HomeMy WebLinkAboutResolution No. 849-25 Utility Fee Schedule AmendmentRESOLUTION NO. 849-25
A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF
ZEPHYRHILLS, FLORIDA TO AMEND THE UNIFORM UTILITY
DEPARTMENT FEE SCHEDULE FOR THE REMAINDER OF THE 2024-
2025 FISCAL YEAR.
WHEREAS, on October 28, 2019, the City Council of the City ofZephyrhills, Florida
sitting in regular session, adopted Master Potable Water Ordinance 1386-19, Master Reclaimed
Water Ordinance 1387-19, and Master Sewer Ordinance 1388-19 which established that the
schedule of fees relating to certain administrative functions of the City Utility Department be set
by resolution each fiscal year; and
WHEREAS, the City Council finds that the following schedule of fees are reasonably
related to the actual costs of performing the related administrative functions.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Zephyrhills, Florida in regular session duly assembled, that said Council hereby establishes the Ut
ility Department schedule of fees to be effective on the passage of this Resolution through the end
of the 2024-2025 Fiscal Year:
SECTION 1. That the Utility Department Schedule of Fees is hereby adopted as attached hereto
as Exhibit "A" and by reference made a part of this Resolution.
SECTION 2. Any prior resolution or portion thereof establishing a rate schedule for
administrative functions regarding the Utility of the City of Zephyrhills that is inconsistent with
this Resolution is hereby repealed to the extent that it is inconsistent herewith.
SECTION 3. This Resolution shall become effective when passed by the City Council and signed
by the Mayor.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City ofZephyrhills,
Florida^^^in'r^ul^ session this 14th day of April, 2025
^...""' ~v'--'y^ -
s^
^.Rid^xio Qumone^ City Clerk
'. w.'-
,.r» \^.^ i^:'!OC^My
Charles E. Proctor, Council President
Mel ie Bahr Monson, Mayor
Approved as to legal form and legal content
for the reliance of the City of Zephyrhills only
/^^
Matthew E. Maggard, City Attorney
ATTACHMENT A
Utility Department Fee Schedule
To be reviewed each Fiscal Year
Water/Sewer Rates - By Ordinance
Water/Sewer Capacity Fees - By Ordinance
Turn On $25.00 water/sewer
Turn Off $25.00 water/sewer
Turn Off Disconnect $50.00 water/sewer
Turn On After 4:00 PM weekdays, weekends, and holiday's $50.00 water/sewer
Late Fee $4r00 1.5% of balance minimum of 4.00
Insufficient Fund Charge (Bad Check) $50.00
Meter Reading Charge $30.00 40.00 (re-read roll a vehicle)
Residential Water Deposit $60.00
Residential Sewer Deposit $60.00
Reclaimed Water Deposit $0.00
Commercial Reclaimed Water Deposit $0.00
Meter cost - See Meter Install Fees
Meter installation charge - See Meter Install Fees
Sewer Install Charge - See Sewer Service Install Fees
Testing meters $125.00
Administration Fee 10% of Cost
Fire sprinkler Fee, 500 or less $3.00 per month
>500 Fir sprinkler Fee, each head $3.00 per month
Utilities Consultant Review Fee - Cost of review plus Administration Fee ($1,500.00
initial de osit. Char ed b Plannin durin ermittin .
Interdepartmental Utility Review Fee - < 50 units $250.00, >. 50 units $500.00. Char ed
by Planning d ring permitting.
Cost Recovery Fee - See Cost Recovery Fee
IVIeter Install Fees
3/4" Meter 1" Meter
Meter
Curb Sto
Fittin s/Materials
Dual Check Backflow Preventer
Reduced Pressure Backflow
Meter Box
Concrete Pad
Labor
TOTAL:
267.85
119.57
284.85
119.63
29.81
441.38
119.57
934.86
399.30
65.00
2 hrs X $35.00/hr = $70 00 8 hrs X $35.00/hr = $280.00
$891.71 $2,240.11
1 1/2" Meter 2" Meter
Meter
Curb Sto
Fittin s/Materials
Reduced Pressure Backflow
Concrete Pad
Labor
TOTAL:
995.50
266.09
2301.70
788.70
65.00
1160.50
387.53
2898.07
982.85
65.00
8 hrs X $35.00/hr = $280.00 8 hrs X $35.00/hr = $280.00
$4,696.99 $5,773.95
Hydrant Meter Security Deposit (NOT account deposit)
Meter
1 160 50715.00
Fittin s/Materials 255.42300.00
Backflow
Preventer 982.85480^0
TOTAL:$2 398.7747485^0
Cost Recovery:
Purpose
Providing a guideline for recovering costs associated with repair, replacement, and/or
installation/removal, etc. of the City of Zephyrhills (City) Utility Department (Department)
materials, equipment, and labor.
