HomeMy WebLinkAbout7471 Gall Blvd (2)PROJECT DETAILS:
NAME: WDG REAL ESTATE
LOCATION: ZEPHYRHILLS, FL
PRODUCT: PARACHUTE BIKE SHELTER
JOB #: 16595
CLIENT: JARRETT CONSTRUCTION
QTY: (1) 9' x 10'
DESIGN LOADS:
DESIGN STANDARD: ASCE 7L14
BUILDING CODE- FBC 2023ULTIMATE WIND SPEED (mp
GROUND SNOW LOAD (psfl:
SCOPE OF WORK:
IIVJ 1 HLL/A I IUN: IJUI
EXISTING PAD: 17' x 10' x 5" BY OTHERS
FOUNDATION: BY OTHERS
STRUCTURE: DGI
GLAZING: DGI
MATERIALS: U.N.O.
EXTRUSIONS: ALUMINUM: 6005-T5, OR EQUAL
ALUMINUM EXTRUSION FINISH: T.B.D.
STEEL FRAMING FINISH: T.B.D.
ALUMINUM ROOF PAN COLOR: T.B.D.
SHEET SCHEDULE:
SHEET 1: TITLE SHEET
SHEET 2: PLAN AND ELEVATIONS
SHEET 3: CONNECTION DETAILS
DATE
REV. 1 8-2-24
REV.2 9-25-24
REV.3 --
REV.4 --
U Z M A N WEST CHESTER PIKE SUIT �REV.
EV. 5 --
SUITE 402
WEST CHESTER, PA 19382
o,slo.azo.zloo 6 --
APPROVAL/REVIEW NOTES:
1. LEAD TIME BEGINS UPON RECEIPT OF SIGNED SUBMITTAL DRAWINGS.
2. THE DRAWINGS IN THIS PACKAGE ARE PROPRIETARY AND FOR THE SOLE USE OF OUR CLIENT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT PRIOR WRITTEN CONSENT FRO DGI.
3. PLEASE REVIEW THESE DRAWINGS CAREFULLY.
4. THESE DOCUMENTS REPRESENT THE BEST INTERPRETATION OF THE INTENT OF THE CONTRACT
DOCUMENTS. DGI WILL ASSUME NO RESPONSIBILITY FOR THE ACCURACY OF THE CONTRACT
DOCUMENTS.
5. UNLESS IT IS NOTED TO THE CONTRARY ON THESE DRAWINGS WHEN RETURNED FROM APPROVAL, IT
WILL BE ASSUMED THAT ALL INFORMATION SHOWN HEREIN HAS THE AFFIRMATION OF THE APPROVAL
AUTHORITY.
6. FABRICATION OF MATERIALS SHOWN IN THESE DRAWINGS WILL NOT PROCEED UNTIL ALL "VERIFIES" ARE
ADDRESSED AND ALL "SUPPLY" INFORMATION IS GIVEN. FAILURE OF THE APPROVAL AUTHORITY TO
PROVIDE REQUESTED INFORMATION WILL RESULT IN DELAY OF FABRICATION AND DELIVERY OF
MATERIALS SHOWN ON THESE DRAWINGS.
7. SUBSEQUENT CHANGES TO INFORMATION ON THESE DRAWINGS AFTER APPROVAL WILL BE CONSIDERED AS
CONTRACT CHANGES.
GENERAL NOTES
1. DGI ASSUMES THAT ALL SITE CONDITIONS ARE PER PROVIDED SPECIFICATION DRAWINGS UNLESS NOTED
OTHERWISE.
2. FOLLOW WRITTEN DIMENSIONS OVER SCALED DIMENSIONS.
SUPPORTING STRUCTURE NOTE:
1. FIELD MEASUREMENTS, IF REQUIRED, WILL BETAKEN BY INSTALLING CONTRACTOR AND SUPPLIED TO DGI
PRIOR TO FABRICATION OR MATERIALS WILL BE FIELD CUT.
