Loading...
HomeMy WebLinkAbout7333 Gall Blvd (4)P.O. Box 2076 Rogers, Arkansas 72756 Phone: 479.636.3545 architecture +engineering DATE: October 23, 2013 TO: City of Zephyrhills Attn: Jackie Boges/William Burgess 5335 8th Street Zephyrhills, FL 33542 813-780-0020 JOB #: R2013.0407.03/50.reimb RE: Plan Revision Two Submittal Hobby Lobby Conversion 7333 Gall Boulevard Zephyrhills, FL 33541 We are sending you the following information on the above referenced project for your use. Please call if you have any questions. Thank you. COPIES DESCRIPTION 3 Signed and crimped sets of revised plans, sheets as follows: CVR, A3.0, A8.0, E1.0, E1.1, E2.0, E2.1, E3.0, E4.0, E5.0, E5.1, E7.0, BAS 1 and BAS2 3 Plan Revision Two Texts If enclosures are not as noted, please notify us immediately. Signed, Der Dague, Permit Coordinator pb2 architecture + engineering derek.daaue@Db2ae.com direct 479.878.3524 xc File Shipping via: UPS Ground Delivery b2 2809 Ajax Avenue Suite 100 Rogers, Arkansas 72758 p hitecture Phone: 479.636.3545 gineering HOBBY LOBBY ZEPHYRHILLS, FLORIDA OCTOBER 22ND, 2013 PLAN REVISION #2 JOB # 2013-0407 This Plan Revision is an integral part of the Contract Documents and shall be treated as such. SCOPE: This Plan Revision is to revise the previously issued documents of Zephyrhills, Florida, Hobby Lobby, to reflect the following changes: SCOPE: Client Directed Changes Page 1 of 3 HOBBY LOBBY ZEPHYRHILLS, FLORIDA ARCHITECTURAL Sheet CVR: Item # 1: Added note reflecting the revised sheets Item #2: Drawing Index, Added sheets BAS 1 and BAS2 to index. Sheet A3.0 Item # 1: Detail 4, added box note for Bid Alternate Item #2: Detail 4, revised note to curtainwall Sheet A8.0 Item # 1: Detail 2, revised notes to curtain wall Item #2: Detail 2, revised box note to curtain wall & storefront OCTOBER 22ND, 2013 PLAN REVISION #2 JOB #2013-0407 ELECTRICAL Sheet E1.0: Item # 1: Detail 1, Revised and added keynotes to clarify issues with fixtures with emergency ballasts. Item #2: Detail 1, Revised Vestibule strip light locations to center of grid. Item #3: Keynotes, Revised all keynotes to clarify circuitry issues. Sheet E1.1: Item # 1: Keynotes, Revised and added keynotes to clarify circuitry issues. Item #2: Detail 3, Revised frame room strip light locations to center of grid. Sheet E2.0: Item # 1: Detail 1, Removed 8 lamps display circuits per HL directive. Sheet E2.1: Item # 1: Keynotes, Revised notes 2 and 3 to 3/" conduits and specified raised plaster rings per HL Directive. Item #2: Keynotes, Added note 11. Item #3: Detail 1, Added J-box and note in Manager's Office. Item #4: Detail 4, Added box for additional unit heater sensor in Mezzanine. Sheet E3.0: Item #1: Detail 1, Removed bottom row of plugmold per HL directive. Item #2: Detail 2, Removed bottom row of plugmold per HL directive. Item #3: Detail 3, Removed bottom row of plugmold per HL directive. Sheet E4.0: Item # 1: Detail 6, Revised Alpine Display plugmold dimensions to correct heights. Sheet E5.0: Item # 1: Panelboard Schedules, Added AIC ratings for clarification. Sheet E5.1: Item # 1: Panelboard Schedules, Added AIC ratings for clarification. Item #2: Panelboard P2, Removed lamps display circuits. Item #3: Contactor Schedule, Removed lamps display circuits. Page 2 of 3 HOBBY LOBBY ZEPHYRHILLS, FLORIDA Sheet E7.0: Item #1: Detail 2, Added "TNBB" panel per HL comments. Sheet BAS1: Item # 1: Sheet added to set. Sheet BAS2: Item # 1: Sheet added to set. OCTOBER 22ND, 2013 PLAN REVISION #2 JOB #2013-0407 Page 3 of 3 b2 2809 Ajax Avenue Suite 100 Rogers, Arkansas 72758 p hitecture Phone: 479.636.3545 gineering HOBBY LOBBY ZEPHYRHILLS, FLORIDA OCTOBER 22ND, 2013 PLAN REVISION #2 JOB # 2013-0407 This Plan Revision is an integral part of the Contract Documents and shall be treated as such. SCOPE: This Plan Revision is to revise the previously issued documents of Zephyrhills, Florida, Hobby Lobby, to reflect the following changes: SCOPE: Client Directed Changes Page 1 of 3 HOBBY LOBBY ZEPHYRHILLS, FLORIDA ARCHITECTURAL Sheet CVR: Item # 1: Added note reflecting the revised sheets Item #2: Drawing Index, Added sheets BAS 1 and BAS2 to index. Sheet A3.0 Item # 1: Detail 4, added box note for Bid Alternate Item #2: Detail 4, revised note to curtainwall Sheet A8.0 Item # 1: Detail 2, revised notes to curtain wall Item #2: Detail 2, revised box note to curtain wall & storefront OCTOBER 22ND, 2013 PLAN REVISION #2 JOB #2013-0407 ELECTRICAL Sheet E1.0: Item # 1: Detail 1, Revised and added keynotes to clarify issues with fixtures with emergency ballasts. Item #2: Detail 1, Revised Vestibule strip light locations to center of grid. Item #3: Keynotes, Revised all keynotes to clarify circuitry issues. Sheet E1.1: Item # 1: Keynotes, Revised and added keynotes to clarify circuitry issues. Item #2: Detail 3, Revised frame room strip light locations to center of grid. Sheet E2.0: Item # 1: Detail 1, Removed 8 lamps display circuits per HL directive. Sheet E2.1: Item # 1: Keynotes, Revised notes 2 and 3 to 3/" conduits and specified raised plaster rings per HL Directive. Item #2: Keynotes, Added note 11. Item #3: Detail 1, Added J-box and note in Manager's Office. Item #4: Detail 4, Added box for additional unit heater sensor in Mezzanine. Sheet E3.0: Item # 1: Detail 1, Removed bottom row of plugmold per HL directive. Item #2: Detail 2, Removed bottom row of plugmold per HL directive. Item #3: Detail 3, Removed bottom row of plugmold per HL directive. Sheet E4.0: Item # 1: Detail 6, Revised Alpine Display plugmold dimensions to correct heights. Sheet E5.0: Item # 1: Panelboard Schedules, Added AIC ratings for clarification. Sheet E5.1: Item # 1: Panelboard Schedules, Added AIC ratings for clarification. Item #2: Panelboard P2, Removed lamps display circuits. Item #3: Contactor Schedule, Removed lamps display circuits. Page 2 of 3 HOBBY LOBBY ZEPHYRHILLS, FLORIDA Sheet E7.0: Item # 1: Detail 2, Added "TNBB" panel per HL comments. Sheet BAS1: Item # 1: Sheet added to set. Sheet BAS2: Item # 1: Sheet added to set. OCTOBER 22ND, 2013 PLAN REVISION #2 JOB #2013-0407 Page 3 of 3 pb2 architecture + engineering P.O. Box 2076 Rogers, Arkansas 72756 Phone: 479.636.3545 DATE: October 2, 2013 TO: City of Zephyrhills Attn: Jackie Boges/William Burgess 5335 8th Street Zephyrhills, FL 33542 813-780-0020 JOB #: R2013.0407.03/50.reimb RE: Plan Revision One Submittal Hobby Lobby Conversion 7333 Gall Boulevard Zephyrhills, FL 33541 We are sending you the following information on the above referenced project for your use. Please call if you have any questions. Thank you. COPIES DESCRIPTION 3 Signed and crimped sets of revised plans, sheets as follows: CVR, F1.0, L1.0, A1.0, A1.2, A5.0, A5.1, A8.0, A8.1, S 1.0, S2.0 and E2.1 3 Plan Revision One Texts If enclosures are not as noted, please notify us immediately. Signed, e , Derek Dague, Permit Coordinator pb2 architecture + engineering derek.daaue@ob2ae.com direct 479.878.3524 xc File Shipping via: UPS Next Day Delivery