0.0 1 120 A SPARE 74 75 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 76 77 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 78 79 SPARE 20 A 1 0.0 0.0 3 30 A SPD 80 81 SPARE 20 A 1 0.0 0.0 -- -- -- 82 83 SPARE 20 A 1 0.0 0.0 -- -- -- 84 Notes: Phase Connected Load: Lighting - Hospital Receptacle Motor Heating Cooling Other Elevator Spare X-Ray Kitchen Equipment - Non -Dwelling Unit 27.5 kVA 19.0 kVA CONN. DEMAND DEMAND LOAD... FACTOR LOAD... 0.5 kVA 40.00% 0.2 kVA 24.8 kVA 70.16% 17.4 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 13.8 kVA 85.00% 11.7 kVA 44.0 kVA 100.00% 44.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 36.6 kVA Total Connected Load: 83.1 kVA Total Demand Load: 73.3 kVA Demand Amps: 88 A 2 SQUARE 'D' NQ PANELBOARD (3 SECTION, 42 CKT EACH) Name: NIX (NEW NORMAL BRANCH) MAIN BREAKER: 300 AMPS _ POLE 3 PHASE Project Name: MAIN LUGS: AMPS 4 WIRE Project Number: K.A.I.C.: 42 AMPS X 208V/120V Fed From: NHK (XFMR T-NLK) SURFACE MTD: X 480V/277V Location: ELEC. 116A FLUSH MTD: 24OV/120V N o C T Load Name Trip Poles A B C Poles Trip Load Name C T N O 1 RECEPTACLE SERVERY 20 A 1 0.2 1.2 1 20 A RECEPTACLE 2 3 KITCHEN EQUIPMENT SERVERY 20 A 1 0.2 2.3 3 15 A BLOWER DRYER 4 5 RECEPTACLE SERVERY 20 A 1 0.2 2.3 1 -- -- -- 6 7 RECEPTACLE SERVERY 20 A 1 0.8 2.3 3 9 EF1-1 15 A 2 0.3 7.0 1 15 A BOOSTER PUMP 10 11 -- -- -- 0.3 0.0 13 KITCHEN EQUIPMENT SERVERY 20 A 2 0.1 0.0 1 20 A SPARE 14 5 15 -- -- -- 0.1 13.0 2 35 A WASHER 16 17 KITCHEN EQUIPMENT SERVERY 20 A 2 0.1 13.0 -- -- I -- 18 19 -- -- -- 0.1 0.2 1 20 A RECEPTACLE KITCHEN 20 /\ 21 KITCHEN EQUIPMENT SERVERY 20 A 2 0.1 0.0 1 20 A SPARE 22 126 3 23 -- -- -- 0.1 0.2 1 20 A OTHER 24 25 RECEPTACLE 30 A 2 1.0 0.2 1 20 A RECEPTACLE KITCHEN 27 -- -- -- 1.0 0.2 1 20 A RECEPTACLE KITCHEN 28 29 KITCHEN E UPMENT SERVERY 20 A 1 0.0 0.2 1 20 A RECEPTACLE KITCHEN 30 31 RECEPTACLE SERVERY 20 A 1 0.2 0.8 1 20 A RECEPTACLE KITCHEN 32 33 RECEPTACLE SERVERY 20 A 1 1.0 0.6 1 20 A RECEPTACLE KITCHEN 34 35 RECEPTACLE SERVERY 20 A 1 0.2 0.1 2 15 A KITCHEN EQUIPMENT 36 37 RECEPTACLE SERVERY 25 A 1 1.2 0.1 -- -- -- 38 39 RECEPTACLE SERVERY 20 A 1 0.2 0.1 3 20 A KITCHEN EQUIPMENT 40 41 RECEPTACLE SERVERY 20 A 1 0.2 0.1 -- -- -- 42 43 RECEPTACLE TEMP KITCHEN 20 A 1 0.8 0.1 1 1 -- -- -- 44 45 RECEPTACLE TEMP KITCHEN 20 A 1 1.0 0.8 1 20 A RECEPTACLE KITCHEN 46 47 RECEPTACLE TEMP KITCHEN 20 A 1 0.8 0.2 1 20 A RECEPTACLE KITCHEN 48 49 1 RECEPTACLE TEMP KITCHEN 20 A 1 1.0 0.2 1 20 A RECEPTACLE KITCHEN 50 51 RECEPTACLE TEMP KITCHEN 20 A 1 0.2 0.2 1 20 A RECEPTACLE KITCHEN 52 53 RECEPTACLE TEMP KITCHEN 20 A 1 0.2 0.8 1 20 A RECEPTACLE KITCHEN 54 55 RECEPTACLE TEMP KITCHEN 20 A 1 0.2 0.8 1 20 A RECEPTACLE KITCHEN 56 57 RECEPTACLE TEMP KITCHEN 20 A 1 0.8 0.8 1 1 20 A RECEPTACLE KITCHEN 58 59 RECEPTACLE TEMP KITCHEN 20 A 1 0.2 0.8 1 20 A RECEPTACLE KITCHEN 60 1611 TEMP KITCHEN EQUIPMENT 20 A 2 0.1 1 0.4 1 20 A RECEPTACLE KITCHEN 62 63 -- -- I -- 0.1 0.8 1 20 A RECEPTACLE KITCHEN 64 65 TEMP KITCHEN EQUIPMENT 20 A 2 0.1 0.2 1 20 A KITCHEN EQUIPMENT 66 67 -- -- -- 0.1 0.0 1 20 A COOLING 68 69 TEMP KITCHEN EQUIPMENT 20 A 2 0.1 0.2 1 20 A KITCHEN EQUIPMENT 70 71 -- -- -- 0.1 0.2 1 20 A KITCHEN EQUIPMENT 72 73 RECEPTACLE TEMP KITCHEN 20 A 1 0.2 0.2 1 1 20 A KITCHEN EQUIPMENT 74 3 75 TEMP KITCHEN EQUIPMENT 20 A 1 0.0 0.0 1 20 A SPARE 76 77 RECEPTACLE TEMP KITCHEN 20 A 1 0.2 1.0 2 30 A RECEPTACLE KITCHEN 78 79 RECEPTACLE TEMP KITCHEN 20 A 1 0.2 1.0 -- -- -- 80 81 TEMP KITCHEN EQUIPMENT 20 A 1 0.0 0.2 1 20 A RECEPTACLE KITCHEN 82 83 TEMP KITCHEN EQUIPMENT 20 A 1 0.0 0.2 1 20 A RECEPTACLE KITCHEN 84 85 SPARE 20 A 1 0.0 0.2 1 20 A RECEPTACLE KITCHEN 86 87 SPARE 20 A 1 0.0 0.7 3 30 A RECEPTACLE KITCHEN 88 89 SPARE 20 A 1 0.0 0.7 -- -- -- 90 91 SPARE 20 A 1 0.0 0.7 -- -- -- 92 93 SPARE 20 A 1 0.0 0.2 1 25 A RECEPTACLE KITCHEN 94 95 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 96 97 SPARE 20 A 1 0.0 0.0 1 20 A SPARE 98 99 SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... ... I SPARE 20 A 1 0.0 0.0 1 1 20 A SPARE ... ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 1 20 A SPARE ... SPARE 20 A 1 0.0 0.0 3 30 A SPD ... SPARE 20 A 1 0.0 0.0 -- -- -- ... SPARE 20 A 1 0.0 1 0.0 -- -- -- Phase Connected Load: 14.6 kVA 32.2 kVA 22.7 kVA 2 1 Lighting - Hospital Receptacle Motor Heating Cooling Other Elevator Spare X-Ray Kitchen Equipment - Non -Dwelling Unit Total Connected Load: 69.4 kVA Total Demand Load: 61.9 kVA Demand Amps: 172 A Notes: CONN. LOAD... DEMAND FACTOR DEMAND LOAD... 0.0 kVA 0.00% 0.0 kVA 24.8 kVA 70.16% 17.4 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.6 kVA 85.00% 0.5 kVA 44.0 kVA 100.00% 44.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA DESIGN SELECTION: SQUARE D NF PANELBOARD MAIN BREAKER: AMPS _ POLE MAIN LUGS: 400 AMPS K.A.I.C.: 35 AMPS SURFACE MTD: X FLUSH MTD: 3 PHASE 4 WIRE 208V/120V X 480V/277V 24OV/120V Name: Project Name: Project Number: Fed From: Location: EOHK (NEW EQUIPMENT BRANCH) ELEC. 116A N 0 C T Load Name Trip Poles A B C Poles Trip Load Name C T N O 5 ------------ 2.2 8.6 3 70 A T-E LK 2 3 POWER SOAK 30 A 3 0.8 8.2 -- -- -- 4 5 -- -- -- 0.8 8.8 -- -- -- 6 7 -- -- -- 0.8 0.0 -- -- SPACE 8 0.0 -- -- SPACE 10 11 SPACE -- -- 0.0 0.0 -- -- SPACE 12 13 SPACE -- -- 0.0 0.0 -- -- SPACE 14 15 SPACE -- -- 0.0 0.0 -- -- SPACE 16 17 SPACE -- -- 0.0 0.0 -- -- SPACE 18 19 SPACE -- -- 0.0 0.0 -- -- SPACE 20 21 SPACE -- -- 0.0 0.0 -- -- SPACE 22 23 1 SPACE -- -- 0.0 0.0 -- -- SPACE 24 25 SPACE -- -- 0.0 0.0 -- -- SPACE 26 27 SPACE -- -- 0.0 0.0 -- -- SPACE 28 29 SPACE -- -- 0.0 0.0 -- -- SPACE 30 31 SPACE -- -- 0.0 0.0 -- -- SPACE 32 33 1 SPACE -- -- 0.0 0.0 -- -- SPACE 34 35 SPACE -- -- 0.0 0.0 -- -- SPACE 36 37 SPACE -- -- 0.0 0.0 -- -- SPACE 38 39 SPACE -- -- 0.0 0.0 -- -- SPACE 40 41 SPACE -- -- 0.0 0.0 -- -- SPACE 42 43 SPACE -- -- 0.0 0.0 -- -- SPACE 44 45 SPACE -- -- 0.0 0.0 -- - SPACE 46 47 SPACE -- -- 0.0 0.0 -- -- SPACE 48 49 SPACE -- -- 0.0 0.0 -- -- SPACE 50 51 SPACE -- -- 0.0 0.0 -- -- SPACE 52 53 SPACE -- -- 0.0 0.0 -- -- SPACE 54 55 SPACE -- -- 0.0 0.0 -- -- SPACE 56 57 SPACE -- -- 0.0 0.0 -- -- SPACE 58 59 1 SPACE -- -- 0.0 0.0 -- -- SPACE 60 61 SPACE -- -- 0.0 0.0 -- -- SPACE 62 63 SPACE -- -- 0.0 0.0 -- -- SPACE 64 65 SPACE -- -- 0.0 0.0 -- -- SPACE 66 67 SPACE -- -- 0.0 0.0 -- -- SPACE 68 69 SPACE -- -- 0.0 0.0 -- -- SPACE 70 71 SPACE 1 0.0 0.0 -- -- SPACE 72 73 SPACE -- -- 0.0 0.0 -- -- SPACE 74 75 SPACE -- -- 0.0 0.0 -- -- SPACE 76 77 SPACE -- -- 0.0 0.0 -- -- SPACE 78 79 SPACE -- -- 0.0 0.0 3 30 A SPD 80 81 SPACE -- -- 0.0 0.0 -- -- -- 82 83 SPACE 1 0.0 0.0 -- 1 184 Notes: Phase Connected Load: Lighting - Hospital Receptacle Motor Heating Cooling Other Elevator Spare X-Ray Kitchen Equipment - Non -Dwelling Unit 11.6 kVA 9.0 kVA CONN. DEMAND DEMAND LOAD... FACTOR LOAD... 2.2 kVA 40.00% 0.9 kVA 2.8 kVA 100.00% 2.8 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 17.0 kVA 85.00% 14.5 kVA 8.3 kVA 100.00% 8.3 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 0.0 kVA 0.00% 0.0 kVA 9.6 kVA Total Connected Load: 30.3 kVA Total Demand Load: 26.5 kVA Demand Amps: 32 A 2 i RS&H 1715 N. Westshore Blvd., Suite 600 Tampa„ Florida 33607-3999 904-256-2500 Fax 904-256-2503 www.rsandh.com FL Cert. Nos. AAC001886 * IB26000956 5620 * LCC000210 * GB238 TLC ENGINEERING SOLUTIONS® 255 S. Orange Avenue Suite 1600 Orlando, FL 32801 P 407.841.9050 www.tic-engineers.com COA 15 © Copyright 2019 TLC Engineering Solutions, Inc. TLC Project No.: 119333 THINK. LISTEN. CREATE. PROJECT TITLE: i W ROF 1. AM 90 PROJECT ADDRESS: 7050 Gall Blvd. Zephyrhills, FL 33541 Christopher V. O'Hara, P.E. Florida License #66504 %%�OTHER � , o� V' No 66504 .