INSTALLATION NOTES:
1. INSTALLATION SHALL BE PERFORMED BY DGI OR BY A FULLY TRAINED INSTALLER AUTHORIZED BY DGI.
2. ALL FRAMING WORK SHALL BE TRUE TO LINE, LEVEL, AND PLUMB PRIOR TO INSTALLATION OF DGI SYSTEM
COMPONENTS,
3. NO ITEMS MAY ATTACH TO OR BE SUSPENDED FROM DGI PRODUCTS (UNLESS NOTED IN DESIGN).
4. UPON COMPLETION OF THE INSTALLATION, THE INSTALLER SHALL REMOVE ALL PACKAGING MATERIALS AND
LEAVE WORK AND WORK AREAS CLEAN AND IN SATISFACTORY CONDITION.
JOB SPECIFIC NOTES:
1. CONCRETE PAD RECOMMENDATIONS ARE MANUFACTURER RECOMMENDATION ONLY, ALL APPLICABLE
STATE AND LOCAL CODES GOVERN. DGI PAD RECOMMENDATIONS ARE AS FOLLOWS: 6" MIN PAD THICKNESS,
PAD LENGTH AND WIDTH MIN 6" LARGER THAN SHELTER FRAME ON ALL SIDES.
®PHASE/NOTES
- •-�
■ R
01, F
REVIEW MATE: . 2cr
CITY OF ZEPHYR ILLS
BUILDING OFFICIAL__
SCALE EQUIVALENCY CHART
NUMERICAL SCALE I ARCHITECTURAL SCALE
2:1
24" = 1'-0"
3:2
18" = 1'-0"
1:1
12" = V-0" FULL
3:4
9" = 1'-0"
2:3
8" = 1'-0"
1:2
6" = 1'-0"
1:3
4" = 1'-0"
1:4
3" = 1'-0"
1:6
2" = 1'-0"
1:8
1-1/2" = V-0"
1:12
1" = 1'-0"
1:16
3/4" = 1'-0"
1:24
1 /2" = 1'-0"
1:32
3/8" = 1'-0"
1:48
1 /4" = 1'-0"
1:64
3/16" = V-0"
1:96
1 /8" = 1'-0"
1:128
3/32" = V-0"
1:192
1 /16" = V-0"
1:256
3/64" = V-0"
1:384
1 /32" = 1'-0"
ABBREVIATION KEY:
B.O. = BY OTHERS
D.O. = DAYLIGHT OPENING
R.O. = ROUGH OPENING
�= CENTERLINE
0 = DIAMETER
O.C. = ON CENTER
T.B.D. = TO BE DETERMINED
TYP. = TYPICAL
SIM. = SIMILAR
OPP. = OPPOSITE
U.N.O. = UNLESS NOTED OTHERWISE
ASM. = ASSEMBLY
DIM(S) = DIMENSION(S)
ALUM. = ALUMINUM
S/S = STAINLESS STEEL
PCSS = POLYCARBONATE STRUCTURED SHEET
POLYCARB = POLYCARBONATE
DGI = DUO-GARD INDUSTRIES, INC.
I I-IIJ Ur MVVIIVV IJ F'KU!"Mir-IAMT /AINU I'UI'C
THE SOLE USE OF OUR CUSTOMER. IT MAY
NOT BE COPIED OR REPRODUCED WITHOUT
WDG REAL ESTATE
PRIOR WRITTEN CONSENT FROM
DUO-GARD INDUSTRIES INC.