Analysis
Occasionally, City personnel are contacted via emergency phone, regular phone, email,
etc. to respond to a water or sewer leak or break, fire hydrant damage, etc., due to an
accident, vandalism, natural causes, material failure, etc., prior to, during, or after normal
working hours. Additionally, City personnel are contacted about water and/or sewer line
breaks, leaks, etc. at places we provide utility services to but are not responsible for the
maintenance of. Such as the Valleydale Resident Owned (RO) Mobile Home Park,
Winter's Mobile Home Park, etc. Department materials, equipment, and labor could be
utilized to correct the previously mentioned conditions.
With costs/charges in place there would be a form of continuity so the City would be able
to recover all costs relating to the above. Requesting reimbursement from an insurance
company, resident, or other organization to recover all costs would be known and equal
among situations/conditions, and should be unchallenged if/when questioned by an
organization, attorney, courts, etc. An itemized list of charges will be completed as soon
as reasonably possible prior to any work commencing or within a reasonable time after.
Costs/Charges
Normal Working Hours - Monday through Friday, 7am-3:30pm, excluding City
Holidays
Non-Normal Working Hour charges are to be calculated at 1 7z (one and one half)
times the Normal Working Hour Rates
Minimum 1 (one) hour charge beginning at time of call out, and ending at
completion of task, such as the return of vehicles and/or equipment and/or
personnel to starting location
Employee:
Normal working hour rate - $325.00 per hour, per employee. Charged in half-hour
increments
Equipment (employee NOT included in cost):
Vehicles (car, standard and/or utility truck, or similar) $320.00 per hour, per
vehicle. Charged in half-hour increments.
Specialty Vehicles (Crane Truck, TV Truck, Flat Bed Truck, or similar) $10075.00
per hour. Charged in half-hour increments.
Heavy Equipment (VacCon, Mini-Excavator, Backhoe, Loader, or similar)
$1500.00 per hour, per piece of equipment. Charged in half-hour increments.
Materials:
All materials used for repair, replacement, etc. shall be charged to the organization,
resident, insurance company, etc. at the City's cost(s), plus_a 10% (ten percent)
fef Administration Fee.
*Rest of Page Intentionally Left Blank*
Wastewater Installation Fee Schedule
4" connection to existing Sewer Gravity Main < 5' deep
(same side of road, no asphalt cuts or repair required)
Item Qty Hr Rate Subtotal
Heavy Equipment Charge (Per Hour) 8 $150.00 $1200.00
Employee Labor Charge (Per Hour) 24 $ 35.00 $ 840.00
Service Vehicle Charge (Per Hour) 16 $ 30.00 $ 480.00
Parts & Materials Bundled $ 500.00
Total* $ 3,020.00
4" connection to existing Sewer Gravity Main > 5' deep
(same side of road, no asphalt cuts or repair required)
Item Qty Hr Rate Subtotal
Heavy Equipment Charge (Per Hour) 16 $150.00 $2,400.00
Employee Labor Charge (Per Hour) 36 $ 35.00 $1,260.00
Service Vehicle Charge (Per Hour) 16 $ 30.00 $ 480.00
Parts & Materials Bundled $ 500.00
Total* $ 4,640.00
6" connection to existing Sewer Gravity Main < 5' deep
(same side of road, no asphalt cuts or repair required)
Item Qty Hr Rate Subtotal
Heavy Equipment Charge (Per Hour) 8 $150.00 $1,200.00
Employee Labor Charge (Per Hour) 24 $ 35.00 $ 840.00
Service Vehicle Charge (Per Hour) 16 $ 30.00 $ 480.00
Parts & Materials Bundled $ 700.00
Total* $ 3,220.00
6" connection to existing Sewer Gravity Main > 5' deep
(same side of road, no asphalt cuts or repair required)
Item Qty Hr Rate Subtotal
Heavy Equipment Charge (Per Hour) 16 $150.00 $2,400.00
Employee Labor Charge (Per Hour) 36 $ 35.00 $ 1,260.00
Service Vehicle Charge (Per Hour) 16 $ 30.00 $ 480.00
Parts & Materials Bundled $ 700.00
Total* $ 4,840.00
Additional costs if roadway must be excavated to make the proposed sewer
connection (Calculated for a 5' wide cut 24' long)
Item
Heavy Equipment Charge (Per Hour)
Employee Labor Charge (Per Hour)
Service Vehicle Charge (Per Hour)
Streets Heavy Equip Charge (Per Hour)
Streets Labor Charge (Per Hour)
Streets Service Vehicle Chg (Per Hour)
Asphalt & Limerock
Qty
3
6
3
10
12
4
Hr Rate
$ 150.00
$ 35.00
$ 30.00
$ 150.00
$ 35.00
$ 30.00
Bundled
Total"
Subtotal
$ 450.00
$ 210.00
$ 90.00
$ 1,500.00
$ 420.00
$ 120.00
$ 550.00
$ 3,340.00
Assumes that the new service connection will not require a paved road to be excavated. If road xcavation is necessary, additional fees will be applicable.
" Assumes ag egate material costs do not rise significantly above 2016 market rate