•'7 0: =��'� 0'.. STATE OF Digitally •'lay �H Q��� ��iA DN: C�.D OU=A0141 N� 1,35Qdh3D07, �WN O=TLC EN IN � S, C=US Date: 2021.02.04 13:2 : 5'00' pp Cj V V REVISIONS NO. DESCRIPTION DATE 1 REVISION 1 06/15/2020 2 ADDENDUM NO.1 07/17/2020 3 CCD #1 01/07/2021 5 CCD #2 02/03/2021 DATE ISSUED: 03/20/2020 REVIEWED BY: CVO DRAWN BY: MA DESIGNED BY: MA PROJECT NUMBER: 5W- 0226- 000 © 2019 RS&H, INC. SHEET TITLE: PANEL SCHEDULES SHEET ID: -=11I-1 Copyright © 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved. 2 3 4 5 PROJECT STATUS: CONSTRUCTION DOCUMENTS 2 AREA OF WORK 3 .'.p�.. �..... 0.. 4 E1 C C B M. Q N fM O C1 N O N co a L NER REQUEST, REMOVE SCOPERK IN THE BAKERY AREA FROM1: REMOVAL OF EXISTING HOODS,RUCTION OF WALL AND DOOR,G, LIGHTS, POWER, EF1-1, ANDIATED DUCTWORK TO ENCLOSEISHWASH AREA. THIS PORTION OFWILL BE MOVED TO LATER PHASE 2). REVISED PHASING PLAN/FP) TO BE ISSUED UPON OWNERE-TO PROCEED TO START OF 2 CONSTRUCTION. l II I OPEN AIR BREEZEWAY AREA OF WORK OPEN COURTYARD 2 _ . =Mr mwl_ . a -n o -m w MIN acma 6,7 _.. .. -_ f ia-mgm Zama - *no"_. =MINI -.. Motu I was &VIN III III F 111_MwM LEVEL 1 RENOVATION - PHASE 1 - FIRE PROTECTION SCALE: 1/8" =1'-0" n N CART J WASH a] JII O FIRE PROTECTION KEYNOTES 1 REMOVE EXISTING SPRINKLER AND ARM -OVER TO NEW SPRINKLER(S) LOCATION. 2 EXISTING SPRINKLER TO REMAIN IN THIS AREA. 3 NO ELECTRICAL OR MECHANICALIPLUMBING SERVICES SHALL ENTER OR PASS THROUGH THIS ROOM THAT DOES NOT SERVE THE ROOM DIRECTLY IN ACCORDANCE WITH NFPA 99/FGI GUIDELINES. 4 NEW SPRINKLER ADDED, CONNECT TO EXISTING SPRINKLER. 5 REMOVE EXISTING SPRINKLER AND PLUG OUTLET. FIRE PROTECTION NOTE: THE EXISTING FIRE PROTECTION SYSTEM SHALL BE MODIFIED TO ACCOMMODATE THE NEW CEILING AND WALL CONFIGURATIONS. COORDINATE THE EXISTING SPRINKLER SYSTEM WITH THE NEW CEILING `. HEIGHTS AND THE NEW MECHANICAL EQUIPMENT. RS&H 1715 N. Westshore Blvd., Suite 600 Tampa„ Florida 33607-3999 904-256-2500 Fax 904-256-2503 www.rsandh.com FL Cert. Nos. AAC001886 * IB26000956 5620 * LCC000210 * GB238 iLt�_TLC ENGINEERING SOLUTIONS® 255 S. Orange Avenue Suite 1600 Orlando, FL 32801 P 407.841.9050 www.tic-engineers.com COA 15 0 Copyright 2019 TLC Engineering Solutions, Inc. TLC Project No.: 119333 THINK. LISTEN. CREATE. PROJECT TITLE: KITCHEN RENOVATION ADVENTHEALTH ZEPHYRHILLS PROJECT ADDRESS: 7050 Gall Blvd. Zephyrhills, FL 33541 Aaron Lee Johnson, P.E. Florida License #71576 ��`��tJ LEE ,Jo % PO C E N �`r0 :� Q, •.•�,� SF•. �'• No 71576 •• Z N STATE OF :�4J z. 0•. '� • CD 8 0 8 16 SCALE: 1/8" =1'-0" Aaron Jo REVISIONS _ 17218155F670000FE8F, NG SOLUTIONS, C.US N FL fY9tc 2021.' 1576 '14:45:08-05'00' W 0 O v z W J V Q V NO. DESCRIPTION DATE 5 CCD #2 02/03/2021 1 REVISION No.1 06/15/2020 DATE ISSUED: 03/20/2020 REVIEWED BY: AU DRAWN BY: JLL DESIGNED BY: BJL PROJECT NUMBER: 504- 0226- 000 C 2019 RS&H, INC. SHEET TITLE: NEW FLOOR PLAN - PHASE 1 - FIRE PROTECTION SHEET ID: FP1 01 PROJECT STATUS: CONSTRUCTION DOCUMENTS Copyright 0 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved. 2 3 4 3 F, 3 4 5 10 HVAC KEY NOTES: I F C B A I AREA OF WORK PER OWNER REQUEST, REMOVE SCOPE OF WORK IN THE BAKERY AREA FROM PHASE 1: REMOVAL OF EXISTING HOODS, CONSTRUCTION OF WALL AND DOOR, CEILING, LIGHTS, POWER, EF1-1, AND ASSOCIATED DUCTWORK TO ENCLOSE POT/DISHWASH AREA. THIS PORTION OF WORK WILL BE MOVED TO LATER PHASE (PHASE 2). REVISED PHASING PLAN (A/MEP/FP) TO BE ISSUED UPON OWNER j NOTICE TO PROCEED TO START OF I PHASE 2 CONSTRUCTION. Ij I I� l I� j OPEN AIR BREEZEWAY IPMENT WILL AIN IN THIS' N. FOR PREP 3E ONLY' P,'gil 'jai (E)AHU-4 REBALANCE SCHEDULE SUPPLY RETURN OUTSIDE AIR OLD 1,737 1,160 577 NEW 1,400 750 650 NOTES: 1. ADJUST VFD AS NECESSARY TO COMPLETE AIR BALANCE. 