PROJECT NUMBER
DESCRIPTION (SHEET NAME):
LEAD TIME BEGINS UPON RECEIPT OF
SIGNED SUBMITTAL DRAWINGS
16595
TITLE SHEET
PRJT. ENG. BH
DRW G. DATE 9_25-24 1
TYPE
X
CHECKED AP
CHK. DATE 9.25-24
DETAIL
PRJT. MGR. JW
PRJT. PHASE RECORD SET
APPROVAL SIGNATURE DATE
BUIKE SHELTER
PARACHUTE
SHEET SCALE NTS
VIEW SCALE SUPERCEDES
SHEET SCALE IF APPLICABLE
SHEET 1 OF 4
24 GA. GALVALUME 102"
STANDING SEAM METAL ROOF PANS - TS 2.5" X 4" TUBE PURLIN
FRONT ELEVATION
DATE ENG. REV. PHASE/NOTES
REV.1 8-2-24 BH SUBMITTAL
REV. 2 9-25-24 BH RECORD SET
REV.3 --
REV. 4 -- -- --
J Z M A N _ 1244 WEST CHESTER PIKE REV. 5 -- -- --
suirE 402 - WEST CHESTER, PA 19382 REV. 6
0-610,320.2100 -- "- --
144"
"Z7" TS 3" X 4" TUBE RAFTER
3" ASTM A500
HSS ROUND COLUMNS TYP.
111 g"
16 96" [8'] 1.5" ASTM A500
R168" HSS ROUND "STRUTS" TYP.
STAINLESS STEEL BASE PLATE TYP.
END ELEVATION
NOTES:
*FRAMEWORK TO BE WELDED AND MECHANICALLY FASTENED STEEL
*ALL FASTENERS TO BE STAINLESS STEEL
*ROOF is 24 GA. GALVALUME STANDING SEAM METAL ROOF PANS
*STEEL FINISHING:
*MEDIA BLAST PREP
*TNEMEC TNEME ZINC 90-97 PRIMER
*TNEMEC SERIES N69 HI -BUILD EPDXOLINE 2-PART EPDXY MIDCOAT;
*TNEMEC SERIES 73 ENDURA-SHIELD TOPCOAT.
*ALUMINUM TRIM TO HAVE SAME TOP TWO COATS.
*ALL DIMENSIONS TO BE FIELD VERIFIED
*4' ALUMINUM HOOP BENCH WITH ALUMINUM SLATS
STEEL/ALUMINUM FINISH: 85BR MEDIUM BRONZE
ROOF PAN COLOR: MEDIOUM BRONZE
W,{
11`110 UKAVVII14U 10 h'KUYKIt IAKT AINU t-UK
THE SOLE USE OF OUR CUSTOMER. IT MAY
NOT BE COPIED OR REPRODUCED WITHOUT
-..I�.
WDG REAL ESTATE
..,.�
r
DUO PoCARDSIGNED
„., .. _ SIC�._,. ' ..
PRIOR WRITTEN CONSENT FROM
DUO-GARD INDUSTRIES INC.
LEAD TIME BEGINS UPON RECEIPT OF
SUBMITTAL DRAWINGS
PROJECT NUMBER
16595
DESCRIPTION (SHEET NAME):
PLAN & ELEVATIONS
REV.
A
PRJT. ENG. BH
DRVU'G. DATE 9-25-24 ��" PE BUIKE SHELTER
SHEET SCALE NTS
'X
CHECKED AP
CHK. DATE 9-25-24]`=TAILS PARACHUTE
VIEW SCALE
PRJT. MGR. JW
PRJT. PHASE RECORD SET
SHEET 2 OF 4
_ ._ ....
APPROVAL SIGNATURE DATE
DATE ENG. REV. PHASE/NOTES
REV.1 8-2-24 BH SUBMITTAL
REV. 2 9-25-24 BH RECORD SET
REV.3 -- --
REV.4 -- -- -
U Z M A N SUIT WEST CHESTER PIKE REV. 5 -- --
SUITE 402
WEST CHESTER, PA 19382
0 - 610,320.21010 REV. 6 -- -- --
24 GA. GALVALUMI
STANDING SEAM METAL ROOF PAN;
#12 S/S TEK SCREWS - (2) PER CONNECTIOP
INTERNAL GALVANIZED CLIP TY
EDGE CAP ALONG EAVE TYP.