2. T&B CONTRACTOR SHALL PROVIDE ALL BELTS AND SHEAVES AS NECESSARY TO COMPLETE AIR BALANCE. 3. PROVIDE FULL PRE -DEMO AND FINAL REPORT INCLUDING SUPPLY FAN DATA. (E)AHU-3A REBALANCE SCHEDULE SUPPLY RETURN OUTSIDE AIR OLD 1 2,989 1,726 1,263 NEW 2.625 1,400 1,175 NOTES: 1. ADJUST VFD AS NECESSARY TO COMPLETE AIR BALANCE. 2. T&B CONTRACTOR SHALL PROVIDE ALL BELTS AND SHEAVES AS NECESSARY TO COMPLETE AIR BALANCE. 3. PROVIDE FULL PRE -DEMO AND FINAL REPORT INCLUDING SUPPLY FAN DATA. 0 REBALANCE EXISTING AIR DISTRIBUTION DEVICE (TYP.) Q PROVIDE NEW FIRE RATED DAMPER AT FIRE RATED WALL, FIELD VERIFY EXISTING DUCT ROUTING, SIZE, AND LOCATION PRIOR TO BID. O3 COORDINATE NEW DUCTWORK WITH EXISTING CONDUITS, PIPING, LIGHTS EXISTING DUCTWORK ETC. ® FABRICATED DUCTWORK MADE FROM STAINLESS STEEL CONFORMING TO ASTM A430, TYPE 304 WITH 2B FINISH, ALL WELDED CONSTRUCTION. PROVIDE VOLUME DAMPER ON EACH DROP. SEE DISHWASHER VENDOR CUTSHEETS FOR ADDITIONAL INFORMATION. SLOPE DUCT AT A MINIMUM OF 1/8 TOWARDS DISHWASHER UNIT. O REBALANCE EXISTING EXHAUST FAN. © BLANK OFF DIFFUSER. O7 EXISTING FIRE DAMPER TO REMAIN, CONTRACTOR TO VERIFY THAT EXISTING FIRE DAMPER IS IN GOOD WORKING CONDITION PRIOR TO NEW DUCTWORK CONNECTION. ® CONNECT NEW 12"x12" DUCTWORK TO EXISTING FIRE DAMPER PROVIDE TRANSITION AND ALL THE NECESSARY ACCESORIES TO MAKE PROPER INSTALLATION. PROVIDE DUCTMOUNTED ACCESS DOOR FOR FIRE DAMPER. (E)AHU-3 REBALANCE SCHEDULE SUPPLY RETURN OUTSIDE AIR OLD 11,385 0 11,385 NEW 7,625 0 7,625 NOTES: 1. ADJUST VFD AS NECESSARY TO COMPLETE AIR BALANCE. 2. T&B CONTRACTOR SHALL PROVIDE ALL BELTS AND SHEAVES AS NECESSARY TO COMPLETE AIR BALANCE. 3. PROVIDE FULL PRE -DEMO AND FINAL REPORT INCLUDING SUPPLY FAN DATA. EFREBALANCE SCHEDULE MARK OLD —7NEW (E)EF-41 2,030 1,725 NOTES: 1. T&B CONTRACTOR SHALL PROVIDE ALL BELTS AND SHEAVES AS NECESSARY TO COMPLETE AIR BALANCE. 2. PROVIDE FULL PRE -DEMO AND FINAL REPORT VENTILATION TABLE- PHASE 1 ROOM SUPPLY RETURN EXHAUST AREA CEILING HEIGHT REQUIRED OA AC/HR DESIGN OA AC/HR REQUIRED AC/HR DESIGN AC/HR DISHWASH 800 0 1200 730 8.0 0.0 0.0 10.0 11.6 ELEC 300 300 0 60 15.0 N/A 0.0 0.0 26.7 TEMP. POT/DISH 425 0 500 156 8.5 0.0 0.0 10.0 22.6 NOTE: 1.) THE REQUIRED OUTDOOR AIR AND AIR CHANGES ARE PER HEALTH CARE GUIDELINES AND ASHRAE 170 2.) AIR CHANGES PER HOUR = CFM*60/AREA*HEIGHT RS&H 1715 N. Westshore Blvd., Suite 600 Tampa„ Florida 33607-3999 904-256-2500 Fax 904-256-2503 www.rsandh.com FL Cert. Nos. AAC001886 * IB26000956 5620 * LCC000210 * GB238 8' TL C ENGINEERING SOLUTIONS 255 S. Orange Avenue Suite 1600 Orlando, FL 32801 P 407.841.9050 www.tic-engineers.com COA 15 0 Copyright 2019 TLC Engineering Solutions, Inc. TLC Project No.: 119333 THINK. LISTEN. CREATE. PROJECT TITLE: KITCHEN RENOVATION ADVENTHEALTH ZEPHYRHILLS PROJECT ADDRESS: 7050 Gall Blvd. Zephyrhills, FL 33541 Aaron Lee Johnson, P.E. Florida License #71576 LEE ,U0y i - No 71576 ST 4U: REVISIONS NO. DESCRIPTION DATE 1 REVISION No.1 06/15/2020 3 CCD #1 01 /07/2021 5 CCD #2 02/03/2021 DATE ISSUED: 03/20/2020 REVIEWED BY: AU DRAWN BY: LLP DESIGNED BY: LLP PROJECT NUMBER: 504- 0226- 000 0 2019 RS&H, INC. SHEET TITLE: LEVEL 1 RENOVATION PLAN - PHASE 1- DUCTWORK SHEET ID: M101 r- A N co 0 M N UJ C O t� Z W J C.i a c� LEVEL 1 RENOVATION - PHASE 1 - DUCTWORK SCALE: 1/8" =1'-0" Copyright C 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the 2 expressed written consent of this corporation is prohibited. All rights reserved. 3 4 8 0 8 16 SCALE: 1/8" = V-0" 5 PROJECT STATUS: CONSTRUCTION DOCUMENTS 111 3 4 5 0 a CL 00 T U w 0 ly L Y N T Q f7 M M m m 0 O J A 11 L B n NOTE: THIS IS PARTIAL PLAN OF MECHANICAL AND TOOLS SHOP LOCATED EAST OF BAKERY OPEN COURTYARD AREA PER OWNER REQUEST, REMOVE SCOPE OF WORK IN THE BAKERY AREA FROM PHASE 1: REMOVAL OF EXISTING HOODS, CONSTRUCTION OF WALL AND DOOR, CEILING, LIGHTS, POWER, EF1-1, AND ASSOCIATED DUCTWORK TO ENCLOSE POT/DISHWASH AREA. THIS PORTION OF WORK WILL BE MOVED TO LATER PHASE (PHASE 2). REVISED PHASING PLAN (A/MEP/FP) TO BE ISSUED UPON OWNER NOTICE -TO PROCEED TO START OF PHASE 2 CONSTRUCTION. 1 OPEN AIR BREEZEWAY _ i/■-.- ■i■ ii111 -man`,-EMS t.. - iMi ■ii.. ONE ■{7 r: 12x8 cl ��HRA - 0 ' 04 191 11 I ICI 1 OPEN AIR BREEZEWAY GENERAL HVAC DEMOLITION NOTES: 1. THE DEMOLITION PLAN IS INTENDED TO PROVIDE THE CONTRACTOR WITH A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA, EXISTING EQUIPMENT, STRUCTURE, DUCTWORK, ETC... LOCATED ON DRAWING WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THIS DRAWING MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES AND LOCATIONS PRIOR TO ANY DEMOLITION WORK ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT AND ENGINEER PRIOR TO BEGINNING DEMOLITION. BEGINNING OF DEMOLITION SHALL SIGNIFY CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED DEMOLITION WHETHER SHOWN ON THE PLANS OR NOT. 2. CONTRACTOR SHALL PERFORM A PRE -BID SURVEY TO FIELD -VERIFY AND COORDINATE ALL DIMENSIONS PRIOR TO PROCUREMENT OR FABRICATION. FIELD CONDITIONS SHALL GOVERN. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES. SPRINKLER PIPING, LIGHTS. PLUMBING. AND ELECTRICAL CONDUIT. COST OF REROUTING DUCTWORK OR PIPING DUE TO CONFLICTS WITH EXISTING CONDITIONS SHALL BE PAID BY CONTRACTOR. 3. ALL MECHANICAL SYSTEMS SERVING OTHER SPACES OR FLOORS THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE ANY DISRUPTION TO THESE OTHER SPACES DURING THE DEMOLITION OF THE EXISTING DUCTWORK. 4. TEMPORARY MECHANICAL SERVICES SHALL BE PROVIDED WHEN NEW WORK AFFECTS SERVICES NEEDING TO REMAIN ACTIVE. COORDINATE SERVICE INTERRUPTIONS WITH OWNER AT LEAST TWO WEEKS IN ADVANCE, 5. ALL EQUIPMENT REMOVED UNDER THIS PROJECT SHALL BE DOUBLE -BAGGED AND DISPOSED OF UNLESS OTHERWISE NOTED, 6. CONTRACTOR SHALL REMOVE OR RELOCATE EXISTING CONTROLS WHERE NECESSARY. REMOVED CONTROLS SHALL BE RETURNED TO OWNER. 7. PROPERLY REMOVE AND DISPOSE OF ALL EXISTING TO -BE -REMOVED HVAC DUCTWORK, PIPING AND AIR DISTRIBUTION DEVICES. CONSULT WITH OWNER AND OBTAIN OWNER'S APPROVAL PRIOR TO DISPOSAL OF REMOVED MATERIAL. 8. PATCH HOLES LEFT IN WALLS AND FLOOR AFTER REMOVAL OF EXISTING DUCTWORK. CONDUIT, ETC., TO MATCH NEW EXISTING CONSTRUCTION AND FIRE RATING, THIS INCLUDES ANY EXISTING OPENINGS IN RATED WALLS OR FLOORS. 9. PROVIDE PRE -CONSTRUCTION TEST & BALANCE FOR SUPPLY, RETURN AND EXHAUST OF EXISTING MECHANICAL EQUIPMENT SERVING PROJECT AREA. INCLUDE FLOW AND STATIC PRESSURE IN MAIN DUCTS, FAN STATIC PRESSURE, MOTOR HP AND FLA. PRESSURE DROP ACROSS COILS AND FILTERS. AND CHILLED WATER FLOW. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE AIR HANDLER AND DUCTWORK SERVING THE AREA PRIOR TO FINAL TEST AND BALANCE. CLEANING OF THE AIR HANDLER AND DUCTWORK SHALL CONSIST OF REPLACING THE FILTERS. 11 ALL EXISTING AIR DISTRIBUTION DEVICES LOCATED WITHIN PROJECT AREA SHALL BE FITTED WITH TEMPORARY CONSTRUCTION FILTERS THROUGHOUT PROJECT DURATION TO HELP PREVENT ACCUMULATION OF DUST IN DEVICES AND DUCTWORK. 