EAVE STARTER TRIM ALONG EAVE TYP.
ACCESS HO
2 1/2" x 4" x 11 GA. ASTM A500B HS PURL
01/2" S/S BOL
THRU ACCESS HOL
IN TOP OF PURLIN,
INTO THREADED
RAFTER HOLE, TYP.
'THICK S/S ANCHOR
ATE, 304 STAINLESS STEEL
0 x 8" (6" EMBEDMENT MIN.)
EPDXY ANCHOR BOLTS,
DER BASE PLATE
(L ) SECTION THRU COLUMN
3
3/4-10" x 2" SERRATED
FLANGE BOLT (A-325)
THROUGH ACCESS HOLE
0 DETAIL AT EAVE / PURLIN
PLASTIC HOLE PLUG
RAFTER
\--1/4" WELDED END CAP
3/4-10 A325 STEEL NUT
COLUMN WELDED TO END CAP
4 DETAIL AT COLUMN CONNECTION
DUOmaGARDSIGNED
� ~ ,
A
OF
&
x
THE SOLE USE OF OUR CUSTOMER. IT MAY
NOT BE COPIED OR REPRODUCED WITHOUT
PRIOR WRITTEN CONSENT FROM
DUO-GARD INDUSTRIES INC.
LEAD TIME BEGINS UPON RECEIPT OF
SUBMITTAL DRAWINGS
WDG REAL ESTATE
PROJECT NUMBER
16595
DESCRIPTION (SHEET NAME):
CONNECTION DETAILS
REV.
A
PRJT.ENG. BH
DRWG. DATE 9-25-24
TYPE BUIKE SHELTER
SHEET SCALE NTS
HE KE
AP
CHK. DATE
9-25-24
TAILS
PARACHUTE
VIEW SCALE SUPERCEDES
SHEET SCALE IF APPLICABLE
APPROVAL SIGNATURE DATE
PRJT. MGR.
JW
PRJT. PHASE
RECORD SET
SHEET 3 OF 4
DATE
ENG.
REV. PHASE/NOTES
REV.1
8-2-24
BH
SUBMITTAL
REV. 2
9-25-24
BH
RECORD SET
REV.3
--
--
REV. 4
--
1244 WEST PI IE
91).ZMAN WEST CHE TER, PAR19382
.3 = 0 - 610.320,2100
REV, 5
REV. 6
--
--
--
--
--
36.000"
0 (20) #8 VERTICAL BARS
o ® ® a
#3 STIRRUPS
36.000" o (SEE SPACING BELOW)
3,000 PSI
°
°o' a
I� 2.000" TYP.
36.000"
12.000"
TYP.
a
42.0001, °
#3 STIRRUP TYP.
°
FOUNDATION DETAIL
I Y'lIJ UKAVVI NU IJ YKUh'KIt IAKY ANU r-UK
THE SOLE USE OF OUR CUSTOMER. IT MAY
NOT BE COPIED OR REPRODUCED WITHOUT
WDG REAL ESTATE
PRIOR WRITTEN CONSENT FROM
DUO-GARD INDUSTRIES INC.
PROJECT NUMBER
DESCRIPTION (SHEET NAME):
REV.
DUO P*GARDSIGNED
LEAD TIME BEGINS UPON RECEIPT OF
SUBMITTAL DRAWINGS
16595
FOUNDATION DETAILS
A
X
PRJT. ENG. BH
DRW G. DATE 9_25-24
TYPEBUIKE SHELTER
SHEET SCALE NTS
CHECKED AP
HK.DA E 9-25-24
D AiLs PARACHUTE
SHVIEW SCALEEET SCALE SFUPERCEDES
APPLICABLE
molummoolml Emma
APPROVAL SIGNATURE DATE
PRJT. MGR. JW
11PRJT. PHASE RECORD SET
SHEET 4 OF 4