12. CAP ALL DEMOLISHED BRANCH DUCT AT DUCT MAIN. CAP AND SEAL OPENINGS DURING ENTIRE RENOVATION OF THE HVAC DUCTWORK. 13. ALL EXISTING AND/OR NEW WALL, CEILING AND FLOOR PENETRATIONS TO THE SPACE SHALL BE CAULKED AND SEALED AIR TIGHT AND VAPOR TIGHT AFTER DEMOLITION AND PRIOR TO NEW CONSTRUCTION BY AN APPROVED CONTRACTOR. 14. ALL NEW AND EXISTING HEATING HOT WATER PIPING TO THE SPACE SHALL BE INSULATED WITH NEW APPROVED INSULATION, MINIMUM 1" THICK. 15. MINIMUM DUCT SIZE IS 10" X 6" EXCEPT WHERE SPECIFICALLY INDICATED OTHERWISE. T O DEMO HVAC KEY NOTES: 0 PROVIDE A TEMPORARY HEPA FILTERED NEGATIVE AIR FAN FOR CONSTRUCTION AREA. MAINTAIN A MINIMUM 0.03" NEGATIVE PRESSURE IN THIS AREA RELATIVE TO THE ADJACENT SPACES, PROVIDE VISUAL DISPLAY OF AIRFLOW DIRECTION. PROVIDE ADDITIONAL NEGATIVE AIR MACHINES AS REQUIRED TO ACHIEVE MINIMUM NEGATIVE PRESSURE. PROVIDE TEMPORARY DUST BARRIER PARTITIONS. ALL EXISTING RETURN REGISTERS AND OPENINGS LOCATED WITHIN THE RENOVATION AREA SHALL BE SHUT AND TAPED CLOSED ISOLATING THE RENOVATION AREA FROM THE AIR HANDLER SYSTEM. ALL EXISTING EXHAUST REGISTERS LOCATED WITHIN THE RENOVATION AREA SHALL BE PROVIDED WITH TEMPORARY CONSTRUCTION FILTERS, ROUTE TEMPORARY 120 FLEXIBLE DUCT FROM DISCHARGE OF HEPA UNIT TO OUTSIDE OF DEMOLITION BOUNDARY. PROVIDE 2 SETS OF HEPA FILTERS - ONE HEPA FILTER AT NEGATIVE AIR FAN, AND ONE HEPA FILTER AT DISCHARGE INTO CLEAN CORRIDOR. O PROVIDE AN INCLINED MANOMETER DIFFERENTIAL PRESSURE TYPE. WITH WHITE FACE GAUGE AND BLACK LETTERS WITH MAXIMUM PRESSURE RANGE OF 0.1" W G. THIS SHALL BE USED BY THE CONTRACTOR TO RECORD. ON A DAILY BASIS, THE NEGATIVE PRESSURE IN THE RENOVATION AREA RELATIVE TO THE ADJACENT SPACES. O3 PROVIDE TEMPORARY CONSTRUCTION BARRIER AS SHOWN IN ARCHITECTURAL DRAWINGS. ® PROVIDE PORTABLE DUST ENCLOSURE. O DEMOLISH DUCTWORK AND ALL ASOCIATED AIR TERMINALS TO POINT INDICATED. CAP AND SEAL AIRTIGHT WHERE NECESSARY. © REMOVE EXISTING OVEN HOOD, DUCTWORK, EXHAUST FAN AND ASSOCIATED EQUIPMENT. PATCH AND REPAIR EXISTING WALL AND FINISH AS NECCESSARY. 1 O7 REMOVE EXISTING SIDE WALL GRILLE. 1715 N. Westshore Blvd., Suite 600 Tampa,, Florida 33607-3999 904-256-2500 Fax 904-256-2503 www.rsandh.com FL Cert. Nos. AAC001886 ` IB26000956 5620' LCC000210 ` GB238 TLC ENGINEERING SOLUTIONS® 255 S. Orange Avenue Suite 1600 Orlando, FL 32801 P 407.841.9050 www.tic-engineers.com COA 15 Z Copyright 2019 TLC Engineering Solutions. Inc. TLC Project No.: 119333 THINK. LISTEN. CREATE. PROJECT TITLE: KITCHEN RENOVATION ADVENTHEALTH ZEPHYRHILLS PROJECT ADDRESS: 7050 Gall Blvd, Zephyrhills, FL 33541 Aaron Lee Johnson, P.E. Florida License #71576 0� LEE JOy� .''XGENS' 0 No 71576 STATE OF 441 44/ AA Aaron Johrig n-'iiiq, �s REVISIONS NO. DESCRIPTION DATE 1 REVISION No.1 06/15/2020 3 CCD #1 01/07/2021 5 CCD #2 02/03/2021 DATE ISSUED: REVIEWED BY: DRAWN BY: 03/20/2020 ALJ LLP DESIGNED BY: LLP PROJECT NUMBER: 504- 0226- 000 © 2019 RS&H. INC. SHEET TITLE: LEVEL 1 DEMOLITION PLAN - PHASE 1 - DUCTWORK SHEET ID: MD1 01 LEVEL 1 DEMOLITION - PHASE 1 - DUCTWORK SCALE: 1/8" = 1'-0" Copyright © 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved. 2 3 4 8 0 : 16 5 PROJECT STATUS: CONSTRUCTION DOCUMENTS 2 3 An 4 1 5 I C 11! A Q N M O N 0 N N DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS - CLASS IV DURING CONSTRUCTION: 1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. 2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE HEPA VACUUM FOR VACUUMING PRIOR TO EXIT BEFORE CONSTRUCTION BEGINS. 3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. 4. SEAL OLES, PIPES, CONDUITS, AND PUNCTURES. 5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE. 6.ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA. 7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPT. UPON COMPLETION 1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT AND DEBRIS 2. CONTAIN CONSTRUCTION WASTE BEFORE TRNASPORT IN TIGHTLY COVERED CONTAINERS. 3. COVER TRANSPORT RECETACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. 4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. 5. WET MOP AREA WITH DISINFECTANT. 6, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. Copyright 0 2018. This drawing is an instrument of service and property of RS&H. Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved. NOTE: THIS IS PARTIAL PLAN OF MECHANICAL AND TOOLS SHOP LOCATED EAST OF BAKERY ] 0 2 NEW CONSTRUCTION WORK TO i - - OFFICE ENCLOSE NEW ELECTRICAL ^ 101 -- i !u_ OPEN AIR BREEZEWAY OPEN AIR BREEZEWAY STAIR „C„ I --�n _- _ �� ❑ i I - ' OFFICE I -�1 - - - Q o AREA OF WORK • k _ _ _ _.-- - - - - - PHI -1 - I o_ -- - I� ELECTRICAL -- -' H TEMP''--PH1 3 - J I - STORAGE FE il OFFICE PH1-2 • i ! PASSAGE L] MECHANICAL MECHANICAL PHASING SCHEDULE PHASE 1: (CONSTRUCTION COMPLETION BY DECEMBER 2020) l RS&H 1. 1715 N. Westshore Blvd., Suite 600 J Tampa„ Florida 33607-3999 2. RENOVATE DISHWASH ROOM, EVS. ADJACENT PASSAGEWAY AND STAFF TOILET/ ROOMS. 904-256-2500 Fax 904-256-2503 3. WORK INCLUDES REMOVAL/ REPLACEMENT OF THE FLOORING AND FLOOR SLAB TO REPLACE UNDERGROUND UTILITIES (SEE PHASING PLAN FOR EXTENT OF SLAB REMOVAL). www.rsandh.com 4. REMOVAL/ REPLACEMENT OF THE CEILING, ALL CEILING DEVICES AND WALL FINISHES. FL Cert. Nos. AAC001886 ` IB26000956 5. REMOVAL AND REPLACEMENT OF DISHWASH ROOM EQUIPMENT (PER FOOD SERVICE CONSULTANT DRAWINGS) AND WATER 5620 ` LCC000210 ` GB238 SOFTENER SYSTEM. 6. CONSTRUCT WALL AND DOORS FOR NEW ELECTRICAL PANELS IN TEMPORARY STORAGE ROOM 7. REPLACEMENT OF MECHANICAL AND ELECTRICAL SYSTEMS. 8. REPLACEMENT OF MAIN PLUMBING SYSTEM RUNNING BENEATH THE DISHWASH AND ADJACENT PASSAGE AREA 9. OBTAIN C. 0. FOR USE OF RENOVATED DISHWASH ROOM AND STAFF TOILET ROOMS. PHASE 2: (CONSTRUCTION DURING 21ND QUARTER OF 2021) 5 Advent Health 1 RE OVAL OF EX ST NG HOOD A D ONS U TI N F WA L. O R. F -1 ND ASSO IA E D CT O K 0 N LOSE 0 IS W S A EA IN H B KE Y AR A. PER FOOD SERVICE CONSULTANT DRAWINGS. 3 CONSTRUCT NEW CONCRETE PAD AND INSTALL NEW AHU IN COURTYARD PROVIDE ALL NECESSARY HARDWARE AND ACCESSORIES TO COMPLETE INSTALLATION, INCLUDING BUT NOT LIMITED TO CONNECTING TO THE EXISTING CHILLED WATER AND REHEAT SYSTEM IN THE EXISTING MECHANICAL ROOM. THE MAIN KITCHEN MUST REMAIN IN OPERATION UNTIL PHASE 3. CONSTRUCT WALLS AND DOORS TO ENCLOSE NEW AIR HANDLER UNIT. 4. RENOVATE SERVERY AREA TO ADD NEW RETAIL SERVING LINE AND COOKLINE PER FOOD SERVICE CONSULTANT DRAWINGS. 5 RENOVATE DIETICIAN OFFICE TO CONVERT TO DRY STORAGE. 6. RENOVATE/ FINISH UPGRADE PASSAGEWAY AND NEW DIETICIAN OFFICE. 7. REPLACEMENT OF MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS. 8. OBTAIN C.O. FOR USE OF RENOVATED OFFICE. DRY STORAGE, SERVERY AND TEMPORARY KITCHEN PREP. - - - - -- - PROJECT TITLE: PHASE 3 & 4: (CONSTRUCTION AFTER PHASE 2) 1. RENOVATE EXISTING KITCHEN AREA. 2. WORK INCLUDES REMOVAL/ REPLACEMENT OF THE FLOORING AND FLOOR SLAB TO REPLACE ALL UNDERGROUND UTILITIES. REMOVAL/ REPLACEMENT OF THE FINISHED CEILING, ALL CEILING DEVICES. WALL FINISHES AND FOOD SERVICE EQUIPMENT. REMOVAL OF EXISTING AHUs AND LOUVER IN THE EXISTING MECHANICAL ROOM. CONSTRUCT INFILL WALL AT LOUVER OPENING AND CONCRETE PADS FOR EQUIPMENT CONDENSER UNITS. 3. REPLACEMENT OF MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS. 4. REPLACEMENT OF MAIN PLUMBING SYSTEMS RUNNING BENEATH THE KITCHEN AREA. KITCHEN RENOVATION 5. REMOVAL/ REPLACEMENT OF DOORS IN THE ENGINEERING ROOM. 6. REMOVAL/ REPLACEMENT OF FOOD SERVICE EQUIPMENT IN TEMP. KITCHEN PREP (BAKERY) TO CONVERT TO DRY STORAGE ADVENTHEALTH ZEPHYRHILLS 7. OBTAIN C.O. FOR USE OF RENOVATED KITCHEN AND DRY STORAGE. PHASE 1 SEQUENCE NOTES QPH1-1 OWNER VACATES PHASE 1 AREA OF WORK AND REMOVES FURNISHINGS AND ACCESSORIES 1 PH1-2 CONTRACTOR INSTALLS DUST BARRIER PARTITIONS AND SETS UP ICRA PI1-3 PROVIDE A HEPA UNIT WITH TEMPORARY EXHAUST. SEE MECHANICAL DRAWINGS. PI1-4 CONTRACTOR PERFORMS DEMOLITION AND NEW CONSTRUCTION WORK IN PHASE 1 AREA OF WORK. PI1-5 CONTRACTOR SCHEDULES ACHA AND BUILDING DEPARTMENT INSPECTIONS PH1-6 UPON INSPECTION APPROVALS, OWNER EQUIPS AND OCCUPIES PHASE 1 AREA OF WORK, PHASING PLAN LEGEND EXISTING ITEM TO REMAIN - - - - - EXISTING ITEM TO BE DEMOLISHED SCOPE OF WORK EXISTING TO REMAIN/ NOT IN A CONTRACT - SUPERVISOR ❑ 1 1 FE �`- Lj TAPE SEAL FULL PERIMETER OF DOOR (BOTH SIDES) u � I 1 L1 - - 1 I EXISTING 2HR FIRE WALL, I DECOMMISSION THIS WALL I �- DIET 1 1 I TAPE SEAL FULL PERIMETER 6 RI ( - I lil AREA OF WORK tom- EL OF DOOR (BOTH SIDES) DISHWA H � � � LJ � PASSAGE � �TOILET7 ' '1 S _ / 1 _ - ROOM C -- ---- --- �� i - - EXISTING 1HR FIRE WALL. PI1-1 i 1' I DECOMMISSION THIS WALL - I - PH1-4 PH1-2TOTt REMOVE EXISTING FLOOR SLAB AND I - BELOW GROUND UTILITIES AS INDICATED. I- CONTR. I REMOVE CEILING TILES AS REQUIRED FOR 'HOFFICE ' ANTE WOMEN R.R. MEN R.R. CONNECTING TO EXISTING DUCTWORK. � , z - PHI 3 I ROOM 1 FE - REMOVE AND ADD NEW CORRIDOR _ _ _ _ CONTRACTOR ACCESS - _ _ J WATER SOFTENER SYSTEM PHASE 1 CONSTRUCTION SCALE: N.T.S. 3 4 EXTENT OF SLAB REMOVAL I.C.R.A DUST BARRIER LEGEND TEMPORARY CONSTURCTION DUST BARRIER WALL - SEE DETAIL A-501 TEMPORARY PLASTIC MEMBRANE DUST BARRIER: •- USED IN SERVERY FOR WORK RELATED TO NEW DUCTWORK. EXTEND PLASTIC MEMBRANE FROM FLOOR TO CEILING. SEAL TIGHT DURING CONSTRUCTION. PATH OF CONTRACTOR ACCESS FROM EXTERIOR DOOR TO ENTRY DOOR OF CONSTRUCTION ANTE ROOM. PROVIDE STICKY MATTS ON BOTH SIDES OF ANTE CONTRACTOR ACCESS ROOM DOOR. A DIFFERENTIAL - - - - - - - - - n PRESSURE GAUGE ADJACENT TO THE ♦�♦ ANTE ROOM DOOR, AND A HEPA VACUUM INSIDE OF THE CONSTRUCTION ANTE ROOM. REFER TO OWNER'S ICRA PERMIT FOR ADDITIONAL REQUIREMENTS NIGHT SHIFT WORK AREA: INSTALL PLASTIC MEMBRANE DUST BARRIER FOR OVERNIGHT ABOVE CEILING WORK -- IN THIS AREA. COORDINATE ACCESS TO EACH SPACE WITH OWNER AND SAFETY OFFICER AND FOLLOW OWNER'S ICRA PROTOCOLS FOR ABOVE CEILING WORK. REMOVE DUST BARRIER AND CLEAN SPACE BY 6 A.M. � _I[ 21 NEGATIVE PRESSURE HEPA FILTER LHi 1L y MACHINE. SEE MECH. DWGS NOTE: THE PRIMARY AND FIRST INSPECTION OF AN ICRA IS THE RESPONSIBILITY OF THE FACILITY. PROCEDURES INCLUDE A PERMIT AND DAILY INSPECTION THAT IS TO BE LOGGED IN. AT THE 80%, FACILITY MUST PROVIDE A COPY OF THE ICRA LOG AND PERMIT (SIGNED BY FACILITY AND CONTRACTOR) TO ARCH REVIEWER (AT THE INITIAL MEETING) BEFORE CONDUCTING THE SURVEY OF THE AREA FOR ICRA COMPLIANCE. CONTRACTOR TO PROVIDE TEMPORARY EXIT SIGNS AND FIRE EXTINGUISHERS AS REQUIRED. 5 PROJECT ADDRESS: 7050 Gall Blvd. Zephyrhills, FL 33541 SEAL OF F(��/o .9 y00-JIN K/M . AR95652 ST ED.Ao Digitally signed by Yoo-Jin Kim Date: 201121.02.04 10:59['&-�UR00 ' REVISIONS NO-T DESCRIPTION DATE 1 1 REVISION NO.1 6/15/20 5 1 CCD NO.2 2/03/21 DATE ISSUED: 03/20/2020 REVIEWED BY: YK DRAWN BY: YK/ KN DESIGNED BY: JS PROJECT NUMBER: 504- 0226- 000 0 2019 RS&H. INC. SHEET TITLE: PHASING PLANS SHEET ID: PH001 PROJECT STATUS: CONSTRUCTION DOCUMENTS r%4 N 7 to �r a 0 0 M W 0 0 v F-- z w_ J U Q U 2 Q